The Department of Public Works and Highways (DPWH) Represented Building

Total Page:16

File Type:pdf, Size:1020Kb

The Department of Public Works and Highways (DPWH) Represented Building \+ Department of Public Works and Highways Contract ID : 20LC0157 Contract Name : Repair/Maintenance Of DENR Building CENRO Office Building - New Corella (Brgy. Magdum, Tagum City) and Brgy. Salvacion, Panabo City, Davao del Norte Location of the Contract = Davao del Norte ___-_--_-----------------------------------------------------------------------------------------------------------------------------------------____ CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS: This CONTRACT AGREEMENT, made this Jg= day of AUGUST and between: The GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES through the Department of Public Works and Highways (DPWH) represented herein by MINDA R. ROSLINDA, District Engineer, duly authorized for this purpose, with main office address at Kin. 48, Canocotan, Tagum City, hereinafter referred to as the "PROCURING ENTITY"; -and- CJEP Builders and Engineering Services, a single proprietorship, organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at 2/F, Rm. 202 Valgosons BIdg., City Hall Drive, Brgy. 2-A, Davao City represented herein by CATEVIL S. PLARISAN, Proprietor, duly authorized for this purpose, hereinafter referred to as the "CONTRACTOR;" WITNESSFTH: WHEREAS, the PROCURING ENITIY is desirous that the CONTRACTOR executes the Works under 20LC0157: Repair/Maintenance of DENR Building CENRO Office Building - New Corella (Brgy. Magdum, Tagum City) and Bngy. Salvacjon, Panabo City, Davao del Norie hereinafter called ``the Works," and the PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works at the calculated unit bid prices shown in the attached Bill of Quantities, or a total Contract price of One Million Two Hundred EightylThree Thousand Seven HLlnd]ied FortylFive Pesos and 59/100 (1,283,745,59) NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto agree as follows: 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority: a. This Contract Agreement b. Documents forming part of the Contract Agreement: _--------------------------------------------------------------------------------------------------------------------------------------------------..- DPWH-INFR-51-2016 Page 1 of 5 Depail:ment of Public Works and Highways Contract ID : 20LC0157 Colitract Name : Repair/Maintenance of DENR Building CENR0 Office Building -New Corella (Brgy. Magdum, Tagum City) and Brgy. Salvacion, Panabo Gty, Davao del Norte Location of the Contract : Davao del Norte _____-----------------------------------------------------------------------------------------------------------------------------------------------_ (1) Notice of Award (NOA) with the Contractor's signed ``conforme" (2) Contractor's Bid in the Form of Bid, including its Technical and Financial Proposals, as calculated by the Procuring Entity and conformed to by the Contractor through the NOA, (3) Bidding Documents with Bulletins (4) Specifications (5) Drawings (6) Special Conditions of Contract (SCC) (7) General Conditions of Contract (GCC) (8) Performance Security (9) Integrity Pledge under Department Order No. 86, series of 2013 (10) Other Documents (a) Construction Methods (b) Construction Schedule in the form of PERT/CPM Diagram or Precedence Diagram and Bar Chart with S-Curve, or other approved tools of project scheduling, and Cash Flow. (c) Manpower Schedule (d) Equipment Utilization Schedule (e) Construction Safety and Health Program initially approved by the Head of the Procuring Entity (f) Contractor's All Risk Insurance (CARI) 3. In consideration of the payments to be made by the PROCURING ENITIY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTm/ to execute and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all respects. 