Prottasha Monthly Update July 2021

Total Page:16

File Type:pdf, Size:1020Kb

Prottasha Monthly Update July 2021 Monthly Update July 2021 Bangladesh: Sustainable Reintegration and Improved Migration Governance (Prottasha) Project Overview SPECIFIC OBJECTIVE 01 Duration: 60 Months Irregular migrants returning to Bangladesh are sustainably reintegrated OVERALL OBJECTIVE (April 2017—April 2022) Contributing to the SPECIFIC OBJECTIVE 02 Funded by: The European Union sustainable reintegration of Lead Ministries: The Ministry of returnees and the progressive The capacities of the Government of Bangladesh and other migration achievement of Goal 10.7 to Expatriates Welfare and Overseas actors are strengthened to manage migration at central and local levels facilitate orderly, safe, regular and to ensure reintegration of irregular migrants Employment (MoEWOE) and The and responsible migration and Ministry of Foreign Aairs (MoFA) mobility of people, including Implementing Partner: BRAC through the implementation SPECIFIC OBJECTIVE of planned and well-managed 03 Service Coverage: 64 Districts of policies Returnees, potential migrants, families and community are empowered to Bangladesh make informed decisions about migration and adopt regular, safe, orderly Number of Primary Beneciaries and responsible migration behaviours including remittance management Reached: 2,289 Sustainable Reintegration TOTAL ASSISTANCE PROVIDED TO DATE (31 JULY) * The overall number of unique project beneciary is not equal to the total of the - gures as some beneciaries received a combination of social, psychosocial, and economic assistance and are SOCIAL PSYCHOSOCIAL ECONOMIC therefore counted multiple times. 88 (87 Men; 1 Women) 692 (689 Men; 10 Women) 1,387 (1,363 Men; 24 Women) Returnees Proled and Screened Beneciaries receiving Total Immediate Assistance July Cumulative July Cumulative Total Immediate Assistance (M: 299; W: 09) EU 22 1,451 00 308 Non-EU 2 838 Total Assistance Received 00 554 (M: 531; W: 23) Total Number 24 2,289 (M: 24/2,235; W: 00/53) Beneciaries receiving Economic Reintegration Support July Cumulative Beneciaries receiving Psycho-social Support Completed Reintegration Plans 73 2,175 (M: 2125; W: 50) July Cumulative Received In-kind Support 19 867 (M: 850; W: 17) Enrolled 16 824 (M: 811; W: 13) Referred for Skills Training 00 110 (M: 108; W: 02) Completed 67 692 (M: 682; W: 10) Received Skill Training (M: 249; W: 06) Referred for Trauma Counselling 00 12 (M: 10; W: 00) 40 255 Received Medical Treatment 06 46 (M: 45; W: 01) Referred for Economic Reintegration Support 00 163 (M: 161; W: 02) Received Economic Reintegration Support 00 04 (M: 04) Information Center Services (M: 260; W: 1) July Cumulative Enrolled in Community Enterprise 00 261 Men 04 313 Social Reintegration Support Women 03 152 July Cumulative Total Calls Received 07 465 Workshops 00 588 Hotline Services IPT Shows 00 1,878 July Cumulative DCC Meetings 00 64 Men 102 2,202 Women 06 166 Video Shows 00 3,162 Total Calls Received 108 2,368 Referred for Social Reintegration Support 00 56 This Project is led by Funded by Implemented by In Partnership with Government of the the European Union IOM BRAC People's Republic of Bangladesh Contact Us: [email protected] 1 Monthly Update July 2021 Prottasha project supports Halder’s reintegration into society "I was forced to return to Bangladesh from France in 2017 as I was an irregular migrant and did not have a legal work permit. My family was disappointed in me because I returned empty handed. I was almost on the edge of depression, but the Prottasha Project provided me a chance to reconcile with my family and assisted me with establishing a business venture. I am grateful to the Prottasha project for the much needed assistance in getting my life back on track. I am positive that the project will benet many other returnees like me." Shimul Halder, a Bangladeshi migrant, originally from Tongibari Upazila in Munshiganj district, received an education up to the eighth grade only. Like many other Bangladeshi migrants, Halder thought of going abroad expecting a better income and life so that he could overcome his nancial hardships. Halder was swayed by a middlemen and he contracted the middleman paying him BDT 1,200,000 (EUR 12,085) to send him to Europe. He managed his migration cost by selling his brother’s shop. Shimul Halder, at rst, migrated to Italy expecting to change his fortune in 2011. But his dreams were soon shattered when he discovered that his Shimul Halder receiving the cheque from the salary was far less compared to what he was originally promised by the Prottasha project sta. @Prottasha 2020 sub-agent. He could barely cover his minimum expenses in Italy. Then he decided to move to France following a short stint in Italy. Unfortunately, life in France was not as smooth as he had expected. He went through so many hurdles in France as he could not manage to nd a better job. Halder used to work as a seasonal worker, selling owers, working as a street hawker in Paris, and