IN: KOSI BASIN DEVELOPMENT PROJECT (P127725)

I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan: Draft Procurement Plan dated May 20, 2015 Revision 0 agreed by the Bank on May 20, 2015

2. Date of General Procurement Notice: May 29 2014

3. Period covered by this procurement plan: 18 months

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Public Disclosure Authorized

Procurement Methods and Threshold Category Method of Procurement Threshold (US$ Equivalent) Goods and Non-consultant ICB >3,000,000 services LIB Wherever agreed by the Bank NCB Up to 3,000,000 (with NCB conditions) Shopping Up to 50,000 DC As per Para 3.7 of the Bank Guidelines, wherever agreed and with prior agreement with the Bank Public Disclosure Authorized Force Account As per Para 3.9 of Guidelines Framework Agreements As per Para 3.6 of Guidelines Works and Supply and ICB >40,000,000 Installation NCB Up to 40,000,000 (with NCB conditions) Shopping Up to 50,000 carried out through a qualified local contractor selected through shopping (after inviting a minimum of three quotations in response to a written invitation with a minimum of 15 days notice period) Force Account As per Para 3.9 of Guidelines Public Disclosure Authorized DC As per Para 3.7 of Guidelines,

1. Prior Review by the Bank. The Bank will prior review the following contracts: • Works: All contracts more than US$ 10.0 million equivalent; • Goods: All contracts more than US$ 1.0 million equivalent; • Non-Consulting Services: All contracts more than US$ 1.0 million equivalent; 2. First contract issued by each implementing agency will be prior reviewed by the Bank irrespective of value. In addition, the justifications for all contracts to be issued on LIB, single- source (>US$ 50,000) or direct contracting (>US$ 50,000) basis will be subject to prior review. These thresholds are for the initial 18 months period and are based on the procurement performance of the project, these thresholds will be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above.

All contracts not covered under prior review will be subject to post review during supervision missions, and/or review by consultants to be appointed by the by Bank.

2. Prequalification. Not applicable

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable]

4. Reference to Project Operational/Procurement Manual: BAPEPS has prepared the Project Procurement Manual and agreed with the Bank. All the contracts issued under the project will follow the World Bank’s Guidelines: Bank’s “Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011and revised in July 2014and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated January 2011 and revised in July 2014, In case of any inconsistency between the Procurement Manual or Bihar Government Procurement Procedures and the Bank Guidelines, the latter shall prevail.

5. Any Other Special Procurement Arrangements: The bid evaluation will be carried out as per agreed timeline in the Procurement Manual.

NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions: The Standard Bidding documents of the Bank as agreed with GoI task force (and as amended from time to time) for all procurement under NCB will be used. For ICB/LIB contracts Bank’s latest Standard Bidding Documents (SBDs) only will be used. The following conditions must be met in order for the bidding process under NCB to be acceptable to the Bank:

• only the model bidding documents for NCB agreed with the GOI Task Force (and as amended from time to time) shall be used for bidding; • invitations to bid shall be advertised in at least one widely circulated national daily newspaper or on a widely used website or electronic portal with free national and international access along with an abridge version of the said advertisement being published in a widely circulated national daily newspapers inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded, at least 30 days prior to the deadline for the submission of bids; • no special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given state; • except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; • extension of bid validity shall not be allowed with respect to Contracts subject to Bank Prior review, without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of Force Majeure and circumstance beyond the control of the Purchaser/Employer; • re-bidding shall not be carried out with respect to contracts subject to Bank Prior Review, without the prior concurrence of the Bank. The system of rejecting bids outside a pre- determined margin or “bracket” of prices shall not be used in the project; • Framework agreement using DGS&D rate contracts can be used to procure goods up to NCB threshold contracts will need to comply with the following :

 Use of DGS&D rate contracts as Framework Agreement must be reflected in the procurement plan agreed by the Bank for particular goods.  Before issuing the purchasing order, the Task Team will have to advise the government on carrying out a price analysis on the specific good that is intended to be purchased. If after this due diligence the GoB concludes and Bank agrees that the DGS&D rate contract is not suitable, then the GoB will have to proceed using NCB or shopping depending on the value.  To meet the Bank's requirements for right to audit and F&C, these clauses may be included in the Purchase Orders, in case the purchasers are directly placing the purchase orders to DGS&D rate contract holders. On the other hand, if indent is placed through DGS&D, the Purchaser has the option to sign a separate undertaking with DGS&D rate contract holder, where Bank’s right to audit and F&C clauses could be mentioned; and  two or three envelop system shall not be used

