Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program: Background and Issues for Congress Updated September 14, 2021 Congressional Research Service https://crsreports.congress.gov R41129 Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program Summary The Navy’s Columbia (SSBN-826) class ballistic missile submarine (SSBN) program is a program to design and build a class of 12 new SSBNs to replace the Navy’s current force of 14 aging Ohio-class SSBNs. Since 2013, the Navy has consistently identified the Columbia-class program as the Navy’s top priority program. The Navy procured the first Columbia-class boat in FY2021 and wants to procure the second boat in the class in FY2024. The Navy’s proposed FY2022 budget requests $3,003.0 (i.e., $3.0 billion) in procurement funding for the first Columbia-class boat and $1,644.0 million (i.e., about $1.6 billion) in advance procurement (AP) funding for the second boat, for a combined FY2022 procurement and AP funding request of $4,647.0 million (i.e., about $4.6 billion). The Navy’s FY2022 budget submission estimates the procurement cost of the first Columbia- class boat at $15,030.5 million (i.e., about $15.0 billion) in then-year dollars, including $6,557.6 million (i.e., about $6.60 billion) in costs for plans, meaning (essentially) the detail design/nonrecurring engineering (DD/NRE) costs for the Columbia class. (It is a long-standing Navy budgetary practice to incorporate the DD/NRE costs for a new class of ship into the total procurement cost of the first ship in the class.) Excluding costs for plans, the estimated hands-on construction cost of the first ship is $8,473.0 million (i.e., about $8.5 billion). -
The Effectiveness of Canada's Navy on Escort Duty
Munich Personal RePEc Archive The Effectiveness of Canada’s Navy on Escort Duty Skogstad, Karl Lakehead University 16 January 2015 Online at https://mpra.ub.uni-muenchen.de/61467/ MPRA Paper No. 61467, posted 20 Jan 2015 09:32 UTC The Effectiveness of Canada’s Navy on Escort Duty Karl Skogstad1 January 2015 Abstract This paper examines the potential costs a country faces when it fails to develop domestic arms manufacturing. I examine these costs using the historical example of Canada’s decision to not develop domestic naval shipbuilding capacity prior to World War II. Canada’s primary naval responsibility during the war was to escort convoys be- tween the United Kingdom and North America. However its lack of advanced domestic shipbuilding capacity and congestion at Allied shipyards, meant that Canada could not obtain the relatively advanced destroyer class vessels necessary for convoy duty. Instead it had to rely on less advanced corvette class vessels, which were simple enough to be manufactured domestically. Using a unique data set, created for this project, I match convoy movements to German U-boat locations in order to examine the escort compo- sition and the number of merchant ships lost when an engagement occurred. Using this data I find that destroyers were 2.14 more effective than corvettes at preventing the loss of a merchant ship. Then, by constructing a counterfactual scenario, I find that developing a domestic ship building industry in Canada would have netted the Allies a benefit of 28.7 million 1940 Canadian dollars. JEL classification: N42, F51, F52, H56, H57 Keywords: Canadian Navy, World War II, Convoys, Domestic Arms industries. -
Naval Shipbuilding Expansion: the World War II Surface Combatant Experience
Naval Shipbuilding Expansion: The World War II Surface Combatant Experience Dr. Norbert Doerry and Dr. Philip Koenig Naval Sea Systems Command David W. Taylor Lecture Series Naval Surface Warfare Center Carderock Division June 13, 2019 From material originally presented at: SNAME Maritime Convention 2018, Providence, RI, Oct 24-26, 2018 and 16th Annual Acquisition Research Symposium, Monterey, CA, 8-9 May 2019 10/24/2018 Statement A: Approved for Release. Distribution is Unlimited. 1 Introduction • The post-Cold War “Peace Dividend” era is over • “Overt challenges to the free and open international order and the re-emergence of long- term, strategic competition between nations.” (DoD 2018) • Possibility of non-nuclear, industrial-scale war has re-emerged. What can we learn from the last time we engaged in industrial-scale war? 10/24/2018 Statement A: Approved for Release. Distribution is Unlimited. 2 U.S. Destroyer Acquisition Eras World War I Era (up to 1922) • 68 destroyers commissioned prior to U.S. entry into WW I — One would serve in WW II • 273 “Flush-Deckers” acquired in response to U.S. entry into WW I — 41 commissioned prior to end of hostilities — The rest were commissioned after WW I — 105 lost or scrapped prior to WW II, remainder served in WWII Treaty Period (1922-1936) USS Fletcher (DD 445) underway off New York, 18 July 1942 • Limitations placed on displacement, weapons, and number (www.history.navy.mil – 19-N-31245) • Torpedo tubes and 5 inch guns were the primary weapon systems • 61 destroyers in seven classes procured Pre-War (1936-1941) • Designs modified to reflect experiences of foreign navies in combat — Lend-Lease prepared industry for production ramp-up • 182 destroyers in four classes authorized • 39 in commission upon U.S. -
