New Jharkhand a Progressive Journey Since 2014 Khunti Parliamentary Constitutuency PREFACE

Total Page:16

File Type:pdf, Size:1020Kb

New Jharkhand a Progressive Journey Since 2014 Khunti Parliamentary Constitutuency PREFACE Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhand A progressive journey since 2014 Khunti Parliamentary Constitutuency PREFACE Indian Railways is the lifeline of the Nation and a catalyst for India’s progress and economic development. South Eastern Railway (SER) plays a significant role in the socio-economic development of the state of Jharkhand. 36% of SER’s jurisdiction covers Jharkhand. With a view to improve railway infrastructure and extend the railway network in Jharkhand, the Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and co-operation to this railway towards development of Jharkhand and improvement of train services. Railways have achieved many visible milestones in Jharkhand in the last 5 years in different fields viz. construction of new lines, doubling, introduction of new trains, extension of service, increase in frequency of trains etc. On the freight side, loading of South Eastern Railway has reached the mile stone of 154.87 Million Tonnes, where the lead role has been taken by the state. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with top most priority. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand have been highlighted in this Pamphlet. It may be noted that the budgets allocated to various projects are not apportioned constituency- wise but reflect the cost of the project. *Jharkhand Railway Network Map Not To Scale INPUTS BY RAILWAY IN KHUNTI CONSTITUENCY KHUNTI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Khunti, Kolebera, u Improvement of passenger amenities at Pokla Kharswan, Tamar, Torpa & Simdega station by providing piped water supply, improving approach & circulating area at a B. WORKS COMPLETED IN LAST FIVE YEARS: cost of Rs.1.00 crores B.1 Infrastructural Developments: u Water supply arrangement at Lodhma and u Diversion of road from level crossing No.152 Karra stations at KM 26807-09 between Gamharia-Sini to u 600 numbers of replacement of conventional newly constructed Road Under Bridge by lights by LED lights Jharkhand Development Corporation Limited u Bano : Improvement of platform surface at at a cost of Rs.1.38 crores platform No.1 and ancillary works at Bano u 17 numbers of Road Under Bridge in lieu of u 01 bay RDSO type platform shelter at each level crossings at a cost of Rs.26.97 crores of Bakaspur, Govindpur Road, Kanaroan, u 9 numbers of Limited Height Subway have Karra, Lodhma, Orga, Tati, Mahabuang and been constructed at a cost of Rs.12.79 crores Parbatonia - 9 stations at a cost of Rs.1.42 u Pendrasali-Rajkharswan: Jacketing of crores u abutment, piers intrados of arch bridge No.6A Platform surfacing at Rajkharswan station u at a cost of Rs.4.25 crores Provision of platform shelter at Karra, u Sini-Chandil : Metalising of girder bridges Sini- Lodhma, Bano, Kanaaroan, Govindpur Road, Orga, Khunti, Parbotania, Tati and Chandil Section Br. No.335 UP DN 7x100 US Mahabhuang stations u Parbatonia - Nuagaon - CTRP - 2.219 km at a u Platform surfacing, improvement to cost of Rs. 4.2 crores circulating area at Sini station u Kanarona - Tati - CTRP - 1.61 km at a cost of Rs. 2.53 crores C. ON-GOING WORKS: u Tati - Orga TRRP- 4.55. Km at a cost of Rs. 6.89 u Bondamunda-Ranchi (158.5 Km) New Line at crores a cost of Rs.3177.60 crores u u Hatia - Orga SL - TFR - 32.25 km at a cost of Rs. Bondamunda-Hatia replacement of level 2.65 crores frames with centralised operation of points u Ranchi Division TBR-121km at a cost of Rs. and signals at 13 stations at a cost of Rs.105.5 8.25 crores crores u u Complete renewal of 10 nos. of 60 kg and 10 3 numbers of Ranchi Division - Limited Restricted Normal Height Subways in lieu nos. of 52 kg ordinary SEJ including fittings of manned level crossings at a cost of Rs.8.1 and bearing plates