SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh

Total Page:16

File Type:pdf, Size:1020Kb

SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2018 25 Jun 2021 COMPANY Tel No: Fax: 8767838, No 30 Simpang 766 No 30 Simpang 766 8281194 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0347/2018 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 2 Jun 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 6 ABDUR RAZAQ ISMAIL ENTERPRISE KPN-6128 I KA01, B01 [email protected] 14 Jun 2018 13 Jun 2021 Tel No: Fax: 8191959, No 2 Jalan 127 No 2 Jalan 127 8819059 Rancangan Perumahan Negara Rancangan Perumahan Negara Kampong Rimba BE 3119 Kampong Rimba BE 3119 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0312/2018 7 ABU FAMILY'S ENTERPRISE KPN-5759 I KA01, B01, M03, abufamilysenterprises@gmail. 09 Jul 2018 8 Jul 2021 KPB02, KPB04, KPB12, com S01, S02, S03 Tel No: Fax: 8775838 P. O. Box 699 No 9 Simpang 64 Jalan Mumong Kuala Belait KA 1189 Kuala Belait Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/357/2018 8 AD'DAM'S ENTERPRISE KPN-5843 I KA01, B01, KPB04 nhzawiyah.yahaya@gmail. 15 Feb 2021 14 Feb 2024 com Tel No: Fax: 8631789, Lot 5344 Simpang 109 Lot 5344 Simpang 109 3236104 Kampong Sungai Tali Lumut Kampong Sungai Tali Lumut Kuala Belait KC 3135 Kuala Belait KC 3135 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0052/2021 9 AFWANIS CONTRACTOR KPN-5312 I KA01, B01, S02 hjsulaimanhjhidup@outlook. 20 Dec 2019 19 Dec 2021 com Tel No: Fax: 8814441 No 75 Jalan 64 No 75 Jalan 64 Perumahan Negara Lambak Kanan Perumahan Negara Lambak Kanan BC 3115 Negara Brunei Darussalam BC 3115 Negara Brunei Darussalam No Siri sijil SK/0056/2019 10 AFZANI CONTRACTOR KPN-6486 I KPB12, S01, S02 afzani.business. 20 Jan 2021 4 Mar 2023 [email protected] Tel No: Fax: 7378802 Lot 8440 Simpang 231-12 Lot 8440 Simpang 231-12 Jalan Sungai Pandan Jalan Sungai Pandan Kuala Belait K A 2931 Kuala Belait K A 2931 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0013/2021 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..2 2 Jun 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 11 AL KHAIR CONTRACTOR KPN-5992 I B01 alkhaircontractor.bn@gmail. 14 Dec 2019 13 Dec 2022 com Tel No: Fax: 8311858, No 6 C Wisma Temanggong No 6 C Wisma Temanggong 8669220 Bandar Seri Begawan B S 8411 Bandar Seri Begawan B S 8411 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0618/2019 12 ALIAZ CONTRACTOR KPN-5774 I KA01 [email protected] 23 Dec 2023 23 Dec 2023 Tel No: Fax: 2457666, Unit No 4 2nd Floor Block A Unit No 4 2nd Floor Block A 8620808 Sempurna Complex Batu Bersurat Sempurna Complex Batu Bersurat Kampong Pengkalan Gadong B E 3519 Kampong Pengkalan Gadong B E 3519 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2020 13 AMILLENNIUM HOLDINGS COMPANY SDN KPN-5925 I B01 Amillennium.holdings@gmail. 01 Apr 2019 31 Mar 2022 BHD com Tel No: Fax: 8398505, Unit 10 Block B 2nd Floor Unit 10 Block B 2nd Floor 2233383, Higher Point Qlap Simpang 88 Higher Point Qlap Simpang 88 8165152 Kampong Kiulap B E 1518 Kampong Kiulap B E 1518 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0149/2019 14 AMIRIZA ENTERPRISE KPN-6718 I KA01, B01 [email protected] 05 Dec 2020 4 Dec 2023 Tel No: Fax: 8922221 No 4 Simpang 11 No 4 Simpang 11 Jalan Nenas Paun Jalan Nenas Paun Kampong Katok B B E 1918 Kampong Katok B B E 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0316/2020 15 AMUNIRNISA CONTRACTOR KPN-6282 I KPB12, S01 amunirnisa.contractor@gmail. 