The Corner That Could North Bank Bridge—Our

Total Page:16

File Type:pdf, Size:1020Kb

The Corner That Could North Bank Bridge—Our 11.14 making massachusetts more WalkaBle walk b By ken krauSe north Bank Bridge—our persistence paid off Sometimes successful advocacy means making sure you they were basically dooming these two new parks to very are in the right place at the right time. little use.” oston MassDOT officials were sympathetic, but said the holdup was simply due to lack of funding. Undeterred, Landman led a well-attended lunchtime walk in July 2005 to bring broader public attention to the significance of the “Lost Half Mile” in the Charles River Basin near the Zakim Bridge and the need for the promised bridges. Transportation, parks, environmental and elected officials, business and institutional representatives, local residents and commuters gathered for the walk at one of the “dead end” paths near the banks of the Charles. From there, Landman North Bank Bridge—Big Dig mitigation that almost didn’t happen. could easily point out how the bridges would link the nearby Museum of Science, Spaulding Hospital, North Early in her 10-year tenure as WalkBoston executive Point development in Cambridge, Paul Revere Park in director, Wendy Landman started attending meetings Charlestown and other destinations. of the New Charles River Basin Citizens Advisory Committee. Landman and committee members were A Boston Globe article on the morning of the walk concerned that three Charles River pedestrian bridges prompted the state Secretary of Environmental Affairs to promised in 1993 by the state as mitigation for the Big call WalkBoston and ask if he could attend, and an editorial Dig were still not constructed 12 years later. WalkBoston in the Boston Herald a few days later said constructing WalkBoston Boardi had long supported these plans for pedestrian/bicycle the bridge was “a promise that simply must be kept.” paths on both sides of the Charles River to connect the Joe Beggan David Black Then, timing again played a part. Cambridge, Charlestown and Esplanade park systems to Betsy Boveroux the Boston Harborwalk and the Rose Kennedy Greenway. Amy Branger “While we were able to push the North Bank Bridge Nina Cohen “There was a long list of things the state had committed project to the top of the agenda, what ultimately got it Whitney Dailey Joyce DiBona to do that were getting done, but the three Charles River built was that it was shovel-ready when ARRA (American Mark Favermann bridges kept getting pushed down the list,” Landman Recovery and Reinvestment Act) funds became Nina Garfinkle recalls. “It was a matter of reordering the priorities. available,” Landman says. Paula Gold WalkBoston took this on as our cause, and several other Ann Hershfang the north Bank Bridge was completed and opened Betsy Johnson stakeholder organizations joined in.” Karla Karash in July 2012, a testament to WalkBoston and citizens Matt Lawlor/president Joining the conversation from the perspective of walkers advisory committee energetic advocacy over seven years. Erik Lund/counsel and bicyclists, Landman had a practical and persuasive Jerry Pucillo The other two promised pedestrian bridges – at the Bill Reyelt argument for honoring the bridge commitments. “The MBTA commuter rail bridge and the South Bank Greg Rogers/treasurer state was spending hundreds of millions of dollars Linda Sharpe/vice president Bridge – still are being designed, but you can count on creating an incredible park system that essentially was Karen Cord Taylor WalkBoston to continue to be there to make sure they a set of dead ends,” she says. “The North Bank Bridge Emma Rothfeld Yashar/secretary become a reality as well. was absolutely the critical missing piece in the plan. contacts/committeesi Without the connection and with very limited access, executive director Wendy Landman By BoB Sloane staff Stacey Beuttell the old state house corner: the corner that could Julie DeMauro Dorothea Hass Boston’s Old State House, at the corner of State and A major shortcoming of these plans was where the Brendan Kearney Congress Streets, is known for its 1713 statues of the Freedom Trail passes the corner of the Old State House Barbara Maratos British symbols—the Lion and the Unicorn—installed with its heavily-used door that leads into the Blue Laura O’Rourke Robert Sloane up where the gable meets the roof. For some 200 years, and Orange Line T stations, a spot travelled daily by interns slow-moving horse and pedestrian traffic swirled around over 26,000 people, plus another 10,000 people on Sunny Menozzi it until the streets were transformed into traffic channels the Freedom Trail. For these 36,000 daily walkers, the Kasia Hart in the 20th century that surrounded a small island where sidewalk would still to be only 6 feet wide. advocacy a ring of stones commemorated the famous Boston Karla Karash Massacre of 1770 (an event that actually took place So, WalkBoston got involved. We drew up and presented communications further down State Street!). to the MBTA