then nally ended up getting a job at a restaurant. Halder’s misfortunes continued unfortunaly and which resulted in him returning to Bangladesh as he did not have legal documents to stay on in France permanently. Upon his arrival in Bangladesh, Shimul Halder wanted to start a business but was unable to do so owing to the lack of sucient capital to invest. In June 2019, he happened to see a video show organized under the Prottasha project in Tongibari Upazilla at the local Bazar of Baligaon. He came to know about the dierent services oered under the project supporting the reintegration of Bangladeshi returnees from EU countries. The Prottasha project carried out 3,162 video shows to date. Halder was initially identied as an eligible beneciary under the Prottasha project through the video show initiative, following which the Prottasha sta communicated with Halder and conducted the screening process to conrm him as a beneciary. He was then connected with the Reintegration Service Center (RSC) in Munshiganj where he was assisted with a Tailored Reintegration Plan (TRP) to access multiple services. Halder was assisted with psycho-social services provided by a counselor from the Prottasha project. The psycho-social services assisted him to communicate with his family and reduce his anxiety and stress. He began to feel comfortable, hopeful, and active again. Halder also received medical services under the Prottasha project through referral linkages. Halder also received in-kind assistance to the value of BDT 100,000 (EUR 1007) under the Prottasha project which enabled him to start his business Shimul Halder at in his shop set up with assistance in 2019. He now generates an income between approx. BDT 15,000 (EUR under the Prottasha project. @Prottasha 2020 151) and BDT 20,000 (EUR 201) per month. The Prottasha project is helping him to reintegrate into society. This Project is led by Funded by Implemented by In Partnership with Government of the the European Union IOM BRAC People's Republic of Bangladesh Contact Us: [email protected] 2 Monthly Update July 2021 Returnee Identication: A total of 58 eligible returnees were identied in July by the district supervisors and community mobilizers working in 12 districts (Brahmanbaria, Comilla, Chandpur, Feni, Gazipur, Hobiganj, Jashore, Lokkhipur, Madaripur, Moulobhibazar, Mymensingh, and Sunamganj). During the period March - July 2021, a total of 978 returnees were identied while 745 returnees were conrmed to be eligible as project beneciaries following the screening process. Volunteers in Cumilla engaging with the community to collect information of returned migrants in July. Volunteers engaged in proling returned @IOM 2021 migrants in Hobiganj. @IOM 2021 Awareness Raising Number of persons reached with messages on safe migration, reintegration and remittance management July Cumulative July Cumulative Interactive Popular Theatre (IPT) Shows 00 518,454 School Programmes 00 49,296 M: 329,001; W: 189,453 M: 22,956; W: 26,340 Financial Literacy Trainings 114 2,127 Video Shows 00 621,647 M: 1,825; W: 302 M: 523,695; W: 97,952 Tea Stall Meetings 00 26,245 Pot Songs 00 88,566 M: 25,312; W: 933 M: 52,416; W: 36,150 Increase capacity of migrants and their families on financial literacy Number of advocacy events (workshops and consulta�ve dialogues) and their awareness of available products and services: with financial service providers: July Cumulative July Cumulative Number of financial literacy engagement Number of consulta�ons and (community-based dialogues on access to financial services, 04 88 advocacy engagements: 01 30 capacity building on financial literacy) facilitated: This Project is led by Funded by Implemented by In Partnership with Government of the the European Union IOM BRAC People's Republic of Bangladesh Contact Us: [email protected] 3 Monthly Update July 2021 Monitoring and Evaluation Reintegration Sustainability Survey (RSS) and Reintegration Assistance Satisfaction Survey (RASS): The data collection through RASS and RSS was completed in July 2021. IOM and BRAC M&E teams jointly conducted the RASS and RSS across the 10 RSCs and reached 1,793 beneciaries under the RSS and 1,618 beneciaries under RASS. The aim of the RSS and RASS is to measure the sustainability of the reintegration services assistance received, as expressed by the returnees as well as the level of satisfaction as expressed by the beneciaries. Communications Number of communications products developed: 8 Number of persons reached through social media: 92,336 July Cumulative Facebook 89,929 3,798,620 Twitter 2,407 319,643 Observing World Day Against Tracking in Persons 2021: IOM launched a social media campaign to observe World Day Against Tracking in Persons 2021 to increase awareness on tracking in persons and safe migration. The Prottasha project's content on reintegration and safe migration were disseminated online which reached 75,645 people. Additionally, the campaign was also promoted through mainstream media promoting further visibility.
