SESSION A- 830AM- Bridge Rehab- Kurt Jergensen

Total Page:16

File Type:pdf, Size:1020Kb

SESSION A- 830AM- Bridge Rehab- Kurt Jergensen Bridge Rehabilitation: Boston’s Historic Longfellow Bridge Kurt Jergensen, Historic Bridge Specialist MassDOT Highway Division Longfellow Bridge, at a glance • Originally called either the Cambridge Bridge, or the West Boston Bridge; renamed and dedicated to Henry Wadsworth Longfellow in 1927 • Construction began in 1900 and was completed in 1907 • The bridge designed and constructed to carry the double-tracked Boston Elevated Railway Co. rapid-transit line (now the MBTA Red Line), though the line was not actually completed and put into service until 1912 • Designed for the Boston and Cambridge Bridge Commission by engineer William Jackson and architect Edmund Wheelwright • Bridge steel fabricated and assembled by Phoenix Bridge Company; substructure built by Holbrook, Cabot & Daly • 2,135’ total length, consisting of eleven open-spandrel steel rib arch spans, springing from granite-clad hollow piers and abutments of similar construction. The arch spans are graduated in length, rising to a crest over the 188’-long central span Repairs to Longfellow Bridge • Major repairs were completed in 1959, focusing on the repair or replacement of deteriorated elements of the superstructure and floor system • Minor repairs and other emergency repairs took place over the past decade, intended to keep the bridge open until the present major rehabilitation project could begin • Structural elements that are in particularly deteriorated condition include the steel floorbeams, stringers, deck buckle plates and steel spandrel posts • Another structural issue involves the settlement and tilting of the four 58’-high towers on Piers 5 and 6; the downstream tower on Pier 6 is the worst, with a 6.3” lean to the north Why pursue sensitive rehabilitation? Longfellow Bridge is listed in the National Register of Historic Places as part of the Charles River Basin Historic District. The bridge is an iconic landmark within Boston and Cambridge, and is a monument to civic pride in both cities during the City Beautiful era. Accordingly, MassDOT has sought to avoid any adverse impacts on this significant historic resource, in compliance with Section 106 of the National Historic Preservation Act and Section 4(f) of the National Transportation Act. This rehabilitation project was developed in coordination with the Federal Highway Administration, Massachusetts Historical Commission, MA Dept. of Conservation and Recreation, and the Local Historical Commissions for Cambridge and Boston. .
Recommended publications
  • Reconstruction of Historic Longfellow Bridge Announced - the Office of the Governor - Mass.Gov
    Reconstruction of Historic Longfellow Bridge Announced - The Office of the Governor - Mass.Gov State Agencies State A-Z Topics Alert - No Active Alerts Skip to main content Need help resizing text? The official website of the Governor of Massachusetts Governor in Governor's Office Deval Patrick Legislation & The Administration Constituent Services Press Office Agenda Get Involved Executive Orders Home Press Office Press Releases DEVAL L. PATRICK For Immediate release - June 21, 2010 GOVERNOR TIMOTHY P. MURRAY LIEUTENANT GOVERNOR Governor Partick Announces Reconstruction of Historic Longfellow Bridge Media Contact Iconic Bridge Represents Signature Accelerated Bridge Program Investment Along the Charles River Basin Juan Martinez Kim Haberlin BOSTON - Monday, June 21, 2010 - As part of the Patrick-Murray Heather Johnson Administration's Massachusetts Works program to promote job growth Caitlin Coyle 617-725-4025 and long-term economic recovery, Governor Deval Patrick today Colin Durrant (MassDOT) announced that the reconstruction of the historic Longfellow Bridge is 617-973-7870 moving forward, a signature project funded by Governor Patrick's eight- year, $3 billion Accelerated Bridge Program to repair structurally deficient and obsolete bridges across the Commonwealth. The estimated $260 million investment in rebuilding the Longfellow Bridge begins this year with a $20 million early action contract to include preparatory work, with the full reconstruction expected to begin in fall 2011. The Longfellow project is the largest of several investments totaling more than $300 million in rebuilding the bridges along the Charles River Basin, including the BU Bridge, Craigie Drawbridge, and the Western Avenue, River Street, and Anderson Memorial Bridges. "There may be no greater symbol of the neglect our roads and bridges suffered under previous administrations than the Longfellow Bridge," said Governor Patrick.
