Driving Directions to Frisco

Total Page:16

File Type:pdf, Size:1020Kb

Driving Directions to Frisco DRIVING DIRECTIONS TO FRISCO FROM DALLAS/FORT WORTH FROM INTERSTATE 35 SOUTHBOUND INTERNATIONAL AIRPORT (OKLAHOMA) Take the North exit out of DFW Airport and continue From Interstate 35 South, head east on Texas 288 Loop. on Highway 121 North (Sam Rayburn Tollway). Continue Take the U.S. Highway 377/U.S. Highway 380 ramp to north for approximately 22 miles; Highway 121 runs along Decatur/McKinney. Turn left on to U.S. 380/University the southern boundary of Frisco. Drive and head east. Take a right on Dallas North Tollway and head south. For the Westin and Sheraton hotels, exit at Legacy Drive. For the Westin and Sheraton hotels, exit at Main Street. For Comfort Suites, exit at the Dallas North Tollway Turn right on Main (west) and left on Legacy Drive and stay on the frontage road (Dallas Parkway) for (south), then travel approximately five miles. approximately five miles. Comfort Suites is just north of Main Street on Dallas Parkway. For Comfort Suites, exit at Main Street and make a U-turn to northbound Dallas Parkway frontage road. For all other hotels, exit at Parkwood Boulevard. For all other hotels, stay southbound on Dallas North Cash is not collected on the Sam Rayburn Tollway, so Tollway to Gaylord Parkway. there is no need for change. The approximate toll cost to Gaylord Parkway is $2.18. FROM LOVE FIELD AIRPORT (HOME OF SOUTHWEST AIRLINES) FROM U.S. HIGHWAY 75 CENTRAL EXPRESSWAY SOUTHBOUND Take a left out of the airport property onto Mockingbird Lane; this road will reach a Y – stay to (OKLAHOMA) the right on Mockingbird Lane. Stay on Mockingbird From U.S. Highway 75 Central Expressway South, exit at to the Dallas North Tollway; head north (left) and U.S. Highway 380/University Drive and head west. Exit at merge onto the Tollway. Preston Road (Highway 289) and head south; this route will have multiple traffic signals, but no tolls. Another For the Westin and Sheraton hotels, exit at Highway 121 option is to exit U.S. 380/University Drive at the Dallas and go south (left) at the light. Stay on the frontage North Tollway southbound (left). road to Legacy Drive. For the Westin and Sheraton hotels, exit at Main Street. For Comfort Suites, remain on Dallas North Tollway Turn right on Main (west) and left on Legacy Drive heading north. Comfort Suites is just north of Main Street (south), then travel approximately five miles. on Dallas Parkway. For Comfort Suites, exit Main Street and make a U-turn to For all other hotels, exit at Gaylord Parkway and turn northbound Dallas Parkway frontage road. right (east). For all other hotels, stay southbound on Dallas North The approximate cost of tolls into Frisco is $4.40. Tollway to Gaylord Parkway. The approximate toll cost to Gaylord Parkway is $2.18. 7.
Recommended publications
  • Dfw Toll Road Guide
    DFW TOLL ROAD GUIDE OPEN TO TRAFFIC PROPOSED/IN PLANNING UNDER CONSTRUCTION Independence Title LEARN MORE IndependenceTitle.com OPEN TO TRAFFIC PROPOSED CONSTRUCTION To order a motorcycle tag, call 1-888-468-9824. A refundable deposit TxTag is required. With an electronic TxTag sticker on Bumper Tags: Bumper tags are required for vehicles with certain your windshield, you can pay tolls windshields. Because bumper tags can be reused, a refundable without stopping at a toll booth or deposit is required. If you have questions, call 1-888-468-9824. digging for change. As you enter or exit the toll road, a device above the How do I get a TxTag? road reads a signal from the microchip Online (txtag.org) inside your tag and automatically deducts the toll from Filling out an online application form takes only a few minutes. Your TxTag will be mailed to you within 3-4 business days already activated your pre-paid TxTag account. and ready for immediate installation. How does TxTag Work? By Phone TxTag makes paying tolls simple and fast. Call the TxTag Customer Service Center Monday-Friday, from 8:00 a.m. There's no stopping or slowing down to pay, no waiting in line at a toll to 7:00 p.m., toll-free at 1-888-468-9824. A representative will assist you booth and no searching for change on toll roads across Texas. The TxTag with the short application process. sticker goes on the inside of your windshield behind your rearview mirror. An electronic reader above the toll roads sends a signal to the By Mail microchip inside the sticker, and tolls are automatically deducted from You may also download and print the application for a TxTag.
