%208% %208% Page 1 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2018 Nenana Little Goldstream 202(23) Lump 1 21,500.00 48,055.56 76,000.00 936,532 01 Bridge Replacement Removal of Existing Sum 65,000.00 21,500.00 52,000.00 30,000.00 (#2080) (45491//5517) Bridge No. 2080 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2018 Nenana Little Goldstream 202(23) Square 942.0 22.82 51.01 80.68 936,532 01 Bridge Replacement Removal of Existing Foot 69.00 22.82 55.20 31.85 (#2080) (45491) Bridge No. 2080 (Alt) 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2014 Haines Ferry Terminal 208(1) Each 21 1,000.00 6,612.50 9,950.00 14,979,745 05 Improvements GROUND ANCHORS 5,000.00 8,500.00 9,950.00 7,000.00 (39251/68433/0) 1.08% 1.19% 1.30% 0.91% 4 Bids Tendered 2016 Skagway - Replace 208(1) Linear 2,100 158.22 249.64 390.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 355.00 158.22 200.00 200.00 Moore Bridge Bolt 5.44% 1.76% 2.08% 1.94% (46281//1432) 5 Bids Tendered 2017 Haines Highway 208(1) Linear 3,885 55.00 66.50 80.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 160.00 80.00 76.00 55.00 3.9 to 12.2, Phase 1 Bolt 1.68% 0.86% 0.80% 0.53% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(2) Linear 875 158.22 248.44 359.00 18,907,426 12 Captain William Henry Stabilization - Foot 415.00 158.22 225.00 200.00 Moore Bridge (46281//0) Foundation Rock Bolt 2.65% 0.73% 0.97% 0.81% 5 Bids Tendered 2017 Haines Highway 208(2) Linear 1,005 45.00 54.25 67.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 150.00 60.00 67.00 45.00 3.9 to 12.2, Phase 1 Dowel 0.41% 0.17% 0.18% 0.11% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(3) Linear 300 154.85 253.97 420.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 238.00 154.85 195.00 200.00 Moore Bridge Dowel 0.52% 0.25% 0.29% 0.28% (46281//1433) 5 Bids Tendered 2009 Allakaket P-208a Cubic 16,000 44.95 47.32 52.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 44.95 45.00 52.00 (23512/62595/1703) Surface Course 13.97% 8.90% 8.47% 5.92% 3 Bids Tendered 2009 Chignik Lagoon P-208a Cubic 1,460 150.00 227.50 282.50 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 275.00 200.00 (23073/51024/4828) Surface Course 5.71% 4.61% 7.96% 5.65% 5 Bids Tendered 2009 P-208a Cubic 23,800 90.00 157.00 250.00 18,744,897 05 Relocation Crushed Aggregate Yard 135.00 150.00 90.00 145.00 (22592/59011/4828) Surface Course 18.13% 19.05% 10.31% 15.78% 5 Bids Tendered %208% %208% Page 2 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2009 Tuluksak Airport P-208a Cubic 21,500 110.00 201.92 280.00 17,533,365 07 (24079/51795/4828) Crushed Aggregate Yard 150.00 110.00 200.00 150.00 6 Bids Tendered Surface Course 20.61% 13.49% 23.55% 17.07% 2009 Runway P-208a Cubic 19,500 38.00 50.50 75.00 5,448,815 02 Relocation Crushed Aggregate Yard 110.00 42.00 50.00 38.00 (19058/57775/4828) Surface Course 26.51% 15.03% 