4. In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTITY hereby covenants to pay the CONTRACTOR the unit prices in the CONTRACTOR's Calculated Bid, as applied to the actual quantities accomplished as certified by the PROCURING ENITIY under the provisions of this CONTRACT AGREEMENT, at the times and in the manner prescribed by this CONTRACT AGREEMENT. Page 2 Of 5 DPWH-INFR-51-2016 Department of Public Works and Highways Contract ID = 20LC0157 Contract Name : Repair/Maintenance of DENR Building CENRO Office Building -New Corella (Brgy. Magdum, Tagum City) and Brgy. Salvacion, Panabo City, Davao del Norte Location of the Contract : Davao del Norte The following items and quantities are included in the scope of work: Item ke. De5argiv Lfro± unanfty ufroft prLe {?I Total -t (?) PAVE OTi+ER ffiMERAL REquFtERE]rTs 8.5 Project Bjllhoard and Signboard Each 3.00 4,400.00 13,200.00 a.7(2) OccLipatimal Safety and Hearth Program L5 1,00 46,769.25 46,769.25 a.9 Mobilization and Demobilization Ls 1.00 5,500.00 5,500.00 PAT Ill trm. Reel+ArmcAL, ELECTRICAL A«i] sAiuTAFLy/ mLLrmmG w\ORics I,rm A EARTTWV- Removal of StructLires and Obstruction (jnclLidjng DENRPanabo) 801(1) Ls i.00 71,500.00 71.500.00 Puma fljLDi Arm REINFORffD OO«enETE v«mrs 903(2) Formworks and Fal5eworke Sq.in. 72.02 649.51 +A JT' `J\ PART C F-REVy- 1018(1) Ceramic Tiles Sq.in. 100.00 I,332.43 133,243.00 6mm Ordinary Plywood on Metal Frame Cejljng 1003(1) Sq.in. 162.1 /lnaludino DENR Panabel 1,211.13 q96,348.3 1032[1)a painting Works ' Masonry 5q.in. 184.00 439.34 80,838.5 1032(1)b Paintjng Works - Wood (including DENR Panabo) Sq.in. 197. 259.02 51,254.8 1032(I)t Painting Works - Metal Sq.in. 120.24 347.55 41,789.41 1010(1) Frames (Door Jambs) set 9.00 5,041.6 45,375.03 1010(2to Doors (Fltrsh) Sq-in. 13.23 2,823.58 37,355.96 10|Oi2)b Door (Wood Panel) Sq.in. 9.4 5.936.51 56,100.01 1008 (1)b AluminLlm Glass Window (Casement) Sq.in. 70.00 1,728.57 120,999.90 1013(1) Cormgated Metal Roofing (incliiding DENR Panaha) 5q.in. 120.00 924.00 110,880.00 1001(8) Sewer/Sanitary Line Works Ls 1.00 21,197.00 21,197.00 1001(9) Storm Dri]iriage and Downspout Le 1.00 1g,640.sO 19,640.50 1002(4) Plumbing Fixtures Ls I.00 65,076.00 65,076.00 PJur I ELECTFucAL v«mirs Conduits, Boxes & Ftings (Conduit Works/Conduit 1100(11.) L5 1.00 31,900.00 F`out]h-int (jndudina DENR Pan@be\ 31,goo.00 1101[33) VI/ires and Wi frog Devices (incltiding DENR Panabo) Ls 1.00 48,1SO.00 48,180.00 1103(1) Lighting Fixtures Lamps (including DENR P@nabo) L5 1.00 39,820.00 39,82o.un I.283.745.59 5, The CONTRACTOR warrants that he has not given nor promised to give any money or gift to any employees of the ENTITY (or any Philippine Government lnstrumentally) to secure the contract. 6. The CONTRACTOR shall pay taxes in full and on time and that failure to do so will entitle the Government to suspend payment for the services delivered by the contracting party. 7. The CONTRACTOR shall likewise regularly present within the duration of the contract, tax clearance from BIR as well as a copy of its income and business tax returns duly stamped and received by the BIR and duly validated with tax payments made thereon, 8. The CONTRACTOR shall comply with a valid instruction of the ENTITY and proceed expeditiously and without delay, however, a slippage of more than 30 days from the original schedule due to the fault of the former would result a non-payment, cancellation of contract, blacklisting of the erring contractor and the entry of new contractor who will finish the project. DPWH-INFR-51-2016 Page 3 of 5 Department of Public Works and Highways Contract ID : 20LC0157 Contract Name : Repair/Maintenance of DENR Building CENRO Office Building -New Corella (Brgy. Magdum, Tagum City) and Brgy. Salvacion, Panabo City, Davao del Norte Location of the Contract : Davao del Norte ACKNOWLEDGEMENT REPUBLIC OF THE PHILPPINES) BEFORE ME, as the Notary Public for and within the Gty of Tagum, personally appeared: NAME COMM. TAX CERT. NO. DATE/PLACE ISSUED MINDA R. ROSLINDA 30623458 January 24, 2020 - Nabunturan District Engineer CATEVIL S. PLARISAN 08852113 January 08, 2020 - Davao City Proprietor Known to me to be the same person who executed the foregoing instrument which consists of five (5) pages, including this page, on which this Acknowledgement is written and acknowledged to me that the same is their free and voluntary act and deed. WITNESS MY HAND AND SEAL, this 12th AIIGur 2020 in the City of Tagum, Philippines. Notary Public: ATTY. W !i n!J S. TIMBO[ I.I-'`;,. L'Lic Doc. No" qtl UNTIL ECEl^[iER 31, 202. lTR No. 2711120; r) 1-02-20; T.C. Page NO.. r`Oii NO, 4354€` T!N,,918-139-24. IBP OR No.10?iJ,1: r)1 -03-2.20: MNI Book Nol MCLE CoMPLI^NCE No. virooi23i; 11-21-i® Series of 2020 DPWH-INFR~51-2016 Page 4 of 5 Department Of Pub`\c Vvorks and VAghwaLvs Contract ID : 20LC0157 Contract Name : Repair/Maintenance of DENR Building CENRO Office Building -New Corella (Brgy. Magdum, Tagum City) and Brgy. Salvacion, Panabo City, Davao del Norte Location of the Contract : Davao del Norte _._._._..-...._-----------------------------------------------------.---------------------------------------------..-----...-...---.----------__-__-_ IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, month and year first above written. PROCURING ENTITY: CONTRACTOFL: Represented by: Represented by: Witnessed by: LEONARD F. CARTAGENA Accountant Ill _._-.'....-.---.-----------------------------------------------------------------.------------------------------------------------------------..------ DPWH-INFR-51-2016 Page 5 of 5 Special Conditions of the Contract GCC Clause 1.19 The Intended Completion Date is December 15, 2020 The Procuring Entity: Department of Public Works and Highways, Davao 1.24 del Norte District Engineering Office, Tagum City The Procuring Entity's Representative: Minda R.
Recommended publications
  • Nd Drrm C Upd Date
    NDRRMC UPDATE Sitrep No. 15 re: Effects of Tropical Depression “AGATON” Releasing Officer: USEC EDUARDO D. DEL ROSARIO Executive Director, NDRRMC DATE : 19 January 2014, 6:00 AM Sources: PAGASA, OCDRCs V,VII, IX, X, XI, CARAGA, DPWH, PCG, MIAA, AFP, PRC, DOH and DSWD I. SITUATION OVERVIEW: Tropical Depression "AGATON" has moved southeastward while maintaining its strength. PAGASA Track as of 2 AM, 19 January 2014 Satellite Picture at 4:32 AM., 19 January 2014 Location of Center: 166 km East of Hinatuan, Surigao del Sur (as of 4:00 a.m.) Coordinates: 8.0°N 127.8°E Strength: Maximum sustained winds of 55 kph near the center Movement: Forecast to move South Southwest at 5 kph Monday morninng: 145 km Southeast of Hinatuan, Surigao del Sur Tuesday morninng: Forecast 87 km Southeast of Davao City Positions/Outlook: Wednesday morning: 190 km Southwest of Davao City or at 75 km West of General Santos City Areas Having Public Storm Warning Signal PSWS # Mindanao Signal No. 1 Surigao del Norte (30-60 kph winds may be expected in at Siargao Is. least 36 hours) Surigao del Sur Dinagat Province Agusan del Norte Agusan del Sur Davao Oriental Compostela Valley Estimated rainfall amount is from 5 - 15 mm per hour (moderate - heavy) within the 300 km diameter of the Tropical Depression Tropical Depression "AGATON" will bring moderate to occasionally heavy rains and thunderstorms over Visayas Sea travel is risky over the seaboards of Luzon and Visayas. The public and the disaster risk reduction and management councils concerned are advised to take appropriate actions II.
