Special Provisions
Total Page:16
File Type:pdf, Size:1020Kb
VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENT TO JFK AIRPORT – CONTRACT 2 PIN X735.83, Contract D900050 CONTRACT DOCUMENTS REQUEST FOR PROPOSALS PART 5 SPECIAL PROVISIONS Final April 21, 2020 New York State Department of Transportation TABLE OF CONTENTS SP-1. SECIAL PROVISION TO SECTION 100 OF NYSDOT STANDARD SPECIFICATIONS CONSTRUCTION AND MATERIAL ............................................... 1 SP-2. SPECIAL PROVISION TO SECTIONS 200 THROUGH 699 OF THE NYSDOT STANDARD SPECIFICATIONS CONSTRUCTION AND MATERIAL AND APPLICABLE NYSDOT SPECIAL SPECIFICATIONS ................................................. 1 SP-3. CRITICAL PATH METHOD SCHEDULE ...................................................................... 3 3.1 DESCRIPTION ......................................................................................................... 3 3.2 DEFINITIONS ........................................................................................................... 3 3.3 CONSTRUCTION DETAILS .................................................................................... 7 3.3.1 Project Scheduler ................................................................................................ 7 3.3.2 Scheduling Software ........................................................................................... 8 3.3.3 Prestart Schedule Meeting .................................................................................. 9 3.3.4 Progress Schedule ............................................................................................ 11 3.3.5 Progress Schedule Review and Analysis .......................................................... 30 3.3.6 Changes to Progress Schedule due to Added/Deleted/Changed Work: ........... 32 3.3.7 Failure to Submit Progress Schedules and/or Recovery Schedules ................. 34 3.3.8 Recovery Schedule ........................................................................................... 34 3.3.9 Float .................................................................................................................. 35 3.3.10 Progress Schedule Updates and Weekly Status Reports: ................................ 35 3.4 PROGRESS CHECK POINTS AND PAYMENT .................................................... 35 SP-4. MATERIALS APPROVAL PROCEDURES FOR DESIGN-BUILD PROJECTS ......... 35 SP-5. SPECIAL PROVISIONS FOR TESTING BRIDGE BEARINGS .................................. 37 5.1 Disc-Design Structural Bridge Bearings ............................................................ 37 5.1.1 Polyether Urethane Structural Element ............................................................. 37 5.1.2 Steel Plates ....................................................................................................... 38 5.1.3 Stainless Steel ................................................................................................... 38 5.1.4 Polytetrafluoroethylene (PTFE) Sheet and Strip ............................................... 38 5.1.5 Welding Procedure ............................................................................................ 38 5.1.6 Compression Strain ........................................................................................... 38 5.1.7 Sliding Coefficient of Friction ............................................................................. 38 5.1.8 Rotation Test ..................................................................................................... 38 5.2 Pot-Design Structural Bridge Bearings .............................................................. 38 5.2.1 Elastomeric Rotational Element ........................................................................ 38 5.2.2 Steel .................................................................................................................. 39 5.2.3 Stainless Steel ................................................................................................... 39 5.2.4 Polytetrafluoroethylene (PTFE) Sheet and Strip ............................................... 39 5.2.5 Welding Procedure ............................................................................................ 39 5.2.6 Sliding Coefficient of Friction ............................................................................. 39 VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT – CONTRACT 2 Part 5 - Special Provisions PIN X735.83, Contract D900050 i Final April 21, 2020 New York State Department of Transportation 5.2.7 Rotation Test ..................................................................................................... 39 5.3 Steel Laminated Elastomeric Bridge Bearings and Elastomeric Bridge Bearings with External Load Plates ................................................................... 39 5.3.1 Elastomeric Material .......................................................................................... 39 5.3.2 Internal Steel Plates (shims) ............................................................................. 39 5.3.3 External Load Bearing Plates and Steel Backing Plates ................................... 40 5.3.4 Welding Procedure ............................................................................................ 40 5.3.5 Bearing Tolerances ........................................................................................... 40 5.3.6 Compression / Deflection .................................................................................. 40 5.3.7 Adhesion ........................................................................................................... 40 SP-6. PAYMENT REDUCTIONS, LIQUIDATED DAMAGES AND EARLY COMPLETION BONUS ........................................................................................................................ 40 6.1 Payment Reductions and Liquidated Damages ................................................ 40 6.1.1 Project Completion ............................................................................................ 40 6.1.2 Interim Completion ............................................................................................ 40 6.1.3 Impacts to Traffic ............................................................................................... 41 6.1.4 Lane Closure Period Exceedances ................................................................... 41 6.1.5 Additional or Reduced Lane Closures ............................................................... 41 6.2 Early Completion Bonus ...................................................................................... 41 SP-7. CONSTRUCTION INSPECTION REQUIREMENTS ................................................... 41 SP-8. COST LOADED SCHEDULE ...................................................................................... 50 SP-9. DB PERFORMANCE ENGINEERED CONCRETE MIXTURES ................................. 51 SP-10. DOWNSTATE POLYMER MODIFIED PG BINDER, PG 64E-22 (EXTREME) ........... 52 SP-11. VAN WYCK CONTRACT 2 RISK REGISTER ............................................................. 53 SP-12. LIRR REQUIREMENTS ............................................................................................... 54 SP-13. MIGRATORY BIRD PROTECTION AND AVOIDANCE .............................................. 55 13.1 Migratory Bird Protection and Avoidance .......................................................... 55 13.2 Migratory Bird Treaty Act – Birds Nesting on or Under Bridges ..................... 56 SP-14. PROJECT LABOR AGREEMENT (PLA) .................................................................... 58 SP-15. PANYNJ – AIRTRAIN REQUIREMENTS .................................................................... 59 SP-16. ESTABLISHING TURF WITH ENDOPHYTES (PANYNJ) .......................................... 60 SP-17. NEW YORK CITY TRANSIT REQUIREMENTS .......................................................... 61 SP-18. NYCDEP SEWER STANDARD SPECIFICATION SECTION 53.11 ........................... 62 VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT – CONTRACT 2 Part 5 - Special Provisions PIN X735.83, Contract D900050 ii Final April 21, 2020 New York State Department of Transportation SP-19. DB SUPPLEMENTAL AGREEMENT .......................................................................... 63 VAN WYCK EXPRESSWAY (VWE) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT – CONTRACT 2 Part 5 - Special Provisions PIN X735.83, Contract D900050 iii Final April 21, 2020 New York State Department of Transportation SP-1. SECIAL PROVISION TO SECTION 100 OF NYSDOT STANDARD SPECIFICATIONS CONSTRUCTION AND MATERIAL Amend Section 100 of the New York State Department of Transportation Standard Specifications Construction and Materials, in effect as of the Proposal Due Date, as described in Part 2, § DB 100 and as follows: The following amendments apply to Section 100 of the New York State Department of Transportation Standard Specifications Construction and Materials in effect as of the Proposal Due Date: A. All references to “Contractor” shall mean “Design-Builder”; B. All references to “Bid(s)”, “Bidder(s)” and “Bidding”, shall mean “Proposal(s)”, “Proposer(s)” and “Proposing” respectively; C. All references to “Contract Plans” shall mean “Contract Documents”; D. All references to “the Engineer” or “the Engineer-in-Charge” shall mean the Department’s Project Manager or designated representative; E. All references to a section, denoted by “§”, that is covered in Part 2, § DB 100, shall