Project Election Project Title Cost Project Description Location District (1,000'S) Klawock Airport Hardstands 130.0 Install

Total Page:16

File Type:pdf, Size:1020Kb

Project Election Project Title Cost Project Description Location District (1,000'S) Klawock Airport Hardstands 130.0 Install FY2013 Aviation - Deferred Maintenance Inventory/Backlog Project Election Project Title Cost Project Description Location District (1,000's) Klawock Airport Install new hardstands for increased jet traffic in Klawock 130.0 2 Hardstands order to minimize pavement damage Kake Kake Airport Security 50.0 Repair over 100 holes in security fence 5 Fence Hole Repairs Gustavus Airport Gustavus Supplemental Lighted 35.0 Install new supplemental Lighted Wind cone 5 Wind Cone Haines Lease Lot Haines 25.0 Place and compact D-1 on lease lot access taxiway 5 Access Improvement Gustavus Vegetation Cut vegetation on Runway Safety Areas 11/29 and Gustavus 20.0 5 Control 2/20 At Cordova Airport identify and remove trees that Valdez Tree Removal Cordova 50.0 5 penetrate runway 16-34 glide slope District Total HD 5 180.0 Stoney River Airport 400.0 Runway rehabilitation Stoney River 6 Interior Airport Cut Vegetation at five interior airports – Rampart, 75.0 Interior 6 Vegetation Control Stevens Village, Beaver, Hughes, Huslia Total HD 6 475.0 Healy River Airport lighting is in need of updating Healy River Airport 300.0 using conduit and cans instead of direct burial and Denali District 8 Lighting lights which are stuck in traffic cones Tazlina Lake Louise Airport 60.0 Apply dust palliative to Lake Louise Airport. District/ 12 Dust Palliative Nelchina Kake Vegetation Kake 75.0 Cut Vegetation on Runway Safety Area 11/29 35 Control Klawock Vegetation Klawock 35.0 Cut vegetation on Runway Safety Area 2/20 35 Control Total HD 35 110.0 Old Harbor Airport 150.0 Surface course Old Harbor 36 Larson Bay Airport 25.0 Lighting system repairs, windsock pole replacement Larson Bay 36 Total HD 36 175.0 King Salmon Airport 75.0 Fence and gate repair King Salmon 37 Chignik Chignik Lagoon Airport 25.0 Windsock, poles and markers 37 Lagoon Total HD 37 100.0 Red Devil Airport 150.0 Gravel surfacing Red Devil 38 Replace approx. 35 damaged & barrel (old style) Segmented Circle Northern 250.0 segmented circles with current design standard 1-40 Replacement Region (panel-type circles) for various rural airports. D-1 (crushed Provide D-1 aggregate stockpiles at various airports Northern 500.0 1-40 surfacing) Stockpiles throughout the Northern Region Region Northern Region Northern Airport Lighting 250.0 Airport lighting and electrical repairs 1-40 Region Repairs 231-1 FY2013 Aviation - Deferred Maintenance Inventory/Backlog Project Election Project Title Cost Project Description Location District (1,000's) This funding allows the department to respond to Commissioner's unforeseen conditions that require immediate action. 70.0 Statewide 1-40 Reserve This funding is used statewide to respond, as needed, as unsafe conditions arise. Total HD 1-40 1,070.0 Seldovia/ Chenega Bay/ Quartz Crk./ Kasilof/ Lawing/ Peninsula District Replacement of threshold markers and/or edge Nanwalek/ Pt. 100.0 35, 36 Repairs cones Graham/ Old Harbor/ Larsen Bay/ Ouzinkie/ Karluk / Akhiok Southwest District Various lighting replacement and repair in Southwest Southwest 150.0 36-38 Lighting Repairs District District Gravel stockpiles to assist with runway, taxiway, and Y-K Delta Airports 500.0 Various 37, 38 apron maintenance. Total Aviation Deferred $3,500.0 Maintenance Allocation: 231-2.
