Spit Bridge to Manly (Manly Scenic Walkway)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Narrabeen Lakes to Manly Lagoon
To NEWCASTLE Manly Lagoon to North Head Personal Care BARRENJOEY and The Spit Be aware that you are responsible for your own safety and that of any child with you. Take care and enjoy your walk. This magnificent walk features the famous Manly Beach, Shelly Beach, and 5hr 30 North Head which dominates the entrance to Sydney Harbour. It also links The walks require average fitness, except for full-day walks which require COASTAL SYDNEY to the popular Manly Scenic Walkway between Manly Cove and The Spit. above-average fitness and stamina. There is a wide variety of pathway alking conditions and terrain, including bush tracks, uneven ground, footpaths, The walk forms part of one of the world’s great urban coastal walks, beaches, rocks, steps and steep hills. Observe official safety, track and road signs AVALON connecting Broken Bay in Sydney’s north to Port Hacking in the south, at all times. Keep well back from cliff edges and be careful crossing roads. traversing rugged headlands, sweeping beaches, lagoons, bushland, and the w Wear a hat and good walking shoes, use sunscreen and carry water. You will Manly Lagoon bays and harbours of coastal Sydney. need to drink regularly, particularly in summer, as much of the route is without Approximate Walking Times in Hours and Minutes 5hr 30 This map covers the route from Manly Lagoon to Manly wharf via North shade. Although cold drinks can often be bought along the way, this cannot to North Head e.g. 1 hour 45 minutes = 1hr 45 Head. Two companion maps, Barrenjoey to Narrabeen Lakes and Narrabeen always be relied on. -
Infrastructure Approval
Infrastructure approval Section 115ZB of the Environmental Planning & Assessment Act 1979 I grant approval to the State significant infrastructure application referred to in schedule 1, subject to the conditions in schedules 2. These conditions are required to: • prevent, minimise, and/or offset adverse environmental impacts including economic and social impacts; • set standards and performance measures for acceptable environmental performance; • require regular monitoring and reporting; and • provide for the ongoing environmental management of the SSI. The Hon Pru Goward MP Minister for Planning Sydney 2015 SCHEDULE 1 Application no.: SSI-6136 Proponent: Roads and Maritime Services Approval Authority: Minister for Planning Land: Land in the suburbs of Hornsby, North Wahroonga, Wahroonga, Normanhurst, Thornleigh, Pennant Hills, Beecroft, West Pennant Hills, Carlingford, North Rocks, Northmead and Baulkham Hills State Significant Infrastructure: Development for the purposes of the NorthConnex project being a new multi-lane road link between the M1 Pacific Motorway (formerly the F3 Sydney–Newcastle Expressway) at North Wahroonga and the Hills M2 Motorway at Baulkham Hills, including: ▪ construction and operation of two road tunnels for traffic traveling north - south between the M1 Pacific Motorway and the Hills M2 Motorway; ▪ M2 integration works; ▪ construction of access points and improvements to intersections and interchanges in the vicinity of NorthConnex; ▪ construction of ventilation facilities; ▪ motorway control centre; and ▪ 11 -
Speed Camera Locations
April 2014 Current Speed Camera Locations Fixed Speed Camera Locations Suburb/Town Road Comment Alstonville Bruxner Highway, between Gap Road and Teven Road Major road works undertaken at site Camera Removed (Alstonville Bypass) Angledale Princes Highway, between Hergenhans Lane and Stony Creek Road safety works proposed. See Camera Removed RMS website for details. Auburn Parramatta Road, between Harbord Street and Duck Street Banora Point Pacific Highway, between Laura Street and Darlington Drive Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Bar Point F3 Freeway, between Jolls Bridge and Mt White Exit Ramp Bardwell Park / Arncliffe M5 Tunnel, between Bexley Road and Marsh Street Ben Lomond New England Highway, between Ross Road and Ben Lomond Road Berkshire Park Richmond Road, between Llandilo Road and Sanctuary Drive Berry Princes Highway, between