BY M/S SHRI BAJRANG POWER & ISPAT LTD., UPDATED FORM 1 (As per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E) (I) BASIC INFORMATION S. No Item Details 1 Name of the Project/s Integrated Steel Plant at Tandwa & Kundru Villages, Tilda Tehsil, Raipur District, Chhattisgarh by M/s Shri Bajrang Power and Ispat Ltd., – Reg., 2 S. No. in the schedule 3(a) Metallurgical industries (ferrous & nonferrous) 2(b) Mineral beneficiation 1(d) Thermal Power Plants 4 (b) Coke oven plants 3 Proposed capacity/ area/ EC granted and amendment obtained for length/ tonnage to be handled/ the following capacities: command area/ lease area/ number of wells to be drilled S. Environmental Clearance Obtained NO. - Capacity 01 Sponge Iron -6,00,000 TPA (3 Nos X 600 TPD X 330 Days) 02 Power Plant – 125 MW WHRB – 3 X 16 MW Blast Furnace – 10 MW Coke Oven – 25 MW AFBC – 42 MW 03 Hot Re-Rolling Mill – 2X 0.20 = 0.40 MTPA 04 Pellet Plant 1.40 MTPA with Coal Gasifier (3 X 17000 Nm3/Hr) 05 Iron Ore beneficiation Plant- 2.0 MTPA 06 Ferro Alloys Plant 36000TPA 07 Steel Melting Shop & continuous Casting Machine – 1.0 MTPA 08 Coal Washery – 2.4 MTPA 09 Coke Oven Battery – 0.5 MTPA 10 Sintering Plant – 0.7 MTPA 11 Blast Furnace – 0.55 MTPA 12 Oxygen Plant – 500 TPD 13 Fly Ash Bricks Plant – 100,00,000 NPA The project is located in Tandwa & Kundru Villages, Tilda Tehsil, Raipur District, and Chhattisgarh. Area of the Plant 140.8 Ha (348 acres). 4 New/ expansion/modernization The subject proposal is for Extension of validity of Environmental Clearance 5 Existing capacity/ Area etc. The project could not be fully implemented within the EC validity period due to (a) economic (b) sluggish market conditions and (c) delay in receiving the plant machinery. The following units are Installed and fully operational

Existing capacity: · Sponge iron 0.2 MTPA (1 x 600 TPD x 330 days), · Power Plant - 16MW (WHRB) · Pellet Plant – 1.40 MTPA with Coal Gasifier-1x17000NM3/Hr · Iron Ore beneficiation Plant- 2.0 MTPA · Fly Ash Bricks Plant – 100,00,000 NPA Plant established and CTO under process : · Sponge Iron 0.2 MTPA (1 x 600 TPD x 330 days) · Power Plant - 16MW (WHRB 63 TPH Boiler) · Power Plant - 09MW (AFBC Combustor 35 TPH Boiler) · Coal Gasifier - 5,500NM3/Hr

Area: 348.89 acre 6 Category of Project i.e ‘A’ or ‘B’ A 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location The sponge iron and captive power plant (integrated steel plant) is located at Villages: Tandwa & Kundru, Block - Tilda, District- Raipur, and State- Chhattisgarh 493 116.

The Area falls in Survey of , Topo-sheet No. 64 G/10, 64 G/14, 64 G/15 The geographical location of the plant area are given below :- S.No. Latitude Longitude 1 21°29'20.7"N 81° 45'41.0"E 2 21°29'06.1"N 81° 46'11.9"E 3 21°29'06.3"N 81° 46'10.9"E 4 21°29'31.3"N 81° 46'20.8"E Plot/ Survey/ Khasra No 521/44 Village Tandwa & Kundru, Block Tilda Tehsil Tilda District Raipur State Chhattisgarh 10 Nearest railway station/ airport Nearest railway station: along with distance in Kms. Baikunth - 2 Kms, NNE Nearest airport : Swami Vivekananda Airport ~ 33.0 Km, SSW 11 Nearest town, city, district Nearest Town: Tilda Newra~ 6.3 Km, headquarters along with NNE distance in kms. Nearest City: Raipur ~ 45 Km, SSW District HQ: Raipur ~ 45 Km, SSW 12 Village panchayaths, Zilla Village Panchayat: Gram Panchayat – parishad, Municipal Corporation, Villages: Tandwa, Kundru, Tehsil: Tilda, Local body (Complete postal District: Raipur, Chhattisgarh-493 116. addresses with telephone nos to be given) Zila Parishad: Collector Office, Raipur, Chhattisgarh 492 001 Tel: 0771-2426024

