L5 T6 I7 L8 BIDWELL, BUILDING a BETTER PETITIONERS

Total Page:16

File Type:pdf, Size:1020Kb

L5 T6 I7 L8 BIDWELL, BUILDING a BETTER PETITIONERS 1 2 J 4 5 6 7 SHORELINES HEARINGS BOARD 8 STATE OF V/ASHINGTON 9 DR. DONALD DAVIDSON, GEOFFREY l0 BIDWELL, BUILDING A BETTER BELLEVUE and KEMPER No DEVELOPMENT COMPANY, A W ll corporation, PETITION FOR REVIEV/ 12 Petitioners, 13 VS. 14 THE CITY OF BELLEVUE, through its l5 DEVELOPMENT SERVICES DEPARTMENT, Decision Maker; and TRANSIT ANd ELLIE ZIEGLER t6 SOLIND FOR SOUND TRANSIT, Applicanl, I7 DEPARTMENT OF ECOLOGY, l8 I. PETITIONERS 19 The Petitioners are Dr. Donald Davidson, Geoffrey Bidwell, Building A Better 20 Bellevue and Kemper Development Company, Petitioners are represented by: 21 22 Keith W. Dearborn Alison Moss 23 Troy D. Greenf,reld Schwabe, Williamson & V/yatt 24 1420 5Th Avenue, Suite 3400 Seattle, V/A 981 0l -401 0 25 Telephone: 206-407 -1581 26 Facsimile: 206-292-0460 SCHWABE, WILLIAMSON & WYATT, P C PETITION FOR REVIEW - 1 Attorneys al Law Pacwesl Center 121 1 SW sth Ave , Suite 1900 Portland, OR 97204 Telephone: 5O3 222 9981 PDX\t 27954\200497\KDA\l 5 138887. I I Email : [email protected] [email protected] 2 tgreenfi eld@schwabe. com J II. DESCRIPTION OF PETITIONERS 4 Petitioner Dr. Donald Davidson is a resident of the City of Bellevue with a strong 5 history of public service to Bellevue. He sat on the City Council for more than25 years and 6 was the mayor of Bellevue for four years. During his time on the City Council, Dr. Davidson 7 served as Environmental Services Commission Liaison, served on the Metropolitan Water 8 Pollution Abatement Advisory Committee and on the Regional V/ater Quality Committee, 9 chaired the V/atershed Resource Inventory Area 8 Forum, served on the Cascade l0 Water Alliance Board and its Resource Planning Committee, co-chaired the Puget Sound 11 Salmon Recovery Council, and served on the Shared Salmon Strategy I2 Development Committee. Dr. Davidson's passions are fly-fishing, bagpiping, and cleaning l3 up Puget Sound. He has used the Mercer Slough Nature Park shoreline for recreation t4 frequently and he intends to continue to do so. l5 Petitioner Geoffrey Bidwell-a retired rocket engineer-has resided in Bellevue for t6 the past 38 years. He is the founder of the Save the Mercer Slough Committee formed t7 in 1986. The organizationwas instrumental in petitioning the City of Bellevue to prevent l8 commercial development in the Mercer Slough wetlands and in forming the Mercer Slough 19 Nature Park. Mr. Bidwell has worked to protect the land and its vegetation and wildlife, and 20 the waters adjacent to the Mercer Slough and their aquatic life. He also personally frequently 2t avails himself of the public's opportunity to enjoy the physical and aesthetic qualities of 22 natural shorelines within Mercer Slough and he intends to continue to do so. 23 Petitioner Building a Better Bellevue ("BBB") is a nonprofit association comprised 24 of Bellevue homeowners, residents, businesses, and neighborhood groups concerned with 25 protecting Bellevue's neighborhoods, parks, and historic resources. Members created BBB in 26 June, 2010 in order to give a voice to the views and positions of its members and to represent P c' PETITION FOR REVIEV/ - 2 SoHWABE' il,:Ìlåy"9tf-*Arr' Pacwest Center "]:',:"Ïåiliå,'iilff - PD)Or 279s4U00497\KDA\l 5 l 38887. I to political and governmental leaders of the City of Bellevue, and other local, regional, and federal government agencies, the strong concerns of its members regarding implementation and operation of light rail services. It advocates in order to obtain assurances that the City of Bellevue does not damage their neighborhoods, nearby parks, and natural environment during the planning, implementation, and operation of light rail services. Its members avail themselves of the public's opportunity to enjoy the physical and aesthetic qualities of natural shorelines within Mercer Slough and they intend to continue to do so. Petitioner Kemper Development Company ("KDC") is a fourth-generation, family- owned company whose growth has mirrored the astounding boom of the Eastside of Puget Sound and is at the epicenter of one of the country's most sophisticated, fastest- growing markets. KDC is proudly the largest contributor of tax revenue to the City of Bellevue. KDC has a green initiative, with leading practices to control waste while significantly reducing water and energy consumption. KDC believes the Mercer Slough Nature Park includes some of the most valuable and fragile natural resources in the State of Washington and is dedicated to its preservation. Specifically, KDC recognizes the unique importance of a320 acre natural arca in an urban setting. KDC and its founding family have repeatedly contributed to the historic legacy of the Eastside. Almost all of the users of the KDC Bellevue Collection (Bellevue Square, Bellevue Place and Lincoln Square) travel on