To Let Design and Build Opportunity

Total Page:16

File Type:pdf, Size:1020Kb

To Let Design and Build Opportunity WAKEFIELD EUROPORT, J31 M62 WEST YORKSHIRE SAT NAV: WF10 5QH TO LET DESIGN AND BUILD OPPORTUNITY Fully Consented Cross Dock Logistics Development of up to 510,000 sq ft (47,298 sq m) 31 INDICATIVE CGI 2 WELCOME TO Switch comprises one of the largest Design and Build opportunities in the north of England with full planning consent for warehouse and distribution accommodation up to approximately 510,000 sq ft. The development is located immediately adjacent to Junction 31 of the M62 within the well established Wakefield Europort business park and benefits from excellent links to the region, the rest of the UK and mainland Europe via road, rail and sea. Wakefield Europort is regarded as one of the regions most sought after distribution locations which is already home to occupiers such as Haribo, Royal Mail, Asda, Bibby and Warburtons. INDICATIVE CGI A MAJOR EQUIDISTANT BETWEEN DISTRIBUTION HUB M1 AND A1(M) CORRIDORS HIGH SPEC FANTASTIC PORT CROSS DOCK UNIT CONNECTIONS EXCELLENT ACCESS ADJACENT TO THE WAKEFIELD TO J31, M62 RAIL FREIGHT TERMINAL INDICATIVE CGI 3 INDICATIVE LAYOUT & SPECIFICATION 78 DOCK LEVEL LOADING DOORS GATE HOUSE 7 LEVEL DOORS HGV PARKING YARD DEPTH MAX 50M TRANSPORT HUB 4 LEVEL ACCESS 10 DOCKS 10 DOCKS 10 DOCKS 10 DOCKS 22 MOTORCYCLE SPACES 437 PARKING SPACES OVER 3 LEVELS (25,245 SQ FT) 2 STOREY OFFICES 2 YARD DEPTH MAX 50M 15M TO HAUNCH 80 HGV PARKING SPACES 110 COVERED CYCLE SPACES Accommodation 3 LEVEL CAR PARKING (437 SPACES) Sq ft Sq m 3 LEVEL ACCESS 10 DOCKS 10 DOCKS 10 DOCKS 8 DOCKS Gatehouse 215 20 TRANSPORT HUB YARD DEPTH MAX 35M Offices 25,245 2,345 Transport Offices 7,342 682 Warehouse 476,310 44,251 Total 509,112 47,298 Site Area 22.8 Acres 4 DEMOGRAPHICS 6.2% UNEMPLOYMENT RATE (MARCH 2021) MEDIAN HOURLY PAY RATE IS 92% OF THE NATIONAL AVERAGE (Respective of national average) 67,000 PEOPLE EMPLOYED IN LOGISTICS AND DISTRIBUTION WITHIN THE LEEDS CITY REGION 45 MILLION PEOPLE WITHIN 4.5 HOUR HGV DRIVE TIME TALENT POOL OF 2.1 MILLION WITHIN 35 MILE RADIUS 17,000 (11%) PEOPLE IN WAKEFIELD DISTRICT EMPLOYED IN TRANSPORTATION AND STORAGE (4.9% national average) Source: Wakefield Council 5 YORK A1079 A65 A56 A682 6 A6086 A658 A61 A58 A64 A19 A650 A6120 Drive Times A1(M) A6177 1 Hour A629 A6110 LEEDS BRADFORD M621 M1 2 Hours A656 44 42 A63 M606 A63 3 Hours 43 A1041 M65 CASTLEFORD A640 29 M62 A56 4.5 Hours M62 30 A655 42 A646 31 GLASGOW 32 GOOLE A58 M62 A638 33 EDINBURGH WAKEFIELD LOCATION A638 A666 M74 A1 A637 A19 Connections A628 M66 A58 A1(M) M61 A629 M1 NEWCASTLE M180 UPONA627(M) TYNE BARNSLEY Road A74(M) A663 A628 A635 DONCASTER Switch benefits from immediate access to A56 Junction 31 of the M62 which is within close A62 A628 A616 proximity to both the M1 and A1(M) intersections MANCHESTER M6 Cities A638 which in turn provide easy access to the national M67 M62 Wakefield M18 8 Miles motorway network. The majority of the UK can be A631 reached within 4.5 hour drive time of the site. A1(M) Leeds A61 13 Miles M60 Sheffield A631 35 Miles A57 A630 Sea YORK SHEFFIELD A60 M56 Manchester 79 Miles A6 A57 A1 LEEDS A156 The site is well located with easy access to the HULL Liverpool 113 Miles M62 ports of Hull, Immingham, Grimsby and Goole Birmingham WORKSOP113 Miles (inland port) as well as Liverpool to the west, MANCHESTERA523 A61 A57 A623 A619 providing a gateway to markets in Scandinavia London (Central) 189 Miles LIVERPOOL SHEFFIELD A619 and mainland Europe. A6 M1 A34 