14.63% 10.66% 5 Bids Tendered 2015 Pilot Station Airport P-208a Cubic 28,000 70.00 117.83 170.00 19,784,261 08 Relocation Crushed Aggregate Yard 50.00 110.00 70.00 85.00 (44341/62581/1703) Surface Course 9.23% 15.57% 9.80% 10.98% 6 Bids Tendered 2009 P-208a Cubic 23,940 23.00 38.37 54.50 9,708,914 05 RELOCATION Crushed Aggregate Yard 100.00 37.00 23.00 40.00 (22632/56957/4828) Surface Course 12.73% 9.12% 5.07% 8.79% 9 Bids Tendered 2015 P-208a Cubic 29,000 30.00 39.46 45.00 5,314,269 09 Improvements Crushed Aggregate Yard 50.00 33.67 45.00 40.00 (44828/60851/1703) Surface Course 18.40% 18.37% 22.38% 18.22% 8 Bids Tendered 2017 2013 Scammon Bay P-208a Cubic 7,529 125.00 150.00 173.00 4,929,362 06 Airport Flood Permanent Crushed Aggregate Yard 200.00 150.00 173.00 172.00 Repairs DMVA/FEMA Surface Course 26.14% 22.91% 24.14% 23.55% (46836/58357/4828) 5 Bids Tendered 2009 Takotna Airport Relocation P-208a Cubic 23,300 30.00 41.25 60.00 13,296,580 07 (23792/56774/4828) Crushed Aggregate Yard 75.00 40.00 35.00 30.00 4 Bids Tendered Surface Course 11.63% 7.01% 5.94% 4.76% 2010 Relocation - P-208a Cubic 15,750 135.00 194.78 238.90 13,477,354 06 Phase II Crushed Aggregate Yard 200.00 135.00 175.00 200.00 (28834/57796/4828) Surface Course 17.74% 15.78% 17.69% 18.65% 5 Bids Tendered 2010 Chefornak Airport P-208a C.Y. 20,400 53.00 61.94 85.00 17,443,650 09 Relocation - Stage ii Crushed Aggregate 120.00 55.00 61.15 60.00 (30873/57281/4828) Surface Course 11.19% 6.43% 7.12% 6.47% 8 Bids Tendered 2010 P-208a Cubic 18,416 30.89 63.60 130.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 55.00 41.00 48.00 (17512/62603/1703) Surface Course 16.97% 16.91% 12.28% 13.42% 11 Bids Tendered 2013 Goodnews Airport Disaster P-208a Cubic 180 200.00 328.00 456.00 680,000 07 Repairs Crushed Aggregate Yard 150.00 200.00 456.00 0.00 Contract No. 12-25-1-026 Surface Course 5.26% 5.29% 7.18% 0.00% (41174/53961/4828) 2 Bids Tendered 2009 Huslia Airport P-208a Cubic 22,500 75.00 117.33 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 126.30 93.00 175.00 (23892/61457/1703) Surface Course 34.89% 48.39% 33.31% 39.52% 4 Bids Tendered %208% %208% Page 3 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2011 Manley Airport Relocation P-208a.1 Cubic 4,170 28.00 46.20 70.50 11,049,742 02 (32893/61564/1703) Crushed Aggregate Yard 50.00 42.00 47.50 40.00 10 Bids Tendered Surface Course 1.79% 1.59% 1.72% 1.38% 2009 Platinum Airport Runway P-208a.1 Cubic 3,000 31.10 49.92 75.00 5,448,815 02 Relocation Crushed Aggregate Yard 110.00 42.00 50.00 31.10 (19058/57775/4828) Surface Course 4.08% 2.31% 2.25% 1.34% 5 Bids Tendered 2009 P-208a.1 Cubic 9,335 30.00 36.00 44.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 34.00 30.00 44.00 (23512/62595/1703) Surface Course 8.15% 3.93% 3.29% 2.92% 3 Bids Tendered 2009 Huslia Airport P-208a.2 Cubic 3,850 60.00 99.50 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 60.00 93.00 175.00 (23892/61457/0) Surface Course 5.97% 3.93% 5.70% 6.76% 4 Bids Tendered 2009 Allakaket Airport P-208a.2 Cubic 456 30.00 36.00 44.