Madhepura Inception Report.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Uranium Occurence in Shallow Aquifer in India 1.0 Introduction
भारत सरकार GOVERNMENT OF INDIA जल शक्ति मंत्रालय MINISTRY OF JAL SHAKTI जल संसाधन, नदी विकास और गंगा संरक्षण विभाग DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA कᴂद्रीय भूजल बो셍ड CENTRAL GROUND WATER BOARD CHQ, FARIDABAD JUNE 2020 URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA CONTENTS Sl No. DESCRIPTION PAGE NO. Executive Summary 1 1 Introduction 3 2 Hydrogeology 3 3 Sources of Uranium in Ground water 5 4 Impact of Uranium on Human Health 7 5 Sampling and Analytical methods 8 6 Uranium Occurrence and Spatial Distribution 10 6.1 Andhra Pradesh 15 6.2 Assam & Meghalaya 17 6.3 Bihar 6.4 Chhattisgarh 6.5 Delhi 6.6 Gujrat & Daman & Diu 6.7 Haryana & Chandigarh 6.8 Himachal Pradesh 6.9 Jammu & Kashmir 6.10 Jharkhand 6.11 Karnataka & Goa 6.12 Kerala 6.13 Madhya Pradesh 6.14 Maharashtra 6.15 Odisha 6.16 Punjab 6.17 Rajasthan 6.18 Tamil Nadu & Pondicherry 6.19 Telangana 6.20 Uttarakhand 6.21 Uttar Pradesh 6.22 West Bengal & Andaman & Nicobar 7 Remedial measures 8 Pilot study cases List of Contributors URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURRENCE IN SHALLOW AQUIFERS IN INDIA URANIUM OCCURENCE IN SHALLOW AQUIFERS IN INDIA EXECUTIVE SUMMARY 1. -
Report of the Comptroller and Auditor General of India STATUS OF
Report of the Comptroller and Auditor General of India STATUS OF ONGOING PROJECTS IN INDIAN RAILWAYS for the year ended March 2014 Laid in Lok Sabha/Rajya Sabha on_____________ Union Government (Railways) No. 48 of 2015 CONTENTS Paragraph Pages List of Abbreviations i to ii Executive Summary iii to ix CHAPTER 1 - Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion Introduction 1.1 1 Organisation Structure 1.2 2 Audit objectives 1.3 2 Scope and Audit Methodology 1.4 3 Audit Criteria 1.5 3 Audit Findings 1.6 4-35 Conclusion 1.6.14 35 Recommendations 1.6.15 36 CHAPTER 2 - Management of Works Contract in Indian Railways Introduction 2.1 37 Audit Findings 2.2 38-56 Conclusion 2.4 56 Recommendations 2.5 56 CHAPTER 3 - Dedicated Freight Corridor Projects Introduction 3.1 58 About the Project 3.1.1 58 Approval and Planning of the Project 3.2 60 Conclusion 3.4 69 Recommendations 3.5 69 CHAPTER 4 – Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit Introduction 4.1 70 Organisation Structure 4.2 72 Audit Findings 4.4 72 Conclusion 4.6 94 Recommendations 4.7 95 APPENDIX Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 96-179 Management of Works Contract in Indian Railways 180-181 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 182-186 ANNEXURE Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 187-286 Management of Works Contract in Indian Railways 287-302 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 303-316 PREFACE This Report for the year ended March 2014 has been prepared for submission to the President of India under Article 151 of the Constitution of India. -
Adoption of Modern Agricultural Technologies: a Micro Analysis at Farm Level in Bihar
