Section G Harvard Bridge to Longfellow Bridge
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Reconstruction of Historic Longfellow Bridge Announced - the Office of the Governor - Mass.Gov
Reconstruction of Historic Longfellow Bridge Announced - The Office of the Governor - Mass.Gov State Agencies State A-Z Topics Alert - No Active Alerts Skip to main content Need help resizing text? The official website of the Governor of Massachusetts Governor in Governor's Office Deval Patrick Legislation & The Administration Constituent Services Press Office Agenda Get Involved Executive Orders Home Press Office Press Releases DEVAL L. PATRICK For Immediate release - June 21, 2010 GOVERNOR TIMOTHY P. MURRAY LIEUTENANT GOVERNOR Governor Partick Announces Reconstruction of Historic Longfellow Bridge Media Contact Iconic Bridge Represents Signature Accelerated Bridge Program Investment Along the Charles River Basin Juan Martinez Kim Haberlin BOSTON - Monday, June 21, 2010 - As part of the Patrick-Murray Heather Johnson Administration's Massachusetts Works program to promote job growth Caitlin Coyle 617-725-4025 and long-term economic recovery, Governor Deval Patrick today Colin Durrant (MassDOT) announced that the reconstruction of the historic Longfellow Bridge is 617-973-7870 moving forward, a signature project funded by Governor Patrick's eight- year, $3 billion Accelerated Bridge Program to repair structurally deficient and obsolete bridges across the Commonwealth. The estimated $260 million investment in rebuilding the Longfellow Bridge begins this year with a $20 million early action contract to include preparatory work, with the full reconstruction expected to begin in fall 2011. The Longfellow project is the largest of several investments totaling more than $300 million in rebuilding the bridges along the Charles River Basin, including the BU Bridge, Craigie Drawbridge, and the Western Avenue, River Street, and Anderson Memorial Bridges. "There may be no greater symbol of the neglect our roads and bridges suffered under previous administrations than the Longfellow Bridge," said Governor Patrick. -
Stephen Pritchard, Secretary Executive Office of Environmental Affairs 100 Cambridge St., Suite 900 Boston, MA 02114 Attn: MEPA Office, Deirdre Buckley
Stephen Pritchard, Secretary Executive Office of Environmental Affairs 100 Cambridge St., Suite 900 Boston, MA 02114 attn: MEPA Office, Deirdre Buckley John A. Blundo, P.E. Chief Engineer Massachusetts Highway Department 10 Park Plaza Boston, MA 02116 June 7, 2006 Re: Restoration of the Longfellow Bridge/Charles River EOEA #13777 MHD Project File No. 604361 Dear Secretary Pritchard and Mr. Blundo: WalkBoston appreciates the opportunity to comment on this project during the early phases of project design, and also appreciates the time and in depth information and conversation that your staff and consultants provided at the Beacon Hill Civic Association meeting that I attended last week. We are also pleased that your approach to the bridge design is carefully considering the needs of pedestrians, bicycles (including bike lanes) and universal access in addition to the needs of vehicular traffic and the MBTA. We realize that the constraints of historic preservation and impacts to adjacent parkland mean that the designs must juggle many issues in a very tight space. Our comments primarily address issues that were not yet incorporated into the plans that were presented at the meeting. When the comments were brought up at the meeting, the MHD and DCR staff and consultants all expressed a willingness to include these items in the next rounds of planning and design for the project. We look forward to their inclusion in the ENF that we understand is to be filed later this summer. 1. Information about traffic, pedestrian and bicycle volumes on the bridge, with estimates of future volumes based on enhanced bicycle and pedestrian conditions and connections to/from city streets and Charles River parkland. -
The Charles River Conservancy Presents
