Maintenance and Special Maintenance Hart 2009/10
Item 4 – Table 1a Maintenance and Special Maintenance Hart 2009/10 1. SPECIAL MAINTENANCE / RESURFACING - Non Principal Roads Special Maintenance Contact : Steve Pellatt 01256 764455 Road County Estimated Location Description Ward Status No Councillor Cost The Street, Rotherwick C100 Drainage Rotherwick Glen N/A Completed (0809) Carriageway C401 Ancells Road, Fleet Fleet North Collett £280,000 Completed Reconstruction Carriageway Hartley Pale Lane, Elvetham Simpson £85,000 Completed Resurfacing Wintney Carriageway Hook Road, North B3349 Resurfacing and Odiham Glen £150,000 Completed Warnborough drainage repairs Carriageway U237 Sunnyside, Fleet Fleet West Wheale £20,000 Completed Resurfacing Scheme deferred to Redfields Lane, Church Carriageway C8 Crondall Radley £165,000 2010/11 as result of Crookham Resurfacing weather issues Scheme deferred to Carriageway Blackwater U250 Lakeside, Blackwater Collett £20,000 2010/11 as result of Resurfacing and Hawley weather issues Carriageway Fleet U248 Courtmoor Avenue (part) Resurfacing and Radley £18,000 Completed Courtmoor Kerbing Scheme partly complete. Awaiting C164 Red Hill, Mattingley Drainage Eversley Simpson £30,000 ditches to dry out before returning to site ITEM 4 Table 1a Page 1 of 10 Scheme cancelled to fund 2010/11 Rosemary Lane, Blackwater Blackwater C150 Drainage Collett £30,000 resurfacing of (91a – 117) and Hawley Vicarage Rd, B’water Scheme deferred to West Green Road, Hartley Hartley C46 Drainage Simpson £28,000 2010/11 as result of Wintney Wintney weather issues Works halted
[Show full text]