Munich Personal RePEc Archive Adoption of Modern Agricultural Technologies: A Micro Analysis at Farm Level in Bihar Singh, K.M. and Singh, R.K.P. and Kumar, Abhay and Kumar, Anjani RAU, Pusa„ ICRISAT, Hyderabad, ICAR-RCER, Patna 15 August 2014 Online at https://mpra.ub.uni-muenchen.de/59674/ MPRA Paper No. 59674, posted 04 Nov 2014 15:09 UTC 8th International Conference of Asian Society of Agricultural Economists (ASAE), Savar, Bangladesh, on 15th to 17th October, 2014 Sub-theme II: Farm Size and Productivity Revisited Adoption of Modern Agricultural Technologies: A Micro Analysis at Farm Level in Bihar K M Singh1, R K P Singh2 Abhay Kumar3 and Anjani Kumar4 Abstract Technology adoption has been the main obstacle in realizing agricultural potential in the country in general and Bihar in particular. The present study focuses on level of adoption, access of farmers to farm technology, quality of modern technology, access to agricultural extension institutions and problems faced by extension officials in transfer of farm technology. It has been observed that the coverage of agricultural development programme is limited to few villages; however, line department still dominates in spreading of modern agricultural technology. Small size of land holding and fragmented land emerged as main constraint to adoption of modern horticultural technology in Bihar. While analyzing use of modern varieties of principal crops, a comparatively high level of adoption on small and medium farms was observed. Hence, there is no relationship between size of farm and adoption of modern varieties of seeds in Bihar. Inadequate staff, infrequent supervision and lack of conveyance facility are some other factors responsible for poor transfer of technologies in Bihar. -
World Bank Document
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 55671 - IN EMERGENCY PROJECT PAPER ON A Public Disclosure Authorized PROPOSED EMERGENCY RECOVERY CREDIT IN THE AMOUNT OF SDR 148.80 MILLION (US$220 MILLION EQUIVALENT) TO THE REPUBLIC OF INDIA FOR A Public Disclosure Authorized BIHAR KOSI FLOOD RECOVERY PROJECT August 12, 2010 Sustainable Development Unit India Country Management Unit South Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective June 30, 2010) Currency Unit = Indian Rupees (INR) INR 46.13 = US$ 1 US$ 1.48 = SDR 1 FISCAL YEAR April 1 – March 31 ABBREVIATIONS AND ACRONYMS ARCS Audit Reports Compliance System AWP Annual Work Plans BDO Block Development Officers BAPEPS Bihar Aapada Punarwas Evam Punarnirman Society BME Benefit Monitoring and Evaluation BPCU Block Project Coordination Unit BPIU Block Project Implementation Unit BPL Below Poverty Line BRRDA Bihar Rural Road Development Agency BRLP Bihar Rural Livelihoods Project BRLS Bihar Rural Livelihood Promotion Society BRPNN Bihar Rajya Pul Nirman Nigam CAA&A Controller of Aid, Accounts and Audit CAS Country Strategy CBO Community Based Organization CCA Cultivable Command Area CGI Corrugated Galvanized Iron CID Community Institution Development CIF Community Institution Fund COM Community Operations Manual -
Press Note Bihar 2020
