Draughtsman Class 2
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Press Release
English Section Listed below are the designated areas for the planned maintenance work as for February, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.00 am to 4.00 pm Monday Substation Ikas Bandung, Kupang, Extension of 11kV network to New Industrial 1 (For info: Department of Electrical Service will supply Kampong Ikas Bandung and surrounding areas. 12th February 2018 temporary electricity to the affected areas through mobile Tutong. areas Kg Lugu. generator service at the substation) Thursday 08.30 am to 04.00 pm Kampong Pengkalan Pinang, Jln Spg 193 dan Spg 205 Kampong Pengkalan Pinang 2 Replacement of Distribution Feeder pillar. 15th February 2018 Penanjong. Tutong and surrounding areas. Thursday Wayleave clearing works for Low voltage Spg 1304, Spg 1274 Kampong Sungai Kelugos and surrounding 3 08.30 am to 09.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1048, Spg 1030 Kampong Sungai Kelugos and surrounding 4 09.30 am to 11.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1179, Spg 1148, Spg 1080 Kampong Sungai Kelugos and 5 01.30 pm to 04.30 pm Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines surrounding areas. Monday 08.30 am to 04.00 pm Substation Sungai Damuan, Kupang, 6 Replacement of Distribution Feeder pillar. Part of Kampong Kupang, Tutong 19th February 2018 Tutong Monday 08.30 am to 11.30 am Wayleave clearing works for Low voltage Spg 935, Spg 873, Spg 861 Kampong Sungai Kelugos and 7 Kampong Sungai Kelugos, Tutong 19th February 2018 overhead lines surrounding areas. -
PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong. -
Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN -
MEMO 029 Copy of PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday 8.30 am to 11.30 am Kampong Rambai, 1 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 2 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 3 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 4 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 5 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 6 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas. Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. -
PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for November and December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 1 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 19th Nov 2018 Wednesday 2 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 21st Nov 2018 Thursday 3 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Lorong 105 Penanjong Kem 22nd Nov 2018 Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 4 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Rambai Tutong. Saturday 8.00 am to 12.00 noon Spg 509 Jln Kecil Nong Janang, Kampong Bukit 5 Wayleave Clearing Whole Spg 509 Jln Kecil Nong Janang and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Udal, Mukim Tanjong Maya, Tutong. Monday 8.00 am to 12.00 noon Jln Kecil Bukit Kukob, Kampong Bukit Udal, 6 Wayleave Clearing A whole area Jln Kecil Bukit Kukob and surrounding areas. 26th Nov 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong. Monday 8.00 am to 12.00 noon Jln Kampong Sebakit Atas Bangunggus, Mukim A whole of Kampong Sebakit Atas Bangunggus, Spg 49 Kampong 7 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Tanjong Maya Tutong Sebakit Atas and surrounding area. -
SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017
SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017 DAERAH RESTORAN / KEDAI MAKAN Belait 1 ADIANN RESTORAN & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/12/2017 Gerai No. 05, Jalan Bunga Simpur, Kuala Belait, Negara Brunei Darussalam. 2 ALBAASITHU RASA RESTAURANT & CATERING Tarikh Mansuh Catatan SERVICES 13/2/2018 Cawangan : - Lot 7563, Unit 12B, Block B, Jalan Pandan Enam, Kuala Belait, Negara Brunei Darussalam. 3 ALL SEASONS RESTAURANT Tarikh Mansuh Catatan Cawangan : - 18/12/2018 Unit No. F5 & F6, Sentral Shopping Centre, Jalan Seri Maharaja, Kampung Mumong 'A' KA1531, Negara Brunei Darussalam 4 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 4, Belait 17/12/2017 Unit No. 14, Bangunan Haji Hassan bin Haji Abd Ghani & Anak-Anak, Pandan 4, Kuala Belait, Negara Brunei Darussalam. 5 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 7, Belait 17/12/2017 (P/P) A4. Lot. 7268, Jalan Pandan 7, Kuala Belait, Negara Brunei Darussalam. 6 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Mukim Liang, Belait 17/12/2017 Lot. 2061, B-3, Ground Floor, Kampong Gana, Mukim Liang, Daerah Belait, Negara Brunei Darussalam. 7 AMEY & MIMI'S RESTAURANT & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/9/2017 Lot 4005,Jalan Setia Negara, Negara Brunei Darussalam 8 AMIRA SDN BHD Tarikh Mansuh Catatan Cawangan : - 19/8/2018 Lot 4838, No 188 D, No 4, Kampong Sungai Bakong, Lumut, Negara Brunei Darussalam Hak Cipta Terpelihara Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam Page 1 of 175 DAERAH RESTORAN / KEDAI MAKAN 9 ANISA RESTAURANT& CATERING Tarikh Mansuh Catatan Cawangan : - 9/4/2017 Lot 4486 , No.2 Simpang 131, Jalan Pantai, Sungai Liang, Kuala Belait, Negara Brunei Darussalam 10 ANJUNG WARISAN RESTAURANT & CAFÉ Tarikh Mansuh Catatan Cawangan : - 14/11/2017 Lot 7065, Block B, Unit No. -
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY I B01 [email protected] 05 Apr 2018 4 Apr 2021 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0158/2018 2 A.G.DEKEN CONSTRUCTION I KA01, B01, E01 [email protected] 05 Mar 2018 4 Mar 2021 Tel No: Fax: 8366444, No 58 Simpang 791-103-4 No 6 Simpang 717 2650309 Skim Tanah Kurnia Rakyat Jati Kampong Tasek Meradun Km 8 1/2 Sungai Buloh Jalan Tutong BF 1520 Jalan Muara BU 1229 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0243/2018 3 A.J. CONSTRUCTION AND TRADING COMPANY I KA01, B01 [email protected] 26 Jun 2018 25 Jun 2021 Tel No: Fax: 8767838, No 30 Simpang 766 No 30 Simpang 766 8281194 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0347/2018 4 A.LEEZIQ CONTRACTOR I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 10 Oct 2020 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh -
3/31/2014 Pelitabrunei PB 31 Mac 2014 Pelita1
PETIKAN TITAH MANISNYA IMAN “PARA ilmuwan dan pelajar mestilah jadi mentor “DARI Sulaiman katanya: (pembimbing), guru dan pakar Rasulullah Sallallahu Alaihi pemikir. Mereka adalah sumber Wasallam bersabda: Tiada budaya intelektual. Mereka patut yang boleh menolak qadak disokong dan didukung untuk melahirkan budaya Allah kecuali doa dan yang sihat ini.” tiada yang boleh menambah - Titah Sempena Majlis Sambutan umur kecuali dengan Hari Raya Aidilfitri Tahun 1428 berbuat amal kebajikan.” Hijriah / 2007 Masihi anjuran - (Sabda Rasulullah Yayasan Sultan Haji Hassanal Sallallahu Alaihi Wasallam Bolkiah di Pusat Persidangan yang diriwayatkan oleh Antarabangsa pada Imam Ad-Tarmizi). 11 Syawal 1428H / 23 Oktober 2007M. TAHUN 59 / BILANGAN 43 31 MAC 2014 / 1435 29 JABATAN PENERANGAN EDISI ISNIN / PERCUMA Larian Hari Kebangsaan 2014 Earth Hour dapat sambutan memberangsangkan pupuk kesedaran penjimatan tenaga Oleh : Abdullah Asgar BANDAR SERI BEGAWAN, Sabtu, 29 Mac. - Projek Hari Bumi (Earth Hour) merupakan kempen sejagat bagi memupuk kesedaran iklim, di mana ianya diraikan dengan penutupan lampu selama satu jam bermula pada 8.30 malam. Sehubungan itu, Negara Brunei Darussalam juga tidak ketinggalan untuk meraikan kempen tersebut yang diadakan di Kompleks Yayasan Sultan Haji Hassanal Bolkiah (YSHHB), di sini. Acara bertemakan 'Gunakanlah Tenaga untuk Menyelamatkan Bumi (Use Your YANG Teramat Mulia Paduka Seri Duli Pengiran Muda ‘Abdul Wakeel ibni Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan Haji Hassanal Bolkiah Mu’izzaddin Waddaulah dan -
Sijil Kontraktor Dec 2017
SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1. A-MAS CONTRACTOR I KA01, B01 8749773 07 Apr 2016 06 Apr 2018 P. O. Box 564 No 48 Kampong Sepakon Email : Pusat Memproses Mel Berakas B B 3577 Tanjong Maya Tutong T D 1141 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2. A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 3. A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2016 18 Aug 2018 No 6 Simpang 64 No 6 Simpang 64 Email : Simpang 64/6 Jalan 60 Simpang 64/6 Jalan 60 Kampong Perpindahan Rimba Gadong B E Kampong Perpindahan Rimba Gadong B E 3319 3319 Negara Brunei Darussalam Negara Brunei Darussalam 4. A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 02 Jul 2019 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Email : Kiudang Tutong Kiudang Tutong julaihi.othman @outlook.com Negara Brunei Darussalam Negara Brunei Darussalam 5. ABA BIN OPAK DAN ANAK ANAK CONTRACTOR I KA01, B01, S03 8650010 16 Mar 2016 15 Mar 2018 Lot 4617 No 315 Lot 4617 No 315 Email : Kampong Sungai Taring Lumut Seria Kampong Sungai Taring Lumut Seria Kuala Belait K C 3135 Kuala Belait K C 3135 Negara Brunei Darussalam Negara Brunei Darussalam 6. -
Senarai Syarikat-Syarikat Pembina Yang Berdaftar Di Kementerian Pembangunan Sehingga Januari 2019
SENARAI SYARIKAT-SYARIKAT PEMBINA YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN SEHINGGA JANUARI 2019 Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1 3A & COMPANY I B01 8242518 05 Apr 2018 04 Apr 2021 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Email : Gadong BE 1918 Gadong BE 1918 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2 A.G.DEKEN CONSTRUCTION I KA01, B01, E01 8366444, 05 Mar 2018 04 Mar 2021 2650309 No 58 Simpang 791-103-4 No 6 Simpang 717 Skim Tanah Kurnia Rakyat Jati Kampong Tasek Meradun Km 8 1/2 Email : Sungai Buloh Jalan Tutong BF 1520 [email protected] Jalan Muara BU 1229 Negara Brunei Darussalam Negara Brunei Darussalam 3 A.J. CONSTRUCTION AND TRADING COMPANY I KA01, B01 8767838, 26 Jun 2018 25 Jun 2021 8281194 No 30 Simpang 766 No 30 Simpang 766 Kampong Sungai Lalit Kampong Sungai Lalit Email : Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 4 A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 5 A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2018 18 Aug 2021 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Email : Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam 6 A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 -
Copy of Copy of PMW Tutong District (Press Release) Ogos Dan 15 September18rev1
English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday Kampong Kupang, Mukim Keriam, Erection of 8.5m poles and stringing of existing 1 8.30 am to 11.30 am Jalan Ikas Bandung kg. Kupang and surrounding areas. 30th August 2018 Tutong. LV Aerial Bundle Cable Saturday Kampong Kupang, Mukim Keriam, Straightening of existing 8.5m poles and 2 8.30 am to 4.30 pm Spg 436 Kampong Kupang and surrounding areas 01st Sept 2018 Tutong. retentioning of LV Aerial Bundle Cable Monday Kampong Keriam, Mukim Keriam , Erection of 8.5m poles and stringing of existing 3 8.30 am to 11.30 am Spg 442 Kampong Keriam and surrounding areas. 03rd Sept 2018 Tutong LV Aerial Bundle Cable Saturday Kampong Birau, Mukim Kiudang, 4 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Birau and surrounding areas. 08th Sep 2018 Tutong. Saturday Kampong Pengkalan Pinang, Penanjong, Maintenance works for Low voltage overhead Spg 42-21 Jln Pangkalan Pinang, Kampong Penanjong and 5 8.30 am to 12.00 noon 08th Sept 2018 Mukim Pekan Tutong lines. surrounding areas. Saturday Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 6 2.00 pm to 4.30 pm Spg 550 Kampong Kupang and surrounding areas. 08th Sep 2018 Tutong. lines. Monday Kampong Lubuk Pulau, MukimTanjong 7 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Lubuk Pulau and surrounding areas. -
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2018 25 Jun 2021 COMPANY Tel No: Fax: 8767838, No 30 Simpang 766 No 30 Simpang 766 8281194 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0347/2018 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara