Strassenbahnen Ausserhalb Europas/Tramways Outside Europe Stand:31.12.2020/Status:31.12.2020 Afrika/Africa

Total Page:16

File Type:pdf, Size:1020Kb

Strassenbahnen Ausserhalb Europas/Tramways Outside Europe Stand:31.12.2020/Status:31.12.2020 Afrika/Africa STRASSENBAHNEN AUSSERHALB EUROPAS/TRAMWAYS OUTSIDE EUROPE STAND:31.12.2020/STATUS:31.12.2020 AFRIKA/AFRICA: :جمهوريّة مصر العربيّة/ÄGYPTEN/EGYPT/DSCHUMHŪRIYYAT MISR AL-ʿARABIYYA :اﻹسكندرية/ALEXANDRIA/AL-ISKANDARIYA :TURĀM AR-RAML/ترام الرمل/TRAM AL RAMLEH :محطة الرمل/EL RAMLEH-محطة النصريا ا/(LINE 1:EL NASR(VICTORIA 12.08.2019 https://www.youtube.com/watch?v=jr0MWtgEjsM EL NASR(VICTORIA)-EL RAMLEH 01:07:29 Abd-Alrahman Kaled Midra :محطة الرمل/EL RAMLEH-محطة النصر/(LINE 2:EL NASR(VICTORIA 12.08.2019 https://www.youtube.com/watch?v=cddgR2xPYbs EL NASR(VICTORIA)-EL RAMLEH 01:09:39 Abd-Alrahman Kaled Midra :محطة الرمل/EL RAMLEH-سان ستيفان/LINE 5:SAN STEFANO :محطة الرمل/EL RAMLEH-سان ستيفان/LINE 6:SAN STEFANO :TURĀM AL-MADINA/ترام المدينة/TRAM AL MADINA :المتراس/EL METRAS-النزهة/LINE 1:EL NOZHA :كرموز/KARMOUZ-النزهة/LINE 2:EL NOZHA :ساحة سانت كاترين/SAINT CATHERINE SQUARE-موراهام بك/LINE 4:MORAHAM BEY :رأس التين/RAS EL TIN-موراهام بك/LINE 6:MORAHAM BEY :كاثرين/CATHERINE-النزهة/LINE 10:EL NOZHA :الشنداء/EL SHONDAA-النزهة/LINE 11:EL NOZHA :محطة الرمل/EL RAMLEH-رأس التين/LINE 15:RAS EL TIN 20.09.2020 https://www.youtube.com/watch?v=Wm6ly-SHoxA RAS EL TIN-EL RAMLEH 33:02 (LINKES SEITENFENSTER/LEFT WINDOW!) ahmed salah 1 :كرموز/KARMOUZ-ساحة سانت كاترين/LINE 16:SAINT CATHERINE SQUARE :ساحة سانت كاترين/SAINT CATHERINE SQUARE-النزهة/LINE 18:EL NOZHA :إل ماكس/EL MAX-الشنداء/LINE 19:EL SHONDAA ÄTHIOPIEN/ETHOPIA/YÄ-ITYOPPtƏYA FEDERALAWI DIMOKRASIYAWI RIPÄBLIK/ የኢትዮጵያ ፌዴራላዊ ዲሞክራሲያዊሪፐብሊክ: ADDIS ABEBA/አዲስ አበባ: LINE:GREEN LINE:AYAT/አያት-TOR HAILOCH/በር ሃይሎክ: LINE:BLUE LINE:MENILIK II SQUARE/ዳግማዊ ሚኒሊክ አደባባይ-KALITY/ቃሊቲ: ALGERIEN/ALGERIA/AL-DSCHUMHŪRĪYA AL-DSCHAZĀ'IRĪYA AD-DĪMŪGRĀTĪYA ASCH- /TAGDUDA TAZZAYRIT TAMAGDAYT TAỴERFANT/ الجمهورية ال َجزائرية الديمقراطيةالشعبية/SCHA'BĪYA ⵜⴰⴳⴷⵓⴷⴰ ⵜⴰⵣⵣⴰⵢⵔⵉⵜ ⵜⴰⵎⴰⴳⴷⴰⵢⵜ ⵜⴰⵖⴻⵔⴼⴰⵏⵜ : /DZAYER TAMANEỴT/ دزاير/DZAYER/مدينة الجزائر/ALGIER/ALGIERS/MADĪNAT AL DSCHAZĀ'IR ⴷⵣⴰⵢⴻⵔ ⵜⴰⵎⴰⵏⴻⵖⵜ :جدول نهر صغير/RUISEAU-مركز درقانة/LINE:DERGANA CENTRE :ⵇⵙⵏⵟⵉⵏⴰ/قسنطينة/CONSTANTINE :شهيد قدري ابراهيم/CHAHID KADRI BRAHIM-بن عبد الملك رمضان/LINE:BEN ABDELMALEK RAMDANE 03.04.2015 https://www.youtube.com/watch?v=RpWzlO1k39c BEN ABDELMALEK RAMDANE-ZOUAHGI SLIMANE 23:19 Sied Ali Yagoubi : ⵡⴻⵀⵔⴰⵏ/وهران/ORAN سينيا تيرمينوس:/SENIA TERMINUS-محطة حافﻻت سيدي معروف/LINE:GARE ROUTIER SIDI MAAROUF 26.11.2014 https://www.youtube.com/watch?v=XVlaxqxHrVI 05:33 messi lionel :ⵡⴰⵔⴳⵕⴰⵏ/ورقلة/OUARGLA :شنين قدور/CHENINE KADOUR-سيد روحو/LINE:SID ROUHOU :ⵙⵉⵜⵉⴼⵉⵙ/سطيف/SÉTIF :بيرشي عابد /أوسيسا ليد/BERCHI ABID/OUCISSA LAID- ديسمبر LINE:11 DÉCEMBRE 1960/1960 11 2 :ⵙⵉⴷⵉ ⴱⴻⵍ ⵄⴻⴱⴱ/سيدي بلعباس/SIDI BEL ABBES :محطة الحافﻻت الجنوبية/GARE ROUTIÈRE SUD-الشﻻﻻت/LINE:LES CASCADES 11.07.2017 https://www.youtube.com/watch?v=1loPMosI2JY LES CASCADES-GARE ROUTIÈRE SUD 10:16 S.Turgut GOZLUKAYA / المملكة المغربية/MAROKKO/MOROCCO/AL-MAMLAKA AL-MAGHRIBĪYA TAGELDIT N ELMAỴRIB/ⵜⴰⴳⵍⴷⵉⵜ ⵏ ⵍⵎⴰⵖⵔⵉⴱ: : ⴰⵏⴼⴰ/الدار البيضاء/CASABLANCA :ليساسفة/LISSASFA-سيدي مؤمن/LINE T 1:SIDI MOUMEN :شاطئ عين دياب/AÏN DIAB PLAGE-سيدي البرنوصي/LINE T 2:SIDI BERNOUSSI :ⴰⵕⴱⴰⵟ/الرباط/RABAT :مدينة العرفان/MADINAT AL IRFANE-حي كريمة/LINE 1:HAY KARIMA :مستشفى موﻻي يوسف/HÔPITAL MOULAY YOUSSEF-الحسن الثاني/LINE 2:HASSAN II MAURITIUS/MAURICE/RÉPUBLIQUE DE MAURICE: PORT LOUIS: LINE:PORT LOUIS VICTORIA-ROSE HILL CENTRAL 15.06.2020 https://www.youtube.com/watch?v=CIxhZjqtkBE PORT LOUIS VICTORIA-ROSE HILL CENTRAL 19:59 (LINKES SEITENFENSTER/LEFT WINDOW!) eMauritius Videos : الجمهورية التونسية/TUNESIEN/TUNISIA/Al-DSCHUMHŪRIYYA AT TŪNISYYA :تونس/TUNIS :SNCFT من محطة قطار برشلونة/PLACE DE BARCELONE GARE SNCFT-بن عروس/LINE 1:BEN AROUS /(PLACE DE LA RÉPUBLIQUE-(PLACE DE BARCELONE GARE SNCFT-أريانة/LINE 2:ARIANA ساحة الجمهورية :تونس البحرية/TUNIS MARINE-ابن خلدون/LINE 3:IBN KALDOUN :SNCFT من محطة قطار برشلونة/PLACE DE BARCELONE GARE SNCFT-خير الدين/LINE 4:KHEIREDDINE :SNCFT من محطة قطار برشلونة/PLACE DE BARCELONE GARE SNCFT-انطﻻقة/LINE 5:INTILAKA 3 :المروج EL MOUROUJ 4/4-تونس البحرية/LINE 6:TUNIS MARINE AMERIKA/AMERICA: ARGENTINIEN/ARGENTINA/REPÚBLICA ARGENTINA: BUENOS AIRES: LINE:PREMETRO LINE P:INTENDENTE SAGUIER-GENERAL SAVIO/CENTRO CIVICO 11.01.2020 https://www.youtube.com/watch?v=vC6yCcLgMx0 GENERAL SAVIO-INTENDENTE SAGUIER 27:21 Pablo Marti Krenz 18.10.2018 https://www.youtube.com/watch?v=-YeZ7Qx7VUw INTENDENTE SAGUIER-GENERAL SAVIO 27:56 (LINKES SEITENFENSTER/LEFT WINDOW!) Ricardo Guillermo Lauret 19.10.2018 https://www.youtube.com/watch?v=kBCMBLABFFs GENERAL SAVIO-INTENDENTE SAGUIER 30:21 (LINKES SEITENFENSTER/LEFT WINDOW!) Ricardo Guillermo Lauret 19.10.2018 https://www.youtube.com/watch?v=5gOJNw6oiD0 POLA-CENTRO CIVICO 03:55 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Ricardo Guillermo Lauret 18.10.2018 https://www.youtube.com/watch?v=EJenpiH4Ssc CENTRO CIVICO-POLA 07:36 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Ricardo Guillermo Lauret MENDOZA: LINE:PANQUEHUA AVELLANEDA-GUTIÉRREZ 09.04.2012 https://www.youtube.com/watch?v=x2ZXsvCX1z8 09:19 Pablo Anglat 20.02.2013 https://www.youtube.com/watch?v=HGRtrZ05KzU 17:16 Sobre Rieles BRASILIEN/BRAZIL/REPÚBLICA FEDERATIVA DO BRASIL: CAMPOS DE JORDÃO: LINE:PINDAMONHANGABA-CAPIVARI 23.07.2014 https://www.youtube.com/watch?v=grsKhqt8cmY PINDAMONHANGABA-CAMPOS DE JORDÃO 28:50 Ferrovias no Brasil 4 27.03.2012 https://www.youtube.com/watch?v=uzj8HiPjd9k 11:20 Estação Porão 05.07.2015 https://www.youtube.com/watch?v=2c1vjo2mzWo 23:04 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Nilson Frederico 07.07.2015 https://www.youtube.com/watch?v=HLPsZTy6ljU 23:04 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Nilson Frederico RIO DE JANEIRO: LINE 1:SANTOS DUMONT-PRAIA FORMOSA 31.10.2019 https://www.youtube.com/watch?v=kYrw4rXeDr8 SANTOS DUMONT-PRAIA FORMOSA 29:12 Arlindo Pereira 28.12.2017 https://www.youtube.com/watch?v=rYyMyGIxoT8 PRAIA FORMOSA-SANTOS DUMONT 31:26 Arlindo Pereira LINE 2:PRAÇA XV-PRAIA FORMOSA 30.10.2017 https://www.youtube.com/watch?v=K-0JNssSvCU PRAÇA XV-RODOVIÁRIA 24:55 Arlindo Pereira 31.10.2019 https://www.youtube.com/watch?v=j7rL0avyOUk PRAIA FORMOSA-PRAÇA XV 22:32 Arlindo Pereira LINE 3:SANTOS DUMONT-CENTRAL DO BRASIL 29.10.2019 https://www.youtube.com/watch?v=XsHkzQjrCfo SANTOS DUMONT-CENTRAL DO BRASIL 21:27 Arlindo Pereira 29.10.2019 https://www.youtube.com/watch?v=IEU6DxoyM8s CENTRAL DO BRASIL-SANTOS DUMONT 24:10 Arlindo Pereira 5 STRASSENBAHN/TRAMWAY SANTA TERESA: LINE:LARGO DA CARIOCA-LARGO DAS NEVES/DOIS IRMÃOS 24.10.2018 https://www.youtube.com/watch?v=w5xtSxfBzU4 LARGO DO CARIOCA-LARGO DO FRANÇA 20:20 Arlindo Pereira 22.01.2019 https://www.youtube.com/watch?v=zVOfWhhBX_A LARGO DO CARIOCA-DOIS IRMÃOS 22:22 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Arlindo Pereira 22.01.2019 https://www.youtube.com/watch?v=lCvAzoN1cc8 DOIS IRMÃOS-LARGO DE CARIOCA 24:09 (LINKES SEITENFENSTER/LEFT WINDOW!) Arlindo Pereira LINE:TREM DO CORVOCADO:COSME VELHO-CRISTO REDENTOR (ZAHNRADBAHN/RACK RAILWAY!) 30.01.2020 https://www.youtube.com/watch?v=gdylbkGLnnY COSME VELHO-CRISTO REDENTOR 18:35 Arlindo Pereira 06.02.2020 https://www.youtube.com/watch?v=f4B-7r9eLBM CRISTO REDENTOR-COSME VELHO 20:46 Arlindo Pereira SEILBAHNEN/AERIAL CABLE CARS: LINE:MORRO DA URCA-PÃO DE AÇÚCAR 05.01.2017 https://www.youtube.com/watch?v=1jjFFceOKOs MORRO DA URCA-PÃO DE AÇÚCAR 09:18 Richard's World Traveler LINE:MORRO DA URCA-PRAIA VERMELHA LINE:CENTRAL-GAMBOA TELEFÉRICO DA PROVIDÊNCIA 09.10.2016 https://www.youtube.com/watch?v=5RUe-W6FBqY CENTRAL-GAMBOA 05:13 Arlindo Pereira LINE:BONSUCESSO/TIM-PALMEIRAS 23.08.2014 https://www.youtube.com/watch?v=lvnR8OzY724 01:07 Daniel Lampinen 6 30.06.2014 https://www.youtube.com/watch?v=6E6iBHJfSKw 05:00 Daniel Lampinen 04.07.2014 https://www.youtube.com/watch?v=4i7N6nP0wfc 05:00 Daniel Lampinen 10.08.2017 https://www.youtube.com/watch?v=2TVH2q086U8 11:11 Rio de Janeiro by Car SANTOS: LINE:PORTO-BARREIROS 11.02.2017 https://www.youtube.com/watch?v=A7MrOoaiQj4 BARREIROS-PORTO 43:29 Puppi Videos EKUADOR/ECUADOR/REPÚBLICA DEL ECUADOR/ECUADOR MAMALLAKTA: CUENCA: LINE:PARQUE INDUSTRIAL-RÍO TARQUI 29.12.2020 https://www.youtube.com/watch?v=YvLlk9RfMcI 07:44 John Foote 22.11.2020 https://www.youtube.com/watch?v=5aqST76ILHw RÍO TOMEBAMBA-MILCHICHIG 20:08 (RECHTES SEITENFENSTER/RIGHT WINDOW!) Laura Carchipulla 03.11.2020 https://www.youtube.com/watch?v=4YmFiXnAnVU AEROPUERTO-PARQUE INDUSTRIAL 03:52 (LINKES SEITENFENSTER/LEFT WINDOW!) Laura Carchipulla 29.12.2020 https://www.youtube.com/watch?v=5rBdUDpLHho AVENIDA MÉXICO-RÍO TARQUI 07:42 (LINKES SEITENFENSTER/LEFT WINDOW!) Laura Carchipulla 7 KANADA/CANADA: CALGARY: LINE 201:RED LINE:TUSCANY-SOMERSET-BRIDLEWOOD 22.08.2016 https://www.youtube.com/watch?v=tnvcqcZlX2Y&list= PLkL0xkcZrNxAbazH0MqY665MKm6nRR1a3&index=1 TUSCANY-CROWFOOT 02:26 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=cAcSkUjpSrA CROWFOOT-DALHOUSIE 03:30 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=j831nemqsww DALHOUSIE-BRENTWOOD 02:35 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=aNbt-15UBmc BRENTWOOD-UNIVERSITY 01:19 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=wze-_KTVhdM UNIVERSITY-BANFF TRAIL 01:25 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=i32RyflNDe4 BANFF TRAIL-LIONS PARK 01:57 chrisvazquez7 16.07.2013 https://www.youtube.com/watch?v=_qOUINt5x2o LIONS PARK-SAIT/ACAD/JUBILEE 01:26 chrisvazquez7 17.07.2013 https://www.youtube.com/watch?v=4cZx8x1lJ2A SAIT/ACAD/JUBILEE-SUNNYSIDE 01:27 chrisvazquez7 17.07.2013 https://www.youtube.com/watch?v=D1z8gkey4ck SUNNYSIDE-8 TH STREET 03:25 chrisvazquez7 19.05.2013 https://www.youtube.com/watch?v=q-g_S9To0w8 8 TH STREET-CITY HALL 04:31 chrisvazquez7 8 19.07.2013 https://www.youtube.com/watch?v=gGNTmiXVN9Q
Recommended publications
  • Brochure Correction
    Greenwood Nest is the only answer The Royal Nest When it comes to home, everyone has their preferences. Bengal Shrachi has come up with a residential project in the lap of nature, surrounded by various ammenities to fit your exclusive lifestyle. Greenwood Nest, the sole new project in Rajarhat, off New Town, Action Area 1, spread over 4.45 acres of land with two B+G+12 HIG towers, one G+12 HIG towers, two G+12 MIG towers, one G+12 LIG towers and two G+4 LIG towers. The total number of 491 apartments present you a luxurious and cosy life in the midst of nature. Luscious greenery, to make your each day refreshing and rejuvenating. Artist’s Impression Artist’s Get the taste of a better Features to Envy life • The only new residential project in Rajarhat, off New Town, Action Area 1, near DLF IT Park and just 15 mins. away from the Airport • Pollution-free, healthy environment • Garden-facing apartments with a breathtaking view of the greenery • Each tower is provided with two automatic elevators Ample car parking facility for hassle-free living. Artist’s Impression Artist’s Features to Envy • Ample car parking facility on the ground floor and basement • Water filtration plant • Generator for power backup • Fire safety system Children's play ground, to give your child the freedom of happiness. Artist’s Impression Artist’s Luxury Amenities • Central Green for Walking/Jogging • Children's Play Area • Community Hall Gymnasium, brings you the daily dose of fitness and health. Artist’s Impression Artist’s • Club House • Swimming Pool • Gym Synthesis
    [Show full text]
  • Eternis Rating Assigned: ‘Kolkata 5 Star’
    Eternis Rating assigned: ‘Kolkata 5 star’ May 2016 Project Profile Type of project Residential Location of project NH-34 at Doltala, Jessore Road (South),Kolkata Type of development Joint Development (29% landowner, 71% PS Srijan) Land Area 6 acres Total saleable area 0.88 million sq. ft. No. of blocks 13 No. of units 824 apartments Unit configuration 823 - 1637 sq ft (2,3 & 4 BHK) No. of floors Basement + Ground + 11 (all blocks) Location: The project is 6 kilometre (km) from Netaji Subhas Chandra Bose International Airport, 3 km from New Barrackpore railway station, 3 km from Madhyamgram railway station, and 11 km from Dum Dum metro station. Educational institutes such as Julian Day School, DPS Megacity, DPS Newtown, National English School, BP Poddar College, Barasat College, and Techno India College are within 8-10 km radius. For the location map, please refer to http://www.srijanrealty.com/project-details.php?pid=66&pname=Eternis CREST Rating Report 2016 Pricing Table Loading on carpet area 38 percent Loading on built-up area 24 percent Base price Rs.2.9-6.1 million (super built-up)* Stamp duty & registration charge 7.0 percent of the agreement value VAT 1.1 percent of the agreement value Service tax 4.2 percent of the agreement value * Ticket range is calculated on base price of the project Sponsor Profile Name of the project Eternis Name & address of the company PS Srijan Real Venture LLP developing the project 83, 3rd Floor, Trinity Tower, Topsia Road South, Opposite Vishwakarma Building, Kolkata, West Bengal – 700046 Name of the developer group PS Srijan Group Chairman Mr.
    [Show full text]
  • Dubai [Metro]Polis: Infrastructural Landscapes and Urban Utopia
    Dubai [Metro]polis: Infrastructural Landscapes and Urban Utopia When Dubai Metro was launched in 2009, it became a new catalyst for urban change but also a modern tool to interact with the city - providing a visual experience and an unprecedented perception of moving in space and time, almost at the edge between the imaginary and the real. By drawing on the traditional association between train, perception and the city we argue that the design and planning of Dubai Metro is intended as a signifier of modernity for the Gulf region, with its futuristic designs and in the context of the local socio-cultural associations. NADIA MOUNAJJED INTRODUCTION Abu Dhabi University For the last four decades, Dubai epitomized a model for post-oil Gulf cities and positioned itself as a subject for visionary thinking and urban experimentation. PAOLO CARATELLI During the years preceding 2008, Dubai became almost a site of utopia - evoking Abu Dhabi University a long tradition of prolific visionary thinking about the city – particularly 1970s utopian projects. Today skyscrapers, gated communities, man-made islands, iconic buildings and long extended waterfronts, dominate the cityscape. Until now, most of the projects are built organically within a fragmented urban order, often coexisting in isolation within a surrounding incoherence. When inaugu- rated in 2009, Dubai Metro marked the beginning of a new association between urbanity, mobility and modernity. It marked the start of a new era for urban mass transit in the Arabian Peninsula and is now perceived as an icon of the emirate’s modern urbanity (Ramos, 2010, Decker, 2009, Billing, n.
