East Link Light Rail East Link light rail Segment B: South Bellevue 1 1 2 Segment B Alternatives T H Segment SE 6TH ST C A B1 LA KE BellevueHILLS CON WayN V E CT Segment Details Segment SURREY E B O BNSF R B2A 112th SE At-Grade DOWNS S B3 R E D B2E 112th SE Elevated PARK Wilburton In Segment B, light rail runs between I-90 and B2M K 112thelsey C SE Side-Running Park & Ride reek 108TH 108TH SE 8th B2M 112th SE Center-Running Station B3 112th SE Bypass SE 6th Street in south Bellevue. Sound Transit ST H A B2A SE 8T B1 SE VE B3 114th SE Design Option B7 BNSF evaluated five light rail route alternatives BELLEVUE B3 114th B2M to C11A B2M to C11A Design Option in the 2008 East Link Draft Environmental 118th SE W Station 104TH 104TH A Y B2E SE Impact Statement (DEIS) and studied one 123RD A t VE SE VE s B2M to C9T a E A t VE SE h to s B2M C9T g new alternative in the Supplemental Draft e 1 u W 1 o l MERCER 8 h B2A S T g u r H e SLOUGH o B3 l c S r A Environmental Impact Statement (SDEIS). The e V r M NATURE e E c r S BELLEVUE e PARK E preferred alternative (B2M) runs elevated from M I-90 north along the Eastside of Bellevue Way Revised/New Alternatives SE to a station at the South Bellevue Park-and- At-Grade Route B2E B2A Elevated Route BELLEVUE B3 Ride, an existing regional transit hub. From Retained-Cut Route Retained-Fill Route W A Station Y Bellevue Way SE, the preferred alignment SE DEIS Alternatives 108TH BNSF continues north on 112th Avenue SE. During At-Grade Route A B1 VE SE Elevated SERoute 25TH ST summer 2010, the Sound Transit Board Retained-Cut Route B2M MERCER Retained-Fill Route SLOUGH South South Bellevue Station NATURE identified an alignment connecting to Segment Bellevue Park & Ride Station PARK B2A C running on 112th Avenue SE, after extensive B E A U X A R T S B2E public outreach. The SDEIS also studies a new B3 t s a E B7 113TH h proposal to preserve the Winters House by g u o l S r A e VE SE c L r running light rail trains in front of the house in e a k e B1 M W Segment B2A a Segment B2M s a lidded trench east of Bellevue Way SE. h B2E in g t B on A There are two variations of the B2M preferred B3 B7 SCALE B1 MERCER SLOUGH alternative, depending on whether a tunnel or NATURE PARK 0 0.125 0.25 Mile Source: City of Bellevue (2005) and King County (2006). an at-grade alternative is selected for Segment Revised/NewB2M Alternatives (PreferredDEISAlternatives Alternative) and other EIS Alternatives At-Grade Route At-Grade Station Exhibit 2-13 Elevated Route Elevated New and/or Expanded Segment B, South Bellevue C in downtown Bellevue. If the route connects Retained-Cut Route Retained-Cut Park-and-Ride Lot Alternatives A B Segment Limit East Link Project to a tunnel alternative (C9T), trains would SegmentRetained-Fill RouteB could includeRetained-Fill two stations. Stations would be located at: remain at-grade on the east side of 112th Avenue SE until the SE 8th Station. However, • South Bellevue Station: Elevated station with a new 1,400 stall if the route connects to an at-grade alternative parking structure at the existing South Bellevue Park-and-Ride lot. (C11A), it would move from the east side of • SE 8th Station: If the route connects to the tunnel in downtown 112th Avenue SE to the center median near Bellevue (C9T), the route would include an at-grade station at SE 15th Street until reaching Segment C at SE SE 8th Street and 112th Avenue SE. The variation connecting to 6th Street. an at-grade alignment in downtown Bellevue (C11A) does not include a station at this location. The C11A at-grade alternative does not include a station at SE 8th Street. Instead, a station would be located at Main Street and 108th Avenue NE in downtown Bellevue. Nov. 2010 Sound Transit • 401 S. Jackson St. Seattle WA 98104 For information in alternative formats, call 1-800-201-4900/TTY Relay: 711 or email [email protected] Chapter 3 Environmental Consequences 1 Operation. Preferred Alternative B2M passes 2 directly in front of the Winters House in a lidded 3 trench. The eastern edge of the Preferred Alternative 4 B2M right-of-way measures approximately 5 feet 5 from the edge of the Winters House but located 6 below grade and lidded to prevent visual effects on 7 the Winters House historic context. The guideway is 8 within the 50-foot boundary for the property 9 established by the NRHP nomination. 