Municipal Corporation: Commissioner, Municipal Corporation, Raipur, Chhattisgarh Tel: 0771-2536660 13 Name of the applicant M/s Shri Bajrang Power & Ispat Ltd. 14 Registered address Village: Borjhara, Urla Guma Road, Urla-Growth Center, Raipur 493 221(C.G.) 15 Address for correspondence Kh.No. 521/44, Vill.Tandwa, Dharsiwa- Tilda Road, Tehsil Tilda, Dist-Raipur- 493 116 (C.G.) Ph. No.0771 4288025/ 35 Fax No. 0771 4288075 [email protected] Name Mr. S. K. Goyal Designation (Owner /Partner/ Director CEO) Address Village: Borjhara, Urla Guma Road, Urla-Growth Center , Raipur 493221(C.G.) Pincode 493 221 E- mail [email protected] Telephone no. Ph. No.0771 4288019/ 29/ 39 Fax no. Fax No. 0771 4288123 /2323602 16 Details of Alternative sites Not applicable. examined, if any location of EC granted for the project site these sites should be shown Project site is falling in Topo sheet No. on a topo sheet. 64 G/10, 64 G/14, 64 G/15 17 Interlinked projects The present application is for Extension of EC validity for integrated Steel Plant. 18 Whether separate application No. of interlinked project has been submitted? 19 If yes, date of submission Not Applicable

20 If no, reason The present application is for Extension of EC validity for integrated Steel plant.

The EC obtained for above proposal is vide 1. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 06.10.2010, 2. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 23.05.2012, 3. Amendment EC Letter No. F.No.J- 11011/394/2009 –IA II (I) dated 06.09.2016) 21 Whether the proposal involves None approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation)Act, 1980 (b) The Wild Life (Protection)Act, 1972 (c) The CRZ Notification, 1991 22 Whether there is any None Government Order/ Policy relevant/ relating to the site? 23 Forest land involved (hectares) None 24 Whether there is any litigation None pending against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No (c) Orders/ directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist Yes/No possible) with source of confirmation information data 1.1 Permanent or temporary Yes The project was accorded EC for change in land use, land setting up of integrated steel plant. cover or topography including increase in The project is proposed in 348.89 intensity of land use (with acre which is under the possession of respect to local land use M/s Shri Bajrang Power & Ispat Ltd. plan) The project is implemented partially and the subject proposal is request for extension of validity for the units which are under implementation.

No additional land will be acquired.

No additional land issues/change in land use are involved 1.2 Clearance of existing land, No Not envisaged vegetation and buildings? 1.3 Creation of new land uses? Yes The Land Breakup of the project is in 348.89 acre is given below

S.No. Details Area (Acres ) 1 Area for green belt 115.0 2 Open land 175.29 3 Pellet Plant 015.00 4 Sponge Iron 015.00 Division 5 Captive Power 007.00 Plant 6 Iron Ore 021.60 Beneficiation Total 348.89 1.4 Pre-construction Yes Pre-construction investigations were investigations e.g. bore done and the project was houses, soil testing? implemented partially.

1.5 Construction works? Yes The construction work will involve installation of balance units which are under implementation 1.6 Demolition works? No No demolition works involved

1.7 Temporary sites used for Yes Temporary sites for construction construction works or works will be located within the housing of construction existing plant area workers? 1.8 Above ground buildings, Yes Structures will be installed above structures or earthworks ground level including linear structures, cut and fill or excavations 1.9 Underground works No Not envisaged including mining or tunneling? 1.10 Reclamation works? No Not involved 1.11 Dredging? No No dredging is involved 1.12 Offshore structures? No No offshore structures needed. 1.13 Production and Yes 1. Manufacturing of sponge iron by manufacturing processes? DRI process 2. Power generation based on Rankine cycle 3. Ferro alloy production by submerged arc furnace 4. SMS by Induction Furnace. 5. Coke oven by non-recovery type 6. Sintering plant - iron ore fine, coke fines and flux materials mixture is ignited for converting in to fused agglomerate which is suitable as feed for the blast furnace. 7. Sinter Plant to produce inputs for Blast Furnace; 8. Blast Furnace (BF) with Sinter, Iron Ore Lumps, Coke and Fluxes to produce Hot Metal; 9. Pellet production by Induration process 10. Refining of Hot Metal (HM) from BF in an Oxygen Furnace to produce Liquid Steel; 11. Further refining of Liquid Steel in a Ladle Refining Furnace (LRF); 12. Casting of Refined Steel to Billets in a suitable Caster (CCM) 13. Coal beneficiation by Coal washery 14. Fly ash bricks manufacturing 1.14 Facilities for storage of goods Yes Existing facility (stock yard is or materials? present) 1.15 Facilities for treatment or Yes Rejects (Fly Ash) generated during disposal of solid waste or the process stacked at their liquid effluents? designated place for a short period and being used for bricks manufacturing in its own plant.