Recommended publications
  • Government of the People's Republic of Bangladesh
    GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH OFFICE OF THE EXECUTIVE ENGINEER EDUCATION ENGINEERING DEPARTMENT, NARAYANGANJ ZONE SHIKKHA BHABAN, MASDAIR, NARAYANGANJ [email protected] Memo No: 74/EED/NZ/2019-20/2328 Date: 18/12/2019 Invitation for e-Tender LTM (5974-2nd) Name of Project: Repair/Renovation of Non-Govt. Educational Institutions. SL Tender ID Last Selling Last Closing Name of Works no No. Date & Time Date & Time Repair & Renovation Works of 02-Storied Academic Building at 15-Jan-2020 16-Jan-2020 1 399803 Malkhanagar Dakhil Madrasha Sirjdikhan Upazila Munshiganj 17:00 12:00 District. Repair & Renovation Works of Single Storied Academic Building & 15-Jan-2020 16-Jan-2020 2 399802 Office Room at Rasulpur Islamia Dakhil Madrasah Louhajang Upazila 17:00 12:00 Munshiganj District. Repair & Renovation Works at Beltoli G J High School Sreenagar 15-Jan-2020 16-Jan-2020 3 399801 Uapzila Munshiganj District. 17:00 12:00 Repair & Renovation Works at Kamargaon Adarsha School Sreenagar 15-Jan-2020 16-Jan-2020 4 399799 Upazila Munshiganj District. 17:00 12:00 Repair & Renovation Works 02-Storied Academic Building at 15-Jan-2020 16-Jan-2020 5 399798 Malopdia Adarsha High School Sirajdikhan Upazila Munshiganj 17:00 12:00 District. Repair & Renovation Works of 02-Storied Academic Building at 15-Jan-2020 16-Jan-2020 6 399797 Shekhornagar Girls High School Sirajdikhan Upazila Munshiganj 17:00 12:00 District. Repair & Renovation Works of Single Storied Academic Building at 15-Jan-2020 16-Jan-2020 7 399796 Bikrampur Adarsha College Sirajdikhan Upazila Munshiganj District. 17:00 12:00 Repair & Renovation Works of Three Storied Academic Building at 15-Jan-2020 16-Jan-2020 8 399795 Ali Asgar and Abdullah Degree College Sirajdikhan Upazila 17:00 12:00 Munshiganj District Repair & Renovation Works of Boundary Wall at Brahammangaon M 15-Jan-2020 16-Jan-2020 9 399794 L High School Lauhaganj Upazila Munshiganj District.