plans that would narrow streets and/or Nina Garfinkle eliminate curbside parking and put that space into wide development In 2011, the MBTA was planning to redesign this sidewalks. We also recommended a raised crosswalk Emma Rothfeld Yashar intersection as part of its improvements to the State T near the MBTA entrance. While our extravagant hopes newsletter editor Christine Giraud station. Their plans eliminated one roadway to create were not all adopted, we did manage to gain a sidewalk a commodious plaza for groups of tourists walking the widened to 10 feet at the squeezed MBTA exit location Freedom Trail. and a raised crosswalk. The MBTA’s plans called for 6-foot sidewalks on both For many, this would seem a small victory. But for the sides of the street, a 24-foot wide one-way street to 36,000 people a day here, it is a significant gain—of accommodate fire trucks and MBTA buses and a 7-foot which WalkBoston is quite proud. parking lane for MBTA deliveries/pickups. 1990-2015—wow! vision zero thank you! raceWalker Microsoft NERD Center CommuterChoice We will be celebrating our 25th Zero is the number of people Millennium Partners Copley Wolff Design anniversary throughout 2015. permitted to die in Swedish traffic, New Balance Crosby, Schlessinger, NStar Smallridge renew today—don’t miss any of according to national law. Pillars Plymouth Rock Edelstein & Company the celebrations. Your support of the Swedish model include the Sasaki Environmental Business continues to make our work pos- reduction of default speed limits Stantec Council of N.E. TEC Engineering Friends of PO Square sible! Stay tuned for our schedule and the expansion of automated striders The Collaborative Gilbane of walks, talks, and events across enforcement. On many city streets, Eaton Vance Toole Design Halvorson Design Massport Massachusetts—we hope to see the speed limit has dipped below TranSystems Harpoon Brewery Partners HealthCare Zipcar Jacobs Engineering Group you there. 20 miles per hour. In a departure Robinson & Cole LifePlans from most American traffic safety Trinity Financial amBlers McMahon Assoc. Vanasse Hangen Brustlin A Better City approaches, Swedish authorities Nitsch Engineering Alta Planning & Design Parsons Brinckerhoff have generally dismissed the effects strollers Architectural Heritage STV Boston Society of of education or enforcement on Foundation Transit Realty Assoc. Architects BETA Group URS pedestrian safety. “Design around DLA Piper Barrington Wright Assoc. the human as we are,” said Claes Eastern Bank Beth Israel Deaconess contriButors Epsilon Tingvall, the director of traffic Medical Center AAA Fay, Spofford & Thorndike BEVCO Assoc. ADD safety at the Swedish Transport Goody, Clancy BSC Group BR Alexander Administration and a godfather of Goulston & Storrs CBT Architects Cambridge Traffic, Parking HMFH Architects Cabot, Cabot & Forbes & Transportation the “Vision Zero plan.” HNTB Carol R. Johnson Directr New York Times 05/1/2014 HYM Investment Cecil Group Leers Weinzapfel Assoc. Howard/Stein-Hudson Cetrulo LLP Modell’s MassDevelopment communities. communities. environment and vibrant vibrant and environment cleaner a health, better Massachusetts to encourage encourage to Massachusetts walking safer and easier in in easier and safer walking makes WalkBoston mission www.walkboston.org info@walkboston.org info@walkboston.org F: 617.367.9285 617.367.9285 F: T: 617.367.9255 617.367.9255 T: walkboston.org/donate MA Boston, 02108 School Street School 45 ! today donate Please walk oston b 11.14 our successes TM By ChriStine Giraud teens and seniors shoot [speedguns] Why walk audits matter This October 25th, with support from the Tufts Health Plan Foundation, For years WalkBoston has been using the walk audit as a tool for Massachusetts WalkBoston held “Speed Gun Day,” a day where teenagers and seniors communities to analyze the state of walkability in their areas. A walk audit is measured street speeds throughout Brookline in order to make walking safer. used to assess the walking environment of a street, school environment, or neighborhood. It helps point out deficiencies such as missing sidewalks or Seniors and teens walk more than other people, according to WalkBoston. curb ramps, obstacles, and offers concrete solutions for improvement. Many teens walk because they are too young to drive or don’t have access to cars. Seniors often walk to stay in shape or because they’re worried about Fall River recently received a $10,000 grant as part of a collaboration driving safety. Nationally, the largest numbers of people killed or seriously between the MA Dept. of Public Health Mass in Motion and the MA Assoc. injured in crashes with cars fall into these two age groups. of Councils on Aging. Julie Kelly, who oversees the Fall River Mass in Motion program, and Pauline Gousie, Director of Fall River’s Council on Aging, used This past spring, WalkBoston used speed guns to measure average speeds the funds to assess conditions around the Niagara and Flint Senior Centers at 16 spots in Coolidge Corner.