    [Show full text]
  • Stephen Pritchard, Secretary Executive Office of Environmental Affairs 100 Cambridge St., Suite 900 Boston, MA 02114 Attn: MEPA Office, Deirdre Buckley
    Stephen Pritchard, Secretary Executive Office of Environmental Affairs 100 Cambridge St., Suite 900 Boston, MA 02114 attn: MEPA Office, Deirdre Buckley John A. Blundo, P.E. Chief Engineer Massachusetts Highway Department 10 Park Plaza Boston, MA 02116 June 7, 2006 Re: Restoration of the Longfellow Bridge/Charles River EOEA #13777 MHD Project File No. 604361 Dear Secretary Pritchard and Mr. Blundo: WalkBoston appreciates the opportunity to comment on this project during the early phases of project design, and also appreciates the time and in depth information and conversation that your staff and consultants provided at the Beacon Hill Civic Association meeting that I attended last week. We are also pleased that your approach to the bridge design is carefully considering the needs of pedestrians, bicycles (including bike lanes) and universal access in addition to the needs of vehicular traffic and the MBTA. We realize that the constraints of historic preservation and impacts to adjacent parkland mean that the designs must juggle many issues in a very tight space. Our comments primarily address issues that were not yet incorporated into the plans that were presented at the meeting. When the comments were brought up at the meeting, the MHD and DCR staff and consultants all expressed a willingness to include these items in the next rounds of planning and design for the project. We look forward to their inclusion in the ENF that we understand is to be filed later this summer. 1. Information about traffic, pedestrian and bicycle volumes on the bridge, with estimates of future volumes based on enhanced bicycle and pedestrian conditions and connections to/from city streets and Charles River parkland.
    [Show full text]
  • The Charles River Conservancy Presents
    Charles River Conservancy The Charles River Conservancy presents Volume III River Stories River Stories River Stories Volume III Volume © Frank Costantino A treasury of poems, stories, artwork, maps, and quotations about the river and its parklands by those who cherish them Table of Contents Dear Parklands Friend Renata von Tscharner.................................................................................................................................................1 A Charles River Journal David Gessner..........................................................................................................................................................2 The Day They Took Our Beach Away from Us Michael Dukakis.......................................................................................................................................................4 Just Once Anne Sexton............................................................................................................................................................5 An Epic Paddle Tom Ashbrook..........................................................................................................................................................6 A Tiny Arm of a Vast Sea Stephen Greenblatt....................................................................................................................................................8 Down by the River David Ferry.............................................................................................................................................................10
    [Show full text]
  • Cambridge Historian
    The Cambridge Historian e NEWSLETTER of the CAMBRIDGE HISTORICAL SOCIETY CAMBRIDGE, MA 2015 VOLUME XIV NUMBER 3 THE 110 TH ANNIVERSARY ISSUE Summer 2015 1905: A Year of New Beginnings Volume XIV Number 3 BY MICHAEL KENNEY Call 1905 “a year of new beginnings.” It marked not only the final decision on a new Table of subway route—today’s Red Line—but also the birth of the Cambridge Historical Society. Contents Well into the year, there was debate over whether to run a subway underground once it crossed the Charles River, or to run an elevated line through Central Square, going under- 1905: A Year of New ground at Bay Street. That option was favored by the Square’s business community and Beginnings................................1 by none other than Harvard President Charles William Eliot. “Transportation in a tunnel,” Eliot opined, “is the most disagreeable mode now anywhere used.” But in mid-April, a Why the “Longfellow” “who’s who [of] leading citizens,” as the Cambridge Chronicle put it, tipped the scales for a Bridge? ......................................1 fully underground route. CONTINUED ON PAGE 11 Letter from the President....2 Why the “Longfellow” Bridge? From the First Book BY FRANKLIN REECE of Proceedings ........................3 From the Archives..................4 Messages To and From the Spirit World ..........5 Cambridge and the Vaccine Wars ...........................6 In 1905, the magnificent Longfellow Bridge was nearing completion, even as the Cambridge Historical Society came to life. And today, 110 years later, the iconic bridge is New CHS Councilors..............7 being restored, just as the society enters an exciting new stage of life.