    [Show full text]
  • Bounced Back List.Xlsx
    SL Cycle Name Beneficiary Name Bank Name Branch Name Upazila District Division Reason for Bounce Back 1 Jan/21-Jan/21 REHENA BEGUM SONALI BANK LTD. NA Bagerhat Sadar Upazila Bagerhat Khulna 23-FEB-21-R03-No Account/Unable to Locate Account 2 Jan/21-Jan/21 ABDUR RAHAMAN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number SHEIKH 3 Jan/21-Jan/21 KAZI MOKTADIR HOSEN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 4 Jan/21-Jan/21 BADSHA MIA SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 5 Jan/21-Jan/21 MADHAB CHANDRA SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number SINGHA 6 Jan/21-Jan/21 ABDUL ALI UKIL SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 7 Jan/21-Jan/21 MRIDULA BISWAS SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 8 Jan/21-Jan/21 MD NASU SHEIKH SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 9 Jan/21-Jan/21 OZIHA PARVIN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 10 Jan/21-Jan/21 KAZI MOHASHIN SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 11 Jan/21-Jan/21 FAHAM UDDIN SHEIKH SONALI BANK LTD. NA Chitalmari Upazila Bagerhat Khulna 16-FEB-21-R04-Invalid Account Number 12 Jan/21-Jan/21 JAFAR SHEIKH SONALI BANK LTD.
    [Show full text]
  • Bangladesh: Human Rights Report 2015
    BANGLADESH: HUMAN RIGHTS REPORT 2015 Odhikar Report 1 Contents Odhikar Report .................................................................................................................................. 1 EXECUTIVE SUMMARY ............................................................................................................... 4 Detailed Report ............................................................................................................................... 12 A. Political Situation ....................................................................................................................... 13 On average, 16 persons were killed in political violence every month .......................................... 13 Examples of political violence ..................................................................................................... 14 B. Elections ..................................................................................................................................... 17 City Corporation Elections 2015 .................................................................................................. 17 By-election in Dohar Upazila ....................................................................................................... 18 Municipality Elections 2015 ........................................................................................................ 18 Pre-election violence ..................................................................................................................
    [Show full text]
  • Department of Sociology University of Dhaka Dhaka University Institutional Repository
    THE NATURE AND EXTENT OF HOMICIDE IN BANGLADESH: A CONTENT ANALYSIS ON REPORTS OF MURDER IN DAILY NEWSPAPERS T. M. Abdullah-Al-Fuad June 2016 Department of Sociology University of Dhaka Dhaka University Institutional Repository THE NATURE AND EXTENT OF HOMICIDE IN BANGLADESH: A CONTENT ANALYSIS ON REPORTS OF MURDER IN DAILY NEWSPAPERS T. M. Abdullah-Al-Fuad Reg no. 111 Session: 2011-2012 Submitted in partial fulfillment of the requirements of the degree of Master of Philosophy June 2016 Department of Sociology University of Dhaka Dhaka University Institutional Repository DEDICATION To my parents and sister Dhaka University Institutional Repository Abstract As homicide is one of the most comparable and accurate indicators for measuring violence, the aim of this study is to improve understanding of criminal violence by providing a wealth of information about where homicide occurs and what is the current nature and trend, what are the socio-demographic characteristics of homicide offender and its victim, about who is most at risk, why they are at risk, what are the relationship between victim and offender and exactly how their lives are taken from them. Additionally, homicide patterns over time shed light on regional differences, especially when looking at long-term trends. The connection between violence, security and development, within the broader context of the rule of law, is an important factor to be considered. Since its impact goes beyond the loss of human life and can create a climate of fear and uncertainty, intentional homicide (and violent crime) is a threat to the population. Homicide data can therefore play an important role in monitoring security and justice.
    [Show full text]
  • Report on AK Taj Group Masrur M. A. Hoque.Pdf (983.4Kb)
    Internship Report on AK TAJ GROUP Prepared for, MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Prepared By, Masrur M. A. Hoque ID # 12164092 Submission Date – 15/12/2015 LETTER OF TRANSMITTAL December 15, 2015 MD. Tamzidul Islam Assistant Professor BRAC BusinessSchool BRAC University Subject: Internship Report. Dear Sir, I would like to thank you for supervising and helping me throughout the semester. With due respect I am submitting a copy of intern report foryourappreciation. I have given my best effort to prepare the report with relevant information that I have collected from an onsite production department which is belongs to a group of company and from other sources during my accomplishthe course. I have the immense pleasure to have the opportunity to study on the marketing practices of AK TAJ Group. There is no doubt that the knowledge I have gathered during the study will help me in real life. For your kind consideration I would like to mention that there might be some errors and mistakes due to limitations of my knowledge. I expect that you will forgive me considering that I am still learner and in the process of learning. Thanking for your time and reviews. Yours faithfully Masrur M. A. Hoque ID-12164092 BRAC Business School BRAC University Acknowledgement The successful completion of this internship might not be possible in time without the help some person whose suggestion and inspiration made it happen. First of all I want to thank my Course Instructor MD. Tamzidul Islam for guiding me during the course. Without his help this report would not have been accomplished.