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness : Available in separate Excel file. III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Category Method of Procurement Threshold (US$ Equivalent) Consultants’ Services CQS/LCS Up to 300,000 per contract SSS As per Para 3.9-3.11 of Guidelines Individuals As per Section V of Guidelines Use of NGO As per Para 3.16 of Guidelines QCBS/QBS/FBS For all other cases (i) International shortlist > 800,000 (ii) Shortlist may comprise Up to 800,000 national consultants only Prior Review by the Bank. The Bank will prior review the following contracts:

• Consultancy Services: All contracts more than US$ 500,000 equivalent for firm; and • Consultancy Services: All contracts more US$ 200,000 equivalent for individuals. First contract issued by each implementing agency will be prior reviewed by the Bank irrespective of value. In addition, the justifications for all contracts to be issued on single-source (>US$ 50,000) or direct contracting (>US$ 50,000) basis will be subject to prior review. These thresholds are for the initial 18 months period and are based on the procurement performance of the project, these thresholds will be modified. In addition, the Bank will carry out an annual ex post procurement review of the procurement falling below the prior review threshold mentioned above.

All contracts not covered under prior review will be subject to post review during supervision missions, and/or review by consultants to be appointed by the by Bank.

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: The finalization of consulting services shall follows the timeline agreed in the Procurement Manual

4. Consultancy Assignments with Selection Methods and Time Schedule Available as separate Excel file E-procurement and use of SEPA:

1. Currently many undertakings of the government of Bihar following e-procurement system for State and centrally funded projects through portal system. The NIC portal system has been reviewed by the Bank and has been cleared to be used for Bank financed project. Therefore, e-procurement shall be adopted for this project. Further, use of procurement plan monitoring tool SEPA has also been discussed and agreed to be used for this project.

2. Procurement Review by BAPEPS: Independent review or audit will be undertaken for the project for BAPEPS’s own internal due diligence, and as agreed in the implementation arrangements for the project.

1. BAPEPS will review procurement documents for procurement of works and goods by IAs for all post review cases. For prior review cases, BAPEPS will carry out initial review and then forward it to the Bank for no-objection. 2. External audit: The external auditor appointed by BAPEPS will conduct the audit of all implementing agencies and BAPEPS including procurement review/audit. In case there is any procurement related observation made by the external auditor in their audit report, the same shall be shared with Bank along with the comments of BAPEPS. PROCUREMENT : IN: BIHAR KOSI BASIN DEVELOPMENT PROJECT PLAN General Information

Country: India Bank’s Approval Date of the Original Procurement Plan: 2016-09-09 Revised Plan Date(s): (comma delineated, leave blank if none)2019-01-03 Project ID: P127725 GPN Date: Project Name: IN: BIHAR KOSI BASIN DEVELOPMENT PROJECT Loan / Credit No: IDA / 56960 Executing Agency(ies):Bihar Pul Nirman Nigam Ltd.

WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

WBP/PH-2/PACKAGE-6/2014- 15 / Construction of H.L. R.C.C Bridge with its approach road in 7th K.m of Single Stage - Two Saraigarh- IDA / 56960 Prior Request for Bids Open - National 2,648,760.30 Signed 2016-09-08 2016-09-08 2016-09-08 2016-09-08 2016-11-05 2018-11-05 Envelope Lalganj-Ganpatganj road and 7th K.m of Mehasimar- Ganpatganj road in the district of .

WBP/PH-2PACKAGE-2/2014- 15 / Construction of H.L. R.C.C. Bridge in 2nd K.m. Single Stage - Two IDA / 56960 Prior Request for Bids Open - National 2,304,147.92 Signed 2016-09-08 2016-09-08 2016-09-08 2016-10-08 2016-12-05 2018-12-05 Karpuri Chowk-Patarghat Envelope road in the district of .

WBP/PH-2/PACKAGE- 01/2014-15 / Construction of H.L. R.C.C. Bridge in 1st Single Stage - Two K.m. & 6th K.m. of IDA / 56960 Post Request for Bids Open - National 1,570,287.05 Signed 2016-09-09 2016-09-09 2016-09-09 2016-09-09 2016-09-09 2019-02-21 Envelope Saraigarh-Lalganj-Ganpatganj road in the district of Supaul.