18 Mar 2019 17 Mar 2022 com Tel No: Fax: 8656294, 2672242 Lot 36220 Simpang 46 Lot 36220 Simpang 46 2672242 Kampong Tanjong Nangka Kampong Tanjong Nangka Jalan Kecil Tanjong Nangka B G 2321 Jalan Kecil Tanjong Nangka B G 2321 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0176/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..3 2 Jun 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 16 ANUGRAH'HI CONTRACTOR KPN-6591 I KA01, B01 anugrahhicontractor@gmail. 27 Jul 2020 26 Jul 2023 com Tel No: Fax: 8176688, Lot No 34946 Lot No 34946 8199990 Jalan Ban 3 Kilanas Bf 2520 Jalan Ban 3 Kilanas Bf 2520 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0197/2020 17 ARJEY CONTRACTOR KPN-4721 I KA01, B01, S02 [email protected] 05 Oct 2020 4 Oct 2023 Tel No: Fax: 8752939 No 17 Simpang 49 No 17 Simpang 49 Jalan Haji Halus Kampong Bunut Jalan Haji Halus Kampong Bunut Jalan Tutong B F 1320 Jalan Tutong B F 1320 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0261/2020 18 ASAZ CONTRACTOR KPN-4907 I KA01, B01, M03, S03 [email protected] 11 Jan 2020 10 Jan 2023 Tel No: Fax: 8866056 No 3 Jalan 3 Simpang 159 No 25 Simpang 360 Rancangan Perumahan Negara Kampong Lambak Jalan Pasir Berakas Lambak Kanan Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0030/2020 19 ASPZ CONSTRUCTION & ENGINEERING KPN-3958 I KA01, B01, S03 AsPzConstruction@hotmail. 22 May 2019 21 May 2022 com Tel No: Fax: 7292292 P. O. Box 985 No 10 Simpang 320 Pusat Memproses Mel Berakas BB 3577 Kampong Lambak Jalan Pasir Negara Brunei Darussalam Berakas BB 1714 Negara Brunei Darussalam No Siri sijil SK/0254/2019 20 ASREENDA CONTRACTOR KPN-5417 I KA01, KPB04, KPB10, [email protected] 28 Sep 2019 27 Sep 2022 S03 Tel No: Fax: 8299394 P. O. Box 361 No 1072 Pejabat Pos Sengkurong BE 1121 Kampong Rambai Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0479/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..4 2 Jun 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 21 ATAULLAH ENTERPRISE KPN-2581 I KA01, B01, S03 [email protected] 09 Jul 2019 8 Jul 2022 Tel No: Fax: 8647390, No 28 Simpang 415-73 No 28 Simpang 415-73 2791467 Jalan Wasai Limuru Jalan Wasai Limuru Rancangan Perumahan Negara Rancangan Perumahan Negara Kampong Tanah Jambu Jalan Muara BU Kampong Tanah Jambu Jalan Muara BU 1129 1129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0317/2019 22 ATRAR CONTRACTOR KPN-3934 I KA01, B01, KPB12, prabakaran300566@gmail. 24 Jun 2019 23 Jun 2022 S01, S02, S03 com Tel No: Fax: 8728032, No 16 Jalan 50 No 16 Jalan 50 7180851 Perumahan Negara Kg Rimba Perumahan Negara Kg Rimba Gadong B E 3319 Gadong B E 3319 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0345/2019 23 AZ ' BADZLIN ENTERPRISE KPN-6571 I KA01, B01 [email protected] 13 Jun 2020 12 Jun 2023 Tel No: Fax: 8783387 No 29 Jalan Bukit Bintagur No 29 Jalan Bukit Bintagur Simpang 85 Rancangan Perumahan Simpang 85 Rancangan Perumahan Negara Negara Kampong Mengkubau B U 1729 Kampong Mengkubau B U 1729 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0156/2020 24 AZ ZUKHRUF REEN CONTRACTOR KPN-5936 I KA01, B01, M03, [email protected] 17 Mar 2020 16 Mar 2023 KPB04, S02, S03 Tel No: Fax: 8919708 No 508 ' A ' Kampong Pelambaian No 508 ' A ' Kampong Pelambaian Jalan Kota Batu B D 2317 Jalan Kota Batu B D 2317 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0089/2020 25 AZAM MURNI CONTRACTOR KPN-6465 I B01 [email protected] 01 Feb 2020 31 Jan 2023 Tel No: Fax: 7309619 No 73 Simpang 1185-73-109 No 73 Simpang 1185-73-109 Rpn Bukit Beruang T C 3345 Rpn Bukit Beruang T C 3345 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0039/2020 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..5 2 Jun 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 26 B.SYUKREN CONTRACTORS KPN-5012 I KA01, B01, S01, S02, b.syukren- 23 Mar 2019 22 Mar 2022 S03 [email protected] Tel No: Fax: 8601909 No 182 Simpang 180 No 182 Simpang 180 Jalan Kecil Sungai Bakong Lumut Seria