Zero effluent discharge is being followed and domestic wastewater is sent to soak pit/septic tank. 1.16 Facilities for long term Yes Housing Colony is being constructed housing of operational near project site (0.5 km) workers? 1.17 New road, rail or sea traffic Not Applicable. Existing facilities will during construction or No be used. (Dedicated Railway siding is operation? in operation.) 1.18 New road, rail, air Yes Existing road network is sufficient to waterborne or other cater the transportation. Existing transport infrastructure roads will be further strengthened including new or altered from time to time to maintain the road routes and stations, ports, in proper conditions. airports etc? 1.19 Closure or diversion of No No diversion of existing transport existing transport routes or routes is proposed. infrastructure leading to changes in traffic No changes in existing traffic movements? movements are envisaged 1.20 New or diverted No No transmission lines or power lines transmission lines or will be diverted. pipelines? 1.21 Impoundment, damming, No No water bodies are existing hence culverting, realignment or impoundment, damming, culverting, other changes to the realignment does not arise. hydrology of watercourses or aquifers? 1.22 Stream crossings? No No perennial/seasonal stream exists in the plant premises. 1.23 Abstraction or transfers of Yes The total water requirement of 18145 water form ground or m3/day. Source of water is River surface waters? Shivnath. The permission of drawl of 5.4 MCM water from river Shivnath has already been obtained from water resource department Govt. of Chhattisgarh. However the rainwater harvesting is being adopted to minimize water requirement from river. Also Applied for obtaining Ground water abstraction Permission from CGWA, New Delhi for Drinking Water purposes only. 1.24 Changes in water bodies or No Not envisaged the land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes All personnel will use public / plant materials for construction, /own transport. operation or During Operation Phase: decommissioning? a) Transport of raw materials such as Coal and Iron ore by road/Railway b) Transport of Product by road/Railway. 1.26 Long-term dismantling or No No long-term dismantling or decommissioning or decommissioning works are involved. restoration works? 1.27 Ongoing activity during Yes Increase in dust levels for short decommissioning which duration could have an impact on the environment? 1.28 Influx of people to an area No No major influx is envisaged due to in either temporarily or the project. permanently? 1.29 Introduction of alien No Native species will be planted species? 1.30 Loss of native species or No Greenbelt is already developed. Floral genetic diversity? diversity is improved within the plant premises. No loss of native species or genetic diversity neither in the project site nor in the surroundings. 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with S.No. Information/checklist Yes/No approximate quantities /rates, confirmation wherever possible) with source of information data 2.1 Land especially undeveloped Yes The project was accorded EC for or agricultural land (ha) setting up of integrated steel plant.

The project was proposed in 348.89 acre which is under the possession of M/s Shri Bajrang Power & Ispat Ltd. The project is implemented partially and the subject proposal is request for extension of validity for the units which are under implementation.

No additional land will be acquired.

No additional land issues/change in landuse are involved 2.2 Water (expected source & Yes The total water requirement of competing users) unit: KLD 18145 m3/day. Source of water is River Shivnath. The permission of drawl of 5.4 MCM water from river Shivnath has already been obtained from water resource department Govt. of Chhattisgarh. However the rainwater harvesting is being adopted to minimize water requirement from river.