    [Show full text]
  • TTC Subway and Streetcar Map – May 2019
    501 502 503 504 505 Subway and 900 506 509 510 511 512 Express bus to Subway lines Streetcar routes Streetcar Map Pearson Airport Connections to: Interchange station GO Transit Züm (Brampton Transit) Vaughan Metropolitan Centre Accessible station York Region Transit/Viva Union Pearson Express Highway 407 Washroom MiWay VIA Rail Pioneer Village York University Finch Finch West North York Centre Downsview Park Bayview Leslie Sheppard-Yonge Don Mills Midland Sheppard West Bessarion McCowan Scarborough Wilson York Mills Ellesmere Centre Yorkdale Pearson Airport Lawrence West Lawrence Lawrence East Glencairn Kennedy Eglinton West Eglinton Davisville Gunns Loop St Clair Ave W St Clair West 900 512 512 St Clair Airport Express (Keele) Warden Summerhill Dupont West Rosedale Victoria Park St George IslingtonRoyal YorkOld MillJane RunnymedeHigh ParkKeele DundasLansdowneDufferinOssingtonChristieBathurst Bay Castle FrankBroadviewChesterPape DonlandsGreenwoodCoxwellWoodbine Kipling Main Street Spadina Bloor- Sherbourne Main St Yonge 504A 505 505 504B 511 510 Wellesley 506 Dundas Museum Broadview Ave Broadview Parliament St Parliament Howard St W Gerrard St E High Park Loop College St College St Carlton St Park Ave 506 Coxwell Ave Queen’s College Gerrard St E Bingham Loop Dundas Park (Victoria Park) Bathurst St St W Ave Spadina Dundas St W Dundas St E 505 502 St Patrick Dundas 503 Roncesvalles Ave Roncesvalles McCaul Loop Osgoode Queen Queen St E 502 Kingston Rd The Queensway Queen St W 501 501 501 Neville Park Loop Humber Loop 503 504A King St E King St W St Andrew King 504 501 StChurch 504B 511 510 Wellington St W 504A Dufferin Distillery Long Branch Gate Loop Sumach St Loop Loop Union Lake Shore Blvd W Fleet St Lake Ontario 510 509 Bay St Dufferin St Exhibition / Loop Cherry St 509 Queens Quay W Billy Bishop Airport ©2019 Toronto Transit Commission 05/19 – Map not to scale.
    [Show full text]
  • City Response to DART Downtown Transit Study
    Oak Cliff Gateway Community Meeting TIGER Streetcar Project Update Bicycle and Pedestrian Projects TIGER Streetcar Project Initial Dallas streetcar planning efforts grew out of CBD Comprehensive Transportation Plan and D2 light rail analysis Focused within downtown loop NCTCOG received a grant on behalf of the City of Dallas from the Federal Transit Administration for the streetcar starter line to serve the CBD and North Oak Cliff workforce The 1.6 mile base project runs from Union Station to Methodist Hospital at a cost of approximately $48.6M including vehicles $26M in federal funding $12.8M in local funding (Regional Toll-road Revenue) $9M from DART for vehicles 2 TIGER Streetcar Project 3 TIGER Streetcar Project Stacey and Witbeck/Carcon were given notice to proceed with final design and construction in September 2012 and bridge demolition is currently underway Base project has been enhanced to provide double track operation along Zang and Colorado Completion of base project is scheduled for October 2014 Brookville Equipment Corporation was given notice to proceed with production of two vehicles in March 2013 First American made off-wire modern streetcar vehicle The Dallas streetcar will be 8’ wide, 66.5’ long with capacity to carry 41 passenger seated and maximum 170 standees Anticipated vehicle delivery is late summer 2014 4 TIGER Streetcar Project Extension The Regional Transportation Council (RTC) recently reprogrammed $30.87M in Texas Mobility Funds to the Dallas Streetcar Project The funds are proposed to extend the base project an additional 1.25 miles and provide two additional vehicles .75 miles south from Methodist Hospital to the Bishop Arts District ($15M) .5 miles north to the Dallas Convention Center/Omni Hotel ($7.87M) Streetcar Vehicles ($8M) 5 TIGER Streetcar Project Extension 6 TIGER Streetcar Project Extension Operation and Maintenance Cost Operation for base Streetcar Project funded by Dallas Area Rapid Transit Base project assumes weekday service only 5:00 a.m.