10 Exhibit 3-8 depicts the Winters House with the 11 proposed project, and Exhibit 3-9 shows the cross- 12 section for Preferred Alternative B2M with the 13 existing cross-section. The perspective and cross- 14 section views illustrate minimization and avoidance 52 15 designs incorporated into the project to maintain 53 EXHIBIT 3-6 16 historic integrity during light rail operation. These 54 Winters House, 2102 Bellevue Way SE 17 elements include placing the light rail in a lidded 18 trench for the property length, and a landscape plan 19 will be designed that is sensitive to the historic 20 nature of the building and setting. 21 Whereas the Winters House continues to fully 22 convey its significance as outlined in its NRHP 23 registration form, the 50-foot boundary around the 24 house, which is now reduced due to the widening of 25 Bellevue Way SE, and the landscape no longer retain 26 integrity and are not historic or character-defining. 27 Further, although the presence of land surrounding 28 the property has been a feature since it was 55 29 constructed, the setting of the residence as it relates 30 to Bellevue Way SE is not a character-defining 56 EXHIBIT 3-7 31 feature given the roadway’s loss of integrity. As a 57 January 6, 1939 Photograph of the Winters House, 2102 Bellevue Way SE (Courtesy of Eastside Heritage Center) 32 result, Preferred Alternative B2M would not impact 58 33 a historic resource related to the extant landscape. 34 Due to the proximity of the covered trench and light 35 rail guideway to the Winters House, the potential 36 for noise, settlement, and vibration impacts during 37 operation was analyzed and is described in more 38 detail in the Noise and Vibration section above. The 39 project would likely have ground-borne noise 40 impact at the Winters House. As described in the 41 Noise and Vibration section, resilient fasteners or 42 ballast mats would reduce the ground-borne noise 43 levels, and such measures are incorporated into the 44 project. Ground-borne noise will still be over the 45 impact criteria at one location, but the building 46 could continue to be used as it is currently. 47 Sound Transit applied the Criteria of Adverse Effect 59 48 (36 CFR 800.5) in analyzing each aspect of Preferred Simulation of South Bellevue Station and Park-and-Ride Simulation of light rail in front of Winters House 49 Alternative B2M, considering the property’s 60 EXHIBIT 3-8 50 character-defining features that convey its 61 Winters House – Preferred Alternative B2M Birds Eye View 51 significanceBenefits: and qualify its listing in the NRHP. 62 • Provides access to high quality, frequent transit service Travel times* East Link Projectthat Supplementaloperates 20 Draft hours EIS per day. 3-19 (from South Bellevue Station) August 2010 DRAFT: For internal discussion only; not reviewed by, approved by, or on behalf of any party. • Approximately 4,500 to 5,500 daily boardings in • International District/Chinatown = 14 minutes Segment B. • University of Washington = 26 minutes • Increases park-and-ride capacity and travel options • Bellevue Transit Center = 5-8 minutes for south Bellevue residents and commuters, as well as employees in business parks located east of • Overlake Transit Center = 16-18 minutes 112th Avenue SE, consistent with City of Bellevue • Sea-tac Airport = 49 minutes transportation goals. What’s new in *Reflects preferred alternative travel times Segment B? For more information: Since the publication of the 2008 DEIS, there is one new alternative in Segment B, the preferred 112th Project Web page: Avenue SE Modified Alternative (B2M), as described on www.soundtransit.org/eastlink front. In addition, there are two design modifications Contact: to alternatives identified in the 2008 DEIS. The first is Katie Kuciemba a design modification to Alternative B3, known as the Sound Transit Community Outreach Corridor Lead 114th Extension Design Option. The BNSF Alternative 206-398-5459 (B7) was also modified in order to address changes along [email protected] the corridor due to the Washington State Department of Transportation’s I-405 Project. Nov. 2010 Sound Transit • 401 S. Jackson St. Seattle WA 98104 For information in alternative formats, call 1-800-201-4900/TTY Relay: 711 or email [email protected] .