Bellevue Way SE for access from the south, east, and west. Increasingly, due to congestion, I-405 is no longer the route of choice to Downtown Bellevue. In addition, maintaining the travel capacity of Bellevue Way is critical to the livelihood and viability of the KDC Bellevue Collection and its many commercial partners. The Petitioners collectively exercised many opportunities to provide public comment and have their voices heard regarding the proposed project and its impacts to the shoreline. For instance, the Petitioners commented upon the Shoreline Substantial Development Permit, the Shoreline Variance, the draft EIS ("DEIS") andlor draft Supplemental EIS ("DSEIS"). PETITION FOR REVIEV/ - 3 S.HWABE' TLt"!låy,t9t***o"'t' Pacwest Center ";:r:"i'ii!.tå,åigá:i' PDX\l 27954U00497\KDA\l 5 | 38887 I 1 The following is a non-exclusive list of the substantive topics addressed rn 2 the comments: J l. The inability to fully compare the impacts of segment alternatives on the natural 4 environment; 5 2, Construction, visual, wetland, traff,rc and transportation, private property, 6 pedestrian safety, and social impacts; 7 3. Impacts to the Mercer Slough; 8 4. Impacts to the historic Winters House, businesses, residents and other property 9 owners from traff,rc congestion, construction, noise and vibrations; l0 5. Conflicts with Land Use Plans, Goals and Policies; and ll 6. Identification of alternative B-7 as the B segment with the least environmental I2 impacts and/or the benefits of an alternative alignment, namely B-7R (the Segment B 13 Alternatives are shown on Exhibit A). T4 Each Petitioner has standing under both the Shorelines Management Act ("SMA") l5 and the State Environmental Policy Act ("SEPA"), as they each will suffer injury if the 16 shoreline of the Mercer Slough Nature Park is adversely impacted by the project. As used in I7 this Petition the reference to the "Project" is to the B Segment of the East Link light rail 18 project. They each have an interest in the public use of the Mercer Slough and the Nature t9 Park, their own usage of Mercer Slough and the Nature Park, and environmental stewardship 20 within the City of Bellevue. 2t ilI. LOCAL GOVERNMENT FOR \ilHOSE DECISION PETITIONERS SEEK REVIEW 22 This Petition seeks review of the Shoreline Substantial Development Permit ("SDP") 23 and Shoreline Variance ("Variance") (collectively the "Permits" or the "Decision")1, issued 24 by the City of Bellevue ( "City"), through its Development Services Department, to Sound 25 I 26 Attached as Exhibit B. SCHWABE, WILLIAMSON A WIATT, P C PETITION FOR REVIEV/ - 4 Attorneys at Law Pailest Center 1211 SW sth Ave , Suite 1900 Portland, OR 97204 ïelêphone: 503 222 9981 PDX\127954U00497\KDA\l 5 1 38887. I Transit for construction of the East Link light rail extension through the City. The 2 Department of Ecology also approved the Variance. The SDP authorizes development of a J new regional light rail transit ("RLRT") facility. The Variance authorizes construction of the 4 light rail facility 10 feet higher than the 35-foot shoreline height limit within the B Segment 5 of the Project alignment north of the South Bellevue Park-and-Ride and south of the historic 'Winters 6 House. Sound Transit's application is included as a CD and referenced as Exhibit 7 C. 8 ry. ISSUES PRESENTED FOR REVIE\il 9 A. Sound transit and the City staff misrepresented City Council actions so that the 10 SDP and the Variance were treated as afait accompli. ll B. Sound Transit and the City staff did not consider the environmental impacts of the Issaquah extension on the Mercer Slough Nature Park. 12 C. Review of the Project has been improperly piecemealed. 13 D. The SDP does not comply with the City's Shoreline Master Program ("SMP"). t4 E. Sound Transit has not demonstrated that the criteria for the granting of a Shoreline 15 variance have been met. t6 F. New information shows the Project will have more significant environmental impacts on the historic Winters House than was disclosed in the environmental documents. l7 G. Shoreline impacts have been ignored or discounted because the City staff treated 18 the Project as having been approved by the City Council. 19 H. Changes in the Project will have significant adverse environmental impacts that have not been adequately evaluated or mitigated, 20 L New information shows the Project will have signiflcant adverse environmental 2l impacts that have not been adequately evdluated or mitigaled.2 22 J. Alternative B-7R or a tunnel are reasonable and feasible alternatives with lesser environmental impacts than the chosen alternative B-2M. 23 K Construction and operational impacts of the Project have not been adequately 24 disclosed, evaluated, andl or mitigated. 25 L. Tree removal proposed for the Mercer Slough Nature Park does not comply with 26 'For ease of discussion, the Petitioners address Issues G-I together in $ VIII.G SCHWABE, WILLIAMSON & WYATT, P C.