    [Show full text]
  • Investigation Future Planning of Railway Networks in the Arabs Gulf Countries
    M. E. M. Najar & A. Khalfan Al Rahbi, Int. J. Transp. Dev. Integr., Vol. 1, No. 4 (2017) 654–665 INVESTIGATION FUTURE PLANNING OF RAILWAY NETWORKS IN THE ARABS GULF COUNTRIES MOHAMMAD EMAD MOTIEYAN NAJAR & ALIA KHALFAN AL RAHBI Department of Civil Engineering, Middle East College, Muscat, Oman ABSTRACT Trans-border railroad in the Arabian Peninsula dates back to the early 20th century in Saudi Arabia. Over the recent decades due to increasing population and developing industrial zones, the demands are growing up over time. The Gulf Cooperation Council (GCC) is now embarking on one of the largest modern cross-border rail networks in the world. This is an ambitious step regarding the planning and establishment of the rail network connecting all the six GCC countries. This railway network will go through at least one city in each country to link the cities of Kuwait in Kuwait, Dammam in Saudi Arabia, Manama in Bahrain, Doha in Qatar, the cities of Abu Dhabi and Al Ain in the United Arab Emirates and Sohar and then Muscat in Oman in terms of cargo and passengers. The area of investigation covers different aspects of the shared Arabian countries rail routes called ‘GCC line’ and their national rail network. The aim of this article is to study the existing future plans and policies of the GCC countries shared line and domestic railway network. This article studies the national urban (light rail transportation (LRT), metro (subways) and intercity rail transportation to appraise the potential of passenger movement and commodity transportation at present and in the future.
    [Show full text]
  • Fy 2018 Business Plan
    Dallas Area Rapid Transit FY 2018 BUSINESS PLAN Including FY 2018 Annual Budget and Twenty-Year Financial Plan FY 2018 Business Plan L4.indd 1 7/31/17 9:40 AM DART BOARD MEMBERS Sue Bauman Dallas Catherine Cuellar Dallas and Cockrell Hill Mark C. Enoch Garland, Rowlett and Glenn Heights Tim A. Hayden Carrollton and Irving Ray Jackson Dallas Jonathan R. Kelly Garland Patrick Kennedy Dallas Jon-Bertrell Killen Dallas Michele Wong Krause Dallas Amanda Moreno Dallas Gary Slagel Richardson, University Park, Addison and Highland Park Rick Stopfer Irving Dominique Torres Dallas Paul N. Wageman Plano Faye Moses Wilkins Plano and Farmers Branch FY 2018 Business Plan L4.indd 2 7/31/17 9:40 AM FY 2018 Business Plan (09/26/17) How to Use This Book What’s in this Book This book contains the Business Plan for Fiscal Year 2018 (FY 2018 – which ends September 30, 2018) for Dallas Area Rapid Transit (DART or the Agency). The Business Plan provides the DART Board of Directors, customers, taxpayers, elected officials, and other stakeholder groups of our region with a comprehensive summary of the Agency's plans and commitments to improve regional mobility, enhance the quality of life, and stimulate economic development. This document consolidates the key elements of the FY 2018 Annual Budget, the FY 2018 Twenty-Year Financial Plan, the Transit System Plan, and the Agency's Strategic Plan. A summary of the information contained in the various sections follows. The formal Letter of Transmittal summarizes priorities and issues for the upcoming year. The section titled Who We Are should help those not familiar with DART to understand the basis from which the Agency operates.
    [Show full text]
  • Hizli Rayli Sistemlerin Yolcu Taşima Kapasite Hesaplamalari Ve Türkiyedeki Benzer Sistemlerin Birbirleriyle Karşilaştirilmasi
    HIZLI RAYLI SİSTEMLERİN YOLCU TAŞIMA KAPASİTE HESAPLAMALARI VE TÜRKİYEDEKİ BENZER SİSTEMLERİN BİRBİRLERİYLE KARŞILAŞTIRILMASI Ilgaz CANDEMİR_ , Serhan TANYEL_ SUMMARY Rail transit systems are found to be the most trusted transit systems all over the world. They have become one of the main parts of daily urban life as they provide, fast, safe and comfortable journey for passengers. If they are planned precisely, capacities up to10000-40000 passengers/hour can be achieved. They are also used as an important tool for to maintain well developed cities and provide dynamic city centers. In this study, some of the most important rail transit systems in Turkey are introduced. Their capacities tried to be determined by using different capacity calculation methods and the results are tired to be compared. ÖZET Dünyada halen en güvenilir ulaşõm modu, raylõ sistemlerdir. Gelişen teknolojinin yansõmasõ ile birlikte hõz, sinyalizasyon ve konfor problemlerini çözen kentsel raylõ sistemler büyük şehirler için vazgeçilmez olmuşlardõr. Planlama ,dizayn,araç ve ekipman seçimi, inşaat ve sonrasõnda çok titiz bir işletim isteyen metro hatlarõ ortalama 10000-40000 yolcu/saat kapasiteleri olan güçlü toplu taşõmacõlõk sistemlerdir. Raylõ sistemler ayrõca kentin homojen olarak gelişmesinin sağlanmasõnda önemli bir araç olarak görülmekte ve dinamik kent merkezlerinin oluşturulmasõnda etken olmaktadõrlar. Bu bildiride Türkiye’deki raylõ sistemleri hakkõnda kõsaca bilgi verildikten sonra, Türkiye’deki bazõ önemli raylõ ulaşõm sistemlerinin kapasiteleri farklõ yöntemlerle hesaplanarak, birbirleriyle karşõlaştõrõlmaya çalõşõlmõştõr. 1.GİRİŞ Dünyada 179 farklõ şehrin benimsendiği Metro ,hafif raylõ ve tramvay gibi kentiçi raylõ ulaşõm sistemleri, son yõllarda geç kalõnmasõna rağmen belediyelerimizin de rağbet ettiği ve ulaşõm politikalarõnõn baş hedefi haline gelen pahalõ inşaat yatõrõmlarõdõr.