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 34.00 30.00 44.00 (23512/62595/1703) Surface Course 0.40% 0.19% 0.16% 0.14% 3 Bids Tendered 2009 Chignik Lagoon Runway P-208a.2 Cubic 1,530 110.00 168.00 240.00 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 160.00 110.00 (23073/51024/4828) Surface Course - Add 5.98% 4.83% 4.85% 3.25% 5 Bids Tendered 3" to Runway 2009 Huslia Airport P-208a.3 Cubic 1,400 60.00 99.50 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 60.00 93.00 175.00 (23892/61457/0) Surface Course 2.17% 1.43% 2.07% 2.46% 4 Bids Tendered 2010 Nulato Airport P-208a.aa1 Cubic 61 45.00 205.34 1,600.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 45.00 56.00 45.00 (17512/62603/1703) Surface Course 0.06% 0.05% 0.06% 0.04% 11 Bids Tendered 2011 Manley Airport Relocation P-208a.n2 Cubic 15,135 37.00 48.25 71.00 11,049,742 02 (32893/61564/1703) Crushed Aggregate Yard 50.00 49.00 47.50 45.00 10 Bids Tendered Surface Course 6.48% 6.71% 6.23% 5.65% 2010 Nulato Airport P-208a.n2 Cubic 1,821 13.00 51.37 90.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 37.50 38.00 48.00 (17512/62603/0) Surface Course 1.68% 1.14% 1.13% 1.33% 11 Bids Tendered 2009 Chignik Lagoon Runway P-208a.NTP2 Cubic 315 125.00 217.00 350.00 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 230.00 125.00 (23073/51024/4828) Surface Course 1.23% 0.99% 1.44% 0.76% 5 Bids Tendered 2010 P-208b Cubic 9,300 9.00 21.69 35.00 1,289,610 03 Improvements, Stage I I Uncrushed Aggregate Yard 27.00 17.90 12.00 18.00 (26219/62331/43) Surface Course 10.99% 12.91% 8.47% 11.72% 16 Bids Tendered 2015 Gravel P-208b Cubic 3,170 90.00 132.67 168.00 1,683,560 06 Surface Repairs Uncrushed Aggregate Yard 125.00 168.00 90.00 140.00 (44658/64005/62112/64110/64279/0) Surface Course, 44.19% 31.63% 16.04% 22.48% 3 Bids Tendered Grading E-1 %208% %208% Page 4 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Lake Louise Airport P-208b.1 Cubic 900 9.10 21.67 35.00 1,289,610 03 Improvements, Stage I I Uncrushed Aggregate Yard 27.00 16.89 12.00 18.00 (26219/62331/2636) Surface Course 1.06% 1.18% 0.82% 1.13% 16 Bids Tendered 2010 Lake Louise Airport P-208b.2 Cubic 800 9.10 22.28 35.00 1,289,610 03 Improvements, Stage I I Uncrushed Aggregate Yard 27.00 15.89 12.00 18.00 (26219/62331/2636) Surface Course 0.95% 0.99% 0.73% 1.01% 16 Bids Tendered 2013 Runway P-208c .n2_A Ton 1,120 28.00 47.67 65.00 26,561,061 09 Safety Area Crushed Aggregate 45.00 50.00 28.00 65.00 Improvements/ Nome Surface Course 0.15% 0.21% 0.10% 0.17% Apron Improvements