Jalan Kecil Sungai Bakong Lumut Seria Kuala Belait K C 2935 Kuala Belait K C 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0166/2019 27 BANGUNJAYA CONTRACTOR KPN-4745 I KA01, B01 [email protected] 17 Apr 2019 16 Apr 2022 Tel No: Fax: 2654550, 2654551 No 6 Simpang 73 Jalan Ban 3 A No 6 Simpang 73 Jalan Ban 3 A 7322990 Kampong Pasai Sengkurong B G 1221 Kampong Pasai Sengkurong B G 1221 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0211/2019 28 BELAKO ELECTRICAL AND TRADING KPN-2408 I KA01, B01, S03 [email protected] 16 Oct 2019 15 Oct 2022 COMPANY Tel No: Fax: 8731897 2670867 P.
Recommended publications
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for February, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.00 am to 4.00 pm Monday Substation Ikas Bandung, Kupang, Extension of 11kV network to New Industrial 1 (For info: Department of Electrical Service will supply Kampong Ikas Bandung and surrounding areas. 12th February 2018 temporary electricity to the affected areas through mobile Tutong. areas Kg Lugu. generator service at the substation) Thursday 08.30 am to 04.00 pm Kampong Pengkalan Pinang, Jln Spg 193 dan Spg 205 Kampong Pengkalan Pinang 2 Replacement of Distribution Feeder pillar. 15th February 2018 Penanjong. Tutong and surrounding areas. Thursday Wayleave clearing works for Low voltage Spg 1304, Spg 1274 Kampong Sungai Kelugos and surrounding 3 08.30 am to 09.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1048, Spg 1030 Kampong Sungai Kelugos and surrounding 4 09.30 am to 11.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1179, Spg 1148, Spg 1080 Kampong Sungai Kelugos and 5 01.30 pm to 04.30 pm Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines surrounding areas. Monday 08.30 am to 04.00 pm Substation Sungai Damuan, Kupang, 6 Replacement of Distribution Feeder pillar. Part of Kampong Kupang, Tutong 19th February 2018 Tutong Monday 08.30 am to 11.30 am Wayleave clearing works for Low voltage Spg 935, Spg 873, Spg 861 Kampong Sungai Kelugos and 7 Kampong Sungai Kelugos, Tutong 19th February 2018 overhead lines surrounding areas.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • MEMO 029 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday 8.30 am to 11.30 am Kampong Rambai, 1 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 2 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 3 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 4 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 5 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 6 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas. Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 1 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 19th Nov 2018 Wednesday 2 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 21st Nov 2018 Thursday 3 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Lorong 105 Penanjong Kem 22nd Nov 2018 Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 4 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Rambai Tutong. Saturday 8.00 am to 12.00 noon Spg 509 Jln Kecil Nong Janang, Kampong Bukit 5 Wayleave Clearing Whole Spg 509 Jln Kecil Nong Janang and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Udal, Mukim Tanjong Maya, Tutong. Monday 8.00 am to 12.00 noon Jln Kecil Bukit Kukob, Kampong Bukit Udal, 6 Wayleave Clearing A whole area Jln Kecil Bukit Kukob and surrounding areas. 26th Nov 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong. Monday 8.00 am to 12.00 noon Jln Kampong Sebakit Atas Bangunggus, Mukim A whole of Kampong Sebakit Atas Bangunggus, Spg 49 Kampong 7 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Tanjong Maya Tutong Sebakit Atas and surrounding area.