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • East Link Light Rail Draft EIS -- Excerpts Only
    See the Fact Sheet for persons who may be contacted for additional information concerning this document. Abstract Sound Transit proposes to construct and operate an Downtown Redmond via either Redmond Way or the eastern extension of the Link light rail system BNSF Railway corridor. Alternatives considered providing urban transportation improvements in the include a No Build Alternative, one alternative for Central Puget Sound metropolitan region. The East Segment A, five alternatives for Segment B, six Link project would connect to the rail system’s Initial alternatives for Segment C, four alternatives for Segment in downtown Seattle and extend the system Segment D, three alternatives for Segment E, and four east to Mercer Island, Bellevue, and Redmond. maintenance facility alternatives. Overall, the project Alternatives are considered in five geographic would have between 10 and 13 stations. Interim segments in this EIS. Segment A, Interstate 90, termini could occur at the east end of Segment C or connects downtown Seattle to Mercer Island and any station in Segments D or E. Construction is South Bellevue via I-90. Segment B, South Bellevue, expected to start in 2013, with operation under way connects I-90 to approximately SE 6th Street along one between 2020 and 2021. The analysis and impact of three corridors: Bellevue Way, 112th Avenue SE, or information in this EIS addresses potential long-term the BNSF Railway right-of-way. Segment C, and short-term impacts of transportation; acquisitions, Downtown Bellevue, would travel through displacements and relocations; land use; economics; downtown Bellevue between approximately SE 6th social impacts, community facilities, and Street and an I-405 crossing at either NE 6th Street or neighborhoods; visual and aesthetic resources; air NE 12th Street on either an at-grade, elevated, or quality and greenhouse gas; noise and vibration; tunnel profile.
    [Show full text]
  • Section 27 60 02
    CONTRACT SPECIFICATIONS SECTION 27 60 02 TUNNEL RADIO SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Design, furnish, and install all necessary fiber-optic equipment, amplifiers, antennas, devices, interconnecting cabling, and software to completely implement the fiber-fed 800 MHz Radio Distributed Antenna Systems (DAS) described in these Specifications and in the attached Contract Drawings. B. Section includes the requirements for furnishing, installing, and testing two DAS Systems to provide radio communications for both Sound Transit and for public safety agencies in the NorthNorthgate Link and East Link tunnel segments; U-District Station and Roosevelt Station; the Bellevue Transit Center tunnel and station, other East Link Stations and parking garages (described below), the Mount Baker I-90 Tunnel, and the Mercer Island I-90 Lid. The Distributed Antenna Systems will provide coverage both in the NorthNorthgate Link and East Link tunnel segments and in all public and ancillary spaces in the NorthNorthgate Link and East Link stations. Section also includes requirements for relocating existing Downtown Seattle Transit Tunnel (“DSTT”) DAS panel antennas in the International District Station (“IDS”) to provide clearance for the new Overhead Contact System (“OCS”) that will be installed in the IDS Station as part of the implementation of the East Link alignment. B.C. The NorthNorthgate Link System will have two RF distribution Hubs located at U-District Station and Roosevelt Station. The East Link System will have two RF distribution Hubs located at the Mt. Baker Tunnel and the Mercer Island Tunnel. These RF distribution The North Link Hubs will be fed via an analog RF-over-fiber link from the Distributed Antenna system Headend at the Sound Transit Operations and Maintenance Facility (OMF).
