NCI Makes History

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Spreading the warmth At home in the air Building the future 1000 cords and counting. NGC delivers free NGC News profles two Benefciaries who Nunatsiavut Construction’s building division frewood to north coast elders for 6th year. made a career in aviation. Pages 5 & 8 taps into a growing market. Page 4 Page 3 Vol. 1 No. 2 December 2016 Work got underway in early November on NCI’s contract to rebuild the wharf at Englee on the northern peninsula. This is NCI’s frst construction project outside Labrador. New Chief Financial NCI Makes History Officer for NGC Company gets frst contract on the island Keith Harbin joined NGC in early October as Chief Financial In a frst for Nunatsiavut Construction, the St. John’s. The pilot delivered the bid documents Offcer. Keith is a Chartered company has won a half-million dollar contract to Nunatsiavut Marine on Duckworth Street, and Professional Accountant (CPA, on the island to rebuild a wharf in the northern NMI’s crewing offcer Susan Gallant walked up the CGA), with extensive experience. peninsula community of Englee. The news came street to personally hand it over to Public Works Immediately prior to joining on October 17, and it had NCI winning the bid and Services Canada. “It was a real team effort,” NGC, Keith was Manager of over six competitors. “This was part of our plan says Brown. “And we are extremely proud that Operations with the Goose Bay from the start,” said vice president of operations, this is NCI’s frst federal job in Newfoundland.” Airport Corporation. Prior to Adam Brown, as he explained the strategy of that role, he held positions as going outside Labrador to bid on work. “This Long-Term Beneft a manager in Grant Thornton’s goes along with our plan to build capacity at NCI The value to NCI could go well beyond the Happy Valley-Goose Bay offce, and with NGC’s mission to build wealth in trust for current contract at Englee. “We get to develop and before that, as chief fnancial Nunatsiavut benefciaries.” a track record with the federal government,” offcer with the Sheshatshiu Innu It took an NGC team effort to get the bid to St. says Brown. “They will see our work and that is First Nation. Keith’s experience John’s in time for closing on September 30. Once important because the federal authorities have a in fnance and accounting are NCI completed the bid documents, the package rating system.” Work on the project got underway strong assets for NGC. was handed to an Air Labrador pilot who few it to in early November. Stevedoring Business Profitable Strong Future Potential Nunatsiavut Marine’s stevedoring busi- ness has a low profle, but the business of loading and unloading ships was a strong performer in 2016, largely because of the volume of material coming through the Port of Goose Bay for the Muskrat Falls project. “2016 has been our most suc- cessful year,” says NGC’s Chief Operating Offcer, Peter Adams. “We’ve seen our highest revenue earnings so far from ste- vedoring. We’ve had increased employ- ment at the dock.” Partnership working The Goose Bay stevedoring operation is a partnership between Nunatsiavut Marine and Integrated Logistics. In 2016, Nun- The Northern Ranger steams into Rigolet on the frst trip of the 2016 season. atsiavut Integrated Logistics handled all Photo by Eldred Allen, Bird’s Eye Inc. the unloading for international vessels ar- riving with material for the hydro project. That material included cargoes of fy ash Nunatsiavut Marine Overcomes for concrete production and huge spools of wire. Normally, Nunatsiavut Marine Challenges to Post Strong Year employs a port superintendent and six Nunatsiavut Marine had more than its share partners,” says Adams, “especially through stevedores for its north coast ferry opera- of challenges in 2016, including a late start trying to increase tourism as an economic tions. But additional hiring was needed to because of heavy sea ice and a shortened driver for each of those communities.” handle the international cargo, bringing season due to provincial budget cuts. The peak employment at the dock to between Northern Ranger operated with reduced 2017 plans 10 and 12 people. passenger capacity due to unforeseen is- Nunatsiavut Marine plans to build on its sues with the launching devices for two of passenger improvement plan for the 2017 Future potential the lifeboats. Still, NMI managed its way season, and to further respond to customer Peter Adams expects 2017 to be the last through the challenges, while carrying thou- feedback. “Tourists would like more local busy year for shipments to Muskrat Falls, sands of passengers and delivering the sea- dishes and healthier options in our cafete- with the arrival of the transformers at son’s supply of freight. “It’s been another ria,” says Adams. “We will try to meet those