Greater LM

Fourth Generation Integrated Development Plan 1st Review

Jul 2018 to Jun 2019

31 May 2018

1

Greater Taung LM

CONTACT DETAILS

Private Bag X1048 Main Street Taung 8580

The Mayor: Kgosi N Motlhabane (053) 994 9600

The Municipal Manager: Katlego Gabanakgosi (053) 994 9400

Enquiries: Spatial Development Manager: [email protected] Steyn de Jager (053) 994 9400

2

T A B L E O F C O N T E N T S

1. EXECUTIVE SUMMARY ...... 5 2. INTRODUCTION ...... 6 2.1. ABBREVIATIONS: ...... 6 3. THE PLANNING PROCESS...... 7 3.1. PROCESS PLAN ...... 7 3.2. IDP: INSTITUTIONAL ARRANGEMENTS, ROLES AND RESPONSIBILITIES: ...... 7 3.2.1. THE MUNICIPAL COUNCIL: ...... 7 3.2.2. THE MAYOR: ...... 7 3.2.3. THE IDP REPRESENTATIVE FORUM: ...... 7 3.2.4. THE PORTFOLIO COMMITTEES (PROJECT TASK TEAMS)...... 7 3.2.5. THE WARD COUNCILLORS & WARD COMMITTEES: ...... 7 3.2.6. THE COMMUNITY DEVELOPMENT WORKERS: ...... 8 3.2.7. THE MUNICIPAL MANAGER: ...... 8 3.2.8. SPATIAL PLANNING MANAGER: ...... 8 3.2.9. THE IDP COORDINATOR: ...... 8 3.2.10. THE PMS UNIT: ...... 8 3.2.11. THE COMMUNICATIONS OFFICER: ...... 8 3.2.12. MANAGEMENT COMMITTEE (SENIOR MANAGEMENT MEETINGS) ...... 9 3.2.13. THE BUDGET STEERING COMMITTEE:...... 9 3.2.14. OTHER ROLE PLAYERS WILL BE: ...... 9 3.3. COMMUNITY BASED PLANNING ...... 10 4. ANALYSIS OF THE STATUS QUO OF GTLM ...... 22 4.1. DYNAMIC DEMOGRAPHIC PROFILE OF GTLM ...... 22 5. OBJECTIVES AND STRATEGIES ...... 36 5.1. GTLM - POWERS AND FUNCTIONS ...... 36 5.2. VISION, MISSION & VALUES ...... 42 5.1. STRATEGIC PLANNING SESSION ...... 43 5.2. STRATEGIC OBJECTIVES ...... 56 6. INTEGRATED PROGRAMMES ...... 58 6.1. INTRODUCTION TO INTEGRATED PROGRAMMES ...... 58 6.2. SUMMARY - STATUS OF INTEGRATED PROGRAMMES ...... 59 6.3. INSTITUTIONAL CLUSTER ...... 60 6.3.1. ORGANIZATIONAL STRUCTURE ...... 62 6.3.2. GTLM - DEPARTMENTS ...... 62 6.3.3. DEPARTMENT – MUNICIPAL MANAGER ...... 63 6.3.4. DEPARTMENT – CORPORATE SERVICES ...... 64 6.3.5. DEPARTMENT – INFRASTRUCTURE DEVELOPMENT ...... 65 6.3.6. DEPARTMENT – SPATIAL PLANNING & HUMAN SETTLEMENT ...... 67 6.3.7. DEPARTMENT – FINANCE ...... 68 6.3.8. DEPARTMENT – COMMUNITY SOCIAL SERVICES ...... 69 6.3.9. POLITICAL OFFICE ...... 71 6.3.10. POLICIES ADOPTED BY GTLM ...... 72 6.3.11. EMPLOYMENT EQUITY PLAN (EEP) ...... 73 6.3.12. OCCUPATIONAL HEALTH AND SAFETY PLAN ...... 74 3 6.3.13. EMPLOYEE WELLNESS PROGRAMME...... 75 6.3.14. SKILLS DEVELOPMENT PLAN ...... 75 6.4. FINANCIAL CLUSTER ...... 76 6.4.1. BUDGET SUMMARY - SCHEDULE A1 ...... 76 6.4.2. REVENUE & EXPENDITURE BY FUNCTIONAL CLASSIFICATION - SCHEDULE A2 ...... 80 6.4.3. REVENUE & EXPENDITURE BY VOTE - SCHEDULE A3 ...... 82 6.4.4. OPERATIONAL BUDGET BY SERVICE – SCHEDULE A4 ...... 83 6.4.5. MTEF – SCHEDULE A5 (5 YEAR CAPITAL INVESTMENT) ...... 86 6.4.1. MIG PROJECTS – OUTER YEARS ...... 87 6.4.2. MAINTENANCE BUDGET...... 89 6.4.3. BUDGET LINK TO STRATEGIC OBJECTIVES – SCHEDULE SA4 TO SA6 ...... 90 6.4.4. BUDGETED MONTHLY REVENUE AND EXPENDITURE BY SOURCE – SCHEDULE SA25: ...... 93 6.5. SPATIAL PERSPECTIVE ...... 95 6.5.1. SPATIAL DEVELOPMENT FRAMEWORK (SDF)...... 95 6.5.2. LAND USE MANAGEMENT SCHEME ...... 97 6.5.3. INTEGRATED ENVIRONMENTAL MANAGEMENT PLAN AND PROGRAMME ...... 98 6.5.4. TAUNG PRECINCT PLAN ...... 99 6.6. INFRASTRUCTURE CLUSTER ...... 101 6.6.1. WATER SERVICES DEVELOPMENT PLAN AND PROGRAMME (WSDP) ...... 101 6.6.2. INTEGRATED WASTE MANAGEMENT PLAN AND PROGRAMME (IWMP) ...... 101 6.6.3. INTEGRATED TRANSPORT PLAN AND PROGRAMME (ITP)...... 101 6.7. SOCIAL CLUSTER ...... 101 6.7.1. INTEGRATED POVERTY REDUCTION AND GENDER EQUITY PLAN AND PROGRAMME ...... 101 6.7.2. DISASTER MANAGEMENT PLAN ...... 101 6.7.3. INTEGRATED HIV/AIDS PLAN AND PROGRAMME ...... 101 6.8. ECONOMIC CLUSTER ...... 102 6.8.1. GREATER TAUNG LOCAL ECONOMIC DEVELOPMENT STRATEGY ...... 102 7. PROJECT REGISTER ...... 103 7.1. GTLM MIG PROJECTS...... 103 7.1. GTLM - DRAFT TOP LAYER SDBIP ...... 104 7.2. DR RUTH S MOMPATI DISTRICT MUNICIPALITY ...... 142 7.3. ESKOM AND DME ...... 144 7.4. DEPARTMENT OF RURAL DEVELOPMENT AND HUMAN SETTLEMENT ...... 146 7.5. DEPARTMENT OF PUBLIC WORKS & ROADS ...... 148 7.6. DEPARTMENT OF SOCIAL DEVELOPMENT...... 148 7.7. SASSA ...... 155 8. PERFORMANCE MANAGEMENT ...... 160 9. CONSULTATION AND APPROVAL PHASE ...... 204 9.1. CONSULTATION AND PUBLIC PARTICIPATION ...... 204 9.2. APPROVAL BY GTLM ...... 204 9.3. SUBMISSION AND PUBLICATION OF THE IDP ...... 204 10. CONCLUSION ...... 204

4

1. EXECUTIVE SUMMARY

This Integrated Development Plan has been drafted with the purpose to review the 2017/22 five year IDP that was approved during May 2017.

Ward Councillors and Ward Committees consulted the communities through a comprehensive CBP consultation process which included:

 Ninety Two Ward Consultation Meetings were held and were attended by approximately 4,714 delegates from different stakeholders.

 Ward Councillors were also requested to confirm the developmental priorities of each village to ensure a credible IDP owned by communities.

The main challenge of planning and development in GTLM is still to balance and spread the limited resources to all corners of the municipality taking into account:

 the basic services backlog;  investment in areas were rates and taxes are charged;  limited financial resources and vastness of the area;  high capital cost of road infrastructure which is the number one priority sector;  urban sprawl and the impact there-off on the cost of service reticulation;  the implementation of National and Provincial objectives;  the implementation of GTLM’s Spatial Development Framework and Precinct Plan and stimulation of LED initiatives and catalysts.

GTLM also seek to facilitate development initiatives with the Traditional Authorities and there- for ensured that representatives did form part of the Strategic Planning Session of GTLM.

GTLM is looking forward to build on a good relationship with the Traditional Authorities and to work towards a common goal of an improved socio-economic environment in GTLM.

The institutional arrangements of GTLM are place to ensure that GTLM can fulfil its obligation with regard to Basic Service Delivery. It must how-ever be mentioned that institutional and administrative gaps were identified during the Strategic Planning session that was held on the 19 to 21 of February 2018 and that these gaps will be addressed within the scope of available resources, organizational structure IDP and SDBIP.

Like in previous year’s, it was again a challenge to prepare a balanced budget that will address the needs on all levels of the GTLM society, this scenario creates conflict between the principle of taking services to the people and considering economy of scale.

A meeting was held between The North-West Provincial Legislature and GTLM on the 09th of March 2018 as part of the oversight role of The NW Legislature where GTLM did took note of the input that was given by the delegates to improve on the content of the IDP as well as to focus on Economic Development as a high priority especially in areas like the Taung Dam and Revitalization of small “dorpies” like . It was also highlighted that the housing issues, ownership security and the municipal demarcation must be addressed as a matter of urgency.

5

2. INTRODUCTION

2.1. ABBREVIATIONS:

The following abbreviations used in the IDP are terms and language that is commonly used by officials at Local Government level to refer to certain documentations or processes for the sake of quicker communication:

Institutions CoGTA Department Of Cooperative Governance And Traditional Affairs DDLG&TA Department Of Developmental Local Government And Traditional Affairs DrRSMDM Dr Ruth S Mompati District Municipality GTLM Greater Taung Local Municipality NT National Treasury PT Provincial Treasury NWPG North West Provincial Government SPATIAL CBD Central Business District GIS Geographical Information System Legislation DoRA Division of Revenue Act MStructA Municipal Structures Act MSysA Municipal Systems Act MFMA Municipal Finance Management Act SPLUMA Spatial Planning and Land Use Management Act Strategic Documents and Programmes CWP Community Works Programme EEP Employment Equity Plan EMP Environmental Management Plan EPWP Expanded Public Works Programme IDP Integrated Development Plan ITP Integrated Transport Plan IWMP Integrated Waste Management Plan LED Local Economic Development LUMS Land Use Management Scheme NDP National Development Plan PMS Performance Management System SDBIP Service Delivery and Budget Implementation Plan SDF Spatial Development Framework WSDP Water Services Development Plan WSP Workplace Skills Plan Programme in the Office of The Premier VTSD Village, Town & Small Dorpie Development in the North West Province RRR Rebrand, Reposition and Renewal Programme RHR Reconciliation, Healing and Renewal Programme MSCOA Municipal Standard Chart of Accounts GRANTS FMG Finance Management Grant RBIG Rural Bulk Infrastructure Grant RHIG Rural Housing Infrastructure Grant GRAP General Recognized Accounting Practices MIG Municipal Infrastructure Grant

6

3. THE PLANNING PROCESS

3.1. PROCESS PLAN

The IDP and Budget Process Plan were approved with Council Resolution Number CR46/2017 on the 22nd of September 2017.

3.2. IDP: INSTITUTIONAL ARRANGEMENTS, ROLES AND RESPONSIBILITIES:

3.2.1.THE MUNICIPAL COUNCIL:

 Herewith and as part of this IDP Processes and Resolutions, resolve to Delegate the development of the IDP to The Municipal Manager.  Considers and adopt the IDP process plan.  Responsible for the adoption of the Draft and Final IDP & Budget.

3.2.2.THE MAYOR:

 Will chair the IDP Representative Forum meetings and ensure compliance to legislation with regard to all IDP & PMS processes.  Table all relevant documentation as legislated to Council, where applicable to take notice and where applicable to be approved.

3.2.3.THE IDP REPRESENTATIVE FORUM:

 Will be chaired by the Mayor,  Form a structured link between the municipality and representatives of the public.  Represent the interests of various constituencies in the IDP review process.  Provide a means to transfer and clarify information between all the stakeholder representatives including the municipality.  Provide an organizational mechanism for discussion, negotiation and decision-making between the stakeholders and municipality.  Coordination and alignment in planning and service delivery.  Monitor the performance of the planning and implementation process.  Consider and discuss all recommendations and input from the IDP & Budget Steering Committee and Performance presentations of Directors.  Recommend the Draft and Final IDP through Exco to Council for approval.

3.2.4.THE PORTFOLIO COMMITTEES (PROJECT TASK TEAMS)

 Will be part of Project Task Teams relevant to the sector and the portfolio for technical assistance on programmes and projects.  Co-opt resource persons to serve on the PTTs.  Consider input from Senior Management and/or Management Committee.  Give input to the Budget Steering Committee wrt Priority CBP Issues, Objectives, Strategies, Performance Indicators, Programmes & Projects with budget allocation for implementation.

3.2.5.THE WARD COUNCILLORS & WARD COMMITTEES:

 Facilitate identification and conceptualization of community needs and compile Ward Plans.  Will be the key-role-players to communicate all information to the communities, to ensure that all needs and issues will be included in the IDP Document.  Oversight role on Programme and Project implementation.

7

3.2.6.THE COMMUNITY DEVELOPMENT WORKERS:

 Assist Ward Councillors with coordination of the CBP Process, gathering of baseline information and compilation of Ward Plans.

3.2.7.THE MUNICIPAL MANAGER:

 Will chair the IDP Management Committee.  Will ensure compliance, as delegated in the Delegation Framework, with regard to all relevant IDP and PMS regulations and legislation.

3.2.8.SPATIAL PLANNING MANAGER:

 Responsible for the preparation of the Process Plan.  Will manage and co-ordinate the IDP Process.  Consolidate all relevant input from Ward Plans and Other Stakeholder input.  Do research that will inform the IDP.  Responsible for the daily coordination of the planning process and day to day activities.  Ensure that the planning process involves all relevant role players, is strategic and implementation focused.  Ensure proper documentation.  Adjust the IDP in accordance with MEC’s and AG’s comments.  Compile the Draft and Final IDP.

3.2.9.THE IDP COORDINATOR:

 Will assist the Spatial Development Manager to make all arrangements necessary to comply with the IDP process plan, including research and Community Participation.  Will work together with the Political Support Staff to ensure compliance w.r.t. Community Participation, Imbizos and Publications.  Will draft and consolidate all reports relevant to community participation processes.  Will assist the Spatial Development Manager or the Manager responsible for development of the IDP with administrative and logistical arrangements.

3.2.10. THE PMS UNIT:

 Will ensure the development of “SMART” Objectives and Performance Measures to be included in the IDP.  Will ensure the Draft Top-Layer SDBIP is included in the IDP.  Will assist the Spatial Development Manager to ensure alignment between the IDP & Performance Measures.

3.2.11. THE COMMUNICATIONS OFFICER:

 Will coordinate and ensure communication to the general public as required by legislation.  Will ensure the publication of all documentation as required by legislation.

8

3.2.12. MANAGEMENT COMMITTEE (SENIOR MANAGEMENT MEETINGS)

Will be chaired by the Municipal Manager, and consist of senior officials who will take responsibility for and assist in:

 the drafting of the process plan;  do research and analysis on status quo information;  the Portfolio Committee (PTT) to formulate objectives, strategies and performance indicators to be finally discussed at the IDP Rep Forum;  provision of relevant sector information;  provision of budget information;  prepare and integrate programmes & project proposals as determined by the PTT;  development of Core Components of the IDP as legislated;  development of Integrated Sector, Financial and Other Programmes and Plans as determined in the IDP methodology;  preparing the Top Layer SDBIP and Technical SDBIPS;  signing of all Performance and Contract related documents;  preparation of all Performance Related documents and reports as required by The Performance Regulations, PMS Framework and relevant legislation;  present to the IDP Rep Forum the past performance of the directorate as well as the Top Layer SDBIP with measurable Key Performance Indicators for the new financial year.

3.2.13. THE BUDGET STEERING COMMITTEE:

 Will be chaired by Mayor and consist of Party Representatives and management.  Will consider and discuss the input received from all stakeholders.  Will prepare recommendations to Exco.

3.2.14. OTHER ROLE PLAYERS WILL BE:

 Provincial Departments (will be engaged at district level).  Dr Ruth S Mompati District Municipality  Traditional Leaders.  Service Agencies.  Consultants.  NGO & CBOs.

9

3.3. COMMUNITY BASED PLANNING

GTLM, again, went the extra mile to ensure that communities participate in the facilitation process, and so doing, allow communities to own the development priorities in their respective wards and villages. A total of 92 CBP meetings were held and 4,714 residents attended these meetings.

This was done through the Community Based Planning Methodology that runs parallel with the IDP Processes as well as the gathering of information through provincial initiatives.

The priorities of the current CBP were confirmed by the Ward Councillors to ensure that Sector Planning and Programmes are based on the priorities as determined by the communities.

Communities were advised to review their priorities but not to “re-invent the wheel”. This approach is important to ensure consistency in planning that will address identified priority issues in the short and long term.

It is important to note that administration needs to gather information and record the needs to ensure effective forward planning there for a clear distinction must be made between the needs and the bankable projects.

The following Table reflects the CBP consultative meetings that were held in GTLM:

COMMENT BY IDP WARD VILLAGE DATE VENUE ATTENDANCE Office 1 Lykso 18.10.2017 Lykso 50 1 Qhoo 23.10.2017 Steel structure 47 Meeting were held but attendance 1 Reivilo 18.10.2017 Boipelo Community Hall register is still outstanding 1 Vaaltein 20.10.2017 Valtyn 78 2 Khaukhwe 12.02.2018 Khaukhwe 60 2 Ntswanahatshe 12.02.2018 Ntswanahatshe 41 2 Moretele 12.02.2018 Moretele Kgotla 23 3 Loselong 10.10.2017 Kgotla 48 3 Matlapaneng 16.10.2017 Kgotla 38 3 Mase 11.10.2017 Kgotla 78 No meeting report 3 Choseng was submitted 3 Sedibeng 23.10.2017 Kgotla 43 3 Karelstad 16.10.2017 Kgotla 47 4 Pompong&Lohatlheng 16.11.2017 Tribal 103 Ratshid/Matsuakeng&Siting 4 25.10.2017 Tshimologo Methodist Church 53 Polar 5 Matlhako 1,2 &Pudumoe 30.10.2017 Matlhako Community Hall 112 6 Cokonyane 14.11.2017 Cokonyane Comm Hall 33 6 Khibicwane ext 20.06.2017 Sports Ground 47 6 Mogopela A 24.07.2017 Mogopela A Primary 58 6 Mogopela B 08.11.2017 Morwalela Primary 32 6 Myra 10.10.2017 Myra Kgotla 105 7 Ditompong 22.11.2017 Ditompong 58 7 Leshobo 23.11.2017 Leshobo 103 7 Ntokwe 21.11.2017 Ntokwe 67

10 COMMENT BY IDP WARD VILLAGE DATE VENUE ATTENDANCE Office 8 Diretsaneng/Takaneng 21.09.2017 kgotla 88 8 Ext 6&7 14.03.2017 park nd mankurwane 213 8 Gasebuso 21.11.2017 kgotla 28 8 Letlhapong 16.02.2017 letlhapong 36 8 Lokgabeng 21.11.2017 kgotla Meeting were held but minutes and 8 Rooiwal attendance register were not submitted Meeting were held 8 Extension 4 16.11.2017 depot hall but attendance is still outstanding Priorities were submitted with the Ward Plan but 9 Buxton minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Thomeng minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Tlapeng minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Marotaneng minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Mocweding minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Buxton minutes and attendance registers were not submitted

11 COMMENT BY IDP WARD VILLAGE DATE VENUE ATTENDANCE Office Priorities were submitted with the Ward Plan but 9 Dryhoek minutes and attendance registers were not submitted Priorities were submitted with the Ward Plan but 9 Tamasikwa minutes and attendance registers were not submitted 10 Cokonyane 14.11.2017 Kgotla/Comm Hall 49 10 Hellenspan 26.07.2017 Hellenspan 36 10 Madibaneng 11.10.2017 Kgotla 23 10 Mamashokwane 20.09.2017 Mamashokwane 113 10 Modimong 30.08.2017 Kgotla 45 10 Pache 25.10.2017 Pache 63 10 Setlhabeng(Moseja) 10.10.2017 Setlhabeng 31 11 Khibicwane 22.10.2017 Kgotla ya Rra Kasienyane 55 11 Lokaleng 04.11.2017 Boareng Middle school 30 12 Lethwanyeng 05.09.2017 Kgotla 16 12 Manokwane Central &Kuaneng 08.02.2018 Manokwane 37 12 Matolong 11.09.2017 Matolong Crech 24 12 Nhole 13.09.2017 Kgotla 73 12 Ratompe 13.12.2017 Garatompe 27 13 Blekkies 15.08.2017 Blekkies 49 13 Chiefscourt 07.08.2017 Chiefscourt 81 13 Ditshilong One 17.08.2017 Ditshilong 52 13 Ditshilong Two 17.08.2018 Ditshilong 61 13 Nommer One 03.08.2017 Nommer One 69 13 Kgatlheng 07.08.2017 Kgatlheng 51 13 Veertien 16.08.2017 Veertien 93 13 Extension 5&Pinagare 03.08.2017 Ext 5 54 14 Kolong/Randstad 09.11.2017 Kolong Kgotla 56 14 Makwating 09.11.2017 Makwating Kgotla 26 14 Manthe 12.10.2017 Manthe White Hall 71 14 RDP 10.08.2017 Seodi Park 51 15 Khudutlou 26.10.2017 Kgotla 45 15 Molelema 22.11.2017 Community hall 89 16 20.09.2017 Kgotla 73 Meeting were held but the attendance 16 Dikhuting 20.11.2017 Boikutlo Primary register was not submitted 16 Gamokake 14.09.2017 GaMokake 10 16 Graspan 19.09.2017 Kgotla 47 Meetings were held but 16 Longaneng 17.11.2017 SASSA Office attendance registers could not be submitted 16 Picong 27.11.2017 Picong Primary 68 16 14.09.2017 Kgotla 24 16 Mothanthanyaneng 09.09.2017 Gobopamang Primary 16 12 COMMENT BY IDP WARD VILLAGE DATE VENUE ATTENDANCE Office 17 Bogosing Etxension 11.10.2017 Bogosing Ext 62 17 Gamoduana 13.10.2017 Gamoduana 58 17 Magogong Clinic 25.10.2017 Magogong Tribal/Roma 43 17 Magogong Roma 25.10.2017 Magogong Roma 20 17 Maphoitsile 18.10.2017 Maphoitsile Tribal hall 15 Minutes were submitted but 18 Diplankeng&Dipitshing 13.08.2017 Dipitshing Community hall without the attendance registers 19 Lower Majeakgoro 24.09.2017 Community hall 46 19 Upper Majeakgoro 20.08.2017 Upper Majeakgoro 37 20 Ikageng 18.10.2017 Ikageng 35 20 Kameelput 17.10.2017 Kameelput 43 20 Kgomotso 16.10.2017 Kgomotso 59 20 Losasaneng 17.10.2017 Losasaneng 52 20 Madithamaga 16.10.2017 Madithamaga 44 20 Thotatau 18.10.2017 Thotatau 39 No meeting report 21 Rietfontein was submitted No meeting report 21 Sekhing that was submitted No meeting report 21 Seoding that was submitted 22 Gataote 11.12.2017 Gataote Community Hall 43 22 Madipelesa 41 22 Mammutla 11.12.2017 Mammutla Community Hall 78 22 Shaleng 13.12.2017 Shaleng Community Hall 105 23 Kokomeng 25.09.2017 Kokomeng SASSA 100 23 Matsheng 26.09.2017 Matsheng Kgotla 120 23 Tlapeng 1 27.10.2017 Tlapeng 1 37 23 Tlapeng 2 30.10.2017 Kgotla 31 24 Itireleng 06.11.2017 Itireleng 45 24 Majaneng 12.11.2017 Majaneng 45 24 Mokasa 1 10.01.2018 Sedibeng Office 38 24 Mokasa 2 30.01.2018 Mokasa 2 43 24 Takapori 10.11.2017 Takapori 38 TOTAL 92 4,714

13 The Table and Graph below reflects the number of times that a sector was listed under the top three priorities. This gives an indication of the most important sectors or issues that need to be addressed in the IDP and SDBIPs and for which resources must be allocated to ensure that the most important priorities of the communities are addressed.

The information as reflected on the consolidated CBP Analysis is crucial to inform the Project Phase and the planning of the Project Task Teams of GTLM, The Dr Ruth S Mompati District Municipality, Parastatals and The Provincial Sector Departments to ensure resources are focused on the needs as identified by the communities.

Number of Times that a Sector was mentioned in the CBP:

CBP PRIORITY SECTORS 1 ROAD INFRASTRUCTURE 93 2 WATER 60 4 AREA LIGHTING 59 3 HOUSING 47 5 WARD BUILDINGS 43 7 LED 17 8 EDUCATION 11 6 ELECTRICITY 11 10 RECREATION 7 9 HEALTH 6 11 SANITATION 3 12 LAND 0 13 SAFETY & SECURITY 1 14 CEMETERIES 0 TOTAL 358

CBP PRIORITIES - Nu OF TIMES LISTED 0 10 20 30 40 50 60 70 80 90 100

ROAD INFRASTRUCTURE WATER AREA LIGHTING HOUSING WARD BUILDINGS LED EDUCATION ELECTRICITY RECREATION HEALTH SANITATION LAND SAFETY & SECURITY CEMETERIES

14 The following Table is a list reflecting the 3 highest priority needs as identified by the community of each village:

GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu

R&L 1 Boipelo 1 Housing Housing R&L 1 Boipelo 2 LED LED R&L 1 Boipelo 3 Recreation Recreational facilities R&L 1 Lykso 1 Housing Housing R&L 1 Lykso 2 Water Water & Sanitation R&L 1 Lykso 3 LED LED R&L 1 Qhoo 1 Road Infrastructure Road & Storm water R&L 1 Qhoo 2 Area Lighting High Mast Lights R&L 1 Qhoo 3 Health Clinic R&L 1 Reivilo 1 Electricity Metering & Accounts R&L 1 Reivilo 2 Road Infrastructure Roads & Storm Water R&L 1 Reivilo 3 Housing Housing Development (Disaster Houses) R&L 1 Vaaltyn 1 Ward Buildings Community Hall/Complex R&L 1 Vaaltyn 2 Road Infrastructure Road & Storm water R&L 1 Vaaltyn 3 LED LED 3 2 Dryharts (Station) 1 Road Infrastructure Paving 3 2 Dryharts (Station) 2 Housing Housing 3 2 Dryharts (Station) 3 Area Lighting High Mast Lights 3 2 Khaukhwe 1 Housing Housing Construction of 3km road from Moretele to 3 2 Khaukhwe 2 Road Infrastructure Maganeng 3 2 Khaukhwe 3 Ward Buildings Community Hall Construction of 9km road from Moretele to 3 2 Maganeng 1 Road Infrastructure Maganeng 3 2 Maganeng 2 Housing Housing 3 2 Maganeng 3 Recreation Sports facilities 3 2 Moretele 1 Water Water reticulation 3 2 Moretele 2 Ward Buildings Community Hall 3 2 Moretele 3 Area Lighting High Mast Lights 3 2 Ntswanahatshe 1 Ward Buildings Community Hall 3 2 Ntswanahatshe 2 Housing Housing 3 2 Ntswanahatshe 3 Road Infrastructure Roads 4 3 Choseng 1 Education New crèche 4 3 Choseng 2 Housing Housing Additional classrooms at Choseng middle 4 3 Choseng 3 Education school 4 3 Karelstad 1 Road Infrastructure Road/Storm water 4 3 Karelstad 2 Area Lighting High Mast Lights 4 3 Karelstad 3 Ward Buildings Community Hall 4 3 Loselong 1 Ward Buildings Community Hall 4 3 Loselong 2 Water Water 4 3 Loselong 3 Area Lighting High Mast Lights 4 3 Mase 1 Road Infrastructure Roads 4 3 Mase 2 Ward Buildings Community Hall 4 3 Mase 3 Area Lighting High Mast Lights 4 3 Matlapaneng 1 Road Infrastructure Roads (D201) 4 3 Matlapaneng 2 Housing Housing 4 3 Matlapaneng 3 LED LED 4 3 Sedibeng 1 Electricity Electricity 4 3 Sedibeng 2 Housing Housing 4 3 Sedibeng 3 Water Water 3 4 Lohatlheng 1 Road Infrastructure Roads 3 4 Lohatlheng 2 Housing Housing 3 4 Lohatlheng 3 LED LED 15 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 3 4 Myra Sitting Pollar 1 Road Infrastructure Roads 3 4 Myra Sitting Pollar 2 Health Health 3 4 Myra Sitting Pollar 3 Housing Housing 3 4 Pompong 1 Road Infrastructure Roads 3 4 Pompong 2 Housing Housing 3 4 Pompong 3 LED LED 3 4 Ratshidi/Matsuakeng 1 Road Infrastructure Roads 3 4 Ratshidi/Matsuakeng 2 Housing Housing 3 4 Ratshidi/Matsuakeng 3 Area Lighting High Mast Lights P 5 Matlhako I 1 Road Infrastructure Roads Infrastructure P 5 Matlhako I 2 Water Water(Ext of standpipes P 5 Matlhako I 3 Housing Housing P 5 Matlhako II 1 Water Water(Ext of standpipes P 5 Matlhako II 2 Road Infrastructure Internal roads P 5 Matlhako II 3 Housing Housing P 5 1 Road Infrastructure Road Infrastructure (Paving) P 5 Pudimoe 2 Housing Housing P 5 Pudimoe 3 Recreation Recreational facilities 3 6 Cokonyane 1 Road Infrastructure Roads & Storm water drainage 3 6 Cokonyane 2 Electricity Electricity 3 6 Cokonyane 3 Housing Housing 3 6 Khibicwane Ext 1 Water Water 3 6 Khibicwane Ext 2 Electricity Electricity 3 6 Khibicwane Ext 3 Road Infrastructure Storm water & Bridge 3 6 Mogopela A 1 Housing Housing 3 6 Mogopela A 2 Road Infrastructure Road & Storm water 3 6 Mogopela A 3 Electricity Electricity 3 6 Mogopela B 1 Housing Housing 3 6 Mogopela B 2 Road Infrastructure Roads & Storm Water 3 6 Mogopela B 3 Electricity Electricity 3 6 Myra 1 Water Water 3 6 Myra 2 Electricity Connections/Infills 3 6 Myra 3 Housing Housing 4 7 Ditompong 2 Area Lighting High Mast Lights 4 7 Ditompong 3 Housing Housing 4 7 Ditompong 1 Ward Buildings Community Hall 4 7 Leshobo/Matlhababa 1 Road Infrastructure Road Infrastructure 4 7 Leshobo/Matlhababa 2 Ward Buildings Community Hall 4 7 Leshobo/Matlhababa 3 Area Lighting High Mast Lights 4 7 Ntokwe 1 Housing Housing 4 7 Ntokwe 3 Area Lighting High Mast Lights 4 7 Ntokwe 2 Ward Buildings Community Hall 5 8 Diretsang 1 Road Infrastructure Roads & Storm water 5 8 Diretsang 2 Area Lighting High Mast Lights 5 8 Diretsang 3 Water Water & Sanitation 5 8 Gasebuso 1 Water Water & Sanitation 5 8 Gasebuso 2 Ward Buildings Community Hall 5 8 Gasebuso 3 Housing Housing 5 8 Letlhapong 2 Area Lighting High Mast Lights 5 8 Letlhapong 3 Road Infrastructure Roads &Storm Water 5 8 Letlhapong 1 Water Water 5 8 Lokgabeng 1 Area Lighting High Mast Lights 5 8 Lokgabeng 2 Road Infrastructure Roads & Storm Water drainage 5 8 Lokgabeng 3 Water Water & Sanitation 5 8 Rooiwal 1 Road Infrastructure Roads & Storm Water 5 8 Rooiwal 2 Water Water 5 8 Rooiwal 3 Road Infrastructure Bridge 5 8 Takaneng 1 Road Infrastructure Roads & Storm Water

16 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 5 8 Takaneng 2 Water Water & Sanitation 5 8 Takaneng 3 Road Infrastructure Bridge T 8 Taung Ext 4 (Depot) 1 Recreation Park T 8 Taung Ext 4 (Depot) 2 LED LED T 8 Taung Ext 4 (Depot) 3 Area Lighting High Mast Lights T 8 Taung Ext 6 2 Area Lighting High Mast Lights T 8 Taung Ext 7 2 Road Infrastructure Roads & Storm Water T 8 Taung Ext 7 3 4 9 Buxton 1 Ward Buildings Community Hall 4 9 Buxton 2 Housing RDP Houses 4 9 Buxton 3 Road Infrastructure Access road 4 9 Dryhoek 1 Road Infrastructure Access bridge 4 9 Dryhoek 2 Recreation Sports complex 4 9 Dryhoek 3 Ward Buildings Community Hall 4 9 Marotaneng 1 Road Infrastructure D201(Pampierstad to Mokasa 2) 4 9 Marotaneng 2 Ward Buildings Community Hall 4 9 Marotaneng 3 Education Library 4 9 Motsweding 1 Road Infrastructure D201(Pampierstad t0 Mokasa 2) 4 9 Motsweding 2 Housing RDP Houses 4 9 Motsweding 3 Education Library Road from Buxton to Reivilo road Via 4 9 Tamasikwa 1 Road Infrastructure Takananeng 4 9 Tamasikwa 2 Ward Buildings Community Hall 4 9 Tamasikwa 3 Water Water 4 9 Thomeng 1 Water Water 4 9 Thomeng 2 Education Scholar transport 4 9 Thomeng 3 Education ECD Crèche 4 9 Tlapeng 1 Area Lighting High Mast Lights 4 9 Tlapeng 2 Ward Buildings Community Hall 4 9 Tlapeng 3 Road Infrastructure Paving Access Road & Bridge 5 10 Cokonyane (Dishenting) 1 Road Infrastructure Internal roads 5 10 Cokonyane (Dishenting) 2 Area Lighting High Mast Lights 5 10 Cokonyane (Dishenting) 3 Electricity Infills 5 10 Hellenspan 1 Water Water 5 10 Hellenspan 2 LED LED (Boresetse) 5 10 Hellenspan 3 Housing Housing 5 10 Madibaneng 1 Area Lighting High Mast Lights 5 10 Madibaneng 2 LED LED(Food gardening) 5 10 Madibaneng 3 Housing Housing 5 10 Mamashokwane 1 Road Infrastructure Roads 5 10 Mamashokwane 2 Road Infrastructure Connector road 5 10 Mamashokwane 3 Electricity Electricity 5 10 Modimong 1 Road Infrastructure Roads 5 10 Modimong 2 Electricity Infills 5 10 Modimong 3 Water Water 5 10 Phache 1 Road Infrastructure Internal roads 5 10 Phache 2 Water Ext of standpipes 5 10 Phache 3 Housing Housing 5 10 Setlhabeng 1 Area Lighting High Mast Lights 5 10 Setlhabeng 2 Road Infrastructure Road 5 10 Setlhabeng 3 Water Water 5 11 Khibicwane 1 Water Water 5 11 Khibicwane 2 Road Infrastructure Road & Bridge 5 11 Khibicwane 3 Area Lighting High Mast Lights 5 11 Lokaleng 1 Water Standpipes 5 11 Lokaleng 2 Area Lighting High Mast Lights 5 11 Lokaleng 3 Road Infrastructure Roads 5 11 Lokaleng Ext/Machonisa 1 Area Lighting High Mast Lights

17 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 5 11 Lokaleng Ext/Machonisa 2 Road Infrastructure Roads 5 11 Lokaleng Ext/Machonisa 3 Water Water 5 12 Lethwanyeng 1 Water Water 5 12 Lethwanyeng 2 Road Infrastructure Road(Pavement) 5 12 Lethwanyeng 3 Ward Buildings Community Hall 5 12 Manokwane 1 Road Infrastructure Roads 5 12 Manokwane 2 Water Water 5 12 Manokwane 3 Ward Buildings Community Hall 5 12 Matolong 1 Road Infrastructure Roads & Storm Water 5 12 Matolong 2 Water Water(Ext of standpipes 5 12 Matolong 3 Housing Housing 5 12 Nhole 1 Road Infrastructure Roads 5 12 Nhole 2 Water Water 5 12 Nhole 3 Ward Buildings Community Hall 5 13 Blekkies 1 Water Water 5 13 Blekkies 2 Road Infrastructure Road Infrastructure 5 13 Blekkies 3 Housing Housing 5 13 Chiefscourt 1 Road Infrastructure Roads 5 13 Chiefscourt 2 Water Water 5 13 Chiefscourt 3 LED Job creation 5 13 Ditshilong 1 1 Road Infrastructure Roads 5 13 Ditshilong 1 2 Water Water 5 13 Ditshilong 1 3 LED LED 5 13 Ditshilong 2 1 Electricity Electricity/Ext 5 13 Ditshilong 2 2 Water Water reticulation 5 13 Ditshilong 2 3 Housing Housing 5 13 Kgatleng 1 Road Infrastructure Road from Baphuduhutswana to Church 5 13 Kgatleng 2 LED Job creation 5 13 Kgatleng 3 Sanitation Sanitation 5 13 Nommer 1 1 Water Water 5 13 Nommer 1 2 Road Infrastructure Roads 5 13 Nommer 1 3 Housing Housing T 13 Taung Ext 5 1 Water Water reticulation T 13 Taung Ext 5 2 Area Lighting High mast lights T 13 Taung Ext 5 3 Road Infrastructure Roads & Storm Water T 13 Taung Ext 6 1 Road Infrastructure Roads T 13 Taung Ext 6 3 T 13 Taung Ext 7 1 Water Water reticulation 5 13 Veertien 1 Road Infrastructure Roads 5 13 Veertien 2 Water Water 5 13 Veertien 3 LED LED 2 14 Kolong/Randstad 1 Ward Buildings Community Hall 2 14 Kolong/Randstad 2 Area Lighting High Mast Lights 2 14 Kolong/Randstad 3 Road Infrastructure Access road from Matharise 2 14 Makwating 2 Road Infrastructure Internal roads 2 14 Makwating 3 Housing Housing 2 14 Makwating 1 Area Lighting High Mast Lights 2 14 Manthe 1 Water Ext of standpipes 2 14 Manthe 2 Road Infrastructure Internal roads & Storm Water 2 14 Manthe 3 Safety & Security Police station 2 14 RDP Houses 1 Road Infrastructure Roads & Storm Water 2 14 RDP Houses 2 Area Lighting High Mast Lights 2 14 RDP Houses 3 LED LED 2 15 Khudutlou 1 Ward Buildings Community Hall 2 15 Khudutlou 2 Housing Housing 2 15 Khudutlou 3 Area Lighting High Mast Lights 2 15 Molelema 1 Road Infrastructure Paving 2 15 Molelema 2 Housing Housing

18 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 2 15 Molelema 3 Area Lighting High Mast Lights 2 16 Dikhuting 1 Water Water 2 16 Dikhuting 2 Road Infrastructure Roads 2 16 Dikhuting 3 LED Community Projects 2 16 GaMokake 3 LED Community Projects 2 16 GaMokake 1 Ward Buildings Community Hall 2 16 GaMokake 2 Road Infrastructure Roads 2 16 Graspan 1 Water Water 2 16 Graspan 2 Road Infrastructure Roads Infrastructure 2 16 Graspan 3 Ward Buildings Community Hall 2 16 Longaneng 2 Road Infrastructure Roads & Storm Water drainage 2 16 Longaneng 3 Recreation Sports facilities 2 16 Longaneng 1 Ward Buildings Community Hall 2 16 Magogong 1 Water Water 2 16 Magogong 2 Housing Housing 2 16 Magogong 3 Ward Buildings Community Hall 2 16 Morokweng 1 Ward Buildings Community Hall 2 16 Morokweng 2 Housing Housing 2 16 Morokweng 3 Road Infrastructure Roads & Storm Water 2 16 Mothanthanyaneng 1 Ward Buildings Community Hall 2 16 Mothanthanyaneng 2 Road Infrastructure Road from Manthe to Mothanthanyaneng 2 16 Mothanthanyaneng 3 Water Water(Ext of standpipes 2 16 Picong 1 Road Infrastructure Tar road from Mothanthanyaneng to Manthe 2 16 Picong 2 Water Water 2 16 Picong 3 Area Lighting High Mast Lights 4 17 Bogosieng Ext 1 Water Yard connections(Water) 4 17 Bogosieng Ext 2 Area Lighting High Mast Lights 4 17 Bogosieng Ext 3 Road Infrastructure Roads & Storm Water 4 17 Ga-Moduana 1 Ward Buildings Community Hall 4 17 Ga-Moduana 2 Road Infrastructure Roads & Storm Water 4 17 Ga-Moduana 3 Water Water 4 17 Magogong Clinic 1 Water Water 4 17 Magogong Clinic 2 LED LED 4 17 Magogong Clinic 3 Ward Buildings Community Hall 4 17 Magogong Roma 1 Ward Buildings Community Hall 4 17 Magogong Roma 2 Area Lighting High Mast Lights 4 17 Magogong Roma 3 Road Infrastructure Access road 4 17 Maphoitsile 1 Water Water 4 17 Maphoitsile 2 Health Health facilities(Nurses home 4 17 Maphoitsile 3 Area Lighting High Mast Lights 4 18 Dipitshing 1 Water Water 4 18 Dipitshing 2 Area Lighting High Mast Lights 4 18 Dipitshing 3 Housing Housing 4 18 Diplankeng 1 Road Infrastructure Sewerage 4 18 Diplankeng 2 Housing Housing 4 18 Diplankeng 3 Area Lighting High Mast Lights 4 18 Diplankeng Ext 1 1 Housing Housing 4 18 Diplankeng Ext 1 2 Water Water 4 18 Diplankeng Ext 1 3 Area Lighting High Mast Lights 4 18 Diplankeng Ext 2 1 Housing Housing 4 18 Diplankeng Ext 2 2 Water Water 4 18 Diplankeng Ext 2 3 Area Lighting High Mast Lights 4 18 Diplankeng Ext 3 1 Area Lighting High Mast Lights 4 18 Diplankeng Ext 3 2 Housing Housing 4 18 Diplankeng Ext 3 3 Water Water 4 18 Modutung 1 Water Water 4 18 Modutung 2 Housing Housing 4 18 Modutung 3 Road Infrastructure Storm Water &bridge

19 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 4 18 Sebatleng (Modutung) 1 Water Water 4 18 Sebatleng (Modutung) 2 Health Health Care 4 18 Sebatleng (Modutung) 3 Road Infrastructure Roads 1 19 Lower Majeakgoro 1 Area Lighting High Mast Lights 1 19 Lower Majeakgoro 2 Water Water 1 19 Lower Majeakgoro 3 Health Ext of Clinic 1 19 Upper Majeakgoro 1 Road Infrastructure Roads 1 19 Upper Majeakgoro 2 Area Lighting High Mast Lights 1 19 Upper Majeakgoro 3 Sanitation Sanitation at RDP 1 20 Ikageng 1 Road Infrastructure Road Infrastructure 1 20 Ikageng 2 Area Lighting Area lighting 1 20 Ikageng 3 Sanitation Sanitation 1 20 1 Water Water riticulation 1 20 Kameelputs 2 Ward Buildings Community Hall 1 20 Kameelputs 3 Area Lighting High Mast Lights 1 20 Kgomotso 1 Education Educational Facilities 1 20 Kgomotso 2 Water Water riticulation 1 20 Kgomotso 3 Ward Buildings Community Hall 1 20 Losasaneng 1 Water Water riticulation 1 20 Losasaneng 2 Education Educational facilities 1 20 Losasaneng 3 Area Lighting High Mast Lights 1 20 Madithamaga 1 Area Lighting High Mast Lights 1 20 Madithamaga 2 Health Health services 1 20 Madithamaga 3 Water Water riticulation 1 20 Thota-ya-tau 1 Ward Buildings Community Hall 1 20 Thota-ya-tau 2 Area Lighting Area lighting 1 20 Thota-ya-tau 3 Recreation Park 1 21 Rietfontein 1 Road Infrastructure Roads & Storm Water 1 21 Rietfontein 2 Area Lighting High Mast Lights 1 21 Rietfontein 3 Ward Buildings Community Hall 1 21 Sekhing 1 Area Lighting High Mast Lights 1 21 Sekhing 2 Road Infrastructure Roads & Storm Water 1 21 Sekhing 3 Education Library 1 21 Seoding 1 Housing Housing 1 21 Seoding 2 Area Lighting High Mast Lights 1 21 Seoding 3 Road Infrastructure Roads & Storm Water 1 22 Gataote 1 Road Infrastructure 5KM paving 1 22 Gataote 2 Area Lighting High Mast Lights 1 22 Gataote 3 Education Library 1 22 Madipelesa 1 Road Infrastructure Connector road from Madipelesa to Sekhing 1 22 Madipelesa 2 Area Lighting High Mast Lights 1 22 Madipelesa 3 Ward Buildings Community Hall 1 22 Mammutla 2 Water ext of stand pipes (Water) 1 22 Mammutla 1 Area Lighting High Mast Lights 1 22 Mammutla 3 Education Library 1 22 Shaleng 1 Road Infrastructure 3KM paving 1 22 Shaleng 2 Area Lighting High Mast Lights 1 22 Shaleng 3 Road Infrastructure Access road 2 23 Kokomeng 1 Housing Housing 2 23 Kokomeng 2 Area Lighting High Mast Lights 2 23 Kokomeng 3 Ward Buildings Community Hall 2 23 Matsheng 1 Area Lighting High Mast Lights 2 23 Matsheng 2 Water Ext of standpipes 2 23 Matsheng 3 Road Infrastructure Moseja access bridge 2 23 Tlapeng 1 1 Ward Buildings Community Hall 2 23 Tlapeng 1 2 Road Infrastructure Roads 2 23 Tlapeng 1 3 Water Ext of standpipes 2 23 Tlapeng 2 1 Road Infrastructure Roads(Paving)

20 GTLM - CBP PRIORITIES Prio Ward Village Sector Priority Input Received From Wards Nu 2 23 Tlapeng 2 2 Water Ext of standpipes 2 23 Tlapeng 2 3 Housing Housing 4 24 Itireleng 1 Road Infrastructure Roads & Storm Water 4 24 Itireleng 2 Area Lighting High Mast Lights 4 24 Itireleng 3 Ward Buildings Community Hall 4 24 Majaneng 1 Ward Buildings Community Hall 4 24 Majaneng 2 Road Infrastructure Access road 4 24 Majaneng 3 Area Lighting High Mast Lights 4 24 Mokasa 1 1 Road Infrastructure Roads Infrastructure 4 24 Mokasa 1 2 Ward Buildings Community Hall 4 24 Mokasa 1 3 Area Lighting High Mast Lights 4 24 Mokasa 2 1 Ward Buildings Community Hall 4 24 Mokasa 2 2 Area Lighting High Mast Lights 4 24 Mokasa 2 3 Road Infrastructure Access road 4 24 Mokgareng 1 Ward Buildings Community Hall 4 24 Mokgareng 2 Area Lighting High Mast Lights 4 24 Mokgareng 3 Road Infrastructure Roads & Storm Water 4 24 Takapori 1 Ward Buildings Community Hall 4 24 Takapori 2 Area Lighting High Mast Lights 4 24 Takapori 3 Road Infrastructure Roads

TOTAL LISTED 358

21

4. ANALYSIS OF THE STATUS QUO OF GTLM

The information in this section is an analysis of the Socio-Economic & Dynamic Demographic Profile of GTLM based on the latest available census data.

4.1. DYNAMIC DEMOGRAPHIC PROFILE OF GTLM

Locality of GTLM in the Northwest Province and Dr Ruth S Mompati DM:

Spatial Overview of GTLM:

22 Census Data:

The latest Census Data as gathered during 2011 and released during 2013; indicated that the GTLM population has declined from 214,765 to 177,642 people and now represents 38,3% of the district population.

Population distribution and density of GTLM:

The households have on the other hand increased from 42,953 to 48,454 meaning that the numbers of residents per household are now at 3.66 people per household. The Dr Ruth S Mompati DM population is currently standing at 463,815 people. The unemployment rate is currently estimated to be at 49.8%. The percentage of people residing in rural areas of GTLM is currently about 90%. The grading of the municipality is grade 3 for Councillors and Officials.

