Studies for the verƟ cal access --

2007-EL-07020-S • Part of Priority Project 7

Commission Decision: C(2008)7010 Member States involved:

ImplementaƟ on schedule: Start date: January 2009 End date: December 2012 EsƟ mated end year: 2012

Budget: Total project cost: €4,700,000 EU contribuƟ on: €2,350,000 NaƟ onal budget: €2,350,000

Percentage of EU support: Studies: 50%

riority Project 7 (Motorway Axis /Patra-Athina-Sofi a-) will provide signifi cant improvements to Pthe road network of southeastern . IniƟ ally, it involved the construcƟ on of two new motorways in Greece - “Via EgnaƟ a” (from Igoumenitsa to Kipi) and Pathe (--Thessaloniki and Evzoni). In 2004, it was extended to connect to the neighbouring countries and Central Europe: one branch to Sofi a and Budapest and another towards the port of Constanta.

The project is focused on the studies necessary for the compleƟ on of the link between the secƟ on of Priority Project 7 running through Greece and the Greek-Bulgarian borders. It concerns studies for re-aligning/upgrading two road secƟ ons (Riziana- Strimoniko and Christos-K. Ambelia) on the verƟ cal axis Thessaloniki-Serres-Promachonas over a length of +/-17.6 km.

MAP Review

The Mid-Term Mid Term evalua Ɵ on confi rmed that the oveoverall project implementaƟ on faces delay because of internal administraƟ ve issues. The revised implementaƟ on plan confi rming the original compleƟ on date (December 2012) is feasible provided that the plans are implemented as foreseen. Studies for the verƟ cal access Thessaloniki-Serres-Promachonas 2007-EL-07020-S • Part of Priority Project 7

MAP Review

Planned, updated and revised cumulative costs (€ Million)* 4.7 5 4.7 4 4.7

3

2

1

0 End End End 2010 2011 2012

Planned costs (Decision) Revised costs (MAP review) Updated costs (as reported by the beneficiary)

Planned and revised cumulative TEN-T contribution (€ Million)* 3 2.4

2 2.4

1

0 End End End 2010 2011 2012

Planned TEN-T contribution (Decision) Revised planned TEN-T contribution (MAP review)

*Rounded fi gures Studies for the development of the motorway project of PP7 (Igoumenitsa/ Patras-Athens-Sofi a-Budapest motorway axis) 2007-EL-07040-S • Part of Priority Project 7

Commission Decision: C(2008)7070 Member States involved: Greece

ImplementaƟ on schedule: Start date: December 2009 End date: December 2011 Es mated end year: 2011

Budget: Total project cost: €2,250,000 EU contribu on: €1,125,000 Na onal budget: €1,125,000

Percentage of EU support: Studies: 50%

riority Project 7 (Motorway Axis Igoumenitsa/Patra-Athina-Sofi a-Budapest) will provide signifi cant improvements to Pthe road network of southeastern Europe. Ini ally, it involved the construc on of two new motorways in Greece - “Via Egna a” (from Igoumenitsa to Kipi) and Pathe (Patras-Athens-Thessaloniki and Evzoni). In 2004, it was extended to connect to the neighbouring countries and Central Europe: one branch to Sofi a and Budapest and another towards the port of Constanta.

The project is focused on the prepara on of a strategic study related to the development and upgrading of Priority Project 7. In order to achieve homogeneity, a global overview and strategic approach of the en re axis will be performed, both in terms of future traffi c volume demand forecas ng and minimum opera onal standards and geometric characteris cs. This aims to secure the appropriate priori sa on of interven ons and an op mum alloca on of resources.

MAP Review

The Mid-Term Mid Term evalua on took note that the impimplementa on of the ac on has not yet started because of administra ve procedures. Nevertheless, the revised implementa on plan confi rming the original comple on date (December 2011) is feasible provided that the plans are implemented as foreseen. Studies for the development of the motorway project of PP7 (Igoumenitsa/Patras- Athens-Sofi a-Budapest motorway axis) 2007-EL-07040-S • Part of Priority Project 7

MAP Review

Planned, updated and revised cumulative costs (€ Million)* 3 2.3 2.3 2 2.3

1

0 End End 2010 2011

Planned costs (Decision) Revised costs (MAP review) Updated costs (as reported by the beneficiary) When the updated plans are confi rmed by the review, the curve of the updated costs reported by the benefi ciary overlaps the curve of the revised costs (MAP review)

Planned and revised cumulative TEN-T contribution (€ Million)* 2

1.1

1 1.1

0 End End 2010 2011

Planned TEN-T contribution (Decision) Revised planned TEN-T contribution (MAP review)

*Rounded fi gures