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • East Link Light Rail Draft EIS -- Excerpts Only
    See the Fact Sheet for persons who may be contacted for additional information concerning this document. Abstract Sound Transit proposes to construct and operate an Downtown Redmond via either Redmond Way or the eastern extension of the Link light rail system BNSF Railway corridor. Alternatives considered providing urban transportation improvements in the include a No Build Alternative, one alternative for Central Puget Sound metropolitan region. The East Segment A, five alternatives for Segment B, six Link project would connect to the rail system’s Initial alternatives for Segment C, four alternatives for Segment in downtown Seattle and extend the system Segment D, three alternatives for Segment E, and four east to Mercer Island, Bellevue, and Redmond. maintenance facility alternatives. Overall, the project Alternatives are considered in five geographic would have between 10 and 13 stations. Interim segments in this EIS. Segment A, Interstate 90, termini could occur at the east end of Segment C or connects downtown Seattle to Mercer Island and any station in Segments D or E. Construction is South Bellevue via I-90. Segment B, South Bellevue, expected to start in 2013, with operation under way connects I-90 to approximately SE 6th Street along one between 2020 and 2021. The analysis and impact of three corridors: Bellevue Way, 112th Avenue SE, or information in this EIS addresses potential long-term the BNSF Railway right-of-way. Segment C, and short-term impacts of transportation; acquisitions, Downtown Bellevue, would travel through displacements and relocations; land use; economics; downtown Bellevue between approximately SE 6th social impacts, community facilities, and Street and an I-405 crossing at either NE 6th Street or neighborhoods; visual and aesthetic resources; air NE 12th Street on either an at-grade, elevated, or quality and greenhouse gas; noise and vibration; tunnel profile.
    [Show full text]
  • Section 27 60 02
    CONTRACT SPECIFICATIONS SECTION 27 60 02 TUNNEL RADIO SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Design, furnish, and install all necessary fiber-optic equipment, amplifiers, antennas, devices, interconnecting cabling, and software to completely implement the fiber-fed 800 MHz Radio Distributed Antenna Systems (DAS) described in these Specifications and in the attached Contract Drawings. B. Section includes the requirements for furnishing, installing, and testing two DAS Systems to provide radio communications for both Sound Transit and for public safety agencies in the NorthNorthgate Link and East Link tunnel segments; U-District Station and Roosevelt Station; the Bellevue Transit Center tunnel and station, other East Link Stations and parking garages (described below), the Mount Baker I-90 Tunnel, and the Mercer Island I-90 Lid. The Distributed Antenna Systems will provide coverage both in the NorthNorthgate Link and East Link tunnel segments and in all public and ancillary spaces in the NorthNorthgate Link and East Link stations. Section also includes requirements for relocating existing Downtown Seattle Transit Tunnel (“DSTT”) DAS panel antennas in the International District Station (“IDS”) to provide clearance for the new Overhead Contact System (“OCS”) that will be installed in the IDS Station as part of the implementation of the East Link alignment. B.C. The NorthNorthgate Link System will have two RF distribution Hubs located at U-District Station and Roosevelt Station. The East Link System will have two RF distribution Hubs located at the Mt. Baker Tunnel and the Mercer Island Tunnel. These RF distribution The North Link Hubs will be fed via an analog RF-over-fiber link from the Distributed Antenna system Headend at the Sound Transit Operations and Maintenance Facility (OMF).