No groundwater is being abstracted. 2.3 Minerals (MT) Yes Enclosed as Annexure – 1 2.4 Construction material – Yes The construction materials stone, aggregates, sand / soil required for the project is (expected source – MT) sourced locally. 2.5 Forests and timber (source – No Not envisaged MT) 2.6 Energy including electricity Yes The electric power requirement and fuels (source, competing for the project will be met from users) Unit: fuel (MT), energy existing and proposed Captive (MW) Power plant 125 MW (Total) which are based on Waste heat, coke oven gas, coal and blast furnace gas. 2.7 Any other natural resources No No other natural resources will (use appropriate standard be used. units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate quantities/ S.No. Information/Checklist Yes/No rates, wherever possible) with confirmation source of information data 3.1 Use of substances or materials, No No use of Hazardous substance which are hazardous (as per / chemicals as per MSIHC rules) to human health Manufacture, Storage & Import or the environment (flora, of Hazardous Chemicals fauna, and (MSIHC) Rules are not involved. water supplies) 3.2 Changes in occurrence of No No changes in occurrence of disease or affect disease vectors disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes Direct and indirect employment by changing living conditions? avenues will be created due to project, which would improve the living conditions of the people, through socio-economic measures taken up by proponent. Direct and indirect employment avenues will be created due to project, which would improve the living conditions of the people, through socio-economic measures taken up by the proponent.

The area will also be benefited due to better infrastructure, health care, educational facilities and other community development activities to be undertaken by the project authorities during CSR activities 3.4 Vulnerable groups of people No No habitation is present at the who could be affected by the plant. Hence the effect on the project e.g. hospital patients, vulnerable people does not children, the elderly etc., arise. 3.5 Any other causes No No other causes.

\ 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate quantities/ rates, S. Information/Checklist Yes/No wherever possible) with source No. confirmation of information data 4.1 Spoil, overburden or mine wastes No Proposed project is integrated steel plant. Hence no issue of Overburden or Mine wastes 4.2 Municipal waste (domestic and or Yes Domestic waste generated from commercial wastes) the plant is being segregated for organics and inorganics. Organic waste is used for composting whereas inorganic waste is sent to approve vendors.

From beneficiation plant generated Tailing is being discharged to a tailing pond located near the plant through internally rubber lined seamless MS pipe. The tailings do not contain any soluble minerals. The water from tailing is also being reused after treatment by pumping back to the beneficiation plant. 4.3 Hazardous wastes (as per Yes During operation, hazardous Hazardous Waste wastes-used oil and resin are Management Rules) being generated. Used oil is being used for lubrication. Balance used oil & Resin will be sold to authorized Recycling agency. We have already obtained Hazardous Waste Management authorization from the CECB, Raipur vide letter No. 221/ HO/ HSMD/ CECB/RAIPUR dated 11/09/2018 which is renewed and valid up to 21/08/2023 4.4 Other industrial process wastes Yes Fly ash from power plant, will be used in own Bricks manufacturing unit and also being sold to other Bricks manufacturing units and Cement Manufacturing Unit. 4.5 Surplus product No No surplus product will be generated. 4.6 Sewage sludge or other sludge No Domestic effluent is being from effluent treatment discharged in Septic Tank and Soak Pit. And after its treatment it is being used for plantation and dust suppression. 4.7 Construction or demolition wastes No No demolition waste will be generated. 4.8 Redundant machinery or No No redundant machinery or equipment equipment is involved. 4.9 Contaminated soils or other No Contamination of soils or other materials materials is not envisaged. 4.10 Agricultural wastes No No agricultural wastes will be generated. 4.11 Other solid wastes No Solid waste generated from process like Dolochar, Mill scale and Miss-roll and end cuts which will be 100% utilized in Captive power plant, Ferro Alloys plant and SMS respectively as raw materials. Slag of Ferro Alloys & SMS units, after crushing & screening will be used in Bricks Plant. Plant will run on zero waste concept.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate quantities/rates, wherever S.No. Information/Checklist Yes/ possible) with source of confirmation No information data 5.1 Emissions from combustion Yes Kg/Hr of fossil fuels from stationary PM - 39.41 or mobile sources SO2 - 250.57 NOx - 229.02 5.2 Emissions from production Yes Fugitive dust from sponge iron, processes SMS, coal dry washing, coal crushing etc. will be controlled through bag filters and Mist spray system and water sprinklers. 5.3 Emissions from materials Yes Fugitive dust generation will be handling including storage there due to unloading and or transport handling of Ore, Coal and ash handling, etc. It will be controlled by installing dust extraction system with bag filters and movable water sprinklers. It will be contained due to covered area and shed. Emissions of SO2, NOx and CO are envisaged due to vehicular movements. 5.4 Emissions from construction Yes There will be fugitive dust emission activities including plant and during construction activities. Dust equipment suppression measures (fugitive emission) like water sprinkling will be used for control/minimize it. 5.5 Dust or odours from handling Yes There will be fugitive dust emission of materials including during handling of construction construction materials, materials, which will be controlled sewage and waste by regular water sprinkling at site. No odour will be generated. 5.6 Emissions from incineration No No incineration of waste is involved. of waste 5.7 Emissions from burning of No No burning of waste in open air is waste in open air (e.g. slash involved. materials, construction debris) 5.8 Emissions from any other No No emissions from any other sources sources.