Recommended publications
  • FY2014 Aviation - Deferred Maintenance
    FY2014 Aviation - Deferred Maintenance Project Cost Project Description Location House Project Title (1,000's) (City) District Brush cutting at 3 Interior Aviation airports back to original clearing Interior Interior Airport Brush-Cutting 90.0 limits: Stevens Village, Beaver and Fort Yukon – to improve Aviation 39 aviation safety District Southwest District Lighting Southwest 35 - 37 150.0 Various lighting replacement and repair in Southwest District Repairs District Brush Cutting on RSA 2/20 50.0 Brush cutting with excavator & hand brushing Klawock 34 Repair airport fencing (at At Cordova Airport, repair or replace 900 LF of deteriorated Valdez 100.0 6 Cordova) fencing. District Y-K Delta Airports 500.0 Contract for gravel stockpile for surfacing repairs Various 36 - 38 Brush Cutting on RSA 8/26 50.0 Brush Cutting on RSA 8/26 Haines 34 Replace equipment fuel storage tanks at (6) Interior Aviation airports; Ruby, Rampart, Lake Minchumina, Hughes, Chalkyitsik, Interior Fuel Storage Tank Bettles; in order to burn ultra low sulfur diesel, provide for 200.0 Aviation 38 - 39 Repair/Replacement economical bulk fuel delivery, and store enough fuel onsite to operate snow removal equipment for a normal winter season. Dist Enhance security through fencing and lights to prevent loss of expensive fuel due to theft. New Access Gate 35.0 Replace access gate Skagway 32 Valdez Repair airport fencing (at Nome) 50.0 At Nome Airport, repair or replace 250 LF of fencing. 6 District Old Harbor Airport 150.0 Replace deteriorated surface course Old harbor 35
    [Show full text]
  • June 30 Final DOT Layout.Indd
    Alaska Department of Transportation and Public Facilities 2010 Department Overview June 30, 2011 THE MISSION of the Department of Transportation and Public Facilities is to provide for the safe and effi cient movement of people and goods and the delivery of state services. Table of Contents Letter from Commissioner Luiken . 3 Introduction . 4 Challenges in Alaska Transportation . .5-7 Long Range Transportation Policy Plan . 8 Statewide Transportation Improvement Plan (STIP) . 9-11 Budget . 12 Divisions and Responsibilities . 13 Statewide Aviation . 13 International Airports . 14 Marine Highway System . 15 Surface Transportation . 16 Transportation Operations . 17-18 Bridge Section . 19 Ports and Harbors . 20 Resource Roads. 21 Transportation Safety . 22 Statewide Systems . 23 Bicycle and Pedestrian Program . 24 Data Services . 25 Buildings and Facilities . 26 Measurement Standards . 27 The Road Ahead . 28 The 2010 Department Overview was produced by the Alaska Department of Transportation and Public Facilities in Juneau, Alaska, at a cost of $9.96 per copy. Cover and inside cover photos (Kodiak roads), back cover (M/V Columbia, Auke Bay), and this page (Dutch Harbor bridge), by Peter Metcalfe 2 Waterfront construction, Kotzebue, by Peter Metcalfe June 30, 2011 Dear Fellow Alaskan, As the Commissioner of the Department of Transportation and Public Facilities, it is my pleasure to present the 2010 Department Overview. All Alaskans use the state’s transportation system, whether they are driving to work, headed for the outdoors, meeting the ferry, or catching a fl ight at the local airport. We use these transportation systems daily, and often take them for granted, unaware of the effort that happens behind the scenes to keep the systems working.
    [Show full text]
  • Notice of Adjustments to Service Obligations
    Served: May 12, 2020 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. CONTINUATION OF CERTAIN AIR SERVICE PURSUANT TO PUBLIC LAW NO. 116-136 §§ 4005 AND 4114(b) Docket DOT-OST-2020-0037 NOTICE OF ADJUSTMENTS TO SERVICE OBLIGATIONS Summary By this notice, the U.S. Department of Transportation (the Department) announces an opportunity for incremental adjustments to service obligations under Order 2020-4-2, issued April 7, 2020, in light of ongoing challenges faced by U.S. airlines due to the Coronavirus (COVID-19) public health emergency. With this notice as the initial step, the Department will use a systematic process to allow covered carriers1 to reduce the number of points they must serve as a proportion of their total service obligation, subject to certain restrictions explained below.2 Covered carriers must submit prioritized lists of points to which they wish to suspend service no later than 5:00 PM (EDT), May 18, 2020. DOT will adjudicate these requests simultaneously and publish its tentative decisions for public comment before finalizing the point exemptions. As explained further below, every community that was served by a covered carrier prior to March 1, 2020, will continue to receive service from at least one covered carrier. The exemption process in Order 2020-4-2 will continue to be available to air carriers to address other facts and circumstances. Background On March 27, 2020, the President signed the Coronavirus Aid, Recovery, and Economic Security Act (the CARES Act) into law. Sections 4005 and 4114(b) of the CARES Act authorize the Secretary to require, “to the extent reasonable and practicable,” an air carrier receiving financial assistance under the Act to maintain scheduled air transportation service as the Secretary deems necessary to ensure services to any point served by that air carrier before March 1, 2020.