    [Show full text]
  • Request for Bids (RFB) for Sam Rayburn Tollway Segment
    Request for Bids (RFB) for Sam Rayburn Tollway Segment 3 Frontage Roads (SH 121) Restriping Solicitation Number: 05261-SRT-00-CN-PD Date Issued December 18, 2020 Date Revised Pre-Bid Conference January 12, 2021 at 3:00 p.m. CT Microsoft Teams Virtual Meeting Details: Virtual Pre-Bid Conference Request meeting presentation from: Join Microsoft Teams Meeting Reginald Valentine, Sr. Procurement Specialist +1 469-214-9499 United States, Dallas (Toll) [email protected] Conference ID: 108 781 198# Bid Question Deadline January 14, 2021 at 5:00 p.m. CT Submit Questions via www.nttamarketplace.org January 21, 2021 at 11:00 a.m. CT NTTA Bid Due Date 5900 West Plano Parkway, Suite 100, Submit Bids via www.nttamarketplace.org Customer Service Center, Plano, Texas 75093 January 21, 2021 at 3:00 p.m. CT Bid Opening Date Virtual Bid Opening Microsoft Teams Virtual Meeting Details: Join Microsoft Teams Meeting +1 469-214-9499 United States, Dallas (Toll) Conference ID: 313 699 906# Solicitation Contact Person Reginald Valentine, Sr. Procurement Specialist [email protected] Contract Term 5 Months Project Description: Removal and installation of new thermoplastic pavement markings along the SH-121 Frontage Road and all intersections from south of Dallas North Tollway to north of Medical Center Drive. Work includes long lines, skips, graphics and raised pavement markers as well as the installation of delineators on the MBGF and concrete rail along the SH-121 Frontage Roads. NOTE: To be considered for this procurement, each Bidder MUST include with their Bid Sheet, and all REQUIRED documents. Bidders are encouraged to upload their bids to NTTA’s Marketplace (https://www.nttamarketplace.org), no later than the date and time identified above as the “Bid Due Date”.
    [Show full text]
  • Sam Rayburn Tollway Fourth Lane Project
    PROGRESS REPORT Sam Rayburn Tollway Fourth Lane Project WINTER 2017 The North Texas population continues to grow. The Sam Rayburn Project Manager: Tollway will be widened to keep up with demand and to keep Kelly Johnson, P.E. (Planning and Design Stages) traffic moving. A fourth lane will be added in each direction to the entire 26-mile tollway. This widening project is currently in the planning phase. WHAT HAPPENED RECENTLY? WHAT TO EXPECT? • Environmental and preliminary design work continued. • Two community meetings will be held along the SRT in February to update the public about the future project. • NTTA Board of Directors approved two contracts for design The come-and-go meetings will be held from 5:30 to 7:30 p.m. engineering services in Dec. 2016 for SRT: DNT to U.S. 75 and Feb. 21 at Creek Valley Middle School, located at 4109 Creek SRT: Denton Tap Road to DNT. Valley Blvd., Carrollton and from 5:30 to 7:30 p.m. Feb. 23 in the Cottonwood Creek Baptist Church Atruim, located at 1015 Sam Rayburn Tollway, Allen. More information is available on the NTTA website, www.NTTA.org • DNT to U.S. 75 and west of Denton Tap Road to DNT: Final design will start in 2017. Construction will begin in mid-2018. The fourth lane is expected to open to traffic at the end of 2020. Subscribe for Updates Follow Us Questions? [email protected] Click here Hotline: 972.628.3134 www.ProgressNTTA.org SSAMAM RRAYBURNAYBURN TTOLLWAYOLLWAY FOURTHFOURTH LLANEANE PROJECTPROJECT · PPROGRESSROGRESS RREPORTEPORT WWINTERINTER 22017017 Panther Creek Pkwy.