    [Show full text]
  • East Link Extension Washington Into East King County, and South of University of Washington Bel-Red/130Th Sea-Tac International Airport
    Lynnwood Link Light Rail System Mountlake Terrace 185th 145th Downtown Redmond In 2008, voters approved the Sound Transit 2 Not funded for construction Plan. Link will expand the current system from Northgate SE Redmond Seattle north into Snohomish County, across Lake Roosevelt Redmond Technology Center U District Overlake Village East Link Extension Washington into East King County, and south of University of Washington Bel-Red/130th Sea-Tac International Airport. OCTOBER 2016 Capitol Hill Spring District/120th Westlake/Seattle Wilburton University Street Bellevue Downtown Bellevue Pioneer Square East Main Downtown to Int’l District/Chinatown South Bellevue Redmond Technology Center Stadium Judkins Mercer SODO Park Island 10 minutes Beacon Hill Mount Baker Columbia City Othello South Bellevue Rainier Beach to Stadium Tukwila/Int’l Blvd 20 minutes SeaTac/Airport Link in service Angle Lake Under construction Kent/Des Moines For information in alternative formats, call 1-800-201-4900/ In final design S 272nd Not funded for TTY Relay: 711 or email [email protected]. construction In planning Federal Way Bellevue East Link Alignment Downtown to University Of Washington Map Key 30 minutes Station P Park & Ride Redmond Link in service Technology Center P NE 40th Tunnel route Elevated route Overlake Bellevue to Surface and 520 Village existing bridges Spring District/ Sea-Tac Airport 120th Light rail under P 55 minutes construction Bel-Red/ 52nd Ave NE includes transfer Future extension Wilburton 130th 1 Lake NE 8th St Washington NE 6th St Bellevue Downtown Bellevue to East Main Main St International District station Intl District/ Chinatown Mercer 20 minutes Judkins Park Island Rainier Ave S P S P South Bellevue Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound.
    [Show full text]
  • Transformative Transit-Sound Transit
    WA State Transportation Commission Peter Rogoff, CEO 11-17-2020 Construction & planning updates, Powering Progress Largest rail expansion in the country Serving a region of over 3 million Link Light Rail • 116-mile regional system with 50 stations. • Connecting Bellevue, Redmond, Kirkland, Issaquah, Tacoma, Everett, Ballard and West Seattle. Tacoma Link extensions to Hilltop and TCC • 12 new stations. Sounder commuter rail • 91 miles of commuter rail. • Expansion of service, 40% capacity increase. • Parking and access improvements. • Platform extensions. Bus • Bus Rapid Transit serving 12 cities. • Bus-on-Shoulder opportunities. 3 East Link Opens 2023 • Connects Redmond to downtown Bellevue, Seattle, University of Washington and Northgate • 14 miles, 10 stations, 4 cities • Bellevue to downtown Seattle: 23 minutes 4 East Link construction South Bellevue Station Downtown Bellevue Tunnel Bellevue Downtown Station 5 Bus Rapid Transit – New Line of Service Sound Transit welcomes Station Design Concept 6 I-405 BRT BRT Bus Base Project Overview: Lynnwood to Burien . 37-mile corridor . 11 BRT stations across 8 cities . Three new/expanded parking facilities . One transit center . Connections to Link light rail in Lynnwood, Bellevue and Tukwila 7 BRT System Elements of Success • Transit speed, reliability and access improvements • BRT stations (signage, shelter, amenities) • Parking facilities • Bus OMF and New BRT fleet • Branding • Rider information system 8 I-405 BRT travel times 9 History: I-405 Master Plan and the Sound Transit Long-Range Plan I-405 Master Plan adopted in 2002 • Identified a master list of potential projects, to be implemented incrementally when funds were secured • Identified BRT as the preferred high- capacity-transit mode • Sound Transit and WSDOT were co-leads • Improve personal and freight mobility and reduce foreseeable traffic congestion in the I-405 study area 10 Realigning expansion plans Revenue loss projections • Recession likely to reduce revenue by $310-$436 million by 2020-2021.