Junctions A60 Air M6 M6 NOTTINGHAM A617 A1 A515 J31 M62 Adjacent A53 A614 Several airports offering domestic and A1 / M62 Intersection 5 Miles international flights are within easy reach, LEICESTER including Leeds Bradford, Doncaster Sheffield M62 / M1 Intersection 6 Miles BIRMINGHAM and Manchester Airports. A1(M) M62 / M18 Intersection 25 Miles CAMBRIDGE Rail FELIXSTOWE M1 Sea Ports M5 M40 Wakefield Europort incorporates a high capacity M11 Port of Hull 49 Miles inter-modal railfreight terminal situated within SWANSEA OXFORD Port of Immingham / Grimsby 62 Miles 0.8 miles of Switch. The open access rail terminal LONDON CARDIFF is operated by DB Schenker and provides a daily M4 direct import / export service between Wakefield and the principal markets on the European BRISTOL M25 Railfreight M20 mainland via the Channel Tunnel. DOVER Wakefield Railfreight Terminal 0.8 Miles M5 SOUTHAMPTON Airports EXETER Leeds Bradford 21 Miles Doncaster Sheffield 29 Miles Manchester 62 Miles East Midlands 75 Miles 7 WHO ARE DELIN PROPERTY ALL ENQUIRIES We are a long term property developer, investor and asset manager of logistics real estate building a significant presence in the logistics real estate market. Founded in London in 2012 by a team of pan-European logistics real estate experts, we now have operations in the Netherlands, Spain and the UK. We own, develop and manage properties in core 0113 246 1533 European markets and continue to grow our portfolio through 0113 200 1800 0114 272 9750 acquisition and development, both on a build to suit and colliers.com/uk/industrial 0207 629 8171 speculative basis. Focusing on the operational requirements of our occupiers, we aim to be their long-term logistics property partner of choice providing fit-for-purpose best in class warehouse facilities across major [email protected] [email protected] European logistics hubs. [email protected] [email protected] [email protected] FURTHER INFORMATION Delivery Delivery is anticipated to be the second half of 2023. However we are keen to engage with interested parties immediately to discuss delivery of a bespoke facility. Planning /// what3words QR CODE The site has full planning consent for the layout outlined within this / reported / ratio / junction / brochure, however the design can be altered in-line with occupiers specific requirements (subject to consent). SCAN WITH YOUR Terms PHONE CAMERA Switch is available on Full Repairing & Insuring lease terms for a term of years to be agreed. A DEVELOPMENT BY IMPORTANT NOTICE RELATING TO THE MISREPRESENTATION ACT 1967 Colliers International & Knight Frank on their behalf and for the sellers or lessors of this property whose agents they are, give notice that: (i) The Particulars are set out as a general outline only for the guidance of intending purchasers or lessees, and do not constitute, nor constitute part of, an offer or contract; (ii) All descriptions, dimensions, references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct, but any intending purchasers or tenants should not rely on them as statements or representations of fact, but must satisfy themselves by inspection or otherwise as to the correctness of each of them; (iii) No person employed by Colliers International & Knight Frank has any authority to make or give any representation or warranty in relation to this property. Unless otherwise stated prices and rents quoted are exclusive of VAT. The date of this publication is May 2021. Designed and produced by Anderson Advertising and Property Marketing Limited T. 0113 274 3698..
