MTA Capital Program 2008–2013
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Audit Committee Meeting
Audit Committee Meeting October 2020 Committee Members J. Barbas, Chair F. Borelli D. Jones R. Linn R. Mujica, Jr. Audit Committee Meeting MTA Board Room - 20th Floor 2 Broadway Wednesday, 10/28/2020 10:00 AM - 5:00 PM ET 1. PUBLIC COMMENTS 2. APPROVAL OF MINUTES Minutes of July 22, 2020 Meeting - Page 3 3. AUDIT COMMITTEE WORK PLAN 2021 WORKPLAN - Condensed - Page 5 2021 WORKPLAN - Detailed - Page 7 4. QUARTERLY FINANCIAL STATEMENTS - 2ND QUARTER 2020 Draft - Consolidated Interim Financial Statements - Q2 2020 - Page 12 5. APPOINTMENT OF EXTERNAL AUDITORS PCAOB Report on 2018 Inspection of Deloitte - Page 133 6. AUDIT APPROACH/COORDINATION WITH EXTERNAL AUDITORS (Materials previously distributed) 7. REVIEW OF AUDIT COMMITTEE CHARTER Audit Committee Charter - Page 153 8. OPEN AUDIT RECOMMENDATIONS Past Due Remediation Plans Report - October 2020 - Page 160 9. ANNUAL AUDIT COMMITTEE ACTIVITY REPORT (Materials previously distributed) 10. 2020 AUDIT PLAN PRESENTATION 2020 Audit Committee Status Presentation - October 2020 - Page 164 MINUTES OF MEETING AUDIT COMMITTEE OF THE BOARD WEDNESDAY, JULY 22, 2020 -10 A.M. RONAN BOARD ROOM - 20™ FLOOR 2BROADWAY Because of the ongoing COVID-19 public health crisis, the MTA Chairman convened a one-day, virtual Board and Committee meeting session on July 22, 2020, which included the following committees: • Long Island Rail Road and Metro-North Railroad; • New York City Transit; • MT A Bridges and Tunnels; • Finance; • Safety; • Audit; • Corporate Governance; and • Capital Program Oversight Committee To see a summary of the meeting and the actions taken by the Audit Committee, please refer to the July 22, 2020 Board minutes in the July Board Book available here on the Board materials website: https://new.mta.info/transparency/board-and-committee-meetings/july-2020. -
ITS 500 Series the New Alsaldobreda/Firema Meneghino Train for Milan
Connectors ITS 500 ITS 500 Series Reverse Bayonet Single Pole Power Connector Introduction New York MTA The new AlsaldoBreda/Firema Glenair is proud to supply connectors and Meneghino train for Milan, Italy interconnect systems for various programs for the The Meneghino is a new six-car dual- New York MTA. voltage train for the Metropolitana Milanese Glenair interconnects are employed on critical (Milan underground). It belongs to the “MNG” Traction Motor System and Intercar Jumper (Metropolitana di Nuova Generazione or Metro applications on the M8 EMU Railcars supplied by New Generation) family.The MNG is designed and Kawasaki for Metro North Railroad. manufactured in cooperation with Ansaldo Breda, a premier Italian rail transport and engineering company. Each train is built with two identical traction units, in the “Rp-M-M” configuration: Each unit includes one trailer coach (Rp) equipped with a driver’s cab, and two intermediate motor coaches (M) without a driver’s cab. C The M8 is an electric multiple unit (EMU) railroad car built by Kawasaki for use on the New Haven Line of the Metro-North Railroad. Photo: office of Dannel Malloy Glenair has also supplied product for numerous applications on the Long Island Railroad / Metro North M9 cars such as Traction Motor Systems, Intercar Jumpers, Lighting, Communication, HVAC, Converters, as well as others. The new AlsaldoBreda/Firema Meneghino train for Milan, Italy The electrically - controlled passenger doors (8 on each coach) grant a high reliability standard and very low maintenance. The train is equipped with a highly advanced Passengers’ Audio/ Video Information System. With this system, passengers receive informational messages and video The EMU M9 railcars will replace the M-3 fleet and regarding train service, broadcast directly to LCD expand the electric fleet for East Side Access. -
Bowery - Houston - Bleecker Transportation Study (Congestion Analysis)