under jurisdiction of crores ADEN/South/THE u Replacement of power supply arrangement u Ranchi Division different section - TBR 33.65 for Optic Fibre Cable Equipment km at a cost of Rs. 3.45 crores u Ranchi Division : Replacement or u Govindpur road – Tati SL - CTRP - 17.201 km at rehabilitation of electrical power supply a cost of Rs. 32.54 crores system 4 transformers and associated works u Hatia – Orga SL - TRRP - 8.25 km at a cost of at a cost of Rs.2.75 crores Rs. 4.85 crores u Ranchi Division : Replacement of lever frames B.2 Passenger Amenities with centralised operation of points and u 3 numbers of water booth at various signals at 2 stations at a cost of Rs.13.79 platforms of Sini and Rajkharswan stations crores u u Platform raising at Barabamboo and Ranchi Division : Complete track circulating Rajkharswan at a cost of Rs.1.01 crores loop lines 30 stations E special and E route at u Extension of Dn and Up platform at Sini a cost of Rs.8.4 crores u u Improvement of circulating area in front of Ranchi - Link B - CTRP - 21.35 Km TRRP - 4 km station with canopy at Bano at a cost of Rs. 21.47 crores u Muri-Ranchi-Orga -TBR - 34.35 km at a cost of u Ranchi - Link -B CTRP of existing 52KG rail laid Rs. 4.87 crores on PSC-5 Sleeper with new 60KG 90UTS rail on u Hatia - Orga SL Muri-Ranchi UP - TRRP -13.169 PSC-6 sleeper for 1.147 Tr.Km at a cost of Rs. km at a cost of Rs. 7.32 crores 2.22 crores u Ranchi Division TBR-121km at a cost of Rs. u Ranchi - Link -B CTRP of existing 52KG rail laid 8.24 crores on PSC-5 Sleeper with new 60KG 90UTS rail on u Govindpur road - TatiSL - CTRP - 17.201 km at PSC-6 sleeper for 1.265 Tr.Km at a cost of Rs. a cost of Rs. 32.55 crores 2.45 crores u Hatia - OrgaSL - TRRP - 8.25 km at a cost of Rs. u Ranchi - Link -B CTRP of existing 52KG rail laid 4.85 crores on PSC-5 Sleeper with new 60KG 90UTS rail u Ranchi Division different section - TBR 33.65 on PSC-6 sleeper for 1.25 Tr.Km at a cost of Rs. km at a cost of Rs. 3.45 crores 2.42 crores u Ranchi-Link-B - Easement of cutting at u Setting up of Quick watering arrangement at different locations in Hatia – Orga at a cost of Muri Station at a cost of Rs. 2.44 crores Rs. 27.46 crores u Ranchi Station Setting up of Quick watering u Hatia - Orga SL - CTRP - 4.66 km at a cost of arrangement at Ranchi Station at a cost of Rs. Rs. 8.93 crores 2.5 crores u Hatia - OrgaSL - TRR P - 12.10 at a cost of Rs. u Limited restricted normal height subways 14.49 crires in lieu of manned level crossings in Ranchi Division at a cost of Rs. 8.1 crores SOME IMPORTANT PHOTOS.
Recommended publications
  • District Environment Plan for Khunti District Jharkhand
    DISTRICT ENVIRONMENT PLAN FOR KHUNTI DISTRICT JHARKHAND PREPARED BY DISTRICT ADMINISTRATION-KHUNTI CONTENT Index Page No. A. INTRODUCTION 1-2 B. CHAPTER- 1- A BRIEF DESCRIPTION OF 3-6 KHUNTI DISTRICT C. CHAPTER- 2 - WASTE MANAGEMENT PLAN (2.1) Solid Waste Management Plan 7-9 (2.1.1) Baseline Data 10-12 (2.1.2) Action Plan 12-13 (2.2) Plastic Waste Management Plan 14-15 (2.2.1) Baseline Data 16-17 (2.2.2) Action Plan 17-18 (2.3) C&D Waste Management Plan 18-19 (2.3.1) Baseline Data 20 (2.3.2) Action Plan 20-21 (2.4) Bio- Medical Waste Management Plan 21 (2.4.1) Baseline Data 22 (2.4.2) Action Plan 23 (2.5) Hazardous Waste Management Plan 24 (2.5.1) Baseline Data 24-25 (2.5.2) Action Plan 25 (2.6) E- Waste Management Plan 26 (2.6.1) Baseline Data 26-27 (2.6.2) Action Plan 28 D. CHAPTER- 3.1– WATER QUALITY 29 MANAGEMENT PLAN (3.1.1) Baseline Data 29-30 (3.1.2) Action Plan 31 District Environment Plan, Khunti. E. CHAPTER – 4.1 – DOMESTIC SEWAGE 32 MANAGEMENT PLAN (4.1.1) Baseline Data 32-33 (4.1.2) Action Plan 33-34 F. CHAPTER– 5.1– INDUSTRIAL WASTE WATER 35 MANAGEMENT PLAN (5.1.1) Baseline Data 35-36 G. CHAPTER – 6.1 – AIR QUALITY MANAGEMENT 37 PLAN (6.1.1) Baseline Data 37-38 (6.1.2) Action Plan 39 H. CHAPTER – 7.1 – MINING ACTIVITY 40 MANAGEMENT PLAN (7.1.1) Baseline Data 40 (7.1.2) Action Plan 40-41 I.
