Appendix 4-13...Traffic Data at 2042
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Civil Service Newsletter July 2016 Issue No.96
安達臣道前石礦場發展項目 Development of the former Anderson Road Quarry Site 地盡其用 東涌新巿鎮擴展 Tung Chung 濟民之急 New Town Extension Land optimised for a greater cause 啟德發展區 Kai Tak Development 洪水橋新發展區 Hung Shui Kiu New Development Area 以上電腦設計圖只供參考之用。 The above computer graphics are for illustrative purposes only. Contents Features EDITORIAL BOARD Government takes lead in combating climate change 3-6 Philip Yung Wai-hung (Commerce and Land optimised for a greater cause 7-10 Economic Development Bureau) Vivian Sum Fong-kwang Civil Service Outstanding (Civil Service Bureau) Service Award Scheme 2015 Series Vivian Tam Tam Kit-lai Police winning three outstanding service awards 11-13 (Civil Service Bureau) Continuous innovation of WSD – 14-15 Joyce Lee Tze-ching (Efficiency Unit) Water power scores Gold Glenis Liong Ka-yi Giant Dinosaurs walk away with Gold Prize 16-17 (Information Services Department) Fiona Chan Siu-ling Departments work together for 18-19 (Civil Service Bureau) environmental protection Jenny Wai Mei-chu (Civil Service Bureau) Pensioners’ Corner Bessie Yee Lai-shan A fulfilling career in rehabilitation services 20-23 (Civil Service Bureau) Pensioners’ outing 24 Mark Pinkstone (Freelance Editor) Pension increase 2016 24 Health Address : Staff Relations Division, Civil Service Bureau, Diabetes theme for World Health Day 25 6/F, West Wing, Central Government Offices, Overcoming new job challenges with ease 26-28 2 Tim Mei Avenue, Tamar, Hong Kong Information Fax no. : 2537 1112 Appointment of senior officials 29 For enquiries about this Newsletter, please call 2810 3708. Basic Law Website : http://www.csb.gov.hk Civil Service Bureau Pensioner Services Learning the Basic Law through cases 29 Unit enquiry no.: 2810 3850 Centre spread (This Newsletter is also available at the Appreciate Hong Kong 30 CSB website at http://www.csb.gov.hk) We are committed to Hong Kong Published by the Civil Service Bureau. -
Executive Summary of Technical Report on Traffic and Transport
Civil Engineering and Development Department Agreement No. CE61/2007(CE) and Planning Department North East New Territories New Development Areas Planning and Engineering Study – Investigation Traffic and Transport Assessment Executive Summary INTRODUCTION This report provides a baseline review and a traffic and transport impact assessment of the proposed North East New Territories (NENT) New Development Areas (NDAs) Development under the Recommended Outline Development Plans (RODPs), for the existing and planned transport system. A 2-tier transport modelling approach is adopted. Strategic transport model is developed to provide quantitative input for highway capacity analysis of the major highway corridors, whereas local transport models are developed to support the local network and junction design. TRAFFIC AND TRANSPORT ASSESSMENT ON THE RODPs The model runs have identified the potential overloading of the existing Fanling Highway Kwu Tung Section, the Po Shek Wu Interchange and the So Kwun Po Interchange due to the proposed NDAs Development. Various highway network improvement options to resolve the problem and minimise noise and air pollution are explored and outlined below. HIGHWAY INFRASTRUCTURES Widening of Fanling Highway Kwu Tung Section It is recommended to widen the existing Fanling Highway Kwu Tung Section between the San Tin Interchange and Po Shek Wu Interchange from the existing dual 3-lane without hard shoulder to dual 4-lane with hard shoulder, and to divert the adjacent Castle Peak Road with the associated utilities. Various widening scheme options have been reviewed and it is recommended to widen the expressway towards the northern side so that the impacts to the existing nearby historical buildings and Old and Valuable Trees (OVTs) could be minimised. -
