2006 Capital Bond Program Development
Street and Transportation Needs
City Council Briefing April 5, 2006 Public Works and Transportation Project Categories That Make Up the Street and Transportation Program
1. Alley Petitions 2. Alley Reconstruction 3. Barrier Free Ramps (NEW) 4. Bridge Repair and Modifications 5. Intelligent Trans. System (ITS) Adaptive Signal Timing 6. ITS Speed and Travel Time System 7. Intergovernmental Partnership Projects 8. School Flasher Upgrades (NEW) 9. Sidewalk Improvements 10. Sidewalk Petitions 11. Street Lighting – CBD Roadway Lighting 12. Street Lighting – Enhanced Fixtures 13. Street Lighting-Existing Thoroughfares (NEW) 14. Street Lighting – Freeway Lighting 15. Street Petitions 16. Street Reconstruction – Local Streets
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 2 Project Categories That Make Up the Street and Transportation Program (cont’d)
17. Street Reconstruction – Thoroughfares 18. Street Resurfacing 19. Streetscape/Urban Design 20. Target Neighborhood 21. Thoroughfares 22. Traffic Accident Reduction Roadway Improvements (NEW) 23. Traffic Intersection Capacity and Safety Improvements 24. Traffic Safety Improvements – Guardrail Upgrades (NEW) 25. Traffic Sign Upgrades (NEW) 26. Traffic Signal Control Equipment Upgrades (NEW) 27. Traffic Signal Upgrades – CBD 28. Traffic Signal Upgrades – Citywide 29. Transportation System Mgt (TSM) – Dynamic Message Signs 30. TSM – Flood Detour Signs 31. TSM – Roadside Cameras 32. Warranted Signals and School Flashers
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 3 Funding History and Leveraged Funds for Previous Bond Programs
Bond Bond Leveraged Program Funding Funding Year Amount Amount
1995 $87.1 M $86.5 M
1998 $125.025 M $58.7 M
2003 $266.86 M $104 M
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 4 Funded Projects 2003 Bond
Marsalis Bridge Repairs Mockingbird Pedestrian Bridge
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 5 Funded Projects 2003 Bond
Harwood Reconstruction La Reunion Reconstruction
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 6 Funded Projects 2003 Bond
Barrier Free Ramp
Cockrell Hill N. Extension Roadside Camera 2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 7 Current Needs
{ Alley Petitions z Builds new alleys requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $470 K z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs { Alley Reconstruction z Reconstructs existing alleys at the end of their service life z Total Need - $256.83 M z Level of investment in the 95, 98, and 03 Bond Programs - $1.55 M per year
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 8 Current Needs (cont’d)
{ Barrier Free Ramps (new category) z Builds barrier free sidewalk ramps at requested locations z Total Need - $1.45 M z Receive 480 requests for ramps each year. z Average cost is $1,900 per ramp { Bridge Repair and Modification z Corrects noted deficiencies in bridge infrastructure based on TXDOT inspections z Total Need - $5.84 M z Level of investment in the 95, 98, and 03 Bond Programs - $1.21 M per year z These are necessary repairs and modifications for safety and have possibility of leveraged funds.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 9 Current Needs (cont’d)
{ Intelligent Transportation System (ITS) -Adaptive Signal Timing z Automatically changes signal timing to accommodate detouring traffic due to freeway incidents z Total Need - $638 K z Level of investment in the 03 Bond Program - $50 K per year z Need real-time software to be developed with new transportation computer system prior to further investment. { ITS-Speed & Travel Time System z Installs toll tag readers on thoroughfares approaching the Dallas North Tollway in order to provide real time travel information on the thoroughfares. z Total Need - $290 K z Need standardized toll-tag technology prior to further investment.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 10 Current Needs (cont’d)
{ Intergovernmental Partnership Projects z Develops transportation projects with other governmental agencies z Total Need - $298.37 M z Level of investment in the 95, 98, and 03 Bond Programs - $8.11 M per year z Historically funded all projects in the Needs Inventory { School Flasher Upgrades (new category) z Replaces outdated flasher system to allow flexible flasher schedules, increase reliability, eliminate underground cable repairs, and reduce electric bills z Total Need - $5.57 M
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 11 Current Needs (cont’d)
{ Sidewalk Improvements z Provides new sidewalks requested by schools and the public for pedestrian safety and replacement of deteriorated sidewalks requested by property owners. Property owners are assessed for a portion of the cost. z Total Need - $2.55 M z Level of investment in the 98, and 03 Bond Programs - $1.21 M per year { Sidewalk Petitions z Builds new sidewalk projects requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $225 K z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs .
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 12 Current Needs (cont’d)
{ Street Lighting-CBD Roadway Lighting z Addresses high number of requests for improved lighting in CBD. z Total Need - $1.35 M z Level of investment in the 03 Bond Program - $175 K per year { Street Lighting-Enhanced Fixtures z Provides higher lighting levels in high pedestrian activity areas z Total Need - $319 K z Level of investment in the 03 Bond Program - $7.5 K per year z Growing increase in requests for additional lighting.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 13 Current Needs (cont’d)
{ Street Lighting-Existing Thoroughfares (new category) z Provides consistent lighting levels on thoroughfares citywide. Five thoroughfares currently have no lighting. z Total Need - $2.06 M { Street Lighting-Freeway Lighting z Installs lighting on sections of freeways that currently have no lighting z Total Need - $2.31 M z Need confirmation from TXDOT on freeway reconstruction schedules prior to further investment.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 14 Current Needs (cont’d)
{ Street Petitions z Builds new streets requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $14.42 M z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs { Street Reconstruction Local Streets z Addresses reconstruction needs of local streets at the end of their useful life. z Total Need - $64.94 M z Level of investment in the 03 Bond Program - $980 K per year
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 15 Current Needs (cont’d)
{ Street Reconstruction Thoroughfares z Addresses reconstruction needs of thoroughfares at the end of their useful life. z Total Need - $205.19 M z Level of investment in the 95, 98, and 03 Bond Programs - $4.95 M per year { Street Resurfacing z Provides for resurfacing of streets to extend their useful life z Total Need - $217.05 M z Level of investment in the 95, 98, and 03 Bond Programs - $8.62 M per year
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 16 Current Needs (cont’d)
{ Streetscape/Urban Design z Develops landscape and urban design improvements. z Total Need - $227.19 M z Level of investment in the 03 Bond Program - $4.15 M per year { Target Neighborhood z Provides city initiated improvements to bring residential streets to standard z Level of investment in the 95 and 03 Bond Programs - $1.69 M per year
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 17 Current Needs (cont’d)
{ Thoroughfares z Builds new or widened thoroughfares as specified by the Dallas Thoroughfare Plan. z Total Need - $2.318 B z Level of investment in the 95, 98, and 03 Bond Programs - $6.54 M per year { Traffic Accident Reduction Roadway Improvements (new category) z Improves accident analysis using existing police database and automate detection of accident trends. Funds countermeasures required to eliminate accident trends. z Total Need - $396 K
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 18 Current Needs (cont’d)
{ Traffic Intersection Capacity and Safety Improvements z Provides safety and/or geometric improvements to existing intersections z Total Need - $48.08 M z Historically funded through partnership projects to improve congestion and air quality. { Traffic Safety Improvements – Guardrail Upgrades (new category) z Upgrades existing 1960’s guardrail to current standards at 291 locations on thoroughfares (minor and residential streets to be in future phases). z Total Need - $5.93 M
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 19 Current Needs (cont’d)
{ Traffic Sign Upgrades (new category) z Replaces existing traffic control signs z Total Need - $25.91 M { Phase 1 - $6.13 M (at signals and school crossings) z Visibility standards were increased by Federal Highway Admin. for needs of aging population. 80% of the city’s 300,000 signs are older than 20 years and have low visibility. { Traffic Signal Control Equipment Upgrades (new category) z Replaces existing signal controllers as design life is exceeded (incl. battery powered backups for power failures). z Total Need - $6.64 M z Last citywide replacement was 1990 thru 2000. 2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 20 Current Needs (cont’d)
{ Traffic Signal Upgrades-CBD z Installs signal mast arms at locations with visibility issues. z Total Need - $6.81 M z Level of investment in the 03 Bond Program - $600 K per year { Traffic Signal Upgrades-Citywide z Installs signal hardware upgrades at locations with structural deficiencies or history of knockdowns. z Total Need - $51.58 M z Level of investment in the 03 Bond Program - $330 K per year
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 21 Current Needs (cont’d)
{ TSM (Traffic System Mgt.) - Dynamic Message Signs z Installs electronic message signs to display variable messages about incidents and congestion on freeways. z Total Need - $1.84 M z Signs that are identified in the ITS Master Plan. { TSM - Flood Detour Signs z Installs electronic message signs to give advanced warning of closures at major intersections. z Total Need - $1.81 M z Complements existing flood warning system.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 22 Current Needs (cont’d)
{ TSM-Roadside Cameras z Installs roadside cameras used to remotely view traffic so that messages regarding incidents may be posted or signal timing may be changed from City Hall. z Total Need - $676 K z Level of investment in the 03 Bond Program - $20 K per year z Cameras are for locations identified in the ITS Master Plan. { Warranted Signals and School Flashers z Installs new traffic signals and school flashers as warranted. z Total Need - $4.62 M z Level of investment in the 03 Bond Program - $410 K per year z Historically receive requests for 5 new school flashers and 8 new warranted traffic signals per year.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 23 Current Needs (cont’d)
{ Total needed for 32 individual categories as of March 31, 2006 - $3.78 B { The Needs Inventory is still being updated. { Projects continue to be added, and costs and rankings continue to be revised. { Costs are based on 2010 projections.
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 24 Leveraged Funds from Other Agencies
{ Existing Intergovernmental Partnership Projects with total value of $160.58 M estimated to leverage $112.94 M { Pending project selection in calls for projects z Dallas County Major Capital Improvement Program – project selection Summer ‘06 z Statewide Transportation Enhancement Program (STEP) – project selection late ‘06 z NCTCOG Partnership Program 3 - project selection Summer ‘06
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 25 Summary
{ Street and Transportation needs address many of the Council’s Key Focus areas; z Economic Development – providing for safe and efficient movement of people and goods and transportation to developing areas z Neighborhood Quality of Life z Public Safety { Needs have grown from $2.2 B in 2003 to $3.78 B as of March 31, 2006 { These needs continue to be updated based on public input received recently from various stakeholders. { The updated comprehensive Needs Inventory will be presented April 19, 2006
2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 26 Appendix A
Street and Transportation Needs Inventory by Council District in Priority Order as of March 31, 2006
Note: The Needs Inventory is still being updated. Projects continue to be added. Costs and rankings continue to be revised.
Tier 2 projects are generally lower in priority and may not have a rank or cost estimate. Street and Transportation Needs Inventory
Project Name Description Tier Score Estimate Council District CW I.T.S. - Adaptive Signal Timing
Adaptive Signal Timing System Med Volume Arterial Computer Software, Traffic Flow Sensors and Engineering for 2 $638,154 Adaptive Signal Timings Summary for 'Category' = I.T.S. - Adaptive Signal Timing (1 detail record) Sum $638,154 Intergovernmental Partnership Projects
Congestion Mitigation&Air Quality Intersection Imp Partnership project with Dallas County and TxDOT to 1 $638,150 supplement 1995 and 1998 Bond Program funding to complete Dallas County CMAQ intersection improvement projects. Total estimated cost of $62.5 million. Dallas County 2006 Call for Projects In anticipation of Summer 2006 project selection from recent 1 $3,828,900 call for projects. This amount will cover the City's share of design. Construction will be funded in future bond program. STEP 2006 Call for Projects In anticipation of December 2006 project selection from recent 1 $0 call for projects. Summary for 'Category' = Intergovernmental Partnership Projects (3 detail records) Sum $4,467,050 School Flasher Upgrades
School Flasher Upgrades - Citywide Citywide Projects 1 $5,565,306
Summary for 'Category' = School Flasher Upgrades (1 detail record) Sum $5,565,306 Sidewalk Improvements
Sidewalk Replacement This program provide funding to assist individual owners with 1 $2,552,600 the cost of replacing sidewalks
Friday, March 31, 2006 Page 1 of 349 Project Name Description Tier Score Estimate Council District CW Sidewalk Improvements
Summary for 'Category' = Sidewalk Improvements (1 detail record) Sum $2,552,600 Street Lighting - Enhanced Fixtures
Street Lighting-Enghanced Fixtures - On-Demand On Demand Projects 1 $319,075
Summary for 'Category' = Street Lighting - Enhanced Fixtures (1 detail record) Sum $319,075 Street Resurfacing
Street Resurfacing Tier 2 Total estimated value for all individual blocks recommended for 2 $124,183,990 street resurfacing listed in Tier 2. Individual blocks listed in Tier 2 must be field evaluated, scored, and combined with contiguous blocks, if appropriate, before assigning a project cost. Summary for 'Category' = Street Resurfacing (1 detail record) Sum $124,183,990 Streetscape / Urban Design
Pedestrian Access Master Plan District wide study regarding pedestrian access limitations & 2 $2,233,525 opportunities as recommended in the Trinity River Comprehensive Land Use Plan Transit Link - Phase II Create link from Slocum to Stemmons Service Road. 2 $697,327
Trinity Parkway Retaining Walls - for two future pedestrian Retaining walls to support future 2 Pedestrian Decks over 2 $5,105,200 decks Trinity Parkway as recommended in Trinity River Balanced Vision Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $8,036,052 Traffic Accident Reduction Roadway Improvements
Traffic Accident Reduction Roadway Improvements - On- On-Demand Projects 1 $395,653 Demand
Friday, March 31, 2006 Page 2 of 349 Project Name Description Tier Score Estimate Council District CW Traffic Accident Reduction Roadway Improvements
Summary for 'Category' = Traffic Accident Reduction Roadway Improvements (1 detail record) Sum $395,653 Traffic Sign Upgrades
Phase 1 Upgrade traffic signs citywide. This project will be implemented 1 $6,126,240 in three phases. Phase 1 includes; 1) the purchase of sign inventory software and mobile data computers for sign crews, and 2) the design, materials and installation labor to upgrade signs Phase 2 Upgrade traffic signs citywide. This project will be implemented 1 $4,722,310 in three phases. Phase 2 includes the design , materials and installation labor to upgrade signs on all major arterials (non- residential streets). Phase 3 Upgrade traffic signs citywide. This project will be implemented 2 $15,060,340 in three phases. Phase 3 includes the design, material and installation lboar to upgrade signs in residential neighborhoods. Residential neighborhoods require street name signs at every in Summary for 'Category' = Traffic Sign Upgrades (3 detail records) Sum $25,908,890 Traffic Signal Control Equipment Upgrades
Traffic Signal Control Equipment Upgrades - Citywide Citywide Projects 1 $6,636,760
Summary for 'Category' = Traffic Signal Control Equipment Upgrades (1 detail record) Sum $6,636,760 Warranted Signals and School Flashers
Warranted Signals and School Flashers - On-Demand Locations are determined as traffic conditions demand. Traffic 1 $4,620,206 signals or school flashers will be installed when warranted by a traffic engineering study. Summary for 'Category' = Warranted Signals and School Flashers (1 detail record) Sum $4,620,206
Friday, March 31, 2006 Page 3 of 349 Project Name Description Tier Score Estimate Council District CW
Summary for 'Program' = STREET AND TRANSPORTATION (17 detail records) Sum $183,323,736 Summary for 'CD' = (17 detail records) Sum $183,323,736
Friday, March 31, 2006 Page 4 of 349 Project Name Description Tier Score Estimate Council District 1 Alley Reconstruction
Tennant (509-517) Hampton - Jefferson to Davis Full recon Tennant (509 - 517) 1 69 $35,736 Marsalis & Lancaster - E. Tenth To E. Ninth Full Reconstruction 1 64.5 $118,501
Marsalis & Lancaster - 11th to Jefferson Full reconstruction 1 46 $59,731
9Th St & 10Th St - Zang to Madison Full reconstruction - 9Th St 200-226 1 43 $100,394
Image La (4406 - 4530) "T" Alley to Cockrell Hill Full reconst Image Ln. (4406 - 4530) 1 40 $301,207
Berkley & Newport - Waverly To Rugged Full Reconstruction 1 32.5 $225,532
Steinman Avenue (300-322) 8yh - Patton to Denver Full recon Steinman Ave. (300 - 322) 1 31 $75,302
Bentley Av - 2400 - 2550 Full Reconstruction 2 $343,524
Bocaraton & Meadowcrest - Preston to "T" Alley (including Full Reconstruction 1 $287,168 "T" alley) Boyd St 2402 - 2510 Full reconstruction - Boyd St 2402 - 2510 2 $146,775
Dutton Dr - 3302 - 3434 Full Reconstruction 2 $246,685
Eighth St (E) - 510 - 520 Full Reconstruction 2 $68,807
Eighth St (E) - 618 - 624 Full Reconstruction 2 $136,339
Ewing Av (N) - 201 - 239 Full Reconstruction 2 $135,320
Falls Dr - 2503 - 2555 Full Reconstruction 2 $173,291
Falls Dr - 2603 - 2649 Full Reconstruction 2 $178,387
Falls Dr - 2902 - 3052 Full Reconstruction 2 $240,313
Illinois Av - 1101 - 1141 Full Reconstruction 2 $146,023
June Dr - 3303 - 3435 Full Reconstruction 2 $248,214
Montclair Av (S) - 603 - 719 Full Reconstruction 2 $133,535
Montreal Av - 1300 - 1430 Full Reconstruction 2 $215,849
Mt Royal St - 4102 - 4230 Full Reconstruction 2 $280,833
Friday, March 31, 2006 Page 5 of 349 Project Name Description Tier Score Estimate Council District 1 Alley Reconstruction
Ninth St - 901 - 939 Full Reconstruction 2 $132,517 Northaven & Yorkshire - Yorkshire to Royalshire Full Reconstruction (6123 Northaven Rd) 1 $179,320
Parkchester & Crestbrook - Royalshire to Bocaraton Full Reconstruction 1 $356,088
Royalshire & Parkchester - Royalshire to Bocaraton Full Reconstruction 1 $188,892
Tenth St (E) - 901 - 939 Full Reconstruction 2 $100,916
Tenth St (W) - 101 - 137 Full Reconstruction 2 $131,497
Twelfth St (W) - 2600 - 2650 Full Reconstruction 2 $173,546
Twelfth St (W) - 603 - 637 Full Reconstruction 2 $134,300
Wood Valley Pl - 2548 - 2558 Full Reconstruction 2 $68,042
Summary for 'Category' = Alley Reconstruction (31 detail records) Sum $5,362,582 Barrier Free Ramps
900 W. Canty St 4 BFRs on W. Canty St. @ Tyler 1 47 $5,207
10th St & Oak Cliff One BFR needed at the corner of 2100 W 10th St. Modification 1 36 $5,105 of parkway and existing SW is needed. Remove existing steps and build sidewalk curb where needed. Polk St. @ 9th St. Install 4 ramps at this intersection 1 33 $7,658
9th St @ Tyler Construct 4 ramps 1 23 $7,658
Bishop @ Yarmouth 2 BFRs needed at intersection 1 18 $3,829
301 S. Brighton One BFR to be constructed at corner of this house 1 3 $1,914
Suffolk( W) @ Bishop construct 2 BFRs on intersection's corners 1 3 $3,829
Summary for 'Category' = Barrier Free Ramps (7 detail records) Sum $35,200
Friday, March 31, 2006 Page 6 of 349 Project Name Description Tier Score Estimate Council District 1 Intergovernmental Partnership Projects
Davis - Hampton to Westmoreland Partnership project with Dallas County to reconstruct and widen 1 $3,798,269 to 4 lane divided. Total estimated cost of $12.4 million. Summary for 'Category' = Intergovernmental Partnership Projects (1 detail record) Sum $3,798,269 Sidewalk Petitions
Ewing Ave (S) - Clarendon Dr to 12th St Engineering, Paving 400 Block 1 100 $21,059
Summary for 'Category' = Sidewalk Petitions (1 detail record) Sum $21,059 Street Petitions
Ninth St (W) - Westmoreland Rd (N) to RaviniaDr(N) Paving and Drainage construction only 3000-3200 blk 1 90 $530,245
Marcell Av - Dacki Av to Hord Av Enginerring, Paving and Drainage 4500 blk 1 87 $650,913
Summary for 'Category' = Street Petitions (2 detail records) Sum $1,181,158 Street Reconstruction Local Streets
Western St - Cocrell Hill Rd to Sunny Side Av 4200 - 4300 Blks 1 46.97 $518,178
Summary for 'Category' = Street Reconstruction Local Streets (1 detail record) Sum $518,178 Street Reconstruction Thoroughfares
Westmoreland Rd (S) - 9th St to W Jefferson Blvd 100(S) - 100(N) Blks 1 59.35 $1,595,375
Larue St - Knoxville St to Sage Valley Ln 4600 Blk 1 40.98 $1,199,722
Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $2,795,097 Street Resurfacing
Friday, March 31, 2006 Page 7 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Fleming Pl. - R.L. Thornton Frwy. to Jefferson Blvd. 400 Block 1 79.145 $30,631 Colorado Blvd. (W) - Beckley Ave. to Sylvan Ave. 100 - 800 1 78.545 $374,977
Ninth St. (E) - Patton Ave. to Marsalis Ave. 400 - 500 1 73.79 $105,039
Knoxville St. - Dead End to Old Spanish Tr. 1500 - 1700 1 68.375 $76,323
Denver St. (N) - Davis St. to Fifth St. 300 - 600 1 64.635 $230,245
Page Ave. (W) - Zang Blvd. toMadison Ave. 200 block 1 63.705 $58,199
Crawford St. (N) - Jefferson Blvd. to Eighth St. 100 - 400 1 62.93 $114,995
Fifth St. (W) - Beckley Ave. to Elsbeth Ave. 100 Block 1 61.635 $46,968
Ballard Ave. - Colorado Blvd. to Eldorado Ave. 1100 - 1200 1 61.455 $110,910
Fouraker St. - Cedar Hill Ave. to N. Tyler St. 600 - 800 1 60.995 $135,415
Winston St. - Tyler St. to Vernon Ave. 800 block 1 60.91 $32,801
Betterton Cir. - Eleventh St. to R.L. Thornton Frwy. 800 - 900 1 57.09 $43,139
Cumberland St. - Brooklyn Ave. to Suffolk Ave. 700 - 800 1 56.88 $78,365
Comal St. - Jefferson Blvd. to IH-30 900 Block 1 56.42 $19,527
Delaware Ave. - Vernon Ave. - Tyler St. 800 Block 1 54.465 $29,100
Lakehurst Ct. - Randolph Dr. to Cockrell Hill Rd. 4200 - 4300 1 54.315 $35,609
Sunset Ave. - Franklin St. to Superior St. 2500 - 2600 1 53.37 $87,809
Patton Ave. (N) - Ninth St. to Eighth St. 200 block 1 52.695 $65,219
Seventh St. (E) - Jefferson Blvd. to Eads Ave. 900 - 1000 1 52.505 $23,229
Plymouth Rd. (N) - Superior St. to Davis St. 100 - 500 1 52.225 $184,042
Delaware Ave. Bishop Ave. to Griffth Ave. 400 - 600 1 49.565 $110,655
Marlborough Ave. (N) - Tenth St. to Davis St. 100 - 400 1 47.695 $48,755
Friday, March 31, 2006 Page 8 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Vernon Ave. (N) - Davis St. to Winston St. 600 block 1 47.28 $62,283 Ewing Ave. (N) - R.L. Thornton Frwy. to Viola St. 300 - 400 1 46.585 $43,267
Boyd St. - Dead End to Ferndale Ave. 1600 - 1900 1 46.455 $54,626
Ewing Ave. (S) - Eleventh St. to IH-35 200 Block 1 45.44 $55,647
Crawford St. (S) - Tenth St. to Twelfth St. 100 - 200 1 45.025 $49,010
Marlborough Ave. (S) - Brandon St. to Wright Ave. 1300 - 1400 1 44.515 $42,246
Suffolk Ave. (W) - Madison Ave. to Zang Blvd. 200 block 1 43.22 $70,069
Pembroke Ave. (E) - Rockwood St. to Story St. 200 block 1 43.16 $81,556
Alco Ave. - Franklin Ave. to Plymouth Rd. 2500 - 2600 1 42.92 $85,384
Gladstone Dr. - Superior St. to Pierce St. 2700 Block 1 41.645 $68,154
Eleventh St. (E) - Leads St. to Cliff St. 1100 Block 1 28.165 $23,229
Adams Av. (N) - 100 2 $0
Adams Av. (S) - 100 2 $0
Adams Av. (S) - 300 2 $0
Aster St. - 2600 2 $0
Barnett Av. (S) - 2500 2 $0
Beckley Av. (N) - 200 2 $0
Beckley Av. (S) - 200 2 $0
Berkley Av. - 1100 2 $0
Bishop Av. (N) - 1100 2 $0
Briscoe Blvd. (S) - 400 2 $0
Brooklyn Av. (W) - 2100 2 $0
Friday, March 31, 2006 Page 9 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Canty St. (W) - 100 2 $0 Cavender St. (N) - 200 2 $0
Cedar Hill Av. - 1100 2 $0
Chalmers St. - 400 2 $0
Clarendon Dr. (E) - 500 2 $0
Clarendon Dr. (W) - 200 2 $0
Clarendon Dr. (W) - 300 2 $0
Clarendon Dr. (W) - 3300 2 $0
Clarendon Dr. (W) - 3400 2 $0
Clarendon Dr. (W) - 3500 2 $0
Clinton Av. (S) - 2200 2 $0
Clinton Av. (S) - 500 2 $0
Clinton Av. (S) - 700 2 $0
Clinton Av. (S) - 800 2 $0
Colorado Blvd. (E) - 100 2 $0
Colorado Blvd. (E) - 200 2 $0
Colorado Blvd. (E) - 300 2 $0
Colorado Blvd. (E) - 400 2 $0
Colorado Blvd. (E) - 500 2 $0
Coombs Creek Dr. - 1800 2 $0
Coombs Creek Dr. - 1900 2 $0
Cumberland St. - 100 2 $0
Friday, March 31, 2006 Page 10 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Cumberland St. - 300 2 $0 Davis St. (E) - 100 2 $0
Davis St. (E) - 200 2 $0
Davis St. (W) - 100 2 $0
Dawes Dr. - 3100 2 $0
Denver St. (S) - 200 2 $0
Division St. - 4300 2 $0
Dutton Dr. - 3500 2 $0
Edgefield Av. (S) - 1500 2 $0
Edgefield Av. (S) - 2300 2 $0
Edgefield Av. (S) - 500 2 $0
Edgefield Av. (S) - 600 2 $0
Edgefield Av. (S) - 800 2 $0
Eighth St. (E) - 300 2 $0
Eighth St. (E) - 400 2 $0
Eighth St. (E) - 500 2 $0
Eighth St. (E) - 900 2 $0
Eli Av. - 600 2 $0
Elmwood Blvd. - 1700 2 $0
Ewing Av. (N) - 800 2 $0
Frances St. (S) - 100 2 $0
Grafton Av. - 2600 2 $0
Friday, March 31, 2006 Page 11 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Hampton Rd. (S) - 1000 2 $0 Hampton Rd. (S) - 500 2 $0
Hampton Rd. (S) - 900 2 $0
Hollywood Av. - 100 2 $0
Hollywood Av. - 2500 2 $0
Hollywood Av. - 300 2 $0
Hollywood Av. - 400 2 $0
Ivandell Av. - 2800 2 $0
Jefferson Blvd. (W) - 2400 2 $0
Jefferson Blvd. (W) - 3000 2 $0
Jefferson Blvd. (W) - 3600 2 $0
Jefferson Blvd. (W) - 800 2 $0
Jefferson Blvd. (W) - 900 2 $0
Jefferson Serv. (W) N - 3300 2 $0
Jerden La. (E) - 200 2 $0
Keats Dr. - 2100 2 $0
Kessler Lake Dr. - 700 2 $0
Kidd Springs Dr. - 800 2 $0
Knoxville St. - 2200 2 $0
Knoxville St. - 2300 2 $0
Lancaster Av. (N) - 400 2 $0
Larue St. - 4500 2 $0
Friday, March 31, 2006 Page 12 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Madison Av. (S) - 300 2 $0 Madison Av. (S) - 800 2 $0
Madison Av. (S) - 900 2 $0
Marlborough Av. (S) - 100 2 $0
Marsalis Av. (S) - 500 2 $0
Marvin Av. - 2500 2 $0
Mather Ct. - 3900 2 $0
Melbourne Av. - 2500 2 $0
Mt Everest St. - 3700 2 $0
Mt Royal St. - 4000 2 $0
Mt Shasta St. - 100 2 $0
Neely St. (W) - 500 2 $0
Paisley St. - 400 2 $0
Pampas St. - 4000 2 $0
Patton Av. (S) - 200 2 $0
Pembroke Av. (W) - 200 2 $0
Plymouth Rd. (S) - 100 2 $0
Poinsettia Dr. - 3500 2 $0
Randolph Dr. (N) - 200 2 $0
Randolph Dr. (N) - 300 2 $0
Randolph Dr. (S) - 300 2 $0
Richmondell Av. - 600 2 $0
Friday, March 31, 2006 Page 13 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Rolinda Dr. - 2500 2 $0 Rugged Dr. (E) - 2100 2 $0
Rugged Dr. (E) - 2200 2 $0
Sabine St. - 600 2 $0
Sixth St. (E) - 900 2 $0
Starr St. - 200 2 $0
Sunnyside Av. - 1300 2 $0
Sunset Av. - 900 2 $0
Superior St. - 1200 2 $0
Superior St. - 1800 2 $0
Superior St. - 1900 2 $0
Superior St. - 2000 2 $0
Superior St. - 2100 2 $0
Tennant St. (N) - 400 2 $0
Twelfth St. (E) - 600 2 $0
Twelfth St. (W) - 2100 2 $0
Twelfth St. (W) - 2700 2 $0
Tyler St. (N) - 1200 2 $0
Tyler St. (S) - 1200 2 $0
Van Buren Av. (S) - 200 2 $0
Westmoreland Rd. (S) - 1900 2 $0
Westmoreland Rd. (S) - 200 2 $0
Friday, March 31, 2006 Page 14 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing
Westmoreland Rd. (S) - 600 2 $0 Wilbur St. - 2700 2 $0
Wilton Av. - 2400 2 $0
Wilton Av. - 2500 2 $0
Windomere Av. (S) - 800 2 $0
Yarmouth St. (W) - 200 2 $0
Zang Blvd. (S) - 600 2 $0
Summary for 'Category' = Street Resurfacing (161 detail records) Sum $2,677,422 Streetscape / Urban Design
Beckley Ave. Enhancement ROW acquisition, Remediation, Relocation, Streetscaping 2 $1,799,104
Davis St Phase II - Cedar Hill Av to Polk St 5 intersection improvements (paving, drainage, landscaping) on 2 $2,362,544 Davis St. Sidewalk curb, gutter and drive approach replacement Jefferson Blvd Median Improvement Intersection Improvements at Marsalis Ave and at Beckley Ave 2 $697,327 with left-turn lanes, and leave-out sidewalks for Davis St from Marsalis to Zang Oak Cliff Gateway Portal enhancements, designed with 2003 BP 2 $1,174,196
Summary for 'Category' = Streetscape / Urban Design (4 detail records) Sum $6,033,171 Target Neighborhood
Polk St (S) - Wilbur St to Ferndale Av Engineering, Paving and Drainage Blks 1900-2300 1 100 $673,886
Polk St (S) - Ferndale Av to Clarendon Av Engineering, Paving and Drainage blks 1100-1900 1 99 $1,876,455
Summary for 'Category' = Target Neighborhood (2 detail records) Sum $2,550,341
Friday, March 31, 2006 Page 15 of 349 Project Name Description Tier Score Estimate Council District 1 Thoroughfares
Clarendon - Gilpin to Zang Widen to standard four lane undivided roadway 1 50 $26,511,265 Davis Street - Westmoreland to Hampton Widen to 4 lanes divided with new bridge at Coombs Creek 1 48 $4,016,604
Clarendon - Zang to 750' West of Marsalis Widen to a four lane undivided roadway 1 41 $6,113,980
Clarendon (E) - Marsalis to Corinth Widen to a four lane undivided 1 37 $655,141
Davis - Zang to Eighth Reconstruct roadway to lane roadway. Thoroughfare Plan 1 37 $2,306,190 amendment required. Duncanville - Illinois to Shelley Widen to a four lane divided roadway froma two lane road. 1 35 $1,716,366
Shelley - Duncanville to Knoxville Build a new 4 lane divided roadway 1 25 $1,114,764
Cockrell Hill - Davis to Cockrell Hill CL Widen to a four lane undivided 1 20 $1,341,254
Ewing - Jefferson Blvd. E to I.H. 35 Widen to a four lane undivided roadway 1 18 $1,308,689
Knoxville - Illinois to Shelley Widen to a four lane divided roadway 1 18 $8,126,590
Summary for 'Category' = Thoroughfares (10 detail records) Sum $53,210,844 Traffic Intersection Capacity & Safety Improvement
Davis St at Cockrell Hill Rd Construct a free right turn lane on westbound Davis Street at 1 45 $0 Cockrell Hill Road. Beckley @ Jefferson Widen Beckely approaching Jefferson to provide northbound 1 35 $440,324 and southbound left-turn pockets. Jefferson @ Marsalis Street Modifications and Bott Widen Marsalis at Jefferson to provide northbound and 1 35 $513,073 southbound left-turn pockets. Eighth @ Jefferson Street Modifications and Bottle Widen Jefferson at Eighth to provide northbound and 1 30 $440,324 southbound left-turn lanes. Jefferson @ Westmoreland Street Modifications and Use wide median area to provide dual left-turns on Jefferson for 1 30 $720,841 eastbound and westbound approaches. Remove dip in roadway as you cross the intersection. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (5 detail records) Sum $2,114,561
Friday, March 31, 2006 Page 16 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Safety Improvements-Guardrail Upgrades
Hampton 400 N BLK Guardrail Upgrade 1 73 $7,307 Westmoreland 200 N BLK Guardrail Upgrade 1 67 $8,583
Marsalis 800 S BLK Guardrail Upgrade 1 60 $38,417
Tyler 900 S BLK Guardrail Upgrade 1 60 $9,317
Illlinois 4200 W BLK Guardrail Upgrade 1 47 $4,658
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (5 detail records) Sum $68,282 Traffic Signal Upgrades - Citywide
Cedar Hill @ Davis (Llewellyn) Traffic Signal Upgrade 1 93 $118,696
Davis @ Gilpin Traffic Signal Upgrades Citywide 1 80 $51,180
Jefferson @ Zang Traffic Signal Upgrade 1 80 $81,938
Marsalis @ Twelfth Traffic Signal Upgrade 1 80 $107,464
Polk @ Twelfth Traffic Signal Upgrade 1 80 $52,137
Adams @ Jefferson Traffic Signal Upgrade 1 67 $107,464
Bishop @ Twelfth Traffic Signal Upgrade 1 67 $81,938
Clarendon @ Westmoreland Traffic Signal Upgrade 1 67 $81,364
Duncanville @ Illinois Traffic Signal Upgrade 1 67 $62,564
Eighth @ Jefferson Traffic Signal Upgrade 1 67 $107,464
Falls @ Westmoreland Traffic Signal Upgrade 1 67 $120,610
Hampton @ Illinois Traffic Signal Upgrades Citywide 1 67 $53,924
Illinois @ Knoxville Traffic Signal Upgrade 1 67 $109,379
Jefferson @ Westmoreland Traffic Signal Upgrade 1 67 $191,445
Friday, March 31, 2006 Page 17 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Signal Upgrades - Citywide
Llewellyn @ Twelfth Traffic Signal Upgrade 1 67 $107,464 Twelfth @ Tyler Traffic Signal Upgrade 1 67 $104,274
Bishop @ Jefferson Traffic Signal Upgrade 1 53 $107,464
Clarendon @ Tyler Traffic Signal Upgrade 1 53 $82,896
Colorado @ Sylvan(Tyler) Traffic Signal Upgrade 1 53 $40,491
Crawford @ Jefferson Traffic Signal Upgrade 1 53 $107,464
Edgefield @ Illinois Traffic Signal Upgrade 1 53 $54,689
Eighth @ RL Thornton Traffic Signal Upgrade 1 53 $121,912
Jefferson @ Marsalis Traffic Signal Upgrade 1 53 $107,464
Marsalis @ RL Thornton Traffic Signal Upgrade 1 53 $203,187
RL Thornton @ Yarmouth (Zang) Traffic Signal Upgrade 1 53 $107,464
Twelfth @ Zang Traffic Signal Upgrade 1 53 $82,321
Clarendon @ Zang Traffic Signal Upgrade 1 40 $108,422
Davis @ Kings Hwy Traffic Signal Upgrade 1 40 $53,732
Davis @ Polk Traffic Signal Upgrade 1 40 $51,180
Davis @ Tyler Traffic Signal Upgrade 1 40 $75,746
Jefferson @ Llewellyn Traffic Signal Upgrade 1 40 $107,464
Jefferson @ Madison Traffic Signal Upgrade 1 40 $107,464
Jefferson @ Marlborough Traffic Signal Upgrade 1 40 $107,464
Jefferson @ Polk Traffic Signal Upgrade 1 40 $51,180
Jefferson @ Tyler Traffic Signal Upgrade 1 40 $102,359
Kiest @ Walton Walker Traffic Signal Upgrade 1 40 $80,809
Friday, March 31, 2006 Page 18 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Signal Upgrades - Citywide
Polk @ Tenth Traffic Signal Upgrade 1 40 $50,156 Tenth @ Tyler Traffic Signal Upgrade 1 40 $102,359
Tenth @ Zang Traffic Signal Upgrade 1 40 $120,610
Beckley @ Clarendon Left turn pockets on all approaches 1 27 $114,867
Clarendon @ Edgefield Left turn pockets on all approaches 1 27 $107,464
Edgefield @ Twelfth Traffic Signal Upgrade 1 27 $23,642
Summary for 'Category' = Traffic Signal Upgrades - Citywide (42 detail records) Sum $3,919,581 Traffic System Management - Roadside Cameras
Hampton-Illinois Roadside Camera 1 30 $6,382
Davis-Hampton Roadside Camera 1 25 $6,382
Singleton-Walton Walker Traffic Systems Management - Roadside Camera 1 20 $25,526
Summary for 'Category' = Traffic System Management - Roadside Cameras (3 detail records) Sum $38,289 Summary for 'Program' = STREET AND TRANSPORTATION (277 detail records) Sum $84,324,035 Summary for 'CD' = 1 (277 detail records) Sum $84,324,035
Friday, March 31, 2006 Page 19 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Petitions
Thurston Dr & Wanebe Dr - Bombay Ave to Gilford St Engineering, Paving and Drainage 7800 - 7900 blks 1 99 $88,703 Summary for 'Category' = Alley Petitions (1 detail record) Sum $88,703 Alley Reconstruction
Hondo & Arroyo Ave - Brown St. To N. Tollway Full Reconstruction 1 60 $169,468
Fitzhugh(1719 N)& Westburg alley parallel to Ross Full Reconstruction 1 56 $46,442
Columbia Ave & Eastside - Saint Mary to Garrett Full reconstruction - Columbia Ave (5108 - 5126) 1 49 $91,894
Gaston Av (5200 - 5324) Junius - Munger to Dumas Full reconst Gaston Ave (5200 - 5324) 1 49 $125,460
Moser Avenue (2100-2324) Henderson - Capitol to Fuqua Full recon Moser Ave. (2100 - 2324) 1 49 $231,010
Columbia Ave & Reiger - Beacon to Augusta Full Reconstruction - Columbia Ave (5501 - 5535) 1 46 $122,525
Maple Avenue (4431-4447) Sylvester - Lucas to Arroyo Full reconst Maple Avenue (4431 - 4447) 1 37 $62,539
Belmont & Richmond - Glencoe to McMillan Full Reconstruction 1 30 $200,813
Concord Ave (7302 - 7514) Denton - Lovedale to Anson Full reconstruction Concord Ave (7302 - 7514) 1 25 $202,932
Parry Av (4803 - 48843) Lindsley - Caldwell to Fitzhugh Full recons Parry Ave. (4803 - 48843) 1 25 $134,012
Parry & R. L. Thornton - Fitzhugh To Dead End Full Reconstruction 1 18 $64,475
Amherst Av - 2303 - 2427 Full Reconstruction 2 $187,307
Arroyo Av. 2300- 2346 Full reconstruction 2 $153,156
Beacon St. 1115 ----- Full reconstruction (T-alley only) 2 $76,578
Beeman Av - 5214 - 5322 Full Reconstruction 2 $238,784
Belmont Av - 4512 - 4614 Full Reconstruction 2 $146,787
Bradford Dr - 5427 - 5427 Full Reconstruction 2 $91,742
Brookfield Av - 2303 - 2427 Full Reconstruction 2 $186,543
Friday, March 31, 2006 Page 20 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Reconstruction
Brookfield Av - 2503 - 2529 Full Reconstruction 2 $89,448 Cameron Av - 401 - 523 Full Reconstruction 2 $179,916
Capital Av - 5016 - 5020 Full Reconstruction 2 $91,742
Carlson Dr - 2802 - 3010 Full Reconstruction 2 $294,085
Carlson Dr - 3202 - 3338 Full Reconstruction 2 $230,630
Columbia Av - 4900 - 4950 Full Reconstruction 2 $176,604
Corinth St - 129 - 149 Full Reconstruction 2 $94,800
Culver St - 5600 - 5634 Full Reconstruction 2 $114,932
Denton Dr - 5202 - 5328 Full Reconstruction 2 $204,891
Denton Dr (Serv) (7303 - 7515) Concord - Lovedale to Full reconst Denton Dr. (Serv) (7303 - 7515) 2 $202,932 Anson East Grand Av - 5401 - 5445 Full Reconstruction 2 $146,023
Fairview Av - 1307 - 1427 Full Reconstruction 2 $202,597
Fairview Av - 1500 - 1538 Full Reconstruction 2 $154,943
Fairview Av - 3202 - 3314 Full Reconstruction 2 $243,882
Gilford St - 2303 - 2427 Full Reconstruction 2 $186,032
Grandview Av - 402 - 522 Full Reconstruction 2 $171,762
Hondo Av - 2512 - 2512 Full Reconstruction 2 $186,032
Jerome St - 3001 - 3123 Full Reconstruction 2 $182,465
Live Oak & Bryan - Carroll to Annex Full Reconstruction 2 $143,594
Martinique Av - 401 - 523 Full Reconstruction 2 $170,233
Record Crossing Rd - 1206 - 1270 Full Reconstruction 2 $231,139
Record Crossing Rd - 1302 - 1440 Full Reconstruction 2 $230,630
Friday, March 31, 2006 Page 21 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Reconstruction
Reynolds Av - 3002 - 3124 Full Reconstruction 2 $179,152 Richard Av - 5303 - 5355 Full Reconstruction 2 $182,210
Ross(5010) & San Jacinto - Bennett to N Garrett Full Reconstruction 2 $133,049
Samuell Blvd & I-H 30 - I.H.-30 To Winslow St. Full Reconstruction 2 $154,432
Summary for 'Category' = Alley Reconstruction (44 detail records) Sum $7,110,621 Barrier Free Ramps
Lamar @ Memorial 4 BFRs needed on intersection 1 46 $7,658
Ross @ Summit 2 BFRs on intersection 1 36 $3,829
Bryan St at N Fitzhugh Ave 3 BFRs at Intersection 1 35 $5,743
Bryan St at N Prairie Ave 4 BFRs at Intersection 1 35 $7,658
Butler St @ Harry Hines Blvd Existing inlets(2), a power pole, a traffic signal light, and a 1 32 $7,658 manhole are located at the corner of this intersection. Bryan @ Peak Barrier Free Ramps Need 2 BFRs @ # 4223, # 4302 Bryan St 1 31 $3,829
Bennett Ave at Live Oak St 3 BFRs at Intersection 1 21 $5,743
N Fitzhugh Ave at Sycamore St 2 BFRs at Intersection 1 17 $2,450
N Prairie Ave at Sycamore St 2 BFRs at Intersection 1 17 $3,829
Annex @ Virginia Ave One BFR needed at the corner of 1500 Annex Ave 1 3 $1,914
Congress Ave @ Reagan St 4 BFRs at Inresection 1 3 $7,658
Summary for 'Category' = Barrier Free Ramps (11 detail records) Sum $57,970 Bridge Repair and Modification
Friday, March 31, 2006 Page 22 of 349 Project Name Description Tier Score Estimate Council District 2 Bridge Repair and Modification
Corinth St. over Trinity River Superstructure rehab incl. repair to sheared girder, 2 cracked 1 56.25 $204,208 girders, numerous general spalls, rail damage, repair of spalls under span over N. levee - not full rehab Houston Street Viaduct over Trinity River Completion of rehab begun by TxDOT (design by HNTB) - 1 41.25 $2,871,675 rating based on 2004 BRINSAP - scheduled for reevaluation 2006 Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $3,075,883 Intergovernmental Partnership Projects
Design District Connection Partnership project with ______to design and 1 $0 construct new pedestrian connection from Design District to American Airlines Center. Total estimated cost of $7.5 million. Dolphin Rd - IH 30 to Military Parkway Partnership project with Dallas County to reconstruct existing 4 1 $1,014,659 lane undivided roadway. Total estimated cost of $3.6 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. E. Dallas Veloway Phase 2 Tunnel at DART's SE-1 Partnership project with DART and Dallas County to design and 1 $1,595,375 Crossing construct hike and bike trail under DART's SE Corridor Light Rail. Total estimated cost of $3.3 million. DART to begin construction on overall project mid 2006. Supplements 2003 Bond Program Industrial Blvd - Cadiz St to Continental Ave Partnership project with Dallas County and TxDOT to 1 $20,580,338 reconstruct the existing six and eight lane divided roadway. Total estimated cost of $40 million. Supplements 2003 Bond Program funds. Estimated to be let by mid 2010. Industrial Blvd - Cadiz St to Corinth St Design and Reconstruction to 8 lane cross section, turn lanes 2 $33,183,800 at major signalized intersections, ROW acquisition, bicycle lanes, and landscaping to serve as a Collector-Distributor for the Trinity Parkway as recommended in the Trinity Corridor Balanced Vi Irving Blvd. (EB) @ Old River Channel Bridge rehabilitation and/or reconstruction 2 $0
Friday, March 31, 2006 Page 23 of 349 Project Name Description Tier Score Estimate Council District 2 Intergovernmental Partnership Projects
Live Oak St. - Liberty to Peak Partnership project with Dallas County to reconstruct existing 1 $482,441 five lane undivided roadway. Total estimated cost of $4.6 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Malcolm X @ SFRR-Hickory Street Bridge rehabilitation and/or reconstruction 2 $0
Motor St - IH 35E to Medical Center Dr Partnership project with TxDOT and Dallas County to widen 1 $5,870,980 existing roadway to 6 lane divided and rebuild TRE bridge. Total estimated cost of $23.4 million. Estimated to be let by late 2010. Sylvan Bridge from Irving to Gallagher - Amenities Partnership project with TxDOT to provide new six lane bridge 1 $1,837,872 with amenities over the Trinity River. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2007. Supplements 2003 Bond Program funds. Trinity River - Consolidation of Power Transmission Lines Cost to remove existing aerial power transmission lines 1 $2,042,080 along East Levee with proposed new line along Industrial currently along the East Levee of the Trinity River Corridor Blvd. floodway and consolidate with the proposed new transmission lines along Industrial Blvd. to avoid utility conflicts with MHH Signature Bri Trinity River - Underground existing transmission lines Cost to underground existing power transmission lines along 1 $16,783,345 along East Levee the East Levee of the Trinity River Corridor to avoid utility conflicts with three Signature Bridges and Trinity Parkway (Potential cost share with TxDOT for partial segment) Trinity River - Underground transmission lines, UPRR to Cost to underground proposed power transmission lines from 1 $6,892,020 proposed Dallas South Network Substation approximately UPRR to proposed Dallas South Network Substation to avoid utility conflicts with Pegasus Project (Potential cost share with TxDOT) Summary for 'Category' = Intergovernmental Partnership Projects (13 detail records) Sum $90,282,909 Street Lighting-CBD Roadway Lighting
Jefferson @ I-30 to Young Roadway Lighting Installation 1 40 $128,014
Canton @ Akard to Harwood Roadway Lighting Installation 1 35 $181,353
Jackson @ Houston to Griffin Roadway Lighting Installation 1 35 $106,678
Friday, March 31, 2006 Page 24 of 349 Project Name Description Tier Score Estimate Council District 2 Street Lighting-CBD Roadway Lighting
Harwood @ Commerce to Canton Roadway Lighting Installation 1 30 $51,206 Wood @ Ervay to Pearl Roadway Lighting Installation 1 10 $32,003
Wood @ Griffin to Akard Roadway Lighting Installation 1 10 $20,909
Summary for 'Category' = Street Lighting-CBD Roadway Lighting (6 detail records) Sum $520,164 Street Petitions
Kimsey Dr - Maple Av to Dead End Engineering, Paving & Drainage 2500-2700 Blks 1 94 $491,848
St. Mary Avenue - Terry Street - Garland Avenue Engineering Paving and Drainage S500 to S600 Blks 1 75 $187,279
Summary for 'Category' = Street Petitions (2 detail records) Sum $679,127 Street Reconstruction Local Streets
Gano St - Harwood St to Central Expwy 200 Blk 1 65.44 $188,211
Durant St - McKee St to Gano St 1600 Blk 1 64.67 $130,300
Fletcher St - Parry Ave to Ash Ln 700 - 800 Blks 1 64.3 $521,200
Lake Ave - Kings Rd to dead end 4700 Blk 1 63.19 $463,289
Park Av - St Louis St South to Dead-End 1100 Blks 1 62.86 $102,104
Ferris St - Orleans St to Malcolm X Blvd 2700 Blk 1 61.92 $463,289
Park Av - Beaumont St to Richardson Av 1800 - 2100 Blk 1 60.94 $978,922
Gurley Av - S Carroll Av to Stonewall St 4400 Blk 1 60.66 $216,971
Beaumont St - S. Ervay St to St Paul St 1700 Blk 1 59.98 $425,008
Ann Ave - Garland Rd to Parry Ave 800 blk 1 58.51 $232,287
Congo St - Carroll Ave to Bank St 4500 Blk 1 57.51 $367,574
Friday, March 31, 2006 Page 25 of 349 Project Name Description Tier Score Estimate Council District 2 Street Reconstruction Local Streets
Beeman Ave - Spurlock St to Jerome St 5100 blk 1 57.15 $491,376 Hudnall St - Denton Dr to Bradford Dr 2800 blk 1 55.14 $388,710
Roanoke Ave - Huron Av to Harry Hines Blvd 2100 Blk 1 54.82 $433,942
Fairmount St - Clara St to Kings Rd 4700 Blk 1 53.14 $446,705
Weldon St - N Carroll Av to Belmont Av 4500 - 4600 Blks 1 50.5 $701,965
Summary for 'Category' = Street Reconstruction Local Streets (16 detail records) Sum $6,551,853 Street Reconstruction Thoroughfares
Samuell Blvd - Winfield Av to UP RR 3500 - 3600 Blks 1 78.42 $657,767
Dolphin Rd - Samuell Blvd to R L Thornton Frwy 5400 Blk 1 77.38 $188,254
Dolphin Rd - R L Thornton Frwy to Jerome St 5200 - 5300 Blks 1 72.76 $1,398,825
Henderson Av (S) - Winslow Av to R L Thornton (Serv Rd) 1400 Blk 1 71.36 $707,070
Hobbs St - Haskell Av to Alpine St 4900 Blk 1 71.31 $446,705
Crowdus St (S) - Taylor St to St Louis St 400 Blk 1 69.45 $125,303
McKee St - Austin St to Dart L R 800 - 1000 Blks 1 68.57 $751,741
Lindsley Ave - Graham Av to Munger Blvd 5100 - 5400 Blks 1 68.34 $2,127,592
Peters St - W Griffin St to Powhattan St 1100 - 1200 Blks 1 68.12 $319,075
Benson St - Exposition Av to Commerce St 3700 Blk 1 67.37 $255,260
King George Dr - Regal Row to Viceroy Dr 8600 - 8700 Blks 1 64.84 $1,659,190
Hill Av (N) - Elm St to Simpson St 300 Blk 1 63.41 $355,183
Griffin St (E) - 900 Blk 900 Blk 1 62.99 $361,945
Valdina St - Wycliff Av West to Dead-End 2200 - 2300 Blks 1 61.37 $670,058
Friday, March 31, 2006 Page 26 of 349 Project Name Description Tier Score Estimate Council District 2 Street Reconstruction Thoroughfares
Gaston Av - Fitzhugh Av to Collett Av 4900 Blk 1 60.25 $728,767 River Bend Dr - Stemmons (Serv Rd) to Dead-end (Turn 1200 Blk 1 59.97 $2,127,592 Around) Cedar Crest Blvd Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $5,662,439 Bonnie View Ln to the Trinity River Bridge Cedar Crest Blvd, from Bonnie View Ln to the Trinity River Bridge, to serve as gateway for both East Oak Cliff and Trinity River greenbelt as recommended in the Trinity River Comprehensive Land Use Pl Continental Ave. - Industrial Blvd. to Stemmons Frwy Design and Reconstruction to 8 lane cross section, turn lanes, 1 $3,701,270 signalization, ROW acquisition, and pedestrian friendly streetscaping as recommended in the Trinity River Balanced Vision Plan Ervay Street Reconstruction / Urban Design, from MLK to Roadway reconstruction & streetscape enhancements on 1 $3,682,776 Marilla Ervay, from MLK to Marilla, to serve as a gateway into Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan S. Lamar St. - Grand Ave. to IH 45 - Construction Only Reconstruction (initially to 4 lanes), including ROW acquisition 1 $0 for 6 lanes, Signalization and turn lanes at major signalized intersections, and landscaping as recommended in the Trinity River Balanced Vision Plan (Construction Only) S. Lamar St. - Grand Ave. to IH 45- Design Only Design for Reconstruction (initially to 4 lanes), and landscaping 1 $957,225 as recommended in the Trinity River Balanced Vision Plan Summary for 'Category' = Street Reconstruction Thoroughfares (21 detail records) Sum $26,884,037 Street Resurfacing