Recommended publications
  • North Point: a Hidden Gem Walking Tour
    The Cambridge Pedestrian Committee presents: North Point Tour Map: MBTA Maintenance North Point: Facility A Hidden Gem END Saturday, June 20, 2015 10 8 11:00 am – 12:30 pm 9 Start: 11:00 am Lechmere Canal Park, at the gazebo behind the mall End: 12:30 pm, 24 East Street 6 (Off Monsignor O’Brien Hwy) ART Gilman Bridge 5 ST 4 3 Sponsored by: 7 2 1 Cambridgeside Galleria (Commuter Rail) 1/4 mile -or- 5 minutes walking N Data sources: OpenStreetMaps, Hubway (Rapid Transit) 1. Lechmere Canal 3. North Bank Bridge 5. Miller’s River 8. Twenty|20 Once a tidal estuary and considerably longer than it is today, the Miller’s River began being filled in to create land for railroad and industrial purposes during the 19th century. Today all that remains is the short, polluted water visible under the North Bank Bridge; underground portions are believed responsible for flooding in Somerville and East Cambridge. Developer HYM and Canyon-Johnson’s new residential building at NorthPoint. Attached to the north side of the 6. Lynch Family Skate Park building is the newly completed Brian P. Murphy Memorial Staircase, a pedestrian and bike connection to the adjacent Gilmore Bridge, providing a fast and convenient route to the Constructed in 1895 and named after an early local family, Opened in 2012 and also part of Big Dig mitigation, the Orange Line’s Community College station. the canal was part of an active seaport until the Charles North Bank Bridge is the first of three proposed bridges River Dam Bridge was built in 1910.
    [Show full text]
  • East Coast Greenway Webinar Presentation Fall 2020
    East Coast Greenway Connecting people to place, Maine to Florida greenway.org Thank you, REI! greenway.org Dennis: then … and now. greenway.org 1992: Greenway pioneers greenway.org Canadian border to the Florida Keys greenway.org The East Coast Greenway follows paths on land originally inhabited by Indigenous Native Americans Deerskin painting by Karen Harley, a Haliwa-Saponi Indian greenway.org Connecting local and regional trails together. The East Coast Greenway is just over 1/3 complete with over 1,000 miles of shared-use biking and walking paths, being linked together up and down the coast. greenway.org HQ Partners with local, state, and 6 Regional national agencies and Coordinators organizations to… Advocate, plan, and promote the development, stewardship, and public enjoyment the East Coast Greenway greenway.org Maine to Florida: 50 million visits greenway.org We connect urban and rural, north and south, along the most populated corridor of the United States. greenway.org The East Coast Greenway is more than a trail. greenway.org It’s active, equitable transportation. greenway.org It’s a gym, free and open to all. greenway.org It’s a community center. greenway.org It’s a tourism attraction, good for local business. greenway.org It’s a park, encouraging It’s a tourism environmental attraction stewardship. greenway.org It's infrastructure that tackles climate change. greenway.org Trail use has increased considerably during the COVID-19 pandemic. Exploregreenway.org your own backyard... ECG in Massachusetts Spine Route: 41% complete Comp. Route: 55% complete Check out: map.greenway.org Eastgreenway.org Coast Greenway in Boston Northern Strand Community Trail Gateway Park Path Encore Riverwalk North Bank Bridge Connect Historic Boston Charles River Bike Path Ferry to Provincetown greenway.org Boston greenway.org The Greenway in Boston is part of something much larger ..