Charles River Conservancy The Charles River Conservancy presents Volume III River Stories River Stories River Stories Volume III Volume © Frank Costantino A treasury of poems, stories, artwork, maps, and quotations about the river and its parklands by those who cherish them Table of Contents Dear Parklands Friend Renata von Tscharner.................................................................................................................................................1 A Charles River Journal David Gessner..........................................................................................................................................................2 The Day They Took Our Beach Away from Us Michael Dukakis.......................................................................................................................................................4 Just Once Anne Sexton............................................................................................................................................................5 An Epic Paddle Tom Ashbrook..........................................................................................................................................................6 A Tiny Arm of a Vast Sea Stephen Greenblatt....................................................................................................................................................8 Down by the River David Ferry.............................................................................................................................................................10 -
The Corner That Could North Bank Bridge—Our
11.14 making massachusetts more WalkaBle walk b By ken krauSe north Bank Bridge—our persistence paid off Sometimes successful advocacy means making sure you they were basically dooming these two new parks to very are in the right place at the right time. little use.” oston MassDOT officials were sympathetic, but said the holdup was simply due to lack of funding. Undeterred, Landman led a well-attended lunchtime walk in July 2005 to bring broader public attention to the significance of the “Lost Half Mile” in the Charles River Basin near the Zakim Bridge and the need for the promised bridges. Transportation, parks, environmental and elected officials, business and institutional representatives, local residents and commuters gathered for the walk at one of the “dead end” paths near the banks of the Charles. From there, Landman North Bank Bridge—Big Dig mitigation that almost didn’t happen. could easily point out how the bridges would link the nearby Museum of Science, Spaulding Hospital, North Early in her 10-year tenure as WalkBoston executive Point development in Cambridge, Paul Revere Park in director, Wendy Landman started attending meetings Charlestown and other destinations. of the New Charles River Basin Citizens Advisory Committee. Landman and committee members were A Boston Globe article on the morning of the walk concerned that three Charles River pedestrian bridges prompted the state Secretary of Environmental Affairs to promised in 1993 by the state as mitigation for the Big call WalkBoston and ask if he could attend, and an editorial Dig were still not constructed 12 years later. -
Cambridge Historian
The Cambridge Historian e NEWSLETTER of the CAMBRIDGE HISTORICAL SOCIETY CAMBRIDGE, MA 2015 VOLUME XIV NUMBER 3 THE 110 TH ANNIVERSARY ISSUE Summer 2015 1905: A Year of New Beginnings Volume XIV Number 3 BY MICHAEL KENNEY Call 1905 “a year of new beginnings.” It marked not only the final decision on a new Table of subway route—today’s Red Line—but also the birth of the Cambridge Historical Society. Contents Well into the year, there was debate over whether to run a subway underground once it crossed the Charles River, or to run an elevated line through Central Square, going under- 1905: A Year of New ground at Bay Street. That option was favored by the Square’s business community and Beginnings................................1 by none other than Harvard President Charles William Eliot. “Transportation in a tunnel,” Eliot opined, “is the most disagreeable mode now anywhere used.” But in mid-April, a Why the “Longfellow” “who’s who [of] leading citizens,” as the Cambridge Chronicle put it, tipped the scales for a Bridge? ......................................1 fully underground route. CONTINUED ON PAGE 11 Letter from the President....2 Why the “Longfellow” Bridge? From the First Book BY FRANKLIN REECE of Proceedings ........................3 From the Archives..................4 Messages To and From the Spirit World ..........5 Cambridge and the Vaccine Wars ...........................6 In 1905, the magnificent Longfellow Bridge was nearing completion, even as the Cambridge Historical Society came to life. And today, 110 years later, the iconic bridge is New CHS Councilors..............7 being restored, just as the society enters an exciting new stage of life. -