भारत निर्ााचि आयोग ELECTION COMMISSION OF INDIA Tel. No. 011-23052246 निर्ााचि सदि, Fax 011-23052001 अशोक रोड, िई दद쥍 ली-110001. Website: www.eci.gov.in Nirvachan Sadan, Asoka Road, New Delhi-110001 No. ECI/PN/64/2020 Dated:25th September, 2020 PRESS NOTE Subject: General Election to the Legislative Assembly of Bihar, 2020 -reg. The term of the Legislative Assembly of Bihar is due to expire on 29.11.2020. The term and strength of the assembly is indicated as below: Name of State Term of Assembly No. of Assembly Seats Bihar 30.11.2015 to 29.11.2020 243 81 The Election Commission of India (hereinafter ECI) is committed to hold free, fair and safe election to the Legislative Assembly of Bihar before the cessation of its term, in exercise of the authority and powers conferred upon under Article 324 read with Article 172 (1) of the Constitution of India and Section 15 of the Representation of the People Act, 1951. 1. Assembly Constituencies- The total number of Assembly Constituencies in the State of Bihar and seats reserved for the Scheduled Castes and the Scheduled Tribes, as determined by the Delimitation of Parliamentary and Assembly Constituencies Order, 2008, are as under: - State Total No. of ACs Reserved for SCs Reserved for STs Bihar 243 38 2 2. Broad Guidelines to be followed during entire election processes for all persons- 1) Every person shall wear face mask during every election related activity. 2) At the entry of hall/ room/ premises used for election purposes: (a) Thermal Scanning of all persons shall be carried out; (b) Sanitizer shall be made available at all locations. -
Answered On:06.12.2001 Survey for New Railway Lines Ramkrishna Kusmaria
GOVERNMENT OF INDIA RAILWAYS LOK SABHA STARRED QUESTION NO:243 ANSWERED ON:06.12.2001 SURVEY FOR NEW RAILWAY LINES RAMKRISHNA KUSMARIA Will the Minister of RAILWAYS be pleased to state: (a) the details of surveys conducted for laying new rail lines during the Ninth Five Year Plan but such new lines have not been laid so far, State-wise; (b) the steps taken to lay these new lines; and (c) the time by which such new lines are likely to be completed? Answer MlNISTER OF RAILWAYS ( SHRI NIT1SH KUMAR) (a) to (c): A statement is laid on the Table of tile Sabha. STATEMENT REFERRED TO IN REPLY TO PARTS (a} TO (c) OF LOK SABHA STARRED QUESTlON NO. 243 BY DR. RAMKRlSHNA KUSMARI TO BE ANSWERED ON 06.12..2001 REGARDING SURVEY FOR NE\I\ RAILWAY LINES. (a): The details of surveys for new lines completed during 9th plan but works have not been Included in the budget are given as under:- Sl no. Rly State Name of the Project 1. CR Maharashtra Pune-Nasik 2. CR Uttar Pradesh Hamirpur-Hamirpur Road 3. CR Maharashtra Wardha-Pusad-Nanded 4. CR Uttar Pradesh Bye pass line between Idgah and Fatehpur 5 CR Maharashtra Kalyan to Ahmednagar via Murbad 6. CR Maharashtra Dhule-Nardana-Shjrpur 7 CR Rajasthan Dholpur-Sirmutra-Gangapur 8. CR Uttar Pradesh Agra area provision of Bye pass line 9. CR Maharashtra Kopargaon to Shirdi. 10. CR Madhya Pradesh Biyavra-Rajgarh-Sirong and Bina 11. CR Maharashtra Manmad-Dhule via Malegaon 12. CR Uttar Pradesh Linking Bad with Bhainsa 13. -
Government of India Ministry of Road Transport and Highways