    [Show full text]
  • Top 15 Lgus with Highest Poverty Incidence, Davao Region, 2012)
    Table 1. City and Municipal-Level Small Area Poverty Estimates (Top 15 LGUs with Highest Poverty Incidence, Davao Region, 2012) Rank Province Municipality Poverty Incidence (%) 1 Davao Occidental Jose Abad Santos (Trinidad) 75.5 2 Davao Occidental Don Marcelino 73.8 3 Davao del Norte Talaingod 68.8 4 Davao Occidental Saragani 65.9 5 Davao Occidental Malita 60.8 6 Davao Oriental Manay 58.1 7 Davao Oriental Tarragona 56.9 8 Compostela Valley Laak (San Vicente) 53.8 9 Davao del Sur Kiblawan 52.9 10 Davao Oriental Caraga 51.6 11 Davao Occidental Santa Maria 50.7 12 Davao del Norte San Isidro 43.2 13 Davao del Norte New Corella 41.6 14 Compostela Valley Montevista 40.2 15 Davao del Norte Asuncion (Saug) 39.2 Source: Philippine Statistics Authority Note: The 2015 Small Area Poverty Estimates is not yet available. Table 2. Geographically-Isolated and Disadvantaged Areas (GIDAs) PROVINCE/HUC CITY/MUNICIPALITY BARANGAYS Baganga Binondo, Campawan, Mahan-ob Boston Caatihan, Simulao Caraga Pichon, Sobreacrey, San Pedro Cateel Malibago Davao Oriental Gov. Generoso Ngan Lupon Don Mariano, Maragatas, Calapagan Manay Taokanga, Old Macopa Mati City Langka, Luban, Cabuaya Tarragona Tubaon, Limot Asuncion Camansa, Binancian, Buan, Sonlon IGaCoS Pangubatan, Bandera, San Remegio, Libertad, San Isidro, Aundanao, Tagpopongan, Kanaan, Linosutan, Dadatan, Sta. Cruz, Cogon Davao del Norte Kapalong Florida, Sua-on, Gupitan San Isidro Monte Dujali, Datu Balong, Dacudao, Pinamuno Sto. Tomas Magwawa Talaingod Palma Gil, Sto. Niño, Dagohoy Laak Datu Ampunan, Datu Davao Mabini Anitapan, Golden Valley Maco Calabcab, Elizalde, Gubatan, Kinuban, Limbo, Mainit, Malamodao, Masara, New Barili, New Leyte, Panangan, Panibasan, Panoraon, Tagbaros, Teresa Maragusan Bahi, Langgawisan Compostela Valley Monkayo Awao, Casoon, Upper Ulip.
    [Show full text]
  • Chapter 5 Improved Infrastructure and Logistics Support
    Chapter 5 Improved Infrastructure and Logistics Support I. REGIONAL DEVELOPMENT CHALLENGES AND OPPORTUNITIES Davao Region still needs to improve its infrastructure facilities and services. While the Davao International Airport has been recently completed, road infrastructure, seaport, and telecommunication facilities need to be upgraded. Flood control and similar structures are needed in flood prone areas while power and water supply facilities are still lacking in the region’s remote and underserved areas. While the region is pushing for increased production of staple crops, irrigation support facilities in major agricultural production areas are still inadequate. Off-site infrastructure in designated tourism and agri-industrial areas are likewise needed to encourage investment and spur economic activities. Accessibility and Mobility through Transport There is a need for the construction of new roads and improvement of the existing road network to provide better access and linkage within and outside the Region as an alternate to existing arterial and local roads. The lack of good roads in the interior parts of the municipalities and provinces connecting to major arterial roads constrains the growth of agriculture and industry in the Region; it also limits the operations of transport services due to high maintenance cost and longer turnaround time. Traffic congestion is likewise becoming a problem in highly urbanized and urbanizing areas like Davao City and Tagum City. While the Region is physically connected with the adjoining regions in Mindanao, poor road condition in some major highways also hampers inter-regional economic activities. The expansion of agricultural activities in the resettlement and key production areas necessitates the opening and construction of alternative routes and farm-to-market roads.
