PROGRESS REPORT

Fourth Lane Project WINTER 2017

The North population continues to grow. The Sam Rayburn Project Manager: Tollway will be widened to keep up with demand and to keep Kelly Johnson, P.E. (Planning and Design Stages) traffic moving. A fourth lane will be added in each direction to the entire 26-mile tollway. This widening project is currently in the planning phase.

WHAT HAPPENED RECENTLY? WHAT TO EXPECT?

• Environmental and preliminary design work continued. • Two community meetings will be held along the SRT in February to update the public about the future project. • NTTA Board of Directors approved two contracts for design The come-and-go meetings will be held from 5:30 to 7:30 p.m. engineering services in Dec. 2016 for SRT: DNT to U.S. 75 and Feb. 21 at Creek Valley Middle School, located at 4109 Creek SRT: Denton Tap Road to DNT. Valley Blvd., Carrollton and from 5:30 to 7:30 p.m. Feb. 23 in the Cottonwood Creek Baptist Church Atruim, located at 1015 Sam Rayburn Tollway, Allen. More information is available on the NTTA website, www.NTTA.org

• DNT to U.S. 75 and west of Denton Tap Road to DNT: Final design will start in 2017. Construction will begin in mid-2018. The fourth lane is expected to open to traffic at the end of 2020.

Subscribe for Updates Follow Us Questions? [email protected] Click here Hotline: 972.628.3134 www.ProgressNTTA.org SSAMAM RRAYBURNAYBURN TOLLWAYTOLLWAY FOURTHFOURTH LANELANE PROJECTPROJ· EPPROGRESSCRTO GRESS RREPORTEPORT WWINTERINTER 20172017

Panther Creek Pkwy. II 75 Oak 720 Little Elm

Point 5 Eldorado Pkwy. I I Lewisville Lake Corridor I

PROPOSED TYPICAL SECTION II North Tollway Eldorado Pkwy. McKinney McKinney I Ranch Pkwy.

720 Hackberry Hardin Blvd. I

. MAIN LANES MainCL SRT St. Stacy Rd. I

Dr SHOULDER(4 LANES) SHOULDER I

King Rd. S. Lake Forest Dr.

Lakewood Frisco I MainI St. Craig Ranch Lewisvilles Lake Village Pkwy. (Future)

Shores Tollll Bridge Cotton

Lake GinI Rd. Stonebrook Pkwy. II

Dallas Stacy Rd. I Alma Dr. Fairview Shady vvi I

John Hickman Independence Pkwy. o EXISTING PROPOSED The I Chelsea Blvd.

Pkwy. (Future) Rd. N. Watters Hickory CreekMAIN LANES MAIN LANE Colony Lebanon Rd. W. Exchange Pkwy. I

Coit Rd. I I Teel Pkwy. Teel Lebanon Rd. I 5

I I Warren Pkwy. Main St. Hillcrest Rd. Allen I

I GaylordParkwood Pkwy. Blvd.

I Sam Rayburn Tollway Lakeview

Airport Rasor Rd. I I

Custer Rd. I

Lewisville I Legacy Dr. Ohio Dr. I

I I

I Headquarters Dr. I Legacy I D I Lewisville Lake r. Morning Star Dr.

I Te I Paige Rd. Main St. Spring nnys Parker I Creek Pkwy. on Blair Oaks Dr. Sp

Plano ri Pk . I I n wy I LewisvilleI S. Colony Blvd. g I Pkwy. C r I I e

I Standridge Dr. I e I I I I I I I I I SamTollway Rayburn k Pkwy. I I I Plano I Castle I I JoseyI Ln. Windhaven Pkwy. 75 I Hills Dr. Parker Rd. I 544 I Parker Rd. I

I I I M

I Carrollton I

I I Pkwy. Park Blvd. LEGEND

I I I

IIIII Parkwood u Hebron Pkwy. Preston Rd.

I I PlanoBlvd. Pkwy. SRT Fourth Lane

I

Marchant Blvd. I

I I Tollway North Dallas NTTA System (Open to TraffiI c) Midway Rd. III

I Ohio Dr. I

I

I I I

I I Non-NTTA System I

I I I I Ave. K

Rosemeade Pkwy. I Custer Rd. I I Alma Dr.

I I

Jupiter Rd. I

Frankford Rd. I MainI Lane Plaza

I I Independence Pkwy.

I Coit Rd. I I

Huffines Blvd. I I Ramp Plaza

I LakeI III I I Interstate Highway Vista Dr. Renner Rd.

I I

SamTollway Rayburn I U.S. and State Highway

I II

I I I Denton I Old Denton Rd. II

Tap Rd. MacArthur Blvd. Kelly Blvd. Rail Hillcrest Rd.

II Josey Ln. Trinity Mills Rd. I I LookoutPresident Dr. George I I

Plano Rd. County Line

I 75 Bush Turnpike

I I I Campbell Rd.

Addison I

PresidentI George Bush Toll project details

I Airport I I I Marsh Ln.

Turnpike not to scale Rd

Keller Springs Rd. I I

Sandy Lake Rd. I

I

I Shiloh Rd. I

I I Addison rd Rd. Brand Arapaho Rd I I ve. Carrollton Ai lfo A