    [Show full text]
  • ICAMM '17) NIFFT, Ranchi, Jharkhand (INDIA
    INTERNATIONAL CONFERENCE ON ADVANCES IN MATERIA L S AN D MANUFACTURING (ICAMM ’17) NIFFT, Ranchi , Jharkhand (INDIA) FIRST ANNOUNCEMENT AND CALL FOR PAPERS Conference Venue National Institute of Foundry and Forge Technology, Hatia Ranchi - 834 003 INDIA Conference Theme Search for emerging trends in materials and manufacturing areas to imprint development of technology into make in India. Topics, but not limited to Additive manufacturing Advanced materials characterization Alloys design and development Biomaterials CAD / CAM / CAE Casting, forming and joining Corrosion engineering Computational material mechanics Conventional and unconventional machining Heat treatment Machine learning applications to manufacturing Manufacturing systems engineering MEMS / NEMS Metrology and quality control Micro and nano manufacturing Nanomaterials and technology Polymers, ceramics and composites Product design and development Production planning and control Rapid tooling Robotics, automation and mechatronics Smart materials Surface engineering of materials Testing and evaluation Tribology Important Dates Submission of abstract August 5, 2016 Intimation of abstract acceptance August 12, 2016 Submission of full paper September 30, 2016 Intimation of reviewer comments to authors October 29, 2016 Submission of camera-ready paper November 11, 2016 Early-bird registration November 25, 2016 Last date of registration December 16, 2016 Conference dates January 19 - 21, 2017 Registration Fees Category of Delegate Early-bird Regular Academia ` 3,500 ` 4,000 Industries and Research ` 4,500 ` 5,000 Research Scholars ` 2,000 ` 2,500 Delegates from Abroad US $ 150 US $ 200 Sponsorship We invite renowned organizations and institutions, technology and equipment suppliers, and publishing houses to participate in the conference as sponsors. The entitlement of individual categories of sponsors and their respective fees are mentioned hereunder.