    [Show full text]
  • LONGFELLOW BRIDGE HISTORIC REHABILITATION Abstract the Longfellow Bridge Is a Well-Known Boston and Cambridge Landmark
    LONGFELLOW BRIDGE HISTORIC REHABILITATION Abstract The Longfellow Bridge is a well-known Boston and Cambridge landmark. The structure, which carries both roadway traffic and rail, has recently been rehabilitated through a $305 million Design-Build Contract. Built in 1907, the bridge has become an emblem for the Commonwealth. The Rehabilitation of the Longfellow Bridge set out not only to re-establish the functionality of a critical piece of Massachusetts infrastructure, but also to preserve the original bridge aesthetic appearance. The paper below provides a brief overview of the project and a description of the steel detailing and fit up challenges which involved the installation of over 200,000 new pieces of steel. Introduction Company/Skanska/Consigli Construction Co. (WSC) and STV, as the lead designer, for the $305 The historic Longfellow Bridge spans the Charles million project. STV was a sub-consultant to the River connecting Boston and Cambridge. WSC joint venture. Stretching more than 1,900 feet, it carries Route 3 and the Massachusetts Bay Transportation The project encompassed the complete Authority’s (MBTA) Red Line subway over the reconstruction of the bridge’s original 11 arch river. Having served motorists, pedestrians, and spans; a 12th span installed in the 1950s; the rail travelers for more than 100 years, the bridge seismic retrofit of 12 masonry substructures; and had widespread deterioration of its arches, the dismantling, repair and reconstruction of the columns, ornate masonry and unique metal casting four signature “salt and pepper” granite towers features. flanking the main span. The name stems from the 58-foot towers’ resemblance to salt and pepper The rehabilitation project improved the structural shakers.
    [Show full text]
  • Appendix B Public Participation
    Appendix B Public Participation Rehabilitation and Restoration of the Longfellow Bridge Jacobs Civil Inc. Two Center Plaza Memorandum Boston, MA 02108-1906 U.S.A. 617.742.8060 Fax: 617.742.8830 Date May 25, 2006 To Jonathan Taylor Copy Thom Morin From John Mahony Project Longfellow Bridge Rehabilitation and Restoration, Job Number E2X24200 Subject Meeting Minutes – Public Information Meeting of May 24, 2006 Attendees: The attendees consisted of staff members from the Department of Environmental Conservation, the Massachusetts Highway Department, and the Jacobs Team and members of the general public. The Department of Conservation and Recreation: David Lenhardt. The Massachusetts Highway Department: George Batchelor, Landscape; Jessica Lavallee, Environmental; Michael O’Dowd, Project Manager; Stephen Roper, Cultural Resources. The Jacobs Team: Ginny Adams, The Public Archaeology Laboratory, Architectural Historian; Kate Barrett, Regina Villa, Public Involvement Specialist; John Mahony, Jacobs, Environmental Planner; David O’Connor, The Cecil Group, Landscape Architect; Miguel Rosales, Rosales, Gottemoeller & Associates, Architect; Jonathan Taylor, Jacobs, Project Manager; Edward White, Jacobs, Structural Engineer. The General Public: About thirty attendees. Introduction Purpose: The purpose of the meeting was to provide an opportunity for the public to become fully acquainted with the project and to raise issues and ask questions. A formal notice of the Public Information Meeting was read. Goals of the Project: There are four main goals of the project: Rehabilitate the structural system of the bridge, Rehabilitate the architectural elements of the bridge, Improve the transportation connections across the bridge, and A Subsidiary of Jacobs Engineering Group Inc. F:\Proj\E2X24200 Longfellow\600 Discipline Files\Environmental\EA\public information meetings\2006 May 24 Public Information Meeting.doc Memorandum (Continued) Page 2 of 5 Achieve as close compliance with current standards as is reasonable.