    [Show full text]
  • List of Upazilas of Bangladesh
    List Of Upazilas of Bangladesh : Division District Upazila Rajshahi Division Joypurhat District Akkelpur Upazila Rajshahi Division Joypurhat District Joypurhat Sadar Upazila Rajshahi Division Joypurhat District Kalai Upazila Rajshahi Division Joypurhat District Khetlal Upazila Rajshahi Division Joypurhat District Panchbibi Upazila Rajshahi Division Bogra District Adamdighi Upazila Rajshahi Division Bogra District Bogra Sadar Upazila Rajshahi Division Bogra District Dhunat Upazila Rajshahi Division Bogra District Dhupchanchia Upazila Rajshahi Division Bogra District Gabtali Upazila Rajshahi Division Bogra District Kahaloo Upazila Rajshahi Division Bogra District Nandigram Upazila Rajshahi Division Bogra District Sariakandi Upazila Rajshahi Division Bogra District Shajahanpur Upazila Rajshahi Division Bogra District Sherpur Upazila Rajshahi Division Bogra District Shibganj Upazila Rajshahi Division Bogra District Sonatola Upazila Rajshahi Division Naogaon District Atrai Upazila Rajshahi Division Naogaon District Badalgachhi Upazila Rajshahi Division Naogaon District Manda Upazila Rajshahi Division Naogaon District Dhamoirhat Upazila Rajshahi Division Naogaon District Mohadevpur Upazila Rajshahi Division Naogaon District Naogaon Sadar Upazila Rajshahi Division Naogaon District Niamatpur Upazila Rajshahi Division Naogaon District Patnitala Upazila Rajshahi Division Naogaon District Porsha Upazila Rajshahi Division Naogaon District Raninagar Upazila Rajshahi Division Naogaon District Sapahar Upazila Rajshahi Division Natore District Bagatipara
    [Show full text]
  • Date : 03 December, 2005
    Date : 03 December, 2005 PROCUREMENT PLANNING AND MONITORING FORMAT Public Disclosure Authorized Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2012 #DIV/0! Sl. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial No. (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 30 of 30 Currency) Start Completion Name June'12 June'12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 UZR-1.1 Improvement of Ghior-Jabra Road and construction of 8.00 Km The Slice UZR-1.1 of Package Man/UZR-1 has been merged into Package Man/UZR-49 (Sl. No. 49) as a part of single package and transferred from 1st Phase to 2nd Phase. appurtenant structures. Public Disclosure Authorized 01. Man/UZR-1 UZR-1.2 Improvement of Balirteck-Harirampur Road and 3.01 Km 3.01 Km 14.07 14.07 NCB Yes1 1/18/2004 7/21/2005 7/21/2005 10/25/2003 M/S Good Luck 100% 100% construction of appurtenant structures. Trading Corporation UZR-2.1 Improvement of Kaliganj - Jamalpur road and 3.65 Km The Slice UZR-2.1 of Package Gaz/UZR-2 has been shifted to Package Gaz/UZR-32, Slice No. UZR-32.3 (Sl.
