
UPDATED FORM – I FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE (Environmental Clearance granted vide 1. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 06.10.2010, 2. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 23.05.2012, 3. Amendment EC Letter No. F.No.J-11011/394/2009 –IA II (I) dated 06.09.2016) OF INTEGRATED STEEL PLANT AT TANDWA & KUNDRU VILLAGES, TILDA TEHSIL, RAIPUR DISTRICT, CHHATTISGARH BY M/S SHRI BAJRANG POWER & ISPAT LTD., UPDATED FORM 1 (As per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E) (I) BASIC INFORMATION S. No Item Details 1 Name of the Project/s Integrated Steel Plant at Tandwa & Kundru Villages, Tilda Tehsil, Raipur District, Chhattisgarh by M/s Shri Bajrang Power and Ispat Ltd., – Reg., 2 S. No. in the schedule 3(a) Metallurgical industries (ferrous & nonferrous) 2(b) Mineral beneficiation 1(d) Thermal Power Plants 4 (b) Coke oven plants 3 Proposed capacity/ area/ EC granted and amendment obtained for length/ tonnage to be handled/ the following capacities: command area/ lease area/ number of wells to be drilled S. Environmental Clearance Obtained NO. - Capacity 01 Sponge Iron -6,00,000 TPA (3 Nos X 600 TPD X 330 Days) 02 Power Plant – 125 MW WHRB – 3 X 16 MW Blast Furnace – 10 MW Coke Oven – 25 MW AFBC – 42 MW 03 Hot Re-Rolling Mill – 2X 0.20 = 0.40 MTPA 04 Pellet Plant 1.40 MTPA with Coal Gasifier (3 X 17000 Nm3/Hr) 05 Iron Ore beneficiation Plant- 2.0 MTPA 06 Ferro Alloys Plant 36000TPA 07 Steel Melting Shop & continuous Casting Machine – 1.0 MTPA 08 Coal Washery – 2.4 MTPA 09 Coke Oven Battery – 0.5 MTPA 10 Sintering Plant – 0.7 MTPA 11 Blast Furnace – 0.55 MTPA 12 Oxygen Plant – 500 TPD 13 Fly Ash Bricks Plant – 100,00,000 NPA The project is located in Tandwa & Kundru Villages, Tilda Tehsil, Raipur District, and Chhattisgarh. Area of the Plant 140.8 Ha (348 acres). 4 New/ expansion/modernization The subject proposal is for Extension of validity of Environmental Clearance 5 Existing capacity/ Area etc. The project could not be fully implemented within the EC validity period due to (a) economic (b) sluggish market conditions and (c) delay in receiving the plant machinery. The following units are Installed and fully operational Existing capacity: · Sponge iron 0.2 MTPA (1 x 600 TPD x 330 days), · Power Plant - 16MW (WHRB) · Pellet Plant – 1.40 MTPA with Coal Gasifier-1x17000NM3/Hr · Iron Ore beneficiation Plant- 2.0 MTPA · Fly Ash Bricks Plant – 100,00,000 NPA Plant established and CTO under process : · Sponge Iron 0.2 MTPA (1 x 600 TPD x 330 days) · Power Plant - 16MW (WHRB 63 TPH Boiler) · Power Plant - 09MW (AFBC Combustor 35 TPH Boiler) · Coal Gasifier - 5,500NM3/Hr Area: 348.89 acre 6 Category of Project i.e ‘A’ or ‘B’ A 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location The sponge iron and captive power plant (integrated steel plant) is located at Villages: Tandwa & Kundru, Block - Tilda, District- Raipur, and State- Chhattisgarh 493 116. The Area falls in Survey of India, Topo-sheet No. 64 G/10, 64 G/14, 64 G/15 The geographical location of the plant area are given below :- S.No. Latitude Longitude 1 21°29'20.7"N 81° 45'41.0"E 2 21°29'06.1"N 81° 46'11.9"E 3 21°29'06.3"N 81° 46'10.9"E 4 21°29'31.3"N 81° 46'20.8"E Plot/ Survey/ Khasra No 521/44 Village Tandwa & Kundru, Block Tilda Tehsil Tilda District Raipur State Chhattisgarh 10 Nearest railway station/ airport Nearest railway station: along with distance in Kms. Baikunth - 2 Kms, NNE Nearest airport : Swami Vivekananda Airport ~ 33.0 Km, SSW 11 Nearest town, city, district Nearest Town: Tilda Newra~ 6.3 Km, headquarters along with NNE distance in kms. Nearest City: Raipur ~ 45 Km, SSW District HQ: Raipur ~ 45 Km, SSW 12 Village panchayaths, Zilla Village Panchayat: Gram Panchayat – parishad, Municipal Corporation, Villages: Tandwa, Kundru, Tehsil: Tilda, Local body (Complete postal District: Raipur, Chhattisgarh-493 116. addresses with telephone nos to be given) Zila Parishad: Collector Office, Raipur, Chhattisgarh 492 001 Tel: 0771-2426024 Municipal Corporation: Commissioner, Municipal Corporation, Raipur, Chhattisgarh Tel: 0771-2536660 13 Name of the applicant M/s Shri Bajrang Power & Ispat Ltd. 14 Registered address Village: Borjhara, Urla Guma Road, Urla-Growth Center, Raipur 493 221(C.G.) 15 Address for correspondence Kh.No. 521/44, Vill.Tandwa, Dharsiwa- Tilda Road, Tehsil Tilda, Dist-Raipur- 493 116 (C.G.) Ph. No.0771 4288025/ 35 Fax No. 0771 4288075 [email protected] Name Mr. S. K. Goyal Designation (Owner /Partner/ Director CEO) Address Village: Borjhara, Urla Guma Road, Urla-Growth Center , Raipur 493221(C.G.) Pincode 493 221 E- mail [email protected] Telephone no. Ph. No.0771 4288019/ 29/ 39 Fax no. Fax No. 0771 4288123 /2323602 16 Details of Alternative sites Not applicable. examined, if any location of EC granted for the project site these sites should be shown Project site is falling in Topo sheet No. on a topo sheet. 