Walton St. (N) - Elm St. to Main St. 100 - 300 1 89.49 $70,069
Good Latimer Expy. (S) - Corinth St. to S. Central Expy. 2100 - 2700 1 89.265 $25,552
Willow St. - Exposition Ave. to Peak St. 3700 - 4300 1 88.75 $163,749
Wichita St. - Industrial Blvd. to Slocum St. 200 - 300 1 87.375 $68,282
Cass St. - Motor St. to Dead End 4800 - 4900 1 85.77 $97,382
Friday, March 31, 2006 Page 27 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Browder St. - Griffin St. (E) to Blakeney Blvd. 1100 - 1200 1 85.37 $43,649 McKee St. - Wall St. to Ervay St. 1100 - 1600 1 84.56 $174,343
Pauline St. - Crutcher St. to Simpson St. 400 block 1 83.41 $24,760
Redfield St. - Lofland St. to Inwood Rd. 5200 - 5600 1 83.22 $249,389
Barry Ave. (S) - RL Thornton Frwy. To Phillip Ave. 900 - 1000 1 83.015 $141,031
Crowdus St. - Indiana St. to Canton St. 200N - 200S 1 82.68 $128,651
Hi Line Dr. - Edison St. to Oak Lawn Ave. 1400 - 1800 1 82.37 $211,866
Dawson St. - Good Latimer Expy. to Orleans St. 2500 - 2700 1 82.17 $131,969
Buffalo St. - Austin St. to Cockrell Ave. 800 Block 1 82.02 $30,376
Hickory St. - Ervay St. to First Ave. 1700 - 3400 1 81.76 $627,940
Adair St. - Race St. to Concrete 300 Block 1 81.07 $37,906
Worth St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 81.01 $79,131
Cockrell Ave. - 1900 Lamar to 2700 Lamar 2000 - 2700 1 80.73 $172,030
First Ave. - Exposition Ave. to Ash Ln. 400 - 800 1 80.18 $47,095
Arnold st. - S. Lamar St. to Austin St. 800 Block 1 80.125 $17,996
Walton St. (S) - Main St. to Taylor St. 100 - 300 1 79.685 $37,013
Bomar Ave. - Forest Park Rd. to Maple Ave. 2300 - 2400 1 79.475 $138,606
Denton Dr. - King Rd. to Minert St. 4700 Block 1 79.45 $107,082
Tex Oak Ave. - Dead End to Butler St. 5200 - 5300 1 79.05 $129,800
Munger Blvd. (S) - East Side Ave. to Garland Ave. 200 - 600 1 78.52 $300,313
Washington Ave (S). - Main St. to East Side Ave. 100 block 1 77.91 $23,356
Kinmore St. - St Charles Ave. to Winfield Ave. 3000 - 3400 1 77.9 $37,864
Friday, March 31, 2006 Page 28 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Corinth St. - Lamar St. to Gould St. 1100 - 1300 1 77.58 $55,519 Barry Ave. (S) - Ware St. to Haskell Ave. 1400 - 1700 1 77.27 $337,964
Denton Dr. - Hudnall St. to Denton Dr. Cut-Off 5400 - 5500 1 77.075 $166,174
Lofland St. - Harry Hines Blvd. to Redfield Dr. 2100 block 1 77.06 $69,431
Baylor St. - Dawson St. to Dead End 1500 - 1700 1 77.01 $54,243
Main St. - Exposition Ave. to Commerce St. 3600 block 1 76.23 $84,874
Taylor St. - Henry St. to Hall St. 2700 - 3000 1 76.215 $75,812
Corinth St. - Good Latimer Expy. To Bourbon St. 2500 Block 1 76.1 $45,436
Forest Park Rd. - Hawes Ave. to Empire Central Dr. 6800 - 6900 1 75.99 $102,104
Swiss Ave. - Apple St. to Carroll Ave. 4000 - 4400 1 75.42 $100,368
Lear St. - S. Ervay St. to Park Ave. 1700 - 1800 1 75.38 $69,175
Louise Ave. - S. Good Latimer Expy. to Malcom X 2500 - 2700 1 75.37 $128,651
Jerome St. - Beeman St. to Dolphin Rd. 2900 - 3300 1 74.72 $141,542
Beaumont St. - Akard St. to Wall St. 1200 Block 1 74.305 $28,844
Peak St. (N) - Gaston Ave. to Live Oak St. 900 - 1200 1 74.125 $159,155
Sullivan Dr. - Wall St. to Ervay St. 1200 - 1600 1 74.02 $110,017
Munger Blvd. (N) - Bryan St. to Live Oak St. 1300 block 1 73.955 $80,407
Malcolm X Blvd. (S) - Elm St. to Concrete 200 - 500 1 73.675 $99,934
Crutcher St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 73.015 $86,278
Knight St. - Harry Hines Blvd. to Brown St. 2200 - 2600 1 73.01 $171,407
Ash Ln. - Peak St. to Fletcher St. 4200 Block 1 72.56 $15,954
Seegar St. - Browder St. to Ervay St. 1500 - 1600 1 72.52 $63,432
Friday, March 31, 2006 Page 29 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Chestnut St. - Hall St. to Santa Fe Ave. 1400 - 1800 1 72.355 $284,232 Spurlock St. - Beeman Ave. to Dolphin Rd. 2900 - 3300 1 72.3 $171,279
Simpson St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 71.92 $72,239
Harwood St. (S) - St. Louis St. to Corinth St. 1200 - 1900 1 71.905 $273,383
Henderson Ave. (S) - R.L. Thornton Frwy. to Oleander St. 1300 Block 1 71.65 $10,338
Gurley Ave. - Dead End to Stonewall St. 4200 - 4300 1 70.3 $24,747
Annex Ave. - Live Oak St. to Ross Ave. 1300 - 1600 1 69.88 $127,502
Grigsby Ave. - Gaston Ave. to Swiss Ave. 900 - 1000 1 69.79 $53,349
Bourbon St. - Corinth St. to Santa Fe Ave. 2000 block 1 69.77 $4,722
Murray St. - Main St. to Canton St. 100 - 200 1 69.72 $40,203
Harwood St (N) - Payne St. to Olive St. 2500 - 2600 1 69.7 $21,314
Washington Ave. (N) - Main St. to Worth St. 200 - 500 1 69.685 $173,704
Owenwood Ave. - Samuell Blvd. to Kinmore St. 4700 - 5200 1 69.58 $21,203
Plantation Rd. - Wyche Blvd. to Harry Hines Blvd. 1900 block 1 69.21 $47,606
St Mary Ave. (S) - East Grand Ave. to Philip Ave. 1100 block 1 69.12 $35,736
Bennett Ave. - Live Oak St. to Ross Ave. 1300 - 1600 1 68.71 $212,759
Beaumont St. - Park Ave. to Harwood St. 1900 Block 1 68.64 $27,313
Glass St. - Levee St. to Industrial Blvd. 100 block 1 68.635 $55,009
La Vista Dr. - East Grand Ave. to Cul-de-Sac 7400 block 1 68.35 $83,981
Orr St. - Sullivan Dr. to Ervay St. 1300 block 1 68.28 $44,032
King George Dr. - Viceroy Dr. to Regal Row 8600 - 8700 1 68.19 $180,724
Continental Ave. - Industrial Blvd. to Continental Bridge 100 Block 1 67.7 $319,330
Friday, March 31, 2006 Page 30 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Sycamore St. - Peak St. to Fitzhugh Ave. 4300 - 4800 1 67.675 $248,368 Cadiz St. - Lamar St. to R.R. Tracks (Conc.) 900 - 1000 1 67.52 $25,654
Beeman Ave. - Jerome St. to RL Thornton Frwy. 5200 - 5300 1 67.22 $81,300
St Charles Ave. - Jerome St. to Samuell Blvd. 5200 - 5400 1 67.17 $79,258
Harry Hines Blvd. - Record Crossing to Exchange Park 6000 - 6200 1 66.83 $280,403
Santa Fe Ave. - Dead End to Carroll Ave. 4300 - 4400 1 66.44 $16,337
St Louis St. - St. Paul St. to Harwood St. 1800 - 1900 1 66.37 $63,177
East Side Ave. - Fitzhugh Ave. to Beacon St. 4900 - 5500 1 66.13 $191,828
Junius St. - Washington Ave. to Haskell Ave. 3800- 4000 1 65.95 $63,177
Crutcher St. - Hall St. to Pauline St. 3500 Block 1 65.69 $81,811
Swiss Ave. - Annex Ave. to Fitzhugh Ave. 4700 - 4800 1 64.73 $82,194
San Jancinto St. - Haskell Ave. to Bennett Ave. 4100 - 4900 1 63.755 $502,862
Ross Ave. - Peak St. to Live Oak St. 4300 - 6000 1 63.685 $625,898
Greenville Ave. - Bryan St. to Palo Pinto Ave. 1300 - 2500 1 63.39 $386,208
Lindsley Ave. - S. Munger Blvd. to St. Mary St. 5000 - 5100 1 63.37 $67,006
Fuqua St. - Fitzhugh Ave. to Bennett Ave. 4900 Block 1 63.27 $21,059
Throckmorton St. - Maple Ave. to Holland Ave. 2500 - 3600 1 63.12 $430,879
Prairie Ave. (N) - Sycamore St. to Bryan St. 1200 - 1300 1 62.54 $51,690
Peeler St. - Atwell St. to Manor Way 5900 - 6200 1 62.265 $104,784
Crestview Dr. - Cedar Springs Rd. to Dead End 3100 - 3400 1 62.13 $183,021
Collville Ave. - Dead End to Mockingbird Ln. 6500 Block 1 61.91 $37,396
Alexander Ave. - Cockrell Ave. to Lamar St. 900 Block 1 61.7 $39,948
Friday, March 31, 2006 Page 31 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Shelby Ave. - Maple Ave. to Dickason Ave. 2500 - 2900 1 61.16 $121,759 Bowser Ave. - Wheeler St. to Dead End 5000 - 5100 1 61.025 $28,206
Lovedale Ave. - Harry Hines Blvd. to Mohawk Dr. 2100 - 2200 1 60.66 $184,042
Bryan St. - Haskell Ave. to Munger Ave. 4100 - 5100 1 60.63 $534,642
Ervay St. (S) - McKee St. to Corinth St. 1700 - 2000 1 60.61 $171,024
Fillmore Dr. - Empire Central Dr. to Lovedale Ave. 7000 - 7200 1 60.59 $99,169
Lamesa St. (S) - Alma St. to Montgomery St. 2200 - 2300 1 60.44 $52,839
Garrett Ave. (N) - Live Oak St. to Ross Ave. 1300 - 1600 1 60.09 $113,335
Samuell Blvd. - Winslow Ave. to Sibley Ave. 2800 - 3000 1 59.82 $189,786
Gano St. - Akard St. to Wall St. 1200 Block 1 58.895 $32,035
Holly Ave. - Bryan St. to San Jancinto St. 1400 - 1500 1 58.78 $135,543
Hedgerow Dr. - Cedar Springs Rd. to Lemmon Ave. 3100 - 3400 1 58.68 $163,494
Magnolia St. - McKinney Ave. to Field St. 2000 block 1 58.26 $27,696
Reagan St. - Dickason Ave. to Maple Ave. 2500 - 3100 1 58.16 $152,314
Alma St. - Lamesa St. to Lamar St. 900 - 1000 1 58.145 $21,314
Virginia Ave. - Annex Ave. to Fitzhugh Ave. 4600 - 4800 1 58.12 $101,721
Browder St. - Corinth St. to Parker St. 2100 Block 1 57.885 $24,633
Gould St. - Gano St. to Parker St. 1600 - 2100 1 57.6 $288,571
Madera St. - Manette St. to Bonita Ave. 2600 block 1 57.58 $21,825
Ash Ln. - Glasgow Dr. to Cameron Ave. 6200 - 6300 1 57.25 $44,926
Roanoke Ave. - Thurston Dr. to Denton Dr. 2500 - 2600 1 55.92 $79,641
Richardson Ave. - S. Ervay St. to S. Harwood St. 1700 - 2000 1 55.5 $117,802
Friday, March 31, 2006 Page 32 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Cedarplaza Ln. - Cedar Springs Rd. to Lemmon Ave. 3100 - 3400 1 55.34 $114,101 Viceroy Dr. - 1600 Viceroy Dr. to Regal Row 1600 - 1700 1 53.98 $112,697
Henderson Ave. (N) - Capitol Ave. to Alcott St. 2400 - 2700 1 53.39 $164,643
Wayne St. - Santa Fe Ave. to Lindsley Ave. 400 - 700 1 53.31 $61,135
Martinique Ave. - Santa Fe. Ave. - Ash Ln. 400 - 500 1 53.255 $49,265
Hartford St. - Douglas Ave. to Dead End 4300 - 4400 1 51.96 $67,516
Monarch St. - California Dr. to Fitzhugh Ave. 4500 - 4800 1 51.845 $120,100
St Paul St. (S) - Gano St. to Beaumont St. 1700 block 1 51.54 $83,215
Congress Ave. - Hood St. to Douglas Ave. 3600 - 4300 1 51.24 $225,650
Henderson Ave. (N) - Lewis St. to McMillian Ave. 1600 - 1800 1 50.545 $316,012
Shea Rd. - Mohawk Dr. to Harry Hines Blvd. 2000 - 2200 1 49.925 $156,474
Amherst Ave. (W) - Huron Dr. to Denton Dr. 2200 - 2600 1 49.85 $162,984
Browder St. - McKee St. to Beaumont St. 1700 Block 1 49.46 $28,461
Lindsley Ave. - S. Beacon St. to Graham Ave. 5500 block 1 49.105 $22,718
Lemmon Ave. - Inwood Rd. to Atwell St. 5700-6000 1 48.88 $122,014
Collett Ave. (S) - Columbia Ave. to Concrete 100 Block 1 47.815 $22,591
Herschel Ave. - Cedar Springs Rd. to Dickason Ave. 3000 Block 1 47.125 $27,568
Collett Ave. (N) - Worth St. to Bryan St. 700 - 1300 1 44.42 $337,454
Santa Fe. Ave. - Fitzhugh Ave. to Munger Blvd. 4900 block 1 43.515 $17,996
Wheeler St. - Lemmon Ave. to Dead End 3500 - 3700 1 42.39 $79,424
Shorecrest Dr. - Harry Hines Blvd. to Denton Dr. 2100 - 2400 1 40.63 $161,835
Garrett Ave. (S) - Munger Blvd. to Santa Fe Ave. 100 - 300 1 39.05 $29,355
Friday, March 31, 2006 Page 33 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Adeline St. - 1900 2 $0 Akard St. (S) - 400 2 $0
Alcott St. - 4700 2 $0
Ann Av. - 700 2 $0
Annex Av. - 1900 2 $0
Annex Av. - 900 2 $0
Anson Rd. - 2700 2 $0
Ash La. - 4800 2 $0
Ash La. - 5500 2 $0
Atoka St. - 4400 2 $0
Beacon St. (S) - 300 2 $0
Beaumont St. - 2000 2 $0
Belleview St. - 1300 2 $0
Belmont Av. - 4600 2 $0
Belmont Av. - 5500 2 $0
Bengal St. - 4700 2 $0
Bengal St. - 4800 2 $0
Bengal St. - 4900 2 $0
Bennett Av. - 2600 2 $0
Bennett Av. - 2700 2 $0
Benson St. - 3900 2 $0
Bombay Av. - 2300 2 $0
Friday, March 31, 2006 Page 34 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Bombay Av. - 2400 2 $0 Bonita Av. - 5200 2 $0
Briar Cliff Rd. - 1400 2 $0
Briar Cliff Rd. - 1500 2 $0
Brookfield Av. - 2500 2 $0
Brookriver Dr. - 8000 2 $0
Brookriver Dr. - 8200 2 $0
Brown St. - 3800 2 $0
Caroline St. - 2500 2 $0
Carroll Av. (N) - 400 2 $0
Carroll Av. (N) - 800 2 $0
Cedar Springs Rd. - 4700 2 $0
Cedar Springs Rd. - 5400 2 $0
Cedar Springs Rd. - 5500 2 $0
Cedar Springs Rd. - 5600 2 $0
Cedar Springs Rd. - 5700 2 $0
Cedar Springs Rd. - 5800 2 $0
Cedar Springs Rd. - 5900 2 $0
Cedar Springs Rd. - 6300 2 $0
Cedar Springs Rd. - 6400 2 $0
Cedar Springs Rd. - 6500 2 $0
Colony Ct. - 2300 2 $0
Friday, March 31, 2006 Page 35 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Columbia Av. - 4800 2 $0 Continental Av. - 500 2 $0
Corbin St. - 1100 2 $0
Core St. - 800 2 $0
Corinth St. - 2000 2 $0
Corinth St. - 2100 2 $0
Cortland Av. - 7100 2 $0
Crampton St. - 1200 2 $0
Crampton St. - 1300 2 $0
Dawson St. - 3000 2 $0
Dawson St. - 3200 2 $0
Denton Dr. - 8000 2 $0
Denton Dr. - 8200 2 $0
Dolphin Rd. - 5000 2 $0
Dolphin Rd. - 5100 2 $0
East Side Av. - 3800 2 $0
Edison St. - 1600 2 $0
Elmbrook Dr. - 7800 2 $0
Elmbrook Dr. - 7900 2 $0
Elmbrook Dr. - 8000 2 $0
Elmbrook Dr. - 8200 2 $0
Exposition Av. (N) - 100 2 $0
Friday, March 31, 2006 Page 36 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Fairview Av. - 1300 2 $0 Fairview Av. - 1500 2 $0
Farrington St. - 2000 2 $0
Farrington St. - 2100 2 $0
Farrington St. - 2300 2 $0
Farrington St. - 2400 2 $0
Farrington St. - 2600 2 $0
Field St. (N) - 2500 2 $0
Field St. (N) - 2600 2 $0
Fielder Ct. - 2600 2 $0
Fielder Ct. - 2700 2 $0
Fitzhugh Av. (N) - 2700 2 $0
Forest Park Rd. - 6600 2 $0
Forest Park Rd. - 6700 2 $0
Garrett Av. (N) - 1900 2 $0
Garrett Av. (N) - 2000 2 $0
Garrett Av. (N) - 2100 2 $0
Garrett Av. (S) - 400 2 $0
Good Latimer Exwy. (S) - 100 2 $0
Griffin Blvd. (N) - 800 2 $0
Griffin St. (N) - 100 2 $0
Grigsby Av. - 1300 2 $0
Friday, March 31, 2006 Page 37 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Grigsby Av. - 1600 2 $0 Hall St. (S) - 300 2 $0
Hall St. (S) - 500 2 $0
Harry Hines Blvd. - 2500 2 $0
Harry Hines Blvd. - 2700 2 $0
Harry Hines Blvd. - 2800 2 $0
Harry Hines Blvd. - 5400 2 $0
Harwood St. (N) - 2800 2 $0
Harwood St. (N) - 3100 2 $0
Hawes Av. - 1700 2 $0
Hawes Av. - 2000 2 $0
Hawes Av. - 2100 2 $0
Hawes Av. - 2200 2 $0
Henderson Av. (N) - 300 2 $0
Henry St. - 200 2 $0
Henry St. - 300 2 $0
Herschel Av. - 3000 2 $0
Hi Line Dr. - 1900 2 $0
Hill Av. (N) - 500 2 $0
Hinton St. - 1500 2 $0
Hinton St. - 1600 2 $0
Hinton St. - 1700 2 $0
Friday, March 31, 2006 Page 38 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Hinton St. - 1800 2 $0 Hondo Av. - 2200 2 $0
Hotel St. - 900 2 $0
Houston Viad. (N) - 600 2 $0
Houston Viad. (N) - 700 2 $0
Howell St. - 100 2 $0
Hudnall St. - 3400 2 $0
Indiana Blvd. - 2800 2 $0
Jackson St. - 800 2 $0
Junius St. - 5300 2 $0
Kelly Av. - 1700 2 $0
Kirby St. - 2700 2 $0
Knight St. - 2800 2 $0
Knight St. - 2900 2 $0
Lafayette St. - 4300 2 $0
Lahoma St. - 5100 2 $0
Lamar St. (S) - 2000 2 $0
Lamar St. (S) - 2100 2 $0
Langdon Av. - 2100 2 $0
Langdon Av. - 2300 2 $0
Langdon Av. - 2400 2 $0
Langdon Av. - 2500 2 $0
Friday, March 31, 2006 Page 39 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Langdon Av. - 2600 2 $0 Lemmon Av. - 2200 2 $0
Levee St. - 1000 2 $0
Levee St. - 1700 2 $0
Levee St. - 1800 2 $0
Levee St. - 1900 2 $0
Levee St. - 2000 2 $0
Lovers La. (W) - 2200 2 $0
Lovers La. (W) - 2500 2 $0
Lovers La. (W) - 2600 2 $0
Mail Av. - 2200 2 $0
Manufacturing St. - 100 2 $0
Manufacturing St. - 1300 2 $0
Maple Av. - 5300 2 $0
Maple Av. - 5400 2 $0
Maple Av. - 5600 2 $0
Maple Av. - 6000 2 $0
Maple Av. - 6300 2 $0
Maple Av. - 6400 2 $0
Market Center Blvd. - 1700 2 $0
Market Center Blvd. - 2000 2 $0
Market Center Blvd. - 2100 2 $0
Friday, March 31, 2006 Page 40 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Market St. (N) - 1700 2 $0 Mckinnon St. - 2600 2 $0
Medical Center Dr. - 5000 2 $0
Medical Center Dr. - 5500 2 $0
Moody St. - 1800 2 $0
Moody St. - 2000 2 $0
Munger Av. - 900 2 $0
Oak Lawn Av. - 100 2 $0
Oak Lawn Av. - 2300 2 $0
Oakbrook Blvd. - 6600 2 $0
Oakbrook Blvd. - 6700 2 $0
Pace St. - 1300 2 $0
Parkhouse St. - 100 2 $0
Peak St. (N) - 1800 2 $0
Peters St. - 1200 2 $0
Philip Av. - 4600 2 $0
Philip Av. - 4700 2 $0
Philip Av. - 4800 2 $0
Pittsburg St. - 100 2 $0
Race St. - 3900 2 $0
Rawlins St. - 5600 2 $0
Record Crossing Rd. - 1100 2 $0
Friday, March 31, 2006 Page 41 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Record Crossing Rd. - 1200 2 $0 Record Crossing Rd. - 1300 2 $0
Record Crossing Rd. - 1600 2 $0
Record Crossing Rd. - 1900 2 $0
Record Crossing Rd. - 2000 2 $0
Record St. (N) - 1700 2 $0
Record St. (N) - 1800 2 $0
Regal Row. - 1600 2 $0
Regal Row. - 1700 2 $0
Regal Row. - 1800 2 $0
Reiger Av. - 5200 2 $0
Reunion Blvd. - 200 2 $0
Richard Av. - 5300 2 $0
Richard Av. - 5400 2 $0
River Bend Dr. - 1100 2 $0
River Bend Dr. - 1300 2 $0
Riveredge Dr. - 100 2 $0
Rock Island St. - 1800 2 $0
Rock Island St. - 1900 2 $0
Ross Av. - 700 2 $0
Ross Av. - 800 2 $0
Sheridan St. - 2200 2 $0
Friday, March 31, 2006 Page 42 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing
Sheridan St. - 2300 2 $0 Sheridan St. - 2400 2 $0
Sleepy Hollow Dr. - 1200 2 $0
Sleepy Hollow Dr. - 1300 2 $0
Slocum St. - 800 2 $0
Slocum St. - 900 2 $0
Sports St. - 700 2 $0
St Mary Av. (N) - 100 2 $0
Stoneleigh Av. - 5000 2 $0
Stoneleigh Av. - 5100 2 $0
Stoneleigh Av. - 5200 2 $0
Stoneleigh Av. - 5300 2 $0
Summit Av. - 2100 2 $0
Summit Av. - 2200 2 $0
Terry St. - 4100 2 $0
Turtle Creek Blvd. - 1300 2 $0
Wanebe Dr. - 7800 2 $0
Wichita St. - 1800 2 $0
Winslow Av. - 5700 2 $0
Winslow Av. - 5800 2 $0
Summary for 'Category' = Street Resurfacing (355 detail records) Sum $16,702,412
Friday, March 31, 2006 Page 43 of 349 Project Name Description Tier Score Estimate Council District 2 Streetscape / Urban Design
Cadiz / Corinth Tunnel Pedestrian Enhancements Design and construction of pedestrian enhancements and 2 $7,657,800 demolition of existing tunnel to provide pedestrian friendly access into Trinity Park Columbia Ave. Munger to Carroll Lnadscape / street Scape crosswalks at major intersections. 2 $3,556,368
Commerce St - Houston to Pearl See also: PB98N610 for design only, from Griffin to Harwood 2 $2,118,480 (Phase I). IMPS No. 10655, Intergovernmental Partnership Projects for street major rehab and/or reconstruction, from IH 35E to US-75 ~4,800 LF Deisgn District - Victory Station Pedestrian Link Provides a pedestrian/bicycle/zero emission vehicle link 2 $2,789,309 underneat Stemmons Freeway between the Trinity/Stemmons Elm St - Houston to Pearl Phase I - Griffin to Ervay. Bus lane improvements and 2 $2,186,818 pedestrian enhancements Freeway Air Rights Develop.-Woodall Rodgers & I-30 Study potential bridging of these freeway barries, providing 2 $178,515 landscping and pedestrian connections to Uptown and the Cedars Houston Street Pedestrian Way Extends the existing protected pedestrian walkway on Houston 2 $1,501,338 Street Viaduct from Greenbriar/Oak Cliff Founders Park to Reunion Boulevard/Union Station Lamar Street Lighting - Woodall Rodgers to Young Increased public safety on route between Convention Center 2 $767,060 and Uptown ~3,200 LF, lights @ 50' o/c each side Lamar Street Urban Design Enhancements along Lamar, IH-30 to Hatcher to encourage 2 $7,531,514 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Ross Avenue - Lamar to Julius Schepps Freeway Includes screening for parking, pedestrian and streetscape 2 $429,551 enhancements and upgrading street light. ~5,300 LF - currently under design Ross/San Jacinto Connector-Lamar to Griffin Complete planned couplet, preliminary engineering, ROW 2 $2,091,982 acquisition and construction San Jacinto Street Lighting - Lamar to Routh Increased public safety ~4,500 LF lights @ 50' o/c each side 2 $108,086
Stemmons Design District -Transit Link - Phase I Create link between west side of Stemmons and new DART 1 $2,091,982 Victory Light Rail Station.
Friday, March 31, 2006 Page 44 of 349 Project Name Description Tier Score Estimate Council District 2 Streetscape / Urban Design
Streetscape Improvements Streetscape and landscape improvements: Oaklawn, Market 2 $11,436,166 Center, Irving and Industrial. ~8,200 LF Trinity River Park - Reunion Gateway to Trinity Park - Design and Construction of major pedestrian and vehicular 2 $8,838,378 Access from Industrial Blvd. access to Reunion Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Trinity River Park - Reunion Gateway to Trinity Park - Design of major pedestrian and vehicular access to Reunion 2 $893,410 Access from Industrial Blvd. - Design Only Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Young St - Harwood to Ervay Landscape between Farmers Market and Civic Center ~1,200 2 $1,673,585 LF Summary for 'Category' = Streetscape / Urban Design (17 detail records) Sum $55,850,343 Thoroughfares
Inwood -Harry Hines to Maple Widen existing six lane roadway with 4' median to 15' median 1 67 $2,616,077 with left turn pockets Inwood -Maple to Cedar Springs Widen existing six lane roadway with 4' median to 15' median 1 67 $2,270,557 with left turn pockets Houston -Young to Elm Convert operation from 1-way to 2-way 1 61 $497,757
Continental - Industrial to IH 35E Design & reconstruction to an eight lane roadway with six left 1 56 $8,161,300 turns Haskell - Lemmon to Main Rebuild a three lane coupletwith sidewalk, streetscape & 1 56 $8,786,628 landscape improvements. Haskell - Main to East Grand Rebuild a three lane couplet 1 56 $30,298,865
Harry Hines - Mockingbird to Webb Chapel Ext Widen to 8 lane divided roadway 1 52 $24,333,859
Harry Hines - Oak Lawn to Market Center Widen to 8 lane divided roadway 1 50 $15,677,952
Industrial -Continental to Corinth Widen to eight lane divided cross section, Railway bridge 1 50 $5,857,548 reconstruction Haskell - Dolphin/ Hatcher to Crosstown Widen to a six lane divided roadway 1 48 $1,435,936
Griffin St - Corbin to Woodall Rodgers Widen to 40' of pavement 1 44 $3,226,816
Friday, March 31, 2006 Page 45 of 349 Project Name Description Tier Score Estimate Council District 2 Thoroughfares
Oak Lawn - IH 35E to Irving Blvd Widen to 6 lane divided roadway 1 44 $6,342,626 Harry Hines - Market Center to Inwood Widen to 8 lane divided roadway 1 40 $10,248,448
Industrial -UPRR bridge north of Commerce Replace UPRR bridge and widen to eight lane dvided cross 1 37.714 $15,738,017 section Lindsley -Munger to Tennison Memorial Reconstruct to a two lane undivided roadway; NTM Calming 1 37 $7,762,224 Project Harry Hines - Inwood to Mockingbird Widen to 8 lane divided roadway 1 35 $5,999,909
Loop 354/ Harry Hines - Motor to Oak Lawn Widen to an eight lane divided roadway 1 35 $591,979
Denton- Inwood to Mockingbird Widen to a four lane undivided roadway 1 34 $5,787,904
Young - Ervay to Harwood Enhanced sidewalks and streetscape 1 34 $1,723,724
Lamar (S) - Corinth to Cadiz Reconstruct to a six lane divided roadway 1 33 $16,865,652
St. Paul - Canton to Elm Widen to 44 foot pavement 1 31 $1,304,867
Wycliff - Sylvan Conn. - Harry Hines to IH 35 Build a new six lane bridge, including ramps at Market Center 1 31 $34,587,428
Beaumont - Lamar to Harwood Build New 4 lane undivided roadway 1 30 $5,526,282
Canton - Good Latimer to Trunk Widen to standard five lane roadway 1 28 $5,411,248
Canton - Good Latimer to Second Enhanced sidewalks and streetscape 1 28 $2,355,136
East Grand - Haskell to Barry Widen to a four lan e undivided roadway 1 27 $1,725,194
Maple -Mockingbird to Empire Central Widen to a four lane roadway 1 21 $3,145,055
Main - Exposition to Haskell Widen to a six lane divided roadway 1 20 $2,703,267
Cadiz - I-30 to WB Frontage Road Convert operation from 1-way to 2-way with Project Pegasus 1 13 $0
CBD Fair Link/Exposition/Second Ave - Hall St to I-30 Build five and six lane undivided north of DART SE LRT to 1 13 $9,857,677 Second at I030 Hiline -500' North of Turtle Creek to Market Center Blvd Build new four lane divided roadway and bridge over Turtle 1 13 $3,115,526 Creek (TP amendment required) IH 30/ RL Thornton Frwy - Munger to Carroll Enhanced Service Roads 1 13 $2,537,050
Friday, March 31, 2006 Page 46 of 349 Project Name Description Tier Score Estimate Council District 2 Thoroughfares
Commerce - Central to Fair Park Link Widen to four lane undivided roadway 1 12 $1,991,234 Continental Avenue - East Levee to Industrial Widen to a six lane divided roadway 1 11 $5,400,360
Continental Viaduct - Trinity River to IH 35 1 11 $4,327,822
Memorial Drive/Canton Connection-Griffin to Akard New four lane undivided (support Pegasus & next Convention 1 10 $1,903,041 Center expansion phase) Empire Central - Thurston to Forest Park Widen to a four lane undivided roadway 1 8 $2,029,641
Harwood - Elm to Canton Streescape and enhanced sidewalks 1 0 $36,979
Industrial - Corinth to MLK, Jr 1 0 $7,426,534
Industrial - I.H. 35 to Lake June 1 0 $7,670,599
Industrial - MLK,Jr to I-45 1 0 $7,077,871
Industrial - South Central to Lake June 1 0 $53,892,118
Belleview / McKee Extension to Trinity Park, from Lamar Build new four lane undivided roadway including undepass at 1 $27,006,721 to Industrial UPRR. ROW acquisition, remediation, relocation, and bridge and streetscaping over RR for vehicular access to the Canoe Launch for Trinity Lakes and Trinity Park, as recommended in the Trinity Riv Downtown Levee Road Design and Construction of Downtown Levee Road as 1 $2,068,323 recommended in the Trinity River Balanced Vision Plan Industrial - I-45 to South Central 1 $17,572,645
Summary for 'Category' = Thoroughfares (45 detail records) Sum $384,896,395 Traffic Intersection Capacity & Safety Improvement
Garland at Gaston Improve intersection geometrics to improve safety for 1 55 $1,155,052 northbound left-turn. Change to more urban intersection design. Tighten curves and square up intersection. Maple @ Oak Lawn Widen southbound Maple to construct a right turn lane. 1 45 $113,591
Friday, March 31, 2006 Page 47 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Intersection Capacity & Safety Improvement
Haskell @ State Construct a U-turn lane on Haskelll to allow westbound to 1 40 $109,124 eastbound movement. Haskell at Lemmon Improve lane channelization. 1 35 $468,402
Good Latimer @ Hickory Street Modifications and Bo Widen Hickory to alignment eastbound/westbound approaches, 1 30 $490,099 increase corner radii, and construct eastbound/westbound left- turn pockets. Hickory at South Central Exp. Increase turning radius on all corners. 1 10 $135,288
Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (6 detail records) Sum $2,471,555 Traffic Safety Improvements-Guardrail Upgrades
Harry Hines 3400 BLK Guardrail Upgrade 1 80 $25,751
Harry Hines 6500 BLK Guardrail Upgrade 1 80 $50,988
Harry Hines 7000-9100 BLK Guardrail Upgrade 1 80 $198,528
Harry Hines 9200 BLK Guardrail Upgrade 1 80 $44,830
Irving 2900 BLK Guardrail Upgrade 1 80 $6,653
Cedar Springs 4700 BLK Guardrail Upgrade 1 73 $13,337
Harry Hines 3800 BLK Guardrail Upgrade 1 73 $11,806
Harry Hines 3900-4300 BLK Guardrail Upgrade 1 73 $44,115
Harry Hines 5900 BLK Guardrail Upgrade 1 73 $9,317
Harry Hines 6000 BLK Guardrail Upgrade 1 73 $8,487
Irving 2300 BLK Guardrail Upgrade 1 73 $6,669
Irving 3000 BLK Guardrail Upgrade 1 73 $4,658
M.L. King 400 BLK Guardrail Upgrade 1 73 $33,024
Continental 200 BLK Guardrail Upgrade 1 67 $6,637
Friday, March 31, 2006 Page 48 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Safety Improvements-Guardrail Upgrades
Continental 300 BLK Guardrail Upgrade 1 67 $30,792 Irving 2600 BLK Guardrail Upgrade 1 67 $3,063
Maple 4900 BLK Guardrail Upgrade 1 67 $14,614
Continental 100 BLK Guardrail Upgrade 1 60 $3,063
Industrial 700 S BLK Guardrail Upgrade 1 60 $23,739
Industrial 800 S BLK Guardrail Upgrade 1 60 $5,392
Maple 5800 BLK Guardrail Upgrade 1 60 $19,751
Wycliff 1200 BLK Guardrail Upgrade 1 60 $15,890
Corinth 600 BLK Guardrail Upgrade 1 53 $18,136
Industrial 1300 S BLK Guardrail Upgrade 1 53 $23,612
Industrial 1800 S BLK Guardrail Upgrade 1 53 $26,930
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (25 detail records) Sum $649,783 Traffic Signal Upgrades - CBD
Austin @ Jackson Traffic Signal Upgrades CBD 1 63 $49,674
Field @ Wood Traffic Signal Upgrades CBD 1 63 $24,837
Jackson @ Lamar Traffic Signal Upgrade 1 63 $49,674
Main @ Record Traffic Signal Upgrade 1 63 $49,674
Austin @ Commerce Traffic Signal Upgrade 1 53 $49,674
Austin @ Main Traffic Signal Upgrades CBD 1 53 $55,851
Ervay @ Young Traffic Signal Upgrades CBD 1 53 $57,887
Field/Marilla @ Young Traffic Signal Upgrades CBD 1 53 $66,100
Friday, March 31, 2006 Page 49 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD
Lamar @ Main Traffic Signal Upgrades CBD 1 53 $62,028 Lamar @ Young Traffic Signal Upgrades CBD 1 53 $49,674
Record @ Wood Traffic Signal Upgrades CBD 1 53 $49,674
Akard @ Wood Traffic Signal Upgrade 1 47 $21,748
Austin @ Elm Traffic Signal Upgrades CBD 1 47 $43,496
Commerce @ Houston Traffic Signal Upgrade 1 47 $49,674
Elm @ Record Traffic Signal Upgrade 1 47 $43,496
Ervay @ Wood Traffic Signal Upgrade 1 47 $18,703
Houston @ Jackson Traffic Signal Upgrade 1 47 $59,922
St Paul @ Wood Traffic Signal Upgrade 1 47 $7,394
Griffin @ Memorial Traffic Signal Upgrades CBD 1 37 $59,922
Griffin @ Wood Traffic Signal Upgrades CBD 1 37 $29,961
Houston @ Reunion East/Young Traffic Signal Upgrades CBD 1 37 $57,887
Lamar @ Wood Traffic Signal Upgrades CBD 1 37 $43,496
Market @ Wood Traffic Signal Upgrades CBD 1 37 $43,496
Market @ Young Traffic Signal Upgrades CBD 1 37 $43,496
Record @ Young Traffic Signal Upgrades CBD 1 37 $43,496
Lamar @ Pacific/San Jacinto Traffic Signal Upgrades CBD 1 33 $88,703
Market @ Pacific Traffic Signal Upgrades CBD 1 33 $43,496
Pacific @ Record Traffic Signal Upgrades CBD 1 33 $49,674
Cadiz @ Ervay Traffic Signal Upgrade 1 30 $48,617
Cadiz @ St Paul Traffic Signal Upgrade 1 30 $35,283
Friday, March 31, 2006 Page 50 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD
Canton @ Ervay Traffic Signal Upgrade 1 30 $49,674 Canton @ Good Latimer Traffic Signal Upgrade 1 30 $70,043
Canton @ St Paul Traffic Signal Upgrade 1 30 $49,674
Commerce @ Good Latimer Traffic Signal Upgrade 1 30 $57,724
Commerce @ Griffin Traffic Signal Upgrade 1 30 $24,837
Commerce @ Record-Kennedy Crosswalk Traffic Signal Upgrade 1 30 $37,319
Corbin @ Lamar Traffic Signal Upgrades CBD 1 30 $62,028
Elm @ Good Latimer (Monument) Traffic Signal Upgrade 1 30 $52,681
Field/Griffin @ Munger Traffic Signal Upgrades CBD 1 30 $16,624
Good Latimer @ Main Traffic Signal Upgrade 1 30 $26,672
Griffin @ Jackson Traffic Signal Upgrade 1 30 $6,205
Griffin @ Ross Traffic Signal Upgrade 1 30 $78,454
Griffin @ San Jacinto Traffic Signal Upgrade 1 30 $35,416
Harwood @ Wood Traffic Signal Upgrade 1 30 $17,757
Harwood @ Young Traffic Signal Upgrade 1 30 $25,470
Houston @ Main Traffic Signal Upgrade 1 30 $55,851
Lamar @ Ross Traffic Signal Upgrade 1 30 $62,028
St Paul @ Young Traffic Signal Upgrade 1 30 $55,851
Akard @ Canton Traffic Signal Upgrade 1 20 $55,851
Akard @ Young Traffic Signal Upgrades CBD 1 20 $53,745
Griffin @ Young Traffic Signal Upgrades CBD 1 20 $70,171
Hotel @ Reunion East Traffic Signal Upgrades CBD 1 20 $55,851
Friday, March 31, 2006 Page 51 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD
Hotel @ Reunion West Traffic Signal Upgrades CBD 1 20 $49,674 Houston @ Reunion West/Wood Traffic Signal Upgrades CBD 1 20 $49,674
Commerce @ Market Traffic Signal Upgrade 1 17 $43,496
Houston at Ross Traffic Signal Upgrades CBD 1 17 $68,135
Cadiz/Marilla @ Harwood Traffic Signal Upgrades CBD 1 10 $35,085
Canton/Young @ Pearl Traffic Signal Upgrades CBD 1 10 $53,745
Griffin @ Main Traffic Signal Upgrades CBD 1 10 $26,872
Lamar @ Munger Traffic Signal Upgrades CBD 1 10 $49,674
Summary for 'Category' = Traffic Signal Upgrades - CBD (60 detail records) Sum $2,792,987 Traffic Signal Upgrades - Citywide
Capitol at Peak Traffic Signal Upgrades Citywide 1 93 $118,696
Commonwealth @ Stemmons Traffic Signal Upgrades Citywide 1 93 $107,209
Greenville @ Richmond Traffic Signal Upgrades-City Traffic Signal Upgrade 1 93 $61,416
Junius @ Washington Traffic Signal Upgrades Citywide 1 87 $102,359
Bryan @ Carroll Traffic Signal Upgrades Citywide 1 80 $107,464
Harry Hines @ Market Center Traffic Signal Upgrades Citywide 1 80 $80,981
Lemmon @ Mahanna Traffic Signal Upgrades Citywide 1 80 $88,830
Abrams @ Beacon (Columbia) Traffic Signal Upgrade 1 67 $54,689
Beacon @ Lindsley Traffic Signal Upgrade 1 67 $100,828
Cameron @ East Grand (Tennison) Traffic Signal Upgrade 1 67 $100,955
Cedar Springs @ Hudnall Traffic Signal Upgrade 1 67 $53,732
Friday, March 31, 2006 Page 52 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide
Columbia @ Munger Traffic Signal Upgrade 1 67 $64,421 Congress @ Dallas N Tollway (Wycliff) Traffic Signal Upgrade 1 67 $75,302
Dolphin @ Haskell(Military Pkwy) Traffic Signal Upgrade 1 67 $21,876
Fitzhugh @ Gaston Traffic Signal Upgrade 1 67 $107,464
Gaston @ Haskell Traffic Signal Upgrade 1 67 $84,897
Gaston @ Peak Traffic Signal Upgrade 1 67 $107,464
Inwood - Lemmon Traffic Signal Upgrades Citywide 1 67 $61,262
Main @ Peak Traffic Signal Upgrade 1 67 $102,359
Maple @ Mockingbird Traffic Signal Upgrade 1 67 $118,313
Oak Lawn @ Stemmons Fwy Traffic Signal Upgrade 1 67 $244,411
Beacon @ East Grand Traffic Signal Upgrade 1 53 $100,828
Belleview @ Lamar Traffic Signal Upgrade 1 53 $88,384
Belmont @ Henderson Traffic Signal Upgrade 1 53 $114,867
Bennett @ Bryan(Collett) Traffic Signal Upgrade 1 53 $145,115
Brookriver @ Mockingbird Traffic Signal Upgrade 1 53 $108,422
Bryan @ Fitzhugh Traffic Signal Upgrade 1 53 $105,933
Carroll @ Lindsley (Parry) Traffic Signal Upgrade 1 53 $107,464
Cedar Crest @ Eleventh (Pontiac) Traffic Signal Upgrade 1 53 $77,650
Cedar Crest @ Morrell Traffic Signal Upgrade 1 53 $53,924
Collett @ Columbia Traffic Signal Upgrade 1 53 $86,737
Columbia @ Fitzhugh Traffic Signal Upgrade 1 53 $94,066
Commerce @ Malcolm X Traffic Signal Upgrade 1 53 $128,842
Friday, March 31, 2006 Page 53 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide
Corinth @ Ervay Traffic Signal Upgrade 1 53 $107,464 Corinth @ Harwood Traffic Signal Upgrade 1 53 $107,464
East Grand @ Fitzhugh Traffic Signal Upgrades Citywide 1 53 $53,732
Elm @ Hall Traffic Signal Upgrade 1 53 $128,842
Elm @ Malcolm X Traffic Signal Upgrade 1 53 $128,842
Empire Central @ Stemmons Fwy Traffic Signal Upgrade 1 53 $101,785
Forest Park @ Mockingbird Traffic Signal Upgrade 1 53 $106,890
Harry Hines @ Research Row Traffic Signal Upgrades Citywide 1 53 $109,379
Harry Hines @ Shorecrest Traffic Signal Upgrades Citywide 1 53 $103,316
Haskell @ Live Oak Traffic Signal Upgrades Citywide 1 53 $23,931
Haskell @ Main Traffic Signal Upgrade 1 53 $102,359
Lemmon @ Manor Way(Roper) Traffic Signal Upgrade 1 53 $41,410
Live Oak @ Peak Traffic Signal Upgrades Citywide 1 53 $49,393
Market Center Blvd @ Oak Lawn Traffic Signal Upgrade 1 53 $119,653
McKinnon @ Wolf Traffic Signal Upgrade 1 53 $35,614
Peak @ Ross Traffic Signal Upgrade 1 53 $102,359
Dorothy/Hudnall @ Lemmon Traffic Signal Upgrades Citywide 1 47 $71,792
Baylor Crosswalk @ Gaston Traffic Signal Upgrade 1 40 $30,950
Bennett @ Capitol Traffic Signal Upgrade 1 40 $107,464
Bryan @ Haskell Traffic Signal Upgrade 1 40 $54,250
Bryan @ Peak Traffic Signal Upgrade 1 40 $102,359
Canton @ Malcolm X Traffic Signal Upgrade 1 40 $107,464
Friday, March 31, 2006 Page 54 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide
Capitol @ Fitzhugh Traffic Signal Upgrade 1 40 $107,464 Carroll @ Columbia (Main) Traffic Signal Upgrade 1 40 $109,379
Carroll @ Gaston Traffic Signal Upgrade 1 40 $107,464
Cedar Springs @ Wycliff Traffic Signal Upgrades Citywide 1 40 $51,180
Commerce @ Hall Traffic Signal Upgrade 1 40 $128,842
Dallas N Tollway @ Wycliff (SBSR) Traffic Signal Upgrade 1 40 $83,534
East Grand @ Graham (Samuell) Traffic Signal Upgrade 1 40 $107,464
East Grand @ Mt Auburn School Traffic Signal Upgrade 1 40 $52,966
Elm @ Haskell Traffic Signal Upgrade 1 40 $102,359
Elm @ Peak Traffic Signal Upgrade 1 40 $102,359
Good Latimer @ Hickory Traffic Signal Upgrade 1 40 $128,842
Graham @ Lindsley Traffic Signal Upgrade 1 40 $102,359
Greenville @ Ross Traffic Signal Upgrades Citywide 1 40 $53,732
Harry Hines - Wycliff Traffic Signal Upgrades Citywide 1 40 $74,344
Harry Hines @ Mockingbird Traffic Signal Upgrades Citywide 1 40 $103,316
Harry Hines @ Moody Traffic Signal Upgrade 1 40 $192,977
Harry Hines @ Regal Row (Burbank) Traffic Signal Upgrade 1 40 $106,890
Haskell @ Ross Traffic Signal Upgrades Citywide 1 40 $24,696
Hi Line @ Oak Lawn Traffic Signal Upgrade 1 40 $150,221
Maple @ Turtle Creek Traffic Signal Upgrade 1 40 $57,035
Market Center @ Market Hall/Trade Mart Traffic Signal Upgrades Citywide 1 40 $122,780
Market Center Blvd @ Turtle Creek Traffic Signal Upgrade 1 40 $107,847
Friday, March 31, 2006 Page 55 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide
Mockingbird @ Oakbrook Traffic Signal Upgrade 1 40 $117,356 Samuell @ Tennison Traffic Signal Upgrade 1 40 $47,085
Airdrome @ Mockingbird Traffic Signal Upgrades Citywide 1 27 $14,007
Beacon @ Samuell (Winslow) Traffic Signal Upgrade 1 27 $105,933
Belmont @ Greenville Traffic Signal Upgrade 1 27 $53,732
Canton @ Hall Traffic Signal Upgrade 1 27 $107,464
Capitol @ Haskell(State) Traffic Signal Upgrade 1 27 $117,101
Cedar Springs @ Manor Way Traffic Signal Upgrade 1 27 $107,464
Empire Central @ Harry Hines Traffic Signal Upgrade 1 27 $148,689
Hall @ Main Traffic Signal Upgrades Citywide 1 27 $107,464
Hall @ Worth Traffic Signal Upgrades Citywide 1 27 $107,464
Haskell @ Lemmon(Peak) Traffic Signal Upgrade 1 13 $76,731
Washington @ Worth Traffic Signal Upgrades Citywide 1 13 $107,464
Summary for 'Category' = Traffic Signal Upgrades - Citywide (90 detail records) Sum $8,469,891 Traffic System Management - Flood Detour Signs
Good Latimer under Pacific Dynamic Signs - Flood Detours 1 80 $5,054
Lamar, 2400 S. under RR Dynamic Signs - Flood Detours 1 80 $10,108
Second Ave. Low Road Dynamic Signs - Flood Detours 1 80 $42,118
Ervay, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $35,379
Harwood, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $16,005
Hi Line under RR Dynamic Signs - Flood Detours 1 60 $42,118
Friday, March 31, 2006 Page 56 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic System Management - Flood Detour Signs
Summary for 'Category' = Traffic System Management - Flood Detour Signs (6 detail records) Sum $150,782 Traffic System Management - Roadside Cameras
Denton-Mockingbird Traffic Systems Management - Roadside Camera 1 60 $6,382
Field-Woodall Rodgers Frwy Roadside Camera 1 60 $6,382
Denton-Inwood Traffic Systems Management - Roadside Camera 1 40 $12,763
Elm-Houston Roadside Camera 1 40 $12,763
Continental-Houston Roadside Camera 1 35 $12,763
Field-Wichita Roadside Camera 1 35 $8,551
Houston E-Wichita Roadside Camera 1 35 $12,763
Houston W-Wichita Roadside Camera 1 35 $12,763
Houston-Ross Roadside Camera 1 35 $12,763
Lamar-Mckinney Roadside Camera 1 35 $12,763
Wycliff-Congress Roadside Camera 1 10 $12,763
Summary for 'Category' = Traffic System Management - Roadside Cameras (11 detail records) Sum $123,418 Summary for 'Program' = STREET AND TRANSPORTATION (731 detail records) Sum $607,358,833 Summary for 'CD' = 2 (731 detail records) Sum $607,358,833
Friday, March 31, 2006 Page 57 of 349 Project Name Description Tier Score Estimate Council District 3 Alley Petitions
Pringle Dr & Norco St - Canada Dr to Bernal St Engineering, Pavivng and Drainage 4000-4100 blks 1 97 $173,577 Summary for 'Category' = Alley Petitions (1 detail record) Sum $173,577 Alley Reconstruction
Kimball Ridge (W. of) - Kimball Dale to Blue Ridge Full Reconstruction, T-alleys included 1 50 $73,904
Anzio Cir - 3039 - 3063 Full Reconstruction 2 $171,507
Anzio Dr - 3002 - 3068 Full Reconstruction 2 $252,545
Beckley Av (N) - 1703 - 1909 Full Reconstruction 2 $349,129
Blue Ridge - 3618 - 3622 Full Reconstruction 2 $165,391
Bonnywood & Whitewood - Cedarhurst To Wayland Dr. Full Reconstruction 2 $322,904
Colorado (W) & Frot Worth - Colorado to Hampton Full Reconstruction (2128 Fort Worth Ave) 2 $121,048
Driftwood Dr - 1510 - 1642 Full Reconstruction 2 $369,262
Drowsy - 4116 - 4128 Full Reconstruction 2 $177,367
Edgefield Av (S) - 2902 - 2930 Full Reconstruction 2 $301,984
Edgefield Av (S) - 2972 - 2978 Full Reconstruction 2 $288,988
El Tivoli Dr - 2710 - 2772 Full Reconstruction 2 $188,581
Evergreeen Hills (B 905) - Kessler Canyon to DeadE 2 $26,044
Garapan Dr - 2603 - 2931 Full Reconstruction 2 $430,169
Hansboro Av - 1103 - 1323 Full Reconstruction 2 $294,085
Kimballdale - 3622 - 3936 Full Reconstruction 2 $466,865
Kings Hwy - 1103 - 1147 Full Reconstruction 2 $150,101
Montclair Av (N) - 201 - 317 Full Reconstruction 2 $149,845
Friday, March 31, 2006 Page 58 of 349 Project Name Description Tier Score Estimate Council District 3 Alley Reconstruction
Monte Carlo Cir - 1647 - 1655 Full Reconstruction 2 $297,652 Nicholson Dr - 2315 - 2465 Full Reconstruction 2 $237,764
Nicholson Dr - 2503 - 2933 Full Reconstruction 2 $538,221
Pictureline & ShadyHollow-ShadyHollow to Shady Hollow Full Reconstruction 2 $432,208
Pomeroy - 3817 ------Full Reconstruction 2 $250,252
Salerno Dr - 3103 - 3239 Full Reconstruction 2 $281,087
Shady Hollow - 3810 - 3858 Full Reconstruction 2 $221,285
Shady Hollow - 4030 - 4040 Full Reconstruction 2 $102,955
Singleton Blvd. 3317 Full recon 2 $63,815
Southwood Dr - 2505 - 2653 Full Reconstruction 2 $317,020
Summary for 'Category' = Alley Reconstruction (28 detail records) Sum $7,041,979 Barrier Free Ramps
900 W. Canty St 4 BFRs on W. Canty St. @ Tyler 1 47 $2,450
Wynnewood Dr. Polk to Illinois 12 BFRs Needed on Wynnewood as follows: 4 @ Illinois, 3 @ 1 46 $22,973 Pristol, 4 @ Edwards, and 1 on West end of the median on Polk Kings Hwy - Polk to Timbergrove 12 BFRs needed as follows: Kings @ Winnetka (4), @ Clinton 1 42 $22,973 (1), @ Lausanne (2), @ Montclair (2), @ Marycliff (2), and @ Timbergrove (1) Illinois @ Vernon Barrier Free Ramps Construct BFRs on NW & SW corners 1 32 $3,829
Monte Carlo @ Saner Construct 2 BFRs at intersection corners 1 18 $3,829
Burgoyne St @ Westmoreland Rd Construct 4 Ramps 1 12 $7,658
Obannon @ Bristol Construct 4 ramps 1 8 $7,658
Friday, March 31, 2006 Page 59 of 349 Project Name Description Tier Score Estimate Council District 3 Barrier Free Ramps
Navajo @ Legendary (and @ Nakomis) 2 BFRs needed on each intersection 1 3 $3,829 Summary for 'Category' = Barrier Free Ramps (8 detail records) Sum $75,200 Bridge Repair and Modification
Canada Drive over W. Fork Trinity River Embankment eroded and settling; moderately severe; grout 1 58.75 $63,815 injection beneath abutment caps, grout injection beneath approach slabs, replace sidewalks Duncanville Road over Five Mile Creek 3rd intermediate support from N, d/s end, 2'X40' spall, core for 1 46.25 $38,289 strength, repair as req., min. clean and coat rebar, grout patch; may need reinforcement by buttressing. Critical. Houston Street Viaduct over Trinity River Completion of rehab begun by TxDOT (design by HNTB) - 1 41.25 $319,075 rating based on 2004 BRINSAP - scheduled for reevaluation 2006 Colorado Blvd. over Coombs Creek Clean rebar, coat, repair spalls, grout or flowable fill in scour 1 36.25 $76,578 areas beneath culverts; not severe Summary for 'Category' = Bridge Repair and Modification (4 detail records) Sum $497,757 Intergovernmental Partnership Projects
Canada @ W. Fork Trinity River Bridge rehabilitation and/or reconstruction. 2 $0
Cockrell Hill - IH 30 to Davis Partnership project with Dallas County and TxDOT to construct 1 $399,737 interchange, frontage roads and 6 lane divided thoroughfare. This is funding needed to make final payment to TxDOT from their audit done at project's completion. Cockrell Hill - La Reunion to Singleton Partnership project with Dallas County to design and construct 1 $7,211,095 new 4 lane divided roadway. Total estimated cost of $11.3 million. Estimated to be let by Dallas County late 2008. Davis - Hampton to Westmoreland Partnership project with Dallas County to reconstruct and widen 1 $4,114,791 to 4 lane divided. Total estimated cost of $12.4 million. Hampton @ TPGCSFRR-Muncie Bridge rehabilitation and/or reconstruction 2 $0
Friday, March 31, 2006 Page 60 of 349 Project Name Description Tier Score Estimate Council District 3 Intergovernmental Partnership Projects
Ledbetter / Grady Niblo Ext - Merrifield to Mt. Creek Partnership project with Dallas County to build new 4 lane 1 $1,276,300 divided roadway. Total estimated cost of $7.8 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. Loop 12 - Spur 408 to IH 35E. Partnership project with TxDOT to fulfill 10% funding 1 $287,168 requirement for right of way and utility relocations to accommodate freeway improvements. Total estimated cost of $20 million. Supplements 2003 Bond Program funds. Mountain Creek - Grady Niblo to Spur 408 Partnership project with TxDOT and Dallas County to widen 1 $4,467,050 roadway to 4 lane divided. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2006. Singleton Blvd - Chalk Hill to E of Peoria Partnership project with Dallas County to reconstruct existing 1 $1,715,347 six lane divided roadway. Total estimated cost of $5.3 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Singleton Blvd Urban Design Phase II - Hampton Rd to Urban design enhancements along Singleton as recommended 1 $12,039,146 Walton Walker (Loop 12) in the Trinity River Comprehensive Land Use Plan. Summary for 'Category' = Intergovernmental Partnership Projects (10 detail records) Sum $31,510,635 Street Lighting - Freeway Lighting
IH 20 - Entire Length Across Dallas Freeway Lighting Installation 1 5 $493,768
Loop 12 (Walton Walker) - I-30 to I-35E Freeway Lighting Installation 1 5 $42,676
Loop 12 (Walton Walker) - I-30 to Spur 408 Freeway Lighting Installation 1 5 $53,659
Summary for 'Category' = Street Lighting - Freeway Lighting (3 detail records) Sum $590,104 Street Petitions
Westmount Av - Davis St to Avon St Engineering, Paving & Drainage 600-900 Blks 1 84 $926,721
Westmount Ave. - Avon St. to Fort Worth Ave. Engineering, Paving & Drainage 1000 & 1100 Blk 1 83 $721,282
Friday, March 31, 2006 Page 61 of 349 Project Name Description Tier Score Estimate Council District 3 Street Petitions
Cliffdale Ave. - Avon St. to Dead End Engineering, Paving & Drainage 1000-1100 Blks 1 82 $308,865 Avon St. - Westmount Av. to Cliffdale Av. Engineering, Paving & Drainage 2800 Block 1 81 $118,917
Ranier Street - Mary Cliff Road - Montclair Avenue (N) Engineering Paving and Drainage 1600 Blk 1 78 $268,023
Summary for 'Category' = Street Petitions (5 detail records) Sum $2,343,808 Street Reconstruction Local Streets
Vinson St Singleto Blvd South to Dead-End 2800-2900 Blks 1 61.19 $1,276,300
Garapan Dr - Illinois Ave to Bristo Dr 2300 - 2500 Blks 1 56.98 $1,084,855
Gallant Fox Dr - Merrifield Rd East to 750 Ft 1000 Blk 1 54.5 $239,306
Bastille Rd - La Reunion Pkwy South to Dead End 3900 Blk 1 51.63 $701,965
Grayson Dr - Fennesee Av to Hoke Smith Dr 3300 Blk 1 47.03 $419,855
Lake Vista Dr - High Brush Dr to Eagle Ford Dr 6000-6100 1 44.32 $909,170
Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,631,451 Street Reconstruction Thoroughfares
Commerce St (W) - Postal Way to Lone Star 2500 - 2700 Blks 1 71.65 $1,378,404
Terre Colony Ct - Lone Star Dr North to 1200 ft 1600 blk 1 70.93 $1,033,803
Lone Star Dr - Commerce St to Dead End (BNSF RR) 1800 Blk 1 70.04 $427,561
Weir St - Fitchburg St to Singleton Blvd 2400 - 2900 Blks 1 63.12 $1,289,063
Fitchburg St - Chalk Hill Rd to Weir St 4900 - 5000 Blks, Including RR crossing 1 62.83 $704,518
Joseph Hardin Dr - W Ledbetter Dr to Country Creek 4100 - 4200 Blks 1 61.61 $474,784
Joseph Hardin Dr - W Ledbetter to 1000' S Ledbette 4300 - 4400 Blk, Including RR crossing. 1 60.18 $1,276,300
Friday, March 31, 2006 Page 62 of 349 Project Name Description Tier Score Estimate Council District 3 Street Reconstruction Thoroughfares
Preakness Ln - Walton Walker Blvd Dr East to Dead-End 5200 - 5700 Blks 1 55.05 $791,306 Furey St - Bickers St to Morris St 3500 Blk 1 53.68 $445,429
West Commerce Street Reconstruction / Urban Design, Roadway reconstruction and streetscape enhancements on 1 $2,931,470 from Davis to Trinity River Levee West Commerce, from levee to Davis, to serve as gateway in Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (10 detail records) Sum $10,752,636 Street Resurfacing
Hansboro Ave. - Pierce St. to Westmoreland Rd. 2800 - 3200 1 81.715 $182,894
Puget St. - Singleton Blvd. to Bickers St. 3000 - 3600 1 74.87 $304,525
Llewellyn Ave (S). - Obannon Dr. to Saner Ave. 2700 block 1 68.335 $48,755
Stevens Wood Ln. - Oak Cliff Blvd. to Stevens Wood Ct. 2200 block 1 66.23 $40,842
Tilden St. - Beckley Ave. to Concrete 100 block 1 66.115 $31,908
Garapan Dr. - Illinois Ave. to 2404 Garapan Dr. 2300 Block 1 65.605 $67,644
Kessler Canyon Dr. - Kessler Pkwy. To Evergreen Hill Rd. 1600 block 1 65.365 $65,474
Kessler Pkwy. - Evergreen Hill Rd. to Sylvan Ave. 1000 - 1400 1 65.115 $257,174
Nicholson Dr. - Illinois Ave. to 2524 Nicholson Dr. 2300 - 2500 1 65 $173,449
Temple Dr. - Winnetka Ave. to Windomere Ave. 1100 - 1300 1 64.38 $48,117
Franklin St. (S) - Gladiolus Ln. to Cul-De-Sac 3900 Block 1 64.11 $27,696
Mary Cliff Rd. - Ranier St. to Kings Hwy. 700 - 900 1 63.985 $74,919
Handley Dr. - Greenbriar Ln. to Stemmons Ave. 1600 Block 1 60.67 $60,241
Keeneland Pkwy. - 670' E Walton Walker Frwy. To Walton 5600 block 1 60.18 $115,378 Walker Frwy.