    [Show full text]
  • Interstate Routes in Between Odisha and Jharkhand
    .,-. AIFEE LIST OF VACANT -INTERSTATE •ROUTES IN BETWEEN ODISH A AND JHARKHAND No., . Permits to No. of SI Distance of the Route in KMs Name of the routes be issued Trips Nature of No. J . by Service Jharkh W. Total Length Odisha Bihar Odisha Odisha and Bengal of the Route 1 2 3 4 5 6 7 8 9 10 ,Bhadrak to Tata via.Balasore, 1 255 Baripada, Rairangpur, Tiring 40 0 0 295 1 1 Express Baripada to Chakulia 2 41 via.Jamsola 39 0 0 80 2 ' 4 Ordinary _ Bolani to Chaibasa via.Barbil, 3 40 Nalda, Badajamda 107 0 0 147 1 2 Ordinary Baripada to Bokaro 4 via.Rairangpur, Tiring, Tata, 118 166 0 64 348 2 2 -Express Purulia . Baripada to Musabani 5 40 via.Jamsola 45 0 0 85 3 6 Ordinary - . Chaibasa to Rairangpur 6 45 via.Tiring, Hata 120 0 . 0 165 1 • 2 Ordinary Chaibasa to Barbil via.Cha mpua, 7 65 Jayantgarh 67 0 0 132 1 2 Ordinary . Deoghar to Baripada via.Giridih, 8 Hazaribag, Ranchi, Tata, 118 500 0 0 618 2 2 •ExpFess . Rairangpur, Tiring • • 9 Gumla to Baripada via.Sisai, 118 270 0 Ranchi, Tata, Tiring, RaWangpur 388 2 2 express 10 Jharadihi to Saraikela via.Tata, Tiring 95 0 135 1 2 Ordinary Ranchi to Keonjhar via.Khunti, 11 195 0 0 Chaibasa, Champua 249 2 2 Ordinary Rourkela to Gua via.Barbil, 12 Nalda 20 0 0 194 1 2 Ordinary Simdega to Sundergarh 13 via.Subdega, Rouldega, 88 60 0 0 148 Sagbahal 1 2 Ordinary Simdega to Debgarh 14 via.Birmitrapur, Rourkela, 190 48 0 0 238 Panposh, Bonai, Barkot 1 1 Ordinary 15 Joda to Gumla via.Lasthikata, 175 130 0 0 Rourkela, Biramitrapur 305 1 1 .Express Baripada to Chatra via.Jamsola, 16 40 355 0 0 Tata, Ranchi 39'5 1 1 Express Baripada ato Daltanganj 17 via.Rairangpur, Tiring, Tata, 118 395 0 0 513 Ranchi 1 1 Express Berhampur to Tata via.Baripai 18 da, Jamsola renamed 483 235 0 0 as Berhampur to Ranchi 718 1 1 Expr-ess via.Jamsola, Tata • LIST OF VACANT INTERSTATE ROUTES PLYING BETWEEN ODISHA AND BIHAR PASSING THROUGH JHARKHAND THE .
    [Show full text]
  • Ranchi District, Jharkhand State Godda BIHAR Pakur
    भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Sahibganj Ranchi District, Jharkhand State Godda BIHAR Pakur Koderma U.P. Deoghar Giridih Dumka Chatra Garhwa Palamau Hazaribagh Jamtara Dhanbad Latehar Bokaro Ramgarh CHHATTISGARH Lohardaga Ranchi WEST BENGAL Gumla Khunti Saraikela Kharsawan SIMDEGA East Singhbhum West Singhbhum ORISSA के न्द्रीय भूमिजल बोड ड Central Ground water Board जल स車साधन ि車त्रालय Ministry of Water Resources (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाडलय, रा更ची Mid-Eastern Region िध्य-पूर्वी क्षेत्र Patna पटना मसि車बर 2013 September 2013 भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Ranchi District, Jharkhand State Prepared By हﴂ टी बी एन स (वैज्ञाननक ) T. B. N. Singh (Scientist C) रा煍य एकक कायाडलय, रा更ची िध्य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna Contents Serial no. Contents 1.0 Introduction 1.1 Administration 1.2 Drainage 1.3 Land use, Irrigation and Cropping pattern 1.4 Studies, activities carried out by C.G.W.B. 2.0 Climate 2.1 Rainfall 2.2 Temperature 3.0 Geomorphology 3.1 Physiography 3.2 Soils 4.0 Ground water scenario 4.1 Hydrogeology Aquifer systems Exploratory Drilling Well design Water levels (Pre-monsoon, post-monsoon) 4.2 Ground water Resources 4.3 Ground water quality 4.4 Status of ground water development 5.0 Ground water management strategy 6.0 Ground water related issues and problems 7.0 Awareness and training activity 8.0 Area notified by CGWA/SCGWA 9.0 Recommendations List of Tables Table 1 Water level of HNS wells in Ranchi district (2012) Table 2 Results of chemical analysis of water quality parameters (HNS) in Ranchi district Table 3 Block-wise Ground water Resources of Ranchi district (2009) List of Figures Fig.