    [Show full text]
  • 12-16-15 Design Public Hearing Minutes
    MEMODRANDUM To: Michael O’Dowd Date: December 28, 2015 Project Manager From: Elizabeth Flanagan HSH Project No.: 2013061.17 Howard Stein Hudson Subject: MassDOT Highway Division North Washington Street Bridge Replacement Project 25% Design Public Hearing Meeting Notes of December 16, 2015 Overview On December 16, 2015 members of the North Washington Street Bridge Replacement Project team from the City of Boston Department of Public Works, MassDOT Highway Division, Alfred Benesch & Company, and Rosales + Partners held the 25% Design Public Hearing at the West End Museum at 150 Staniford Street, Boston. The North Washington Street Bridge Replacement Project is being undertaken to replace the structurally deficient North Washington Street Bridge with a new structure that will provide improved vehicle, pedestrian, cycling, and boat navigation facilities while serving as a visual complement to the iconic Zakim Bridge. The project will also maintain flood control measures associated with the Charles River Locks which are just west of the bridge site. The purpose of the Design Public Hearing was to give the public the opportunity to become fully acquainted with the project’s proposed 25% design, and provide feedback for consideration by the project team. The meeting started with a presentation and was then opened up for public comments and questions. The presentation began with a welcoming statement and introductions by Michael O’Dowd of MassDOT. Next, Para Jayasinghe of the City of Boston DPW presented an outline of the purpose, history, and design guidelines of the project by, followed by a discussion of the architectural elements of the proposed bridge by Miguel Rosales of Rosales + Partners.
    [Show full text]
  • Everett-Boston BRT
    Everett-Boston BRT IMPLEMENTATION PLAYBOOK AUTHORS Ari Ofsevit Aileen Carrigan Julia Wallerce Michael Kodransky ACKNOWLEDGEMENTS The authors would like to thank Ulises Navarro, Jeff Rosenblum, Li Wei, Miranda Briseño, and Anna Wyner for providing valuable contributions. A special thanks also for careful reviews by Jim Aloisi, Sarah Lee, Kristiana Lachiusa, and Jay Monty of a previous version of this document. This work is made possible thanks to support from the Barr Foundation. Published in April 2021 CONTENTS EXECUTIVE SUMMARY 2 INTRODUCTION 8 1 OPERATIONS PLANNING Demand Analysis 16 Corridor and Network Development 23 Service Planning 24 Optimize System Speed and Capacity 29 Traffic Impact Analysis 30 Summary of Next Steps: Operations Planning 32 2 COMMUNICATIONS AND MARKETING Strategic planning for communications 33 Public Engagement 35 Marketing and Branding 37 Summary of Next Steps: Communications and Marketing 39 3 GOVERNANCE AND FINANCIAL PLAN Project Governance 40 Financing the BRT Corridor 42 Summary of Next Steps: Governance & Financial Plan 46 4 INFRASTRUCTURE PLAN Roadway and Station Configurations 47 Roadway Design 50 Intersections and Signals 58 Stations 61 Garages 66 Summary of Next Steps: Infrastructure Planning 68 5 TECHNOLOGY F l e e t 7 0 Fare System 72 Traffic Signal Control and TSP 73 Summary of Next Steps: Technology 74 6 INTEGRATION Multimodal Integration 75 Pedestrian Connections 77 Bicycle and Micromobility Connections 78 Transportation Demand Management (TDM) Strategies 79 Equitable Transit-Oriented Communities 82 Summary of Next Steps: Integration 87 REFERENCES 88 2 EXECUTIVE SUMMARY Good, reliable transit service is a baseline for livable, equitable communities and is essential to well- functioning cities and societies.