Friday, March 31, 2006 Page 63 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Elmore Ave. (W) - Beckley Ave. to Zang Blvd. 100 - 400 1 60.1 $21,136 Owensons Dr. - Tyler St. to End of Circle Drive 700 - 800 1 58.75 $44,798
Montreal Ave. (S) - Illinois Ave. to Savoy St. 2600 - 2800 1 58.335 $131,076
Boisenberry Ln. - Country View Rd. to Bayberry Ln. 7200 - 7400 1 55.02 $63,177
Nomas St. - Furey St. to Esmalda Dr. 3500 - 3600 1 54.425 $113,208
Morris St. - Westmoreland Rd. to Furey St. 3300 - 3400 1 54.025 $65,602
Keeneland Pkwy. - Cavalcade Dr. to Merrifield Rd. 6100 - 6200 1 53.695 $63,949
Elderberry Ln. - Sugarberry Rd. to Wheatland Rd. 7100 - 7400 1 53.07 $99,551
Adbritian Dr. - Westmoreland Rd. to Dead End 3200 Block 1 51.325 $20,548
Bridal Wreath Ln. - Deerfield Ln. to Periwinkle Dr. 2700 block 1 50.805 $36,119
Willow Crest Ln. - Boulder Dr. to Westmoreland Rd. 3300 - 3500 1 49.735 $64,581
Kessler Pkwy. - Edgefield Ave. to Colorado Blvd. 2100 - 2300 1 48.745 $164,132
Franklin St. (N) - Dead End to Davis St. 600 Block 1 47.985 $19,272
Kimballdale Dr. - Wenatchee Dr. to Oak Arbor Dr. 3900 - 4000 1 46.06 $52,456
Lawndale Dr. - Leander Dr. to Walter Dr. 2200 - 2300 1 45.835 $50,414
La Senda Pl. - Greenbrier Ln. to Shady Ln. 1400 block 1 44.73 $17,230
Country View Rd. - Wheatland Rd. to Christie Ln. Alley 8700 - 8800 1 43.785 $44,926
Puget St. - Bayside St. to Angelina Dr. 3800 block 1 43.64 $29,483
Sugarberry Rd. - Elderberry Ln. to Alley N of Christie Ln. 8600 - 8700 1 43.185 $23,994
Elderberry Ct. - Elderberry Ln. to Cul-De-Sac 8600 Block 1 42.87 $9,700
Country View Rd. - Ashcrest Ln. to Bluestem Rd. 9100 Block 1 37.52 $39,821
Akron St. - 2200 2 $0
Friday, March 31, 2006 Page 64 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Akron St. - 2300 2 $0 Angelina Dr. - 1800 2 $0
Angelina Dr. - 1900 2 $0
Anzio Dr. - 3000 2 $0
Argonne Dr. - 1500 2 $0
Ashcrest La. - 7500 2 $0
Atlantic St. - 2000 2 $0
Baker Av. - 4100 2 $0
Barlow Av. - 1600 2 $0
Barlow Av. - 2100 2 $0
Bayberry La. - 7100 2 $0
Bayberry La. - 7300 2 $0
Bayberry La. - 7400 2 $0
Bayside St. - 1900 2 $0
Beckley Av. (N) - 2000 2 $0
Belvoir Cir. - 3900 2 $0
Bernal Dr. - 3700 2 $0
Bernal Dr. - 3800 2 $0
Bernal Dr. - 3900 2 $0
Bernal Dr. - 4000 2 $0
Bernal Dr. - 4100 2 $0
Bernal Dr. - 4200 2 $0
Friday, March 31, 2006 Page 65 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Bonnywood La. - 2800 2 $0 Boulder Dr. - 4200 2 $0
Boynton St. - 2700 2 $0
Brass Wy. - 4400 2 $0
Briarcrest Dr. - 1500 2 $0
Bridal Wreath La. - 3100 2 $0
Bristol Dr. - 2500 2 $0
Bristol Dr. - 2800 2 $0
Bronze Wy. - 4400 2 $0
Bronze Wy. - 4500 2 $0
Bronze Wy. - 4600 2 $0
Calypso St. - 2000 2 $0
Calypso St. - 2100 2 $0
Calypso St. - 2200 2 $0
Canada Dr. - 2500 2 $0
Canada Dr. - 2600 2 $0
Canada Dr. - 2700 2 $0
Canada Dr. - 2800 2 $0
Canada Dr. - 2900 2 $0
Casino Dr. - 3100 2 $0
Cedar Hill Av. - 1400 2 $0
Cedar Hill Av. - 1500 2 $0
Friday, March 31, 2006 Page 66 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Chevez Dr. - 1000 2 $0 Circle Dr. - 300 2 $0
Clinton Av. - 1200 2 $0
Cockrell Hill Rd. (S) - 3200 2 $0
Colorado Blvd. (E) - 100 2 $0
Colorado Blvd. (E) - 200 2 $0
Colorado Blvd. (W) - 2600 2 $0
Colorado Blvd. (W) - 2800 2 $0
Commerce St. (W) - 2100 2 $0
Commerce St. (W) - 2300 2 $0
Commerce St. (W) - 2800 2 $0
Commerce St. (W) - 2900 2 $0
Commerce St. (W) - 3200 2 $0
Conrad St. - 300 2 $0
Coombsville Av. - 2800 2 $0
Country Creek Ct. - 4700 2 $0
Crepe Myrtle Cir. - 3600 2 $0
Crow Creek Dr. - 2400 2 $0
Dan Morton Dr. - 3300 2 $0
Dan Morton Dr. - 3400 2 $0
Darien St. - 4000 2 $0
Davis Pkwy. - 2700 2 $0
Friday, March 31, 2006 Page 67 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Dennison St. - 1900 2 $0 Dennison St. - 2000 2 $0
Drowsy La. - 4100 2 $0
Edgefield Av. (N) - 1400 2 $0
Edgefield Av. (S) - 3200 2 $0
Edgefield Av. (S) - 3300 2 $0
Eighth St. (W) - 1200 2 $0
Eighth St. (W) - 1300 2 $0
El Tovar Av. - 3000 2 $0
Engle Av. - 1600 2 $0
Engle Av. - 2100 2 $0
Engle Av. - 2500 2 $0
Exchange Service Dr. - 4300 2 $0
Exchange Service Dr. - 4500 2 $0
Ferndale Av. - 800 2 $0
Finis St. - 4000 2 $0
Five Mile Pkwy. (W) - 2000 2 $0
Five Mile Pkwy. (W) - 2400 2 $0
Fort Worth Av. - 2400 2 $0
Fort Worth Av. - 2500 2 $0
Fort Worth Av. - 2900 2 $0
Fountainhead La. - 3900 2 $0
Friday, March 31, 2006 Page 68 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Franklin St. (S) - 2700 2 $0 Franklin St. (S) - 3200 2 $0
Franklin St. (S) - 3300 2 $0
Fullerton Dr. - 1200 2 $0
Furey St. - 3300 2 $0
Furey St. - 3400 2 $0
Gallagher St. - 1700 2 $0
Gallagher St. - 3500 2 $0
Gallagher St. - 3600 2 $0
Gallagher St. - 3700 2 $0
Garapan Dr. - 3000 2 $0
Gentry Dr. - 4100 2 $0
Glenfield Av. - 1600 2 $0
Glenfield Av. - 1700 2 $0
Glenfield Av. - 2200 2 $0
Glenfield Av. - 2400 2 $0
Glenfield Av. - 2500 2 $0
Glenfield Av. - 2600 2 $0
Glenfield Av. - 2700 2 $0
Glenfield Av. - 2800 2 $0
Glenfield Av. - 3000 2 $0
Glenfield Av. - 3100 2 $0
Friday, March 31, 2006 Page 69 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Glenfield Av. - 3200 2 $0 Grayson Dr. - 2800 2 $0
Greenbriar La. (W) - 200 2 $0
Greenbriar La. (W) - 600 2 $0
Greenbriar La. (W) - 800 2 $0
Groveview Dr. - 2800 2 $0
Groveview Dr. - 2900 2 $0
Groveview Dr. - 3000 2 $0
Guthrie St. - 400 2 $0
Haines Av. - 1300 2 $0
Haines Av. - 1400 2 $0
Hampton Rd. (N) - 3500 2 $0
Hampton Rd. (N) - 3600 2 $0
Hampton Rd. (N) - 3700 2 $0
Hampton Rd. (N) - 3800 2 $0
Hampton Rd. (N) - 3900 2 $0
Hampton Rd. (N) - 4000 2 $0
Hampton Rd. (N) - 700 2 $0
Harston St. - 3600 2 $0
Hartsdale Dr. - 1000 2 $0
Hartsdale Dr. - 1300 2 $0
Hedge Dr. - 7000 2 $0
Friday, March 31, 2006 Page 70 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Hoke Smith Dr. - 1100 2 $0 Hoke Smith Dr. - 1200 2 $0
Houston Viad. (S) - 800 2 $0
Investment Dr. - 5000 2 $0
Jefferson Blvd. (E) - 1500 2 $0
Jefferson Blvd. (W) - 1200 2 $0
Jefferson Blvd. (W) - 1300 2 $0
Jefferson Blvd. (W) - 1500 2 $0
Joseph Hardin Dr. - 4500 2 $0
Joseph Hardin Dr. - 4600 2 $0
Junior Dr. - 1400 2 $0
Junior Dr. - 1500 2 $0
Junior Dr. - 1700 2 $0
Kelly Av. - 2000 2 $0
Kiest Blvd. (W) - 2400 2 $0
Kiest Blvd. (W) - 2500 2 $0
Kiest Blvd. (W) - 3200 2 $0
Kilgore St. - 4100 2 $0
Kingbridge St. - 3200 2 $0
La Reunion Pkwy. - 3300 2 $0
Lancaster Av. (N) - 900 2 $0
Larkspur La. - 2700 2 $0
Friday, March 31, 2006 Page 71 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Ledbetter Dr. (W) - 4700 2 $0 Ledbetter Dr. (W) - 4800 2 $0
Ledbetter Dr. (W) - 5000 2 $0
Legendary La. - 3600 2 $0
Legendary La. - 3700 2 $0
Llewellyn Av. (S) - 2300 2 $0
Llewellyn Av. (S) - 3200 2 $0
Lone Star Dr. - 1900 2 $0
Lone Star Dr. - 2400 2 $0
Lone Star Dr. - 2500 2 $0
Lone Star Dr. - 2600 2 $0
Lone Star Dr. - 2700 2 $0
Louisiana Av. (W) - 400 2 $0
Lourdes St. - 3000 2 $0
Lourdes St. - 3100 2 $0
Mateur St. - 2700 2 $0
Mcadams Av. - 1100 2 $0
Mcbroom St. - 1900 2 $0
Mesa Glen La. - 4200 2 $0
Mountain Creek Pkwy. - 5500 2 $0
Mountain Creek Pkwy. - 5800 2 $0
Mountain Creek Pkwy. - 6100 2 $0
Friday, March 31, 2006 Page 72 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Mountain Creek Pkwy. - 6300 2 $0 Navaro St. - 3500 2 $0
Ninth St. (W) - 1500 2 $0
Nob Hill Rd. - 1600 2 $0
Nokomis Av. - 1400 2 $0
Nomas St. - 2000 2 $0
Nomas St. - 3400 2 $0
Norco St. - 4100 2 $0
North Boulevard Ter. - 600 2 $0
Norwich St. - 2900 2 $0
Obannon Dr. - 3100 2 $0
Overcrest St. - 2700 2 $0
Pecan Meadow Dr. - 4700 2 $0
Pentagon Pkwy. (W) - 1200 2 $0
Pentagon Pkwy. (W) - 2800 2 $0
Pentagon Pkwy. (W) - 3100 2 $0
Pentagon Pkwy. (W) - 3200 2 $0
Pentagon Pkwy. (W) - 3300 2 $0
Periwinkle Dr. - 3800 2 $0
Perryton Dr. - 2000 2 $0
Perryton Dr. - 2100 2 $0
Perryton Dr. (E) - 2900 2 $0
Friday, March 31, 2006 Page 73 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Pierce St. - 3000 2 $0 Plowman Av. - 1300 2 $0
Polk St. (N) - 600 2 $0
Postal Wy. - 2000 2 $0
Pueblo St. - 2000 2 $0
Ranier St. - 1200 2 $0
Rio Vista Ct. - 1700 2 $0
Rio Vista Dr. - 1700 2 $0
Rugged Dr. - 3900 2 $0
Rugged Dr. - 4200 2 $0
San Jose Dr. - 2700 2 $0
Saner Av. (W) - 1400 2 $0
Seventh St. (W) - 1000 2 $0
Seventh St. (W) - 1100 2 $0
Seventh St. (W) - 1500 2 $0
Shadow Wood Dr. - 3200 2 $0
Shady La. - 800 2 $0
Shaw St. - 1700 2 $0
Singleton Blvd. - 1800 2 $0
Singleton Blvd. - 1900 2 $0
Singleton Blvd. - 2000 2 $0
Sorcey Rd. - 7000 2 $0
Friday, March 31, 2006 Page 74 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Southwood Dr. - 2700 2 $0 Southwood Dr. - 2800 2 $0
Sportsmans Pkwy. - 5800 2 $0
Sportsmans Pkwy. - 5900 2 $0
Stemmons Av. - 1300 2 $0
Stevens Village Dr. - 600 2 $0
Stevens Wood Ct. - 900 2 $0
Sunset Av. - 1000 2 $0
Terre Colony Ct. - 1500 2 $0
Toronto St. - 3600 2 $0
Tram Dr. - 4100 2 $0
Turnpike Av. - 200 2 $0
Tyler St. (N) - 1200 2 $0
Vernon Av. (S) - 1400 2 $0
Vernon Av. (S) - 1500 2 $0
Vernon Av. (S) - 2000 2 $0
Vernon Av. (S) - 2100 2 $0
Vernon Av. (S) - 2300 2 $0
Vernon Av. (S) - 2400 2 $0
Vernon Av. (S) - 2500 2 $0
Vilbig Rd. - 2100 2 $0
Vilbig Rd. - 2200 2 $0
Friday, March 31, 2006 Page 75 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing
Vineyard Dr. - 3700 2 $0 Vineyard Dr. - 4100 2 $0
Vinson St. - 2400 2 $0
Vinson St. - 2500 2 $0
Vinson St. - 2600 2 $0
Vinson St. - 2700 2 $0
Walter Dr. - 1200 2 $0
Weir St. - 2700 2 $0
Wentworth St. - 1300 2 $0
Wentworth St. - 1500 2 $0
Wentworth St. - 1600 2 $0
Westmoreland Rd. (N) - 1000 2 $0
Whitewood Dr. - 2400 2 $0
Willomet Av. (N) - 600 2 $0
Windomere Av. (N) - 1000 2 $0
Windomere Av. (N) - 1100 2 $0
Winnetka Av. (S) - 400 2 $0
Summary for 'Category' = Street Resurfacing (295 detail records) Sum $2,674,187 Streetscape / Urban Design
Beckley Ave. Enhancement ROW acquisition, Remediation, Relocation, Streetscaping 2 $2,384,859
Friday, March 31, 2006 Page 76 of 349 Project Name Description Tier Score Estimate Council District 3 Streetscape / Urban Design
Bickers Street Urban Design- Vilbig to Hampton Urban design enhancements along Bickers, from Vilbig to 2 $1,740,695 Hampton, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Bickers Street Urban Design, from Hampton to Urban design enhancements along Bickers, from Hampton to 2 $5,025,687 Westmoreland Westmoreland, to encourage pedesrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Bickers Street Urban Design, from Westmoreland to Urban design enhancements along Bickers, from 2 $1,801,561 Norwich Westmoreland to Norwich, to encourage pedesrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Davis St Phase II - Cedar Hill Av to Polk St 5 intersection improvements (paving, drainage, landscaping) on 2 $705,695 Davis St. Sidewalk curb, gutter and drive approach replacement Hampton Road Urban Design, from UPRR to Trinity River Urban design enhancements along Hampton, from Union 2 $9,118,423 Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Norwich Street Urban Design, from Singleton to Bernal Urban design enhancements along Norwich, from Singleton to 2 $2,738,078 Bernal, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Oak Cliff Gateway Park Lanscaping, Streetscaping at Houston/Jefferson area and 2 $1,185,457 along Zang Blvd. Westmoreland Road Urban Design, from UPRR to Trinity Urban design enhancements along Westmoreland, from Union 2 $4,093,783 River Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (9 detail records) Sum $28,794,238 Thoroughfares
Chalk Hill - Singleton to I 30 construct 4 lane divided 1 48 $3,486,984
Friday, March 31, 2006 Page 77 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares
Davis Street - Westmoreland to Hampton Widen to 4 lanes divided with new bridge at Coombs Creek 1 48 $4,351,321 Colorado - Walton Walker to Westmoreland Build a new 4 lane undivided roadway 1 43 $16,800,381
Duncanville - Illinois to Shelley Widen to a four lane divided roadway froma two lane road. 1 35 $1,786,422
Mountain Creek - Kiest to Spur 408 Build a new a six lane divided roadway 1 35 $26,003,452
Merrifield - Mountain Creek to Ledbetter Build a new 6 lane divided roadway 1 33 $27,011,946
Merrifield -Mountain Creek to Davis Build a new six lane divided roadway 1 33 $17,375,181
Jefferson - Walton Walker to Calumet Widen to a six lane divided roadway 1 31 $3,969,343
Canada Dr. - Hampton Road to Westmoreland Reconstruct roadway 1 29 $5,487,537
Canada Dr. - Westmoreland to Pluto build a new 4 lane roadway 1 29 $5,280,460
Plymouth - Hampton to Davis Widen to two lane undivided roadway from a one lane asphalt 1 29 $13,530,937 road Bahama - Fort Worth to Plymouth Build 4-lane roadway to replace existing asphalt roadway 1 28 $2,590,431
FM 1382 - Eagle Ford to 800 N of Camp Wisdom Widen to a six lane divided roadway 1 28 $11,149,495
FM1382 - 800' north of Camp Wisdom to IH 20 Widen to a six lane divided roadway 1 28 $4,233,086
Kiest - Mountain Creek to Grand Prairie CL Widen to a six lane divided roadway 1 28 $53,096,718
Canada Dr. - Sylvan Road to Hampton Road Rebuild to 4 lanes 1 27 $725,596
Ledbetter (W) - Ledbetter S. to Duncanville Widen to a six lane divided roadway 1 27 $5,074,102
Commerce (W) - Hampton to Sylvan Widen to six lane divided roadway from a two to four lane 1 26 $2,741,711 roadway Mountain Creek - 1900' west of Wheatland to Clark Build a new a six lane divided roadway 1 25 $14,554,171
Mountain Creek - Camp Wisdom to IH20 Widen to a six lane divided roadway 1 25 $3,262,590
Mountain Creek - IH20 to Ledbetter Widen to a six lane divided roadway 1 25 $4,977,183
Shelley - Duncanville to Knoxville Build a new 4 lane divided roadway 1 25 $1,114,764
Vilbig - Canada to Singleton Widen to a four lane undivided roadway 1 25 $3,974,712
Friday, March 31, 2006 Page 78 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares
Merrifield - Ledbetter to Kiest Build a new 6 lane divided roadway 1 23 $11,967,198 Duncanville - Kiest to Walton Walker Widen to a six lane divided roadway from a four lane roadway 1 21 $7,179,789
Cockrell Hill - Davis to Cockrell Hill CL Widen to a four lane undivided 1 20 $813,547
Mountain Creek - Eagle Ford to 1900' west of Wheatland Widen to a six lane divided roadway 1 20 $1,939,106
Chalk Hill Rd - Davis St to 800' south of IH-30 4-Lane Divided, Thoroughfare Plan anticipated to be revised 1 19 $2,741,676 from 6 to 4 due to the construction of Cockrel Hill Road. Camp Wisdom - Clark to Mountain Creek Build a new 6 lane bridge and roadway 1 17 $15,110,842
Canada - Beckley to Sylvan Widen 8'-10' on each side, increase median to 15' 1 17 $338,274
Duncanville - Ledbetter to Kiest Widen to a six lane divided roadway froma four lane roadway 1 17 $6,852,861
Red Bird (W) - Duncanville C.L. to Westmoreland Widen to a six lane divided roadway 1 17 $481,370
Camp Wisdom - FM 1382 to City Limit Build a new 6 lane bridge and roadway 1 15 $19,432,288
Camp Wisdom - FM 1382 to Mountain Creek Build a new 6 lane bridge and roadway 1 15 $7,339,552
Saner (W) - Westmoreland to Pierce Widen to a four lane undivided roadway 1 15 $2,281,796
Ledbetter (S) - Kiest to Ledbetter W. Widen to a six lane divided roadway 1 13 $6,720,393
Red Bird (W) - Kiwanis to Cedar Ridge Widen to a four lane undivided roadway 1 13 $2,106,292
S. Ledbetter - Kiest to Ledbetter Widen to a six lane divided roadway 1 13 $14,878,055
Cedar Ridge - Ledbetter to Ranchero Build a new six lane divided roadway 1 10 $11,217,856
Fourteenth (SE) - Grand Prairie CL to Skyline Widen to a six lane divided roadway and add right turn lanes 1 10 $10,022,472
Kiwanis - Red Bird to Spur 408 Widen to a four lane undivided roadway 1 10 $4,393,399
Pierce - Saner to Groveview Build a new two lane divided roadway 1 10 $5,703,122
Unnamed SW7 - Walton Walker to Unnamed SW6 Build a new 4 lane undivided roadway 1 10 $5,931,856
Ledbetter - Illinos to Kiest Widen to a six lane divided roadway 1 8 $12,769,821
S. Ledbetter - Illinois to Kiest Widen to a six lane divided roadway 1 8 $7,086,323
Friday, March 31, 2006 Page 79 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares
Vilbig - Akron to W. Commerce Widen to a four lane undivided roadway 1 5 $1,882,492 Cedar Ridge - Ranchero to IH 20 Widen 6 lanea divided from 66' to 72' 1 0 $3,328,405
Crystal Lake - South Ledbetter to Dan Morton Widen to a four lane undivided roadway 1 0 $1,842,109
Dan Morton - Crystal Lake to Ledbetter Widen to a four lane undivided roadway 1 0 $611,547
Unnamed SW6 - Mountain Creek to Merrifield Build a new 4 lane undivided roadway 1 0 $6,542,487
Duncanville - Red Bird to Ledbetter Widen to a six lane divided roadway 1 $6,453,633
Greenbriar/Beckley Permanent Ramps to IH-30 Design and construction of permanent ramps to IH-30 from 1 $0 (Methodist Hospital) Greenbriar/Beckley Greenbriar/Beckley Temporary Ramps to IH-30 (Methodist Design and construction of temporary ramps to IH-30 from 1 $3,190,750 Hospital) Greenbriar/Beckley Oak Cliff Levee Road Design and Construction of Oak Cliff Levee Road to TxDOT 1 $17,301,772 standards with connections to both IH-30 and IH-35 as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan) Summary for 'Category' = Thoroughfares (54 detail records) Sum $431,039,607 Traffic Intersection Capacity & Safety Improvement
Ledbetter @ Westmoreland Street Modifications and Widen both Ledbetter and Westmoreland approaches to 1 50 $809,812 construct dual left-turn lanes and right-turn lanes on all approaches. Construction will also remove dip in roadway. Davis St at Cockrell Hill Rd Construct a free right turn lane on westbound Davis Street at 1 45 $0 Cockrell Hill Road. Fort Worth at Westmoreland Widen Fort Worth Ave at Westmoreland to provide eastbound 1 45 $1,023,593 and westbound dual left-turn lanes. Widen Westmoreland to provide northbound and southbound right turn lanes. Bickers at Hampton Widen Bickers approaching Hampton to provide eastbound and 1 40 $440,324 westbound left-turn lanes. Correct alignment of east and west Bickers approaches.
Friday, March 31, 2006 Page 80 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Intersection Capacity & Safety Improvement
Canada @ Westmoreland Widen Canada approaching Westmoreland to provide an 1 40 $225,905 eastbound left-turn pocket. Bickers @ Westmoreland Widen Bickers at Westmoreland to provide eastbound and 1 30 $440,324 westbound left-turn lanes. Pentagon @ Polk Widen Pentagon Pkwy at Polk to provide eastbound and 1 25 $220,162 westbound left-turn pockets. Coombs Creek @ Kiest Widen Coombs Creek to align the northbound and southbound 1 15 $220,800 approaches and increase sight distance. Singleton @ Westmoreland Widen both roadway approaches to provide dual left-turn lanes 2 $1,805,912 and right turn lanes for all approaches. The project will improve truck and bus operations by improving turning radi. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (9 detail records) Sum $5,186,831 Traffic Safety Improvements-Guardrail Upgrades
Hampton 2200 N BLK Guardrail Upgrade 1 80 $7,403
Hampton 2300 N BLK Guardrail Upgrade 1 80 $6,382
Hampton 700 N BLK Guardrail Upgrade 1 80 $11,136
14th St 1300 BLK Guardrail Upgrade 1 73 $78,046
Camp Wisdom 7800 W BLK Guardrail Upgrade 1 73 $8,041
Canada 2700 BLK Guardrail Upgrade 1 73 $6,155
Cockrell Hill 2900 BLK Guardrail Upgrade 1 73 $32,386
Duncanville 3900 BLK Guardrail Upgrade 1 73 $5,935
Hampton 1400 N BLK Guardrail Upgrade 1 73 $10,785
Hampton 1500 N BLK Guardrail Upgrade 1 73 $31,461
Hampton 6900 S BLK Guardrail Upgrade 1 73 $11,870
Hampton 800 N BLK Guardrail Upgrade 1 73 $5,935
Friday, March 31, 2006 Page 81 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Safety Improvements-Guardrail Upgrades
Illinois 700 W BLK Guardrail Upgrade 1 73 $4,658 Jefferson 4600 W BLK Guardrail Upgrade 1 73 $8,583
Duncanville 3000 BLK Guardrail Upgrade 1 67 $15,890
Duncanville 4300 BLK Guardrail Upgrade 1 67 $4,658
Duncanville 4900 BLK Guardrail Upgrade 1 67 $4,658
Duncanville 5300 BLK Guardrail Upgrade 1 67 $9,317
Eagle Ford 5400 BLK Guardrail Upgrade 1 67 $40,140
Eagle Ford 5700 BLK Guardrail Upgrade 1 67 $32,801
Eagle Ford 5800 BLK Guardrail Upgrade 1 67 $12,252
Kiest 2400 W BLK Guardrail Upgrade 1 67 $6,669
Kiest 4700 W BLK Guardrail Upgrade 1 67 $27,568
Kiest 500 W BLK Guardrail Upgrade 1 67 $4,658
Westmoreland 3100 S BLK Guardrail Upgrade 1 67 $19,277
Zang 1500 N BLK Guardrail Upgrade 1 67 $25,462
Bernal 4300 BLK Guardrail Upgrade 1 60 $55,333
Camp Wisdom 8400 W BLK Guardrail Upgrade 1 60 $15,443
Camp Wisdom 8500 W BLK Guardrail Upgrade 1 60 $16,911
Clark 8500 BLK Guardrail Upgrade 1 60 $13,465
Clark 8600 BLK Guardrail Upgrade 1 60 $73,451
Clark 9000 BLK Guardrail Upgrade 1 60 $15,188
Clark 9300 BLK Guardrail Upgrade 1 60 $10,785
Clark 9500 BLK Guardrail Upgrade 1 60 $5,392
Friday, March 31, 2006 Page 82 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Safety Improvements-Guardrail Upgrades
Duncanville 3500 BLK Guardrail Upgrade 1 60 $4,658 Kiest 1400 W BLK Guardrail Upgrade 1 60 $4,658
Kiest 3500 W BLK Guardrail Upgrade 1 60 $16,177
Kiest 4300 W BLK Guardrail Upgrade 1 60 $10,593
Kiest 800 W BLK Guardrail Upgrade 1 60 $4,658
Tyler 1200 S BLK Guardrail Upgrade 1 60 $8,870
Westmoreland 1300 N BLK Guardrail Upgrade 1 60 $5,392
Westmoreland 4200 S BLK Guardrail Upgrade 1 60 $12,252
Wheatland 7500 W BLK Guardrail Upgrade 1 60 $9,062
Clark 8100 BLK Guardrail Upgrade 1 53 $11,997
Kiest 2900 E BLK Guardrail Upgrade 1 53 $38,417
Kiest 3800 W BLK Guardrail Upgrade 1 53 $4,658
Kiest 3900 W BLK Guardrail Upgrade 1 53 $10,051
Mountain Creek 7700 BLK Guardrail Upgrade 1 53 $5,839
Vernon 1400 S BLK Guardrail Upgrade 1 53 $6,126
Vernon 2500 S BLK Guardrail Upgrade 1 53 $5,392
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (50 detail records) Sum $796,897 Traffic Signal Upgrades - Citywide
Cockrell Hill @ Redbird Traffic Signal Upgrades Citywide 1 87 $52,966
Davis @ Gilpin Traffic Signal Upgrades Citywide 1 80 $51,180
Polk @ Twelfth Traffic Signal Upgrade 1 80 $52,137
Friday, March 31, 2006 Page 83 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Signal Upgrades - Citywide
Ledbetter @ Westmoreland Traffic Signal Upgrade 1 73 $54,881 Bahama @ Ft Worth (Jacqueline) Traffic Signal Upgrade 1 67 $121,568
Cockrell Hill @ Kiest Traffic Signal Upgrade 1 67 $109,762
Duncanville @ Illinois Traffic Signal Upgrade 1 67 $47,198
Hampton @ Illinois Traffic Signal Upgrades Citywide 1 67 $53,924
Hampton @ Kiest Traffic Signal Upgrade 1 67 $109,762
Illinois @ Vernon Traffic Signal Upgrade 1 67 $109,762
Kiest @ Polk Traffic Signal Upgrade 1 67 $109,762
Kiest @ Rugged Traffic Signal Upgrade 1 67 $90,873
Polk @ Saner Traffic Signal Upgrade 1 67 $118,313
Chalk Hill @ Davis Traffic Signal Upgrade 1 53 $51,180
Colorado @ Sylvan(Tyler) Traffic Signal Upgrade 1 53 $40,491
Edgefield @ Illinois Traffic Signal Upgrade 1 53 $54,689
Edgefield @ Jefferson Traffic Signal Upgrade 1 53 $109,379
Hampton @ Plymouth Traffic Signal Upgrade 1 53 $109,379
Illinois @ Nicholson Traffic Signal Upgrade 1 53 $107,847
Jefferson @ Montclair (Tenth) Traffic Signal Upgrade 1 53 $178,618
Kiest @ M. D. Love Traffic Signal Upgrades Citywide 1 53 $122,972
Kiest @ Westmoreland Traffic Signal Upgrade 1 53 $120,227
Louisiana @ Zang (Wynnewood) Traffic Signal Upgrade 1 53 $159,155
Kessler Pkwy @ Sylvan Traffic Signal Upgrade 1 47 $105,933
Colorado @ Ft Worth Traffic Signal Upgrade 1 40 $109,379
Friday, March 31, 2006 Page 84 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Signal Upgrades - Citywide
Colorado @ Hampton Traffic Signal Upgrade 1 40 $109,379 Davis @ Edgefield Traffic Signal Upgrade 1 40 $107,464
Davis @ Kings Hwy Traffic Signal Upgrade 1 40 $53,732
Davis @ Montclair Traffic Signal Upgrade 1 40 $107,464
Davis @ Polk Traffic Signal Upgrade 1 40 $51,180
Davis @ Tyler Traffic Signal Upgrade 1 40 $26,613
Dennison @ Hampton Traffic Signal Upgrade 1 40 $107,464
Jefferson @ Polk Traffic Signal Upgrade 1 40 $51,180
Kiest @ Walton Walker Traffic Signal Upgrade 1 40 $68,837
Kings Hwy @ Polk (Tyler) Traffic Signal Upgrade 1 40 $102,359
Polk @ Tenth Traffic Signal Upgrade 1 40 $52,203
Saner @ Zang Traffic Signal Upgrade 1 40 $99,870
Bickers @ Hampton Traffic Signal Upgrade 1 33 $107,464
Edgefield @ Twelfth Traffic Signal Upgrade 1 27 $83,822
Hampton @ Leath Traffic Signal Upgrades Citywide 1 27 $107,464
Pentagon Pkwy @ Polk Traffic Signal Upgrade 1 27 $59,348
Summary for 'Category' = Traffic Signal Upgrades - Citywide (41 detail records) Sum $3,647,180 Traffic System Management - Dynamic Message Signs
Illinois EB approaching Vernon Dynamic Message Sign 1 25 $153,156
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (1 detail record) Sum $153,156
Friday, March 31, 2006 Page 85 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic System Management - Roadside Cameras
Hampton-Illinois Roadside Camera 1 30 $6,382 Davis-Hampton Roadside Camera 1 25 $6,382
Hampton-Ledbetter Roadside Camera 1 20 $4,339
Singleton-Westmoreland Traffic Systems Management - Roadside Camera 1 20 $12,763
Illinois-Walton Walker Roadside Camera 1 15 $12,763
Ledbetter-Westmoreland Roadside Camera 1 15 $6,382
Summary for 'Category' = Traffic System Management - Roadside Cameras (6 detail records) Sum $49,010 Summary for 'Program' = STREET AND TRANSPORTATION (540 detail records) Sum $529,958,252 Summary for 'CD' = 3 (540 detail records) Sum $529,958,252
Friday, March 31, 2006 Page 86 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Petitions
Nebraska Av & Ramona Av - Maywood Av to Graceland Av Engineering Paving and Drainage 3000 blk 1 100 $54,881 Summary for 'Category' = Alley Petitions (1 detail record) Sum $54,881 Alley Reconstruction
Ashbrook & Everglade - Hazelhurst to Everglade Full Reconstruction 1 78 $352,259
Fallon(4847) & Chilton - Hazlehurst to Hazlehurst Full Reconstruction 1 78 $360,163
Hunters View&ForestHavenTr -Firefly to Rock Garden Full Reconstruction 1 78 $173,214
Morning Dew Cir(3800)-Morning Dew Tr toMorning dew Full Reconstruction 1 78 $273,107
Forest Haven(5939) & Rock Garden-'T' to Red Bird Full Reconstruction 1 73 $77,570
Garrison St 4002 & Volga - Garrison to Cardinal Full reconst Garrison St. 4002 1 72 $347,154
Elkridge & Breakwood -Breakwood to Enchanted Full Reconstruction 1 70 $406,179
Allview & Ashbrook - Forney to Hunnicut Full Reconstruction 1 69 $366,630
Hunters View(6026)&Red Bird-Rock Garden to RedBird Full Reconstruction 1 67 $171,208
Marsalis Avenue (1716-1734) Maryland - Iowa to Vermont Full reconst Marsalis Ave. (1716 - 1734) 1 66 $63,815
Ashbrook & Chilton - Hazelhurst to Hovenkamp Full Reconstruction -Ashbrook 4816 1 65 $363,899
Brownlee Ave & Halsey - Toluca to "T" Alley Full reconstruction - Brownlee Ave (202 - 346) 1 63 $266,491
Cove Hollow Dr. & Pentagon - Morning Dew to Morning Full reconstruction. L-shape - Cove Hollow Dr. (606 - 646) 1 63 $266,491 Springs Ewing Av (1310 - 1346) Harlandale - Winters to Genoa Full reconst Ewing Ave. (1310 - 1346) 1 60 $148,051
Beckley (S) & Arborvitae-Whipoorwill to Brookhaven Full Reconstruction 1 47 $179,662
Kathleen Avenue (2402-2562) Volga - Garrison to Cardinal Full recon Kathleen Ave. (2402 - 2562) 1 46 $344,601
Crest Av. (2403 - 2423) Corinth St. - Ohio to Missouri Full reconstruction Crest Ave. (2403 - 2423) 1 43 $79,131
Marsalis Avenue (2814-2848) Maryland - Brownlee to Full reconst Marsalis Ave. (2814 - 2848) 1 40 $108,486 Saner
Friday, March 31, 2006 Page 87 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction
Denley Dr. (3002 - 3022) & Lancaster - Corning to McVey Full reconstruction Denely Dr. (3002 - 3022) 1 37 $72,749 Lancaster Road (3404-3414) "T" Alley - Stovall to Lea Full reconst Lancaster Rd. (3404 - 3414) 1 37 $62,539 Crest Edgemont Dr (1502 - 1514) Glen - Denley to Stirling full reconst Edgemont Dr. (1502 - 1514) 1 34 $91,894
Cardinal Dr (3404 - 3444) Lea Crest - Sunnyvale to Full reconstruction Cardinal Dr (3404 - 3444) 1 28 $236,116 Garrison Deerpath Dr. 1801 - 1931 Full reconstruction 1 28 $228,458
Deerpath Dr. 2206 - 2252 Full reconstruction 1 28 $150,603
Denley Dr. 3106 - Lancaster - Corning to Keist Full reconst Denley Dr. 3106 1 28 $104,657
Fordham Rd (1303 - 1339) Grinnell - Malden to Kostner Full reconst Fordham Rd. (1303 - 1339) 1 28 $116,143
Kathleen Avenue (2602-2672) Volga - Cardinal to Full recon Kathleen Ave. (2602 - 2672) 1 28 $211,866 Sunnyvale Woodin Blvd. (603-623) Louisiana - Alaska to Marsalis Full recon Woodin Blvd (603 - 623) 1 28 $77,854
Eagle Dr (2955 - 2969) Illinois - Parrott to Overton Full reconst Eagle Dr. (2955 - 2969) 1 25 $186,340
Georgia Av (1503 - 1537) Iowa - Bruck to Corinth St. Full reconst Georgia Ave. (1503 - 1537) 1 25 $63,815
Malden La 3803 - 3827 Ful recon 1 25 $93,170
Marsalis Avenue 2702-2746 1 25 $137,840
Moffatt Avenue (2703-2781) Scotland - Sunnyvale to Full recon Moffatt Ave. (2703 - 2781) 1 25 $252,707 Tacoma Morrell Avenue (907-923) Claude - Harlandale to Fernwood Full recon Morrell Ave. (907 - 923) 1 25 $74,025
Seevers Avenue (1901-1931) Beckley - Georgia to Full recon Seevers Ave. (1901 - 1931) 1 25 $99,551 Louisiana Sunnyvale Street (3203-3219) "T" Alley - Skyland to Mundy Full recon Sunnyvale St. (3203 - 3219) 1 25 $153,156
Woodin Blvd. (1102-1114) Montana - Harlandale to "T" Full recon Woodin Blvd. (1102 - 1114) 1 25 $116,143 Alley Adelaide Dr - 1302 - 1354 Full Reconstruction 2 $207,694
Friday, March 31, 2006 Page 88 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction
Alabama Av - 3203 - 3335 Full Reconstruction 2 $256,623 Alhambra & Houghton - Umphress to Tillman Full Reconstruction - Alahambra Street 1704 - 1840 1 $275,234
Ann Arbor & Sleeth St. - Marsalis To Maryland Full Reconstruction 2 $124,106
Ann Arbor Av 1303 - 1355 Full recontruction 2 $172,301
Arizona Av - 1203 - 1247 Full Reconstruction 2 $162,842
Arizona Av - 1303 - 1347 Full Reconstruction 2 $163,097
Arizona Av 2802 - 2846 Full Reconstruction 2 $153,156
Ashbrook Rd - 5104 - 5310 Full Reconstruction 2 $390,923
Ashbrook Rd. 5105- 5341 Full Reconstruction 2 $319,075
Banting Wy - 5005 - 5207 Full Reconstruction 2 $310,140
Beckley Av (S) - 1819 Full Reconstruction 2 $220,436
Bergstorm Dr. 2104 -2260 Full reconstruction - Bergstorm Dr. 2104 -2260 1 $349,706
Blaney Wy - 5304 - 5346 Full Reconstruction 2 $422,778
Bonnie View Rd. 4203 - 4235 Full reconstruction - Bonnie View Rd. 4203 - 4235 2 $116,143
Bonnie View Rd. 4303 - 4435 Full reconstruction - Bonnie View Rd. 4303 - 4435 2 $248,879
Britton Ave 2600 - 2646 Full Reconstruction 2 $145,498
Britton Ave 2700 - 2746 Full reconstruction 2 $137,840
Britton Rd 3002 - 3046 Full reconstruction - Britton Rd 3002 - 3046 2 $146,775
Brook Valley Cir - 605 - 1015 Full Reconstruction 2 $424,307
Brook Valley La - 423 - 435 Full Reconstruction 2 $387,356
Buckner Blvd - 2303 - 2431 Full Reconstruction 2 $211,007
Canary Dr (2711 - 2821) Eagle - Keist to Parrott Full reconstruction Canary Dr. (2711 - 2821) 1 $245,586
Friday, March 31, 2006 Page 89 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction
Carson St 1503 - 1547 Full reconstruction 2 $148,051 Carson St. 1330 - 1346 Full reconstruction - Carson St. 1330 - 1346 2 $58,710
Cicero St - 4303 - 4447 Full Reconstruction 2 $275,226
Colebrook St - 7710 - 7836 Full Reconstruction 2 $266,308
Conrad St - 118 - 228 Full Reconstruction 2 $279,813
Courtney St - 7730 - 7766 Full Reconstruction 2 $103,211
Dugan St - 7714 ------Full Reconstruction 2 $73,138
Elmore Av (1607 - 1659) Missouri - Beknap to Fowler Full reconst Elmore Ave. (1607 - 1659) 2 $159,538
Ewing Av (1400 - 1446) Harlandale - Genoa to Edgemont Full reconst Ewing Ave. (1400 - 1446) 2 $148,051
Ewing Av (2903 - 2947) Idaho - McVey to Brownlee Full reconst Ewing Ave (2903 - 2947) 2 $142,946
Ewing Av (3402 - 3546) Utah - Holden to Overton Full reconst Ewing Ave. (3402 - 3546) 2 $259,089
Five Mile Pkwy - 806 - 1038 Full Reconstruction 2 $346,582
Five Mile Pkwy (W) - 606 - 724 Full Reconstruction 2 $193,933
Fonville Dr - 2305 - 2431 Full Reconstruction 2 $209,223
Galloway Av - 1002 - 1038 Full Reconstruction 2 $136,593
Galloway Av - 1102 - 1130 Full Reconstruction 2 $146,787
Galloway Av (1303 - 1351) Strickland - Denley to Full reconst Galloway Ave. (1303 - 1351) 2 $160,814 Woodbine Gaylord Dr - 1314 - 1348 Full Reconstruction 2 $115,443
Gaylord Dr - 2104 - 2248 Full Reconstruction 2 $343,269
Gaylord Dr - 2105 - 2248 Full Reconstruction 2 $341,995
Green Cove La - 604 - 634 Full Reconstruction 2 $164,626
Green Cove La - 816 ------Full Reconstruction 2 $97,093
Friday, March 31, 2006 Page 90 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction
Haywood Pkwy - 4904 - 5034 Full Reconstruction 2 $254,585 Hillard Dr - 7602 - 7634 Full Reconstruction 2 $155,707
Hillburn Dr - 1803 - 1861 Full Reconstruction 2 $228,590
Hillburn Dr - 1905 - 2061 Full Reconstruction 2 $395,001
Houghton Rd - 1704 - 1836 Full Reconstruction 2 $265,033
Kingsley Dr - 1315 - 1355 Full Reconstruction 2 $168,193
Kushla Av - 4304 - 4655 Full Reconstruction 2 $490,311
Locust Av - 2702 - 2780 Full Reconstruction 2 $279,558
Lonsdale Av - 1304 - 1366 Full Reconstruction 2 $218,398
Lonsdale Av - 1305 - 1359 Full Reconstruction 2 $281,087
Louisiana Av & Woodin - Lamont to Denlay Full reconst Louisiana Ave. (1200 - 1248) 2 $126,864
Major Dr - 2104 - 2242 Full Reconstruction 2 $314,471
Marfa Av - 2203 - 2339 Full Reconstruction 2 $251,272
Michigan Avenue (2803-2847) Saner to Brownlee Full Recon Michigan Ave. (2803 - 2847) 1 $143,137
Missouri Avenue (201-239) Guthrie - Toluca to Orial Full Recon Missouri Ave. (201 - 239) 2 $114,867
Overton Rd 1821 - 2019 Inc T-alley Full reconstruction. T-alley included 2 $179,958
Prichard La - 1824 - 1840 Full Reconstruction 2 $231,139
Prichard La - 1907 - 1923 Full Reconstruction 2 $81,294
Prichard La - 2102 - 2240 Full Reconstruction 2 $310,904
Red Bird(1031) & Fox Hill - S. Polk to Glen Oaks Full Reconstruction 2 $112,953
Rockport Dr - 4706 - 4844 Full Reconstruction 2 $260,701
Seydel St - 7714 - 7836 Full Reconstruction 2 $258,917
Friday, March 31, 2006 Page 91 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction
Terrace Drive (111-239) Elmore - Toluca to Beckley Full recon Terrace Dr. (111 -239) 2 $236,116 WindingWoods(5855)&Marview-UrbanCrestto Hazelhurst Full Reconstruction 2 $382,890
Summary for 'Category' = Alley Reconstruction (106 detail records) Sum $22,381,619 Barrier Free Ramps
Bruton Prichard to Buckner Construct 10 BFRs as folows: 4 on Bruton @ Prichard, 4 on 1 32 $22,973 Bruton @ Utica And two on Bruton @ Shortal. Also sidewalk transitions are needed on driveways between Prichard and shortal Montana @ Marsalis Need 1 BFR at intersection (700 Montana) 1 32 $1,914
726 Edgemont One Curb Cut needed in front of address, 4 BFRs on the 1 28 $9,572 intersection of Edgemont @ Ewing Briston @ Saner Install 1 BFR @ the bus stop 1 28 $1,914
Idaho @ Louisiana 4 BFRs on corners of intersection 1 27 $7,658
Polk @ Drury 2 BFRs on Polk @ Drury, one Curb Cut on end of crosswalk, 1 25 $4,135 and 2 BFRs on Polk @ Clear Fork 2001 Deer Path A Curb Cut in front of school entrance is needed. Remove and 1 22 $1,914 replace part of existing Side/Leadwalk to match new curb 2601 Prichard Ln @ Reva St 1 20 $7,658
Lake June @ Whitley BFR @ bus stop on North side of Lake June service road 1 19 $1,914
1631 S. Marsalis 2 BFRs on corners of Marsalis @ Vermont are needed 1 18 $3,829
Harlandale Ave @ Brightside Dr Construct 4 ramps 1 14 $7,658
1630 Danube Dr One curb cut is needed at lead walk 1 12 $1,914
Houghton @ Tillman BFRs on 4 corners of intersection 1 3 $7,658
Lea Crest @ Cardinal 4 BFRs are needed on corners of intersection 1 3 $7,658
Summit Ridge @ Fordham 4 BFRs on corners of intersection 1 3 $7,658
Friday, March 31, 2006 Page 92 of 349 Project Name Description Tier Score Estimate Council District 4 Barrier Free Ramps
Summary for 'Category' = Barrier Free Ramps (15 detail records) Sum $96,029 Bridge Repair and Modification
E. Kiest Blvd over Lancaster Kiest Shoping Center Clean & protect exposed rebar & grout; repair armor joints, 1 51.25 $255,260 seal; overlay deck; repair retaining walls and replace approach slabs both ends; repair damaged railing. Kiest Blvd. over DART (BNSF) RR Replace failed slope protection NE corner, replace slope 1 46.25 $76,578 protection SW corner, repair guardrail, correct settlement, repalce sidewalk sections; very severe Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $331,838 Intergovernmental Partnership Projects
Appian Way at Trib. to Cedar Creek Bridge rehabilitation and/or reconstruction 2 $0
Ramsey Ave. at Trib. To Cedar Creek Bridge rehabilitation and/or reconstruction 2 $0
Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $0 Sidewalk Petitions
Claymont Dr - Dangerfield Dr to 7233 Claymont Dr Engineering, Paving 7300-7400 Blocks 1 99 $158,261
Huttig Ave - Shortal Dr to Buckner Blvd (S) Engineering, Paving & Drainage 8000 Blk 1 98 $28,239
Summary for 'Category' = Sidewalk Petitions (2 detail records) Sum $186,501 Street Petitions
Locust Ave - Dalton St to Dead End This project provides paving and drainage improvements for 1 96 $435,661 Locus Ave from Dalton St to DeadEnd and a segment of Dalton St from Scotland Ave to Locust Ave
Friday, March 31, 2006 Page 93 of 349 Project Name Description Tier Score Estimate Council District 4 Street Petitions
Fowler St - Missouri Av to Illinois Av (E) Engineering, Paving & Drainage - 2300 blk 1 77 $109,762 Missouri Av (E) - Fowler St to Illinois Ave (E) Engineering, Paving & Drainage - 1700 blk 1 76 $89,596
Summary for 'Category' = Street Petitions (3 detail records) Sum $635,019 Street Reconstruction Local Streets
Linfield Rd - Bonny View Rd to Cranfill Dr 2800 Blk 1 58.32 $421,370
Traymore Ave - Lake June Rd to Hilburn Dr 1300 - 1400 Blks 1 56.08 $1,301,826
Chariot Dr - Rollington Rd to S Buckner Blvd 8000 Blk 1 55.06 $867,884
Hudspeth Ave - Biglow St to Garrison St 2100 - 2300 Blks 1 54.67 $1,129,526
Garrison St - Fordham Rd to Volga Av 4000 Blk 1 53.03 $321,628
Whitley Dr - Maxwell Av to Hillburn Dr 1400 Blk 1 51.52 $752,845
Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,795,078 Street Reconstruction Thoroughfares
Fordham Rd - Bonnie View Rd to Hale St 2500 - 2900 Blks 1 70.87 $4,300,863
South Lamar Street Reconstruction / Urban Design , from Roadway reconstruction and streetscape enhancements on 1 $20,612,245 IH-45 to SH310 South Lamar, from Hatcher to SH310, to spur pedestrian- friendly development and improve vehicular movement as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $24,913,108 Street Resurfacing
Moffatt Ave. - Tacoma St. to Cul-de-sac 2600 - 2700 1 75.205 $218,503
Friday, March 31, 2006 Page 94 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Five Mile Dr. - Yewpon Ave. to Frio Ln. 1400 - 1600 1 69.965 $178,069 Vesper St. - Bexar St. to Dead End 2500 block 1 69.69 $52,328
Idaho Ave. - Louisiana Ave. to Illinois Ave. 2000 - 2200 1 69.19 $96,999
Denley Dr. (S) - McVey Ave. to Illinois Ave. 2300 - 2900 1 68.88 $208,547
Lea Crest Dr. - Lancaster Rd. to Easter Ave. 1800 - 2100 1 68.085 $219,013
Overton Rd (E) - Idaho Ave. to Kushla Ave. 900 - 1100 1 67.145 $138,096
Tillman St. - Prichard Ln. to N. Buckner Blvd. 7900 - 8000 1 66.35 $115,122
Moffatt Ave. - Garrison St. to Aztec Dr. 2300 - 2400 1 65.205 $132,480
Strickland St. - Denley Dr. to Fernwood Ave. 1000 - 1200 1 64.56 $70,835
Hillard Dr. - Traymore Ave. to Hillburn Dr. 7600 - 7800 1 64.465 $52,954
Iowa Ave. (E) - Bruck St. to Cortnth Street Rd. 1500 Block 1 64.335 $39,948
Ewing Ave. (S) - Saner Ave. - Hobson Ave. 2700 Block 1 63.86 $39,565
Locust Ave. - Cul -De-Sac to Tocoma St. 2600 - 2700 1 63.165 $166,430
Springview Ave. - Bonnie View Rd. to Prosperity Av 3000 - 3100 1 61.8 $85,512
Hillburn Dr. - Piedmont Dr. to Daingerfield Dr. 2500 - 2600 1 61.795 $78,365
Elmore Ave. (W) - Beckley Ave. to Zang Blvd. 100 - 400 1 60.1 $119,768
Eisenhower Dr. - Brodie St. to Kiest Blvd. 3100 - 3200 1 59.94 $35,098
Marfa Ave. - Frio Dr. to Fernwood Ave. 1600 block 1 59.82 $72,239
Berwick Ave. - Sussex Ave. to Corinth St. 1900 - 2400 1 59.76 $125,588
Ewing Ave. (S) - Morrell Ave. to Galloway Ave. 900 - 1000 1 59.27 $120,355
Tacoma St. - Fordham Rd. to Cummings Ave. 4100 - 4700 1 58.39 $150,323
Halsey St. - Toluca Dr. to Eisenhower Dr. 200 - 300 1 58.38 $46,074
Friday, March 31, 2006 Page 95 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Edgemont Ave. - Marsalis Ave. to Ewing Ave. 700 Block 1 58.26 $63,687 Bardwell Ave. - Canary Dr. to Eagle Dr. 2900 Block 1 57.72 $38,161
Corning Ave. (W) - Beckley Ave. to Toluca Ave. 100 Block 1 57.465 $35,226
Houghton Rd. - Seco Blvd. to Tillman St. 1500 - 1800 1 56.715 $180,214
Hillburn Dr. - Lake June Rd. to Courtney St. 1300 Block 1 56.42 $52,711
Hillburn Dr. - Aurora St. to Umphress Rd. 1600 Block 1 56.21 $98,530
Ann Arbor Ave. - Malden Ln. to Kostner Ave. 1300 Block 1 55.85 $74,664
Scotland Dr. - 150' E of Landrum Ave. to Tacoma St. 2600 - 2700 1 55.275 $142,563
Belknap Ave. - Illinois Ave. to Elmore Ave. 2300-2500 1 54.89 $125,205
Asbrook Rd. - Havenkamp Dr. to Samuell Blvd. 5000 - 5400 1 54.335 $200,251
Claude St. - Denley Dr. to Moore St. 1300 Block 1 54.025 $48,499
Compton St. - Moore St. to 500' E. of Carey St. 1400 - 1500 1 53.69 $46,202
Rock Garden Tr. - Red Bird Ln. to Hunters View Ln. 6000 block 1 53.345 $19,783