San Tin / Lok Ma Chau Development Node Project Profile
Civil Engineering and Development Department San Tin / Lok Ma Chau Development Node Project Profile Final | May 2021 This report takes into account the particular instructions and requirements Ove Arup & Partners Hong Kong Ltd of our client. Level 5 Festival Walk It is not intended for and should not be 80 Tat Chee Avenue relied upon by any third party and no Kowloon Tong responsibility is undertaken to any third Kowloon party. Hong Kong www.arup.com Job number 271620 Civil Engineering and Development Department San Tin / Lok Ma Chau Development Node Project Profile Contents Page 1 Basic Information 3 1.1 Project Title 3 1.2 Purpose and Nature of Project 3 1.3 Name of Project Proponent 3 1.4 Location and Scale of Project and History of Site 3 1.5 Number and Types of Designated Projects to be Covered by the Project Profile 4 1.6 Name and Telephone Number of Contact Person 7 2 Outline of Planning and Implementation Programme 8 2.1 Project Implementation 8 2.2 Project Time Table 8 2.3 Interactions with Other Projects 8 3 Possible Impacts on the Environment 9 3.1 General 9 3.2 Air Quality 9 3.3 Noise 9 3.4 Water Quality 10 3.5 Waste Management 11 3.6 Land Contamination 11 3.7 Hazard to Life 11 3.8 Landfill Gas Hazard 12 3.9 Ecology 12 3.10 Agriculture and Fisheries 14 3.11 Cultural Heritage 14 3.12 Landscape and Visual 14 4 Major Elements of the Surrounding Environment 16 4.1 Surrounding Environment including Existing and Planned Sensitive Receivers 16 4.2 Air Quality 17 4.3 Noise 17 4.4 Water Quality 17 4.5 Waste Management 17 4.6 Land Contamination -
Transport Infrastructure and Traffic Review
Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be -
Explanatory Statement
KWU TUNG NORTH OUTLINE DEVELOPMENT PLAN No. D/KTN/1A EXPLANATORY STATEMENT ODP No. D/KTN/1 Approved by CPLD on 17.10.2013 ODP No. D/KTN/1A Agreed by NT DipCon on 12.5.2020 Fanling, Sheung Shui & Yuen Long East District Planning Office Planning Department Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement CONTENTS Page 1. Background ………………………………………………………………..1 2. Objectives and Authority of the Plan ……………………………………...2 3. The Planning Scheme Area ………………………………………………..3 4. Population .………………………………………………………………...6 5. Planning Themes and Urban Design and Landscape Framework .……..…6 6. Land Use Proposals ………………………………………………………15 7. Transport ………………………………………………………………….33 8. Environmental Considerations …………...……………………………….37 9. Cultural Heritage ………………………………………………………….41 10. Utility Services ……………………………………………………………41 11. Implementation ……………………………………………………….......43 Plan 1 : Kwu Tung North New Development Area Location Plan Plan 2 : Urban Design and Landscape Framework Plan 3 : Pedestrian Connections Plan Plan 4 : Cycle Track Network Plan Plan 5 : Transport Network Plan Appendix 1: Schedule of Requirement and Provision of G/IC Facilities and Open Space in Kwu Tung North New Development Area Appendix 2: Development Parameters of Major Development Sites in Kwu Tung North New Development Area Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement 1. Background 1.1 The Territorial Development Strategy Review in 1990s first identified that there was potential for strategic growth in the North East New Territories (NENT). The Planning and Development Study on NENT commissioned in 1998 identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable for New Development Areas (NDAs) development. The Hong Kong 2030: Planning Vision and Strategy, promulgated in 2007, recommended to proceed with the KTN and FLN NDAs, among others, to address the long-term housing demand and provide employment opportunities. -
D8014 2018 年第39 期憲報第4 號特別副刊s. S. No. 4 to Gazette No