    [Show full text]
  • 1. Follow Dallas North Tollway N 2. Take the Exit Towards Warren Pkwy/Gaylord Pkwy 3
    DIRECTIONS FROM DOWNTOWN DALLAS: 1. Follow Dallas North Tollway N 2. Take the exit towards Warren Pkwy/Gaylord Pkwy 3. Use the 2nd from the left lane to turn LEFT onto Warren Pkwy 4. Turn Right onto Gaylord Pkwy 5. Turn left to enter the Omni Frisco Hotel. DIRECTIONS FROM DFW: 1. Take TX-121 N and Sam Rayburn Tollway to Frisco and follow signs for Dallas North Tollway N. 2. Using the 2nd from the right lane to take the exit. 3. Keep left at the fork, and merge onto Dallas North Tollway N. 4. Take the exit for Lebanon Rd, make a U-turn to cross under the Dallas North Tollway and continue on Dallas Pkwy S frontage road. 5. Turn right onto Cowboys Way and right onto Gaylord Pkwy 6. Turn left to enter the Omni Frisco Hotel. DIRECTIONS FROM OKLAHOMA: 1. Take I-35E S Towards Denton to TX-121N and Sam Rayburn Tollway to Frisco 2. Using the 2nd from the right lane to take the exit 3. Keep left at the fork, and merge onto Dallas North Tollway N. 4. Take the exit for Lebanon Rd, make a U-turn to cross under the Dallas North Tollway and continue on Dallas Pkwy S frontage road 5. Turn right onto Cowboys Way and right onto Gaylord Pkwy 6. Turn left to enter the Omni Frisco Hotel. DIRECTIONS FROM EAST TEXAS: 1. Take I-30 W towards Dallas 2. Take exit 96 for TX-302 Spur W in Greenville. 3. Keep right to continue on Lee St.
    [Show full text]
  • 4100 International Parkway
    INTERNATIONAL BUSINESS PARK ibptexas.com 4100 INTERNATIONAL PARKWAY CARROLLTON, TX 75007 BUILDING SPECIFICS AMENITIES TYPICAL FLOOR PLAN • Two Stories • Immediate access to Dallas North Tollway and George Bush Turnpike • 51,000 SF Floor Plates • Energy Star Certifi ed • On-site ownership, property management and maintenance • Structural Bay: 30’ x 30’ • 100,378 Total SF • Artwork and sculpture gardens • 15’ Floor to Floor • 51,000 SF Floor Plates • Multiple parks with water features • 5:1,000 Parking Ratio • Outdoor plaza and dining areas • Dual feed electricity from • On-site café/deli two substations • Outdoor grills and picnic areas • Multi Tenant Factor 14.5% • Ranch House Conference Center • Single Tenant Factor 6% • 24x7 Security • Committed to energy conservation, sustainability and recycling TECHNOLOGY SPECIFICATIONS • Dual feed electricity from two substations • High-speed fi ber optic cabling for data, voice and video transmission • Multiple fi ber providers: AT&T, XO, Grande, TW Telecom, AboveNet, FiberLight & Verizon • Contracted providers offer the best electricity rates in the deregulated Texas market • Conduit connectivity to 4120 International • Generator pad sites available FOR LEASING INFORMATION: Trevor Franke or Gini Dibrell | Phone: 214.220.0600 Fax: 214.220.0619 | ibptexas.com Developed by 20150220 4100 Intl.indd 1 2/23/2015 1:15:40 PM In t e PPlano Parkway r l n a a n t io o n P al a r k w ay a y MMidway Road Dallas North Tollway DDallas North i a d l w l a a s y N R o o r a t h d T o l l w a y GGeorgeeorge BushBush TurnpikeTurnpike INTERNATIONAL BUSINESS PARK ibptexas.com 4100 INTERNATIONAL PARKWAY CARROLLTON, TX 75007 DEMOGRAPHICS PRIME LOCATION 2014 Demographics 1 mile 3 miles 5 miles International Business Park is located on the north side of George Bush Turnpike (190) and adjacent to 2014 Population 12,152 149,323 332,520 the Dallas North Tollway, putting you at the center of America’s fastest growing suburban offi ce district – 2014–2019 Population Growth 17.46% 15.80% 13.96% Dallas’ Platinum Corridor.