The Census Data was adjusted after the 2016 Community Survey and the following information was released that is relevant to GTLM:

23

The following Tables reflect the access to basic services released by STATSSA on the 16th August 2013 which can be used as a baseline for planning and performance measures:

Population Age Group Count Gender Count 00-04 20,303 Male 23,790 05-09 19,715 Female 22,378 10-14 17,295 Total 46,168 15-19 20,417

20-24 17,041 25-29 13,437 Gender Percentage 30-34 10,899 Male 52 35-39 7,612 Female 48 40-44 6,444 Total 100 45-49 6,185 50-54 5,574 55-59 5,356 60-64 4,987 Age of Household Head 65+ 12,563 Count Total 167,827 0-17 years 643 18 - 35 11,817

Population Age Group Percentage 36 - 64 22,901 00-04 12 65 + 10,808 05-09 12 Total 46,168 10-14 10 15-19 12 20-24 10 Age of Household Head 25-29 8 Percentage 30-34 6 0-17 years 1 35-39 5 18 - 35 26 40-44 4 36 - 64 50 45-49 4 65 + 23 50-54 3 Total 100 55-59 3 60-64 3 65+ 7 Total 100

Population Gender Count Male 77855 Female 89972 Total 167827

Population Gender Percentge Male 46 Female 54 Total 100

24

Highest level of Education Population Count Source of Drinking Water No schooling 31,741 (GTLM) Percentage Primary Education 62,264 Piped (tap) water inside the Secondary Education 48,384 dwelling/house 5.0 Grade 12/Standard 10/Form Piped (tap) water inside yard 12.0 5/Matric/NCV Level 4/ Occupational Piped water on community stand - certificate NQF Level 3 18,700 Distance Not Measured 77.0 N4-N6 800 Borehole in the yard 3.0 N1-N3 471 Rain-water tank in yard 0.0 Post Matric Qualifications 3,184 Neighbours tap 1.0 Certificate with less than Grade Water-carrier/tanker 1.0 12/Std 10 159 Borehole outside the yard 1.0 Other - Unspecified 2,124 Flowing water/stream/river 0.0 Total 167,827 Well 0.0

Spring 0.0 Highest level of Education Percentage Other 0.0 Total 100.0 No schooling 19

Primary Education 37 Secondary Education 29 Access to Electricity Grade 12/Standard 10/Form Count 5/Matric/NCV Level 4/ Occupational In-house conventional meter 1,828 certificate NQF Level 3 11 In-house prepaid meter 41,330 N4-N6 0 Connected to other source which N1-N3 0 household pays for (e.g. con 147 Post Matric Qualifications 2 Connected to other source which household is not paying for Certificate with less than Grade 60 12/Std 10 0 Generator 5 Other - Unspecified 1 Solar home system 6 Total 100 Battery - Other 54 No access to electricity 2,738 Total 46,168 Main Source of Drinking Water (GTLM) Count

Piped (tap) water inside the Access to Electricity Percentage dwelling/house 2,111 In-house conventional meter 4 Piped (tap) water inside yard 5,662 In-house prepaid meter 90 Piped water on community stand - Connected to other source which Distance Not Measured 35,371 household pays for (e.g. con 0 Borehole in the yard 1,476 Connected to other source which household is not paying for Rain-water tank in yard 28 0 Generator Neighbours tap 487 0 Solar home system Water-carrier/tanker 287 0 Battery Borehole outside the yard 391 - Other Flowing water/stream/river 77 0 No access to electricity Well 54 6 Total Spring 27 100 Other 197 Total 46,168

25

Energy for Cooking Count Energy for Heating Space Count Electricity from mains 38,816 Electricity from mains 26446 Other source of electricity (e.g. Other source of electricity (e.g. generator; generator; etc.) 11 etc.) 29 Gas 489 Gas 264 Paraffin 905 Paraffin 438 Wood 4,518 Wood 10,118 Coal 18 Coal 44 Animal dung 13 Animal dung 25 Solar - Solar 18 Other 87 Other 585 None 1,311 None 8,169 Unspecified - Unspecified 33 Total 46168 Total 46,168

Energy for Cooking Percentage Energy for Heating Space Percentage Electricity from mains 84 Electricity from mains 57 Other source of electricity (e.g. Other source of electricity (e.g. generator; generator; etc.) 0 etc.) 0 Gas 1 Gas 1 Paraffin 2 Paraffin 1 Wood 10 Wood 22 Coal 0 Coal 0 Animal dung 0 Animal dung 0 Solar - Solar 0 Other 0 Other 1 None 3 None 18 Unspecified - Unspecified 0 Total 100 Total 100

Energy for Lighting Count Electricity from mains 42,806 Other source of electricity (e.g. generator; etc.) 52 Gas 20 Paraffin 296 Candles 2,701 Solar 13 Other 52 None 200 Unspecified 28 Total 46,168

Energy for Lighting Percentage Electricity from mains 93 Other source of electricity (e.g. generator; etc.) 0 Gas 0 Paraffin 1 Candles 6 Solar 0 Other 0 None 0 Unspecified 0 Total 100 26

Type of Toilet Facility Count Refuse Removal Count Flush toilet connected to a public Removed by local authority/private sewerage system 3,663 company/community members at least once Flush toilet connected to a septic tank or a week 2,389 conservancy tank 452 Removed by local authority/private Chemical toilet 350 company/community members less often than once a week 272 Pit latrine/toilet with ventilation pipe 31,194 Communal refuse dump Pit latrine/toilet without ventilation pipe 7,186 1,183 Ecological toilet (e.g. urine diversion; Communal container/central collection point enviroloo; etc.) 34 50 Own refuse dump Bucket toilet (collected by municipality) - 39,972 Dump or leave rubbish anywhere (no Bucket toilet (emptied by household) 34 rubbish disposal) 1,920 Other 170 Other 381 None 3,086 Total 46,168 Total 46,168

Type of Toilet Facility Percentage Refuse Removal Percentage Flush toilet connected to a public Removed by local authority/private sewerage system 8 company/community members at least once Flush toilet connected to a septic tank or a week 5 conservancy tank 1 Removed by local authority/private Chemical toilet 1 company/community members less often than once a week Pit latrine/toilet with ventilation pipe 68 1 Communal refuse dump Pit latrine/toilet without ventilation pipe 16 3 Ecological toilet (e.g. urine diversion; Communal container/central collection point enviroloo; etc.) 0 0 Own refuse dump Bucket toilet (collected by municipality) - 87 Bucket toilet (emptied by household) 0 Dump or leave rubbish anywhere (no rubbish disposal) 4 Other 0 Other 1 None 7 Total 100 Total 100

27

Type of Dwelling Count Difficulty Facing Municipality Count Formal dwelling/house or Lack of safe and reliable water supply 9,571 brick/concrete block structure on a 39,904 Cost of water 1,056 Traditional dwelling/hut/structure Lack of reliable electricity supply 1,278 made of traditional mater 1,730 Cost of electricity 2,479 Flat or apartment in a block of flats 18 Inadequate sanitation/sewerage/toilet Cluster house in complex - services 1,297 Townhouse (semi-detached house Inadequate refuse/waste removal 82 in a complex) 17 Inadequate housing 2,270 Semi-detached house 146 Inadequate roads 7,267 Formal dwelling/house/flat/room in Inadequate street lights backyard 1,375 2,083 Lack of/inadequate employment Informal dwelling/shack in backyard 1,215 opportunities 12,246 Informal dwelling/shack not in Lack of/inadequate educational backyard (e.g. in an informal 922 facilities 361 Room/flatlet on a property or larger Violence and crime dwelling/servants quart 240 1,412 Drug abuse Caravan/tent 21 395 Alcohol abuse Other 569 304 Gangsterism Unspecified 11 46 Total 46,168 Lack of/inadequate parks and recreational area 100

Type of Dwelling Lack of/inadequate healthcare services Percentage 1,327 Formal dwelling/house or Lack of/inadequate public transport 344 brick/concrete block structure on a 86 Corruption 279 Traditional dwelling/hut/structure Other made of traditional mater 4 483 None Flat or apartment in a block of flats 0 1,490 Unspecified Cluster house in complex - - Townhouse (semi-detached house Total 46,168 in a complex) 0 Semi-detached house 0 Formal dwelling/house/flat/room in backyard 3 Informal dwelling/shack in backyard 3 Informal dwelling/shack not in backyard (e.g. in an informal 2 Room/flatlet on a property or larger dwelling/servants quart 1 Caravan/tent 0 Other 1 Unspecified 0 Total 100

28 The following Tables reflect the Population Group and Gender by Age released by STATSSA on the 16th August 2017:

Age Black African Coloured Indian or Asian Male Female Total Male Female Total Male Female Total

0 - 4 11342 11145 22487 100 99 199 10 12 22 5 - 9 10646 10556 21203 85 82 168 7 6 13 10 - 14 10004 9248 19252 81 89 170 10 3 13 15 - 19 10108 9547 19656 94 78 172 12 7 20 20 - 24 7120 7558 14678 74 87 160 47 8 55 25 - 29 4958 6379 11337 59 80 139 86 9 96 30 - 34 4142 5383 9525 50 67 118 65 5 69 35 - 39 3578 5090 8668 46 61 107 47 3 51 40 - 44 3317 4462 7779 36 38 75 20 0 20 45 - 49 3210 4258 7468 45 54 99 15 3 18 50 - 54 3156 3824 6981 42 52 94 3 9 12 55 - 59 2690 3519 6210 41 44 84 4 0 4 60 - 64 2448 3130 5578 28 27 55 5 5 10 65 - 69 2027 2750 4778 19 25 44 0 0 0 70 - 74 1406 2127 3533 20 12 33 0 0 0 75 - 79 930 1582 2512 11 13 23 0 0 0 80 - 84 521 959 1480 7 10 17 0 0 0 85+ 421 964 1384 5 7 12 0 0 0 Total 82026 92480 174506 843 927 1770 332 71 402

White Other Total

Male Female Total Male Female Total Male Female Total

0 - 4 16 22 39 7 13 20 11476 11291 22767 5 - 9 11 14 25 5 4 9 10755 10662 21416 10 - 14 8 21 29 0 3 3 10103 9365 19468 15 - 19 31 3 34 8 8 16 10254 9644 19898 20 - 24 18 14 33 29 9 39 7288 7676 14964 25 - 29 30 11 41 47 11 59 5181 6490 11671 30 - 34 10 17 27 26 6 31 4293 5477 9770 35 - 39 32 17 49 18 5 22 3720 5176 8896 40 - 44 24 19 44 17 0 17 3414 4520 7934 45 - 49 26 21 47 5 3 8 3301 4339 7640 50 - 54 28 27 56 0 3 3 3230 3916 7146 55 - 59 23 32 55 7 4 11 2765 3599 6364 60 - 64 33 32 65 3 0 3 2518 3194 5712 65 - 69 29 28 56 0 5 5 2075 2808 4883 70 - 74 19 24 43 4 0 4 1449 2164 3613 75 - 79 19 14 33 3 0 3 962 1608 2571 80 - 84 5 9 13 0 0 0 533 978 1510 85+ 4 6 10 0 3 3 429 979 1409 Total 368 333 700 179 76 255 83748 93886 177633

29 The following Tables reflect the Population Group and Gender by Employment released by STATSSA on the 16th August 2017:

Black Indian or Coloured White Other Total African Asian Employed

Male 8315 174 237 172 131 9028 Female 7223 100 12 76 25 7436 Total 15538 273 249 248 155 16464 Unemployed

Male 7666 54 11 6 3 7741 Female 8451 78 7 18 9 8563 Total 16118 132 18 24 12 16303 Discouraged work-seeker

Male 5422 70 0 6 5 5504 Female 7179 78 3 10 0 7270 Total 12601 149 3 16 5 12774 Other not economically active

Male 23324 217 55 72 24 23693 Female 30297 333 26 91 17 30763 Total 53621 550 82 163 41 54456

30 Spatial Representation of Basic Service Backlog:

First priority Road Infrastructure Issues identified in the CBP:

31 Corridors identified in the SDF that need to be supported by good road infrastructure:

Spatial Representation of Housing Infrastructure Backlog:

32 Spatial Representation of Electricity Infrastructure Backlog:

Spatial Representation of Water Infrastructure Backlog:

Spatial Representation of Sanitation Infrastructure Backlog:

33

Spatial Representation of Refuse Removal Backlog:

Spatial Representation of Access to Schools:

34

35

5. OBJECTIVES AND STRATEGIES

5.1. GTLM - POWERS AND FUNCTIONS

Powers and functions of municipalities

The Constitution contains two main sections for dealing with the powers and functions of municipalities, namely section 156 and 229. Section 156 reflects the powers and functions of municipalities whilst section 229 contains Municipal fiscal powers and functions. It must be borne in mind that the Constitution sits at the top of the legislative hierarchy; consequently no national or provincial legislation may contain provisions which conflict with those contained within the Constitution.

Section 156 of the Constitution states the following: (1) A municipality has executive authority in respect of, and has the right to administer (a) the local government matters listed in Part B of Schedule 4 and Part B of Schedule 5; and (b) any other matter assigned to it by national or provincial legislation. (2) A municipality may make and administer by-laws for the effective administration of the matters which it has the right to administer. (3) Subject to section 151(4), a by-law that conflicts with national or provincial legislation is invalid. If there is a conflict between a bylaw and national or provincial legislation that is inoperative because of a conflict referred to in section 149, the by- law must be regarded as valid for as long as that legislation is inoperative. (4) The national government and provincial governments must assign to a municipality, by agreement and subject to any conditions, the administration of a matter listed in Part A of Schedule 4 or Part A of Schedule 5 which necessarily relates to local government, if (a) that matter would most effectively be administered locally; and (b) the municipality has the capacity to administer it. (5) A municipality has the right to exercise any power concerning a matter reasonably necessary for, or incidental to, the effective performance of its functions.

36

The 2011/12 capacity assessment was the first to be conducted according to the new model.

Key Features of the New Model

New approach to understanding capacity and its implications for adjustments. Updated means of data collection through a web-based data collection system, supported by telephonic engagement. Provision of value-added feedback to municipalities to enable better planning and budgeting. Open resource on capacity available to the local government sector. A deeper, more rigorous qualitative engagement in 20% of municipalities where adjustments are being considered.

Purpose of new model

 To provide a strategic data resource on local government capacity to inform policy, planning and decision-making;  To provide municipalities with an analysis of their own capacity and performance while comparing it to peers and those in similar contexts. This will be an invaluable resource to all municipalities ensuring better planning and resourcing;  To provide data for future assessments of local government powers and functions;  To extend the scope of the assessments to include Metropolitan Municipalities.

Municipalities are categorized as follows:

 Category A: A municipality that has exclusive municipal executive and legislative authority in its area (Metropolitan municipality).  Category B: A municipality that shares municipal executive and legislative  authority in its area with a category C municipality within whose area it falls  (Local Municipality).  Category C: A municipality that has municipal executive and legislative authority in an area that includes more than one municipality (District Municipality).

37

The powers and functions allocated to local government in terms of the Constitution section 156(1)(a) are as follows:

According to the Municipal Demarcation Board based on Section 156 of the Constitution and Section 84 of the Municipal Structures Act the following functions were assigned to Dr Ruth S Mompati District Municipality and Greater Taung Local Municipality.

Done Responsible Function Nu Function Definition By GTLM Comment Assigned GTLM Department Any change in the quality of the air that adversely affects human health or well- LM/DM Personnel Budget 1 Air Pollution No Na being or the ecosystems useful to mankind, now or in the future. Function Limitations Beaches means the area for recreational opportunities and facilities along the sea shore available for public use and any other aspect in this regard which falls Amusement Facilities outside the competence of the national and provincial government. Local Personnel Budget 2 No Na (34. Public Places) Amusement facilities means a public place for entertainment. Function Limitations The management, maintenance and control of any land or facility owned by the municipality for public use The display of written or visual descriptive material, any sign or symbol or light that is not intended solely for illumination or as a warning against danger which: promotes the sale and / or encourages the use of goods and services found in: o streets Billboards & Display of o roads Local 3 Advertisements in o throughfares Yes SP&HS Function Public Places o sanitary passages o squares or open spaces and or o private property The above definition excludes any aspect that may be covered by provincial or national legislation. The regulation, through by-laws, and legislated building regulations, of any temporary or permanent structure attached to, or to be attached to, the soil within the area of jurisdiction of a municipality, which must at least provide for: Enforcement of o Approval of building plans, Local 4 Building Regulations Yes SP&HS National Building o Building inspections, Function Regulations o Issue of completion certificates, and Control of operations and enforcement of contraventions of building regulations if not already provided for in national and provincial legislation. The establishment, conduct and control of facilities for the purpose of disposing of human and animal remains. In addition, in relation to the district municipality, it means: Cemeteries, Funeral Community The establishment, conduct and control of cemeteries and crematoria serving the Local 5 Parlours and Yes Social area of a major proportion of municipalities in the district. Function Crematoria Services And in relation to the local municipality, it means: The establishment, conduct and control of cemeteries and crematoria serving the area of the local municipality only. Ensuring a safe and healthy environment within facilities not included in national Local Personnel Budget 6 Child Care Facilities No Na and provincial legislation pertaining to child care facilities. Function Limitations Community The cleaning of public streets, roads and other public spaces either manually or Local 7 Cleansing Yes Social mechanically. Function Services The regulation, control and monitoring of any activity, condition or thing that may Control of Public adversely affect a person or a community Local 8 Yes SP&HS Nuisances The control and monitoring of any noise that adversely affects human health or Function well-being or the ecosystems useful to mankind, now or in the future The control of undertakings that sell liquor to the public that is permitted to do so in Control of Undertakings terms of provincial legislation, regulation and licenses, and includes an inspection Local Personnel Budget 9 that Sell Liquor to the No Na service to monitor liquor outlets for compliance to license requirements in as far as Function Limitations Public such control and regulation are not covered by provincial legislation The provision of and/or the regulation, control and monitoring of facilities which Facilities for the provide accommodation and care for well or sick animals and the burial or Local Personnel Budget 10 Accommodation, Care No Na cremation of animals, including monitoring of adherence to any standards and Function Limitations and Burial of Animals registration requirements outlined in legislation. Fencing and fences means ensuring the provision and maintenance and/or Local Personnel Budget 11 Fencing and Fences regulation of any boundary or deterrents to animals and pedestrians along streets No ? Function Limitations or roads Any function not included in the definition applicable to a district municipality, Personnel Budget including fighting and extinguishing of all fires; the rescue and protection of any LM/DM Limitations 12 Fire Fighting Service No ? person, animal or property in emergency situations not covered by other legislation Function Assigned to The or powers and functions. DM

38 Done Responsible Function Nu Function Definition By GTLM Comment Assigned GTLM Department Municipal Planning means the compilation and implementation of an integrated development plan in terms of the Systems Act. Additionally in relation to the district municipality “municipal planning” means: Integrated development planning for the district as a whole, including a framework Integrated (IDP) Local Municipal 13 for integrated development plans of all municipalities in the area of the district Yes Municipal Planning Function Manager municipality. Additionally in relation to the local municipality “municipal planning” means: Integrated development planning for the local municipality in accordance with the framework for integrated development plans prepared by the district municipality Levying of fees for Local 14 Services Provided by Yes Finance Function LM Levying of Rates on Local 15 Yes Finance Property Function Levying of Surcharges on Fees for Services Local 16 Yes Finance Provided for or on Function behalf of the LM Ensuring the quality and the maintenance of food safety and hygiene related environmental health standards through regulation, a issuance of a certificate of acceptability and monitoring of any place that renders in the course of any Licensing and control of commercial transaction the supply/handling of food intended for human Local Personnel Budget 17 undertakings that sell No Na consumption. Implement policy and regulations 'as provided for and prescribed in Function Limitations food to the public terms of the Foodstuffs, Cosmetics and Disinfectants Act, 1972 (Act 54 of 1972) and the Health Act, 1977 (Act 63 of 1977), including the relevant regulations published under the mentioned Acts. The control over the number and health status of dogs through a licensing Local Is the Function 18 Licensing of Dogs No Na mechanism Function Still Relevant? The provision, manage, preserve and maintenance of any municipal place, land, and building reserved for the protection of places or objects of scenic, natural, Community Local 19 Local Amenities historical and cultural value or interest and the provision and control of any such or Yes Social Function other facility for public use but excludes such places, land or buildings falling within Services competencies of national and provincial governments. The construction, maintenance, and control of a road which the public has the right to and includes, in addition to the roadway the land of which the road consists or over which the road extends and anything on that land forming part of, connected Local Roads and with, or belonging to the road. Local Infrastructure 20 Yes Streets In relation to a district municipality it also means: Function Development Municipal roads which form an integral part of a road transport system for the area of the district municipality as a whole. In relation to a local municipality it also means a street in a built-up area. Community The provision, management and/or control of any sport facility within the municipal Local 21 Local Sport Facilities Yes Social area. Function Services Fresh Produce Markets means: The establishment, operation, management, conduct, regulation and control of markets restricted to the selling of fresh products, vegetables, fruit, flowers, fish and meat. Markets means: The establishment, operation, management, conduct, regulation and/or control of markets other than fresh produce markets including market permits, location, Local No capacity at 22 Local Markets Yes LED times, conduct etc. Function Local Level (i) In relation to a District Municipality it also means: The establishment, conduct and control of fresh produce markets serving the area of a major proportion of the municipalities in the district (ii) In relation to a Local Municipality it also means: The establishment, conduct and control of fresh produce markets serving the local municipality area only Municipal abattoirs means The establishment, conduct and/or control of facilities for the slaughtering of livestock and poultry (iii) In relation to a District Municipality it also means: LM/DM 23 Municipal Abattoirs The establishment, conduct and control of abattoirs serving the area of a major No Na Done by DM Function proportion of the municipalities in the district (iv) In relation to a Local Municipality it also means: The establishment, conduct and control of abattoirs serving the local municipality area only Municipal airport means a demarcated area on land or water or a building which is used or intended to be used, either wholly or in part, for the arrival or departure of aircraft which includes the establishment and maintenance of such facility including all infrastructure and services associated with an airport, and the regulation and control of the facility, but excludes airports falling within the competence of national LM/DM Infrastructure Maintenance of 24 Municipal Airports Yes and provincial governments Function Development the Airstrip. Additionally, in relation to the district it is a “municipal airport” serving the area of the district municipality as a whole. In relation to the local municipality it is a “municipal airport” serving the area of the local municipality only. 39 Done Responsible Function Nu Function Definition By GTLM Comment Assigned GTLM Department According to the Minmec resolution in July 2002: Municipal Health Services to be defined as environmental health services, as defined in the latest draft of the National Health Bill, namely: for the protection, promotion and maintenance of human health, potable water quality monitoring, food control, waste management, control of premises, communicable disease control, vector control, environmental pollution control, disposal of the dead, chemical safety and noise control but excluding port health, malaria control and control of hazardous substances. This definition of municipal health service includes aspects of at least the following Schedule 4 Part B and Schedule 5 Part B functions: o Air pollution Personnel Budget Municipal Health LM/DM 25 o Noise pollution No Na Limitations, No Service Function o Solid waste removal and & disposal Infrastructure o Water and sanitation o Licensing and control of undertakings that sell food to the public o Control of public nuisances o Facilities for the accommodation, care and burial of animals In order for the above definition of municipal health services to be enforceable, an amendment to at least the Municipal Structures Act will be required. The Minister for Provincial and Local Government has published regulations in the Government Gazette on 3 January 2003 for the municipal health services function, which will come into affect on 1 July 2004. In the interim, the MECs have made adjustments for the some of the functions listed above. The provision, management, control and maintenance of any land, gardens or Community Municipal Parks & Local 26 facility set aside for recreation, sightseeing and/or tourism and includes Yes Social Recreation Function playgrounds but excludes sport facilities Services Development and implementation of a town planning scheme or land use management scheme for the municipality including administration of development Municipal Planning Local 27 applications in terms of special consents and rezonings. Yes SP&HS (Town Planning) Function It may therefore be advisable to establish integrated development planning and municipal planning as two separate functions. In relation to the local municipality: The regulation and control, and where applicable, the provision of: . Services for the carriage of passengers, whether scheduled or unscheduled, Personnel Budget operated on demand along a specific route or routes or, where applicable, within a Municipal Public LM/DM Limitations, No 28 particular area No Na Transport Function Fleet or . Scheduled services for the carriage of passengers, owned and operated by Infrastructure the municipality, on specific routes In relation to the district means: The regulation of passenger transport services. Municipal Public Works LM/DM Personnel Budget 29 relating to any Function No Na Function Limitations of the LM The control and monitoring of any noise that adversely affects human health or LM/DM Personnel Budget 30 Noise Pollution No Na well-being or the ecosystems useful to mankind, now or in the future Function Limitations Pontoons, Ferries, Pontoons, ferries, jetties, piers and harbours, excluding the regulation of LM/DM Not applicable to 31 Jetties, Piers & international and national shipping and matter related thereto, and matters falling Na Na Function GTLM Harbours within the competence of national and provincial governments The provision, management, maintenance and control of any area or facility set Community LM/DM 32 Pounds aside by the municipality for the securing of any animal or object confiscated by Yes Social Function the municipality in terms of its by-laws. Services The promotion, marketing and, if applicable, the development, of any tourist attraction within the area of the municipality with a view to attract tourists; to ensure access, and municipal services to such attractions, and to regulate, Promotion of Local Local Assigned to the 33 structure and control the tourism industry in the municipal area subject to any Yes LED Tourism for the Area Function DM provincial and national legislation, and without affecting the competencies of national/provincial government pertaining to “nature conservation”, “museums”, “libraries” and “provincial cultural matters”. Amusement facilities means a public place for entertainment Community Local 34 Public Places The management, maintenance and control of any land or facility owned by the Yes Social Function municipality for public use. Services

40 Done Responsible Function Nu Function Definition By GTLM Comment Assigned GTLM Department “Refuse removal, refuse dumps and solid waste disposal” Refuse removal, refuse dumps and solid waste disposal means the removal of any household or other waste and the disposal of such waste in an area, space or facility established for such purpose, and includes the provision, maintenance and control of any infrastructure or facility to ensure a clean and healthy environment for the inhabitants of a municipality (v) In relation to the District municipality it means: Solid waste disposal sites, in so far as it relates to- Refuse Removal, (i) the determination of a waste disposal strategy for the district as a whole; Community Refuse Dumps and (ii) the regulation of waste disposal strategy for the district as a whole; Local 35 Yes Social Solid Waste Disposal (iii) the establishment, operation and control of waste disposal sites, bulk waste Function Services Sites transfer facilities and waste disposal facilities for more than one local municipality in the district. In relation to the Local Municipality it means: (i) The determination of a waste disposal strategy for the local municipality only (ii) The regulation of local waste disposal for the local municipality only (iii) The collection and removal of waste and transporting to a local waste disposal site, bulk transfer facility and district waste disposal site The establishment, operation and control of waste disposal sites, bulkwaste transfer facilities and waste disposal facilities for the local municipality only The establishment or procurement, where appropriate, operation, management and regulation of a potable water supply system, including the services and infrastructure required for the regulation of water conservation, purification, reticulation and distribution; bulk supply to local supply points, metering, tariffs Retail Potable Water setting and debt collection; and provision of appropriate education so as to ensure GTLM is supply systems and reliable supply of a sufficient quantity and quality of water and effective water use maintaining the domestic waste-water amongst end-users, including informal households, to support life and personal Local Infrastructure 36 Yes service in areas as and sewerage disposal hygiene. Function Development before systems serving the “Domestic waste-water and sewage disposal systems” means amalgamation. area of the municipality The establishment or procurement, where appropriate,, provision, operation, management, maintenance and regulation of a system, including infrastructure, for the collection, removal, disposal and/or purification of human excreta and domestic waste-water to ensure minimum standard of services necessary for safe and hygienic households Bulk supply of electricity, which includes for the purposes of such supply, the transmission, distribution and, where applicable, the generation of electricity, and GTLM is rendering Retail Supply of also the regulation, control and maintenance of the electricity reticulation network, Local Infrastructure 37 Yes the service in Electricity and Gas tariff policies, monitoring of the operation of the facilities for adherence to Function Development licensed areas. standards and registration requirements, and any other matter pertaining to the provision of electricity in the municipal areas. GTLM is rendering LM/DM Infrastructure 38 Street Lighting The provision and maintenance of lighting for the illuminating of streets Yes the service in Function Development licensed areas. The control, regulation and monitoring of the selling of goods and services along a Local 39 Street Trading public pavement, road reserve and other public places but excluding the following: Yes SP&HS Function Fresh produces markets as defined above. Storm Water Local Infrastructure 40 Management in Build The management of systems to deal with storm water in built-up areas. Yes Function Development Areas The regulation of any area facility and/or activity related to the trading of goods and Local 41 Trading Regulations services within the municipal area not already being regulated by national and Yes SP&HS Function provincial legislation The management and regulation of traffic and parking within the area of the municipality including but not limited to, the control over operating speed of Local Personnel Budget 42 Traffic and Parking No Na vehicles on municipal roads but excluding any provincial competences as specified Function Limitations in legislation.

41

5.2. VISION, MISSION & VALUES

The following Vision, Mission and Values were adopted by the 3rd generation of council and were not amended by the 4th term of council:

VISION

A PROSPEROUS COMMUNITY THAT IS SOCIALLY, CULTURALLY AND ECONOMICALLY SUSTAINABLE ------“MORAFE O O ATLEGILENG O O BOTSALANO O O IPELANG KA SETSO LE MORUO O O TSEPAMENG” ------‘N WELVARENDE GEMEENSKAP WAT SOSIAAL, KULTUREEL EN EKONOMIES VOLHOUBAAR IS

MISSION

INITIATING AND PROMOTING SUSTAINABLE SOCIO-ECONOMIC GROWTH THAT IS ACCESSIBLE TO DEVELOPMENT THROUGH AGRICULTURE, HERITAGE AND MINING

VALUES

BOTHO / CONSULTATION / TRANSPARENCY / ACCOUNTABILITY / INTEGRITY / PROFESSIONALISM

42 5.1. STRATEGIC PLANNING SESSION

Inserted in the pages here-after is an executive summary of the outcome of the Strategic Planning Session that was held from the 19th to the 21st of February which took into consideration past performance, the Auditor General Report as well as the planned initiatives of all departments:

43

GREATER TAUNG LOCAL MUNICIPALITY STRATEGIC PLANNING SESSION

REPORT

TAUNG HOTEL SCHOOL 19 -21 FEBRUARY 2018

44 GREATER TAUNG LOCAL MUNICIPALITY STRATEGIC PLANNING SESSION REPORT 1. Introduction The purpose of the strategic planning session was to reposition the Greater Taung Local Municipality in order to maximise the efficiency, effectiveness and impact of the Municipal Council both within the municipality as well as the entire district. Greater Taung Local Municipality convened a Strategic Planning Session on the 19th ,20th and 21st of February 2018. The session was attended by members of the political leadership (His Worship the Mayor, the Honourable Speaker, the Honourable Chief Whip, all Councillors), the Municipal Manager, Representative from the Dr Ruth Segomotsi Mompati District Municipality, Representative from Provincial Local Government & Human Settlement,representative from Eskom, Rural Environmental Agricultural Development, Directors and Managers of the municipality. The key success criterion to this strategic re-positioning is an organisational form that will enable the GTLM to deliver on its strategy and mandate. In addition the strategic planning process came at an opportune time as there have been significant changes in the administrative leadership of the municipality. Municipal Manager, Director Corporate Service and Community Service has recently been appointed. The municipality is still having challenge of recruiting the most suitable candidates for the position of the director technical service and land and human settlement which had been vacant for a long time. These vacancies have had some negative impact in the administration of the programmes of the Municipality. It is against this background that the leadership of GTLM has embarked upon a process to review their current strategic framework to curve a new way forward for the Municipality. The purpose of the strategic session was to reposition the Greater Taung Local Municipality in order to maximise the efficiency, effectiveness and impact of the Municipal Council both within the municipality as well as the North West Province

2. OBJECTIVES OF THE STRATEGIC PLANNING SESSION The objectives of the strategic planning session were thus as follows:  To conduct an assessment of the current state and performance of the municipality;  To develop strategies to attain the proposed outcomes and indicators in the IDP and SDBIP;  To develop a perspective of the imperatives driving the need for repositioning;

45  To align the strategies to the perspective based on the balanced scorecard that will be used to monitor and evaluate the performance of the municipality on achieving the desired outcomes and indicators  To present to councillors inputs made by various department for budget adjustment  To review the municipal organogram to ensure alignment with the IDP

3. OUTPUTS OF THE SESSION

The political and the administration leadership of the municipality agreed from the onset that the following should be the outputs of the strategic session:  A reviewed Service Delivery and Budget Implementation Plan that has Specific, Measurable Achievable, Realistic and Time bound indicators.  2017/18 adjustment budget that will address service delivery priorities of the current financial year  Pivotal inputs on the organogram that will necessitate review thereof  Draft departmental plans for 2018/19  Sector plans for 2018/19

4. STRATEGIC POINTS OF DEPARTURE

4.1 Executive Mayor’s Input The Honorable Mayor, N Motlhabane, opened the workshop and addressed the participants. Outlined below are some of the key points and highlights of the speech:  Local government is and will remain the implementing agent of government’s transformation and delivery programs.  We need to push good values of the organisation to our employees.  We need to introduce change that is founded on good principles and culture  To realize this vision, municipalities are encouraged to build local democracy by developing strategies and mechanisms to continuously engage with citizens, business and community groups.  Achieving positive results is preceded by developing a sound plan which takes into account all the merits and demerits of pursuing the set objectives.  Ensure that all our policies and by-laws strengthen our capacity to manage this municipality  Development of the program of action which will guide implementation by various programs and ensures that their programs are synergiesed with the municipal broad strategies 46  Strategy is about understanding the linkages between issues and identifying the key drivers and points of leverage. As Councillors, we are defined as Architects since we have to set and develop the vision for our municipality. Managers, as Builders, have to ensure that the vision set is realised.

4.2 Context and Workshop Programme The Municipal Manager, Mr. K. Gabanakgosi, presented the context of the Strategic Planning Session to the delegates. Outlined below are the key components of his message: As background and context he referenced:  Poverty and Unemployment are a challenge  Revenue Collection remains a challenge  Incompetence, staff ill-discipline, and commitment is apparent  There are opportunities in i.e. tourism, mining, agriculture  More issues to be presented by other presenters

Outlined below are some of the key points and highlights of the presentation:  The outcomes that needs to be achieved by the end of the workshop;  Need for collective thinking to ensure that delegates reach consensus;  Without an appropriate structure that supports the strategy of the organisation, the Municipality has little chance of achieving its medium and long term objectives  Motivated Staff are critical to achieving acceptable performance. A function performance management system that rewards good behavior is central to improving staff morale and attitude

5. Brief Organisational performance analysis 5.1 Organisational Level of Performance There is a need to put more efforts in the current performance plans that will develop the municipality in the areas of agriculture, heritage, tourism and mining.

5.2 The Process Level of Performance . Some departments are well on track towards the attainment of their planned outputs by the end of the financial year 2017/18; whilst others are well behind. The example in point is the department of Community Services. . Process performance should be supported by an aligned organogram to achieve desired outputs. Our realisation is that in most departments there are no permanently filled positions; this reality of acting has got a tendency to create high levels of Organisational anxiety. This can potentially undermine performance.

47 . Deliberate effort has to be taken to align all department’s organograms to what the respective departments want to achieve through their planned processes. We recommend the review of the organisation’s organogram as a whole. . GTLM is a municipality that serves on land that is owned by traditional leadership. The relationship with this critical stakeholder, Traditional Leadership is vital for the successful implementation of the municipality’s projects.

48 Detailed recommendations indicating the department, the issue, and the resolution, by whom and by when are attached as annexure A:

Department or Section Issues Raised Strat Plan Resolutions Responsible Person Deadline

Sector Department

Eskom Eskom in its presentation indicated An urgent meeting between all Manager : Political 28 February 2018 that they are not going to electrify councillors, chiefs and headman of the office houses that are built on illegal stands. affected areas/villages to address haphazard allocation of stands. invitation also be extended to Eskom and Rural Development Department

Local Government & Human Housing delivery progress report not Arrange an urgent meeting with Manager : Housing April 2018 Settlement specific to ward. The department has department of Local Government and not responded to the Disaster report Human Settlement in an endeavor to that was submitted in 2016 address housing issues such as: Emergency housing programmes, incomplete housing projects, accreditation.

Rural Development No issue No resolution N/a N/a

DR Ruth Segomotsi Mompati Councillors expressed their The district must be invited again to Director : Community May 2018 DM disappointment in respect of the come and present a clear disaster Service presentation as the expectation was management plan for GTLM very high

49

ANNEXURE A: STRATEGIC PLAN – PROGRAMME OF ACTION Department or Section Issues Raised Strat Plan Resolutions Responsible Person Deadline KPA 1: Basic Service Delivery and Infrastructure Development Infrastructure Development Slow gravelling programme Services: Roads and Stormwater Roads and Stormwater Access roads should not only be constructed Department will source additional Manager : Roads & June 2018 in Pudumoe and Reivilio. funding to augment EPWP budget in an Stormwater, Municipal Implementation of projects that are not endeavor to intensify construction of Manager from the IDP internal paved roads. Selection of roads will be based on the IDP. ( Five roads will be constructed in 2018/19) Infrastructure Development Implementation of projects that are not The department to consolidate service Acting Director May 2018 Services from the IDP delivery report based on the IDP and make submission at the next council meeting. KPA 1: Basic Service Delivery and Infrastructure Development Community Service Department : Renovations of new halls Renovation of Dryharts hall to be PMU & Director : March 2018 Social Amenities advertised within two weeks. community Service Social Amenities More money spent on extension 6 park whilst there is no security Disaster management Construction of shacks All shacks to be constructed in a Disaster Officer On going central place Community Service Staff is misplaced Audit of staff Director June 2018 Community Service The municipality does not have the capacity To recruit an environmentalist once Director & MM September to address all environmental issues raised by the position of a manager become 2018 the AG vacant in June Community Service Low staff morale in the said department The director to come up with a Director June 2018 strategy or a plan to boost morale of employees in the department. KPA 1: Basic Service Delivery and Infrastructure Development

50 ANNEXURE A: STRATEGIC PLAN – PROGRAMME OF ACTION Department or Section Issues Raised Strat Plan Resolutions Responsible Person Deadline Land Use & Human Settlement Township establishment is only for RDP Municipal Manager investigate the Municipal Manager and September Department houses nothing is planned by the possibility of establishing a proper Director – Land Use 2018 municipality for housing development that township which will cater for the could cater the middle/ working class in working class and also allocate budget Taung to execute the strategy Land Use & Human Settlement Department to conduct an audit of all Manager: Housing May 2018 Department Public Works properties in town and extension 7. A report be submitted to council in that regard Land Use & Human Settlement The department of housing is very slow on Department to furnish council with a Manager: Housing May 2018 Department implementing housing projects in Taung comprehensive report on housing backlog in GTLM. Land Use & Human Settlement Public works building that are not use Establishment of ad hoc committee of Municipal Manager April 2018 Department council to deal with buildings that belong to public works to investigate the possibility of the public works transferred to the municipality and the MM to be the convener for operational activities. KPA 2: Municipal Transformation & Institutional Development Corporate Service Ward committee secretaries are not able to Department to speed up the process of Manager – June 2018 execute their administrative responsibilities procuring laptops forward ward administration due to lack of tools of trade such as laptops. committee secretaries Training Councillors should only be provided Skills Development On going with relevant training intervention. Facilitator Training Some councillors are not conversant with Department to speed up training of Skills Development June 2018 Microsoft office package councillors on basic computer literacy Facilitator

KPA 3: Municipal Financial Viability and Administration

51 ANNEXURE A: STRATEGIC PLAN – PROGRAMME OF ACTION Department or Section Issues Raised Strat Plan Resolutions Responsible Person Deadline Finance Department The municipality’s audit outcome is not Diagnosis report of why the CFO May 2018 improving municipality is not getting clean audit be compiled by the CFO and submitted to council Revenue Section A full report on leasing of municipal Revenue manager May 2018 stalls be submitted to councillors Revenue Section Revenue base of the municipality: clear Establishment of a Unit that will focus Municipal Manager June 2018 indication/ intension to increase revenue by on free basic and indigents increasing indigent on the indigent register Finance No official in finance department is capable Restructuring of budget and revenue Municipal Manager September of compiling Financial Statement section and recruitment of a qualified 2018 chartered accountant who has specialized in compilation of Annual Financial Statement Finance No segregation of duties between salary Segregate function of salary payroll Municipal Manager & July 2018 payroll and budget office. Instruction from budget office and allow HR to Director : Corporate regarding salaries, overtime, and leave done provide valid instructions ito salaries, Service by budget office. overtime and leave Good Governance and Public Participation Office of the Municipal Manager : GTLM is not getting any joy from the District The municipality to establish its own Chief Internal Auditor June 2018 audit committee shared services and the AG audit committee before the beginning Internal Audit in his report also indicated that the audit of the 2018/19 financial year committee is not effective. Internal Audit Position of internal Auditor is not captured The position of Internal Audit Officer Director Corporate June 2018 correctly on the organogram be amended to internal auditor during service the review of the organogram. Communication The unit is operating with only two The position of the Graphic Designer Manager June 2018 permanent employees and interns and communication officer be Communication and budgeted and filled. MM Communication Loud hailer be procured for Ward Communication June 2018 committee to assist the municipality Manager with loud hailing and the ward councillor will lead

52 ANNEXURE A: STRATEGIC PLAN – PROGRAMME OF ACTION Department or Section Issues Raised Strat Plan Resolutions Responsible Person Deadline Information Technology High office telephone bill IT should monitor usage of office IT Manager Ongoing telephones and compile reports that will be submitted to relevant department. Controls should also be in place. KPA 3: Local Economic Development Local Economic Development Establishment of Agency A workshop on the establishment of LED Manager & MM March 2018 the agency to be held in a month and NWDC will provide technical support in that regard. All relevant stakeholders will also be invited.

53

DEPARTMENTS INPUTS ON THE REVIEW OF THE ORGANOGRAM Department or Section Current position status Proposed new vacancies Decision taken Deadline Technical Service Department 2 technician positions PMU structure be reviewed to No decision taken N/a Project Management Unit filled include (PMU) one (1) position of technician Roads & Stormwater • 2 x TLB/Roller operator – frozen • Create one (1) post of TLB/Roller No decision taken N/a • 1 x Excavator operator –frozen operator. Funds to be sourced • 1 x Lowbed driver – frozen from the savings of Foreman post • 2x Tipper truck driver – frozen at Reivilo unit). • Unfreeze 1 x excavator operator, position be budgeted and filled • Unfreeze 1 x Lowbed driver. Position be budgeted and filled • Unfreeze 2 x Tipper Truck driver. Position be budgeted and filled Water and Sanitation Reivilo No decision taken N/a 2 x General workers ( 1Store keeper and 1x General worker Taung 2 x General worker (Drivers) Honey Sucker: with the intention of servicing Ba GaMaidi, Ba GaMothibi and Ba GaPhuduhutswana without hindrance Flatbed driver Electricity unit 1 Electrician and 2 Electrician aides (all It is proposed that the one position No decision taken N/a filled) of an electrician aide be revised to that of a data capturer /admin assistant.

54 DEPARTMENTS INPUTS ON THE REVIEW OF THE ORGANOGRAM Department or Section Current position status Proposed new vacancies Decision taken Deadline Fleet management Unit All position filled except 1 vacant None Fleet manager June 2018 position of Manager position be filled ASAP

Conclusion . Maintenance budget not utilised fully and going forward managers and directors should increase spending on maintenance budget to avoid penalties by treasury . “We cannot solve today’s problems with the same level of thinking that created the problems in the first place” (Albert Einstein). . We need to do things differently if we want different solutions. We must change our paradigm to focus on serving the people and not extractive elites. . The core services that local government provides - clean drinking water, sanitation, electricity, shelter, waste removal and roads - are basic human rights, essential components of the right to dignity enshrined in our Constitution and Bill of Rights.

55

5.2. STRATEGIC OBJECTIVES

It is important to note that the National and Provincial Strategic Development initiatives were included in the original 5 year plan and were there-for not repeated in this review, due to the fact that it is still relevant in the current local government environment.

Local Objectives were developed for GTLM that is relevant for the 5 year period, 2017 to 2022.

These local objectives will be relevant for the entire 5 year period and was reviewed at the Strategic Planning Session that was held from the 19th to 22nd of February 2018.

The following table reflects the current local objectives as well as the additions and/or amendments to the objectives:

The main purpose of this section is to inform the Service Delivery and Budget Implementation Plan and must be used by directors to draft their SDBIPs.

The following table contains the Strategic Objectives that will inform the SDBIPs of directorates.

Strategic Objective - Cross Cutting to Relevant Departments National & Municipal KPA and Units Create an environment that promotes development of local Local Economic 1 economy & facilitate job creation Development Local Economic 2 Create an organised and safe environment for street traders Development Infrastructure Eradicate backlogs in order to improve access to services 3 Development & Service and ensure proper operations and maintenance Delivery Infrastructure To maintain a reliable ICT Infrastructure and render effective 4 Development & Service end-user support Delivery Infrastructure Improve library infrastructure & services that reflect the 5 Development & Service specific needs of the communities they serve. Delivery Good Governance & 6 Improve organisational cohesion effectiveness Public Participation Infrastructure Improve staff capacity at libraries to respond appropriately 7 Development & Service to community knowledge & information needs Delivery Infrastructure 8 Improve the culture of reading Development & Service Delivery Good Governance & 9 Promote a culture of participatory & good governance Public Participation Infrastructure Promote and align environmental management with spatial 10 Development & Service development plans Delivery

56 Strategic Objective - Cross Cutting to Relevant Departments National & Municipal KPA and Units Infrastructure 11 Promote compliance with National Building regulations Development & Service Delivery Infrastructure 12 Promote integrated human settlements Development & Service Delivery Infrastructure 13 Promoting security of land tenure. Development & Service Delivery To facilitate regular flow of information between GTLM and its Good Governance & 14 internal and external stakeholders Public Participation To improve overall financial management in the municipality Municipal Finance 15 by developing & implementing appropriate systems & Viability & Management controls To initiate and maintain mutually beneficial relationships with Good Governance & 16 local, regional and national media. Public Participation Infrastructure To maintain and Control public amenities and areas to 17 Development & Service promote a safe and healthy environment Delivery To promote GTLM as a Municipal Brand which strives for Good Governance & 18 Excellence (to Internal and External Stakeholders). Public Participation Infrastructure To coordinate all disaster related incidents within the 19 Development & Service jurisdiction of the municipality. Delivery Infrastructure To accelerate waste removal by providing households with 20 Development & Service weekly waste removal in formal areas Delivery Infrastructure To provide education and awareness on waste 21 Development & Service management issues Delivery To provide agricultural support services to farmers in order to Local Economic 22 ensure sustainable development and management of Development agricultural resources To create healthy and prosperous rural communities with viable alternatives to subsistence farming. Facilitate and empower the farming households and communities to Local Economic 23 benefit from new opportunities being created from growth in Development demand for agricultural commodities and expanding markets for high-values products in local, district and regional markets. To promote and unlock tourism development potential in Local Economic 24 order to ensure that Greater Taung is a preferred tourism Development destination To promote heritage and cultural activities in Greater Taung Local Economic 25 through events Development To develop the value chain approach in the poverty Local Economic 26 alleviation projects and to establish the socio-economic Development viability of the industry in GTLM and secure external market

57

6. INTEGRATED PROGRAMMES

6.1. INTRODUCTION TO INTEGRATED PROGRAMMES

This section covers the Integrated Plans and Programmes. It is not practically possible to include all the documentation of the integrated programmes into the IDP content and there for the IDP will refer to these documents were relevant.

To ensure a focussed approach towards project implementation and improvement on service delivery it was important to deal with each of the following sectors in detail in the form of an integrated plan/programme.

Usually integrated plans or programmes are plans that will inform the priorities for development within a specific sector and will also align to relevant sectors that it will depend on or will have an impact on when it is implemented.

It has become crucial not to look at integrated plans only as plans but also to consider its strategic value in development and there for it was important from a strategic point of view to include (integrate) the section of integrated plans and programmes under this section of the IDP which deal with strategies.

Notice must also be taken that these programmes are dynamic by nature which means that it might be reviewed or are still in the process of being reviewed.

58

6.2. SUMMARY - STATUS OF INTEGRATED PROGRAMMES

Integration Phase Document Status Action Financial Cluster Budget Summary Completed Five Year Capital Completed Investment Programme Institutional Cluster Organizational Structure Reviewed at StratPlan 19 to 21 Feb 2018 Employment Equity Plan In Place Workplace Skills Plan In Place Health and Safety Plan In Place Employee Wellness In Place Programme Spatial Perspective Spatial Development Approved – In Place 31 Oct 2016 – Res No 99/2016 Framework (SDF) Focus on implementation Land Use Management Approved – In Place 31 Oct 2016 – Res No 99/2016 Scheme Focus on implementation Environmental Approved – In Place 31 Oct 2016 – Res No 99/2016 Management Plan and Focus on implementation Programme Taung Precinct Plan Approved – In Place 31 Oct 2016 – Res No 99/2016 Focus on implementation Infrastructure Cluster Water Services In Place District Function Development Plan Requested from DM IDP Manager Waste Management In the Process, District Function Plan Draft Submitted to Requested from DM IDP Exco Manager Transport Plan In Process of Review Done at Provincial Level Social Cluster Poverty Reduction and Outstanding Gender Equity Plan Disaster Management Reviewed District Function Plan In Place Review done locally HIV/AIDS Plan and Outstanding Programme Housing Sector Plan Stopped by Provincial Provincial Project Department Economic Cluster GTLM LED Strategy Old Strategy In Place

59

6.3. INSTITUTIONAL CLUSTER

The Department (Corporate Services) complied with the prescripts of the legislations which compels the municipality to conduct the investigations and compile reports and submit those reports to various National Departments for compliance. Accordingly, the reports were conduct on the (i) employment equity status (EEA, 55 of 1998), (ii) harzadous incidents (OHS, 85 of 1993), and (iii) the training interventions (SDAA, 37 of 1993) respectively. The Department presented the items before the Portfolio Committee and the EXCO, it will subsequently be submitted before the Council as scheduled 23rd May 2018.

The availability of office space, congestion in offices as well as the lack of proper council facilities impacts negatively on the productivity of officials and councillors.

The current office space is as follows:

 Admin Office = 745 sqm  Political Office = 385 sqm  Lease Office = 205 sqm

A survey was done taking into account the institutional profile and organizational structure of GTLM which concluded that the required office space is 5,010 sqm, but if the institutional growth of the past 5 years as well as future demand is concerned this figure need to be adjusted.

The following Table reflects the buildings that are used by GTLM for daily operations:

Nu Map Nu Building Name Nu of Users GPS Coordinates 1 T1 Taung Admin 74 -27.56167, 24.74730 2 T2 Taung Political 21 -27.55982, 24.74795 3 T3 Taung Library 3 -27.55824, 24.75019 4 T4 Taung Training Centre 4 -27.55780, 24.75023 5 T5 Katlego Lease Building (Private) -27.56092, 24.74497

6 T6 Taung Shed (Private) 1 -27.56192, 24.74436 7 P1 Pudimoe Admin 6 -27.41028, 24.72039 8 P2 Pudimoe Library 3 -27.41038, 24.71993 9 P3 Dryharts Container Library 1 -27.33416, 24.71956 10 R1 Reivilo Admin 8 -27.56313, 24.18228 11 R2 Boipelo Library 1 -27.56621, 24.19237 12 R3 Reivilo Workshop (Private) 3 -27.57496, 24.18633 13 R4 Reivilo Infrastructure Works 1 -27.56936, 24.18479 14 TC1 Losasaneng - Thusong Service Centre 2 -28.02545, 24.53190 15 TC2 Mokassa II - Thusong Service Centre 2 -27.60958, 24.66936 16 TC3 Moretele - Thusong Service Centre 2 -27.31956, 24.69376 17 TC4 Longaneng - Thusong Service Centre 2 -27.62678, 24.94648 18 TC5 Kokomeng - Thusong Service Centre 2 -27.63181, 25.03971 19 WO1 Kolong – Ward Office 2 -27.53902, 24.82845

60

A Map Reflecting GTLM Office Buildings:

61

6.3.1.ORGANIZATIONAL STRUCTURE

The Organogram was reviewed in order to keep up with changing Local Government environment and was aligned with the IDP to ensure improvement on service delivery and implementation of the IDP Objectives and Outputs.

The Organizational Structure was reviewed to that need to be performed by the municipality.

GTLM did adopt a salary structure and a Skills Retention Policy that can enable the municipality to retain and attract skilled personnel to build capacity at the municipality.

The new posts (structure) will be amended as soon as a council resolution has been formulated after the meeting that was planned for the 23rd of May 2018, it was also recommended that the a Library Assistant be added to the Library Unit that will be paid through the provincial grant.

6.3.2.GTLM - DEPARTMENTS

The GTLM consist of six main departments. The Municipal Manager does have a department on its own with different units that report directly to the Municipal Manager.