SESSION A- 830AM- Bridge Rehab- Kurt Jergensen
Bridge Rehabilitation: Boston’s Historic Longfellow Bridge Kurt Jergensen, Historic Bridge Specialist MassDOT Highway Division Longfellow Bridge, at a glance • Originally called either the Cambridge Bridge, or the West Boston Bridge; renamed and dedicated to Henry Wadsworth Longfellow in 1927 • Construction began in 1900 and was completed in 1907 • The bridge designed and constructed to carry the double-tracked Boston Elevated Railway Co. rapid-transit line (now the MBTA Red Line), though the line was not actually completed and put into service until 1912 • Designed for the Boston and Cambridge Bridge Commission by engineer William Jackson and architect Edmund Wheelwright • Bridge steel fabricated and assembled by Phoenix Bridge Company; substructure built by Holbrook, Cabot & Daly • 2,135’ total length, consisting of eleven open-spandrel steel rib arch spans, springing from granite-clad hollow piers and abutments of similar construction. The arch spans are graduated in length, rising to a crest over the 188’-long central span Repairs to Longfellow Bridge • Major repairs were completed in 1959, focusing on the repair or replacement of deteriorated elements of the superstructure and floor system • Minor repairs and other emergency repairs took place over the past decade, intended to keep the bridge open until the present major rehabilitation project could begin • Structural elements that are in particularly deteriorated condition include the steel floorbeams, stringers, deck buckle plates and steel spandrel posts • Another structural issue involves the settlement and tilting of the four 58’-high towers on Piers 5 and 6; the downstream tower on Pier 6 is the worst, with a 6.3” lean to the north Why pursue sensitive rehabilitation? Longfellow Bridge is listed in the National Register of Historic Places as part of the Charles River Basin Historic District. -
LONGFELLOW BRIDGE HISTORIC REHABILITATION Abstract the Longfellow Bridge Is a Well-Known Boston and Cambridge Landmark
LONGFELLOW BRIDGE HISTORIC REHABILITATION Abstract The Longfellow Bridge is a well-known Boston and Cambridge landmark. The structure, which carries both roadway traffic and rail, has recently been rehabilitated through a $305 million Design-Build Contract. Built in 1907, the bridge has become an emblem for the Commonwealth. The Rehabilitation of the Longfellow Bridge set out not only to re-establish the functionality of a critical piece of Massachusetts infrastructure, but also to preserve the original bridge aesthetic appearance. The paper below provides a brief overview of the project and a description of the steel detailing and fit up challenges which involved the installation of over 200,000 new pieces of steel. Introduction Company/Skanska/Consigli Construction Co. (WSC) and STV, as the lead designer, for the $305 The historic Longfellow Bridge spans the Charles million project. STV was a sub-consultant to the River connecting Boston and Cambridge. WSC joint venture. Stretching more than 1,900 feet, it carries Route 3 and the Massachusetts Bay Transportation The project encompassed the complete Authority’s (MBTA) Red Line subway over the reconstruction of the bridge’s original 11 arch river. Having served motorists, pedestrians, and spans; a 12th span installed in the 1950s; the rail travelers for more than 100 years, the bridge seismic retrofit of 12 masonry substructures; and had widespread deterioration of its arches, the dismantling, repair and reconstruction of the columns, ornate masonry and unique metal casting four signature “salt and pepper” granite towers features. flanking the main span. The name stems from the 58-foot towers’ resemblance to salt and pepper The rehabilitation project improved the structural shakers. -
Appendix B Public Participation