    [Show full text]
  • Region XI 19,322,368,000 750 Projects
    Annual Infrastructure Program Revisions Flag: (D)elisted; (M)odified; (R)ealigned; (T)erminated Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Region XI 19,322,368,000 750 projects GAA 2016 MFO-1 10,337,257,000 156 projects Compostela Valley District Engineering Office 4,600,043,000 172 projects COMPOSTELA VALLEY (FIRST DISTRICT) Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary 165003014600116 Montevista-Compostela-Mati Bdry Rd - K1456+200 - K1456+240, P00006583MN-CW1 Construction of Road Square meters 1,360 13,000,000 Compostela Valley District K1456+400 - K1456+450, K1456+500 - K1456+560, K1456+600 - Slope Protection Engineering Office / K1456+700, K1456+900 - K1456+922 - Construction of Road Slope Structure Compostela Valley District Protection Structure Engineering Office 165003014600117 Montevista-DNAS Rd - K1423+010 - K1423+078, K1423+400 - K1423 P00006594MN-CW1 Construction of Road Square meters 464 6,300,000 Compostela Valley District +448 - Construction of Road Slope Protection Structure Slope Protection Engineering Office / Structure Compostela Valley District Engineering Office Network Development - Improvement/Widening of National Roads - Primary 165003015000068 Daang Maharlika (MN) - K1396+242 - K1397+120, K1398+251 - P00005063MN-CW1 Road Widening Lane Km 8.756 130,375,000 Region XI / Region XI K1401+770, including RROW - Road
    [Show full text]
  • PHI-OCHA Logistics Map 04Dec2012
    Philippines: TY Bopha (Pablo) Road Matrix l Mindanao Tubay Madrid Cortes 9°10'N Carmen Mindanao Cabadbaran City Lanuza Southern Philippines Tandag City l Region XIII Remedios T. Romualdez (Caraga) Magallanes Region X Region IX 9°N Tago ARMM Sibagat Region XI Carmen (Davao) l Bayabas Nasipit San Miguel l Butuan City Surigao Cagwait Region XII Magsaysay del Sur Buenavista l 8°50'N Agusan del Norte Marihatag Gingoog City l Bayugan City Misamis DAVAO CITY- BUTUAN ROAD Oriental Las Nieves San Agustin DAVAO CITY TAGUM CITY NABUNTURAN MONTEVISTA MONKAYO TRENTO SAN FRANS BUTUAN DAVAO CITY 60km/1hr Prosperidad TAGUM CITY 90km/2hr 30km/1hr NABUNTURAN MONTEVISTA 102km/2.5hr 42km/1.5hr 12km/15mns 8°40'N 120km/2.45hr 60km/1hr 30km/45mns. 18kms/15mns Claveria Lianga MONKAYO 142km/3hr 82km/2.5hr 52km/1.5hr 40km/1hr 22km/30mns Esperanza TRENTO SAN FRANCISCO 200km/4hr 140km/3 hr 110km/2.5hr 98km/2.hr 80km/1.45hr 58km/1.5hr BUTUAN 314km/6hr 254km/5hr 224km/4hr 212km/3.5hr 194km/3hr 172km/2.45hr 114km/2hr l Barobo l 8°30'N San Luis Hinatuan Agusan Tagbina del Sur San Francisco Talacogon Impasug-Ong Rosario 8°20'N La Paz l Malaybalay City l Bislig City Bunawan Loreto 8°10'N l DAVAO CITY TO - LORETO, AGUSAN DEL SUR ROAD DAVAO CITY TAGUM CITY NABUNTURAN TRENTO STA. JOSEFA VERUELA LORETO DAVAO CITY 60km/1hr Lingig TAGUM CITY Cabanglasan Trento 90km/2hr 30km/1hr NABUNTURAN Veruela Santa Josefa TRENTO 142km/3hr 82km/2.5hr 52km/1.5hr STA.
    [Show full text]
  • 2. Laiza Mae O. Colobong Talaingod 3
    Republic of the PhiliptirEs Departmcnt of Health REGX)XAL OCFlcE N DOH Compoun4 lP larel Are., Eajada, Davao Oty TrunHin€s: +63 (82) 3O&1q13, 3Grllo/r, 1E1906r 277 1O7r, 227146?; Fu, 221-6320 email ddtllAnoernJl@n uebsite ww..ol,.ddr€o.far May 8, 2018 RO XI PERSONNEL ORDER r,lo.2or8 - it-11'{ -F SUBJECT: AUTHORIW OF THE FOLLOWNG HRH PERSONNEL TO ATTEND THE TRA]NING ON COMMUNITY TANAGEMENT ON ACUTE MALNUTRMON BY BATCH IN TAGUM CITY, DAVAO DEL NORTE FROM MAY 21.23; MAY 23-25, AND MAY 29-31,2018. The following HRH Personnel are heEby authorized to attend the Community Management on Acute Malnutrition (CMAM) on the following dates: Date of Traininq Name of HR Place of Assi0nment May21-23,2018 (32) 1. t{oleven C. Anosas Talaingod 2. Laiza Mae O. Colobong Talaingod 3. Ann H. Filipinas Talaingod 4. Jeyson C. Gonato Talaingod 5. Lodrita L. Mercado Talaingod 6. Norhaina R. Salipoden Talaingod 7. Anna Marie P. Bacano Panabo City 8. Abigail L. Balladares Panabo City 9. Mark Gregor Barcena Panabo Clty 10. Lalin M. Bamido Panabo City 1 1. Bryan Roger Q. Bemaldez Pambo City 12. Mcenta L. Bifian Panabo City 13. Mary Grace S. Abrina New Corella 14. Angelie D. Arafias New Corella 15. Loriza Jane D. Baco New Corella 16. Doris C. Bercilla New Corella 17. Jonna Kissmet A. Calio New Corela 18. Ana Marie O. Comidoy New Corella '19. Mariam Jamila l. Dolorican New Corella 20. Manielyn O. Durang New Corella 21. Mary Grace P. Embalsado New Corella 22. Leuna Faula L.