Bowery - Houston - Bleecker Transportation Study (Congestion Analysis) Technical Memorandum No. 1 - Existing Conditions P.I.N. PTDT11D00.H07 DRAFT December 2011 Bowery – Houston - Bleecker Transportation Study Technical Memorandum No. 1 Existing Conditions PTDT11D00.H07 The preparation of this report has been financed in part through funds from the U.S. Department of Transportation, Federal Highway Administration (FTA) through the New York State Department of transportation and the New York Metropolitan Transportation Council. This document is disseminated by the New York City of transportation in the interest of information exchange. It reflects the views of the New York City Department of Transportation (NYCDOT) which is responsible for the facts and the accuracy of the data presented. The report does not necessarily reflect any official views or policies of the Federal Transit Administration, the federal Highway Administration or the State of New York. This report does not constitute a standard, specification or regulation. Prepared by: New York City Department of Transportation Janette Sadik-Khan, Commissioner Lori Ardito, First Deputy Commissioner Gerard Soffian, Deputy Commissioner Ryan Russo, Assistant Commissioner Margaret Forgione, Manhattan Borough Commissioner Naim Rasheed, Project Director Michael Griffith, Deputy Project Director Harvey LaReau, Project Manager Hilary Gietz, Principal Administrative Assistant Joe Li, City Planner Ali Jafri, Highway Transportation Specialist Milorad Ubiparip, Highway Transportation Specialist Eva Marin, Highway Transportation Specialist Table of Contents S.0 EXECUTIVE SUMMARY S.1 Introduction S.2 Demographics S.3 Zoning and Land Use S.4 Traffic and Transportation S.5 Public Transportation S.6 Parking S.7 Pedestrians and Bicycles S.8 Accidents/Safety S.9 Goods Movements S.10 Public Participation 1. -
Training Front Line Personnel to Provide Quality Customer Service
Best Foot Forward: Training Front Line Personnel to Provide Quality Customer Service NOVEMBER 2003 Katherine Brower Associate Director Ellyn Shannon Transportation Planner Karyl Berger Research Associate Permanent Citizens Advisory Committee to the MTA 347 Madison Avenue, New York, NY 10017 ACKNOWLEDGEMENTS The authors would like to acknowledge the professional and courteous customer assistance provided to them by personnel at all the transportation agencies contacted during the preparation of this report. This report has been a work in progress for many months and there are many people the authors would like to recognize for their time, assistance and perseverance in obtaining and sharing volumes of information with us. At the LIRR, special thanks go to Director of Government Affairs Janet Lewis who helped coordinate meetings and garnered the information from a variety of departments and personnel. Also at the LIRR, we would like to thank: Robert Cividanes, Donald Corkery, James Coumatos, Dr. John Diekman, Nathaniel Ham, Raymond P. Kenny, Rosanne Neville, Chris Papandreou, William E. Sellerberg and Fred Wedley. Metro-North staff were instrumental in pulling together a mountain of information and we want to acknowledge and thank: Margarita Almonte, Delana Glenn, Gus Meyers, George Okvat, Mario Riccobon, John Roberto, Mark Stoessner, Tom Tendy and Diana Tucker. The authors would also like to specially thank Lois Tendler, NYC Transit director of Government and Community Relations and Deborah Hall-Moore, Assistant director of Government and Community Relations. Without them, we would have never been able to complete this report. Also at NYC Transit, we would like to thank: Ralph Agritelley, Fred Benjamin, Rocco Cortese, Nathaniel Ford, Termaine Garden, John Gaul, Daniel Girardi, Anthony Giudice, John Grass, Kevin Hyland, Christopher Lake, Robert Newhouser, Louis Nicosia, Millard Seay, Barbara Spencer, Jennifer Sinclair and Steve Vidal. -
No Action Alternative Report
No Action Alternative Report April 2015 TABLE OF CONTENTS 1. Introduction ................................................................................................................................................. 1 2. NEC FUTURE Background ............................................................................................................................ 2 3. Approach to No Action Alternative.............................................................................................................. 4 3.1 METHODOLOGY FOR SELECTING NO ACTION ALTERNATIVE PROJECTS .................................................................................... 