    [Show full text]
  • G Oogle Maps Google
    DFW International Airport to Co ll in Col lege - Spring Creek Campus -... Page 1 of 2 Google Maps DFW International Airport to Collin College Dri ve 32.7 miles, 35 min -Spri ng Creek Campus "'" ('\,~.. -·· 6") .,...--' f- J Allen ~ ..,_,""'""" .. I -"" I Collin College · if Spring Creek Campus (isi) no Flower Mound fa Garland ...... Row Mol.lmain - I Google ~ Dallas ~ Mesqurte Map data ©2017 Google 2 mi ....__ __, DFW International Airport 2400 Av1at1on Or, OFW Ai rport , TX 75261 Take International Pkwy, TX-121 Nand President George Bush Turnpike E to N Central Expy in Pl ano. Take exit 31 from US-75 N 30 min (30.5 mi) t 1. Head north on International Pkwy A Partial toll road 4.0mi A 2. Merge onto TX-121 N 4.2mi t 3. Continue onto Sam Rayburn Tollway A Toll road 2.8mi 4. Take the Interstate 35E S exit toward Dallas A Partial toll road 1.6mi 'I 5. Keep ri ght at the fork to continue on Exit 4458 and merge onto President George Bush Turnpike E A Partial toll road 14.4 mi https ://www.google .com/maps/dir/DFW+Internationai+Airport,+24 ... DFW International Airport to Collin College - Spring Creek Campus -... Page 2 of 2 6. Use the right 21 anes to merge onto US-75 N toward McKinney 3.2mi Y' 7. Take ex it 31 toward Spring Creek Pkwy 0.3mi Continue on N Central Expy to your destination 6 min (2.2 mi) A 8. Merge onto N Central Expy 0.9mi r+ 9.
    [Show full text]
  • President George Bush Turnpike Eastern Extension Now on Google Maps
    Media Contact: Customer Contact: Susan Slupecki 972-818-NTTA (6882) 214-224-2481 [email protected] 5900 W. Plano Parkway, Plano, Texas 75093 [email protected] www.NTTA.org PRESIDENT GEORGE BUSH TURNPIKE EASTERN EXTENSION NOW ON GOOGLE MAPS PLANO, Texas – March 30, 2012 – Motorists can now find the President George Bush Turnpike Eastern Extension as a route on Google Maps. Google Map users will find the Eastern Extension as a continuous route from Rowlett to destinations around the Metroplex. The North Texas Tollway Authority opened the Eastern Extension in December 2011. The 9.9-mile toll road is a portion of the outer loop around Dallas and its suburbs and provides direct connections to Interstate 30 in Garland and Rowlett, the Dallas North Tollway, U.S. 75 and destinations such as DFW International Airport. The NTTA next expects the Eastern Extension will be visible as a route on TomTom, a portable GPS system, by early May. The average toll for driving on the Eastern Extension is 15.3 cents per mile for vehicles with a TollTag. TollTags offer the most convenient, lowest-cost option for paying tolls, and NTTA toll roads provide a seamless route around the Metroplex. Full TollTag benefits include: The lowest toll rates – ZipCash customers pay 50 percent more. Simple online account management – visit us 24/7 at www.NTTA.org. Discounted terminal parking and pass-through at DFW International Airport and convenient parking payment at all lots. Convenient parking payment at Dallas Love Field Airport terminal lots. Easy payment for travel on any Texas toll road.
    [Show full text]
  • 2018 Traffic and Revenue Forecast
    VOLUNTARY DISCLOSURE FILING Filed by the Texas Transportation Commission Date of Filing: January 29, 2020 Evaluation and Confirmation of Central Texas Turnpike System 2018 Traffic and Revenue Study Forecast In connection with the offering by the Texas Transportation Commission (the "Commission") of the proposed Central Texas Turnpike System Revenue Refunding Bonds (the "Bonds"), Stantec Consulting Services Inc, ("Stantec"), the acting Traffic Consultant for the Commission in connection with the Central Texas Turnpike System (the "System"), reviewed the report they prepared titled Central Texas Turnpike System 2018 Traffic & Revenue Study dated August 29, 2018 (the "2018 Report") to determine if changes to the underlying economics and other conditions warrant any change to the original forecast. Stantec has issued a letter dated as of January 21, 2020 (the "2020 Update Letter") updating the 2018 Report. For more information regarding the System, the 2020 Update Letter and the 2018 Report, please refer to the Preliminary Official Statement dated January 28, 2020, for the Commission's Bonds which is accessible here and contains updated information regarding the System including the 2020 Update Letter and the 2018 Report. After pricing the Bonds, the final Official Statement will also be filed under the base CUSIPs for the Bonds. This filing is not required to be provided by the Commission or the Texas Department of Transportation ("TxDOT") pursuant to their respective contractual continuing disclosure undertaking relating to their outstanding obligations and, accordingly, should not be construed as obligating the Commission or TxDOT to provide such additional information in future continuing disclosure filings or to provide any updates to the information contained in this filing.