    [Show full text]
  • State Library of Massachusetts
    MASSACHUSETTS RIVERS AND WETLANDS MONTHS CALENDAR FOR 2014 MAY IS WETLANDS MONTH, and JUNE IS RIVERS MONTH! This calendar, covering river-and wetland-related events in Massachusetts from Saturday, April 26 to Sunday, July 6, has been compiled by the Mass. Department of Fish and Game’s Division of Ecological Restoration (DER) to provide you with the opportunity to participate in events in, on, along or about the rivers and wetlands of the Commonwealth. Take this opportunity to invite your friends, family, local leaders, legislators, and/or a favorite reporter to clean up, paddle, protect, enjoy and celebrate your favorite rivers, streams, salt marshes and freshwater wetlands, or experience new ones. Get some healthful exercise and spend time in nature in and/or along the Commonwealth’s many scenic waterways and marshes. The events below are listed in chronological order and are labeled with the Massachusetts river or watershed the activity takes place in or on. Many activities require reservations in advance. Please call/e-mail ahead to inquire about any restrictions, fees, rain dates or cancellations that may apply. Any questions should be directed to the event organizers at the contact phone numbers and/or e-mails provided for each listing. If you know of an event that is not yet listed on this Calendar but ought to be, send the info along to Russ Cohen at Russ.Cohen@state.ma.us, and he may be able to add it. You may also want to re-visit this Calendar from time to time to look for any newly-added events, updated info, etc.
    [Show full text]
  • Map Template
    St t ool Sch T o t J S ol S o h t t om ho 2 n S S LECHMERE e Sc c s s s s s s t s o o o o o r s o n n n n n n vi e n th ll W if a e p St 9 F N p a o r Lechmere North r n h a t e i Square h re c Point G r t G P o S l Common o c t S a i COMMUNITY t s n NORTH n S s t o s CHARLESTOWN r w M C d t i o COLLEGE ir S F N u r H h k o lt a d s i i T n r - POINT g A t P Aus h o v h u tin St e c e P r Thompson S v e p o W S o t L L L L L A L Square in s a a a a t e a w w w w w w EAST w B O’Neill Bunker r r r r l r e e e e vd P Memorial e Sem n n n in Hill a e Rink ary ch c c c c t g W c r A h id u t e e e e z CAMBRIDGE St Br e Ch S Momument e n re 93 a O Ct s p to o s l i l S S S o gh ilm h d S rd t t t t t L Graves ei G i t o S Lechmere L n C L Landing g Canal Park t Unio e Housing M o R n St n K N L u s o y t t g n S h n r a r R d t e s bbp .
    [Show full text]
  • Charles River Esplanade - New Basin Complex
    Massachusetts Department of Conservation and Recreation Bureau of Planning, Design & Resource Protection Resource Management Planning Program RESOURCE MANAGEMENT PLAN Charles River Esplanade - New Basin Complex Including the Charles River Lower and New Basins, and City Square Park February 2015 Cover Photo Hatch Memorial Shell Area on the Boston Esplanade Charles River Esplanade - New Basin Complex Including the Charles River Lower and New Basins, and City Square Park RESOURCE MANAGEMENT PLAN 2015 Charles D. Baker, Governor Karyn E. Polito, Lt. Governor Matthew A. Beaton, Secretary John P. Murray, Commissioner Resource Management Plans provide guidelines for management of properties under the stewardship of the Department of Conservation and Recreation (DCR). They are intended to be working documents for setting priorities, enabling the Department to adapt to changing fiscal, social and environmental conditions. The planning process provides a forum for communication and cooperation with park visitors, partners and the surrounding communities to ensure transparency in the DCR’s stewardship efforts. The parks within the Charles River Esplanade - New Basin Complex are among the most popular in the Commonwealth. They provide a variety of recreational opportunities, from scenic walks along the river, to bike rides along the 18-mile Dr. Paul Dudley White Bicycle Path, to taking in a summer concert at the Hatch Shell or in City Square Park. These parks are a common ground where people of widely different backgrounds meet. Intense boating activity makes the Lower Basin one of the nation’s great water parks. Each year the Charles River welcomes crew teams and rowers from around the world. The Lower Basin has a long tradition of public rowing and sailing programs.