Stella Ave. - Denley Dr. to Corinth Street Rd. 1400 - 1600 1 52.345 $76,578
Maryland Ave. - Illinois Ave. to Elmore Ave. 2300 - 2500 1 52.24 $112,314
Claude St. - Walnut St. to Corinth Street Rd. 1500 Block 1 52.145 $22,718
Forest Haven Tr. - Dead End to Cul-de-Sac 5800 - 5900 1 52 $54,626
Toluca St. - Beckleywood Blvd. to Granger St. 1700 block 1 51.265 $42,246
Montana Ave. (E) - S. Marsalis Ave. to Maryland Av 700 block 1 50.72 $19,145
Maywood Ave. - Frio Dr. to Fernwood Ave. 1400 block 1 50.065 $29,100
Skylark Dr. - Kiest Blvd. to Illinois Ave. 2000 - 2400 1 49.51 $200,634
Harlandale Ave. - Winters St. to Genoa Ave. 1300 Block 1 48.92 $69,558
Friday, March 31, 2006 Page 96 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Carson St. - Genoa Ave. to Edgemont Ave. 1400 Block 1 48.57 $37,268 Fernwood Ave. - Elmore Ave. to Saner Ave. 2600-2700 1 48.3 $62,539
Ewing Ave. (S) - Montana Ave. to Elmore Ave. 2200 - 2500 1 46.505 $118,696
Easter Ave. - Almeda Dr. to Elmore Ave. 2500 Block 1 44.36 $18,251
Marfa Ave. - Biglow St. to Easter Ave. 2100 block 1 43.09 $50,159
Custer Dr. - Tacoma St. to Sunnyvale St. 2700 Block 1 42.735 $67,389
Stella Ave. - Corinth Street Rd. to Cedar Crest Blvd. 1700 - 1800 1 42.43 $84,363
Vista Wood Blvd. - Ledbetter Dr. to Concrete 4700 block 1 38.47 $21,569
Maryland Ave. - McVey Ave. to Corning Ave. 3000 block 1 38.105 $28,461
Eisenhower Dr. - Bradley St. to Nimitz Dr. 2800 Block 1 34.955 $29,993
Adelaide Dr. - 1200 2 $0
Alabama Av. - 3100 2 $0
Alaska Av. - 1300 2 $0
Almeda Dr. - 2600 2 $0
Amy St. - 7300 2 $0
Ann Arbor Av. - 800 2 $0
Arborvitae Av. - 1300 2 $0
Arizona Av. - 1200 2 $0
Arizona Av. - 1500 2 $0
Avenue B - 1500 2 $0
Avenue D - 1600 2 $0
Aztec Dr. - 4300 2 $0
Friday, March 31, 2006 Page 97 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Aztec Dr. - 4400 2 $0 Beauchamp St. - 3000 2 $0
Beauchamp St. - 3100 2 $0
Benning Av. - 7000 2 $0
Bergstrom Dr. - 2100 2 $0
Bergstrom Dr. - 2200 2 $0
Bexar St. - 6500 2 $0
Bexar St. - 6700 2 $0
Blossom La. - 8000 2 $0
Brookmere Dr. - 1100 2 $0
Brookmere Dr. - 1200 2 $0
Bruton Rd. - 6600 2 $0
Buckner Blvd. (S) - 2100 2 $0
Cape Cod Dr. - 1400 2 $0
Cedar Haven Av. - 1300 2 $0
Cedar Lake Dr. - 4100 2 $0
Chariot Dr. - 7800 2 $0
Circle Dr. - 100 2 $0
Circle Dr. - 200 2 $0
Clear Creek Rd. - 4800 2 $0
Clear Creek Rd. - 4900 2 $0
Conway St. - 3400 2 $0
Friday, March 31, 2006 Page 98 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Conway St. - 3500 2 $0 Corinth St Rd. (S) - 2300 2 $0
Corinth St Rd. (S) - 300 2 $0
Corinth St Rd. (S) - 500 2 $0
Corning Av. (E) - 200 2 $0
De Haes Av. - 300 2 $0
De Kalb Av. - 4500 2 $0
Dover St. - 700 2 $0
Easter Av. - 2900 2 $0
Edgemont Av. - 1000 2 $0
Elmore Av. (E) - 1700 2 $0
Everglade Rd. - 5200 2 $0
Ewing Av. (S) - 4500 2 $0
Firefly La. - 600 2 $0
Five Mile Pkwy. (E) - 700 2 $0
Five Mile Pkwy. (E) - 800 2 $0
Fordham Rd. - 1200 2 $0
Fordham Rd. - 1700 2 $0
Fordham Rd. - 2000 2 $0
Fordham Rd. - 2200 2 $0
Fordham Rd. - 2300 2 $0
Fordham Rd. - 2700 2 $0
Friday, March 31, 2006 Page 99 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Fordham Rd. - 3000 2 $0 Fordham Rd. - 3200 2 $0
Fordham Rd. - 3400 2 $0
Fordham Rd. - 500 2 $0
Fordham Rd. - 600 2 $0
Forney Rd. - 7700 2 $0
Forney Rd. - 7900 2 $0
Fortune La. - 3800 2 $0
Fortune La. - 4100 2 $0
Fox Hill La. - 4800 2 $0
Front St. - 1200 2 $0
Galloway Av. - 1000 2 $0
Galloway Av. - 1200 2 $0
Garza Av. - 1700 2 $0
Garza Av. - 300 2 $0
Garza Av. - 700 2 $0
Genoa Av. - 600 2 $0
Genoa Av. - 700 2 $0
Glen Oaks Blvd. - 800 2 $0
Green Cove La. - 800 2 $0
Grinnell St. - 1300 2 $0
Harlandale Av. - 2800 2 $0
Friday, March 31, 2006 Page 100 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Haywood Pkwy. - 4700 2 $0 Hendricks Av. - 1100 2 $0
Hendricks Av. - 1200 2 $0
Hortense Av. - 1400 2 $0
Hortense Av. - 1500 2 $0
Hunnicut Rd. - 7200 2 $0
Idaho Av. - 1700 2 $0
Idaho Av. - 4300 2 $0
Jennings Av. - 2300 2 $0
Jim Miller Rd. (N) - 1900 2 $0
Kellogg Av. - 3100 2 $0
Kellogg Av. - 3200 2 $0
Kellogg Av. - 3300 2 $0
Kingsley Dr. - 1300 2 $0
Lake June Rd. - 6300 2 $0
Lake June Rd. - 6400 2 $0
Las Cruces La. - 2300 2 $0
Lea Crest Dr. - 1800 2 $0
Ledbetter Dr. (E) - 200 2 $0
Loganwood Dr. - 3100 2 $0
Loganwood Dr. - 3200 2 $0
Loganwood Dr. - 3600 2 $0
Friday, March 31, 2006 Page 101 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Louisiana Av. (E) - 1100 2 $0 Lynnhaven Av. - 1500 2 $0
Lynnhaven Av. - 1600 2 $0
Mcvey Av. (E) - 1000 2 $0
Mcvey Av. (E) - 700 2 $0
Mcvey Av. (E) - 800 2 $0
Mcvey Av. (E) - 900 2 $0
Mentor Av. - 700 2 $0
Michigan Av. - 1300 2 $0
Michigan Av. - 2000 2 $0
Michigan Av. - 3100 2 $0
Missouri Av. (E) - 1600 2 $0
Misty Glen La. - 800 2 $0
Misty Glen La. - 900 2 $0
Moberly La. - 8200 2 $0
Moberly La. - 8300 2 $0
Montague Av. - 1300 2 $0
Moore St. (S) - 400 2 $0
Moore St. (S) - 500 2 $0
Morning Springs Trl. - 4000 2 $0
Moss Point Rd. - 4800 2 $0
Moss Point Rd. - 4900 2 $0
Friday, March 31, 2006 Page 102 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Moss Point Rd. - 5000 2 $0 Mundy Cir. - 3500 2 $0
Nimitz Dr. - 400 2 $0
Norfolk Av. - 1800 2 $0
Norfolk Av. - 1900 2 $0
Oak Creek Cir. - 3700 2 $0
Oak Creek Cir. - 3800 2 $0
Ohio Av. (E) - 100 2 $0
Ohio Av. (E) - 1500 2 $0
Ohio Av. (E) - 200 2 $0
Olson Dr. - 4800 2 $0
Overton Rd. (E) - 1600 2 $0
Overton Rd. (E) - 1800 2 $0
Overton Rd. (E) - 1900 2 $0
Overton Rd. (E) - 2100 2 $0
Owega Av. - 1300 2 $0
Paloduro La. - 4800 2 $0
Penland St. - 100 2 $0
Penland St. - 200 2 $0
Pentagon Pkwy. (E) - 800 2 $0
Presidio Av. - 1500 2 $0
Prichard La. - 1800 2 $0
Friday, March 31, 2006 Page 103 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Ramsey Av. - 3000 2 $0 Ramsey Av. - 3300 2 $0
Ravehill La. - 7400 2 $0
Ravehill La. - 7500 2 $0
Ravehill La. - 7600 2 $0
Ravehill La. - 7700 2 $0
Ravehill La. - 7800 2 $0
Rockbluff Dr. - 3600 2 $0
Rockbluff Dr. - 3700 2 $0
Rockbluff Dr. - 3800 2 $0
Rothington Rd. - 8000 2 $0
Samuell Blvd. - 5900 2 $0
Saner Av. (E) - 600 2 $0
Seco Blvd. - 7500 2 $0
Seco Blvd. - 7600 2 $0
Seevers Av. - 2300 2 $0
Shafter Dr. - 8100 2 $0
Sleeth St. - 700 2 $0
Somerset Av. - 1800 2 $0
Somerset Av. - 1900 2 $0
Sorenson Cir. - 7100 2 $0
Stirling Av. - 1300 2 $0
Friday, March 31, 2006 Page 104 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing
Summit Ridge Dr. - 3900 2 $0 Sunnyvale St. - 4100 2 $0
Templecliff Dr. - 1400 2 $0
Terrace Dr. - 100 2 $0
Traymore Av. - 1500 2 $0
Tribune Dr. - 3600 2 $0
Utah Av. - 3800 2 $0
Utica Dr. - 1900 2 $0
Vermont Av. - 1300 2 $0
Vermont Av. - 1500 2 $0
Vermont Av. - 300 2 $0
Village Wy. - 2100 2 $0
Warrington Dr. - 3900 2 $0
Wells St. - 2400 2 $0
Whippoorwill Dr. - 100 2 $0
Whitaker Av. - 1300 2 $0
Whitaker Av. - 1500 2 $0
Wilhurt Av. - 2800 2 $0
Summary for 'Category' = Street Resurfacing (239 detail records) Sum $4,833,514 Streetscape / Urban Design
Bexar Street Corridor - Rochester S. to Cul-de-sac Rochester S. to end - ~2,000 LF 2 $2,485,258
Friday, March 31, 2006 Page 105 of 349 Project Name Description Tier Score Estimate Council District 4 Streetscape / Urban Design
Illinois Ave fr IH-35E to Ozona St Median Beautification & Three Gateways at IH-35/ Illinois 2 $1,813,051 (TxDOT), Denley/ Illinois (DART) & Belknap/ Illinois (Park) South Central (SH310) Urban Design/Streetscape, from S. Pedestrian friendly enhancments along SH310, from South 2 $6,190,693 Loop 12 to the Trinity River Bridge Loop 12 to the Trintiy River bridge as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $10,489,002 Thoroughfares
Military Pkwy - Buckner to Jim Miller Widen to 6 lane divided roadway 1 55 $5,720,203
Overton - S.M. Wright to IH 45 Widen to 6 lane divided roadway 1 42 $1,691,368
Overton (E) - SH 310/ SM Wright to IH 45 Widen to a six lane divided roadway 1 42 $1,537,606
Sunnyvale - Kiest to Ann Arbor Widen to 4 lane divided roadway 1 41 $7,270,069
Overton - Conway to I.H. 35E Build a new 4 lane undivided roadway 1 39 $3,052,848
Ann Arbor - Marsalis to Ramona Widen to 4 lane undivide roadway (36 to 44 feet) 1 35 $5,412,375
Forney - Jim Miller to Lawnview Widen to a four lane undivided roadway 1 31 $2,233,216
Scyene - E. Scyene Cir. to West Scyene Widen to a four lane undivided roadway 1 30 $4,354,221
Saner - Beckley to Lancaster Widen to a four lane undivided roadway 1 25 $4,333,041
Morrell - Corinth to Ewing Widen to a four lane undivided roadway 1 24 $1,902,787
Military Pkwy - Buckner Blvd. to Prairie Creek Widen to a six lane divided roadway 1 23 $6,618,440
Conway - Kiest to Villiage Fair Widen to a four lane undivided roadway 1 19 $5,814,001
Beckley (S) - Kiest to IH 35E Exit Ramp Widen to 6 lane roadway 1 18 $2,029,641
Hunnicut - Samuell to I.H. 30 Widen to a four lane undivided roadway 1 16 $787,358
Greenspan - Laureland to Hammerking Build a new 4 lane undivided roadway 1 10 $1,470,231
Hammerking - IH 35 to Greenspan Build a new 4 lane undivided roadway 1 10 $1,997,069
Friday, March 31, 2006 Page 106 of 349 Project Name Description Tier Score Estimate Council District 4 Thoroughfares
Delafield - Hoyle to Military Pkwy Widen to a four lane undivided roadway 1 0 $2,537,050 Hoyle - Buckner to Delafield Widen to a four lane undivided roadway 1 0 $2,120,251
Scyene (Old) - Scyene Cir. to Buckner 1 $1,271,109
Summary for 'Category' = Thoroughfares (19 detail records) Sum $62,152,884 Traffic Intersection Capacity & Safety Improvement
Buckner at Hoyle Trim back median noses to allow simultaneous east and west 1 50 $51,402 left-turns on Hoyle. Ann Arbor @ Sunnyvale Widen the southbound approach to a left-turn pocket. 1 30 $215,593
Forney @ Jim Miller Street Modifications and Bottl Widen Forney approaching Jim Miller to provide an eastbound 1 25 $283,339 left-turn pocket. Kiest at Sunnyvale Widen Sunnyvale at Kiest to provide northbound and 1 25 $220,162 southboud left-turn lanes. Overton @ Sunnyvale Street Modifications and Bottl Install left turn pockets for all directions and increase the 1 25 $991,685 turning radius on all corners. Pentagon @ Polk Widen Pentagon Pkwy at Polk to provide eastbound and 1 25 $220,162 westbound left-turn pockets. Fordham @ Sunnyvale Widen all approaches to provide left-turn pockets. 1 20 $709,623
IH 35 @ Ledbetter Widen Ledbetter to provide a eastbound and westbound left- 2 $634,736 turn lanes. Widen both service road intersections to provide right turn lanes for all approaches. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $3,326,700 Traffic Safety Improvements-Guardrail Upgrades
Military 8000 BLK Guardrail Upgrade 1 87 $12,543
Military 8600 BLK Guardrail Upgrade 1 80 $10,785
Friday, March 31, 2006 Page 107 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Safety Improvements-Guardrail Upgrades
Military 9900 BLK Guardrail Upgrade 1 80 $3,925 Bruton 6100-6900 BLK Guardrail Upgrade 1 73 $58,008
Corinth St. Rd. 900-2100 S BLK Guardrail Upgrade 1 73 $36,470
Corinth St. Rd. 100 S BLK Guardrail Upgrade 1 67 $5,568
Jim Miller 4900 BLK Guardrail Upgrade 1 67 $16,911
Beckley 1300 S BLK Guardrail Upgrade 1 60 $27,058
Jim Miller 4700 BLK Guardrail Upgrade 1 60 $5,392
Marsalis 1200 S BLK Guardrail Upgrade 1 60 $62,252
Marsalis 4600 S BLK Guardrail Upgrade 1 60 $8,487
Marsalis 800 S BLK Guardrail Upgrade 1 60 $38,417
Military 4600 BLK Guardrail Upgrade 1 53 $10,529
Kiest 2200 E BLK Guardrail Upgrade 1 47 $5,246
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (14 detail records) Sum $301,590 Traffic Signal Upgrades - Citywide
Ewing @ Morrell Traffic Signal Upgrade 1 100 $111,676
Houston School Rd @ Ledbetter Traffic Signal Upgrade 1 87 $86,839
Ann Arbor @ Marsalis Traffic Signal Upgrade 1 80 $107,847
Kiest @ RL Thornton Traffic Signal Upgrade 1 80 $245,943
Kiest @ Sunnyvale Traffic Signal Upgrade 1 80 $54,211
Ledbetter @ RL Thornton Traffic Signal Upgrade 1 80 $187,935
Beckley @ Illinois Traffic Signal Upgrade 1 67 $82,896
Friday, March 31, 2006 Page 108 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Signal Upgrades - Citywide
Beckley @ Kiest Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 67 $122,525 Forney @ Jim Miller Traffic Signal Upgrade 1 67 $54,689
Illinois @ Kiest Traffic Signal Upgrade 1 67 $97,694
Kiest @ Marsalis Traffic Signal Upgrade 1 67 $120,227
Ledbetter @ Village Fair Traffic Signal Upgrade 1 67 $109,379
Marsalis @ Overton Traffic Signal Upgrade 1 67 $118,313
Marsalis @ Saner Traffic Signal Upgrade 1 67 $91,830
Marsalis @ Winters Traffic Signal Upgrade 1 67 $116,399
Overton @ Sunnyvale Traffic Signal Upgrade 1 67 $116,399
Polk @ Redbird Traffic Signal Upgrade 1 67 $67,438
Buckner @ Military Traffic Signal Upgrade 1 60 $201,655
Bruton @ Hillburn Traffic Signal Upgrade 1 53 $107,847
Conway @ Kiest Traffic Signal Upgrades Citywide 1 53 $103,316
Everglade @ Jim Miller Traffic Signal Upgrades Citywide 1 53 $53,924
Ewing @ Illinois Traffic Signal Upgrade 1 53 $109,379
Hampton @ Wheatland Traffic Signal Upgrade 1 53 $53,924
Hillburn @ Lake June Traffic Signal Upgrade 1 53 $60,305
Illinois @ Marsalis Traffic Signal Upgrade 1 53 $111,293
Jim Miller @ Seco Traffic Signal Upgrade 1 53 $118,313
Kiest @ M. D. Love Traffic Signal Upgrades Citywide 1 53 $122,972
Ledbetter @ Marsalis Traffic Signal Upgrades Citywide 1 53 $59,635
Polk @ Reynoldston Traffic Signal Upgrade 1 53 $34,311
Friday, March 31, 2006 Page 109 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Signal Upgrades - Citywide
Beckley @ Saner Traffic Signal Upgrades Citywide 1 40 $114,867 Eighth @ Marsalis Traffic Signal Upgrade 1 40 $107,464
Harrell Bud School @ Marsalis Traffic Signal Upgrade 1 40 $97,254
Bruton @ Prichard Traffic Signal Upgrade 1 27 $107,464
Pentagon Pkwy @ Polk Traffic Signal Upgrade 1 27 $59,348
Summary for 'Category' = Traffic Signal Upgrades - Citywide (34 detail records) Sum $3,515,513 Traffic System Management - Dynamic Message Signs
Ledbetter 1400 E Dynamic Message Sign 1 10 $76,578
Ledbetter 1400 W Dynamic Message Sign 1 10 $76,578
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (2 detail records) Sum $153,156 Traffic System Management - Flood Detour Signs
Illinois @ Linfield I.T.S. - Dynamic Signs - Flood Dynamic Signs - Flood Detours 1 80 $13,057
Polk @ Pentagon Pkwy Dynamic Signs - Flood Detours 1 80 $42,118
Beckley, 1200 S. Dynamic Signs - Flood Detours 1 60 $42,118
Louisiana, 200 W. Dynamic Signs - Flood Detours 1 60 $42,118
Umphress @ Hillburn Dynamic Signs - Flood Detours 1 60 $34,537
Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $173,947 Traffic System Management - Roadside Cameras
Buckner-Bruton Roadside Camera 1 20 $6,382
Friday, March 31, 2006 Page 110 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic System Management - Roadside Cameras
Illinois-IH45 Roadside Camera 1 10 $6,382 Summary for 'Category' = Traffic System Management - Roadside Cameras (2 detail records) Sum $12,763 Summary for 'Program' = STREET AND TRANSPORTATION (465 detail records) Sum $138,353,143 Summary for 'CD' = 4 (465 detail records) Sum $138,353,143
Friday, March 31, 2006 Page 111 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction
Glengreen & Dale Glade- Eastshore to St. Augustine Full Reconstruction 1 78 $328,877 Muskogee (10356) & Cymbal - Muskogee to Muskogee Full Reconstruction. 1 78 $322,684
Trailcrest & Racine - 'T' to Highfall Full Reconstruction 1 78 $202,422
St.Augustine&EarlecoveCir-EarlecoveCir toJennie Full Reconstruction 1 77 $241,716
Autmn Woods(6626) & Racine - Millet to Racine Full Reconstruction 1 76 $433,540
Muskogee and Springhaven - Amity to Gardenside Full Reconstruction - SR# 04-00096226. 1 76 $670,058
Springhaven(10321) & Checota - Springhaven to 'T' Full Reconstruction 1 75 $294,746
Lapanto(8816) &Mosswood- Mosswood to incl.'T'alley Full Reconstruction 1 72 $376,557
Bissonet Av & Bolero Av - Bissonet Av to Elam Rd Full Reconstruction 780 FT 1 65 $179,958
Elder Oaks(2102)& Camp Wisdom-HamptontoCamp 1 64 $246,939 Wisdom Golden Trophy & Ferncliff-Polk St.to Sheady Meadow Full Reconstruction 1 63 $108,562
Jennie Lee Lane (9341 - 9357) Renova - Sandstone to full reconstruction Jennie Lee Ln. (9341 - 9357) 1 63 $72,749 Cypress Mossglen Drive (2606-2614) Jennie Lee to Groveridge Full recon Mossglen Dr (2606 - 2614) 1 60 $85,512
Autumun Meadow & Hunters Run - Mesa Verde(7411) Full Reconstruction 1 56 $309,278
Blossom La 8605 - 8623 Full Reconstruction - Blossom La 8605 - 8623 1 49 $54,881
Rosemeade(7822) & Courtney - Hillburn to Maxwell Full Reconstruction 1 49 $275,640
Lolita Drive (2500-2632) Pleasant - Jennie Lee to Ricardo Full reconst Lolita Dr. (2500 - 2632) 1 46 $204,234
Humoresque & Bowling Brook-Bowling Brook to Bowling Full Reconstruction 1 40 $245,050 Brook Jeane & Godfrey ( Godfrey toJonelle) 1 39 $505,415
Silvery Moon Drive (6112-6342) Rhapsody - Lazy River to Full recon Silvery Moon Dr. (6112 - 6342) 1 34 $248,879 Singing Hills Lazy River Drive (5706-5930) Red Bird to Wagon Wheels Full reconstr Lazy River Dr. (5706 - 5930) 1 31 $239,944
Friday, March 31, 2006 Page 112 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction
Cranfill Dr. 4830 Wadsworth - 51st to "T" Alley Full reconstruction Cranfill Dr. 4830 1 28 $74,025 Jim Miller Road (1031 - 1045) "T" Alley - Rosalinda to Full Reconstruction Jim Miller Rd. (1031 - 1045) 1 25 $66,368 Sarah Lee Alcorn Av & Antler Av - "T" Alley to Elam Rd Full Reconstruction - Alcorn Av 412-476 1 $277,774
Allentown Dr - 1605 - 1729 Full Reconstruction 2 $235,726
Ann Arbor & Marjorie - Tacoma to Bonnie View Full Reconstruction - Ann Arbor Avenue 2828-2842 1 $290,772
Atha & Marla - Woodmont to Bissonet Full Reconstruction - Atha Drive 6806 - 6942 1 $273,697
Atha Dr - 7005 - 7031 Full Reconstruction 2 $104,229
Aurora St - 7703 - 7835 Full Reconstruction 2 $318,804
Bilco St - 1521 - 1537 Full Reconstruction 2 $173,036
Bismark Dr - 4810 - 4856 Full Reconstruction 2 $201,324
Bissonet Av - 230 - 312 Full Reconstruction 2 $126,655
Blanton St - 2403 - 2423 Full Reconstruction 2 $204,382
Blanton St - 2511 - 2527 Full Reconstruction 2 $464,572
Blanton St - 2607 - 2653 Full Reconstruction 2 $156,726
Bluffcreek Dr - 9504 - 9580 Full Reconstruction 2 $255,349
Bluffcreek Dr - 9805 - 9923 Full Reconstruction 2 $389,905
Bonnie View Rd - 4703 - 4735 Full Reconstruction 2 $152,139
Brierfield Dr - 6705 - 7019 Full Reconstruction 2 $298,162
Castle Bay Dr - 9825 - 9923 Full Reconstruction 2 $190,874
Castlefield Dr - 9507 - 9577 Full Reconstruction 2 $240,569
Checota Dr - 9715 - 9743 Full Reconstruction 2 $309,375
Cherry Point Dr - 101 - 235 Full Reconstruction 2 $254,074
Friday, March 31, 2006 Page 113 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction
Cherrybrook Dr - 8602 - 8822 Full Reconstruction 2 $320,587 Coleshire Dr - 6805 - 7027 Full Reconstruction 2 $221,201
Colwick Av (4540 - 4544) Tacoma - Kilburn to "T" Alley Full Reconstruction Colwick Ave (4540 - 4544) 1 $253,820
Dahlia Ct. 3254 - 3268 full reconstruction. U-shape 2 $219,651
Dahlia Dr - 3006 - 3122 Full Reconstruction 2 $228,081
Dahlia Dr - 3122 - 3244 Full Reconstruction 2 $225,278
Dart Av - 6806 - 6936 Full Reconstruction 2 $262,485
Denham St - 6204 - 6256 Full Reconstruction 2 $178,133
Donnybrook La - 9006 - 9158 Full Reconstruction 2 $321,352
Elam Rd - 8203 - 8247 Full Reconstruction 2 $157,746
Ella Av - 405 - 429 Full Reconstruction 2 $296,633
Fenway St - 6240 - 6378 Full Reconstruction 2 $299,691
Fenway St 6136-6138 Full reconstruction 2 $160,814
Fiftieth St - 3012 - 3132 Full Reconstruction 2 $251,272
Fifty-second St - 3226 - 3248 Full Reconstruction 2 $81,803
Foxwood La - 8507 - 8539 Full Reconstruction 2 $357,540
Garden Crest & Autumn Meadow - Autumn Meadow to Me Full reconstruction (2030 Garden Crest Ln) 2 $283,339
Glen Forest La - 5505 - 5525 Full Reconstruction 2 $166,410
Glengreen Dr - 9851 ------Full Reconstruction 2 $74,667
GoldenTrphy & Ferncliff - AutumnWoods to Sheady Full Reconstruction 2 $172,893 Meadow Greenmound Av - 8311 - 8425 Full Reconstruction 2 $206,420
Heatherglen & Cedar Valley - Marblehead to Shady Glen Full Reconstruction 2 $376,557
Friday, March 31, 2006 Page 114 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction
Hillard Dr - 7702 - 7826 Full Reconstruction 2 $263,759 Hillmont Dr - 6812 - 6846 Full Reconstruction 2 $162,077
Hillvale Dr - 511 - 545 Full Reconstruction 2 $114,932
Hymie Cir (10001 - 10035) Glengeen to "T" Alley Full Reconstruction Hymie Cir. (10001 - 10035) 1 $315,491
Inca Dr - 2105 - 2365 Full Reconstruction 2 $503,308
Jennie Lee La - 8608 - 8824 Full Reconstruction 2 $243,627
Jennie Lee La - 8906 - 8928 Full Reconstruction 2 $110,856
Kilburn Av - 2746 ------Full Reconstruction 2 $90,213
Lake June Rd - 10121 - Tokowa - "T" Alley to Masters Full Reconstruction Lake June Rd. 10121 1 $216,104
Lake June Rd - 7843 ------Full Reconstruction 2 $246,685
Loop 12 - 6901 ------Full Reconstruction 2 $169,213
Marjorie Av - 3011 - 3129 Full Reconstruction 2 $253,310
Mattison St - 7847 ------Full Reconstruction 2 $84,352
McCutcheon La - 2333 ------Full Reconstruction 2 $85,372
McCutcheon La - 2608 - 2626 Full Reconstruction 2 $350,658
Meadow Valley La - 1806 - 1850 Full Reconstruction 2 $209,733
Mesita Dr - 10004 - 10058 Full Reconstruction 2 $235,726
Mirage Valley Dr - 7806 - 7920 Full Reconstruction 2 $245,411
Muskogee Dr - 10006 - 10128 Full Reconstruction 2 $170,742
Neosho Dr - 10018 - 10108 Full Reconstruction 2 $217,887
Neosho Dr - 10112 - 10116 Full Reconstruction 2 $38,991
Prichard La - 1326 - 1354 Full Reconstruction 2 $124,872
Friday, March 31, 2006 Page 115 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction
Robin Glen Dr & Willow Glen - Spring Glen to Cedar Glen Full Reconstruction Robin Glen Dr. (1208 - 1254) - T alley 2 $188,581 Included Shayna Dr - 10002 - 10140 Full Reconstruction 2 $256,878
Shyana Dr. & Hymie Cir. - Glengreen to Hymie Cir. Full Reconstruction 2 $163,606
Sunnyglen & Wedgecrest - Concrete 'T' to Sunnyglen Full Reconstruction 2 $110,261
Swansee St - 2104 - 2306 Full Reconstruction 2 $250,252
Valentine Court 7914 Buckner - Seco to Hillard Full recon Valentine Crt. 7914 2 $114,867
Woodlark Trl - 216 - 320 Full Reconstruction 2 $169,213
Summary for 'Category' = Alley Reconstruction (94 detail records) Sum $21,529,526 Barrier Free Ramps
6300 Elam Construct 18 BFR on all Driveways and leadwalks of Rufus 1 47 $34,460 Burleson School Ella @ Alcorn Construct BFRs on 4 corners 1 47 $7,658
Ella @ Capestove Construct 2 BFRs on corners pf intersection 1 47 $3,829
Ella @ Elam Construct 4 BFRs on corners of intersection 1 47 $7,658
Stoneport @ Alcorn 2 BFRs on intersection 1 47 $3,829
2100 Prairie Creek Construct BFRs on driveways of # 2112, 2116 N. Prairie Creek 1 46 $11,487 and driveways of 9199 Bruton (Exxon) Blue Creek Dr @ Horizon Dr Construct 2 BFR on corners of intersection 1 31 $3,829
Goldwood Dr @ Indian Ridge Trail 1 25 $10,042
Polk @ Drury 2 BFRs on Polk @ Drury, one Curb Cut on end of crosswalk, 1 25 $3,523 and 2 BFRs on Polk @ Clear Fork Masters @ Checota 4 BFRs needed on intersection 1 23 $7,658
Masters @ Muskogee 4 BFRs needed on intersection 1 23 $7,658
Friday, March 31, 2006 Page 116 of 349 Project Name Description Tier Score Estimate Council District 5 Barrier Free Ramps
Masters @ Tokowa 4 BFRs needed on intersection 1 23 $7,658 Stonehurst @ Ridgedorf Need 1 BFR at intersection on the corner of #1727 Ridgedorf 1 3 $1,914
Jade Dr. (4905) @ Misty Glen Ln. Install 4 ramps for this intersection 1 $7,658
Summary for 'Category' = Barrier Free Ramps (14 detail records) Sum $118,859 Bridge Repair and Modification
Lake June Rd. over Prairie Creek Repair/replace alum. railing, fill void below wingwall SE corner, 1 43.75 $114,867 fill before riprap both sides of channel w/grout injection, place grout around piers; mod.severe Gayglen Dr. over Elam Creek Scour, use grout injection/flowable fill beneath d/s apron, 1 36.25 $102,104 replace and repair u/s wingwalls; severe Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $216,971 Intergovernmental Partnership Projects
Polk @ Woody Branch Bridge rehabilitation and/or reconstruction 2 $0
Summary for 'Category' = Intergovernmental Partnership Projects (1 detail record) Sum $0 Street Lighting - Freeway Lighting
IH 35 E (S. RLT) - I-20 to Ledbetter Freeway Lighting Installation 1 5 $120,013
Summary for 'Category' = Street Lighting - Freeway Lighting (1 detail record) Sum $120,013 Street Petitions
Helena Ave - Elam Rd to Jeane St Enginering, Paving and Drainage 500-700 blks 1 97 $1,432,647
Old Homestead Dr - Pleasant Dr to Holcomb Rd Egineering, Paving and Drainage 8300 & 8400 Blks 1 93 $809,174
Friday, March 31, 2006 Page 117 of 349 Project Name Description Tier Score Estimate Council District 5 Street Petitions
San Leon Av - Glencliff Dr to Dead End Engineerin Paving & Drainage 9200 - 9400 Blks 1 86 $554,942 Summary for 'Category' = Street Petitions (3 detail records) Sum $2,796,763 Street Reconstruction Local Streets
Ann Arbor Ave (E) - Bonnie View Rd E. to Cranfill 2900 Blk 1 60.47 $1,094,705
Rocky Ridge Rd - Ledbetter Dr to Woodacre Dr 4900 Blk 1 60.06 $216,469
Rayville Dr - Jacobie Blvd to Buckner Blvd 7500 - 8000 Blks 1 59.97 $2,002,378
Memory Ln - Lake June Rd to Musgrave Dr 1300 - 1500 Blks 1 59.5 $943,186
Mattison St - Seco Blvd to Prichard Ln 7800 Blk 1 58.88 $593,589
Linfield Rd - Bonny View Rd to Cranfill Dr 2800 Blk 1 58.32 $172,109
Creekside Dr - Houghton Rd to Houghton Rd 1000 - 1100 Blks 1 58.09 $981,475
Myers Cir - Elam Rd to dead end 400 Blk 1 57.07 $392,351
Aurora St - Prichard Ln to Hillburn Dr 7800 blk 1 54.8 $492,245
Brightwood Dr - Elam Rd to Elam Heights Dr 500 Blk 1 54.3 $275,078
Bismark Dr - 51st St to Ledbetter Dr 4800 Blk 1 53.39 $887,029
Rosecliff Dr - N Prairie Creek Rd to Riverway Dr 9200 Blk 1 52.44 $382,890
Mckissick La - Weathland Rd to Egyptian Dr 7800 - 8100 Blks 1 48.8 $1,276,300
Summary for 'Category' = Street Reconstruction Local Streets (13 detail records) Sum $9,709,805 Street Reconstruction Thoroughfares
Lake June Rd - Pemberton Dr to C F Hawn Frwy(Serv Rd) 6100 Blk 1 68.81 $987,106
Summary for 'Category' = Street Reconstruction Thoroughfares (1 detail record) Sum $987,106
Friday, March 31, 2006 Page 118 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Rayville Dr. - Buckner Blvd. to Pleasant Dr. 8100 - 8200 1 74.19 $84,236 Oak Hill Cir. - Grovecrest Dr. to Holcomb Rd. 1500 - 1900 1 71.94 $213,653
Greendale Dr. - Tonawanda Dr. to Bruton Rd. 1800 - 2000 1 71.75 $168,599
Five Mile Dr. - Yewpon Ave. to Frio Ln. 1400 - 1600 1 69.965 $44,517
Kristen Dr. - Cranfill Dr. to 294 3200 block 1 65.835 $25,526
Hampton Rd. (S) - Challenger Dr. to nMarvin D. Love Frwy. 4900 - 5700 1 64.9 $507,074
Shorelark Dr. - Prairie Creek Rd. to Undercliff Dr 8900 - 9000 1 64.79 $48,627
Hidden Valley Dr. - Carioca Dr. to Dead End 1300 - 1400 1 64.68 $40,203
Sunnyvale St. - Ledbetter Dr. to Fifty Second St. 4800 block 1 64.68 $135,288
Springhaven Dr. - Gardenside Dr. to Amity Ln. 10300 - 10400 1 64.675 $67,006
Hillard Dr. - Traymore Ave. to Hillburn Dr. 7600 - 7800 1 64.465 $123,559
Red Bird Ln. (E) - 160' W of Sunny Crest Ln. to Old Ox Rd. 1300 - 1500 1 64.34 $216,078
Musgrave Dr. - Dead End to St. Augustine Rd. 9300 - 9500 1 63.96 $100,828
Los Gatos Dr. - Kirnwood Dr. to Dead End 7700 block 1 62.91 $28,844
Foxwood Ln. - Pleasant Dr. to Oak Hill Cir. 8300 - 8500 1 60.71 $120,100
Bridges St. - Cul-De-Sac to Redkey St. 100 - 200 1 60.535 $171,407
Denley Dr. (S) - Mentor Ave. to Kingsley Dr. 4500 - 4800 1 60.33 $208,803
Barret Dr. - Jim Miller Rd. to Bramlett Dr.@ Cul-d 7100-7300 1 59.09 $167,451
Tacoma St. - Fordham Rd. to Cummings Ave. 4100 - 4700 1 58.39 $100,215
Library Ln. - Camp Wisdom Rd. to Dead End 7100 - 7300 1 58.29 $63,304
Bollero Ave. - Antler Ave. to Elam Rd. 400 block 1 57.84 $57,561
Woodmont Dr. - Loop 12 to Alcorn Ave. 100 - 300 1 57.56 $76,578
Friday, March 31, 2006 Page 119 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Sedalia St. - 51st St. to Dahlia Dr. 4800 block 1 57.415 $72,366 Riverway Dr. - Riverway Bend Cir. To Bruton Rd. 1700 - 2000 1 56.675 $192,721
Coleshire Dr. - Greenspan Ave. to Highfall Dr. 6800 - 7000 1 56.655 $65,474
Mesita Dr. - Algonquin Dr. to Cul-de-sac 10000 block 1 55.775 $58,072
Penguin Dr. - Sumatra Dr. to Stratton Dr. 600 - 800 1 55.67 $131,969
Holcomb Rd. - Tonawanda Dr. to Bruton Rd. 1800 - 2000 1 55.54 $143,584
Broken Tree Tr. - Deerwood Dr. to Library Ln. 7300 Block 1 54.755 $35,864
Kilburn Ave. - Corrigan Ave. to Haas Dr. 2600 - 3100 1 54.635 $284,998
Penguin Dr. - Rocky Ridge Rd. to Cul-De-Sac 300 block 1 54.245 $38,800
Modree Ave. - Underwood Dr. to C. L. Veasey Blvd. 2700 block 1 54.07 $27,058
Heather Glen Dr. - Lake Placid Dr. to Marblehead Dr. 1800 - 2200 1 52.04 $153,411
Ravenwood Dr. - Elam Rd. to Elam Heights Dr. 500 block 1 50.645 $45,181
Dale Glade Dr. - St. Augustine Rd. to Glengreen Dr. 9600 Block 1 50.545 $63,687
Underwood St. - Kilburn Ave. to Modree Ave. 4500 - 4600 1 50.515 $55,902
Riverway Cir. - Riverway Dr. to Circle 1800 block 1 50.43 $20,931
Rilla Ave. - Dasch St. to Hillburn Dr. 7700 block 1 50.17 $35,226
Cummings St. - Sunnyvale St. to Bonnie View Rd. 2900 Block 1 49.895 $169,748
Dahlia Dr. - Bonnie View Rd. to Sedalia Dr. 3000 Block 1 49.515 $35,992
Blue Creek Dr. - Ledbetter Dr. to Horizon Dr. 2300 block 1 48.635 $151,114
Donnybrook Cir. - Donnybrook Ln. to Cul-De-Sac 8900 Block 1 47.96 $15,698
Donnybrook Pl. - Donnybrook Ln. to Cul-De-Sac 9000 Block 1 47.455 $16,464
Tokowa Dr. - Dead End to Gardenside Dr. 10000 - 10200 1 47 $58,710
Friday, March 31, 2006 Page 120 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Bluffcreek Dr. - Mossglen Dr. to Koonce Ave. 9700 - 9900 1 45.585 $99,807 Cardella Ave. - Prairie Creek Rd. to Quinn St. 9000 Block 1 45.495 $58,965
Hillvale Dr. - End of Curb to Rocky Ridge Rd. 300 Block 1 44.61 $9,189
Manhattan Dr. - Old Homestead Dr. to Eden Valley Dr. 700 - 800 1 44.385 $38,672
Autumn Woods Tr. - Red Bird Ln. to Highcrest Dr. 6200 - 6600 1 44.36 $178,427
Waterwood Ln. - Pleasant Dr. to Holcomb Rd. 8300 - 8400 1 44.19 $69,303
Lewiston Ave. - Gulf Palms Dr. to Dead End 2400 block 1 43.925 $6,509
Old Jamestown Ct. - Cymbal Dr. to Cymbal Dr. 1400 block 1 43.575 $31,397
Dorfspring Dr. - Stonehurst St. to Bohannon Dr. 1700 Block 1 43.32 $22,335
Claudia Ln. - Lake June Rd. to Dead End 1300 - 1400 1 43.31 $73,004
Eleventh St. (E) - Ewing Ave. to Betterton Cir. 800 Block 1 42.51 $15,571
Cedar Mountain Cir. - Red Cloud Dr. to Red Cloud Dr. 9900 Block 1 42.09 $81,045
Pilot Dr. - Rosemont Rd. to Dead End 800 block 1 41.63 $44,671
Undercliff Dr. - Shore Lark Dr. to Prairie Creek R 8900 block 1 40.39 $27,440
Eldon Dr. - Pleasant Dr. to Cherry Brook Dr. 8300 - 8800 1 39.79 $183,149
Singing Hills Dr. - Red Bird Ln. to Houston School 6000 - 6100 1 37.67 $75,174
Kristen Dr. - Veterans Dr. to Cul-de-S 2400 block 1 37.39 $30,759
Mossglen Dr. - Dead End to Bluff Creek Dr. 2400 block 1 35.27 $12,763
Acapulco Dr. - 1300 2 $0
Acuna St. - 10100 2 $0
Adonis Dr. - 700 2 $0
Altadena La. - 1800 2 $0
Friday, March 31, 2006 Page 121 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Antler Av. - 6800 2 $0 Atha Dr. - 6800 2 $0
Atlas Dr. - 1800 2 $0
Atlas Dr. - 1900 2 $0
Atlas Dr. - 2000 2 $0
Aurora St. - 7700 2 $0
Bartlett Av. - 4700 2 $0
Bartlett Av. - 4800 2 $0
Bartlett Av. - 4900 2 $0
Belfast Av. - 8400 2 $0
Biloxi Dr. - 2400 2 $0
Bissonet Av. - 300 2 $0
Boca Chica Cir. - 1100 2 $0
Boca Chica Dr. - 1200 2 $0
Boca Chica Dr. - 1300 2 $0
Boca Chica Dr. - 1700 2 $0
Brewster St. - 9400 2 $0
Brierfield Cir. - 6800 2 $0
Brierfield Dr. - 6700 2 $0
Brierfield Dr. - 6900 2 $0
Brierfield Dr. - 7000 2 $0
Bruton Rd. - 9500 2 $0
Friday, March 31, 2006 Page 122 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Bruton Rd. - 9600 2 $0 Bruton Rd. - 9700 2 $0
Buckner Blvd. (S) - 1300 2 $0
Buckner Blvd. (S) - 1500 2 $0
Buckner Blvd. (S) - 1600 2 $0
Calcutta Dr. - 700 2 $0
Camp Wisdom Rd. (W) - 200 2 $0
Camp Wisdom Rd. (W) - 400 2 $0
Camp Wisdom Rd. (W) - 500 2 $0
Camp Wisdom Rd. (W) - 600 2 $0
Camp Wisdom Rd. (W) - 700 2 $0
Camp Wisdom Rd. (W) - 800 2 $0
Camp Wisdom Rd. (W) - 900 2 $0
Cherry Point Dr. (W) - 100 2 $0
Cherry Point Dr. (W) - 200 2 $0
Cherry Point Dr. (W) - 300 2 $0
Cheyenne Rd. - 1500 2 $0
Clover Ridge Dr. - 2200 2 $0
Clover Ridge Dr. - 2300 2 $0
Colwick Av. - 4500 2 $0
Concerto La. - 6300 2 $0
Conner Dr. - 1500 2 $0
Friday, March 31, 2006 Page 123 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Craige Dr. - 9100 2 $0 Creek Cove Dr. - 200 2 $0
Cy Blackburn Cir. - 1300 2 $0
Dahlia Ct. - 3200 2 $0
Dartway Dr. - 8900 2 $0
Dasch St. - 7800 2 $0
Deerwood Dr. - 1100 2 $0
Deerwood Dr. - 1200 2 $0
Denley Dr. (S) - 5000 2 $0
Dolores Wy. - 1700 2 $0
Dolores Wy. - 1800 2 $0
Dolores Wy. - 1900 2 $0
Dove Creek Wy. - 4700 2 $0
Drury Dr. - 1500 2 $0
Egyptian Dr. - 1700 2 $0
Egyptian Dr. - 1800 2 $0
Elam Rd. - 7000 2 $0
Elam Rd. - 7100 2 $0
Elam Rd. - 7200 2 $0
Elam Rd. - 7300 2 $0
Elderoaks La. - 2300 2 $0
Elena St. - 4800 2 $0
Friday, March 31, 2006 Page 124 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Fiftieth St. - 2900 2 $0 Fifty-fourth St. - 2700 2 $0
Fordham Rd. - 3200 2 $0
Fordham Rd. - 3400 2 $0
Foxboro La. - 700 2 $0
Foxboro La. - 800 2 $0
Foxboro La. - 900 2 $0
Garrison St. - 4500 2 $0
Glen Arbor Dr. - 700 2 $0
Glen Arbor Dr. - 800 2 $0
Glencliff Dr. - 1300 2 $0
Grassy Ridge Trl. - 5600 2 $0
Grassy Ridge Trl. - 5700 2 $0
Greenspan Av. - 6600 2 $0
Greenspan Av. - 6700 2 $0
Greenspan Av. - 6800 2 $0
Greenspan Av. - 6900 2 $0
Greenspan Av. - 7000 2 $0
Haas Dr. - 4600 2 $0
Haas Dr. - 4700 2 $0
Haas Dr. - 4800 2 $0
Hampton Rd. (S) - 4300 2 $0
Friday, March 31, 2006 Page 125 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Hawley La. - 1500 2 $0 Highcrest Dr. - 400 2 $0
Highcrest Dr. - 600 2 $0
Highcrest Dr. - 700 2 $0
Highfall Dr. - 400 2 $0
Highfall Dr. - 500 2 $0
Highfall Dr. - 600 2 $0
Highfall Dr. - 700 2 $0
Hodde St. - 6800 2 $0
Hodde St. - 7000 2 $0
Holcomb Rd. - 1100 2 $0
Holcomb Rd. - 1300 2 $0
Holcomb Rd. - 700 2 $0
Holcomb Rd. - 800 2 $0
Holcomb Rd. - 900 2 $0
Houston School Rd. - 5200 2 $0
Houston School Rd. - 6100 2 $0
Houston School Rd. - 6700 2 $0
Houston School Rd. - 6800 2 $0
Houston School Rd. - 6900 2 $0
Inca Dr. - 2200 2 $0
Indian Ridge Trl. - 7700 2 $0
Friday, March 31, 2006 Page 126 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Jennie Lee La. - 8300 2 $0 Jennie Lee La. - 8900 2 $0
Kerrville St. - 9400 2 $0
Kildare Av. - 4700 2 $0
Kildare Av. - 4900 2 $0
Lake June Rd. - 6200 2 $0
Lake June Rd. - 6300 2 $0
Lake June Rd. - 6400 2 $0
Lake June Rd. - 8100 2 $0
Lake June Rd. - 8600 2 $0
Lake June Rd. - 9100 2 $0
Lake June Rd. - 9300 2 $0
Lake Placid Dr. - 5100 2 $0
Lake Placid Dr. - 5200 2 $0
Lake Placid Dr. - 5300 2 $0
Lake Placid Dr. - 5400 2 $0
Laureland Rd. (E) - 300 2 $0
Lazy River Dr. - 6100 2 $0
Lazy River Dr. - 6200 2 $0
Ledbetter Dr. (E) - 200 2 $0
Ledbetter Dr. (E) - 3100 2 $0
Ledbetter Dr. (E) - 4200 2 $0
Friday, March 31, 2006 Page 127 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Loop 12 (S) - 6100 2 $0 Loop 12 (S) - 7000 2 $0
Mark Trail Wy. - 4300 2 $0
Marla Dr. - 6800 2 $0
Marvel Dr. - 8100 2 $0
Masters Dr. (N) - 2100 2 $0
Masters Dr. (N) - 2400 2 $0
Matagorda Dr. - 1400 2 $0
Maxwell Av. - 7800 2 $0
Mccutcheon La. - 2100 2 $0
Midvale Dr. - 700 2 $0
Millett Dr. (E) - 400 2 $0
Milverton Dr. - 8700 2 $0
Minoco Dr. - 2900 2 $0
Moonglow Dr. - 6000 2 $0
Mountain Bend Cir. - 9900 2 $0
Myrtlewood Dr. - 1900 2 $0
Myrtlewood Dr. - 2000 2 $0
Mystic Trl. - 5100 2 $0
Mystic Trl. - 5300 2 $0
Neosho Dr. - 10000 2 $0
Neosho Dr. - 10100 2 $0
Friday, March 31, 2006 Page 128 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Oak Gate La. - 10400 2 $0 Oak Hill Cir. - 1200 2 $0
Oak Hill Pl. - 1900 2 $0
Old Jamestown Av. - 1300 2 $0
Palisade Dr. - 8800 2 $0
Palisade Dr. - 9200 2 $0
Polk St. (S) - 7000 2 $0
Polk St. (S) - 7500 2 $0
Prairie Creek Rd. (N) - 1300 2 $0
Prairie Creek Rd. (N) - 1800 2 $0
Prairie Creek Rd. (N) - 2300 2 $0
Prichard La. - 1300 2 $0
Prichard La. - 1400 2 $0
Prichard La. - 1500 2 $0
Rayenell Av. - 600 2 $0
Rayenell Av. - 700 2 $0
Rayenell Av. - 800 2 $0
Red Bird La. (E) - 1000 2 $0
Red Bird La. (E) - 900 2 $0
Red Cloud Dr. - 1900 2 $0
Red Cloud Dr. - 2000 2 $0
Reynoldston La. - 1800 2 $0
Friday, March 31, 2006 Page 129 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Reynoldston La. - 1900 2 $0 Reynoldston La. - 2000 2 $0
Reynoldston La. - 2200 2 $0
Reynoldston La. - 2300 2 $0
Riverway Pl. - 1800 2 $0
Rocky Ridge Rd. - 5100 2 $0
Rocky Ridge Rd. - 5300 2 $0
Rocky Ridge Rd. - 5400 2 $0
Rosemead Dr. - 7800 2 $0
Sand Springs Av. - 10200 2 $0
Sandstone Dr. - 2700 2 $0
Sarah Lee Dr. - 7000 2 $0
Scottsboro La. - 700 2 $0
Scottsboro La. - 800 2 $0
Scyene Rd. - 9200 2 $0
Seaway Dr. - 9200 2 $0
Shady Crest Trl. - 5800 2 $0
Shayna Dr. - 10000 2 $0
Shayna Dr. - 10100 2 $0
Shayna Dr. - 10200 2 $0
Shayna Dr. - 10400 2 $0
Simpson Stuart Rd. - 4900 2 $0
Friday, March 31, 2006 Page 130 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Singing Hills Dr. - 6000 2 $0 Singing Hills Dr. - 6100 2 $0
Slay St. - 9000 2 $0
St Augustine Dr. (N) - 1100 2 $0
St Augustine Dr. (N) - 1500 2 $0
St Augustine Dr. (N) - 1700 2 $0
St Augustine Dr. (N) - 2700 2 $0
Starkey St. - 6700 2 $0
Stonehurst St. - 8600 2 $0
Stonehurst St. - 8700 2 $0
Stratton Dr. - 5500 2 $0
Templecliff Dr. - 1100 2 $0
Templecliff Dr. - 1200 2 $0
Trailwood Dr. - 5800 2 $0
Turf Dr. - 1600 2 $0
Valentine Ct. - 7900 2 $0
Veterans Dr. - 4500 2 $0
Wes Hodges Rd. - 7900 2 $0
Western Hills Dr. - 6800 2 $0
Western Hills Dr. - 6900 2 $0
Wilbarger Dr. - 3300 2 $0
Wilbarger Dr. - 3400 2 $0
Friday, March 31, 2006 Page 131 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing
Woodacre Cir. - 300 2 $0 Woodmont Dr. - 600 2 $0
Summary for 'Category' = Street Resurfacing (288 detail records) Sum $5,700,607 Streetscape / Urban Design
Lake June Road Urban Design, from US 175 to S. Loop 12 Urban design enhancements on Lake June Rd, from US 2 $4,948,215 Hwy175 to Jim Miller Rd, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Pemberton Hill Rd Expansion / Urban Design, from Lake Urban design enhancements on Pemberton Hill Rd. from Lake 2 $6,435,105 June Rd. to S. Loop 12 June Rd to South Loop 12, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan South Central (SH310) Urban Design/Streetscape, from S. Pedestrian friendly enhancments along SH310, from South 2 $6,190,693 Loop 12 to the Trinity River Bridge Loop 12 to the Trintiy River bridge as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $17,574,013 Thoroughfares
Buford - Camp Wisdom to Millet Build a 4 lane undivided roadway 1 70 $1,965,020
Elam - Jim Miller to Pemberton Hill Widen to a six lane divided roadway 1 43 $6,738,980
Red Bird (W) - Hampton to Polk Widen to a six lane divided roadway 1 35 $6,220,917
Long Acre - Loop 12 to Jim Miller Build a new 4 lane undivided roadway 1 25 $4,312,872
Military Pkwy - Buckner Blvd. to Prairie Creek Widen to a six lane divided roadway 1 23 $2,090,034
Simpson Stuart - S. Central to Locust Thoroughfare Widen to a six lane divided roadway 1 23 $2,009,344
Military Pkwy - Sam Houston to Prairie Creek WIDEN TO 6 LANE ROADWAY. 1 21 $6,457,947
Friday, March 31, 2006 Page 132 of 349 Project Name Description Tier Score Estimate Council District 5 Thoroughfares
Red Bird (W) - Westmoreland to U.S. 67 Widen to a six lane divided roadway 1 19 $4,323,417 Sam Houston - Forney to Mesquite CL. Widen to a four lane divided roadway 1 19 $10,993,886
Pemberton Hill - Elam to Lake June Build a new four lane undivided roadway 1 18 $3,289,326
Pemberton Hill - Loop 12 to Elam Build a new four lane undivided roadway 1 18 $1,897,519
Cheyenne - Cradlerock to Bruton Widen existing NB service road from 2 lane to 3 lane 1 13 $4,465,210
Haas - Ledbetter to Stag Widen to a four lane undivided roadway 1 10 $448,110
Sand Springs - Master to Lewinston Widen to a four lane undivided roadway 1 10 $5,458,503
SH 310/ SM Wright - Loop 12 to Simpson Stuart Widen to a six lane divided roadway 1 8 $13,192,664
Dallas Eco Business Park Complete extension of Locust Drive, with water, wastewater, 1 0 $6,868,521 and storm drainage, site grading, and construction of flood storage pond/wetlands mitigation area. Summary for 'Category' = Thoroughfares (16 detail records) Sum $80,732,269 Traffic Intersection Capacity & Safety Improvement
Buckner @ Lake June Street Modifications and Bottl Widen Buckner and Lake June to provide dual left-turn lanes 1 75 $1,474,127 on all approaches. Also, add right-turn lanes on all approaches. Buckner @ CF Hawn Frwy Street Modifications and Bo Widen Buckner approaching CF Hawn to provide three through 1 55 $282,062 lanes for northbound and southbound approaches. Ledbetter @ Veterans Street Modifications and Bott Widen Veterans approaching Ledbetter ro provide northbound 1 35 $256,536 and southbound left-turn pockets. Ann Arbor @ Sunnyvale Widen the southbound approach to a left-turn pocket. 1 30 $47,325
Camp Wisdom at Polk Increase curb radius on all four corners. Reduce damage 1 30 $98,275 caused by turning truck traffic. Glencliff @ Lake June Widen Lake June approaching Glencliff to provide an 1 30 $218,247 eastbound left-turn pocket.