Appendix B Public Participation Rehabilitation and Restoration of the Longfellow Bridge Jacobs Civil Inc. Two Center Plaza Memorandum Boston, MA 02108-1906 U.S.A. 617.742.8060 Fax: 617.742.8830 Date May 25, 2006 To Jonathan Taylor Copy Thom Morin From John Mahony Project Longfellow Bridge Rehabilitation and Restoration, Job Number E2X24200 Subject Meeting Minutes – Public Information Meeting of May 24, 2006 Attendees: The attendees consisted of staff members from the Department of Environmental Conservation, the Massachusetts Highway Department, and the Jacobs Team and members of the general public. The Department of Conservation and Recreation: David Lenhardt. The Massachusetts Highway Department: George Batchelor, Landscape; Jessica Lavallee, Environmental; Michael O’Dowd, Project Manager; Stephen Roper, Cultural Resources. The Jacobs Team: Ginny Adams, The Public Archaeology Laboratory, Architectural Historian; Kate Barrett, Regina Villa, Public Involvement Specialist; John Mahony, Jacobs, Environmental Planner; David O’Connor, The Cecil Group, Landscape Architect; Miguel Rosales, Rosales, Gottemoeller & Associates, Architect; Jonathan Taylor, Jacobs, Project Manager; Edward White, Jacobs, Structural Engineer. The General Public: About thirty attendees. Introduction Purpose: The purpose of the meeting was to provide an opportunity for the public to become fully acquainted with the project and to raise issues and ask questions. A formal notice of the Public Information Meeting was read. Goals of the Project: There are four main goals of the project: Rehabilitate the structural system of the bridge, Rehabilitate the architectural elements of the bridge, Improve the transportation connections across the bridge, and A Subsidiary of Jacobs Engineering Group Inc. F:\Proj\E2X24200 Longfellow\600 Discipline Files\Environmental\EA\public information meetings\2006 May 24 Public Information Meeting.doc Memorandum (Continued) Page 2 of 5 Achieve as close compliance with current standards as is reasonable. -
Tahoma Literary Review – Issue 13 Tahomaliteraryreview.Com
TLR Tahoma Literary Review – Issue 13 tahomaliteraryreview.com TAHOMA LITERARY REVIEW Number 13 Fall/Winter 2018 Copyright © 2018 Tahoma Literary Review, LLC Seattle • California tahomaliteraryreview.com All rights reserved. No part of this publication may be reproduced or trans - mitted in any form or by any means, electronic or mechanical, includ - ing photocopy, recording, or any information storage and retrieval sys - tem, without permission in writing from the publisher. For information about permission to reproduce selections from this book, contact the publishers by email at [email protected]. tahoma literary review III Tahoma Literary Review Ann Beman Prose Editor Jim Gearhart Managing Editor Mare Heron Hake Poetry Editor Yi Shun Lai Prose Editor Joe Ponepinto Layout & Design Petrea Burchard Copy Editor Associate Fiction Editors Michal Lemberger Stefen Styrsky Cover Artist Pausha Foley Founding Editors Joe Ponepinto Kelly Davio tahoma literary review V About the Cover “Ales-captem,” Pausha Foley here is a certain feeling one gets when Tfacing mountains covered in snow. The closer one approaches the stronger it becomes—the feeling of still, austere presence. Devoid of sound, devoid of scent. Unmovable, unshakable, untouchable. One could say: lifeless. But it is emphatically not that—rather it is the feeling one experiences when facing the foundations of life. The raw, bare bones of life stripped of all color and sound and emotion. Stripped of meaning, yearning, of striving. Stripped of hopes and dreams, of ambition and desperation alike. When nothing is left but the cold, hard essence of existence. This experience of facing the raw, bare essence of existence is what I attempt to convey through my drawings. -
FENWAY Project Completion Report
BOSTON PUBLIC LIBRARY Digitized by the Internet Archive in 2011 with funding from Boston Public Library http://www.archive.org/details/fenwayprojectcomOObost 1983 Survey & Planninsr Grant mperty Of bGblu^ MT A.nTunKifv PART I -FENWAY Project Completion Report submitted August 31, 1984 to Massachusetts Historical Commission Uteary Boston Landmarks Commission Boston Redevelopment Authority COVER PHOTO: Fenway, 1923 Courtesy of The Bostonian Society FENWAY PROJECT COMPLETION REPORT Prepared by Rosalind Pollan Carol Kennedy Edward Gordon for THE BOSTON LANDMARKS COMMISSION AUGUST 1984 PART ONE - PROJECT COMPLETION REPORT (contained in this volume) TABLE OF CONTENTS I. INTRODUCTION Brief