    [Show full text]
  • Lieutenant George Inman
    The Proceedings of the Cambridge Historical Society, Volume 19, 1926 Volume Nineteen Table Of Contents Publishing Note PROCEEDINGS SEVENTY-THIRD MEETING.....................................................................5 ​ SEVENTY-FOURTH MEETING..................................................................7 SEVENTY-FIFTH MEETING......................................................................8 SEVENTY-SIXTH MEETING.....................................................................8 PAPERS CAMBRIDGE HISTORY IN THE CAMBRIDGE SCHOOLS.............................9 ​ BY LESLIE LINWOOD CLEVELAND THE RIVERSIDE PRESS........................................................................15 ​ ​ BY JAMES DUNCAN PHILLIPS EARLY GLASS MAKING IN EAST CAMBRIDGE.........................................32 ​ DORIS HAYES-CAVANAUGH LIEUTENANT GEORGE INMAN................................................................46 ​ MARY ISABELLA GOZZALDI REPORTS ANNUAL REPORT OF SECRETARY AND COUNCIL ..................................80 ANNUAL REPORT OF TREASURER.........................................................85 ANNUAL REPORT OF AUDITOR.............................................................86 REPORT OF THE COMMITTEE ON DESCENDANTS OF EARLY SET- TLERS OF CAMBRIDGE...................................................................88 OFFICERS..............................................................................................89 ​ MEMBERS..............................................................................................90
    [Show full text]
  • Horrid Henrys Rainy Day Ebook Free Download
    HORRID HENRYS RAINY DAY PDF, EPUB, EBOOK Francesca Simon,Tony Ross | 80 pages | 01 May 2012 | Hachette Children's Group | 9781444001136 | English | London, United Kingdom Horrid Henrys Rainy Day PDF Book The bridge he crossed during those walks is now officially known as the Longfellow Bridge. Steer clear of buying stocks for your rainy day fund. Topics fashion Rain Spring Style. How to Renovate. Indulge your nostalgia and rewatch some old favorite childhood throwbacks, whether it's a weird '90s Nickelodeon show, Twin Peaks the perfect rainy day vibe, if you ask me , or Casablanca. Knows maybe too much about pop culture. In fact, rainy days have a plethora of perks, like giving you the perfect excuse to get cozy and stay indoors. MyDomaine's Editorial Guidelines. Share Flipboard Email. BUY NoW. Thanks for letting us know! SELF does not provide medical advice, diagnosis, or treatment. Download a story online or write up your own plot and and characters to play with a group of friends. Sold by MuddyBootsHerbalTeas. Designate each room in your home to be a different region. That weird conspiracy you've always been secretly fascinated by? Treat Yourself to Some Grooming Whitening strips, self-waxing kits, manicure sets, the whole enchilada. Look out for your first newsletter in your inbox soon! This candle has it. Don't let a little drizzle keep you from an outdoor jog. The "day" is a metaphor for "life. Time Out says 2 out of 5 stars. Tea is always a great idea for rainy days, and this collection will help you get through the bad weather.
    [Show full text]
  • The Commonweakh of Massachusetts Mecutive Offrce Ofanergy Andenvironmentac~Lairs 100 Cam6ndge Street, Suite 900 Boston, MA 02114
    The Commonweakh of Massachusetts mecutive Offrce ofanergy andEnvironmentaC~lairs 100 Cam6ndge Street, Suite 900 Boston, MA 02114 Deval 1,. Patrick GOVERNOR Tel: (617) 626-1000 Timothy P. Murray LIEUTENANT GOVERNOR Fax: (617) 626-1 181 http://www.mass.gov/envir Ian A. Bowles SECRETARY May 15,2009 CERTIFICATE OF THE SECRETARY OF ENERGY AND ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM PROJECT NAME : Longfellow Bridge rehabilitation Project PROJECT MUNICIPALITY : Boston and Cambridge PROJECT WATERSHED : Boston harbor EEA NUMBER : 14384 PROJECT PROPONENTS : Massachusetts Highway DepartmentIDepartment of Conservation and Recreation DATE NOTICED IN MONITOR : March 25,2009 Pursuant to the Massachusetts Environmental Policy Act (MEPA) (G. L. c. 30, ss. 61- 621) and Section 1 1.06 of the MEPA regulations (30 1 CMR 1 1.00), I hereby determine that this project does not require the preparation of an Environmental Impact Report (EIR). Project Description As described in the Environmental Notification Form (ENF), the project entails the rehabilitation of the Longfellow Bridge. A primary goal of the proposed Project is to upgrade the bridge's structural capacity and meet modem codes. The Project concurrently seeks to ensure repairs and modifications of the bridge will be consistent with the historic character of the bridge. Restoration and rehabilitation of the bridge was chosen as the preferred method, rather than complete replacement. The Longfellow Bridge is one of the most architecturally and historically distinguished bridges in Massachusetts. The Longfellow Bridge (originally named the Cambridge Bridge), located on the site of the 1793 West Boston Bridge, was completed in 1908 and was renamed to EEA# 14384 ENF Certificate May 15,2009 honor Henry Wadsworth Longfellow in 1927.
