The PRIDE Group of Companies has been working on the Russian construction market since 2002. During this time, a vast experience in the design, fabrication and assemblage of structures, as well as communications with suppliers and manufacturers of building materials, have been accumulated. The group of companies includes: - SMK PRIDE. Management Company. With an integrated approach to the implementation of the construction of the facility, there is no gap in responsibility between the various contract organizations, and all decisions are taken within one organization that is responsible for the final result. High qualification of workers: assemblers, welders and engineering personnel, solid experience in the construction market, use of modern installation technologies allow not only to maintain relations regular customers with whom the organization has been cooperating for many years, but also actively involve new ones. - Stroymontazhkonstruktsiya. Factory for the production of construction and industrial structures of metal in the city of Kamensk-Uralsky. This is a large production site with a powerful potential of about 30,000 m2, dozens of shops, a large factory management and many auxiliary enterprises. - PCB PRIDE. Design Bureau, which has a high technical level for solving complex issues in the field of design. The numerical strength of the bureau includes 16 highly qualified employees. With the participation of our specialists, project documentation for sign objects of local and federal significance was developed. - Montazhnik. A division specializing in the installation of special technological equipment.

Certification: - Quality management system ISO 9001: 2008; - Safety and security management system OHSAS 18001: 2007; - Environmental management system ISO 14001: 2004; - Certified welding technology NAKS; - Atomic license.

Construction of objects: - Production buildings and premises; - Power plants; - Industrial facilities and equipment; - Warehouse and logistics complexes; - Sports facilities; - Shopping and entertainment and business centers; - Agro-industrial complexes, etc.

Our production: - The welded beam; - Chimneys, air ducts, smoke exhausters and other equipment for boiler houses; - Masts, towers for different purposes; - Screw piles of various sizes; - Pipeline supports: - Elements of pipelines; - Technological metal structures; - Non-standard equipment for metallurgical and mining industries - Racks for various purposes; - Vertical and horizontal tanks; - Manufacturing of orders from stainless steel and aluminum, etc. Shipment is carried out by any mode of transport (railway, motor transport).