    [Show full text]
  • OUT North Texas 1825 Market Center Blvd Ste
    THE EXPERIENCE A Complete Guide to Visiting DFW From TOP to BOTTOM THE SOURCE Our Dynamic Visitors and Relocation Guides THE CONNECTION A Comprehensive Business Directory THE COVER OUT Texas Actor | Singer | Dancer Todrick Hall OUTNT2017 2 3 OUTNT2017 4 2017 NT pain relief OUT wellnessNOW! done RIGHT! In Network with Cigna, BCBS, Aetna, United & more. State of the Art Physical Therapy & Hands on Care. Auto, Work & Sports Injuries. Neck & Back Pain. Bulging Disc Decompression. Yearsof service to our community. 304-time Winner Readers Voice Awards CEDAR SPRINGS CHIROPRACTICDr. Steven Tutt Clinical Director 4245 Cedar Springs Road (Between Douglas & Wycliff) www.drtuttdc.com • [email protected] Call or visit for a consultation 214.528.1900 5 OUTNT2017 OUTNT2017 6 7 2017 NT OUT Providing compassionate medical care in North Texas for more more than 25 Years! Peter Triporo, NP Comprehensive HIV/AIDS management Marc A. Tribble, M.D. STD testing and treatment Donald A. Graneto, M.D. David M. Lee, M.D. PrEP counseling and treatment Brady L. Allen, M.D. General adult medical care Eric Klappholz, NP Cosmetic - BOTOX® and Jason Vercher, PA JUVÉDERM® Uptown Physicians Group Uptown Tower, 4144 N. Central Expy Suite 750, Dallas, TX 75204 214-303-1033 www.UptownDocs.com New patients are currently being accepted. Most major insurances accepted. OUTNT2017 8 9 2017 NT RON ALLEN CPA, PC OUT • Former IRS Agent IRS Negotiations • Individual and Business Tax Returns • Accounting and Payroll Services • QuickBooks Pro Advisor On Staff First Consultation Free 2909 Cole Ave. Suite 119 Dallas, TX 75204 214.954.0042 [email protected] www.ronallencpa.com Gay owned and operated.
    [Show full text]
  • Toll Per Mile Comparisons 2017
    Copyright (C) 2018 E470 Oversight Project NON INTERSTATE ROADS TOLLS PER MILE (EXCLUDING TOLL ROADS SHORTER THAN 3 MILES) MINIMUM TOLL FOR PASSENGER CARS AS OF JANUARY 1 2017 SOURCE: FEDERAL HIGHWAY ADMINISTRATION MIN PASSENGER VEH TOLL PER STATE NAME FROM TO MILES MILE New York Whiteface Mountain Veterans Memorial Highway Wilmington Whiteface Mountain 5.00 $2.20 New York Prospect Mountain Veterans Memorial Highway US 9 (gate) Top of Prospect Mountain 5.90 $1.69 Illinois Elgin O'Hare Expressway Lake Street Interstate 290 6.43 $0.52 Colorado Pikes Peak Toll Road Town of Cascade, US 24 west of Colorado Springs Top of Pikes Peak Mountain -14, 110' elevation 19.00 $0.39 Alabama Foley Beach Express AL 59 (in Foley) AL 180 (in Orange Beach) 8.53 $0.39 Colorado Northwest Parkway I-25, MP 228 in North Denver 96th Street (in City of Broomfield) 10.00 $0.36 Colorado E-470 I-25 & C-470; Douglas County I-25 & Northwest Parkway; Adams County 47.00 $0.30 Texas Loop 1 Parmer Lane SH 45 4.00 $0.27 Texas Manor Expressway Springdale Road Parmer Lane 5.00 $0.26 Florida Miami Airport Expressway I-95 Lejeune Rd (SR 953) 4.07 $0.26 Florida Wekiva Parkway CR 435/Mount Plymouth Road West of Old McDonald Road 3.14 $0.24 Florida Poinciana Parkway US 17/92 and Kinny Harmon Road Cypress Parkway 9.70 $0.23 Texas Fort Bend Parkway - Fort Bend County BW 8 SH 6 6.20 $0.23 Florida Orchard Pond Old Bainbridge Road Meridian Road 5.20 $0.23 Florida John Land - Apopka Expressway (SR 414) SR 429 (Western Beltway) US 441 South 5.00 $0.23 Texas SH 249 Tomball Tollway Spring-Cypress
    [Show full text]
  • PIKEPASS INTEROPERABLE with NTTA August 10 - Oklahoma PIKEPASS Customers May Use PIKEPASS on NTTA Tollraods