    [Show full text]
  • Standard 62.2-2010 Addendum N
    ANSI/ASHRAE Addendum n to ANSI/ASHRAE Standard 62.2-2010 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings Approved by the ASHRAE Standards Committee on January 21, 2012; by the ASHRAE Board of Directors on January 25, 2012; and by the American National Standards Institute on January 26, 2012. This addendum was approved by a Standing Standard Project Committee (SSPC) for which the Standards Committee has estab- lished a documented program for regular publication of addenda or revisions, including procedures for timely, documented, con- sensus action on requests for change to any part of the standard. The change submittal form, instructions, and deadlines may be obtained in electronic form from the ASHRAE Web site (www.ashrae.org) or in paper form from the Manager of Standards. The latest edition of an ASHRAE Standard may be purchased on the ASHRAE Web site (www.ashrae.org) or from ASHRAE Customer Service, 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. E-mail: [email protected]. Fax: 404-321-5478. Telephone: 404-636-8400 (worldwide), or toll free 1-800-527-4723 (for orders in US and Canada). For reprint permission, go to www.ashrae.org/permissions. © 2012 ASHRAE ISSN 1041-2336 © ASHRAE (www.ashrae.org). For personal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted without ASHRAE's prior written permission. ASHRAE Standing Standard Project Committee 62.2 Cognizant TC: TC 4.3, Ventilation Requirements and Infiltration SPLS Liaison: Robert G. Baker Steven J. Emmerich, Chair* Thomas P. Heidel Armin Rudd Don T.
    [Show full text]
  • DOTPF Alaskan Airports, AIP, APEB
    Northern Region Airport Overview -------------------------------------------- DOT&PF Town Hall Meeting October 22, 2010 Jeff Roach, Aviation Planner Northern Region, DOT&PF Topics • Northern Region Airports • Northern Region Aviation Sections • Aviation Funding • Types of Projects • Anticipated Future Funding Levels • Anticipated Northern Region Projects Northern Region 105 Airports 40% of the State’s airports are in the Northern Region • One International Airport • Seaplane Bases • Community Airports • Public, Locally Owned Airports Northern Region Aviation Organization • Planning • Design • Construction • Airport Leasing • Maintenance and Operations (M&O) Aviation Planning • Identify project needs, develops project packages for APEB scoring • Develop project scopes • Conduct airport master plans Project Needs Identification Rural Airports Needs List Development Project needs collected from: • Public, aviation interests, community representatives, DOT&PF and FAA staff, Legislature • DOT&PF Staff (Design, M&O, Leasing) • Needs identified in airport master plans • Regional transportation plans Project Scoping: DOT&PF Regional staff evaluate potential projects to develop preliminary project scope, cost estimate and other supporting information for APEB project evaluation State AIP Project Scoring (APEB) Aviation Project Evaluation Board (APEB): • The APEB is a six-member airport capital project review and evaluation group composed of DOT&PF’s Deputy Commissioner, three Regional Directors (SE, CR, NR), Statewide Planning Director, and State
    [Show full text]
  • ABS RTF Report
    Alaska Satellite Interconnect Equipment Replacement and FY2020 Request: $500,000 System Upgrade Reference No: 61878 AP/AL: Appropriation Project Type: Equipment / Commodities Category: General Government Location: Statewide House District: Statewide (HD 1-40) Impact House District: Statewide (HD 1-40) Contact: Cheri Lowenstein Estimated Project Dates: 07/01/2019 - 06/30/2024 Contact Phone: (907)465-5655 Brief Summary and Statement of Need: This infrastructure provides a critical link for emergency communications, video, and audio services to bush, rural, and urban Alaskan audiences and broadcasters. The project work scope includes system design, equipment purchase, installation, and commissioning of equipment that will sustain and improve existing service levels by replacing the end-of-life/ end-of-service satellite distribution system currently in place. Funding: FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 Total 1197 AK Cap $500,000 $500,000 Inc Total: $500,000 $0 $0 $0 $0 $0 $500,000 State Match Required One-Time Project Phased - new Phased - underway On-Going 0% = Minimum State Match % Required Amendment Mental Health Bill Operating & Maintenance Costs: Amount Staff Project Development: 0 0 Ongoing Operating: 0 0 One-Time Startup: 0 Totals: 0 0 Prior Funding History / Additional Information: Project Description/Justification: The primary purpose of the State of Alaska's satellite infrastructure is supporting Alaska Rural Communications Services (ARCS); the state owned and operated rural television service, and delivery of noncommercial broadcasting, distance education, and emergency communications services. These funds will allow State of Alaska (SOA) to meet their statutory responsibilities by ensuring delivery of these mission critical public services. This system of multiple statewide public and emergency communications services is a State of Alaska owned distribution platform.
