<<

Store UK Anti Doping PRESS LOC PSS BT ROOMS office WORLD GRAND PRIX 2018 TV

TV

Ambulance Public 42.80 m

Mixed Mixed (8.1m (8.1m base Dining Zone

9.32 9.32 m FIELD OF PLAY PLAN DRAPE 1 DRAPE

SPECTATOR SEATING Medical

) 5.32m Tent 2m 9.50 48.44m 5m

ATHLETE ATHLETE SEATING 6cm 6cm

14.4m

DRAPE 5 DRAPE EventContainer 9.50 Regional Arena Etihad Campus

Athlete 3m

4m Process Manchester 9.50 26.72 m Centre Line 2m Disabled Seating Production M11 3FF OVR & IVR Pres HB Coms WTF & CSB BBC Referee Referee’s Broadcast

VIP 7.2m Public 24.00 m Media VIP VIP Catering 3.5 15.60m 8.40m VIP TV Media Athlete 10.80 m 10.80 m Warm up DRAPE 3 Buffet serving area Storage 19th – 21st VIP Room October LOC Athlete Dining warm 2017

up equipment equipment Officials Gym dining

Accredita tion

8m ( 10 mats) 5.6m x 5.6m

BROADCASTER & PRODUCTION NOTES FOR Semi finals & Finals

Athlete Entrance Coaches Positions Coaches Positions Camera positions Camera Positions

1 Main Tower Camera

2 Beauty shot Camera

3 Fixed Court Camera (Super slow mo x3) 6 5 4 Fixed Court Camera 5 EFP Camera 6 EFP Camera Overhead Camera 7 (Movable/Zoon in & out) 7

4 2 3 SSM 1 Grand Prix Information LED TV’s (VGA & HDMI ports) – to power and distribute Connection position / direction Screen Plan D1/L1/R1

12 Screens and cable provided by Taekwondo but installed by production partner Laptop Laptop Laptop

Competition D3/L3/R3 Management Broadcast D6 D5 R6 R5 D4/L4/R4 15 Screens provided by Taekwondo but installed Live and D1 Media Room Live L1 Media Room Results R1 Media Room and cabled by broadcast Upcoming D2 VIP Room – Court L2 VIP Room – Squash Court R2 VIP Room – Squash Court matches D3 Athlete area – Main floor L3 Athlete area – Main floor * R3 Athlete area – Main floor partner D4 Public Entrance R4 Public Entrance (power supplied by D5 Media Tribune R5 Media Tribune production partner) D6 VIP Tribune R6 VIP Tribune where required IT/IP distribution Plan Cat 6 FTP cable

Control Control Control

Competition Management Broadcast (OVR)

- 2 x Master Cat 6 FTP cables from OVR to each court (2nd cable is a spare / redundancy) Supplied & installed by - Then this single cable on each court into a switcher box Broadcast partner and out as 5 x 2m network cables GRAND PRIX 2018

LED PERIMETRE PLAN A T H SPECTATOR SEATING L E T E Athletes TV 3 32 1 E N

Presentation party T R A N C E & B A C OVR & IVR OVR & IVR OVR & IVR K D R TV Waiting O P MEDAL PRESENTATION FORMAT WORLD TAEKWONDO PRESS GRAND PRIX 2018 ROOMS

Mixed Zone Mixed FIELD OF PLAY POWER PLAN SPECTATOR SEATING

ATHLETESEATING Regional Arena, DRAPE 1 DRAPE

DRAPE 5 DRAPE Rowsley Street, Etihad Campus Manchester M11 3FF

Production

OVR & IVR Sports Pres HB Coms WTF & CSB BBC Referee Referee’s 7.2m XX Media VIP VIP 15.60m XX 8.40m XX XX Media XX VIP XX 10.80 m 10.80 m 19th – 21st DRAPE 3 October

2018 TEAM TEAM GB Key 4 gang sockets Uninterruptable Power supply (UPS)