OBRM Business Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Download LIRR Alternative Subway & Bus Information Brochure
To Get to: Branch/Stations From Penn Station From Jamaica From Atlantic Termina l Travel Tips: PORT JEFFERSON BRANCH Take 179th St/Jamaica-bound F train to last stop. On Hillside Ave transfer to At LIRR Jamaica Station transfer to 165th St Bus Terminal bound Q6/Q8/Q9/Q41 Walk to Lafayette Av Station, take Euclid Av-bound C train to Broadway Junction East of Hicksville Hicksville-bound N22 bus. buses. From 165th St Bus Terminal transfer to a Hicksville bound N22 bus. Station, then take Jamaica Center-bound J train and exit at Sutphin/Archer (JFK) • Be prepared: Have a MetroCard with you at all times. To Huntington: At Hicksville, transfer to N78 /N79 bus to Walt Whitman Mall. To Huntington: At Hicksville, transfer to N78 /N79 bus to Walt Whitman Mall. stop. Follow directions from Jamaica Station. Buses and subways cost $2.25 per ride, but MetroCard Then take H9 or S1 bus to Huntington. Then take H9 or S1 bus to Huntington. provides free transfers between certain bus and subway lines. To Greenlawn & Northport: At Hicksville, transfer to N78 /N79 bus to H9 bus. To Greenlawn & Northport: At Hicksville, transfer to N78 /N79 bus to H9 bus. Transfer at Huntington Hospital to H6 . Transfer at Huntington Hospital to H6 . • Familiarize yourself with subway and bus routes in advance. To Kings Park and Smithtown: At Hicksville, take N78 /N79 bus to Walt Whitman To Kings Park and Smithtown: At Hicksville, take N78 /N79 bus to Walt Whitman NYC Subway & Bus Maps/Schedules are online at Mall. Then take S54 bus to Commack Shopping Plaza and transfer to S56 bus. -
MTA Capital Program 2008–2013
MTA Capital Program 2008–2013 February 2008 TABLE OF CONTENTS Page Overview: The MTA 2008-2013 Capital Program-- - i - “Building for the Future on a Firm Foundation” 2008-2013 Introduction: Investment Summary and Program Funding - 1 - I. Core CPRB Capital Program - 7 - MTA NYC Transit 2008-2013 Capital Program - 13 - Overview Program Plan MTA Long Island Rail Road 2008-2013 Capital Program - 45 - Overview Program Plan MTA Metro-North Railroad 2008-2013 Capital Program - 73 - Overview Program Plan MTA Bus Company 2008-2013 Capital Program - 101 - Overview Program Plan MTA Security 2008-2013 Capital Program - 111 - Overview Introduction MTA Interagency 2008-2013 Capital Program - 115 - Overview Program Plan II. Capacity Expansion - 123 - Completing the Current Expansion Projects: MTA Capital Construction Company: - 125 - Overview Program plan East Side Access Second Avenue Subway Fulton Street Transit Center South Ferry Terminal Regional Investments Miscellaneous 2005-2009 Capital Program New Capacity Expansion Investments - 141 - Overview Investments to Implement Congestion Pricing New Capacity Expansions to Support Regional Growth Communications Based Train Control Second Avenue Subway Next Phase Penn Station Access Jamaica Capacity Improvements #7 Fleet Expansion Capacity Planning Studies Sustainability Investments Program Project Listings (blue pages) - 149 - (not paginated; follows order above, beginning with blue pages for MTA NYC Transit and ending with blue pages for MTA Capital Construction Company) MTA Bridges and Tunnels 2008-2013 Capital Program - B-1 - Overview Program Plan Program Project Listings - B-25 - 2005-2009 Capital Program THE 2008-2013 CAPITAL PROGRAM: Building for the Future on a Firm Foundation In the early 1960’s, the New York Metropolitan Region’s mass transportation network faced financial collapse and a crisis of capacity. -
Electric Vehicle Charging Stations in New York Based on Alternative Fuel Stations in New York
