Remote Desktop Redirected Printer

Remote Desktop Redirected Printer

%208% %208% Page 1 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2018 Nenana Little Goldstream 202(23) Lump 1 21,500.00 48,055.56 76,000.00 936,532 01 Bridge Replacement Removal of Existing Sum 65,000.00 21,500.00 52,000.00 30,000.00 (#2080) (45491//5517) Bridge No. 2080 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2018 Nenana Little Goldstream 202(23) Square 942.0 22.82 51.01 80.68 936,532 01 Bridge Replacement Removal of Existing Foot 69.00 22.82 55.20 31.85 (#2080) (45491) Bridge No. 2080 (Alt) 3.98% 2.30% 5.51% 3.00% 9 Bids Tendered 2014 Haines Ferry Terminal 208(1) Each 21 1,000.00 6,612.50 9,950.00 14,979,745 05 Improvements GROUND ANCHORS 5,000.00 8,500.00 9,950.00 7,000.00 (39251/68433/0) 1.08% 1.19% 1.30% 0.91% 4 Bids Tendered 2016 Skagway - Replace 208(1) Linear 2,100 158.22 249.64 390.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 355.00 158.22 200.00 200.00 Moore Bridge Bolt 5.44% 1.76% 2.08% 1.94% (46281//1432) 5 Bids Tendered 2017 Haines Highway 208(1) Linear 3,885 55.00 66.50 80.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 160.00 80.00 76.00 55.00 3.9 to 12.2, Phase 1 Bolt 1.68% 0.86% 0.80% 0.53% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(2) Linear 875 158.22 248.44 359.00 18,907,426 12 Captain William Henry Stabilization - Foot 415.00 158.22 225.00 200.00 Moore Bridge (46281//0) Foundation Rock Bolt 2.65% 0.73% 0.97% 0.81% 5 Bids Tendered 2017 Haines Highway 208(2) Linear 1,005 45.00 54.25 67.00 36,149,513 11 Reconstruction Milepost Stabilization - Rock Foot 150.00 60.00 67.00 45.00 3.9 to 12.2, Phase 1 Dowel 0.41% 0.17% 0.18% 0.11% (47539//0) 4 Bids Tendered 2016 Skagway - Replace 208(3) Linear 300 154.85 253.97 420.00 18,907,426 12 Captain William Henry Stabilization - Rock Foot 238.00 154.85 195.00 200.00 Moore Bridge Dowel 0.52% 0.25% 0.29% 0.28% (46281//1433) 5 Bids Tendered 2009 Allakaket Airport P-208a Cubic 16,000 44.95 47.32 52.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 44.95 45.00 52.00 (23512/62595/1703) Surface Course 13.97% 8.90% 8.47% 5.92% 3 Bids Tendered 2009 Chignik Lagoon Runway P-208a Cubic 1,460 150.00 227.50 282.50 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 275.00 200.00 (23073/51024/4828) Surface Course 5.71% 4.61% 7.96% 5.65% 5 Bids Tendered 2009 Akiachak Airport P-208a Cubic 23,800 90.00 157.00 250.00 18,744,897 05 Relocation Crushed Aggregate Yard 135.00 150.00 90.00 145.00 (22592/59011/4828) Surface Course 18.13% 19.05% 10.31% 15.78% 5 Bids Tendered %208% %208% Page 2 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2009 Tuluksak Airport P-208a Cubic 21,500 110.00 201.92 280.00 17,533,365 07 (24079/51795/4828) Crushed Aggregate Yard 150.00 110.00 200.00 150.00 6 Bids Tendered Surface Course 20.61% 13.49% 23.55% 17.07% 2009 Platinum Airport Runway P-208a Cubic 19,500 38.00 50.50 75.00 5,448,815 02 Relocation Crushed Aggregate Yard 110.00 42.00 50.00 38.00 (19058/57775/4828) Surface Course 26.51% 15.03% 14.63% 10.66% 5 Bids Tendered 2015 Pilot Station Airport P-208a Cubic 28,000 70.00 117.83 170.00 19,784,261 08 Relocation Crushed Aggregate Yard 50.00 110.00 70.00 85.00 (44341/62581/1703) Surface Course 9.23% 15.57% 9.80% 10.98% 6 Bids Tendered 2009 OUZINKIE AIRPORT P-208a Cubic 23,940 23.00 38.37 54.50 9,708,914 05 RELOCATION Crushed Aggregate Yard 100.00 37.00 23.00 40.00 (22632/56957/4828) Surface Course 12.73% 9.12% 5.07% 8.79% 9 Bids Tendered 2015 Coldfoot Airport P-208a Cubic 29,000 30.00 39.46 45.00 5,314,269 09 Improvements Crushed Aggregate Yard 50.00 33.67 45.00 40.00 (44828/60851/1703) Surface Course 18.40% 18.37% 22.38% 18.22% 8 Bids Tendered 2017 2013 Scammon Bay P-208a Cubic 7,529 125.00 150.00 173.00 4,929,362 06 Airport Flood Permanent Crushed Aggregate Yard 200.00 150.00 173.00 172.00 Repairs DMVA/FEMA Surface Course 26.14% 22.91% 24.14% 23.55% (46836/58357/4828) 5 Bids Tendered 2009 Takotna Airport Relocation P-208a Cubic 23,300 30.00 41.25 60.00 13,296,580 07 (23792/56774/4828) Crushed Aggregate Yard 75.00 40.00 35.00 30.00 4 Bids Tendered Surface Course 11.63% 7.01% 5.94% 4.76% 2010 Kipnuk Airport Relocation - P-208a Cubic 15,750 135.00 194.78 238.90 13,477,354 06 Phase II Crushed Aggregate Yard 200.00 135.00 175.00 200.00 (28834/57796/4828) Surface Course 17.74% 15.78% 17.69% 18.65% 5 Bids Tendered 2010 Chefornak Airport P-208a C.Y. 20,400 53.00 61.94 85.00 17,443,650 09 Relocation - Stage ii Crushed Aggregate 120.00 55.00 61.15 60.00 (30873/57281/4828) Surface Course 11.19% 6.43% 7.12% 6.47% 8 Bids Tendered 2010 Nulato Airport P-208a Cubic 18,416 30.89 63.60 130.