    [Show full text]
  • Building Energy Asset Score Program Overview and Technical Protocol
    PNNL-22045 Rev. 1.2 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Building Energy Asset Score Program Overview and Technical Protocol (Version 1.2) N Wang S Goel V Srivastava A Makhmalbaf September 2015 PNNL-22045 Rev. 1.2 Building Energy Asset Score Program Overview and Technical Protocol (Version 1.2) N Wang S Goel V Srivastava A Makhmalbaf September 2015 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 Summary The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial and multi-family residential buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to encourage cost- effective investment in energy efficiency improvements for these types of buildings. The system, known as the Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track energy efficiency impacts of building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. Prior to developing the Asset Score, DOE performed a market study1 to ensure that the effort would help address market needs and fill identified gaps. In 2012, DOE began initial pilot testing of the Asset Score. In 2013, DOE continued to assess the Asset Score through additional pilot testing and a variety of technical evaluations and performance analyses.
    [Show full text]
  • Page 1 of 7 5/20/2015
    Page 1 of 7 Average wind speeds are based on the hourly data from 1996-2006 from automated stations at reporting airports (ASOS) unless otherwise noted. Click on a State: Arizona , California , Colorado , Hawaii , Idaho , Montana , Nevada , New Mexico , Oregon , Utah , Washington , Wyoming ALASKA AVERAGE WIND SPEED - MPH STATION | ID | Years | Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec | Ann AMBLER AIRPORT AWOS |PAFM|1996-2006| 6.7 8.5 7.9 7.7 6.7 5.3 4.8 5.1 6.1 6.8 6.6 6.4 | 6.5 ANAKTUVUK PASS AWOS |PAKP|1996-2006| 8.9 9.0 9.1 8.6 8.6 8.5 8.1 8.5 7.6 8.2 9.3 9.1 | 8.6 ANCHORAGE INTL AP ASOS |PANC|1996-2006| 6.7 6.0 7.5 7.7 8.7 8.2 7.8 6.8 7.1 6.6 6.1 6.1 | 7.1 ANCHORAGE-ELMENDORF AFB |PAED|1996-2006| 7.3 6.9 8.1 7.6 7.8 7.2 6.8 6.4 6.5 6.7 6.5 7.2 | 7.1 ANCHORAGE-LAKE HOOD SEA |PALH|1996-2006| 4.9 4.2 5.8 5.7 6.6 6.3 5.8 4.8 5.3 5.2 4.7 4.4 | 5.3 ANCHORAGE-MERRILL FLD |PAMR|1996-2006| 3.2 3.1 4.4 4.7 5.5 5.2 4.8 4.0 3.9 3.8 3.1 2.9 | 4.0 ANIAK AIRPORT AWOS |PANI|1996-2006| 4.9 6.6 6.5 6.4 5.6 4.5 4.2 4.0 4.6 5.5 5.5 4.1 | 5.1 ANNETTE AIRPORT ASOS |PANT|1996-2006| 9.2 8.2 8.9 7.8 7.4 7.0 6.2 6.4 7.2 8.3 8.6 9.8 | 8.0 ANVIK AIRPORT AWOS |PANV|1996-2006| 7.6 7.3 6.9 5.9 5.0 3.9 4.0 4.4 4.7 5.2 5.9 6.3 | 5.5 ARCTIC VILLAGE AP AWOS |PARC|1996-2006| 2.8 2.8 4.2 4.9 5.8 7.0 6.9 6.7 5.2 4.0 2.7 3.3 | 4.6 ATKA AIRPORT AWOS |PAAK|2000-2006| 15.1 15.1 13.1 15.0 13.4 12.4 11.9 10.7 13.5 14.5 14.7 14.4 | 13.7 BARROW AIRPORT ASOS |PABR|1996-2006| 12.2 13.1 12.4 12.1 12.4 11.5 12.6 12.5 12.6 14.0 13.7 13.1 | 12.7 BARTER ISLAND AIRPORT |PABA|1996-2006|
    [Show full text]
  • Remote Desktop Redirected Printer