Friday, March 31, 2006 Page 133 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Intersection Capacity & Safety Improvement
IH 35 @ Ledbetter Widen Ledbetter to provide a eastbound and westbound left- 2 $634,736 turn lanes. Widen both service road intersections to provide right turn lanes for all approaches. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (7 detail records) Sum $3,011,309 Traffic Safety Improvements-Guardrail Upgrades
Harry Hines 6900 BLK Guardrail Upgrade 1 80 $6,573
Lake June 9400 BLK Guardrail Upgrade 1 73 $26,419
Camp Wisdom 200 W BLK Guardrail Upgrade 1 67 $1,962
Camp Wisdom 400 E BLK Guardrail Upgrade 1 67 $47,319
Elam 7100 BLK Guardrail Upgrade 1 67 $19,176
Lake June 7300 BLK Guardrail Upgrade 1 67 $10,402
Lake June 9000 BLK Guardrail Upgrade 1 67 $14,774
Masters 3000 N BLK Guardrail Upgrade 1 67 $3,925
Prairie Creek 800 N BLK Guardrail Upgrade 1 67 $106,571
Simpson Stuart 4700 BLK Guardrail Upgrade 1 67 $5,935
Bruton 10200 BLK Guardrail Upgrade 1 60 $4,658
Camp Wisdom 1100 E BLK Guardrail Upgrade 1 60 $9,684
Camp Wisdom 700 E BLK Guardrail Upgrade 1 60 $5,392
Elam 6400 BLK Guardrail Upgrade 1 60 $5,839
Elam 8900 BLK Guardrail Upgrade 1 60 $18,825
Prairie Creek 1500 N BLK Guardrail Upgrade 1 60 $6,126
Prairie Creek 600 S BLK Guardrail Upgrade 1 60 $38,512
Friday, March 31, 2006 Page 134 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Safety Improvements-Guardrail Upgrades
Red Bird 3100-3200 W BLK Guardrail Upgrade 1 60 $12,252 Simpson Stuart 4300 BLK Guardrail Upgrade 1 60 $7,578
St. Augustine 1200 S BLK Guardrail Upgrade 1 60 $12,444
St. Augustine 900 S BLK Guardrail Upgrade 1 60 $3,286
Bruton 10100 BLK Guardrail Upgrade 1 53 $5,392
Masters 1900 N BLK Guardrail Upgrade 1 53 $4,658
Prairie Creek 2500 N BLK Guardrail Upgrade 1 53 $9,317
Prairie Creek 500 S BLK Guardrail Upgrade 1 53 $10,529
Prairie Creek 200 N BLK Guardrail Upgrade 1 33 $1,962
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (26 detail records) Sum $399,515 Traffic Signal Upgrades - Citywide
Simpson Stuart @ S M Wright Traffic Signal Upgrade 1 100 $27,249
Houston School Rd @ Ledbetter Traffic Signal Upgrade 1 87 $33,771
Sam Houston @ Scyene Traffic Signal Upgrade 1 87 $117,739
Camp Wisdom @ Hampton Traffic Signal Upgrade 1 80 $41,161
Camp Wisdom @ Polk Traffic Signal Upgrade 1 80 $69,150
Hampton @ Redbird Traffic Signal Upgrade 1 80 $54,881
Polk @ Wheatland Traffic Signal Upgrade 1 80 $54,881
Elam @ Jim Miller Traffic Signal Upgrade 1 67 $107,847
Polk @ Redbird Traffic Signal Upgrade 1 67 $50,875
Conner @ Lake June Traffic Signal Upgrade 1 60 $109,379
Friday, March 31, 2006 Page 135 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Signal Upgrades - Citywide
Camp Wisdom @ Greenspan Traffic Signal Upgrade 1 53 $54,689 Camp Wisdom @ Pastor Bailey Traffic Signal Upgrade 1 53 $53,924
Hampton @ Wheatland Traffic Signal Upgrade 1 53 $53,924
Hillburn @ Lake June Traffic Signal Upgrade 1 53 $60,305
Ledbetter @ Marsalis Traffic Signal Upgrades Citywide 1 53 $59,635
Polk @ Reynoldston Traffic Signal Upgrade 1 53 $84,002
Lake June @ Pleasant Traffic Signal Upgrade 1 47 $108,422
Holcomb @ Lake June Traffic Signal Upgrade 1 40 $116,781
Elam at Prairie Creek Traffic Signal Upgrades Citywide 1 13 $52,966
Summary for 'Category' = Traffic Signal Upgrades - Citywide (19 detail records) Sum $1,311,581 Traffic System Management - Dynamic Message Signs
Ledbetter 2800 E Dynamic Message Sign 1 15 $76,578
Ledbetter 1400 E Dynamic Message Sign 1 10 $76,578
Ledbetter 1400 W Dynamic Message Sign 1 10 $76,578
Loop 12 (Walton Walker) 6000 Dynamic Message Sign 1 10 $153,156
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (4 detail records) Sum $382,890 Traffic System Management - Flood Detour Signs
Illinois @ Linfield I.T.S. - Dynamic Signs - Flood Dynamic Signs - Flood Detours 1 80 $29,061
Pemberton Hill @ Sarah Lee Dynamic Signs - Flood Detours 1 60 $42,118
St. Augustine @ Lake June Dynamic Signs - Flood Detours 1 60 $27,798
Friday, March 31, 2006 Page 136 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic System Management - Flood Detour Signs
Umphress @ Hillburn Dynamic Signs - Flood Detours 1 60 $7,581 Summary for 'Category' = Traffic System Management - Flood Detour Signs (4 detail records) Sum $106,558 Traffic System Management - Roadside Cameras
Buckner-Bruton Roadside Camera 1 20 $6,382
Buckner-Lake June Roadside Camera 1 20 $12,763
Camp Wisdom-RLT Traffic Systems Management - Roadside Camera 1 20 $6,382
Hampton-IH20 Roadside Camera 1 20 $12,763
Hampton-Ledbetter Roadside Camera 1 20 $4,212
Lancaster-Ledbetter Roadside Camera 1 20 $6,382
Buckner-CF Hawn Frwy Roadside Camera 1 15 $12,763
Illinois-IH45 Roadside Camera 1 10 $6,382
Summary for 'Category' = Traffic System Management - Roadside Cameras (8 detail records) Sum $68,027 Summary for 'Program' = STREET AND TRANSPORTATION (504 detail records) Sum $144,765,810 Summary for 'CD' = 5 (504 detail records) Sum $144,765,810
Friday, March 31, 2006 Page 137 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction
Blue Grass(700) & Furlong - Furlong to 'T' alley Full Reconstruction 1 78 $210,666 Lockmoor & Newcastle - Dale Crest to Harwich Full Reconstruction 1 73 $251,527
Crossman Ave (3200 - 3218) Winnetka - Pueblo to Nomas Full reconstruction Crossman Ave (3200 - 3218) 1 60 $68,920
Dennis & Brockbank - Royal To Silverton Full Reconstruction 1 60 $436,539
Kinkaid & Darvany - Harwich to Web Chappel Full Reconstruction 1 60 $219,161
Newcastle Drive (3023-3097) Walnut Hill - Brockbank to Full recon Newcastle Dr. (3023 - 3097) 1 60 $316,522 Dale Crest Norwalk Avenue 3103-3235 Full recon 1 60 $243,773
Witham(9900) & Valley Ridge - Arvana to Marsh Ln Full Reconstruction 1 60 $534,915
Seguin Dr. & Marsh Place - Marsh Ln To Marsh Ln P Full Reconstruction 1 52.5 $326,449
Flowerdale & Royal Ln. - Coogan to Brockbank Full Reconstruction 1 51 $266,052
Kendale(3000) & Clydale - T-alley to Timberline Full Reconstruction 1 45 $186,535
Lockmoor & Darvany - Dale Crest to Harwich Full Reconstruction 1 45 $256,114
Brockbank & Bellknoll - Channel Dr. to Seymour Full Reconstruction 1 43 $254,839
Witham Street & Valley Ridge - Park to Arvana Full recon. T-ally included Witham St. (9910 - 9946) 1 43 $216,971
Witham(9905) & Constance - Arvana to Constance Full Reconstruction 1 43 $459,397
Matador & Rockdale - Marsh Ln to & incl T-alley Full Reconstruction 1 40.3 $301,220
Community Dr (3031 - 3069) Lanoue - Timberland to "T" Full reconstruction Community Dr (3031 - 3069) 1 28 $192,721 Alley Conroe St (3322 - 3366) Obanchain - McBroom to Morris Full reconstruction Conroe St (3322 - 3366) 1 25 $145,498
Lively Lane (3854-3966) Van Ness - Mixon to Lenel Full reconst Lively Ln. (3854 - 3966) 1 25 $339,496
Witham Street (9951-9987) Constance - Arvana to Glenrio Full recon Witham St. (9951 - 9987) 1 25 $151,880
Allegheny Dr - 10405 - 10731 Full Reconstruction 2 $1,064,210
Allegheny Dr - 10616 Full Reconstruction 2 $94,290
Friday, March 31, 2006 Page 138 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction
Almazan & Bolivar Dr. - El Centro To Marsh Ln. Full Reconstruction 2 $156,730 Almazan Dr - 3704 - 3770 Full Reconstruction 2 $233,433
Beau Purple(5842) - Furlong to Blue Grass Full Reconstruction 2 $69,147
Bimbella La 702 -760 reconstruction - Bimbella La 702 -760 1 $213,142
Bowman Blvd 9805 - 9989 Full reconstruction 2 $518,178
Brockbank Dr - 10002 - 10134 Full Reconstruction 2 $301,984
Brockbank Dr - 10777 - 10785 Full Reconstruction 2 $74,923
Cortez Dr - 3703 - 3771 Full Reconstruction 2 $237,000
Darvany Dr - 3105 - 3195 Full Reconstruction 2 $339,191
Darvany Dr - 3305 - 3363 Full Reconstruction 2 $234,962
Davila Dr - 3702 - 3770 Full Reconstruction 2 $235,981
Dunhaven Rd - 3755 - 3769 Full Reconstruction 2 $332,310
Dunhaven Rd - 3841 - 3899 Full Reconstruction 2 $247,194
Envoy Ct - 7108 - 7188 Full Reconstruction 2 $295,104
Gallant Fox Dr - 611 - 631 Full Reconstruction 2 $215,339
Gallant Fox Dr - 806 - 860 Full Reconstruction 2 $217,633
Harwell Dr - 9905 - 9929 Full Reconstruction 2 $99,897
Harwell Dr - 9906 - 9930 Full Reconstruction 2 $127,165
Kendale Dr - 3102 - 3234 Full Reconstruction 2 $298,926
Linda Dr - 3415 - 3459 Full Reconstruction 2 $180,936
Lockmoor La - 3061 - 3185 Full Reconstruction 2 $342,759
Lockmoor La - 3303 - 3369 Full Reconstruction 2 $243,882
Friday, March 31, 2006 Page 139 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction
Lombardy Lane (3302-3333) Storey Cir.- Geraldine to Full reconst Lombardy Ln. (3302 - 3333) 2 $86,916 Webb Chapel Manana Dr - 3704 - 3772 Full Reconstruction 2 $265,288
Manana Dr - 3705 - 3773 Full Reconstruction 2 $239,295
Northwest Hwy (W) - 3205 - 3249 Full Reconstruction 2 $144,749
Park La - 3902 - 3990 Full Reconstruction 2 $295,104
Rockdale Dr - 3611 - 3683 Full Reconstruction 2 $336,388
Webb Chapel & El Rito - Larza to Almazan Full recon Webb Chapel 9526 2 $79,131
Winnetka Avenue & Crossman - Pueblo to Nomas Full recon Winnetka Ave. (3203 - 3223) 2 $70,197
Summary for 'Category' = Alley Reconstruction (52 detail records) Sum $13,270,578 Bridge Repair and Modification
Canada Drive over W. Fork Trinity River Embankment eroded and settling; moderately severe; grout 1 58.75 $63,815 injection beneath abutment caps, grout injection beneath approach slabs, replace sidewalks Sylvan Avenue (3 spans) over Trinity River Repair spalls girder ends N & S spans, repair impact damage 1 56.25 $153,156 SE wingwall N span, jack & support on bent cap N span, repair scour C span using cofferdam, critical, programmed for repl 12/07 Continental Ave. over Trinity River Major rehab necessary, spalls, rebar exposed, cracks ($1M), 1 45 $127,630 alternatively, replace NW retaining wall, replace approaches; not critical Summary for 'Category' = Bridge Repair and Modification (3 detail records) Sum $344,601 I.T.S. - Speed & Travel Time System
Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $60,305
Friday, March 31, 2006 Page 140 of 349 Project Name Description Tier Score Estimate Council District 6 I.T.S. - Speed & Travel Time System
Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $60,305 Intergovernmental Partnership Projects
California Crossing @ Elm Fork of Trinity River Bridge rehabilitation and/or reconstruction 2 $0
Canada @ W. Fork Trinity River Bridge rehabilitation and/or reconstruction. 2 $0
Industrial Blvd - Cadiz St to Continental Ave Partnership project with Dallas County and TxDOT to 1 $6,860,113 reconstruct the existing six and eight lane divided roadway. Total estimated cost of $40 million. Supplements 2003 Bond Program funds. Estimated to be let by mid 2010. Loop 12 - Spur 408 to IH 35E. Partnership project with TxDOT to fulfill 10% funding 1 $1,308,208 requirement for right of way and utility relocations to accommodate freeway improvements. Total estimated cost of $20 million. Supplements 2003 Bond Program funds. Singleton - WB at Trib. of W Fork (E of Martinez) Bridge rehabilitation and/or reconstruction 2 $0
Singleton Blvd - Chalk Hill to E of Peoria Partnership project with Dallas County to reconstruct existing 1 $1,347,773 six lane divided roadway. Total estimated cost of $5.3 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Singleton Blvd Urban Design Phase II - Hampton Rd to Urban design enhancements along Singleton as recommended 1 $12,039,146 Walton Walker (Loop 12) in the Trinity River Comprehensive Land Use Plan. Sylvan Bridge from Irving to Gallagher - Amenities Partnership project with TxDOT to provide new six lane bridge 1 $9,648,828 with amenities over the Trinity River. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2007. Supplements 2003 Bond Program funds. Trinity River - Consolidation of Power Transmission Lines Cost to remove existing aerial power transmission lines 1 $2,042,080 along East Levee with proposed new line along Industrial currently along the East Levee of the Trinity River Corridor Blvd. floodway and consolidate with the proposed new transmission lines along Industrial Blvd. to avoid utility conflicts with MHH Signature Bri
Friday, March 31, 2006 Page 141 of 349 Project Name Description Tier Score Estimate Council District 6 Intergovernmental Partnership Projects
Trinity River - Underground existing power transmission Cost to underground existing power transmission lines between 1 $35,991,660 lines upstream from future Margaret Hunt Hill Bridge switching stations, upstream from future Margaret Hunt Hill Bridge to avoid utility conflicts with MHH Signature Bridge and Trinity Parkway (Potential cost share with TxDOT) Trinity River - Underground existing transmission lines Cost to underground existing power transmission lines along 1 $16,783,345 along East Levee the East Levee of the Trinity River Corridor to avoid utility conflicts with three Signature Bridges and Trinity Parkway (Potential cost share with TxDOT for partial segment) Walnut Hill - Malibu to Luna Partnership project with Dallas County to design and construct 1 $23,930,625 6 lane divided roadway. Total estimated cost of $25 million. Estimated to be let by late 2009. Summary for 'Category' = Intergovernmental Partnership Projects (12 detail records) Sum $109,951,777 Street Lighting - Freeway Lighting
Loop 12 (Walton Walker) - I-30 to I-35E Freeway Lighting Installation 1 5 $205,851
Loop 12 (Walton Walker) - I-30 to Spur 408 Freeway Lighting Installation 1 5 $228,758
Summary for 'Category' = Street Lighting - Freeway Lighting (2 detail records) Sum $434,609 Street Petitions
Bagley St (N) - Goodman St to Dead End Engineering, Paving and Drainage 1200 block 1 99 $530,941
Goodman St. - N Bagley St. to Morocco Ave. Engineering, Paving & Drainage 5100-5200 Blk 1 80 $390,548
Summary for 'Category' = Street Petitions (2 detail records) Sum $921,489 Street Reconstruction Local Streets
Beatrice St - Comstock St to Commerce St 2200 - 2400 Blks 1 68.37 $982,751
Goodnight Ln - Royal Ln to Crown Rd 11400 Blk 1 57.35 $1,340,115
Friday, March 31, 2006 Page 142 of 349 Project Name Description Tier Score Estimate Council District 6 Street Reconstruction Local Streets
Gallant Fox Dr - Merrifield Rd East to 750 Ft 1000 Blk 1 54.5 $239,306 Van Ness Lane - Marsh Lane to Mixon Drive 3700 Blk 1 54.24 $739,167
Weisenberger Dr - Bernal Dr to Leath St 3700 - 3800 Blks 1 53.55 $462,021
Hammerly Dr - Leath St to Angelina Dr 3900 blk 1 48.88 $257,813
Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,021,172 Street Reconstruction Thoroughfares
Regal Row - Viscount Row to UP RR 200 - 300 Blks 1 78.17 $2,393,063
Fort Worth Av - Clinton Av to Edgefield av 1300 Blk 1 72.25 $842,358
Crown Rd - Emerald St to Goodnight Ln 2300 Blk 1 71.62 $1,114,782
Pulaski St - Irving Blvd to Halifax St 5000 - 5100 Blks 1 68.66 $1,249,498
Southwell Rd - Ables Ln to Shady Tr 2500 Blk 1 66.76 $984,027
River Wharf Dr - Barge Ln to Sea Harbor Rd 6300 Blk 1 66.44 $391,824
Empire Central Pl - Empire Central Dr to Empress Row 1100 Blk 1 65.61 $1,161,433
Irving Blvd (N Serv Rd) - Mockingbird ln to Woodall St 3100 - 3200 Blks 1 64.08 $2,125,040
Empress Row - Regal Row to Viceroy Dr 9000 Blk 1 62.81 $583,269
Titan Dr - Empress Row to Governors Row 1200 Blk 1 62.72 $1,410,312
Walnut Hill La - Harry Hines Blvd to Denton Dr 2700 Blk 1 62.45 $814,279
Wire Way - 10600 Blk 10600 Blk 1 60.93 $868,666
Composite Dr - Program Dr to Electronic Ln 10700 blk 1 60.72 $631,769
Newkirk St - W Northwest Hwy North to 700 Ft 10500 Blk 1 58.67 $724,938
Friday, March 31, 2006 Page 143 of 349 Project Name Description Tier Score Estimate Council District 6 Street Reconstruction Thoroughfares
Continental Ave. - Industrial Blvd. to Stemmons Frwy Design and Reconstruction to 8 lane cross section, turn lanes, 1 $3,701,270 signalization, ROW acquisition, and pedestrian friendly streetscaping as recommended in the Trinity River Balanced Vision Plan Trinity River - Underground Transmission Lines below Cost to underground proposed power transmission lines below 1 $21,441,840 Canada Dr, from Sylvan to West Levee Switching Station Canada Drive, from Sylvan to West Levee Switching Station near Continental West Commerce Street Reconstruction / Urban Design, Roadway reconstruction and streetscape enhancements on 1 $2,931,470 from Davis to Trinity River Levee West Commerce, from levee to Davis, to serve as gateway in Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (17 detail records) Sum $43,369,837 Street Resurfacing
Ladybird Ln. - Denton Dr. to Monroe Dr. 2800 - 2900 1 88.21 $120,355
Sharp St. - Quebec St. to Halifax St. 4800-5100 1 82.07 $292,656
Congressman Ln. - Denton Dr. to Monroe Dr. 2800 - 2900 1 81.775 $102,232
Lakawana St. - Quebec St. to Irving Blvd. 4900-5000 1 80.77 $137,330
Calvert St. - Quebec St. to Irving Blvd. 4800-4900 1 80.48 $141,031
Iron Ridge St. - Lakawana St. to Stemmons Fwy. 3000-3100 1 79.95 $187,233
Zodiac Ln. - Virgo Ln. to Royal Ln. 11200 - 11300 1 76.92 $157,623
Monroe Dr. - Walnut Hill Ln. to Merrell Rd. 10000 - 10200 1 76.215 $431,645
Grissom Ln. - Royal Ln. to Forest Ln. 10800 - 11500 1 76.04 $559,530
Hawick Ln. - Marsh Ln. to Cul-De- Sac 3700 Block 1 75.98 $52,328
Doric St. - Abernathy Ave. to Cul-De-Sac 10500 - 10700 1 75.93 $72,494
Royal Ln. - Emerald St. to Denton Dr. 2400 - 2600 1 75.86 $457,681
Friday, March 31, 2006 Page 144 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Perth St. - Harry Hines Blvd. to Cul-de-Sac 2600 block 1 74.2 $114,995 Emerald St. - Royal Ln. to LBJ Frwy. 11400 - 11700 1 74.07 $310,269
Anaheim Dr. - Northaven Rd. to Forest Ln. 11300 - 11500 1 73.88 $212,504
Hidalgo Dr. - Webb Chapel Rd. to Marsh Ln. 3400 - 3600 1 73.395 $323,414
Fontana Dr. - Larga Dr. to Marsh Ln. 3500 - 3600 1 73.38 $176,129
Indian Tr. - Royal Ln. to Denton Dr. 10800 - 11300 1 72.75 $378,933
Linda Dr. - Larga Dr. to Marsh Ln. 3500 - 3600 1 72.74 $106,826
Transport Dr. - Black Gold Dr. to Irving Blvd. 4800-4900 1 72.24 $189,786
Gaspar Dr. - Larga Dr. to Lakemont Dr. 3500 - 3900 1 70.66 $284,870
Arvana St. - Constance St. to Valley Ridge Rd. 9900 Block 1 70.36 $100,572
Halifax St. - Iron Ridge St. to mockingbird Ln. 3100 - 3200 1 70.145 $377,274
Manana Dr. - Nekirk St. to Shady Tr. 2200 - 2500 1 69.96 $458,702
La Joya Dr. - Larga Dr. to Dunhaven Rd. 3500 - 3700 1 69.765 $408,416
Sovereign Row - Cul-De-Sac to Dividend Dr. 7600 - 8300 1 69.26 $286,657
Directors Row - Cul-De-Sac to Profit Dr. 8300 - 8800 1 67.925 $283,466
Wemdon Dr. - Lenel Pl. to Mixon Dr. 3800 - 3900 1 67.73 $247,602
Durango Dr. - El Centro Dr. to Marsh Ln. 3600 Block 1 67.09 $141,797
Dunhaven Rd. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 66.95 $258,578
Electronic Ln. - Composite Dr. to Composite Dr. 2500 - 2600 1 66.86 $156,219
Northaven Rd. - Denton Dr. to Cromwell Dr. 2600-3300 1 66.555 $263,658
Black Gold Dr. - Cash Rd. to Transport Dr. 3900 - 4000 1 66.215 $136,947
El Centro Dr. - Webb Chapel Rd. to Manana Dr. 9400 - 9700 1 66 $416,074
Friday, March 31, 2006 Page 145 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Hawick Ln. - Mixon Dr. to Wemdon Dr. 3800 - 3900 1 65.975 $227,054 Kelso Dr. - Beau Purple Dr. to 533 Kelso Dr. 500 block 1 65.59 $90,745
Eaton Dr. - Mixon Dr. to Wemdon Dr. 3800 Block 1 65.53 $117,547
Fort Worth Ave. - Windomere Ave. to Montclair Ave. 1500 Block 1 65.005 $59,220
Hargrove Dr. - Webb Chapel Ext. to Larga Dr. 9600 - 9700 1 64.98 $31,269
Sheila Ln. - Northwest Hwy. to Timberline Dr. 3200 block 1 64.4 $158,006
Bowman Blvd. - Park Ln. to Walnut Hill Ln. 9800 - 9900 1 64.39 $198,337
Tumalo Tr. - Bernal Dr. to Cul-De-Sac 3100 - 4000 1 64.11 $245,943
Ables Ln. - Electronic Ln. to Southwell Rd. 10900 - 11000 1 63.66 $219,651
Webb Chapel Rd. - Almazan Dr. to Walnut Hill Ln. 9500 - 9900 1 63.61 $1,036,228
Chireno St. - Bowman Blvd. to Walnut Hill Ln. 9900 Block 1 62.76 $182,128
Harlingen St. - Leath St. to Dead End 3900 Block 1 62.37 $50,797
Clover Ln. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 61.14 $183,423
Lively Ln. - Park Ln. to Lenel Pl. 3800 - 3900 1 60.99 $187,999
Profit Dr. - Chancellor Row to Premier Row 500 - 700 1 60.38 $245,177
Irving Blvd. Svc. Rd. (S) - Lakawana St. to Calvert St. 2700 - 2800 1 60.06 $300,441
Davila Dr. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 59.72 $191,056
Allegheny Dr. - Carrizo Ln. to Brockbank Dr. 10400 - 10700 1 58.83 $187,744
Chappel St. - Ft Worth Ave. to IH-30 Svc. Rd. 1600 - 1700 1 58.11 $32,290
Jane Ln. - Mockingbird Ln. to Don Dr. 3300 - 3400 1 57.14 $108,868
Zodiac Ln. - Merrell Rd. to Dairy Milk Ln. 10300 block 1 56.1 $90,745
Shorecrest Dr. Denton Dr to 445' W. of 3250 Shorecrest 2500 - 3100 1 55.68 $596,415 Dr.
Friday, March 31, 2006 Page 146 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Mixon Dr - Northwest Hwy. to Van Ness Ln. 9300 - 9700 1 55.66 $384,804 Odessa St. - Tumalo Tr. toDead End 3100 - 4100 1 54.41 $386,591
Larga Dr. - Hidalgo Dr. to Park Ln. 9700 block 1 54.23 $152,263
Keeneland Pkwy. - Cavalcade Dr. to Merrifield Rd. 6100 - 6200 1 53.695 $52,322
Winnetka Ave. (N) - Singleton Blvd. to Morris St. 3000 - 3300 1 53.4 $128,396
Winnetka Ave. (N) - Vecinos Blvd. to Canada Dr. 3600 block 1 53.305 $15,316
Dennis Rd. - Northaven Rd. to Forest Ln. 11400 - 11700 1 53.17 $208,930
Finnell St. - Lombardy Ln. to Rentzel St. 10500 - 10700 1 52.71 $197,571
Furlong Dr. - Blue Grass Dr. to 145' N of Beau Purple Dr. 500 - 700 1 51.28 $98,658
Iroquois Dr. - Dead End to Chippewa Dr. 1900 - 2000 1 51.15 $140,265
Kinkaid Cir. - Webb Chapel Rd. to Cul-De-Sac 3400 block 1 51 $10,849
Top Line Dr. - Blackgold Dr. to Irving Blvd. 4800 - 4900 1 50.57 $226,160
Cherry Laurel Ln. - Keenland Pkwy. To Sportsmans Pkwy. 900 - 1200 1 50.2 $136,309
Brockbank Dr. - Merrell Rd. to Coogan Dr. 10400 - 10600 1 50.09 $302,738
Sumter Dr. - Timberline Dr. to Hargrove Dr. 3100 - 3200 1 50.08 $180,724
Palacios Ave. - Gallagher St. to Homeland St. 3500 - 3600 1 49.42 $55,264
Viceroy Dr. - Governors Row to Stemmons Frwy. 1200 - 1300 1 49.29 $273,001
Metromedia Pl. - Chancellor Row to J.W. Carpenter Frwy. 800 - 1000 1 48.98 $218,120
Dale Crest Dr. - Park Ln. to Park Ln. 9700 - 9800 1 45.08 $121,631
Dividend Dr. - Directors Row to John W. Carpenter Frwy. 700 - 1000 1 45.08 $211,228
Ablene St. - Gallagher St. to Leath St. 3500 - 3800 1 43.42 $175,236
Kinkaid Dr. - Brockbank Dr. to Dale Crest Dr. 3000 - 3100 1 39.97 $145,115
Friday, March 31, 2006 Page 147 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Barge Ln. - Singleton Blvd. to River Wharf Dr. 2600 - 2900 1 38.63 $89,469 Fannie St. - Chalk Hill Rd. to Dead End 5100 - 5500 1 38.13 $248,623
Monetary Dr. - Viscount Row to Directors Row 400 - 500 1 37.79 $117,292
Valley Ridge Rd. - Park Ln. to Marsh Ln. 3500 - 3600 1 35.755 $295,336
Harwell Dr. - Chapel Creek Dr. to Kinkaid Dr. 9800 - 9900 1 33.88 $126,992
Ingersoll St. - Nomas St. to Gallagher St. 3300 - 3400 1 33.51 $92,276
Admiral Dr. - 9300 2 $0
Alberta Dr. - 2300 2 $0
Amos St. - 1300 2 $0
Andjon Dr. - 2600 2 $0
Angelina Dr. - 4800 2 $0
Bay Oaks Dr. - 2900 2 $0
Bayonne St. - 800 2 $0
Beau Purple Dr. - 5800 2 $0
Beckley Av. (N) - 2100 2 $0
Beckley Av. (N) - 2600 2 $0
Beckley Av. (N) - 2700 2 $0
Beckley Av. (N) - 3000 2 $0
Bernal Dr. - 5700 2 $0
Bimebella La. - 700 2 $0
Blackhawk Dr. - 5400 2 $0
Bogata Blvd. - 3400 2 $0
Friday, March 31, 2006 Page 148 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Botany Bay Dr. - 700 2 $0 Brenner Dr. - 2600 2 $0
Canada Dr. - 2200 2 $0
Canada Dr. - 2500 2 $0
Canada Dr. - 2600 2 $0
Canada Dr. - 2700 2 $0
Canada Dr. - 2800 2 $0
Canada Dr. - 2900 2 $0
Canada Dr. - 3100 2 $0
Canada Dr. - 3300 2 $0
Canada Dr. - 3400 2 $0
Canada Dr. - 3500 2 $0
Carrizo La. - 2900 2 $0
Cartwright St. - 2400 2 $0
Cartwright St. - 2500 2 $0
Century St. - 2800 2 $0
Chapel Creek Dr. - 3200 2 $0
Chihuahua St. - 3500 2 $0
Clymer St. - 2300 2 $0
Conveyor La. - 1200 2 $0
Crown Rd. - 2400 2 $0
Darvany Dr. - 3200 2 $0
Friday, March 31, 2006 Page 149 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Darvany Dr. - 3300 2 $0 Davis St. (W) - 5300 2 $0
Davis St. (W) - 5400 2 $0
Deason St. - 2300 2 $0
Diplomacy Row. - 9200 2 $0
Directors Row. - 9100 2 $0
Don Dr. - 4800 2 $0
Easy St. - 3400 2 $0
Empress Row. - 8800 2 $0
Forest La. - 2500 2 $0
Gallant Fox Dr. - 500 2 $0
Gallant Fox Dr. - 600 2 $0
Gemini La. - 11300 2 $0
Glenrio La. - 9900 2 $0
Goodnight La. - 11500 2 $0
Governors Row. - 9100 2 $0
Gretna St. - 4700 2 $0
Halifax St. - 4200 2 $0
Hammerly Dr. - 3600 2 $0
Hammerly Dr. - 3700 2 $0
Hammerly Dr. - 4000 2 $0
Harry Hines Blvd. - 11500 2 $0
Friday, March 31, 2006 Page 150 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Indian Trl. - 11000 2 $0 Iroquois Dr. - 2400 2 $0
King Arthur Dr. - 9100 2 $0
King William Dr. - 10500 2 $0
King William Dr. - 10600 2 $0
Kinkaid Cir. - 3400 2 $0
Lakawana St. - 4800 2 $0
Lemmon Av. E - 9200 2 $0
Leo La. - 11200 2 $0
Life Av. - 1500 2 $0
Lockmoor La. - 3100 2 $0
Lockmoor La. - 3200 2 $0
Lockmoor La. - 3300 2 $0
Lombardy La. - 2300 2 $0
Majesty Dr. - 1200 2 $0
Marsh Lane Pl. - 3600 2 $0
Maybank Dr. - 10500 2 $0
Maybeth St. - 3400 2 $0
Mcbroom St. - 1200 2 $0
Mcbroom St. - 900 2 $0
Memphis St. - 4700 2 $0
Mercantile Row. - 5000 2 $0
Friday, March 31, 2006 Page 151 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Mercantile Row. - 5100 2 $0 Merrell Rd. - 2400 2 $0
Mockingbird La. (W) - 500 2 $0
Montclair Av. (N) - 2000 2 $0
Morocco Av. (N) - 1200 2 $0
Morrison La. - 11000 2 $0
Morrison La. - 11100 2 $0
Nagle St. - 2800 2 $0
Navaro St. - 3500 2 $0
Newcastle Dr. - 3100 2 $0
Newkirk St. - 10600 2 $0
Nogales Dr. - 3400 2 $0
Nomas St. - 1200 2 $0
Norma St. - 4800 2 $0
Nova Dr. - 2600 2 $0
Obenchain St. - 3500 2 $0
Oradell La. - 3000 2 $0
Overlake Dr. - 9400 2 $0
Park La. - 3200 2 $0
Park La. - 3700 2 $0
Ponder Dr. - 3000 2 $0
Profit Dr. - 1200 2 $0
Friday, March 31, 2006 Page 152 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Quaker St. - 1100 2 $0 Quebec St. - 3000 2 $0
Quinella Dr. - 800 2 $0
Reading St. - 4800 2 $0
Reading St. - 4900 2 $0
Regal Row. - 100 2 $0
Rochelle Dr. - 3900 2 $0
Rutz St. - 3300 2 $0
Security Dr. - 1100 2 $0
Security Dr. - 1200 2 $0
Seymour Dr. - 2900 2 $0
Shady Trl. - 10600 2 $0
Shaw St. - 1600 2 $0
Shorecrest Dr. - 3600 2 $0
Silverton Dr. - 2900 2 $0
Singleton Blvd. - 1000 2 $0
Singleton Blvd. - 1100 2 $0
Singleton Blvd. - 1300 2 $0
Singleton Blvd. - 1400 2 $0
Singleton Blvd. - 1500 2 $0
Singleton Blvd. - 1600 2 $0
Singleton Blvd. - 1700 2 $0
Friday, March 31, 2006 Page 153 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Singleton Blvd. - 200 2 $0 Singleton Blvd. - 300 2 $0
Singleton Blvd. - 400 2 $0
Singleton Blvd. - 500 2 $0
Singleton Blvd. - 600 2 $0
Singleton Blvd. - 6400 2 $0
Singleton Blvd. - 700 2 $0
Singleton Blvd. - 800 2 $0
Singleton Blvd. - 900 2 $0
Southwell Rd. - 2400 2 $0
Sovereign Row. - 8400 2 $0
Sovereign Row. - 8600 2 $0
Sovereign Row. - 8700 2 $0
Sovereign Row. - 8800 2 $0
Spangler Rd. - 10600 2 $0
Sportsmans Pkwy. - 5800 2 $0
Sportsmans Pkwy. - 5900 2 $0
Storey La. - 2600 2 $0
Sylvan Av. - 2300 2 $0
Sylvan Av. - 2400 2 $0
Sylvan Av. - 2700 2 $0
Sylvan Av. - 2800 2 $0
Friday, March 31, 2006 Page 154 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing
Sylvan Av. - 2900 2 $0 Tarna Dr. - 2600 2 $0
Tillery Av. (S) - 200 2 $0
Vicksburg St. - 4700 2 $0
Vilbig Rd. - 2100 2 $0
Viscount Row. - 9100 2 $0
Walnut Hill La. - 2300 2 $0
Walnut Ridge St. - 2400 2 $0
Webb Chapel Ext. - 3000 2 $0
Webb Chapel Ext. - 3100 2 $0
Winnetka Av. (N) - 3500 2 $0
Witham St. - 9800 2 $0
Witham St. - 9900 2 $0
Woodall St. - 5100 2 $0
Zelrich La. - 2600 2 $0
Summary for 'Category' = Street Resurfacing (247 detail records) Sum $17,878,391 Streetscape / Urban Design
Northwest Hwy Urban Design Project Pedestrian bridge across Northwest Hwy at Timberline. 1 74 $418,397
Bernal Drive Urban Design, from Singleton to Peoria Urban design enhancementsalong Bernal, from Singleton to 2 $4,124,593 Peoria, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan
Friday, March 31, 2006 Page 155 of 349 Project Name Description Tier Score Estimate Council District 6 Streetscape / Urban Design
Norwich Street Urban Design, from Singleton to Bernal Urban design enhancements along Norwich, from Singleton to 2 $2,738,078 Bernal, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Sylvan Ave Urban Design, from W. Commerce to Trinity Enhancements on Sylvan, from West Commerce to levee, to 2 $6,293,627 River Levee encourage pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Trinity River Park - Reunion Gateway to Trinity Park - Design and Construction of major pedestrian and vehicular 2 $8,838,378 Access from Industrial Blvd. access to Reunion Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Trinity River Park - Reunion Gateway to Trinity Park - Design of major pedestrian and vehicular access to Reunion 2 $893,410 Access from Industrial Blvd. - Design Only Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan West Dallas Gateway Park Parking, Pedestrian Ramps, Signage for Parks at west end of 2 $2,789,309 Continental St Viaduct at Beckley Westmoreland Road Urban Design, from UPRR to Trinity Urban design enhancements along Westmoreland, from Union 2 $4,093,783 River Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (8 detail records) Sum $30,189,575 Thoroughfares
Singleton -Walton Walker to Trinity River Widen to a six lane divided roadway 1 74 $0
Community - NW Hwy to Webb Chapel Widen to 4 lane undivide roadway 1 68 $4,543,597
Commerce - Sylvan to Canada Widen to 6 lane divided roadway 1 60.586 $4,459,113
Luna - Royal to Spur 482/ NW Highway Widen to a six lane divided roadway 1 60 $18,039,340
Singleton - Grand Prairie C.L. to Walton Walker Widen to 4 lane undivided roadway 1 53 $2,890,234
Harry Hines - Mockingbird to Webb Chapel Ext Widen to 8 lane divided roadway 1 52 $5,707,942
Friday, March 31, 2006 Page 156 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares
Harry Hines - Royal to NW Hwy Widen to 8 lane divided roadway 1 50 $23,679,139 Chalk Hill - Singleton to I 30 construct 4 lane divided 1 48 $4,093,416
Storey - Spur 482 to Dallas C.L. Widen to 6 lane divided roadway 1 48 $7,442,016
Luna - Wildwood - NW Hwy to Irving C.L. Widen to 6 lane divided roadway 1 46.989 $2,301,179
Goodnight - Offset Elim. from Walnut Hill (at Malibu) to Build a new four lane undivided roadway 1 46 $3,340,039 Ex. Align 1000' Colorado - Walton Walker to Westmoreland Build a new 4 lane undivided roadway 1 43 $8,274,815
Northaven - Denton to Harry Hines Build a new 4 lane undivided roadway 1 42 $1,014,819
Shorecrest - Harry Hines to Regal Row Build a new four lane undivided roadway with new right of way. 1 42 $4,602,359 UP/HP water treatment plant is in path of roadway alignment. Harry Hines - Webb Chapel to NW Highway Widen to 8 lane divided roadway 1 40 $5,618,797
Manana - IH 35E to Newkirk Widen to 4 lane undivided roadway 1 38.107 $1,014,819
Goodnight- Lombardy to Manana Widen to a four lane undivided roadway 1 38 $3,918,009
Storey - Spur 482 to IH 35 Widen to 6 lane divided roadway 1 38 $2,621,620
Manana - Loop 354/ Harry Hines to IH 35E Widen to a four lane undivided roadway 1 36 $1,522,230
Wildwood - Irving City Limit to Nortwest Highway Build a new four lane undividedeast of BNSF RR 1 33 $7,020,099
Brockbank - Lombardy to Wheellock Widen from 38' to 44' 1 31 $2,976,806
Jefferson - Walton Walker to Calumet Widen to a six lane divided roadway 1 31 $3,118,770
Mican/Pluto/Schuster -Singleton to Bernal Build a new four lane undivided roadway 1 30 $5,544,619
Canada Dr. - Hampton Road to Westmoreland Reconstruct roadway 1 29 $4,866,306
Canada Dr. - Westmoreland to Pluto build a new 4 lane roadway 1 29 $5,073,383
Newkirk - Joe Field to Manana Build a new 4 lane undivided roadway 1 29 $7,103,742
Merrell - IH 35E to Goodnight Thoroughfares - B Widen to a 4 lane undivided roadway 1 28 $1,014,819
Canada Dr. - Sylvan Road to Hampton Road Rebuild to 4 lanes 1 27 $4,855,915
Friday, March 31, 2006 Page 157 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares
Goodnight - Joe Field to Royal Build a new 4 lane undivided roadway 1 27 $3,842,655 Manana - Newkirk to Spangler Widen to 4 lane undivided roadway 1 27 $2,434,542
Commerce (W) - Hampton to Sylvan Widen to six lane divided roadway from a two to four lane 1 26 $3,786,173 roadway Emerald - Royal to I-635 Widen to a four lane undivided roadway 1 26 $3,803,628
Manana - Spangler to Luna Build a new 4 lane undivided roadway 1 26 $1,691,368
California Crossing - Wildwood to N.W. Hwy. widen to standard 4 lane roadway 1 24 $7,469,615
Manana - Hines to I.H. 35E Widen to 4 lane undivide roadway 1 24 $1,522,230
Newkirk - Royal to Joe Field Widen to a four lane undivided roadway 1 24 $1,099,390
Timberline - Lombardy to N.W. Hwy Widen to a four lane undivided roadway 1 23 $5,419,389
Merrell - Shady Trail to IH 35E Widen to four lane undivided roadway 1 22 $2,114,209
Merrell - Harry Hines to Denton Widen to a four lane undivided roadway 1 21 $1,463,445
Merrell -Denton to Harry Hines Widen to a four lane undivided roadway 1 21 $1,463,445
Goodnight - Crown to IH635 Widen to a four lane undivided roadway 1 20 $2,106,330
Reeder - Royal to Forest Widen to a four lane undivided roadway 1 20 $4,228,418
Chalk Hill Rd - Davis St to 800' south of IH-30 4-Lane Divided, Thoroughfare Plan anticipated to be revised 1 19 $2,068,282 from 6 to 4 due to the construction of Cockrel Hill Road. Walnut Hill - 250' West of Malibu to IH35E Widen to a six lane divided roadway 1 19 $636,603
Walnut Hill - Luna to 250' west of Malibu Build new 6 lane divided roadway 1 19 $16,916,776
Lombardy - NW Highway to Harry Hines Widen to a four lane undivided roadway 1 18 $2,875,325
Merrell - Luna to Goodnight Build a new 4 lane undivided roadway 1 18 $5,919,786
California Crossing - Irving City Limit to Wildwood Build a 4 lane undivided bridge and roadway 1 17 $5,852,554
Canada - Beckley to Sylvan Widen 8'-10' on each side, increase median to 15' 1 17 $1,353,094
Shady Trail - Loop 12 to Harry Hines Widen to a four lane undivided roadway 1 17 $9,897,211
Friday, March 31, 2006 Page 158 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares
Crown - Emerald to I.H. 35E Widen to a four lane undivided roadway 1 16 $323,804 Canada Dr. - Margret Hunt Hill Bridge to Sylvan Avenue Build a four lane roadway 1 15 $4,749,121
Unnamed NW2 - Harry Hines and Unnamed NW1 Build a new 4 lane divided roadway 1 15 $1,590,502
Crown - Newkirk to Goodnight Widen to a four lane undivided roadway 1 14 $259,044
SH 356/ Commonwealth - I.H. 35 to Irving Bouleva Widen to a six lane divided roadway 1 14 $1,014,819
Commonwealth - I.H. 35 to Irving Blvd Widen to 6 lane divided roadway 1 12 $1,014,819
Continental Viaduct - Trinity River to IH 35 1 11 $3,837,879
Beckley - 500' south of Commerce to Margret Hunt Hill Widen to fourand six lane divided roadway (Supplement Trinity 1 10 $3,973,571 Bridge Bond Funds) Crown - IH 35E to Reeder Widen to a four lane undivided roadway 1 10 $253,705
Newkirk - Crown to 500' N of Royal Widen to a four lane undivided roadway 1 10 $1,268,525
Program Dr -IH 35E to Composite Add a new four lane undivided roadway (TP amendment 1 10 $1,593,441 required) Schuster - Mican to Bernal Build a new 4 lane undivided roadway 1 10 $1,090,302
Vilbig - Akron to W. Commerce Widen to a four lane undivided roadway 1 5 $1,669,380
IH 35E - Spur 348/ Northwest Hwy to North of Store Enhanced service roads 1 3 $2,537,050
IH 35E - Walnut Hill to Manana Enhanced service roads 1 3 $2,959,893
Goodnight - Royal to North of Harcourt 1 0 $3,399,212
Unnamed NW1 - I.H. 35E to I.H. 635 Build a new 4 lane divided roadway 1 0 $6,229,466
Downtown Levee Road Design and Construction of Downtown Levee Road as 1 $2,068,323 recommended in the Trinity River Balanced Vision Plan Extend / Connect Herbert & Hardwick Streets Extend / Connect Herbert & Hardwick Streets, from IH-30 to 1 $0 Canada Drive, to provide better access for LaBajada community as recommended in the Trinity River Comprehensive Land Use Plan
Friday, March 31, 2006 Page 159 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares
Irving Blvd Enhancements, from Industrial Blvd. to Irving Widening and streetscape enhancments of Irving Blvd, from 1 $39,178,581 City Limits Industrial Blvd to Irving city limits as recommended in the Trinity River Comprehensive Land Use Plan Luna Road / Wildwood Realignment / Connection, south Widen Luna Rd / Wildwood, south of Northwest Highway to 1 $12,534,517 of Northwest Highway to south of California Crossing south of California Crossing Rd, into a four lane divided thoroughfare with sidewalks, curbs, gutters, and drainage as recommended in the Trinity River Comprehensive Land Use Plan Luna Road Widening / Enhancements, from Royal Lane to Widen Luna Rd, from Royal Lane to south of Northwest 1 $10,738,838 Northwest Highway Highway, into a six lane divided thoroughfare with sidewalks or parallel trails, drainage, and intersection improvements as recommended in the Trinity River Comprehensive Land Use Plan Shorecrest - Lemmon to Denton widen to a standard four lane roadway 1 $4,538,779
Summary for 'Category' = Thoroughfares (73 detail records) Sum $341,445,983 Traffic Intersection Capacity & Safety Improvement
Lombardy at Brockbank Widen both Lombary and Brockbank to construct left-turn lanes 1 60 $491,376 for alll approaches. High accident location. Shady Trail at Walnut Hill Widen Shady Trail to provide northbound and southbound left- 1 50 $440,324 turn pockets. Also, increase the turning radius on the southwest and northeast corners. Ables at Walnut Hill Widen Ables approaching Walnut Hill to provide northbound 1 40 $440,324 and southbound left-turn lanes. Canada @ Westmoreland Widen Canada approaching Westmoreland to provide an 1 40 $225,905 eastbound left-turn pocket. Royal - 400 ft West of Gemini Provide a left-turn pocket for westbound traffic 400 feet west of 1 40 $86,788 Gemini. This project will improve access to the post office and increase safety related to internal circulation through the post office parking lot. Dennis/Brockbank at Royal Widen Royal Lane approaching Dennis/Brockbank to provide 1 35 $805,345 eastbound and westbound left-turn lanes.
Friday, March 31, 2006 Page 160 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Intersection Capacity & Safety Improvement
Shorecrest @ Webb Chapel Widen Webb Chapel approaching Shorecrest to provide a 1 30 $256,536 southbound left-turn pocket. Widen Shorecrest approaching Webb Chapel to provide an eastbound left-turn pocket. Crown @ Newberry Improve intersection alignment. 2 $0
Crown @ Newkirk Improve intersection alignment. 2 $0
Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (9 detail records) Sum $2,746,598 Traffic Safety Improvements-Guardrail Upgrades
Canada 600 BLK Guardrail Upgrade 1 87 $7,307
Canada 1400 BLK Guardrail Upgrade 1 80 $20,191
Canada 700 BLK Guardrail Upgrade 1 80 $63,815
Harry Hines 9500 BLK Guardrail Upgrade 1 80 $22,113
Harry Hines 9600 BLK Guardrail Upgrade 1 80 $20,804
Irving 2900 BLK Guardrail Upgrade 1 80 $6,653
Jefferson 5900 W BLK Guardrail Upgrade 1 80 $46,776
Lemmon 9300 BLK Guardrail Upgrade 1 80 $20,868
Belt Line 500 E BLK Guardrail Upgrade 1 73 $60,816
Canada 2700 BLK Guardrail Upgrade 1 73 $6,155
Commerce 100 W BLK Guardrail Upgrade 1 73 $8,232
Harry Hines 9700 BLK Guardrail Upgrade 1 73 $13,465
Irving 2300 BLK Guardrail Upgrade 1 73 $6,669
Irving 3000 BLK Guardrail Upgrade 1 73 $4,658
Jefferson 5600 W BLK Guardrail Upgrade 1 73 $5,392
Friday, March 31, 2006 Page 161 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Safety Improvements-Guardrail Upgrades
Sylvan 3500 BLK Guardrail Upgrade 1 73 $25,942 Sylvan 3800 BLK Guardrail Upgrade 1 73 $7,403
Walnut Hill 2500 BLK Guardrail Upgrade 1 73 $15,009
Beckley 2500 N BLK Guardrail Upgrade 1 67 $10,096
Canada 2400 BLK Guardrail Upgrade 1 67 $7,307
Continental 200 BLK Guardrail Upgrade 1 67 $6,637
Irving 2600 BLK Guardrail Upgrade 1 67 $3,063
Singleton 4400 BLK Guardrail Upgrade 1 67 $6,669
Singleton 5600 BLK Guardrail Upgrade 1 67 $20,422
Bernal 4600 BLK Guardrail Upgrade 1 60 $16,212
Continental 100 BLK Guardrail Upgrade 1 60 $3,063
Marsh 9400 BLK Guardrail Upgrade 1 60 $37,523
Park 8200 BLK Guardrail Upgrade 1 53 $5,457
Webb Chapel 9900 BLK Guardrail Upgrade 1 53 $5,392
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (29 detail records) Sum $484,109 Traffic Signal Upgrades - Citywide
Commerce @ Justice Center Traffic Signal Upgrades Citywide 1 93 $148,306
Commonwealth @ Stemmons Traffic Signal Upgrades Citywide 1 93 $107,209
Nomas @ Sylvan Traffic Signal Upgrade 1 93 $117,739
Fort Worth @ W. Commerce Traffic Signal Upgrade 1 80 $97,254
Harry Hines @ Webb Chapel Ext Traffic Signal Upgrade 1 67 $164,962
Friday, March 31, 2006 Page 162 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Signal Upgrades - Citywide
Chalk Hill @ Davis Traffic Signal Upgrade 1 53 $51,180 Davis @ Justin Traffic Signal Upgrade 1 53 $80,981
Empire Central @ Stemmons Fwy Traffic Signal Upgrade 1 53 $101,785
Harry Hines @ Raceway Traffic Signal Upgrades Citywide 1 53 $79,450
Irving @ Lakawana Traffic Signal Upgrades Citywide 1 53 $106,890
Larga @ Webb Chapel Ext Traffic Signal Upgrade 1 53 $108,422
Sylvan @ W. Commerce Traffic Signal Upgrade 1 53 $120,610
Ambassador @ Mockingbird Traffic Signal Upgrade 1 40 $81,364
Brockbank - Dennis @ Royal Ln Traffic Signal Upgrade 1 40 $203,570
Clover @ Marsh Traffic Signal Upgrade 1 40 $109,443
Commonwealth @ Iron Ridge Traffic Signal Upgrade 1 40 $123,737
El Centro @ Webb Chapel Rd Traffic Signal Upgrade 1 40 $100,828
Gemini @ Royal Traffic Signal Upgrades Citywide 1 40 $107,847
Halifax @ Mockingbird Traffic Signal Upgrade 1 40 $106,890
Larga @ Webb Chapel Rd Traffic Signal Upgrade 1 40 $106,890
Park Ln @ Webb Chapel (Bogata) Traffic Signal Upgrade 1 40 $109,379
Newkirk-Northwest Hwy Traffic Signal Upgrade 1 33 $105,933
Bond @ Davis Traffic Signal Upgrade 1 27 $107,464
Davis @ Morocco Traffic Signal Upgrade 1 27 $107,464
Davis @ Walton Walker Traffic Signal Upgrades Citywide 1 27 $212,504
Summary for 'Category' = Traffic Signal Upgrades - Citywide (25 detail records) Sum $2,868,101
Friday, March 31, 2006 Page 163 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic System Management - Dynamic Message Signs
Northwest Hwy EB approaching Lemmon Traffic Systems Management - Dynamic Message Signs 1 30 $153,156 Westmoreland NB approaching Irving Traffic Systems Management - Dynamic Message Signs 1 25 $153,156
Irving EB approaching Mockingbird Traffic Systems Management - Dynamic Message Signs 1 20 $153,156
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (3 detail records) Sum $459,468 Traffic System Management - Flood Detour Signs
Luna @ X, Y, & Z Dynamic Signs - Flood Detours 1 60 $42,118
California Crossing @ Luna Dynamic Signs - Flood Detours 1 40 $42,118
Goodnight @ Walnut Hill Dynamic Signs - Flood Detours 1 40 $42,118
Tantor @ X, Y, & Z Dynamic Signs - Flood Detours 1 40 $42,118
Wildwood @ California Crossing Dynamic Signs - Flood Detours 1 40 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $210,590 Traffic System Management - Roadside Cameras
Irving-Mockingbird Traffic Systems Management - Roadside Camera 1 25 $12,763
Summary for 'Category' = Traffic System Management - Roadside Cameras (1 detail record) Sum $12,763 Summary for 'Program' = STREET AND TRANSPORTATION (495 detail records) Sum $568,669,946 Summary for 'CD' = 6 (495 detail records) Sum $568,669,946
Friday, March 31, 2006 Page 164 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction
S. Ervay & Holmes - South to Grand S. Ervay 2707-2829, Full reconstruction 1 85 $206,761 Homeway and Babalos - Homeway to Babalos Full Reconstruction 1 67 $277,279
James (Beside 3515) - James to Unimp. Alley Alley Reconstruction, Beside 3515 James From James to 1 63 $173,909 Unimproved Alley Blyth & Gross Rd. - Shiloh To La Parada Full Reconstruction 1 61.5 $230,630
Shorewood(3011) & Klondike - La Prada to Michael Full Reconstruction 1 57 $225,934
Cleveland St. (2803 - 2829) Gould - South to Park Row Full reconstruction Cleveland St. (2803 - 2829) 1 52 $64,326
Klondike Dr. & Jones Boro - Ashdown To Shiloh Full Reconstruction 1 48.9 $367,988
Meyers St. & Grand Plaza - Ash to Grand Full Reconstruction - Meyers St. 2602 1 46 $174,598
Martin Luther King Blvd & Peabody - Latimer to Atlanta Full reconstruction - Martin Luther King Blvd. 2506 1 43 $111,038
Gill St (3305 - 3345) Hollis to Fairway Full reconst Gill St. (3305 - 3345) 1 40 $243,773
Healey Dr. & Larry - Tellerson To Casa Oaks Full Reconstruction 1 40 $258,661
Marimont & Michael - Oates Dr. To T- Alley Full Reconstruction 1 40 $312,178
Pennsylvania Avenue (1301-1327) Peabody - Parnell to Full recon Pennsylvania Ave. (1301 - 1327) 1 40 $89,341 Cleveland Scottsbluff Drive (2905-3027) Shorewood - La Prada to Full recon Scottsbluss Dr. (2905 - 3027) 1 31 $208,037 Michael Colonial St &Wendelkin - Lenway to Cooper Full reconstruction - Colonial St 3500 - 3530 1 28 $95,723
Klondike Dr. & Oates Rd. - La Parada Dr. To Marimo Full Reconstruction 1 28 $173,546
Colonial Ave (3701 - 3739) Spence - Romine to Full reconstruction Colonial Ave (3701 - 3739) 1 25 $122,525 Metropolitan Ferguson Rd &Villa Cliff Full reconst - Ferguson Rd 7727 - 7907 1 25 $339,623
Martin Luther King Blvd. & Peabody - Meadow to Trunk Full Reconstruction - Martin Luther King Blvd. 3114 1 18 $103,380
Edgewood St (3402 - 3426) Pondrom - Warren to Lenway Full reconst Edgewood St. (3402 - 3426) 1 15 $85,512
Bannock St. 1715- 1729 Full reconstruction (T-Alley not included) 2 $53,605
Friday, March 31, 2006 Page 165 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction
Birmingham Ave 3001 - 3033 reconstruction - Birmingham Ave 3001 - 3033 2 $108,486 Blackheath & Osborn - Showbend to Everglade Full Reconstruction 2 $254,504
Blaydon Dr - 2507 - 2537 Full Reconstruction 2 $129,204
Blaydon Dr (2307 - 2439) Bluffton - Freeport to Ashdown Full Reconstruction Blaydon Dr (2307 - 2439) 1 $274,462
Bluffton Dr - 2307 - 2439 Full Reconstruction 2 $273,953
Blyth Dr - 2307 - 2439 Full Reconstruction 2 $274,717
Cinnabar Dr - 4307 - 4339 Full Reconstruction 2 $241,588
Dugald Pl - 2104 - 2336 Full Reconstruction 2 $415,388
Freeland Wy & Babalos - Freeport to Babalos Full Reconstruction 2 $282,200
Freeport Dr - 8905 - 9233 Full Reconstruction 2 $300,710
Globe Av - 2506 - 2650 Full Reconstruction 2 $371,046
Healey Dr - 2604 - 2668 Full Reconstruction 2 $222,220
Healey Dr - 2702 - 2944 Full Reconstruction 2 $347,346
Healey Dr - 2703 - 2945 Full Reconstruction 2 $346,582
Healey Dr - 3105 - 3149 Full Reconstruction 2 $172,782
Healey Dr - 3205 - 3261 Full Reconstruction 2 $234,706
Hillglenn Rd - 3215 - 3273 Full Reconstruction 2 $247,449
Hillsboro Av - 2505 - 2655 Full Reconstruction 2 $370,026
Hollis Av - 5943 ------Full Reconstruction 2 $191,894
Inadale Av - 2315 - 2445 Full Reconstruction 2 $307,082
Inadale Av - 2505 - 2655 Full Reconstruction 2 $369,772
Jonesboro Av - 2315 - 2451 Full Reconstruction 2 $354,482
Friday, March 31, 2006 Page 166 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction
Klondike Dr - 2315 - 2449 Full Reconstruction 2 $305,042 Klondike Dr - 2505 - 2651 Full Reconstruction 2 $370,281
Klondike Dr - 2703 - 2829 Full Reconstruction 2 $228,336
Klondike Dr - 2704 - 2830 Full Reconstruction 2 $226,807
Larry Dr - 2404 - 2542 Full Reconstruction 2 $301,220
Larry Dr - 2604 - 2660 Full Reconstruction 2 $199,539
Larry Dr - 3005 - 3071 Full Reconstruction 2 $286,694
Lockhart Av - 2305 - 2445 Full Reconstruction 2 $346,327
Lockhart Av - 2505 - 2651 Full Reconstruction 2 $369,772
Lockhart Av - 2703 - 2829 Full Reconstruction 2 $227,061
Marbella La - 2606 - 2648 Full Reconstruction 2 $164,626
Maverick Av - 2405 - 2563 Full Reconstruction 2 $319,823
Maverick Av - 2605 - 2645 Full Reconstruction 2 $163,352
Maverick Av - 2705 - 2835 Full Reconstruction 2 $206,420
Millmar and Hillglenn - LaPrada to Modlin Full Reconstruction 2 $176,584
Pinebluff Dr - 2454 - 2546 Full Reconstruction 2 $412,075
Piper La - 9406 ------Full Reconstruction 2 $349,385
Rimdale Dr - 2702 - 2814 Full Reconstruction 2 $212,281
Scottsbluff Dr - 2703 - 2831 Full Reconstruction 2 $284,656
Scottsbluff Dr (2904 - 3028) Shenstone - LaPrada to Full Reconstruction Scottsbluff Dr. (2904 - 3028) 1 $228,846 Michael South Blvd. 1846 Full recon 2 $45,947
Wonderlight & Gross - Peavy to cul-de-sac Full Reconstruction 2 $206,761
Friday, March 31, 2006 Page 167 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction
Summary for 'Category' = Alley Reconstruction (65 detail records) Sum $15,640,801 Barrier Free Ramps
Dixon @ Bourquin Install 4 ramps 1 47 $7,658
York St @ 2nd Ave 1 ramps needed at this intersection 1 33 $1,914
Hatcher St @ Roberts Ave 2 ramps needed at this intersection 1 28 $3,829
Hatcher St @ Spring Garden Dr 2 ramps needed at this intersection 1 28 $3,829
Hatcher St @ Verdun Ave 2 ramps needed at this intersection 1 28 $3,829
Pickrell @ Osborn Need (One) BFR on even side of block 1 24 $1,914
Hatcher St @ Electra St 2 ramps needed at this intersection 1 23 $3,829
Grand @ Jefferies Need BFR at Bus Stop on SE corner of intersection 1 22 $1,914
Ferguson Rd @ Peavy Rd Construct 4 ramps 1 21 $842
Dorrington Dr @ Ferguson Rd 1 19 $7,658
Hatcher St @ Bradshaw St 2 ramps needed at this intersection 1 18 $3,829
Hatcher St @ Meadow St 3 ramps needed at this intersection 1 18 $5,743
York St @ Verdun Ave 4 ramps needed at this intersection 1 18 $7,658
Ferguson Rd @ Healy Dr Construct 4 ramps 1 16 $2,987
2nd Ave @ Bertrand Ave 3 ramps needed at this intersection 1 13 $5,743
3145 Mcdermott Ave construct a new BFR or modify the existing driveway of # 3145 1 13 $3,829 for a wheel chair pick up Colonial @ Eugene 2 BFRs needed on intersection 1 13 $3,829
Lindaro @ Inadale 2 BFRs on intersection 1 13 $3,829
Ferguson Rd @ Hilglenn Rd Construct 2 ramps 1 11 $3,829
Friday, March 31, 2006 Page 168 of 349 Project Name Description Tier Score Estimate Council District 7 Barrier Free Ramps
Ferguson Rd @ Larry Dr Construct 4 ramps 1 11 $3,446 Bertrand Ave @ Bradshaw St 2 ramps needed at this intersection 1 8 $3,829
Bertrand Ave @ Spring Garden Dr 2 ramps needed at this intersection 1 8 $3,829
Bertrand Ave @ Verdun Ave 2 ramps needed at this intersection 1 8 $3,829
Spring Garden Dr @ York St 4 ramps needed at this intersection 1 8 $7,658
Bertrand Ave @ Electra St 2 ramps needed at this intersection 1 3 $3,829
