Display PDF in Separate
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Hart DC, Chair), Kathryn Steele (Hart DC, Secretary), Therese Abbott (Easement Holders), John Collman (Naturalist), Lindsay Mackay (Small Land Owners
Hazeley Heath Consultative Group 22/08/2017 Victoria Hall, Hartley Wintney Present: Phil Maund (Hart DC, Chair), Kathryn Steele (Hart DC, Secretary), Therese Abbott (Easement holders), John Collman (Naturalist), Lindsay Mackay (Small land owners) Apologies: Leigh Wallace (Hart DC), Mike Coates (RSPB), David Sexton (Mattingley Parish), Julian Bishop (Commoners) 1. Minutes from previous meeting Minutes were considered and approved. 2. Matters arising Hart Ponds - PM: Previously awaiting confirmation if consent is required for new ponds, consent is not required if an existing pond. Letter from Mattingley Parish - PM: Hart and RSPB are awaiting a signed letter of consent for the PINS application from Mattingley Parish Council. This has been completed via LW and MC. Natural England surveys - Action is outstanding for Matt Taylor (Natural England) to find out when the field units are due at Hazeley. ACTION: PM Bramshill crossing - PM: No change from 09/05/2017 meeting. ACTION: LW/PM Himalayan Balsam – PM: No enforcement available for neighbouring land on Hazeley streams and rivers. Hart can manage what they are responsible for. There is scope for an initiative such as volunteering to aid in the removal of Himalayan Balsam. Fencing Application – PM: HART and the RSPB have met and chose the same specification and structures. Naming of Features – JC: The features still require naming such as the scrapes. This is to be carried out during winter when there is less work on. HART and the RSPB to aid in choosing these alongside the management plan. Are these to be short coded names or site relevant names? ACTION: PM/ JC Surveys 1. -
Please Not Phone Number Asda Pharmacy
Pharmacy Trading Name Address 1 Address 2 Town County Postcode Friday 8 May Opening hours (PleasePhone Numbernote 14:00 - 17:00 unless otherwise confirmed Asda Pharmacy Asda Store, Purbrook Way Bedhampton Hampshire PO9 3QW 09:00 - 18:00 023 92445800/02392 445 810 Rowlands Pharmacy Aldershot Centre For Health Hospital Hill Aldershot Hampshire GU11 1AY 14:00 - 17:00 01252 329098 Aldershot Pharmacy 21 High Street Aldershot Hampshire GU11 1BH Closed 01252 317285; 01252 333200 Wellington Pharmacy 5-7 High Street Aldershot Hampshire GU11 1BH 14:00 - 17:00 01252 332551 Boots The Chemists 39-40 Wellington Centre Aldershot Hampshire GU11 1DB 10:00-17:00 01252 317444 Tesco Instore Pharmacy Tesco Superstore, Willems Park Wellington Avenue Aldershot Hampshire GU11 1SQ 09:00-18:00 0345 6779004 Lloyds Pharmacy 280b Lower Farnham Road Aldershot Hampshire GU11 3RD 14:00 - 17:00 01252 333400 Vernons Chemist 41 Lower Newport Road Aldershot Hampshire GU12 4QB 14:00 - 17:00 01252 314018 Integro Pharmacy Unit 4 The Alpha centre North Lane Aldershot Hampshire GU12 4RG Closed 01252 447226 Alton Pharmacy 68 High Street Alton Hampshire GU34 1ET Closed 01420 83176 Boots The Chemists 52 High Street Alton Hampshire GU34 1ET 14:00 - 17:00 01420 83126 Your Local Boots Pharmacy Chawton Park Surgery Chawton Park Road Alton Hampshire GU34 1RJ 14:00 - 17:00 01420 590245 Anstey Road Pharmacy Alton Health Centre Anstey Road Alton Hampshire GU34 2QX 14:00-17:00 01420 88327 Day Lewis Pharmacy 17 Adelaide Road Andover Hampshire SP10 1HF 09.00 - 12.00 01264 332264 Boots 27 High -
Bramshill Site of Special Scientific Interest
The Dragonflies of Bramshill Site of Special Scientific Interest Freshwater Habitats Trust Author Ken Crick Forward Bramshill Site of Special Scientific Interest (SSSI) is a Flagship Pond Site. Part of a network of the very best of Britain’s ponds; sites of exceptional importance for freshwater wildlife and some of our finest freshwater habitats. The Flagship sites can be a single special pond, or more commonly group of ponds, selected because they support rich, often irreplaceable, communities and species at risk of extinction. They represent some of the least impacted, most diverse pond habitats remaining in the country. Many of our nation’s most beautiful and biodiverse waterbodies have degraded irrevocably, and it’s critically important that the remaining sites are well protected and well managed. In 2015, with funding from the