Recommended publications
  • Electrification October 2009  Foreword
    Network RUS Electrification October 2009 2 Foreword I am pleased to present this Electrification Electrification has a potentially significant role Strategy, which forms part of the Network Route to play in reducing carbon emissions from rail Utilisation Strategy (RUS). The Network RUS transport as well as improving air quality and looks at issues affecting the whole network reducing noise. Electric trains, on average, rather than in specific geographical areas. emit 20 to 30 percent less carbon than diesel trains, and their superior performance in Approximately 40 percent of the network in terms of braking and accelerating can help terms of track miles is currently electrified, reduce journey times. In addition, they provide though several main lines, much of the cross- more seats for passengers, making a greater country network, as well as key freight links contribution to increasing the overall capacity of and diversionary routes remain un-electrified. the railway. Passengers and freight operators This document therefore sets out a potential would also both benefit from an improved longer-term strategic approach to further service in other ways, such as through the electrification of the network. creation of more diversionary routes. Electrification presents a huge opportunity for In England and Wales, two options in particular the industry, for those who use the railway and – the Great Western and Midland Main Lines for the country as a whole. Our analysis shows – are shown to have high benefit to cost ratios. the long-term benefits of electrifying key parts These options, along with key strategic infill of the network, in terms of both reducing its schemes, are both presented in the proposed ongoing cost to the country and improving its strategy.
    [Show full text]
  • Warehousing-And-Logistics-In-Leicester-And-Leicestershire-Managing-Growth-And-Change
    Warehousing and Logistics in Leicester and Leicestershire: Managing growth and change Leicester and Leicestershire Authorities Final Report April 2021 Prepared by GL Hearn 65 Gresham Street London EC2V 7NQ T +44 (0)20 7851 4900 glhearn.com With MDS Transmodal Ltd Iceni Projects Ltd Public Warehousing and Logistics in Leicester and Leicestershire: Managing growth and change, April 2021 Leicester and Leicestershire Authorities, Final Report Contents Section Page 0 EXECUTIVE SUMMARY 10 Key messages from the report 10 1 INTRODUCTION AND CONTEXT 20 Context 21 Study Area 21 Stakeholders 23 2 DRIVERS FOR CHANGE IN THE LOGISTICS MARKET 24 Better Delivery: The Challenge for Freight 24 National Planning Policy Framework and Planning Practice Guidance 31 National Planning Statement for National Networks 34 The Growth of E-commerce 35 Rail Freight Trends and Forecasts 41 Rail Network Enhancements 45 Highway Network Enhancements 50 Brexit 52 3 WAREHOUSING STOCK POSITION (2019) 60 4 PROPERTY MARKET REVIEW 67 Warehouse / Industrial Market Review 67 Warehousing Floorspace 70 Agent Consultation: Key Drivers and Trends 82 5 EXISTING SRFI RAIL FREIGHT VOLUMES 85 6 WAREHOUSE LAND SUPPLY AND SUPPLY TRAJECTORY, LEICESTERSHIRE AND ‘GOLDEN TRIANGLE’ 87 7 ESTIMATES FOR FUTURE STRATEGIC WAREHOUSING NEED – LABOUR DEMAND AND COMPLETIONS TRENDS 90 Labour Demand Model 90 Baseline Forecasts 94 Completions Trend Model 98 8 ESTIMATES FOR FUTURE STRATEGIC WAREHOUSING NEED – REPLACEMENT AND TRAFFIC GROWTH 102 9 TESTING DEMAND FORECASTS AND SUPPLY 113 Road Only Sites – Demand and Supply 122 10 FUTURE WAREHOUSE FLOORSPACE GROWTH SCENARIOS SUMMARY 127 GL Hearn Page 2 of 209 P:\Projects\Harborough District Council - Future of Wareshousing in Leicestershire - 20-322\4.
    [Show full text]
  • A Sheffield Hallam University Thesis
    Railways, land-use planning and urban development : 1948-94. HAYWOOD, Russell. Available from the Sheffield Hallam University Research Archive (SHURA) at: http://shura.shu.ac.uk/19777/ A Sheffield Hallam University thesis This thesis is protected by copyright which belongs to the author. The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the author. When referring to this work, full bibliographic details including the author, title, awarding institution and date of the thesis must be given. Please visit http://shura.shu.ac.uk/19777/ and http://shura.shu.ac.uk/information.html for further details about copyright and re-use permissions. Fines are charged at 50p per hour 2 4 SEP 2003 H- I fp M Z\ 2 1 NOV^OP ProQuest Number: 10697079 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a com plete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. uest ProQuest 10697079 Published by ProQuest LLC(2017). Copyright of the Dissertation is held by the Author. All rights reserved. This work is protected against unauthorized copying under Title 17, United States C ode Microform Edition © ProQuest LLC. ProQuest LLC. 789 East Eisenhower Parkway P.O. Box 1346 Ann Arbor, Ml 48106- 1346 Railways, Land-Use Planning and Urban Development: 1948-94 Russell Haywood A thesis submitted in partial fulfilment of the requirements of Sheffield Hallam University for the degree of Doctor of Philosophy January 2001 Thanks Many people and organisations have provided me with help and support over the five years or so that I have been carrying out this research.