The breakdown of the departments are included in the IDP and is there for approved as part of the IDP and will be applicable for the duration of the 5 year IDP unless it is reviewed and approved by Council during the annual review process.

GREATER TAUNG LM - ORGANIZATIONAL STRUCTURE MAIN STRUCTURE UNDER MUNICIPAL MANAGER

MUNICIPAL MANAGER

DIRECTOR DIRECTOR DIRECTOR DIRECTOR CORPORATE DIRECTOR COMMUNITY IFRASTRUCTURE SPATIAL PLANNING & FINANCE SERVICES SOCIAL SERVICES DEVELOPMENT HUMAN SETTLEMENT (CFO)

REFER TO DEPARTMENT REFER TO DEPARTMENT REFER TO DEPARTMENT REFER TO DEPARTMENT REFER TO DEPARTMENT REFER TO DEPARTMENT INFRASTRUCTURE SPATIAL PLANNING & COMMUNITY SOCIAL CORPORATE SERVICES FINANCIAL SERVICES MUNICIPAL MANAGER DEVELOPMENT HUMAN SETTLEMENT SERVICES

62

6.3.3.DEPARTMENT – MUNICIPAL MANAGER

GTLM GTLM GTLM MM MUNICIPAL MANAGER MM PMS & MM SUPPORT LOCAL ECONOMIC DEVELOPMENT INTERNAL AUDIT

MANAGER IN THE OFFICE OF PMS MANAGER LED MANAGER CHIEF INTERNAL AUDIT THE MM

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

AGRICULTURAL RURAL DEV SECRETARY PMS COORDINATOR LED COORDINATOR AUDIT OFFICER COORDINATOR

BUDGET ACTING BUDGET FILLED BUDGET VACANT BUDGET FILLED NO BUDGET FROZEN

AGRICULTURAL RURAL DEV LED OFFICER OFFICER

BUDGET VACANT NO BUDGET FROZEN

GTLM GTLM MUNICIPAL MANAGER MUNICIPAL MANAGER MEDIA, COMMUNICATIONS & MARKETING ICT

MEDIA COMMUNICATION MUNICIPAL INFO SYSTEMS MANAGER SECURITY MANAGER

BUDGET FILLED BUDGET ACTING

COMMUNICATION OFFICER ICT TECHNICIAN ICT TECHNICIAN

NO BUDGET FROZEN BUDGET VACANT BUDGET FILLED

REIVILO CUSTOMER CARE TAUNG CUSTOMER CARE PUDIMOE CUSTOMER CARE ICT TECHNICIAN COORDINATOR COORDINATOR COORDINATOR

BUDGET ACTING NO BUDGET FROZEN NO BUDGET FROZEN BUDGET FILLED

GRAPHIC DESIGNER PHOTOGRAPHER (MEDIA)

NO BUDGET FROZEN BUDGET FILLED

Subject to Council Resolution and Ammendment

63

6.3.4.DEPARTMENT – CORPORATE SERVICES

GTLM GTLM GTLM GTLM GTLM CORPORATE SERVICES CORPORATE SERVICES CORPORATE SERVICES CORPORATE SERVICES CORP SERVICES SUPPORT STAFF HUMAN RESOURCE LEGAL SECTION SECRETARIAL SERVICES ARCHIVES

ADMIN & COUNCIL SECRETARIAL ADMIN & COUNCIL SECRETARIAL MPAC RECEARCHER MANAGER HR & TRAINING MANAGER LEGAL SERVICE SERVICES MANAGER SERVICES MANAGER

BUDGET FILLED BUDGET FILLED BUDGET FILLED

MPAC COORDINATOR SKILLS DEV & EEP FACILITATOR SALARY/HR CLERK LEGAL OFFICER COUNCILLOR SUPPORT OFFICER ARCHIVE & RECORDS OFFICER

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

DEPARTMENTAL & PORTFOLIO SAFETY OFFICER LABOUR RELATIONS OFFICER SENIOR COMMITTEE OFFICER ARCHIVE & RECORDS CLERK SECRETARY (OH&S)

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET ACTING BUDGET FILLED

ADMIN ASSISTANT EAP COORDINATOR ADMIN ASSISTANT ARCHIVE & RECORDS CLERK

BUDGET FILLED NO BUDGET FROZEN NO BUDGET FROZEN NO BUDGET FROZEN

GTLM CORPORATE SERVICES CORPORATE SUPPORT

ADMIN & COUNCIL SECRETARIAL SERVICES MANAGER

BUDGET FILLED

SWITHBOARD / RECEPTIONIST CLEANER TAUNG LIBRARY & CLEANER PUDIMOE ADMIN DRIVERS / MESSENGER CLEANER REIVILO CLEANER TAUNG ADMIN OFFICE CLEANER POLITICAL OFFICE TAUNG ADMIN OFF TRAINING CENTRE OFFICE

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

SWITHBOARD / RECEPTIONIST CLEANER PUDIMOE ADMIN DRIVERS / MESSENGER CLEANER REIVILO CLEANER TAUNG ADMIN OFFICE CLEANER TAUNG LIBRARY CLEANER LEASE OFFICE POLITICAL OFF OFFICE

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

DRIVERS / MESSENGER CLEANER TAUNG ADMIN OFFICE CLEANER TAUNG LIBRARY CLEANER LEASE OFFICE CLEANER PUDIMOE LIBRARY

BUDGET ACTING BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

64

6.3.5.DEPARTMENT – INFRASTRUCTURE DEVELOPMENT

GTLM GTLM GTLM GTLM INFRASTRUCTURE INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT DEVELOPMENT SUPPORT STAFF REIVILO - MUNICIPAL WORKS TAUNG - MUNICIPAL WORKS PUDIMOE - MUNICIPAL WORKS

SECRETARY MANAGER MUNICIPAL WORKS

BUDGET FILLED BUDGET FILLED

FOREMAN MUN WORKS REIVILO FOREMAN MUN WORKS TAUNG FOREMAN MUN WORKS PUDIMOE

BUDGET FILLED BUDGET FILLED BUDGET FILLED

TEAM LEADER TEAM LEADER TEAM LEADER

BUDGET FILLED BUDGET FILLED BUDGET FILLED

DRIVER DRIVER DRIVER DRIVER DRIVER DRIVER

BUDGET FILLED NO BUDGET FROOZEN BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

GENERAL GENERAL GENERAL GENERAL GENERAL GENERAL X4 X4 X5 X6 X5 X4 WORKER WORKER WORKER WORKER WORKER WORKER BUDGET FILLED X4 BUDGET FILLED X4 BUDGET FILLED X5 BUDGET FILLED X6 BUDGET FILLED X5 BUDGET FILLED X4

GTLM GTLM GTLM INFRASTRUCTURE DEV INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEV REIVILO - WATER & SANITATION TAUNG - WATER & SANITATION PUDIMOE - WATER & SANITATION

MANAGER WATER & SANITATION

BUDGET FILLED

FOREMAN WATER & SANITATION FOREMAN WATER & SANITATION REIVILO TAUNG & PUDIMOE

BUDGET FILLED BUDGET FILLED

TEAM LEADER PLUMBER HONEY SUCKER DRIVER TEAM LEADER PLUMBER TEAM LEADER PLUMBER

BUDGET FILLED BUDGET ACTING BUDGET FILLED BUDGET FILLED

GENERAL DRIVER DRIVER HONEY SUCKER DRIVER HONEY SUCKER DRIVER X5 DRIVER DRIVER WORKER

BUDGET FILLED BUDGET FILLED BUDGET FILLED NO BUDGET FROZEN BUDGET FILLED X5 BUDGET FILLED BUDGET ACTING

GENERAL GENERAL GENERAL GENERAL X4 X4 X3 X3 WORKER WORKER WORKER WORKER BUDGET FILLED X4 BUDGET FILLED X4 BUDGET FILLED X3 BUDGET FILLED X3

GTLM GTLM GTLM INFRASTRUCTURE INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT WORKSHOP PMU ELECTRICITY

MANAGER MECHANICAL PMU MANAGER MANAGER ELECTRICAL SERVICES WORKSHOP BUDGET ACTING BUDGET FILLED NO BUDGET FROZEN

SENIOR ELECTRICIAN SENIOR ELECTRICIAN MECH WORKSHOP MECHANICAL WORKSHOP MECHANICAL WORKSHOP PMU TECHNICIAN (RED SEAL) (RED SEAL) PLANNER (ADMIN) ARTISAN ARTISAN HIGH VOLTAGE HIGH VOLTAGE BUDGET ACTING BUDGET VACANT BUDGET VACANT BUDGET FILLED BUDGET VACANT BUDGET FILLED

MECHANICAL WORKSHOP MECHANICAL WORKSHOP MECHANICAL WORKSHOP WORKSHOP DRIVER PMU TECHNICIAN ELECTRICIAN ASSISTANT ELECTRICIAN ASSISTANT ARTISAN AID ARTISAN AID ARTISAN AID

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

WORKSHOP DRIVER DATA & EPWP OFFICER

BUDGET FILLED BUDGET ACTING

65 GTLM INFRASTRUCTURE DEVELOPMENT PLANT OPERATORS

MANAGER MUNICIPAL WORKS

TEAM LEADER FUTURE PLANT GRADER / LOW BED OPERATOR (ROAD CONSTRUCTION) BUDGET FILLED

EXCAVATOR OPERATOR GRADER / LOW BED OPERATOR GRADER / LOW BED OPERATOR GRADER / LOW BED OPERATOR

NO BUDGET FROZEN BUDGET FILLED BUDGET FILLED

DRIVER TIPPER TRUCK OPERATOR TIPPER TRUCK OPERATOR TIPPER TRUCK OPERATOR

BUDGET FILLED BUDGET FILLED NO BUDGET FROZEN

TIPPER TRUCK OPERATOR TIPPER TRUCK OPERATOR TIPPER TRUCK OPERATOR

NO BUDGET FROZEN NO BUDGET FROZEN

WATER TRUCK DRIVER WATER TRUCK DRIVER WATER TRUCK DRIVER

BUDGET FILLED NO BUDGET FROZEN

TLB OPERATOR TLB OPERATOR TLB OPERATOR

BUDGET ACTING NO BUDGET FROZEN

ROLLER OPERATOR ROLLER OPERATOR ROLLER OPERATOR

BUDGET ACTING NO BUDGET FROZEN

WORKS TEAM WORKS TEAM WORKS TEAM

66

6.3.6.DEPARTMENT – SPATIAL PLANNING & HUMAN SETTLEMENT

GTLM GTLM INFRASTRUCTURE DIRECTOR SP&HS SUPPORT STAFF HUMAN SETTLEMENT

` ADMIN ASSISTANT HUMAN SETTLEMENT MANAGER

BUDGET FILLED BUDGET FILLED

SENIOR HOUSING OFFICER SENIOR ADMIN OFFICER

BUDGET FILLED BUDGET FILLED

ADMIN CLERK HOUSING ADMIN CLERK HOUSING (REIVILO) (PUDIMOE) NO BUDGET FROZEN NO BUDGET FROZEN

GTLM GTLM DIRECTOR SP&HS DIR SPATIAL PLANNING & HUMAN SETTLEMENT BUILDING INSPECTORATE SPATIAL DEVELOPMENT

SPATIAL DEVELOPMENT MANAGER (IDP) BUDGET FILLED

CHIEF BUILDING INSPECTOR IDP COORDINATOR TOWN PLANNER TOWN PLANNER

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

BUILDING INSPECTOR BUILDING INSPECTOR

BUDGET FILLED NO BUDGET FROZEN

67

6.3.7.DEPARTMENT – FINANCE

GTLM GTLM GTLM FINANCIAL SERVICES FINANCIAL SERVICES FINANCIAL SERVICES

SUPPORT STAFF SUPPLY CHAIN MANAGEMENT EXPENDITURE MANAGEMENT

MANAGER SUPPLY CHAIN SECRETARY RELEVANT MANAGER MANAGER EXPENDITURE MANAGEMENT

BUDGET FILLED BUDGET FILLED BUDGET FILLED

INTERN 1 INTERN 2 SCM - PROCUREMENT OFFICER LOGISTICS OFFICER ACCOUNTANT EXPENDITURE PAYROLL ACCOUNTANT

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

INTERN 3 INTERN 4 PROCUREMENT CLERK PROCUREMENT CLERK CREDITORS CLERK CREDITORS CLERK

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

INTERN 5 INTERN 6

BUDGET VACANT BUDGET VACANT

` INTERN 7

BUDGET VACANT

GTLM GTLM GTLM FINANCIAL SERVICES FINANCIAL SERVICES FINANCIAL SERVICES

ASSET MANAGEMENT BUDGET & TREASURY REVENUE MANAGEMENT

MANAGER ASSET MANAGEMENT MANAGER BUDGET & TREASURY MANAGER REVENUE

BUDGET FILLED BUDGET FILLED BUDGET FILLED

ACCOUNTANT ASSETS ACCOUNTANT ASSETS ACCOUNTANT REVENUE ACCOUNTANT REVENUE BUDGET ACCOUNTANT BUDGET ACCOUNTANT (INFRASTRUCTURE) (MOVABLE) TAUNG & PUDIMOE REIVILO

BUDGET FILLED NO BUDGET FROZEN BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

REPORTING & COMPLIANCE SNR CLERK REVENUE RATES & ASSET MANAGEMENT CLERK DISPOSAL OFFICER FINANCIAL CLERK REIVILO FINANCIAL CLERK REIVILO OFFICER TAXES

BUDGET FILLED BUDGET FILLED NO BUDGET FROZEN BUDGET FILLED BUDGET FILLED BUDGET FILLED

ASSET MANAGEMENT CLERK FINANCIAL CLERK PUDIMOE FINANCIAL CLERK PUDIMOE

BUDGET FILLED BUDGET VACANT BUDGET FILLED

FINANCIAL CLERK TAUNG FINANCIAL CLERK TAUNG FINANCIAL CLERK TAUNG FINANCIAL CLERK TAUNG

BUDGET VACANT BUDGET FILLED BUDGET FILLED BUDGET FILLED

68

6.3.8.DEPARTMENT – COMMUNITY SOCIAL SERVICES

GTLM GTLM COMMUNITY SOCIAL COMMUNITY SOCIAL SERVICES SERVICES SUPPORT STAFF REIVILO - SOLID WASTE

SECRETARY ENVIRONMENTAL MANAGER

BUDGET FILLED BUDGET FILLED

DISASTER COORDINATOR FOREMAN REIVILO

BUDGET FILLED BUDGET FILLED

DRIVER DRIVER TLB OPERATOR

BUDGET FILLED BUDGET FILLED NO BUDGET FROZEN

GENERAL GENERAL X2 X4 WORKER WORKER

BUDGET FILLED X2 BUDGET FILLED X6

69

GTLM

COMMUNITY SOCIAL SERVICES

TAUNG - SOLID WASTE

ENVIRONMENTAL MANAGER

FOREMAN TAUNG

BUDGET FILLED

TLB OPERATOR DRIVER DRIVER DRIVER DRIVER DRIVER DRIVER

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

GENERAL GENERAL GENERAL GENERAL TIPPER TRUCK DRIVER X4 X4 X4 X4 WORKER WORKER WORKER WORKER

BUDGET FILLED BUDGET FILLED X3 BUDGET FILLED X4 BUDGET FILLED X4 NO BUDGET FILLED X0

GENERAL X1 WORKER

BUDGET FILLED X1

GTLM GTLM GTLM GTLM

COMMUNITY SOCIAL SERVICES COMMUNITY SOCIAL SERV COMMUNITY SOCIAL COMMUNITY SOCIAL TAUNG - PARKS & PUDIMOE - PARKS & PUDIMOE - SOLID WASTE REIVILO - PARKS & CEMETRIES CEMETERIES CEMETERIES

ENVIRONMENTAL MANAGER

FOREMAN PUDIMOE HORTICULTURIST

BUDGET FILLED BUDGET FILLED

CARETAKER / GREENKEEPER / CARETAKER / GREENKEEPER / DRIVER DRIVER DRIVER DRIVER DRIVER DRIVER DRIVER

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

GENERAL GENERAL GENERAL GENERAL GENERAL GENERAL GENERAL X4 X4 X3 X4 X3 X4 X2 WORKER WORKER WORKER WORKER WORKER WORKER WORKER

BUDGET FILLED X4 BUDGET FILLED X4 BUDGET FILLED X3 BUDGET FILLED X2 BUDGET FILLED X1 BUDGET FILLED X4 BUDGET FILLED X2

70

GTLM GTLM

COMMUNITY SOCIAL SERVICES COMMUNITY SOCIAL SERVICES

LIBRARIES COUNCIL BUILDINGS, SPORT, ARTS, CULTURE

MANAGER SOCIAL AMENITIES, CHIEF LIBRARIAN ARTS & CULTURE

BUDGET FILLED BUDGET FILLED

GENERAL WORKER LIBRARIAN TAUNG LIBRARIAN PUDIMOE LIBRARIAN REIVILO LIBRARIAN BOIPELO DRIVER MAINTENANCE X2 SPORTS DEVELOPMENT OFFICER COMHALL REIVILO BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED X2 NO BUDGET FROZEN

ASSISTANT LIBRARIAN LIBRARY ASSISTANT GENERAL GENERAL WORKER COMHALL LIBRARY ASSISTANT (REIVILO) LIBRARY ASSISTANT (BOIPELO) X2 (TAUNG) (PUDIMOE) WORKER TAUNG

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED X2 BUDGET FILLED

LIBRARY ASSISTANT GENERAL WORKER COMHALL LIBRARY ASSISTANT (TAUNG) LIBRARY ASSISTANT (REIVILO) (PUDIMOE) PUDIMOE

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

LIBRARY ASSISTANT GENERAL LIBRARY ASSISTANT REIVILO X3 (PUDIMOE) WORKER TSC

BUDGET FILLED BUDGET FILLED BUDGET FILLED X3

6.3.9.POLITICAL OFFICE

GTLM - POLITICAL OFFICE BEARERS

MAYOR COUNCIL WHIP SPEAKER

MANAGER POLITICAL OFFICE

BUDGET FILLED

PA TO MAYOR PA TO CHIEF WHIP PA TO SPEAKER

BUDGET FILLED BUDGET FILLED BUDGET FILLED

COMMUNITY PROGRAMMES COORDINATOR OF WARD FUNCTIONALITY WARD FUNCTIONALITY DRIVER OF MAYOR DEVELOPMENT DRIVER OF SPEAKER CHIEF WHIP COORDINATOR COORDINATOR COORDINATOR BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

YOUTH & SPECIAL PROJECT CDW 1 CDW 2 CDW 3 CDW 4 CDW 5 CDW 6 OFFICER BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

SOCIAL PROGRAM OFFICER CDW 7 CDW 8 CDW 9 CDW 10 CDW 11 CDW 12

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

CDW 13 CDW 14 CDW 15 CDW 16 CDW 17 CDW 18

BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

CDW 19 CDW 20 CDW 21 CDW 22 CDW 23 CDW 24 BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED BUDGET FILLED

71 6.3.10. POLICIES ADOPTED BY GTLM

Name of Policy Status Res No SALGBC COLLECTIVE 1 Grievance Policy Active AGREEMENT 2016 2 Placement Policy Active 60/2008 3 Employment Equity Policy Active 28/2012 4 Induction Policy Active 28/2012 5 Cell Phone Policy Active 28/2012 6 Overtime Policy Active 28/2012 7 Training Policy Active 28/2012 8 Leave Policy Active 28/2012 9 H I V Policy Active 60/2008 10 Medical Policy Active 60/2008 11 Promotion And Transfer Policy Active 28/2012 12 Recruitment And Selection Policy Active 28/2012 13 S And T Policy Active 2016 14 Volunteer And Internship Policy Active 28/2012 15 Employee Assistance Policy Active 28/2012 16 Skills Retention Policy Active 28/2012 17 Health And Safety Policy Active 28/2012 18 Essential Services Policy Active 60/2008 19 Acting Policy Active 28/2012 20 Motor Vehicle Scheme Policy Active 60/2008 21 Bursary Policy Active 28/2012 22 Sexual Harassment Policy Active 28/2012 23 Human Resource Strategy Active National document 2014 SALGBC COLLECTIVE 24 Conditions Of Service Active AGREEMENT 2012 25 Job Evaluation Policy Active 28/2012 SALGBC COLLECTIVE 26 Main Collective Agreement Active AGREEMENT 2016 2012 As per Systems act 27 Code Of Conduct Active section 69 28 Employment Equity Plan Active 2014 29 Human Resources Plan Active 2016 30 Workplace Skills Plan Active 2016 31 Councillor Funeral [Policy Active 2015 32 Fraud Prevention Policy Active 2012 33 Fraud Prevention Strategy And Plan Active 2016 34 Establishment Of Ward Committees Active 2008 35 Corporate Governance Of ICT Policy Framework Active 2016 36 Server Security Baseline Policy Active 2016 37 User Account Management Policy Active 2016 38 Password Management Policy Active 2016 39 Electronic Funds Transfer Policy Active 2016 40 IT End User Back Up Policy Active 2016 41 Sever Backup Policy Active 2016 42 Disaster Recovery Plan Active 2016 43 SCM Policy Active 2016 44 Tariff Policy Active 2016 45 Credit Control And Indigent Policy Active 2016 46 Investment Policy Active 2016 47 Virement Policy Active 2016 48 Asset Management Policy Active 2016 49 Budget Policy Active 2016 50 Risk Management Framework Active 2015 51 Delegation Framework Active 2012 72

6.3.11. EMPLOYMENT EQUITY PLAN (EEP)

GTLM as the designated employer is expected to comply with all the legislative compliance and thus to report in terms of section 21 of the EEA (55 of 1998) on employment equity status of the municipalities. Accordingly, the municipality managed to submit timeous report to the Department of Labour.

The following were some of the targets set. Accordingly, the underneath report is sent to the Department of Labour:

Male Female Foreign Nationals Occupational Levels Total A C I W A C I W Male Female

Top management 1 1

Senior management 3 1 2 6 Professionally qualified and experienced specialists and 12 2 4 10 2 2 32 mid-management Skilled technical and academically qualified workers, junior 16 2 1 13 1 2 35 management, supervisors, foremen, and superintendents Semi-skilled and discretionary decision 54 6 0 4 38 4 0 4 110 making Unskilled and defined 74 8 2 6 46 6 1 2 145 decision making

TOTAL PERMANENT 160 18 2 16 109 13 1 10 329

Temporary employees

GRAND TOTAL 160 18 2 16 109 13 1 10 329

The underneath table indicates the current profile: Because of many resignations the female representation at managerial level has decreased significantly.

Male Female OCCUPATIONAL LEVELS African Colour Indian White Total African Colour Indian White Total Senior Management 1 0 0 1 2 0 0 0 0 0 Professionally qualified and experienced specialists and mid- 11 0 0 3 14 4 1 0 2 7 management Skilled technical and academically qualified workers, junior 17 1 0 0 20 16 0 0 1 17 management,supervisors,foremen,and superitendents Semi-skilled and discretionary decision making 48 1 0 0 49 50 0 0 0 50 Unskilled and defined decision making 81 3 0 0 84 33 2 0 0 35 TOTAL EMPLOYEES/POSTS 158 5 0 4 169 103 3 0 3 109 AS % OF THE TOTAL NUMBER OF EMPLOYEES/POSTS 56.8% 1.8% 0.0% 1.4% 37.1% 1.1% 0.0% 1.1% CURRENT MALE TO FEMALE RATIO Male Female TOTAL NUMBER OF MALE & FEMALE EMPLOYEES 167 109 CURRENT % MALE TO FEMALE RATIO 60% 39%

73 GTLM MALE TO FEMALE RATIO

Female 39%

Male 61%

The current representation of the workforce is as follow

 61 % is male;  39 % is female;  4 % people with disabilities

From the above 94% of the workforce is African, 3% Colour and 3% White

The following still need to be addressed:

 Appointment of females in Senior Management positions  Appointment of Female managers to ensure gender equality  Appointment of minorities groups in the Municipality  Appointment of females in Unskilled and defined decision-making positions  It’s imperative for Council to ensure that a fair representation of females is appointed when appointing section 56 Directors.

6.3.12. OCCUPATIONAL HEALTH AND SAFETY PLAN

The Health and safety OH&S 180001 programme running smoothly. Goals are being reached and polices are in place. The Health and safety committee is working towards creating a safe working environment. The municipality has also employed a Health and safety officer in this regard.

A new employee assistance programme has been implemented to assist employees and to fulfil the following objectives:

 Improve the psychological health of employees and assist employees to develop coping skills and accept a greater degree of responsibility for their own wellness  Promote wellbeing of employees  Promote better work satisfaction and morale  Create a supportive workplace climate and culture  Help employees to resolve their immediate individual, family and job performance problems  Identify hazards and develop control measures to create a safe working environment  Encourage and maintain the well-being and productivity of employees by providing assistance and counseling to those experiencing personal or work-related problems  Reduce absenteeism  Improve productivity  Reduce turnover rate

74 6.3.13. EMPLOYEE WELLNESS PROGRAMME

The Following employee wellness programmes are planned:

 SARS Tax workshop  Policy induction workshop  Personal financial planning workshop  Healthy lifestyle workshop  All relevant employees medically assessed

6.3.14. SKILLS DEVELOPMENT PLAN

Accordingly, the municipality is required to report on the intended training interventions and/or the completed those training interventions completed. These training seeks to build the capacity for both Councillors and Officials of the municipality. In the same vain, the WSP and ATR reports for 2017/2018 were submitted to LGSETA on the 3rd May 2018, this denotes compliance as the regular reporting is expected. Recruitment Two (2) Senior positions (Directors) were advertised, i.e. Director: Infrastructure and Director: Land Use and Spatial Planning, and the shortlisting for both positions were conducted. The interviews are awaited. Seven (7) positions of the Finance Interns as previously advertised were filled. The appointment of the ICT & Security Manager (Mr Lebogang Thotse) was completed and subsequently resumed duties at the beginning of April 2018. The internal positions for: (i) Corporate Secretary, and (ii) 3x cleaners (all from the Corporate Services Department) internally advertised, shortlisted, and interviewed. Therefore, the recommendations for appointment sent to the Municipal Manager for finalisation. The internal positions for: (i) financial clerk, and procurement officer (Finance Department), as well as the (iii) foreman refuse (Community Services Department) were internally advertised and awaits shortlisting and interviews. The delay was as the result of the unavailability of officials from the respective Departments.

75

6.4. FINANCIAL CLUSTER

6.4.1.BUDGET SUMMARY - SCHEDULE A1

2018/19 Medium Term Revenue & Description 2014/15 2015/16 2016/17 Current Year 2017/18 Expenditure Framework Audited Audited Audited Original Adjusted Full Year Pre-audit Budget Year Budget Year Budget Year R thousands Outcome Outcome Outcome Budget Budget Forecast outcome 2018/19 +1 2019/20 +2 2020/21 Financial Performance Property rates 15,777 14,278 26,849 31,500 36,500 36,500 36,500 38,500 39,000 39,500 Serv ice charges 7,557 8,257 7,795 9,839 9,339 9,339 9,339 9,688 10,057 10,500 Inv estment rev enue 5,886 9,011 12,442 7,000 11,000 11,000 11,000 11,500 12,000 12,500 Transfers recognised - operational 137,738 175,285 168,560 177,062 177,062 177,062 177,062 182,135 196,143 209,388 Other ow n rev enue 4,279 7,254 7,707 8,696 10,196 10,196 10,196 9,839 10,013 9,546 Total Revenue (excluding capital transfers 171,237 214,085 223,352 234,097 244,097 244,097 244,097 251,662 267,213 281,434 and contributions) Employ ee costs 56,269 71,598 72,956 87,461 87,461 87,461 87,461 95,554 102,864 111,073 Remuneration of councillors 15,294 17,691 15,653 19,392 19,392 19,392 19,392 19,347 20,791 22,318 Depreciation & asset impairment 28,113 17,854 32,039 27,452 27,452 27,452 27,452 30,570 32,072 33,575 Finance charges 1,531 1,635 1,595 815 20 20 20 238 253 268 Materials and bulk purchases 9,835 11,066 17,637 22,867 22,867 22,867 22,867 27,810 28,278 30,585 Transfers and grants 6,937 6,794 12,742 13,075 13,075 13,075 13,075 12,909 13,033 13,741 Other ex penditure 52,105 38,619 57,062 76,750 81,544 81,544 81,544 77,010 81,674 79,043 Total Expenditure 170,084 165,256 209,684 247,812 251,811 251,811 251,811 263,437 278,966 290,603 Surplus/(Deficit) 1,154 48,829 13,669 (13,715) (7,714) (7,714) (7,714) (11,775) (11,753) (9,169) Transfers and subsidies - capital (monetary allocations) 52,247 (National / Prov 33,179 incial and District) 44,265 61,671 61,671 61,671 61,671 44,841 46,124 48,567 Contributions recognised - capital & contributed assets – – – – – – – – – – Surplus/(Deficit) after capital transfers & 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398 contributions Share of surplus/ (deficit) of associate – – – – – – – – – – Surplus/(Deficit) for the year 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398

Capital expenditure & funds sources Capital expenditure 61,706 104,583 108,138 74,287 80,287 80,287 80,287 58,461 58,349 60,792 Transfers recognised - capital 51,901 93,285 94,752 61,671 61,671 61,671 61,671 44,841 46,124 48,567 Public contributions & donations – – – – – – – – – – Borrow ing – – – – – – – – – – Internally generated funds 9,805 11,299 13,385 12,616 18,616 18,616 18,616 13,620 12,225 12,225 Total sources of capital funds 61,706 104,583 108,138 74,287 80,287 80,287 80,287 58,461 58,349 60,792 Financial position Total current assets 133,025 163,963 222,435 246,745 246,745 288,893 288,830 292,416 292,416 292,416 Total non current assets 469,688 496,886 515,408 614,687 614,687 614,687 614,850 1,118,890 1,118,890 1,118,890 Total current liabilities 56,582 31,481 48,454 21,687 21,687 21,687 33,181 36,703 36,703 36,703 Total non current liabilities 18,656 20,466 22,553 22,002 22,002 22,002 22,002 22,938 22,938 22,938 Community w ealth/Equity 527,475 608,902 666,835 817,742 817,742 859,891 848,495 1,351,665 1,351,665 1,351,665 Cash flows Net cash from (used) operating 99,739 62,855 95,590 77,854 77,854 77,854 86,795 (39,571) (42,944) (46,905) Net cash from (used) inv esting (62,492) (48,929) (51,037) (74,337) (74,337) (74,337) (33,949) (58,461) (58,349) (60,792) Net cash from (used) financing (714) (640) 1,354 (1,600) (1,600) (1,600) (1,600) (1,700) (1,800) (1,900) Cash/cash equivalents at the year end 102,752 116,038 161,945 141,181 141,181 141,181 213,191 127,947 24,854 (84,742) Cash backing/surplus reconciliation Cash and inv estments av ailable 102,753 116,038 161,945 194,692 194,692 236,840 215,137 222,606 222,606 222,606 Application of cash and inv estments 27,319 (2,753) 13,955 (10,532) (7,643) (7,643) (26,652) (2,836) (4,503) (6,674) Balance - surplus (shortfall) 75,434 118,791 147,989 205,223 202,335 244,483 241,789 225,442 227,109 229,280 Asset management Asset register summary (WDV) 469,688 496,886 515,408 509,271 515,433 515,433 600,089 656,151 717,914 Depreciation 28,113 17,854 32,039 27,452 27,452 27,452 30,570 32,072 33,575 Renew al of Ex isting Assets – – – – – – – – – Repairs and Maintenance 6,841 7,857 14,335 19,050 19,050 19,050 23,718 23,900 25,900 Free services Cost of Free Basic Serv ices prov ided – – – – – – – – – – Rev enue cost of free serv ices prov ided – – – – – – – – – – Households below minimum service level Water: – – – – – – – – – – Sanitation/sew erage: – – – – – – – – – – Energy : – – – – – – – – – – Refuse: – – – – – – – – – –

76 BUDGET SUMMARY IN MSCOA FORMAT:

GREATER TAUNG LOCAL MUNICIPALITY 2018/2019 SUMMARY BUDGET TEMPLATE

REVENUE BUDGET 2017/2018 2018/2019 FUNDED 70% ?? SUNDRY INCOME 21,196,000 21,339,000 14,937,300 ELECTRICITY 3,518,000 3,518,000 2,462,600 REFUSE 3,099,000 3,285,000 2,299,500 SEWERAGE 1,927,000 2,043,000 1,430,100 WATER 795,000 842,000 589,400 PROPERTY RATES 36,500,000 38,500,000 26,950,000 TOTAL SERVICES INCOME 67,035,000 69,527,000 48,668,900

PROVINCIAL GRANT 1,320,000 835,000 835,000 F M G 2,345,000 2,415,000 2,415,000 M I G 63,406,000 46,675,000 46,675,000 EPWP GRANT 1,309,000 1,077,000 1,077,000 EQUITABLE SHARE 170,353,000 175,974,000 175,974,000 TOTAL INCOME FROM GRANTS 238,733,000 226,976,000 226,976,000

TOTAL INCOME 305,768,000 296,503,000 275,644,900

EXPENDITURE SUMMARY 2017/2018 2018/2019 TOTAL EXP PAYROLL 106,853,000 114,900,200 114,900,200 TOTAL EXP GENL EXPENSES 91,747,000 88,087,550 88,087,550 PROVISIONS (IMPAIREMENT & DEPRECIATION) 27,452,000 30,570,000 30,570,000 EXP REPAIRS & MAINTENANCE 19,050,000 23,718,000 23,718,000 GRANTS - OPERATIONAL 6,709,000 6,160,750 6,160,750 CONTRIBUTION TO FIX ASSETS 18,616,000 13,620,000 13,620,000 GRANTS - CAPITAL 61,671,000 44,841,250 44,841,250

TOTAL EXPENDITURE 332,098,000 321,897,750 321,897,750 MIN TOTAL INCOME 305,768,000 296,503,000 275,644,900 SURPLUS/DEFICIT -26,330,000 -25,394,750 -46,252,850

77

GREATER TAUNG LM - BUDGET SUMMARY REVENUE BUDGET SUMMARY REVENUE BUDGET 2018/2019 % 2017/2018 % 2016/2017 % SUNDRY INCOME R 21,339,000 7.2% R 21,196,000 6.9% R 15,173,566 5.7% ELECTRICITY R 3,518,000 1.2% R 3,518,000 1.2% R 3,769,700 1.4% REFUSE R 3,285,000 1.1% R 3,099,000 1.0% R 2,923,700 1.1% SEWERAGE R 2,043,000 0.7% R 1,927,000 0.6% R 1,818,000 0.7% WATER & SANITATION R 842,000 0.3% R 795,000 0.3% R 750,000 0.3% PROPERTY RATES R 38,500,000 13.0% R 36,500,000 11.9% R 26,800,000 10.1% TOTAL SERVICES INCOME R 69,527,000 23.4% R 67,035,000 21.9% R 51,234,966 19.3% PROVINCIAL GRANT R 835,000 0.3% R 1,320,000 0.4% R 1,220,000 0.5% M S I G R - 0.0% R - 0.0% R - 0.0% F M G R 2,415,000 0.8% R 2,345,000 0.8% R 2,010,000 0.8% M I G R 46,675,000 15.7% R 63,406,000 20.7% R 45,436,000 17.1% NDP GRANT R - 0.0% R - 0.0% R - 0.0% EPWP GRANT R 1,077,000 0.4% R 1,309,000 0.4% R 1,352,000 0.5% EQUITABLE SHARE R 175,974,000 59.3% R 170,353,000 55.7% R 164,554,000 61.9% TOTAL INCOME FROM GRANTS R 226,976,000 76.6% R 238,733,000 78.1% R 214,572,000 80.7% TOTAL INCOME R 296,503,000 100% R 305,768,000 100% R 265,806,966 100%

SERVICES INCOME

SUNDRY INCOME 30.7%

PROPERTY RATES 55.4% ELECTRICITY 5.1% REFUSE 4.7%

WATER & SEWERAGE SANITATION 2.9% 1.2%

78

SERVICE INCOME GRANTS TOTAL INCOME FINANCIAL YEAR AMOUNT INCREASE AMOUNT INCREASE AMOUNT GROWTH 2016/2017 R 51,234,966 R 214,572,000 R 265,806,966 2017/2018 R 67,035,000 30.8% R 238,733,000 11.3% R 305,768,000 15.0% 2018/2019 R 69,527,000 3.7% R 226,976,000 -4.9% R 296,503,000 -3.0%

SERVICE INCOME GRANT INCOME GROWTH GROWTH R 80,000,000 R 245,000,000 R 70,000,000 R 240,000,000 R 60,000,000 R 235,000,000 R 50,000,000 R 230,000,000 R 225,000,000 R 40,000,000 R 220,000,000 R 30,000,000 R 215,000,000 R 20,000,000 R 210,000,000 R 10,000,000 R 205,000,000 R - R 200,000,000 2016/2017 2017/2018 2018/2019 2016/2017 2017/2018 2018/2019

TOTAL INCOME GROWTH R 310,000,000

R 300,000,000

R 290,000,000

R 280,000,000

R 270,000,000

R 260,000,000

R 250,000,000

R 240,000,000 2016/2017 2017/2018 2018/2019

79

6.4.2. REVENUE & EXPENDITURE BY FUNCTIONAL CLASSIFICATION - SCHEDULE A2

2018/19 Medium Term Revenue & Functional Classification Description Ref 2014/15 2015/16 2016/17 Current Year 2017/18 Expenditure Framework Audited Audited Audited Original Adjusted Full Year Budget Year Budget Year Budget Year R thousand 1 Outcome Outcome Outcome Budget Budget Forecast 2018/19 +1 2019/20 +2 2020/21 Revenue - Functional Governance and administration 105,515 128,908 137,174 153,648 229,832 229,832 237,967 252,816 266,463 Ex ecutiv e and council 42,157 53,383 51,256 54,601 170,690 170,690 176,523 190,905 203,092 Finance and administration 63,359 75,525 85,918 99,048 59,142 59,142 61,444 61,911 63,371 Internal audit – – – – – – – – – Community and public safety 11,755 15,862 16,818 17,344 1,984 1,984 1,501 2,188 2,190 Community and social serv ices 4,307 6,459 8,697 8,709 1,984 1,984 1,501 2,188 2,190 Sport and recreation 7,448 9,403 8,121 8,635 – – – – – Public safety – – – – – – – – – Housing – – – – – – – – – Health – – – – – – – – – Economic and environmental services 67,201 55,835 70,636 77,353 64,553 64,553 47,287 48,216 50,788 Planning and dev elopment 6,556 7,810 7,252 8,272 1,147 1,147 612 612 612 Road transport 60,645 48,025 63,384 69,081 63,406 63,406 46,675 47,604 50,176 Env ironmental protection – – – – – – – – – Trading services 39,013 46,660 42,989 47,423 9,399 9,399 9,748 10,117 10,560 Energy sources 11,521 12,010 15,668 17,980 3,538 3,538 3,538 3,538 3,588 Water management 4,592 5,230 3,286 3,570 815 815 842 892 946 Waste w ater management 7,942 9,891 9,859 10,577 1,947 1,947 2,063 2,185 2,315 Waste management 14,958 19,529 14,176 15,295 3,099 3,099 3,305 3,502 3,711 Other 4 – – – – – – – – – Total Revenue - Functional 2 223,484 247,264 267,617 295,768 305,768 305,768 296,503 313,337 330,001 Expenditure - Functional Governance and administration 115,200 104,361 136,462 163,256 167,656 167,656 170,268 182,306 186,956 Ex ecutiv e and council 35,540 35,182 39,303 54,052 62,372 62,372 70,560 74,707 78,356 Finance and administration 79,660 69,178 97,158 109,204 105,284 105,284 99,708 107,599 108,600 Internal audit – – – – – – – – – Community and public safety 7,432 9,472 10,653 13,646 13,646 13,646 21,343 20,172 22,217 Community and social serv ices 2,917 3,619 4,840 6,834 6,834 6,834 12,613 11,190 12,630 Sport and recreation 4,515 5,854 5,813 6,812 6,812 6,812 8,730 8,982 9,587 Public safety – – – – – – – – – Housing – – – – – – – – – Health – – – – – – – – – Economic and environmental services 21,241 19,310 22,030 25,505 25,105 25,105 23,627 24,636 26,268 Planning and dev elopment 4,931 5,513 6,014 9,248 9,048 9,048 7,355 7,834 8,352 Road transport 16,310 13,797 16,016 16,257 16,057 16,057 16,273 16,802 17,915 Env ironmental protection – – – – – – – – – Trading services 26,211 32,113 40,539 45,405 45,404 45,404 48,198 51,852 55,162 Energy sources 9,515 11,745 17,137 18,044 18,044 18,044 21,958 23,938 25,488 Water management 1,265 1,564 2,151 3,104 3,104 3,104 2,950 3,019 3,032 Waste w ater management 4,777 6,682 9,385 9,274 9,274 9,274 8,969 9,436 9,948 Waste management 10,653 12,122 11,866 14,983 14,983 14,983 14,321 15,459 16,694 Other 4 – – – – – – – – – Total Expenditure - Functional 3 170,084 165,256 209,684 247,812 251,811 251,811 263,437 278,966 290,603 Surplus/(Deficit) for the year 53,400 82,008 57,933 47,956 53,957 53,957 33,067 34,371 39,398

80

GREATER TAUNG LOCAL MUNICIPALITY NW394 MSCOA BUDGET TEMPLATE DETAILED REVENUE 2018/2019 Adjusted VOTE DESCRIPTION % 2017/2018 2018/2019 2019/2020 2020/2021 0001/1601/0000 NW394 R 1601 EQ 21 GRANT: NAT EQUITABLE SHARE 170,353,000 175,974,000 190,263,000 202,947,000 0001/1719/0000 NW394 R 1719 SUN 1 SUNDRY INCOME 337,000 417,000 502,000 0101/1707/0000 NW394 R 1719 SUN 1 COLLECTION COMMISSION: GOVMT ENATIS 120,000 132,000 140,000 145,000 0201/0213/0000 NW394 R 0213 SERV 23 SERVICE: PROPERTY RATES 36,500,000 38,500,000 39,000,000 39,500,000 0201/0301/0000 NW394 R 0301 INT 28 INTEREST: PROPERTY RATES 4,500,000 4,500,000 4,500,000 4,500,000 0201/0803/0000 NW394 R 0301 INT 28 INTEREST: CALL ACCOUNTS 11,000,000 11,500,000 12,000,000 12,500,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: ELECTRICITY 160,000 140,000 120,000 100,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: OTHER SERVICE CHARGES 301,000 318,000 335,000 342,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: SARS 250,000 250,000 250,000 250,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: WASTE MANAGEMENT 720,000 763,000 809,000 810,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: WASTE WATER MANAGEMENT 550,000 583,000 618,000 652,000 0201/1001/0000 NW394 R 0301 INT 28 INTEREST: WATER 160,000 160,000 150,000 150,000 0201/1653/0000 NW394 R 1601 FMG 15 GRANT: FMG 2,345,000 2,415,000 2,880,000 3,312,000 0201/1705/0000 NW394 R 1719 SUN 1 FEES: CLEARANCE CERTIFICATES 27,000 28,000 29,000 30,000 0201/1707/0000 NW394 R 1719 SUN 1 COLLECTION CHARGES 3RD PARTIES 100,000 110,000 120,000 125,000 0201/1721/0000 NW394 R 1719 SUN 1 FEES: TENDER DOCUMENTS 1,000,000 1,000,000 1,000,000 1,000,000 0301/1616/0000 NW394 R 1719 SUN 1 LG SETA 100,000 100,000 100,000 100,000 0403/1602/0000 NW394 R 1601 LIBO 12 GRANT: LIBRARY GRANT Nat 620,000 335,000 335,000 335,000 0403/1665/0000 NW394 R 1601 LIBC 11 GRANT: LIBRARY GRANT Prov 700,000 500,000 500,000 500,000 0403/1715/0000 NW394 R 1719 SUN 1 FEES: LIBRARY 30,000 30,000 30,000 30,000 0409/0701/0000 NW394 R 1719 SUN 29 RENTAL: FROM FIXED ASSETS 596,000 596,000 596,000 596,000 0409/1704/0000 NW394 R 1719 SUN 1 FEES: CEMETRY 38,000 40,000 42,000 44,000 0480/0473/0000 NW394 R 0473 SERV 24 SERVICE: REFUSE CHARGES 3,099,000 3,285,000 3,482,000 3,691,000 0509/1655/0000 NW394 R 1601 MIG 20 GRANT: MIG 63,406,000 46,675,000 47,604,000 50,176,000 0511/1671/0000 NW394 R 1601 EPWP 14 GRANT: EPWP GRANT 1,309,000 1,077,000 - - 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: COMMERCIAL CONVENTIONAL 600,000 600,000 600,000 600,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: COMMERCIAL PRE PAY 360,000 360,000 360,000 360,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: INDUSTRIAL LOW KVA 312,000 312,000 312,000 312,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: INDUSTRIAL LOW KWH 180,000 180,000 180,000 180,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: RESIDENTIAL CONVENTIONAL 1,218,000 462,000 462,000 462,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: RESIDENTIAL INDIGENT (PREP) 36,000 36,000 36,000 36,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: RESIDENTIAL PRE PAY 462,000 1,218,000 1,218,000 1,218,000 0550/0413/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY: DEPARTETAL USAGE 300,000 300,000 300,000 350,000 0550/0414/0000 NW394 R 0413 SERV 22 SERVICE: ELECTRICITY AVAILABILITY EMPTY SITES 50,000 50,000 50,000 50,000 0550/1719/0000 NW394 R 1719 SUN 1 CONNECTION FEES: ELECTRICITY 20,000 20,000 20,000 20,000 0560/0433/0000 NW394 R 0433 SERV 26 SERVICE: WATER: SALES 795,000 842,000 892,000 946,000 0560/1719/0000 NW394 R 1719 SUN 1 CONNECTION FEES: WATER 20,000 20,000 20,000 20,000 0570/0453/0000 NW394 R 0453 SERV 25 SERVICE: SANITATION CHARGES 1,927,000 2,043,000 2,165,000 2,295,000 05701709/0000 NW394 R 1719 SUN 1 CONNECTION FEES: SANITATION 20,000 20,000 20,000 20,000 0601/1701/0000 NW394 R 1719 SUN 1 FEES: ADMINISTRATION 85,000 50,000 50,000 50,000 0601/1711/0000 NW394 R 1719 SUN 1 FEES: INSPECTION 42,000 42,000 42,000 42,000 0601/1717/0000 NW394 R 1719 SUN 1 FEES: BUILDING PLANS 120,000 120,000 120,000 120,000 0601/1841/0000 NW394 R 1719 SUN 1 PROFIT ON DISPOSAL OF ASSETS 400,000 400,000 400,000 400,000

305,768,000 296,503,000 312,652,000 329,316,000

81 6.4.3. REVENUE & EXPENDITURE BY VOTE - SCHEDULE A3

2018/19 Medium Term Revenue & Vote Description Ref 2014/15 2015/16 2016/17 Current Year 2017/18 Expenditure Framework Audited Audited Audited Original Adjusted Full Year Budget Year Budget Year Budget Year R thousand Outcome Outcome Outcome Budget Budget Forecast 2018/19 +1 2019/20 +2 2020/21 Revenue by Vote 1 Vote 1 - Community and Social Serv ices 4,307 6,459 8,697 8,709 1,984 1,984 1,501 2,188 2,190 Vote 2 - Energy Sources 11,521 12,010 15,668 17,980 3,538 3,538 3,538 3,538 3,588 Vote 3 - Ex ecutiv e and Council 42,157 53,383 51,256 54,601 170,690 170,690 176,523 190,905 203,092 Vote 4 - Finance and Administration 63,359 75,525 85,918 99,048 59,142 59,142 61,444 61,911 63,371 Vote 5 - Planning and Dev elopment 6,556 7,810 7,252 8,272 1,147 1,147 612 612 612 Vote 6 - Road Transport 60,645 48,025 63,384 69,081 63,406 63,406 46,675 47,604 50,176 Vote 7 - Sports and Recreation 7,448 9,403 8,121 8,635 – – – – – Vote 8 - Waste Managemnt 14,958 19,529 14,176 15,295 3,099 3,099 3,305 3,502 3,711 Vote 9 - Waste Water Management 7,942 9,891 9,859 10,577 1,947 1,947 2,063 2,185 2,315 Vote 10 - Water Managemnt 4,592 5,230 3,286 3,570 815 815 842 892 946 Vote 11 - [NAME OF VOTE 11] – – – – – – – – – Vote 12 - [NAME OF VOTE 12] – – – – – – – – – Vote 13 - [NAME OF VOTE 13] – – – – – – – – – Vote 14 - [NAME OF VOTE 14] – – – – – – – – – Vote 15 - [NAME OF VOTE 15] – – – – – – – – – Total Revenue by Vote 2 223,484 247,264 267,617 295,768 305,768 305,768 296,503 313,337 330,001 Expenditure by Vote to be appropriated 1 Vote 1 - Community and Social Serv ices 2,917 3,619 4,840 6,834 6,834 6,834 12,613 11,190 12,630 Vote 2 - Energy Sources 9,515 11,745 17,137 18,044 18,044 18,044 21,958 23,938 25,488 Vote 3 - Ex ecutiv e and Council 35,540 35,182 39,303 54,052 62,372 62,372 70,560 74,707 78,356 Vote 4 - Finance and Administration 79,660 69,178 97,158 109,204 105,284 105,284 99,708 107,599 108,600 Vote 5 - Planning and Dev elopment 4,931 5,513 6,014 9,248 9,048 9,048 7,355 7,834 8,352 Vote 6 - Road Transport 16,310 13,797 16,016 16,257 16,057 16,057 16,273 16,802 17,915 Vote 7 - Sports and Recreation 4,515 5,854 5,813 6,812 6,812 6,812 8,730 8,982 9,587 Vote 8 - Waste Managemnt 10,653 12,122 11,866 14,983 14,983 14,983 14,321 15,459 16,694 Vote 9 - Waste Water Management 4,777 6,682 9,385 9,274 9,274 9,274 8,969 9,436 9,948 Vote 10 - Water Managemnt 1,265 1,564 2,151 3,104 3,104 3,104 2,950 3,019 3,032 Vote 11 - [NAME OF VOTE 11] – – – – – – – – – Vote 12 - [NAME OF VOTE 12] – – – – – – – – – Vote 13 - [NAME OF VOTE 13] – – – – – – – – – Vote 14 - [NAME OF VOTE 14] – – – – – – – – – Vote 15 - [NAME OF VOTE 15] – – – – – – – – – Total Expenditure by Vote 2 170,084 165,256 209,684 247,812 251,811 251,811 263,437 278,966 290,603 Surplus/(Deficit) for the year 2 53,400 82,008 57,933 47,956 53,957 53,957 33,067 34,371 39,398