WBP/PH-2/PACKAGE- 24/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 15th K.m IDA / 56960 Prior Request for Bids Open - National 2,753,203.68 Signed 2017-03-17 2017-03-17 2017-03-17 2017-04-26 2017-06-07 2019-06-07 Envelope of Ranginiya- Sonebarsa road in the district of .

WBP/PH-2/PACKAGE- 04/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 3rd K.m of Single Stage - Two Belghachhi-(PWD) Via IDA / 56960 Post Request for Bids Open - National 619,994.83 Signed 2017-03-17 2017-03-17 2017-03-17 2017-03-17 2017-03-17 2017-05-26 Envelope Nitendra-Kalimandir- Machhatta-Geria (Section- Palsa to Kalimandir) road in the district of .

WBP/PH-2/PACKAGE- 03/2014-2015 / Construction of H.L. R.C.C. Bridge with its approach road in 3rd Single Stage - Two K.m of Panchgachhiya- IDA / 56960 Post Request for Bids Open - National 2,509,851.02 Signed 2017-04-03 2017-04-03 2017-04-03 2017-04-03 2017-04-03 2018-12-20 Envelope road & 7th K.m of Panchgachhiya-Nauhatta road in the district of Saharsa.

Page 1 WBP/PH-2/PACKAGE- 07/2014-2015 / Construction of H.L. R.C.C. Bridge with its approach road in 10th K.m of Khurhan-Parail- Ratwara-Kapasia (Extended Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,516,578.65 Signed 2017-04-03 2017-04-03 2017-04-03 2017-04-03 2017-04-03 2018-11-06 Part of RCD road 0 to 15 Envelope

K.m) road & 5th K.m of -Budhma-Mali (near Khurhan-Parail more) road in the district of Madhepura.

WBP/PH-2/PACKAGE- 08/2014-15 / Construction of H.L. R.C.C. Bridge (3x33m) with its approach road in Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,505,162.00 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2019-03-26 5th K.m of Baluwahat Kosi Envelope

Bandh via Aghori-Sakra- Paharpur- road in the district of Saharsa.

WBP/PH-2/PACKAGE- 09/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 4th K.m Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,272,387.38 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2019-03-26 and 8th K.m of Baisi-Amour- Envelope

Bahadurganj-Dighalbank (SH- 99) road in the district of Purnia.

WBP/PH-2/PACKAGE- 10/2014-15 / Construction of H.L. R.C.C Bridge with its Single Stage - Two approach road in 11th K.m IDA / 56960 Post Request for Bids Open - National 936,687.31 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2018-09-23 Envelope of Chandradei-Bangama- Matiyari-Mogra road in the district of .

WBP/PH-2/PACKAGE- 11/2014-15 / Construction of H.L, R.C.C Bridge with its approach road in Tharbitya- Single Stage - Two IDA / 56960 Post Request for Bids Open - National 2,251,926.41 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2020-01-09 Bisanpur (near Parsa) road Envelope and in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul.

WBP/PH-2/PACKAGE- 12/2014-15 / Construction of H.L. R.C.C. Bridge in 13th K.m (1st cutting) at Khapur Single Stage - Two Culvert of Kurhan-Parail- IDA / 56960 Post Request for Bids Open - National 2,644,420.93 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2019-12-05 Envelope Ratwara-Kapasia (Extended part of RCD road 0 to 15K.m) road in the district of Madhepura.

WBP/PH-2/PACKAGE- 13/2014-15 / Construction of H.L. R.C.C. Bridge with its Under approach road in 3rd Km of Single Stage - Two IDA / 56960 Post Request for Bids Open - National 0.00 Implementati 2017-07-20 2017-07-20 2017-07-20 2017-09-18 2017-10-09 2020-11-05 Baluwahat Kosibandh via Envelope on Aghori-Sakra-Paharpur- Baghwa road in the district of Saharsa.

WBP/PH-2/PACKAGE- 14/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 16th K.m IDA / 56960 Post Request for Bids Open - National 1,524,199.13 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2019-03-26 Envelope and 18th K.m of Kadava- Sonouli road in the district of Purnia.

Page 2 WBP/PH-2/PACKAGE- 15/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two IDA / 56960 Post Request for Bids Open - National 731,475.63 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2018-06-22 approach road in 5th K.m of Envelope

Jokihat-Dalmalpur road in the district of Araria.

WBP/PH-2/PACKAGE- 16/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 1st K.m. of Persarma-Chikni, 4th K.m Single Stage - Two IDA / 56960 Post Request for Bids Open - National 2,701,327.14 Signed 2017-07-20 2017-07-20 2017-07-20 2017-07-20 2017-08-02 2020-08-29 of Persarma-Chikni (on Envelope

Khardaha Dhar) and 4th K.m. of Persarma-Chikni (Barwari Station-Simra) road in the district of Supaul.