    [Show full text]
  • SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017
    SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017 DAERAH RESTORAN / KEDAI MAKAN Belait 1 ADIANN RESTORAN & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/12/2017 Gerai No. 05, Jalan Bunga Simpur, Kuala Belait, Negara Brunei Darussalam. 2 ALBAASITHU RASA RESTAURANT & CATERING Tarikh Mansuh Catatan SERVICES 13/2/2018 Cawangan : - Lot 7563, Unit 12B, Block B, Jalan Pandan Enam, Kuala Belait, Negara Brunei Darussalam. 3 ALL SEASONS RESTAURANT Tarikh Mansuh Catatan Cawangan : - 18/12/2018 Unit No. F5 & F6, Sentral Shopping Centre, Jalan Seri Maharaja, Kampung Mumong 'A' KA1531, Negara Brunei Darussalam 4 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 4, Belait 17/12/2017 Unit No. 14, Bangunan Haji Hassan bin Haji Abd Ghani & Anak-Anak, Pandan 4, Kuala Belait, Negara Brunei Darussalam. 5 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 7, Belait 17/12/2017 (P/P) A4. Lot. 7268, Jalan Pandan 7, Kuala Belait, Negara Brunei Darussalam. 6 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Mukim Liang, Belait 17/12/2017 Lot. 2061, B-3, Ground Floor, Kampong Gana, Mukim Liang, Daerah Belait, Negara Brunei Darussalam. 7 AMEY & MIMI'S RESTAURANT & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/9/2017 Lot 4005,Jalan Setia Negara, Negara Brunei Darussalam 8 AMIRA SDN BHD Tarikh Mansuh Catatan Cawangan : - 19/8/2018 Lot 4838, No 188 D, No 4, Kampong Sungai Bakong, Lumut, Negara Brunei Darussalam Hak Cipta Terpelihara Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam Page 1 of 175 DAERAH RESTORAN / KEDAI MAKAN 9 ANISA RESTAURANT& CATERING Tarikh Mansuh Catatan Cawangan : - 9/4/2017 Lot 4486 , No.2 Simpang 131, Jalan Pantai, Sungai Liang, Kuala Belait, Negara Brunei Darussalam 10 ANJUNG WARISAN RESTAURANT & CAFÉ Tarikh Mansuh Catatan Cawangan : - 14/11/2017 Lot 7065, Block B, Unit No.