Electric Vehicle Charging Stations in New York Based on Alternative Fuel Stations in New York Fuel Type Code Station Name ELEC Davidson Nissan ELEC Hampton Inn Rome - Tesla Destination ELEC National Grid Liverpool NY ELEC HYATT PLACE HOTEL AMHERST 1 ELEC 300 ALEXANDER 300 ALEXANDER ELEC PISO OFFICE 1 ELEC PANYNJ LGA WEST 2 ELEC The Standard, High Line - Tesla Destination ELEC TRICITYRENTALS PARK SOUTH ELEC Riverhead Auto Mall ELEC EVPASS ONCT-13 ELEC NEW STATION 01 ELEC HAWTHORNE RIDGE STATION 2 ELEC CITY HALL 12534 CITY HALL 3 ELEC 799 SENECA STATION 12 ELEC O. C. BMW STATION 01 Page 1 of 1793 09/26/2021 Electric Vehicle Charging Stations in New York Based on Alternative Fuel Stations in New York Street Address Intersection Directions 18423 Route 11 1352 Floyd Ave 7437 Henry Clay Blvd 5020 Main Street 300 Alexander St 2880 U.S. 9 LGA West Garage LaGuardia Airport 848 Washington St 17 New Scotland Av 1800 Old Country Rd 400-498 Harrison St 1055 E Jericho Turnpike 30 Community Way Hawthorne Ridge 542 Warren St 799 Seneca St 101 Maher Ln Page 2 of 1793 09/26/2021 Electric Vehicle Charging Stations in New York Based on Alternative Fuel Stations in New York City State ZIP Plus4 Watertown NY 13601 Rome NY 13441 Liverpool NY 13088 Amherst NY 14226 Rochester NY 14607 Valatie NY 12184 Flushing NY 11371 New York NY 10014 Albany NY 12208 Riverhead NY 11901 Syracuse NY 13202 Huntington NY 11743 East Greenbush NY 12061 Hudson NY 12534 Buffalo NY 14210 Harriman NY 10926 Page 3 of 1793 09/26/2021 Electric Vehicle Charging Stations in New York Based -
Neighborhood Map ¯
Neighborhood Map ¯ 143-09 Parsons Boulevard 149 Street 9 1 3 9 8 5- - 85 Drive 4 8 161-16 9 138-39 139-01 143-10 152 Street 151 Street 161 Street 85-49 150 Street 84-99 85-49 138-09 159 Street 138-51 85-49 160 Street 138-40 85-69 86 Avenue 85-60 148-09 86 Avenue 160-11 Maple Grove 139-99 85 Drive 85-69 86-01 86-09 138-10 85-99 85-69 Van Wyck Expressway 85-69 160-14 Queens Boulevard Cemetery 85-69 Normal Road 152-09 149-09 151-09 85-79 86-05 150-09 Q44 138-39 139-01 85 Drive SBS 86 Avenue 162-01 Q25 161-45 Q25 8 86-10 Q34 6 Q34 - Q20A 85-80 1 138-40 86 Road 6 86 Road Q20B 85-75 Q60 139 Street 139-99 85-90 148 Street 85-89 Q25 Jamaica 86 Avenue Q25 Q44 LTD 161-30 86-35 LTD SBS 144 Street 161-02 150-99 Q20A 161-18 150-01 Hills Q20B 148-99 86-25 Q60 86 Crescent 138-39 139-01 148-01 86 Avenue 162 Street 86-01 86-99 86-36 86-38 86-40 Briarwood 138-25 86-37 87-01 87 Avenue 86-36 86-14 PS 86 138-40 143 Street 139-99 Hillcrest 86-09 86-17 87 Avenue 86-10 High School 86-43 162-01 -11 143-01 161-99 136 87-01 138-26 86-05 86-10 87-09 150-99 135-09 87 Avenue 143-02 148-99 150-01 87-01 87-01 148-01 87 Avenue P 10 a 87-01 135- r 144-45 s 87-11 139-01 87-10 o 87-12 86-99 1 n 5 s e 87 Avenue 5 B u 87 Road n 150Street o 139-99 S e u t v r l 87-09 e A e 87-10 Our Lady Street148 v e d Victoria Young Women’s Leadership a n of Cenacle Church t r a 87-09 l 135 Street d 136 Street Congregational School of Queens h g 87-39 i Queens Church H High School Boulevard 87-10 for Language 87-47 and Communication 87-25 148-99 150-01 Highland 87 Road 162 Street Development -
David Keller Photographs
1) Keller, David, c.1952- . Long Island Photograph Collection, c.1880-1971. Special Collections Department/Long Island Studies Institute Contact Information: Special Collections Department Axinn Library, Room 032 123 Hofstra University Hempstead, NY 11549 Phone: (516) 463-6411, or 463-6404 Fax: (516) 463-6442 E-mail: [email protected] http://www.hofstra.edu/Libraries/SpecialCollections Compiled by: [M. O’Connor] Date [August 29, 2014] Completed: Keller, David, c.1952- . Long Island Photograph Collection, c.1880-1971. 0.6 cubic ft. Biographical Note: At age 14, self-described “railfan” David Keller, then a resident of Holtsville, purchased a Yashica twin-lens reflex camera, which he taught himself to use. He then set out on a mission to photograph Long Island Rail Road (L.I.R.R.) structures exclusively; however, his subject matter quickly expanded to include things such as trains and train crews. Keller’s father supported the young teen’s ambition, and he drove him all over Long Island to photograph the various L.I.R.R. stations. Keller later became a fixture at the “PD” tower in Patchogue, where he learned all about the history and operation of the railroad. During college, he worked for the L.I.R.R for three summers, first as a ticket clerk and later as a special services attendant. Keller and fellow avid railfan and writer Steven Lynch have published two books of L.I.R.R. photographs: The Long Island Rail Road 1925-1975 (Images of Rail) (2004) and Revisiting the Long Island Rail Road: 1925-75 (2005). In addition, Keller maintains a website titled Dave Keller’s RR Photo Archives (http://sbiii.com/d-keller/d-keller.html). -