A Brief Review on Electromagnetic Aircraft Launch System
International Journal of Mechanical And Production Engineering, ISSN: 2320-2092, Volume- 5, Issue-6, Jun.-2017 http://iraj.in A BRIEF REVIEW ON ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM 1AZEEM SINGH KAHLON, 2TAAVISHE GUPTA, 3POOJA DAHIYA, 4SUDHIR KUMAR CHATURVEDI Department of Aerospace Engineering, University of Petroleum and Energy Studies, Dehradun, India E-mail: [email protected] Abstract - This paper describes the basic design, advantages and disadvantages of an Electromagnetic Aircraft Launch System (EMALS) for aircraft carriers of the future along with a brief comparison with traditional launch mechanisms. The purpose of the paper is to analyze the feasibility of EMALS for the next generation indigenous aircraft carrier INS Vishal. I. INTRODUCTION maneuvering. Depending on the thrust produced by the engines and weight of aircraft the length of the India has a central and strategic location in the Indian runway varies widely for different aircraft. Normal Ocean. It shares the longest coastline of 7500 runways are designed so as to accommodate the kilometers amongst other nations sharing the Indian launch for such deviation in takeoff lengths, but the Ocean. India's 80% trade is via sea routes passing scenario is different when it comes to aircraft carriers. through the Indian Ocean and 85% of its oil and gas Launch of an aircraft from a mobile platform always are imported through sea routes. Indian Ocean also requires additional systems and methods to assist the serves as the locus of important international Sea launch because the runway has to be scaled down, Lines Of Communication (SLOCs) . Development of which is only about 300 feet as compared to 5,000- India’s political structure, industrial and commercial 6,000 feet required for normal aircraft to takeoff from growth has no meaning until its shores are protected. -
Cvf) Programme
CHILD POLICY This PDF document was made available CIVIL JUSTICE from www.rand.org as a public service of EDUCATION the RAND Corporation. ENERGY AND ENVIRONMENT HEALTH AND HEALTH CARE Jump down to document6 INTERNATIONAL AFFAIRS NATIONAL SECURITY The RAND Corporation is a nonprofit POPULATION AND AGING research organization providing PUBLIC SAFETY SCIENCE AND TECHNOLOGY objective analysis and effective SUBSTANCE ABUSE solutions that address the challenges TERRORISM AND facing the public and private sectors HOMELAND SECURITY TRANSPORTATION AND around the world. INFRASTRUCTURE Support RAND Purchase this document Browse Books & Publications Make a charitable contribution For More Information Visit RAND at www.rand.org Explore RAND Europe View document details Limited Electronic Distribution Rights This document and trademark(s) contained herein are protected by law as indicated in a notice appearing later in this work. This electronic representation of RAND intellectual property is provided for non- commercial use only. Permission is required from RAND to reproduce, or reuse in another form, any of our research documents. This product is part of the RAND Corporation monograph series. RAND monographs present major research findings that address the challenges facing the public and private sectors. All RAND mono- graphs undergo rigorous peer review to ensure high standards for research quality and objectivity. Options for Reducing Costs in the United Kingdom’s Future Aircraft Carrier (cvf) Programme John F. Schank | Roland Yardley Jessie Riposo | Harry Thie | Edward Keating Mark V. Arena | Hans Pung John Birkler | James R. Chiesa Prepared for the UK Ministry of Defence Approved for public release; distribution unlimited The research described in this report was sponsored by the United King- dom’s Ministry of Defence. -
China's Logistics Capabilities for Expeditionary Operations
China’s Logistics Capabilities for Expeditionary Operations The modular transfer system between a Type 054A frigate and a COSCO container ship during China’s first military-civil UNREP. Source: “重大突破!民船为海军水面舰艇实施干货补给 [Breakthrough! Civil Ships Implement Dry Cargo Supply for Naval Surface Ships],” Guancha, November 15, 2019 Primary author: Chad Peltier Supporting analysts: Tate Nurkin and Sean O’Connor Disclaimer: This research report was prepared at the request of the U.S.-China Economic and Security Review Commission to support its deliberations. Posting of the report to the Commission's website is intended to promote greater public understanding of the issues addressed by the Commission in its ongoing assessment of U.S.-China economic relations and their implications for U.S. security, as mandated by Public Law 106-398 and Public Law 113-291. However, it does not necessarily imply an endorsement by the Commission or any individual Commissioner of the views or conclusions expressed in this commissioned research report. 1 Contents Abbreviations .......................................................................................................................................................... 3 Executive Summary ............................................................................................................................................... 4 Methodology, Scope, and Study Limitations ........................................................................................................ 6 1. China’s Expeditionary Operations -