    [Show full text]
  • East Link Extension Washington Into East King County, and South of University of Washington Bel-Red/130Th Sea-Tac International Airport
    Lynnwood Link Light Rail System Mountlake Terrace 185th 145th Downtown Redmond In 2008, voters approved the Sound Transit 2 Not funded for construction Plan. Link will expand the current system from Northgate SE Redmond Seattle north into Snohomish County, across Lake Roosevelt Redmond Technology Center U District Overlake Village East Link Extension Washington into East King County, and south of University of Washington Bel-Red/130th Sea-Tac International Airport. OCTOBER 2016 Capitol Hill Spring District/120th Westlake/Seattle Wilburton University Street Bellevue Downtown Bellevue Pioneer Square East Main Downtown to Int’l District/Chinatown South Bellevue Redmond Technology Center Stadium Judkins Mercer SODO Park Island 10 minutes Beacon Hill Mount Baker Columbia City Othello South Bellevue Rainier Beach to Stadium Tukwila/Int’l Blvd 20 minutes SeaTac/Airport Link in service Angle Lake Under construction Kent/Des Moines For information in alternative formats, call 1-800-201-4900/ In final design S 272nd Not funded for TTY Relay: 711 or email [email protected]. construction In planning Federal Way Bellevue East Link Alignment Downtown to University Of Washington Map Key 30 minutes Station P Park & Ride Redmond Link in service Technology Center P NE 40th Tunnel route Elevated route Overlake Bellevue to Surface and 520 Village existing bridges Spring District/ Sea-Tac Airport 120th Light rail under P 55 minutes construction Bel-Red/ 52nd Ave NE includes transfer Future extension Wilburton 130th 1 Lake NE 8th St Washington NE 6th St Bellevue Downtown Bellevue to East Main Main St International District station Intl District/ Chinatown Mercer 20 minutes Judkins Park Island Rainier Ave S P S P South Bellevue Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound.
    [Show full text]
  • Transformative Transit-Sound Transit
    WA State Transportation Commission Peter Rogoff, CEO 11-17-2020 Construction & planning updates, Powering Progress Largest rail expansion in the country Serving a region of over 3 million Link Light Rail • 116-mile regional system with 50 stations. • Connecting Bellevue, Redmond, Kirkland, Issaquah, Tacoma, Everett, Ballard and West Seattle. Tacoma Link extensions to Hilltop and TCC • 12 new stations. Sounder commuter rail • 91 miles of commuter rail. • Expansion of service, 40% capacity increase. • Parking and access improvements. • Platform extensions. Bus • Bus Rapid Transit serving 12 cities. • Bus-on-Shoulder opportunities. 3 East Link Opens 2023 • Connects Redmond to downtown Bellevue, Seattle, University of Washington and Northgate • 14 miles, 10 stations, 4 cities • Bellevue to downtown Seattle: 23 minutes 4 East Link construction South Bellevue Station Downtown Bellevue Tunnel Bellevue Downtown Station 5 Bus Rapid Transit – New Line of Service Sound Transit welcomes Station Design Concept 6 I-405 BRT BRT Bus Base Project Overview: Lynnwood to Burien . 37-mile corridor . 11 BRT stations across 8 cities . Three new/expanded parking facilities . One transit center . Connections to Link light rail in Lynnwood, Bellevue and Tukwila 7 BRT System Elements of Success • Transit speed, reliability and access improvements • BRT stations (signage, shelter, amenities) • Parking facilities • Bus OMF and New BRT fleet • Branding • Rider information system 8 I-405 BRT travel times 9 History: I-405 Master Plan and the Sound Transit Long-Range Plan I-405 Master Plan adopted in 2002 • Identified a master list of potential projects, to be implemented incrementally when funds were secured • Identified BRT as the preferred high- capacity-transit mode • Sound Transit and WSDOT were co-leads • Improve personal and freight mobility and reduce foreseeable traffic congestion in the I-405 study area 10 Realigning expansion plans Revenue loss projections • Recession likely to reduce revenue by $310-$436 million by 2020-2021.
    [Show full text]
  • CD-30 Station Area Planning Implementation
    FY2021-2027 Capital Investment Program CD-30 Station Area Planning Implementation (East Main/South Category: Transportation and Mobility Bellevue)Status: Ongoing Department: CD Location:Various Programmed Expenditures Programmed Appropriated FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Expenditures To Date Budget Budget Budget Budget Budget Budget Budget 5,500,000 3,000,000 1,500,000 1,000,000 - - - - - Description and Scope The purpose of this fund is to connect Sound Transit’s East Main and South Bellevue light rail stations with their neighborhoods. Projects in CD-30 improve access to stations and better integrate stations with the surrounding area. Projects enhance livability by improving access and connectivity across multiple modes. Implementation strategies guiding projects focus on: • Maximizing pedestrian and bicycle convenience; • Promoting access and safety in reaching the stations; • Preserving and reinforcing neighborhood character, and • Addressing the potential impacts of increased traffic in the station areas. The South Bellevue Station Area Plan and East Main Station Area Plan approved in 2016 include representative projects that could be funded by this CIP. These include pedestrian walkways, bicycle facilities, signage, pavement markings, traffic calming technologies, improved lighting, enhanced landscaping, art, or other public realm improvements. Rationale This project focuses on maximizing pedestrian and bicycle convenience, promoting access and safety in the East Main and South Bellevue station areas.