82 6.4.4. OPERATIONAL BUDGET BY SERVICE – SCHEDULE A4

2018/19 Medium Term Revenue & Expenditure Description Ref 2014/15 2015/16 2016/17 Current Year 2017/18 Framework

Audited Audited Audited Original Adjusted Full Year Pre-audit Budget Year Budget Year +1 Budget Year +2 R thousand 1 Outcome Outcome Outcome Budget Budget Forecast outcome 2018/19 2019/20 2020/21 Revenue By Source Property rates 2 15,777 14,278 26,849 31,500 36,500 36,500 36,500 38,500 39,000 39,500 Service charges - electricity revenue 2 2,714 2,913 2,613 4,018 3,518 3,518 3,518 3,518 3,518 3,568 Service charges - water revenue 2 600 767 690 795 795 795 795 842 892 946 Service charges - sanitation revenue 2 1,618 1,893 1,721 1,927 1,927 1,927 1,927 2,043 2,165 2,295 Service charges - refuse revenue 2 2,625 2,685 2,771 3,099 3,099 3,099 3,099 3,285 3,482 3,691 Service charges - other – – – – – – – – – – Rental of facilities and equipment 330 361 484 596 596 596 596 596 596 596 Interest earned - external investments 5,886 9,011 12,442 7,000 11,000 11,000 11,000 11,500 12,000 12,500 Interest earned - outstanding debtors 3,168 5,124 5,190 5,641 6,641 6,641 6,641 6,714 6,782 6,804 Dividends received – – – – – – – – – – Fines, penalties and forfeits – – – 295 – – – – – – Licences and permits – – – – – – – – – – Agency services – – – – – – – – – – Transfers and subsidies 137,738 175,285 168,560 177,062 177,062 177,062 177,062 182,135 196,143 209,388 Other revenue 2 384 1,769 2,033 2,165 2,059 2,059 2,059 2,129 2,235 1,746 Gains on disposal of PPE 398 – – – 900 900 900 400 400 400 Total Revenue (excluding capital transfers and 171,237 214,085 223,352 234,097 244,097 244,097 244,097 251,662 267,213 281,434 contributions)

Expenditure By Type Employee related costs 2 56,269 71,598 72,956 87,461 87,461 87,461 87,461 95,554 102,864 111,073 Remuneration of councillors 15,294 17,691 15,653 19,392 19,392 19,392 19,392 19,347 20,791 22,318 Debt impairment 3 6,109 (7,144) 3,209 8,000 3,000 3,000 3,000 3,000 3,000 3,000 Depreciation & asset impairment 2 28,113 17,854 32,039 27,452 27,452 27,452 27,452 30,570 32,072 33,575 Finance charges 1,531 1,635 1,595 815 20 20 20 238 253 268 Bulk purchases 2 2,994 3,209 3,302 3,817 3,817 3,817 3,817 4,092 4,378 4,685 Other materials 8 6,841 7,857 14,335 19,050 19,050 19,050 19,050 23,718 23,900 25,900 Contracted services 13,310 13,697 17,250 20,568 21,568 21,568 21,568 21,757 22,349 22,461 Transfers and subsidies 6,937 6,794 12,742 13,075 13,075 13,075 13,075 12,909 13,033 13,741 Other expenditure 4, 5 32,548 32,025 36,125 48,182 56,976 56,976 56,976 52,253 56,325 53,582 Loss on disposal of PPE 138 41 477 – – – – – – – Total Expenditure 170,084 165,256 209,684 247,812 251,811 251,811 251,811 263,437 278,966 290,603 Surplus/(Deficit) 1,154 48,829 13,669 (13,715) (7,714) (7,714) (7,714) (11,775) (11,753) (9,169) Transfers and subsidies - capital (monetary allocations) (National / Provincial and District) 52,247 33,179 44,265 61,671 61,671 61,671 61,671 44,841 46,124 48,567 Transfers and subsidies - capital (monetary allocations) (National / Provincial Departmental Agencies, Households, Non-profit Institutions, Private Enterprises, Public Corporatons, Higher Educational Institutions) 6 – – – – – – – – – – Transfers and subsidies - capital (in-kind - all) Surplus/(Deficit) after capital transfers & 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398 contributions Taxation Surplus/(Deficit) after taxation 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398 Attributable to minorities Surplus/(Deficit) attributable to municipality 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398 Share of surplus/ (deficit) of associate 7 Surplus/(Deficit) for the year 53,400 82,008 57,933 47,956 53,957 53,957 53,957 33,067 34,371 39,398

83

GREATER TAUNG LOCAL MUNICIPALITY NW394 MSCOA BUDGET TEMPLATE 2018/2019 RUNNING COST SUMMARY

VOTE DESCRIPTION % 2017/2018 2018/2019 2019/2020 2020/2021 0001/3113/0000 SDL MUNICIPAL MANAGER 71,800 77,500 83,700 0001/3601/0000 DEBT COLLECTION 7,000,000 - - - 0001/4213/0000 NW394 R DMM 37 PROF FEES MM COMM RE A DIRA 300,000 318,000 318,000 320,000 0001/4221/0000 NW394 R ALL 43 CONTRACTED SERV: TELEPHONE & FAX CHARGES 20 3,074,000 3,258,000 3,393,000 2,537,000 0001/4378/0000 NW394 R DMM 38 PROF FEES MM IT SERVICES EXTERNAL 2,750,000 1,300,000 1,365,000 1,433,000 0001/4401/0000 NW394 R ALL 2 ACCOMMODATION EXPENSES BOOKINGS MUN STAFF 78 900,000 900,000 949,000 1,000,000 0001/4405/0000 NW394 R DMM 4 ADVERTISEMENT / PUBLICITY: LEGISLATED 300,000 300,000 300,000 300,000 0001/4415/0000 NW394 R LED 24 BUSINESS ADVISORY SMME's LED 18 1,000,000 1,000,000 1,000,000 1,000,000 0001/4416/0000 NW394 R DSS 47 EMPLOYEE ASSISTANCE: SPORT 112 170,000 150,000 150,000 150,000 0001/4417/0000 NW394 R DMM 17 CATERING SERVICES MM 48 10,000 10,000 10,000 10,000 0001/4473/0000 NW394 R DMM 68 PUBLIC PARTICIPATION: MM (RADIO SLOTS, OTHER) 1 500,000 500,000 500,000 550,000 0001/4487/0000 NW394 R DMM PROF FEES MM INT AUDIT 300,000 320,000 340,000 0001/4491/0000 NW394 R DMM 11 BURSARIES: SEMINARS & CONFERENCES - 100,000 100,000 100,000 100,000 0101/3113/0000 SDL COUNCIL 170,300 184,000 200,000 0101/3701/0000 NW394 DEPRECIATION: OTHER ASSETS 52,000 70,000 72,000 75,000 0101/4401/0000 NW394 R CLLR 1 ACCOMMODATION EXPENSES BOOKINGS CLLRS 110 500,000 500,000 527,000 550,000 0101/4417/0000 NW394 R DCS 16 CATERING SERVICES COUNCIL, EXCO & CLL WORKSHOP 47 427,000 500,000 510,000 520,000 0101/4443/0000 NW394 R DTS 51 FLEET: VEHICLE TRACKING 11 360,000 370,000 380,000 390,000 0101/4463/0000 NW394 R DCS 64 PROFESSIONAL BODIES MEMBERSHIP FEES (SALGA) 96 1,100,000 1,163,000 1,230,000 1,328,000 0101/4473/0000 NW394 R CLL 69 PUBLIC PARTICIPATION: MPAC (REPORTS) 300,000 316,000 332,000 345,000 0101/4483/0000 NW394 R ALL 62 INVENTORY: CONSUMABLES 78 810,000 850,000 900,000 950,000 0103/3113/0000 SDL MAYOR'S OFFICE 22,700 25,000 28,000 0103/3701/0000 NW394 DEPRECIATION: VEHICLES, MACHINARY & EQ - 6,437,000 7,500,000 8,000,000 8,500,000 0103/4405/0000 NW394 R DFS 3 ADVERTISEMENT / PUBLICITY: IDP & BUDGET 300,000 300,000 300,000 300,000 0103/4417/0000 NW394 R CLLR 14 CATERING SERVICES MAYOR 25 50,000 50,000 50,000 50,000 0103/4443/0000 NW394 R DTS 52 FLEET: WET FUEL 41 5,231,000 4,970,000 5,000,000 5,100,000 0103/4473/0000 NW394 R CLLR 66 PUBLIC PARTICIPATION: MAYOR (BUDGET & IDP) 10 500,000 542,000 572,000 603,000 0103/4473/0000 NW394 R DSP 67 PUBLIC PARTICIPATION: MAYOR (IDP REP FORUM) 40,000 - - - 0103/4479/0001 NW394 R CLLR 80 SPEC PROG: MAYOR PROJECTS YOUTH 77 750,000 120,000 126,000 132,000 0103/4479/0002 SPEC PROG: MAYOR PROJECTS DISSABILITY 80,000 84,000 88,000 0103/4479/0003 SPEC PROG: MAYOR PROJECTS W, C, & E 114,000 120,000 125,000 0103/4479/0004 SPEC PROG: MAYOR PROJECTS SPORTS 80,000 84,000 88,000 0103/4479/0005 SPEC PROG: MAYOR PROJECTS HIV/AIDS 80,000 84,000 88,000 0103/4479/0006 SPEC PROG: MAYOR PROJECTS TRAD LEADERS 80,000 84,000 88,000 0103/4479/0007 SPEC PROG: MAYOR PROJECTS FUNERALS 238,000 250,000 262,000 0105/3113/0000 SDL SPEAKER'S OFFICE 12,400 13,300 14,400 0105/3403/0000 NW394 R CLLR 74 REMUNARATION OF WARD COMMITTEE SIT ALL 50 3,000,000 4,500,000 4,500,000 4,500,000 0105/4417/0000 NW394 R CLLR 15 CATERING SERVICES SPEAKER 11 50,000 50,000 50,000 50,000 0105/4473/0000 NW394 R CLL 70 PUBLIC PARTICIPATION: SPEAKER (CBP) 37 40,000 - - - 0105/4473/0000 NW394 R CLL 71 PUBLIC PARTICIPATION: SPEAKER (WARDS) 500,000 570,000 601,000 634,000 0201/3113/0000 SDL FINANCE 96,500 104,200 112,600 0201/3153/0000 NW394 R DFS 60 INTEREST: DEFINED BENEFITS To Employee Cost - 800,000 800,000 800,000 800,000 0201/3501/0000 NW394 PROVISION FOR BAD DEBTS; 3,000,000 3,000,000 3,000,000 3,000,000 0201/3701/0000 NW394 DEPRECIATION: LAND&BUILDINGS 10,199,000 11,500,000 12,000,000 12,500,000 0201/3903/0000 NW394 R DFS 61 INTEREST: CREDITORS OVERDUE; 76 20,000 20,000 20,000 22,000 0201/4205/0000 NW394 R DFS 42 CONTRACTED SERV: SHORT TERM INSURANCE 77 1,060,000 1,120,000 1,168,000 1,227,000 0201/4211/0000 NW394 R DFS 30 CONTRACTED SERV: LICENCE FEES ALL SOFTWARE & SEBATA - ICT 2,000,000 2,300,000 2,600,000 2,900,000 0201/4213/0000 NW394 R DFS 33 PROF FEES CFO AFS & OTHERS 97 3,500,000 2,720,000 3,000,000 3,500,000 0201/4215/0000 NW394 R DFS 28 CONTRACTED SERV: LEASE OFFICE MACHINES; 53 1,600,000 1,700,000 1,800,000 1,900,000 0201/4219/0000 NW394 R DFS 25 CONTRACTED SERV: CASH IN TRANSIT 51 106,000 144,000 153,000 162,000 0201/4223/0000 NW394 R DFS 44 VALUATION ROLL COST 9 50,000 80,000 3,000,000 80,000 0201/4339/0000 NW394 R 0213SERV 232 INDIGENT SUPPORT: REVENUE FOR GONE - 500,000 500,000 500,000 500,000 0201/4339/0001 NW394 R 0213SERV 23I INDIGENT SUPPORT: PROPERTY RATES - 2,803,000 - - -

84 GREATER TAUNG LOCAL MUNICIPALITY NW394 MSCOA BUDGET TEMPLATE 2018/2019 RUNNING COST SUMMARY

VOTE DESCRIPTION % 2017/2018 2018/2019 2019/2020 2020/2021 0201/4377/0000 PROF FEES CFO MSCOA & HANDHOLDING 2,100,000 1,500,000 200,000 0201/4378/0000 NW394 R DFS VETTING & ASSET MAN PLAN - 885,000 385,000 385,000 0201/4405/0000 NW394 R DFS 5 ADVERTISEMENT / PUBLICITY: SCM 91 500,000 500,000 500,000 500,000 0201/4409/0000 NW394 R DFS 8 AUDIT FEES; 72 3,710,000 3,922,000 4,168,000 4,200,000 0201/4411/0000 NW394 R DFS 9 BANK CHARGES 60 265,000 268,000 273,000 288,000 0201/4417/0000 NW394 R DFS 18 CATERING SERVICES CFO 6 10,000 10,000 10,000 10,000 0201/4471/0000 NW394 R DFS 32 STATIONARY 34 737,000 781,000 828,000 878,000 0201/4473/0000 NW394 R DFS 65 PUBLIC PARTICIPATION: CFO (INDIGENTS) 8 300,000 300,000 300,000 300,000 0301/3113/0000 SDL CORPORATE 84,850 91,600 99,000 0301/3701/0000 NW394 DEPRECIATION: SOLID WASTE INFRASTRUCTURE 10,764,000 11,500,000 12,000,000 12,500,000 0301/4209/0000 NW394 R DCS 29 CONTRACTED SERV: LEGAL COST 98 4,000,000 4,000,000 4,000,000 4,000,000 0301/4219/0000 NW394 R DCS 41 CONTRACTED SERV: SECURITY GUARDS 56 7,890,000 8,000,000 8,500,000 9,000,000 0301/4405/0000 NW394 R DCS 6 ADVERTISEMENT / PUBLICITY: VACANSIES (HR) 300,000 300,000 300,000 300,000 0301/4413/0000 NW394 R DCS 10 BOOKS & MAGAZINES - 5,000 5,000 5,000 5,000 0301/4417/0000 NW394 R DCS 21 CATERING SERVICES CORP SERV 61 10,000 10,000 10,000 10,000 0301/4425/0000 NW394 R CLLR 12 BURSARIES: STUDENTS (MAYOR) - 1,000,000 500,000 500,000 500,000 0301/4439/0000 NW394 R DCS 27 LEASE COMMUNICATION (DOC MAN) 18 382,000 404,000 429,000 450,000 0301/4445/0000 NW394 R DCS 63 OCCUPATIONAL HEALTH & SAFETY - 138,000 146,000 146,000 150,000 0301/4469/0000 NW394 R DCS 31 POSTAGE & COURIER SERVICES; 15 56,000 60,000 64,000 68,000 0301/4485/0000 S & T CONSULTANTS 900,000 1,000,000 1,000,000 500,000 0301/4486/0000 NW394 R ALL 75 S&T: ACCOMMODATION 500,000 550,000 600,000 650,000 0301/4486/0000 NW394 R ALL 76 S&T: DAILY ALLOWANCE 120,000 200,000 250,000 300,000 0301/4486/0000 NW394 R ALL 77 S&T: INCIDENTAL COST 400,000 800,000 850,000 850,000 0301/4486/0000 NW394 R ALL 78 S&T: OWN TRANSPORT 56 1,131,000 1,298,000 1,370,000 1,500,000 0301/4488/0000 NW394 R DCS 48 EMPLOYEE ASSISTANCE: 84 202,000 205,000 205,000 205,000 0301/4491/0000 NW394 R DCS 13 BURSARIES: TRAINING CLLRS & OFFICIALS 98 700,000 700,000 700,000 700,000 0301/4495/0000 NW394 R DCS 81 UNIFORMS & PROTECTIVE CLOTHING 9 490,000 519,000 551,000 570,000 0301/4497/0000 NW394 R DCS 82 WORKMENS COMPENSASION FUND - 700,000 764,000 840,000 920,000 0403/3113/0000 SDL LIBRARY 12,900 13,900 15,000 0409/4378/0000 NW394 R MM PROF FEES: ADDITIONAL BUILDING (OFFICE PARK) 500,000 - - 0409/4404/0000 NW394 R DCS 53 HIRE CHARGES: ADD BUILDINGS 25 880,000 960,000 1,056,000 1,200,000 0409/4437/0000 NW394 R DSS DISASTER RELIEF 1,000,000 1,050,000 1,100,000 0409/4479/0000 PUBLIC PARTICIPATION: SPEAKER (WOMEN) 550,000 - - 0421/3113/0000 SDL PARKS 40,100 43,300 46,700 0421/4417/0000 NW394 R DSS 83 EXPENDITURE: ABOR WEEK 88 50,000 50,000 50,000 60,000 0480/3113/0000 SDL REFUSE 87,600 94,600 102,200 0480/4339/0000 NW394 R 0473SERV 24I INDIGENT SUPPORT: REFUSE 35 204,000 216,000 229,000 250,000 0480/4417/0000 NW394 R DSS 19 CATERING SERVICES SOCIAL SERV - 10,000 10,000 10,000 10,000 0480/4421/0000 NW394 R DSS 23 CLEANING MATERIAL & SUPPLIES 46 650,000 690,000 730,000 774,000 0501/3113/0000 SDL WORKSHOP 17,300 18,700 20,200 0501/4419/0000 NW394 R DTS 50 FLEET: MOTOR VEHICLE ROAD WORTHY TEST 44 163,000 163,000 163,000 165,000 0501/4477/0000 NW394 R DTS 49 FLEET: MOTOR VEHICLE LIC & REG 22 120,000 120,000 120,000 126,000 0531/3113/0000 SDL ROADS 74,500 80,500 86,900 0531/4201/0000 NW394 R DTS 7 AERODROM LICENCE; - 1,000 1,000 1,000 1,000 0531/4417/0000 NW394 R DTS 20 CATERING SERVICES TECH SERV - 10,000 10,000 10,000 10,000 0531/4487/0000 NW394 R DTS 39 PROF FEES ROADS 69 500,000 500,000 500,000 500,000 0550/3113/0000 SDL ELEC 7,700 8,300 8,900 0550/4101/0000 NW394 R DTSELEC 72 PURCHASES: ELECTRICITY BULK 47 3,817,000 4,092,000 4,378,000 4,685,000 0550/4339/0000 NW394 R 0413SERV 22I INDIGENT SUPPORT: ELECTRICITY 41 6,366,000 6,748,000 7,153,000 7,300,000 0550/4431/0000 NW394 R DSS 46 ELECTRICITY: OWN USAGE & HIGHMASTS 26 4,800,000 4,800,000 4,800,000 4,800,000 0560/4103/0000 NW394 R DSS 73 WATER: OWN USAGE 23 1,060,000 1,120,000 1,187,000 1,200,000 0560/4339/0000 NW394 R 0433SERV 26I INDIGENT SUPPORT: WATER 3 28,000 30,000 32,000 32,000 0570/3113/0000 SDL WATER & SAN 40,200 43,400 46,900 0570/4213/0000 NW394 R DTS 40 PROF FEES SANITATION & WATER - 500,000 500,000 500,000 500,000 0570/4339/0000 NW394 R 0453SERV 25I INDIGENT SUPPORT: SANITATION 30 161,000 171,000 181,000 190,000 0601/3113/0000 SDL LANDUSE 41,700 45,000 48,600 0601/4417/0000 NW394 R DSP 22 CATERING SERVICES LAND USE - 10,000 10,000 10,000 10,000 0601/4427/0000 NW394 R DSP 26 CONTRACTED SERV: DEEDS LANDUSE - 350,000 350,000 350,000 350,000 0601/4451/0000 NW394 R DSP 45 ZONING LANDUSE - 60,000 60,000 60,000 60,000 0601/4487/0000 NW394 R DSP 34 PROF FEES LAND USE - 1,000,000 120,000 120,000 120,000 0601/4487/0000 NW394 R DSP 35 LAND USE APPLICATIONS - 116,000 116,000 116,000 120,000 0601/4487/0000 NW394 R DSP 36 LAND USE SPLUMA IMPLEMENTATION - 200,000 200,000 200,000 200,000

118,455,000 118,657,550 124,435,300 123,712,100

85 6.4.5. MTEF – SCHEDULE A5 (5 YEAR CAPITAL INVESTMENT)

Capital Expenditure - Functional Governance and administration 9,805 7,753 7,159 3,361 3,361 3,361 3,361 3,639 2,780 2,909 Ex ecutiv e and council – – – 165 165 165 165 3,029 2,620 2,749 Finance and administration 9,805 7,753 7,159 3,196 3,196 3,196 3,196 610 160 160 Internal audit – – – – – – – Community and public safety – 30,438 – 38,248 38,248 38,248 38,248 24,029 24,235 19,235 Community and social serv ices – 30,438 – 37,128 37,128 37,128 37,128 22,929 14,445 13,445 Sport and recreation – – – 1,120 1,120 1,120 1,120 1,100 9,790 5,790 Public safety – – – – – – – Housing – – – – – – – Health – – – – – – – Economic and environmental services 51,901 66,393 100,978 23,636 29,636 29,636 29,636 15,344 17,133 23,448 Planning and dev elopment – – – 51 51 51 51 20 Road transport 51,901 66,393 100,978 23,585 29,585 29,585 29,585 15,324 17,133 23,448 Env ironmental protection – – – – – – – Trading services – – – 9,042 9,042 9,042 9,042 15,450 14,200 15,200 Energy sources – – – 6,642 6,642 6,642 6,642 9,780 9,100 10,600 Water management – – – – – – – 600 600 600 Waste w ater management – – – 2,400 2,400 2,400 2,400 700 Waste management – – – – – – – 4,370 4,500 4,000 Other – – – – – – – Total Capital Expenditure - Functional 3 61,706 104,583 108,138 74,287 80,287 80,287 80,287 58,461 58,349 60,792 Funded by: National Gov ernment 51,901 93,285 94,167 60,971 60,971 60,971 60,971 44,341 45,224 47,667 Prov incial Gov ernment – – 585 700 700 700 700 500 900 900 District Municipality – – – – – – – – – – Other transfers and grants – – – – – – – – – – Transfers recognised - capital 4 51,901 93,285 94,752 61,671 61,671 61,671 61,671 44,841 46,124 48,567 Public contributions & donations 5 – – – – – – – – – – Borrowing 6 – – – – – – – – – – Internally generated funds 9,805 11,299 13,385 12,616 18,616 18,616 18,616 13,620 12,225 12,225 Total Capital Funding 7 61,706 104,583 108,138 74,287 80,287 80,287 80,287 58,461 58,349 60,792

GTLM MUNISIPAL INFRASTRUCTURE GRANT PROJECTS 2018/2019 46,675,000

Project Function Item Fund Regional Mun Stand Class Detailed Info 2018/2019

NW394 MIG OPEX PMU Opex MIG All of Taung PMU R 2,333,750.00

NW394 MIG LED PMU Capital MIG All of Taung LED R 2,333,750.00

PMU Capital MIG Lokgabeng Community Hall Ward 8 BUILDING Construction of Lokgtabeng Community Hall 300 sqm R 1,000,000.00

PMU Capital MIG Qhoo Community Hall Ward 1 BUILDING Construction of Qhoo Community Hall 300 sqm R 1,000,000.00

PMU Capital MIG Tlhapeng Community Hall Ward 23 BUILDING Construction of Tlapeng Community Hall 300sqm R 1,000,000.00

PMU Capital MIG Highmast Lights Various Wards AREA LIGHTNING Highmast Lights Various Wards R 330,000.00

PMU Capital MIG Matlhako Access Road Ward 5 ROADS Matlhako 2 Access Road 2,5 km R 410,000.00

PMU Capital MIG Community Facility Seking Ward 21 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00

PMU Capital MIG Community Facility Longaneng Ward 16 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00

PMU Capital MIG Community Facility Mokassa 1 Ward 24 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00 Highmast Lights Various Wards (Sekhing - 21, Lower Majeakgoro - 19, PMU MIG Highmast Lights Various Wards Phase 3 AREA LIGHTNING R 5,850,000.00 Capital Lokaleng - 11, Madibaneng - 10, Seodi Park, Losasaneng - 20, Construction of Buxton Community Hall 300 sqm, fencing, ablution PMU MIG Buxton Community Hall Ward 9 COMM FACILITY R 5,040,000.00 Capital and parking Construction of Kameelputs Community Hall 300 sqm, fencing, PMU MIG Kameelputs Community Hall Ward 20 COMM FACILITY R 5,040,000.00 Capital ablution and parking PMU MIG Cokonyane Raod Ward 6 ROADS Construction of 3 km paved road with edge beams R 10,700,000.00 Capital PMU Capital MIG Moretele Storm water Ward 2 ROADS Construct 2km stone pitched channel with crossings R 3,833,500.00

PMU Capital MIG Pudimoe Community Facility Ward 5 COMM FACILITY Upgrading soccer turf, combi court, vending and change rooms R 3,356,000.00

PMU Capital MIG Taung Community Facility Ward 8 COMM FACILITY Upgrading soccer turf, combi court, vending and change rooms R 3,356,000.00

R 46,675,000.00

86

6.4.1.MIG PROJECTS – OUTER YEARS

Region Detailed Info 2019/2020

All of Taung PMU Opex R 2,380,200.00

All of Taung LED - GTLM R 2,380,200.00

Community Hall Khudutlou Construction of 300 sqm Khudutlou Community Hall R 6,000,000.00

Community Hall Randstad Construction of 300 sqm Randstad Community Hall R 6,000,000.00

Storm Water Matlhako Construction 2 km stone pitched channel with crossings R 5,505,000.00 Highmast Lights various Wards R 5,000,200.00

Community Facility Manthe Soccer field, Combi court Change rooms and Parking R 4,545,200.00

Community Facility Reivilo Soccer field, Combi court Change rooms and Parking R 4,545,200.00

Road Cokonyane 3 km paved road with edge beams R 500,000.00

Storm Water Moretele 2 km stone pitched channel with crossings R 316,000.00

Matolong Bridge 50 m Concrete Bridge R 10,432,000.00

TOTAL R 47,604,000.00

Regional Detailed Info 2020/2021

All of Taung PMU Opex R 2,508,800.00

All of Taung LED - GTLM R 2,508,800.00

Community Hall Leshobo Construction of 300 sqm hall, fencing, ablution and parking R 5,500,000.00

Community Hall Construction of 300 sqm hall, fencing, ablution and parking R 5,500,000.00

Storm Water Rietfontein Construction of 2km stone pitched channel with crossings R 6,000,000.00 Highmast Lights various Wards R 6,000,000.00 Comm Facility Manokwane Soccer field, Combi court Change rooms and Parking R 5,090,400.00

Road Upper Majeakgoro 3 km paved road with edge beams R 10,068,000.00

Storm Water Matlhako Construction of 2km stone pitched channel with crossings R 6,500,000.00

Matolong Bridge 50 m Concrete Bridge R 500,000.00

TOTAL R 50,176,000.00

87

GREATER TAUNG LOCAL MUNICIPALITY NW394 MSCOA BUDGET TEMPLATE 2018/2019 CONTRIBUTION TO FIX ASSETS SUMMARY

VOTE NR PROJECT NAME 2017/2018 % 2018/2019 2019/2020 2020/2021 0001/6201/0000 NW394 C DMM OFFICE EQUIPMENT MM LED Camera & Windows Upgrades & Wi-fi 505,000 200,000 200,000 0001/6203/0000 NW394 C DTS 31 LAND & BUILDINGS - N18 CIRCLE - - - 0101/6201/0000 NW394 C CLLR OFFICE EQUIPMENT CLLRS - - - 0101/6207/0000 NW394 C CLLR 29 FURNITURE CLLRS - POLITICAL OFFICE - 50,000 20,000 20,000 0103/6207/0000 NW394 C CLLR 30 FURNITURE CLLRS - Mayor & Speaker 50,000 20,000 20,000 0105/6205/0000 VEHICLE & MACHINARY SPEAKER - LDV - - - 0105/6207/0000 NW394 C CLLR 28 FURNITURE CLLRS - Exco 36 90,000 - - 0201/6201/0000 NW394 C DFS 1 OFFICE EQUIPMENT CFO Computers as and when needed 70 40,000 40,000 40,000 0201/6203/0000 NW394 C DFS LAND & BUILDINGS FINANCE - Container Storage Unit Bid Docs 250,000 - - 0201/6207/0000 NW394 C DFS 25 FURNITURE CFO Furniture as and when needed - 20,000 20,000 20,000 0301/6201/0000 NW394 C DCS 4 OFFICE EQUIPMENT CORP - Computer Council Recording 56 - - - 0301/6205/0000 VEHICLE & MACHINARY CORP SERV - LDV - - - 0301/6207/0000 NW394 C DCS 27 FURNITURE CORP - Boardroom Chairs & Training Centres - 200,000 - - 0409/6203/0000 NW394 C DSS 5 LAND & BUILDINGS SOCIAL Depot Hall Blinds & Hall Aircons 1,000,000 1,000,000 1,000,000 0409/6205/0000 NW394 C DSS EQUIPMENT AMENITIES - Maintenance team 100,000 100,000 100,000 0409/6209/0000 VEHICLE & MACHINARY SOCIAL SERV - LDV - - - 0409/6213/0000 NW394 C DSS 6 LAND & BUILDINGS SOCIAL Pit-latrine Toilets in Wards 445,000 445,000 445,000 0421/6203/0000 NW394 C DSS 8 LAND & BUILDINGS SOCIAL Lawn & Plants for Parks - 200,000 200,000 200,000 0421/6205/0000 NW394 C DSS 24 EQUIPMENT PARKS - Lawnmowers, Slasher & other eq 96 500,000 500,000 500,000 0421/6209/0000 VEHICLE & MACHINARY SOCIAL - D/C - - - 0421/6211/0000 VEHICLE & MACHINARY SOCIAL - Small Tracktor 400,000 - - 0480/6203/0000 NW394 C DSS 9 LAND & BUILDINGS SOCIAL Transfer Stations Taung & Reivilo - 2,000,000 2,000,000 2,000,000 0480/6205/0000 NW394 C DSS 16 VEHICLE & MACHINARY SOCIAL - Roll-on-roll-of Truck - 2,000,000 2,000,000 2,000,000 0480/6206/0000 EQUIPMENT REFUSE - 2 Ton Scale & Water pump 350,000 500,000 - 0480/6207/0000 NW394 C DSS FURNITURE SOCIAL 20,000 - - 0501/6201/0000 NW394 C DTS 2 OFFICE EQUIPMENT TECH Computer Roads Manager 26 - - - 0501/6205/0000 NW394 C DTS 17 VEHICLE & MACHINARY ROADS - Grader - - - - 0501/6205/0000 NW394 C DTS 21 EQUIPMENT WORKSHOP - Equipment as and when needed 1 100,000 100,000 100,000 0501/6207/0000 NW394 C DTS 26 FURNITURE TECH - - - - - 0501/6209/0000 NW394 C DTS 18 VEHICLE & MACHINARY ROADS - LDV Single Cab 1 Ton - - - - 0501/6209/0000 NW394 C DTS 19 VEHICLE & MACHINARY ROADS - Water Tanker - - - 0531/6203/0000 NW394 C DTS 10 LAND & BUILDINGS ROADS Chiefscourt - construction of edge beam 18 - - - 0531/6203/0000 NW394 C DTS 11 LAND & BUILDINGS ROADS Speedbumps: Mokgareng, Veertien to Khibitswane, Chiefscourt - - - 0531/6203/0000 NW394 C DTS 12 LAND & BUILDINGS ROADS Stormwater drift: Reivilo - - - 0531/6203/0000 NW394 C DTS 13 LAND & BUILDINGS ROADS Taung Entrance Fix tarred road levels - - - 0531/6203/0000 NW394 C DTS 14 LAND & BUILDINGS ROADS Maintenance Camp Ba Ga Maidi - - - 0531/6203/0000 NW394 C DTS 15 LAND & BUILDINGS ROADS - Stormwater Drifts Reivilo, Pudimoe & Taung 300,000 300,000 300,000 0531/6205/0000 NW394 C DTS 22 EQUIPMENT ROADS - 80,000 80,000 80,000 0531/6209/0000 VEHICLE & MACHINARY ROADS - D/C - - - 0550/6203/0000 LAND & BUILDINGS ELEC Upgrade Reivilo Network 2,000,000 2,500,000 3,000,000 0550/6204/0000 LAND & BUILDINGS ELEC Streetlights Taung & Pudimoe 1,000,000 1,000,000 1,000,000 0550/6205/0000 NW394 C DTS EQUIPMENT ELEC - Transformers 600,000 600,000 600,000 0560/6205/0000 NW394 C DTS 23 EQUIPMENT WATER & SANITATION - Equipment as and when needed 1 600,000 600,000 600,000 0570/6203/0000 LAND & BUILDINGS WATER & SAN - Container Chemicals - - - 0570/6203/0000 LAND & BUILDINGS ELEC Sewer MCC Box & Palasides 700,000 - - 0570/6209/0000 NW394 C DTS 20 VEHICLE & MACHINARY WATER & SAN - Trailor & Honey sucker - - - 0601/6201/0000 NW394 C DSP 3 OFFICE EQUIPMENT LANDUSE - IDP Desktop, Printer, Projector & Screen - - - - 0601/6207/0000 NW394 C DSP FURNITURE LANDUSE Director Furniture 20,000 - - 0601/6209/0000 VEHICLE & MACHINARY LAND USE - LDV - - -

13,620,000 12,225,000 12,225,000

88

6.4.2. MAINTENANCE BUDGET

GREATER TAUNG LOCAL MUNICIPALITY NW394 MSCOA BUDGET TEMPLATE 2018/2019

MAINTENANCE PROJECTS DETAILED 2017/2018 VOTE DESCRIPTION % 2018/2019 2019/2020 2020/2021 0001/3803/0000 NW394 M DMM IT 3 Maintenance on all office equipment 550,000 600,000 650,000 0101/3801/0000 NW394 M DMM ALL 2 Maintenance Emergency: Other assets 2,000,000 2,500,000 3,000,000 0101/3801/0000 NW394 M DSS CIVB 4 Maintenance - Community Halls 1,000,000 1,000,000 1,000,000 0101/3801/0000 NW394 M DSS CIVB 5 Gataote - - - 0101/3801/0000 NW394 M DSS CIVB 6 - - - 0101/3801/0000 NW394 M DSS CIVB 7 - - - 0101/3801/0000 NW394 M DSS CIVB 8 - - - 0101/3801/0000 NW394 M DSS CIVB 9 - - - 0409/3801/0000 Maintenance - Sport Stadiums & Parks 1,070,000 1,100,000 1,200,000 0409/3801/0000 NW394 M DSS CIVB 10 Taung - - - 0409/3801/0000 NW394 M DSS CIVB 11 Pudimoe - - - 0409/3801/0000 Ext 6 Park - - - 0409/3801/0000 NW394 M DSS CIVB 12 Manthe - - - 0409/3801/0000 NW394 M DSS CIVB 13 Thota Ya Tau - - - 0409/3801/0000 NW394 M DSS CIVB 14 Reivilo - - - 0409/3801/0000 NW394 M DSS CIVB 15 Reivilo Golf Club - - - 0421/3801/0000 Maintenance - Libraries & Office Buildings 1,750,000 750,000 750,000 0421/3801/0000 NW394 M DSS CIVB 16 Pudimoe & Boipelo Library - - - 0421/3813/0000 NW394 M DSS PARK 17 Maintenance: Nursary nets 800,000 560,000 620,000 0501/3815/0000 NW394 M DTS FLEET 26 General Maintenance GTLM Fleet 4,748,000 5,000,000 5,200,000 0531/3801/0000 NW394 M DTS ROAD 22 Maintenance Roads & Streets: Stormwater Reiv, Pud & Taung 1,500,000 1,590,000 1,680,000 0531/3811/0000 NW394 M DTS ROAD 25 Maintenance: Roads: Streets, Potholes & Stormwater 1,000,000 1,000,000 1,000,000 0531/3813/0000 NW394 M DTS ROAD 23 Maintenance Roads & Streets Traffic Signs ALL 200,000 200,000 200,000 0531/3813/0000 NW394 M DTS ROAD 24 Pudimoe: Semausu Road Patching & Re-sealing 500,000 - - 0550/3801/0000 NW394 M DTS ELEC 20 Maintenance Electricity Taung & Pudimoe 1,500,000 2,000,000 2,500,000 0550/3807/0000 NW394 M DTS ELEC 19 Maintenance Electricity Network Reivilo 3,500,000 4,000,000 4,500,000 0560/3807/0000 NW394 M DTS WATR 18 Maintenance Water Network 1,800,000 1,800,000 1,800,000 0570/3807/0000 NW394 M DTS SAN 21 Maintenance Sanitation Network 1,800,000 1,800,000 1,800,000

23,718,000 23,900,000 25,900,000 25,791,000 28,500,000

89

6.4.3. BUDGET LINK TO STRATEGIC OBJECTIVES – SCHEDULE SA4 TO SA6

Goal 2018/19 Medium Term Revenue & Strategic Objective Goal 2014/15 2015/16 2016/17 Current Year 2017/18 Code Expenditure Framework Ref Audited Audited Audited Original Adjusted Full Year Budget Year Budget Year Budget Year R thousand Outcome Outcome Outcome Budget Budget Forecast 2018/19 +1 2019/20 +2 2020/21 Eradicate backlogs in order to Electricity 11,521 12,010 15,668 17,980 3,538 3,538 3,538 3,538 3,588 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Water 4,592 5,230 3,286 3,570 815 815 842 892 946 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Sew erage 7,942 9,891 9,859 10,577 1,947 1,947 2,063 2,185 2,315 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Refuse 14,958 19,529 14,176 15,295 3,099 3,099 3,305 3,502 3,711 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Roads 60,645 48,025 63,384 69,081 63,406 63,406 46,675 47,604 50,176 improv e access to serv ices nd ensure proper operations and maintenance Promote a culture of May or,council & Municipal 42,157 53,383 51,256 54,601 170,690 170,690 176,523 190,905 203,092 participatory and good manager gov ernance Promote intergrated human Land use & Dev elopment 6,556 7,810 7,252 8,272 1,147 1,147 612 612 612 settlements Improv e library infrastructure Library Serv ice & Civ ic 4,307 6,459 8,697 8,709 1,984 1,984 1,501 2,188 2,190 & serv ices that reflect specific Buldings needs of the communities they serv e To maintain and control public Parks and Recreation 7,448 9,403 8,121 8,635 – – – – – amenities and areas to promote a safe and healthy env iroment To improv e ov erall financial Financial Management 35,740 40,388 51,492 50,842 57,733 57,733 61,344 61,811 63,271 management in the municipality by dev eloping and implementing appropriate sy stems and controls Improv e organisational Corporate Serv ices 27,619 35,137 34,426 48,206 1,409 1,409 100 100 100 cohesion effectiv eness

Allocations to other priorities 2 Total Revenue (excluding capital transfers and contributions) 1 223,484 247,264 267,617 295,768 305,768 305,768 296,503 313,337 330,001

90

NW394 Greater Taung - Supporting Table SA5 Reconciliation of IDP strategic objectives and budget (operating expenditure) Goal 2018/19 Medium Term Revenue & Strategic Objective Goal 2014/15 2015/16 2016/17 Current Year 2017/18 Code Expenditure Framework Ref Audited Audited Audited Original Adjusted Full Year Budget Year Budget Year Budget Year R thousand Outcome Outcome Outcome Budget Budget Forecast 2018/19 +1 2019/20 +2 2020/21 Eradicate backlogs in order to Electricity 9,515 11,745 17,137 18,044 18,044 18,044 21,958 23,938 25,488 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Water 1,265 1,564 2,151 3,104 3,104 3,104 2,950 3,019 3,032 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Sew erage 4,777 6,682 9,385 9,274 9,274 9,274 8,969 9,436 9,948 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Refuse 10,653 12,122 11,866 14,983 14,983 14,983 14,321 15,459 16,694 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Roads 16,310 13,797 16,016 16,257 16,057 16,057 16,273 16,802 17,915 improv e access to serv ices nd ensure proper operations and maintenance Promote a culture of May or,council & Municipal 35,540 35,182 39,303 54,052 62,372 62,372 70,560 74,707 78,356 participatory and good manager gov ernance

Promote intergrated human Land use & Dev elopment 4,931 5,513 6,014 9,248 9,048 9,048 7,355 7,834 8,352 settlements

Improv e library infrastructure Library Serv ice & Civ ic 2,917 3,619 4,840 6,834 6,834 6,834 12,613 11,190 12,630 & serv ices that reflect specific Buldings needs of the communities they serv e To maintain and control public Parks and Recreation 4,515 5,854 5,813 6,812 6,812 6,812 8,730 8,982 9,587 amenities and areas to promote a safe and healthy env iroment To improv e ov erall financial Financial Management 56,129 36,165 69,315 71,932 66,012 66,012 46,865 51,831 50,478 management in the municipality by dev eloping and implementing appropriate sy stems and controls Improv e organisational Corporate Serv ices 23,530 33,013 27,843 37,272 39,272 39,272 52,843 55,768 58,122 cohesion effectiv eness

Allocations to other priorities Total Expenditure 1 170,084 165,256 209,684 247,812 251,811 251,811 263,437 278,966 290,603

91

NW394 Greater Taung - Supporting Table SA6 Reconciliation of IDP strategic objectives and budget (capital expenditure) Goal 2018/19 Medium Term Revenue & Strategic Objective Goal 2014/15 2015/16 2016/17 Current Year 2017/18 Code Expenditure Framework Ref Audited Audited Audited Original Adjusted Full Year Budget Year Budget Year Budget Year R thousand Outcome Outcome Outcome Budget Budget Forecast 2018/19 +1 2019/20 +2 2020/21 Eradicate backlogs in order to Electricity A – – – 6,642 6,642 6,642 9,780 9,100 10,600 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Water B – – – – – – 600 600 600 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Sew erage C – – – 2,400 2,400 2,400 700 – – improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Refuse D – – – – – – 4,370 4,500 4,000 improv e access to serv ices nd ensure proper operations and maintenance Eradicate backlogs in order to Roads G 51,901 66,393 100,978 23,585 29,585 29,585 15,324 17,133 23,448 improv e access to serv ices nd ensure proper operations and maintenance Promote intergrated human Land use & Dev elopment K – – – 51 51 51 20 settlements

Improv e library infrastructure Library Serv ice & Civ ic L – 30,438 – 37,128 37,128 37,128 22,929 14,445 13,445 & serv ices that reflect specific Buldings needs of the communities they serv e Promote a culture of May or,council & Municipal M – – – 165 165 165 3,029 2,620 2,749 participatory and good manager gov ernance

To maintain and control public Parks and Recreation N – – – 1,120 1,120 1,120 1,100 9,790 5,790 amenities and areas to promote a safe and healthy env iroment To improv e ov erall financial Financial Management O – 47 2,116 176 176 176 310 60 60 management in the municipality by dev eloping and implementing appropriate sy stems and controls Improv e organisational Corporate Serv ices P 9,805 7,706 5,044 3,021 3,021 3,021 300 100 100 cohesion effectiv eness

Allocations to other priorities 3 Total Capital Expenditure 1 61,706 104,583 108,138 74,287 80,287 80,287 58,461 58,349 60,792

92

6.4.4.MONTHLY REVENUE AND EXPENDITURE BY SOURCE – SCHEDULE SA25:

F M G PROVINCIAL 1% SERVICES INCOME INCOME GRANT 0% FROM GRANTS M I G SUNDRY 21% INCOME 31% EPWP GRANT 0%

PROPERTY

RATES ELECTRICITY 55% 5% REFUSE 5% EQUITABLE SEWERAGE SHARE WATER 3% 78% 1%

INCOME RATIO TOTAL SERVICES INCOME 23%

TOTAL INCOME FROM GRANTS 77%

93

EXPENDITURE

CAPITAL GRANTS 14% CONTR TO FIX ASSETS 4% EMPLOYEE COST 36% OPERATIONAL GRANTS 2% REPAIR AND MAINTENANCE 7%

PROVISIONS & DEPRECIATION 10%

GENERAL EXPENSES 27%

94

6.5. SPATIAL PERSPECTIVE

The fundamentals of planning are established through legislation – the Constitution of the Republic of sets the developmental agenda for local government; and the Local Government Municipal Systems Act 2000 (Act 32 of 2000) asserts the developmental agenda by mandating municipalities to have Integrated Development Plans. In the context of Spatial planning in the municipality the two most important are the Spatial Planning and Land Use Management Act (Act 16 of 2013) and the National Environmental Management Act (Act 107 of 1998). As a result, the municipality has approved four spatial planning tools which did form part of the new 5 year cycle of the 2017/22 IDP and which is still relevant that must be taken into account when planning. The following spatial planning tools are available in the Spatial Planning & Human Settlement Department:

 The Environmental Management Framework (EMF)  Spatial Development Framework (SDF)  Land Use Scheme (LUS)  Taung Central Precinct Plan

6.5.1.SPATIAL DEVELOPMENT FRAMEWORK (SDF)

The purpose of the Spatial Development Framework is to achieve the desired spatial form of the municipality; the following spatial vision emerged for the municipality:

“A municipality that is collectively involved in the sustainable preservation and efficient restructuring of its space, towards economic vitality and independence by the year 2035.”

The above vision is efficiency driven; and relies on all stakeholders agreeing to aggressively address the spatial complexities of planning in the municipality. This will include the need to tackle sprawling rural; villages and the promotion of dense and compact settlements. There will be a need for the expedition of future housing programmes in suitably located land in proximity to opportunities and services.

Following an assessment of relevant strategic legislative and policy directives, and an analysis of major issues which emerged during the SDF processes; the SDF puts forward the following objectives:

 Providing a framework that will ensure adequate consideration for eco-system integrity in land use and land use development matters;  Providing a framework to guide land allocation and settlement development in the Municipality;  Providing a framework that will promote the optimal spatial allocation of resources in the development planning of the Municipality;  Providing a framework for the sustainable development of the municipality's economic resources in the pursuit of economic vitality and independence;  Providing a spatial basis for stakeholder cooperation and institution building.

One of the major challenges facing the municipality is the spatially fragmented character of settlements – the municipality’s rural context has been identified as a key national challenge. The spatial reality confronting rural settlements is one which emphasizes the location and accessibility of service nodes to highly critical level. Besides their roles in terms of the provision of needed services; these service centres also contribute the focal point for the exchange of useful and profitable ideas, from which those with ready access to them can draw.

95 The central spatial issue with settlement development in Greater Taung Local Municipality is the absence of an urban system. Settlement development at an average density of 2du/ha is unsustainable. There is unremitting sprawls at densities which are too low to promote any meaningful socioeconomic intensification, and unviable in terms of providing conventional forms of social facilities and services. For this reason; the SDF identified areas with central place functions (service nodes); and from analysis the strategic significance of these areas for development and planning is beyond doubt. Nodes are locations where it is desirable to promote a higher intensity of economic, social and community activities and land uses, in order to facilitate economically useful thresholds, easy access, and support for transport infrastructure (especially pedestrian and cycling). From a settlement restructuring perspective, the point of departure is that, government can indirectly influence settlement patterns, by clustering publicly provided services in these locations, and permitting a wider range of land uses in terms of the municipal Land Use Scheme (LUS). By doing this, the conditions for spontaneous infill can be created, and the challenge of unremitting spatial sprawls can be abated in the long run.

It is therefore necessary to assist with the gradual making of more balanced settlements, and ultimately realising the municipality’s spatial development vision.

THE FOLLOWING NODES ARE PROPOSED; AS IT IS DESIRABLE TO PROMOTE HIGHER DENSITY ECONOMIC, SOCIAL, COMMUNITY AS WELL AS INVESTMENT SPENDING (BOTH PUBLIC AND PRIVATE) IN THESE VILLAGES/ AREAS, THROUGH THE LAND USE SCHEME (LUS) AND IDP DECISIONS.

Settlement Index Range NODE Sub-area Settlements hierarchy of (Km) settlements Nhole, Kolong Manokwane, Matolong, Rooiwal, Taung CBD 397.7 10 Mokgareng, Leshobo, Tsokoyane, & the rest of the municipality Reivilo 107.4 Surrounding farms Kgomotso 30.1 5 Madithamage Pudimoe, Matshelapane, Choseng, Matlapaneng, Pudimoe 28.7 5 Mogopela, & Myra Molelema 22.9 5 Kokomeng, Longaneng, Molelema, & Matsheng Thomeng, Tamasikwa, Mokasa 2, Motsweding, & Norlim 21.9 5 Takaneng Modutung, Maphoitsile Gamokuane, Dikhuting, Magogong 13.1 5 Mothanthanyang, & Graspan Dryharts 12.6 5 Ntswanahatshe, Moretele, & Maganeng Mmamutla 11.8 5 Gataote, Losasaneng, Kameelputs, & Thota ya Tau Lower 8.6 5 Upper Majeakgoro, Sekhing, Seoding, Pampierstad Majeakgoro

The following guidelines should guide land development decisions in relation to nodal developments, in the municipal area:

 The central place/service provision character of the nodes should be consolidated. The emergence of activities (or investments) in any sub-area settlement, which may result in the subtraction of useful thresholds from a node, should be discouraged, and favored in the node instead. This is easily achieved by ensuring that no sub-area settlement is competing with the node;  Land Uses (activities) which draw crowd and cause people to gather, such as organised open space, sports & recreation, shopping, local cinema, taxi rank etc., must be promoted through the LUS in the node;  Nodes must be prioritised for beautification projects such as, surfacing of internal roads, pedestrian sidewalks, and external roads that link their sub-area settlements, landscaping and tree planting, as well as installation of street lighting and furniture;

96  Adequate communication with government departments and municipal line departments should be made regarding budgets. An appeal should be made for the consideration of these nodes with regard to infrastructure provision and upgrade;  Within the limits imposed by finance, all Order B nodes should be treated with equal level of priority; and  New councilors and ward committee members should be fully apprised of the plan for nodal development, so that planning can be politically supported.

6.5.2.LAND USE MANAGEMENT SCHEME

Land Use Scheme (LUS)

The purpose of a Land Use Scheme (LUS) is for it to give effect to and be consistent with the Spatial Development Framework and determine the use and development of land within the municipal area to which it relates in order to promote: (a) give effect to the municipal spatial development framework; (b) make provision for orderly development and the welfare of the community; and (c) determine use rights and development parameters, with due consideration of the principles referred to in the Spatial Planning and Land Use Management Act, 2013. The LUS consists of regulations setting out the procedures and conditions relating to the use and development of land in any zone; a map indicating the zoning of the municipal area into land use zones and a register of all amendments to such land use scheme. It is important to note that, the LUS addresses the entire municipal area (including traditional areas). As informal and traditional land use development processes are poorly integrated into formal systems of spatial planning and land use management. Therefore, the LUS had to integrate all areas to address land use management. Land use management focuses on ‘influencing’ and ‘managing’ what land is allocated where.