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress September 16, 2021 Congressional Research Service https://crsreports.congress.gov RL32665 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Summary The current and planned size and composition of the Navy, the annual rate of Navy ship procurement, the prospective affordability of the Navy’s shipbuilding plans, and the capacity of the U.S. shipbuilding industry to execute the Navy’s shipbuilding plans have been oversight matters for the congressional defense committees for many years. In December 2016, the Navy released a force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-ship goal was made U.S. policy by Section 1025 of the FY2018 National Defense Authorization Act (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense (DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal. The new goal is expected to introduce a new, more distributed fleet architecture featuring a smaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier of large unmanned vehicles (UVs). On June 17, 2021, the Navy released a long-range Navy shipbuilding document that presents the Biden Administration’s emerging successor to the 355-ship force-level goal. The document calls for a Navy with a more distributed fleet architecture, including 321 to 372 manned ships and 77 to 140 large UVs. A September 2021 Congressional Budget Office (CBO) report estimates that the fleet envisioned in the document would cost an average of between $25.3 billion and $32.7 billion per year in constant FY2021 dollars to procure. -
The Cost of the Navy's New Frigate
OCTOBER 2020 The Cost of the Navy’s New Frigate On April 30, 2020, the Navy awarded Fincantieri Several factors support the Navy’s estimate: Marinette Marine a contract to build the Navy’s new sur- face combatant, a guided missile frigate long designated • The FFG(X) is based on a design that has been in as FFG(X).1 The contract guarantees that Fincantieri will production for many years. build the lead ship (the first ship designed for a class) and gives the Navy options to build as many as nine addi- • Little if any new technology is being developed for it. tional ships. In this report, the Congressional Budget Office examines the potential costs if the Navy exercises • The contractor is an experienced builder of small all of those options. surface combatants. • CBO estimates the cost of the 10 FFG(X) ships • An independent estimate within the Department of would be $12.3 billion in 2020 (inflation-adjusted) Defense (DoD) was lower than the Navy’s estimate. dollars, about $1.2 billion per ship, on the basis of its own weight-based cost model. That amount is Other factors suggest the Navy’s estimate is too low: 40 percent more than the Navy’s estimate. • The costs of all surface combatants since 1970, as • The Navy estimates that the 10 ships would measured per thousand tons, were higher. cost $8.7 billion in 2020 dollars, an average of $870 million per ship. • Historically the Navy has almost always underestimated the cost of the lead ship, and a more • If the Navy’s estimate turns out to be accurate, expensive lead ship generally results in higher costs the FFG(X) would be the least expensive surface for the follow-on ships. -
China Naval Modernization: Implications for U.S
China Naval Modernization: Implications for U.S. Navy Capabilities—Background and Issues for Congress (name redacted) Specialist in Naval Affairs April 25, 2018 Congressional Research Service 7-.... www.crs.gov RL33153 China Naval Modernization: Implications for U.S. Navy Capabilities Summary The question of how the United States should respond to China’s military modernization effort, including its naval modernization effort, is a key issue in U.S. defense planning and budgeting. China has been steadily building a modern and powerful navy since the early to mid-1990s. China’s navy has become a formidable military force within China’s near-seas region, and it is conducting a growing number of operations in more-distant waters, including the broader waters of the Western Pacific, the Indian Ocean, and waters around Europe. Observers view China’s improving naval capabilities as posing a challenge in the Western Pacific to the U.S. Navy’s ability to achieve and maintain control of blue-water ocean areas in wartime— the first such challenge the U.S. Navy has faced since the end of the Cold War. More broadly, these observers view China’s naval capabilities as a key element of a broader Chinese military challenge to the long-standing status of the United States as the leading military power in the Western Pacific. China’s naval modernization effort encompasses a wide array of platform and weapon acquisition programs, including anti-ship ballistic missiles (ASBMs), anti-ship cruise missiles (ASCMs), submarines, surface ships, aircraft, unmanned vehicles (UVs), and supporting C4ISR (command and control, communications, computers, intelligence, surveillance, and reconnaissance) systems. -
Naval Ships' Technical Manual, Chapter 583, Boats and Small Craft