D8014 2018 年第 39 期憲報第 4 號特別副刊 S. S. NO. 4 TO GAZETTE NO. 39/2018 G.N. (S.) 41 of 2018 BOOKS REGISTRATION ORDINANCE (CHAPTER 142) A CATALOGUE OF BOOKS PRINTED IN HONG KONG 1ST QUARTER 2018 (Edited by Books Registration Office, Hong Kong Public Libraries, Leisure and Cultural Services Department) This catalogue lists publications which have been deposited with the Books Registration Office during the first quarter of 2018 in accordance with the above Ordinance. These include:— (1) Books published or printed in Hong Kong and have been deposited with the Books Registration Office during this quarter. Publications by the Government Logistics Department, other than separate bills, ordinances, regulations, leaflets, loose-sheets and posters are included; and (2) First issue of periodicals published or printed in Hong Kong during this quarter. Details of their subsequent issues and related information can be found at the fourth quarter. (Please refer to paragraph 3 below) The number in brackets at the bottom right-hand corner of each entry represents the order of deposit of the book during the year, whereas the serial number at the top left-hand corner of each entry is purely an ordering device, linking the annual cumulated author index with the main body of the catalogue. In the fourth quarter, in addition to the list of publications deposited with the Books Registration Office during that quarter, the catalogue also includes the following information for the year:— (1) Chinese and English Author Index; (2) Publishers’ Names and Addresses; (3) Printers’ Names and Addresses; and (4) Chinese and English Periodicals Received;- their title, frequency, price and publisher. -
North East New Territories New Development Areas Project Profile
North East New Territories New Development Areas November 2007 Project Profile North East New Territories New Development Areas Project Profile (prepared in accordance with the Environmental Impact Assessment Ordinance (Cap. 499)) November 2007 Civil Engineering and Development Department NENT NDA_Project Profile_Rev.2 i Civil Engineering and Development Department North East New Territories New Development Areas November 2007 Project Profile Project Profile Table of Contents 1. BASIC INFORMATION..................................................................................................1 1.1 Project Title.........................................................................................................1 1.2 Purpose and Nature of Project..........................................................................1 1.3 Name of Project Proponent ...............................................................................1 1.4 Location and Scale of Project and History of Site ...........................................1 1.5 Number and Types of Designated Projects to be Covered by the Project Profile...............................................................................................3 1.6 Name and Telephone Number of Contact Person............................................3 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME............................4 2.1 Project Implementation......................................................................................4 2.2 Project Time Table .............................................................................................4 -
Project: Title: AP Locations Use No. of Floor R1024 Kam Tsin Village R 4
Project: 25278 Agreement No. CE61/2007 (CE) North East New Territories New Development Areas Planning and Engineering Study Title: Location, name of building, use and floor of each and every selected assessment point - Construction Noise (KTN) AP Locations Use No. of Floor R1024 Kam Tsin Village R 4 R1103 Europa Garden R 3 R1105 Europa Garden R 2 R1122 Scattered Village Houses West of Europa Garden Phase I R 1 R1141 Scattered Village Houses along Chau Tau Tsuen R 2 R1282 Golf Parkview R 4 R1301 Pak Shek Au R 2 R1321 Scattered Village Houses along Kwu Tung Road R 2 R1322 Scattered Village Houses along Kwu Tung Road R 2 R1412 Residential Premises along Ma Tso Lung Road R 3 R1421 Po Sheung