    [Show full text]
  • SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
    SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY I B01 [email protected] 05 Apr 2018 4 Apr 2021 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0158/2018 2 A.G.DEKEN CONSTRUCTION I KA01, B01, E01 [email protected] 05 Mar 2018 4 Mar 2021 Tel No: Fax: 8366444, No 58 Simpang 791-103-4 No 6 Simpang 717 2650309 Skim Tanah Kurnia Rakyat Jati Kampong Tasek Meradun Km 8 1/2 Sungai Buloh Jalan Tutong BF 1520 Jalan Muara BU 1229 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0243/2018 3 A.J. CONSTRUCTION AND TRADING COMPANY I KA01, B01 [email protected] 26 Jun 2018 25 Jun 2021 Tel No: Fax: 8767838, No 30 Simpang 766 No 30 Simpang 766 8281194 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0347/2018 4 A.LEEZIQ CONTRACTOR I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 10 Oct 2020 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh
    [Show full text]
  • 3/31/2014 Pelitabrunei PB 31 Mac 2014 Pelita1
    PETIKAN TITAH MANISNYA IMAN “PARA ilmuwan dan pelajar mestilah jadi mentor “DARI Sulaiman katanya: (pembimbing), guru dan pakar Rasulullah Sallallahu Alaihi pemikir. Mereka adalah sumber Wasallam bersabda: Tiada budaya intelektual. Mereka patut yang boleh menolak qadak disokong dan didukung untuk melahirkan budaya Allah kecuali doa dan yang sihat ini.” tiada yang boleh menambah - Titah Sempena Majlis Sambutan umur kecuali dengan Hari Raya Aidilfitri Tahun 1428 berbuat amal kebajikan.” Hijriah / 2007 Masihi anjuran - (Sabda Rasulullah Yayasan Sultan Haji Hassanal Sallallahu Alaihi Wasallam Bolkiah di Pusat Persidangan yang diriwayatkan oleh Antarabangsa pada Imam Ad-Tarmizi). 11 Syawal 1428H / 23 Oktober 2007M. TAHUN 59 / BILANGAN 43 31 MAC 2014 / 1435 29 JABATAN PENERANGAN EDISI ISNIN / PERCUMA Larian Hari Kebangsaan 2014 Earth Hour dapat sambutan memberangsangkan pupuk kesedaran penjimatan tenaga Oleh : Abdullah Asgar BANDAR SERI BEGAWAN, Sabtu, 29 Mac. - Projek Hari Bumi (Earth Hour) merupakan kempen sejagat bagi memupuk kesedaran iklim, di mana ianya diraikan dengan penutupan lampu selama satu jam bermula pada 8.30 malam. Sehubungan itu, Negara Brunei Darussalam juga tidak ketinggalan untuk meraikan kempen tersebut yang diadakan di Kompleks Yayasan Sultan Haji Hassanal Bolkiah (YSHHB), di sini. Acara bertemakan 'Gunakanlah Tenaga untuk Menyelamatkan Bumi (Use Your YANG Teramat Mulia Paduka Seri Duli Pengiran Muda ‘Abdul Wakeel ibni Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan Haji Hassanal Bolkiah Mu’izzaddin Waddaulah dan
    [Show full text]
  • Sijil Kontraktor Dec 2017
    SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1. A-MAS CONTRACTOR I KA01, B01 8749773 07 Apr 2016 06 Apr 2018 P. O. Box 564 No 48 Kampong Sepakon Email : Pusat Memproses Mel Berakas B B 3577 Tanjong Maya Tutong T D 1141 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2. A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 3. A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2016 18 Aug 2018 No 6 Simpang 64 No 6 Simpang 64 Email : Simpang 64/6 Jalan 60 Simpang 64/6 Jalan 60 Kampong Perpindahan Rimba Gadong B E Kampong Perpindahan Rimba Gadong B E 3319 3319 Negara Brunei Darussalam Negara Brunei Darussalam 4. A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 02 Jul 2019 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Email : Kiudang Tutong Kiudang Tutong julaihi.othman @outlook.com Negara Brunei Darussalam Negara Brunei Darussalam 5. ABA BIN OPAK DAN ANAK ANAK CONTRACTOR I KA01, B01, S03 8650010 16 Mar 2016 15 Mar 2018 Lot 4617 No 315 Lot 4617 No 315 Email : Kampong Sungai Taring Lumut Seria Kampong Sungai Taring Lumut Seria Kuala Belait K C 3135 Kuala Belait K C 3135 Negara Brunei Darussalam Negara Brunei Darussalam 6.