WBP/PH-2/PACKAGE- 17/2014-15 / Construction of H.L, R.C.C Bridge with its approach road in 13th Km (2nd Cutting) Khurhan-Parel- Single Stage - Two Ratwara-Kapasia road in IDA / 56960 Post Request for Bids Open - National 1,467,973.13 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2020-01-09 Envelope between Rudho-Mandal Tola and Pandit Tola in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.)

WBP/PH-2/PACKAGE- 18/2014-15 / Construction of H.L, R.C.C Bridge with its approach road in 11th K.M. Single Stage - Two of Baluwahat koshi bandh IDA / 56960 Post Request for Bids Open - National 1,956,587.17 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2019-10-27 Envelope via Aghori-Sakra-Paharpur- Baghwa road in Place of SP Bridge in the district of Saharsa.

WBP/PH-2/PACKAGE- 19/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 4th K.m of Falka-Sripur-Bhawanipur- Single Stage - Two Karman Chowk (at Sripur IDA / 56960 Post Request for Bids Open - National 1,477,428.83 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2019-03-26 Envelope Ghat) road & 25th K.m of Falka-Sripur-Bhawanipur- Karman Chowk (at Balia Ghat) road in the district of Purnia.

WBP/PH-2/PACKAGE- 21/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 3rd K.m of Supaul Station to Bariya Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,607,028.46 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2019-03-26 Manch road & 3rd K.m of Envelope

Sesouni-East Kosi Embankment (Near Khakhi) road in the district of Supaul.

WBP/PH-2/PACKAGE- 20/2014-15 / Construction of H.L. R.C.C. Bridge with its Under Single Stage - Two approach road in 3rd K.m of IDA / 56960 Post Request for Bids Open - National 0.00 Implementati 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2018-06-29 Envelope Nasir Chowk-Belwa-Mazgama- on Mongara road in the district of Araria.

Page 3 WBP/PH-2/PACKAGE- 22/2014-15 / Construction of H.L, R.C.C Bridge with its Single Stage - Two approach road in Chandradei- IDA / 56960 Post Request for Bids Open - National 546,678.64 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2018-06-23 Envelope Kamaldha-Paratha road along Laliahi Dhar in 2nd Km in the district of Araria.

WBP/PH-2/PACKAGE- 25/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 5th K.m of IDA / 56960 Post Request for Bids Open - National 2,829,798.37 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2020-03-12 Envelope Chatapur-Girdharpatti-Chuni road in the district of Supaul.

WBP/PH-2/PACKAGE- 26/2014-15 / Construction of H.L, R.C.C Bridge with its approach road in 2nd K.M. Single Stage - Two IDA / 56960 Post Request for Bids Open - National 371,401.68 Signed 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2017-07-26 2019-03-26 of Mehadipur-Fatehpur on Envelope river surser (Near wooden Bridge) road in the district of Supaul.

WBP/PH-2/PACKAGE- 27/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 11th K.m of Sonebarsa- road, Single Stage - Two IDA / 56960 Post Request for Bids Open - National 3,916,704.41 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2020-01-02 17th K.m (1st cutting) of Envelope

Sonebarsa-Gwalpara road and 17th K.m (2nd cutting) of Sonebarsa-Gwalpara road in the district of Saharsa

WBP/PH-2/PACKAGE- 28/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 6th K.m of IDA / 56960 Post Request for Bids Open - National 607,506.61 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-06-23 Envelope Balua-Baysi road in Place of Murli Branch Canal road in the district of Supaul

WBP/PH-2/PACKAGE- 30/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 8th K.m of IDA / 56960 Post Request for Bids Open - National 1,068,725.07 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-11-11 Envelope Simri-Bakhtiyarpur-Salkhua road in the district of Saharsa

WBP/PH-2/PACKAGE- 32/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 14th K.m IDA / 56960 Post Request for Bids Open - National 822,316.37 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-09-23 Envelope of Chaughara-Amha-Lokha- Saharsa road in the district of Saharsa.

WBP/PH-2/PACKAGE- 33/2014-15 / Construction of H.L. R.C.C. Bridge with its Single Stage - Two approach road in 3rd K.m of IDA / 56960 Post Request for Bids Open - National 502,022.90 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-06-23 Envelope Belgachhi-Chandpur to Rouniya-Kanharia road in the district of Purnia.