Briarwood Richmond Hill Kew Gardens
Neighborhood Map ¯ 83-99 147-01 123-01 t 84 Avenue e e Austin Street t Q60 e r 8 e t tr 4 A 123-02 S S v 84-01 Archbishop Molloy 143-01 e n 84-40 ai r nu C High School M e e d 84-14 u Talbot Street th Q60 Manton Street n b 141-99 a e L r 84-37 84 Road t Q44SBS t R cen 143-99 o es 83-99 r Smedley Street a C 143-22 84-15 d Hoover ing 84-99 sh Kew Gardens Playground er 8 P P Synagogue 3 84-49 e - r 142-09 Kew Gardens Road 9 s 9 h t 147-01 84 Road in e g e Q20A r 84-01 Q20B C t r S 12 e 4-16 Q44 s SBS s l Q20A c ie 84 Road e n Q20B n Q44 t a scen t D 84-99 84-01 SBS e Cr en Main Street rd Briarwood Bu 84-45 Library 147-01 125 Street 1 4 0 - 84 Drive Q44SBS 9 9 141-99 142-11 123-35 Kew Gardens Road Main Street 139-01 142-34 84-99 123-16 Eight Oaks Triangle 143-98 Cuthbert Road Brevoort Street 8 85-15 4 84-01 e 85-01 Maple Grove riv D 126-02 Briarwood D ri 4 84 Drive ve Q 84-53 8 Cemetery u 84-79 e e 137-73 82-12 n s 139-01 Abingdon Road B 140-01 3 271 o 138-1 u 141-01 l 84 Drive 84-01 e Austin Street 84-83 122-01 v 126 Street 139-01 a 84-60 127-18 r M 139-18 d a 138-01 138-44 n t 8 o 1 85-99 n - 8 147-99 4 5 A Metropolitan Avenue S 8 venu t Briarwood e re e Joyce Keld Briarwood t School, PS 117 Kew Q44SBS 85 Road 141-99 Robert A. -
Proposed MTA Capital Program 2010-2014
Proposed MTA Capital Program 2010-2014 September 23, 2009 TABLE OF CONTENTS Page OVERVIEW 1 The MTA 2010-2014 Capital Program-- “Preserving the Transportation System’s Rich Heritage for Future Generations” INTRODUCTION 15 Investment Summary and Program Funding CORE CPRB CAPITAL PROGRAM: 2010-2014 MTA NYC Transit Capital Program 25 Overview Program Plan MTA Long Island Rail Road Capital Program 53 Overview Program Plan MTA Metro-North Railroad Capital Program 77 Overview Program Plan MTA Bus Company Capital Program 101 Overview Program Plan MTA-Wide Security and Safety Capital Program 109 Overview Introduction MTA Interagency Capital Program 115 Overview Program Plan NETWORK EXPANSION: 2010-2014 MTA Capital Construction Capital Program 125 Overview Program plan MTA BRIDGES AND TUNNELS CAPITAL PROGRAM: 2010-2014 143 Overview Program Plan PROGRAM PROJECT LISTINGS: 2010-2014 165 Proposed 2010-2014 Capital Program (This page intentionally left blank.) Proposed 2010-2014 Capital Program THE 2010-2014 CAPITAL PROGRAM: Preserving the Transportation System’s Rich Heritage for Future Generations Introduction The MTA’s network of subways, buses and railroads move 2.6 billion New Yorkers a year, about one in every three users of mass transit in the United States and two thirds of the nation’s rail riders. MTA bridges and tunnels carry nearly 300 million vehicles annually—more than any bridge and tunnel authority in the nation. This vast transportation network –North America’s largest— serves a population of 14.5 million people in the 5,000 square–mile area fanning out from New York City through Long Island, southeastern New York State and Connecticut. -
Proposed MTA Capital Program 2010-2014