    %208% %208% Page 1 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2018 Nenana Little Goldstream 202(23) Lump 1 21,500.00 48,055.56 76,000.00 936,532 01 Bridge Replacement Removal of Existing Sum 65,000.00 21,500.00 52,000.00 30,000.00 (#2080) (45491//5517) Bridge No. 2080 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2018 Nenana Little Goldstream 202(23) Square 942.0 22.82 51.01 80.68 936,532 01 Bridge Replacement Removal of Existing Foot 69.00 22.82 55.20 31.85 (#2080) (45491) Bridge No. 2080 (Alt) 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2014 Haines Ferry Terminal 208(1) Each 21 1,000.00 6,612.50 9,950.00 14,979,745 05 Improvements GROUND ANCHORS 5,000.00 8,500.00 9,950.00 7,000.00 (39251/68433/0) 1.08% 1.19% 1.30% 0.91% 4 Bids Tendered 2016 Skagway - Replace 208(1) Linear 2,100 158.22 249.64 390.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 355.00 158.22 200.00 200.00 Moore Bridge Bolt 5.44% 1.76% 2.08% 1.94% (46281//1432) 5 Bids Tendered 2017 Haines Highway 208(1) Linear 3,885 55.00 66.50 80.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 160.00 80.00 76.00 55.00 3.9 to 12.2, Phase 1 Bolt 1.68% 0.86% 0.80% 0.53% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(2) Linear 875 158.22 248.44 359.00 18,907,426 12 Captain William Henry Stabilization - Foot 415.00 158.22 225.00 200.00 Moore Bridge (46281//0)
    [Show full text]
  • FEDERAL REGISTER INDEX January–October 2019
    FEDERAL REGISTER INDEX January–October 2019 Transportation Department GA 8 Airvan (Pty) Ltd Airplanes – 16202 ( Apr 18) RULES GE Honda Aero Engines Turbofan Engines – 39176 ( Aug 9) General Electric Company Turbofan Engines – 2709 ( Feb 8) Airspace Designations – 45651 ( Aug 30) Gulfstream Aerospace LP (Type Certificate Previously Held by Israel Airspace Designations: Aircraft Industries, Ltd.) Airplanes – 7272 ( Mar 4) Incorporation by Reference Amendments – 52757 ( Oct 3) Honeywell International Inc. Turbofan Engines – 10403 ( Mar 21) Airworthiness Criteria: HPH s. r.o. Gliders – 12880 ( Apr 3) Glider Design Criteria for Alexander Schleicher GmbH & Co. International Aero Engines AG Turbofan Engines – 11642 ( Mar 28); 41621 Segelflugzeugbau Model ASK 21 B Glider – 27707 ( Jun 14) ( Aug 15); 47406 ( Sep 10) Special Class Airworthiness Criteria for the Yamaha Fazer R – 17942 International Aero Engines Turbofan Engines – 2715 ( Feb 8); 11214 ( Apr 29) ( Mar 26); 13105 ( Apr 4); 27511 ( Jun 13) Airworthiness Directives: Learjet, Inc. Airplanes – 45068 ( Aug 28) 328 Support Services GmbH (Type Certificate previously held by AvCraft Leonardo S.p.A. (Type Certificate Previously Held by Finmeccanica S.p.A., Aerospace GmbH; Fairchild Dornier GmbH; Dornier Luftfahrt GmbH) AgustaWestland S.p.A) Helicopters – 24703 ( May 29) Airplanes – 41599 ( Aug 15) Leonardo S.p.A. Helicopters – 8965 ( Mar 13); 29797 ( Jun 25); 30866 Airbus Helicopters – 8250 ( Mar 7); 22693 ( May 20); 47877 ( Sep 11); 56109 ( Jun 28); 47875 ( Sep 11) ( Oct 21) Lockheed Martin
    [Show full text]
  • AK Aviators Safety Handbook 2017 Ver3.Indd