    [Show full text]
  • Town Survey Report, Dhanbad, Part XB, Series-4, Bihar
    CENSUS OF INDIA 1981 PARTXB SERIES 4 BIHAR TOWN SURVEY REPORT DHANBAD Drafted by Rajendra Prasad Asstt. Director Edited by S.C. Saxena Deputy Director Supervised by V.K. Bhargava Deputy Director Directorate of Census Operations BIHAR FOREWORD Apart from the decennial enumeration of population, the Indian Census is ~teeped in the tradition of undertaking a variety of studies of topical interest. In fact, the publications brought out in connection with the earlier censuses contained veritable mines of informatfon!On racial, cultural, linguistic and a number of other aspects of life of the people of this country. With the advent of freedom, however, the scope and dimension of these special studies had to be re­ structured in a manner that would provide the basic feedbacks on the processes of development taking place in different spheres of life of the people especially under planned development. Thus, in connection with the 1961, Census, a massive programme wa~s launched inter-alia to conduct socio-economic survey of about 500 villages selected from different parts of the country. The main objective of this study was to know the way of life of the people living in Indian villages which accounted for 82 per cent of the total population as per the 1961 Census. There was, however, an imperative need to extand the area of the study to urban centres as well, to -provide a complete coverage of the people living in diverse sodo economic conditions. It was with this objective in view ancillary studies on towns were launched as part of the social studies programme in connection with the 1971 Census.
    [Show full text]
  • Food Availability in the Poorest Households
    Food Availability in the Poorest Households Report of a survey in central Jharkhand Violayne Schoch - Gene Campaign July-August 2009 Contents I) Introduction .................................................................................................................3 II) Methodology ............................................................................................................... 5 III) Present situation and food availability in the poorest villages............................ 8 IV) The failures of the Public Distribution System.................................................... 12 Conclusion .................................................................................................................... 17 Sources.......................................................................................................................... 18 Annex............................................................................................................................. 20 2 I) Introduction As food security and hunger preoccupations have become a recurrent topic in all the Indian newspapers due to the monsoon failures of 2009, it is more meaningful than ever to consider the situation of the poorest households of Jharkhand, one of the most food insecure states in India. The 2003 Food Insecurity Atlas of Rural India1 published by the M. S. Swaminathan Research Foundation (MSSRF) presents a map depicting Jharkhand as one of just two extremely food insecure states in India, thus requiring some “immediate attention”. According
    [Show full text]
  • State District Branch Address Centre Ifsc Contact1 Contact2 Contact3 Micr Code
    STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE ANDAMAN NO 26. MG ROAD AND ABERDEEN BAZAR , NICOBAR PORT BLAIR -744101 704412829 704412829 ISLAND ANDAMAN PORT BLAIR ,A & N ISLANDS PORT BLAIR IBKL0001498 8 7044128298 8 744259002 UPPER GROUND FLOOR, #6-5-83/1, ANIL ANIL NEW BUS STAND KUMAR KUMAR ANDHRA ROAD, BHUKTAPUR, 897889900 ANIL KUMAR 897889900 PRADESH ADILABAD ADILABAD ADILABAD 504001 ADILABAD IBKL0001090 1 8978899001 1 1ST FLOOR, 14- 309,SREERAM ENCLAVE,RAILWAY FEDDER ROADANANTAPURA ANDHRA NANTAPURANDHRA ANANTAPU 08554- PRADESH ANANTAPUR ANANTAPUR PRADESH R IBKL0000208 270244 D.NO.16-376,MARKET STREET,OPPOSITE CHURCH,DHARMAVA RAM- 091 ANDHRA 515671,ANANTAPUR DHARMAVA 949497979 PRADESH ANANTAPUR DHARMAVARAM DISTRICT RAM IBKL0001795 7 515259202 SRINIVASA SRINIVASA IDBI BANK LTD, 10- RAO RAO 43, BESIDE SURESH MYLAPALL SRINIVASA MYLAPALL MEDICALS, RAILWAY I - RAO I - ANDHRA STATION ROAD, +91967670 MYLAPALLI - +91967670 PRADESH ANANTAPUR GUNTAKAL GUNTAKAL - 515801 GUNTAKAL IBKL0001091 6655 +919676706655 6655 18-1-138, M.F.ROAD, AJACENT TO ING VYSYA BANK, HINDUPUR , ANANTAPUR DIST - 994973715 ANDHRA PIN:515 201 9/98497191 PRADESH ANANTAPUR HINDUPUR ANDHRA PRADESH HINDUPUR IBKL0001162 17 515259102 AGRICULTURE MARKET COMMITTEE, ANANTAPUR ROAD, TADIPATRI, 085582264 ANANTAPUR DIST 40 ANDHRA PIN : 515411 /903226789 PRADESH ANANTAPUR TADIPATRI ANDHRA PRADESH TADPATRI IBKL0001163 2 515259402 BUKARAYASUNDARA M MANDAL,NEAR HP GAS FILLING 91 ANDHRA STATION,ANANTHAP ANANTAPU 929710487 PRADESH ANANTAPUR VADIYAMPETA UR
    [Show full text]
  • 49125-001: Khunti-Tamar Road Resettlement Plan
    Resettlement Plan March 2015 IND: Second Jharkhand State Road Project Khunti - Tamar Road Prepared by State Highways Authority of Jharkhand (SHAJ), Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (As of March 2015) Currency Unit – Indian Rupee (INR) INR 1.00 = 0.016 USD USD 1.00 = INR 62 ABBREVIATIONS ADB Asian Development Bank AHH Affected Households AP Affected Person BSR Basic Schedule of Rates CPR Common Property Resources EA Executing Agency EE Executive Engineer FGD Focus Group Discussion FHH Female Headed Household GoI Government of India GoJH Government of Jharkhand GRC Grievance Redress Committee GRM Grievance Redressal Mechanism IR Involuntary Resettlement KMS Kilometers LA Land Acquisition LARC Land Acquisition and Resettlement Commission MAW Minimum Agriculture Wage M&E Monitoring & Evaluation NGO Non-Governmental Organization NRRP National Resettlement Rehabilitation Policy PMU Project Management Unit PIU Project Implementation Unit RFCLARRA, 2013 The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 R&R Resettlement & Rehabilitation RO Resettlement Officer RP Resettlement Plan RoW Right-of-Way SC Scheduled Caste SPS Safeguard Policy Statement (ADB 2009) ST Scheduled Tribe This Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Of 258 SL. No. Page No. Name of Advocates Address Phone &Mobile
    SL. No. Page No. Name of Advocates Enrolment No. Date of Enrol. Asso. Member Address Phone &Mobile no. 1 786 A.Sumir Kumar Sinha 617/2008 13/08/2008 16/09/2008 Amrawati Colony, Near Ranchi Railway 9835340442 Colony, South, P.O.- Chutia, P.S.-Chutia, 9576126246 Ranchi. 2 750 Aabhas Parimal D/1171/2007 1/9/2007 10/12/2007 3 248 Aashutosh Kumar 41/2001 18/4/01 30/10/01 4 205 Abbinus Oreo 182/1989 24/2/89 16/3/01 5 15 Abdul Allam, Sr.Adv. 158/1981 24/2/1981 12/7/1984 6 201 Abdul Hakim 72/1974 5/3/1974 24/1/01 7 41 Abdul Kalam Rashidi 376/1990 23/3/90 28/1/91 Lane No.-5, Sattar Colony, Bariatu, 09835536572 Ranchi-834009 09304191572 8 280 Abha Sinha 1407/2002 9/11/2002 13/1/03 9 279 Abhas Kumar Pandey 3076/2000 18/8/2k 13/1/03 92, Malti Kunj, Jyoti Path, S.P. Colony 9661879595 Road, Diebdih, Doranda, Ranchi-834002 10 262 Abhay Kumar 1271/1999 9/4/1999 10/6/2002 Page 1 of 258 SL. No. Page No. Name of Advocates Enrolment No. Date of Enrol. Asso. Member Address Phone &Mobile no. 11 19 Abhay Kumar Chaturvedy 1411/1983 16/12/1983 7/1/1985 Sukhdeo Nagar, Ratu Road, Ranchi. 0651-2282923 12 184 Abhay Kumar Mishra 2322/2000 15/5/2000 6/7/2k House No.14, Road No.-1, Birsa Nagar, 9431101731 Hatia Station Road, Hatia, Ranchi. 13 678 Abhay Kumar Tiwari 5580/1995 12/12/1995 11/5/2006 14 713 Abhay Prakash 151/2007 28/02/2007 9/4/2007 33k, Madhukum Lane, Ratu Road, Ranchi- 9431579611 5 15 5 Abhay Shankar Dayal 455/475/1976 13/7/76 13/1/1977 Dayal Niwas, Tharpakhna, Ranchi.