Page 4 WBP/PH-2/PACKAGE- 34/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in Dubhari- Single Stage - Two Chakla Ghat to Kosi IDA / 56960 Post Request for Bids Open - National 2,294,729.73 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-11-13 Envelope Embankment road (Near Spur) on 57.20 R.D. of Kosi Embankment in the district of Supaul.

WBP/PH-2/PACKAGE- 35/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road over Tilyuga river in Parrari-Kadmaha Single Stage - Two IDA / 56960 Post Request for Bids Open - National 2,625,540.62 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-08-10 2019-03-26 road in Marona Block & Envelope over Tilyuga river Hariyahia- Haripur village road near Islampur village road in the district of Supaul.

WBP/PH-2/PACKAGE- 36/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road over Marne river near primary school Single Stage - Two Gordh Ratho to Koni village IDA / 56960 Post Request for Bids Open - National 1,609,370.88 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-03-26 Envelope road in Marona South Panchyat & over Marne river near Sikhariya- Khushyali village road in the district of Supaul.

WBP/PH-2/PACKAGE- 37/2014-15 / Construction of H.L., R.C.C. Bridge with its approach road over Khardaha river near Bela Single Stage - Two village in Veena-Jharkha IDA / 56960 Post Request for Bids Open - National 1,794,771.87 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-03-26 Envelope road & H.L. R.C.C. Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura- Amha road over Tilave river.

WBP/PH-2/PACKAGE- 38/2014-15 / Construction of HL RCC Bridge over Tilyuga river besides screw pile bridge in Kewtapatti- Bazar road in Single Stage - Two IDA / 56960 Post Request for Bids Open - National 2,067,937.30 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2020-03-13 Nirmali Block & over Envelope

Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali Block in the district of Supaul.

WBP/PH-2/PACKAGE- 39/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in Basba Single Stage - Two IDA / 56960 Post Request for Bids Open - National 685,344.29 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-06-23 Gaon in Basbitti Panchayat Envelope near 62.6 R.D of Kosi Embankment in the district of Supaul .

WBP/PH-2/PACKAGE- 40/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road over Tilyuga Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,243,940.44 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-10-27 river at Barmotra Ghat in Envelope

Manga to Barmotra road under Marona Block in the district of Supaul.

Page 5 WBP/PH-2/PACKAGE- 41/2014-15 / Construction of H.L. R.C.C. Bridge with its approach road in 24th K.m Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,008,786.56 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-09-23 of Chandradei-Bangama- Envelope

Paktola-Matiyari-Mongra (along Kakurwa Dhar) in the district of Araria

WBP/PH-2/PACKAGE- 42/2014-15 / Construction of H.L R.C.C Bridge with its approach road in Bhawesa Single Stage - Two Dhar near Khanwa Santhali IDA / 56960 Post Request for Bids Open - National 540,044.31 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2018-06-23 Envelope Tola of Kukron West Panchayat of Dhamdaha Block in the District of Purnia.

WBP/PH-2/PACKAGE- 43/2015-16 / Construction of H.L.R.C.C Bridge with its approach road in Khurhan- Single Stage - Two IDA / 56960 Post Request for Bids Open - National 1,696,319.22 Signed 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2017-07-27 2019-03-26 Parail-Ratwara-Kapsiya path Envelope on West Side of Screw Pile Bridge in the district of Madhepura.

WBP/PH-2/PACKAGE- 23/2014-15 / Construction of H.L. R.C.C. Bridge in 15th Km in Kurhan-Parail- Pending Single Stage - Two Ratwara-Kapasia (on IDA / 56960 Post Request for Bids Open - National 0.00 Implementati 2018-10-04 2018-10-04 2018-10-04 2018-10-04 2018-10-04 2020-10-03 Envelope Laliyahi Dhar) (Extended on Part of RCD road 0 to 15 K.m) road in the district of Madhepura.

WBP/PH-2/PACKAGE- 29/2014-15 / Construction of H.L, R.C.C Bridge with its Pending approach road in 9th K.M. Single Stage - Two IDA / 56960 Post Request for Bids Open - National 0.00 Implementati 2018-12-29 2018-12-29 2018-12-29 2019-02-15 2019-03-12 2021-03-11 of Shaur-Patarghat Road in Envelope on Palce of Shitalpatti Old S.P. Bridge in the district of Saharsa.

GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 6 INDIVIDUAL CONSULTANTS

Page 7