Cartwright and other shipments at Goose strong year, despite the setbacks” said Pres- needs.” NMI is also exploring improving on- Bay. Now, he’s looking beyond 2017 and ident and CEO Captain Peter Adams. “We board internet through satellite coverage. sees new opportunities. “We’re hoping to did a good job of managing our way through 2017 is the fnal year of NMI’s two- leverage our relationship with Integrated the issues we faced, and made sure we kept year contract extension for the north coast Logistics into work at the Voisey’s Bay people aware of what was happening.” service. Adams expects the contract will be mine, and potentially other work in Lab- extended for an additional year, while the rador and possibly into the north,” says Support for community events provincial government fnalizes details of a Adams. But it’s not just those opportu- As operators of the Labrador Ferry Service, long-term plan to provide ferry service in the nities. “Labrador has tremendous oil and NMI directs the movements of the Northern province. “We communicate regularly with gas potential,” he says. “It may be 10-15 Ranger and Astron, which essentially oper- (the province) to get a sense of how all of years away, but oil and gas development ate as the highway for the remote commu- that will roll out. We are confdent NMI will will come to Labrador. And increased nities on the north coast of Labrador. The be operating the north coast ferry service mineral exploration will likely create de- schedule is tight, and turnaround in the vari- well into the future.” mand for our stevedoring services as ous ports is short. However, NMI adjusted well.” the Northern Ranger’s schedule this sum- mer to accommodate important community This edition of the newsletter events, including Come Home Year celebra- can also be found online at tions in Black Tickle and the Salmon Festival in Rigolet. “We put extra effort into ensur- www.ngc-ng.ca ing we meet the needs of our community 2 NGC News Vol. 1, No. 2 December 2016 Warming North Coast Homes Sixth year for NGC frewood project The still of an early October morning was the combined efforts of NGC, Nunatsiavut broken by the sound of a chainsaw near Construction, Nunatsiavut Marine, and the the dock in Goose Bay. Working next to a provincial government. “Not only is sending hulking pile of logs, NCI staff sawed 8-foot frewood to our communities important for lengths to be packed inside sea containers our stakeholders,” said NGC COO Peter Ad- and on wood trailers for the journey to the ams, “it also is an example of inter-company North Coast. The activity at the dock sig- collaboration, where we have several com- The MV Astron at the dock in Goose Bay with two nalled this year’s start to a project that NGC panies involved in delivering on this pro- trailers of frewood for the north coast. began six years ago, when it shipped fre- gram.” wood to north coast communities for free While Nunatsiavut Marine gets the distribution to elders and others who had wood into Nain and Hopedale, it’s Adam problems getting access to frewood. “I am Brown and Nunatsiavut Construction who very proud that our group of companies is prepare the wood. NCI hires contractors to once again able to provide wood to those in retrieve the wood from the Muskrat Falls need,” said Nunatsiavut Group of Compa- construction site, and transport it to Goose nies CEO, Chris Webb, “given how diffcult Bay for sawing and packing into sea contain- it is to get wood in the communities of Nain ers and onto trailers. Brown estimates there and Hopedale.” are still 100,000 cords scattered on the Since that frst shipment, more than ground in six huge piles on the north side of A contractor cuts frewood into lengths for ship- 1000 cords have been provided free-of- Muskrat Falls, with an equal amount on the ment to Nain and Hopedale. charge to help people heat their homes. This south side. The wood was cut several years year, NGC is providing 150 cords to Nain ago and some of it is starting to decay. Still, and Hopedale, the two communities with there’s lots of quality wood to send north. Nunatsiavut Group of the least access to a frewood supply. Nain “Once the wood is shipped, I notify the north Companies will receive 90 cords of wood from NGC, and coast communities,” says Brown. When the Hopedale will get 60 cords. wood arrives on the dock, the community 2-6 Royal Street • PO Box 1000, Stn. B turns out to distribute the wood. “It’s a very Happy Valley - Goose Bay, NL • A0P 1E0 Joint NGC project worthwhile project,” he says, “and one that Tel: (709) 896-8505 The frewood project brings together three NCI and the entire NGC operation is proud Fax: (709) 896-5834 units of the Nunatsiavut Group of Compa- to support.” E-mail: [email protected] nies.
Recommended publications
  • Southern Labrador Regional Airport Pre-Design Studyopens in New Window