Government of India Ministry of Road Transport and Highways Public Disclosure Authorized Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lane / 2 lane with Paved Shoulders and strengthening of Birpur - Udakishanganj Section (km 0 to 106) of NH-106 in the State of Bihar Public Disclosure Authorized ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized February 2014 Consulting Engineers Group Ltd. Public Disclosure Authorized Rehabilitation and upgrading to 2 lane/2 lane with paved shoulder of EIA /EMP Report Birpur-Udakishanganj Section of NH-106 in the State of Bihar TABLE OF CONTENTS S. No. Description Page No ABBREVIATION EXECUTIVE SUMMARY ES-1 Introduction E-1 ES-2 Project Description E-2 ES-2.1 Existing and Proposed the Project Road E-4 ES-3 Analysis of Alternatives E-4 ES-4 Description of Existing Environment E-4 ES-5 Impact Assessment and Mitigation Measures E-7 ES-6 Additional Studies E-8 ES-7 Environmental Management Plan E-9 ES-8 Environmental Budget E-9 CHAPTER 1 INTRODUCTION 1.1 Background of the Project 1 1.2 Project Proponent 3 1.3 Objective and Need of Environmental Impact Assessment 5 1.3.1 Environmental Clearance Process 5 1.4 Policies, Legal Framework and Legal Stipulations 6 1.4.1 Forest (Conservation) Act, 1980 9 1.4.2 Wildlife Protection Act 1972 9 1.4.3 World Bank’s Environmental and Social Safeguards 9 1.5 Terms of Reference (TOR approved by EAC) 10 1.6 Validity of Environmental Clearance 18 1.7 Post Environmental Clearance -
Adapting with Freedm
ADAPTING WITH FREEDM Flood Resilient Environmentally Enhanced Disaster Management In Bihar Photographs: Siddharth Behl, SEEDS team Stories: SEEDS Team Content & Design: Saferworld Communications | www.saferworld.in Contents The vulnerability of the Kosi basin 1 Adopting an overall resilience model 2 Enhancing disaster preparedness 3 A community-led multi-tiered disaster management system Early warning Task force training Managing and mitigating risks 7 Bioshields combat ecological fragility Linking ecological protection with livelihoods Community disaster resilience fund Insurance schemes Adapting for livelihood security 11 New farming techniques and short-term crops Improving food security: Grain banks Reclaiming water bodies 15 Broader linkages and advocacy 16 Saharsa Nagrik Manch Making a mark 17 Unplanned trigger for social change: Women take the lead Tried and tested: A successful community- led early warning system india | bihar bihar | saharsa the vulnerability of the Kosi basin The Kosi Basin is prone to frequent flooding. With 50% of the silt load of Nepal flowing through the Kosi, the water used to have little depth and helped keep the land fertile. The situation has now changed dramatically. The construction of embankments and dams has increased the water depth. Instead of the earlier phenomenon where silt used to spread, it now piles up in limited locations. Over a period of time, the course of the river has also changed and therefore the old river beds are now dry. Increase in the siltation means the water already has less natural seepage; a problem compounded by unplanned development. Saharsa also faces the lethal combination of alluvial soil and water which leads to liquefaction. -
Madhepura District & Blocks