    [Show full text]
  • Department of Conservation and Recreation Celebrates Opening of New Tennis and Basketball Courts at DCR’S North Point Park
    Mass.gov PRESS RELEASE Department of Conservation and Recreation Celebrates Opening of New Tennis and Basketball Courts at DCR’s North Point Park FOR IMMEDIATE RELEASE: 8/14/2019 Department of Conservation & Recreation MEDIA CONTACT Olivia Dorrance, Press Secretary Phone (617) 626-4967 (tel:6176264967) Online Olivia.K.Dorrance@state.ma.us (mailto:Olivia.K.Dorrance@state.ma.us) DCR Commissioner Leo Roy joins with state and local officials to celebrate the opening of the new tennis and basketball courts CAMBRIDGE — Today, in a continued effort to revitalize the New Charles River Basin area, the Department of Conservation and Recreation (DCR) joined EF Education First (EF) to celebrate the completion of new tennis and basketball courts at the agency’s North Point Park in the City of Cambridge. The $2.2 million project, known as the Viaduct Courts, was completed in partnership with EF and will provide residents and visitors with new outdoor recreational attractions that support a healthy, active lifestyle. “The new Viaduct Courts are an important urban recreation center for visitors of the New Charles River Basin and the City of Cambridge,” said Department of Conservation and Recreation Commissioner Leo Roy. “The Baker-Polito Administration is proud to hold strong public-private partnerships with organizations like EF that continue to support park improvements, encouraging residents and visitors to get outdoors and find themselves in a DCR park.” Details of the courts include: The full remediation of the site; The creation of a combined tennis and half basketball court; The installation of lighting; The creation of new approaches to the courts; and, The installation of associated site amenities, such as benches, and landscaping.
    [Show full text]
  • Selfie Scavenger Hunt About DCR Discover Your State Parks
    Selfie Scavenger Hunt About DCR Discover your state parks. The Department of Conservation and Thank you for your support of DCR. Can you find them all? Recreation (DCR) operates one of the With your partnership, we will continue most diverse park systems in the country this rich legacy—to preserve, protect Help DCR celebrate our 125th anniversary –overseeing 450,000 acres of parks, for- and promote our common wealth of nat- in State Parks! Take the Selfie Scavenger ests, beaches and pedestrian trails, wa- ural, cultural and recreational resources Hunt challenge and explore state parks tersheds, dams, and parkways— for the well-being of all. Discover Metropolitan within the Metropolitan Boston area of for the people. Massachusetts. Boston One hundred and twenty-five years ago, Get outside, locate the featured destination, DCR’s foundations began with the crea- take a selfie and share it on social media tion of a regional park system to pre- Celebrate 125 Years of SELFIE SCAVENGER HUNT #DCR125. serve our natural resources for the public Stewardship! as the city of Boston continued to ex- In this brochure, you will find 10 pictures (including the cover). Accompanying each pand. The first of its kind in the country, picture, you will find a written clue. All 10 the Metropolitan Park System was pictures were taken in a Metropolitan formed on June 3, 1893 with Beaver Brook Reservation as the first park Boston area DCR state park. acquired for all people of the Have fun discovering your state parks. Commonwealth to enjoy recreation and Find as many of these locations as you can.