Proposed MTA Capital Program 2010-2014 DRAFT - August 2009 TABLE OF CONTENTS Page OVERVIEW 1 The MTA 2010-2014 Capital Program-- “Preserving the Transportation System’s Rich Heritage for Future Generations” INTRODUCTION 15 Investment Summary and Program Funding CORE CPRB CAPITAL PROGRAM: 2010-2014 MTA NYC Transit Capital Program 25 Overview Program Plan MTA Long Island Rail Road Capital Program 53 Overview Program Plan MTA Metro-North Railroad Capital Program 77 Overview Program Plan MTA Bus Company Capital Program 103 Overview Program Plan MTA-Wide Security and Safety Capital Program 111 Overview Introduction MTA Interagency Capital Program 117 Overview Program Plan NETWORK EXPANSION: 2010-2014 MTA Capital Construction Company Capital Program 127 Overview Program plan MTA BRIDGES AND TUNNELS CAPITAL PROGRAM: 2010-2014 145 Overview Program Plan CAPITAL PROGRAM PROJECT LISTINGS: 2010-2014 167 Proposed Draft 2010-2014 Capital Program (This page intentionally left blank.) Proposed Draft 2010-2014 Capital Program THE 2010-2014 CAPITAL PROGRAM: Preserving the Transportation System’s Rich Heritage for Future Generations Introduction The MTA’s network of subways, buses and railroads move 2.6 billion New Yorkers a year, about one in every three users of mass transit in the United States and two thirds of the nation’s rail riders. MTA bridges and tunnels carry nearly 300 million vehicles annually—more than any bridge and tunnel authority in the nation. This vast transportation network –North America’s largest— serves a population of 14.5 million people in the 5,000 square–mile area fanning out from New York City through Long Island, southeastern New York State and Connecticut. -
BULLETIN - OCTOBER, 2010 Bulletin New York Division, Electric Railroaders’ Association Vol
TheNEW YORK DIVISION BULLETIN - OCTOBER, 2010 Bulletin New York Division, Electric Railroaders’ Association Vol. 53, No. 10 October, 2010 The Bulletin BROOKLYN’S FIRST ELEVATED LINE Published by the New QUIT 60 YEARS AGO York Division, Electric Railroaders’ Association, Lexington Avenue was Brooklyn’s first ele- discontinued. Service was provided by Myrtle Incorporated, PO Box vated line, which ran continuously from May Avenue trains via a new curve at the north- 3001, New York, New 14, 1885 to October 13, 1950. east corner of Myrtle and Grand Avenues. York 10008-3001. Ground was broken on May 24, 1876 at Remnants of this curve were still in place Reid and Lexington Avenues and a few when the line was abandoned in 1969. For general inquiries, stones were set in place. Construction pro- Manhattan-bound riders had two choices. contact us at nydiv@ ceeded slowly. They could ride Lexington Avenue trains to erausa.org or by phone at (212) 986-4482 (voice The original line extended from Washington Sands Street and transfer to the Brooklyn mail available). The and York Streets via York Street, Hudson Bridge Cable Railway, which ran to Park Division’s website is Avenue, Park Avenue, Grand Avenue, Lex- Row. There they were near several office www.erausa.org/ ington Avenue, and Broadway to Gates Ave- buildings and stores. If they rode Myrtle Ave- nydiv.html. nue. Stations were located at Bridge and nue trains, they had to transfer to the Fulton Editorial Staff: York Streets, Navy Street and Park Avenue, Ferry, which was unreliable and uncomfort- Editor-in-Chief: Washington and Park Avenues, Myrtle and able in bad weather. -
The Nation's First Regional Small Business Mentoring Program
SUCCESS STORIES: SEVEN YEARS OF SUCCESS MTA SMALL BUSINESS DEVELOPMENT PROGRAM THE NEW PARADIGM FOR SMALL BUSINESS IN TRANSPORTATION The Nation’s First Regional Small Business Mentoring Program MTA Small Business MTA Small Business MTA Emerging Mentoring Program Federal Program Contractor Program YEARS OF SUCCESS BUILDING CERTIFIED MINORITY, WOMEN-OWNED, DISADVANTAGED BUSINESS ENTERPRISES AND SMALL BUSINESSES 72010-2017, AND MOVING FORWARD 7 YEARS OF SUCCESS BUILDING CERTIFIED MINORITY, WOMEN-OWNED, DISADVANTAGED BUSINESS ENTERPRISES AND SMALL BUSINESSES 1 MTA SMALL BUSINESS DEVELOPMENT PROGRAM THE NEW PARADIGM FOR SMALL BUSINESS IN TRANSPORTATION contents 4 6 8 10 The Power of An Idea A Statewide Diversity The Leaders Creating a Bring small business Commitment Behind the Program Mentoring Program to the MTA, and they Governor Andrew M. Top down visions A simple idea, going will build it. Cuomo and his team advance the MTA viral at the MTA. make a transformative diversity agenda. commitment. 