Kangaroo Valley Road and Victoria Street Bexley North Bexley Road, between Kingsland Road North and Miller Avenue Blandford New England Highway, between Hayles Street and Mills Street Bomaderry Bolong Road, between Beinda Street and Coomea Street Bonnyrigg Elizabeth Drive, between Brown Road and Humphries Road Bonville Pacific Highway, between Bonville Creek and Bonville Station Road Brogo Princes Highway, between Pioneer Close and Brogo River Broughton Princes Highway, between Austral Park Road and Gembrook Road safety works proposed. See Auditor-General Deactivated Lane RMS website for details. Bulli Princes Highway, between Grevillea Park Road and Black Diamond Place Bundagen Pacific Highway, between Pine Creek and Perrys Road Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Burringbar Tweed Valley Way, between Blakeneys Road and Cooradilla Road Burwood Hume Highway, between Willee Street and Emu Street Road safety works proposed. -
Western Harbour Tunnel & Warringah Freeway Upgrade
NSW Major Projects NSW Government 30th March, 2020. Dear Sir or Madame, RE: Western Harbour Tunnel & Warringah Freeway Upgrade I am writing in support of Bike North and their submission on the Western Harbour Tunnel & Warringah Freeway Upgrade.i Bicycle NSW has been the peak bicycle advocacy group now in NSW for over forty-three years, and has over 30 affiliated local Bicycle User Groups, including Bike North. Bicycle NSW exists to create a better environment for all bicycle riders and our advocacy is guided by three policy pillars to achieve this namely: Build it for Everyone: cycling infrastructure should be built suitable for all riders, and we say ‘from 8-80’ as a reminder that children through to elders should all be able to use it independently Safe Home: because everyone deserves to arrive home safely and laws, regulation and enforcement need to support this Invest Now for Health: calls for government to recognise the importance of investment in safe cycling to address the rising impact of inactivity on human health Bicycle NSW agrees with and supports the objections of Bike North to the proposal on the basis that: The proposal would entrench private, environmentally damaging transport at the expense of public and active transport The EIS fails to provide a full detailed business case to support this proposal over public transport investment The project fails to include delivery of the North Shore Cycleway as part of the project or at least the section between Naremburn and the Sydney Harbour Bridge. This directly contradicts Sydney’s Cycling Future (NSW Government, Dec 2013) that requires that the ‘needs of people on bike be included throughout the planning of new and upgraded road projects’, and that ‘bicycle facilities be identified and delivered parallel to major transport corridors’. -
EDO Western Harbour Tunnel and Beaches Link Program
Western Harbour Tunnel and Beaches Link Program What you need to know and how to have your say About the EDO • National Community Legal Centre • Specialists in planning and environmental law • Non-government and non-profit • Legal information , advice and representation • Community education • Policy and law reform expertise www.edo.org.au Information, not advice • The information in this workshop is a guide only and not a substitute for legal advice. • If you need legal advice, call our Environmental Law Advice Line on 1800 626 239 • Visit https://www.edo.org.au/get-advice/ By law we can only assist one client on any issue – We prefer to work with community groups Overview 1. The proposal 2. State Significant Infrastructure 3. Assessment pathway 4. Environmental Impact Statement 5. Community Participation: Submission writing 6. What to expect next 7. Legal avenues 1. The Proposal Western Harbour Tunnel and Warringah Freeway Upgrade Quick Overview: Who is the proponent? • Roads and Maritime Service What is being proposed? • New crossing of Sydney Harbour • Twin tolled motorway tunnels – approx. 