    Media Contact: Jack Damrill - Public Information Officer Oklahoma Turnpike Authority Cell: 405.206.0005 Tel: 405.425.3610 [email protected] www.pikepass.com IMMEDIATE RELEASE PIKEPASS INTEROPERABLE WITH NTTA August 10 - Oklahoma PIKEPASS customers may use PIKEPASS on NTTA tollraods OKLAHOMA CITY, Okla. (August 4, 2014) — The Oklahoma Turnpike Authority (OTA) has finalized an interoperability agreement with the North Texas Tollway Authority (NTTA), which will begin August 10, 2014. “We are excited to announce that PIKEPASS customers will be able to use their transponders in North Texas,” said Tim Stewart, OTA director. “This added accommodation is an example of how we continually listen to our customers and provide innovative ways to make faster, safer and easier.” NTTA operates the Dallas North Tollway, George Bush Turnpike, Sam Rayburn Tollway, LBJ TEXpress, Addison Airport Toll Tunnel and the Chisholm Trail Parkway—all of which will be interoperable with the Oklahoma PIKEPASS. NTTA TollTag customers will have the same convenience on all Oklahoma turnpikes. Both NTTA and OTA passed resolutions to allow interoperability. Although customers should only need one transponder, users who have both TollTag and PIKEPASS should call to determine if one or two accounts work best. It may be better for customers keep both their OTA and NTTA accounts. However, due to double billing, OTA recommends users call PIKEPASS Customer Service at 1-800-PIKEPAS (1-800- 745-3727) or NTTA Customer Service at 1-972- 818-NTTA (1-972-818-6882) to determine the needs of the individual driver. The customer’s PIKEPASS account must be in good standing to qualify for interoperability on NTTA toll roads.
    [Show full text]
  • PUBLIC HEARING SCHEDULED on SRT IMPROVEMENTS Fourth Lane to Be Added in Each Direction for Entire Tollway Length
    Media Contact: Customer Contact: Michael Rey 972-818-NTTA (6882) 214-224-2237 [email protected] 5900 W. Plano Parkway, Plano, Texas 75093 [email protected] www.NTTA.org PUBLIC HEARING SCHEDULED ON SRT IMPROVEMENTS Fourth lane to be added in each direction for entire tollway length PLANO, TX – July 17, 2017 – The North Texas Tollway Authority (NTTA) will conduct a public hearing July 25 regarding proposed improvements to the Sam Rayburn Tollway. NTTA is proposing the addition of one main lane in each direction along the Sam Rayburn Tollway (SRT) from Business 121 (West) to U.S. Highway 75. The project is located within the cities of Allen, Carrollton, Coppell, Fairview, Frisco, Lewisville, McKinney, Plano, and The Colony within Collin, Dallas, and Denton Counties, Texas. The total distance of the proposed project is approximately 26 miles. The public hearing will be held at Taylor Elementary School, 9865 Gillespie Drive, Plano, TX 75025. Displays will be available for viewing at 6:30 p.m. with the formal hearing starting at 7:00 p.m. The purpose of the hearing is to present the planned improvements and to receive public comment on the proposed project. It would widen the SRT facility by adding one main lane in each direction within the existing median and construct operational improvements to enhance traffic flow along the SRT. The purpose of the proposed project is to respond to the forecasted increase in traffic demand and on-going commercial and residential development in the project area. The proposed improvements would be constructed entirely within existing operational right of way (ROW) and would not require additional ROW or easements.
    [Show full text]