    Southern Labrador Regional Airport Pre-Design Studyopens in New Window

    Southern Labrador Regional Airport Pre-Design Study Port Hope Simpson, Labrador Prepared for: Department of Works, Services and Transportation EDM Project # 20340 Proposed 1220 m x 30 m Runway Proposed 915 m x 23 m Runway March 8, 2005 March 8, 2005 GOVERNMENT OF NEWFOUNDLAND AND LABRADOR Southern Labrador Regional Airport March 2005 Pre-Design Study Table of Contents TABLE OF CONTENTS Page 1.0 General 1.1 Background ..................................................................................1 1.2 Terms of Reference.......................................................................1 1.3 Regional Airport Definition ..........................................................1 1.4 Existing Port Hope Simpson Aerodrome.......................................2 2.0 Review of Southern Labrador’s Airport Operations 2.1 Aerodromes ..................................................................................6 2.2 Needs Assessment ........................................................................7 2.3 Proposed Facilities/Infrastructure..................................................9 3.0 Evaluation of Existing Port Hope Simpson Aerodrome/Site 3.1 Summary of Evaluation ..............................................................11 3.2 Conclusion..................................................................................12 4.0 Engineering Work Completed to Date 4.1 General.......................................................................................15 4.2 Design Criteria............................................................................15
  • I; / Air Saguenay

    I; / Air Saguenay

    TOUJOURS TRÈS PRÉSENT APRÈS SQi ANS % \ Compte rendu du 29e Congrès aniMuel I; c.e r|TA . j Portrait d'un transpqrteur / Air Saguenay VOLUME 21. NUMÉRO 1 Y" MARS 2005 SOMMAIRE CIRCUU'AIR CIRCUUAIR, VOLUME 21 , NUMÉRO 1 LE MAGAZINE QUÉBÉCOIS EDITORIAL LA RELEVE DU TRANSPORT LE 600, 61 AVENUE CONSEIL D'ADMINISTRATION AÉRIEN COTISATION ANNUELLE ACTIVITÉ À VENIR TROPHÉE PLEIN VOL Notre (ouverture (de g. à dr.) ; RAC COIN d'Air Saguenoy COMPÉTENCES LINGUISTIQUI-S Jean-Claude Tremblay, président et Jean Tremblay, vice-président HYDRO QUÉBEC Éditeur : APPEL DE SOUMISSION-AVIONS John McKenna PROGRAMME DE FORMATION SPÉCIFIQUE Rédactrice en chef : Johanne Lemelin SERVICE AÉRIEN GOUVERNEMENTAL Rédocteur : Daniel Adonis TRANSPORT AÉRIEN RÉGIONAL Publicité ; ACTUALITE 7 Daniel Adam s AU QUÉBEC Johanne Lemelin Conception et réalisation ; 8 ET 9 APPROCHE D'ALIGNEMENT ARRIÈRE Johanne Lemelin DE LA PISTE 24 À L'AÉROPORT Prépresse ; INTERNATIONAL JEAN-LESAGE Atlante Communication Graphique Impression : 11 JETSGO CESSE SES OPÉRATIONS Transcontinental Inc. Préparation postale ; QUOI DE NEUF ? ET PosteExpress 10. 26 27 Distribution : Société canadienne des postes PORTRAIT D'UN Contrat de vente no. 40050783 TRANSPORTEUR 12 PORTRAIT DES GENS Dépôts légaux ; BNC, ISSN 0832-6371 13 À 16 AIR SAGUENAY BNQ, 2' trimestre 1986 ©CIRCUL'AIR 1985 Toute reproduction lolole ou partielle est interdite sons l'opprobotion écrite de l'éditeur. Abonnement, publicité ou correspondance : Mogaiine Circul'AiR 600. 6' Avenue Aéroport inlernotionol Jean-Lesage 29e CONGRES AN'NUEL Soinie-Foy (ûuébecl G2G 215 Tél. 1(418) 871-4635. Téléc. ; (418) 871 -8189 DE L'AQTA 17 À 23 COMPTE-RENDU Adresse électronique : «ww.oqta.org Courrier électronique : [email protected] 24 ET 25 QUOI DE NEUF CHEZ LES EXPOSANTS ? Parutions : Mars, juillet et novembre EDITORIAL LA RELEVE e présent mandat à la présidence de votre Association s'effectuera sous l'étiquette de « La relève ».
  • Le Transport Arien Rgional