    [Show full text]
  • £14M Rail Freight Boost for Peak District Site
    135 May 2019 NEWS www.rfg.org.uk Helping ensure a sustainable future for UK rail freight £14m rail freight boost for Peak District site Disused council tip transformed into 430m of P.3 railway siding to benefit local quarries Teesport Express A new £14m railway extension has been really pleased that this upgrade will give gets underway to unveiled in Buxton that will provide a both a boost to the UK economy through service growing significant boost to the local aggregate greater productivity, as well as improving Scottish demand and wider construction sector. the local environment by reducing the reli- ance on lorries which cause congestion and Network Rail has transformed the disused produce harmful CO2 emissions.” council tip into 430 metres of new railway sidings to allow longer freight trains to bet- Andrew Sumner, head of industrial sales ter serve local quarries. from DB Cargo UK, said: “This is a signifi- cant development for rail freight in the Peak The Great North Rail Project investment District and will go a long way to relieve means DB Cargo and Freightliner can now some of the constraints we face in the area. increase the number of wagons on each This is another example of a successful train from 18 to 26. This allows up to 2,500 partnership approach between operators, P.3 tonnes of stone to be transported during industry bodies and stakeholders working RFG each load. together to develop and innovate the indus- Annual Handbook try - we are stronger together.” now available! Each freight train takes around 76 lorries off the local road network and every tonne of Adam Cunliffe, chief commercial officer at freight carried by rail cuts carbon emissions Freightliner, added: “The extended sidings by a huge 76%.
    [Show full text]
  • Working Timetable
    BOOK YH Private and not for publication WORKING TIMETABLE SUNDAY 13 DECEMBER 2015 to SATURDAY 14 MAY 2016 FREIGHT AND DEPARTMENTAL SERVICES Section YH10 HEBDEN BRIDGE TO COLTON JN YH10 - HEBDEN BRIDGE TO COLTON JN Mondays to Fridays 14 December to 13 May 12345678910111213141516 Signal ID 4E48 6E16 4N98 4N67 0H21 4S78 3S10 1Q64 4E79 4N59 6E41 4N59 4S03 1Q08 4N21 4N81 Orig. Dep. Time 21.25 19.08 23.36 23.30 23.48 23.54 23.55 08.53 19.00 00.31 16.56 00.21 00.57 21.30 00.47 00.42 Orig. Loc. Name Ratcliffe Heavy Knowsley Drax Aes (Gbrf) Ferrybridge Pwr Leeds Balm Rd Milford West Doncaster West Derby Rugeley B Sudforth Lane Penyffordd Sudforth Lane Milford West Cambridge Eggborough Drax Aes (Gbrf) Haul Freight Terminal Stn Gbrf Loco (Fhh) Sidings Yard R.T.C.(Network Power Stn (Fhh) Down (Ews) Cement Sdgs Down (Ews) Sidings C.S.D. P.S. (Gbrf) Rail) Dest. Loc. Name York Yard South Wilton F.L.T. Tyne Coal Tyne Coal Sudforth Lane Hunterston H.L. York Thrall Neville Hill Leeds Sig L929 Tees N.Y. Doncaster Down Tees N.Y. New Cumnock Derby Redcar Bulk Tyne Coal (Fhh) Terminal Gbrf Terminal Gbrf (Flhh) Ews Europa T&R.S.M.D Decoy U.R.S. R.T.C.(Network Terminal Gbrf Terminal Gbrf Rail) Timing Load 75-66S06 60C66S20 75-66S06 75-66S06 LD75 75-66S06 60-TR40 LD75 75-66S06 75-66S06 60-TR40 75-66S06 75-66S06 HSMT 75-66S06 75-TR40 Operating Characteristics QQQQ QQYQQYQY Dates Of Operation FSX FSX MSX Sun MO MSX MO MO MSX MSX WO MO MSX TO MSX MSX Hebden Bridge arr 1 ..