    Alaskan Region Aviator’s Safety Handbook A REFERENCE MANUAL Table of Contents Letter from Kerry Long, FAA Regional Administrator, Alaska 1 Letter from Jim LaBelle, (retired) Chief, Alaska NTSB 2 Aviation Weather Cameras 4 Alaska Flight Service Stations Information 5 Airport Forecast & METAR Explanations 15 ATIS Phone Numbers 17 Runway Safety Information 18 Construction Projects 2017 24 Alaska RCO Frequencies & Locations 25 Alaska CTAF Frequencies 42 Denali Park Aviation Information 43-53 Off Airport Operations 54-56 1 406 ELT Information 57-59 Alaska Seaplane Operation Information 60 Alaska Statute for Emergency Equipment 61 i TOP CAUSES OF ACCIDENTS IN ALASKA: 1. Failure to land on the correct spot 2. Inadequate compensation for wind 3. Loss of direction control Every Flight Review is an opportunity to reduce accidents! Accident/Incident reporting for FAA/NTSB Regional Operations Center (ROC) 907-271-5936 (24 hours) Useful Links: www.faasafety.gov www.faa.gov/airports/runway_safety avcams.faa.gov www.faa.gov/go/fl yalaska www.faa.gov/about/offi ce_org/headquarters_offi ces/avs/offi ces/afs/divisions/alas kan_region/fl yalaska www.faa.gov/about/offi ce_org/headquarters_offi ces/ato/service_units/air_traf- fi c_services/artcc/anchorage/ www.faa.gov/about/offi ce_org/headquarters_offi ces/ato/service_units/air_traf- fi c_services/fl ight_plan_fi ling/ www.faa.gov/go/alaskafss/ www.faa.gov/uas/ ii 11 National Transportation Safety Board There have been many times in my career as an NTSB investigator that I wished I could reach out and literally grab one of my fellow airmen by the lapels and shake them, shake them back from the dead, give them another chance at life.
    [Show full text]
  • Buzzkill: Minimizing Aircraft Noise Over Denali National Park
    MINIMIZING AIRCRAFT NOISE BUZZKILL OVER DENALI NATIONAL PARK BACKGROUND RESULTS A primary role the 1962 Wilderness Act sets for the National Park Service is to High Overflight Impact There is no single best new route that comes from this project; that is for stakehold- preserve “outstanding opportunities for solitude”. Yet in Denali National Park in Low Overflight Impact ers to decide as they explore the possibilities it has generated. However, many Alaska, this solitude is increasingly interrupted by small, low-flying aircraft, which of the optimal routes resemble changes that have already been proposed, such carry flightseers and climbers between surrounding airports and the peaks at the Least Cost Path Healy River Airport as avoiding popular backpacking areas south of the road in the northeast of the heart of the park. Solitude-seeking hikers are outspokenly disturbed, and studies Destination ERA Denali Heliport park. Politically, seeing this result lends those proposals more credibility, which indicate noise pollution’s effect on animal behavior can change ecosystems in Origin McKinley National Park Airport may help drive their adoption. Other weight combinations suggest drastic but fea- yet-unknown ways. Selected Current Flightpaths Denali Airport sible changes, such as directing east-west flights along the southeastern park bor- National Park Boundary der, well away from popular hiking areas. Pilots, scientists, and park officials have met to change common flight routes, try- Kantishna Airport ing to move them away from sound-sensitive areas while keeping them safe and Roads The model also uncovered flaws in the ArcGIS Least Cost Path algorithm. When Cantwell Airport practical.
    [Show full text]