Heritage Lottery Fund, Freshwater Habitats Trust launched the Flagship Ponds project, Mats of Water Crowfoot flower on Bramshill working with land managers and community groups to ensure that the most Plantation’s Longwater. critical pond sites in Britain were protected for the long term. This book has been published with the aim of enabling people visiting this, Introduction immensely important Flagship Pond Site in Northern Hampshire, to identify the dragonflies and damselflies they encounter - by reference to a simple text This nationally important Site of managed by Forestry Commission and in places subsequent backfilling Special Scientific Interest (SSSI) England (FCE), please see the site with landfill, Bramshill SSSI has and photographs. It should also inform those visiting the site of the location is notified as such in part for its map on page 6 which depicts the through a combination of careful of the majority of freshwater habitats. -
Sites of Importance for Nature Conservation Sincs Hampshire.Pdf
Sites of Importance for Nature Conservation (SINCs) within Hampshire © Hampshire Biodiversity Information Centre No part of this documentHBIC may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recoding or otherwise without the prior permission of the Hampshire Biodiversity Information Centre Central Grid SINC Ref District SINC Name Ref. SINC Criteria Area (ha) BD0001 Basingstoke & Deane Straits Copse, St. Mary Bourne SU38905040 1A 2.14 BD0002 Basingstoke & Deane Lee's Wood SU39005080 1A 1.99 BD0003 Basingstoke & Deane Great Wallop Hill Copse SU39005200 1A/1B 21.07 BD0004 Basingstoke & Deane Hackwood Copse SU39504950 1A 11.74 BD0005 Basingstoke & Deane Stokehill Farm Down SU39605130 2A 4.02 BD0006 Basingstoke & Deane Juniper Rough SU39605289 2D 1.16 BD0007 Basingstoke & Deane Leafy Grove Copse SU39685080 1A 1.83 BD0008 Basingstoke & Deane Trinley Wood SU39804900 1A 6.58 BD0009 Basingstoke & Deane East Woodhay Down SU39806040 2A 29.57 BD0010 Basingstoke & Deane Ten Acre Brow (East) SU39965580 1A 0.55 BD0011 Basingstoke & Deane Berries Copse SU40106240 1A 2.93 BD0012 Basingstoke & Deane Sidley Wood North SU40305590 1A 3.63 BD0013 Basingstoke & Deane The Oaks Grassland SU40405920 2A 1.12 BD0014 Basingstoke & Deane Sidley Wood South SU40505520 1B 1.87 BD0015 Basingstoke & Deane West Of Codley Copse SU40505680 2D/6A 0.68 BD0016 Basingstoke & Deane Hitchen Copse SU40505850 1A 13.91 BD0017 Basingstoke & Deane Pilot Hill: Field To The South-East SU40505900 2A/6A 4.62 -
A Settlement Hierarchy for Hart District
Local Development Framework Background Paper A Settlement Hierarchy for Hart District January 2010 (updated August 2010) - 2 - Contents 1 Introduction …………………………………………………………... 2 2 The Local Plan Approach ……………………………………………... 3 3 Core Strategy Preferred Options (2006) approach ………………….. 6 4 Policy Context ………………………………... ……………………… 8 5 Profile of Rural Hampshire …………………………………………… 10 6 Analysis of settlements ………………………………………………... 12 7 Formulating a new settlement hierarchy……………………………… 12 Appendices Appendix 1: Breakdown of settlements by population, facilities and services……................. 18 Appendix 2: Map of road and rail network in Hart District ………………………………. 21 Figures Figure 1: Map of the Settlement Boundaries in the Adopted Local Plan (1996-2006) .……. 5 Figure 2: Map of Hampshire County Council Rural and Urban Classification…….................. 11 Figure 3: Map of the Proposed Settlement Hierarchy …………………………….................. 16 - 1 - 1. Introduction 1.1 Following the revocation of the Regional Spatial Strategies by the new Conservative – Liberal Democrat Coalition Government in June 2010 it is considered necessary to update the original Settlement Hierarchy Background Paper (January 2010) in light of the changes. 1.2 Hart District contains a number of towns and villages that vary in size. It is useful for plan-making purposes to group these settlements into a hierarchy based on an understanding of their current size and level of service provision. 1.3 It is important to note that the hierarchy does not in itself amount to a spatial strategy and does not dictate the levels of growth that will go to different settlements. It is a hierarchy based on the settlements as they are now, rather than as they might look in the future. It is merely a framework around which one or more options for a spatial strategy can be articulated. -