Bertrand Ave @ Roberts Ave 2 ramps needed at this intersection 1 3 $3,829
Culver St @ Winfield Construct 4 BFRs on corners of intersection 1 3 $7,658
Electra St @ York St 4 ramps needed at this intersection 1 3 $7,658
Harrison @ Clarence One BFR needed at the corner of 2604 Harrison Ave 1 3 $1,914
Meadow St @ Marburg St 2 ramps needed at this intersection 1 3 $3,829
Meadow St @ Southland St 2 ramps needed at this intersection 1 3 $3,829
Meadow St @ York St 2 ramps needed at this intersection 1 3 $3,829
York St @ Bradshaw St 4 ramps needed at this intersection 1 3 $7,658
York St @ Roberts Ave 4 ramps needed at this intersection 1 3 $7,658
Meadow St @ Bertrand Ave 2 ramps needed at this intersection 1 $3,829
Summary for 'Category' = Barrier Free Ramps (35 detail records) Sum $156,602 Bridge Repair and Modification
Corinth St. over Trinity River Superstructure rehab incl. repair to sheared girder, 2 cracked 1 56.25 $433,942 girders, numerous general spalls, rail damage, repair of spalls under span over N. levee - not full rehab Summary for 'Category' = Bridge Repair and Modification (1 detail record) Sum $433,942
Friday, March 31, 2006 Page 169 of 349 Project Name Description Tier Score Estimate Council District 7 Intergovernmental Partnership Projects
Lakeland Dr @ Ash Creek Bridge rehabilitation and/or reconstruction. 2 49.04 $0 Dolphin Rd - IH 30 to Military Parkway Partnership project with Dallas County to reconstruct existing 4 1 $899,792 lane undivided roadway. Total estimated cost of $3.6 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. E. Dallas Veloway Phase 2 Tunnel at DART's SE-1 Partnership project with DART and Dallas County to design and 1 $1,595,375 Crossing construct hike and bike trail under DART's SE Corridor Light Rail. Total estimated cost of $3.3 million. DART to begin construction on overall project mid 2006. Supplements 2003 Bond Program East Dallas RR Xings - 8 Xings along the KCS Partnership project with TxDOT to upgrade gates, install 1 $117,420 medians, and signs. Total estimated cost of $2.3 million. Estimated to be let by early 2008. La Prada - Oates to Motley Partnership project with Dallas County to design and 1 $2,010,173 reconstruct existing 4 and 6 lane divided roadway. Total estimated cost of $6.2 million. Estimated to be let by Dallas County mid 2010. Supplements 2003 Bond Program funds. Malcolm X @ SFRR-Hickory Street Bridge rehabilitation and/or reconstruction 2 $0
Military Pkwy (EB) @ Trib. to White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0
Military Pkwy (WB) @ Trib. to White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0
Second Ave. (NB) at Trib. To White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0
Second Ave. (SB) to .5 Miles SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0
Second Ave. (SB) to 1.1 Mile SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0
Second Ave. (SB) to 1.3 Miles SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0
Summary for 'Category' = Intergovernmental Partnership Projects (12 detail records) Sum $4,622,759 Sidewalk Petitions
Ewing Ave (S) - Clarendon Dr to 12th St Engineering, Paving 400 Block 1 100 $17,230
Friday, March 31, 2006 Page 170 of 349 Project Name Description Tier Score Estimate Council District 7 Sidewalk Petitions
Summary for 'Category' = Sidewalk Petitions (1 detail record) Sum $17,230 Street Lighting - Existing Thoroughfares
Military Pkwy @ Lawnview Street Lighting 1 27 $510,520
Summary for 'Category' = Street Lighting - Existing Thoroughfares (1 detail record) Sum $510,520 Street Petitions
Fairway Ave - Gill St to James St Engineering, Paving & Drainage 5700 blk 1 92 $181,235
Summary for 'Category' = Street Petitions (1 detail record) Sum $181,235 Street Reconstruction Local Streets
Harrison Ave - Clarence St to Grand Ave 2600 Blk 1 65.8 $225,905
Coombs St - Good Latimer Expwy to RR 2400 Blk 1 65.62 $419,410
Logan - Good Latimer Expwy to Myrtle St 2500 - 2700 Blks SR# 04-00327242 1 65.61 $765,780
Clarence St - Central Exwy East to Dead End 2100 blk 1 65.33 $167,195
Bethurum Ave - Bexar St to Belt Line St (Railroad) 2700 Blk 1 63.74 $854,189
Sutton St - Spring Ave to Pine St 2800 Blk 1 61.56 $182,511
Crozier St - Pine St to Carpenter Av 4200 - 4300 Blks 1 60.86 $453,087
Troy St - Spring Ave to Hatcher St 2900 Blk 1 60.72 $289,555
Clarence St - Good Latimer Expwy to Malcolm X Blvd 2500 - 2700 Blks 1 60.61 $1,177,054
Bannock St - S. Lamar St to Colonial Ave 1600 Blk 1 60.46 $521,200
Casa Oaks Dr - Healey Dr to Oates Dr 9800 Blk 1 60.39 $746,636
Friday, March 31, 2006 Page 171 of 349 Project Name Description Tier Score Estimate Council District 7 Street Reconstruction Local Streets
Borich St - R. B. Cullum Blvd to Second Ave 3400 Blk 1 60.06 $189,411 Junction St - Bertrand Ave to Montie St 3200 Blk 1 59.98 $390,900
Clarence St - King St to S Harwood St 1800 - 1900 Blks 1 59.94 $536,046
Meadow St - Birmingham Ave to Warren Ave 3300 Blk 1 59.79 $304,034
Emery St - S Lamar St to Hohen Av 1600 Blk 1 59.27 $440,324
Culver St - Winfield Ave to Boone Ave 3500 Blk 1 59 $477,766
Lyons St - Monte Pl to Hatcher St 3200 Blk 1 58.62 $115,822
Ash La - 1st Av to Exposition Av 3600 Blk 1 58.12 $217,166
Mingo St - Dolphin Rd to Silver Av 3300 Blk 1 58.08 $321,628
Jeffries St - Tanner St to Warren Av 3400 Blk 1 58 $261,642
Healey Dr - Ferguson Rd to Tellerson Ave 2300 Blk 1 56.57 $554,703
Gay St - Spring Ave to Copeland St 2900 Blk 1 56.17 $332,989
Pasteur Ave - Ferguson Rd to Beck Ave 2600 Blk 1 55.13 $874,266
Menger Av - Elmira St to Lawnview Av 6000 Blk 1 55.05 $313,970
Laughlin Dr - Avenue Q South to Dead End 2400 Blk 1 54.33 $231,645
Boone Av - Fairview Av to Dead End 5200 Blk 1 53.38 $319,075
Avenue G - Sanderson Ave to 500 feet north 400 Blk 1 52.36 $376,422
Summary for 'Category' = Street Reconstruction Local Streets (28 detail records) Sum $12,060,328 Street Reconstruction Thoroughfares
Samuell Blvd - Winfield Av to UP RR 3500 - 3600 Blks 1 78.42 $946,542
Dolphin Rd - Samuell Blvd to R L Thornton Frwy 5400 Blk 1 77.38 $130,821
Friday, March 31, 2006 Page 172 of 349 Project Name Description Tier Score Estimate Council District 7 Street Reconstruction Thoroughfares
Prairie Creek Rd (N) - Forney Rd to City Limits 4700 Blk 1 74.29 $1,114,789 Cedar Crest Blvd Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $5,662,439 Bonnie View Ln to the Trinity River Bridge Cedar Crest Blvd, from Bonnie View Ln to the Trinity River Bridge, to serve as gateway for both East Oak Cliff and Trinity River greenbelt as recommended in the Trinity River Comprehensive Land Use Pl Ervay Street Reconstruction / Urban Design, from MLK to Roadway reconstruction & streetscape enhancements on 1 $3,682,776 Marilla Ervay, from MLK to Marilla, to serve as a gateway into Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Hatcher Street Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $6,150,260 Malcolm X to Lamar Hatcher, from Malcolm X to Lamar, to serve the community as recommended in the Trinity River Comprehensive Land Use Plan S. Lamar St. - Grand Ave. to IH 45 - Construction Only Reconstruction (initially to 4 lanes), including ROW acquisition 1 $0 for 6 lanes, Signalization and turn lanes at major signalized intersections, and landscaping as recommended in the Trinity River Balanced Vision Plan (Construction Only) S. Lamar St. - Grand Ave. to IH 45- Design Only Design for Reconstruction (initially to 4 lanes), and landscaping 1 $957,225 as recommended in the Trinity River Balanced Vision Plan S. M. Wright Freeway Downgrade - Grand Ave. to C.F. Construction of conversion of S. M. Wright Freeway to city 1 $30,375,940 Hawn - Construction Only boulevard, including demolition of bridges, retaining walls and freeway mainlanes and reconstructing 6 lanes with neighborhood park located in median and streetscaping as recommended in the Trinit South Lamar Street Reconstruction / Urban Design , from Roadway reconstruction and streetscape enhancements on 1 $20,612,245 IH-45 to SH310 South Lamar, from Hatcher to SH310, to spur pedestrian- friendly development and improve vehicular movement as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (10 detail records) Sum $69,633,038 Street Resurfacing
Friday, March 31, 2006 Page 173 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Herald St. - Lamar St. to Colonial Ave. 1600 Block 1 90.725 $58,582 Good Latimer Expy. (S) - Corinth St. to S. Central Expy. 2100 - 2700 1 89.265 $485,479
Clarendon Dr. (E) - Cliff St. to Corinth St. 1200 - 1600 1 85.91 $520,220
Logan St. - Merlin St. to Myrtle St. 2800 - 2900 1 83.57 $45,181
Caswell St. - R.B.Cullum Blvd. to Second Ave. 3400 Block 1 82.88 $15,698
Peabody Ave. - SM Wright Frwy. to Dead End 1300 - 1900 1 82.88 $125,588
Harwood St (S) - Concrete @ Coombs St. to Pennsylvania 2500 - 3200 1 80.96 $291,379 Ave. Cockrell Ave. - 1900 Lamar to 2700 Lamar 2000 - 2700 1 80.73 $105,438
First Ave. - Exposition Ave. to Ash Ln. 400 - 800 1 80.18 $141,286
Holmes St. - Grand Ave. to Pine St. 2700 - 4100 1 78.31 $383,018
Eleventh St. (E) - Cedar Crest Dr. to Eighth St. 2100 - 2900 1 77.92 $154,305
Kinmore St. - St Charles Ave. to Winfield Ave. 3000 - 3400 1 77.9 $76,875
Harrison Ave. - Logan St. to Coombs St. 2400 Block 1 77.42 $34,077
St Clair St. - Municipal St. to Bexar St. 2400 - 2500 1 76.98 $77,599
Peabody Ave. - Malcom X Blvd. to Trunk Ave. 2800 - 3100 1 74.72 $30,248
Spring Ave. - Hector St. to Hatcher St. 3600 - 4900 1 74.21 $336,816
Dilido Rd. - John West Rd. to Senate St. 3300 - 3600 1 74.14 $198,465
Metropolitan Ave. - Gertrude Ave. to Foreman St. 4100 - 4300 1 73.94 $167,451
La Prada Dr. - Oates Dr. to Millmar Dr. 9800 - 9900 1 73.75 $355,322
Cedar Crest Blvd. - Cadillac Dr. to Morrell Ave. 2900 block 1 73.39 $38,800
South Blvd. - Parnell St. to Ervay St. 1300 - 1600 1 73.24 $128,523
Senate St. - St Francis Ave. to Dilido Rd. 8800 - 9000 1 71.905 $241,731
Friday, March 31, 2006 Page 174 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Riek Rd. - Ferguson Rd. to End of Concrete 2300 block 1 71.705 $38,034 Glover Pass - Scyene Rd. to Overlook Dr. 3000 - 3600 1 70.77 $240,200
Garden Dr. - SM Wright Frwy. To Harwood St. 2200 Block 1 70.325 $42,373
Gurley Ave. - Dead End to Stonewall St. 4200 - 4300 1 70.3 $45,960
Owenwood Ave. - Samuell Blvd. to Kinmore St. 4700 - 5200 1 69.58 $36,103
Oak Ln. - Jeffries St. to Fourth Ave. 2900 - 3100 1 69.575 $93,808
Trunk Ave. (S) - Oak St. to Grand Ave. 700 - 1200 1 69.1 $167,068
Fleetwood St. - Concrete @ Haskell Ave to Schull St. 1500 - 1600 1 69.02 $63,304
Schull St. - Caldwell Ave. to Fleetwood St. 1600 block 1 68.87 $34,205
Eugene St. - Central Expy. to Malcolm X Blvd. 2200 - 2700 1 68.85 $140,904
Sanger Ave. - Ervay St. to Harwood St. 1700 - 1900 1 68.83 $71,728
K St. - Good Latimer Expy. (S) to Dead End 2400 block 1 68.665 $52,328
Bonnie View Rd. - Illinois Ave. to King Cole Ave. 3300 - 3400 1 67.99 $84,619
Foreman St. - Hamilton Ave. to Spring Ave. 2200 - 2700 1 67.745 $108,230
Fletcher St. - Gurley Ave. to Dead End 1100 - 1300 1 67.615 $125,205
Lawrence St. - SM Wright Frwy. To Crozier St. 2200 - 2400 1 67.005 $63,560
Kenilworth St. - Second Ave. to Todd St. 3500 - 3700 1 66.965 $80,407
Kimble St. - Lenway St. to Warren Ave. 3400 block 1 66.76 $13,912
Third Ave. - Concrete to Fourth Ave. 600 - 800 1 66.68 $141,669
Elmira St. - Greenmere Pl. to Hollis Ave. 3100 Block 1 66.63 $37,651
Latimer St. - Cooper St. to Romine Ave. 3600 - 3700 1 65.86 $45,947
St Francis Ave. - Bridge to Creekwood Dr. 1900 block 1 65.785 $18,762
Friday, March 31, 2006 Page 175 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Hutchins Ave. - Cliff St to Cleaves St. 1200 - 1400 1 65.57 $80,279 Southland St. - Malcom X Blvd. to Meadow St. 2800 - 3000 1 65.53 $82,704
Gould St. - Grand Ave. to MLK Blvd. 2700 - 2900 1 65.33 $67,389
Hamilton Ave. - Lagow St. to Dead End 4200 - 4400 1 65.305 $327,881
Lyons St. - Spring Ave. to Hatcher St. 2900 - 3100 1 64.94 $39,948
Chenault St. - Buckner Blvd. to Dead End 1900 Block 1 64.43 $54,498
Cliff St. (N) - Tenth St. to Ninth St. 100 Block 1 63.79 $25,781
Meyers St. - Lenway St. to McDermott Ave. 3500 - 3700 1 61.985 $71,218
Avenue E - Sanderson Ln. to Eleventh St. 300 - 400 1 61.31 $53,477
Lawnview Ave. - Forney Rd. to Samuell Blvd. 4500 - 5200 1 60.29 $242,369
Atlanta St. - Grand Ave. to MLK Blvd. 2700 - 2900 1 60.26 $58,199
Jim Miller Rd. (N) - R.L. Thornton Frwy. To Highland Rd. 5700 block 1 59.565 $38,289
Shiloh Rd. - Dead End to Blyth Dr. 8700 block 1 59.45 $51,945
Christiensen Dr. - Latta Pkwy. to Ethel Dr. 6300 Block 1 59.41 $42,501
Stoneman St. - Lamar St. to SM Wright Frwy. 1600 - 1700 1 59.25 $95,340
Ervay St. (S) - South Blvd. to MLK Blvd. 2900 Block 1 58.995 $14,039
Park Row Ave. - Meadow St. to Concrete 3000 block 1 58.975 $32,163
McKenzie St. - Haskell Ave. to Herndon St. 1200 - 1400 1 58.635 $47,223
Pear St. - Lamar St. to Sm Wright Frwy. 1600 - 1700 1 58.54 $77,727
Hooper St. - US 175 Svc. Rd. to Hodge St. 2200 Block 1 58.35 $20,421
Bannock St. - Colonial Ave. to SM Wright Frwy. 1700 Block 1 57.985 $30,504
Marshall St. - Swanson St. to Foreman St. 4200 - 4300 1 57.21 $41,990
Friday, March 31, 2006 Page 176 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Pine St. - Holmes St. to SM Wright Frwy. 1600 - 1700 1 57 $73,132 Bradshaw St. - Garden Ln. to Dead End 5000 - 5100 1 56.325 $32,673
Du Bois Ave. - Eleventh St. to Childs St. 300 - 500 1 56.105 $61,518
Romine Ave. - Julius Schepps Frwy. To Lamar St. 1400 block 1 56.07 $13,401
Park Row Ave. - Jeffries St. to Malcolm X Blvd. (S) 2800 block 1 54.925 $65,219
South Blvd. - Harwood St. to Dead End 1900 block 1 54.48 $21,314
Anderson St. - S.M. Wright Frwy. To Shield St. 2200 - 2400 1 54.31 $43,777
Latimer St. - Eugene St. to Pine Ave. 4000 block 1 54.28 $54,115
South Blvd. - Dead End to Malcolm X Blvd. 2300 - 2700 1 53.785 $131,331
Marlin Dr. - Oates Dr. to La Prada Dr. 9800 - 9900 1 53.585 $188,758
Avenue J - Eleventh St. to Childs St. 300 - 500 1 53.385 $40,459
South Blvd. - Malcom X Blvd. to Meadow St. 2800 - 3000 1 52.97 $76,450
Starks Ave. - Bexar St. to Dead End 2500 - 2700 1 52.8 $55,902
Reed Ln. - Meyers St. to Second Ave. 3000 - 3400 1 52.53 $138,479
Seventh St. (E) - Jefferson Blvd. to Eads Ave. 900 - 1000 1 52.505 $9,955
South Blvd. - Meadow St. to Trunk Ave. 3100 block 1 52.455 $45,947
Harris Ct. - Durett Cir. To Dead End 1500 - 1600 1 52.18 $56,540
Birmingham Ave. - Malcolm X Blvd. to Meyers St. 2800 - 2900 1 51.79 $87,809
Cleveland St. - MLK Blvd. to Grand Ave. 2700 - 2900 1 51.21 $69,048
Hamilton Ave. -Cross St. to Lagow St. 3800 - 4100 1 50.36 $125,333
Jamaica St. - Lagow St. to Foreman St. 4200 - 4300 1 48.23 $54,498
Tanner St. - Malcom X Blvd. to Jefferies St. 2800 block 1 47.07 $19,910
Friday, March 31, 2006 Page 177 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Avenue F - Eleventh St. to Sanderson Ave. 300 - 400 1 44.465 $41,735 Sidney St. - Todd St. to Racell St. 3800 - 3900 1 44.33 $53,349
Avenue I - Eleventh St. to Childs St. 300 - 500 1 43.45 $43,905
Avenue H - Eleventh St. to Sanderson Ave. 300 - 400 1 39.13 $47,606
Anderson St. - Bexar St. to Dead End 2600 - 2700 1 38.315 $45,053
Academy Dr. - 3800 2 $0
Academy Dr. - 4100 2 $0
Areba St. - 2200 2 $0
Atlanta St. - 3100 2 $0
Avenue D - 1600 2 $0
Avenue G - 300 2 $0
Baldwin St. - 4400 2 $0
Baldwin St. - 4600 2 $0
Baldwin St. - 4700 2 $0
Baldwin St. - 4800 2 $0
Beck Av. - 9300 2 $0
Beck Av. - 9400 2 $0
Belgrade Av. - 5800 2 $0
Belgrade Av. - 6300 2 $0
Birmingham Av. - 2400 2 $0
Birmingham Av. - 2500 2 $0
Bonnie View Rd. - 2800 2 $0
Friday, March 31, 2006 Page 178 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Bonnie View Rd. - 2900 2 $0 Bonnie View Rd. - 400 2 $0
Boone Av. - 5300 2 $0
Canyon St. - 1700 2 $0
Carpenter Av. - 4200 2 $0
Casa Oaks Dr. - 9900 2 $0
Catron Dr. - 4900 2 $0
Catron Dr. - 5200 2 $0
Claremont Dr. - 7700 2 $0
Cooper St. - 1400 2 $0
Copeland St. - 3600 2 $0
Copeland St. - 4200 2 $0
Copeland St. - 4300 2 $0
Corinth St Rd. (S) - 300 2 $0
Corinth St Rd. (S) - 500 2 $0
Crozier St. - 4200 2 $0
Crozier St. - 4400 2 $0
Crozier St. - 4600 2 $0
Crozier St. - 4800 2 $0
Crozier St. - 4900 2 $0
Dathe St. - 2800 2 $0
Denley Dr. (N) - 300 2 $0
Friday, March 31, 2006 Page 179 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Dorris St. - 2600 2 $0 Eads Av. - 600 2 $0
Eads Av. - 800 2 $0
East Grand Av. - 4200 2 $0
East Grand Av. - 4300 2 $0
Echo Av. - 5000 2 $0
Edgewood St. - 2800 2 $0
Edgewood St. - 2900 2 $0
Elmira St. - 4200 2 $0
Farragut St. - 2800 2 $0
Fitzhugh Av. (S) - 3500 2 $0
Frost Av. - 2800 2 $0
Gaisford St. - 1600 2 $0
Garden Dr. - 1600 2 $0
Ghent St. - 2500 2 $0
Ghent St. - 2600 2 $0
Goldspier Dr. - 3300 2 $0
Gross Rd. - 1700 2 $0
Gross Rd. - 2700 2 $0
Guaranty St. - 3700 2 $0
Hancock St. - 3500 2 $0
Harding St. - 2300 2 $0
Friday, March 31, 2006 Page 180 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Harding St. - 2400 2 $0 Harrell Av. - 2300 2 $0
Harwood St. (S) - 2400 2 $0
Harwood St. (S) - 3400 2 $0
Harwood St. (S) - 4800 2 $0
Haven St. - 1600 2 $0
Healey Dr. - 2600 2 $0
Hickman St. - 2300 2 $0
Hilltop St. - 3600 2 $0
Hilltop St. - 4000 2 $0
Hilltop St. - 4100 2 $0
Hilltop St. - 4400 2 $0
Hooper St. - 2400 2 $0
Hunnicut Rd. - 8200 2 $0
Jb Jackson Jr Blvd. - 2200 2 $0
Jeffries St. - 2900 2 $0
Jim Miller Rd. (N) - 6200 2 $0
Jonesboro Av. - 2500 2 $0
Jonesboro Av. - 2600 2 $0
Jordan St. - 2200 2 $0
Jordan St. - 2300 2 $0
Jordan St. - 2400 2 $0
Friday, March 31, 2006 Page 181 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Kellogg Av. - 2800 2 $0 Kennison Dr. - 6800 2 $0
King St. - 2400 2 $0
Kynard St. - 3800 2 $0
La Prada Dr. - 9500 2 $0
La Vern Av. - 3500 2 $0
La Vern Av. - 3600 2 $0
Lagow St. - 3100 2 $0
Lasca St. - 3000 2 $0
Lasca St. - 4000 2 $0
Lasca St. - 4100 2 $0
Lasca St. - 4200 2 $0
Lasca St. - 4300 2 $0
Leland Av. - 4400 2 $0
Leland Av. - 4600 2 $0
Logan St. - 2400 2 $0
Lowery St. - 2600 2 $0
Maceo Cir. - 2700 2 $0
Macon St. - 2200 2 $0
Macon St. - 2300 2 $0
Macon St. - 2500 2 $0
Macon St. - 2600 2 $0
Friday, March 31, 2006 Page 182 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Macon St. - 2700 2 $0 Macon St. - 2800 2 $0
Malcolm X Blvd. (S) - 2700 2 $0
Malcolm X Blvd. (S) - 3000 2 $0
Marburg St. - 2500 2 $0
Marburg St. - 2600 2 $0
Marburg St. - 2700 2 $0
Marne St. - 5000 2 $0
Martin Luther King Blvd. - 1300 2 $0
Maurine F Bailey Wy. - 2700 2 $0
Mcdermott Av. - 3100 2 $0
Meadow St. - 3400 2 $0
Meadow St. - 3600 2 $0
Medill St. - 2700 2 $0
Menger Av. - 6100 2 $0
Merlin St. - 2400 2 $0
Merlin St. - 2600 2 $0
Metropolitan Av. - 3300 2 $0
Military Pkwy Serv. N - 6800 2 $0
Military Pkwy Serv. S - 5900 2 $0
Millard St. - 800 2 $0
Millmar Dr. - 2900 2 $0
Friday, March 31, 2006 Page 183 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Millmar Dr. - 3000 2 $0 Millmar Dr. - 3100 2 $0
Millmar Dr. - 3200 2 $0
Mingo St. - 3400 2 $0
Mingo St. - 3500 2 $0
Modlin St. - 3400 2 $0
Morrell Av. - 2200 2 $0
Municipal St. - 6100 2 $0
Myrtle St. - 3300 2 $0
Myrtle St. - 3600 2 $0
Myrtle St. - 3800 2 $0
Myrtle St. - 3900 2 $0
Oakdale St. - 2800 2 $0
Octavia St. - 3700 2 $0
Olson Dr. - 4800 2 $0
Park Row Av. - 2300 2 $0
Parry Av. - 3400 2 $0
Peabody Av. - 1200 2 $0
Peabody Av. - 2500 2 $0
Peabody Av. - 2600 2 $0
Peavy Rd. - 2700 2 $0
Peavy Rd. - 2800 2 $0
Friday, March 31, 2006 Page 184 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
Peavy Rd. - 2900 2 $0 Pecan Rd. - 400 2 $0
Penelope St. - 3700 2 $0
Pennsylvania Av. - 1200 2 $0
Pennsylvania Av. - 1500 2 $0
Pennsylvania Av. - 1600 2 $0
Petain Av. - 6200 2 $0
Piper La. - 9400 2 $0
Pondrom St. - 3500 2 $0
Prairie Creek Rd. (N) - 4500 2 $0
Prairie Creek Rd. (N) - 4600 2 $0
Romine Av. - 2400 2 $0
Rowan Av. - 1400 2 $0
Rowan Av. - 1600 2 $0
Rustown Dr. - 9600 2 $0
Samuell Blvd. - 6000 2 $0
Seldon Wy. - 4700 2 $0
Silver Av. - 4600 2 $0
Southland St. - 2200 2 $0
St Francis Av. - 2600 2 $0
St Francis Av. - 2700 2 $0
St Francis Av. - 2800 2 $0
Friday, March 31, 2006 Page 185 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing
St Francis Av. - 2900 2 $0 St Francis Av. - 3000 2 $0
St Francis Av. - 3100 2 $0
St Francis Av. - 3200 2 $0
Starks Av. - 2300 2 $0
Sutter St. - 1800 2 $0
Tayloe St. - 6900 2 $0
Terrell St. - 3400 2 $0
Terrell St. - 3500 2 $0
Tips Blvd. - 3000 2 $0
Todd St. - 4500 2 $0
Trunk Av. (S) - 1300 2 $0
Tuskegee St. - 3200 2 $0
Warren Av. - 1800 2 $0
Wildoak Dr. - 2400 2 $0
Woodhue Rd. - 8100 2 $0
Summary for 'Category' = Street Resurfacing (280 detail records) Sum $9,051,158 Streetscape / Urban Design
Bexar Street Corridor - Rochester S. to Cul-de-sac Rochester S. to end - ~2,000 LF 2 $582,962
Ferguson Road Urban Design Plan Ferguson from IH-30 to Buckner, and Highland from Ash Creek 2 $1,534,120 to Dorrington - gateway, sidewalk, intersection, street lighting and landscaping improvements ~20,000 LF
Friday, March 31, 2006 Page 186 of 349 Project Name Description Tier Score Estimate Council District 7 Streetscape / Urban Design
Lamar Street Urban Design Enhancements along Lamar, IH-30 to Hatcher to encourage 2 $7,531,514 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $9,648,596 Thoroughfares
Haskell - Main to East Grand Rebuild a three lane couplet 1 56 $8,054,129
Military Pkwy - Buckner to Jim Miller Widen to 6 lane divided roadway 1 55 $706,991
Haskell - Dolphin/ Hatcher to Crosstown Widen to a six lane divided roadway 1 48 $2,245,951
Bexar - Myrtle to C.F. Hawn Widen to five lane undivided roadway 1 46 $4,602,492
Bexar - Dysen to C.F. Hawn Widen to a four lane undivided roadway 1 44 $1,835,095
Clarendon (E) - Marsalis to Corinth Widen to a four lane undivided 1 37 $5,300,688
Eleventh - Corinth to M.L. King Widen to a four lane undivided roadway 1 33 $341,651
Second - Dixon to U175/ CF Hawn Widen to a four lane divided roadway 1 32 $2,706,187
Forney - Jim Miller to Lawnview Widen to a four lane undivided roadway 1 31 $3,802,503
Lamar (S) - IH 45 to Sanger Widen to a six lane divided roadway 1 31 $18,736,471
Gurley - Haskell to Fairgrounds Build a new four lane divided roadway -entrance to Fair Park 1 30 $1,183,957
Gurley - Haskell to Fairgrounds Build a new 4 lane divided roadwy - entrance to Fair Park 1 30 $1,073,884
East Grand - Haskell to Barry Widen to a four lan e undivided roadway 1 27 $1,657,539
Kiest - Bonnie View to Southerland Widen to a six lane divided roadway 1 21 $2,178,275
Lamar (S) - 500' South of Hatcher to IH 45 Widen to a six lane divided roadway 1 21 $8,961,657
Pennsylvania - Lamar to Colonial Widen to a four lane undivided roadway 1 21 $1,812,280
Chenault - Dilido to C.L. Widen to 4 lane undivided roadway 1 20 $6,757,549
Friday, March 31, 2006 Page 187 of 349 Project Name Description Tier Score Estimate Council District 7 Thoroughfares
Forney - Lawnview to Military Widen to a four lane undivided roadway 1 16 $3,419,339 La Prada - East CL to Oates Widen to a six lane divided roadway from a four lane roadway 1 0 $1,361,136
Unnamed NE 1 - Chenault to I.H. 30 Build a new 4 lane undivided roadway 1 0 $508,612
Military Pkwy - Jim Miller to Lawnview 1 $5,829,655
Military Pkwy - Forney to Dolphin/ Hatcher 1 $1,304,002
Oak Cliff Levee Road Design and Construction of Oak Cliff Levee Road to TxDOT 1 $17,301,772 standards with connections to both IH-30 and IH-35 as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan) S. M. Wright Freeway Downgrade - Grand Ave. to C.F. Design of conversion of S. M. Wright Freeway to city 1 $3,828,900 Hawn - Design Only boulevard, including demolition of bridges, retaining walls and freeway mainlanes and reconstructing 6 lanes with neighborhood park located in median and streetscaping as recommended in the Trinity Rive Summary for 'Category' = Thoroughfares (24 detail records) Sum $105,510,716 Traffic Intersection Capacity & Safety Improvement
Buckner @ East R.L. Thornton Use one of the existing Buckner southbound service road lanes 1 50 $174,853 on the bridge to make an eastbound to westbound U-turn lane. Use one of the existing Buckner northbound service road lanes on the bridge to make a westbound to eastbound U-turn lane. Martin Luther King @ R B Cullum (SH 352) Use wide median area to construct northbound and southbound 1 50 $509,244 dual left-turn lanes. This project will reduce vehicle delays for AM rush hour traffic and for high volume traffic generated by special events at Fair Park, State Fair an the Cotton Bowl. Grand Ave at RB Cullum (SH 352) Use the wide median area to construct an additional 1 45 $145,498 northbound left-turn lane. This improvement will reduce vehicle delays during the AM rush hour and after special events at Fair Park/State Fair/Cotton Bowl. Hunnicut at Military Pkwy Construct an eastbound left-turn pocket on Military Pkwy. 1 30 $227,181
Friday, March 31, 2006 Page 188 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Intersection Capacity & Safety Improvement
Forney @ Jim Miller Street Modifications and Bottl Widen Forney approaching Jim Miller to provide an eastbound 1 25 $283,339 left-turn pocket. Forney @ Lawnview Widen all approaches to provide left turn pockets. 1 25 $690,478
Kiest at Sunnyvale Widen Sunnyvale at Kiest to provide northbound and 1 25 $220,162 southboud left-turn lanes. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (7 detail records) Sum $2,250,755 Traffic Safety Improvements-Guardrail Upgrades
Second 5400 BLK Guardrail Upgrade 1 80 $51,500
Corinth St. Rd. 900-2100 S BLK Guardrail Upgrade 1 73 $36,470
M.L. King 400 BLK Guardrail Upgrade 1 73 $33,024
Military 5100 BLK Guardrail Upgrade 1 73 $4,819
Bruton 5400 BLK Guardrail Upgrade 1 67 $19,336
Corinth St. Rd. 100 S BLK Guardrail Upgrade 1 67 $5,568
Ferguson 9400 BLK Guardrail Upgrade 1 67 $11,056
Jim Miller 3400 BLK Guardrail Upgrade 1 67 $12,252
Military 4900 BLK Guardrail Upgrade 1 67 $18,925
Military 5700 BLK Guardrail Upgrade 1 67 $10,689
Samuell 3800 BLK Guardrail Upgrade 1 67 $22,112
Kiest 1900 E BLK Guardrail Upgrade 1 53 $4,658
Military 5200 BLK Guardrail Upgrade 1 53 $4,754
Bruton 5600 BLK Guardrail Upgrade 1 47 $7,849
Military 7400 BLK Guardrail Upgrade 1 47 $4,658
Friday, March 31, 2006 Page 189 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Safety Improvements-Guardrail Upgrades
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (15 detail records) Sum $247,672 Traffic Signal Upgrades - Citywide
Lagow @ Spring Traffic Signal Upgrade 1 100 $125,396
Garden @ Second Traffic Signal Upgrades Citywide 1 93 $103,316
Lawnview @ Scyene Traffic Signal Upgrades Citywide 1 87 $107,464
Kiest @ Sunnyvale Traffic Signal Upgrade 1 80 $54,211
La Prada @ Oates Traffic Signal Upgrade 1 80 $109,762
Dolphin @ Haskell(Military Pkwy) Traffic Signal Upgrade 1 67 $87,503
Forney @ Jim Miller Traffic Signal Upgrade 1 67 $54,689
IH 45 (Julius Schepps) @ Lamar Traffic Signal Upgrades Citywide 1 67 $298,016
Illinois @ Kiest Traffic Signal Upgrade 1 67 $22,916
Hatcher @ Second Traffic Signal Upgrade 1 60 $105,933
Buckner @ Peavy Traffic Signal Upgrade 1 53 $107,847
Cedar Crest @ Eleventh (Pontiac) Traffic Signal Upgrade 1 53 $30,197
Cedar Crest @ Morrell Traffic Signal Upgrade 1 53 $53,924
East Grand @ Fitzhugh Traffic Signal Upgrades Citywide 1 53 $53,732
Eighth @ RL Thornton Traffic Signal Upgrade 1 53 $81,275
Ervay @ Grand Traffic Signal Upgrade 1 53 $107,464
Everglade @ Jim Miller Traffic Signal Upgrades Citywide 1 53 $53,924
Ferguson @ Highland Traffic Signal Upgrades Citywide 1 53 $120,610
Ferguson @ Millmar Traffic Signal Upgrade 1 53 $19,413
Friday, March 31, 2006 Page 190 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Signal Upgrades - Citywide
Forest Ave @ M L King Traffic Signal Upgrade 1 53 $95,723 Grand @ Harwood Traffic Signal Upgrade 1 53 $107,464
Grand @ R B Cullum Traffic Signal Upgrade 1 53 $148,689
Gross Rd @ Peavy Rd Traffic Signal Upgrade 1 53 $107,464
Hatcher @ SM Wright Traffic Signal Upgrade 1 53 $216,333
Hatcher @ Spring Traffic Signal Upgrade 1 53 $145,115
M L King @ R. B. Cullum Traffic Signal Upgrades Citywide 1 53 $123,737
M L King @ S M Wright Traffic Signal Upgrade 1 53 $175,172
Oates @ Shiloh Traffic Signal Upgrade 1 53 $118,313
Pennsylvania @ R. B. Cullum Traffic Signal Upgrades Citywide 1 53 $189,531
Ferguson @ St. Francis Traffic Signal Upgrades Citywide 1 40 $107,464
Fitzhugh @ R B Cullum Traffic Signal Upgrade 1 40 $171,599
John West @ La Prada Traffic Signal Upgrades Citywide 1 40 $159,155
Malcolm X @ Pine Traffic Signal Upgrade 1 40 $107,464
Samuell @ Tennison Traffic Signal Upgrade 1 40 $55,274
Atlanta @ M L King Traffic Signal Upgrade 1 27 $107,464
Colonial (Ervay) @ ML King Traffic Signal Upgrade 1 27 $107,464
Holmes @ M. L. King Traffic Signal Upgrades Citywide 1 27 $107,464
M L King @ Meadow Traffic Signal Upgrade 1 27 $150,221
Malcolm X @ Pennsylvania Traffic Signal Upgrade 1 27 $107,464
Summary for 'Category' = Traffic Signal Upgrades - Citywide (39 detail records) Sum $4,306,170
Friday, March 31, 2006 Page 191 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic System Management - Flood Detour Signs
Lamar, 2400 S. under RR Dynamic Signs - Flood Detours 1 80 $32,010 Second Ave. @ Dixon Dynamic Signs - Flood Detours 1 80 $42,118
Ervay, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $6,739
Harwood, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $26,113
Hatcher, 4700 Dynamic Signs - Flood Detours 1 60 $42,118
Lawnview between Samuel and Forney Dynamic Signs - Flood Detours 1 60 $42,118
Sargent @ Southerland Dynamic Signs - Flood Detours 1 60 $42,118
Bertrand @ Junction Dynamic Signs - Flood Detours 1 40 $42,118
Bexar, 6000 St. under RR Dynamic Signs - Flood Detours 1 40 $42,118
Frost @ Oakland Channel Dynamic Signs - Flood Detours 1 40 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (10 detail records) Sum $359,687 Traffic System Management - Roadside Cameras
Buckner-Samuell Traffic Systems Management - Roadside Camera 1 25 $12,763
Hatcher-Second Roadside Camera 1 20 $12,763
Hatcher-SM Wright Roadside Camera 1 15 $12,763
IH 45-Lamar Roadside Camera 1 15 $25,526
Summary for 'Category' = Traffic System Management - Roadside Cameras (4 detail records) Sum $63,815 Summary for 'Program' = STREET AND TRANSPORTATION (536 detail records) Sum $234,695,024 Summary for 'CD' = 7 (536 detail records) Sum $234,695,024
Friday, March 31, 2006 Page 192 of 349 Project Name Description Tier Score Estimate Council District 8 Alley Reconstruction
Pecan Ridge (7340) - Conc. to Meadow Stone Full Reconstruction 1 78 $87,161 Texridge Dr & Bettyrae Way (Leigh Ann to Texridge) Full reconstruction,. T-alley is not included. 1 76 $260,365
Meadow Isle & Meadow Gate - 'T' to Bainbridge Full Reconstruction 1 75 $200,041
Mill Valley & Grove Oaks - Mill Valley to Apache Full reconstruction 1 71 $206,761
Robertson Drive (4015-4151) Mehalia - "T" Alley to Full recon Robertson Dr. (4015 - 4151) 1 66 $289,720 Crosswood Club Wood Dr. (6425 - 6621) Marvin D. Love - Club Manor Full reconstruction Club Wood Dr. (6425 - 6621) 1 60 $210,590 to Hampton Frosty Trl & Pebbleshores - Strawberry to Pebbleshores Full reconst 1 60 $217,354
Firewood Dr (4209 - 4223) Happy canyon - Roseville to Full reconst Firewood Dr. (4209 - 4223) 1 55 $63,815 Golden Gate Silverhill Drive (3409-3545) Softcloud - Moonhill to Full recon Silverhill Dr. (3409 - 3545) 1 43 $298,654 Strawberry Robertson Drive (4205-4251) Mehalia - Crosswood to Full recon Robertson Dr. (4205 - 4251) 1 31 $134,012 Goldenagate Jadewood Dr (808 - 950) Kirnwood - Woodshire to Racine Full reconst Jadewood Dr (808 - 950) 1 28 $241,221
Arborcrest Dr - 7104 - 7230 Full Reconstruction 2 $245,411
Arborcrest Dr - 7105 - 7231 Full Reconstruction 2 $324,920
Camp Wisdom Rd - 1004 - 1060 Full Reconstruction 2 $118,245
Clark College Dr - 4106 - 4260 Full Reconstruction 2 $359,578
Deerwood Dr - 810 - 944 Full Reconstruction 2 $303,768
Goldwood Dr - 706 - 786 Full Reconstruction 2 $269,875
Greenspan Av - 7812 - 7850 Full Reconstruction 2 $262,994
Greenspan Av - 7930 - 8004 Full Reconstruction 2 $112,385
Grove Oaks Blvd - 9906 - 10030 Full Reconstruction 2 $195,208
Friday, March 31, 2006 Page 193 of 349 Project Name Description Tier Score Estimate Council District 8 Alley Reconstruction
Havenwood Dr - 706 - 786 Full Reconstruction 2 $269,110 Ivywood Dr - 806 - 954 Full Reconstruction 2 $301,984
Loop 12 - 7900 - 7950 Full Reconstruction 2 $145,767
Mclarty Dr - 3710 - 3780 Full Reconstruction 2 $205,911
Summary for 'Category' = Alley Reconstruction (24 detail records) Sum $5,324,850 Barrier Free Ramps
Bonnie View Rd @ Highland Hills Dr 2 ramps needed 1 48 $3,829
6500 S. Cockrell Hill One BFR needed on the Southern Driveway of Arborstone 1 27 $1,914 Apartments Camp Wisdom Rd @ Westmoreland Rd Construct 2 ramps 1 26 $3,829
Simpson Stuart @ Bonnie View Rd. Need a BFR @ NE corner of Simpson Stuart & Bonnie View Rd 1 26 $1,914
8613 Old Hickory Tr One BFR @ Bus stop @ 8613 Old Hickory Tr 1 23 $1,914
Clearwood Dr @ Polk St (S) Construct 4 ramps 1 18 $7,658
Clearwood Dr @ Woodshire Dr Construct 2 ramps 1 18 $3,829
Treetop @ Tioga 2 BFRs needed on corners of intersection 1 13 $3,829
9805 Caravelle Ct One Curb Cut needed in front of this address 1 3 $1,914
Summary for 'Category' = Barrier Free Ramps (9 detail records) Sum $30,631 Bridge Repair and Modification
Simpson Stuart Rd. over Fivemile Creek Repair voids E approach slab, SE corner abutment cap, 1 63.75 $114,867 sidewalks, repair storm sewer & backfill trench, use grout injection/flowable fill and gabions; critical Ravenview Rd. over Hickory Creek Fill voids beneath abutments, construct grout collars around 1 45 $15,316 exposed drillshaft/column connections; mod. severe
Friday, March 31, 2006 Page 194 of 349 Project Name Description Tier Score Estimate Council District 8 Bridge Repair and Modification
Cloverhill Road over Hickory Creek Trib. Severe scour d/s end, less u/s end, potential threat to culverts - 1 42.5 $89,341 severe - 50x25 gabion mattress, flowable fill d/s, 50x10 mattress u/s Belt Line Rd. over Hickory Creek Scour, d/s riprap undermined, grout beneath, provide gabion 1 38.75 $191,445 matress, severe. Lawson Rd. over Mesquite Br. Trib. Culverts blocked with silt, channel obustructed - clear and 1 26.25 $51,052 clean, repair slight erosion Summary for 'Category' = Bridge Repair and Modification (5 detail records) Sum $462,021 Intergovernmental Partnership Projects
Bonnie View Rd - Langdon to Wintergreen Partnership project with Dallas County to design and construct 1 $21,339,736 6 lane divided roadway. Total estimated cost of $22.8 million. Estimated to be let early 2009. McCommas Bluff Rd. at Trib. to Five Mile Creek Bridge rehabilitation and/or reconstruction 2 $0
Southern Dallas RR Xings - Cleveland & Witt @ BNSF Partnership project with TxDOT to resurface crossings. Total 1 $63,815 estimated cost of $250,000. Estimated to be let by late 2007. Summary for 'Category' = Intergovernmental Partnership Projects (3 detail records) Sum $21,403,551 Street Lighting - Existing Thoroughfares
Simpson Stuart - Bonnie View to Lancaster Street Lighting 1 50 $408,416
Summary for 'Category' = Street Lighting - Existing Thoroughfares (1 detail record) Sum $408,416 Street Lighting - Freeway Lighting
IH 20 - Entire Length Across Dallas Freeway Lighting Installation 1 5 $1,049,258
IH 35 E (S. RLT) - I-20 to Ledbetter Freeway Lighting Installation 1 5 $120,013
Friday, March 31, 2006 Page 195 of 349 Project Name Description Tier Score Estimate Council District 8 Street Lighting - Freeway Lighting
Summary for 'Category' = Street Lighting - Freeway Lighting (2 detail records) Sum $1,169,271 Street Petitions
Pleasant Vista Dr - Elam to Silver Meadow (Alley) Engineering, Paving and Drainage 500-600 blks 1 98 $779,181
Woodway Dr - Fountaindale Dr to Dead-End Engineering, Paving and Drainage 1 91 $288,920
Fairport Rd - Murdock Rd to Dowdy Ferry Rd Engineering, Paving & Drainage 8100 & 8200 blks 1 89 $784,925
Bainbridge Dr - Camp Wisdom to Cliffwood Dr Engineering, Paving & Drainage - 2600-2700 blks 1 79 $894,686
Summary for 'Category' = Street Petitions (4 detail records) Sum $2,747,712 Street Reconstruction Local Streets
Olusta Dr - Murdock Rd to Oklaunion Dr 7900 - 8000 Blks 1 52.96 $844,911
Forsythe Dr - Gayglen Dr to Komatty Dr 400 Blk 1 52.17 $434,334
Phantom Hill Rd - Bitter Creek Dr to Cheyenne Rd 10800 Blk 1 50.02 $550,155
Summary for 'Category' = Street Reconstruction Local Streets (3 detail records) Sum $1,829,400 Street Reconstruction Thoroughfares
Simpson Stuart - Highland Hills Dr to Flagstaff 3800 Blk 1 69.8 $1,521,427
St Augustine Rd(S) - Old Seagoville Rd to CF Hawn 300 - 400 Blks 1 67.49 $2,250,117
Old Seagoville Rd - St Augustine Dr to September Ln 9600 - 9700 Blks 1 63.29 $1,793,202
Gannon Ln - Westmoreland Rd to Marvin D Love (Serv Rd) 3800 - 3900 Blks 1 43.95 $1,419,246
Summary for 'Category' = Street Reconstruction Thoroughfares (4 detail records) Sum $6,983,991
Friday, March 31, 2006 Page 196 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Leigh Ann Dr. - Kirnwood Dr. to Wheatland Rd. 7700 - 8100 1 72.51 $346,133 Pebble Valley Ln. - Dead End to Masters Dr. 9800 - 10100 1 72.135 $98,658
Beltline Rd. (S) - 1803 Beltline Rd. to Kleberg Rd 1800-2400 1 70.57 $374,722
St Augustine Dr. (N) - Grove Oaks Blvd. to Tamalpais Dr. 200 - 700 1 70.23 $521,751
Hidden Valley Dr. - Carioca Dr. to Dead End 1300 - 1400 1 64.68 $40,203
Forsythe Dr. - Loop 12 to Gayglen Dr. 100 - 300 1 55.97 $132,480
Bambi St. - Murdock Rd. to Dowdy Ferry Rd. 8100 - 8200 1 53.465 $144,094
Happy Hollow Ln. - Bitter Creek Dr. to Cheyenne Rd. 10800 Block 1 51.03 $42,373
Friendship Dr. - Rain Forest Dr. to Lake June Rd. 1200 Block 1 49.785 $38,544
Woodspan Dr. - Goldwood Dr. to Kirnwood Dr. 7600 - 7700 1 49.63 $114,484
Fifty-Sixth St. - Bonnie View Rd. to 2869 Fifty-Sixth St. 2900 Block 1 48.93 $44,288
Burroaks Cir. - Burroaks Dr. to Cul-de-sac 8100 Block 1 48.885 $41,990
Wild Honey Dr. - Dead End to Pebbleshores Dr. 6500 - 6600 1 43.13 $42,628
Cricket Dr. - Trego Ct. to Pleasant Woods Dr. 10300 - 10400 1 42.685 $43,649
Angus Dr. - 700 2 $0
Anise La. - 2200 2 $0
Arborcrest Dr. - 7100 2 $0
Arborcrest Dr. - 7200 2 $0
Bainbridge Dr. - 3100 2 $0
Belt Line Rd. (S) - 1300 2 $0
Belt Line Rd. (S) - 1400 2 $0
Belt Line Rd. (S) - 1600 2 $0
Friday, March 31, 2006 Page 197 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Bitter Creek Dr. - 800 2 $0 Bluewood Dr. - 400 2 $0
Bluewood Dr. - 600 2 $0
Bluewood Dr. - 700 2 $0
Bluewood Dr. - 900 2 $0
Bonnie View Rd. - 5300 2 $0
Bonnie View Rd. - 5600 2 $0
Bonnie View Rd. - 5700 2 $0
Brierfield Dr. - 7100 2 $0
Camp Wisdom Rd. (E) - 1200 2 $0
Camp Wisdom Rd. (W) - 200 2 $0
Camp Wisdom Rd. (W) - 400 2 $0
Camp Wisdom Rd. (W) - 500 2 $0
Camp Wisdom Rd. (W) - 600 2 $0
Camp Wisdom Rd. (W) - 700 2 $0
Camp Wisdom Rd. (W) - 800 2 $0
Camp Wisdom Rd. (W) - 900 2 $0
Cherry Valley Blvd. - 2500 2 $0
Cleardale Dr. - 700 2 $0
Cleardale Dr. - 800 2 $0
Cleardale Dr. - 900 2 $0
Cockrell Hill Rd. (S) - 4500 2 $0
Friday, March 31, 2006 Page 198 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Cockrell Hill Rd. (S) - 4800 2 $0 Cockrell Hill Rd. (S) - 5400 2 $0
Cockrell Hill Rd. (S) - 5900 2 $0
Cockrell Hill Rd. (S) - 6200 2 $0
Crimnson Ct. - 9400 2 $0
Crosswood La. - 6500 2 $0
Del Rey Dr. - 7000 2 $0
Dowdy Ferry Rd. - 2000 2 $0
Edgedale Dr. - 900 2 $0
Edna Av. - 4400 2 $0
Elam Rd. - 10400 2 $0
Elam Rd. - 9200 2 $0
Emberwood Dr. - 700 2 $0
Gannon La. - 4000 2 $0
Glennlyons Dr. - 4000 2 $0
Gold Rd. - 4900 2 $0
Goldwood Dr. - 400 2 $0
Goldwood Dr. - 700 2 $0
Goldwood Dr. - 800 2 $0
Greenspan Av. - 7000 2 $0
Greenspan Av. - 7500 2 $0
Hogan Dr. - 900 2 $0
Friday, March 31, 2006 Page 199 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Houston School Rd. - 6900 2 $0 Houston School Rd. - 7000 2 $0
Independence Dr. - 4100 2 $0
Independence Dr. - 4200 2 $0
Ivywood Dr. - 700 2 $0
Ivywood Dr. - 800 2 $0
Jadewood Dr. - 800 2 $0
Kinslow Dr. - 10300 2 $0
Kinslow Dr. - 10400 2 $0
Lancaster Rd. (S) - 8000 2 $0
Lancaster Rd. (S) - 8100 2 $0
Lancaster Rd. (S) - 8200 2 $0
Longridge Dr. - 300 2 $0
Longridge Dr. - 400 2 $0
Marvel Dr. - 9200 2 $0
Masters Dr. (S) - 100 2 $0
Masters Dr. (S) - 200 2 $0
Masters Dr. (S) - 300 2 $0
Morgan Dr. - 2700 2 $0
Motor City Blvd. - 2500 2 $0
Murdeaux La. (S) - 100 2 $0
Murdock-Dowdy Ferry Conn. - 8100 2 $0
Friday, March 31, 2006 Page 200 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Neuhoff Dr. - 7500 2 $0 Overridge Dr. - 7800 2 $0
Pleasant Vista Dr. - 300 2 $0
Polk St. (S) - 7200 2 $0
Polk St. (S) - 7300 2 $0
Polk St. (S) - 7500 2 $0
Polk St. (S) - 7600 2 $0
Polk St. (S) - 7800 2 $0
Polk St. (S) - 7900 2 $0
Polk St. (S) - 8000 2 $0
Polk St. (S) - 9200 2 $0
Prairie Creek Rd. (N) - 300 2 $0
Prairie Creek Rd. (S) - 200 2 $0
Quartet Dr. - 1400 2 $0
Rain Forest Dr. - 1000 2 $0
Rain Forest Dr. - 1100 2 $0
Rain Forest Dr. - 1200 2 $0
Rylie Rd. - 9800 2 $0
Schepps Pkwy. - 7400 2 $0
Schepps Pkwy. - 7600 2 $0
Simpson Stuart Rd. - 3500 2 $0
Simpson Stuart Rd. - 3600 2 $0
Friday, March 31, 2006 Page 201 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing
Simpson Stuart Rd. - 3700 2 $0 Simpson Stuart Rd. - 3900 2 $0
Simpson Stuart Rd. - 4000 2 $0
Simpson Stuart Rd. - 4100 2 $0
Simpson Stuart Rd. - 4900 2 $0
Tamalpais Dr. - 10000 2 $0
Wheatland Rd. (W) - 4000 2 $0
Woodlot Dr. - 10300 2 $0
Woodshire Dr. - 7600 2 $0
Woodshire Dr. - 7700 2 $0
Woodshire Dr. - 7800 2 $0
Woodshire Dr. - 7900 2 $0
Woodwick Dr. - 7100 2 $0
Summary for 'Category' = Street Resurfacing (123 detail records) Sum $2,025,999 Streetscape / Urban Design
Dowdy Ferry Road Urban Design, from IH20 to Midland Urban design enhancements along Dowdy Ferry Rd, from IH20 2 $7,867,113 to Midland, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan South Central (SH310) Urban Design/Streetscape, from Enhancements along SH310, from IH20 to South Loop 12 as 2 $24,545,802 IH20 to S. Loop 12 recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (2 detail records) Sum $32,412,915
Friday, March 31, 2006 Page 202 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares
Buford - Camp Wisdom to Millet Build a 4 lane undivided roadway 1 70 $4,982,730 Youngblood /Tioga Connection- JJ Lemmon to SH 310 Build a new 4 lane undivided roadway including grade crossing 1 50 $10,794,878 a UPRR JJ Lemmon - Newton Creek to IH635 Widen to a four lane undivided roadway 1 48 $4,228,418
JJ Lemmon - Robertson to Clark College Widen to a four lane undivided roadway 1 42 $5,278,870
Morgan - Plaza to Tioga Build a new four lane undivided roadway 1 39 $6,043,726
Teagarden - Dowdy Ferry to Jordan Valley Widen to a standardnfour lane undivided roadway 1 38 $22,872,089
Beckleymeade/Seahawk - Hampton to Polk Widen to 4 lane undivided roadway 1 37 $8,321,911
Cotton Valley - Danieldale to Beckleymeade Widen to 4 lane undivided roadway 1 35 $2,181,021
Kirnwood - I.H. 35E to Houston School Road Build a new 4 lane undivided roadway 1 35 $10,334,967
Pentagon - Lancaster to Haas Build a new four lane undivided roadway 1 35 $4,957,014
Pentagon - Lancaster to Bronx Build a new 4 lane undivided roadway 1 35 $2,180,829
Pentagon - Veterans to Haas Build a new 4 lane undivided roadway 1 35 $11,187,674
Woody - Seagoville to Skyfrost Build a new 4 lane undivided roadway 1 35 $17,160,635
Silverado - Kleberg to Arrowdell Build a new four lane divided roadway 1 30 $6,520,404
Clover Hill - Kleberg to Simonds Widen to 4 lane undivided roadway 1 29 $5,259,551
Lasater - Lawson to City Limit Build a new 6 lane divided roadway 1 29 $7,868,183
Kirnwood Dr - IH-20 WBSR to Wheatland Rd Widen to a four lane divided 1 26 $1,537,606
Blanco - Langdon to Telephone Build a new 4 lane undivided roadway 1 25 $5,888,363
Crouch - Old Ox to Lancaster Build a two lane undivided roadway with curbs and gutters 1 25 $4,822,789
Fireside - Murdock to St. Augustine Widen to a four lane undivided roadway 1 25 $4,627,961
Rylie - Loop 12 (at Lake June) to Prairie Creek Build a new 6 lane divided roadway 1 25 $41,164,101
Telephone - Blanco to Bonnie View Widen to a six lane divided roadway 1 25 $4,121,743
Friday, March 31, 2006 Page 203 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares
Telephone - Bonnie View to Lancaster Widen to a six lane divided roadway 1 25 $12,254,126 Bonnie View - Lancaster City Limitsat Wintergreen to Build a 6 lane divided thoroughfare. 1 24 $24,530,589 Langdon Golden Gate - JJ Lemmon to Simpson Stuart Widen to a four lane undivided roadway 1 23 $3,254,902
Rylie Crest - C.F. Hawn to Dallas City Limit Widen to a four lane undivided roadway 1 23 $3,269,701
Rylie Crest - U.S. 175 to Balch Springs C.L. Build a new 4 lane undivided roadway 1 23 $10,655,612
Simpson Stuart - S. Central to Locust Thoroughfare Widen to a six lane divided roadway 1 23 $2,557,347
Acres - Rylie Crest to Elam Build 6-lane roadway to replace existing asphalt roadway 1 20 $8,201,069
Bainbridge - Kirnwood to Camp Wisdom widen from 46-53'pave./68-80' ROW to 33/var/33' pave./120' 1 20 $9,066,507 ROW Edd - Kleburg to U.S. 175 Widen to a four lane undivided roadway 1 20 $6,127,662
Old Ox - Crouch to Camp Wisdom Build a new 4 lane undivided roadway 1 20 $2,537,050
Red Bird (W) - Westmoreland to U.S. 67 Widen to a six lane divided roadway 1 19 $3,537,341
Red Bird (W) - Duncanville C.L. to Westmoreland Widen to a six lane divided roadway 1 17 $2,956,988
St. Augustine - IH20 to Teagarden Widen to a four lane undivided roadway 1 16 $2,747,454
Beckett - S. Belt Line to C.L. Widen to 4 lane undivided roadway 1 15 $8,456,835
Blanco - Telephone to C.L. Widen to 4 lane undivided roadway 1 15 $9,024,384
Cleveland Rd. - Hutchins C.L. to Bonnie View Build a new four lane roadway. 1 15 $25,904,300
Log Cabin - S. Belt Line to C.L. Build a new 4 lane undivided roadway 1 15 $8,462,240
Unnamed SE2 - Rylie to I.H. 635 Build a new 4 lane undivided roadway 1 15 $6,210,630
Unnamed SE3 - Hutchins C.L. to Witt Build a new 4 lane undivided roadway 1 15 $15,669,604
Westmoreland - Desoto C.L. at Kirnwood to Wheatland Build a new 4 lane divided roadway 1 15 $2,704,228
Witt - City Limit to Blanco Build a new four lane undivided roadway 1 15 $6,010,642
Woody - Kleberg to 175 Widen to a four lane undivided roadway 1 15 $3,366,425
Friday, March 31, 2006 Page 204 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares
Danieldale - Hampton Road to Old Hickory WIden to a six lane divided roadway 1 14 $5,612,599 Danieldale - IH 35E to Hampton Road Widen to a six lane divided roadway 1 14 $22,666,264
Garden Grove - Rylie Crest to Edd Widen to a four lane undivided roadway 1 13 $6,919,229
Wheatland - Lancaster to Lancaster CL Widen to a four lane undivided roadway 1 13 $5,295,618
Kirnwood - Hampton to Bainbridge Widen to a four lane undivided 1 12 $2,448,430
Lasater - Balch Springs City Limit to Seagaville C Widen to a six lane divided roadway 1 12 $7,416,364
Wheatland - IH 35 to Houston School Widen to a six lane divided roadway 1 12 $7,219,523
Beauford - US 175 to Garden Grove Widen to 6 lane roadway 1 10 $6,523,717
Cedardale - C.L. to Bonnie View Widen to 4 lane undivided roadway 1 10 $10,056,635
Edd - Gardengrove to Seagoville Widen to a four lane undivided roadway 1 10 $2,485,647
Haas - Ledbetter to Stag Widen to a four lane undivided roadway 1 10 $700,890
Langdon - Cedardale to JJ Lommon Widen to a four lane undivided roadway 1 10 $14,580,843
Skyfrost - S. Belt Line to Stark Widen to a four lane undivided roadway 1 9 $6,023,456
SH 310/ SM Wright - Simpson Stuart to I.H. 20 Widen to a six lane divided roadway 1 8 $13,869,210
TIOGA - Morgan to Cinnamon Oaks Build a new four lane undivided roadway 1 7 $541,655
S. Belt Line (S) - Kleburg to City Limit Widen to a six lane divided roadway 1 5 $8,841,627
Old Hickory Tr. - Stoneview to Danieldale Widen to a four lane undivided roadway from a two lane 1 4 $5,201,727 undivided Haymarket - Teagarden to St. Augustine Widen to a four lane undivided roadway 1 3 $6,926,127
Jordan Valley - C.F. Hawn Freeway to Middlefield Widen to a four lane undivided roadway 1 3 $11,944,089
Middlefield - City Limits to Jordan Valley Widen to a four lane undivided roadway 1 3 $5,512,775
Rylie Crest - Shephers to Seagoville Widen to a four lane undivided roadway 1 3 $5,171,948
Edd - Foothill to Kleberg Widen to a four lane undivided roadway 1 0 $3,481,372
Friday, March 31, 2006 Page 205 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares
Kleberg - S. Belt Line to Cloverhill Widen to a four lane undivided roadway 1 0 $8,771,221 La Palma - Skyfrost to Seagoville CL Widen to a four lane undivided roadway 1 0 $1,048,368
Ravenview - Garden Grove to Balch Spring CL Widen to a six lane divided roadway 1 0 $15,652,134
Shepherd - Balch Springs CL to Beauford Build a new four lane divided roadway 1 0 $5,390,591
Unnamed SE4 - I-635E to Telephone Build a new 4 lane undivided roadway 1 0 $12,830,321
Ravenview - US 75 to Belt Line Widen to a six lane divided roadway 1 $15,652,134
S. Belt Line - Balch Springs CL to Dallas County L Widen to six lane divided roadway 1 $12,116,060
S. Belt Line - S. Belt Line Ext. to S. Belt Lin Widen to six lane divided roadway 1 $10,404,438
Summary for 'Category' = Thoroughfares (74 detail records) Sum $611,146,108 Traffic Intersection Capacity & Safety Improvement
Buckner @ CF Hawn Frwy Street Modifications and Bo Widen Buckner approaching CF Hawn to provide three through 1 55 $282,062 lanes for northbound and southbound approaches. Camp Wisdom @ Westmoreland Street Modifications an Widen Camp Wisdom and Westmoreland approaches to 1 50 $1,474,127 provide dual left-turn lanes and right-turn lanes on all approaches. Ledbetter @ Westmoreland Street Modifications and Widen both Ledbetter and Westmoreland approaches to 1 50 $809,812 construct dual left-turn lanes and right-turn lanes on all approaches. Construction will also remove dip in roadway. Ledbetter @ Veterans Street Modifications and Bott Widen Veterans approaching Ledbetter ro provide northbound 1 35 $256,536 and southbound left-turn pockets. Camp Wisdom at Polk Increase curb radius on all four corners. Reduce damage 1 30 $98,275 caused by turning truck traffic. Simpson Stuart Rd at SM Wright Frwy Widen all approaches to provide left-turn pockets. 1 30 $500,310
SM Wright Frwy at Youngblood Rd Widen SM Wright to provide a southbound left-turn lane and 1 30 $182,511 northbound right turn lane into the McCommas Land Fill. Trucks currently stop in a queue on the through travel lanes while they wait to enter the McCommans Landfill.