97

6.5.3.INTEGRATED ENVIRONMENTAL MANAGEMENT PLAN AND PROGRAMME

Environmental Management Framework (EMF)

The Environmental Management Framework (EMF) forms part of Integrated Environmental Management that can be used to support informed decisions regarding the management of environmental impacts that arise out of human activities and development. The EMF informs both project level decisions making by the North West Provincial Government (Environmental Impact Assessments authorizations) and the Greater Taung Local Municipality (land use authorizations), as well as strategic spatial planning, primarily the Spatial Development Framework of the municipality. The EMF provides a compilation of information and maps, illustrating attributes of the environment for a specific geographic area that becomes useful in a diverse field of environmental applications. The information includes Environmental Impact Assessment processes and other planning processes, such as the development of IDPs, SDFs and other open space planning applications. Moreover, The EMF reveals where specific land uses may be best practiced; and offers performance standards for maintaining appropriate uses of land.

The EMF addresses the following as strategic objectives when management, protection and development of the environment are concerned:

 Hydrology and water resource management  Land use  Agricultural development  Socio-economic development  Physical infrastructure and built structures  Mining  Protect and conserve the unique topographical and geological features  Biodiversity and conservation  Optimal development and utilization of the tourism potential  Solar energy potential (renewable energy generation)

The SDF took into account the EMF; as the Spatial Planning and Land use Management Act (Act 16 of 2013) requires the development of SDFs that must include a strategic assessment of the environmental pressures and opportunities within the municipal area – the spatial location of environmental sensitivities; high potential agriculture; etc.

The EMF is available at The Spatial Planning & Human Settlement office on request.

98

6.5.4.TAUNG PRECINCT PLAN

Taung Central Precinct Plan

The Taung Central Precinct Plan involved the preparation of a plan or proposal for the Taung central area; this included the investigations of appropriate land use options, physical environment constraints, and infrastructure requirements. The Taung Central Town serves the entire municipal area including all the rural villages and is a very important and influential node with a number of prominent municipal, government and business activities. The purpose of the compilation of the precinct plan was to unlock the inherent development potential located in the area. Precinct commonly refers in planning to a geographically smaller area with specific characteristics that requires detailed planning within the broader administrative boundaries of a municipality. A rural precinct is a spatially explicit area within a municipal area that is subject to particular administrative arrangements to protect and promote rural and regional landscape values and supporting activities within the rural precinct.

THE PRECINCT PLAN ALSO GIVES EFFECT TO THE SDF – AS THE SDF IDENTIFIES TAUNG AS A SERVICE NODE WHERE IT IS DESIRABLE TO PROMOTE A HIGHER INTENSITY OF ECONOMIC, SOCIAL AND COMMUNITY ACTIVITIES AND LAND USES, IN ORDER TO FACILITATE ECONOMICALLY USEFUL THRESHOLDS, EASY ACCESS, AND SUPPORT FOR TRANSPORT INFRASTRUCTURE (ESPECIALLY PEDESTRIAN AND CYCLING).

The vision for the Precinct Plan is as follows:

“Create a vibrant, safe, accessible and sustainable environment that will enhance private sector investment as well as socioeconomic development.”

(Precinct Plan Boundary)

99

The objectives are as follows:

 Identifying land for business/ commercial uses and possible expansion of the CBD area;  Identifying land for residential development including new layout plan for the settlement South of Taung Extension 7;  Improving the traffic flow within the precinct area, including access roads from the N18;  Determining the factors that bring about urban decay Taung CBD;  Determining the impact of the informal sector on CBD development;  Introducing the concept of urban design in future planning and upgrading of the CBD;  Developing business retention strategies for the existing business as well as attraction strategies for potential investors;  Define CBD entrances;  Upgrading of the corridors linking the CBD with the Taung village to serve as a mixed use zone;  Land Reservation based on SANRAL’s norms and standard for the upgrading of the N18.

(The Precinct Plan)

The Taung Central Precinct plan is aligned with the SDF and LUS and all plans and proposals have been outlined in the document. Challenges such as ‘access into the Taung CBD’ have been addressed and implementation should be planned for. Relevant departments – Infrastructure; Spatial Planning and Human Settlements; and LED should develop their action plans in response to the implementation proposed as part of SDBIP targets for 2017/2018 financial year.

100

6.6. INFRASTRUCTURE CLUSTER

6.6.1.WATER SERVICES DEVELOPMENT PLAN AND PROGRAMME (WSDP)

Dr Ruth S Mompati DM is the Water Authority and there for the WSDP need to be done and reviewed at district level, the review is currently work in progress.

The developmental needs of GTLM need to be facilitated in the WSDP.

6.6.2.INTEGRATED WASTE MANAGEMENT PLAN AND PROGRAMME (IWMP)

GTLM did develop an IWMP at local level with a methodology that address waste management from a local point of view to link with initiatives at Naledi LM and the district.

6.6.3.INTEGRATED TRANSPORT PLAN AND PROGRAMME (ITP)

The ITP is the responsibility of the district. One meeting was held at district level to resuscitate the development of the ITP. GTLM is part of the scope of the project and the plan will be submitted as soon as the project has been completed.

6.7. SOCIAL CLUSTER

6.7.1.INTEGRATED POVERTY REDUCTION AND GENDER EQUITY PLAN AND PROGRAMME

A plan addressing specifically this issue is not in place but GTLM did develop the LED Strategy and does apply the Supply Chain Management Policy which does have an indirect impact with regard to this initiative.

6.7.2.DISASTER MANAGEMENT PLAN

Disaster Management is a function of the Dr Ruth Mompati DM and there for the Disaster Management Plan is being developed, reviewed and coordinated at a district level.

GTLM did review the plan to align with the current reality but more detail need to be included with regard to the management of climate change which have an impact in the form of floods and drought.

6.7.3.INTEGRATED HIV/AIDS PLAN AND PROGRAMME

An old HIV policy in place since November 2008. The policy & procedure was designed to:

 Reinforce a mature and enlightened culture and approach to HIV and AIDS;  To ensure that staff living with HIV/AIDS have the same rights and obligations as other staff;  To take steps to enhance the health of employees who are HIV positive and reduce their exposure to a debilitating illness.  To avoid discrimination and prejudice among employees towards HIV positive employees; To maintain maximum stability and productivity in the workplace.  To promote consistency in dealing with the issues of AIDS and HIV in the work environment;  To create a balance between rights and responsibilities of all parties relating to HIV/AIDS;

101

6.8. ECONOMIC CLUSTER

6.8.1.GREATER TAUNG LOCAL ECONOMIC DEVELOPMENT STRATEGY

The LED Unit in the Office of the Municipal Manager does have the following programmes to improve LED in GTLM:

KEY FOCUS AREA STRATEGIC OBJECTIVES PROJECTS/PROGRAMME Agricutural And Rural To provide agricultural support services to farmers Farmers Support Programme Development in order to ensure sustainable development and management of agricultural resources To create healthy and prosperous rural communities Small-scale Farmers Grant funding with viable alternatives to subsistence farming. Vegetables Production Projects Facilitate and empower the farming households and Small-scale farmers Support communities to benefit from new opportunities being created from growth in demand for agricultural commodities and expanding markets for high-values products in local, district and regional markets. Tourism To promote and unlock tourism development Tourism Product Development and Development potential in order to ensure that Greater Taung is a Marketing: preferred tourism destination Taung Cultural Village Taung Skull Site and Heritage Museum New Development of Tourism Facilities Taung Dam and Spitskop Dam Game Reserve Development Buxton Military Base Taung Hotel School Cultural To promote heritage and cultural activities in Establishment of Cultural villages Development Greater Taung through events Enterprise To develop the value chain approach in the poverty Brickmaking Development alleviation projects and to establish the socio- Sewing and shoemaking Project economic viability of the industry in GTLM and Carpentry Project secure external market Bakery Recycling Flea Market Enterprise Development Conference Enterprise Development Centre Establishment Of To accelerate a process of job-creation and to Gamothibi Economic hub Economic Hubs enable local people to contribute in the Gamaidi Econo infrastructure and economic development of their area.

102

7. PROJECT REGISTER

The following information was submitted by the relevant departments:

7.1. GTLM MIG PROJECTS

GTLM MUNISIPAL INFRASTRUCTURE GRANT PROJECTS 2018/2019 46,675,000

Project Function Item Fund Regional Mun Stand Class Detailed Info 2018/2019

NW394 MIG OPEX PMU Opex MIG All of Taung PMU R 2,333,750.00

NW394 MIG LED PMU Capital MIG All of Taung LED R 2,333,750.00

PMU Capital MIG Lokgabeng Community Hall Ward 8 BUILDING Construction of Lokgtabeng Community Hall 300 sqm R 1,000,000.00

PMU Capital MIG Qhoo Community Hall Ward 1 BUILDING Construction of Qhoo Community Hall 300 sqm R 1,000,000.00

PMU Capital MIG Tlhapeng Community Hall Ward 23 BUILDING Construction of Tlapeng Community Hall 300sqm R 1,000,000.00

PMU Capital MIG Highmast Lights Various Wards AREA LIGHTNING Highmast Lights Various Wards R 330,000.00

PMU Capital MIG Matlhako Access Road Ward 5 ROADS Matlhako 2 Access Road 2,5 km R 410,000.00

PMU Capital MIG Community Facility Seking Ward 21 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00

PMU Capital MIG Community Facility Longaneng Ward 16 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00

PMU Capital MIG Community Facility Mokassa 1 Ward 24 COMM FACILITY Soccer field, Combi court Change rooms and Parking R 364,000.00 Highmast Lights Various Wards (Sekhing - 21, Lower Majeakgoro - 19, PMU MIG Highmast Lights Various Wards Phase 3 AREA LIGHTNING R 5,850,000.00 Capital Lokaleng - 11, Madibaneng - 10, Seodi Park, Losasaneng - 20, Construction of Buxton Community Hall 300 sqm, fencing, ablution PMU MIG Buxton Community Hall Ward 9 COMM FACILITY R 5,040,000.00 Capital and parking Construction of Kameelputs Community Hall 300 sqm, fencing, PMU MIG Kameelputs Community Hall Ward 20 COMM FACILITY R 5,040,000.00 Capital ablution and parking PMU MIG Cokonyane Raod Ward 6 ROADS Construction of 3 km paved road with edge beams R 10,700,000.00 Capital PMU Capital MIG Moretele Storm water Ward 2 ROADS Construct 2km stone pitched channel with crossings R 3,833,500.00

PMU Capital MIG Pudimoe Community Facility Ward 5 COMM FACILITY Upgrading soccer turf, combi court, vending and change rooms R 3,356,000.00

PMU Capital MIG Taung Community Facility Ward 8 COMM FACILITY Upgrading soccer turf, combi court, vending and change rooms R 3,356,000.00

R 46,675,000.00

103

7.1. GTLM - DRAFT TOP LAYER SDBIP

The Draft Top Layer will be presented at the IDP Rep Forum and will only be included in the Final IDP as a draft document to be approved by the Mayor by the 25th of June 2018.

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Municipal Improve Hold quarterly Number of quarterly Institutional Director: Meeting Minutes / Institutional organisational departmental staff departmental staff Development N/A Technical 4 Accumulative Number Attendance OpEx OpEx 4 Development cohesion meetings by end June meetings held by end and Services Register effectiveness 2019 June 2019 Transformation Number of quarterly Promote a Report quarterly to Good reports submitted to Portfolio Meeting culture of Portfolio on the Director: Institutional Governance Portfolio on the Minutes / participatory implementation of N/A Technical 4 Accumulative Number OpEx OpEx 4 Development and Public implementation of Attendance and good Council Resolutions by Services Participation Council Resolutions by Register governance end June 2019 end June 2019 Promote a Good Update the risk register culture of Number of risk registers Director: Risk Governance of the directorate Attendance participatory updated quarterly by end N/A Technical 4 Accumulative Number OpEx OpEx 4 Management and Public quarterly by end June Register and good June 2019 Services Participation 2019 governance Spend 100% of the Percentage of the municipal capital budget municipal capital budget Build and on capital projects actually spent on capital strengthen the identified in terms of the projects identified in Basic Service administrative, IDP measured as terms of the IDP (Actual Director: Infrastructure Delivery and Expenditure institutional and (Actual amount spent on amount spent on N/A Technical 100% Accumulative Percentage 100% Development Infrastructure Report financial projects as identified for projects as identified for Services Development capabilities of the year in the IDP/Total the year in the IDP/Total the municipality amount spent on capital amount spent on capital projects) x 100) by end projects) x 100) by end June 2019 June 2019

104

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Number of monthly Submit monthly report to reports submitted to the the MM, within 7 days MM, within 7 days after after month-end, on the month-end, on the Promote a corrective actions Good corrective actions culture of implemented to address Director: Governance implemented to address Audit participatory & the matters raised in the N/A Technical 6 Accumulative Number Audit Action Plan OpEx OpEx 6 and Public the matters raised in the good management letter of Services Participation management letter of the governance the AG for which the AG for which the Directorate is department is responsible by end June responsible by end June 2019 2019 Number of quarterly Municipal Promote a Compile quarterly assessment reports Institutional culture of assessment report on all Director: Performance Performance compiled on all Development participatory managers reporting to N/A Technical 0 Accumulative Number Assessment OpEx OpEx 4 Management managers reporting to and and good the Director by end June Services Report the Director by end June Transformation governance 2019 2019 Promote a Good Submit monthly Number of monthly culture of Director: Institutional Governance consolidated B2B Report consolidated B2B Acknowledgement participatory N/A Technical 12 Accumulative Number OpEx OpEx 12 Development and Public to the PMS Unit by end Reports submitted by of Receipt and good Services Participation June 2019 end June 2019 governance Eradicate backlogs in Basic Service order to improve Street lights at Pudimoe Director: New KPI Delivery and access to Delivery Note / Electricity and Taung by end June 8 Technical for Carry Over Percentage R 1,000,000 1 Infrastructure services and Invoice 2018 Services 2018/19 Development ensure proper operations and maintenance Eradicate backlogs in Basic Service order to improve Procure a 100KVA Number of 100KVA Director: New KPI Delivery and access to generator for the Taung generators procured for Delivery Note / Electricity 8 Technical for Carry Over Percentage R 600,000 1 Infrastructure services and Admin Office by end the Taung Admin Office Invoice Services 2018/19 Development ensure proper November 2018 by end November 2018 operations and maintenance

105

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Eradicate backlogs in Number of MCC Boxes Basic Service order to improve Upgrade the MCC Box upgraded at the main Director: New KPI Delivery and access to at the main sewer Delivery Note / Electricity sewer substation in 8 Technical for Carry Over Percentage R 700,000 1 Infrastructure services and substation in Taung by Invoice Taung b end January Services 2018/19 Development ensure proper end January 2018 2018 operations and maintenance Eradicate Spend 100% of the Percentage of the backlogs in approved budget on the approved budget spent Basic Service order to improve upgrading of the on the upgrading of the Director: New KPI Delivery and access to electricity network at electricity network at Expenditure Electricity 1 Technical for Accumulative Percentage R 2,000,000 Infrastructure services and Reivilo (Total budget Reivilo (Total budget Report Services 2018/19 Development ensure proper spent/ Total approved spent/ Total approved operations and budget x 100) by end budget x 100) by end maintenance June 2019 June 2019 Eradicate Spend at least 90% of Percentage of approved backlogs in approved budget on the budget actually spent on Basic Service order to improve maintenance of the maintenance of Delivery and access to electricity network at electricity network at Expenditure Electricity 1 Electrician 90% Accumulative Percentage 0550/3807/M/DTS/ELEC/19 R 3,500,000 90% Infrastructure services and Reivilo (Total budget Reivilo (Total budget Report Development ensure proper spent/ Total approved spent/ Total approved operations and budget x 100) by end budget x 100) by end maintenance June 2019 June 2019 Spend at least 90% of Percentage of approved Eradicate approved budget on the budget actually spent on backlogs in maintenance of the maintenance of Basic Service order to improve electricity network at electricity network at Delivery and access to Expenditure Electricity Taung & Pudimoe Taung & Pudimoe 5, 8, 13 Electrician 90% Accumulative Percentage 0550/3807/M/DTS/ELEC/20 R 1,500,000 90% Infrastructure services and Report measured as (Total measured as (Total Development ensure proper budget spent/ Total budget spent/ Total operations and approved budget x 100) approved budget x 100) maintenance by end June 2019 by end June 2019

Eradicate backlogs in Basic Service order to improve Construct 25 high mast Number of high mast 6, 9, New KPI Delivery and access to lights (Phase 3) in lights (Phase 3) Manager: Completion Electricity 12, 18, for Carry Over Number R 5,850,000 25 Infrastructure services and various Wards by end constructed in various PMU Certificate 22, 24 2018/19 Development ensure proper June 2019 Wards by end June 2019 operations and maintenance

106

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Eradicate backlogs in Basic Service order to improve Completion of the Complete Lokgabeng Community Delivery and access to Lokgabeng Community Manager: Completion Community Hall project 8 60% Carry Over Number R 1,000,000 1 Halls Infrastructure services and Hall project by end PMU Certificate by end August 2018 Development ensure proper August 2018 operations and maintenance Eradicate backlogs in Basic Service order to improve Complete Qhoo Completion of the Qhoo Community Delivery and access to Manager: Completion Community Hall project Community Hall project 1 60% Carry Over Number R 1,000,000 1 Halls Infrastructure services and PMU Certificate by end August 2018 by end August 2018 Development ensure proper operations and maintenance Eradicate backlogs in Basic Service order to improve Completion of the Complete Tlapeng Community Delivery and access to Tlapeng Community Hall Manager: Completion Community Hall project 23 60% Carry Over Number R 1,000,000 1 Halls Infrastructure services and project by end August PMU Certificate by end August 2018 Development ensure proper 2018 operations and maintenance Eradicate backlogs in Basic Service order to improve Completion of the Complete Buxton New KPI Community Delivery and access to Buxton Community Hall Manager: Completion Community Hall project 9 for Carry Over Number R 5,040,000 1 Halls Infrastructure services and project by end June PMU Certificate by end June 2019 2018/19 Development ensure proper 2019 operations and maintenance Eradicate backlogs in Basic Service order to improve Completion of the Complete Kammeelputs New KPI Community Delivery and access to Kammeelputs Manager: Completion Community Hall project 20 for Carry Over Number R 5,040,000 1 Halls Infrastructure services and Community Hall project PMU Certificate by end June 2019 2018/19 Development ensure proper by end June 2019 operations and maintenance

107

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Eradicate backlogs in Basic Service order to improve Number of upgrades of Complete upgrading of New KPI Delivery and access to Pudimoe sport facility Manager: Completion Sport Facility Pudimoe Sport Facility 5 for Carry Over Number R 3,356,000 1 Infrastructure services and completed by end June PMU Certificate by end June 2019 2018/19 Development ensure proper 2019 operations and maintenance Eradicate backlogs in Basic Service order to improve Number of upgrades of Complete upgrading of New KPI Delivery and access to Taung sport facility Manager: Completion Sport Facility Taung Sport Facility by 8 for Carry Over Number R 3,356,000 1 Infrastructure services and completed by end June PMU Certificate end June 2019 2018/19 Development ensure proper 2019 operations and maintenance Eradicate backlogs in Basic Service order to improve Complete construction of Number kilometers of Multi- Delivery and access to 3km Access Road in access road completed PMU Completion R Roads 6 year Carry Over Number 3 Infrastructure services and Cokonyane by end June in Cokonyane by end Manager Certificate 10,700,000,000 Project Development ensure proper 2019 June 2019 operations and maintenance Eradicate backlogs in Complete the upgrading Complete the upgrading Basic Service order to improve of the N18 Traffic circle of the N18 Traffic circle Delivery and access to PMU Completion Roads and alteration to road and alteration to road 8 65% Carry Over Number R 6,000,000 1 Infrastructure services and Manager Certificate lanes by end September lanes by end September Development ensure proper 2018 2018 operations and maintenance Eradicate backlogs in Basic Service order to improve Complete construction of Number kilometers of New KPI Delivery and access to 2km Stormwater channel stormwater channel PMU Completion Stormwater 2 for Carry Over Number R 3,833,500 2 Infrastructure services and in Moretele by end June completed in Moretele Manager Certificate 2018/19 Development ensure proper 2019 by end June 2019 operations and maintenance

108

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Eradicate backlogs in Complete palisade fence Number of palisade Basic Service order to improve projects at Taung fence projects completed Manager: New KPI Water & Delivery and access to chlorine house, Taung, at Taung chlorine house, N/A Water & for Carry Over Number ? ? Sanitation Infrastructure services and Pudimoe and Reivilo Taung, Pudimoe and Sanitation 2018/19 Development ensure proper pump stations by end Reivilo pump stations by operations and September 2018 end September 2018 maintenance Eradicate backlogs in Basic Service order to improve Procure 2 high Number of high Manager: New KPI Water & Delivery and access to velocity70I/min@130 bar velocity70I/min@130 bar N/A Water & for Carry Over Number ? ? Sanitation Infrastructure services and sewer cleaning machine sewer cleaning machine Sanitation 2018/19 Development ensure proper by end March 2019 by end March 2019 operations and maintenance Eradicate backlogs in Number of 6m x 3m Basic Service order to improve Procure a 6m x 3m steel steel container with Manager: New KPI Water & Delivery and access to container with windows windows and shelves N/A Water & for Carry Over Number ? ? Sanitation Infrastructure services and and shelves by end procured by end Sanitation 2018/19 Development ensure proper December 2018 December 2018 operations and maintenance Eradicate Number of quarterly Submit quarterly reports backlogs in reports submitted to to Portfolio on progress Basic Service order to improve Portfolio on progress Portfolio Meeting made on rural water and Manager: Water & Delivery and access to made on rural water & Minutes / sanitation projects N/A Water & 4 Accumulative Number OpEx OpEx 4 Sanitation Infrastructure services and sanitation projects Attendance (Projects are Sanitation Development ensure proper (Projects implemented Register implemented by DRSM) operations and by DRSM) by end June by end June 2019 maintenance 2019 Eradicate Spend at least 90% of 90% 0560/3807/M/DTS/WATR/18 R 1,800,000 90% Percentage of approved backlogs in approved budget on the budget actually spent on Basic Service order to improve maintenance of the the maintenance of the Manager: Water & Delivery and access to water & sewer network Expenditure water & sewer network N/A Water & Accumulative Percentage Sanitation Infrastructure services and measured as (Total 90% Report 0570/3807/M/DTS/SAN/21 R 1,800,000 90% (Total budget spent/ Sanitation Development ensure proper budget spent/ Total Total approved budget x operations and approved budget x 100) 100) by end June 2019 maintenance by end June 2019

109

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Create an Number of Full Time Create 42 Full Time environment Equivalents (calculated Equivalents (calculated that promotes as (days worked x Director: Temporary Local Economic as (days worked x EPWP development of number of participants / N/A Technical 101 Accumulative Number Employment 0511/1671/R/1601/EPWP/14 R 1,077,000 42 Development number of participants / local economy 230) created through Services Contracts 230) through EPWP by and facilitate job EPWP by end June end June 2019 creation 2019 Create an Number of quarterly environment Submit quarterly reports reports on the Monthly EPWP that promotes to Council on the Manager: Local Economic implementation of EPWP Expenditure EPWP development of implementation of N/A Roads & 4 Accumulative Number OpEx OpEx 4 Development programme submitted to Report / Quarterly local economy EPWP programme by Stormwater Council by end June Evaluation Report and facilitate job end June 2019 2019 creation Spend at least 95% of 0531/3811/M/DTS/ROAD/22 R 1,500,000 Eradicate approved budget on the Percentage of approved backlogs in maintenance of roads budget actually spent on Basic Service order to improve infrastructure network the maintenance of Manager: Delivery and access to (i.e. potholes, road roads infrastructure Expenditure Roads N/A Roads & 90% Accumulative Percentage Infrastructure services and marking and roads traffic network (Total budget Report 0531/3811/M/DTS/ROAD/23 R 200,000 95% Stormwater Development ensure proper signs) measured as spent/ Total approved operations and (Total budget spent/ budget X 100) by end maintenance Total approved budget X June 2019 100) by end June 2019 Eradicate backlogs in Number of stormwater Basic Service order to improve Construct 15 stormwater drifts constructed at New KPI Delivery and access to drift at Reivilo, Pudimoe Director Confirmation Stormwater Reivilo, Pudimoe and 1 for Carry Over Number 0531/6203/C/DTS/15 R 300,000 15 Infrastructure services and and Taung by end Infrastructure Letter Taung by end March 2018/19 Development ensure proper March 2019 2019 operations and maintenance Spend at least 95% of Eradicate approved budget on the Percentage of approved backlogs in maintenance of storm budget actually spent on Basic Service order to improve water channels the maintenance of Manager: Delivery and access to (manholes, channels Expenditure Stormwater storm water channels N/A Roads & 90% Accumulative Percentage 0531/3811/M/DTS/ROAD/25 R 1,000,000 95% Infrastructure services and and small bridges) Report (Total budget spent/ Stormwater Development ensure proper measured as (Total Total approved budget X operations and budget spent/ Total 100) by end June 2019 maintenance approved budget X 100) by end June 2019

110

TECHNICAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Unit of Programme KPI Target Portfolio of Annual REF National KPA KPI Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective measurement Driver type Evidence Target type Target Eradicate Number of quarterly backlogs in Submit quarterly reports reports submitted to Basic Service order to improve to Portfolio on the Portfolio Meeting Portfolio on the Fleet Delivery and access to management of the Manager: Minutes / management of the N/A 100% Accumulative Percentage OpEx OpEx 4 Management Infrastructure services and Municipal Fleet & Fleet Attendance Municipal Fleet & Development ensure proper Workshop by end of Register Workshop by end of operations and June 2019 June 2019 maintenance Eradicate Spend 100% of Percentage of approved backlogs in approved budget on budget actually spent on Basic Service order to improve managing the Municipal managing the Municipal Fleet Delivery and access to Fleet & Workshop Manager: Expenditure Fleet & Workshop (Total N/A 100% Accumulative Percentage 0501/3815/M/DTS/FLEET/26 R 4,748,000 100% Management Infrastructure services and measured as (Total Fleet Report budget spent/ Total Development ensure proper budget spent/ Total approved budget X 100) operations and approved budget X 100) by end June 2019 maintenance by end June 2019 Eradicate Spend 100% of Percentage of approved backlogs in approved budget on wet budget actually spent on Basic Service order to improve fuel consumption of the wet fuel consumption of New KPI Fleet Delivery and access to Municipal Fleet & the Municipal Fleet & Manager: Expenditure N/A for Accumulative Percentage 0103/4443/R/DTS/52 R 5,270,000 100% Management Infrastructure services and Workshop (Total budget Workshop (Total budget Fleet Report 2017/18 Development ensure proper spent/ Total approved spent/ Total approved operations and budget X 100) by end budget X 100) by end maintenance June 2019 June 2019

111

COMMUNITY SOCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Focus Area Objective Driver type Evidence Target type Municipal Improve Hold quarterly Number of quarterly Director: Meeting Minutes / Institutional Institutional organisational departmental staff departmental staff Community N/A 4 Accumulative Number Attendance OpEx OpEx 4 Development Development and cohesion meetings by end June meetings held by end Social Register Transformation effectiveness 2019 June 2019 Service Number of quarterly Report quarterly to Good reports submitted to Director: Portfolio Meeting Promote a culture Portfolio on the Institutional Governance and Portfolio on the Community Minutes / of participatory & implementation of Council N/A 4 Accumulative Number OpEx OpEx 4 Development Public implementation of Council Social Attendance good governance Resolutions by end June Participation Resolutions by end June Service Register 2019 2019 Good Director: Promote a culture Update Risk Register of Number of quarterly risk Risk Governance and Community Attendance of participatory & the Directorate quarterly registers updated by end N/A 4 Accumulative Number OpEx OpEx 4 Management Public Social Register good governance by end June 2019 June 2019 Participation Service Submit monthly report to Number of monthly reports the MM, within 7 days submitted to the MM, after month-end, on the within 7 days after month- Good corrective actions end, on the corrective Director: Promote a culture Governance and implemented to address actions implemented to Community Audit of participatory & N/A 6 Accumulative Number Audit Action Plan OpEx OpEx 6 Public the matters raised in the address the matters raised Social good governance Participation management letter of the in the management letter Service AG for which the of the AG for which the Directorate is responsible department is responsible by end June 2019 by end June 2019 Number of quarterly Municipal Promote a culture Compile quarterly Director: assessment reports Performance Performance Institutional of participatory assessment report on all Community compiled on all managers N/A 0 Accumulative Number Assessment OpEx OpEx 4 Management Development and and good managers reporting to the Social reporting to the Director by Report Transformation governance Director by end June 2019 Service end June 2019 Good Submit monthly Number of monthly Director: Promote a culture Institutional Governance and consolidated B2B Report consolidated B2B Reports Community Acknowledgement of participatory & N/A 12 Accumulative Number OpEx OpEx 12 Development Public to the PMS Unit by end submitted to the PMS Unit Social of Receipt good governance Participation June 2019 by end June 2019 Service

Basic Service To maintain and Complete construction of Number of pit latrine toilets Director: Delivery and manage all 10 cemetery pit latrine construction projects 1, 3, 5, 6, Community Completion Amenities 4 Carry Over Number 0409/6203/C/DSS/6 R 445,000 10 Infrastructure council buildings toilets in identified areas completed in identified 7, 8 Social Certificate Development and facilities by end March 2019 areas by end March 2019 Service Basic Service To maintain and Number of renovation Director: Complete renovation New KPI Delivery and manage all projects at the Depot Hall Community Completion Amenities project at the Depot Hall 3, 15 for Carry Over Number 0409/6203/C/DSS/5 R 1,000,000 1 Infrastructure council buildings completed by end March Social Certificate by end March 2019 2017/18 Development and facilities 2019 Service Basic Service To maintain and Complete renovation Number of Community Gataote Manager: New KPI Completion Amenities Carry Over Number 0409/3801/M/DSS/CIVB/4 R 1,000,000 6 Delivery and manage all project at various Hall renovation projects Amenities for Certificate

112

COMMUNITY SOCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Focus Area Objective Driver type Evidence Target type Infrastructure council buildings Community Halls by end completed by end March 2018/19 Development and facilities March 2019 2019

Reivilo Golf Club Reivilo Basic Service To maintain and Complete renovation Number of Sport Facility Manthe New KPI Delivery and manage all project at various Sport renovation projects Thota Ya Manager: Completion Amenities for Carry Over Number 6 Infrastructure council buildings Facilities by end March completed by end March Yau Amenities Certificate 2018/19 Development and facilities 2019 2019 Pudimoe R 1,070,000 Cover Taung Cover Basic Service To maintain and Number of toilet Complete renovation New KPI Delivery and manage all renovation projects at Ext. Manager: Completion Amenities project of toilets at Ext. 6 for Carry Over Number 1 Infrastructure council buildings 6 Park completed by end Amenities Certificate Park by end June 2019 2018/19 Development and facilities June 2019 New KPI Manager: Completion Basic Service To maintain and Complete renovation Number of renovation Pudimoe for Carry Over Number R 30,000 Amenities Certificate Delivery and manage all project of various projects of municipal 2018/19 Amenities 0421/3801/M/DSS/CIVB/16 Infrastructure council buildings municipal libraries by end libraries completed by end New KPI Manager: Completion Development and facilities Mach 2019 March 2019 Boipelo for Carry Over Number R 30,000 Amenities Certificate 2018/19 Number of quarterly Report quarterly to Basic Service To maintain and reports submitted to Portfolio Meeting Portfolio on routine Delivery and manage all Portfolio on routine Manager: Minutes / Amenities maintenance of Council N/A 4 Accumulative Number OpEx OpEx 4 Infrastructure council buildings maintenance of Council Amenities Attendance Amenities by end June Development and facilities Amenities by end June Register 2019 2019 Promote literacy Basic Service Complete 717 m² clear Number of m² clear view Director: in communities New KPI Library Delivery and view fencing project of the fencing projects completed Community Completion through 11 for Carry Over Number 0403/1665/R/1601/LIBC/11 R 800,000 717m² Service Infrastructure Taung Library by end June at the Taung Library by Social Certificate comprehensive 2018/19 Development 2019 end June 2019 Service Library Services Promote literacy Number of theme-based Basic Service Conduct 4 theme-based in communities reading programmes Attendance Library Delivery and reading programmes at 3 Chief through conducted at 3 Municipal 1, 5, 8 3 Accumulative Number Register / 4 Service Infrastructure Municipal Libraries by end Librarian comprehensive Libraries by end June Feedback Report Development June 2019 Library Services 2019 0403/1602/R/1601/LIBO/12 R 620,000 Promote literacy Basic Service Coordinate 5 holiday Number of holiday reading in communities Attendance Library Delivery and reading programmes at programmes coordinated Chief through 1, 4, 5, 8 5 Accumulative Number Register / 5 Service Infrastructure Municipal Libraries by end in Municipal Libraries by Librarian comprehensive Feedback Report Development June 2019 end June 2019 Library Services

113

COMMUNITY SOCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Focus Area Objective Driver type Evidence Target type Promote literacy Number of reports Basic Service Submit quarterly report to Portfolio Meeting in communities submitted to Portfolio on Library Delivery and Portfolio on library Chief Minutes / through library services at all N/A 4 Accumulative Number OpEx 4 Service Infrastructure services at all municipal Librarian Attendance comprehensive municipal libraries end Development libraries by end June 2019 Register Library Services June 2019

Accelerate waste removal by Basic Service Director: providing New KPI Delivery and Transfer stations at Reivilo Community Refuse households with N/A for Carry Over Number Signed Report 0480/6203/C/DSS/9 R 2,000,000 2 Infrastructure and Pudimoe Social weekly waste 2018/19 Development Services removal in formal areas Accelerate waste removal by Basic Service Director: providing Procure Roll-on-Roll-off Number of Roll-on-Roll-off New KPI Delivery and Community Delivery Note / Refuse households with Truck by end December Trucks procured by end N/A for Carry Over Number 0480/6205/C/DSS/16 R 2,000,000 1 Infrastructure Social Invoice weekly waste 2018 December 2018 2018/19 Development Services removal in formal areas Accelerate waste removal by Basic Service Director: providing Number of 2 ton scales New KPI Delivery and Procure a 2 ton scale by Community Delivery Note / Refuse households with procured by end N/A for Carry Over Number R 300,000 1 Infrastructure end December 2018 Social Invoice weekly waste December 2018 2018/19 Development Services removal in formal areas

Accelerate waste removal by Basic Service Director: providing Number of water pums New KPI Delivery and Procure a water pump by Community Delivery Note / Refuse households with procured by end N/A for Carry Over Number R 50,000 1 Infrastructure end December 2018 Social Invoice weekly waste December 2018 2018/19 Development Services removal in formal areas Accelerate waste Number of monthly reports removal by Submit monthly reports to Basic Service submitted to the Director providing the Director on the weekly Delivery and on the weekly refuse Manager: Refuse households with collection of refuse of N/A 12 Carry Over Number Signed Report OpEx OpEx 12 Infrastructure collection of 2759 Refuse weekly waste 2759 households by end Development households by end June removal in formal June 2019 2019 areas

114

COMMUNITY SOCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Focus Area Objective Driver type Evidence Target type Accelerate waste Number of monthly reports removal by Submit monthly reports to Basic Service submitted to the Director providing the Director on the weekly Delivery and on the weekly refuse Manager: Refuse households with collection of refuse of 110 N/A 12 Carry Over Number Signed Report OpEx OpEx 12 Infrastructure collection of 110 Refuse weekly waste businesses by end June Development businesses by end June removal in formal 2019 2019 areas

To maintain and control public Basic Service Supply trees to all GTLM Number trees supplied to amenities and Delivery and Wards during the National all Wards during National Manager: Attendance Parks areas to promote N/A Carry Over Number R 100,000 480 Infrastructure Arbour Week by the end of Arbour Week by end Parks Register a safe and Development September 2018 September 2018 healthy environment To maintain and control public Basic Service amenities and Greening of Council New KPI Invoice / Delivery and Manager: Parks areas to promote Amenities by end March for Carry Over Number Completion 0421/6203/C/DSS/8 R 200,000 1 Infrastructure Parks a safe and 2019 2018/19 Certificate Development healthy environment To maintain and control public Basic Service amenities and New KPI Delivery and Rehabilitation of Reivilo Manager: Parks areas to promote for Carry Over Number R 400,000 1 Infrastructure Nursery by end June 2019 Parks a safe and 2018/19 Development healthy environment To maintain and control public Basic Service Director: amenities and New KPI Delivery and Procure tractor by end Community Parks areas to promote N/A for Carry Over Number 1 Infrastructure December 2018 Social a safe and 2018/19 Development Services healthy environment 0421/3801/M/DSS/PARK/17 To maintain and Spend 100% of approved Percentage of approved control public budget on cleaning budget spent on cleaning Basic Service amenities and equipment & supplies for equipment & supplies for New KPI Delivery and Manager: Parks areas to promote the Refuse Unit measured the Refuse Unit (Total for Accumulative Number R 500,000 100% Infrastructure Parks a safe and as (Total budget spent/ budget spent/ Total 2018/19 Development healthy Total approved budget X approved budget X 100) environment 100) by end June 2019 by end June 2019

115

COMMUNITY SOCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Focus Area Objective Driver type Evidence Target type Eradicate Spend 100% of approved Percentage of approved backlogs in order budget on equipment budget spent on Basic Service to improve required by the Parks Unit equipment required by the New KPI mSCOA Delivery and access to Manager: Parks measured as (Total Parks Unit (Total budget N/A for Accumulative Percentage Expenditure 0421/6205/C/DSS/24 R 500,000 100% Infrastructure services and Parks budget spent/ Total spent/ Total approved 2018/19 Report Development ensure proper approved budget X 100) budget X 100) by end operations and by end March 2019 March 2019 maintenance Prevent / reduce losses that occur due to man-made Number of quarterly Basic Service Submit quarterly reports to Portfolio Meeting / natural disaster reports on all disaster Delivery and Portfolio on all disaster Disaster Minutes / Disaster through related incidents submitted N/A 4 Accumulative Number R 1,000,000 4 Infrastructure related incident by end Coordinator Attendance preparedness, to Portfolio by end June Development June 2019 Register mitigation, 2019 response and recovery

116

SPATIAL PLANNING & HUMAN SETTLEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Revised Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Annual Focus Area Objective Driver Evidence Target type type Target Director: Municipal Improve Hold quarterly Number of quarterly Meeting Spatial Institutional Institutional organisational departmental staff departmental staff Minutes / N/A Planning & 9 Accumulative Number OpEx OpEx 4 Development Development and cohesion meetings by end June meetings held by end Attendance Human Transformation effectiveness 2019 June 2019 Register Settlement Number of quarterly Report quarterly to Director: Portfolio Promote a culture reports submitted to Good Governance Portfolio on the Spatial Meeting Institutional of participatory Portfolio on the and Public implementation of Council N/A Planning & 4 Accumulative Number Minutes / OpEx OpEx 4 Development and Good implementation of Council Participation Resolutions by end June Human Attendance Governance Resolutions by end June 2019 Settlement Register 2019 Director: Promote a culture Good Governance Update the risk register of Spatial Risk of participatory Number of risk registers Attendance and Public the directorate quarterly by N/A Planning & 4 Accumulative Number OpEx OpEx 4 Management and Good updated by end June 2019 Register Participation end June 2019 Human Governance Settlement Submit monthly report to Number of monthly reports the MM, within 7 days after submitted to the MM, month-end, on the within 7 days after month- Director: Promote a culture corrective actions end, on the corrective Good Governance Spatial of participatory implemented to address actions implemented to Audit Action Audit and Public N/A Planning & 6 Accumulative Number OpEx OpEx 6 and Good the matters raised in the address the matters raised Plan Participation Human Governance management letter of the in the management letter Settlement AG for which the of the AG for which the Directorate is responsible department is responsible by end June 2019 by end June 2019 Number of quarterly Director: Municipal Promote a culture Compile quarterly assessment reports Spatial Performance Performance Institutional of participatory assessment report on all compiled on all managers N/A Planning & 0 Accumulative Number Assessment OpEx OpEx 4 Management Development and and good managers reporting to the reporting to the Director by Human Report Transformation governance Director by end June 2019 end June 201 Settlement Number of IDP Process IDP Process Integrated Good Governance Promote a culture Submit IDP Process Plan Plans submitted to Council Plan / Council Development and Public of participatory & to Council by end August N/A Manager: IDP 1 Carry Over Number OpEx OpEx 1 for approval by end August Resolution / Planning Participation good governance 2018 2018 Minutes Consolidate CBP inputs of Number of CBP input Integrated Good Governance Promote a culture 24 Wards by the end reports consolidated by Consolidated Development and Public of participatory & N/A Manager: IDP 1 Carry Over Number OpEx OpEx 1 January 2019 for inclusion end January 2019 for CBP Report Planning Participation good governance into the final IDP inclusion into the final IDP Integrated Good Governance Promote a culture Hold an IDP Rep Forum Number of IDP Rep forum Attendance Development and Public of participatory & meeting by early March meetings held by early N/A Manager: IDP 1 Carry Over Number OpEx OpEx 1 Register Planning Participation good governance 2019 March 2019

117

SPATIAL PLANNING & HUMAN SETTLEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Revised Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Annual Focus Area Objective Driver Evidence Target type type Target Number of draft IDP Integrated Good Governance Promote a culture Tabling of the draft IDP to Draft IDP & Documents tabled to Development and Public of participatory & Council by the end March N/A Manager: IDP 1 Carry Over Number Council OpEx OpEx 1 Council by end March Planning Participation good governance 2019 Resolution 2019 Hold IDP/Budget Road Number of IDP/Budget shows for the 2019/20 FY Road shows held for the Integrated Good Governance Promote a culture by end April 2019 after 2019/20 FY during April Attendance Development and Public of participatory & N/A Manager: IDP 1 Carry Over Number 0103/4473/R/CLLR/66 R 542,000 5 approval of draft 2019 after approval of draft Registers Planning Participation good governance documents at the end of documents at the end of March 2019 March 2019 Director Number of final reviewed Integrated Good Governance Promote a culture Submit final reviewed IDP Spatial Council IDP Documents submitted Development and Public of participatory & to Council by the end May N/A Planning & 1 Carry Over Number Resolution / OpEx OpEx 1 to Council by end May Planning Participation good governance 2019 Human Minutes 2019 Settlement Promoting a wall Number of quarterly Submit quarterly reports to Director Portfolio Basic Service to wall of reports submitted to Portfolio on the preliminary Spatial Meeting Town Delivery and management of Portfolio on the preliminary studies for the Township 1 Planning & 4 Accumulative Number Minutes / 3 Planning Infrastructure all land studies for the Township establishment in Boipelo Human Attendance Development development establishment in Boipelo by end March 2018 Settlement Register activities by end March 2018 Promoting a wall Number of quarterly Submit quarterly reports to Director Portfolio Basic Service to wall of reports submitted to Portfolio on the preliminary Spatial New KPI Meeting Town Delivery and management of Portfolio on the preliminary studies for the Township 5 Planning & for Accumulative Number Minutes / 3 Planning Infrastructure all land studies for the Township 0601/4487/R/DSP/34 R 120,000 establishment in Pudimoe Human 2017/18 Attendance Development development establishment in Pudimoe by end June 2018 Settlement Register activities by end June 2018 Number of quarterly Promoting a wall Submit quarterly reports to reports submitted to Director Portfolio Basic Service to wall of Portfolio on the Portfolio on the Spatial New KPI Meeting Town Delivery and management of implementation of the implementation of the 5 Planning & for Accumulative Number Minutes / 4 Planning Infrastructure all land regeneration strategy in regeneration strategy in Human 2017/18 Attendance Development development Pudimoe by end June Pudimoe by end June Settlement Register activities 2018 2018 Number of quarterly Submit quarterly progress Portfolio Basic Service progress reports on Promoting reports on properties Meeting Town Delivery and properties registered with Spatial security of land registered with the Deeds 1, 5, 11 4 Accumulative Number Minutes / 0601/4427/R/DSP/26 R 350,000 4 Planning Infrastructure the Deeds Office Manager tenure Office to Portfolio by end Attendance Development submitted to Portfolio by June 2019 Register end June 2019 Promoting a wall Number of quarterly Portfolio Basic Service to wall of Submit quarterly reports reports on the Meeting Town Delivery and management of on the implementation of Spatial implementation of N/A 4 Accumulative Number Minutes / 0601/4487/R/DSP/36 R 200,000 4 Planning Infrastructure all land SPLUMA to Portfolio by Manager SPLUMA submitted to Attendance Development development end June 2019 Portfolio by end June 2019 Register activities

118

SPATIAL PLANNING & HUMAN SETTLEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Revised Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Annual Focus Area Objective Driver Evidence Target type type Target Promoting a wall Number of quarterly Portfolio Basic Service to wall of Submit quarterly reports to reports submitted to Meeting Town Delivery and management of Portfolio on town planning Portfolio on town planning Spatial N/A 4 Accumulative Number Minutes / 0601/4427/R/DSP/35 R 116,000 4 Planning Infrastructure all land development applications land development Manager Attendance Development development by end June 2019 applications by end June Register activities 2019 Promoting a wall Number of quarterly Report quarterly to Portfolio Basic Service to wall of reports submitted to Portfolio on progress made Meeting Town Delivery and management of Portfolio on progress made Spatial on the disposal of N/A 4 Accumulative Number Minutes / OpEx OpEx 4 Planning Infrastructure all land on the disposal of Manager immovable property by Attendance Development development immovable property by end June 2018 Register activities end June 2018 Number of quarterly Portfolio Basic Service Promote Submit quarterly reports to reports submitted to Meeting Delivery and compliance with Portfolio on Building Plan Chief Building Building Unit Portfolio on Building plan N/A 4 Accumulative Number Minutes / OpEx OpEx 4 Infrastructure National Building assessments by end June Inspector assessments by end June Attendance Development regulations 2019 2019 Register Number of quarterly Submit quarterly reports to Portfolio Basic Service Promote reports submitted to Portfolio on the inspection Meeting Delivery and compliance with Portfolio on the inspection Chief Building Building Unit of buildings under N/A 4 Accumulative Number Minutes / OpEx OpEx 4 Infrastructure National Building of buildings under Inspector construction by end June Attendance Development regulations construction by end June 2019 Register 2019 Eradicate Number of quarterly Submit quarterly report to backlogs in order reports submitted to Portfolio Basic Service Portfolio on the to improve access Portfolio on the Meeting Delivery and implementation of low cost Manager: Housing Unit to services and implementation of low cost N/A 9 Accumulative Number Minutes / OpEx OpEx 4 Infrastructure housing projects by LGHS Housing ensure proper housing projects by LGHS Attendance Development in GTLM by end June operations and in GTLM by end June Register 2019 maintenance 2019 Eradicate backlogs in order Basic Service Number of housing to improve access Host housing consumer Delivery and consumer awareness 14, 15, Manager: Attendance Housing Unit to services and awareness campaign by 3 Accumulative Number OpEx OpEx 4 Infrastructure campaigns by end June 17 Housing Register ensure proper end June 2019 Development 2019 operations and maintenance Eradicate backlogs in order Number of quarterly Portfolio Basic Service Submit quarterly reports to to improve access reports submitted to Meeting Delivery and Portfolio on facilitation of Manager: Housing Unit to services and Portfolio on facilitation of N/A 4 Accumulative Number Minutes / OpEx OpEx 4 Infrastructure the Housing Sector Plan Housing ensure proper the Housing Sector Plan Attendance Development review by end June 2018 operations and review by end June 2018 Register maintenance

119

SPATIAL PLANNING & HUMAN SETTLEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Revised Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Annual Focus Area Objective Driver Evidence Target type type Target Eradicate Number of quarterly backlogs in order Submit quarterly Portfolio Basic Service reconciliation reports to improve access reconciliation report to New KPI Meeting Delivery and submitted to Portfolio Manager: Housing Unit to services and Portfolio on municipal N/A for Carry Over Number Minutes / OpEx OpEx 4 Infrastructure Committee on rental Housing ensure proper rental properties leased by 2017/18 Attendance Development municipal properties operations and end June 2019 Register leased by end June 2019 maintenance

120

CORPORATE SERVICE YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Target type Target Municipal Improve Hold quarterly departmental Number of quarterly Director: Institutional Institutional organisational staff meetings by end June departmental staff meetings N/A Corporate 4 Accumulative Number OpEx OpEx 4 Development Development and cohesion 2019 held by end June 2019 Service Transformation effectiveness Number of quarterly reports Report quarterly to Portfolio Good Governance Promote a culture submitted to Portfolio on the Director: Institutional on the implementation of and Public of participatory and implementation of Council N/A Corporate 4 Accumulative Number OpEx OpEx 4 Development Council Resolutions by end Participation Good Governance Resolutions by end June Service June 2019 2019 Good Governance Promote a culture Update the risk register of Director: Risk Number of risk registers and Public of participatory and the directorate quarterly by N/A Corporate 4 Accumulative Number OpEx OpEx 4 Management updated by end June 2019 Participation Good Governance end June 2019 Service Number of monthly reports Submit monthly report to the submitted to the MM, within MM, within 7 days after 7 days after month-end, on month-end, on the corrective the corrective actions Good Governance Promote a culture actions implemented to Director: implemented to address the Audit and Public of participatory & address the matters raised in N/A Corporate 6 Accumulative Number OpEx OpEx 6 matters raised in the Participation good governance the management letter of the Service management letter of the AG AG for which the Directorate for which the department is is responsible by end June responsible by end June 2019 2019 Number of quarterly Municipal Compile quarterly Promote a culture assessment reports Director: Performance Institutional assessment report on all of participatory and compiled on all managers N/A Corporate 0 Accumulative Number OpEx OpEx 4 Management Development and managers reporting to the good governance reporting to the Director by Service Transformation Director by end June 2019 end June 2019 Number of monthly Good Governance Promote a culture Submit monthly consolidated Director: Institutional consolidated B2B Reports and Public of participatory & B2B Report to the PMS Unit N/A Corporate 12 Accumulative Number OpEx OpEx 12 Development submitted to the PMS Unit Participation good governance by end June 2019 Service by end June 2019