    [Show full text]
  • East Link Light Rail
    East Link light rail Segment B: South Bellevue 1 1 2 Segment B Alternatives T H Segment SE 6TH ST C A B1 LA KE BellevueHILLS CON WayN V E CT Segment Details Segment SURREY E B O BNSF R B2A 112th SE At-Grade DOWNS S B3 R E D B2E 112th SE Elevated PARK Wilburton In Segment B, light rail runs between I-90 and B2M K 112thelsey C SE Side-Running Park & Ride reek 108TH 108TH SE 8th B2M 112th SE Center-Running Station B3 112th SE Bypass SE 6th Street in south Bellevue. Sound Transit ST H A B2A SE 8T B1 SE VE B3 114th SE Design Option B7 BNSF evaluated five light rail route alternatives BELLEVUE B3 114th B2M to C11A B2M to C11A Design Option in the 2008 East Link Draft Environmental 118th SE W Station 104TH 104TH A Y B2E SE Impact Statement (DEIS) and studied one 123RD A t VE SE VE s B2M to C9T a E A t VE SE h to s B2M C9T g new alternative in the Supplemental Draft e 1 u W 1 o l MERCER 8 h B2A S T g u r H e SLOUGH o B3 l c S r A Environmental Impact Statement (SDEIS). The e V r M NATURE e E c r S BELLEVUE e PARK E preferred alternative (B2M) runs elevated from M I-90 north along the Eastside of Bellevue Way Revised/New Alternatives SE to a station at the South Bellevue Park-and- At-Grade Route B2E B2A Elevated Route BELLEVUE B3 Ride, an existing regional transit hub.
    [Show full text]
  • CD-30 Station Area Planning Implementation
    FY2021-2027 Capital Investment Program CD-30 Station Area Planning Implementation (East Main/South Category: Transportation and Mobility Bellevue)Status: Ongoing Department: CD Location:Various Programmed Expenditures Programmed Appropriated FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Expenditures To Date Budget Budget Budget Budget Budget Budget Budget 5,500,000 3,000,000 1,500,000 1,000,000 - - - - - Description and Scope The purpose of this fund is to connect Sound Transit’s East Main and South Bellevue light rail stations with their neighborhoods. Projects in CD-30 improve access to stations and better integrate stations with the surrounding area. Projects enhance livability by improving access and connectivity across multiple modes. Implementation strategies guiding projects focus on: • Maximizing pedestrian and bicycle convenience; • Promoting access and safety in reaching the stations; • Preserving and reinforcing neighborhood character, and • Addressing the potential impacts of increased traffic in the station areas. The South Bellevue Station Area Plan and East Main Station Area Plan approved in 2016 include representative projects that could be funded by this CIP. These include pedestrian walkways, bicycle facilities, signage, pavement markings, traffic calming technologies, improved lighting, enhanced landscaping, art, or other public realm improvements. Rationale This project focuses on maximizing pedestrian and bicycle convenience, promoting access and safety in the East Main and South Bellevue station areas.
    [Show full text]
  • Presentation on Sound Transit Art Program
    Sound Transit Art Program (STart) Seattle Design Commission Briefing March 4, 2021 STart Seattle Design Commission Briefing | Opportunity Design Today’s Presentation • Recent projects • What we’ve learned • How we’ve adapted STart Seattle Design Commission Briefing | Opportunity Design System Expansion Overview STart Seattle Design Commission Briefing | Opportunity Design Current service Link light rail • University of Washington to Angle Lake • Tacoma Dome to Theater District Sounder rail • Everett to Seattle • Lakewood/Tacoma to Seattle ST Express bus • 28 regional bus routes STart Seattle Design Commission Briefing | System Expansion 2021 Link light rail • Northgate Link Extension Sounder commuter rail • Puyallup station parking and access improvements STart Seattle Design Commission Briefing | System Expansion 2022 Link light rail • Tacoma Dome Link Extension STart Seattle Design Commission Briefing | System Expansion 2023 Link light rail • East Link Extension Sounder rail • Kent, Auburn, and Sumner station parking and access improvements STart Seattle Design Commission Briefing | System Expansion 2024 Link light rail • Lynnwood Link Extension • Downtown Redmond Link Extension • Federal Way Link Extension completed Sounder rail • Sounder North added parking and access improvements 2025 Bus Rapid Transit • I- 405 BRT (Lynnwood to Burien) • SR 522 BRT (Shoreline to Bothell) Link In-Fill Station • NE 130th Street, Seattle STart Seattle Design Commission Briefing | System Expansion 2030 Link light rail • West Seattle to Downtown STart
    [Show full text]
  • NE SPRING BOULEVARD Bellevue, Washington Tranformsformation to Multimodal | Belred Neighborhood