(41524/61413/60558/4830) 3 Bids Tendered 2013 2012 P-208c Ton 250 27.25 43.63 60.00 415,812 02 Flood Permanent Repairs Crushed Aggregate 12.50 32.50 42.00 40.00 DMVA/DHS Surface Course 0.81% 1.95% 0.00% 0.00% (39936/55713/4828) 6 Bids Tendered 2011 P-208c Ton 17,675 63.00 98.72 200.00 6,767,130 03 Relocation, Stage I V Crushed Aggregate 105.00 67.00 67.73 63.00 (32334/62325 & Surface Course 18.76% 17.50% 16.66% 15.01% 61823/4830) 7 Bids Tendered 2012 P-208c Ton 43,800 14.00 21.60 30.00 11,875,670 08 Improvements Crushed Aggregate 35.00 15.00 14.00 20.00 (38124/59304/4828) Surface Course 8.44% 5.53% 4.23% 6.00% 5 Bids Tendered 2012 Tununak Airport P-208c Ton 45,200 22.00 28.00 37.00 19,963,988 09 Relocation Crushed Aggregate 22.00 25.00 31.00 22.00 (38596/51791/4830) Surface Course 4.42% 5.66% 6.70% 4.59% 5 Bids Tendered 2015 P-208c Ton 60,650 90.00 108.00 125.00 25,767,875 08 Improvements Crushed Aggregate 60.00 90.00 117.00 125.00 (44980/57419/4830) Surface Course 13.67% 21.18% 25.51% 26.15% 4 Bids Tendered 2016 P-208c Ton 1,420 30.00 41.67 50.00 13,242,749 06 Improvements 2016 Crushed Aggregate 75.00 30.00 50.00 45.00 (45927/53754 & Surface Course 0.72% 0.32% 0.51% 0.42% 57329/2638) 3 Bids Tendered 2014 Platinum Airport Runway P-208c Ton 14,635 41.00 45.75 52.50 01 Extension Crushed Aggregate 24.00 45.00 44.50 41.00 (42065/54774/4830) Surface Course 15.32% 0.00% 0.00% 0.00% 4 Bids Tendered 2009 P-208c Ton 101,200 22.00 30.17 36.00 11,250,000 05 Resurfacing Crushed Aggregate 32.00 29.00 22.00 35.00 (20553/62650/0) Surface Course 25.56% 26.09% 18.95% 28.85% 6 Bids Tendered %208% %208% Page 5 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2014 Koliganek Airport P-208c Ton 52,125 19.00 32.33 42.14 7,994,086 09 Reconstruction Crushed Aggregate 37.00 19.00 35.50 42.14 (43353/59276/4830) Surface Course 27.79% 12.39% 21.60% 22.56% 5 Bids Tendered 2015 Shishmaref Airport P-208c TON 2,000 116.00 146.17 162.50 5,927,495 08 Resurfacing CRUSHED 120.00 116.00 160.00 162.50 (44516/61427/2638) AGGREGATE 3.94% 3.91% 4.05% 3.19% 3 Bids Tendered SURFACE COURSE 2017 Runway Shift P-208c TON 7,940 21.00 27.88 35.00 38,969,351 09 (47424//0) CRUSHED 100.00 21.00 25.50 30.00 4 Bids Tendered AGGREGATE 1.69% 0.43% 0.51% 0.58% SURFACE COURSE 2016 P-208c TON 14,260 8.30 22.89 35.00 6,793,720 04 Improvements & CRUSHED 40.00 8.30 16.00 24.00 Pavement Rehabilitation AGGREGATE 4.41% 1.74% 3.33% 4.26% (45740//0) SURFACE COURSE 11 Bids Tendered 2009 Northern Region P-208c.1 Ton 2,400 150.00 220.00 290.00 563,821 08 Certificated Airport Crushed Aggregate 200.00 290.00 150.00 0.00 Compliance Surface Course 27.61% 123.44% 42.01% 0.00% (24535/63184/4830) 2 Bids Tendered 2011 Alakanuk Airport P-208c.1 Ton 6,825 60.00 84.40 132.00 6,767,130 03 Relocation, Stage I V Crushed Aggregate 105.00 60.00 66.82 60.00 (32334/62325 & Surface Course 7.24% 6.05% 6.35% 5.52% 61823/4830) 7 Bids Tendered 2011 Alakanuk Airport P-208c.2 Ton 5,340 60.00 84.22 132.00 6,767,130 03 Relocation, Stage I V Crushed Aggregate 105.00 60.00 68.52 60.00 (32334/62325 & Surface Course 5.67% 