4 3.2 DISINVESTMENT SCENARIO ...................................................................................................................................................... 5 4. No Action Alternative ................................................................................................................................... 6 4.1 TRAIN SERVICE ........................................................................................................................................................................ 6 4.2 NO ACTION ALTERNATIVE RAIL PROJECTS ............................................................................................................................... 9 4.2.1 Funded Projects or Projects with Approved Funding Plans (Category 1) ............................................................. 9 4.2.2 Funded or Unfunded Mandates (Category 2) ....................................................................................................... -
M7 Electric Multiple Unitанаnew York
Electric Multiple Unit -M- 7 POWERCAR WITH TOILET ---10' 6' B END FEND I 3,200 mi , -: -" 0 C==- ~=0 :- CJCJ ~~[] CJCJCJCJCJCJ [] I D b 01 " ~) -1::1 1211-1/2 t~J ~~W ~~IL...I ~w -A'-'1~~~- I ~~ 309~mmt ~ 1 I~ 11 m 2205~16~m-! 591..1.6" mm --I I 1- -- 59°6" ° 4°8-1/2. , ~ 16,~:,60~m ~-- -;cl 10435mm ~ .-1 25.908 mm F END GENERAL DATA wheelchair locations 2 type of vehicle electric multiple unit passenger per car (seated) under design operator Metropolitan Transportation Authority passengers per car (standing) crush load under design Long Island Railroad order date May 1999 TECHNICAL CHARACTERISTICS quantity 113 power cars without toilet .power fed by third rail: 400-900 Vdc 113 power cars with toilet .auxiliary voltages: 230 Vac / 3 ph / 60 Hz train consist up to 14 cars 72 Vdc .AC traction motor: 265 hp (200 kW) DIMENSIONS AND WEIGHf Metric Imperial .dynamic and pneumatic (tread & disc) braking system length over coupler 25,908 mm 85'0" .coil spring primary suspension width over side sheets 3,200 mm 10'6" .air-bag secondary suspension rail to roof height 3,950 mm 12' II Y;" .stainless steel carbody rail to top of floor height I ,295 mm 51" .fabricated steel frame trucks rail to top of height 4,039 mm 13' 3" .automatic parking brake doorway width 1,270 mm 50" .forced-air ventilation doorway height 1,981 mm 6'6" .air-conditioning capacity of 18 tons floor to high ceiling height 2,261 mm 89" .electric strip heaters floor to low ceiling height 2,007 mm 79" .ADA compliant toilet room (8 car) wheel diameter 914 mm 36" .vacuum sewage system -
National Conference on Mass. Transit Crime and Vandali.Sm Compendium of Proceedings
If you have issues viewing or accessing this file contact us at NCJRS.gov. n co--~P7 National Conference on Mass. Transit Crime and Vandali.sm Compendium of Proceedings Conducted by T~he New York State Senate Committee on Transportation October 20-24, 1980 rtment SENATOR JOHN D. CAEMMERER, CHAIRMAN )ortation Honorable MacNeil Mitchell, Project Director i/lass )rtation ~tration ansportation ~t The National Conference on Mass Transit Crime and Vandalism and the publication of this Compendium of the Proceedings of the Conference were made possible by a grant from the United States Department of Transportation, Urban Mass Transportation Administration, Office of Transportation Management. Grateful acknowledgement is extended to Dr. Brian J. Cudahy and Mr. Marvin Futrell of that agency for their constructive services with respect to the funding of this grant. Gratitude is extended to the New York State Senate for assistance provided through the cooperation of the Honorable Warren M. Anderson, Senate Majority Leader; Dr. Roger C. Thompson, Secretary of the Senate; Dr. Stephen F. Sloan, Director of the Senate Research Service. Also our appreciation goes to Dr. Leonard M. Cutler, Senate Grants Officer and Liaison to the Steering Committee. Acknowledgement is made to the members of the Steering Committee and the Reso- lutions Committee, whose diligent efforts and assistance were most instrumental in making the Conference a success. Particular thanks and appreciation goes to Bert'J. Cunningham, Director of Public Affairs for the Senate Committee on Transportation, for his work in publicizing the Conference and preparing the photographic pages included in the Compendium. Special appreciation for the preparation of this document is extended to the Program Coordinators for the Conference, Carey S. -
Trimet's Last Best Offer
Tri-County Metropolitan Transportation District of Oregon & Amalgamated Transit Union Local 757 Mediation (ME-15-20) TriMet REVISED LAST BEST OFFER 3-30-2021 Any contract language currently in the WWA, which is not changed or removed during bargaining shall continue in the subsequent agreement. Only the general wage proposal is retroactive, all other changes are intended to be implemented prospectively. Page No. Section 4 Discipline 3 Section 9 – Health and Welfare 3 Section 19 Par. 11. Service Improvement Program 4 Article 2 Section 4 – INSTRUCTORS 5 ARTICLE 3: MAINTENANCE DEPARTMENT. 6 Section 1 – GENERAL 6 Par 8 Assistant Supervisor 6 Par. 9. Service Worker 6 Section 5 – ALLOWANCES 7 Section 7 – BUS MECHANIC TRAINING PROGRAM 7 Section 11 – LRT MAINTENANCE VEHICLE MECHANICS’ TRAINING 8 Section 15 – LRT APPRENTICESHIP MOW TRAINING PROGRAMS 9 Section 16 – ASSISTANT SUPERVISOR – RAIL 12 Section 19 – TRAINING ASSISTANTS 12 Section 21 -– HIRING APPRENTICES FROM OUTSIDE 13 ARTICLE 4 - OPERATIONS DIVISION/FACILITIES MAINTENANCE 15 ARTICLE 9 – PAY SCHEDULES AND CLASSIFICATION 16 WAGE RATE ADJUSTMENT 16 Differential increases – add in New wage for maintenance worker 16 Trainees wages Listing of Job classifications 17 MOA’s to be taken forward 22 1 Tentative Agreements Description/title of Tentative agreements Date Signed Page No. ERB required strikes 3-26-21 23 General provisions 3-26-21 24 MOW Overtime 3-29-21 25 Facilities Overtime 3-29-21 27 Representative Rights 3-26-21 28 Article 6 Par 10 3-26-21 29 Article 1.2.3.b-e Release time 3-26-21 -
Drmnsmay-July2013
The Railyard Local Volume 12, Issue 3 -The Monthly Newsletter of the Danbury Railway Museum- May‐July 2013 DRM at GCT’s Grand In This Issue ~ Upcoming Events at DRM ‐ Page 2 Centennial Parade of Trains ~ Words from Our President ‐ Page 4 Huge crowds come to see famous and ~ Board of Directors News ‐ Page 5 historic railcars on display Plus . Ten Years Ago and New Members Danbury Railway Museum was honored to have five pieces of its rolling stock chosen to be dis‐ Burro Crane Revival played at Grand Central Terminal’s 100th anniversary Part 1 Introduction “Parade of Trains” the weekend of May 11th & 12th. The By Michael Madyda, Project Manager Metropolitan After itʹs arrival in October 1995, our 1947 Transportation Model 30 Burro crane CB3004 had sat unrestored and Authority hand‐picked inoperable. A couple of unsuccessful attempts had the Tonawanda Valley been made in the past to restore it. For those of you Pullman Co. observa‐ who remember, CB3004 came with a counterpart, tion car, the PRR Class CB3001, that was supposed to provide parts for the BNM‐70 Baggage/ restoration of CB3004. Several years ago, a decision Railway Post Office was made to scrap CB3001 when the yard was being car, the 1171 ACMU, cleaned up. Unfortunately, vital parts from CB3004 the NYC 2013 EMD that were removed, but not replaced, for its restoration FL‐9 diesel electric were lost or scrapped during that time. locomotive, and the CDOT 605 ALCO RS‐ A sign welcomes visitors. 3m diesel to be trans‐ Top photo: Carolyn Taylor ported and displayed Bottom photo: Bob Boothe at the event. -
The Bulletin the MILEPOSTS of THE
ERA BULLETIN — JANUARY, 2017 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 60, No. 1 January, 2017 The Bulletin THE MILEPOSTS OF THE Published by the Electric NEW YORK SUBWAY SYSTEM Railroaders’ Association, Incorporated, PO Box by ERIC R. OSZUSTOWICZ 3323, New York, New York 10163-3323. Many of us are familiar with the chaining three former divisions (plus the Flushing and system for the tracks of the New York sub- Canarsie Lines) had one zero point. Most of For general inquiries, or way system. Each track on the system has a these signs have been removed due to vari- Bulletin submissions, marker every 50 feet based on a “zero point” ous construction projects over the years and contact us at bulletin@ for that particular track. For example, the ze- were never replaced. Their original purpose erausa.org. ERA’s ro point for the BMT Broadway Subway is is unknown, but shortly after their installation, website is just north of 57th Street-Seventh Avenue. The they quickly fell into disuse. www.erausa.org. southbound local track is Track A1. 