    NE SPRING BOULEVARD Bellevue, Washington Tranformsformation to Multimodal | BelRed Neighborhood October 2020 Northeast Spring Boulevard is a new multimodal, east-west roadway in the BelRed neighborhood of Bellevue, Washington. It is being built in phases from Northeast 12th Street to 136th Place Northeast. When complete, the new street will bisect the BelRed area, improving mobility for people who walk, bike, drive or take transit, while helping to unlock development potential in the area. Northeast Spring Boulevard will connect to Eastrail and complement Sound Transit’s future light rail line. NE Spring Blvd Corridor Improvements 520 405 Northup Way NE 20th St 120th Ave NE 116th Ave NE 124th Ave NE 130th Ave NE 132nd Ave NE 136th Pl NE 140th Ave NE T T NE Spring Blvd NE Spring Blvd Bel-Red Rd NE 12th St Legend Open October 2020 Eastrail — Open for use Eastrail — Future (2021/2022) Not funded Under construction (Sound Transit), Complete by 2023 Map not to scale T Future station Design underway, Construction begins early 2021 — 1 — Phased Transformation: At-a-glance Project limits Improvements Status ◼ 4-lane roadway with turn pockets 116th Avenue NE to ◼ New traffic signal Completed 120th Avenue NE ◼ Multipurpose path for pedestrians and bicyclists Opened to public (Zone 1) ◼ Two bridges over the light rail October 2020 ◼ Landscaping and urban design elements ◼ 4-lane roadway with turn pockets ◼ 4 new traffic signals and a pedestrian scramble 120th Avenue NE to Completed ◼ Sidewalks 124th Avenue NE Opened to public ◼ Off-street bike path
    [Show full text]
  • Progress Report Link Light Rail Program
    Progress Report Link Light Rail Program Waterproof patching in the Downtown Bellevue Tunnel. July | 2019 Prepared by Project Control & VE l Design, Engineering & Construction Management 0;o` // TABLE of CONTENTS Program Overview .............................................................. 1 University Link Extension ................................................... 5 Northgate Link Extension .................................................... 9 Lynnwood Link Extension ................................................... 29 I-90 Two-Way Transit & HOV Operations (Stage 3) ........... 45 East Link Extension….......................................................... 49 Downtown Redmond Link Extension ................................. 73 W. Seattle & Ballard Link Extensions ................................. 77 Federal Way Transit Extension ........................................... 81 Hilltop Tacoma Link Extension ...........................................91 Tacoma Dome Link Extension ............................................101 Link Operations & Maintenance Facility: East .................. 105 LRV Fleet Expansion ........................................................... 113 Staffing .................................................................................. 118 Acronyms .............................................................................. 120 Link Light Rail Program Overview 0;o` Link Light Rail // Program Overview University Link Extension (U-Link): This project is a 3.15- bridge over Duwamish River. The Ballard
    [Show full text]
  • Link Light Rail Open House: Preparing for Sound Transit's
    Link Light Rail Open House: Preparing for Sound Transit’s Design Process Shorewood High School January 27, 2016 This meeting is about The Sound Transit Design Process, including City and resident involvement Purpose to: • Provide information about background and how to participate moving forward • Solicit comment on City Council Draft Guiding Principles for Light Rail Facility Design • Visualize design elements for stations and garages This meeting is NOT about • Subarea Planning or Corridor Studies • No programmed discussion of zoning or property impacts tonight That said… • There are multiple distinct but related projects that the City and Sound Transit are working on in 2016 145th Corridor Study • Open House on February 24 • Council could select Preferred Concept in April • Preferred Concept would be refined through multiple year process of Environmental Review and Design • shorelinewa.gov/145corridor • Subarea Planning will resume with discussions at Planning Commission in February, March, and April • Council could select Preferred Alternative zoning scenario for Final EIS in May, potentially adopt in September • shorelinewa.gov/145station or shorelinewa.gov/lightrail City hosted • 5 Visioning events in 2013 • 4 Design Workshops in 2013 and 2014 • Many comments received about station and garage design • Became basis for Guiding Principles Guiding Principles for Light Rail Facility Design • Multi-modality • Public Safety • Sustainability • Mobility • Neighborhood Character • Public Amenities • Transit-Oriented Development • Public
    [Show full text]