    [Show full text]
  • 9 Parliamentary Election Observation Report Odhikar
    9th Parliamentary Election Observation Report Odhikar Reporting Date: 31 December 2008 Executive Summary One of the broader missions of Odhikar is election observing. Since its inception in 1994, Odhikar has established itself as a credible and reliable organisation in Bangladesh regarding the observation of elections, both national and local. Internationally it has earned a good reputation and established relationships with regional election and democracy campaign organisations. Odhikar does not limit its election observing activities only within observing the procedural aspects of elections, but it also watches the condition of the civil and political rights of the electorate. Being a member of the Election Working Group (EWG), Odhikar observed 56 constituencies of 40 districts under 6 divisions during the 2008 national election1. A single team consists of five mobile election observers, deployed in each of the 56 constituencies. Odhikar observers were responsible for identifying and gathering key information on irregularities, intimidation, violation of the election Code of Conduct and incidents of election-related violence within each constituency. Background Article 123 (3) of the Constitution of the People’s Republic of Bangladesh states that “A general election of Members of Parliament shall be held within ninety days after Parliament is dissolved, whether by reason of the expiration of its term or otherwise than by reason of such expiration”.: According to Bangladesh's electoral system, a caretaker government is obligated to hold the elections in due time, which must be held within ninety days of dissolving a parliament2. However, the last government’s tenure ended on 26 October 2006 and the Caretaker Government came to the power and prepared to hold an election on 22 January 2007.
    [Show full text]
  • Inventory of LGED Road Network, March 2005, Bangladesh
    The Chief Engineer Local Government Engineering Department PREFACE It is a matter of satisfaction that LGED Road Database has been published through compilation of data that represent all relevant information of rural road network of the country in a structured manner. The Rural Infrastructure Maintenance Management Unit of LGED (former Rural Infrastructure Maintenance Cell) took up the initiative to create a road inventory database in mid nineties to register all of its road assets country-wide with the help of customized software called, Road and Structure Database Management System. The said database was designed to accommodate all relevant information on the road network sequentially and the system was upgraded from time to time to cater the growing needs. In general, the purpose of this database is to use it in planning and management of LGED's rural road network by providing detailed information on roads and structures. In particular, from maintenance point of view this helps to draw up comprehensive maintenance program including rational allocation of fund based on various parameters and physical condition of the road network. According to recent road re-classification, LGED is responsible for construction, development and maintenance of three classes of roads, which has been named as Upazila Road, Union Road and Village Road (category A & B) in association with Local Government Institution. The basic information about these roads like, road name, road type, length, surface type, condition, structure number with span, existing gaps with length, etc. has been made available in the road inventory. Side by side, corresponding spatial data are also provided in the road map comprising this document.
    [Show full text]
  • World Bank Document
    Document of The World Bank Public Disclosure Authorized Report No: ICR507 IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H1010) ON A GRANT Public Disclosure Authorized IN THE AMOUNT OF SDR 27.6 MILLION (US$ 40.0 MILLION EQUIVALENT) SUBSEQUENTLY REDUCED AFTER RESTRUCTURING TO THE AMOUNT OF SDR 11.8 MILLION (US$ 18.6 MILLION EQUIVALENT) TO THE PEOPLE’S REPUBLIC OF BANGLADESH Public Disclosure Authorized FOR A WATER SUPPLY PROGRAM PROJECT June 14, 2011 Urban, Water and Disaster Management Unit Public Disclosure Authorized Sustainable Development Department South Asia Region CURRENCY EQUIVALENTS (Exchange Rate Effective March 31, 2011) Currency Unit = Taka Taka 1.00 = US$ 0.01379 US$ 1.00 = Taka 72.52 FISCAL YEAR July 1 –June 30 ABBREVIATIONS AND ACRONYMS BAMWSP Bangladesh Arsenic Mitigation OBA Output Based Aid Water Supply Project BWSPP Bangladesh Water Supply Program OHT Overhead Tank Project CBO Community-Based Organization PAD Project Appraisal Document DPHE Department of Public Health PDO Project Development Engineering Objectives DPP Development Proforma Proposal PMU Project Management Unit DTW Deep Tube Wells PPPs Public-Private Partnerships EOI Expression of Interest ERR External Rate of Return PPWS Pourashava Piped Water Supply GOB Government of Bangladesh RDA Rural Development Academy HFSKS Hilful Fuzul Samaj Kallayan RDPP Revised Development Sangstha (NGO managing rural Project Pro-forma piped schemes) ISRs Implementation Status and RPWS Rural Piped Water Supply Completion Reports LGD Local Government Division SCF Standard Conversion Factor LGI Local Government Institutions SIPP Social Investment Program Project M&E Monitoring and Evaluation SST Shallow Tube Well MoU Memorandum of Understanding VSST Very Shallow Tube Well MTR Mid-Term Review WAMWUG Ward Arsenic Mitigation Water User Group NPV Net Present Value WSP Water and Sanitation Program WTP Willingness to Pay ii Vice President: Isabel Guerrero Country Director: Ellen A.