Done works: № NAME PERIOD INDUSTRIAL OBJECTS THERMAL POWER STATION-1, Kazan. Installation of a waste heat boiler ED- 160/14 (NUTAR ERIXON, H=26m, 880 tons) with a chimney (H=60m, D=4000mm, 120 2016- 1. tons), thermal insulation of the outside surfaces and rust protection; 2017 "SUAL CREMNY- (RUSAL GROUP) (Production of metallurgical silicon), Kamensk- Uralsky - assemblage of framework of a gas cleaning unit (Block of fabric filters) and gas 2016- 2. pipe line (1200 tons); 2017 "URAL FOIL" ("RUSAL" GROUP), Mykhaylovsk - a set of works on installation of equipment for an annealing furnace of 75 tons, manufacturing and assembling of equipment 3. for annealing of aluminum 2016 THE BRANCH "REFTINSKAYA GRES" OF PJSC "ENEL " - a complex of works on the replacement of the guiding partitions of the flue gas duct of the fume-laden gas of bag 2016 4. filters; "POULTRY FARM" SVERDLOVSKAYA", settlement of Sosnovskoe, Sverdlovsk region - designing, fabrication, delivery, assemblage, anticorrosive protection, thermal isolation of 2 5. potable water tanks of 2000 m3 each; 2016 POWER STATION OF THE URAL POWER SYSTEM BRANCH OF OJSC "FORTUM" Power units No. 1, No. 2, No. 3 (PGU-247.5 MW). Construction and installation work on the complex of water treatment plants and treatment facilities for Voronezh-Aqua 6. LLC, Chelyabinsk 2016 THE BRANCH "REFTINSKAYA GRES" OF PJSC "ENEL RUSSIA" – an installation of instrumental air receivers and installation of cooling towers for the compressor cooling system within the framework of the project "Technical re-equipment of SZShU (System of dry ash and slag removal); 2015- 7. Systems; 2016 "SEWAGE TREATMENT PLANTS" - manufacturing and installation of equipment for biological treatment plants: aerotanks with aeronautical system and sedimentation tanks for 2015- 8. PAO NPF "Ecoton", 2016 THE BRANCH "REFTINSKAYA GRES" OF PJSC "ENEL RUSSIA" - an installation of foundations, including their modification to dry cooling towers, manufacturing and installation of support of pipelines and transition ladders, installation of sidewalks for technical re- equipment of the compressor cooling system; The arrangement of foundations, including their dismantling under receivers 1,2,3,4, including dismantling of foundations, manufacturing and installation of fences and platforms for maintenance of receivers 1,2,3,4, installation of sidewalks for technical re-equipment of the system of instrumental air supply within the 9. framework of the project "Re-equipment of separate SZShU facilities; 2015 THE BRANCH "REFTINSKAYA GRES" OF PJSC "ENEL RUSSIA" - technical re- equipment of power units No. 4, No. 7 - dismantling, pre-assembly and mechanical assembly of metal structures of the bag filter of unit No.4. Technical re-equipment of power unit №4; Implementation of works on the assembly and assembly of metal structures of the fabric 2014- 10. filter. Technical re-equipment of power unit №7; 2015 HEAT STATION ACADEMICHESKAYA - an installation of a waste heat boiler 230 MW at 2014- 11. the facility Construction of PK-2, Yekaterinburg; 2015 "RECONSTRUCTION OF THE SUGRES HEAT AND POWER COMPLEX" - installation of equipment (heat exchanger, pumps) (200 tons), manufacturing and installation of pipelines for strapping (400 tons), fabrication and installation of metal structures, rust protection and 2014- 12. isolation of equipment and pipelines for the project, 2015 "REFINSTRUCTION OF NIZHNETURINSKAYA GRES" - installation of waste-heat boilers: KU-1 (230 MW), KU-2 (230 MW) Installation of hot water boilers PTVM-1, PTVM-2; Assemblage of a tanks (V = 5000m3 - 2 pcs, V = 1000m3 - 3 pcs.); application of rust 2013- 13. protection and thermal insulation on tanks; installation of manifold of tanks, 70 tons; 2015 CLYDE BERGEMANN MATERIALS HANDLING LTD. - manufacture of lime carbonate silo 14. metal structures for the new bag filter of power unit 7 of Reftinskaya GRES; 2014 15. TEK-MOSENERGO - manifold of dry cooling towers at the Construction of TPP-12, Moscow; 2014 NOVOGORKOVSKAYA POWER STATION - installation of equipment (tanks, pumps) and 16. pipelines (including hot steam) (400 tons), Kstovo 2014 KAMENSK-URALS METALLURGICAL PLANT - manufacturing and installation of metal 17. structures for the project "Rolling Mill Complex"; 2013 JSC "URALELECTROMED" - fabrication of a chimney stem H = 45 m, Verkhnyaya 18. ; 2012 19. "URAL LOCOMOTIVES" - installation of the assembly shop (300t); 2012 20. JSC "SVYATOGOR" (UMMC) - manufacturing and installation of steel structures of high- 2011 rise sanitary pipe Н = 120м (400 tons); "-POLYMER" - installation of metal structures of the plant for production of 21. polypropylene; 2011 "PUROVSKY ZPK" - manufacturing of metal structures (900 tons) for field development in 22. the city of Gubkinsky, YaNAO; 2011 23. "SHIROKORECHENSKY" POLYGON - manufacturing of metal structures (320 tons); 2011 2005- 24. URAL ALUMINUM PLANT - modernization of the buildings (1000t); 2010 KARABASHMED - manufacturing and installation of metal structures of reservoirs for 25. 