!. ÆR !. !. ÆR !. TRIVENIGANJ !. 045 CHHATAPUR Chakla Nirmali RS KOSI RIVER 044 KAMALPUR MSAUÆRPAUL DHEPURA DISTRICT & BLOCKS !. !. !. MADHUBA03N9I 042 TRIBENIGANJ (SC) 046 RANIGANJ PHULPARAS E PIPRA !. 049 N NARPATGANJ I KOSI RIVER !.BHARGAMA ARARIA SUPAL UL 043 Y KOSI RIVER A 081 SUPAUL BISHUNPUR SUNDAR !. W ARARIA GAMHARIA !. ALINAGAR L Bina Ekrna RS !. 047 GHANSHAMPUR I !. ÆR A SHANKERPUR RANIGANJ (SC) R SHANKARPUR GAMHARIA !. J N 072 Garh Baruari RS A ÆR SINGHESHWAR (SC) G KUMARKHAND !.KUMARKHAND P KIRATPUR JHAGRUA SINGHESHWAR !. NAUHATTA A !. T SINGHASWAR A !. DARBHANGA GHAILARH R !. µ P GHAILARH PATORI - ÆR !. SRINAGAR !. H PACHGACHHIA RS 079 !. !. GORA BAURAM R !.JAMALPUR 077 A G MAHISHI I 058 CHAMPANAGAR A !. !. KASBA R MADHEPURA A 073 ÆR BUDHMA RS S ÆR M!.URLIGANJ RS - BAIJNATHPUR RSMADHEPURA ÆR BANMAKHI DAURAM MADHEPURA RS ÆRMURLIGANJ RAMNAGAR PHARSAHÆR!.I A ÆR ÆRMurliganj RS !. ÆRBAIJNATHPATTI RS RAMNAGAR PHAÆRRSAHI S 059 Sarsi RS R MURLIGANJ BANMANKHI (SC) ÆR A SAHARSA RS !.SAHARSA H ÆR KAHARA NH !. -1 A 07 S MAHISHI !. Kirtiananagar RS SAUR BAZAR Aurahi RS ÆR!. 075 !. ÆR KRITYANAND NAGAR SAHARSA M MADHEPURA A KUSHESHWAR ASTHAN !. SN AHARSA PATARGHAT !. !. S 071 !. SONBARSA KACHARI RS I - BIHARIGANJ Barahara Kothi RS ÆR S ÆRBARHARA A GWALPARA !. 061 H Raghubanshnagar RS PURNIA DHAMDAHA A GOALPARA ÆR R !. DHAMDAHA S !. A !. - 074 BIHARIGÆRANJ B SIMRI BAKHTIPUR RS H SONBARSA (SC) BIHARIGANJ ÆR A !. 076 P SIMRI BAKHTIARPUR T Legend I A 140 SONBARSA KISHANGANJ !. SAMASTIPUR H !. !. TOWNS HASANPUR I !. ÆR R RAILWAY STATIONS A BANMA ITAHARI !. KOPARIA RS I BHAWANIPUR RAJDHAM RAILWAYLINES L KISHANGANJ !. !. SALKÆRHUA W FALKA NATIONAL HIGHWAYS A !. -
Araria Raniganj Araria Araria Araria Palashi Araria Narpatganj Araria
BIHAR STATE EDUCATIONAL INFRASTRCUTURE DEVELOPMENT CORPORATION LIMITED, PATNA PHYSICAL STATUS OF CONSTRUCTION OF CDPO (CHILD DEVELOPMENT PROJECT OFFICE CO-HOUSING) Te Physical Status Report Dated : 30.11.2017 nd Ret Fo Ground 1st 2nd Co Name of er Fini SL. No. Name of Block Group No. Name of Work en Not Lay un Pli floor floor Floor mp District Pro shi Remarks der Start out dat nth let ces ng ion LL RL LL RL LL RL e s Child Development Project Office co- 1 Araria Raniganj CDPO-10 1 Handover housing (CDPO) at Raniganj Child Development Project Office co- 2 Araria Araria CDPO-11 1 Inaugurated 16.7.2017 housing (CDPO) at Araria Child Development Project Office co- 3 Araria Palashi CDPO-12 1 housing (CDPO) at Palashi Child Development Project Office co- 4 Araria Narpatganj CDPO-13 1 housing (CDPO) at Narpatganj Child Development Project Office co- 5 Araria Bhargama CDPO-14 1 housing (CDPO) at Bhargama Child Development Project Office co- 6 Araria Kursakatta CDPO-15 1 housing (CDPO) at Kursakatta Child Development Project Office co- 7 Banka Dhoraiya CDPO-29 1 Inaugurated 16.7.2017 housing (CDPO) at Dhoraiya Child Development Project Office co- 8 Banka Barhat CDPO-30 1 housing (CDPO) at Barhat Child Development Project Office co- 9 Banka Banka CDPO-31 1 housing (CDPO) at Banka Child Development Project Office co- 10 Banka Belhar CDPO-32 1 Work stop. Fund returned housing (CDPO) at Belhar Child Development Project Office co- 11 Banka Chandan CDPO-33 1 Roof Casted housing (CDPO) at Chandan Child Development Project Office co- 12 Jamui Sikandra CDPO-21 1 Work stop. -
Ga-10.06 Khagaria Saharsa and Madhepura