    [Show full text]
  • Presentation on Sound Transit Art Program
    Sound Transit Art Program (STart) Seattle Design Commission Briefing March 4, 2021 STart Seattle Design Commission Briefing | Opportunity Design Today’s Presentation • Recent projects • What we’ve learned • How we’ve adapted STart Seattle Design Commission Briefing | Opportunity Design System Expansion Overview STart Seattle Design Commission Briefing | Opportunity Design Current service Link light rail • University of Washington to Angle Lake • Tacoma Dome to Theater District Sounder rail • Everett to Seattle • Lakewood/Tacoma to Seattle ST Express bus • 28 regional bus routes STart Seattle Design Commission Briefing | System Expansion 2021 Link light rail • Northgate Link Extension Sounder commuter rail • Puyallup station parking and access improvements STart Seattle Design Commission Briefing | System Expansion 2022 Link light rail • Tacoma Dome Link Extension STart Seattle Design Commission Briefing | System Expansion 2023 Link light rail • East Link Extension Sounder rail • Kent, Auburn, and Sumner station parking and access improvements STart Seattle Design Commission Briefing | System Expansion 2024 Link light rail • Lynnwood Link Extension • Downtown Redmond Link Extension • Federal Way Link Extension completed Sounder rail • Sounder North added parking and access improvements 2025 Bus Rapid Transit • I- 405 BRT (Lynnwood to Burien) • SR 522 BRT (Shoreline to Bothell) Link In-Fill Station • NE 130th Street, Seattle STart Seattle Design Commission Briefing | System Expansion 2030 Link light rail • West Seattle to Downtown STart
    [Show full text]
  • NE SPRING BOULEVARD Bellevue, Washington Tranformsformation to Multimodal | Belred Neighborhood
    NE SPRING BOULEVARD Bellevue, Washington Tranformsformation to Multimodal | BelRed Neighborhood October 2020 Northeast Spring Boulevard is a new multimodal, east-west roadway in the BelRed neighborhood of Bellevue, Washington. It is being built in phases from Northeast 12th Street to 136th Place Northeast. When complete, the new street will bisect the BelRed area, improving mobility for people who walk, bike, drive or take transit, while helping to unlock development potential in the area. Northeast Spring Boulevard will connect to Eastrail and complement Sound Transit’s future light rail line. NE Spring Blvd Corridor Improvements 520 405 Northup Way NE 20th St 120th Ave NE 116th Ave NE 124th Ave NE 130th Ave NE 132nd Ave NE 136th Pl NE 140th Ave NE T T NE Spring Blvd NE Spring Blvd Bel-Red Rd NE 12th St Legend Open October 2020 Eastrail — Open for use Eastrail — Future (2021/2022) Not funded Under construction (Sound Transit), Complete by 2023 Map not to scale T Future station Design underway, Construction begins early 2021 — 1 — Phased Transformation: At-a-glance Project limits Improvements Status ◼ 4-lane roadway with turn pockets 116th Avenue NE to ◼ New traffic signal Completed 120th Avenue NE ◼ Multipurpose path for pedestrians and bicyclists Opened to public (Zone 1) ◼ Two bridges over the light rail October 2020 ◼ Landscaping and urban design elements ◼ 4-lane roadway with turn pockets ◼ 4 new traffic signals and a pedestrian scramble 120th Avenue NE to Completed ◼ Sidewalks 124th Avenue NE Opened to public ◼ Off-street bike path
    [Show full text]
  • L5 T6 I7 L8 BIDWELL, BUILDING a BETTER PETITIONERS
    1 2 J 4 5 6 7 SHORELINES HEARINGS BOARD 8 STATE OF V/ASHINGTON 9 DR. DONALD DAVIDSON, GEOFFREY l0 BIDWELL, BUILDING A BETTER BELLEVUE and KEMPER No DEVELOPMENT COMPANY, A W ll corporation, PETITION FOR REVIEV/ 12 Petitioners, 13 VS. 14 THE CITY OF BELLEVUE, through its l5 DEVELOPMENT SERVICES DEPARTMENT, Decision Maker; and TRANSIT ANd ELLIE ZIEGLER t6 SOLIND FOR SOUND TRANSIT, Applicanl, I7 DEPARTMENT OF ECOLOGY, l8 I. PETITIONERS 19 The Petitioners are Dr. Donald Davidson, Geoffrey Bidwell, Building A Better 20 Bellevue and Kemper Development Company, Petitioners are represented by: 21 22 Keith W. Dearborn Alison Moss 23 Troy D. Greenf,reld Schwabe, Williamson & V/yatt 24 1420 5Th Avenue, Suite 3400 Seattle, V/A 981 0l -401 0 25 Telephone: 206-407 -1581 26 Facsimile: 206-292-0460 SCHWABE, WILLIAMSON & WYATT, P C PETITION FOR REVIEW - 1 Attorneys al Law Pacwesl Center 121 1 SW sth Ave , Suite 1900 Portland, OR 97204 Telephone: 5O3 222 9981 PDX\t 27954\200497\KDA\l 5 138887. I I Email : [email protected] [email protected] 2 tgreenfi eld@schwabe. com J II. DESCRIPTION OF PETITIONERS 4 Petitioner Dr. Donald Davidson is a resident of the City of Bellevue with a strong 5 history of public service to Bellevue. He sat on the City Council for more than25 years and 6 was the mayor of Bellevue for four years. During his time on the City Council, Dr. Davidson 7 served as Environmental Services Commission Liaison, served on the Metropolitan Water 8 Pollution Abatement Advisory Committee and on the Regional V/ater Quality Committee, 9 chaired the V/atershed Resource Inventory Area 8 Forum, served on the Cascade l0 Water Alliance Board and its Resource Planning Committee, co-chaired the Puget Sound 11 Salmon Recovery Council, and served on the Shared Salmon Strategy I2 Development Committee.
    [Show full text]
  • Progress Report Link Light Rail Program
    Progress Report Link Light Rail Program Waterproof patching in the Downtown Bellevue Tunnel. July | 2019 Prepared by Project Control & VE l Design, Engineering & Construction Management 0;o` // TABLE of CONTENTS Program Overview .............................................................. 1 University Link Extension ................................................... 5 Northgate Link Extension .................................................... 9 Lynnwood Link Extension ................................................... 29 I-90 Two-Way Transit & HOV Operations (Stage 3) ........... 45 East Link Extension….......................................................... 49 Downtown Redmond Link Extension ................................. 73 W. Seattle & Ballard Link Extensions ................................. 77 Federal Way Transit Extension ........................................... 81 Hilltop Tacoma Link Extension ...........................................91 Tacoma Dome Link Extension ............................................101 Link Operations & Maintenance Facility: East .................. 105 LRV Fleet Expansion ........................................................... 113 Staffing .................................................................................. 118 Acronyms .............................................................................. 120 Link Light Rail Program Overview 0;o` Link Light Rail // Program Overview University Link Extension (U-Link): This project is a 3.15- bridge over Duwamish River. The Ballard
    [Show full text]
  • Link Light Rail Open House: Preparing for Sound Transit's
    Link Light Rail Open House: Preparing for Sound Transit’s Design Process Shorewood High School January 27, 2016 This meeting is about The Sound Transit Design Process, including City and resident involvement Purpose to: • Provide information about background and how to participate moving forward • Solicit comment on City Council Draft Guiding Principles for Light Rail Facility Design • Visualize design elements for stations and garages This meeting is NOT about • Subarea Planning or Corridor Studies • No programmed discussion of zoning or property impacts tonight That said… • There are multiple distinct but related projects that the City and Sound Transit are working on in 2016 145th Corridor Study • Open House on February 24 • Council could select Preferred Concept in April • Preferred Concept would be refined through multiple year process of Environmental Review and Design • shorelinewa.gov/145corridor • Subarea Planning will resume with discussions at Planning Commission in February, March, and April • Council could select Preferred Alternative zoning scenario for Final EIS in May, potentially adopt in September • shorelinewa.gov/145station or shorelinewa.gov/lightrail City hosted • 5 Visioning events in 2013 • 4 Design Workshops in 2013 and 2014 • Many comments received about station and garage design • Became basis for Guiding Principles Guiding Principles for Light Rail Facility Design • Multi-modality • Public Safety • Sustainability • Mobility • Neighborhood Character • Public Amenities • Transit-Oriented Development • Public