    [Show full text]
  • Senarai Syarikat-Syarikat Pembina Yang Berdaftar Di Kementerian Pembangunan Sehingga Januari 2019
    SENARAI SYARIKAT-SYARIKAT PEMBINA YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN SEHINGGA JANUARI 2019 Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1 3A & COMPANY I B01 8242518 05 Apr 2018 04 Apr 2021 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Email : Gadong BE 1918 Gadong BE 1918 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2 A.G.DEKEN CONSTRUCTION I KA01, B01, E01 8366444, 05 Mar 2018 04 Mar 2021 2650309 No 58 Simpang 791-103-4 No 6 Simpang 717 Skim Tanah Kurnia Rakyat Jati Kampong Tasek Meradun Km 8 1/2 Email : Sungai Buloh Jalan Tutong BF 1520 [email protected] Jalan Muara BU 1229 Negara Brunei Darussalam Negara Brunei Darussalam 3 A.J. CONSTRUCTION AND TRADING COMPANY I KA01, B01 8767838, 26 Jun 2018 25 Jun 2021 8281194 No 30 Simpang 766 No 30 Simpang 766 Kampong Sungai Lalit Kampong Sungai Lalit Email : Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 4 A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 5 A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2018 18 Aug 2021 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Email : Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam 6 A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Ogos Dan 15 September18rev1
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday Kampong Kupang, Mukim Keriam, Erection of 8.5m poles and stringing of existing 1 8.30 am to 11.30 am Jalan Ikas Bandung kg. Kupang and surrounding areas. 30th August 2018 Tutong. LV Aerial Bundle Cable Saturday Kampong Kupang, Mukim Keriam, Straightening of existing 8.5m poles and 2 8.30 am to 4.30 pm Spg 436 Kampong Kupang and surrounding areas 01st Sept 2018 Tutong. retentioning of LV Aerial Bundle Cable Monday Kampong Keriam, Mukim Keriam , Erection of 8.5m poles and stringing of existing 3 8.30 am to 11.30 am Spg 442 Kampong Keriam and surrounding areas. 03rd Sept 2018 Tutong LV Aerial Bundle Cable Saturday Kampong Birau, Mukim Kiudang, 4 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Birau and surrounding areas. 08th Sep 2018 Tutong. Saturday Kampong Pengkalan Pinang, Penanjong, Maintenance works for Low voltage overhead Spg 42-21 Jln Pangkalan Pinang, Kampong Penanjong and 5 8.30 am to 12.00 noon 08th Sept 2018 Mukim Pekan Tutong lines. surrounding areas. Saturday Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 6 2.00 pm to 4.30 pm Spg 550 Kampong Kupang and surrounding areas. 08th Sep 2018 Tutong. lines. Monday Kampong Lubuk Pulau, MukimTanjong 7 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Lubuk Pulau and surrounding areas.
    [Show full text]
  • Sijil Kontraktor Okt 2017
    SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1. A-MAS CONTRACTOR I KA01, B01 8749773 07 Apr 2016 6 Apr 2018 P. O. Box 564 No 48 Kg Sepakon Email : Pusat Memproses Mel Berakas B B 3577 Tanjong Maya Tutong T D 1141 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2. A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 3. A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2016 18 Aug 2018 No 6 Simpang 64 No 6 Simpang 64 Email : Simpang 64/6 Jalan 60 Simpang 64/6 Jalan 60 Kampong Perpindahan Rimba Gadong B E Kampong Perpindahan Rimba Gadong B E 3319 3319 Negara Brunei Darussalam Negara Brunei Darussalam 4. A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 2 Jul 2019 No. 676 Kampong Pengkalan Mau No. 676 Kampong Pengkalan Mau Email : Kiudang Tutong Kiudang Tutong julaihi.othman @outlook.com Negara Brunei Darussalam Negara Brunei Darussalam 5. ABA BIN OPAK DAN ANAK ANAK CONTRACTOR I KA01, B01, S03 8650010 16 Mar 2016 15 Mar 2018 Lot 4617 No 315 Lot 4617 No 315 Email : Kg Sungai Taring Lumut Seria Kg Sungai Taring Lumut Seria Kuala Belait K C 3135 Kuala Belait K C 3135 Negara Brunei Darussalam Negara Brunei Darussalam 6.
    [Show full text]