Good Governance Promote a culture Facilitate the monthly sitting Number of monthly Ward Corporate Manager: and Public of participatory & of 24 Ward Committees by Committee meetings N/A 302 Accumulative Number 0105/4473/R/CLLR/71 R 570,000 288 Support Administration Participation good governance end June 2019 facilitated by end June 2019 Number of quarterly Good Governance Promote a culture Submit quarterly reports on Corporate complaints management Manager: and Public of participatory & complaints management to N/A 4 Accumulative Number OpEx OpEx 4 Support reports submitted to LGHS Administration Participation good governance LGHS by end June 2019 by end June 2019 Arrange quarterly Statutory Number of quarterly Good Governance Promote a culture ExCo meetings in Statutory ExCo meetings Corporate Manager: and Public of participatory & accordance with the arranged in accordance with N/A 4 Accumulative Number 0101/4417/R/DCS/16 R 500,000 4 Support Administration Participation good governance Structures Act by end June the Structures Act by end 2019 June 2019

121

CORPORATE SERVICE YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Target type Target Arrange quarterly Statutory Number of quarterly Good Governance Promote a culture Council meetings in Statutory Council meetings Corporate Manager: and Public of participatory & accordance with the arranged in accordance with N/A 4 Accumulative Number 4 Support Administration Participation good governance Structures Act by end June the Structures Act by end 2019 June 2019 Good Governance Promote a culture Corporate and Public of participatory & Security guards Accumulative Number 0301/4219/R/DCS/41 R 8,000,000 Support Participation good governance Good Governance Promote a culture Corporate Boardroom / training centre and Public of participatory & Carry Over Number 0301/6207/C/DCS/27 R 200,000 Support furniture Participation good governance Apply for Records Disposal Successful application for Good Governance Promote a culture Authority from Provincial Records Disposal Authority Corporate Manager: and Public of participatory & Achieves & Records from Provincial Achieves & N/A 1 Carry Over Number OpEx OpEx 1 Support Administration Participation good governance Management by end June Management by end June 2018 2018

Municipal Improve Review & submit 6 by-laws Number of by-laws reviewed Legal Institutional organisational Manager: Legal to Portfolio for adoption by and submitted to Portfolio for N/A 9 Carry Over Number OpEx OpEx 6 Services Development and cohesion Service end June 2019 approval by end June 2019 Transformation effectiveness Municipal Improve Submit quarterly reports to Number of quarterly reports Legal Institutional organisational Portfolio on the status of to Portfolio on the status of Manager: Legal N/A 4 Accumulative Number 0301/4209/R/DCS/29 R 4,000,000 4 Services Development and cohesion litigations against GTLM by litigations against GTLM by Service Transformation effectiveness end June 2019 end June 2019 Submit quarterly reports on Number of quarterly reports Municipal Improve the management of submitted to Portfolio on the Legal Institutional organisational Manager: Legal contracts across the management of contracts N/A 4 Accumulative Number OpEx OpEx 4 Services Development and cohesion Service Municipality to Portfolio by across the Municipality by Transformation effectiveness end June 2019 end June 2019

Employ 3 people from Number of people from EE employment equity target target groups employed in Municipal Improve groups appointed in the the three highest levels of Director: Institutional organisational three highest levels of Recruitment management in accordance N/A Corporate 2 Accumulative Number OpEx OpEx 3 Development and cohesion management in accordance with approved Municipal Service Transformation effectiveness with approved Municipal Employment Equity Plan by Employment Equity Plan by end June 2019 end June 2019 Municipal Improve Fill at least 16 vacant funded Manager: Human Institutional organisational Number of vacant funded positions by the end of June N/A Human 71 Accumulative Number OpEx OpEx 16 Resource Development and cohesion position filled by June 2019 2019 Resource Transformation effectiveness

122

CORPORATE SERVICE YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Target type Target Municipal Improve Facilitate quarterly EAP Manager: Human Institutional organisational Number of EAP interventions interventions for municipal N/A Human 16 Accumulative Number 0301/4488/R/DCS/48 R 205,000 8 Resource Development and cohesion facilitated by end June 2019 official by end June 2019 Resource Transformation effectiveness Municipal Improve Number of quarterly LLF Manager: Labour Institutional organisational Facilitate quarterly LLF meetings facilitated by end N/A Human 2 Accumulative Number OpEx OpEx 4 Relations Development and cohesion meetings by end June 2019 June 2019 Resource Transformation effectiveness Municipal Improve Submit quarterly reports to Number of quarterly reports Manager: Labour Institutional organisational Portfolio on the status of on the status of disciplinary N/A Human 4 Accumulative Number OpEx OpEx 4 Relations Development and cohesion disciplinary hearings by end hearings submitted to Resource Transformation effectiveness June 2019 Portfolio by end June 2019

Municipal Improve Facilitate training of Director: Institutional organisational Number of Municipal officials Municipal Officials by end of N/A Corporate 160 Accumulative Number 120 Development and cohesion and trained by end April 2019 April 2019 Service Transformation effectiveness Training Municipal Improve Facilitate training of Number of Municipal Director: Institutional organisational Municipal Councillors by end Councillors trained by end N/A Corporate 100 Accumulative Number 40 Development and cohesion and April 2019 April 2019 Service Transformation effectiveness 0301/4491/R/DCS/13 R 700,000 Percentage of municipality's budget actually spent on Municipal Improve implementing its workplace Total expenditure on Director: Institutional organisational skills plan measured as training/total operational Training N/A Corporate 90% Accumulative Percentage 90% Development and cohesion (Total Actual Training budget x 100 by end June Service Transformation effectiveness Expenditure/ Total 2019 Operational Budget)x100) by end June 2019 Municipal Improve Provide financial support to Number of students Director: Institutional organisational students that adhere to the Training financially supported by end N/A Corporate 83 Accumulative Number 0301/4425//R/CLLR/12 R 500,000 80 Development and cohesion and relevant requirements by March 2019 Service Transformation effectiveness end March 2019 Municipal Improve Facilitate quarterly Training Number of Training & Manager Institutional organisational & Employment Equity Employment Equity Training N/A Human 4 Accumulative Number OpEx OpEx 4 Development and cohesion Committee Meetings by end Committee meetings Resources Transformation effectiveness June 2019 facilitated by end June 2019 Municipal Improve Develop & submit a Workplace Skills Plan Manager Institutional organisational Workplace Skills Plan to developed & submitted to Training N/A Human 1 Carry Over Number OpEx OpEx 1 Development and cohesion LGSETA by the end of April LGSETA by the end of April Resources Transformation effectiveness 2019 2019 Municipal Improve Number of training & Facilitate training & learning Manager Institutional organisational learning interventions for External Training interventions of unemployed All Human 30 Accumulative Number External Funding 30 Development and cohesion unemployed youth facilitated Funding youth by end June 2019 Resources Transformation effectiveness by end June 2019

123

CORPORATE SERVICE YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Target type Target Municipal Improve Submit progress report to Progress report on EE Manager Institutional organisational Department of Labour (DoL) Training submitted to DoL by 15 N/A Human 1 Carry Over Number OpEx OpEx 1 Development and cohesion on Employment Equity (EE) January 2019 Resources Transformation effectiveness by 15 January 2019

Municipal Improve Facilitate quarterly Occupational Number of quarterly OHS Manager Institutional organisational Occupational Health & Health & meetings facilitated by end N/A Human 12 Accumulative Number OpEx OpEx 4 Development and cohesion Safety (OHS) meetings by Safety June 2019 Resources Transformation effectiveness end June 2019 Number of quarterly Municipal Improve Conduct quarterly inspection Occupational inspections conducted for Manager Institutional organisational for OHS compliance and Health & OHS compliance and reports N/A Human 2 Accumulative Number OpEx OpEx 4 Development and cohesion submit report to Portfolio by Safety submitted to Portfolio by end Resources Transformation effectiveness end June 2019 June 2019 Municipal Improve Occupational Conduct bi-annual H&S Risk Number of bi-annual H&S Manager Institutional organisational Health & Assessment by end June Risk Assessments N/A Human 2 Accumulative Number OpEx OpEx 2 Development and cohesion Safety 2019 conducted by end June 2019 Resources Transformation effectiveness Municipal Improve Conduct annual medical Number of annual medical Occupational Manager Institutional organisational surveillance on at least 150 surveillance conducted on Health & N/A Human 130 Carry Over Number 0301/4445/R/DCS/63 R 146,000 150 Development and cohesion employees by end March employees by end March Safety Resources Transformation effectiveness 2019 2019 Percentage of approved Percentage of approved Municipal Improve budget spent protective budget spent protective Occupational Manager Institutional organisational clothing measured as (Total clothing measured as (Total Health & N/A Human 100% Accumulative Percentage 0301/4495/R/DCS/81 R 519,000 100% Development and cohesion budget spent/ Total budget spent/ Total Safety Resources Transformation effectiveness approved budget X 100) by approved budget X 100) by end June 2019 end June 2019 Submit annual report on Number of annual reports on safety checks conducted on Municipal Improve safety checks conducted on Occupational all relevant municipal Manager Institutional organisational all municipal mechanical Health & mechanical equipment as N/A Human 1 Carry Over Number OpEx OpEx 1 Development and cohesion equipment as prescribed by Safety prescribed by the OHS Act Resources Transformation effectiveness the OHS Act submitted to to Portfolio by end June Portfolio by end June 2019 2019

Municipal Promote a culture Submit Oversight Report on Oversight Report on 2017/18 Director: Institutional MPAC of participatory & 2017/18 Annual Report to Annual Report submitted to N/A Corporate 1 Carry Over Number OpEx OpEx 1 Development and good governance Council by end March 2019 Council by end March 2019 Service Transformation Good Governance Promote a culture Number of monthly MPAC Hold Monthly MPAC MPAC MPAC and Public of participatory & meetings held by end June N/A 12 Accumulative Number OpEx OpEx 12 meetings by end June 2019 Researcher Participation good governance 2019

124

CORPORATE SERVICE YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Target type Target Number of quarterly Submit quarterly progress progress report on all Good Governance Promote a culture reports to Council on all investigations and referrals MPAC MPAC and Public of participatory & investigation conducted on N/A 4 Accumulative Number OpEx OpEx 4 by Council conducted by Researcher Participation good governance all Council referrals by MPAC submitted to Council MPAC by end June 2019 by end June 2019 Host one public hearing Number of public hearing Good Governance Promote a culture meeting on the 2017/18 meetings conducted on the MPAC MPAC and Public of participatory & N/A 1 Carry Over Number 0101/4473/R/CLLR/69 R 316,000 1 Annual Report by end 2017/18 Annual Report by Researcher Participation good governance February 2019 end February 2019 Submit MPAC Annual Work MPAC Annual Work Plan Good Governance Promote a culture Plan Program to Council for program Submitted to MPAC MPAC and Public of participatory & N/A 1 Carry Over Number OpEx OpEx 1 approval by end September Council for approval by end Researcher Participation good governance 2018 September 2018

125

OFFICE OF THE MUNICIPAL MANAGER: LOCAL ECONOMIC DEVELOPMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Focus Area Objective Driver Evidence Target type type Create an environment that Create 300 temporary job Number of temporary jobs Local promotes Appointment Local Economic opportunities through local created through local Economic development of N/A Manager: LED 500 Accumulative Number Contracts / OpEx OpEx 300 Development procurement projects by procurement projects by Development local economy and Register end June 2019 end June 2019 facilitate job creation Create an environment that Support SMMES and Number of SMMES and Enterprise promotes Local Economic Cooperatives through skills Cooperatives supported Attendance Skills development of N/A Manager :LED 100 Accumulative Number 0001/4415/R/LED/24 R 700,000 600 Development development by end May through skills development Register Development local economy & 2019 by end May 2019 facilitate job creation Create an environment that Enterprise promotes Local Economic Construction of hawkers Skills development of Accumulative Number Development stalls Development local economy & facilitate job creation NW394/MIG/LED R 2,333,750 Create an environment that LED promotes Complete construction of 3 Number of economic hubs New KPI Local Economic Completion Infrastructure development of economic hubs in GTLM by constructed in GTLM by end N/A Manager: LED for Carry Over Number 3 Development Certificate Support local economy and end June 2019 June 2019 2017/18 facilitate job creation Create an environment that Support SMMES & Number of SMMES & Local promotes Local Economic Cooperatives through Cooperatives supported Attendance Economic development of N/A Manager :LED 25 Accumulative Number OpEx OpEx 25 Development access to market by end through access to market Register Development local economy & June 2019 by end June 2019 facilitate job creation Create an environment that Meeting Local promotes Number of LED Forums Local Economic Host quarterly LED Forum Minutes / Economic development of meetings held by end June N/A Manager :LED 4 Accumulative Number OpEx OpEx 4 Development meeting by end June 2019 Attendance Development local economy & 2019 Register facilitate job creation

126

OFFICE OF THE MUNICIPAL MANAGER: LOCAL ECONOMIC DEVELOPMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Focus Area Objective Driver Evidence Target type type Create an environment that promotes Number of Tourism events Tourism Local Economic Hold 1 Tourism events by Attendance development of held by end September N/A Manager :LED 5 Carry Over Number 0001/4415/R/LED/24 R 50,000 1 Awareness Development end September 2018 Register local economy & 2018 facilitate job creation

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target Municipal Improve Hold quarterly Number of quarterly Institutional Chief Meeting Minutes / Institutional organisational departmental staff departmental staff Development N/A Financial 4 Accumulative Number Attendance OpEx OpEx 4 Development cohesion meetings by end June meetings held by end and Officer Register effectiveness 2019 June 2019 Transformation Number of quarterly Promote a Report quarterly to Good reports submitted to culture of Council on the Chief Institutional Governance and Council on the participatory and implementation of N/A Financial 4 Accumulative Number Resolution Matrix OpEx OpEx 4 Development Public implementation of Good Council Resolutions by Officer Participation Council Resolutions by Governance end June 2019 end June 2019 Promote a Good Update the risk register culture of Number of risk registers Chief Risk Governance and of the directorate Attendance participatory & updated by end June N/A Financial 4 Accumulative Number OpEx OpEx 4 Management Public quarterly by end June Register Good 2019 Officer Participation 2019 Governance To improve overall financial management in Number of 5 year Capital Municipal Submit 5 Year Capital the municipality Investment Programmes Chief Financial Investment Programme Council Minutes / Finance by developing & submitted to Council for N/A Financial 1 Carry Over Number OpEx OpEx 1 Viability and to Council for approval by Resolution implementing approval by end May Officer Management end May 2019 appropriate 2019 Financial Management

127

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial management in Number of 5 year Municipal Submit 5 Year Financial the municipality Financial Plans Chief Financial Plan to Council for Council Minutes / Finance by developing & submitted to Council for N/A Financial 1 Carry Over Number OpEx OpEx 1 Viability and approval by end May Resolution implementing approval by end May Officer Management 2019 appropriate 2019 Financial Management To improve overall financial management in Municipal Hold bi-annual Budget Number of bi-annual the municipality Chief Financial Steering Committee Budget Steering Attendance Finance by developing & N/A Financial 2 Accumulative Number OpEx OpEx 2 Viability and meetings by end June Committee meetings held Register / Minutes implementing Officer Management 2019 by end June 2019 appropriate Financial Management To improve overall financial management in Number of 2017/18 Municipal the municipality Submit the 2017/18 Annual Financial Chief Financial by developing Annual Financial Acknowledgement Finance Statements submitted to N/A Financial 1 Carry Over Number OpEx OpEx 1 Viability and and Statements to AGSA by of Receipt AGSA by 31 August Officer Management implementing 31 August 2018 2018 appropriate Financial Management To improve Financial viability Financial viability overall financial measured in terms of the measured in terms of the management in available cash to cover available cash to cover Municipal the municipality fixed operating fixed operating Chief Financial by developing Annual Financial Finance expenditure (Available expenditure (Available N/A Financial 7.98 Carry Over Percentage OpEx OpEx 1.5 Viability and and Statement cash + investments / cash + investments / Officer Management implementing Monthly fixed operating Monthly fixed operating appropriate expenditure) by end expenditure) by end Financial December 2018 December 2018 Management

128

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial Debt to Revenue Short management in Financial viability Term Lease + Long Municipal the municipality measured in terms of the Term Lease / Total Chief Financial by developing municipality's ability to Annual Financial Finance Operating Revenue - N/A Financial 0.005 Carry Over Percentage OpEx OpEx 2.1 Viability and and meet its service debt Statement Operating Conditional Officer Management implementing obligations by end Grant by end December appropriate December 2018 2018 Financial Management Number of monthly Submit monthly report to reports submitted to the the MM, within 7 days MM, within 7 days after after month-end, on the month-end, on the Promote a Good corrective actions corrective actions culture of Chief Governance and implemented to address implemented to address Audit participatory & N/A Financial 6 Accumulative Number Audit Action Plan OpEx OpEx 6 Public the matters raised in the the matters raised in the Good Officer Participation management letter of the management letter of the Governance AG for which the AG for which the Directorate is responsible department is by end June 2019 responsible by end June 2019 Number of quarterly Submit quarterly to the reports submitted to the CIA on the corrective CIA on the corrective actions implemented to Promote a actions implemented to Good address the matters culture of address the matters Chief Governance and raised in the Internal Internal Audit Internal Audit participatory & raised in the internal N/A Financial 4 Accumulative Number OpEx OpEx 4 Public report for which the Action Plan good audit report for which the Officer Participation department is governance department is responsible subject to the responsible subject to the Internal Audit Action Plan Internal Audit Action Plan by end June 2019 by end June 2019 Number of quarterly Municipal Promote a Compile quarterly assessment reports Institutional culture of assessment report on all Chief Performance Performance compiled on all Development participatory and managers reporting to N/A Financial 0 Accumulative Number Assessment OpEx OpEx 4 Management managers reporting to and good the Director by end June Officer Report the Director by end June Transformation governance 2019 2019 Promote a Number of monthly Good Submit monthly culture of consolidated B2B Chief Institutional Governance and consolidated B2B Report Acknowledgement participatory & Reports submitted to the N/A Financial 12 Accumulative Number OpEx OpEx 12 Development Public to the PMS Unit by end of Receipt good PMS Unit by end June Officer Participation June 2019 governance 2019

129

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial management in Number of 2018/19 Municipal the municipality Submit 2018/19 Adjustment Budgets Chief Council Financial by developing Adjustment Budget to Budget submitted to Council for N/A Financial 1 Carry Over Number Resolution / OpEx OpEx 1 1 Viability and and Council for approval by approval by end Officer Minutes Management implementing end February 2019 February 2019 appropriate Financial Management To improve overall financial management in Municipal the municipality Submit draft 2019/20 Number of draft 2019/20 Chief New KPI Council Financial by developing Budget to Council for Budgets submitted to Budget N/A Financial for Carry Over Number Resolution / OpEx OpEx Viability and and approval by end March Council for approval by Officer 2018/19 Minutes Management implementing 2019 end March 2019 appropriate Financial Management To improve overall financial management in Municipal the municipality Prepare and submit the Number of final 2019/20 Chief Council Financial by developing Budget final 2019/20 Budget to Budgets submitted to N/A Financial 1 Carry Over Number Resolution / OpEx OpEx 1 1 Viability and and Council by 31 May 2019 Council by 31 May 2019 Officer Minutes Management implementing appropriate Financial Management To improve overall financial management in Review legislative Number of legislative Municipal the municipality required Budget required Budget Council Financial Manager: Budget by developing & implementation policies implementation policies N/A 2 Carry Over Number Resolution / OpEx OpEx 2 2 Viability and Budget implementing and submit drafts to reviewed & submitted to Minutes Management appropriate Council by end May 2019 Council by end May 2019 Financial Management

130

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial Submit MFMA S71 management in Report to Provincial Number of monthly Municipal the municipality Treasury with the MFMA S71 reports Financial Manager: Acknowledgement Budget by developing & monthly actual revenue & submitted to Provincial N/A 12 Accumulative Number OpEx OpEx 12 12 Viability and Budget of Receipt implementing expenditure against the Treasury by end June Management appropriate approved budget by end 2019 Financial June 2019 Management To improve overall financial management in Number of quarterly Municipal Submit quarterly MFMA the municipality MFMA S52 Reports Financial S52 Reports to Provincial Manager: Acknowledgement Budget by developing & submitted to Provincial N/A 4 Accumulative Number OpEx OpEx 4 4 Viability and Treasury by end June Budget of Receipt implementing Treasury by end June Management 2019 appropriate 2019 Financial Management To improve overall financial management in Number of quarterly Municipal Submit quarterly MFMA the municipality MFMA S11(4) reports Financial S11(4) Reports to Manager: Acknowledgement Budget by developing & submitted to Provincial N/A 4 Accumulative Number OpEx OpEx 4 4 Viability and Provincial Treasury by Budget of Receipt implementing Treasury by end June Management end June 2019 appropriate 2019 Financial Management To improve overall financial management in Municipal Number of quarterly the municipality Reconcile the grants Financial grant register Manager: Budget by developing & register quarterly by end N/A 12 Accumulative Number Grants Register OpEx OpEx 4 4 Viability and reconciliations completed Budget implementing June 2019 Management by end June 2019 appropriate Financial Management

Eradicate backlogs in Municipal order to improve Provide free basic Number of households Free Basic Chief Financial access to electricity to 9 000 that received free basic Expenditure Services N/A Financial 8775 Carry Over Number 0560/4339/R/0413SERV/22I R 6,748,000 10 000 9 000 Viability and services and households in GTLM by electricity in GTLM by Report (Electricity) Officer Management ensure proper end June 2019 end June 2019 operations and maintenance

131

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target Eradicate backlogs in Municipal order to improve Number of households Free Basic Provide free basic water Chief Financial access to that received free basic Expenditure Services to 600 households in N/A Financial 591 Carry Over Number 0570/4339/R/0433SERV/26I R 30,000 600 600 Viability and services and water in GTLM by end Report (Water) GTLM by end June 2019 Officer Management ensure proper June 2019 operations and maintenance Eradicate backlogs in Municipal order to improve Provide free basic Number of households Free Basic Chief Financial access to sanitation to 200 that received free basic Expenditure Services N/A Financial 324 Carry Over Number 0480/4339/R/0453SERV/25I R 171,000 350 200 Viability and services and households in GTLM by sanitation in GTLM by Report (Sanitation) Officer Management ensure proper end June 2019 end June 2019 operations and maintenance Eradicate backlogs in Municipal order to improve Provide free basic refuse Number of households Free Basic Chief Financial access to removal to 200 that received free basic Expenditure Services N/A Financial 348 Carry Over Number 0550/4339/R/0473SERV/24I R 216,000 350 200 Viability and services and households in GTLM by refuse removal in GTLM Report (Refuse) Officer Management ensure proper end June 2019 by end June 2019 operations and maintenance To improve overall financial Number of indigent management in Registering of indigent Municipal households in Reivilo, the municipality households in Reivilo, Financial Taung and Pudimoe Manager: Updated Indigent Revenue by developing & Taung, Pudimoe on the N/A 400 Accumulative Number 230 230 Viability and registered on financial Revenue Register implementing financial system by end Management system by end June appropriate June 2019 2019 Financial Management 0201/4473/R/DFS/65 R 300,000 To improve overall financial management in Municipal Number of indigent the municipality Registering of indigent Financial households in rural areas Manager: Updated Indigent Revenue by developing & households in rural areas N/A 10 000 Accumulative Number 9 700 9 700 Viability and registered by end June Revenue Register implementing by end June 2019 Management 2019 appropriate Financial Management

132

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial management in Percentage of monthly Percentage of monthly Municipal the municipality collection rate indicating collection rate indicating Financial Manager: Revenue by developing & billing versus actual billing versus actual N/A 70% Accumulative Percentage Cash-flow Report OpEx OpEx 70% 70% Viability and Revenue implementing money received by end money received by end Management appropriate June 2019 June 2019 Financial Management To improve overall financial Number of quarterly management in Submit quarterly reports Municipal reports submitted to Portfolio Meeting the municipality on actions taken against Financial Portfolio on actions taken Manager: Minutes / Revenue by developing & rates and services N/A 4 Accumulative Number OpEx OpEx 4 4 Viability and against rates and Revenue Attendance implementing defaulters to Portfolio by Management services defaulters by Register appropriate end June 2019 end June 2019 Financial Management

To improve overall financial management in Municipal the municipality Develop a Asset Financial Manager: Signed-off Assets by developing & Management Plan by N/A 12 Carry Over Number 0201/4213/R/DFS R 500,000 12 12 Viability and Assets Reports implementing end December 2018 Management appropriate Financial Management To improve overall financial management in Municipal Number of monthly Asset the municipality Submit monthly Asset Financial Reconciliation reports Manager: Signed-off Assets by developing & Reconciliations report by N/A 12 Accumulative Number OpEx OpEx 12 12 Viability and submitted by end June Assets Reports implementing end June 2019 Management 2019 appropriate Financial Management To improve overall financial management in Number of quarterly Municipal Submit quarterly reports the municipality reports submitted to the Financial on verification of Manager: Signed-off Assets by developing & CFO on verification of N/A 9 Accumulative Number OpEx OpEx 4 4 Viability and moveable assets to the Assets Reports implementing movable assets by end Management CFO by end June 2019 appropriate June 2019 Financial Management

133

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target

To improve overall financial management in Number of quarterly Municipal Submit quarterly report Portfolio Meeting the municipality reports submitted to Supply Financial on the implementation of Manager: Minutes / by developing & Portfolio on the N/A 4 Accumulative Number OpEx OpEx 4 4 Chain Viability and SCM Policy to Portfolio SCM Attendance implementing implementation of SCM Management by end June 2019 Register appropriate Policy by end June 2019 Financial Management To improve overall financial Support Local SMME % of local SMME management in development by development supported Municipal the municipality awarding 30% to total by awarding 30% total Supply Financial Manager: by developing & value of contracts ((Bids value of contracts (Bids N/A 25% Accumulative Percentage Calculations OpEx OpEx 30% 30% Chain Viability and SCM implementing awarded to Local SMME/ awarded to Local SMME/ Management appropriate Total bids awarded) x Total bids awarded) x Financial 100) by end June 2019 100) by end June 2019 Management To improve overall financial management in Improve turn-around time Municipal Number of days taken to the municipality to appoint service Supply Financial appoint service providers Manager: by developing & providers on all tenders N/A 45 days Accumulative Number Signed-off Report OpEx OpEx 40 days 40 days Chain Viability and on all tenders advertised SCM implementing advertised by end June Management by end June 2019 appropriate 2019 Financial Management To improve overall financial Number of quarterly management in Submit quarterly report reports submitted to the Municipal the municipality for contract awarded and CFO on contract Supply Financial Manager: by developing & signed above the awarded and signed N/A 4 Accumulative Number Signed-off Report OpEx OpEx 4 4 Chain Viability and SCM implementing prescribed amount to the above the prescribed Management appropriate CFO by end June 2019 amount by end June Financial 2019 Management To improve overall financial management in Municipal the municipality Procure storage unit for Supply Financial by developing & bid documents by end Carry Over Number 0201/6203/C/DFS R 250,000 Chain Viability and implementing December 2018 Management appropriate Financial Management

134

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial management in Municipal the municipality Supply Financial Vetting of service by developing & 0201/4213/R/DFS R 385,000 Chain Viability and providers implementing Management appropriate Financial Management To improve overall financial management in Municipal the municipality Supply Financial by developing & Annual SCM workshop Carry Over Number 0001/4415/R/LED/24 R 750,000 Chain Viability and implementing Management appropriate Financial Management To improve overall financial management in Municipal Monthly report on Number of monthly the municipality Supply Financial verification of inventory inventory verification Manager: by developing & N/A 12 Accumulative Number Signed-off Report OpEx OpEx 12 12 Chain Viability and submitted to the CFO by reports submitted to the SCM implementing Management end June 2019 CFO by end June 2019 appropriate Financial Management

To improve overall financial Pay all creditors within 30 % of creditors paid within management in Municipal days as required by 30 days as required by the municipality Financial MFMA (Total payment MFMA (Total payment Manager: Age Analysis Expenditure by developing & N/A 100% Carry Over Percentage OpEx OpEx 100% 100% Viability and made/ Total invoices made/ Total invoices Expenditure Report implementing Management submitted) x 100) by end submitted) x 100) by end appropriate June 2019 June 2019 Financial Management To improve overall financial management in Municipal Submit monthly VAT Number of monthly VAT the municipality VAT Report / Financial reconciliation reports to reconciliations reports Manager: Expenditure by developing & N/A 6 Accumulative Number Acknowledgement OpEx OpEx 12 12 Viability and the CFO by end June submitted to the CFO by Expenditure implementing of Receipt Management 2019 end June 2019 appropriate Financial Management

135

FINANCIAL SERVICES YEAR UNDER REVIEW: 2018/19 PLANNING KPI Revised Strategic Strategic Programme KPI Target Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Project Number Budget Weight Annual Focus Area Objective Driver type Evidence Target type Target To improve overall financial management in Municipal Complete the monthly Number of reconciliations the municipality Financial reconciliation of the of the investments Manager: Investment Expenditure by developing & N/A 12 Accumulative Number OpEx OpEx 12 12 Viability and investments register by register completed by Expenditure Register implementing Management end June 2019 end June 2019 appropriate Financial Management

OFFICE OF THE MUNICIPAL MANAGER: MARKETING & COMMUNICATION YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Focus Area Objective Driver Evidence Target type type To promote GTLM Procurement of diaries for Number of diaries procured Good Governance as a Municipal municipal councillors & for Municipal councillors Communication Delivery Note / Communication & Public Brand which N/A 60 Carry Over Number 150 officials by end November and officials by end Manager Invoices Participation strives for 2018 November 2018 Excellence To facilitate regular flow of Number of quarterly History Submit quarterly progress Portfolio Meeting Good Governance information of Taung Research Project Subject to reports to Portfolio on Communication Minutes / Subject to external Communication & Public between GTLM progress reports submitted N/A Accumulative Number external 3 History of Taung Research Manager Attendance funding Participation and its internal to Portfolio by end June funding Project by end June 2019 Register and external 2019 stakeholders To facilitate regular flow of Good Governance information Publish monthly internal Number of monthly internal Communication Approved Copy of Communication & Public between GTLM newsletter by end June newsletter published by N/A 6 Accumulative Number OpEx OpEx 12 Manager the Newsletter Participation and its internal 2019 end June 2019 and external stakeholders To facilitate regular flow of Number of quarterly Rea Good Governance information Publish quarterly issues of Dira magazine issues Communication Delivery note / Communication & Public between GTLM Rea Dira Magazine by end N/A 4 Accumulative Number 0001/4213/R/DMM/37 R 318,000 4 published by end June Manager copy of Magazine Participation and its internal June 2019 2019 and external stakeholders

136

OFFICE OF THE MUNICIPAL MANAGER: MARKETING & COMMUNICATION YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Focus Area Objective Driver Evidence Target type type To facilitate regular flow of Good Governance information Publication of legislated Communication & Public between GTLM 0001/4405/R/DMM/4 R 300,000 notices and adverts Participation and its internal and external stakeholders To facilitate regular flow of Submit quarterly reports to Number of quarterly reports Good Governance information the MM on the usage of submitted to the MM on Communication Acknowledgement Communication & Public between GTLM social media (Twitter, N/A 2 Accumulative Number OpEx OpEx 4 usage of Social Media by Manager of Receipt Participation and its internal Facebook, Instagram) by end June 2019 and external end June 2019 stakeholders To facilitate regular flow of Number of quarterly internal Good Governance information Host quarterly internal information sharing Communication Attendance Communication & Public between GTLM information sharing N/A 6 Accumulative Number OpEx OpEx 4 sessions hosted by end Manager Register Participation and its internal sessions by end June 2019 June 2019 and external stakeholders To promote GTLM Coordinate hosting of 35 Number of slots for Good Governance as a Municipal interview slots on Vaaltar interviews hosted on Communication Signed Questions Communication & Public Brand which N/A 24 Accumulative Number 0001/4473/R/DMM/68 R 500,000 35 FM talk show by end June Vaaltar FM talk show by Manager / CD from Vaaltar Participation strives for 2019 end June 2019 Excellence To promote GTLM Good Governance as a Municipal Hold quarterly status Number of quarterly Communication Attendance Communication & Public Brand which meetings with Vaaltar FM meetings held with Vaaltar N/A 8 Accumulative Number OpEx OpEx 4 Manager Register Participation strives for by end June 2019 FM by end June 2019 Excellence To promote GTLM Number of quarterly Submit quarterly reports to Portfolio Meeting Good Governance as a Municipal Municipal Event Portfolio on Municipal Communication Minutes / Communication & Public Brand which Management reports N/A 4 Accumulative Number OpEx OpEx 4 Event Management by end Manager Attendance Participation strives for submitted to Portfolio by June 2019 Register Excellence end June 2019 To promote GTLM Submit quarterly reports to Number of quarterly GTLM Portfolio Meeting Good Governance as a Municipal Portfolio on GTLM brand Brand Communication Communication Minutes / Communication & Public Brand which N/A 4 Accumulative Number OpEx OpEx 4 Communication by end reports submitted to Manager Attendance Participation strives for June 2019 Portfolio by end June 2019 Register Excellence

137

OFFICE OF THE MUNICIPAL MANAGER: MARKETING & COMMUNICATION YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Project Number Budget Weight Focus Area Objective Driver Evidence Target type type To facilitate regular flow of Number of monthly reports Good Governance information Submit monthly reports to on ad hoc meetings Communication Acknowledgement Communication & Public between GTLM the MM on ad hoc meetings N/A Accumulative Number OpEx OpEx 12 attended submitted to the Manager of Receipt Participation and its internal attended by end June 2019 MM by end June 2019 and external stakeholders

OFFICE OF THE MUNICIPAL MANAGER: INFORMATION TECHNOLOGY YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Revised Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Annual Focus Area Objective Driver Evidence Number Target type type Target Portfolio Municipal Improve Review and submit 6 ICT Number of ICT policies Meeting Information Transformation & organisational Policies to Portfolio for reviewed & submitted to N/A Manager: IT 12 Carry Over Number Minutes / OpEx OpEx 6 6 Technology Institutional cohesion approval by end March Portfolio for approval by Attendance Development effectiveness 2019 end March 2019 Register Portfolio Municipal Improve Submit Quarterly Reports Number of reports Meeting Information Transformation & organisational to Portfolio on the IT status submitted to Portfolio on N/A Manager: IT 4 Accumulative Number Minutes / OpEx OpEx 4 4 Technology Institutional cohesion and activities by end June the IT status & activities by Attendance Development effectiveness 2019 end June 2019 Register

138

OFFICE OF THE MUNICIPAL MANAGER: PERFORMANCE MANAGEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Focus Area Objective Driver Evidence Number Target type type Submit the draft the annual Improve Draft annual Performance Good Governance Performance Report in Performance organisational Report in terms of Sec 46 of Acknowledgement & Public terms of Sec 46 of the MSA N/A Manager: PMS 1 Carry Over Number OpEx OpEx 1 Management cohesion the MSA Submitted to the of Receipt Participation to the AG by 31 August effectiveness AG by 31 August 2018 2018 Improve Performance Agreements Number of performance Good Governance Signed Performance organisational for Municipal Manager and agreements of the MM and & Public N/A Manager: PMS 5 Carry Over Number Performance OpEx OpEx 6 Management cohesion all Senior Managers signed Directors signed by end July Participation Agreements effectiveness by end July 2018 2018 Improve Good Governance Coordinate annual Strategic Number of annual Strategic New KPI Performance organisational Attendance #NAME? & Public Planning by end January Planning coordinated by end N/A Manager: PMS for Carry Over Number R 100,000 Management cohesion Registers Participation 2018 January 2018 2018/19 effectiveness Improve Number of draft 2018/19 Good Governance Submit the draft 2018/19 Council Performance organisational Annual Reports submitted to and Public Annual Report to Council by N/A Manager: PMS 1 Carry Over Number Resolution / OpEx OpEx 1 Management cohesion Council by end January Participation end January 2019 Minutes effectiveness 2019 To improve overall financial Submit Mid-Year Budget management in the Number of mid-term budget and Performance Good Governance municipality by and performance Performance Assessment Report in terms Acknowledgement and Public developing and assessment reports N/A Manager: PMS 1 Carry Over Number OpEx OpEx 1 Management of Section 72 of the MFMA of Receipt Participation implementing submitted to the Mayor by to the Mayor by 25 of appropriate 25 January 2019 January 2019 Financial Management Conduct bi-annual formal Number of bi-annual formal Improve evaluatations on the Good Governance performance evaluations of Performance organisational performance of the MM and & Public the MM and Directors N/A Manager: PMS 6 Carry Over Number Evaluation Report OpEx OpEx 2 Management cohesion Directors in terms of their Participation conducted by end March effectiveness signed agreements by end 2019 March 2019 Improve Good Governance Review the PMS framework Number of PMS frameworks Council Performance organisational & Public and submit to Council by reviewed and submitted to N/A Manager: PMS 1 Carry Over Number Resolution / OpEx OpEx 1 Management cohesion Participation end May 2019 Council by end May 2019 Minutes effectiveness Submit the Top Layer Number of Top Layer Improve Good Governance SDBIP to the Mayor for SDBIP's submitted to the Performance organisational Acknowledgement & Public approval within 14 days after Mayor within 14 days after N/A Manager: PMS 1 Carry Over Number OpEx OpEx 1 Management cohesion of Receipt Participation the approval of the final the approval of the final effectiveness Budget Budget

139

OFFICE OF THE MUNICIPAL MANAGER: PERFORMANCE MANAGEMENT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Focus Area Objective Driver Evidence Number Target type type Submit quarterly Number of quarterly Improve Portfolio Meeting Good Governance Performance Reports in performance reports in Performance organisational Minutes / & Public terms of the Top Layer terms of the Top Layer N/A Manager: PMS 4 Carry Over Number OpEx OpEx 4 Management cohesion Attendance Participation SDBIP to Portfolio by end SDBIP submitted to Portfolio effectiveness Register June 2019 by end June 2019 Submit 12 monthly Back to Good Governance Promote a culture Number of B2B reports Acknowledgement Performance Basics (B2B) reports to & Public of participatory & submitted to National N/A Manager: PMS 12 Accumulative Number of Receipt from OpEx OpEx 12 Management National CoGTA by end Participation good governance CoGTA by end June 2019 CoGTA June 2019 Improve Good Governance Submit the Departmental Number of departmental Performance organisational Acknowledgement & Public SDBIP to the MM by 30 SDBIP's submitted to the N/A Manager: PMS 1 Carry Over Number OpEx OpEx 1 Management cohesion of Receipt Participation June 2019 MM by 30 June 2019 effectiveness Number of compiled Facilitate the compilation of Municipal quarterly assessment Promote a culture quarterly assessment report Performance Performance Institutional reports on all managers of participatory and on all managers reporting to N/A Manager: PMS 0 Accumulative Number Assessment OpEx OpEx 4 Management Development and reporting to the Municipal good governance the Municipal Manager by Report Transformation Manager facilitated by end end June 2019 June 2019

OFFICE OF THE MUNICIPAL MANAGER: INTERNAL AUDIT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Focus Area Objective Driver Evidence Number Target type type Prepare and submit monthly Number of monthly progress Improve progress reports to the reports to the Municipal Good Governance Signed Internal organisational Municipal Manager on the Manager on the Chief Internal & Public N/A 2 Carry Over Number Progress OpEx OpEx 6 Audit cohesion implementation of the audit implementation of the audit Auditor Participation Report effectiveness action plan by end June action plan by end June 2019 2019 Prepare and submit annual Number of annual audit plan Improve Good Governance audit plan to the Audit & prepared and submitted to Internal organisational Chief Internal Meeting & Public Performance Committee for Audit & Performance N/A 1 Carry Over Number OpEx OpEx 1 Audit cohesion Auditor Minutes Participation approval by end September Committee for approval by effectiveness 2018 end September 2018 Improve Submit Audit Committee Number of AC Charters Good Governance Council Internal organisational Charter to Council for submitted to Council for Chief Internal & Public N/A 1 Carry Over Number Resolution / OpEx OpEx 1 Audit cohesion approval by end September approval by end September Auditor Participation Minutes effectiveness 2018 2018

140

OFFICE OF THE MUNICIPAL MANAGER: INTERNAL AUDIT YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Focus Area Objective Driver Evidence Number Target type type Improve Submit the Audit Action Plan Good Governance Number of Audit Action Plan Council Internal organisational for 2016/17 to Council for Chief Internal & Public for 2016/17 submitted to N/A 1 Carry Over Number Resolution / OpEx OpEx 1 Audit cohesion adoption by end January Auditor Participation Council by end January 2019 Minutes effectiveness 2019 Improve Number of internal Audit Good Governance Submit Internal Audit Charter Council Internal organisational Charters submitted to Chief Internal & Public to Council for noting by end N/A 1 Carry Over Number Resolution / OpEx OpEx 1 Audit cohesion Council for noting by end Auditor Participation January 2019 Minutes effectiveness January 2019 Improve Prepare and submit the final Number of final audit reports Audit Good Governance Internal organisational Audit reports to the Audit submitted to the Audit & Chief Internal Committee & Public N/A 1 Carry Over Number OpEx OpEx 8 Audit cohesion Committee by end June Performance Committee by Auditor Meeting Participation effectiveness 2019 end June 2019 Minutes Improve Number of Internal Audit Good Governance Issue final audit reports to Internal organisational reports issued to the Chief Internal Signed final & Public the Municipal Manager by N/A 4 Accumulative Number OpEx OpEx 8 Audit cohesion Municipal Manager by end Auditor audit reports Participation end June 2019 effectiveness June 2019 Prepare and submit quarterly Number of quarterly reports Improve report on the implementation on the implementation status Good Governance Internal organisational status of the action plan for of the action plan for 2016/17 Chief Internal Meeting & Public N/A 1 Carry Over Number OpEx OpEx 2 Audit cohesion 2016/17 to the Audit & submitted to the Audit & Auditor Minutes Participation effectiveness Performance Committee by Performance Committee by end June 2019 end June 2019

OFFICE OF THE MUNICIPAL MANAGER YEAR UNDER REVIEW: 2018/19 PLANNING KPI KPI Strategic Strategic Programme Portfolio of Project Annual REF National KPA KPI Unit of Measurement Ward Baseline Calculation Target Budget Weight Focus Area Objective Driver Evidence Number Target type type Municipal Improve Meeting Number of bi-annual staff Institutional Institutional organisational Coordinate bi-annual staff MM Office Minutes / meetings coordinated by end N/A 2 Carry Over Number OpEx OpEx 2 Development Development & cohesion meetings by end June 2019 Manager Attendance June 2019 Transformation effectiveness Register Municipal Improve Number of monthly Meeting Coordinate monthly Institutional Institutional organisational management meetings MM Office Minutes / management meetings by N/A 12 Accumulative Number OpEx OpEx 12 Development Development & cohesion coordinated by end June Manager Attendance end June 2019 Transformation effectiveness 2019 Register Good Governance Promote a culture Update the risk registers of Risk Number of risk registers MM Office Attendance & Public of participatory & the directorate quarterly by N/A 4 Accumulative Number OpEx OpEx 4 Management updated by end June 2019 Manager Register Participation Good Governance end June 2019

141

7.2. DR RUTH S MOMPATI DISTRICT MUNICIPALITY

2017/18 Medium Term Revenue & Expenditure Framework

Total Project Funding Status Adjustment Total Budget Budget Budget Municipal Vote/Capital project Budget Year Total Progress MTREF Period 2018- Estimate Budget Year Expenditure Year +1 Year +2 Year +3 2017/18 Adjustment % 2021 R'000 2017/18 31 March 2018/19 2019/20 2012/21

Greater Taung: Bulk Water Supply Upgrading Taung Phase 2C: Raw Water Pipeline RBIG 99% 64,866,008 0 7,650,000 7,650,000 1,134,500 14.83% 0 0 0 0 (Moedi/Mosegedi JV & DWS-CU) Greater Taung: Bulk Water Supply Upgrading Taung Phase 2D: New Treatment Works (Bigen RBIG 94% 205,000,000 9,259,400 24,850,000 24,850,000 9,733,174 39.17% 0 0 0 0 Africa & DWS-CU)

Greater Taung: Bulk Water Supply Upgrading Taung Phase 2E-1: BulkWater Supply : Bulk pump RBIG New 74,850,000 20,740,600 31,250,000 31,250,000 10,937,347 35.00% 20,000,000 15,600,000 0 35,600,000 line from new WTW in Taung to new Reservoir in Morokweng (NEP & Amawakawaka)

Greater Taung: Bulk Water Supply Upgrading Taung Phase 2E-1: BulkWater Supply : New pump RBIG New 28,400,000 0 15,450,000 12,950,000 0 28,400,000 Stations at the new WTW in Taung and New Reservoir in Morokweng (NEP & Selenane)

Greater Taung: Bulk Water Supply Upgrading Taung Phase 2E-1: BulkWater Supply : New RBIG New 29,850,000 0 11,100,000 15,000,000 26,100,000 Reservoir and Elevated Tower at Morokweng (NEP & Ultimate Dynamic) Greater Taung: Bulk water supply upgrading Taung: Phase 2E-2 - Bulk distribuction RBIG New 29,650,000 25,000,000 19,300,000 19,300,000 7,436,968 38.53% 13,450,000 75,000 13,525,000 Southern Portion (Moedi & Uncle Paul & Jorian Contractors) Greater Taung: Bulk w ater supply upgrading Taung: Phase 2E-2 - Bulk distribuction Eastern RBIG New 33,050,000 0 10,000,000 16,375,000 0 26,375,000 Portion (Moedi & Lesedi Contractors) Greater Taung: Bulk w ater supply upgrading Taung: Phase 2E-2 - Bulk distribuction Northern RBIG New 32,000,000 0 0 15,000,000 15,000,000 Portion (Moedi & Contractor) Greater Taung: Bulk w ater supply upgrading Taung: Phase 2E-2 - Bulk distribuction Western RBIG New 23,750,000 0 0 18,000,000 18,000,000 Portion (Moedi & Contractor) Greater Taung: Bulk w ater supply upgrading Taung: Phase 2E-2 - Bulk distribuction Central RBIG New 28,600,000 0 0 0 17,000,000 17,000,000 Portion (Moedi & Contractor) TOTALS RBIG 465,666,008 55,000,000 83,050,000 83,050,000 29,241,989 35.21% 70,000,000 60,000,000 50,000,000 180,000,000

142

2017/18 Medium Term Revenue & Expenditure Framework

Total Project Funding Status Adjustment Total Budget Budget Budget Municipal Vote/Capital project Budget Year Total Progress MTREF Period 2018- Estimate Budget Year Expenditure Year +1 Year +2 Year +3 2017/18 Adjustment % 2021 R'000 2017/18 31 March 2018/19 2019/20 2012/21

Greater Taung: Bulk w ater supply to Madipelesa (BVI/OJ JV & Isiphethu/Amanzi JV) WSIG Completed 7,093,100 0 1,384,250 1,384,250 1,000,000 72.24% 0 0 0 0 Greater Taung: Bulk w ater supply to Shaleng (BVI/OJ JV & Isiphethu/Amanzi JV) WSIG New 8,900,000 0 0 0 8,000,000 0 0 8,000,000 Greater Taung: Bulk w ater supply to Reivilo: Phase 1 (BVI/OJ JV & Isiphethu/Amanzi JV) WSIG Construction 12,100,000 986,000 8,308,100 8,308,100 6,039,000 72.69% 0 0 0 0 Greater Taung: Bulk w ater supply to Reivilo: Phase 2 (BVI/OJ JV & Isiphethu/Amanzi JV) WSIG New 13,200,000 0 0 0 5,000,000 8,200,000 0 13,200,000 Greater Taung: Bulk & internal w ater supply to Lykso Phase 1 (BVI/OJ JV & Isiphethu/Amanzi WSIG Completed 5,449,460 2,100,000 4,833,650 4,833,650 4,800,000 99.30% 0 0 0 0 JV) Greater Taung: Bophirima Rural Water Supply Program 2016/19: Picong (BVI/OJ JV & WSIG New 2,850,000 0 0 0 2,850,000 0 0 2,850,000 Isiphethu/Amanzi JV) Greater Taung: Bophirima Rural Water Supply Program 2016/19: Matlhako 1 & 2 (BVI/OJ JV & WSIG New 14,600,000 0 0 0 0 6,600,000 7,000,000 13,600,000 Isiphethu/Amanzi JV) Greater Taung: Bophirima Rural Water Supply Program 2016/19: Molelema (BVI/OJ JV & WSIG New 7,200,000 0 0 7,200,000 0 7,200,000 Isiphethu/Amanzi JV) Greater Taung: Upgrading of Diplankeng Oxidation ponds WSIG New 10,000,000 0 0 0 500,000 9,000,000 500,000 10,000,000 Greater Taung: Upgrading of Pudimoe Oxidation ponds WSIG New 10,000,000 1,000,000 0 0 500,000 9,000,000 500,000 10,000,000 Greater Taung: Upgrading of Reivilo Oxidation ponds WSIG New 15,000,000 0 0 0 0 500,000 11,200,000 11,700,000 Greater Taung: Bophirima Rural Sanitation Programme 2016/2019 - WSIG Funding (Izw elethu WSIG New 35,000,000 15,000,000 15,000,000 15,000,000 10,000,000 66.67% 0 0 0 Cemforce) Greater Taung: Bophirima Rural Sanitation Programme 2019/2022 - WSIG Funding WSIG New 20,000,000 0 0 0 5,000,000 5,000,000 TOTALS WSIG 179,392,560 20,086,000 29,526,000 29,526,000 21,839,000 73.97% 24,050,000 33,300,000 24,200,000 81,550,000 Greater Taung: Bophirima Rural Water Supply Program 2016/19: Kameelputs (BVI/OJ JV & MIG Completed 2,750,000 0 2,318,000 2,318,000 2,318,000 100.00% 0 0 0 0 Isuphethu/Amanzi JV) Greater Taung: Bophirima Rural Water Supply Program 2016/19: Karelstad (BVI/OJ JV & MIG New 5,600,000 0 0 0 5,600,000 0 0 5,600,000 Isuphethu/Amanzi JV) Greater Taung: Bophirima Rural Sanitation Programme 2016/2019 - MIG Funding (Izw elethu MIG Ongoing 86,000,000 15,000,000 15,000,000 30,000,000 15,000,000 50.00% 10,000,000 10,000,000 Cemforce) Greater Taung: Bophirima Rural Sanitation Programme 2019/2022 - MIG Funding MIG New 20,000,000 0 7,000,000 20,000,000 27,000,000 TOTALS MIG 114,350,000 15,000,000 17,318,000 32,318,000 17,318,000 53.59% 15,600,000 7,000,000 20,000,000 42,600,000

GRAND TOTAL GREATER TAUNG LOCAL MUNICIPALITY 759,408,568 90,086,000 129,894,000 144,894,000 68,398,989 47.21% 109,650,000 100,300,000 94,200,000 304,150,000

143

7.3. ESKOM AND DME

Electrification Projects to be implemented by Eskom and DME:

Gazette Completed Project Name Comments Connections Connections Takapori 35 36 Completed and energized Myra 47 57 Completed and energized Mokgareng Ext 202 134 Completed and energized Itireleng Ext 57 58 Completed and energized Mokasa 1 70 69 Completed and energized Matlhako 1 45 58 Completed and energized Manokwane 66 56 Completed and energized Cokonyane 71 64 Completed and energized Ditshilong 87 68 Completed and energized Dikhuting 19 20 Completed and energized Gamoduane 62 57 Completed and energized Lokgabeng Ext 59 39 Completed and energized Underway, to be completed Taung Ext 7 100 716+ 31 March

Planned Mapped Project Name Comments Connections Connections Diplankeng Ext Ph 2 35 29 Design stage Donkerhoek Ext 45 75 Design stage Lokgabeng Ph 2 30 53 Design stage Lower Majeakgoro 250 545 Design stage (Not Budgeted) Mokasa 2 RDP 60 75 Design stage Sekhing 65 92 Design stage Greater Taung Ext 5 25 30 Design stage (Not Budgeted) Khudutlou Ext Ph 2 20 19 Design stage Longaneng Ext Ph 2 35 97 Design stage Manthe Ph 2 65 112 Design stage Matsheng Ext Ph 2 50 69 Design stage (Not Budgeted) Morokweng Ext Ph 2 40 50 Design stage Picong Ext 35 64 Design stage Draaihoek Buxton 50 57 Design stage Dryharts Ext 65 107 Design stage

144

Planned Mapped Project Name Comments Connections Connections Matlhako 2 Ext 20 85 Stands to be allocated Mogopela A Ext Ph 2 20 39 Design stage Mogopela B Ext 80 124 Design stage Ntswanahatshe Ext Ph2 65 93 Design stage (No Budget) Pudumoe Ext 50 107 Stands to be allocated Rooiwal Ext 15 34 Design stage (No Budget) Tlapeng 2 Ext 50 75 Design stage (No Budget) Mokgareng 2 Pump 25 22 Design stage Majaneng Ext 30 78 Design stage Tlapeng Bandrift 3 64 Design stage (No Budget) Matolong 70 110+ Stands to be allocated Manokwane 30 53 Design stage

ELECTRICITY INFILLS

Project Name Planned Connections Comments Matlapaneng 90 30 Infills Myra 60 80 Infills Ranstad 70 Infills

Maphoitsile 40 40 Infills Sedibeng 20 20 Infills Choseng 60 40 Infills Nhole 80 Infills

Kokomeng 90 Infills

Lokgabeng 50 40 Infills Seweding 20 20 Infills Kgomotso 15 30 infills Molelema 80 Infills

Ext 5 40 50 Infills Ext 7 30 20 Infills Tlapeng Bandsdrift 3 64 Infills Khaukhwe 10 19 Infills Enkel Farm 1

145

7.4. DEPARTMENT OF RURAL DEVELOPMENT AND HUMAN SETTLEMENT

GTLM did explore the opportunity to develop Community Residential Units, but need to carefully consider which option will be in the best interest of GTLM.