Landscape Capacity Study 2016
Hart Landscape Capacity Study Main Study and Appendix 1 Hart District Council (2016) Contents Page 1. Executive Summary 1 2. Introduction 8 3. Background to Study 9 4. Objectives 10 5. Approach and Methodology 11 6. Assessment Thresholds 21 7. Study Constraints 25 8. Map of the District: Summary of Results 26 Appendix 1: Local Area Summaries 27 Appendix 2: Local Area Record Sheets 157 Hart District Council Local Plan Landscape Capacity Study 2016 1.0 Executive Summary 1.1 Purpose of the Study This report has been produced to inform the evidence base for the Hart District Council Local Plan. It assesses the relative capacity of the landscape to accommodate development in the rural areas of the District, outside of the established settlement boundaries. The capacity of each area has been awarded by testing the results of each assessment against the following criteria: Low capacity – the landscape area could not accommodate areas of new development without a significant and adverse impact on the landscape character. Occasional, very small scale development may be possible, providing it has regard to the setting and form of existing settlement and the character and the sensitivity of the adjacent character areas. Low/medium capacity – a minimal amount of development could be accommodated only in limited situations, providing it has regard to the setting and form of existing settlement and the character and the sensitivity of the adjacent character areas. Medium capacity – the landscape area could be able to accommodate areas of development in some parts, providing it has regard to the setting and form of existing settlement and the character and the sensitivity of the adjacent character areas. -
SHL023 Land West of Marsh Lane Eversley
Hart District Council Local Plan Site Assessment: Stage 2 – High Level Site Assessment – SHL023 – Land West of Marsh Lane, Eversley Cross Confidential Draft - 1.1 – April 2015 High Level Site Assessment Proforma Site Reference SHL023 Site Name Land West of Marsh Lane Parish Eversley Site Address Land West of Marsh Lane, Eversley Cross Capacity Assessment and Categorisation Site Size (ha) 7.44ha Estimated Capacity 134 Comments on capacity The capacity was calculated using a dph figure of 18 (in accordance with gross-to-net ratio of 60%). Housing Strategy Category(s) Strategy 2 (Dispersal strategy) Land Supply Category Category C: Large and ʻlocal strategicʼ sites adjoining existing urban areas Key to Site Assessments: No overriding constraint to development of the site Constraint requiring further detailed assessment Major constraint undermining suitability of site Site Assessment Assessment Criteria Assessment comments Coloured assessment Accessibility to o Bus Stop – (Fox Lane, services: 82, and 83) 0.86km Employment and o Railway Station – (Sandhurst) 4.89km services o Employment Centre – (Blackbushe Business Park) 3.12km o Public Open Space – (Eversley Recreation Ground) 0.86km o Health Facility – (Monteagle Surgery, Yateley) 1.67km o Primary School – (Charles Kingsleyʼs Primary School) 1.8km o Secondary School – (Yateley School) 2.15km o Supermarket – (Waitrose, Yateley) 1.51km Infrastructure • Schools: There is a pressure for places at Primary education level. Although there are no identified deficits in provision capacity at Primary, Junior or Infant Schools within the Eversley/Yateley/Frogmore area they are full or close to full. Additional housing will exacerbate this situation. There are no planned expansions of any of the schools in the area, if there is any significant development that is not forecast will cause increased pressures on the local primary, junior and infant schools. -
GB Electricity System Operator Daily Report Nationalgrideso UNRESTRICTED GB Electricity System Operator Daily Report Tuesday 11 June 2019