    [Show full text]
  • Altofts and Whitwood Ward
    InstantAtlas™ Server 6 Wakefield Ward Profile Selection: Altofts and Whitwood Ward Introduction The Wakefield district is divided into 21 wards, with each ward being represented by three councillors. Councillors are elected by residents of the district and are responsible for making decisions about local services and budgets, such as Council Tax, on behalf of the local community. Each councillor serves for a period of four years. The ward boundaries are reviewed periodically, and the current boundaries were last altered in 2004. Altofts and Whitwood Ward is situated in the north of the District and contains the settlements of Altofts, Whitwood and Whitwood Mere, and a number of industrial parks that occupy much of the land between Normanton and Castleford. The ward also includes the Cutsyke, Roundhill and Half Acres areas of Castleford. To the north the ward is bounded by the River Calder. The ward is bisected by the M62. Selected landmarks: Trans Pennine Trail Wakefield Europort Profile created: 9/1/2017 Population Profile Population Size The most accurate population estimates are produced every ten years from the Census. These are updated annually using administrative data to produce mid- year population estimates. The mid-2014 estimates show that the size of the resident population in Altofts and Whitwood Ward is 15,972 people. The tables below shows the percentage breakdown by age groups and gender. The actual number of people in each age group is shown in brackets. Population Size Altofts and Whitwood Ward Total population (2014)
    [Show full text]
  • Route Specifications 2011 – London North Eastern
    Network Rail Route Specifications 2011 – London North Eastern “It’s an enormous national industry – surely one of the UK’s biggest.”* More people are using the railways today than at any time since the 1920s – some four million a day. Over the next few years we are investing in expanding and growing the railway, and developing plans for the future. *Passenger comment, May 2011 Helping Britain run better 2014-2019 will see a financially sustainable railway with more seats, shorter journey times and greater passenger satisfaction – we’ve just published an industry plan for the five years to 2019 mapping out what we think needs to be done to deliver a better, more sustainable rail network. Contents SRS G.01 - King's Cross – Peterborough................................................................................................................................ 2 SRS G.02 - Moorgate Branch................................................................................................................................................. 11 SRS G.03 - Hertford Loop....................................................................................................................................................... 15 SRS G.04 - Hitchin - Cambridge............................................................................................................................................. 19 SRS G.05 - Peterborough - Doncaster..................................................................................................................................
    [Show full text]
  • Rail Operations Report
    The Rail Central Rail Freight Interchange and Highway Order 201[x] Rail Operations Report PINS Reference Number: TR050004 Document Reference: 7.5 Regulation Number: Reg 5(2)(q) September 2018 Version 1.0 Planning Act 2008 | Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 The Rail Central Rail Freight Interchange and Highway Order 201[x] Regulation 5(2)(q) Title of Document Rail Operations Report Date September 2018 Prepared by/Author Intermodality The Rail Central Rail Freight Interchange and Highway Order 201[x] Regulation 5(2)(q) Rail Operations Report Contents 1 Introduction ....................................................................................................................................................... 3 1.1 Scope...................................................................................................................................................... 3 2 Rail freight interchanges .................................................................................................................................. 4 2.1 Overview ................................................................................................................................................. 4 2.2 The development of Strategic Rail Freight Interchanges ....................................................................... 5 2.3 Occupiers at SRFI ................................................................................................................................ 13 2.4 Operations
    [Show full text]
  • Continuous Modular Strategic Planning North of England Freight Strategic Questions
    Continuous Modular Strategic Planning North of England Freight Strategic Questions 12 November 2018 Document Control Document Title Continuous Modular Strategic Planning – North of England - Freight Version and date V1.0 12/11/2018 Author Richard Iggulden Security Level Unrestricted 2 Contents Foreword ........................................................................................... 6 Executive Summary .......................................................................... 7 Strategic Questions .............................................................................................. 7 Meeting the growing demand in rail freight ........................................................... 8 Recommendations ............................................................................................... 8 Introduction ....................................................................................... 9 An Investment Strategy to Support Growth .......................................................... 9 The Railways in the North of England ................................................................ 10 Demand and Growth .......................................................................................... 12 The Starting Point............................................................................................... 12 The Funding Environment .................................................................................. 13 New Ways of Attracting Funding and Generating Profit ....................................
