New Jharkhand a Progressive Journey Since 2014 Khunti Parliamentary Constitutuency PREFACE
Total Page:16
File Type:pdf, Size:1020Kb
Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhand A progressive journey since 2014 Khunti Parliamentary Constitutuency PREFACE Indian Railways is the lifeline of the Nation and a catalyst for India’s progress and economic development. South Eastern Railway (SER) plays a significant role in the socio-economic development of the state of Jharkhand. 36% of SER’s jurisdiction covers Jharkhand. With a view to improve railway infrastructure and extend the railway network in Jharkhand, the Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and co-operation to this railway towards development of Jharkhand and improvement of train services. Railways have achieved many visible milestones in Jharkhand in the last 5 years in different fields viz. construction of new lines, doubling, introduction of new trains, extension of service, increase in frequency of trains etc. On the freight side, loading of South Eastern Railway has reached the mile stone of 154.87 Million Tonnes, where the lead role has been taken by the state. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with top most priority. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand have been highlighted in this Pamphlet. It may be noted that the budgets allocated to various projects are not apportioned constituency- wise but reflect the cost of the project. *Jharkhand Railway Network Map Not To Scale INPUTS BY RAILWAY IN KHUNTI CONSTITUENCY KHUNTI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Khunti, Kolebera, u Improvement of passenger amenities at Pokla Kharswan, Tamar, Torpa & Simdega station by providing piped water supply, improving approach & circulating area at a B. WORKS COMPLETED IN LAST FIVE YEARS: cost of Rs.1.00 crores B.1 Infrastructural Developments: u Water supply arrangement at Lodhma and u Diversion of road from level crossing No.152 Karra stations at KM 26807-09 between Gamharia-Sini to u 600 numbers of replacement of conventional newly constructed Road Under Bridge by lights by LED lights Jharkhand Development Corporation Limited u Bano : Improvement of platform surface at at a cost of Rs.1.38 crores platform No.1 and ancillary works at Bano u 17 numbers of Road Under Bridge in lieu of u 01 bay RDSO type platform shelter at each level crossings at a cost of Rs.26.97 crores of Bakaspur, Govindpur Road, Kanaroan, u 9 numbers of Limited Height Subway have Karra, Lodhma, Orga, Tati, Mahabuang and been constructed at a cost of Rs.12.79 crores Parbatonia - 9 stations at a cost of Rs.1.42 u Pendrasali-Rajkharswan: Jacketing of crores u abutment, piers intrados of arch bridge No.6A Platform surfacing at Rajkharswan station u at a cost of Rs.4.25 crores Provision of platform shelter at Karra, u Sini-Chandil : Metalising of girder bridges Sini- Lodhma, Bano, Kanaaroan, Govindpur Road, Orga, Khunti, Parbotania, Tati and Chandil Section Br. No.335 UP DN 7x100 US Mahabhuang stations u Parbatonia - Nuagaon - CTRP - 2.219 km at a u Platform surfacing, improvement to cost of Rs. 4.2 crores circulating area at Sini station u Kanarona - Tati - CTRP - 1.61 km at a cost of Rs. 2.53 crores C. ON-GOING WORKS: u Tati - Orga TRRP- 4.55. Km at a cost of Rs. 6.89 u Bondamunda-Ranchi (158.5 Km) New Line at crores a cost of Rs.3177.60 crores u u Hatia - Orga SL - TFR - 32.25 km at a cost of Rs. Bondamunda-Hatia replacement of level 2.65 crores frames with centralised operation of points u Ranchi Division TBR-121km at a cost of Rs. and signals at 13 stations at a cost of Rs.105.5 8.25 crores crores u u Complete renewal of 10 nos. of 60 kg and 10 3 numbers of Ranchi Division - Limited Restricted Normal Height Subways in lieu nos. of 52 kg ordinary SEJ including fittings of manned level crossings at a cost of Rs.8.1 and bearing plates under jurisdiction of crores ADEN/South/THE u Replacement of power supply arrangement u Ranchi Division different section - TBR 33.65 for Optic Fibre Cable Equipment km at a cost of Rs. 3.45 crores u Ranchi Division : Replacement or u Govindpur road – Tati SL - CTRP - 17.201 km at rehabilitation of electrical power supply a cost of Rs. 32.54 crores system 4 transformers and associated works u Hatia – Orga SL - TRRP - 8.25 km at a cost of at a cost of Rs.2.75 crores Rs. 4.85 crores u Ranchi Division : Replacement of lever frames B.2 Passenger Amenities with centralised operation of points and u 3 numbers of water booth at various signals at 2 stations at a cost of Rs.13.79 platforms of Sini and Rajkharswan stations crores u u Platform raising at Barabamboo and Ranchi Division : Complete track circulating Rajkharswan at a cost of Rs.1.01 crores loop lines 30 stations E special and E route at u Extension of Dn and Up platform at Sini a cost of Rs.8.4 crores u u Improvement of circulating area in front of Ranchi - Link B - CTRP - 21.35 Km TRRP - 4 km station with canopy at Bano at a cost of Rs. 21.47 crores u Muri-Ranchi-Orga -TBR - 34.35 km at a cost of u Ranchi - Link -B CTRP of existing 52KG rail laid Rs. 4.87 crores on PSC-5 Sleeper with new 60KG 90UTS rail on u Hatia - Orga SL Muri-Ranchi UP - TRRP -13.169 PSC-6 sleeper for 1.147 Tr.Km at a cost of Rs. km at a cost of Rs. 7.32 crores 2.22 crores u Ranchi Division TBR-121km at a cost of Rs. u Ranchi - Link -B CTRP of existing 52KG rail laid 8.24 crores on PSC-5 Sleeper with new 60KG 90UTS rail on u Govindpur road - TatiSL - CTRP - 17.201 km at PSC-6 sleeper for 1.265 Tr.Km at a cost of Rs. a cost of Rs. 32.55 crores 2.45 crores u Hatia - OrgaSL - TRRP - 8.25 km at a cost of Rs. u Ranchi - Link -B CTRP of existing 52KG rail laid 4.85 crores on PSC-5 Sleeper with new 60KG 90UTS rail u Ranchi Division different section - TBR 33.65 on PSC-6 sleeper for 1.25 Tr.Km at a cost of Rs. km at a cost of Rs. 3.45 crores 2.42 crores u Ranchi-Link-B - Easement of cutting at u Setting up of Quick watering arrangement at different locations in Hatia – Orga at a cost of Muri Station at a cost of Rs. 2.44 crores Rs. 27.46 crores u Ranchi Station Setting up of Quick watering u Hatia - Orga SL - CTRP - 4.66 km at a cost of arrangement at Ranchi Station at a cost of Rs. Rs. 8.93 crores 2.5 crores u Hatia - OrgaSL - TRR P - 12.10 at a cost of Rs. u Limited restricted normal height subways 14.49 crires in lieu of manned level crossings in Ranchi Division at a cost of Rs. 8.1 crores SOME IMPORTANT PHOTOS.