GB Electricity System Operator Daily Report nationalgridESO UNRESTRICTED GB Electricity System Operator Daily Report Tuesday 11 June 2019 Today’s High Level Risk Status Forecast for the next 24h Time General Status Voltage PSM Demand System Inertia 07:00 - 14:00 System Margins Weather Duty 14:00 - 21:00 Generation Transmission Officer 21:00 - 07:00 Active Constraints Today’s Minimum De-Rated Margin 3891.13 (SP 36) System Warnings None Generation Variable Current BMU Largest Loss Risk Demand 560MW Balancing Costs Last 241 hours'6 ENCC11 BM16 spend212631Total:36 £729k414651566166717681869196 £80k £60k £40k £20k £0k -£20k -£40k Yesterday’s Market Summary Cash out price (Max) £80.00 /MWh (SP 20) Cash Out Price (Min) £23.01 /MWh (SP 15) Peak Demand Yesterday 28,745 MW NETS Status Report; 11 June 2019 2 of 4 nationalgridESO UNRESTRICTED Interconnectors Today Import Export Netherlands (BritNed) 1060 1060 Fully Available France (IFA) 1500 1500 Pole 1 unavailable, due to RTS at 12:00hrs Belgium (Nemo) 1013 1013 Fullly Available Ireland (EWIC) 500 530 Fullly Available Northern Ireland (MOYLE) 395 500 Partially available. Wind Power Forecast Key: Expected embedded generation (MWs) Embedded Generation Forecast 10-JUN-2019 11-JUN-2019 12-JUN-2019 05:00 08:00 12:00 17:00 21:00 00:00 05:00 08:00 12:00 17:00 21:00 00:00 05:00 08:00 12:00 17:00 21:00 Solar (MW) 1 1640 3830 1700 46 0 0 1039 3564 2060 29 0 0 725 2193 1717 38 Wind (MW) 284 381 689 1203 1281 1361 1783 2073 2250 2137 1798 1760 1712 1706 1773 1751 1600 STOR (MW) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total (MW) 285 2021 4519 2903 1327 1361 1783 3112 5814 4197 1827 1760 1712 2431 3966 3468 1638 NETS Status Report; 11 June 2019 3 of 4 nationalgridESO UNRESTRICTED Weather Source Commentary 11/05/2019 Met Office Today: (Summary) SEPA Rain, heavy at times, and strong winds will continue across much of Natural Resources Wales England and Wales, although south and southeastern parts will be brighter with lighter winds but with heavy, thundery showers developing. -
Appendix B Summary of Public Comments
Appendix B Summary of Public Comments TOTAL Objection 187 Comment 43 Mixed 2 Support 3 No reason given 8 Principle / scale of development 141 Highways (general comments) Increase in traffic and congestion (gridlocks at rush hour) 163 Cumulative impact upon congestion with other development in Wokingham Borough Council 73 Highway safety impact of additional traffic (inc drivers and other road/footway users) 115 Highway proposals do not mitigate development (nil detriment not Achieved) 85 Noise from additional traffic (general) 20 Pollution from additional traffic (air, sewage) 22 Impact of additional traffic upon communities 119 Roads are already congested 149 Roads already in a poor condition and should be repaired 14 Impact of construction traffic 23 Congestion will turn country lanes into rat runs 34 Highway improvements will change the character of the area (loss of country lanes) 28 Extra traffic will discourage horse riders, cyclists and pedestrians 54 Object to principle of traffic lights - will increase congestion 3 Extra length of road should be built to accommodate extra cars (bypass) 24 Need to consider M3 & M4 corridor links more broadly 26 Network of footpaths, bridleways and cycle ways required 47 Multi user bridleway necessary to continue to support equestrian business around the development 21 Bridleways required for horse riders 27 Further work required to demonstrate how pupils will get to secondary school (safe walking/cycling routes, bus, green ways) 14 Traffic modelling challenged on it's conclusion and consultation methods 27 Traffic modelling does not take to account the other application TA 4 OFF-SITE: Arborfield Arborfield Cross will be unsafe and congested 2 Arborfield bypass is essential 16 Arborfield bypass needed before any new development 9 Arborfield bypass should join up with Shinfield Eastern Relief Rd 5 Object to bypass going to east of village 2 A327 north of Arborfield would be congested 10 Overload A327 (congestion/safety) 44 Loss of 'village' character to Arborfield 24 OFFSITE: Barkham Bottleneck at Barkham Bridge. -
Loddon Catchment Implementation Plan