86°20'0"E 86°30'0"E 86°40'0"E 86°50'0"E 87°0'0"E 87°10'0"E GEOGRAPHICAL AREA Babhani Bholwa KHAGARIA, SAHARSA AND ! Maura MADHEPURA DISTRICTS ! Piprahi (Part in Gamharia) Aurahi ! ! Bishunpur Sundar ± Gidha ! ! ! Puraini CA-22 ! Parmanandpur CA-20 SHANKARPUR Ramnagar Mahesh ! ! KEY MAP GAMHARIYA Bakaunia Lalpur ! Rupauli (Part in Singheshwar) ! ! Jirwa CA-21 ! Chitti Chikni Mangarwara Purikh ! ! ! Lachhmipur Bhagwati N ! Rakeapatti SINGHESHWAR ! N " ! " 0 Darhar Siripur 0 ' ! Nauhatta ! Raibhir ! CA-23 ' 0 ! Rupauli (Part in Gamharia)* Rampatti ! 0 ° ! ! ! ° 6 CA-11 6 2 KUMARKHAND 2 Bijalpur Patori Israin Kalan NAUHATTA ! Bhatranha Sirinagar Jiwachhpur ! Padumpur ! ! ! (! Sukhasan ! Singhesar Asthan ! ! Ghailarh Maheswa ! ! £91 Pachgachhia Sukhasan! Gauripur ¤ Kharhatelwa Patori ! Sattar ! ! Belari ! ! Barahi Gohumani ! Á! CA-19 Ratanpura ! Bishunpur Korlahi ! Majarhat Dhorgaon ! ! Belsarh Gangaura Behra ! ! ! ! Got Bardaha GHELADH Israin Khurd Aunira Ramauli ! Chandrain ! Sihaul ! ! ! Jhitkia Tamautparsa Lachhmipur Chandi Asthan Murajpur ! Bhelwa ! Sataur ! Ukahi ! ! ! CA-12 Bhadaul ! Rahta Bara Sahugarh ! ! SATTAR ! Bhawantikthi CA-18 KATAIYA Khajuri ! ! Bhatkhori B I H A R ¤£66 ! .!( ! Jorgawan Birgaon MADHEPURA ! ! Gamhariya ! ! ! Manikpur Parwa ! Bhelahi Kalan Khurd Á! MaÁdhipura ! ! ! Á! Á Murho Á! Baijnathpur Tiri Madanpur ! ! (! Murliganj Nariar ! ! ! Rampur Á Jalai ! ! ! .!(! Saharsa ! Madhuban ! Patuwaha Jitapur Telwa ! ! CA-24 Dighi ! Bangaon ! Ara ! Manaur ! Belo MURLIGANJ ! CA-13 Á Sahuria ! ! ! Harpur CA-10 Mahisi ! Pokhram -
The Economy of Saharsa District
S.K. Acharya, G.C. Mishra and Karma P. Kaleon CHAPTER - 3 The Economy of Saharsa District 3.0 Introduction Saharsa is one of the thirty-eight districts of Bihar. The area of Saharsa district is 1702 km²/657 sq miles and its population, according to 2001 census was 11, 32,413 as against 18,97,102 according to 2011 census. The density of population was 11, 25 per sq. km. according to the 2011 census.- Saharsa town is the administrative headquarters of this district. Saharsa district is a part of a larger territory, the Kosi Division and it became a district on 1 April 1954 and subsequently has become smaller with other districts being carved form it, most notably Madhepura in 1981. Saharsa was created on first of april 1954. Formerly it had no independent status and parts of Saharsa were included in the old district of mongyr and Bhagalpur. A large parts of the district in the past was subjected to annual floods and inundation by a host of rivers origination from the Himalayas. The sub tarai was noted for rice cultivation before it was subjected to the vagaries of the unpredictable koshi. The district has been largely influenced RURAL DEVELOPMENT IN INDIA: A STUDY OF SAHARSA DISTRICT OF BIHAR ISBN: 978-93-85822-16-2 45 The Economy of Saharsa District by its geography. Whatever humans of historically important sites that may have been virtually started by the repeated flooding at the koshi during the last half-century or so. With the efforts of some early Europeans however, some important historical objects or landmarks have been preserved in a few places and it is on the basis of these that some kind of a connected account of the early history of the district can be constructed.