PROGRESS REPORT Sam Rayburn Tollway
Fourth Lane Project WINTER 2017
The North Texas population continues to grow. The Sam Rayburn Project Manager: Tollway will be widened to keep up with demand and to keep Kelly Johnson, P.E. (Planning and Design Stages) traffic moving. A fourth lane will be added in each direction to the entire 26-mile tollway. This widening project is currently in the planning phase.
WHAT HAPPENED RECENTLY? WHAT TO EXPECT?
• Environmental and preliminary design work continued. • Two community meetings will be held along the SRT in February to update the public about the future project. • NTTA Board of Directors approved two contracts for design The come-and-go meetings will be held from 5:30 to 7:30 p.m. engineering services in Dec. 2016 for SRT: DNT to U.S. 75 and Feb. 21 at Creek Valley Middle School, located at 4109 Creek SRT: Denton Tap Road to DNT. Valley Blvd., Carrollton and from 5:30 to 7:30 p.m. Feb. 23 in the Cottonwood Creek Baptist Church Atruim, located at 1015 Sam Rayburn Tollway, Allen. More information is available on the NTTA website, www.NTTA.org
• DNT to U.S. 75 and west of Denton Tap Road to DNT: Final design will start in 2017. Construction will begin in mid-2018. The fourth lane is expected to open to traffic at the end of 2020.
Subscribe for Updates Follow Us Questions? [email protected] Click here Hotline: 972.628.3134 www.ProgressNTTA.org SSAMAM RRAYBURNAYBURN TOLLWAYTOLLWAY FOURTHFOURTH LANELANE PROJECTPROJ· EPPROGRESSCRTO GRESS RREPORTEPORT WWINTERINTER 20172017
Panther Creek Pkwy. II 75 Oak 720 Little Elm
Point 5 Eldorado Pkwy. I I Lewisville Lake Corridor I
PROPOSED TYPICAL SECTION II Dallas North Tollway North Dallas Eldorado Pkwy. McKinney McKinney I Ranch Pkwy.
720 Hackberry Hardin Blvd. I
. MAIN LANES MainCL SRT St. Stacy Rd. I
Dr SHOULDER(4 LANES) SHOULDER I
King Rd. S. Lake Forest Dr.
Lakewood Frisco I MainI St. Craig Ranch Lewisvilles Lake Village Pkwy. (Future)
Shores Tollll Bridge Cotton
Lake GinI Rd. Stonebrook Pkwy. II
Dallas Stacy Rd. I Alma Dr. Fairview Shady vvi I
John Hickman Independence Pkwy. o EXISTING PROPOSED The I Chelsea Blvd.
Pkwy. (Future) Rd. N. Watters Hickory CreekMAIN LANES MAIN LANE Colony Lebanon Rd. W. Exchange Pkwy. I
Coit Rd. I I Teel Pkwy. Teel Lebanon Rd. I 5
I I Warren Pkwy. Main St. Hillcrest Rd. Allen I
I GaylordParkwood Pkwy. Blvd.
I Sam Rayburn Tollway Lakeview
Airport Rasor Rd. I I
Custer Rd. I
Lewisville I Legacy Dr. Ohio Dr. I
I I
I Headquarters Dr. I Legacy I D I Lewisville Lake r. Morning Star Dr.
I Te I Paige Rd. Main St. Spring nnys Parker I Creek Pkwy. on Blair Oaks Dr. Sp
Plano ri Pk . I I n wy I LewisvilleI S. Colony Blvd. g I Pkwy. C r I I e
I Standridge Dr. I e I I I I I I I I I SamTollway Rayburn k Pkwy. I I I Plano I Castle I I JoseyI Ln. Windhaven Pkwy. 75 I Hills Dr. Parker Rd. I 544 I Parker Rd. I
I I I M
I Carrollton I
I I Pkwy. Park Blvd. LEGEND
I I I
IIIII Parkwood u Hebron Pkwy. Preston Rd.
I I PlanoBlvd. Pkwy. SRT Fourth Lane
I
Marchant Blvd. I
I I Tollway North Dallas NTTA System (Open to TraffiI c) Midway Rd. III
I Ohio Dr. I
I
I I I
I I Non-NTTA System I
I I I I Ave. K
Rosemeade Pkwy. I Custer Rd. I I Alma Dr.
I I
Jupiter Rd. I
Frankford Rd. I MainI Lane Plaza
I I Independence Pkwy.
I Coit Rd. I I
Huffines Blvd. I I Ramp Plaza
I LakeI III I I Interstate Highway Vista Dr. Renner Rd.
I I
SamTollway Rayburn I U.S. and State Highway
I II
I I I Denton I Old Denton Rd. II
Tap Rd. MacArthur Blvd. Kelly Blvd. Rail Hillcrest Rd.
II Josey Ln. Trinity Mills Rd. I I LookoutPresident Dr. George I I
Plano Rd. County Line
I 75 Bush Turnpike
I I I Campbell Rd.
Addison I
PresidentI George Bush Toll project details
I Airport I I I Marsh Ln.
Turnpike not to scale Rd
Keller Springs Rd. I I
Sandy Lake Rd. I
I
I Shiloh Rd. I
I I Addison rd Rd. Brand Arapaho Rd I I ve. Carrollton Ai lfo A
Subscribe for Updates Follow Us Questions?
[email protected] Click here Hotline: 972.628.3134 www.ProgressNTTA.org