The following list is relevant to planning wrt housing development:

WARD NAME OF VILLAGE PROJECTS PLANNED 1 Boipelo Township-Reivilo 1 Lykso 2 Maganeng 2 Moretele 2 Ntswanahatshe 2 Khaukhwe 3 Loselong 50 3 Leshobo 50 3 Karelstad 50 3 Choseng 23 Mase 50 23 Matlapaneng 50 23 Sedibeng 4 Dryharts 4 Sitting polar 5 Matlhako 1 5 Matlhako 2 6 Mogopela A 6 Mogopela B 6 Myra 8 Lokgabeng 50 7 Ditompong 50 7 Mokgareng 50 7 Ntokwe 50 8 De Beers 50 8 Itireleng 50 8 Majaneng 50 8 Mokasa 1 50 24 Mokasa 2 50 24 Rooiwal 50 8 Takapori 50 24 Draaihoek 50 9 Thomeng 50 9 Motsweding 50 24 Buxton 50 7 Diretsaneng 50 7 Takaneng 50 24 Tamasikwa 65 10 Phatshe 50 10 Modimong 50 10 Mamashokwane 50 10 Setlhabeng 50 10 Madibaneng 50 10 Hellenspan 50 10 Cokonyane 50 25 Lokaleng 11 Matolong 50 25 Khibitswane 12 Nhole 12 Manokwane 12 Kolong 12 Randstad 50 13 Chiefscourt 50 146

WARD NAME OF VILLAGE PROJECTS PLANNED 13 Blekies 50 11 Veertien 50 13 Ditshilong 50 13 Nomer one 50 13 Kgatleng 50 14 Tlapeng Serasengwe 50 26 Matsheng 50 14 Manthestad 50 15 Kokomeng 50 15 Khudutlou 50 15 Molelema 50 16 Dikhuting 50 26 Longaneng 50 16 Graspan 50 16 Mothanthanyaneng 16 Morokweng 50 16 Pitsong 50 17 Ga Moduana 50 17 ga Mokake 50 17 Lothwanyeng 50 17 Roma 50 17 Maphoitsile 18 Dipitsing 50 18 Diplankeng 18 Magogong 93 18 Modutung 50 19 Lower Majeakgoro 19 Tlapeng-Pampierstad 50 20 Kgomotso 20 Losasaneng 20 Madithamage 50 20 Thotayatau 50 21 Upper Majeakgoro 21 Sekhing 21 Seoding 22 Madipelesa 50 22 Shaleng 50 22 Rietfontein 50 22 Gataote 50 22 Mammutle 50 26 Vergenoeg 50 11 Taung Ext 6 50

The following input was given by The Department of Local Government & Human Settlement wrt Housing Projects:

District - Region Dr Ruth Segomotsi Mompati District Sum of Total Annual No of Sites 1759 Sum of Total Annual Site Budget R 79 811 911,00 Sum of Total Annual No of Units 2314 Sum of Total Annual Unit Budget R 317 144 022,00 Sum of Total Annual No of Units Title Deed Restoration 1396 Sum of Total Annual Budget Title Deed Restoration R 1 396 000,00 Sum of Total Annual Professional Fees Budget R 25 746 340,00 Sum of Total Annual Budget R 424 098 273,00

147

Delivery Targets /No of serviced sites Delivery targets/ Funding approved Municipality 2018/19 Planned Units 2018/19 2018/2019 Greater Taung 0 527 R86 619 885

Project Description as Delivery Delivery Funding Potential Project Risks and Risk listed in the (FY) Targets /No of targets/ approved Mitigation Measures Business Plan serviced sites Planned (FY) (FY) Units (FY) 2016/17 Greater Taung 0 126 R20 950 Project under planning in 2016/17 Villages 214 .Geotechnical investigation is complete for the 3 villages and will be under construction. Beneficiary list is available for all villages. Other villages will be under planning for geotechnical investigation in 2018/19 2016/17 Greater Taung 0 0 R3 000 000 The project is under planning in the past Lykso financial year for geotechnical investigation and recommended for dolomite studies 2016/17 Greater Taung 0 12 R2 256 000 A feasibility study/ planning process was Military Vets conducted and project ready for implementation, awaiting appointment of contractor through a closed tender process , confirmation from DMV . Greater Taung Loc Mun 0 50 R6 329 450 Project under construction Sun Succes 119subs

7.5. DEPARTMENT OF PUBLIC WORKS & ROADS

During an IGR meeting held on the 7th of May 2018 it was agreed that The Department of Public Works & Roads will update their Capex (MTEF) to include the Baga Maidi Loop over a three year period and that the presentation not be included in the IDP unless it has been ammended.

7.6. DEPARTMENT OF SOCIAL DEVELOPMENT

The presentation is included in the next page onwards:

148

GREATER TAUNG SERVICE POINT Agricultural Building  Taung Station 8580  Greater Taung Tel: +27 (53) 994 –8900 /01  Fax: +27 (53) 994 – 1741  [email protected]

CONTACT PERSON: DINEO CHUAKA SERVICE POINT MANAGER

1. IDP PLAN

1.1. Service point overview

POPULATION: 177 642 (the largest in the district) WARDS: 24 Reivilo, Pudimoe and Taung Central (24 wards, 109 villages) Total numbers of officials 104, each ward have a social service professional.

community Auxiliary Social Social Work Ward Village Social Worker Ward Supervisor development Worker Grade 1- practitioner 01 Lykso reivilo Mr ofentse serapedi Molly Mosako MS NDIVHUVHO Bridgette Mooki MPHO MOABI gasebuso MUGOGOVHALI 082 325 2296 qho MS NDIVHUVHO Bridgette Mooki vaaltyn MUGOGOVHALI letlhapong 02 Ntswanahatshe Keitumetse MS NDIVHUVHO MS BRIGETTE Letlhogonolo Moretele Khaukhwe Gaotsietse MUGOGOVHALI MOOKI Lekaowa Magananeng Dryharts 079 899 2294 079 885 2184 Station INTERN SOCIAL WORKER: R.PICO 03 MATLAPANENG MOKGETHI DIKATSO MS PHOYANA – MS NDIVHUVHO MS BRIGETTE LETLHOGONOLO MASE MUGOGOVHALI MOOKI LEKAOWA CHOSENG 079 885 2184 SEDIBENG KARELSTADT LOSELONG 04 DRYHARTS- MANKABANE TUELO MS MOGOIWA MS NDIVHUVHO MS BRIGETTE MOJAKI LEPEDI LOHATLHENG MUGOGOVHALI MOOKI 079 880 9495 POMPONG 079 884 2281 SITTING POLAR 05 MATLHAKO 1 MS KAGISO MS NDIVHUVHO MS BRIGETTE MOJAKI LEPEDI MATLHAKO 2 MOSALASHUPING MUGOGOVHALI MOOKI 079 880 9495 PUDIMOE LOCATION 082 042 6467 06 MOGOPELA A MS LESEGO SEDIMO MS KOKWE MS NDIVHUVHO MS BRIGETTE LESEDI TAU MOGOPELA B MUGOGOVHALI MOOKI 079 880 5647 MYRA 079 879 0436 KHIBICWANE EXT. COKONYANE

149

07 MOKGARENG MIMMY NAKO MS MOLEFE MS NDIVHUVHO MS BRIGETTE KGOMOTSO (DITOMPONG) MUGOGOVHALI MOOKI RALOKWAKWENG TIALEJE 079 881 0837 082 324 3168 ROMA NTOKWE LESHOBO 08 LOKGABENG MS MPHO KOMANE MS NKORO MS NDIVHUVHO MS BRIGETTE MPHO MOABI EXT 6 MUGOGOVHALI MOOKI 082 325 2296 EXT 7 082 970 2182 TAUNG DEPOT ROOIVAL TAKANENG LOKGABENG DIRETSANENG 09 BUXTON MR OOKAME MR TSHWEU MS NDIVHUVHO MS BBRIGETTE LIPALESA DRYHOEK TUMELO MUGOGOVHALI MOOKI MPOELENG TAMASIKWA 079 880 5747 LETLHAPONG 082 324 2518 MOCWEDING THOMENG MAROTANENG 10 COKONYANE MATUMELO MS CHWEU MS ENGAGE DIALE RENDANI LESEDI TAU MADIBANENG MANKUROANE MMEREKI 079 880 5647 MODIMONG SETLHABENG 079 882 6368 HELENSPAN PACHE MAMASHOKWANE 11 LOKALENG KGOKONG SINAN NKORO MS ENGAGE DIALE RENDANI KEGOMODITSWE MACHONISA TSHOGANYETSO MMEREKI MPHELA KHIBICWANE 079 881 0155 KGATLHENG 079 882 9006 12 NHOLE 079 884 2250 MS SEGANO MS ENGAGE DIALE RENDANI KGOMOTSO MANOKWANE GASEKOMA LESEDI MMEREKI RALOKWAKWENG RANDSTAD 082 324 3168 KOLONG 13 CHIEFSCOURT KEFILWE MAGANO MR MONCHUSI MS ENGAGE DIALE RENDANI KEGOMODITSWE EXT. 5 MMEREKI MPHELA PINAGARE 079 878 8231 079 881 0155 VEERTIEN LOKALENG DITSHILONG 1 DITSHILONG 2 KGATLHENG NOMMER 1 BLEKKIES 14 SEODI PARK MS TSHOLOFELO MS L MOETI MS ENGAGE DIALE RENDANI MMAKAU MANTHE MOKWENA MMEREKI CHOENEEMANG 079 883 0873 082 325 2214 15 KHUDUTLOU MARY TEGELE MS ENGAGE DIALE RENDANI MMAKAU MOLELEMA MMEREKI CHOENEEMANG KOKOMENG 079 879 1192 079 883 0873 TIRO CWAILE 16 GRASPAN GOODNESS NYATHI MS MOGOIWA MS ENGAGE DIALE RENDANI MOMPATI PICONG 079 885 2105 MMEREKI GABANAKGOSI MOROKWENG 079 878 7772 DIKHUTING LONGANENG MOTHANTHANYANENG 17 MAPHOITSILE KGOMOTSO MS NXONGA -SAW) MS KEALEBOGA NEMUTANZHELA MOMPATI GA-MODUANE PILATSO TEKOLO TSUMBEDZHO GABANAKGOSI ROMA 079 878 7772 BOGOSING EXT 082 324 2987 LETHWANYENG

150

18 MAGOGONG LESEGO MOSINKI MS D MOETI MS KEALEBOGA NEMUTANZHELA MOMPATI DIPOLANKENG 079 879 0364 TEKOLO TSUMBEDZHO GABANAKGOSI MODUTUNG 079 878 7772 LERATO MOSIMANEENG 19 UPPER MAJEAKGORO PHUMLA MS MANONG MS KEALEBOGA NEMUTANZHELA SUZAN LOWER MAJEAKGORO LONTSHITSE TEKOLO TSUMBEDZHO CHABAEMANG 079 882 7032 0798 805 443 20 KGOMOTSO TEBOGO MOSANG MS MOLAOLWA MS KEALEBOGA NEMUTANZHELA SUZAN IKAGENG TEKOLO TSUMBEDZHO CHABAEMANG KAMEELPITS 0798 805 443 THOTA-YA-TAU 21 SEKHING NEO MOGAMISI MS MOCWALEDI MS KEALEBOGA NEMUTANZHELA DOLLY MASHELE RIETFONTEIN 082 324 2562 TEKOLO TSUMBEDZHO SEODING 22 MAMMUTLA MS GOITSEMANG MS CONGWANE MS KEALEBOGA NEMUTANZHELA DOLLY MASHELE GA-TAOTE SEHAKO TEKOLO TSUMBEDZHO SHALENG 079 549 3779 MADIPELESA 23 MATSHENG – MS SEIPELO MS L MOETI MS KEALEBOGA NEMUTANZHELA MMAKAU TLAPENG 1 MORETLWE TEKOLO TSUMBEDZHO CHOENEEMANG TLAPENG 2 079 883 0873 KOKOMENG 079 887 2295 24 MOKASA 1 MS ANGELINE KADI MS SEREO MS KEALEBOGA NEMUTANZHELA LIPALESA MOKASA 2 TEKOLO TSUMBEDZHO MPOELANG ITIRELENG 079 884 2537 TAKAPORI MAJANENG

PROGRAMME SUPERVISORS SUPPORT Administrative – SOCIAL AUXILLAIRY WORKER SOCIAL WELFARE ALL 10 SUB-PROGRAMMES COMMUNITY DEVELOPMENT ALL FIVE SUB- MALEBOGO ALL CDPS PROGRAMME COOPERATE VACANT 2. CANALISATION MS BABE MS THULWANE Ms DITHATO-SAW)

3 ADMINISTRATION MS MOAMOGWE, MS MAINE , MS BOTLHOLO (MONITORING AND EVALUATION MS GOPANE FUNCTIONS, CONSOLIDATED MR TITIES (ALL SAW’s) INTAKE) 4.NPO ORGANISATIONS SUPPORT MS PHEFO ECD & HIV AND AIDS: MS PHEFO Ms Mogapi MS MECHILLE MS PULE MS DUSTILE MS SENOKWANYANE

MS KGOROTLHE MS KGOROTLHE : OLDER PERSONS & DISABILITY NEO MOTSWABANGWE: VEP AND SUBSTANCE ABUSE 5. WARD 1-8 BRIDGETTE MOOKI MS NDIVHUVHO MUGOGOVHALI 6. WARD 09-16 RENDANI MMEREKI MS ENGAGE DIALE 7.WARD 17-24 NEMUTANZHELA MS KEALEBOGA TEKOLO TSUMBEDZHO

151

1.2. Planned programmes/ projects

PROGRAMME TWO: SOCIAL WELFARE SERVICES

SERVICES TO OLDER PERSONS

Project ward Job opportunities Budget

1.REFILWE MPHO SERVICE CLUB GATAOTE 5 R147 840.00 Ward 22 2.ITEKENG SOCIAL CLUB FOR THE MATOLONG 5 R198 240.00 AGED Ward 11 3.MZAMO SERVICE CLUB ROOIVAL 5 R124 800.00 Ward 08 4. ATAMELANG SERVICE CLUB RANDSTAD 5 R124 800.00 Ward 13 5. REDIRAMMOGO OLDER SHALENG 3 R341 900.00 PERSONS SERVICE CENTRE Ward 22 6. IKOPANYENG SERVICE CLUB LOSASANENG 3 R774 614.85 Ward 22 7.RELESEDI HEALTH CARE GROUP LOWER MAJEAKGORO 5 R219 800.00 Ward 19 8. BOTSHELO SOCIAL CLUB MODIMOMG 5 R168 000.00 Ward10 9. BOITUMELO SERVICE CLUB UPPER MAJEAKGORO 5 R222 720.00 Ward 9 10. EMA O DIRE SERVICE CLUB MAPHOITSILE 5 R239 000.00 Ward 175 11. SEDIBENG SA LORATO AGE IN SEKHING 5 R287 806,90. ACTION CENTRE Ward 21 12. REEME MOLELEMA SERVICE MOLELEMA 5 R182 400.00 CLUB Ward 16 13. ITIRELENG SERVICE CLUB 5 R113 280.00

SERVICES TO THE PERSONS WITH DISABILITIES

1.OBAKENG DISABILITY CENTRE MANTHE 6 R253 517.00 Ward 5

2.LOKGABENG DISABLED CENTRE LOKGABENG 20 R1 089 617.40 Ward 4

HIV&AIDS PREVENTION, CARE AND SUPPORT SERVICES

1. IKAGENG WOMEN’S PROJECT REIVILO 15 R1 000 000.00

2. RETSHWENYEGILE HBC LOKGABENG 10 R663 700.00

3. ITUMELENG HBC QHO 15 R923 166.00

4. TLHOMAMO CCC DRYHARTS 20 R1 413 700.00

5. MALEBOGO HBC KGOMOTSO 30 R3 774 704.00 6.KEARABETSWE ISIBINDI MAGOGONG 15 R1 000 000.00

152

FAMILY CARE AND SUPPORT SERVICES PARTIAL CARE AND EARLY CHILDHOOD DEVELOPMENT SERVICES

1.G. D RAKOI E.L.C 04 08 R180 540 2. KATLEGO CRECHE 02 04 R186 000.00 3. TSHWARAGANO E.L.C 12 05 R148 600.00 4. MAATLA E.L.C 02 06 R167 400.00 5. LESEDI BOKAMOSO D.C.C 05 05 R78 120.00 6. MPEPI CRECHE 13 05 R 267 924 7. MPHO ENTLE 22 06 R531 980.00 8. IPELEGENG 19 03 R 477 400.00 9. RETSWELETSE 21 05 R 532 600.00 10. REAGAGABA 22 04 R 252 200.00 11.MOSIMEGE 22 05 R 302 200.00 12. MAGABA 19 05 R 139 450 13. LESEDI GO BOTLHE 22 06 R 215 720 14. IKAELELO 21 06 R 550 786 15.TLHALOGANYANG 20 08 R 599 400 16. ITSHEPENG 21 05 R 265 560 17. ST RAPHAEL 21 04 R384 600 18. TSHEDIMOSETSO 21 08 R 530 200.90 19.THUTO THLHAGO 21 05 R 204 900 20. REATLAGILE BOIPELO 01 21.MODIMONG 10 6 R 167.400.00 22.SECHABA 04 08 R 297 600.00 23.LORATO 0 08 R297 600.00 24.THUSANANG 18 04 186 600 25.TLHALEFANG 04 R 186.000.00 26.MOTHUSI 03 04 R 74 400.00 27.IKAGENG 05 16 R 632 400 28.TSWELELOPELE 12 05 R 78 120 29.KEALEBOGA 07 10 R 327 360.00 30.TSHOLOFELO 09 03 R 111 600.00 31.REITUMETSE 09 06 R 252 960.00 32.ONNELENNA 24 3 R111 600.00 33.BOPAGANANG 03 07 R 241 800.00 34.ABAGOLE E.L.C 17 04 R 260 400.00 35.PAPETLETSO 07 05 R130 200.00 36.LERENG BANA 11 05 R 446.400 37.KUTWANO 5 04 R 111 600.00 38.MMANGWANA 11 04 R 446 400 39.REOTSHEPILE 17 03 R 111 600.00 40.TSHOLOFELO E.L.C 06 05 R186 000.00 41.SELEBANYENG CRECHE 06 03 R 111 600 42.AMOGELANG E.L.C 06 04 R 74 400.00 43.BOITUMELO E.L.C 02 06 R 186 000.00 33.BOPAGANANG 03 07 R 241 800.00 34.ABAGOLE E.L.C 17 04 R 260 400.00 35.PAPETLETSO 07 05 R130 200.00 44.SAMEENG 10 05 R 148 800.00 45.MOTHUSIWAME 14 06 R 148 800.00 46.GOLANG KA THUTO 14 04 R 111 600.00 47.SOLOFELANG 14 06 R 297 600.00 48.BANA BA THARI ECD 13 6 R241 800.00 49.MPEPE KA THARI CRECHE 17 5 R186 000.00 50.KATLEGO CRECHE 1 11 5 R148.800.00 153

51.KIDDIES DEN NURSERY SCHOOL 10 6 R133 120.00 52.TSHWARAGANANG CRECHE 02 4 R59 520.00 45.MOTHUSIWAME 14 06 R 148 800.00 46.GOLANG KA THUTO 14 04 R 111 600.00 47.SOLOFELANG 14 06 R 297 600.00 48.BANA BA THARI ECD 13 6 R241 800.00 49.MPEPE KA THARI CRECHE 17 5 R186 000.00 50.KATLEGO CRECHE 1 11 5 R148.800.00 51.KIDDIES DEN NURSERY SCHOOL 10 6 R133 120.00 52.TSHWARAGANANG CRECHE 02 4 R59 520.00 53.REITIRETSE E.L.C 04 5 R223 200.00 54.THUTO LORE E.L.C 16 4 R111600.00 55.NGWANANEO CRECHE 16 5 R197160.00 56.BOINEELO E.L.C 16 7 R141360.00 57.REGODILE CRECHE 15 5 R145080.00

PROGRAMME FOUR: RESTORATIVE SERVICES VICTIM EMPOWERMENT SERVICES

PUDIMOE CRISIS CENTRE PUDIMOE 10 R500 000.00 WARD 05

SUBSTANCE ABUSE, PREVENTION AND REHABILITATION SERVICES

TAUNG YOUTH BATALLION MOKGARENG 10 R883 161.06 WARD 07

SUSTAINABLE LIVELIHOOD

Readira sewing primary cooperative LOSASANENG WARD 3 5 R 847 306 Boiteko sewing cooperative MANTHE WARD 14 5 R 887 000

Department Public Works and Roads

Notice must be taken that the department was requested during an IGR meeting held on the 7th of May to submit the updated programme that will reflect at least a 3 year planning period (MTEF) to ensure that all phases of the multi-year projects are reflected.

154

7.7. SASSA

Input received from the South African Social Security Agency:

155

156

157

158

159

8. PERFORMANCE MANAGEMENT

The Reviewed Performance Management Framework is included from the next page onwards.

160

PERFORMANCE MANAGEMENT FRAMEWORK

2017/2018

GREATER TAUNG LOCAL MUNICIPALITY 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK 161

1. Background

The White Paper on Local Government (1998) proposed the introduction of performance management systems to local government, as a tool to monitor service delivery progress at local government. It concludes that the integrated development planning, budgeting and performance management are powerful tools which can assist municipalities to develop an integrated perspective on development in their area. It will enable them to focus on priorities within an increasingly complex and diverse set of demands and to direct resources allocations and institutional systems to a new set of development objectives.

Chapters 6 of the Local Government: Municipal Systems Act, 2000 (Act No.32 of 2000), requires local government to:

. Develop a performance management system. . Set targets, monitor and review performance based on indicators linked to the Integrated Development Plan (IDP). . Publish an annual report on performance management for the councillors, staff, the public and other spheres of government. . Incorporate and report on a set of general indicators prescribed nationally by the Minister responsible for local government. . Conduct an internal audit on performance report audited by the Auditor-General. . Involve the community in setting indicators and targets and reviewing municipal performance.

2. Introduction

Section (A) of the Local Government Municipal Systems Act no 32 of 2000 requires every municipality to establish a Performance Management System that is commensurate with its resources and best suited to its circumstances in line with its priorities, objectives, indicators and targets reflected in its Integrated Development Plan (IDP).

It further obliges every municipality to promote a culture of Performance among its political structures, political office bearers, councillors and its administrators and to administer its affairs in an economical, effective, efficient and accountable manner.

In seeking to comply with the above statutory requirement, this document therefore serves a Performance Management Systems Policy Framework for the Greater Taung Local Municipality. This framework caters for the development, implementation and roll-out of Performance Management System within the Greater Taung Local Municipality. .

3. RATIONALE OF PERFORMANCE MANAGEMENT

The requirement for the development and implementation of a Performance Management System is provided for in legislation, which makes it peremptory for municipalities to comply. The Auditor- General is required to audit municipalities for compliance with legislation and non-compliance will result in adverse consequences. 3.1...... POLICY AND LEGAL CONTEXT FOR PMS . THE WHITE PAPER ON LOCAL GOVERNMENT (1998) . BATHO PELE (1998) . THE LOCAL GOVERNMENT: MUNICIPAL SYSTEMS ACT, 2000 (ACT NO. 32 OF 2000). . THE LOCAL GOVERNMENT: MUNICIPAL SYSTEMS ACT, (32/2000): MUNICIPAL PLANNING AND PERFORMANCE MANAGEMENT REGULATIONS (2001) , CHAPTER 3, BY THE DEPARTMENT COOPERATIVE GOVERNANCE.

GREATER TAUNG LOCAL MUNICIPALITY 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK 162

. Guide on Performance Agreements Workshop, 2001, by the South African Local Government Associations (referred to as SALGA Guidelines in short). . DPLG, 2001, PMS Training Manuals (referred to as PMS Training Manuals in short). . MUNICIPAL FINANCE MANAGEMENT ACT (2003) . . MUNICIPAL PERFORMANCE MANAGEMENT REGULATIONS (2006) . . LGTAS and incorporation of specifically Outcome 9 3.2...... OBJECTIVES OF PERFORMANCE MANAGEMENT SYSTEM . FACILITATE INCREASED ACCOUNTABILITY . FACILITATE LEARNING AND IMPROVEMENT . PROVIDE EARLY WARNING SIGNALS . FACILITATE DECISION-MAKING . Recognise outstanding performance

3.3 Benefits of Performance Management . IMPROVED ORGANIZATIONAL PROFITABILITY . INCREASED EMPLOYEE RESPONSIBILITY . EQUITABLE TREATMENT OF EMPLOYEES . ENHANCED QUALITY OF WORK LIFE

3.4 Principles that will guide the development and implementation of the Performance Management System . SIMPLICITY . POLITICALLY DRIVEN . INCREMENTAL IMPLEMENTATION . TRANSPARENCY AND ACCOUNTABILITY . INTEGRATION . Objectivity

3.5 Greater Taung Local Municipality Performance Management Systems (PMS) Model

. What is a performance Measurement Model . The value of a Performance Measurement Model . Criteria of a Good Performance Model . The Balance Scorecard Performance Model . The revised Municipal Scorecard Model . Why Greater Taung Local Municipality will adopt the Revised Municipal Scorecard Model

3.5.1 What is a Performance Measurement Model?

Performance management is defined as a strategic process to management (or system of management), which equips leaders, managers, employees and stakeholders at different levels with a set of tools and techniques to regularly plan, continuously monitor, periodically measure and review performance of the organization in terms of indicators and targets for efficiency, effectiveness and impact. Regulation 7 of the 2001 Performance Regulations requires that every municipality develop a performance management system (PMS) which consists of a performance framework that describes and represents how the municipality’s cycle and processes of performance planning, monitoring, measurement, review, reporting and improvement will be conducted, organized and managed, and must set out the roles and responsibilities of the different stakeholders. The regulations further provide in Regulation 13 that a municipality must, after consultation with the community, develop and

GREATER TAUNG LOCAL MUNICIPALITY 163 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK implement mechanisms, systems and processes for the monitoring, measurement and review of performance in respect of the key performance indicators and targets set by it.

Performance measurement involves determining the extent to which objectives are being achieved through developing indicators and linking them to targets and related standards. Review of performance against set targets is undertaken on a regular basis. A performance measurement framework is a practical plan for the municipality to collect, process, organise, analyse, audit, reflect on and report performance information.

A performance measurement model is the system that is used to monitor, measure and review performance indicators within the above performance management framework. It is a choice about what aspects or dimensions of performance will be measured. It implies the grouping together of indicators into logical categories or groups, called perspectives, as a means to enhance the ability of an organization to manage and analyze its performance.

3.5.2 The Value of a Performance Measurement Model

The value of performance measurement models can be summarized as follows:

 Models simplify otherwise long lists of indicators by organizing them into perspectives which will sufficiently represent effective performance;

 Different models differ enormously on what is viewed as key aspects of performance (Key Performance Areas) and can help organizations make their own decisions on a model that fits their context;

 Models help in aligning the relationship between areas of performance when planning, evaluating and reporting;

 Models help align strategic planning and performance management by directly linking Key Performance Areas to priority areas in the strategic plan.

 Building an own model allows municipalities to agree on what areas of performance should be integrated, managed and measured and what values should inform indicators and standards of achievement.

3.5.3 Criteria of a Good Performance Model

The following characteristics should guide the choice of a performance model:

a) It must be simple to develop and its implementation must be able to be cascaded to the lower levels with ease. b) The model must ensure that there is a balance in the set of indicators being compiled. c) The balance created by the model must encompass all relevant and priority areas of performance. d) The perspectives must be aligned to the IDP objectives. e) The model must be able to timeously diagnose blockages in the system. f) It must be easy to replicate to all other levels. g) It must be easy to integrate with other municipal systems and processes.

3.5.4 The Balanced Scorecard Performance Model

The widely used performance model is the Balanced Scorecard. The Balanced Scorecard ensures that there is balance in the set of indicators being compiled. It was developed as a means to measure performance by combining both financial and non-financial indicators to create a

GREATER TAUNG LOCAL MUNICIPALITY 164 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

balance between financial and other critical functional areas in organizations. By combining financial indicators and non-financial indicators in a single report, the Balanced Scorecard aims to provide managers with richer and more relevant information about the activities that they are managing than is provided by financial indicators alone.

The Balanced Scorecard performance model requires the use of scorecards as a systematic approach to assessing internal results while probing the external environment. This Model groups its indicators into four perspectives: financial perspectives, customer perspective, internal perspective and learning and growth perspective.

3.5.5 The Revised Municipal Scorecard Model

A Municipal Scorecard Model is a balanced scorecard adapted for measuring key performance on developmental areas that are relevant to municipal service delivery and the public sector. There are five KPA’s that municipalities are required to align their strategic planning on and these cut across every functional area of a municipality. The municipal scorecard measures a municipality’s performance through these five perspectives:

a) The Municipal Development Perspective b) The Service Delivery Perspective c) The Institutional Development Perspective d) The Financial Management Perspective, and e) Governance Process Perspective

3.5.6 Why Greater Taung Local Municipality will adopt the Revised Municipal Scorecard Model?

In previous years Greater Taung Local Municipality adopted the balanced scorecard model in its adapted Municipal Scorecard Performance Model format. This model consisted of four perspectives, namely; (1) Development Impact Perspective; (2) Resource Management Perspective; (3) Service Delivery Perspective; and (4) Governance Process Perspective.

The Greater Taung Local Municipality having adopted the Municipal Scorecard Performance Model, will align this framework to the revised Municipal Scorecard Model and its performance will be grouped under the following 5 perspectives:

3.5.6.1 The Municipal Development Perspective

In this perspective the municipality will assess whether the desired development indicators around the performance area of social and economic development is achieved.

3.5.6.2 The Service Delivery Perspective

This perspective will asses the municipality’s performance in the overall delivery of basic and infrastructural services and products.

3.5.6.3 The Financial Management Perspective

This perspective will measure the municipality’s performance with respect to the management of its finances.

3.5.6.3 The Institutional Development Perspective

GREATER TAUNG LOCAL MUNICIPALITY 165 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

This perspective relates to input indicators that measure the functioning of the municipality under areas such as human resources, strategic planning and implementation, performance management and all other indicators that seek to develop and manage the municipal institution.

3.5.6.4 The Governance Process Perspective

This perspective will measure the municipality’s performance in relation to its engagement with its stakeholders in the process of governance, established and functioning governance structures, and good municipal governance processes.

GREATER TAUNG LOCAL MUNICIPALITY 166 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Figure 1 below illustrates the Revised Municipal Scorecard Model and reflects the five perspectives that make up this performance model.

Figure1: The 5 Perspectives of the Revised Municipal Scorecard

Financial Service Management Delivery Municipal Perspective Process, input & Perspectiv Developmen output indicators e t Output & outcome Perspective

Governance Process Perspective Process indicators

Institutional Development Perspective Process & input indicators

3.6 Implementation of the Revised Municipal Scorecard in the Greater Taung Local Municipality

The Greater Taung Local Municipality, had adopted a two-level approach of implementing the scorecard. The two levels were:  The Strategic or Organizational Scorecard Level – reflecting the strategic priorities of the municipality  The Service Scorecard Level – which captured the municipality’s performance in each defined service, provided a comprehensive picture of the performance of a particular service and consisted of objectives, indicators and targets derived from the service plan and service strategies.  In reviewing the Policy Framework, a two-level scorecard approach is proposed. The Strategic or Organizational Scorecard will reflect KPA’s, objectives, indicators and targets at a strategic level and will align directly with the IDP priorities. This scorecard will follow along the lines of the SDBIP, but will not have the monthly financial cash flow projections and the ward level projects. The second scorecard will be service or departmental scorecards, similar to the one currently used by the municipality. This level of scorecard will reflect objectives, indicators and targets at a departmental level. This scorecard will also inform the individual scorecards of the Section 57 Managers.

The two levels of scorecards will then become the organizational performance management GREATER TAUNG LOCAL MUNICIPALITY 167 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

system (PMS) of the Greater Taung Local Municipality. All reporting on the municipality’s performance will be informed by information derived from the two-level scorecard and reflect the municipality’s performance on the five perspectives. An illustration of the two-level scorecard is presented below in Figure 2.

Figure 2: The Two-Level of Scorecard Model

Financial Service Management Delivery Municipal Perspective Perspectiv Developmen e t

Governance Process Perspective

Institutional Development Perspective

Organizational or Strategic Scorecard

Audience: Community, Council, Mayor and Executive Committee

Financial Service Management Delivery Municipal Perspective Perspectiv Developmen e t

Governance Process Perspective

Institutional Development Perspective

Departmental or Service Scorecard

Audience: Mayor, Council Committees, Municipal Manager, Heads of Departments, Section GREATER TAUNG LOCAL MUNICIPALITY 168 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Managers

3.7 Developing the Organizational Scorecard and Outlining the Scorecard Concepts

During the IDP process a corporate vision and mission were formulated for the Greater Taung Local Municipality, together with broad key performance areas (KPA’s), development objectives and key performance indicators (KPIs) which feed into the vision and mission. It is now necessary to take this process further into the performance management system, by developing an organizational or strategic scorecard that will encompass all the relevant areas or concepts that will allow measurement of the performance of the organization using this scorecard. This will be done by using relevant concepts to populate the organizational and service scorecards of the Greater Taung Local Municipality. This process of developing the organizational and service/departmental scorecards will be followed every year after adoption of the IDP and the budget and after evaluation of the previous year’s scorecard or municipal performance. An illustration of the components of an organizational or strategic scorecard is reflected in figure 3 below. Figure 3: Organisational Scorecard Concepts Step 1 Outline the National Key Performance Areas (KPA’s) Step 2 Define Strategic Focus Areas (SFA’s) that fall under each KPA Step 3 Formulate appropriate development objectives (IDP Objectives) for each SFA Step 4 Develop suitable Key Performance Indicators (KPIs) Step 5 Indicate the types of Key Performance Indicators Step 6 Provide baseline information Step 7 Set annual targets for each KPI Step 8 Indicate quarterly targets to be met arising out of the each of the set annual targets Step 9 Allocate responsibility to departments for execution of actions Step 10 Provide frequency of reporting on progress Step 11 Indicate structure mandated to receive progress reports

In the following paragraphs are explanatory notes expanding on each of the component concepts set out in the above illustrative scorecard.

4.1. Step 1: Setting out National Key Performance Areas (KPA’s)

Outlining thematic areas is the first step in the performance management process. Municipalities are required to cluster their priority issues identified during the IDP development and review processes around the following KPA’s:

o Basic Service Delivery; o Municipal Transformation and Organisational Development o Local Economic Development; GREATER TAUNG LOCAL MUNICIPALITY 169 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

o Municipal Financial Viability and Management o Good Governance and Public Participation

4.2 Step 2: Defining Strategic Focus Areas (SFA’s) that fall under each KPA

In its IDP the Greater Taung Local Municipality will cluster the elements within each of the broad KPA’s under Strategic Focus Areas.

An example: Under the Basic Service Delivery KPA there will be several Strategic Focus Areas such as water and sanitation, electricity, etc.

4.3 Step 3: Formulating Appropriate Development Objectives

As a third step the municipality will design high level objectives per (Strategic Focus Areas) SFA. An objective is a measurable statement of intent, measurable either quantitatively or qualitatively. It’s a series of elements of the vision or mission broken down into manageable quantities.

There is no hard-and-fast rule about how many objectives to set, but it is important to make it manageable and realistic and it is therefore advisable to limit the number. An example: Under the KPA of Basic Service Delivery and the SFA of Waste Management, the municipality can formulate an objective that goes along these lines:

“To provide every dwelling with a weekly door-to-door refuse collection service by July 2016”

4.4 Step 4: Developing Suitable Key Performance Indicators (KPIs)

As a fourth step it is necessary to determine KPIs, which define what needs to be measured in order to gauge progress towards achieving the development objectives discussed in the previous step. KPIs must be measurable, relevant, simple and precise. They simply define how performance will be measured along a scale or dimension (example: “number of houses to be built”). The White Paper on Local Government stresses the need for involving communities, officials and organised labour in the development of KPIs.

KPIs can also be used to:  Communicate the achievements and results of the municipality.  Determine whether a municipality is delivering on its developmental mandate.  Indicate whether the organisational structure of a municipality is aligned to deliver on its development objectives.  Promote accountability by the council to its electorate.

4.5 Step 5: Indicate the Types of Indicators (KPIs)

Input Indicators: These indicators are typically cost related. As the name suggests, they literally measure what inputs have been made towards achieving the objective and they are most relevant to the day-to day operations of a municipality. Examples of input indicators include costs, equipment, human resources, time, etc. GREATER TAUNG LOCAL MUNICIPALITY 170 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Process indicators: These indicators describe how well municipalities use their resources in producing services. They cover the activities and operations that convert inputs into outputs. They are essentially internal types of indicators.

Output indicators: These indicators refer to “products” produced by processing inputs (i.e. the end point of an activity), for example the number of houses built or the number of electricity connections made. Output indicators should only be used for those functions for which the municipality is directly responsible.

Outcome indicators: These indicators measure the extent to which strategic goals or outcomes are being met. Outcomes are usually based on the results of different variables acting together (for example increased economic activity as a result of improved water supply). They measure the effect that the goals and objectives are having on the community and they are important diagnostic tools. Based on many variables, they tend to lag behind output indicators because they can only be measured after the outputs have been produced. They are also more difficult to measure and are usually influenced by factors external to the municipality’s control, so it cannot necessarily be said that a municipality is solely responsible for performance in this regard.

Before the KPIs are set, municipalities are expected to identify the KPA’s that require performance measuring and improvement. Once this is done, a municipality will develop KPIs and performance targets with regard to each KPA and development objective.

A KPI has to be consistent with the principles of:

 Measurability;  Relevance;  Simplicity; and  Precision.

KPI’s should also comply with the SMART principle; namely Specific, Measurable, Achievable, Realistic and Time Bound

In terms of Regulation 10 of the Municipal Planning and Performance Management Regulations, 2001, all municipalities must report on general national KPIs by the end of the financial year. The reasons why it is important to incorporate the national KPIs into the municipality’s set of measures is to:

 Ensure accountability.  Direct municipalities to focus on national goals and priorities.  Measure the impact of municipalities on national transformation, development and service delivery programmes.  Enable benchmarking and create the basis for performance comparison across municipalities.  Bring some uniformity in the system by ensuring that there is commonality of measures in performance evaluation across municipalities.

The seven (7) general KPIs are provided for in Regulation 10 of the 2001 Municipal Planning and Performance Regulations and are listed below:

a. the percentage of households with access to basic level of water, sanitation, electricity and solid waste removal; b. the percentage of households earning less than R2700 per month with access to free basic services; GREATER TAUNG LOCAL MUNICIPALITY 171 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

c. the percentage of the municipality’s capital budget actually spent on capital projects identified for a particular financial year in terms of the municipality’s integrated development plan; d. the number of jobs created through the municipality’s local, economic development initiatives including capital projects; e. the number of people from employment equity target groups employed in the three highest levels of management in compliance with the municipality’s approved employment equity plan; f. the percentage of the municipality’s budget actually spent on implementing its workplace skills plan; and g. the municipality’s financial viability as expressed by the ratios for debt coverage, outstanding service debtors to revenue and cost coverage.

4.6 Step 6: Provide Baseline Information for each KPI

The next step is to determine the baseline indicator for each set KPI. A baseline indicator is the value (or status quo) of the indicator prior to the period over which performance is to be monitored and reviewed.

4.7 Step 7: Set Annual Targets for each KPI In this step annual performance targets must be set for each identified KPI. Performance targets should comply with the SMART principles (Specific, Measurable, Achievable, Realistic and Time related). It is important to guard against setting too many performance targets.

Target dates for the completion of actions should be set in conjunction with those Departments responsible for their achievement. It is important to be realistic in the setting of target. If realistic targets are not set the municipality will create false expectations and also set its employees up for failure. A need to align and develop risk management strategies to targets is necessary.

4.8 Step 8: Outline Quarterly Targets

This step is about unpacking each of the annual targets and dividing them into quarterly targets. Provision must be made in the organizational scorecards for targets to be met in respect of the first, second, third or fourth quarter. 4.9 Step 9: Allocating Responsibility It is also necessary to decide who takes responsibility for what actions. In the case of the organisational scorecard responsibility would be allocated to a Department. With regards to departmental and other lower echelon scorecards a name must be place alongside each action described above. This is also a way of cascading the responsibility from the strategic level down to the operational level and from the organisational goals right down to individual employee performance. The allocation of responsibility should be consistent with the employees’ duties and functions as identified on the incumbent’s job description or profile. In this way individual employees can also see exactly what their roles are in achieving the strategic objectives. 4.10 Step 10: Deciding on Frequency of Reporting

In this column the frequency of reporting must be inserted which could be  Monthly  Quarterly  Bi-Annually or  Annually

4.11 Step 11: Indicate the Structure Mandated to Receive Progress Reports This step must show the structure that is mandated to play an oversight or executive role or to manage that particular performance area and the structure that will receive the reports on that KPA and SFA. GREATER TAUNG LOCAL MUNICIPALITY 172 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

A template of the Organizational Scorecard with all the above concepts is illustrated below as Figure 4.

GREATER TAUNG LOCAL MUNICIPALITY 173 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK KEY PERFORMANCE AREA 4: SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT QUARTERLY RESPONSIBL STRATEGI KEY RESPONSIBL FREQUENC BASE ANNUAL TARGETS E C FOCUS OBJECTIVE PERFORMANC TYPE E Y OF LINE TARGET STRUCTURE AREAS S E INDICATORS OF KPI DEPARTMEN REPORTIN INFO S Q1 Q2 Q3 Q4 RECEIVING (SFA’S) (KPIS) T G REPORTS 1. Unit costs for Section 79 purchasing Input R2 R2 R2 R2 Committee water pipes to R10 00 Infrastructure To improve indicato R80 000 0 0 0 0 Monthly responsible for connect to 0 Dept access to r 000 000 000 000 Service water to single Water Delivery households households services in the Section 79 2. No. of informal Output 1 000 Committee households Infrastructure settlements indicato 100 house 250 250 250 250 Monthly responsible for connected in Dept r holds Service one year Delivery

Figure 4: Organizational Scorecard Template

GREATER TAUNG LOCAL MUNICIPALITY 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK 174 5 THE PROCESS OF MANAGING ORGANIZATIONAL PERFORMANCE

The Municipal Systems Act (2000) places the responsibility on the Council to adopt a PMS, while holding the Mayor responsible for the development and management of the system. The Mayor of the Greater Taung Local Municipality delegates the responsibility for the development and management of the PMS to the Municipal Manager. The development of the system is a once-off activity and the Municipal Manager submits the system to the Mayor, who in turn forwards it to the full council for approval. The responsibility of implementation and management of the system remains with the Municipal Manager as part of his/her core functions as provided in Section 55(1) of the Municipal Systems Act of 2000.

4.1 Co-ordination

Co-ordination involves the overall responsibility of and carrying out the function of, and being the custodian of Greater Taung Local Municipality’s performance management system and managing the system on behalf of the Municipal Manager. This is a strategic function which resides in the Office of the Municipal Manager.

The co-ordination of the implementation phases of the PMS will be the function of the PMS Unit who will be responsible for the following core activities:

. Co-ordination of the development and implementation activities of the organisational PMS, through interaction with all relevant stakeholders; . Ensuring and overseeing the implementation of this Performance Policy Framework; . Ensuring compliance with all performance management legislative requirements in respect of implementation of the PMS through further development of a Performance Process Plan; . Facilitating inputs for the review and further development and refinement of the PMS; . Providing regular support and capacity to the different departments in developing service/departmental scorecards; . Continuously providing technical support to the Municipal Manager and the Top management team with implementation, assessment, review, monitoring and information management; . Providing capacity for analysing organizational performance information submitted by Senior Managers on a quarterly, mid-term and annual basis in preparation for reporting; . Responsible for co-ordination and compiling the annual Section 46 performance report; . Ensuring that all quarterly, mid-term and annual organizational performance reports are submitted to all stakeholders timeously, e.g quarterly reports to Mayor; mid-term report to council and annual reports to Auditor General, MEC and the public; . Work closely with the IDP and Audit Offices to co-ordinate performance activities according to the Greater Taung Local Municipality Performance Process Plan; and; . Co-ordinate capacity building activities on municipal performance management for all stakeholders.

4.2 Implementing the Performance Management System

Having identified the preferred performance model to be the Revised Municipal Scorecard, and having agreed to measure its performance against the five perspectives, Greater Taung Local Municipality will adopt a process plan for implementing its performance management system. The PMS implementation and management process will be carried out within the following phases:

Phase 1: Planning for Performance Phase 2: Performance Monitoring and Managing Performance Information

175

Phase 3: Performance Measurement and Analysis Phase 4: Performance Review and Improvement Phase 5: Performance Reporting

The cycle of performance that will be adopted is shown in figure 5 below. Each phase is outlined in detail and this includes the actual step-by-step guide on what each phase entails and how each one will evolve. Templates that will be used in each phase are illustrated figuratively in the document.

PHASE 1 PHASE 2 PLANNING MONITORING Mar-June In Year

PHASE 5 REPORTING PHASE 3 Monthly, Quarterly, MEASUREMENT Mid Year, Annually Quarterly

PHASE 4 REVIEW Quarterly, & Annually

Figure 5: The Performance Management Cycle

5. PERFORMANCE MANAGEMENT CYCLE

5.1 Phase 1: Planning

Planning for performance simply means developing and reviewing the IDP annually

GREATER TAUNG LOCAL MUNICIPALITY 176 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK in preparation for continuous implementation. Municipal performance planning is part of the IDP strategic planning processes. The IDP process and the performance management process are seamlessly integrated. Integrated development planning fulfils the planning phase of performance management. Performance management fulfils the implementation management, monitoring and evaluation of the IDP process. The performance planning phase will be undertaken in three steps.

Step 1: Integrated Development Planning, Priority Setting, Identifying Key Performance Areas, Setting Objectives and Developing Key Performance Indicators and Performance Targets

Integrated development planning, as defined by the Municipal Systems Act, is a process by which municipalities prepare a 5 year strategic plan that is reviewed annually in consultation with communities and stakeholders.

This strategic plan adopts an implementation approach and seeks to promote integration. By balancing the economic, ecological and social pillars of sustainability without compromising the institutional capacity required in the implementation and by coordinating actions across sectors and spheres of government.

The IDP delivers a number of products that translate to the formulation of the municipal budget, the development of an annual Service Delivery and Budget Implementation Plan and an organizational performance scorecard for the municipality. In a nutshell, the IDP process should deliver the following products in relation to performance management:

. An assessment of development in the municipal area, identifying development challenges, marginalised and vulnerable citizens and communities; . A long term development vision for the municipal area that overcomes its development challenges; . A set of delivery priorities and objectives, based on identified needs, achievable in the current term of office, that would contribute significantly to the achievement of the development vision for the area; . A set of internal transformation strategies, priorities and objectives, whose achievement would enable the delivery and the realisation of the development vision; . Programmes and projects identified which contribute to the achievement of the above objectives; . High level Key Performance Indicators and Performance targets that will be used to measure progress on implementation of projects and progress towards attainment of the objectives and the vision; and . A financial plan and medium term income and expenditure framework that is aligned with the priorities of the municipality;

In 2017, the Greater Taung Local Municipality adopted IDP which outlined all the priorities and the plan to address developmental challenges during the current councillors’ term of office. The IDP spans over the period from 2017 to 2022 and is reviewed annually.