Friday, March 31, 2006 Page 206 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Intersection Capacity & Safety Improvement
Belt Line @ CF Hawn Frwy Construct a right turn lane on the CF Hawn Frwy Eastbound 1 20 $220,800 Service Road approaching Beltline Road. Dowdy Ferry at Teagarden Widen Dowdy Ferry approaching Teagarden to provide a 1 20 $299,931 southbound left-turn pocket. Highland Hills Dr @ Simpson Stuart Rd Widen Highland Hills approaching Simpson Stuart to provide 1 15 $513,073 northbound and southbound left-turn pockets. Implement more accessible pedestrian crossings. Lasater @ Lawson Widen the eastbound approach and construct a raised median. 2 $307,844
Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (11 detail records) Sum $4,945,280 Traffic Safety Improvements-Guardrail Upgrades
Dowdy Ferry 2200 BLK Guardrail Upgrade 1 80 $5,457
Dowdy Ferry 2300 BLK Guardrail Upgrade 1 80 $20,804
Harry Hines 6900 BLK Guardrail Upgrade 1 80 $6,573
Belt Line 2600 S BLK Guardrail Upgrade 1 73 $40,331
Belt Line 2700 S BLK Guardrail Upgrade 1 73 $19,783
Belt Line 2800 S BLK Guardrail Upgrade 1 73 $23,165
Belt Line 3000 S BLK Guardrail Upgrade 1 73 $122,684
Belt Line 3400 S BLK Guardrail Upgrade 1 73 $22,718
Red Bird 4200 W BLK Guardrail Upgrade 1 73 $30,897
Wheatland 400 W BLK Guardrail Upgrade 1 73 $24,345
Belt Line 600 S BLK Guardrail Upgrade 1 67 $7,086
Bonnie View 5100 BLK Guardrail Upgrade 1 67 $3,925
Bonnie View 5700 BLK Guardrail Upgrade 1 67 $4,658
Camp Wisdom 1800 E BLK Guardrail Upgrade 1 67 $43,141
Friday, March 31, 2006 Page 207 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Safety Improvements-Guardrail Upgrades
Camp Wisdom 200 W BLK Guardrail Upgrade 1 67 $1,962 Lawson 500 BLK Guardrail Upgrade 1 67 $5,839
Seagoville 15000 BLK Guardrail Upgrade 1 67 $5,935
Simpson Stuart 4700 BLK Guardrail Upgrade 1 67 $5,935
Westmoreland 5100 S BLK Guardrail Upgrade 1 67 $9,317
Westmoreland 5700 S BLK Guardrail Upgrade 1 67 $13,720
Westmoreland 6300 S BLK Guardrail Upgrade 1 67 $18,123
Belt Line 300 S BLK Guardrail Upgrade 1 60 $6,126
Belt Line 500 S BLK Guardrail Upgrade 1 60 $4,658
Bonnie View 6200 BLK Guardrail Upgrade 1 60 $4,658
Camp Wisdom 1100 E BLK Guardrail Upgrade 1 60 $9,684
Camp Wisdom 1700 E BLK Guardrail Upgrade 1 60 $5,392
Camp Wisdom 1900 E BLK Guardrail Upgrade 1 60 $76,833
Camp Wisdom 700 E BLK Guardrail Upgrade 1 60 $5,392
Dowdy Ferry 2100 BLK Guardrail Upgrade 1 60 $5,392
Masters 400 N BLK Guardrail Upgrade 1 60 $3,543
Masters 500 N BLK Guardrail Upgrade 1 60 $10,051
Masters 500 S BLK Guardrail Upgrade 1 60 $5,392
Red Bird 3100-3200 W BLK Guardrail Upgrade 1 60 $12,252
Red Bird 3300 W BLK Guardrail Upgrade 1 60 $12,252
Red Bird 3600 W BLK Guardrail Upgrade 1 60 $12,252
Red Bird 3800 W BLK Guardrail Upgrade 1 60 $7,594
Friday, March 31, 2006 Page 208 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Safety Improvements-Guardrail Upgrades
Simpson Stuart 4300 BLK Guardrail Upgrade 1 60 $7,578 St. Augustine 1200 S BLK Guardrail Upgrade 1 60 $12,444
St. Augustine 300 S BLK Guardrail Upgrade 1 60 $5,839
St. Augustine 900 S BLK Guardrail Upgrade 1 60 $3,286
Westmoreland 7300 S BLK Guardrail Upgrade 1 60 $20,615
Bonnie View 6600 BLK Guardrail Upgrade 1 53 $6,126
Lawson 100 BLK Guardrail Upgrade 1 53 $15,188
Prairie Creek 200 N BLK Guardrail Upgrade 1 33 $1,962
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (44 detail records) Sum $690,914 Traffic Signal Upgrades - Citywide
Simpson Stuart @ S M Wright Traffic Signal Upgrade 1 100 $27,249
Bonnie View @ Corrigan (Stag) Traffic Signal Upgrade 1 87 $107,464
Cherry Valley @ Lancaster Traffic Signal Upgrade 1 87 $107,464
Cockrell Hill @ Redbird Traffic Signal Upgrades Citywide 1 87 $52,966
Camp Wisdom @ Hampton Traffic Signal Upgrade 1 80 $41,161
Camp Wisdom @ Polk Traffic Signal Upgrade 1 80 $40,612
Hampton @ Redbird Traffic Signal Upgrade 1 80 $54,881
Ledbetter @ Veterans Traffic Signal Upgrade 1 80 $93,170
Polk @ Wheatland Traffic Signal Upgrade 1 80 $54,881
Ledbetter @ Westmoreland Traffic Signal Upgrade 1 73 $54,881
Camp Wisdom @ Lancaster (Simp Stuart) Traffic Signal Upgrade 1 67 $82,321
Friday, March 31, 2006 Page 209 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Signal Upgrades - Citywide
Cockrell Hill @ IH20 Traffic Signal Upgrade 1 67 $221,757 Camp Wisdom @ Greenspan Traffic Signal Upgrade 1 53 $54,689
Camp Wisdom @ Pastor Bailey Traffic Signal Upgrade 1 53 $53,924
Gannon @ Westmoreland Traffic Signal Upgrades Citywide 1 53 $107,847
Westmoreland @ Wheatland Traffic Signal Upgrade 1 53 $133,629
Bonnie View @ Simpson Stuart Traffic Signal Upgrade 1 40 $105,933
Old Seagoville @ St Augustine Traffic Signal Upgrade 1 27 $116,399
Redbird @ Westmoreland Traffic Signal Upgrade 1 20 $105,933
Elam at Prairie Creek Traffic Signal Upgrades Citywide 1 13 $52,966
Summary for 'Category' = Traffic Signal Upgrades - Citywide (20 detail records) Sum $1,670,128 Traffic System Management - Dynamic Message Signs
Ledbetter 2800 E Dynamic Message Sign 1 15 $76,578
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (1 detail record) Sum $76,578 Traffic System Management - Flood Detour Signs
Simpson Stuart @ Five Mile Creek Dynamic Signs - Flood Detours 1 80 $42,118
Dowdy Ferry @ Middlefield Dynamic Signs - Flood Detours 1 60 $42,118
Simpson Stuart @ I-45 Dynamic Signs - Flood Detours 1 60 $42,118
St. Augustine @ Lake June Dynamic Signs - Flood Detours 1 60 $14,320
Ravenview, 11900 Dynamic Signs - Flood Detours 1 40 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $182,792
Friday, March 31, 2006 Page 210 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic System Management - Roadside Cameras
Camp Wisdom-RLT Traffic Systems Management - Roadside Camera 1 20 $6,382 Hampton-IH20 Roadside Camera 1 20 $12,763
Hampton-Ledbetter Roadside Camera 1 20 $4,212
Lancaster-Ledbetter Roadside Camera 1 20 $6,382
Buckner-CF Hawn Frwy Roadside Camera 1 15 $12,763
Lancaster-LBJ Roadside Camera 1 15 $12,763
Ledbetter-Westmoreland Roadside Camera 1 15 $6,382
Bonnieview-IH20 Traffic Systems Management - Roadside Camera. Cameras 1 10 $12,763 allow traffic engineers and emergency operations staff to remotely view traffic conditions from the City Hall Traffic Management Center "TMC". Summary for 'Category' = Traffic System Management - Roadside Cameras (8 detail records) Sum $74,408 Summary for 'Program' = STREET AND TRANSPORTATION (343 detail records) Sum $693,584,963 Summary for 'CD' = 8 (343 detail records) Sum $693,584,963
Friday, March 31, 2006 Page 211 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Ferguson & Cassandra (Maylee to Ferguson) Full reconstruction 1 85 $191,445 Milhof(11000)&Delford CIR-Barnes bridge to Plummer Full Reconstruction 1 85 $307,844
Cotillion & Mayhew - Shiloh to Maylee Full Reconstruction 1 77 $385,792
Mayhew(3538) & Delford Cir - 'T' to Cotillion Full Reconstruction 1 77 $98,096
San Lorenzo and San Juan - Inc. T-alley Full Reconstruction 1 76 $200,830
Freemont & Whitehill - Berryhill to 'T'(inclusive) Full Reconstruction 1 75 $242,429
Tascosa St & Ulloa St - Ruidosa to "T" Alley Full reconstruction, include T-alley - 11106 Tascosa St. 1 75 $334,952
Maylee & Libby - Ruth Ann to Gus Thomasson Full Reconstruction 1 69.9 $182,658
Delford(3519) & Barnes Bridge-Ferguson to Dunaway Full Reconstruction 1 67 $222,420
Annapolis & University - Ridgelawn To Berwyn Ln. Full Reconstruction 1 66 $329,830
Lakeshore Drive (6400-6532) Goliad Circle - Abrams to Full reconst Lakeshore Dr (6400 - 6532) 1 66 $160,814 Cambria Vada & Blessing - Blessing to Patrick Full Reconstruction 1 66 $387,700
Lingo La (10104) - Hartline Dr to Highwood Dr Full Reconstruction 1 65 $96,901
Whitehill & Town North - Larmanda to 'T' alley b/ Full Reconstruction 1 65 $265,288
Kingsbury Drive 1 63 $271,852
Newcombe Dr (10105 - 10147) San Juan - Blake Cir. to Full recon Newcombe Dr. (10105 - 10147) 1 63 $135,288 Crest Ridge San Benito &Santa Clara - White Rock to Breezewood Full Reconstruction (8207 San Benito) 1 63 $216,709
San Paula & San Medina-Materhorn to Santa Garza Full reconstruction 1 63 $216,971
Sharondale Lane (10805-10875) Ruth Ann - Maylee to "T" Full recon Sharondale Ln. (10805 - 10875) 1 63 $233,563 Alley Bennington & Rutgers - Trammell to Middlebury Full Reconstruction 1 62 $203,871
Cassandra Way (10808 - 10880) Dunway - Maylee to "T" Full Reconstruction Cassandra Way (10808 - 10880) 1 60 $204,004 Alley
Friday, March 31, 2006 Page 212 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Ulloa Lane (11002-11308) Visalia - Ruidosa to "T" Alley Full recon Ulloa Ln. (11002 - 11308) 1 60 $279,510 Highwood(2908)&Materhorn -Crest Ridge to Materhorn Full Reconstruction 1 50 $140,832
Ruth Ann and Mayhew - Maylee to T-alley Full Reconstruction 1 50 $217,688
Clemson & Havenford - Bucknell to Trammel Full Reconstruction, 7106 Clemson 1 47 $220,434
Mandalay & Sharondale - Maylee to T-alley Full Reconstruction 1 41 $304,034
Cassandra Way (10805 - 10879) Ferguson - Maylee to Full reconstruction Cassandra Way (10805 - 10879) 1 40 $194,355 Plummer Ellsworth Av (6402 - 6464) Kenwood - Abrams to Cambria Full reconst Ellsworth Ave. (6402 - 6464) 1 40 $197,827
Forest Hills Blvd (9103 - 9131) San Fernando - Old Gate Full reconst Forest Hills Blvd. (9103 - 9131) 1 40 $100,828 to Redwood Highwood Dr (2506 - 2648) Materhorn - Casa Oaks to Full reconst Highwood Dr. (2506 - 2648) 1 40 $270,576 Shiloh Kilarney Drive (10017-10225) Lake Gardens - Peavy to Full Reconst Kilarney Dr. (10017 -10225) 1 40 $316,650 Whitehaven San Marcus Avenue (3105-3235) San Lucas - Materhorn Full recon San Marcus Ave. (3105 - 3235) 1 40 $218,247 to Santa Garza Patrick & MKT R/R - Abrams To Blessing Full Reconstruction 1 31 $716,099
Avalon & Lakewood - Avalon to Pearson Full Reconstruction 1 29 $261,210
Aledo Dr - 10402 - 10532 Full Reconstruction 2 $284,146
Aledo Dr - 10403 - 10551 Full Reconstruction 2 $294,594
Aledo Dr - 10663 - 10675 Full Reconstruction 2 $250,507
Andrea & Millmar - LaPrada to Shiloh Full Reconstruction - Andrea Lane 2702 - 2944 1 $346,582
Andrea La - 2703 - 2945 Full Reconstruction 2 $346,327
Andrea La - 3004 - 3206 Full Reconstruction 2 $226,297
Aqua Dr - 403 - 423 Full Reconstruction 2 $281,852
Friday, March 31, 2006 Page 213 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Aqua Dr - 552 - 626 Full Reconstruction 2 $203,871 Ascot La - 6704 - 6712 Full Reconstruction 2 $197,501
Avalon Av - 6703 - 6759 Full Reconstruction 2 $192,659
Axton Ln - 6507 - 6565 Full Reconstruction 2 $222,220
Ballycastle Dr - 2305 - 2373 Full Reconstruction 2 $237,255
Barbarosa Dr - 10813 Full Reconstruction 2 $334,350
Barbarosa Dr - 10814 - 11038 Full Reconstruction 2 $290,517
Barnes Av - 11409 - 11454 Full Reconstruction 2 $225,023
Baronne Cir - 10135 - 10465 Full Reconstruction 2 $305,553
Benbrook Dr - 10614 - 10738 Full Reconstruction 2 $298,672
Benbrook Dr - 10804 - 10848 Full Reconstruction 2 $175,840
Benbrook Dr - 10805 - 10849 Full Reconstruction 2 $159,275
Bennington Dr - 7106 - 7158 Full Reconstruction 2 $144,238
Bennington Dr & Haverford - Trammel to Middlebury Full Reconstruction Bennington Dr (7205 - 7335) 1 $224,629
Berkinshire Dr - 811 - 821 Full Reconstruction 2 $299,946
Berryhill St (6207 - 6245) Winchester - Freemont to "T" Full Reconstruction Berryhill St (6207 - 6245) 1 $157,236 Alley Blake Av - 2104 - 2114 Full Reconstruction 2 $165,900
Blanning and Hambrick - Northlake to Waterview Full Reconstruction 2 $224,629
Blanning Dr - 507 - 563 Full Reconstruction 2 $208,969
Bondstone Dr - 407 - 451 Full Reconstruction 2 $183,994
Bondstone Dr - 507 - 575 Full Reconstruction 2 $239,040
Broadmoor Dr - 11705 - 11855 Full Reconstruction 2 $336,897
Friday, March 31, 2006 Page 214 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Brookcove La - 7121 - 7251 Full Reconstruction 2 $333,585 Brookhurst Dr - 552 - 626 Full Reconstruction 2 $207,949
Bucknell Dr - 6907 - 7151 Full Reconstruction 2 $586,386
Casa Oaks Dr - 10029 - 10045 Full Reconstruction 2 $259,936
Casa Vale Dr - 1407 - 1445 Full Reconstruction 2 $150,356
Casa View Av - 10123 - 10187 Full Reconstruction 2 $296,888
Castalon Dr - 10814 ------Full Reconstruction 2 $247,958
Centerville Rd - 1605 - 1819 Full Reconstruction 2 $251,016
Centerville Rd - 1903 - 2037 Full Reconstruction 2 $302,239
Centerville Rd - 2812 - 2820 Full Reconstruction 2 $133,281
Classen Dr - 407 - 543 Full Reconstruction 2 $190,619
Cotillion Dr - 10709 - 10755 Full Reconstruction 2 $160,804
Cotillion Dr - 10803 - 10855 Full Reconstruction 2 $189,090
Cotillion Dr - 10935 ------Full Reconstruction 2 $234,452
Creekmere Cir - 10134 - 10148 Full Reconstruction 2 $200,813
Crest Ridge & La Prada - Santa Garza to Motley Full Reconstruction, 3322 Crest Ridge Dr. 2 $194,908
Crest Ridge Dr - 2314 - 2350 Full Reconstruction 2 $156,981
Crest Ridge Dr - 2319 - 2349 Full Reconstruction 2 $151,374
Crest Ridge Dr - 2516 - 2648 Full Reconstruction 2 $294,850
Crest Ridge Dr - 2704 - 2812 Full Reconstruction 2 $155,197
Crest Ridge Dr - 2705 - 2821 Full Reconstruction 2 $210,242
Crest Ridge Dr - 3305 - 3351 Full Reconstruction 2 $177,369
Friday, March 31, 2006 Page 215 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Dalehurst Dr - 10515 - 10527 Full Reconstruction 2 $365,950 Dawn Dr - 10502 - 10566 Full Reconstruction 2 $276,500
Desdemona Dr - 11536 - 11544 Full Reconstruction 2 $279,304
Dorchester Dr - 11520 - 11626 Full Reconstruction 2 $204,382
Dumbarton & Glen Cross - Glen Cross to Cotillion Full Reconstruction 2 $236,116
Dunaway (10922) & Park Oak Cir. - Plummer to 'T' Full Reconstruction 2 $142,338
Dunloe Dr - 2302 - 2380 Full Reconstruction 2 $299,946
Eastwood Dr - 10111 - 10231 Full Reconstruction 2 $303,004
Eastwood Dr - 10116 - 10230 Full Reconstruction 2 $288,223
Edgerton Dr - 7108 - 7344 Full Reconstruction 2 $470,179
Encino Dr - 2810 - 2836 Full Reconstruction 2 $106,523
Encino Dr - 2811 - 2837 Full Reconstruction 2 $101,171
Fenwick Dr - 2106 - 2250 Full Reconstruction 2 $277,265
Flamingo La - 11610 - 11830 Full Reconstruction 2 $393,981
Forest Hills Blvd - 8310 - 8378 Full Reconstruction 2 $262,739
Forest Hills Blvd - 8606 - 8838 Full Reconstruction 2 $327,978
Forestgrove Dr - 1005 - 1049 Full Reconstruction 2 $266,308
Freemont St - 7006 - 7066 Full Reconstruction 2 $209,733
Freemont(6945) & Wakefield - "T" Alley to Larmanda Full reconstruction 2 $215,950
Fuller Dr - 1217 - 1319 Full Reconstruction 2 $218,907
Garland Rd - 8310 - 8372 Full Reconstruction 2 $263,250
Garland Rd - 8510 - 8566 Full Reconstruction 2 $225,788
Friday, March 31, 2006 Page 216 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Glengariff Dr - 2305 - 2367 Full Reconstruction 2 $236,491 Greenbrook & Hillgreen - Brookcove To Twin Tree Full Reconstruction 2 $426,280
Harter Rd - 637 - 673 Full Reconstruction 2 $155,707
Highwood Dr - 2404 - 2480 Full Reconstruction 2 $314,727
Highwood Dr - 2704 - 2818 Full Reconstruction 2 $203,362
Housley Dr (2306 - 2828) Tolosa - Joaquin to Shiloh Full Reconstruction Housley Dr. (2306 - 2828) 1 $533,123
Irongate La - 7012 - 7056 Full Reconstruction 2 $451,066
Kingsbury Dr - 6508 - 6524 Full Reconstruction 2 $76,961
Kirkwood Dr - 505 - 559 Full Reconstruction 2 $205,400
Lakeshore Dr - 6700 - 6816 Full Reconstruction 2 $292,046
Lakeshore Dr - 6902 - 6960 Full Reconstruction 2 $280,323
Lakeshore Dr - 7000 - 7038 Full Reconstruction 2 $166,920
Lakeshore Dr - 7001 - 7039 Full Reconstruction 2 $164,626
Lakeshore Dr - 7103 - 7131 Full Reconstruction 2 $129,204
Losa Dr - 10002 - 10024 Full Reconstruction 2 $99,387
Mandalay & Swaffar - Barnes Bridge Rd to Swaffar Full Reconstruction 2 $303,019
Marlin Dr - 9905 - 9921 Full Reconstruction 2 $216,869
Meadow Lake Av - 7002 - 7048 Full Reconstruction 2 $274,971
Myrtice Dr - 11005 - 11307 Full Reconstruction 2 $285,929
Northwest Hwy (E) - 10120 ------Full Reconstruction 2 $275,736
Parader & Drummond- Barnes Bridge to Cotillion Full Reconstruction, 3625 Parader Ct. 2 $398,583
Plummer Dr - 10405 - 10465 Full Reconstruction 2 $234,962
Friday, March 31, 2006 Page 217 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction
Plummer(10119) & Sandra Lynn-Mandalay to Strayhorn Full Reconstruction 2 $215,574 Ravendale La - 6719 - 6729 Full Reconstruction 2 $240,059
San Benito Wy - 8107 - 8185 Full Reconstruction 2 $293,065
San Benito Wy - 8311 - 8379 Full Reconstruction 2 $262,739
San Juan Av - 10105 - 10187 Full Reconstruction 2 $204,382
San Lucas Av - 2906 - 3014 Full Reconstruction 2 $99,133
San Lucas Av (2903 - 3015) San Paula - Shioh to Santa Full Reconstruction San Lucas Ave. (2903 - 3015) 1 $241,333 Garza San Marcus & San Paula - Casa Oaks to Shiloh Full Reconstruction 2 $298,654
San Marcus Av - 2331 - 2373 Full Reconstruction 2 $157,236
San Marcus Av - 2405 - 2455 Full Reconstruction 2 $171,507
San Marcus Av - 3104 - 3234 Full Reconstruction 2 $243,627
San Marcus Av - 3304 - 3350 Full Reconstruction 2 $177,369
Springwater & Sherwood Glen -Springwater to Mercer Full Reconstruction 2 $393,413
Swaffar(11000) Strayhorn -Barnes Bridge to Swaffar Full Reconstruction 2 $328,009
Wakefield and Freemont Full Reconstruction 2 $197,744
Winchester & Wakefield - Wakefield to Larmanda Full Reconstruction 2 $186,340
Yorksprings & Carissa - Valley Spring to T-alley Full Reconstruction 2 $313,970
Summary for 'Category' = Alley Reconstruction (146 detail records) Sum $35,957,732 Barrier Free Ramps
Garland Rd. (Knobb Oaks to Buckner) 1- Construct 5 BFRs at Bus Stops 2- connect BFRs to Bus 1 56 $13,401 Stops with Sidewalk Ferguson Rd @ Woodmeadow Pwy Construct 4 ramps 1 30 $7,658
Friday, March 31, 2006 Page 218 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps
Aqua @ Northlake 4 BFRs on intersection 1 26 $7,658 Aqua @ Waterview 2 BFRs & 2 Curb Cuts on school side 1 26 $7,658
Garland Rd @ Alvin St Construct 3 ramps 1 25 $5,743
Garland Rd @ Fuller Dr Construct 3 ramps 1 25 $5,743
Garland Rd @ Lochmond Cir Construct 2 ramps 1 25 $3,829
Ferguson Rd @ Peavy Rd Construct 4 ramps 1 21 $6,815
Ferguson Rd @ Skyview Dr Construct 4 ramps 1 21 $3,829
Gus Thomasson Rd @ Aledo Dr Construct 4 ramps 1 21 $7,658
Ferguson Rd @ Crest Ridge Dr Construct 4 ramps 1 16 $7,658
Ferguson Rd @ Healy Dr Construct 4 ramps 1 16 $4,671
Ferguson Rd @ Highwood Dr Construct 4 ramps 1 16 $7,658
Ferguson Rd @ Province Ln Construct 4 ramps 1 16 $7,658
Ferguson Rd @ San Paula Ave Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Casa View Ave Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Desdemona Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Fern Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Hermosa Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Losa Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Newcombe Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ San Felipe Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Woodale Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ Zacha Dr Construct 4 ramps 1 16 $7,658
Friday, March 31, 2006 Page 219 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps
Peavy Rd @ Millmar Cir Construct 4 ramps 1 16 $7,658 Peavy Rd @ Millmar Dr Construct 4 ramps 1 16 $7,658
Gus Thomasson Rd @ San Medina Ave Construct 4 ramps 1 14 $7,658
Lippitt Ave @ Lockwood Blvd Construct 4 ramps 1 14 $7,658
Peavy Rd @ Cayuga Dr Construct 4 ramps 1 14 $7,658
Peavy Rd @ Redondo Dr- Naylor St Construct 4 ramps 1 14 $7,658
Ferguson Rd @ Larry Dr Construct 4 ramps 1 11 $4,212
Ferguson Rd @ San Medina Ave Construct 4 ramps 1 11 $7,658
Ferguson Rd @ Viewcrest Dr Construct 2 ramps 1 11 $3,829
Gus Thomasson Rd @ Dawn Dr Construct 4 ramps 1 11 $7,658
Gus Thomasson Rd @ Sylvia Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Cloister Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Estacado Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Hermosa Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Kiltartan Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Losa Dr Construct 2 ramps 1 11 $3,829
Peavy Rd @ Mercer Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Oates Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Olmos Dr Construct 4 ramps 1 11 $7,658
Peavy Rd @ Peavy Pl Construct 4 ramps 1 11 $7,658
Peavy Rd @ Province Ln Construct 4 ramps 1 11 $7,658
Peavy Rd @ Crowberry Dr Construct 4 ramps 1 9 $7,658
Friday, March 31, 2006 Page 220 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps
Lovers Ln @ Ridgelawn Dr Construct 4 ramps 1 7 $7,658 Peavy Rd @ Coldwater Cir Construct 4 ramps 1 7 $7,658
Peavy Rd @ Peavy Cir Construct 4 ramps 1 7 $7,658
Ferguson Rd @ Hartline Dr Construct 4 ramps 1 6 $7,658
Ferguson Rd @ San Marcus Ave Construct 4 ramps 1 6 $7,658
Gus Thomasson Rd @ Cayugo Dr Construct 4 ramps 1 6 $7,658
Gus Thomasson Rd @ Esta Buena Dr Construct 4 ramps 1 6 $7,658
Gus Thomasson Rd @ Kilkenny Pl Construct 4 ramps 1 6 $7,658
Gus Thomasson Rd @ Lavano Ln Construct 4 ramps 1 6 $7,658
Peavy Rd @ San Lorenzo Ave Construct 4 ramps 1 4 $7,658
Peavy Rd @ Tamarack Dr Construct 4 ramps 1 4 $7,658
Summary for 'Category' = Barrier Free Ramps (57 detail records) Sum $415,819 Bridge Repair and Modification
Lawther (West) over White Rock Creek Cofferdam each side for work space, concrete collars around 1 55 $95,723 piers, grout inject beneath abutment beams Williamson Rd. over McCommas Br. Center of 3 bridges on Williamson on erosion needs - scour 1 50 $114,867 severe, abutments undermined - gabions, critical - also on erosion needs - this is the most critical and should be repaired if others are not selected Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $210,590 I.T.S. - Speed & Travel Time System
Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $66,049
Friday, March 31, 2006 Page 221 of 349 Project Name Description Tier Score Estimate Council District 9 I.T.S. - Speed & Travel Time System
Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $66,049 Intergovernmental Partnership Projects
Lakeland Dr @ Ash Creek Bridge rehabilitation and/or reconstruction. 2 49.04 $0
East Dallas RR Xings - 8 Xings along the KCS Partnership project with TxDOT to upgrade gates, install 1 $469,678 medians, and signs. Total estimated cost of $2.3 million. Estimated to be let by early 2008. Jupiter Rd - Garland Rd to Centerville Partnership project with TxDOT to reconstruct and widen to 3 1 $255,260 lane roadway. Total estimated cost of $2.6 million. Estimated to be let by TxDOT early 2007. Supplements 1995 and 1998 Bond Program funds. La Prada - Oates to Motley Partnership project with Dallas County to design and 1 $861,503 reconstruct existing 4 and 6 lane divided roadway. Total estimated cost of $6.2 million. Estimated to be let by Dallas County mid 2010. Supplements 2003 Bond Program funds. Miller Road at Rowlett Creek Bridge rehabilitation and/or reconstruction 2 $0
Mockingbird Ln @ SPRR-Fisher Rd Bridge rehabilitation and/or reconstruction. 2 $0
Northwest Hwy - W. Lawther to Buckner Partnership project with TxDOT and Dallas County to leverage 1 $1,263,537 additional TxDOT $ for amenities and beautification. Total estimated cost of $16.5 million. Estimated to be let by TxDOT late 2007. SH 78 - Buckner (Loop 12) to IH 635 Partnership project with TxDOT to construct amenities to 1 $3,382,195 complement TxDOT's widening project. Total estimated cost of $6.2 million. Estimated to be let by late 2008. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (8 detail records) Sum $6,232,173 Street Petitions
Oldgate Ln. - Garland Rd to Diceman Dr. Engineering, Paving and Drainage 1 100 $1,923,563
Friday, March 31, 2006 Page 222 of 349 Project Name Description Tier Score Estimate Council District 9 Street Petitions
Summary for 'Category' = Street Petitions (1 detail record) Sum $1,923,563 Street Reconstruction Local Streets
Rio Hondo Dr - San Felipe Dr to Hermosa Dr 1300 - 1400 Blks 1 61.42 $284,116
Melody Ln -Shady Brook to 2000' west of Eastridge 5900 - 6200 Blks 1 61.27 $2,347,698
Monterrey Ave - Barbarosa Dr to Farola Dr 1700 - 2000 Blks 1 60.54 $829,595
Larmanda St - Skillman St North to 450 Fft 6600 Blk 1 58.87 $253,665
Whittier Ave - San Leandro Dr to Eustis Ave 1700 Blk 1 58.7 $347,466
Lake Highlands Dr - Northcliff Dr to Waterview Rd 9700 Blk 1 57.74 $144,222
Westlake Ave - Hillside Dr to Nonesuch Rd 6500 Blk 1 57.55 $382,890
San Fernando Wy - Ocalla Av to Oldgate Ln 9000 Blk 1 56.13 $402,035
Coolair Dr - Edgelake Dr to Waterview Rd 500 - 600 Blks 1 55.61 $933,525
Materhorn Dr - Cret Ridge Dr to Shiloh Rd 2800 Blk 1 55.53 $560,296
Wood Dale - Gus Thomasson Rd to Crest Ridge Dr 10400 - 10500 Blks 1 55.43 $717,281
Highwood Dr - Shiloh St to San Marcus Av 2700 - 2900 Blks 1 55.3 $730,044
Clary Dr - Easton Rd to Baronne Cir 10200 blk 1 55.18 $417,350
Centerville Rd (Serv Rd) - Aledo Dr to Galena St 1600 - 2000 Blks 1 55.05 $1,180,578
Whitehill St - Kingsbury Dr to Berryhill St 6800 Blk 1 53.92 $506,722
Farola Dr - Desdemona Dr to Monterrey Av 1900 - 2000 Blks <- Resurfacing 1 53.48 $1,180,578
Abston Ln - Gardenia Dr to Holt Dr 11500 - 11800 Blks 1 53.22 $694,934
Highwood Dr - Ferguson Rd to Hartline Dr 2400 BLK 1 52.84 $433,942
Northridge Dr - Sperry St East to Dead-End 6900 Blk 1 52.53 $130,300
Friday, March 31, 2006 Page 223 of 349 Project Name Description Tier Score Estimate Council District 9 Street Reconstruction Local Streets
El Campo Dr - San Fernando Way to Redondo Dr 1300 Blk 1 52.27 $446,705 Green Tree Ln - Fisher Rd to Mockingbird Ln 6900 Blk 1 51.57 $622,545
Lingo La - Highwood rd to Crestridge Dr 10100 Blk 1 45.57 $580,717
Summary for 'Category' = Street Reconstruction Local Streets (22 detail records) Sum $14,127,201 Street Reconstruction Thoroughfares
La Prada Dr - Millmar Dr to Motley Dr (City Limits) 10000 Blk 1 65.92 $1,467,745
Peavy Rd - Bluff Dale Dr to E Lake Highlands Dr 800 Blk 1 62.55 $1,212,485
Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $2,680,230 Street Resurfacing
Tavaros Ave. - Garland Rd. to San Fernando Way 1200 block 1 78.87 $39,821
San Lucas Ave. - San Marcus Ave. to Materhorn Dr. 2900 - 3000 1 76.445 $59,986
San Paula Ave. - Ferguson Rd. to Santa Garza Dr. 2400 - 3200 1 74.76 $295,336
Pickens St. - Gaston Ave. to Tokalon Dr. 2300 - 2400 1 74.74 $72,494
Barbarosa Dr. - Farola Dr. to Monterrey Ave. 10800 - 11000 1 74.14 $90,617
Kingsbury Dr. - Town North Dr. to Walling Ln. 6500 - 7000 1 72.91 $214,036
Thale Dr. - Aledo Dr. to Desdemona Dr. 1600 - 1700 1 71.835 $63,049
Highwood Dr. - San Marcus Ave. to Crest Ridge Dr. 2900 Block 1 70.89 $44,032
Shiloh Rd. - Highwood Dr. to ferguson Rd. 10100 - 10500 1 70.6 $328,137
Crest Ridge Dr. - Wood Dale Dr. to Casa Oaks Dr. 1600 - 2400 1 70.08 $406,884
Plummer Dr. - Swaffar Dr. to Ferguson Rd. 10200 - 10500 1 69.8 $233,946
Friday, March 31, 2006 Page 224 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Sharondale Ln. - Maylee Blvd. to Sandra Lynn Dr. 10800 block 1 69.12 $115,760 Montalba Ave. - Farola Dr. to Joaquin Dr. 2000 - 2200 1 68.51 $159,920
Hillbrook St. - Lake Circle Dr. to Bob-O-Link Dr. 2900 - 3600 1 68.37 $105,933
Materhorn Dr. - San Marcus Ave. to San Lucas Ave. 3000 block 1 68.315 $16,847
Cotillion Dr. - Shiloh Rd. to Barnes Bridge Rd. 10600 - 11000 1 68.19 $324,818
Park Brook Dr. - Bel Aire Dr. to Cul-de-Sac 300 block 1 67.89 $23,484
Easton Rd. - Lake Highlands Dr. to Kahala Dr. 600 Block 1 67.51 $61,773
Pat Dr. - Aledo Dr. to Desdemona Dr. 1600 - 1800 1 66.105 $118,185
Berryhill St. - Town North Dr. to Kingsbury Dr. 6100 - 6300 1 65.98 $227,054
Groveland Dr. - Lakeland Dr. to Corday St. 8500 Block 1 65.81 $24,505
Dumbarton Dr. - Cotillion Dr. to Drumbarton Dr. 11400 - 11500 1 65.66 $114,229
Sandra Lynn Dr. - Cotillion Dr. to Dunaway Dr. 10400 block 1 65.65 $61,390
Erhard Dr. - Milhof Dr. to Barnes Bridge Rd. 11000 Block 1 65.24 $65,729
St Francis Ave. - Santa Clara Dr. to San Leandro Rd. 1500 - 1600 1 65.23 $79,769
Freemont St. - Kingsbury Dr. to Walling Ln. 6800 - 7000 1 65.175 $155,326
Eastwood Dr. - Fern Dr. to Crest Ridge Dr. 10300 Block 1 65.06 $71,728
Angora St. - Lunar Rd. to Forest Hills Pl. 9200 - 9300 1 64.82 $102,104
Quanah St. - Visalia Dr. to Shiloh Rd. 2800 block 1 64.77 $38,800
San Marcus Ave. - Ferguson Rd. to Shiloh Rd. 2400 - 2600 1 64.3 $171,662
Mayhew Dr. - Plummer Dr. to Cotillion Dr. 3500 block 1 64.28 $81,300
Galena St. - Winthrop Dr. to Centerville Rd. 10600 Block 1 64.23 $70,069
Lanewood Cir. - Lippitt Ave. to Sunland St. 11100 - 11200 1 64.08 $72,494
Friday, March 31, 2006 Page 225 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Emerald Isle Dr. - Garland Rd. to End of Curb 1100 Block 1 63.89 $39,055 Southridge Dr. - Hillbrook St. to Sperry St. 6700 - 6800 1 63.54 $80,535
Santa Garza Dr. - La Prada Dr. to Marlin Dr. 9900 block 1 63.45 $39,693
Evangeline Way - Easton Rd. to Lake Gardens Dr. 10500 Block 1 62.935 $65,985
Ruidosa Ave. - Stallcup Dr. to Shiloh Rd. 2400 - 2800 1 62.79 $141,159
Abrams Rd. - Glennox Ln. to Lover Ln. 5200 block 1 62.67 $35,098
Brookhurst Dr. - Van Dyke Rd. to Waterview Dr. 400 - 600 1 62.64 $89,213
Meadow Lake Ave. - Winstead Dr. to Lawther Dr. 7100 - 7200 1 62.33 $85,129
Forest Hills Blvd. - Oldgate Ln. to Garland Rd. 9100 - 9400 1 59.705 $183,915
Gaston Ave. - Cambria Blvd. to Loving Ave 6600 - 7000 1 59.01 $381,231
Drummond Dr. - Cotillion to Ferguson(Incl.Drumd.Ci 11400 - 11600 1 58.17 $190,807
Cloister Dr. - Loree Dr. to Macmanus Dr. 9600 - 9700 1 57.225 $63,304
San Pedro Pkwy. - St. Francis Ave. to Lakeland Dr. 8400 - 8500 1 56.07 $106,699
Kirkwood Dr. - Northlake Dr. to Lake Highlands Dr. 500 - 900 1 54.785 $112,697
Aledo Dr. - Wood Dale Dr. to Monterrey Ave. 10700 - 11000 1 54.75 $172,301
Mandalay Dr. - Barnes Bridge Rd. to Sandra Lynn Dr. 10900 - 11000 1 54.58 $93,936
El Capitan Dr. - Joaquin Dr. to Dead End north of Barnes 1800-2200 1 53.8 $156,857 Bridge Rd. Marlin Dr. - Oates Dr. to La Prada Dr. 9800 - 9900 1 53.585 $154,439
El Capitan Dr. - San Francisco Dr. to Shiloh Rd. 2500-2800 1 53.48 $76,195
Desdemona Dr. - Barnes Bridge Rd. to Costa Mesa Dr. 11500 - 11600 1 52.715 $59,348
Winchester St. - Freemont St. to Larmanda St. 6800 - 6900 1 52.34 $99,169
Tisinger Ave. - Barbarosa Dr. to Tascosa Dr. 1800 - 2500 1 49.61 $195,912
Friday, March 31, 2006 Page 226 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Wakefield St. - Berryhill St. to Larmanda St. 6900 block 1 49.56 $49,520 Tokalon Dr. - Winsted Dr. to Lawther Dr. (W) 7100 - 7300 1 49.54 $65,985
Mercer Dr. - Vinewood Dr. to Buckner Blvd. 9000 - 9400 1 47.065 $260,110
Mercer Pl. - Mercer Dr. to Cul-De-Sac 9000 block 1 47.045 $23,356
Mercer Cir. - Mercer Dr. to Cul-De-Sac 9100 block 1 41.485 $12,763
Abrams Rd. - 6000 2 $0
Abston La. - 11500 2 $0
Abston La. - 11700 2 $0
Abston La. - 11800 2 $0
Alexander Dr. - 6700 2 $0
Andrea La. - 2500 2 $0
Andrea La. - 2600 2 $0
Arboreal Dr. - 7000 2 $0
Ash Creek Dr. - 9600 2 $0
Ash Creek Dr. - 9800 2 $0
Avalon Av. - 6800 2 $0
Axton La. - 6400 2 $0
Axton La. - 6500 2 $0
Bally Mote Dr. - 1100 2 $0
Benbrook Dr. - 10700 2 $0
Blackwell St. - 5800 2 $0
Bluff Dale Dr. - 9700 2 $0
Friday, March 31, 2006 Page 227 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Bondstone Dr. - 400 2 $0 Bondstone Dr. - 500 2 $0
Brendenwood Dr. - 2300 2 $0
Burwood La. - 6800 2 $0
Carnegie Dr. - 9900 2 $0
Casa Oaks Dr. - 9900 2 $0
Castolon Dr. - 10800 2 $0
Castolon Dr. - 10900 2 $0
Castolon Dr. - 11300 2 $0
Cayuga Dr. - 10600 2 $0
Centerville Serv. - 2000 2 $0
Centerville Serv. - 2200 2 $0
Cimarec St. - 11600 2 $0
Classen Dr. - 600 2 $0
Corporate Dr. - 12000 2 $0
Corporate Dr. - 12100 2 $0
Costa Mesa Dr. - 2300 2 $0
Dalehurst Dr. - 10200 2 $0
Dalhart La. - 6900 2 $0
Danbury La. - 6400 2 $0
Delford Cir. - 3600 2 $0
Dixfield Dr. - 11700 2 $0
Friday, March 31, 2006 Page 228 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Dixfield Dr. - 11900 2 $0 Easton Rd. - 100 2 $0
Easton Rd. - 1400 2 $0
Edgerton Dr. - 7000 2 $0
Edgerton Dr. - 7100 2 $0
Ellsworth Av. - 6800 2 $0
Estacado Dr. - 10800 2 $0
Farola Dr. - 1700 2 $0
Farola Dr. - 1800 2 $0
Fenton Dr. - 7100 2 $0
Freemont St. - 6800 2 $0
Freemont St. - 6900 2 $0
Gaston Pkwy. - 9300 2 $0
Gatewood Dr. - 11500 2 $0
Genetta Dr. - 11000 2 $0
Goliad Av. - 6400 2 $0
Gus Thomasson Rd. - 1600 2 $0
Gus Thomasson Rd. - 2500 2 $0
Gus Thomasson Rd. - 3300 2 $0
Hambrick Rd. - 500 2 $0
Hermosa Dr. - 10800 2 $0
Highwood Dr. - 2100 2 $0
Friday, March 31, 2006 Page 229 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Highwood Dr. - 2200 2 $0 Highwood Dr. - 2600 2 $0
Housley Dr. - 2600 2 $0
Itasca Dr. - 11200 2 $0
Joaquin Dr. - 10300 2 $0
Jupiter Rd. - 11600 2 $0
Jupiter Rd. - 11800 2 $0
Jupiter Rd. - 11900 2 $0
Kenwood Av. - 6900 2 $0
Kiltartan Dr. - 1500 2 $0
Kiltartan Dr. - 1700 2 $0
Kirkwood Dr. - 500 2 $0
La Fonda Blvd. - 11800 2 $0
La Prada Dr. - 2300 2 $0
Lake Highlands Dr. (E) - 9900 2 $0
Lake Terrace Cir. - 800 2 $0
Lakedale Dr. - 10000 2 $0
Larmanda St. - 6700 2 $0
Larmanda St. - 6800 2 $0
Leda Dr. - 100 2 $0
Leda Dr. - 200 2 $0
Libby La. - 10300 2 $0
Friday, March 31, 2006 Page 230 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Lochspring Dr. - 10800 2 $0 Loree Dr. - 1700 2 $0
Loving Av. - 2400 2 $0
Lunar La. - 1200 2 $0
Materhorn Dr. - 2300 2 $0
Mayhew Dr. - 3100 2 $0
Mayhew Dr. - 3200 2 $0
Mercer Cir. - 9100 2 $0
Merrilee La. - 6700 2 $0
Merrilee La. - 6900 2 $0
Milhof Dr. - 11000 2 $0
Millmar Dr. - 2900 2 $0
Millmar Dr. - 3000 2 $0
Millmar Dr. - 3100 2 $0
Millmar Dr. - 3200 2 $0
Modlin St. - 3400 2 $0
Monterrey Av. - 1700 2 $0
Monterrey Av. - 1800 2 $0
Monterrey Av. - 2000 2 $0
Neering Dr. - 11700 2 $0
North Ridge Dr. - 6700 2 $0
Northcliff Dr. - 10200 2 $0
Friday, March 31, 2006 Page 231 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Northwest Hwy. (E) - 12400 2 $0 Northwest Hwy. (E) - 12600 2 $0
Northwest Pkwy. (E) S - 11300 2 $0
Northwest Pkwy. (E) S - 12000 2 $0
Northwest Pkwy. (E) S - 12100 2 $0
Norwood Dr. - 2000 2 $0
Olmos Dr. - 10000 2 $0
Peavy Rd. - 1100 2 $0
Perimeter Dr. - 12500 2 $0
Perimeter Dr. - 12600 2 $0
Ravendale La. - 6600 2 $0
Redwood Cir. - 1300 2 $0
Ridgemont Dr. - 6400 2 $0
Rockview La. - 6900 2 $0
Ruidosa Av. - 3700 2 $0
Rupley La. - 11300 2 $0
San Benito Wy. - 8200 2 $0
San Benito Wy. - 8400 2 $0
San Diego Dr. - 2800 2 $0
San Fernando Wy. - 8900 2 $0
San Juan Av. - 10000 2 $0
San Juan Av. - 10100 2 $0
Friday, March 31, 2006 Page 232 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
San Leandro Dr. - 8400 2 $0 San Leandro Dr. - 8500 2 $0
San Vicente Av. - 2700 2 $0
Sandalwood Dr. - 10800 2 $0
Santa Clara Dr. - 8600 2 $0
Santa Teresa Av. - 3100 2 $0
Santa Teresa Av. - 3200 2 $0
Shiloh Rd. - 10600 2 $0
Shiloh Rd. - 12000 2 $0
Shiloh Rd. - 12100 2 $0
Solta Dr. - 10100 2 $0
Strand St. - 11500 2 $0
Strand St. - 11800 2 $0
Strayhorn Dr. - 10900 2 $0
Sylvania Dr. - 900 2 $0
Syracuse Dr. - 7200 2 $0
Syracuse Dr. - 7300 2 $0
Tealford Dr. - 2800 2 $0
Timplemore Dr. - 1100 2 $0
Twin Tree La. - 7100 2 $0
University Blvd. (E) - 6100 2 $0
Valley Spring Dr. - 12000 2 $0
Friday, March 31, 2006 Page 233 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Vickery Blvd. - 6400 2 $0 Vinewood Dr. - 8700 2 $0
Visalia Dr. - 11300 2 $0
Walling La. - 6800 2 $0
Walling La. - 6900 2 $0
Walling La. - 7400 2 $0
Waterview Rd. - 9300 2 $0
West Shore Dr. - 2700 2 $0
West Shore Dr. - 2800 2 $0
Westglen Dr. - 8700 2 $0
Westlake Av. - 6600 2 $0
Westlake Av. - 6800 2 $0
Westlake Av. - 7000 2 $0
White Rock Dr. - 1600 2 $0
Whitehill St. - 7000 2 $0
Whittier Av. - 1200 2 $0
Whittier Av. - 1400 2 $0
Wildgrove Av. - 7000 2 $0
Williamson Cir. - 7200 2 $0
Winton St. - 6600 2 $0
Woodmeadow Pkwy. - 10600 2 $0
Woodmeadow Pkwy. - 10700 2 $0
Friday, March 31, 2006 Page 234 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing
Woodmeadow Pkwy. - 10800 2 $0 Woodmeadow Pkwy. - 11000 2 $0
Woodmeadow Pkwy. - 11100 2 $0
Woodridge Dr. - 10000 2 $0
Yeager Dr. - 12400 2 $0
Yorkmont Cir. - 11200 2 $0
Summary for 'Category' = Street Resurfacing (237 detail records) Sum $7,145,627 Streetscape / Urban Design
Garland Road Urban Design Plan Garland Road from San Rafael to LBJ - sidewalk, driveway, 1 58.83 $1,534,120 intersection, street lighting and landscaping improvements ~25,600 LF Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $1,534,120 Thoroughfares
Mockingbird - Buckner to Hillside Widen bridge to 6 lanes, add 8 left turn pockets 1 35 $13,530,937
La Prada - East CL to Oates Widen to a six lane divided roadway from a four lane roadway 1 0 $670,410
Santa Ana - Garland to Shiloh Widen to a four lane undivided roadway 1 0 $3,961,666
Summary for 'Category' = Thoroughfares (3 detail records) Sum $18,163,013 Traffic Intersection Capacity & Safety Improvement
Abrams @ Kenwood Street Modifications and Bottlene Widen Abrams at Kenwood to provide northbound and 1 40 $181,873 southbound left-turn lanes. Abrams @ Lake Circle Widen Abrams at Lake Circle to provide northbound and 1 30 $218,247 southbound left-turn pockets.