    [Show full text]
  • Design and Construction of the North Bank Bridge
    4th INTERNATIONAL CONFERENCE DESIGN AND CONSTRUCTION OF THE NORTH BANK BRIDGE David GREENWOLD Simon FRYER Karl HAGLUND Principal Engineer Associate Director Project Manager, New Charles Ammann & Whitney Infrastructure – Bridge River Basin Boston, MA, USA Engineering Massachusetts Department of dgreenwold@ammann-whitney.com Buro Happold Ltd Conservation and Recreation London UK Boston, MA, USA Simon.Fryer@BuroHappold.com Karl.Haglund@state.ma.us Summary The North Bank Bridge is a 213 m long bridge being built as part of a new riverfront park in Boston and Cambridge, Massachusetts, USA. As part of a large scale restoration of the Charles River Basin, the project will transform a 60,000 m2 industrial site into inviting and vibrant parkland, while facilitating the flow of non-motorized traffic through this heavily travelled area. Ammann & Whitney designed a “sinusoidal bridge” for the highly constrained site which was conceptualized in cooperation with Buro Happold in a highly community oriented process. The tubular steel truss bridge features fibre reinforced polymer decking. Analysis of the bridge included a thorough investigation of lateral vibrations and global buckling. The project was initiated as a remediation measure for the Central Artery / Tunnel Project and was ultimately constructed with American Recovery and Reinvestment Act funds. Construction is distinguished by the collegial atmosphere and the Contractor’s efficient method of producing the irregular truss geometry. Keywords: footbridge; tubular; truss; lateral vibrations; global buckling; fibre reinforced polymer (FRP) 1. Background 1.1 Site History The Alster-damm in Hamburg made that city “one of the most beautiful in the world,” according to a Boston resident who in 1859 published an etching of the Alster River in a memorial addressed to the state legislature.
    [Show full text]
  • Technical Appendix
    TRANSIT COOPERATIVE RESEARCH PROGRAM Sponsored by the Federal Transit Administration TCRP REPORT 165 Transit Capacity and Quality of Service Manual Third Edition Transit Capacity and Quality of Service Manual, 3'd Edition CHAPTER 3 OPERATIONS CONCEPTS 1. User's Guide CONTENTS 2. Mode and Service Concepts 3. Operations Concepts 1. INTRODUCTION ........................................................................................................................ 3-1 4. Quality of Service How to Use This Chapter ................................................................................................................... 3-1 Concepts Other Resources .................................................................................................................................... 3-2 5. Quality of Service Methods 2. CAPACITY, SPEED, AND RELIABILITY .............................................................................. 3-3 6. Bus Transit Capacity Overview .................................................................................................................................................. 3-3 7. Demand-Responsive I Transit Capacity Concepts ................................................................................................................................ 3-4 8. Rail Transit Capacity Speed Concepts .................................................................................................................................. 3-10 9. Ferry Transit Capacity Reliability Concepts .........................................................................................................................
    [Show full text]
  • Section G Harvard Bridge to Longfellow Bridge
    Section G Harvard Bridge to Longfellow Bridge The reservation between the Harvard and Longfellow Bridges is one of the Cambridge. Improvements to this street should follow the reconstruction of South Bank. On the Boston side of the river, there are four pedestrian/bicycle overpasses most trafficked in the whole Basin. the intersection at Main and Third Streets. over Storrow Drive between the Harvard Bridge and the Longfellow Bridge. The overpasses at Fairfield Street and Dartmouth Street need better bicycle and pedestrian North Bank. Major improvements are planned for the path system along East of the crosswalks at Wadsworth Street, there is an existing pedestrian connections to Beacon Street. Both streets are one way for that block; however, bicycle Memorial Drive as part of DCR’s Memorial Drive Phase II project. For most of signal and crosswalks to facilitate access to the Longfellow Bridge. This demand is two-way. Counter-flow lanes should be considered in both directions. Further this section there will be a 10-foot, two-way, paved shared-use path adjacent crossing, however, is relatively far from the bridge itself. Wayfinding signage improvements to Fairfield and Dartmouth Streets will improve the connectivity to the river to the roadway with a separated, 6-foot stabilized aggregate path along the should be added to this area to direct path users to Longfellow Bridge and from the Back Bay neighborhood. river. Main Street. The Arthur Fielder foot bridge, built in 1953 and named after the famous Boston Pops Ames Street provides a connection to Kendall Square, the Sixth Street In the Spring of 2013, rehabilitation of the Longfellow Bridge began as part conductor, currently provides a vital pedestrian and bicycle connection between Pedestrian Walk, and East Cambridge.
    [Show full text]