500 feet Over the years, I have been recording and Editorial Staff: south of the zero point, the marker is photographing the locations of the remaining Editor-in-Chief: A1/5+00. One hundred fifty feet further south, mileposts before they all disappear com- Bernard Linder the marker is A1/6+50. If you follow the line pletely. These locations were placed on a Tri-State News and all the way to 14th Street-Union Square, one spreadsheet. Using track schematics show- Commuter Rail Editor: Ronald Yee will find a marker reading A1/120+00 within ing exact distances, I was able to deduce the North American and World the station. -
August 2007 Bulletin.Pub
TheNEW YORK DIVISION BULLETIN - AUGUST, 2007 Bulletin New York Division, Electric Railroaders’ Association Vol. 50, No. 8 August, 2007 The Bulletin SECOND AVENUE SUBWAY Published by the New WILL BE ENERGY-EFFICIENT York Division, Electric WILL BE ENERGY-EFFICIENT Railroaders’ Association, Incorporated, PO Box The Second Avenue Subway is the biggest Federal Emergency Management Agency’s 3001, New York, New expansion in decades of New York City’s flood maps, which establish flood elevations York 10008-3001. public transportation system. Scheduled for for a 50-year flood, 100-year flood, and 500- completion in 2013, Phase One includes the year flood for each area. In new construction, extension of Q service, with stations at 72nd all entrances, exits, and openings from the For general inquiries, th th contact us at nydiv@ Street, 86 Street, and 96 Street. station and tunnel will be built at least one electricrailroaders.org NYC Transit’s April, 2007 At Your Service foot above the 100-year flood elevation. All or by phone at (212) newsletter describes the energy-efficient fea- underground construction will be water- 986-4482 (voice mail tures of the new subway. In 2004, NYC Tran- proofed and will have pump rooms. The older available). ERA’s subway lines have street gratings which pro- website is sit won the Green Building Design Award for www.electricrailroaders. station skylights, energy-efficient lighting, vide ventilation with the piston action of the org. energy-efficient aluminum third rails, and es- trains. The Second Avenue Subway will not calators that run at a reduced speed when have any street gratings, but will have open- Editorial Staff: they are not used. -
Brooklyn-Queens Greenway Guide
TABLE OF CONTENTS The Brooklyn-Queens Greenway Guide INTRODUCTION . .2 1 CONEY ISLAND . .3 2 OCEAN PARKWAY . .11 3 PROSPECT PARK . .16 4 EASTERN PARKWAY . .22 5 HIGHLAND PARK/RIDGEWOOD RESERVOIR . .29 6 FOREST PARK . .36 7 FLUSHING MEADOWS CORONA PARK . .42 8 KISSENA-CUNNINGHAM CORRIDOR . .54 9 ALLEY POND PARK TO FORT TOTTEN . .61 CONCLUSION . .70 GREENWAY SIGNAGE . .71 BIKE SHOPS . .73 2 The Brooklyn-Queens Greenway System ntroduction New York City Department of Parks & Recreation (Parks) works closely with The Brooklyn-Queens the Departments of Transportation Greenway (BQG) is a 40- and City Planning on the planning mile, continuous pedestrian and implementation of the City’s and cyclist route from Greenway Network. Parks has juris- Coney Island in Brooklyn to diction and maintains over 100 miles Fort Totten, on the Long of greenways for commuting and Island Sound, in Queens. recreational use, and continues to I plan, design, and construct additional The Brooklyn-Queens Greenway pro- greenway segments in each borough, vides an active and engaging way of utilizing City capital funds and a exploring these two lively and diverse number of federal transportation boroughs. The BQG presents the grants. cyclist or pedestrian with a wide range of amenities, cultural offerings, In 1987, the Neighborhood Open and urban experiences—linking 13 Space Coalition spearheaded the parks, two botanical gardens, the New concept of the Brooklyn-Queens York Aquarium, the Brooklyn Greenway, building on the work of Museum, the New York Hall of Frederick Law Olmsted, Calvert Vaux, Science, two environmental education and Robert Moses in their creations of centers, four lakes, and numerous the great parkways and parks of ethnic and historic neighborhoods.