= Progress as expected ENVIRONMENT DIRECTORATE PROGRESS – SOUTH RIBBLE: QUARTER 4 JANUARY - MARCH 2014 = Progress not as expected Summary: Environment Directorate progress against delivery of the Commissioning Plan for South Ribble in the fourth quarter of 2013/14 = Issues identified Assistant Director of Commissioning: Joanne Reed :
[email protected] : 01772 530897 = Information SERVICE UPDATE CAPITAL PROGRAMME UPDATE 2013/14 CAPITAL PROGRAMME END OF YEAR SUMMARY Road and Street Maintenance: Pothole Repair Environment and Community Projects 33 schemes (83%) of South Ribble's capital programme planned for delivery in 2013/14 were completed. The capital Farington Hall Wood works for 5 schemes are ongoing. The team have been working with South Ribble An update for these 5 schemes is detailed on the reverse Borough Council to improve access within Farington Hall Wood in Leyland. Contractors have rebuilt 169 metres of footpath within the woodland, replacing edging and laying new stone. A new PROGRESS AS EXPECTED ditch crossing and steps have reconnected the In 2013/14, 97.2% of the potholes, identified through Highway Safety 2013/14 Capital schemes programmed for delivery in quarter 4 paths, allowing residents to enjoy this important Inspections (HSI) across Lancashire, were repaired within a 30 day recreational resource. period. Therefore the 90% target was achieved. In South Ribble, 4,214 6 out of 11 capital schemes, due for delivery in quarter 4, have either been completed or are progressing as planned, and potholes were identified during 2013/14 by HSIs. Of which 4,205 (99.8%) are detailed below. For details of the remaining schemes please see the 'Progress not as Expected' section.