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Yes/No Details thereof (with approximate quantities/rates, wherever S.No Information/Checklist possible) with source of confirmation information data with source of information data 6.1 From operation of equipment e.g. Yes Noise will be generated from engines, ventilation plant, the following: crushers · Rotating equipment like Fans, Blowers, Feed Water Pumps, TG Boiler & Set, Compressors, Mill motors, etc., · Furnace operations, tapping, casting areas. · Coal washery area. · Super heater safety valves. · Vents for BF blast system, steam vents in Power Plant, air/ gas vents in Air Separation Plant. · Metal cutting shears in Rolling Mills 6.2 From industrial or similar Yes Noise will be generated from processes moving equipment such as crane drill machine, water pumps and workshop equipment, Turbine, Compressors, Pumps, Fans, and Coal Handling Plants, ball mills etc. Some of the practices proposed to be adopted for noise attenuation at the plant site are as follows: · Provision of separate cabin for operators; · The plant area will be thickly vegetated with species of rich canopy. · Ear plugs will be provided to workmen working near high noise generating sources 6.3 From construction or demolition Yes Not envisaged 6.4 From blasting or piling No Not envisaged. 6.5 From construction or operational Yes About 75 dB (A) noise traffic generation is envisaged from industrial equipment machinery during operational traffic. There will be generation of noise during the vehicular movement. But this noise will be site specific and will not be contributing to outside the plant premises. The noise levels will be below the permissible limit owing to greenbelt around the plant premises. 6.6 From lighting or cooling systems Yes As the cooling system is located within plant area no impact on the public is expected. 6.7 From any other sources No No other noise generating sources are involved. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate quantities/ rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 7.1 From handling, storage, use or No No hazardous materials storage or spillage of hazardous materials handling are envisaged 7.2 From discharge of sewage or No Followed zero discharge norms. other effluents to water or the The sewage generated will be land (expected mode and place disposed through a series of septic of discharge) tanks and soak pits. Outside discharge of sewage is not envisaged. Water conservation & water recirculation system is being followed. No contamination of ground water or land is envisaged. 7.3 By deposition of pollutants No Fugitive emission control as per emitted to air into the land or CPCB guidelines is implemented into water Chimney is provided as CPCB norms & ESP with 99.5 % SPM removal efficiency as per SPCB norms is provided. 7.4 From any other sources No No other sources of risk are involved 7.5 Is there a risk of long term No No long term buildup of pollutant buildup of pollutants in the from plant activity is involved. environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate quantities/rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data

8.1 From explosions, spillages, No Not envisaged. fires etc from storage, All facilities are provided handling, use or production of hazardous substances 8.2 From any other causes No No other causes. 8.3 Could the project be affected No The project site falls in zone-II as by natural disasters causing per IS 1893 (Part-I): 2002. Hence, environmental damage (e.g. seismically it is a stable zone. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate quantities/ rates, S. No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 9.1 Lead to development of The plant will result in supporting lities, ancillary considerable growth of service development or development - sector. stimulated by the project which could have impact on the The project will lead into overall environment e.g.: Yes improvement and development of area due to increased direct • Supporting infrastructure and indirect employment (roads, power supply, waste or opportunities, infrastructural waste water treatment, etc.) development and consequently economic upliftment of nearby • housing development villagers. Moreover the proposed will also help in development of • extractive industries support industries to increase the economic status of the • supply industries region and state and thereby the country in particular. • other 9.2 Lead to after-use of the site, No No major impacts are envisaged which could have an impact on the environment 9.3 Set a precedent for later No Further development due to developments economic prosperity of the villagers in and around the area will be there. 9.4 Have cumulative effects due to No No cumulative effects after proximity to other existing or taking proper measures to planned projects with similar control the emission. effects (III) Environmental Sensitivity Aerial distance S.No. Areas Name/ (within 15 km.) Identity Proposed project location boundary 1 Areas protected under Nil Not applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Water Bodies : sensitive for ecological reasons - Bhatapara canal 3.5 km Wetlands, watercourses or other water bodies, coastal zone, Kharun river biospheres, mountains, forests 8.3 km SW 3 Areas used by protected, important Nil Not applicable or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or Nil Not applicable underground waters 5 State, National boundaries Nil Not applicable 6 Routes or facilities used by the Nil Not applicable public for access to recreation or other tourist, pilgrim areas 7 Defence installations Nil Not applicable 8 Densely populated or built-up area Tilda 7 km, NNE