history of The Fenway Review of Architectural Styles Notable Areas of Development and Sub Area Maps II. METHODOLOGY General Procedures Evaluation - Recording Research III. RECOMMENDATIONS A. Districts National Register of Historic Places Boston Landmark Districts Architectural Conservation Districts B. Individual Properties National Register Listing Boston Landmark Designation Further Study Areas Appendix I - Sample Inventory Forms Appendix II - Key to IOC Scale Inventory Maps Appendix III - Inventory Coding System Map I - Fenway Study Area Map II - Sub Areas Map III - District Recommendations Map IV - Individual Site Recommendations Map V - Sites for Further Study PART TWO - FENWAY INVENTORY FORMS (see separate volume) TABLE OF CONTENTS I. INTRODUCTION II. METHODOLOGY General Procedures Evaluation - Recording Research III. BUILDING INFORMATION FORMS '^^ n •— LLl < ^ LU :l < o > 2 Q Z) H- CO § o z yi LU 1 L^ 1 ■ o A i/K/K I. INTRODUCTION The Fenway Preservation Study, conducted from September 1983 to July 1984, was administered by the Boston Landmarks Commission, with the assistance of a matching grant-in-aid from the Department of the Interior, National Park Service, through the Massachusetts Historical Commission, Office of the Secretary of State, Michael J. -
North Point: a Hidden Gem Walking Tour
The Cambridge Pedestrian Committee presents: North Point Tour Map: MBTA Maintenance North Point: Facility A Hidden Gem END Saturday, June 20, 2015 10 8 11:00 am – 12:30 pm 9 Start: 11:00 am Lechmere Canal Park, at the gazebo behind the mall End: 12:30 pm, 24 East Street 6 (Off Monsignor O’Brien Hwy) ART Gilman Bridge 5 ST 4 3 Sponsored by: 7 2 1 Cambridgeside Galleria (Commuter Rail) 1/4 mile -or- 5 minutes walking N Data sources: OpenStreetMaps, Hubway (Rapid Transit) 1. Lechmere Canal 3. North Bank Bridge 5. Miller’s River 8. Twenty|20 Once a tidal estuary and considerably longer than it is today, the Miller’s River began being filled in to create land for railroad and industrial purposes during the 19th century. Today all that remains is the short, polluted water visible under the North Bank Bridge; underground portions are believed responsible for flooding in Somerville and East Cambridge. Developer HYM and Canyon-Johnson’s new residential building at NorthPoint. Attached to the north side of the 6. Lynch Family Skate Park building is the newly completed Brian P. Murphy Memorial Staircase, a pedestrian and bike connection to the adjacent Gilmore Bridge, providing a fast and convenient route to the Constructed in 1895 and named after an early local family, Opened in 2012 and also part of Big Dig mitigation, the Orange Line’s Community College station. the canal was part of an active seaport until the Charles North Bank Bridge is the first of three proposed bridges River Dam Bridge was built in 1910. -
Esplanade Cultural Landscape Report - Introduction 1
C U L T U R A L L A N D S C A P E R E P O R T T H E E S P L A N A D E B O S T O N , M A S S A C H U S E T T S Prepared for The Esplanade Association 10 Derne Street Boston, MA 02114 Prepared by Shary Page Berg FASLA 11 Perry Street Cambridge, MA 02139 April 2007 CONTENTS Introduction . 1 PART I: HISTORICAL OVERVIEW 1. Early History (to 1893) . 4 Shaping the Land Beacon Hill Flat Back Bay Charlesgate/Bay State Road Charlesbank and the West End 2. Charles River Basin (1893-1928) . 11 Charles Eliot’s Vision for the Lower Basin The Charles River Dam The Boston Esplanade 3. Redesigning the Esplanade (1928-1950) . 20 Arthur Shurcliff’s Vision: 1929 Plan Refining the Design 4. Storrow Drive and Beyond (1950-present) . 30 Construction of Storrow Drive Changes to Parkland Late Twentieth Century PART II: EXISTING CONDITIONS AND ANALYSIS 5. Charlesbank. 37 Background General Landscape Character Lock Area Playground/Wading Pool Area Lee Pool Area Ballfields Area 6. Back Bay. 51 Background General Landscape Character Boating Area Hatch Shell Area Back Bay Area Lagoons 7. Charlesgate/Upper Park. 72 Background General Landscape Character Charlesgate Area Linear Park 8. Summary of Findings . 83 Overview/Landscape Principles Character Defining Features Next Steps BIBLIOGRAPHY. 89 APPENDIX A – Historic Resources . 91 APPENDIX B – Planting Lists . 100 INTRODUCTION BACKGROUND The Esplanade is one of Boston’s best loved and most intensively used open spaces.