64 G/10, 64 G/14, 64 G/15 17 Interlinked projects The present application is for Extension of EC validity for integrated Steel Plant. 18 Whether separate application No. of interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason The present application is for Extension of EC validity for integrated Steel plant. The EC obtained for above proposal is vide 1. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 06.10.2010, 2. Letter No. F.No.J-11011/394/2009 –IA II (I) dated 23.05.2012, 3. Amendment EC Letter No. F.No.J- 11011/394/2009 –IA II (I) dated 06.09.2016) 21 Whether the proposal involves None approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation)Act, 1980 (b) The Wild Life (Protection)Act, 1972 (c) The CRZ Notification, 1991 22 Whether there is any None Government Order/ Policy relevant/ relating to the site? 23 Forest land involved (hectares) None 24 Whether there is any litigation None pending against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No (c) Orders/ directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist Yes/No possible) with source of confirmation information data 1.1 Permanent or temporary Yes The project was accorded EC for change in land use, land setting up of integrated steel plant. cover or topography including increase in The project is proposed in 348.89 intensity of land use (with acre which is under the possession of respect to local land use M/s Shri Bajrang Power & Ispat Ltd. plan) The project is implemented partially and the subject proposal is request for extension of validity for the units which are under implementation. No additional land will be acquired. No additional land issues/change in land use are involved 1.2 Clearance of existing land, No Not envisaged vegetation and buildings? 1.3 Creation of new land uses? Yes The Land Breakup of the project is in 348.89 acre is given below S.No. Details Area (Acres ) 1 Area for green belt 115.0 2 Open land 175.29 3 Pellet Plant 015.00 4 Sponge Iron 015.00 Division 5 Captive Power 007.00 Plant 6 Iron Ore 021.60 Beneficiation Total 348.89 1.4 Pre-construction Yes Pre-construction investigations were investigations e.g. bore done and the project was houses, soil testing? implemented partially. 1.5 Construction works? Yes The construction work will involve installation of balance units which are under implementation 1.6 Demolition works? No No demolition works involved 1.7 Temporary sites used for Yes Temporary sites for construction construction works or works will be located within the housing of construction existing plant area workers? 1.8 Above ground buildings, Yes Structures will be installed above structures or earthworks ground level including linear structures, cut and fill or excavations 1.9 Underground works No Not envisaged including mining or tunneling? 1.10 Reclamation works? No Not involved 1.11 Dredging? No No dredging is involved 1.12 Offshore structures? No No offshore structures needed. 1.13 Production and Yes 1. Manufacturing of sponge iron by manufacturing processes? DRI process 2. Power generation based on Rankine cycle 3. Ferro alloy production by submerged arc furnace 4. SMS by Induction Furnace. 5. Coke oven by non-recovery type 6. Sintering plant - iron ore fine, coke fines and flux materials mixture is ignited for converting in to fused agglomerate which is suitable as feed for the blast furnace. 7. Sinter Plant to produce inputs for Blast Furnace; 8. Blast Furnace (BF) with Sinter, Iron Ore Lumps, Coke and Fluxes to produce Hot Metal; 9. Pellet production by Induration process 10. Refining of Hot Metal (HM) from BF in an Oxygen Furnace to produce Liquid Steel; 11.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages21 Page
-
File Size-