Tsuen Lane R 3 R1541 KTS/267 Proposed House R 3 R1544 KTS/267 Proposed House R 3 R2042 Ho Sheung Heung R 3 R2046 Ho Sheung Heung R 3 R2102 Yin Kong Tsuen R 3 R2103 Yin Kong Tsuen R 3 R2141 Fung Kong Garden R 3 R3000 Residential Premises along Ma Tso Lung Road R 2 R3001 Residential Premises along Ma Tso Lung Road R 1 R3002 Residential Premises along Ma Tso Lung Road R 2 R3006 Residential Premises along Ma Tso Lung Road R 1 R3007 Residential Premises along Ma Tso Lung Road R 1 R3008 Fung Kong Garden R 3 R3009 Ho Sheung Heung R 3 R3010 Ho Sheung Heung R 3 R3012 Yin Kong Tsuen R 3 R3013 Valasis I R 3 R3014 Valasis I R 3 R3015 Valasis I R 3 R3020 A3-1 E 8 R3021 A3-2 E 8 R3022 A3-3 R 35 R3028 A2-4 R 30 R3029 A2-4 R 30 R8000 A2-2 PRH 35 R8001 A2-2 PRH 35 R8002 A2-2 PRH 35 R8003 A2-2 PRH 35 R8004 A2-2 PRH 35 R8005 A1-5 CDA 30 R8006 A1-5 CDA 30 R8007 A1-5 CDA 30 R8008 B2-7 E 8 R8009 B2-7 E 8 R8010 A1-2 PRH 35 R8100 Residential Premises along Ma Tso Lung Road R 2 R8101 Ma Tso Lung San Tsuen R 2 R8104 Residential Premises along Castle Peak Road - Chau Tau R 1 R8105 B2-10 CDA 20 R8106 D1-7 R 25 R8107 Residential Premises along Ho Sheung Heung Pai Fung Road R 3 G:\env\project\25278\reports\Stage 4 EIA - Option 2\Working File\Chap 4 Noise\Appendix\Number of Floor of AP\Appendix 4.1a-1 - Number of Floor of AP (Construction noise).xlsx Page 1 of 4 Project: 25278 Agreement No. -
North East New Territories New Development Areas Planning & Engineering Study
Enclosure 2 North East New Territories New Development Areas Planning & Engineering Study Stage One Public Engagement Digest Topical Notes Topical Note 1 – Strategic Roles of NDAs Topical Note 2 – People-Oriented Communities Topical Note 3 – Sustainable Living Environment Topical Note 4 – Implementation Mechanism November 2008 North East New Territories Stage One New Development Areas Public Engagement Digest Planning & Engineering Study November 2008 Topical Note 1 – Strategic Roles of NDAs Purpose of the Topical Note The main purpose of the Stage 1 Public Engagement of the “North East New Territories New Development Areas Planning and Engineering Study” is to enable the public to appreciate the Study objectives and key issues relating to the development of the Kwu Tung North, Fanling North and Ping Che/Ta Kwu Ling New Development Areas (NDAs), and to express their visions for the NDAs. It is the intention to solicit public views through discussion on four topics, namely, strategic roles of NDAs, people-oriented communities, sustainable living environment and implementation mechanism. This topical note is prepared to provide background information on strategic roles of NDAs with a view to facilitating public discussion on this topic. 1 Background “The Planning and Development Study on North East New Territories” (the NENT Study) commissioned in the late 1990’s, identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable New Development Areas (NDAs). It recommended that KTN, FLN and PC/TKL could proceed as one scheme (Three-In-One Scheme), i.e. an integral whole with shared community facilities, infrastructure and reprovisioning arrangements. -
The Unruly New Territories
The Unruly New Territories Small Houses, Ancestral Estates, Illegal Structures, and Other Customary Land Practices of Rural Hong Kong Malcolm Merry Hong Kong University Press The University of Hong Kong Pokfulam Road Hong Kong https://hkupress.hku.hk © 2020 Hong Kong University Press ISBN 978-988-8528-32-5 (Hardback) All rights reserved. No portion of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any information storage or retrieval system, without prior permission in writing from the publisher. British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. 