    [Show full text]
  • Sitecode Region Penro Cenro Barangay Municipality Name of Organization Contact Person Commodity Hectares
    AREA IN SITECODE REGION PENRO CENRO BARANGAY MUNICIPALITY NAME OF ORGANIZATION CONTACT PERSON COMMODITY HECTARES Ancestral Domain Tribal Farmers Bamboo, Cacao, Fruit XI Compostela Valley Monkayo Upper Ulip Monkayo Association Mauricio Latiban Trees, Rubber, Timber 75 Barangay Tribal Council of Elders & Leaders Cacao, Fruit Trees, XI Compostela Valley Monkayo San Jose Monkayo of San Jose (BTCEL San Jose) Romeo Capao Rubber, Timber 50 Camanlangan Tree Growers Association Cacao, Fruit Trees, XI Compostela Valley Monkayo Camanlangan New Bataan (CATREGA) Ruperto Sabay Sr. Timber 50 Cacao, Fruit Trees, XI Compostela Valley Monkayo Casoon Monkayo Casoon Tree Farmers Association (CATFA) Gavino Ayco Timber 80 Dalaguete Lebanon San Vicente Montevista Watershed Farmers Association Cacao, Fruit Trees, XI Compostela Valley Monkayo Lebanon Montevista (DALESANMWFA) Martiniano Paniamogan Timber 37 XI Compostela Valley Monkayo Ngan Compostela Kapwersa Comval Agricultural Cooperative Alejandro Cacao, Timber 50 Magangit Upland Farmers Association Cacao, Fruit Trees, XI Compostela Valley Monkayo Fatima New Bataan (MAUFA) Clemente T. Nabor Timber 50 Mangayon Indigenous People and Farmers Cacao, Fruit Trees, XI Compostela Valley Monkayo Mangayon Compostela Association (MIPFA) Timber 70 Maragusan Waterworks & Sanitation Bamboo, Cacao, Fruit XI Compostela Valley Monkayo Poblacion Maragusan Cooperative (MAWASCO) Cesar Escuadro Trees, Timber 100 Mayaon Upland Small Farmers Association Bamboo, Cacao, Fruit XI Compostela Valley Monkayo Mayaon Montevista (MUSFA)
    [Show full text]
  • Tagum-Liboganon River Basin Tagum
    RIVER BASIN CONTROL OFFICE FFoorrmmuullaattiioonn ooff IIn ntteeggrraatteedd RRiivveerr BBaassiinn MMaannaaggeemmeenntt aanndd DDeevveellooppmmeenntt MMaasstteerr PPllaann ((IIRRBBMMDDMMPP)) for Tagum-Libuganon River Basin for Tagum-Libuganon River Basin INAL EPORT FFINAL RREPORT VVOLUME II EEXECUTIVE SSUMMARY November 2016 November 2016 Table of Contents Formulation of an Integrated River Basin Management and Development Master Plan for Tagum-Libuganon River Basin TABLE OF CONTENTS 1.0 RATIONALE ........................................................................................................ 2 2.0 PROJECT OBJECTIVE/S ................................................................................... 2 3.0 THE STUDY AREA ............................................................................................. 3 4.0 SECTORAL PER THEMATIC AREA .................................................................. 6 4.1 Integrated Watershed Management ........................................................... 6 4.2 Biodiversity Conservation .......................................................................... 6 4.3 Water Resources ....................................................................................... 7 4.4 River and River Delta Management ........................................................... 8 4.5 Flood Control, Disaster Risk Reduction and Hazard Management, and Climate Change Adaptation and Mitigation ......................................... 9 4.6 Coastal and Aquatic Resources Management ..........................................