    [Show full text]
  • Jharkhand(72
    Details in subsequent pages are as on 01/04/12 For information only. In case of any discrepancy, the official records prevail. DETAILS OF THE DEALERSHIP OF HPCL Zone: EAST SR. No. Regional Office State Name of dealership Dealership address (incl. location, Dist, State, PIN) Name(s) of Proprietor/Partne outlet Telephone No. 1 RANCHI Jharkhand ABHISHEK AUTOMOBILE HP PETROL PUMP,PO+PS-SILLI,DIST-RANCHI,JH-835101 Smt. Gita Mahto 06522-244111 2 RANCHI Jharkhand AMAN AUTOMOBILES HP PETROL PUMP, GODARMANA KHURD, PO/PS-RAHELA, DIST-PALAMU PREM SHANKAR DUBEY 06584-262702 3 RANCHI Jharkhand AMIT FUEL CENTRE HP PETROL PUMP, KARRA, PS-KARRA, DIST-KHUNTI, Jharkhand MS SIMA DEVI 9430355763 4 RANCHI Jharkhand ANAND TRADERS HP PETROL PUMP, VILL:CHIROUNGIA, PO:NAWADA, GARWAH-822114 Shri Anand Kumar 7677720001 5 RANCHI Jharkhand ASHA S/S HP PETROL PUMP,MESRA,PO-NEORI,RANCHI-835217 Smt Rukma Bathwal,Smt Sarita Bathw 9430765141 6 RANCHI Jharkhand AUTO ENTERPRISES HP PETROL PUMP,LALPUR CHOWK,RANCHI.PIN-834001. Shri Bhagwanji Rathod, 0651 2203332, 256 7 RANCHI Jharkhand BACHRA SS HP PETROL PUMP,PS-PIPARWAR,BACHRA,DIST-CHATRA,JHARKHAND. Smt Anita Singh 06531-261046 8 RANCHI Jharkhand BALAJI FUELS HP PETROL PUMP, BAHUBAZAR, PO & PS:CHUTIA, RANCHI-834001. Deepak Kumar Modi & Saurabh Modi 0651-2284893/ 98 9 RANCHI Jharkhand BALDEO SAHU SHIV PD. SAHU HP PETROL PUMP,LOHARDAGGA,RANCHI-835302 Sanjay Kr Sahu,Uday Shankar Prasad,D06526 222965 10 RANCHI Jharkhand BHOLA CHANDRAVANSHI PETROL PUMP HP PETROL PUMP, VILL-PINDRA, PS-MERAL,GARHWA, JHARKHAND PUSHPA KUMARI 9162895086 11 RANCHI Jharkhand BIJUPARA S S HP PETROL PUMP,BIJUPARA,RANCHI-835214 Dinesh Kumar Singh 06531 2275085 12 RANCHI Jharkhand BIRSA SERVICE CENTRE HP PETROL PUMP,NAGRI,RANCHI.PIN-835303.