Raipur 45 km, SSW 9 Areas occupied by sensitive man- Hospitals & School, 7 km, NNE made land uses (hospitals, Nearest Place of schools, places of worship, Worship (Tandwa- community facilities) Kundru-Tilda-Baikunth) 10 Areas containing important, high Water Bodies : quality or scarce resources Bhatapara canal 3.5 km (ground water resources, surface resources, forestry, agriculture, Kharun river fisheries, tourism, minerals) 8.3 km SW 11 Areas already subjected to Nil Not applicable pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No The area is not known hazard which could cause the for these natural project to present environmental hazards. Seismically, problems this area is categorized (earthquakes, subsidence, under Zone-II as per landslides, erosion, flooding or IS-1893 (Part-1)-2002. extreme or adverse climatic Hence, seismically the conditions) site is a stable zone. “I hereby give under taking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 16.04.2019 Place: Tilda

Signature of the Applicant (Project proponent/ Authorized signatory)

Name Mr. S K Goyal Designation Director Address M/s SHRI BAJRANG POWER & ISPAT LTD., Village: Borjhara, Urla Industrial Area, Raipur 493 221(C.G.) ANNEXURE – 1

RAW MATERIAL REQUIREMENT

· For All Proposed Projects

S. No. Input Quantity (In TPA) Sponge Iron Plant 1 Iron Ore 960000 2 Dolomite 36000 3 Non Coking Coal 960000 Total 1956000 Coal Washery 1 Raw Coal 2400000 Total 2400000 Coke Oven Battery 1 Hard Coking Coal 260000 2 Semi Coking Coal 260000 3 Soft-Non Coking Coal 120000 Total 640000 Blast Furnace 1 Iron Ore Lumps 135500 2 Sinter 742500 3 Coke 214500 4 Pulverized Coal 82500 5 Other Fluxes 55000 Total 1230000 Iron Ore Beneficiation Plant 1 Iron Ore 840000 Total 840000 Pelletization Plant 1 Beneficiated Iron Ore 612000 2 Pulverized Fuel 36000 3 Bentonite 9000 Total 657000 Sinter Plant 1 Iron Ore Fines 490000 2 Return Sinter Fines 140000 3 Fluxes 245000 4 Non Coking Coal 42000 Total 917000 Steel Melting Shop 1 Sponge Iron 520000 2 Hot Metal 550000 3 Melting Scrap 50000 4 Ferro Alloys 15000 5 Fluxes 100000 Total 1235000 Ferro Alloys Plant (Ferro Manganese) 1 Manganese 39600 2 Coke 4500 3 Coal 7200 4 Fluxes 3600 Total 54900 Ferro Alloys Plant (Silico Manganese) 1 Manganese 45000 2 Coke 4950 3 Coal 8100 4 Fluxes 2250 Total 60300 Hot Re-Rolling Mill 1 Billets & Blooms 420000 2 Furnace Oil 9600 Total 429600

· For all Existing Projects

S.No. Raw Materials (Input) Quantity (TPA) Iron Beneficiation Plant 1 Iron Ore 20,00,000 Pelletization Plant 1 Beneficiation Iron Ore (Concentrated Ore) 14,28,000 2 Limestone 21,000 3 Bentonite 11,200 4 Pulverized Fuel 49,000 Coal Gasifier 1 Raw Coal (Coal Gasifier) 75,000 Sponge Iron Plant 1 Iron Ore Pellet 900000 2 Dolomite 36000 3 Non Coking Coal 600000

Note: 1. For Conservation of natural resources like Coal, Dolomite, water and Iron Ore we have reduced consumption of these resources.