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 55.00 41.00 48.00 (17512/62603/1703) Surface Course 16.97% 16.91% 12.28% 13.42% 11 Bids Tendered 2013 Goodnews Airport Disaster P-208a Cubic 180 200.00 328.00 456.00 680,000 07 Repairs Crushed Aggregate Yard 150.00 200.00 456.00 0.00 Contract No. 12-25-1-026 Surface Course 5.26% 5.29% 7.18% 0.00% (41174/53961/4828) 2 Bids Tendered 2009 Huslia Airport P-208a Cubic 22,500 75.00 117.33 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 126.30 93.00 175.00 (23892/61457/1703) Surface Course 34.89% 48.39% 33.31% 39.52% 4 Bids Tendered %208% %208% Page 3 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 66 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2011 Manley Airport Relocation P-208a.1 Cubic 4,170 28.00 46.20 70.50 11,049,742 02 (32893/61564/1703) Crushed Aggregate Yard 50.00 42.00 47.50 40.00 10 Bids Tendered Surface Course 1.79% 1.59% 1.72% 1.38% 2009 Platinum Airport Runway P-208a.1 Cubic 3,000 31.10 49.92 75.00 5,448,815 02 Relocation Crushed Aggregate Yard 110.00 42.00 50.00 31.10 (19058/57775/4828) Surface Course 4.08% 2.31% 2.25% 1.34% 5 Bids Tendered 2009 Allakaket Airport P-208a.1 Cubic 9,335 30.00 36.00 44.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 34.00 30.00 44.00 (23512/62595/1703) Surface Course 8.15% 3.93% 3.29% 2.92% 3 Bids Tendered 2009 Huslia Airport P-208a.2 Cubic 3,850 60.00 99.50 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 60.00 93.00 175.00 (23892/61457/0) Surface Course 5.97% 3.93% 5.70% 6.76% 4 Bids Tendered 2009 Allakaket Airport P-208a.2 Cubic 456 30.00 36.00 44.00 8,080,460 06 Improvements Crushed Aggregate Yard 71.40 34.00 30.00 44.00 (23512/62595/1703) Surface Course 0.40% 0.19% 0.16% 0.14% 3 Bids Tendered 2009 Chignik Lagoon Runway P-208a.2 Cubic 1,530 110.00 168.00 240.00 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 160.00 110.00 (23073/51024/4828) Surface Course - Add 5.98% 4.83% 4.85% 3.25% 5 Bids Tendered 3" to Runway 2009 Huslia Airport P-208a.3 Cubic 1,400 60.00 99.50 175.00 5,873,030 08 Improvements Crushed Aggregate Yard 95.00 60.00 93.00 175.00 (23892/61457/0) Surface Course 2.17% 1.43% 2.07% 2.46% 4 Bids Tendered 2010 Nulato Airport P-208a.aa1 Cubic 61 45.00 205.34 1,600.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 45.00 56.00 45.00 (17512/62603/1703) Surface Course 0.06% 0.05% 0.06% 0.04% 11 Bids Tendered 2011 Manley Airport Relocation P-208a.n2 Cubic 15,135 37.00 48.25 71.00 11,049,742 02 (32893/61564/1703) Crushed Aggregate Yard 50.00 49.00 47.50 45.00 10 Bids Tendered Surface Course 6.48% 6.71% 6.23% 5.65% 2010 Nulato Airport P-208a.n2 Cubic 1,821 13.00 51.37 90.00 5,989,180 06 Improvements Crushed Aggregate Yard 80.00 37.50 38.00 48.00 (17512/62603/0) Surface Course 1.68% 1.14% 1.13% 1.33% 11 Bids Tendered 2009 Chignik Lagoon Runway P-208a.NTP2 Cubic 315 125.00 217.00 350.00 4,754,600 05 Repairs Rebid Crushed Aggregate Yard 216.50 150.00 230.00 125.00 (23073/51024/4828) Surface Course 1.23% 0.99% 1.44% 0.76% 5 Bids Tendered 2010 Lake Louise Airport P-208b Cubic 9,300 9.00 21.69 35.00 1,289,610 03 Improvements, Stage I I Uncrushed Aggregate Yard 27.00 17.90 12.00 18.00 (26219/62331/43) Surface Course 10.99% 12.91% 8.47% 11.72% 16 Bids Tendered 2015 Hughes Airport Gravel P-208b Cubic 3,170 90.00 132.67 168.00 1,683,560 06 Surface Repairs Uncrushed Aggregate Yard 125.00 168.00 90.00 140.00 (44658/64005/62112/64110/64279/0) Surface Course, 44.19% 31.63% 16.04% 22.48% 3 Bids Tendered Grading E-1 %208% %208% Page 4 of 6 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us