36 38 41 44 The MTA Team 2017: The Year of Creating Business Breaking that Builds Small Business Change Through Barriers Small Business at the MTA What's New at the Capital and bonding – “The speed of the MTA SBDP – It's a MTA Small Business two keys to boss is the speed of mini MBA degree Development Program project success. the team.” for contractors. -Lee Iacocca YEARS OF SUCCESS BUILDING CERTIFIED MINORITY, WOMEN-OWNED, DISADVANTAGED BUSINESS ENTERPRISES AND SMALL BUSINESSES 72010-2017, AND MOVING FORWARD 12 32 34 35 SBDP A Regional Economic Our Numbers Talk Payments Success Stories Development Program Over 5,000 new jobs Running Express Nine contractors Numbers that make created and more. -
Mta Property Listing for Nys Reporting
3/31/2021 3:48 PM MTA PROPERTY LISTING FOR NYS REPORTING COUNTY SECTN BLOCKNO LOTNO Property_Code PROPERTYNAME PROPERTYADDDRESS AGENCY LINE PROPERTYTYPE limaster LIRR Customer Abstract Property LIRR Customer Abstract Property LIR Main Line Station Bronx bbl05200 Bronx Whitestone Bridge Hutchson River parkway BT Block/Lot Bridge Bronx 9 mha04650 ROW b 125th & Melrose XXX St MN Harlem ROW Bronx 9 mha06600 ROW b 125th & Melrose Milepost 5,Sta-Mon# 31.5 MN Harlem ROW Bronx 12 mha09500 FORDHAM STATION Fordham Rd (Fordham U) MN Harlem Station Bronx mhu00343 Perm E'ment at Yankee Stadium Sta-mon 30.5 MN Hudson Payable Easement Bronx mhu06251 Spuyten Duyvil Substation Sta-Mon# 68.5 MN Hudson Payable Easement Bronx 19 mhu06301 Parking at Riverdale Milepost 12 , Sta-Mon# 68.5 MN Hudson Parking Bronx tbl03600 Unionport Shop Unionport Rd. NYCT White Plains Road Shop Bronx tbl65340 Con Edison Ducts East 174 St NYCT Block/Lot Ducts Bronx tbw32500 231ST 231 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32600 238 ST 238 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32700 242 ST 242 St-Van Cortlandt Pk NYCT Broadway/7th Avenue Station Bronx tco21000 161 ST Yankee Stadium 161 St/River Ave NYCT Concourse Station Bronx tco21100 167 ST 167 St/Grand Concourse NYCT Concourse Station Bronx tco21200 170 ST 170 St/Grand Concourse NYCT Concourse Station Bronx tco21300 174 175 STs 174-175 Sts/Grand Concourse NYCT Concourse Station Bronx tco21400 TREMONT AVE Tremont Ave/Grand Concourse NYCT Concourse Station Bronx tco21500 182 183 STs 183 St/Grand -
July 29, 2004 MTA Board Members: the Preliminary Capital Program For
347 Madison Avenue Katherine N. Lapp New York, NY 10017-3739 Executive Director 212 878-7274 Tel 212 878-7432 Fax State of New York July 29, 2004 MTA Board Members: The Preliminary Capital Program for 2005-2009 presented today represents the combined efforts of each of our operating agencies to define the core program needs for the system over the next five years (state of good repair, normal replacement and system improvement); to con- tinue to invest in security projects identified after 9/11 to harden the system from terrorist attacks; and to advance system expansion projects, (East Side Access, SAS, #7 Line and LIRR/JFK connection) into the implementation phase. The MTA Board set the course for today’s submission over twenty years ago with the implementation of the first capital program. By the end of 2004, the MTA will have committed more than $48 billion in capital funds to reclaim and improve the core system—and the results have been remarkable. Since the early 1980’s, on-time performance has increased from 85% to 93.1% for LIRR, and from 80.5% to 97.5% for Metro-North. The mean distance between failures (MDBF) for the subway system has increased contin- uously, doubling every five to seven years and increasing overall from 6,988 miles in 1981 to nearly 140,000 miles in 2003. And at MTA Bridges and Tunnels, average peak-hour queue time has dropped from 3 minutes in 1996 to only 20 seconds, despite a 13% increase in traffic over the same period. The agencies of the MTA, Peter S.