    [Show full text]
  • Esplanade Cultural Landscape Report - Introduction 1
    C U L T U R A L L A N D S C A P E R E P O R T T H E E S P L A N A D E B O S T O N , M A S S A C H U S E T T S Prepared for The Esplanade Association 10 Derne Street Boston, MA 02114 Prepared by Shary Page Berg FASLA 11 Perry Street Cambridge, MA 02139 April 2007 CONTENTS Introduction . 1 PART I: HISTORICAL OVERVIEW 1. Early History (to 1893) . 4 Shaping the Land Beacon Hill Flat Back Bay Charlesgate/Bay State Road Charlesbank and the West End 2. Charles River Basin (1893-1928) . 11 Charles Eliot’s Vision for the Lower Basin The Charles River Dam The Boston Esplanade 3. Redesigning the Esplanade (1928-1950) . 20 Arthur Shurcliff’s Vision: 1929 Plan Refining the Design 4. Storrow Drive and Beyond (1950-present) . 30 Construction of Storrow Drive Changes to Parkland Late Twentieth Century PART II: EXISTING CONDITIONS AND ANALYSIS 5. Charlesbank. 37 Background General Landscape Character Lock Area Playground/Wading Pool Area Lee Pool Area Ballfields Area 6. Back Bay. 51 Background General Landscape Character Boating Area Hatch Shell Area Back Bay Area Lagoons 7. Charlesgate/Upper Park. 72 Background General Landscape Character Charlesgate Area Linear Park 8. Summary of Findings . 83 Overview/Landscape Principles Character Defining Features Next Steps BIBLIOGRAPHY. 89 APPENDIX A – Historic Resources . 91 APPENDIX B – Planting Lists . 100 INTRODUCTION BACKGROUND The Esplanade is one of Boston’s best loved and most intensively used open spaces.
    [Show full text]
  • 2 Leif Eriksson Statue on Commonwealth Avenue, C. 1892
    2 Historical Journal of Massachusetts • Summer 2021 Leif Eriksson Statue on Commonwealth Avenue, c. 1892 Eriksson stands above a dragon-headed boat which would have been the basin for a fountain. Source: Boston Public Library, Boston Pictorial Archive Collection– Mouton Photograph Company. 3 PHOTO ESSAY Vikings on the Charles: Leif Eriksson, Eben Horsford, and the Quest for Norumbega GLORIA POLIZZOTTI GREIS Editor’s Introduction: This colorful and intriguing photo essay traces how and why a statue of Norse explorer Leif Eriksson came to occupy a prominent place on Boston’s Commonwealth Avenue in 1877. A group of amateur archaeologists, scholars, and artists, all members of the Boston elite, fostered a growing interest in the theory that Leif Eriksson was the first European to reach North American shores hundreds of years before Columbus. Chemist Eben Horsford invented double-acting baking powder, a lucrative business venture which funded his obsessive interest in proving that Leif Eriksson played a much larger role in the establishment of European settlement on the continent. This photo essay follows his passionate, often misleading, and ultimately discredited contribution to the history of North America. Dr. Gloria Polizzotti Greis is the Executive Director of the Needham History Center and Museum. This is a slightly revised and expanded version of material that was first published on the museum's website.1 * * * * * Historical Journal of Massachusetts, Vol. 49 (2), Summer 2021 © Institute for Massachusetts Studies, Westfield State University 4 Historical Journal of Massachusetts • Summer 2021 At the far western end of Boston’s Commonwealth Avenue promenade, Leif Eriksson stands shading his eyes with his hand, surveying the Charlesgate flyover.
    [Show full text]
  • Longfellow Bridge Rehabilitation Task Force
    Longfellow Bridge Rehabilitation Task Force November 12, 2010 Luisa M. Paiewonsky, Division Administrator Massachusetts Department of Transportation - Highway Division 10 Park Plaza Boston, MA 02116-3933 Dear Administrator Paiewonsky With this letter, I am pleased to transmit the Longfellow Bridge Rehabilitation Task Force’s Final Recommendations to you. On behalf of the Longfellow Bridge Rehabilitation Task Force, I thank you and the MassDOT team for giving us the opportunity to provide input to the process. The Task Force members appreciate the hard work and effort offered by each other in working on these recommendations to the Massachusetts Department of Transportation for alternatives to be analyzed in the Environmental Assessment to be submitted to the Federal Highway Administration. We also recognize and appreciate the openness, flexibility, and transparency of MassDOT and its support team at Jacobs Engineering to consider new ideas and engage in open dialogue. And, we are also grateful for the support provided by the Massachusetts Office of Public Collaboration team throughout the task force’s work. These recommendations, while not legally binding, are evidence of our joint desire and goal to see the process move forward and the rehabilitation of the bridge take place in a timely fashion. The recommendations meet the interest of all stakeholders by presenting and analyzing a range of alternatives, as we seek to address the current and future needs of all users of the Longfellow Bridge. Task Force members will work to explain these recommendations within our own stakeholder communities. We will also work together to support and explain these recommendations to other stakeholders, regulators, the legislature and the Executive Branch to achieve their implementation.
    [Show full text]