    Le Transport Arien Rgional

    REGIONAL AIR TRANSPORT By Christine Audet, Transport Analyst, Air Transport Branch, MTQ INTRODUCTION In recent decades, air transport has experienced the convulsions brought about by the economic deregulation of this mode of transport in Canada and around the world. Deregulation has proven beneficial in Canadian markets, translating into increased competition on domestic and international route networks, resulting in a broader range of services and lower fares. Québec travellers also enjoy these benefits when they fly from Québec to other North American or international destinations. But what about regional air transport within Québec? Travellers complain about exorbitant prices, infrequent flights, and inconvenient schedules, especially in the case of travel from the regions into the major urban centres. Who has never said or heard a comment like “It’s cheaper to fly from Montréal to Paris than from Montréal to Sept-Îles”? Is this myth or reality? What role does the Québec government play within the context of the Canadian regulatory environment in terms of ensuring that the regions have access to the air services that they require? This article will shed some light on the reality of air transport in Québec. The first section outlines the main events that led to the restructuring of the air transport industry in Canada, and its repercussions on the provision of services in Québec. This is followed by an examination of the measures taken by the Québec government in order to maintain a satisfactory network of air transport services. Finally, the last section presents the factors that affect supply and demand in the area of air transport.
  • Québec Air Message from the Minister of Transport I Message from the Minister for Transport and Maritime Policy II Transportation Policy Introduction 1

    Québec Air Message from the Minister of Transport I Message from the Minister for Transport and Maritime Policy II Transportation Policy Introduction 1

    contentsContents Québec Air Message from the Minister of Transport I Message from the Minister for Transport and Maritime Policy II Transportation Policy Introduction 1 Chapter 1 Québec ready for takeoff 1. Air Transportation in Québec: A Key Industry in a Complex Environment 3 1.1 The international environment 4 1.2 Canada’s legislative and constitutional framework 5 1.3 Economic deregulation 6 1.4 Industry restructuring 6 1.5 The federal government’s withdrawal 8 1.6 The scope of opportunities for Québec 9 Chapter 2 2. Stakes and Challenges in Québec 11 2.1 International air service in support of Québec’s economy 12 2.1.1 International and North American connections 12 2.1.2 Québec’s position in Canada’s passenger and goods air transportation market 14 2.2 Regional air service at competitive rates 16 2.2.1 Air service without real competition 17 2.2.2 Regional markets characterized by weak demand 19 2.2.3 Air services increasingly out of sync with regional needs 20 2.2.4 An outdated regulatory framework 22 2.3 Air carrier competitiveness 23 2.3.1 A fragile, changing industry 23 2.3.2 Difficult access for new carriers 24 2.4 Airport system viability 25 2.4.1 A decade of change 25 2.4.2 Québec’s airport sector 27 2.4.3 Québec’s international airports 29 2.5 International recognition of Québec’s expertise 30 2.5.1 Training and research & development 30 2.5.2 International organizations 31 2.5.3 Related industries 32 contentsContents Québec Air Message from the Minister of Transport I Message from the Minister for Transport and Maritime Policy II Transportation Policy Introduction 1 Chapter 1 Québec ready for takeoff 1.
  • Eagle Narrative

    Eagle Narrative

    Eagle River Trout Lodge Welcome to one of the finest fishing lodges in Labrador, Canada. Fishing in Canada offers a safe destination with unspoiled wilderness and trout fishing you can only dream about. Accessible only by floatplane, Eagle River Trout Lodge has been hosting generations of fishermen for more than three decades, and careful resource management has ensured that the fishing today is as good as or better than it was three decades ago. Eagle River Trout Lodge is located 65 miles south east of Goose Bay, Labrador. It is nestled at the headwaters of the world’s renowned Eagle River. Strategically located at a narrow section of the lake, moving water directly in front of the fishing lodge yields huge Eastern Brook Trout and Northern Pike. Angling further afield at inlets and outlets is provided by our experienced sport fishing guides who will transport you in stable 26 foot Gander River boats, where you may fish from the boats or wade the numerous pools. Eagle Lake forms a considerable portion of the headwaters of the Eagle River. While all of the water in this watershed is of a freestone type, limestone-like slicks are numerous, and they are a joy to the dry-fly fisherman. Within a short distance of the fishing lodge, anglers can fish virtually any type of water they prefer. Brook Trout feed on stone flies, mayflies and caddis which abound and make-up the trout’s main diet. For the adventuresome angler there are still virgin waters to explore in our sport fishing areas. At Eagle River Trout Lodge you will be fishing the area in which Solvelinus Fontinalis (Brook Trout) first appeared millions of years ago.
  • Schefferville Area Iron Ore Mine Western Labrador