Loddon Catchment Implementation Plan January 2012 – FOR COMMMENT (Version C2) Glossary.....................................................................................................................3 1 Introduction...................................................................................................6 2 Loddon catchment summary.......................................................................9 2.1 General Description .....................................................................................9 2.2 Catchment map........................................................................................... 10 3 Water body information ............................................................................. 11 3.1 Classification.................................................................................................. 11 3.2 Heavily Modified Water Bodies..................................................................... 11 4 Actions ........................................................................................................ 11 4.1 Operational monitoring (2010-12) ............................................................. 12 4.2 Investigations (2010-12)............................................................................. 12 4.3 Improvement actions (in place by 2012)................................................... 12 4.3.1 ‘Day Job’ activities.............................................................................................. 13 4.3.2 Field actions ...................................................................................................... -
MINUTES of the MEETING of EVERSLEY PARISH COUNCIL HELD by VIDEOCONFERENCE at 7.30Pm on TUESDAY 3Rd NOVEMBER 2020. PRESENT: Cllr
MINUTES OF THE MEETING OF EVERSLEY PARISH COUNCIL HELD BY VIDEOCONFERENCE AT 7.30pm ON TUESDAY 3rd NOVEMBER 2020. PRESENT: Cllr A McNeil (Chairman, AM) Cllr D Deane (DD) Cllr S Dickens (SD) Cllr E Dixon (ED) Cllr C Edge (CE) Cllr S Hughes (SH) Cllr P Todd (PT) ALSO PRESENT: 4 members of the public, R Quarterman (HDCllr and Chair of Yateley Neighbourhood Plan) and J Routley (Clerk) ACTIONS 75 Apologies for Absence Apologies were accepted for Cllr K Neville due to personal commitments. 76 Declarations of Interest Cllr E Dixon declared a non-pecuniary interest in item 4 h) because he knows the applicant, (See Min: 79 h) 77 Minutes of the Last Meeting Receipt of Minutes The minutes of the meeting of Eversley Parish Council held on Tuesday 6th October 2020 had been previously circulated to all Councillors. RESOLVED That the Minutes be approved and signed by the Chairman. (note these will be signed electronically and signed in person at the next Council meeting held in person). AM At 7.41pm 1 member of the public left and 2 members joined 78 Public Questions and Comments 20/02308/FUL Land South Of Eversley Road And East Of Marsh Lane Marsh Lane R. Quartermain explained that he was attending this meeting in D. Simpson’s (HCCllr) place and also in his capacity as Chair of the Yateley Neighbourhood Plan. In this latter capacity he was interested in this application. Dr A. Crampton noted that residents had contacted her with concerns regarding this planning application and item 4 e) 20/02222/FUL . -
Display PDF in Separate
T h ^ j ^ c j NRA Thames 249 1‘ DATE OUT : THE BLACKWATER RIVER CATCHMENT MANAGEMENT PLAN FIRST ANNUAL REVIEW 95/96 DRAFT DOCUMENT 1 ENVIRONMENT AGENCY ■ ■ 111 122688 CONTENTS Section: Page No 1.0 Executive Summary v 1.1 Thames 21 2.0 Vision for the Catchment 3.0 Introduction 4.0 Catchment Overview 5.0 Summary of Progress 5.1 Cove Brook Landscape Assessment 5.3 Environmental Impact Assessment on the Blackwater River 5.4 Water Quality 5.5 Watersports within the catchment 5.6 Pollution Incidents in the Blackwater Catchment 5.7 Oil Care Campaign 5.8 Public Involvement 6.0 Monitoring Report 6.1 Format 7.0 Additions to the Action Tables 7.1 Additional Issues 7.2 Additional Actions 8.0 Activities - (The Action Tables) 9.0 Future Reviews Appendices: I Contacts IV Water Quality II Abbreviations V Pollution Incidents III Progress of Development Plans y> NOTE : THIS PAGE IS TO CONTAIN AN APPROPRIATE STATEMENT RE :THE FORMATION OF THE ENVIRONMENTAL AGENCY TOGETHER WITH THE NRA ’MISSION STATEMENT’. For further information regarding this CMP Review, please contact : Mark Hodgins National Rivers Authority Riverside Works Sunbury-on-Thames Middlesex TW6 6AP (Tel: 01932 789833) 3 1.0 EXECUTIVE SUMMARY One of the main objectives of an Animal Review h to record the progress of Catchment actions as identified la the Blackwater River Catchment Management Han * Final Plan (renamed the Actioultai)* The progression of activities within the catchment as of November 1994 onwards has been generally vety good* fit total there were,.* actions identfed in the Blackwater Final Plan, for the period 1994 and 1999* ,.., of these actions have been successfully completed.