    [Show full text]
  • Republic of the Philippines
    Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO DEL NORTE DISTRICT ENGINEERING OFFICE Region XI Tagum City INVITATION TO BID No. 2020-019 The Department of Public Works and Highways -Davao del Norte District Engineering Office, Tagum City, Davao del Norte, through its Bids and Awards Committee (BAC), invites contractors to submit bids for the following Contract; 1 Procurement ID/Contract ID 20LC0111 Contract Name Jct. Tagum City Bypass Road – San Agustin – New Bohol, New Corella, leading to Matin-ao Inland Resort, New Corella, Davao del Norte Contract Location New Corella, Davao del Norte Brief Description Concreting of Road Approved Budget for the Contract ( ABC ) Php. 2,940,000.00 Source of Fund CY 2020 DOT-DPWH Convergence Program Contract Duration 38 CD 28 C.D. Workable Days 10 C.D. Unworkable Days Cost of Bid Documents 5,000.00 Range of PCAB License Small B 2 Procurement ID/Contract ID 20LC0042 Contract Name Locutan Bridge 1 (B00190MN) along Tagum – Panabo Circumferential Rd. Contract Location Davao del Norte Brief Description Concreting of Road Approved Budget for the Contract ( ABC ) Php. 4,213,020.00 Source of Fund CY 2020 Regular Infrastructure Program Contract Duration 38 CD 27 C.D. Workable Days 11 C.D. Unworkable Days 180 CD 95 C.D. Workable D C.D. Unworkable Cost of Bid Documents 5,000.00 Range of PCAB License Small B 3 Procurement ID/Contract ID 20LC0043 Contract Name Tanglaw Bridge 2 (B00187MN) along Tagum – Panabo Circumferential Rd. Contract Location Davao del Norte Brief Description Concreting of Road Approved Budget for the Contract ( ABC ) Php.
    [Show full text]
  • 2016 2015 2014 October 2018 September 2018 October 2017
    October September October PRICE INDICES (2012 = 100) 2018 2018 2017 Consumer Price Index 122.0 121.0 114.3 Food 119.7 118.1 113.9 Non-Alcoholic Beverages 131.9 130.9 112.5 Alcoholic Beverages 139.4 139.0 130.1 Tobacco 196.8 196.4 155.5 Clothing and Footwear 129.7 129.1 123.9 Housing, Water, Electricity, Gas and Other Fuels 125.9 126.2 115.9 Furnishings, Household Equipment and Maintenance of the House 118.2 117.9 114.3 Health 126.0 125.0 113.2 Transport 109.3 108.0 98.8 Communication 102.0 102.0 101.5 Recreation and Culture 121.8 121.4 116.9 Education 118.3 118.3 127.2 Restaurant and Miscellaneous Goods and Services 125.1 124.2 119.5 Inflation Rate 6.7 6.2 3.8 Purchasing Power of the Peso 0.82 0.83 0.87 GEOGRAPHY (Source: Philippine Statistics Authority) 2016 2015 2014 Number of Component Cities 3 3 3 Number of Municipalities 8 8 8 Number of Barangays 223 223 223 October September October VITAL DOCUMENTS REGISTERED(Source: Vital Statistics Report) 2018 2018 2017 Total Births 2606 2222 2360 Asuncion 67 55 75 Braulio E. Dujali 8 9 10 Carmen 165 174 198 Island Garden City of Samal (IGaCoS) 186 145 177 Kapalong 342 300 255 New Corella 27 37 34 City of Panabo 337 272 320 San Isidro 10 13 14 3/F F.A. Laingo Development Corp. Bldg., Bonifacio St. cor. Quezon St., City of Tagum, Davao del Norte ●Telephone Number: (084) 655-9599 ● Telefax: (084) 655-9600; (084) 655-9605 ● E-mail Address: [email protected] Page 1 of 7 Continuation of Birth Santo Tomas 103 109 89 City of Tagum 1321 1054 1123 Talaingod 40 54 65 Total Marriages 582 597 418 Asuncion 18 77 14 Braulio E.