    [Show full text]
  • List of Our Branches
    LIST OF OUR BRANCHES SR REGION BRANCH CODE BRANCH NAME DISTRICT ADDRESS PIN CODE E-MAIL CONTACT NO 1 Ranchi 419 DORMA KHUNTI VILL+PO-DORMA,VIA-KHUNTI,DISTT-KHUNTI-835 227 835227 [email protected] 0 2 Ranchi 420 JAMHAR KHUNTI VILL-JAMHAR,PO-GOBINDPUR RD,VIA-KARRA DISTT-KHUNTI. 835209 [email protected] 0 3 Ranchi 421 KHUNTI (R) KHUNTI MAIN ROAD,KHUNTI,DISTT-KHUNTI-835 210 835210 [email protected] 0 4 Ranchi 422 MARANGHADA KHUNTI VILL+PO-MARANGHADA,VIA-KHUNTI,DISTT-KHUNTI 835210 [email protected] 0 5 Ranchi 423 MURHU KHUNTI VILL+PO-MURHU,VIA-KHUNTI, DISTT-KHUNTI 835216 [email protected] 0 6 Ranchi 424 SAIKO KHUNTI VILL+PO-SAIKO,VIA-KHUNTI,DISTT-KHUNTI 835210 [email protected] 0 7 Ranchi 425 SINDRI KHUNTI VILL-SINDRI,PO-KOCHASINDRI,VIA-TAMAR,DISTT-KHUNTI 835225 [email protected] 0 8 Ranchi 426 TAPKARA KHUNTI VILL+PO-TAPKARA,VIA-KHUNTI, DISTT-KHUNTI 835227 [email protected] 0 9 Ranchi 427 TORPA KHUNTI VILL+PO-TORPA,VIA-KHUNTI, DISTT-KHUNTI-835 227 835227 [email protected] 0 10 Ranchi 444 BALALONG RANCHI VILL+PO-DAHUTOLI PO-BALALONG,VIA-DHURWA RANCHI 834004 [email protected] 0 11 Ranchi 445 BARIATU RANCHI HOUSING COLONY, BARIATU, RANCHI P.O. - R.M.C.H., 834009 [email protected] 0 12 Ranchi 446 BERO RANCHI VILL+PO-BERO, RANCHI-825 202 825202 [email protected] 0 13 Ranchi 447 BIRSA CHOWK RANCHI HAWAI NAGAR, ROAD NO. - 1, KHUNTI ROAD, BIRSA CHOWK, RANCHI - 3 834003 [email protected] 0 14 Ranchi 448 BOREYA RANCHI BOREYA, KANKE, RANCHI 834006 [email protected] 0 15 Ranchi 449 BRAMBEY RANCHI VILL+PO-BRAMBEY(MANDER),RANCHI-835205 835205 [email protected] 0 16 Ranchi 450 BUNDU
    [Show full text]
  • Jharkhand Annex.H2.Xlsx
    Notice for appointment of Regular / Rural Retail Outlet Dealerships Bharat Petroleum Corporation Limited proposes to appoint Retail Outlet dealers in Jharkhand, as per following details: Sl. No Name of location Revenue District Type of RO Estimated Category Type of Site* Minimum Dimension (in M.)/Area of the site (in Finance to be arranged by the Mode of Fixed Fee / Security Deposit monthly Sales Sq. M.). * applicant Selection Minimum Bid (Rs. Lakhs) Potential # (Rs. Lakhs) amount. (Rs. Lakhs) 1 2 3 4 5 6 7 8 9a 9b 10 11 12 Regular / Rural MS+HSD in Kls SC CC / DC / CFS Frontage Depth Area Estimated Estimated fund Draw of Lots / working capital required for Bidding SC CC-1 requirement for development of SC CC-2 operation of RO infrastructure at RO SC PH ST ST CC-1 ST CC-2 ST PH OBC OBC CC-1 OBC CC-2 OBC PH OPEN OPEN CC-1 OPEN CC-2 OPEN PH Between Kargali gate to Chalkari Draw of 1 Basti BOKARO RURAL 113 ST CFS 30 25 750 0 0 Lots 0 2 Between Phusro to Dumri on Dumri- Draw of 2 Bermo Jaina Marg BOKARO RURAL 149 SC CFS 30 25 750 0 0 Lots 0 2 Between Gomoh Railway Crossing to Khario Railway Crossing on Draw of 3 Topchanchi- Nawagarh Road DHANBAD RURAL 148 ST CFS 30 25 750 0 0 Lots 0 2 Draw of 4 Mouza-TANDWA Not ON SH CHATRA RURAL 178 ST CFS 30 25 750 0 0 Lots 0 2 Within 2 km of Kanvatia Chowk on Kothiya more to Dumma Chowk Draw of 5 road DEOGHAR RURAL 90 ST CFS 30 25 750 0 0 Lots 0 2 Between Govt.
    [Show full text]