4.73% 5.09% 4.32% 61823/4830) 7 Bids Tendered 2009 Alakanuk Airport P-208c.2 Ton 5,600 83.00 128.78 200.00 7,610,950 01 Relocation Stage I I I Crushed Aggregate 120.00 105.00 109.00 111.00 (18472/60231/4830) Surface Course 8.99% 7.73% 7.80% 7.33% 8 Bids Tendered 2011 Alakanuk Airport P-208c.3 Ton 15,600 60.00 82.49 132.00 6,767,130 03 Relocation, Stage I V Crushed Aggregate 105.00 60.00 69.93 60.00 (32334/62325 & Surface Course 16.55% 13.83% 15.18% 12.62% 61823/4830) 7 Bids Tendered 2009 Alakanuk Airport P-208c.3 Ton 8,190 83.00 128.41 200.00 7,610,950 01 Relocation Stage I I I Crushed Aggregate 100.00 105.00 109.00 111.00 (18472/60231/4830) Surface Course 10.95% 11.30% 11.41% 10.72% 8 Bids Tendered 2009 Fort Yukon Airport P-208d Ton 8,400 23.00 32.33 36.00 11,250,000 05 Resurfacing Crushed Aggregate 32.00 29.00 23.00 35.00 (20553/62650/0) Surface Course 2.12% 2.17% 1.64% 2.39% 6 Bids Tendered %208% %208% Page 6 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Chefornak Airport P-208e C.Y. 200 30.00 78.27 257.00 17,443,650 09 Relocation - Stage ii Crushed Aggregate 120.00 45.00 45.00 257.00 (30873/57281/4832) Surface Course 0.11% 0.05% 0.05% 0.27% 8 Bids Tendered Stockpile 2010 Kipnuk Airport Relocation - P-208e Cubic 100 135.00 165.72 200.00 13,477,354 06 Phase II Crushed Aggregate Yard 180.00 135.00 187.00 200.00 (28834/57796/4832) Surface Course 0.10% 0.10% 0.12% 0.12% 5 Bids Tendered Stockpile 2009 OUZINKIE AIRPORT P-208e* Cubic 100 18.00 32.66 44.92 9,708,914 05 RELOCATION Crushed Aggregate Yard 100.00 28.00 20.00 40.00 (22632/56957/4832) Surface Course 0.05% 0.03% 0.02% 0.04% 9 Bids Tendered Stockpile 2009 Akiachak Airport P-208e* Cubic 100 85.00 145.00 250.00 18,744,897 05 Relocation Crushed Aggregate Yard 135.00 130.00 85.00 135.00 (22592/59011/4832) Surface Course 0.08% 0.07% 0.04% 0.06% 5 Bids Tendered Stockpile 2009 Tuluksak Airport P-208e* Cubic 100 110.00 198.00 300.00 17,533,365 07 (24079/51795/0) Crushed Aggregate Yard 100.00 110.00 200.00 140.00 6 Bids Tendered Surface Course 0.06% 0.06% 0.11% 0.07% Stockpile 2009 Takotna Airport Relocation P-208e* Cubic 100 25.00 30.00 35.00 13,296,580 07 (23792/56774/4832) Crushed Aggregate Yard 75.00 35.00 30.00 30.00 4 Bids Tendered Surface Course 0.05% 0.03% 0.02% 0.02% Stockpile 2012 Dillingham Airport P-208g Ton 4,000 14.00 21.51 35.00 11,875,670 08 Improvements Crushed Aggregate 32.00 14.00 14.00 16.54 (38124/59304/5206) Surface Course 0.70% 0.47% 0.39% 0.45% 5 Bids Tendered Stockpile 2015 Hooper Bay Airport P-208g Ton 364 90.00 95.00 110.00 25,767,875 08 Improvements Crushed Aggregate 60.00 90.00 110.00 90.00 (44980/57419/5206) Surface Course 0.08% 0.13% 0.14% 0.11% 4 Bids Tendered Stockpile 2017 Aniak Airport Runway Shift P-208g TON 2,060 20.00 27.63 35.00 38,969,351 09 (47424//0) CRUSHED 50.00 20.00 25.50 30.00 4 Bids Tendered AGGREGATE 0.22% 0.11% 0.13% 0.15% SURFACE COURSE STOCKPILE