The municipality must have established structures for consultation, oversight and management of integrated development planning. These include the following or depending on the applicable individual institutional arrangements. This need to align to institutional plan:

. The IDP Representative Forum . The Ward Councillors and Ward Committees, and . Two IDP Izimbizo per annum

The Local Government Turnaround Strategy indicates that the IDP of the municipality should contain the following thematic areas:

GREATER TAUNG LOCAL MUNICIPALITY 177 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

(a) Service Delivery – this area refers to the delivery of basic services in municipal areas. These are primarily water, sanitation, refuse removal, electricity and roads.

b) Spatial conditions – these include geographic considerations such as characteristics of urban areas, conditions in former ‘Homeland’ or ‘Bantustan’ areas (e.g. Ciskei), location of poverty, and types of economies in the area, such as mining or agriculture.

c) Governance – this covers elements such as political leadership, institutional organization, administration, capacity and skills, oversight and regulation, monitoring and reporting).

d) Financial Management - Municipality budget and income management (e.g. from water, rates, electricity charges. The Intergovernmental Fiscal System distributes grants to municipalities for service delivery. These include the Equitable Share (ES) and the Municipal Infrastructure Grant (MIG).

e) LED – Local Economic Development refers to the approach a municipality and region may take to encouraging investment by big business, small local business development, tourist industries or large sector economy management in mining, manufacturing or farming.

f) Labour Relations – the way the management of municipalities and the workforce of the municipality organize and cooperate together.

The thematic areas should be translated into objectives, and Key Performance Indicators and performance targets have been set for each key performance area. Every year the above elements are reviewed within the period of July and Mach which occurs simultaneously with the implementation of the IDP.

Step 2: Developing and Adoption of the Service Delivery and Budget Implementation Plan (“the SDBIP”)

The SDBIP gives effect to the Integrated Development Plan (IDP) and the budget of the municipality and is effective if the IDP and budget are fully aligned with each other, as required by the Municipal Finance Management Act. The budget gives effect to the strategic priorities of the municipality and is not a management or implementation plan. The SDBIP therefore serves as a “contract” between the administration, council and the community expressing the goals and objectives set by the council as quantifiable outcomes that can be implemented by the administration over the next twelve months. This provides the basis for measuring performance in service delivery against end of year targets and implementing the budget.

The SDBIP provides the vital link between the mayor, council (executive) and the administration, and facilitates the process for holding management accountable for its performance. The SDBIP is a management, implementation and monitoring tool that will assist the mayor, councillors, municipal manager, senior managers and community. A properly formulated SDBIP will ensure that appropriate information is circulated internally and externally for purposes of monitoring the execution of the budget, performance of senior management and achievement of the strategic objectives set by council. It enables the municipal manager to monitor the performance of senior managers, the mayor to monitor the performance of the municipal manager, and for the community to monitor the performance of the municipality. The SDBIP should therefore determine (and be consistent with) the performance agreements between the mayor and the municipal manager and the municipal manager and senior managers determined at the start of every financial year and approved by the mayor. It must also be consistent with outsourced service delivery agreements such as municipal entities, public-private partnerships, service contracts and the like.

The SDBIP is essentially the management and implementation tool which sets in-year information, such as quarterly service delivery and monthly budget targets, and links each service delivery output to the budget of the municipality, thus providing credible management information and a detailed plan for how the municipality will provide such services and the inputs and financial resources to be used. GREATER TAUNG LOCAL MUNICIPALITY 178 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

The SDBIP indicates the responsibilities and outputs for each of the senior managers in the top management team, the inputs to be used, and the time deadlines for each output. The SDBIP will therefore determine the performance agreements of the municipal manager and senior managers, including the outputs and deadlines for which they will be held responsible. The SDBIP should also provide all expenditure information (for capital projects and services) per municipal ward, so that each output can be broken down per ward, where this is possible, to support ward councillors in service delivery information.

The SDBIP is also a vital monitoring tool for the mayor and council to monitor in-year performance of the municipal manager and for the municipal manager to monitor the performance of all managers in the municipality within the financial year. This enables the mayor and municipal manager to be pro- active and take remedial steps in the event of poor performance. The SDBIP aims to ensure that managers are problem-solvers, who routinely look out for unanticipated problems and resolve them as soon as possible. The SDBIP also enables the council to monitor the performance of the municipality against quarterly targets on service delivery.

The SDBIP is a layered plan, with the top layer of the plan dealing with consolidated service delivery targets and in-year deadlines, and linking such targets to top management.

Being a management and implementation plan (and not a policy proposal), the SDBIP is not required to be approved by the council – it is however tabled before council and made public for information and for purposes of monitoring. The SDBIP should be seen as a dynamic document that may (at lower layers of the plan) be continually revised by the municipal manager and other top managers, as actual performance after each month or quarter is taken into account. However, the top-layer of the SDBIP and its targets cannot be revised without notifying the council, and if there is to be changes in service delivery targets and performance indicators, this must be with the approval of the council, following approval of an adjustments budget (section 54(1)(c) of MFMA). This council approval is necessary to ensure that the mayor or municipal manager do not revise service delivery targets downwards in the event where there is poor performance.

The municipal manager is responsible for the preparation of the SDBIP, which must be legally submitted to the mayor for approval once the budget has been approved by the council (around end- May or early-June). However, the municipal manager should start the process to prepare the top-layer of the SDBIP no later than the tabling of the budget (around 1 March or earlier) and preferably submit a draft SDBIP to the mayor by 1 May (for initial approval). Once the budget is approved by the Council, the municipal manager should merely revise the approved draft SDBIP, and submit for final approval within 14 days of the approval of the budget. Draft performance agreements should also be submitted with the draft SDBIP by 1 May, and then submitted for approval with the revised SDBIP within 14 days after the approval of the budget. The mayor should therefore approve the final SDBIP and performance agreements simultaneously, and then make the SDBIP and performance agreement of the municipal manager public within 14 days, preferably before 1 July.

The SDBIP requires a detail of five necessary components are:

1. Monthly projections of revenue to be collected for each source 2. Monthly projections of expenditure (operating and capital) and revenue for each vote 3. Quarterly projections of service delivery targets and performance indicators for each vote 4. Ward information for expenditure and service delivery 5. Detailed capital works plan broken down by ward over three years.

The Greater Taung Local Municipality organizational scorecard will group its indicators and targets under five perspectives and will monitor and measure its performance against achievements and improvement within the 5 perspectives. This is the difference between the SDBIP and the organizational scorecard. The components of the organizational scorecards will differ from those of the SDBIP and will be made up of eleven (11) components as outlined in paragraph 3.8 above under: Developing the Organizational Scorecard and Outlining the Scorecard Concepts and as illustrated in Figure 4 above. GREATER TAUNG LOCAL MUNICIPALITY 179 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Step 3: Development and Approval of the Organizational Scorecard and Service/Departmental Scorecards

It is clear from the above exploratory detail on the SDBIP and its components that there is an overlap between the SDBIP and the municipal performance scorecard as described in paragraph 3.8 above. This overlap usually creates confusion to municipalities as to which performance planning tool to subscribe to and usually it is the SDBIP that is adopted and regarded as the scorecard of the municipality.

However, this causes problems because the SDBIP remains a top level document and is not cascaded to, and aligned to the performance scorecards of individual managers. Moreover, because the components of the SDBIP are mainly along monitoring budget implementation, the other non- financial functional areas of the municipality end up being not monitored and reported on as vigorously as the financial functional area. Furthermore, this vigorousness is also concentrated on spending of the budget on time, not necessarily looking at the whole financial viability and management of the municipality

In addressing the concerns raised in the above argument, the Greater Taung Local Municipality will adopt the Revised Municipal Scorecard Performance model to utilize it as the tool to monitor and measure both the financial and non-financial performance of the municipality. The SDBIP will form part of the performance management tools.

Since the SDBIP monitors the budget performance, it will form part of the overall performance management processes of the municipality and component 3 of the SDBIP (Quarterly projections of service delivery targets and performance indicators for each vote) will have similar information as the one that appears on components 5 and 7 of the organizational scorecard.

The organizational scorecard of the Greater Taung Local Municipality will be laid out in a simple spreadsheet as indicated in Figure 4 above. The organizational scorecard of the Greater Taung Local Municipality will be made up of layers of spreadsheets consisting of information on each of the components as stated above within each of the 5 Key Performance Areas (Municipal Transformation and Institutional Development; Good Governance; Local Economic Development; Municipal Financial Viability; and Service Delivery and Infrastructure Development).

The organizational scorecard will inform departmental scorecards and departmental business plans. These in turn will inform the individual scorecards for the Section 57 Managers and other employees. Drafting of these scorecards should happen simultaneously with the other documents, and submitted to the Mayor for approval and submission to the full council.

Step 4: Attending to Governance and Compliance Issues

Upon approval of all the strategic documents, the Mayor and the Municipal Manager must sign the Municipal Manager’s Performance Agreement before 31 July of every year. The Municipal Manager must do the same and sign Performance Agreements with all the Managers directly accountable to her before 31 July of every year. These agreements will be discussed in detail below under employee performance management.

The Mayor will also publicize the SDBIP, the organizational scorecard and the Municipal Manager’s Performance Agreement as per the provisions of Section 53(3) of the Municipal Finance Management Act.

The Greater Taung Local Municipality will use the following publicity platforms consistent with the provision of the communications policy adopted by the municipality to publicize the above documents:

. Weekly Local newspapers; . Community meetings; GREATER TAUNG LOCAL MUNICIPALITY 180 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

. Ward committees; . Local radios; . Print and electronic media; . Website and intranet; . Community centres; . Intergovernmental forums.

The Mayor will also submit copies of the SDBIP, the Organizational Scorecard and all the Section 57 Managers to the MEC for Local Government in the North West Province

The whole planning process for performance management will be done once per year within the months of March to June, in preparation for implementation in the following year, starting in July. By the beginning of a new financial year, all planning will be complete, compliance issues attended to and resources allocated accordingly.

5.2 Phase 2: Monitoring

Monitoring of performance will be an ongoing process throughout the year and will run parallel to the implementation of the IDP. Monitoring will be conducted within each department. The Greater Taung Local Municipality will use a paper-based and report-based monitoring mechanism. Different role players are allocated tasks to monitor and gather information that would assist the municipality to detect early indications of under-performance and take corrective measures on time. Information management plays a central role during this phase.

The Greater Taung Local Municipality monitoring system places responsibility on each Department, Division/Section and Individual employee to collect relevant data and information to support the monitoring process. Evidence of performance will be gathered, stored by each department and presented to substantiate claims of meeting (or not meeting) performance standards. This evidence is stored on files (both manual filing and digital filing, where possible). The Heads of the Departments must allocate responsibility in their offices for information management, as these performance information files must be separate from normal registry filing. Even though registry will have all the data and files as per their filing system. The performance information will be filed according to key performance area and key performance indicators. These files will be regarded as portfolio of evidence and must be kept for purposes of performance measurement, performance review and audit in the other phases.

The roles and responsibilities for monitoring are allocated as follows:

I. Section Managers – Each section manager will be responsible for monitoring and reporting on each indicator in their departmental scorecards. They will monitor performance of their direct reports under their functional areas and report as per the indicator that has been set to measure that functional area. This monitoring occurs on a daily basis, with report being submitted to section managers by direct reports on a monthly basis. The section manager is responsible for compiling section reports on each indicator, collect the relevant data related to each project and indicator and facilitate proper storage of the data in files. II. Admin Officers – The Admin Officers in each section has a responsibility for managing indicator information files as per the Greater Taung Local Municipality monitoring system. They are also responsible for collating this information in preparation for submission of performance reports to Heads of Departments by section managers. This responsibility must be carried out on a monthly basis. III. Departments or and Teams – The departments will receive progress reports on progress into the implementation of their departmental scorecards from section managers on a monthly basis. The monthly reports are compiled into quartely reports that are discussed at the Management meetings.

GREATER TAUNG LOCAL MUNICIPALITY 181 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

IV. The Management Team – The management team discusses departmental performance progress on a monthly basis and need to reflect on whether targets are being met, reflect on the reasons being provided by departments for targets not being met and suggest corrective action. The purpose for a performance-driven management team is to instill a culture of collective management and eliminate the silo mentality. V. Section 79 Committees – These committees will monitor performance of their respective services against departmental scorecards. They will receive reports on a Quarterly basis and must appraise themselves on progress on performance of their service areas against set targets. Where targets are not being met, the Section 79 Committees should ensure that the reasons for poor performance are satisfactory and sufficient to address whatever delays, and corrective strategies are sufficient to address the poor performance. VI. The Mayor – The Municipal Manager will submit Quarterly progress reports on all the indicators in the organisational scorecard to the Mayor in order for him to monitor if targets are being achieved and where they are not, that proper corrective strategies are put in place to keep to the timelines set for achieving each indicator and targets.

VII. Municipal Council – Performance reports will be submitted to the council twice a year. A mid-term report and an annual report are the two reports that will be submitted council.

A performance monitoring flow chart is illustrated in Figure 6 below.

Ward COUNCIL Committee Mid Term & s Annual Performance Audit Committee Quarterly & Internal Audit Audited performance info MAYOR quarterly Performance info monthly

Sec 79 MM Committee Performance info Performance info Quarterly Quarterly

Management Team Performance info Quarterly

Departments’ Departments’ Departments’ performance performance performance info Quarterly info Quarterly info quarterly

Figure 6: The Greater Taung Local Municipality Performance Monitoring System

5.3 Phase 3: Measurement and Analysis GREATER TAUNG LOCAL MUNICIPALITY 182 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Performance Measurement is essentially the process of analysing the data provided by the Performance Monitoring System in order to assess performance. At organisational level, Performance Measurement is formally executed on a monthly and quarterly basis, whilst Performance Measurement at an individual level is done quarterly. The three core components of the Municipality’s IDP are service delivery, budget and performance management. The three components cannot function outside the ambit of the Municipal IDP. These three components are obviously supported by the aspects such as human resources, skills, municipal infrastructure etc.

It is within this context that the KPA’s, KPI’s and Targets are set for the budget and service delivery components and into the receiving component being the performance management. These measures are set in balance. This means that for every; Service Delivery KPA, a Budget KPA must be set. For example, if the municipal IDP identified Economic Development as a KPA, there must be a proportionate allocation (vote) of the total Budget towards addressing this KPA, e.g. 20% of the total budget to the Vote: Planning and Development. This applies to the KPI’s and targets set, in that for every service delivery KPI and target, an appropriate budget KPI and target must be set.

In developing these KPI’s and targets, the municipality must also take into consideration its current human and infrastructural capital into consideration (risk identification) as well as keeping the following “SMART” (Specific, Measureable, Attainable, Realistic and with deliverable Time-Frames) criteria in mind.

As indicated in section 3, the Greater Taung Local Municipality has adopted the Revised Municipal Balanced Scorecard to analyse the performance information submitted during the monitoring phase and asses its performance levels. The adopted model will measure the municipality’s performance through achievements within the 5 Key Performance Areas and report its organizational performance along the 5 performance perspectives.

The template for the performance measurement scorecard that will be used by the Greater Taung Local Municipality is illustrated below in Figure 7.

All the measured results are then recorded on a report. The municipality will use one reporting template for all key performance indicators and all departments will use this formant to produce quarterly reports and the annual review report. The reporting template will be discussed under the reporting section.

GREATER TAUNG LOCAL MUNICIPALITY 183 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK Figure 7: The link between performance monitoring, analysis and measurement

KEY PERFORMANCE AREA 4: SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT STRATE OBJECTIVES KEY TYPE OF BASELI ANNUAL QUARTERLY TARGETS RESPONS FREQUE RESPONSIBLE GIC PERFORMANC KPI NE TARGETS IBLE NCY OF POLITICAL FOCUS E INDICATORS INDICAT Q1 Q2 Q3 Q4 DEPARTM REPORTI STRUCTURE

AREAS (KPIS) OR ENT NG Water To improve 1. Unit costs for Input R10 000 R80 000 R20 R20 R20 R20 Infrastruct Monthly Section 79 services access to purchasing indicator 000 000 000 ure Dept Committee 000 water to water pipes to responsible for households in connect to Service Delivery the informal single settlements households

2. No. of Output 100 1 000 250 250 250 250 Infrastruct Monthly Section 79 households indicator ure Dept Committee connected in responsible for one year Service Delivery

Yes Departments collect Corrective performance information per Compare Are there measures KPI during the monitoring actual any phase deviations (actual performance) performance from initially Continue against set targets? No monitoring targets set during the planning phase

184

5.4 Phase 4: Performance Reviews

Performance review is a process where the municipality, after measuring its own performance as detailed in the previous phase, assesses whether it is giving effect to the IDP. It is a phase where it will assess whether it is doing the right thing, doing it right and better, or not. Performance reviews will be conducted through the municipality’s scorecard model by assessing performance against the 5 Key Performance Areas (KPA’s), indicators, and targets. Greater Taung Local Municipality reviews will be conducted by using the “best value review” approach in the following three methods:

a. The first method will look at whether the current level of performance is better than that of the previous year, using baseline indicators as adopted in the organizational scorecard. This assessment is important because the municipality can only know if its performance is improving by comparing with past performances. This review method will be the one used regularly alongside the monitoring and analysis processes. The reviews will occur quarterly and annually. b. The second method will be through conducting customer perception surveys on an annual basis. The survey will assess the community’s perceptions about the performance of the municipality against the delivery in their key performance areas. c. The third method will look at the municipality’s performance by comparison with other similar ones through benchmarking exercises conducted once in two years.

The “best value review” approach challenges the current level of municipal performance (through comparing actual performance against the baselines), compare it to others (through benchmarking), consult with customers and communities (through customer perception surveys) and find ways of competing with other municipalities to provide best value in service delivery (through twinning agreements).

The results of measurement and reviews will be captured on the spreadsheet reporting format as shown on Figure 8 under the reporting section below. All performance reports from departmental to organizational will be done on the same format so that there will be consistency on reporting

Who has the Responsibility of Conducting Reviews in Greater Taung Local Municipality?

As in the monitoring and measurement stages, reviews will be conducted according to the lines of accountability within the municipality’s organizational structure. Reviews at all levels on organizational indicators and targets will be conducted quarterly, preceded by coaching sessions by the municipal managers to her/his direct reports. On considering the quarterly reports from each department and the results of the measurement revealing the level of performance in each department, the Municipal Manager must conduct one-on-one coaching sessions with Managers directly accountable to her, to ascertain the level of comfort and confidence in achieving set targets, and to understand the challenges that the Manager might be facing in achieving results. Actions to alleviate any specific problem areas, enhance performance, remove barriers of some sort and agreeing on steps necessary to bring this about must be taken. The coaching session must be recorded and the coaching notes be kept in the department’s evidence file for individual performance evaluation purposes.

Supervisors

Supervisors will review the performance of employees reporting directly to them. These reviews will be conducted on a monthly basis and any deviations can be recommended by the supervisor to their section managers, only if they affect indicators and targets that are at their levels, not organizational or departmental indicators.

Section Managers

These managers review performance of their respective areas on a monthly basis, as they are monitoring, analyzing and measuring performance as against their departmental scorecards. The review will cover all organizational key performance areas and indicators with respect to their GREATER TAUNG LOCAL MUNICIPALITY 185 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK functional areas and any deviations from original targets can be recommended to their respective senior mangers and can be authorised if it is not organizational or departmental targets.

Section 79 Committees

These committees manage the performance of sectors and functions respective to their portfolios. In order to build the role played by Section 79 Committees, while ensuring that their role remains strategic and not operational, it is recommended that they review performance as often as monthly. However, the committees can only approve deviations on targets related to their service areas, after receiving recommendations from the management team.

Senior Management Team

The municipal manager and her management team will review performance prior to, and more often than, the Mayor or Section 79 Committees, as follows:

. Firstly, they will need to review performance more often, such that they can intervene promptly on operational matters where poor performance or the risks thereof occur. . Secondly they will need to review performance before reporting to politicians so that they can prepare; control the quality of performance reports submitted to the councillors and the public; and ensure that adequate response strategies are proposed in cases of poor performance. . It is strongly recommended that the executive management team review performance monthly, prior to reviews being conducted by Mayoral Committee or the Section 79 Committees. At these reviews relevant functional managers will be required to report on respective priority areas.

Mayor

The Performance Management System of Greater Taung Local Municipality is designed in such a way that it allows the Mayor to strategically drive and manage performance in the organisation. Reviews at this level will remain strategic so that the Mayor is not restrained by operational discussions. In order for this review to be strategic it is recommended that the Mayor review performance quarterly, with the final quarterly review taking the form of an annual review. The content of the review should be confined to the adopted 5 key performance areas (KPA’s) and objectives. The Municipal Manager will remain accountable for reporting on performance at this level.

Council

Council will review the performance of the municipal council, its committees and the administration, annually, in the form of a tabled annual report at the end of the financial year.

The Public

The public will be involved in reviewing municipal performance at least annually, in the form of the annual report and the annual customer surveys. While good and excellent performance must also be constantly improved to meet the needs of citizens and improve their quality of life, it is poor performance that needs to be improved as a priority. Poor performance may arise out of one or more of the following:

o Poor systems and processes o Inappropriate structure o Lack of skills and capacity o Inappropriate organisational culture o Absence of an appropriate strategy and departmental business plans that lay the foundation for optimum performance GREATER TAUNG LOCAL MUNICIPALITY 186 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

o Low employee morale; o Ineffective Leadership.

Improving Performance

In order to improve performance, the Greater Taung Local Municipality throughout the performance management phases, will analyse the causal and contributory reasons for poor performance, through coaching sessions from top to lower levels of the administration and appropriate response strategies will be developed. These will include, inter alia:

– Restructuring as a possible solution for an inappropriate structure – Process and system improvement strategies to remedy poor systems and processes – Training and sourcing additional capacity where skills and capacity shortages are identified – Change management and diversity management education programmes can address organisational culture – Review of the IDP by councillors to address shortcomings in strategy – Development of appropriate departmental business plans and operational plans to guide performance in each department – Where results show no chance of improvement through internal measures, alternative service delivery mechanisms shall be considered. – Optimising the applicability of employee wellness programme – Team effectiveness enhancement

5.5 Phase 5: Reporting on Performance

Reporting requires that the municipality take its key performance areas, its performance objectives, indicators, targets, measurements and analysis, and present this information in a simple and accessible format, relevant and useful to the different stakeholders for review. The Greater Taung Local Municipality will adopt the reporting format shown in Figure 8 below as its uniform reporting template at all levels of reporting.

The proposed template will contain only necessary and relevant information and will cover the period for which the reporter is reporting, state the relevant key performance areas, capture all the agreed objectives and indicators, state agreed targets relevant to the period which the report covers, measure current performance over the period for which the report is covering, specify when the measurement was done, specify the source of the measurement, reflect on whether agreed targets have been met, analyse the reasons for the level of performance, and suggest corrective action, if necessary.

All stakeholders who are expected to report on performance will use this one reporting format. The reporting format will remain simple, accessible to all users and useful to the intended reader.

The main feature of the reporting phase is the production of the annual report. This is a consolidated report that reflects results on performance on each of the 5 perspectives as per the adopted model. The main report will be informed by the information gathered through the scorecards throughout the year and one performance report will be compiled as per the requirement of Section 46 of the Municipal Systems Act. Since the Greater Taung Local Municipality adopted the Revised Municipal Scorecard model, its annual report will reflect its performance results clustered in the following 5 perspectives:

. Under the Municipal Development Perspective the municipality will reflect results achieved on indicators around the performance area of social and economic development. This perspective measures the outputs on socio-economic development in the municipality. . Under the Service Delivery Perspective the municipality will reflect its annual performance achievements in the overall delivery of basic and infrastructural services outputs.

GREATER TAUNG LOCAL MUNICIPALITY 187 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

. Under the Financial Management Perspective, the annual report will reflect the municipality’s performance with respect to the management and viability of its finances. It has to reflect the results of the financial process, inputs and output indicators.

. The Institutional Development Perspective will report on input indicators that measure the functioning of the municipality under areas such as human resources, strategic planning and implementation, performance management, etc; and . Under the Governance Process Perspective the municipality’s annual report must indicate results achieved in relation to its processes of engagement with its stakeholders in the process of governance, established and functioning governance structures, for example, a functioning Audit Committee, etc.

GREATER TAUNG LOCAL MUNICIPALITY 188 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Figure 8: The Performance Reporting Template for the Greater Taung Local Municipality

REPORTING PERIOD INFRACTRUCTURE DEPARTMENT (where it is a departmental report) KEY PERFORMANCE AREA 4: SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT PREVIOUS CURRENT CURRENT YEARS CURRENT YEARS REASONS ACTION TO STRATEGIC SERVICE RECOMMNDED TYPE OF CONCLUNG / BUDGET CONCLUDING / FOR CORECT FOCUS OBJECTIVE KPIS SOURCE DELIVERY CORRECTIVE KPI CONSOLIDATED TARGET CONSOLIDATED PERFORMANCE THE AREA TARGET ACTION BASELINE FROM IDP BASELINE STATUS SITUATION FROM IDP MEASUREMENT MEASUREMENT To ensure the provision of adequate % of basic water households and supplied with sanitation potable water facilities to (in dwelling nodal and 25 000 or stand, traditional households Infrastructure standpipes or areas with no 3000 and services communal according to access to taps at <200 acceptable water metres, (RDP) spring water, standards boreholes or ensuring the communal reduction in water tanks). reported cases of diseases

GREATER TAUNG LOCAL MUNICIPALITY 189 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

6. REPORTING

6.1 Who Reports to Whom?

The reporting process will follow the lines of accountability as detailed in the performance monitoring, measurement and review phases above. Reports will be submitted to all different stakeholders using following internal processes as outlined above and through the different political and community stakeholders as required by the Municipal Systems Act, the Municipal Finance Management Act and the Performance Regulations. Reports will be submitted to the following stakeholders during the timelines outlined in the municipality’s performance process plan as shown under the Performance Cycle section:

. Greater Taung Local Municipality Municipal Council reporting to Communities; . Greater Taung Local Municipality Municipal Council reporting to Ward Committees; . Executive Mayor reporting to Council; . Municipal Manager reporting to the Mayor and the Mayoral Committee; . Heads of Departments reporting to the Municipal Manager, through Portfolio Committees; . Section Managers reporting to Heads of Departments; and . Employees reporting to their section managers and supervisors.

6.2 Tracking and Managing the Reporting Process

To ensure that the reporting processes runs smoothly and effectively, the PMS Unit in the Office of the Municipal Manager will co-ordinate all activities related to efficient reporting. The functions of the Unit in this instance include the following:

. Developing a process plan or timetable for all reporting processes for the year; . Prepare logistics for reporting; . Improve the reporting format, should there be a necessity to do so; . Track and monitor reporting processes; . Control the quality of reports going to reviews at political levels in terms of alignment with the adopted reporting format; . Analyse departmental performance reports; . Compile quarterly organisational performance reports and the annual report; and . Review the reporting process and suggest improvements.

6.3 Publication of Performance Reports

The annual report is required by legislation to be availed to the public. The Greater Taung Local Municipality will, however, within its resources and capacity, keep the communities more frequently informed of performance information through:

a. Publication of reports in the municipal website GREATER TAUNG LOCAL MUNICIPALITY 190 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

b. Press releases c. Publication of pamphlets or newsletters d. Local Radio programmes e. Ward Committee meetings.

6.4 Public Feedback Mechanisms

Public feedback on reported performance will be during IDP review processes, annual customer surveys and through ward committee meetings.

6.5 Auditing Performance and Quality Control

In order for the performance management system to enjoy credibility and legitimacy from the public and other stakeholders, performance reports, particularly the annual performance report, must be audited. Audits should ensure that reported performance information is accurate, valid and reliable.

In terms of the provisions of the Municipal Systems Act and the Performance Regulations of 2001, the annual performance report must be audited internally, and before being tabled and made public, the annual performance report will also be audited by the Auditor-General. It is therefore important to allow sufficient time between completion of annual reports and the tabling of the annual report for auditing.

After being reviewed by the council, the annual report must then be submitted to the Auditor-General before 31 August of every year, for auditing and be submitted to the MEC for local government in the province for the MEC to complete an annual report of performance of all municipalities in the province, identifying poor performing municipalities and proposing remedial action and submit the provincial report to the national minister. The national minister will then present a consolidated report to parliament.

6.6 Internal Auditing of Performance Measurements

6.6.1 The Internal Audit Unit of the Greater Taung Local Municipality

In terms of Regulation 14 of the Planning and Performance Regulations of 2001, every municipality must develop and implement mechanisms, systems and processes for auditing the results of performance measurements as part of its internal auditing processes. The functions of the internal audit unit include the assessment of the following:

(i) The functionality of the municipality’s performance management system; (ii) whether the municipality’s performance management system complies with the provisions of the Municipal Systems Act; and

(iii) the extent to which the municipality’s performance measurements are reliable in measuring performance of municipalities on its own indicators and the national indicators

GREATER TAUNG LOCAL MUNICIPALITY 191 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

The Regulations further provides that the municipality’s internal auditors must:

(i) on a continuous basis audit the performance measurements of the municipality; and (ii) submit quarterly reports on their audits to the municipal manager and the performance audit committee.

Greater Taung Local Municipality has established an Internal Audit unit whose functions are provided for by the 2001 Performance Regulations as indicated in the above extract. The Internal Audit Unit will be responsible for quality checks balances of all performance information submitted for measurement and review. Quality control is the central and key function of the Unit that will ensure achievement of effective and efficient performance by the Greater Taung Local Municipality The Municipal Manager and the Mayor will place reliance on the performance audit risk assessments and audit reports to make informed decisions and motivate for any reviews and improvements to the municipal council and communities.

6.6.2 The Performance Audit Committee

Regulation 14 of the Planning and Performance Regulations stipulates the provisions that guide the establishment of the Performance Audit Committee and outline the functions and powers entrusted to the committee as the following:

 review the quarterly reports submitted to it by the Internal Auditors;  review the municipality’s performance management system and in doing so, focus on economy, efficiency, effectiveness and impact in so far as the key performance indicators and performance targets set by the Greater Taung Local Municipality in its organizational scorecard are concerned;  make recommendations in this regard to Greater Taung Municipal council; and  at least twice during a financial year submit an audit report to the municipal council;  communicate directly with the council, municipal manager or the internal and external auditors of the municipality;  access any municipal records containing information that is needed to perform its duties or exercise its powers;  request any relevant person to attend any of its meetings, and if necessary to provide information requested by the committee; and;  investigate any matter it deems necessary for the performance of its duties and the exercise of its powers.

The Greater Taung Local Municipality did not appoint its own Performance Audit Committee, but over the years, had opted to utilize the shared services of the Dr Ruth Segomotsi Mompati District Municipality Performance Audit Committee. This method has proved to be ineffective in realizing the holistic goals of performance auditing.

GREATER TAUNG LOCAL MUNICIPALITY 192 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

7. REPORTING PROCEDURES

Time-frames MFMA Reporting on SDBIP SECTION IN MSA REPORTING ON PMS SECTION IN MSA AND MPPM MFMA Regulations Monthly Reporting The Municipal Manager reports Section 71 (c) The municipality must report regularly Section 41 (c) (2) monthly to the Mayor 10 days after to the Council the month-end (on the prescribed Treasury format)

The Internal Auditors (IA) of the Municipality must on a continuous Regulation 14 (1) (c) basis audit the performance of the Section 165 (b) municipality 1ST ALIGNMENT ASPECT It is recommended that: . The MM report in terms of the MFMA and MSA to the Mayor on a monthly basis . Internal Audit to audit on a Quarterly basis the performance of the municipality and compile quarterly report s authentic and The IA need to report quarterly to the Performance Audit Committee QUARTERLY The Mayor must report on quarterly Section 52 The Internal Auditors of the Regulation 14(i)(c) REPORTING basis to the Council (30 days after municipality must submit quarterly the close of the quarter) reports to the MM and to the Performance Audit Committee Audit Committee must meet at least quarterly per year to advise the Council and MM on PMS Section 166 (4) (b)

2nd ALIGNMENT ASPECT It is recommended that: . The Mayor’s report to the Council be the quarterly audited report done by the Audit Committee of the Municipality and submitted to the MM (and such other necessary information required by the MFMA) BI-ANNUAL The MM must do a mid-year Section 72 (1) . The Performance Audit Committee must meet at REPORTING assessment of budget least twice per year to audit the PMS and reports Regulation 14(4)(a) performance by 25 January of the Municipality. and report to the Mayor who . The Performance Audit Committee must submit will report to the Council at least twice during the year a report to Council. Regulation 14(4)(a) . The Municipality must report to Council at least twice a year. Regulation 13(2)(a) GREATER TAUNG LOCAL MUNICIPALITY 193 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

3RD ALIGNMENT ASPECT The Audit/Performance Audit Committee’s report in January, will inform the MM’’s mid-year assessment of budget performance and report to the Mayor (due to report to MFMA). It will also be in compliance with the MSA requirement of a bi-annual audit to PMS. The Audit/Performance Audit Committee’s must report in July which will inform the Annual Report to be submitted in terms of Section 121 of the MFA and Section 46 of the MSA (as amended).

CONSULTATION REPORTING ON Section 54 (1)(c); REPORTING ON AMENDMENTS TO THE IDP AMENDMENTS TO BUDGET Section 71; and 72 AND PMS TARGETS AND SDBIP TARGETS . A Municipality must annually review its IDP and Section 34 The Mayor on advice from the PMS to Section 41 of the MSA and…. MM can revise (Quarterly and . May amend it in accordance with a prescribed mid-yearly) the targets in the process. Regulation 3 SDBIP on two conditions: . A Municipality must involve the local community as 1. the prior approval of per Chapter 4, to review the Municipalities’ IDP Regulation 42, Regulation Council; and and performance via an established public, 1 2. Council approving an participatory and representative forum. adjustment budget. . An amendment to the IDP and PMS must be published for 21 days for public comment prior to Any revision of the SDBIP adoption. must be made public . A Municipality must report regularly to the public Regulation 3(4)(b) and 15 (assumed, as not stipulated, on PMS. as per Section 21A and 21B Section 41(i)(e) of the MSA. Section 54 (3) 4TH ALIGNMENT ASPECT It appears from the MFMA as if the public involvement in the amendment to the budget or SDBIP is seen as an event, as opposed to a process as per the MSA

It is thus recommended that: The public involvement processes for IDP and PMS Review as prescribed under the MSA be used to inform the MM/Mayor of any amendments to the SDBIP and PMS Municipal Planning and Performance Regulations, 2001

GREATER TAUNG LOCAL MUNICIPALITY 194 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

8. ROLES AND RESPONSIBILITIES OF DIFFERENT STAKEHOLDERS

As can be noted from the above analysis of each phase in performance management and from the plethora of legislative prescripts governing municipal performance, it is clear that, for the performance management system of Greater Taung Local Municipality to be functional, a number of stakeholders have to be involved. These stakeholders have different roles and responsibilities within each of the performance management phases. The tables below will outline roles and responsibilities of each of the stakeholders in each phase.

8.1. The role of Municipal Public Accounts Committee (MPAC)

The Municipal Public Accounts Committee (MPAC) performs:  an oversight function on behalf of Council and is not a duplication of, and should not be confused with the internal audit committee or the finance portfolio committee. o The internal audit committee is an independent advisory body that advises Council and the executive on financial and risk matters and can act as an advisory body to the MPAC o The finance portfolio committee deals with financial management issues such as budgetary, revenue and expenditure management and supply chain management.  The primary function of the MPAC is to assist Council to hold the executive and the municipal administration to account and to ensure the effective and efficient use of municipal resources. It will execute this function by reviewing public accounts and exercising oversight on behalf of the Council. It is however important that good working relationships are developed between the MPAC and the other committees. Whilst guarding its independence, the MPAC should have the right to refer or receive matters from the other committees.

It is recommended that the committee examines the following:  Financial statements of all executive organs of Council  Any audit reports issued on those statements  Any reports issued by the Auditor General on the affairs of any municipal entity  Any other financial statements referred to the committee by Council  The annual report on behalf of Council and make recommendations to Council thereafter

The committee may also:  Report on any financial statements or reports to Council  Initiate and develop the annual oversight report based on the annual report  Initiate any investigation in its area of competence  Perform any other function assigned to it by resolution of Council

When examining financial statements and audit reports, the committee must consider improvements from previous statements and must monitor the extent to which the committee’s and the Auditor General’s recommendations are implemented. The outcomes and the resolutions taken by this committee must be reported to Council and made public.

8.2. The roles of the Auditor-General as per the Public Act No. 25, 2004

(1) The Auditor-General must audit and report on the accounts, financial statements and financial management of— (a) all national and provincial state departments and administrations; (b) all constitutional institutions; (c) the administration of Parliament and of each provincial legislature; (d) all municipalities; (e) all municipal entities; and GREATER TAUNG LOCAL MUNICIPALITY 195 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

(f) any other institution or accounting entity required by other national or by provincial legislation to be audited by the Auditor-General. (2) The Auditor-General must audit and report on the consolidated financial statements of — (a) the national government as required by section 8 of the Public Finance Management Act; (b) all provincial governments as required by section 19 of the Public Finance Management Act; and (c) a parent municipality and all municipal entities under its sole or effective control as required by section 122(2) of the Municipal Finance Management Act. (3) The Auditor-General may audit and report on the accounts, financial statements and financial management of— (a) any public entity listed in the Public Finance Management Act; and (b) any other institution not mentioned in subsection (1) and which is— (i) funded from the National Revenue Fund or a Provincial Revenue Fund or by a municipality; or (ii) authorised in terms of any legislation to receive money for a public purpose. (4) In the event of any conflict between a provision of this section and any other legislation existing when this section takes effect, the provision of this section prevails.

8.3. Other functions in Public Audit Act, 2004 (1) The Auditor-General may, at a fee, and without compromising the role of the Auditor- General as an independent auditor, provide— (a) audit related services to an auditee referred to in section 4(1) or (3) or other body, which is commonly performed by a supreme audit institution on condition that— (i) no services may be provided in respect of any matter that may subsequently have to be audited by the Auditor-General; (ii) such service will not directly result in the formulation of policy; and (iii) there must be full and proper disclosure of such services in terms of section 10(1)(b). (b) advice and support to a legislature or any of its committees outside the scope of the Auditor-General’s normal audit and reporting functions; (c) comments in a report on any responses by an auditee to reported audit findings, or responses by an auditee to a report of any legislature arising from its review of an audit report; or (d) carry out an appropriate investigation or special audit of any institution referred to in section 4(1) or (3), if the Auditor-General considers it to be in the public interest or upon the receipt of a complaint or request. (2) In addition, the Auditor-General may— (a) co-operate with persons, institutions and associations, nationally and internationally; (b) appoint advisory and other structures outside the administration of the Auditor- General to provide specialised advice to the Auditor-General; and (c) do any other thing necessary to fulfil the role of Auditor-General effectively. (3) The Auditor-General may, in the public interest, report on any matter within the functions of the Auditor-General and submit such a report to the relevant legislature and to any other organ of state with a direct interest in the matter.

GREATER TAUNG LOCAL MUNICIPALITY 196 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

8.4.The role of the Department of Cooperative Governance

According to the Section 48 of the Municipal Systems Act No. 32 of 2000:

Section 46 Annual performance reports (1) A municipality must prepare for each financial year a performance report reflecting- (a) the performance of the municipality and of each external service provider during that financial year; (b) a comparison of the performances referred to in paragraph (a) with targets set for and performances in the previous financial year; and (c) measures taken to improve performance. (2) An annual performance report must form part of the municipality's annual report in terms of Chapter 12 of the Municipal Finance Management Act.

Section 47 Reports by MEC (1) The MEC for local government must annually compile and submit to the provincial legislatures and the Minister a consolidated report on the performance of municipalities in the province. (2) The report must- (a) identify municipalities that under-performed during the year; (b) propose remedial action to be taken; and (c) be published in the Provincial Gazette. (3) The MEC for local government must submit a copy of the report to the National Council of Provinces.

Section 48 Reports by Minister (1) The Minister must annually compile and submit to Parliament and the MECs for local government a consolidated report of local government performance in terms of general key performance indicators. (2) The report must be published in the Gazette.

Section 49 Regulations and guidelines (1) The Minister may for the purposes of this Chapter make regulations or issue guidelines in terms of section 120 to provide for or regulate- (a) incentives to ensure that municipalities establish their performance management systems within the applicable prescribed period, and comply with the provisions of this Act concerning performance management systems; (b) the setting of key performance indicators by a municipality with regard to its development objectives; (c) the identification of appropriate general key performance indicators that can be applied to municipalities generally and that reflect the object and intent of section 23; (d) the regular review by a municipality of its key performance indicators; (e) the setting of a framework for performance targets by municipalities consistent with their development priorities, objectives and strategies set out in their integrated development plans; (f) mechanisms, systems and processes for the monitoring and measurement of performance by a municipality with regard to its development objectives; (g) the internal auditing of performance measurements; (h) the assessment of those performance measurements by a municipality; (i) the assessment of progress by a municipality with the implementation of its integrated development plan; (j) the improvement of performance; (k) any other matter that may facilitate- GREATER TAUNG LOCAL MUNICIPALITY 197 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

(i) the implementation by municipalities of an efficient and effective system of performance management; or (ii) the application of this Chapter. (2) When making regulations or issuing guidelines in terms of section 120 to provide for or to regulate the matters mentioned in subsection (1) of this section, the Minister must- (a) take into account the capacity of municipalities to comply with those matters; and (b) differentiate between different kinds of municipalities according to their respective capacities. (3) The Minister, by notice in the Gazette, may phase in the application of the provisions of this Chapter which place a financial or administrative burden on municipalities. (4) A notice in terms of subsection (3) may- (a) determine different dates on which different provisions of this Chapter becomes applicable to municipalities; (b) apply to all municipalities generally; (c) differentiate between different kinds of municipalities which may, for the purpose of the phasing in of the relevant provisions, be defined in the notice in relation to categories or types of municipalities or in any other way; or (d) apply to a specific kind of municipality only, as defined in the notice.

GREATER TAUNG LOCAL MUNICIPALITY 198 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

Roles and responsibilities of stakeholders in the operation and management of the PMS

8.5. Roles and Responsibilities of the Mayor PLANNING MONITORING, ANALYSIS AND MEASUREMENT REVIEW REPORTING ASSESSMENT * Submits priorities and objectives of the * Proposes to Council the annual * Receives monthly budget * Assess and submits the municipal annual Integrated Development Plan to Council review programme of the IDP, statements audit plan and any substantial changes to for approval including the review of key council for approval performance indicators and * Receives performance reports * Submits the PMS policy framework for performance targets quarterly from the internal auditor * Assess and approves the implementation of approval the recommendations of the internal auditor * Proposes the annual performance * Receives performance reports with regard to improvement in the performance * Submits the municipal strategic or improvement measures of the twice a year from the Performance of the municipality or improvement of the organizational scorecard to Council for municipality as part of the municipal Audit performance management system itself approval strategic or organizational Committee scorecard * Receives and assess performance audit * Approves the Service Delivery and * Receives monthly and quarterly report(s) from the Auditor General and Budget Implementation Plans (SDBIP) * Proposes changes to the reports from the Municipal Manager management comments and make priorities, objectives, key on the performance of managers recommendations to Council on addressing * Enters into a performance agreement performance indicators and and the rest of the staff whatever audit queries raised therein with the Municipal Manager on behalf of performance targets of the the Municipal Council municipality * Receives the annual Section 46 reports from the Municipal Manager * Assigns the responsibility for the * Quarterly evaluates the before submission to council, management of the PMS to the performance of the municipality Auditor General and MEC Municipal Manager against adopted KPIs and targets * Report to council on the mid-term * Tables the budget and the SDBIP to * Quarterly reviews the performance review and the annual report on the Council for approval of the departments to improve the performance of the municipality economy, efficiency and * Approves the departmental or service effectiveness of the municipality * Reports to Council on the scorecards and Section 57 Managers recommendations for the scorecards * Quarterly and annually evaluates improvement of the performance the performance of the Municipal management system Manager

GREATER TAUNG LOCAL MUNICIPALITY 199 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

8.6. Roles and Responsibilities of the Municipal Manager PLANNING IMPLEMENTATION MONITORING, ANALYSIS AND MEASUREMENT REVIEW REPORTING ASSESSMENT * Coordinates the process * Manages the overall * Formulates the annual * Receives performance reports * Formulates the of needs identification and implementation of the IDP review programme of the IDP, quarterly from the internal municipal annual audit prioritization among all including the review of key auditor plan stakeholders, including * Ensures that all stakeholders performance indicators and community structures implement the provisions of the performance targets for the * Receives performance reports * Assess and formulate PMS policy framework consideration of Council twice a year from the appropriate responses to * Coordinates the Committees and the Mayor Performance Audit Committee the recommendations of formulation and revision of * Ensures that the Departmental the internal auditor and the PMS policy framework scorecards and departmental * Formulates the annual * Receives monthly the Performance Audit annual programmes serve the performance improvement departmental performance Committee * Coordinates the strategic or organizational measures of the municipality reports formulation and revision of scorecard of the municipality as part of the new municipal * Assess and formulate the municipality’s strategic strategic or organizational * Reports quarterly to the appropriate responses to or organizational scorecard * Ensures that annual programmes scorecard Mayor on the performance of performance audit queries are implemented according to the Departments raised by the Auditor * Leads the process of the targets and timeframes agreed to * Quarterly reviews the General and make formulation and revision of performance of departments to * Reports on the implementation recommendations to the the Service Delivery and * Implements performance improve the economy, of improvement measures Executive Mayor Budget Implementation improvement measures approved efficiency and effectiveness of adopted by the Mayor and Plans by the Mayor and the Council the municipality Council

* Enters into performance * Ensures that performance * Quarterly and annually * Monthly, quarterly and annually agreements with Section 57 objectives in the Section 57 evaluates the performance of reports to the Mayor on the Managers on behalf of Managers’ performance Section 57 Managers performance of Section 57 Council agreements are achieved Managers and departments

* Submit the municipal annual Section 46 report to the Mayor

GREATER TAUNG LOCAL MUNICIPALITY 200 2017/2018 PERFORMANCE MANAGEMENT FRAMEWORK

8.7. Roles and Responsibilities of the Section 79 Committees PLANNING MONITORING, ANALYSIS AND MEASUREMENT REVIEW REPORTING ASSESSMENT * Advice the Mayor on priorities and * Participate in the formulation of the * Reports to the Mayor on the * Advise the Mayor on the objectives of the annual review programme of the IDP, recommendations for the improvement implementation of the Integrated Development Plan including the review of key of the performance management recommendations of the internal performance indicators and system auditor, the Performance Audit performance targets Committee and the Auditor-General * Receive reports from the departmental heads and section managers on performance in their respective service areas

8.8. Roles and Responsibilities of the Section 57 Managers PLANNING IMPLEMENTATION MONITORING, ANALYSIS AND MEASUREMENT REVIEW REPORTING ASSESSMENT * Participate in the formulation of * Manage the implementation * Quarterly and annually * Report on the * Participate in the formulation the SDBIP and the municipal of the Departmental scorecards review the performance of implementation of of the response to the strategic or organizational the department improvement measures recommendations of the scorecard * Ensure the performance adopted by the Mayor and internal auditor, Performance objectives in the performance * Quarterly review Council Audit Committee and the * Manage subordinates’ agreements are achieved performance of direct Auditor performance reports * Annually report on the General performance of their * Enter into performance departments agreements with the Municipal Manager * Receive monthly performance reports from section managers

* Reports monthly on progress

201

8.9. Roles and Responsibilities of Non-Section 57 Municipal Employees PLANNING IMPLEMENTATION MONITORING, ANALYSIS AND MEASUREMENT REVIEW REPORTING ASSESSMENT * Participate in identifying of * Execute individual work * Participate in the review of * Report on progress on * Assess performance review priorities and setting KPIs and plans departmental plans achieving of own reports of own section targets for the municipality’s IDP scorecard targets to * Manage all information and * Participate in the review of section managers * Participate in the development of evidence required for own performance the organizational and the performance measurement departmental scorecards

* Participate in the development of their own score card

8.10. Roles and Responsibilities of the Community PLANNING REVIEW REPORTING * Participate in the drafting and implementation of the *· Participate in the annual review of * Receive annual performance municipality’s IDP through established forums performance through their involvement in and budget reports from council ward committee structures and customer * Participate in the setting of KPIs and targets for the perception surveys. municipality every year

* Make representations on the draft annual budget

8.11. Roles and Responsibilities of Ward Committees PLANNING REVIEW REPORTING * Participate in the drafting and implementation of the *· Participate in the annual review of * Receive quarterly performance reports from council municipality’s IDP performance through their involvement

* Participate in the setting of KPIs and targets for the municipality every year

* Make representations on the draft annual budget

202

8.12. Roles and Responsibilities of Organized Labour PLANNING REVIEW REPORTING * Participate in the drafting and implementation of the * Participate in assessment and the * Receive quarterly performance reports on employee municipality’s IDP through established forums quarterly reviews of employee performance under-performance in the Local Labour Forum and compilation of departmental and * Participate in the setting of KPIs and targets for the organizational performance review reports * Report on any negative effects of the PMS on municipality every year employees

* Participates and provide inputs in the drafting of the organizational and departmental scorecards

* Oversee the overall application of the Performance Management Policy Framework on Non-Section 57 employees

8.13. Roles and Responsibilities of the Internal Audit PLANNING AUDIT ASSESSMENT REPORTING * Develop the risk and * Audit the performance measures * Assess the functioning of the * Submit quarterly reports to the Municipal compliance-based audit plan in the municipal and departmental municipality’s PMS to ensure it Manager. scorecards complies with the Act * Submit quarterly reports to the Performance * Conduct compliance based audits Audit Committee

8.14. Roles and Responsibilities of the Performance Audit Committee PLANNING REVIEW REPORTING * Receive the annual audit plan from Internal * Review quarterly reports from the internal audit * Submit quarterly reports to the municipal Manager and the Audit office on quarterly basis Mayor

* Submit bi-annual reports to the Municipal Council

9. CONCLUSION

The policy framework for performance management supplies the necessary guidelines and direction for the development, implementation and management of performance within the Greater Taung Local municipality.

203

9. CONSULTATION AND APPROVAL PHASE

9.1. CONSULTATION AND PUBLIC PARTICIPATION

The Draft IDP and Budget was consulted with communities at the IDP Rep Forum that was held on the 15th of March 2018 and input from communities will be invited through public advert and through the Mayoral IDP & Budget consultation process that will took place during May 2018.

A summary report of this input will be drafted and the input will be considered by the Projects Task Teams, Exco and Council during the next cycle of the planning processes and Technical SDBIPs.

9.2. APPROVAL BY GTLM

The Draft IDP was submitted during a Council Meeting that was held on the 28th of March 2018.

The Final IDP and Budget was approved on the 30th of May 2018.

9.3. SUBMISSION AND PUBLICATION OF THE IDP

The Greater Taung Local Municipality will publish the IDP through the relevant media and submit the IDP for 2018/19 within 10 days after approval to the following stakeholders:

 The MEC – Department of Local Government and Traditional Affairs  Provincial Legislature  Provincial Treasury  National Treasury

10. CONCLUSION

The IDP Unit in the Office of The Municipal Manager want to acknowledge the input and hard work of all Councillors and Officials who has contributed to the compilation of the First Review of the 4th Generation IDP.

The community consultation and facilitation processes (CBP) went the extra mile to ensure that the IDP is owned by the community.

We are looking forward to ensure the implementation and realization of this IDP as highlighted by the North West Provincial Legislature, who requested that emphasis should be on implementation.

204