5000m3 for sulfuric acid storage. Manufacture of a crushing and sorting plant; 2010 "SREDNEURALSK COPPER SMELTER" "UMMC" - manufacture of metal structures for 26. flue gas supports; 2010 PLANT OF GLASS PRODUCTION "STEKLOTEH" - fabrication and assemblage of metal 27. structures for the construction of workshop, region (900 tons) 2010 Mechel - installation of technological equipment for the milling and sweeping complex in 28. Chelyabinsk, (150 tons); 2010 OJSC URALKALI - manufacturing of technological equipment (200 tons) of the flotation 29. shop; 2009 30. JSC "SEVERSKY PIPE PLANT" - manufacturing of metal structures (1200 tons); 2008 31. Manufacture of a WATER TOWER OF STAINLESS STEEL, Chelyabinsk; 2008 Construction of a MILL COMPLEX with a capacity of 300 tons of grain per day in the village 32. of Pervomaisky; 2008 IVECO-AMT - general contract works for the construction of the IVECO truck assembly plant 33. (930t), Miass, Chelyabinsk region; 2007 34. FERROALLOY PLANT IN SEROV - manufacturing and installation of flues (2200t); 2007 SVINOKOMPLEKS URALSKY - construction of the agro-industrial complex (1800 tons), 35. Sverdlovsk region; 2007 36. BOBROVSKY ISOLATION PLANT - reconstruction of the production department, ; 2006 37. LUKOIL-PNOS, SIBUR-KHIMPROM - installation of process equipment, Perm; 2004 38. AGROGAZ - construction of a timber processing complex (600 tons), Sverdlovsk region; 2003 39. UROMGAZ - reconstruction of the production building , Yekaterinburg; 2003 COMMERCIAL CENTERS Manufacturing and installation of metal structures at the Yeltsin business center in 2013- 40. Ekaterinburg for OOO Fortstroy 2014 41. Installation of metal structures of TRK "Aquarelle" in Volgograd (1500t) 2011 Manufacturing and installation of metal structures for TRC "Kit", Kamensk-Uralsky; The framework of the main terminal "Kirov Wholesale Market" (KOR), Yekaterinburg; shopping center "Greenwich", Yekaterinburg; the shopping mall "PARK-HOUSE", Yekaterinburg; shopping and entertainment center "Antey", Yekaterinburg; MEGA-IKEA center, 2005- 42. Yekaterinburg; commercial center in Kamensk-Uralsky; 2 shopping centers in Beryozovsky. 2009 43. The Taganskiy Ryad retail complex in Ekaterinburg 2007 General contract works on manufacturing and installation of 8 trade and exhibition buildings 44. "DOKER" (1300tn) for ZAO RENOVA-StroyGroup, Yekaterinburg; 2006 General contract works for the construction of a trade-exhibition building for the commercial 45. center Agora; 2006 BUSINESS CENTERS "Trade complex" Lenta "with parking, on-site and external networks, with gas boiler-house in 46. Kamensk-Uralsky 2016 47. Fabrication and assemblage of metal structures for the Business center of Yeltsin; 2014 Manufacturing of metal structures of the passenger platform at the airport terminal "Knevichi", 48. (650 tons) to the APEC summit; 2011 49. Fabrication and assemblage of steel structures for Business Center ""; 2010 Fabrication and assemblage of metal structures of maintenance of ditch for foundation "The 50. Tower" (200t) 2010 51. Reconstruction of the administrative building of the garment factory "BARS", Berezovsky. 2003 CAR SHOWROOMS Fabrication and assemblage of metal structures of the car showroom "Mercedes-Benz", 52. Ekaterinburg. 2013 Fabrication and assemblage of metal structures of the «Citroen» showroom for 53. UralFranceAvto, Yekaterinburg; 2011 54. Fabrication of metal structures for car showroom "Autobahn Berezovsky" in Berezovsky 2011 WAREHOUSE AND LOGISTICS COMPLEXES 55. Fabrication and assemblage of metal structures for the aircraft hangar of the Koltsovo 2016 Airport (520t), Yekaterinburg Assemblage of metal structures of the warehouse building of the special vehicles factory 56. "UralSpetsTrans" (100 t), Miass, Chelyabinsk region 2016 Assemblage of metal structures and enclosing structures of the distribution center "Magnit" in 57. Yekaterinburg (200t) 2013 Fabrication and assemblage of metal structures of the warehouse base (500 tons) for 58. "Company LK", Ekaterinburg; 2010 59. Warehouse building, Koltsovo settlement (400tn); 2010 60. Logistic center (380 tons) for TVC "PLANETA AVTO", Berezovsky; 2007 Manufacturing and installation of metal structures for logopark " Logistic", Verkhnyaya 61. Pyshma (300t) 2007 62. Logistic center (270tn) "turnkey" for TC "TRILINE", Yekaterinburg; 2004 SPORTS FACILITIES AND OBJECTS OF SOCIAL AND CULTURAL LIFE Reconstruction of the building, fabrication and assemblage of metal structures for the 63. Building of Emergency Managment in Yekaterinburg 2012 64. Fabrication of metal structures of the covered court in the village of (350 tons); 2011 Fabrication of metal structures of athletic facilities in Yekaterinburg, Kompresorny and 65. Shcherbakova str. 2011 66. Fabrication of metal structures FLC with an ice arena, (370tn). 2011 Fabrication of metal structures for the Cultural and Sports Complex in Ishim, the Tyumen 67. region 2007 68. Assemblage of a ventilated roof for a sports and health complex in Ekaterinburg 2004

Equipment and machinery: • Self-propelled cranes KOMATSU LW 250-5 (off-road); • Crane Comedil CBR 32N-4; • Truck cranes URAL КС 25тн .; • Autotower Hyundai 23m; • Manipulators 4-10t. (Up to 22m); • Lifting equipment: mast work platforms, self-propelled lifts Genie; • Scaffolds 2000m2, tours 18 pcs., facade lifts; • Formwork kits for monolithic works; • Modular rooms (cabins, tool boxes) 20pcs; • Mobile sets of welding and installation equipment and etc.

The PRIDE Group of Companies invites new partners and customers to cooperate! The enterprise has specialized production and assemblage facilities that allow to execute an order of any complexity.

PRIDE group of companies (OOO “SMK “PRIDE”). 620137, Ekaterinburg, Botanicheskaya 19 Tel./Fax: +7 (343) 375-35-55 Web-site: www.smk-pride.com (www.смк-прайд.рф)