    [Show full text]
  • Occurrence and Diversity of Soil Microflora in Potato Fields of Bangladesh
    Occurrence and diversity of soil microflora in potato fields of Bangladesh ABSTRACT Microflora from potato rhizosphere soil was isolated from different potato fields of Bangladesh. Seventeen soil samples were analyzed for the presence of microflora in selected potato field soils. Seven fungal species and one bacterium species were morphologically characterized using soil dilution and streak plate methods. The predominant fungi isolated including Alternaria sp., Aspergillus sp., Penicillium sp., Rhizopus sp., Bipolaris sp., Phytophthora sp., Fusarium sp. and one bacterium was identified as Ralstonia solanacearum. Individual colonies of fungi and bacteria were counted on Potato Dextrose Agar (PDA) media and their presence in soil was compared in respect of different locations of potato fields. The occurrence of Phytophthora sp. was medium in Tongibari and lower in Singair Union, Sonargaon, Matlab Dakshin, Gobindaganj, Palashbari, Gopinathpur and Bagmara. The highest counts of R. solanacearum were found in Singair Union, Tongibari and Daudkandi and the lowest counts were made in Palashbari and Bagmara. This was the first reported examination of the microbial diversity of soil microflora in some selected potato fields of Bangladesh. Keywords: Microflora; diversity; fungi; bacteria. 1. INTRODUCTION Soils are very composite systems, with many components playing diverse functions mainly due to the activity of soil organisms [1]. Soil microflora plays a pivotal role in evaluation of soil conditions and in stimulating plant growth by biochemical transformation and mineralization activities in soils [2].However, type of cultivation and crop management practices are found to have greater influence on the activity of soil microflora [3]. Continuous use of chemical fertilizers over a long period may cause imbalance in soil microflora and thereby indirectly affect biological properties of soil leading to soil degradation [4].
    [Show full text]
  • WATER LOGGING HAZARD at NORTHERN PART of PADMA BRIDGE ADJACENT AREA Md
    International Journal of Geology, Earth & Environmental Sciences ISSN: 2277-2081 (Online) An Open Access, Online International Journal Available at http://www.cibtech.org/jgee.htm 2017 Vol. 7 (1) January-April, pp. 47-54/Hossain and Arifeen Research Article WATER LOGGING HAZARD AT NORTHERN PART OF PADMA BRIDGE ADJACENT AREA Md. Ashraf Hossain and *Hossain Mohammad Arifeen Geological Survey of Bangladesh, 153, Pioneer Road, Segunbagicha, Dhaka-1000 *Author for Correspondence ABSTRACT Bangladesh government has taken the initiative to construct the Padma Bridge from Mawa point that will ease our communication system as well as boost our GDP. The area is suffering from water logging problem and the problem can be increased by different mega construction for development purposes. The water logging problem is seen this area for various anthropogenic causes like unplanned construction and random sand filling by different government, private organizations and individuals, construction of micro dam by land owners, embankment by local government. Siltation is one of the factors of water logging. A remote sensing based approach discloses that in 1991, total water body in the study area was 10,697 hectares where as in 2014, that was 14,930 hectares. Water logging problem hampers the social, physical, environmental life of the area. It also has the negative impact on economy. To overcome this problem, some measures can be taken including awareness programme, legal action and plan wise development activities. On a whole, government and people should work together to remedy the problem and keep the pace of development. Keywords: Government, Padma Bridge, Development, Water Logging, Remote Sensing INTRODUCTION The government of Bangladesh has taken an initiative to construct a bridge on the Padma River that will connect the southern part of Bangladesh including Barisal, Patuakhali, Bhola, Pirojpur, Jhalakathi, Khulna etc.
    [Show full text]