10 9 8 7 6 5 4 3 2 1 Printed and bound by Paramount Printing Co., Ltd. in Hong Kong, China Contents 1. An Unruly Territory 1 2. Treaty, Takeover, and Trouble 13 3. Land Survey and Settlement 24 4. Profile of a Territory 36 5. Preservation of Custom 53 6. Customary Landholding: Skin and Bones 74 7. Customary Transfer of Land 87 8. Customary Institutions 106 9. Regulation of Customary Institutions 134 10. Small Houses 159 11. The Small House Policy 181 12. Exploitation of Ding Rights 196 13. Lawfulness of the Policy 209 14. Article 40 219 15. Property Theft 237 16. Illegal Structures 259 17. Despoliation 269 Acknowledgements 281 Index 282 1 An Unruly Territory Ever since incorporation into Hong Kong at the end of the nineteenth century, the New Territories have been causing trouble. Initially that was in the form of armed resistance to the British takeover of April 1899. -
NR92 Destinations : Fairview Park, Yuen Long – Tsuen Wan Routeing
Residents’ Service Route No. : NR92 Destinations : Fairview Park, Yuen Long – Tsuen Wan Routeing (Fairview Park – Tsuen Wan) : via Fairview Park Road South, Fairview Park Road West, Fairview Park Road North, Fairview Park Road East, Fairview Park Road South, Fairview Park Boulevard, Fairview Park roundabout, slip road, San Tin Highway, Yuen Long Highway, Tsing Long Highway, Tuen Mun Road, Castle Peak Road, Sai Lau Kok Road, Wai Tsuen Road, Tsuen Kam roundabout, Tai Ho Road North, Tai Ho Road, Sha Tsui Road and Yuen Tun Circuit. Stopping Places: To Tsuen Wan (Outbound Journeys) Pick Up/Set Down : ^*1. Fairview Park Road South near Lotus Road (Outer Terminal Point) 2. Stops within Fairview Park *3. Fairview Park Boulevard near Castle Peak Road #4. Tai Ho Road Flyover layby near KMB No. 51 bus stop (Tsuen Wan Bound) #5. Yuen Tun Circuit near Tai Ho Road (Inner Terminal Point) * Picking up only # Setting down only ^ Interchange point of outbound journeys and inbound journeys Departure time : Mondays to Fridays Saturdays (except Public Holidays) (except public holidays) 7.15 a.m. 8.00 a.m. 7.30 a.m. 8.00 a.m.(2 departures) Routeing (Tsuen Wan – Fairview Park) : via Yuen Tun Circuit, Sha Tsui Road, Tai Ho Road, Sai Lau Kok Road, Wai Tsuen Road, Miu Kong Street, Castle Peak Road, Tuen Mun Road, Tsing Long Highway, Yuen Long Highway, San Tin Highway, Fairview Park roundabout, Fairview Park Boulevard and , Fairview Park Road South. Stopping Places: To Fairview Park (Inbound Journeys) Pick Up/Set Down : *1. Yuen Tun Circuit near Tai Ho Road (Inner Terminal Point) *2. -
Head 706 — HIGHWAYS (Expressed in Hong Kong Dollars)
Capital Works Reserve Fund STATEMENT OF PROJECT PAYMENTS FOR 2017-18 Head 706 — HIGHWAYS (Expressed in Hong Kong dollars) Subhead Approved Original Project Estimate Estimate Actual up to Amended 31.3.2018 Estimate Actual $’000 $’000 $’000 Infrastructure Transport-Footbridges/pedestrian tunnels 6153TB Enhancement of footbridges in Tsim Sha Tsui East 71,400 370 55,387 370 3 6157TB Centre Street escalator link (stage 1) 60,700 - 53,409 50 42 6158TB Elevated walkway between Tong Ming Street and 221,600 30,000 Tong Tak Street, Tseung Kwan O 24,686 30,000 19,143 6164TB Footbridge connecting Tsuen Wan Plaza, Skyline 146,200 42,620 Plaza and adjacent landscaping area 11,993 42,620 11,993 6167TB Provision of barrier-free access facilities at public 292,100 13,695 footbridges, elevated walkways and subways- 230,887 13,695 10,122 design works and phase 1 construction works 6168TB Lift and pedestrian walkway system at Waterloo Hill 116,700 29,822 25,664 29,822 20,529 6169TB Lift and pedestrian walkway system at Cheung Hang 222,700 79,313 Estate, Tsing Yi 34,121 79,313 31,230 6173TB Extension of the CITIC Tower Footbridge to the 74,300 9,050 Legislative Council Complex at Tamar 49,323 9,050 1,505 6175TB Lift and pedestrian walkway system between Kwai 239,400 27,965 Shing Circuit and Hing Shing Road, Kwai Chung 22,393 27,965 22,393 6185TB Lift and pedestrian walkway system between Tai Wo 249,400 518 Hau Road and Wo Tong Tsui Street, Kwai Chung - 518 - Transport-Interchanges/bus termini 6045TI Transport terminus in Area 35, Tsuen Wan 20,900 20,900 -