    Schefferville Area Iron Ore Mine Western Labrador

    Schefferville Area Iron Ore Mine Western Labrador ENVIRONMENTAL IMPACT STATEMENT August 2009 REVISED ENVIRONMENTAL IMPACT STATEMENT 4.2.2 Wildlife 4.2.2.1 Caribou Labrador’s caribou (Rangifer tarandus) can be classified into two main groups, the migratory and sedentary (also known as woodland) ecotypes, which are distinguished by their use of calving grounds or fidelity to specific calving sites. Migratory caribou travel large distances, occupy large home ranges, and aggregate during calving periods. Conversely, sedentary caribou display limited movements, occupy smaller home ranges, and tend to disperse during the calving period (Schaefer et al. 2000; Bergerud et al. 2008). The Project occupies a portion of Western Labrador which overlaps with the range of the George River (GR) Herd. Straddling the Québec-Labrador peninsula, the GR Herd is one of the world’s largest Rangifer populations, with population estimates peaking at almost 800,000 individuals in the 1980’s (Couturier et al. 1996; Russell et al. 1996, Rivest et al. 1998). This area of western Labrador overlaps the GR Herd as a portion of their winter range (Jacobs 1996). In addition to the GR Herd, there is another migratory ecotype that is recognized on the Ungava Peninsula and known as the Rivière-aux-Feuilles (‘Leaf River’) (RAF) Herd. Existing and recognized sedentary populations include the Lac Joseph (LJ) Herd located south of the Assessment Area, and the Red Wine Mountains (RWM), the Joir River (JR), and the Mealy Mountains (MM) Herds all much further to the east. The Mealy Mountains act as a geographic barrier separating this herd from the other herds of Labrador, but the lack of a geographic barrier between the other three sedentary herds results in an overlap of herd ranges (Schmelzer et al.
  • Qui Fait Quoi?

    Qui Fait Quoi?

    Q U I F A I T Q UOI? AÉROPORTS A AÉROPORT DE BAGOTVILLE AÉROPORTS DE MONTRÉAL CORP. DE L’AÉROPORT RÉG. T Monsieur Jean-Marc Dufour Monsieur Antoine Rostworowski DE DRUMMONDVILLE INC. : 2008 : 2007 : 2008 : Directeur général Directeur développement des affaires Monsieur André Veilleux Tél. : 418 677-2651 Tél. : 514 394-7238 Président Téléc. : 418 677-2112 Téléc. : 514 420-2362 Tél. : 819 472-1011 [email protected] [email protected] Téléc. : 819 472-4291 7000, chemin de l’Aéroport 800, Place Leigh-Capreol, bureau 1000 [email protected] Membre depuis Membre La Baie (Québec) G7B 3N8 depuis Membre Dorval (Québec) H4Y 0A5 depuis Membre 4789, boul. Allard www.aeroportbagotville.com www.admtl.com Drummondville (Québec) J2A 2R8 www.aeroportdrummondville.com AÉROPORT DE Aéroport MUnicipale DE PLATTSBURGH CHARLEVOIX-EST ST-JEAN-SUR-RICHELIEU INTERNATIONAL AIRPORT : 2008 : 2006 : Monsieur Pierre Girard Monsieur Jean-Pierre Messier Mr. Garry F. Douglas Directeur général Responsable aux transports President & CEO Tél. : 418 439-3947 Tél. : 450-359-2068 Tél. : 518 563-1000 Téléc. : 418 439-2502 Téléc. : 450-359-2080 Téléc. : 518 563-1028 [email protected] [email protected] [email protected] Nouveau membre Nouveau Membre depuis Membre 172, boul. Notre-Dame 700, rue Boucher, depuis Membre 7061, Route 9, P.O. Box 310 Clermont (Québec) G4A 1G1 Saint-Jean-sur-Richelieu (Québec) Plattsburgh (NY) 12901 www.mrccharlevoixest.ca J3B 7Z8 www.montrealairport-us.com www.ville.saint-jean-sur-richelieu.qc.ca AÉROPORT DE FORESTVILLE CONSEIL DES AÉROPORTS RÉGIE INTERM.
  • Western-Built Jet and Turboprop Airliners