S9086-TX-STM-010/CH-583R3 REVISION THIRD NAVAL SHIPS’ TECHNICAL MANUAL CHAPTER 583 BOATS AND SMALL CRAFT THIS CHAPTER SUPERSEDES CHAPTER 583 DATED 1 DECEMBER 1992 DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED. PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND. 24 MAR 1998 TITLE-1 @@FIpgtype@@TITLE@@!FIpgtype@@ S9086-TX-STM-010/CH-583R3 Certification Sheet TITLE-2 S9086-TX-STM-010/CH-583R3 TABLE OF CONTENTS Chapter/Paragraph Page 583 BOATS AND SMALL CRAFT ............................. 583-1 SECTION 1. ADMINISTRATIVE POLICIES ............................ 583-1 583-1.1 BOATS AND SMALL CRAFT .............................. 583-1 583-1.1.1 DEFINITION OF A NAVY BOAT. ....................... 583-1 583-1.2 CORRESPONDENCE ................................... 583-1 583-1.2.1 BOAT CORRESPONDENCE. .......................... 583-1 583-1.3 STANDARD ALLOWANCE OF BOATS ........................ 583-1 583-1.3.1 CNO AND PEO CLA (PMS 325) ESTABLISHED BOAT LIST. ....... 583-1 583-1.3.2 CHANGES IN BOAT ALLOWANCE. ..................... 583-1 583-1.3.3 BOATS ASSIGNED TO FLAGS AND COMMANDS. ............ 583-1 583-1.3.4 HOW BOATS ARE OBTAINED. ........................ 583-1 583-1.3.5 EMERGENCY ISSUES. ............................. 583-2 583-1.4 TRANSFER OF BOATS ................................. 583-2 583-1.4.1 PEO CLA (PMS 325) AUTHORITY FOR TRANSFER OF BOATS. .... 583-2 583-1.4.2 TRANSFERRED WITH A FLAG. ....................... 583-2 583-1.4.3 TRANSFERS TO SPECIAL PROJECTS AND TEMPORARY LOANS. 583-2 583-1.4.3.1 Project Funded by Other Activities. ................ 583-5 583-1.4.3.2 Cost Estimates. ............................ 583-5 583-1.4.3.3 Funding Identification. -
US Navy Flight Deck Hearing Protection Use Trends
U.S. Navy Flight Deck Hearing Protection Use Trends: Survey Results Valerie S. Bjorn Naval Air Systems Command AEDC/DOF 740 Fourth Street Arnold AFB, TN 38389-6000, USA [email protected] Christopher B. Albery Advanced Information Engineering Services - A General Dynamics Company 5200 Springfield Pike, WP-441 Dayton, OH 45431, USA [email protected] CDR Russell Shilling, Ph.D., MSC, USN Office of Naval Research - Medical and Biological S&T Division 800 N Quincy Street Arlington, VA 22217-5860, USA [email protected] Richard L. McKinley Air Force Research Laboratory (AFRL/HECB) 2610 Seventh Street, Bldg 441 Wright-Patterson AFB, OH 45433-7901 [email protected] ABSTRACT Hearing loss claims have risen steadily in the U.S. Department of Veterans Affairs across all military services for decades. The U.S. Navy, with U.S. Air Force and industry partners, is working to improve hearing protection and speech intelligibility for aircraft carrier flight deck crews who work up to 16 hours per day in 130-150 dB tactical jet aircraft noise. Currently, flight deck crews are required to wear double hearing protection: earplugs and earmuffs (in cranial helmet). Previous studies indicated this double hearing protection provides approximately 30 dB of noise attenuation when earplugs are inserted correctly and the cranial/earmuffs are well-fit and in good condition. To assess hearing protection practices and estimate noise attenuation levels for active duty flight deck crews, Naval Air Systems Command surveyed 301 U.S. Navy Atlantic and Pacific Fleet flight deck personnel from four aircraft carriers and two amphibious assault ships. -
Ships Built by the Charlestown Navy Yard
National Park Service U.S. Department of the Interior Boston National Historical Park Charlestown Navy Yard Ships Built By The Charlestown Navy Yard Prepared by Stephen P. Carlson Division of Cultural Resources Boston National Historical Park 2005 Author’s Note This booklet is a reproduction of an appendix to a historic resource study of the Charlestown Navy Yard, which in turn was a revision of a 1995 supplement to Boston National Historical Park’s information bulletin, The Broadside. That supplement was a condensation of a larger study of the same title prepared by the author in 1992. The information has been derived not only from standard published sources such as the Naval Historical Center’s multi-volume Dictionary of American Naval Fighting Ships but also from the Records of the Boston Naval Shipyard and the Charlestown Navy Yard Photograph Collection in the archives of Boston National Historical Park. All of the photographs in this publication are official U.S. Navy photographs from the collections of Boston National Historical Park or the Naval Historical Center. Front Cover: One of the most famous ships built by the Charlestown Navy Yard, the screw sloop USS Hartford (IX-13) is seen under full sail in Long Island Sound on August 10, 1905. Because of her role in the Civil War as Adm. David Glasgow Farragut’s flagship, she was routinely exempted from Congressional bans on repairing wooden warships, although she finally succumbed to inattention when she sank at her berth on November 20, 1956, two years short of her 100th birthday. BOSTS-11370 Appendix B Ships Built By The Navy Yard HIS APPENDIX is a revised and updated version of “Ships although many LSTs and some other ships were sold for conver- Built by the Charlestown Navy Yard, 1814-1957,” which sion to commercial service.