    [Show full text]
  • DSWD DROMIC Report #3 on the Landslide and Flooding Incident in Davao Region As of 22 February 2021, 6PM
    DSWD DROMIC Report #3 on the Landslide and Flooding Incident in Davao Region as of 22 February 2021, 6PM SUMMARY Issued at 2:00 PM, 14 February 2021, Moderate to at times heavy rainshowers with lightning and strong winds due to thunderstorms are expected over North Cotabato, Davao del Norte, Sulu, Lanao del Norte. Source: DOST-PAGASA I. Status of Affected Families / Persons A total of 18,201 families or 90,891 persons were affected by the flooding incident in 39 barangays in Davao Region (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 39 18,201 90,891 REGION XI 39 18,201 90,891 Davao del Norte 33 18,122 90,584 Braulio E. Dujali 4 1,212 6,060 Carmen 11 9,795 48,975 Kapalong 4 54 217 New Corella 2 131 682 Santo Tomas 10 6,753 33,765 Talaingod 2 177 885 Davao del Sur 6 79 307 Davao City 6 79 307 Note: Ongoing assessment and validation being conducted. Source: DSWD-FO XI II. Status of Displaced Families / Persons Inside Evacuation Center There were 289 families or 1,392 persons took temporary shelter in nine (9) evacuation centers in Davao Region (see Table 2). Table 2. Number of Displaced Families / Persons Inside Evacuation Centers NUMBER OF NUMBER OF DISPLACED EVACUATION INSIDE ECs REGION / PROVINCE / MUNICIPALITY CENTERS (ECs) Families Persons CUM NOW CUM NOW CUM NOW GRAND TOTAL 9 - 289 - 1,392 - REGION XI 9 - 289 - 1,392 - Davao del Norte 4 - 220 - 1,100 - Santo Tomas 3 - 199 - 995 - Talaingod 1 - 21 - 105 - Davao del Sur 5 - 69 - 292 - Davao City 5 - 69 - 292 - Note: Ongoing assessment and validation being conducted.
    [Show full text]
  • 2010 Census of Population and Housing Compostela Valley
    2010 Census of Population and Housing Compostela Valley Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population COMPOSTELA VALLEY 687,195 COMPOSTELA 81,934 Bagongon 1,946 Gabi 3,891 Lagab 2,586 Mangayon 4,403 Mapaca 2,082 Maparat 3,445 New Alegria 3,262 Ngan 7,738 Osmeña 4,753 Panansalan 906 Poblacion 26,773 San Jose 5,114 San Miguel 7,354 Siocon 3,266 Tamia 2,621 Aurora 1,794 LAAK (SAN VICENTE) 70,856 Aguinaldo 4,151 Banbanon 1,352 Binasbas 1,127 Cebulida 1,797 Il Papa 1,189 Kaligutan 2,902 Kapatagan 4,461 Kidawa 2,050 Kilagding 2,012 Kiokmay 1,379 Langtud 2,896 Longanapan 2,334 Naga 1,249 Laac (Pob.) 7,150 San Antonio 2,426 National Statistics Office 1 2010 Census of Population and Housing Compostela Valley Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Amor Cruz 2,675 Ampawid 2,633 Andap 1,745 Anitap 505 Bagong Silang 1,063 Belmonte 1,212 Bullucan 1,229 Concepcion 1,114 Datu Ampunan 1,145 Datu Davao 1,031 Doña Josefa 894 El Katipunan 1,140 Imelda 1,996 Inacayan 1,077 Mabuhay 2,298 Macopa 707 Malinao 711 Mangloy 1,299 Melale 1,701 New Bethlehem 601 Panamoren 911 Sabud 1,211 Santa Emilia 1,438 Santo Niño 1,120 Sisimon 925 MABINI (DOÑA ALICIA) 36,807 Cadunan 3,988 Pindasan 5,524 Cuambog (Pob.) 6,016 Tagnanan (Mampising) 4,735 Anitapan 3,435 Cabuyuan 1,940 Del Pilar 2,054 Libodon 1,145 Golden Valley (Maraut) 5,061 National Statistics Office 2 2010 Census of Population
    [Show full text]