    Western-Built Jet and Turboprop Airliners

    WORLD AIRLINER CENSUS Data compiled from Flightglobal ACAS database flightglobal.com/acas EXPLANATORY NOTES The data in this census covers all commercial jet- and requirements, put into storage, and so on, and when airliners that have been temporarily removed from an turboprop-powered transport aircraft in service or on flying hours for three consecutive months are reported airline’s fleet and returned to the state may not be firm order with the world’s airlines, excluding aircraft as zero. shown as being with the airline for which they operate. that carry fewer than 14 passengers, or the equivalent The exception is where the aircraft is undergoing Russian aircraft tend to spend a long time parked in cargo. maintenance, where it will remain classified as active. before being permanently retired – much longer than The tables are in two sections, both of which have Aircraft awaiting a conversion will be shown as parked. equivalent Western aircraft – so it can be difficult to been compiled by Flightglobal ACAS research officer The region is dictated by operator base and does not establish the exact status of the “available fleet” John Wilding using Flightglobal’s ACAS database. necessarily indicate the area of operation. Options and (parked aircraft that could be returned to operation). Section one records the fleets of the Western-built letters of intent (where a firm contract has not been For more information on airliner types see our two- airliners, and the second section records the fleets of signed) are not included. Orders by, and aircraft with, part World Airliners Directory (Flight International, 27 Russian/CIS-built types.
  • Étude De La Viabilité Des Aéroports Secondaires Au Canada

    Étude De La Viabilité Des Aéroports Secondaires Au Canada

    ÉTUDE DE LA VIABILITÉ DES AÉROPORTS SECONDAIRES AU CANADA Étude soumise à l’examen des: Ministères provinciaux responsables des transports et réalisée par: Sypher:Mueller International Inc. 220, avenue Laurier Ouest, bureau 500 Ottawa ON K1P 5Z9 Août 2002 01579Frnech Version – Small Airport Viability Report\rec Sypher Avant-propos La présente étude avait pour objet de brosser un tableau de la situation financière et des activités d’exploitation des aéroports secondaires au Canada. À cette fin, 26 aéroports témoignant d’une grande diversité de niveaux de trafic et de types de gouvernance ont été sélectionnés. Les 26 aéroports qui ont participé à l’étude ont rempli des questionnaires exhaustifs et se sont prêtés à des entrevues approfondies. Dans ce contexte, les auteurs du présent rapport jugent important de souligner le solide engagement qu’ils ont obtenu des administrateurs de ces aéroports et ils sont reconnaissants à ces derniers de leur appui au bon déroulement de ce projet. 01579Frnech Version – Small Airport Viability Report\rec Sypher ÉTUDE INTERGOUVERNEMENTALE DES AÉROPORTS SECONDAIRES Table des matières Partie Page Avant-propos Sommaire ............................................................................................. i I. INTRODUCTION........................................................................... 1 A. Contexte............................................................................... 1 B. Objectif de l’étude................................................................ 1 C. Méthodologie......................................................................
  • Air Carrier Traffic at Canadian Airports Trafic Des Transporteurs Aériens Aux Aéroports Canadiens

    Air Carrier Traffic at Canadian Airports Trafic Des Transporteurs Aériens Aux Aéroports Canadiens

    Catalogue no. 51-203-XIB No 51-203-XIB au catalogue Air Trafic des carrier transporteurs traffic at aériens aux Canadian aéroports airports canadiens 2003 2003 How to obtain more information Comment obtenir d’autres renseignements Specific inquiries about this product and related statistics Toute demande de renseignements au sujet du présent produit ou au or services should be directed to: Aviation Statistics Centre, sujet de statistiques ou de services connexes doit être adressée à : Transport Division, Statistics Canada, Ottawa, Ontario, Centre des statistiques de l'aviation, Division des transports, Statistique K1A 0T6 (telephone: (613) 951-0068). Canada, Ottawa, Ontario, K1A 0T6 (téléphone : (613) 951-0068). For information on the wide range of data available from Pour obtenir des renseignements sur l’ensemble des données de Statistics Canada, you can contact us by calling one of our Statistique Canada qui sont disponibles, veuillez composer l’un des toll-free numbers. You can also contact us by e-mail or by numéros sans frais suivants. Vous pouvez également communiquer visiting our Web site. avec nous par courriel ou visiter notre site Web. National inquiries line 1 800 263-1136 Service national de renseignements 1 800 263-1136 National telecommunications Service national d’appareils de télécommu- device for the hearing impaired 1 800 363-7629 nications pour les malentendants 1 800 363-7629 Depository Services Program Renseignements concernant le Programme inquiries 1 800 700-1033 des bibliothèques de dépôt 1 800 700-1033 Fax line for Depository Services Télécopieur pour le Progamme des Program 1 800 889-9734 bibliothèques de dépôt 1 800 889-9734 E-mail inquiries [email protected] Renseignements par courriel [email protected] Web site www.statcan.ca Site Web www.statcan.ca Ordering and subscription information Renseignements sur les commandes et les abonnements This product, catalogue no.
  • Annual Aircraft Movements: Major Airports - NAV CANADA Towers and Flight Service Stations – 2017