    [Show full text]
  • The Wave Q4 2020
    ISSUE 19 2020 The WAVE All of the latest news and views from Maritime Transport ISSUE 19 AWAITING A MESSAGE FROM JOHN Writing the story of our journey through one of the most challenging times for humanity is a humbling and extraordinary story to write. 2020 was like no other, and I am relieved and delighted that it is now drawing to a close with a solution in sight for this dreadful virus that has placed so many aspects of our lives on hold. represent a significant redevelopment and enable us to establish the best hub and spoke operation in Yorkshire. CONTENT Anzani House in Felixstowe was demolished, and works have started to commence on the construction of our loaded container storage depot that will stand in its place. We continued to invest in our intermodal division with confidence, and have added four more services with DB Cargo UK and a further two with GB Railfreight, creating a rail operation with ten daily services and five inland rail terminals. We will be continuing to invest further in this area to create a sustainable and environmentally-efficient logistics company. Furthermore, we agreed terms to acquire Wincanton plc’s container transport business, Wincanton Container Logistics. Working ur drivers and staff have all pulled efforts to make up for lost time. We are still through the acquisition and despite the effects together to ensure our business has working our way through this container surge of the pandemic, we did everything possible Ocontinued to perform well. and distribution remains very busy, especially to maintain a great service and keep to our due to the increase in online sales.
    [Show full text]
  • Latitude 135 135,000 Sq
    Potential expansion land Hull/Ports/A1 M62 J31 M62 Leeds/M1 Latitude 135 135,000 sq. ft J31 M62 HigH bAy distribution wAreHouse sAt nAV: wF10 5Qu Location: Ideally located for immediate access Latitude Park is strategically located adjacent to Junction 31 of the M62 motorway. it’s at the heart of the distribution network providing excellent access to the M1, A1 and M18. Leeds, Manchester and the east/west coasts ports are all within easy reach. to the national motorway network Latitude Park is an extension to the well established and hugely successful wakefield europort providing a rail freight terminal with daily direct rail access to europe via the Channel tunnel. other occupiers in the vicinity include Argos, tKMaxx, scottish & newcastle, Asda, Poundworld, Haribo and bosch. Phase 1, Latitude 135, comprising a high demographics: quality high bay distribution/industrial unit. the local population of wakefield is 325,600 and there are over 756,000 employees within a 30 minute Phase 2 can accommodate a 65,000 sq ft INDIICAT VE LAYOUT drive time of the scheme. Latitude Park has access to a strong local workforce with a reputation for flexibility, extension of the existing building providing FUTURE DEVELOPMENTPLOT work ethic and motivation. when compared to other distribution centres such as the Midlands the cost of a total of circa 200,000 sq ft, subject to labour is approximately 15% lower providing a significant competitive advantage. the excellent local metro planning. bus service has been designed to accommodate local business needs and in particular varying shift patterns. specification: AL UNIT INDUSTRI • 10 metres to underside of haunch 42 SQM.
    [Show full text]
  • Wagonload Network Solutions
    Wagonload Network Solutions A FREIGHT FRANCHISE - Unorthodox but effective Illustration: Conventional railway wagon. January 2013 Preface • This scoping study was commissioned by railfuture, which is the campaigning name of the Railway Development Society Limited. • railfuture is organised in 12 regional branches in England and 2 national branches For Scotland and Wales. We work with all levels oF national, devolved and local government, train operators and like-minded voluntary bodies to promote the interests of rail users and secure improvements to rail services. We are completely independent oF political parties, trades unions and railway management. We campaign for more freight to go by rail to increase the viability oF rail freight services and reduce the environmental damage caused by heavy Lorries. • The railfuture Media, Marketing and Communications (MMC) produced this publication on behalF of the railfuture Freight Group. • All enquiries about the content of this publication should be directed to the Freight Group at [email protected] • Media enQuiries about railfuture should be directed to [email protected] railfuture 2013 The Railway Development Society Limited Registered in England and Wales No: 5011634 A Company Limited by Guarantee Registered OFFice: 24 Chedworth Place, Tattingstone, SufFolk IP9 2ND Disclaimer: This study is based upon a desk-based exercise. Further academic and physical appraisal would be reQuired, to ascertain if identified items, could be progressed on a commercial, or co- operative basis. www.railFuture.org.uk www.railFuturescotland.org.uk www.railFuturewales.org.uk www.railwatch.org.uk railfuture on twitter railwatch on twitter railfuture on Facebook railfuture on LinkedIn railfuture on YouTube Wagonload Network Solutions A FREIGHT FRANCHISE - Unorthodox but effective Contents Page Executive Summary – Wagonload 2 I.
    [Show full text]