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • Progress on Edmonton's Valley Line
    Progress on Edmonton’s Valley Line LRT – General Project Update Moderator Georg Josi, DIALOG Design Review Manager Owner’s Engineer – connectEd Transit Partnership Panel Chris Gentile City of Edmonton Technical Manager Valley Line Stage 1 B.Sc., M.Sc., University of Manitoba Panel Josh Jones AECOM Project Manager Valley Line Stage 1 Owner’s Engineer – connectEd Transit Partnership Panel Johanna Hoyt EllisDon Design Project Manager Valley Line Stage 1 TransEd Partners Panel Colin Hill EllisDon Deputy Project Director Valley Line Stage 1 TransEd Partners LRT Development in Edmonton 6 LRT Development in Edmonton 7 LRT Development in Edmonton Capital Line Clareview to University of Alberta 1978 - 1992 Capital Line – Extension University of Alberta to Century Park 2006 - 2010 Metro Line University of Alberta to NAIT 2015 Edmonton’s LRT Vision 9 Edmonton’s LRT Vision Edmonton’s Future LRT Network 11 Edmonton’s LRT Expansion Valley Line - Stage 1 Downtown to Mill Woods 2020 Valley Line - Stage 2 Downtown to Lewis Farms Beyond 2020 Metro Line NAIT to Blatchford Beyond 2020 Balance of LRT Network Multiple Line Expansions 2025 - 2040 Valley Line - Stage 1 Overall Plan Low floor, urban-style LRT line 13 km 11 At-grade Stops 1 Elevated Station Interchange at Churchill Station (Downtown) 1 Tunnel 2 LRT Bridges 2 Elevated Guideways 2 Pedestrian Bridges 1 O&M Facility Valley Line - Stage 1 14 Valley Line - Stage 1 Scope • 13 km Line running from Millwoods Town Centre Mall in the South East of Edmonton to 102 Ave and 102 Street in Downtown Edmonton •
    [Show full text]
  • Metro Line Update-Winter 2014
    FREQUENTLY THE WAY WE MOVE METRO LINE ASKED QUESTIONS UPDATE WINTER 2014 2013 CONSTRUCTION SEASON COMPLETED SIGNAL SYSTEM AND FINAL CLEANUP WORK IN 2014 Building an LRT project like the Metro Line is a massive undertaking that involves hundreds of people; thousands of pounds of concrete, steel and rebar; and the patience and understanding of an entire city. After five years, Edmontonians can finally see the result of this undertaking. The Metro Line’s TWO LRT LINES WILL OPERATE ON ONE SET OF TRACKS final construction season has ended and construction BETWEEN HEALTH SCIENCES STATION AND CHURCHILL will be completed on time this February. STATION, SHOWN HERE FROM THE NORTH. While construction is on track, there have been delays with the delivery of the project’s complex A Communication-Based Train Control (CBTC) system new signalling system. These delays mean that the is being installed to control trains and intersections Metro Line will open to service later than originally on the Metro Line, and trains in the downtown tunnels anticipated. The opening was initially scheduled on the Capital Line, which runs from Clareview for April this year, but is now expected in late to Century Park. The CBTC must be seamlessly June to ensure safe and reliable LRT service for integrated with the existing train control system Edmontonians. on the Capital Line so that operators know how far “This is the first time we’ve had more than one LRT trains are from each other and can adjust their speeds line in Edmonton,” said Program Manager Brad Smid. accordingly. The CBTC will also ensure that traffic “We’re going to have two lines running on the same signals and crossing warning systems (warning bells, track between Health Sciences Station and Churchill flashing lights and gates) at intersections along the Station, and we need to make sure that our signalling Metro Line are activated at the right time to allow systems are routing trains and traffic safely before for the safe and efficient flow of trains, motorists we can open the Metro Line.” and pedestrians.
    [Show full text]