    Annual Aircraft Movements: Major Airports - NAV CANADA Towers and Flight Service Stations – 2017

    Catalogue no. 51-004-X — Vol 50, no. 08 ISSN 1480-7483 Aviation Annual Aircraft Movements: Major Airports - NAV CANADA Towers and Flight Service Stations – 2017 Release date: May 17, 2018 How to obtain more information For information about this product or the wide range of services and data available from Statistics Canada, visit our website, www.statcan.gc.ca. You can also contact us by email at [email protected] telephone, from Monday to Friday, 8:30 a.m. to 4:30 p.m., at the following numbers: • Statistical Information Service 1-800-263-1136 • National telecommunications device for the hearing impaired 1-800-363-7629 • Fax line 1-514-283-9350 Depository Services Program • Inquiries line 1-800-635-7943 • Fax line 1-800-565-7757 Standards of service to the public Note of appreciation Statistics Canada is committed to serving its clients in a prompt, Canada owes the success of its statistical system to a reliable and courteous manner. To this end, Statistics Canada has long-standing partnership between Statistics Canada, the developed standards of service that its employees observe. To citizens of Canada, its businesses, governments and other obtain a copy of these service standards, please contact Statistics institutions. Accurate and timely statistical information could not Canada toll-free at 1-800-263-1136. The service standards are be produced without their continued co-operation and goodwill. also published on www.statcan.gc.ca under “Contact us” > “Standards of service to the public.” Published by authority of the Minister responsible for Statistics Canada © Her Majesty the Queen in Right of Canada as represented by the Minister of Industry, 2018 All rights reserved.
  • 7340.2F W Chgs 1-3 Eff 9-15-16

    7340.2F W Chgs 1-3 Eff 9-15-16

    RECORD OF CHANGES DIRECTIVE NO. JO 7340.2F CHANGE SUPPLEMENTS CHANGE SUPPLEMENTS TO OPTIONAL TO OPTIONAL BASIC BASIC FAA Form 1320−5 (6−80) USE PREVIOUS EDITION U.S. DEPARTMENT OF TRANSPORTATION JO 7340.2F CHANGE FEDERAL AVIATION ADMINISTRATION CHG 3 Air Traffic Organization Policy Effective Date: September 15, 2016 SUBJ: Contractions 1. Purpose of This Change. This change transmits revised pages to Federal Aviation Administration Order JO 7340.2F, Contractions. 2. Audience. This change applies to all Air Traffic Organization (ATO) personnel and anyone using ATO directives. 3. Where Can I Find This Change? This change is available on the FAA Web site at http://faa.gov/air_traffic/publications and https://employees.faa.gov/tools_resources/orders_notices/. 4. Distribution. This change is distributed to selected offices in Washington headquarters, regional offices, service area offices, the William J. Hughes Technical Center, and the Mike Monroney Aeronautical Center; to all field offices and field facilities; to all airway facilities field offices; to all international aviation field offices, airport district offices, and flight standards district offices; and to interested aviation public. 5. Disposition of Transmittal. Retain this transmittal until superseded by a new basic order. 6. Page Control Chart. See the page control chart attachment. Distribution: ZAT-734, ZAT-464 Initiated By: AJV-0 Vice President, Mission Support Services 9/15/16 JO 7340.2F CHG 3 PAGE CONTROL CHART Change 3 REMOVE PAGES DATED INSERT PAGES DATED Subscription Information ................ 10/15/15 Subscription Information ............... 9/15/16 Table of Contents i and ii ............... 5/26/16 Table of Contents i and ii .............