7km long • Connecting WestConnex at Rozelle and the Warringah Freeway at North Sydney • Upgrade and integration works along the Warringah Freeway, including connections to the Beaches Link and Gore Hill Freeway Western Harbour Tunnel and Warringah Freeway Upgrade Where is the process up to? • EIS is being prepared 2017-2019 • EIS submitted and placed on public exhibition 2020 • Public submissions 2020 • Response to submissions • Possible preferred infrastructure report ? • Assessment and determination Scoping Report • Broad description of the project • Brief justification for the project • Selection process for project - do nothing - rejected - more lanes on Sydney Harbour Bridge or Tunnel – rejected - increase public transport – rejected • Reasons for selecting blue corridor • Brief description of community consultation process • Key issues briefly identified Design Development Corridor SEARs Key issues identified by the Department: 1. -
Current Walks Program - for PDF Download
Current Walks Program - for PDF download See end of this program for Search & Rescue information. Note: Trips recently added or changed are shown in bold. Click here to download as PDF Jan 7 (Tue) OATLEY PARK Mortdale station to Oatley Park; walk around the wetlands, Lime Kiln Bay, Jew Fish Bay with the possibility of a swim in the river, return across the top and back to the station. A delightful spot on the Georges River. DISTANCE: SHORT. TRIP GRADE: EASY MAPS: Sydney Street Directory. LEADER: UTE FOSTER [email protected] 9559 2363 (H) TRANSPORT: TRAIN Jan 9 (Thu) MEADOWBANK - BOTANY BAY (RETURN) - Cycling Meadowbank, Olympic Park, South Strathfield, Cooks River Cyclway, Botany Bay & return. Time for a swim before lunch!. Please ring to confirm details etc. Helmets, Hi-Vis jackets, sunscreen, water, spare tube, pump & repair kit required. Party limit 8. DISTANCE: MEDIUM. TRIP GRADE: MEDIUM MAPS: Street Directory. LEADER: COL HALPIN 98761685 (H). Ring by Tuesday TRANSPORT: Bike Jan 14 (Tue) LANE COVE (q) Riverview, Tambourine Bay, Longueville, Woodford Bay, Northwood, Gore Creek Reserve, Shell Park, Greenwich Point, Greenwich Baths, Smoothey Park, Wollstoncraft Station. Swim at Greenwich Baths (High tide). DISTANCE: MEDIUM. TRIP GRADE: EASY/MEDIUM MAPS: STEP. LEADER: PHIL LAMBE [email protected] 9712 1925 (H) 0439 934 180 (M) TRANSPORT: Public. Jan 16 (Thu) SEVEN BRIDGES - SYDNEY HARBOUR CIRCUIT - Cycling Epping, Fig Tree Bridge, Tarban Ck Bridge, Gladesville Bridge, Iron Cove Bridge, Anzac Bridge, Pyrmont Bridge, Harbour Bridge & optional back to Epping via Gore Hill cycleway. Please ring to confirm details etc. Helmets, Hi-Vis jackets, sunscreen, water, spare tube, pump & repair kit required. -
Government Gazette of the STATE of NEW SOUTH WALES Number 187 Friday, 28 December 2007
Government Gazette OF THE STATE OF NEW SOUTH WALES Number 187 Friday, 28 December 2007 Published under authority by Communications and Advertising Summary of Affairs FREEDOM OF INFORMATION ACT 1989 Section 14 (1) (b) and (3) Part 3 All agencies, subject to the Freedom of Information Act 1989, are required to publish in the Freedom of Information Government Gazette, an up-to-date Summary of Affairs. The requirements are specified in section 14 of Part 2 of the Freedom of Information Act. The Summary of Affairs has to contain a list of each of the Agency's policy documents, advice on how the agency's most recent Statement of Affairs may be obtained and contact details for accessing this information. The Summaries have to be published by the end of June and the end of December each year and need to be delivered to Communications and Advertising two weeks prior to these dates. CONTENTS LOCAL COUNCILS Page Page Page Armidale Dumaresq Council 429 Gosford City Council 567 Richmond Valley Council 726 Ashfield Municipal Council 433 Goulburn Mulwaree Council 575 Riverina Water County Council 728 Auburn Council 435 Greater Hume Shire Council 582 Rockdale City Council 729 Ballina Shire Council 437 Greater Taree City Council 584 Rous County Council 732 Bankstown City Council 441 Great Lakes Council 578 Shellharbour City Council 736 Bathurst Regional Council 444 Gundagai Shire Council 586 Shoalhaven City Council 740 Baulkham Hills Shire Council 446 Gunnedah Shire Council 588 Singleton Council 746 Bega Valley Shire Council 449 Gwydir Shire Council 592 -
Western Harbour Tunnel and Warringah Freeway Upgrade - EIS SSI 8863
25 March 2019 File No: 2020/065301 Naomi Moss Contact Planner Department of Planning, Industry and Environment 4 Parramatta Square 12 Darcy Street Parramatta NSW 2150 Via: NSW Planning Portal Dear Naomi Western Harbour Tunnel and Warringah Freeway Upgrade - EIS SSI_8863 Thank you for the opportunity to provide comments on the Environmental Impact Statement for the Western Harbour Tunnel and Warringah Freeway Upgrade State Significant Infrastructure Project. The key points that the City of Sydney wishes to raise are provided in the following pages. Should you wish to speak with a Council officer about the above, please contact Elise Webster, Manager Transport Major Projects on 9265 9333 or at [email protected] Yours sincerely, Graham Jahn AM Director City Planning I Development I Transport 2 Introduction The City of Sydney (the City) has been a long-time critic of WestConnex. This is primarily because this costly motorway project will fail in its primary objective of easing congestion. Urban motorways do not solve congestion; they induce demand for motor vehicle trips and any additional capacity created is quickly filled. This phenomenon applies equally to the Western Harbour Tunnel and Warringah Freeway (the WHT) Project, a component of the WestConnex expansion. The number of vehicles entering the city from the north and the Roselle area is currently limited by the capacity of the Sydney Harbour Bridge and the Anzac Bridge. These bridges also accommodate traffic which bypasses the CBD. When six separate bypass lanes are provided as part of the WHT project there will then be additional capacity on the Harbour Bridge and Anzac Bridge to access the CBD by vehicle. -
Draft Plans of Management for Seaforth Oval, Keirle Park and Tania Park
Draft Plans of Management for Seaforth Oval, Keirle Park and Tania Park Corporate Planning and Strategy Division February, 2004 PLANS OF MANAGEMENT FOR SEAFORTH OVAL, KEIRLE PARK AND TANIA PARK TABLE OF CONTENTS EXECUTIVE SUMMARY .............................................................................................. 7 INTRODUCTION................................................................................................................... 7 PROCESS ............................................................................................................................. 8 1 INTRODUCTION...................................................................................................... 10 1.1 BACKGROUND ........................................................................................................ 10 1.2 LAND TO WHICH THIS PLAN OF MANAGEMENT APPLIES ..................................... 10 1.3 OBJECTIVES OF THIS PLAN OF MANAGEMENT..................................................... 11 1.4 PROCESS OF PREPARING THIS PLAN OF MANAGEMENT....................................... 12 1.4.1 GENERAL PROCESS ............................................................................................ 12 1.4.2 ENVIRONMENTAL ASSESSMENTS ..................................................................... 13 1.4.3 LANDSCAPE MASTERPLANS .............................................................................. 13 1.5 CONTENTS OF THESE PLANS OF MANAGEMENT................................................... 13 2 PLANNING CONTEXT -
Forward Pesticide Application Program North East Sydney Period of Coverage To: 31 May 2016
Forward Pesticide Application Program North East Sydney Period of coverage to: 31 May 2016 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 1 of 21 Contents General Information 3 Information Line: 1300 776 069 3 Warnings: 3 Round-up Bioactive Herbicide 3 Lynx WG 3 Forward Program 4 MSDS 11 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 2 of 21 General Information Pesticide use is used for weed and vegetation control. The pesticides used is a standard mixture of Lynx WG Round-up Bioactive Herbicide All pesticide spraying is programmed between: Sunday to Thursday 8pm – 5am Works will be rescheduled if rain is forecasted within 24hours or the wind speed is above 15kmph. Information Line: 1300 776 069 Warnings: Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used container. When controlling weeds in aquatic situations refer to label directions to minimise the entry of spray into the water. Lynx WG DO NOT use chlorine bleach with ammonia. All traces of liquid fertilizer containing ammonia, ammonium nitrate or ammonium sulphate must be rinsed with water from the mixing and application equipment before adding chlorine bleach solution. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. DO NOT contaminate streams, rivers or waterways with the chemical or used containers. A nil withholding period is applicable for LYNX WG Herbicide. It is recommended, however, not to graze treated areas for 3 days to ensure product efficacy. -
Native Plants of Sydney Harbour National Park: Historical Records and Species Lists, and Their Value for Conservation Monitoring
Native plants of Sydney Harbour National Park: historical records and species lists, and their value for conservation monitoring Doug Benson National Herbarium of New South Wales, Royal Botanic Gardens, Mrs Macquaries Rd, Sydney 2000 AUSTRALIA [email protected] Abstract: Sydney Harbour National Park (lat 33° 53’S; long 151° 13’E), protects significant vegetation on the harbour foreshores close to Sydney City CBD; its floristic abundance and landscape beauty has been acknowledged since the writings of the First Fleet in 1788. Surprisingly, although historical plant collections were made as early as1802, and localised surveys have listed species for parts of the Park since the 1960s, a detailed survey of the flora of whole Park is still needed. This paper provides the first definitive list of the c.400 native flora species for Sydney Harbour National Park (total area 390 ha) showing occurrence on the seven terrestrial sub-regions or precincts (North Head, South Head, Dobroyd Head, Middle Head, Chowder Head, Bradleys Head and Nielsen Park). The list is based on historical species lists, records from the NSW Office of Environment and Heritage (formerly Dept of Environment, Climate Change and Water) Atlas, National Herbarium of New South Wales specimen details, and some additional fieldwork. 131 species have only been recorded from a single precinct site and many are not substantiated with a recent herbarium specimen (though there are historical specimens from the general area for many). Species reported in the sources but for which no current or historic specimen exists are listed separately as being of questionable/non-local status. -
September 2021 Issue 9
Issue 9 September 2021 September 2021 The Tawny Frogmouth 1 We help Australians climb the property ladder with ease by simplifying the mortgage process and doing the legwork for you. The Leading Lending Experts Shore Financial offers a revolutionary mortgage process with intelligent credit, with 15 minute formal approvals. Australia’s Our multi-award winning team have access to market leading interest rates, starting from 1.99%*. #1 Independent We are accredited to negotiate with over 70 lenders Brokerage on our panel, allowing us to provide you expert advice. Being Australia’s #1 independent brokerage, we provide you with the scale, strength, and experience to fight for the best deal and acquire it for you. Take comfort in the fact that we are number one where it matters most. Find Out How Much Check Your You Can Borrow Loan Health James Leader Sales Associate e: jamesleader@shorefinancial.com.au m: 0450 029 418 w: https://shorefinancial.com.au/james-leader/ G'day Beaches The Tawny Frogmouth by Liam Carroll The Tawny Frogmouth Pty Ltd ABN 95 013 114 772 www.thetawnyfrogmouth.com.au Contents Welcome to Issue 9! It should come as Editor [email protected] Issue 9, September 2021 no surprise, the clue’s in the mag’s name, but Ads [email protected] here at The Tawny Frogmouth we love animals, and for the September issue we’ve really gone Circulation 50,000 copies delivered monthly from Manly to Narrabeen; 47,500 all in for an all out animal-protection offensive. 04 G'day Beaches 40 Kangaroo: A Love-Hate Story We showcase the plight of our kangaroos, to letterboxes, 2,500 to local businesses.