Friday, March 31, 2006 Page 235 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Intersection Capacity & Safety Improvement
Abrams @ Lovers Street Modifications and Bottlenec Widen the southside of Lovers just east of Abrams to improve 1 30 $95,084 the transition from three lanes to two lanes. Abrams @ McCommas Widen Abrams Rd at McCommas to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Monticello - Sondra Widen Abrams at Monticello/Sondra to provide northbound and 1 30 $218,247 southbound left-turn pockets. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (5 detail records) Sum $931,699 Traffic Safety Improvements-Guardrail Upgrades
Miller 18000 BLK Guardrail Upgrade 1 87 $47,478
Skillman 6600 BLK Guardrail Upgrade 1 87 $17,007
Abrams 6900 BLK Guardrail Upgrade 1 80 $30,216
Miller 24000 BLK Guardrail Upgrade 1 80 $126,481
Mockingbird 7000 E BLK Guardrail Upgrade 1 80 $33,120
Skillman 6000 BLK Guardrail Upgrade 1 80 $8,487
Mockingbird 6700 E BLK Guardrail Upgrade 1 73 $4,658
Mockingbird 7600 E BLK Guardrail Upgrade 1 73 $18,443
Mockingbird 8100 E BLK Guardrail Upgrade 1 73 $20,644
Rowlett 21000 BLK Guardrail Upgrade 1 73 $84,083
Skillman 6200 BLK Guardrail Upgrade 1 73 $14,039
Abrams 6100 BLK Guardrail Upgrade 1 67 $7,403
Ferguson 8800 BLK Guardrail Upgrade 1 67 $4,658
Ferguson 9400 BLK Guardrail Upgrade 1 67 $11,056
Ferguson 9800 BLK Guardrail Upgrade 1 67 $3,543
Friday, March 31, 2006 Page 236 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Safety Improvements-Guardrail Upgrades
Skillman 4600 BLK Guardrail Upgrade 1 67 $8,870 Skillman 5200 BLK Guardrail Upgrade 1 67 $7,307
Skillman 6100 BLK Guardrail Upgrade 1 67 $13,465
Skillman 6400 BLK Guardrail Upgrade 1 67 $17,868
Easton 800 BLK Guardrail Upgrade 1 60 $16,975
Gus Thomasson 2200 BLK Guardrail Upgrade 1 60 $6,713
Easton 1200 BLK Guardrail Upgrade 1 53 $3,925
Easton 900 BLK Guardrail Upgrade 1 53 $3,925
Ferguson 9500 BLK Guardrail Upgrade 1 53 $3,543
Gus Thomasson 2100 BLK Guardrail Upgrade 1 53 $5,392
Maylee 10300-10500 BLK Guardrail Upgrade 1 53 $126,226
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (26 detail records) Sum $645,526 Traffic Signal Upgrades - Citywide
Gaston @ Richmond Traffic Signal Upgrades Citywide 1 93 $56,317
Abrams @ Monticello(Sondra) Traffic Signal Upgrade 1 87 $48,627
Buckner @ Mockingbird(Peavy) Traffic Signal Upgrade 1 80 $176,704
Ferguson @ Joaquin Traffic Signal Upgrade 1 80 $107,847
Buckner @ Northcliff Traffic Signal Upgrade 1 67 $107,847
Barnes Bridge @ Ferguson Traffic Signal Upgrades-C Traffic Signal Upgrade 1 60 $107,847
Buckner @ Lake Highlands Traffic Signal Upgrade 1 60 $120,610
Gus Thomasson @ Maylee (Mandalay) Traffic Signal Upgrade 1 60 $157,240
Friday, March 31, 2006 Page 237 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Signal Upgrades - Citywide
Lake Highlands @ Peavy Traffic Signal Upgrade 1 60 $118,313 Abrams @ Belmont (Lakewood) Traffic Signal Upgrade 1 53 $59,316
Abrams @ Kenwood Traffic Signal Upgrade 1 53 $13,616
Abrams @ Lovers Traffic Signal Upgrade 1 53 $108,805
Casa View @ Gus Thomasson Traffic Signal Upgrade 1 53 $107,847
Ferguson @ Millmar Traffic Signal Upgrade 1 53 $88,435
Millmar @ Peavy Rd Traffic Signal Upgrade 1 53 $100,828
Skillman @ University Traffic Signal Upgrade 1 53 $29,578
Abrams @ Larmanda Traffic Signal Upgrade 1 40 $106,890
Barnes Bridge @ Shiloh Traffic Signal Upgrade 1 40 $115,824
Buckner @ Poppy/Athlone Traffic Signal Upgrade 1 40 $109,379
Estacado @ Peavy Rd Traffic Signal Upgrade 1 40 $107,464
Ferguson @ Woodmeadow Traffic Signal Upgrades Citywide 1 40 $107,847
Hermosa @ Peavy Rd Traffic Signal Upgrade 1 40 $107,464
Hillside @ Mockingbird Traffic Signal Upgrade 1 40 $120,610
Oates @ Peavy Traffic Signal Upgrade 1 40 $116,399
Mockingbird @ Williamson Traffic Signal Upgrades Citywide 1 27 $102,359
Summary for 'Category' = Traffic Signal Upgrades - Citywide (25 detail records) Sum $2,504,015 Traffic System Management - Flood Detour Signs
Abrams, 4600 under RR Dynamic Signs - Flood Detours 1 100 $42,118
Skillman, 4400 under RR Dynamic Signs - Flood Detours 1 100 $4,633
Friday, March 31, 2006 Page 238 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic System Management - Flood Detour Signs
West Lawther @ Northwest Hwy Dynamic Signs - Flood Detours 1 100 $42,118 Easton, 800 Dynamic Signs - Flood Detours 1 80 $42,118
Ferguson, 11500 Dynamic Signs - Flood Detours 1 80 $42,118
Lake Highlands between Buckner Blvd and Peavy Dynamic Signs - Flood Detours 1 60 $42,118
Lake Highlands, 9500 Dynamic Signs - Flood Detours 1 60 $42,118
Peavy @ Dixon Branch Dynamic Signs - Flood Detours 1 60 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (8 detail records) Sum $299,458 Summary for 'Program' = STREET AND TRANSPORTATION (544 detail records) Sum $92,836,815 Summary for 'CD' = 9 (544 detail records) Sum $92,836,815
Friday, March 31, 2006 Page 239 of 349 Project Name Description Tier Score Estimate Council District 10 Alley Reconstruction
Ferndale & Liptonshire - Liptonshire to Kingsley Full Reconstruction 1 78 $299,349 Lipton shire & Leaside - Livenshire to McCree Full reconstruction 1 73 $336,943
Windy Crest & Webb Kay - Bill Brown to Windy Crest Full Reconstruction 1 70 $326,349
Caribou & Ferndale - Church to Vistadale Full Reconstruction (Caribou 10142) 1 63 $266,491
Shoreview 9805 & Fitzroy - Audelia to Aldwick Full Reconstruction Shoreview 9805 1 63 $205,655
Larchwood Drive (8904-9032) Liptonshire - McCree to Full reconstr Larchwood Dr (8904 - 9032) 1 60 $239,944 Plano Mccree Road (10005-10151) Shady View - Aldwick to Full Reconst Mccree Rd. (10005 - 10151) 1 60 $276,957 Ferndale Lemans Drive (10606-10690) Havenlake - Lullwater to Full Reconstr Lemans Dr. (10606 - 10690) 1 40 $242,497 Plano Aldwick Dr - 9105 - 9209 Full Reconstruction 2 $118,245
Arborside Dr - 8519 - 8615 Full Reconstruction 2 $169,978
Birchcoft Dr - 8466 - 8496 Full Reconstruction 2 $163,352
Blackbird La 7805 - 7845 full reconstruction - Blackbird La 7805 - 7845 2 $144,222
Blackwood Dr - 6967 Full Reconstruction 2 $317,529
Chesterton Dr - 10606 - 10646 Full Reconstruction 2 $264,014
Chiswell Rd - 9707 - 9747 Full Reconstruction 2 $90,723
Chiswell Rd - 9834 - Full Reconstruction 2 $212,536
Ellery Dr - 8426 ------Full Reconstruction 2 $69,316
Estate La - 10407 - 10629 Full Reconstruction 2 $385,572
Ferndale Rd - 9216 ------Full Reconstruction 2 $202,088
Fitzroy Dr - 9805 - 9831 Full Reconstruction 2 $127,419
Forest Green Dr - 3287 - 3363 Full Reconstruction 2 $304,024
Friday, March 31, 2006 Page 240 of 349 Project Name Description Tier Score Estimate Council District 10 Alley Reconstruction
Gladwood La - 8512 - 8546 Full Reconstruction 2 $170,233 Graywood Dr - 8505 - 8635 Full Reconstruction 2 $219,927
Hyde Park Dr - 6806 - 6846 Full Reconstruction 2 $141,945
Lanarkshire Dr - 8812 - 8832 Full Reconstruction 2 $139,397
Lanshire Dr (10005 - 10125) Linkwood - Aldwick to Full Reconstruction Lanshire Dr. (10005 - 10125) 1 $191,130 Ferndale Lanward Cir - 9747 - 9755 Full Reconstruction 2 $72,629
Larchwood Dr - 8804 - 8884 Full Reconstruction 2 $291,281
Larchwood Dr - 9011 - 9033 Full Reconstruction 2 $411,820
Larchwood Dr - 9102 - 9342 Full Reconstruction 2 $286,949
Leaside & Livenshire - Leaside to Mccree Alley Full Reconstruction 2 $283,339
Leaside Dr - 9003 - 9075 Full Reconstruction 2 $371,555
Pleasant View Dr - 7107 - 7205 Full Reconstruction 2 $143,729
Summary for 'Category' = Alley Reconstruction (33 detail records) Sum $7,487,138 Barrier Free Ramps
Racensway Dr @ Church Rd Construct 4 ramps 1 24 $7,658
Winding Ridge Dr @ Church Rd Construct 2 ramps 1 24 $3,829
Abram @ Meadowknoll BFR on NE corner of Abrams @ Meadowknoll need S/W 1 23 $12,763 extension behind signal pole. on SE corner of Abrams @ Whitehurst need similar extension. Modify conc wall on NE corner of Abrams @ Whitehurst to accomdate S/W Chiswell @ Crestedge Construct 2 BFRs at intersection 1 12 $3,829
Cliffmere Dr @ Overwood Rd Construct 2 ramps 1 7 $3,829
Friday, March 31, 2006 Page 241 of 349 Project Name Description Tier Score Estimate Council District 10 Barrier Free Ramps
9510 Shady Valley Dr (Alley Entrance Behind) Construct 2 Ramps 1 4 $3,829 9512 Winding Ridge Dr (Alley Entrance Behind) Construct 2 ramps 1 4 $3,829
Robin Hill (10151) @ Tanglevine 2 BFRs 1 4 $3,829
Winding Ridge Dr @ Shady Valley Dr Construct 2 ramps 1 4 $3,829
Faircrest @ Audelia Construct One BFR on intersection with Audelia & 4 BFRs on 1 3 $9,572 intersection with Trailcliff Whittenburg Gate @ Orbiter Dr Construct 2 BFR on corners of intersection 1 3 $3,829
Summary for 'Category' = Barrier Free Ramps (11 detail records) Sum $60,624 Bridge Repair and Modification
Lawther (West) over White Rock Creek Cofferdam each side for work space, concrete collars around 1 55 $95,723 piers, grout inject beneath abutment beams TI Blvd. over Floyd Branch Riprap undermined, threatens abutment; grout inject/flowable 1 42.5 $51,052 fill/gabions; severe Fair Oaks Crossing over Jackson Br. Trib. Bridge riprap undermined, grout injection, possibly gabion 1 33.75 $63,815 matress; mod. severe Summary for 'Category' = Bridge Repair and Modification (3 detail records) Sum $210,590 I.T.S. - Speed & Travel Time System
Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $34,460
Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $34,460 Intergovernmental Partnership Projects
Audelia Rd. at Jackson Branch Bridge rehabilitation and/or reconstruction 2 $0
Forest Ln - EB @ Cottonwood Creek Bridge rehabilitation and/or reconstruction 2 $0
Friday, March 31, 2006 Page 242 of 349 Project Name Description Tier Score Estimate Council District 10 Intergovernmental Partnership Projects
Forest Ln - EB @ Floyd Branch Bridge rehabilitation and/or reconstruction 2 $0 Forest Ln - WB @ Floyd Branch Bridge rehabilitation and/or reconstruction 2 $0
LBJ/Skillman Station Pedestiran Bridge Partnership project with TxDOT to provide a pedestrian bridge 1 $1,276,300 across LBJ adjacent to the DART LRT. Total estimated cost of $______million. Estimated to be let by late 2007. Supplements 2003 Bond Program funds. Northwest Hwy - W. Lawther to Buckner Partnership project with TxDOT and Dallas County to leverage 1 $421,179 additional TxDOT $ for amenities and beautification. Total estimated cost of $16.5 million. Estimated to be let by TxDOT late 2007. Valley View/Walnut - IH 635 to City Limits Partnership project with TxDOT to widen existing roadway to 6 1 $446,705 lane divided. Total estimated cost of $14.5 million. Estimated to be let by late 2008. Supplements 1995 and 1998 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (7 detail records) Sum $2,144,184 Street Lighting - Existing Thoroughfares
Skillman - Merriman Pkwy to Fair Oaks Street Lighting 1 80 $464,573
Markville/Vantage Point - Greenville to TI Blvd Street Lighting 1 57 $245,050
Abrams - Walnut Hill to Forest Street Lighting 1 40 $428,837
Summary for 'Category' = Street Lighting - Existing Thoroughfares (3 detail records) Sum $1,138,460 Street Reconstruction Local Streets
Boundbrook Ave - Stillwater Ave to Woodbrook Dr 8700 - 8800 blks 1 59.52 $879,408
Linkwood Dr - Ferndale Rd to Lockhaven Dr 10200 Blk 1 51.73 $574,335
Summary for 'Category' = Street Reconstruction Local Streets (2 detail records) Sum $1,453,743
Friday, March 31, 2006 Page 243 of 349 Project Name Description Tier Score Estimate Council District 10 Street Reconstruction Thoroughfares
Dilworth Rd - Pagemill Rd to Hillguard Rd 9600 Blk 1 59.85 $1,276,300 Petal St - 11000 Blk 11000 Blk 1 57.45 $593,585
Pinewood Dr - Gladwood La to Stults Rd 9300 - 9400 Blk 1 48.28 $829,595
Summary for 'Category' = Street Reconstruction Thoroughfares (3 detail records) Sum $2,699,480 Street Resurfacing
Gladwood Ln. - Pinewood Dr. to Westfield Dr. 8400 - 8700 1 82.12 $150,093
Larchwood Dr. - Plano Rd. to McCree Rd. 8800 - 9000 1 74.24 $144,350
Lanarkshire Dr. - Lanarkshire Dr. to Lanshire Dr. 8800 block 1 71.28 $44,415
Longmont Dr. - Ferndale Rd. to McCree Rd. 9000 block 1 70.89 $107,975
Skillman St. - Adleta Ct. to Adleta Blvd. 9200 block 1 69.525 $86,533
Greenstone Dr. - Pinewood Dr. to Gladwood Ln. 8400 Block 1 69.49 $86,150
Chartwell Dr. - Pagemill Rd. to Plano Rd. 9600-9800 1 68.09 $470,955
Boundbrook Ave. - Stillwater Dr. to Gladwood Ln. 8900-9100 1 65.49 $386,719
Sanden Dr. - Miller Rd. to Bekay St. 10700-10900 1 62.15 $205,101
Bryson Dr. - Giddings Cir. To Wallbrook Dr. 9200 - 9500 1 61.68 $161,197
Forest Springs Dr. - Abrams Rd. to Meadowknoll Dr. 9400 - 9500 1 61.64 $230,372
Larchfield Ln. - Lynbrook Dr. to Longmeadow Dr. 10600 block 1 61.205 $49,138
Woodshore Dr. - Gladwood Ln. to Stults Rd. 9200-9400 1 61.06 $63,687
Richardson Branch Tr. - Club Meadows Dr. to Vista View 8400 - 8600 1 57.815 $75,302 Dr. Edgecliff Dr. - Queenswood Ln. to Lynngrove Dr. 9900-10000 1 56.01 $45,819
Fieldcrest Dr. - Spring Branch Dr. to Dartridge Dr 9600-9800 1 55.38 $115,888
Friday, March 31, 2006 Page 244 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Club Glen Dr. - Whitehurst Dr. to Arbor Tr. 9200 Block 1 55.22 $34,332 Lavalle Ln. - Woodbrook Dr. to Greenville Ave. 8800 block 1 54.13 $32,163
Faircrest Dr. - 140 10100 - 10200 1 54.105 $36,502
Heatherdale Dr. - Dove Meadow Dr. to Abrams Rd. 9200 block 1 49.78 $44,798
Sanshire Ave. - Parkshire Ave. to Danashire Ave. 8700 - 8800 1 49 $62,283
Judd Ct. - Forest Ln. to Cul-De-Sac 11800 block 1 47.87 $40,459
Vista View Dr. - Richardson Branch Tr. to Cul-de-S 8400 - 8900 1 46.06 $144,988
Atherton Dr. - Meadowknoll Dr. to Arbor Park Dr. 9500 - 9600 1 45.005 $52,073
Vista Creek Dr. - Whitehurst Dr. to Dead End @ Cul-de- 9000 - 9100 1 43.75 $48,372 Sac Moss Meadows Dr. - Abrams Rd. to Arborside Dr. 8000 block 1 43.31 $55,136
Quail Run - Rolling Rock Ln. to Concrete 10900 block 1 43.145 $6,892
Briarhurst Dr. - Coral Cove Dr. to Whitehurst Dr. 9200 - 9300 1 42.88 $33,822
Arbor Park Dr. - Arbor Park Ct. to Whitehurst Dr. 8800-9100 1 42.51 $146,775
Stone Creek Pl. - Greenville Ave. to Stone Creek 9000 - 9100 1 37.69 $77,216
Arbor Branch Dr. - Club Glen Dr. to Cul-de-Sac 9200 Block 1 35.83 $27,440
Aldwick Dr. - 8600 2 $0
Aldwick Dr. - 8700 2 $0
Alta Oaks Dr. - 9200 2 $0
Arbor Trail Dr. - 9200 2 $0
Arborhill Dr. - 9400 2 $0
Arborhill Dr. - 9500 2 $0
Arborhill Dr. - 9600 2 $0
Friday, March 31, 2006 Page 245 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Arborside Dr. - 8700 2 $0 Ashcroft Av. - 8600 2 $0
Audelia Rd. - 8500 2 $0
Bellafonte Dr. - 12200 2 $0
Bellafonte Dr. - 12300 2 $0
Blackbird La. - 7800 2 $0
Blackwood Dr. - 6900 2 $0
Bonner Dr. - 8000 2 $0
Boundbrook Av. - 8600 2 $0
Buxhill Dr. - 9800 2 $0
Carthage La. - 13300 2 $0
Chesterton Dr. - 10500 2 $0
Chiswell Rd. - 9200 2 $0
Chiswell Rd. - 9700 2 $0
Clayshire Cir. - 7300 2 $0
Clearwater Dr. - 8900 2 $0
Clearwater Dr. - 9300 2 $0
Clearwater Dr. - 9400 2 $0
Clover Valley Dr. - 9200 2 $0
Colfax Dr. - 6800 2 $0
Coral Cove Dr. - 9200 2 $0
Craigshire Av. - 7300 2 $0
Friday, March 31, 2006 Page 246 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Danashire Av. - 7300 2 $0 Debshire Cir. - 7300 2 $0
Dilworth Rd. - 9600 2 $0
Echo Valley Dr. - 8700 2 $0
Fair Oaks Crsg. - 8800 2 $0
Fallbrook Dr. - 9500 2 $0
Fallbrook Dr. - 9600 2 $0
Fenchurch Rd. - 8600 2 $0
Ferndale Rd. - 9800 2 $0
Forestgate Dr. - 12000 2 $0
Garwood Dr. - 10300 2 $0
Glen Creek Ct. - 9000 2 $0
Grader St. - 11200 2 $0
Grader St. - 11300 2 $0
Graywood Dr. - 8600 2 $0
Graywood Dr. - 8700 2 $0
Graywood Dr. - 8800 2 $0
Green Oaks Cir. - 9000 2 $0
Greenville Av. - 9600 2 $0
Greenville Av. - 9700 2 $0
Hayfield Dr. - 10800 2 $0
Heatherdale Dr. - 9500 2 $0
Friday, March 31, 2006 Page 247 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Heatherdale Dr. - 9600 2 $0 High Oaks Cir. - 7800 2 $0
Kingsley Rd. - 9700 2 $0
Lakemere Dr. - 10600 2 $0
Lanshire Dr. - 9700 2 $0
Lanward Dr. - 9600 2 $0
Larchwood Dr. - 9200 2 $0
Leaside Dr. - 9000 2 $0
Leaside Dr. - 9100 2 $0
Lemans Dr. - 10600 2 $0
Liptonshire Dr. - 8800 2 $0
Livenshire Dr. - 9600 2 $0
Lizshire Av. - 7300 2 $0
Lockhaven Dr. - 8500 2 $0
Lullwater Dr. - 8700 2 $0
Lynford Dr. - 10200 2 $0
Lynford Dr. - 10300 2 $0
Mccree Rd. - 10000 2 $0
Mccree Rd. - 10100 2 $0
Merriman Pkwy. - 6800 2 $0
Merriman Pkwy. - 6900 2 $0
Millridge Cir. - 9600 2 $0
Friday, March 31, 2006 Page 248 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Millridge Dr. - 9500 2 $0 Millridge Dr. - 9600 2 $0
Northwest Pkwy. (E) N - 10300 2 $0
Northwest Pkwy. (E) N - 10800 2 $0
Northwest Pkwy. (E) N - 10900 2 $0
Park Highlands Dr. - 9600 2 $0
Parkford Dr. - 10000 2 $0
Parkford Dr. - 10100 2 $0
Parkshire Av. - 7300 2 $0
Pegshire Av. - 8700 2 $0
Petal St. - 10900 2 $0
Petal St. - 11100 2 $0
Petal St. - 11200 2 $0
Petal St. - 11300 2 $0
Plano Rd. - 9600 2 $0
Ridgehaven Dr. - 10100 2 $0
Shadydale La. - 9800 2 $0
Shadyview Dr. - 10000 2 $0
Shadyview Dr. - 10100 2 $0
Switzer Av. - 10700 2 $0
Switzer Av. - 10800 2 $0
Switzer Av. - 11000 2 $0
Friday, March 31, 2006 Page 249 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing
Ti Blvd. - 12600 2 $0 Trailpine Dr. - 10000 2 $0
Trenton Dr. - 12500 2 $0
Twisted Oaks Cir. - 7700 2 $0
Webb Kay Dr. - 9000 2 $0
Westfield Dr. - 8600 2 $0
Westfield Dr. - 8700 2 $0
Westfield Dr. - 8800 2 $0
Westover Dr. - 8000 2 $0
Whitehurst Dr. - 10000 2 $0
Whitehurst Dr. - 9100 2 $0
Wildhaven Dr. - 9300 2 $0
Windy Crest Dr. - 9200 2 $0
Windy Crest Dr. - 9300 2 $0
Woodbluff Ct. - 9000 2 $0
Woodbrook Dr. - 8700 2 $0
Woodbrook Dr. - 8900 2 $0
Woodbrook Dr. - 9000 2 $0
Woodshore Dr. - 8900 2 $0
Summary for 'Category' = Street Resurfacing (145 detail records) Sum $3,266,945 Streetscape / Urban Design
Friday, March 31, 2006 Page 250 of 349 Project Name Description Tier Score Estimate Council District 10 Streetscape / Urban Design
LBJ/Skillman Station Area Plan 1 72.17 $1,952,516 Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $1,952,516 Thoroughfares
TI Drive/ Floyd - Restland to Markville Widen to a four lane undivided roadway 1 26 $1,172,117
Summary for 'Category' = Thoroughfares (1 detail record) Sum $1,172,117 Traffic Intersection Capacity & Safety Improvement
Royal @ Skillman Widen Skillman to provide right turn lanes for the northbound 1 70 $1,032,527 and southbound approaches. Widen Royal to provide eastbound and westbound dual left-turn lanes. T Forest @ Greenville Widen both the Forest Ln and Greenville Ave approaches to 1 55 $1,319,694 construct dual left-turn lanes and right-turn lanes on all approaches. Greenville @ Royal Widen both Greenville and Royal approaches to provide dual 1 55 $2,367,537 left turn lanes on all aproaches. Abrams @ Forest Widen Forest Ln approaching Abrams to provide dual left-turn 1 50 $1,119,315 lanes for eastbound and westbound Forest. Add a westbound right turn lane on Forest. Church @ Skillman Widen Church approaching Skillman to provide eastbound and 2 35 $513,073 westbound left-turn lanes. By widening the roadway on the east side, we can re-establish a second through lane for eastbound traffic that is now used for a westbound left-turn lane. Church @ White Rock Trail Widen Church approaching White Rock Trail to provide 1 25 $453,087 eastbound and westbound left-turn pockets. Audelia Rd at Faircrest Dr Reconsruct approximately 50 feet of the Faircrest approaching 1 20 $218,247 the intersection to eliminate the steep incline.
Friday, March 31, 2006 Page 251 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Intersection Capacity & Safety Improvement
Campanella @ TI Blvd Increase the turning radius on the northwest corner of the 1 20 $21,697 intersection. This will allow DART busses to turn off of TI Blvd into the narrow street without conflicting with vehicles on Campenella. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $7,045,176 Traffic Safety Improvements-Guardrail Upgrades
Forest 9600 BLK Guardrail Upgrade 1 87 $3,543
Forest 9700 BLK Guardrail Upgrade 1 87 $3,543
Skillman 7700 BLK Guardrail Upgrade 1 87 $26,260
Skillman 9500 BLK Guardrail Upgrade 1 87 $17,914
Forest 8300 BLK Guardrail Upgrade 1 80 $47,632
Greenville 8300 BLK Guardrail Upgrade 1 80 $56,604
Walnut Hill 8500 BLK Guardrail Upgrade 1 80 $125,269
Audelia 11700 BLK Guardrail Upgrade 1 73 $8,106
Forest 10200 BLK Guardrail Upgrade 1 73 $17,415
Forest 8400 BLK Guardrail Upgrade 1 73 $7,594
Forest 9800 BLK Guardrail Upgrade 1 73 $17,409
Forest 9900 BLK Guardrail Upgrade 1 73 $5,641
Greenville 8400 BLK Guardrail Upgrade 1 73 $7,594
Miller 10200 BLK Guardrail Upgrade 1 73 $4,365
Miller 10700 BLK Guardrail Upgrade 1 73 $5,935
Plano 10100 BLK Guardrail Upgrade 1 73 $16,081
Plano 10600 BLK Guardrail Upgrade 1 73 $8,870
Friday, March 31, 2006 Page 252 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Safety Improvements-Guardrail Upgrades
Skillman 7600 BLK Guardrail Upgrade 1 73 $8,328 Skillman 7800 BLK Guardrail Upgrade 1 73 $16,420
Skillman 8000-8600 BLK Guardrail Upgrade 1 73 $114,101
Abrams 7100 BLK Guardrail Upgrade 1 67 $5,392
Audelia 11600 BLK Guardrail Upgrade 1 67 $12,106
Royal 9800 BLK Guardrail Upgrade 1 67 $31,881
Walnut Hill 9300 BLK Guardrail Upgrade 1 67 $7,724
Walnut Hill 9700 BLK Guardrail Upgrade 1 67 $7,849
Royal 8600 BLK Guardrail Upgrade 1 60 $15,775
Audelia 10600 BLK Guardrail Upgrade 1 53 $5,392
Buckingham 10300 BLK Guardrail Upgrade 1 53 $12,731
Forest 10300 BLK Guardrail Upgrade 1 53 $20,804
Walnut Hill 8700 BLK Guardrail Upgrade 1 53 $7,594
Royal 10000 BLK Guardrail Upgrade 1 47 $5,392
Walnut Hill 8800 BLK Guardrail Upgrade 1 47 $6,126
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (32 detail records) Sum $657,390 Traffic Signal Upgrades - Citywide
Audelia @ Church Traffic Signal Upgrade 1 73 $107,847
Audelia/Whitehurst @ Skillman Traffic Signal Upgrades Citywide 1 67 $148,689
Walnut Hill @ White Rock Trail Traffic Signal Upgrade 1 67 $120,610
Abrams @ Forest Ln Traffic Signal Upgrade 1 53 $108,805
Friday, March 31, 2006 Page 253 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Signal Upgrades - Citywide
Abrams @ Walnut HIll Traffic Signal Upgrade 1 53 $107,847 Audelia @ Royal Traffic Signal Upgrade 1 53 $107,847
Fair Oaks @ Walnut Hill Traffic Signal Upgrade 1 53 $109,379
Forest Ln @ Shephard (TI) Traffic Signal Upgrade 1 53 $209,632
Plano Rd @ Walnut Hill Traffic Signal Upgrade 1 53 $109,762
Walnut Hill @ Winedale Traffic Signal Upgrade 1 27 $116,399
Fire Station 28 @ Greenville Traffic Signal Upgrades Citywide 1 13 $75,876
Summary for 'Category' = Traffic Signal Upgrades - Citywide (11 detail records) Sum $1,322,694 Traffic System Management - Flood Detour Signs
Goforth @ Lanshire Dynamic Signs - Flood Detours 1 60 $42,118
White Rock Trail, 9200 Dynamic Signs - Flood Detours 1 60 $42,118
Merriman Pkwy, 7400 Dynamic Signs - Flood Detours 1 40 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (3 detail records) Sum $126,354 Summary for 'Program' = STREET AND TRANSPORTATION (264 detail records) Sum $30,771,870 Summary for 'CD' = 10 (264 detail records) Sum $30,771,870
Friday, March 31, 2006 Page 254 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction
Tahoe & Brush Creek-Brush Creek to Roaring Springs Full Reconstruction 1 81 $172,301 Peyton & Sprucewood - Meandering to Paldao Full Reconstruction 1 78 $452,340
Eudora Dr (7110 - 7238) Mason Dells - St. Judes to Saint Full reconst Eudora Dr. (7110 - 7238) 1 60 $290,996 Michaels Mason Dells Drive & Yamini - Chicot to St. Judes Full reconstruction - Mason Dells Dr. (7006 - 7046) 1 60 $175,057
Rolling Hills & Spring Grove - Coit to Carillon Full Reconstruction 1 58 $265,361
Cliffbrook(7019) &Gateridge-Hillcrest to Cliffbroo Full Reconstruction 1 54 $420,413
Rex Dr 6207 to alley E of Royalton Full reconst 1 40 $241,221
Royalton Drive (6207-6331) Rex Cir - Royalshire to Tibbs Full recon Royalton Dr. (6207 - 6331) 1 40 $237,392
Royal Lane (6405-6475) Lavendale - Tibbs to Royalton Full recon Royal Ln. (6405 - 6475) 1 30 $238,668
Alpha Rd - 6919 - 7037 Full Reconstruction 2 $401,881
Ashridge Dr - 13609 - 13735 Full Reconstruction 2 $392,963
Ashridge Dr - 13610 - 13746 Full Reconstruction 2 $342,249
Azalea & Rex - Preston to "T" Alley Full Reconstruction, Alley Behind 6069 Azalea Ln, Including "T" 1 $110,856 Alley (Marty Corbin - 6142 Rex Dr). Field Checked on 1/19/06. Azalea La - 6007 - 6031 Full Reconstruction 2 $321,098
Azalea La - 6118 Full Reconstruction 2 $113,658
Azalea La - 6121 - 6339 Full Reconstruction 2 $294,339
Azalea La - 6405 - 6429 Full Reconstruction 2 $101,936
Azalea La - 7307 - 7523 Full Reconstruction 2 $246,429
Azalea la 6066 ----- Full reconstruction (T-Alley only) 2 $99,551
Azalea La 7306- 7522 Full Reconstruction 2 $229,734
Baxtershire Dr - 7008 - 7026 Full Reconstruction 2 $113,149
Baxtershire Dr - 7110 - 7250 Full Reconstruction 2 $353,718
Friday, March 31, 2006 Page 255 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction
Birchwood Dr - 7131 - 7247 Full Reconstruction 2 $329,507 Blairview Dr - 7367 - 7393 Full Reconstruction 2 $492,349
Blossomheath La - 13206 - 13352 Full Reconstruction 2 $270,130
Boca Raton Dr - 6217 - 6273 Full Reconstruction 2 $573,388
Bradbury La - 6723 - 6841 Full Reconstruction 2 $236,235
Briar Cove Dr - 6718 - 6840 Full Reconstruction 2 $322,372
Briar Cove Dr - 6900 - 7024 Full Reconstruction 2 $326,194
Brookcrest Dr - 14009 - 14067 Full Reconstruction 2 $218,398
Brookridge Dr - 14121 - 14126 Full Reconstruction 2 $301,984
Brushcreek La - 13106 - 13132 Full Reconstruction 2 $213,810
Carillon Dr (13908 - 14030) Peyton - Spring Valley to "T" Full Reconstruction Carillon Dr (13908 - 14030) 1 $178,642 Alley Chicot Dr - 11307 - 11447 Full Reconstruction 2 $313,453
Churchill Wy - 6431 - 6551 Full Reconstruction 2 $271,659
Clearsprings Rd - 8229 - 8241 Full Reconstruction 2 $197,246
Clearsprings Rd 8206-8272 Full reconstruction 2 $0
Cliffbrook Dr - 7314 - 7634 Full Reconstruction 2 $363,656
Dykes Wy - 6301 - 6423 Full Reconstruction 2 $194,697
Dykes Wy - 6504 - 6566 Full Reconstruction 2 $223,239
Egret Ln. 10538 ---- Woodthrush - Ravenscroft to "T" Alley Full reconst Egret Ln. 10538 2 $96,999
Elmridge Dr - 7309 - 7365 Full Reconstruction 2 $285,929
Flagstone La - 13106 - 13230 Full Reconstruction 2 $203,362
Flagstone La - 13306 - 13560 Full Reconstruction 2 $456,162
Friday, March 31, 2006 Page 256 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction
Greenhollow La - 8205 - 8257 Full Reconstruction 2 $212,536 Greenwich La - 6507 - 6651 Full Reconstruction 2 $366,714
Hillbriar Dr - 6602 - 6768 Full Reconstruction 2 $540,259
Kendallwood Dr - 7160 - 7190 Full Reconstruction 2 $159,019
Kenshire La - 7406 - 7436 Full Reconstruction 2 $211,516
Lavendale Av - 6120 - 6338 Full Reconstruction 2 $310,904
Lavendale Av - 6908 - 7048 Full Reconstruction 2 $336,643
Linden La - 6023 - 6263 Full Reconstruction 2 $422,269
Linden La - 6206 - 6262 Full Reconstruction 2 $206,165
Mason Dells Dr - 7810 - 7814 Full Reconstruction 2 $464,317
Meadow Crest Dr - 6006 - 6124 Full Reconstruction 2 $237,001
Midbury Dr - 7108 - 7242 Full Reconstruction 2 $304,024
Midbury Dr - 7506 - 7722 Full Reconstruction 2 $313,707
Midbury Dr - 7507 - 7723 Full Reconstruction 2 $327,468
Northaven Rd - 6008 - 6170 Full Reconstruction 2 $318,549
Overdale Dr - 7411 - 7547 Full Reconstruction 2 $378,182
Paldao Dr (7311 - 7429) Spring Valley - Meandering to Full Reconstruction Paldao Dr. (7311 - 7429) 1 $336,133 Carillon Preston Haven Dr - 6009 - 6057 Full Reconstruction 2 $203,871
Preston Haven Dr - 6111 - 6151 Full Reconstruction 2 $171,253
Rolling Hills and Clearsprings - Coit to Waterfall Full Reconstruction 2 $358,273
Rolling Hills La - 14046 - 14058 Full Reconstruction 2 $132,517
Rollings Hills Lane (13806-13860) Brookgreen - Coit to Full recon Rollings Hills Ln. (13806 - 13860) 2 $179,958 Willow Bend
Friday, March 31, 2006 Page 257 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction
Royalton Dr - 6419 - 6499 Full Reconstruction 2 $422,269 Stonemoss Dr - 13807 - 13915 Full Reconstruction 2 $143,729
Wellcrest(7423)&Woodthrush - Sandpiper to Boedeker Full Reconstruction 2 $223,301
Summary for 'Category' = Alley Reconstruction (69 detail records) Sum $18,965,299 Barrier Free Ramps
14019 Coit - Bustop Install Ramp at bus stop in front of 14019 Coit Road. 1 33 $1,914
13139 Blossomheath Ln @ Alpha Rd Construct 4 ramps 1 20 $7,658
Hillcrest Rd @ Hillwood Ln Construct 4 ramps 1 20 $4,518
Preston Rd @ Highcourt Pl Construct 4 ramps 1 20 $7,658
14740 Meandering Way Construct 4 ramps 1 19 $7,658
Belt Line Rd @ Alexis Dr Construct 4 Ramps 1 18 $7,658
Preston Rd @ Regency Pl Construct 4 ramps 1 16 $7,658
6151 Alpha Rd @ Danvers Dr Construct 2 Ramps 1 11 $3,829
Brookgreen Dr @ Waterfall Way Construct 4 Ramps 1 9 $7,658
Rolling Hills Ln @ Waterfall Way Construct 4 ramps 1 9 $7,658
Highcourt Pl @ Highmark Sq Ct Construct 4 ramps 1 4 $7,658
Meadowcreek Dr @ Townbluff Dr Install 4 ramps 1 4 $7,658
Regency Pl @ Highcourt Pl Construct 4 ramps 1 4 $7,658
Regency Pl @ Highplace Cir Construct 4 ramps 1 4 $7,658
6865 Greenwich One curb cut needed at leadwalk - SR#06-00021456. 1 3 $1,914
Summary for 'Category' = Barrier Free Ramps (15 detail records) Sum $96,412
Friday, March 31, 2006 Page 258 of 349 Project Name Description Tier Score Estimate Council District 11 Intergovernmental Partnership Projects
Alpha Rd - Noel to Preston Partnership project with Dallas County to widen existing 1 $5,105,200 roadway to 6 lane divided. Total estimated cost of $10.2 million. Estimated to be let by Dallas County late 2009. Supplements 1998 Bond Program funds. Hillcrest Road (NB) at White Rock Creek Bridge rehabilitation and/or reconstruction. 2 $0
Montfort from Peterson to Alpha Partnership project with TxDOT to widen to 5 lane divided. 1 $382,890 Total estimated cost of $1.9 million. Estimated to be let by TxDOT by fall 2007. Supplements 1995 and 1998 Bond Program funds. North Dallas RR Xings - 10 Xings along Cotton Belt Partnership project with TxDOT to upgrade gates and extend 1 $331,838 crossing surfaces. Total estimated cost of $2.9 million. Estimated to be let by early 2008. Supplements 2003 Bond Program funds. Preston Rd - Park Lane to N of Royal Partnership project with Dallas County to reconstruct the 1 $421,179 existing six lane divided roadway. Total estimated cost of $13.7 million. Estimated to be let by Dallas County late 2008. Supplements 2003 Bond Program funds. Spring Valley at Goldmark Partnership project with Dallas County for intersection 1 $382,890 improvements in conjunction with Dallas County and City of Richardson. Total estimated cost of $1.5 million. Estimated to be let by mid 2008. Valley View/Walnut - IH 635 to City Limits Partnership project with TxDOT to widen existing roadway to 6 1 $446,705 lane divided. Total estimated cost of $14.5 million. Estimated to be let by late 2008. Supplements 1995 and 1998 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (7 detail records) Sum $7,070,702 Street Reconstruction Local Streets
Pinyon Tree Rd - Lyndon B Johnson Frwy East to 700 ft 9200 Blk 1 57.32 $599,861
Riverbrook Dr - Stone Canyon Rd to Riverfall Dr 7700 Blk 1 57.11 $912,100
Friday, March 31, 2006 Page 259 of 349 Project Name Description Tier Score Estimate Council District 11 Street Reconstruction Local Streets
Summary for 'Category' = Street Reconstruction Local Streets (2 detail records) Sum $1,511,961 Street Resurfacing
Pinyon Tree Rd. - LBJ Frwy. To Dead End 9200 block 1 67.325 $47,478
Baxtershire Dr. - Hillcrest Rd. to St Michaels Dr. 6900 - 7200 1 65.255 $112,953
Goldmark Dr. - Midpark Rd. to Spring Valley Rd. 13500-14000 1 62.69 $313,587
Emily Rd. - Coit Rd. to Kit Ln. 13100-13300 1 59.25 $407,012
Boedeker St. - Blairview Dr. to Lakehurst Ave. 9900 - 10000 1 51.115 $73,898
Blossomheath Ln. - LBJ Svc. Rd. to Coit Rd. 13000-13300 1 50.45 $157,240
Bent Branch Ln. - Firelog Ln. to Flickering Shadow Dr. 9800 Block 1 43.325 $52,711
Laurel Wood Ln. - Meadowside dr. to Valley View Ln. 13200 block 1 42.51 $9,828
Alpha Rd. - 5300 2 $0
Alpha Rd. - 5500 2 $0
Alpha Rd. - 5700 2 $0
Alpha Rd. - 5800 2 $0
Alpha Rd. - 5900 2 $0
Alpha Rd. - 7100 2 $0
Alpha Rd. - 7400 2 $0
Alpha Rd. - 7700 2 $0
Arapaho Rd. - 5300 2 $0
Arapaho Rd. - 5400 2 $0
Arapaho Rd. - 5500 2 $0
Friday, March 31, 2006 Page 260 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing
Arapaho Rd. - 6000 2 $0 Azalea La. - 6000 2 $0
Black Berry La. - 6100 2 $0
Blossomheath La. - 13500 2 $0
Briar Cove Dr. - 7100 2 $0
Briar Cove Dr. - 7200 2 $0
Cliffbrook Dr. - 6900 2 $0
Clodus Fields Dr. - 7900 2 $0
Cypress Hills Dr. - 15300 2 $0
Cypress Hills Dr. - 15400 2 $0
Delmeta Dr. - 6900 2 $0
Edelweiss Cir. - 6900 2 $0
Elmridge Dr. - 7300 2 $0
Emeraldwood Dr. - 6200 2 $0
Ferris Creek La. - 12300 2 $0
Floyd Cir. - 13300 2 $0
Floyd Cir. - 13400 2 $0
Gateridge Dr. - 7000 2 $0
Golden Creek Rd. - 15700 2 $0
Grayport Dr. - 14900 2 $0
Greenhollow La. - 7900 2 $0
Greenwich La. - 6500 2 $0
Friday, March 31, 2006 Page 261 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing
Greenwich La. - 6700 2 $0 Happy La. - 6500 2 $0
Harvest Glen Dr. - 6600 2 $0
Hickory Hill Dr. - 6300 2 $0
Hill Haven Dr. - 11200 2 $0
Hillcrest Rd. - 11100 2 $0
Hillcrest Rd. W - 14900 2 $0
Jasmine La. - 11500 2 $0
Kenshire La. - 7400 2 $0
Knollview Dr. - 14800 2 $0
Maplecrest Dr. - 7300 2 $0
Mason Dells Dr. - 7100 2 $0
Mason Dells Dr. - 7200 2 $0
Meadowcreek Dr. - 6900 2 $0
Meandering Wy. - 14600 2 $0
Meandering Wy. - 14700 2 $0
Merit Dr. - 12000 2 $0
Merit Dr. - 12300 2 $0
Merit Dr. - 12600 2 $0
Merit Dr. - 12700 2 $0
Midbury Dr. - 7000 2 $0
Midbury Dr. - 7100 2 $0
Friday, March 31, 2006 Page 262 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing
Midbury Dr. - 7400 2 $0 Midbury Dr. - 7600 2 $0
Midpark Rd. - 8400 2 $0
Montfort Pl. - 13500 2 $0
Noel Rd. - 14100 2 $0
Northaven Rd. - 7800 2 $0
Northcreek La. - 6700 2 $0
Oakbluff Dr. - 7200 2 $0
Overdale Dr. - 7400 2 $0
Overview Dr. - 14500 2 $0
Pebbledowne Dr. - 11200 2 $0
Peterson La. - 5500 2 $0
Preston Creek Dr. - 6000 2 $0
Ridgeview Cir. - 6700 2 $0
Riverfall Dr. - 7900 2 $0
Rolling Vista Dr. - 6600 2 $0
Rolling Vista Dr. - 6700 2 $0
Royal Crest Dr. - 6100 2 $0
Spring Grove Av. - 13700 2 $0
Spring Valley Rd. - 7000 2 $0
Spring Valley Rd. - 7300 2 $0
Spring Valley Rd. - 7600 2 $0
Friday, March 31, 2006 Page 263 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing
Sprucewood Dr. - 13500 2 $0 Sprucewood Dr. - 13800 2 $0
Tahoe Dr. - 13100 2 $0
Thistle La. - 7700 2 $0
Tophill Cir. - 7100 2 $0
Trails End Dr. - 15300 2 $0
Trails End Dr. - 15400 2 $0
Trails End Dr. - 15500 2 $0
Trails End Dr. - 15600 2 $0
Valley View Pl. - 7200 2 $0
Verde Valley La. - 5000 2 $0
Village Trail Dr. - 7600 2 $0
Village Trail Dr. - 7700 2 $0
White Rose Trl. - 6000 2 $0
Wightman Pl. - 12200 2 $0
Willow Bend Rd. - 13400 2 $0
Willow Bend Rd. - 13500 2 $0
Woodthrush Dr. - 7500 2 $0
Woodthrush Dr. - 7600 2 $0
Yamini Dr. - 7300 2 $0
Summary for 'Category' = Street Resurfacing (105 detail records) Sum $1,174,707
Friday, March 31, 2006 Page 264 of 349 Project Name Description Tier Score Estimate Council District 11 Streetscape / Urban Design
Spring Valley/Coit Urban Design Study Street intersection and median enhacements. 2 86 $278,931 Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $278,931 Thoroughfares
Noel - Spring Valley to Verde Valey Widen to a six lane divided roadway 1 54 $15,997,623
Alpha- Dallas Pkwy to Preston - Phase II Widen to 6 lane divided roadway and adding right turn lanes. 1 45 $9,225,579
Spring Valley - DNT to Montfort Widen to 8 lane divided roadway 1 45 $3,890,145
Noel - Alpha to Spring Valley 6 Lane roadway construction. Estimate adds curb lanes and 1 34 $7,880,172 does not include R.O.W. Spring Valley - Hillcrest to Coit Widen to 6 lane divided roadway 1 30 $6,819,337
Montfort - Verde Valley to Spring Valley Widen to 6 lane divided roadway 1 28.389 $4,089,452
TI Drive/ Floyd - Restland to Markville Widen to a four lane undivided roadway 1 26 $688,386
Arapaho - Dallas Parkway to Knoll Trail Widen from 33' pave./80' ROW to 44' pave./80' ROW 1 13 $2,544,755
Knoll Trail - Arapaho to KellerSprings Build a 4 lane divided roadway. 1 10 $4,351,577
Summary for 'Category' = Thoroughfares (9 detail records) Sum $55,487,025 Traffic Intersection Capacity & Safety Improvement
Forest at Preston Rd Widen Preston Rd to provide a northbound right turn lane and 1 50 $256,536 widen Forest Ln to provide an eastbound right turn lane. Merit @ Park Central Use median area to widen Park Central and create a 1 30 $255,260 northbound right turn lane. Arapaho @ Dallas Parkway Intersection identified on Thoroughfare Plan - project scope not 2 0 $0 currently defined. Town of Addison has committed to make improvements. Arapaho @ Knoll Trail Street Modifications and Bot Intersection identified on Thoroughfare Plan - project scope not 2 $0 currently defined. Need to define.
Friday, March 31, 2006 Page 265 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Intersection Capacity & Safety Improvement
Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (4 detail records) Sum $511,796 Traffic Safety Improvements-Guardrail Upgrades
Belt Line 5600 BLK Guardrail Upgrade 1 80 $32,386
Forest 7600 BLK Guardrail Upgrade 1 80 $42,182
Arapaho 5600 BLK Guardrail Upgrade 1 73 $47,064
Belt Line 6900 BLK Guardrail Upgrade 1 73 $3,543
Forest 6400 BLK Guardrail Upgrade 1 73 $7,594
Forest 6600 BLK Guardrail Upgrade 1 73 $3,925
Forest 6700 BLK Guardrail Upgrade 1 73 $10,529
Forest 7200 BLK Guardrail Upgrade 1 73 $32,497
Hillcrest 13000 BLK Guardrail Upgrade 1 73 $26,515
Hillcrest 13300 BLK Guardrail Upgrade 1 73 $5,641
Hillcrest 13800 BLK Guardrail Upgrade 1 67 $21,059
Spring Valley 6300 BLK Guardrail Upgrade 1 67 $53,337
Hillcrest 11300 BLK Guardrail Upgrade 1 60 $16,209
Royal 7300 BLK Guardrail Upgrade 1 60 $12,252
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (14 detail records) Sum $314,733 Traffic Signal Upgrades - Citywide
Dallas Parkway @ Spring Valley Traffic Signal Upgrades Citywide 1 100 $98,913
Arapaho - Dallas Parkway Traffic Signal Upgrades Citywide 1 93 $205,484
Friday, March 31, 2006 Page 266 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Signal Upgrades - Citywide
Montfort @ Verde Valley Traffic Signal Upgrade 1 87 $118,696 Merit - Park Central Traffic Signal Upgrades Citywide 1 80 $102,359
Preston @ Preston Royal S C Traffic Signal Upgrade 1 73 $60,305
Arapaho @ Hillcrest Traffic Signal Upgrades-Citywi Traffic Signal Upgrade 1 67 $21,569
Abrams @ Flickering Shadow Traffic Signal Upgrade 1 53 $107,847
Alpha @ Montfort Traffic Signal Upgrade 1 53 $109,762
Alpha @ Valley View Mall Traffic Signal Upgrade 1 53 $105,933
Arapaho @ Prestonwood Traffic Signal Upgrade 1 53 $107,847
Beltline @ Meadow Creek Traffic Signal Upgrade 1 53 $107,847
Boedeker @ Walnut Hill Traffic Signal Upgrade 1 53 $59,322
Edgemere @ Royal Ln Traffic Signal Upgrade 1 53 $74,378
Forest Ln @ Park Central Traffic Signal Upgrade 1 53 $132,416
Harvest Hill @ Preston Rd (Linden) Traffic Signal Upgrade 1 53 $40,982
Hillcrest @ Hillcrest Plaza Traffic Signal Upgrade 1 53 $106,890
Hillcrest @ Meadow Traffic Signal Upgrade 1 53 $61,473
Hillcrest @ Spring Valley Traffic Signal Upgrades Citywide 1 53 $82,321
Northaven @ Preston Traffic Signal Upgrade 1 53 $60,340
Abrams @ Chimney Hill (Pinyon Tree) Traffic Signal Upgrade 1 40 $107,847
Alpha @ Hillcrest Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 40 $81,364
Arapaho @ Knoll Trail Traffic Signal Upgrade 1 40 $107,847
Arapaho @ Meadow Creek Traffic Signal Upgrade 1 40 $34,511
Beltline @ Meandering Way Traffic Signal Upgrade 1 40 $51,767
Friday, March 31, 2006 Page 267 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Signal Upgrades - Citywide
Churchill Way @ Hillcrest Traffic Signal Upgrade 1 40 $106,890 Dilbeck @ Preston Rd Traffic Signal Upgrade 1 40 $107,847
Hillcrest @ Midbury (Northaven) Traffic Signal Upgrade 1 40 $109,379
Montfort @ Peterson Traffic Signal Upgrade 1 40 $105,933
Noel @ Peterson Traffic Signal Upgrade 1 40 $105,933
Royal @ St Michaels Traffic Signal Upgrade 1 40 $118,313
Floyd Circle @ T I Blvd Traffic Signal Upgrade 1 33 $79,450
Arapaho @ Golden Creek Traffic Signal Upgrade 1 27 $61,255
Boedeker @ Meadow Traffic Signal Upgrades Citywide 1 27 $107,464
Churchill Way @ Preston Traffic Signal Upgrade 1 27 $43,356
Meandering Way @ Spring Valley Traffic Signal Upgrade 1 27 $116,399
Preston @ Willow Traffic Signal Upgrades Citywide 1 27 $58,199
Sherman @ TI Blvd Traffic Signal Upgrades Citywide 1 13 $101,402
Summary for 'Category' = Traffic Signal Upgrades - Citywide (37 detail records) Sum $3,369,843 Traffic System Management - Dynamic Message Signs
Hillcrest SB approaching Arapaho Dynamic Message Sign 1 60 $76,578
Hillcrest SB approaching LBJ Traffic Systems Management - Dynamic Message Signs 1 60 $153,156
Beltline WB approaching DNP Dynamic Message Sign 1 25 $153,156
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (3 detail records) Sum $382,890 Traffic System Management - Roadside Cameras
Friday, March 31, 2006 Page 268 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic System Management - Roadside Cameras
Dallas Parkway-Keller Springs Roadside Camera 1 30 $6,382 Dallas Parkway-Springvalley Roadside Camera 1 30 $25,526
Summary for 'Category' = Traffic System Management - Roadside Cameras (2 detail records) Sum $31,908 Summary for 'Program' = STREET AND TRANSPORTATION (268 detail records) Sum $89,196,205 Summary for 'CD' = 11 (268 detail records) Sum $89,196,205
Friday, March 31, 2006 Page 269 of 349 Project Name Description Tier Score Estimate Council District 12 Alley Reconstruction
Chattington(7606)&Rolling Acres-Tophill toCarriage Full Reconstruction 1 68 $324,592 Leameadow(7119)& Town Bluff -Hillcrest to Wildvine Full Reconstruction 1 68 $327,042
Brentfield(7424)&Rustic Valley-Havenglen to Brentf Partial Reconstruction. Field checked on 1/19/06. 2 66 $430,805
Roundrock Road (7608-7824) Woodstone - Meandering to Full recon Roundrock Rd. (7608 - 7824) 1 66 $358,640 Spring Creek Alto Caro & La Verdura -La Verdura to Spring Creek Full Reconstruction 1 63 $388,531
Roundrock Road (7906-7986) Woodstone - Springcreek to Full recon Roundrock Rd. (7906 - 7986) 1 60 $250,155 Coit El Estdo & Arapaho - Coit to Arapaho Full Reconst. L-shape (Coit 15615) 1 40 $213,142
Amberwood Rd - 16101 - 16239 Full Reconstruction 2 $399,843
Appledale La - 2604 - 2632 Full Reconstruction 2 $487,253
Briaridge Rd - 7708 - 7820 Full Reconstruction 2 $205,400
Briaridge Rd. 7906 - 7986 Full reconstruction 2 $271,852
Chalkstone Dr - 7628 - 7748 Full Reconstruction 2 $335,368
Chattington & Rolling Acres- Carriage toSpring Crk Full Reconstruction 2 $251,957
Daybreak Dr - 2303 - 2715 Full Reconstruction 2 $497,192
El Pastel & La Sabrina - El Pastel to Spring Creek Full Reconstruction 1 $356,088
Fallmeadow La - 7612 - 7668 Full Reconstruction 2 $251,016
Fallmeadow La - 7931 - 7997 Full Reconstruction 2 $339,191
Farley Trl - 17703 - 17871 Full Reconstruction 2 $459,730
Harbinger La - 2303 - 2423 Full Reconstruction 2 $244,900
Kingsridge - 2307 - 2627 Full Reconstruction 2 $487,253
La Cabeza and La Managa - Salado to Spring Creek Full Reconstruction 2 $190,933
Lawngate Dr - 4203 - 4231 Full Reconstruction 2 $169,468
Friday, March 31, 2006 Page 270 of 349 Project Name Description Tier Score Estimate Council District 12 Alley Reconstruction
Mapleshade(5910) & Deseret-Mahogany to Bentwood Full Reconstruction 2 $263,841 Ridgestone Dr - 2304 - 2448 Full Reconstruction 2 $303,768
Tophill & Rolling Acres - Tophill to Carriage 7615 Top Hill La 2 $173,909
Summary for 'Category' = Alley Reconstruction (25 detail records) Sum $7,981,869 Barrier Free Ramps
18211 Kelly Blvd Curb Cuts are needed on Kelly Blvd (Frankford-18211), 1 33 $34,460 Frankford (City limit-SH 190) And Apple Ridge (Frankford- Dead End). Total 18 Locations Meandering - La Sobrina 2 BFR's at intersection 1 23 $3,829
Kelly Blvd @ Timberglen 2 BFR needed at intersection 1 21 $3,829
Hillcrest Rd @ Hillwood Ln Construct 4 ramps 1 20 $3,140
Applecross Ln @ Springcreek Rd Construct 4 ramps 1 12 $7,658
Brentfield @ Meadow Creek Total 5 BFRs. 3 on Meadowcreek @ Brentfield, 2 on 1 12 $7,658 Meadowcreek @ Windy Ridge Applecross Ln @ Kilbridge Ln Construct 4 ramps 1 4 $7,658
Holly Tree Dr @ Fox Fire Dr One BFR needed @ intersection 1 4 $1,914
Blue Mist La (6005) Need curb cut in front of address 1 3 $1,914
Salado Dr. @ Carta Valley Construct 4 ramps 1 $7,658
Summary for 'Category' = Barrier Free Ramps (10 detail records) Sum $79,718 Bridge Repair and Modification
Dickerson over E. Fork Trib/McKamy Br (Osage) Clean & paint metal, repair timber deck, gabion scour 1 68.75 $51,052 protection, repair guardrails; consider full replacement (~$150,000); leverages TxDOT funding for repair; Serious
Friday, March 31, 2006 Page 271 of 349 Project Name Description Tier Score Estimate Council District 12 Bridge Repair and Modification
Summary for 'Category' = Bridge Repair and Modification (1 detail record) Sum $51,052 Intergovernmental Partnership Projects
Dickerson St @ East Fork McKamy Branch Bridge rehabilitation and/or reconstruction. 2 $0
North Dallas RR Xings - 10 Xings along Cotton Belt Partnership project with TxDOT to upgrade gates and extend 1 $1,327,352 crossing surfaces. Total estimated cost of $2.9 million. Estimated to be let by early 2008. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $1,327,352 Street Petitions
Riseden Dr - Winding Rose Tr to Hillcrest Rd Engineering, Paving & Drainage 6800 Blk 1 88 $555,191
Stedman Dr - Davenport Rd to ex Pavement N Stedman Engineering, Paving & Drainage 17000 Blk 1 85 $344,601
Summary for 'Category' = Street Petitions (2 detail records) Sum $899,792 Street Resurfacing
Arapaho Rd. - Meandering Way to Coit Rd. 7500-7900 1 75.88 $451,810
La Verdura Dr. - Alto Caro Dr. to El Pastel Dr. 7600-7800 1 59.11 $141,542
Highland Glen Tr. - Highland Heather to Meandering 7300 Block 1 55.26 $33,822
Williamswood Dr. - Dickerson St.to Kirkham Dr. 7300 block 1 55.12 $51,307
Arapaho Rd. - Hillcrest Rd. to Meandering Way 7000-7400 1 54.74 $249,134
Kelly Blvd. - Frankford Rd. to Timber Oaks Dr. 18000-18100 1 54.07 $155,326
Winding Creek Ct. - Davenport Rd. to Cul-de-Sac 6900 block 1 53.73 $288,189
La Sobrina Dr. - Spring Creek Rd. to El Pastel Dr. 7800 block 1 52.24 $63,177
Friday, March 31, 2006 Page 272 of 349 Project Name Description Tier Score Estimate Council District 12 Street Resurfacing
Briarnoll Dr. - Carrolwood Dr. to Debbe Dr. 7300 Block 1 47.91 $62,922 Rembrandt Ter. - Michaelanglo Dr. to Gainsboro Dr. 18500-18700 1 37.44 $166,557
Kingstree Dr. - Roundrock Dr. to D.E. @ Cul-de-Sac 15100 block 1 30.2 $66,368
Anglebluff Cir. - 6800 2 $0
Arapaho Rd. - 6000 2 $0
Bentwood Trl. - 6000 2 $0
Bentwood Trl. - 6200 2 $0
Bretton Bay La. - 4400 2 $0
Briargrove La. - 4200 2 $0
Briargrove La. - 4500 2 $0
Briargrove La. - 4600 2 $0
Carriage La. - 15200 2 $0
Carrollwood Dr. - 17900 2 $0
Carrollwood Dr. - 18000 2 $0
Club Hill Dr. - 16800 2 $0
Club Hill Dr. - 16900 2 $0
Debbe Dr. - 7200 2 $0
Flintcove Dr. - 6900 2 $0
Frankford Rd. - 2600 2 $0
Frankford Rd. - 5000 2 $0
High Star La. - 4200 2 $0
Hillcrest Rd. - 15900 2 $0
Friday, March 31, 2006 Page 273 of 349 Project Name Description Tier Score Estimate Council District 12 Street Resurfacing
Hillcrest Rd. W - 14900 2 $0 Kelly Blvd. - 17700 2 $0
Kelly Blvd. - 18200 2 $0
Kirkmeadow La. - 4100 2 $0
Lloyd Cir. - 18900 2 $0
Loveland Dr. - 17600 2 $0
Mccallum Blvd. - 6300 2 $0
Mill Falls Dr. - 6900 2 $0
Misty Trl. - 6200 2 $0
Oakington Ct. - 17400 2 $0
Old Mill Rd. - 2600 2 $0
Platte River Wy. - 18700 2 $0
Rooster La. - 17700 2 $0
Rosemeade Pkwy. - 3600 2 $0
Roundrock Rd. - 7700 2 $0
Roundrock Rd. - 7900 2 $0
Snowbird Trl. - 6100 2 $0
Timberglen Rd. - 3400 2 $0
Warm Mist La. - 5900 2 $0
Woodstone La. - 7900 2 $0
Summary for 'Category' = Street Resurfacing (50 detail records) Sum $1,730,152
Friday, March 31, 2006 Page 274 of 349 Project Name Description Tier Score Estimate Council District 12 Thoroughfares
Rosemeade -Midway to SH 190 Widen to accommodate 14' continuous left turn 1 31 $1,010,989 Frankford - Richardson C.L. to Coit Road Widen to a six lane divided roadway from a two lane roadway 1 29 $12,419,559
Dallas Parkway - Trinty Mills to N. City Limits Widen service roads. 1 0 $5,578,618
Dallas Parkway - Westgrove to Trinity Mills Widen service roads. 1 0 $1,952,516
Summary for 'Category' = Thoroughfares (4 detail records) Sum $20,961,682 Traffic Intersection Capacity & Safety Improvement
Coit Rd at McCallum Blvd Widen Coit Road at McCallum to provide a second northbound 1 45 $513,073 left-turn lane. Arapaho east of Meandering Way Widen Arapaho just east of Meandering Way to provide a 1 40 $86,788 westbound leftturn pocket. Davenport at Frankford 1 35 $0
Frankford at Kelly Remove dip in roadway on Frankford Rd crossing Kelly Blvd. 1 35 $218,247
Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (4 detail records) Sum $818,108 Traffic Safety Improvements-Guardrail Upgrades
Coit 17500 BLK Guardrail Upgrade 1 80 $16,949
Coit 18000 BLK Guardrail Upgrade 1 80 $6,713
Frankford 5400 BLK Guardrail Upgrade 1 80 $37,230
Frankford 4400 BLK Guardrail Upgrade 1 73 $18,123
Frankford 6600 BLK Guardrail Upgrade 1 73 $5,201
Frankford 6800 BLK Guardrail Upgrade 1 73 $41,595
Hillcrest 16100 BLK Guardrail Upgrade 1 67 $8,730
Hillcrest 17500 BLK Guardrail Upgrade 1 67 $19,764
Friday, March 31, 2006 Page 275 of 349 Project Name Description Tier Score Estimate Council District 12 Traffic Safety Improvements-Guardrail Upgrades
Hillcrest 18100 BLK Guardrail Upgrade 1 67 $19,617 Marsh 18700 BLK Guardrail Upgrade 1 67 $13,465
Campbell 6400 BLK Guardrail Upgrade 1 60 $17,868
Hillcrest 10700 BLK Guardrail Upgrade 1 60 $7,594
McCallum 6300 BLK Guardrail Upgrade 1 60 $6,669
McCallum 6800 BLK Guardrail Upgrade 1 60 $18,187
Midway 18900 BLK Guardrail Upgrade 1 60 $5,392
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (15 detail records) Sum $243,097 Traffic Signal Upgrades - Citywide
Arapaho @ Meandering Way Traffic Signal Upgrades-C Traffic Signal Upgrade 1 80 $106,890
Kelly @ Timberglen Traffic Signal Upgrades Citywide 1 80 $102,359
Arapaho @ Hillcrest Traffic Signal Upgrades-Citywi Traffic Signal Upgrade 1 67 $86,278
Campbell @ Davenport Traffic Signal Upgrade 1 67 $80,981
Bentwood @ Genstar(Preston Rd) Traffic Signal Upgrade 1 53 $107,847
Coit @ McCallum Traffic Signal Upgrade 1 53 $107,847
Arapaho @ Meadow Creek Traffic Signal Upgrade 1 40 $73,336
Arapaho @ Spring Creek Traffic Signal Upgrade 1 40 $107,847
Beltline @ Meandering Way Traffic Signal Upgrade 1 40 $56,081
Campbell - Hillcrest Traffic Signal Upgrades Citywide 1 40 $83,279
Campbell - Meandering Way Traffic Signal Upgrades Citywide 1 40 $54,881
Hillcrest @ La Manga Traffic Signal Upgrades Citywide 1 40 $107,464
Friday, March 31, 2006 Page 276 of 349 Project Name Description Tier Score Estimate Council District 12 Traffic Signal Upgrades - Citywide
Arapaho @ Golden Creek Traffic Signal Upgrade 1 27 $46,210 Summary for 'Category' = Traffic Signal Upgrades - Citywide (13 detail records) Sum $1,121,301 Traffic System Management - Dynamic Message Signs
Coit SB approaching Beltline Traffic Systems Management - Dynamic Message Signs 1 60 $153,156
Hillcrest SB approaching Arapaho Dynamic Message Sign 1 60 $76,578
Summary for 'Category' = Traffic System Management - Dynamic Message Signs (2 detail records) Sum $229,734 Traffic System Management - Roadside Cameras
Coit-190 Traffic Systems Management - Roadside Camera 1 40 $25,526
Dallas Parkway-Frankford Roadside Camera 1 40 $25,526
Frankford-Midway Roadside Camera 1 40 $12,763
Frankford-Preston Roadside Camera 1 40 $12,763
Preston-190 Traffic Systems Management - Roadside Camera 1 40 $25,526
Dallas Parkway-Keller Springs Roadside Camera 1 30 $6,382
Dallas Parkway-Trinity Mills Roadside Camera 1 30 $12,763
Summary for 'Category' = Traffic System Management - Roadside Cameras (7 detail records) Sum $121,249 Summary for 'Program' = STREET AND TRANSPORTATION (135 detail records) Sum $35,565,105 Summary for 'CD' = 12 (135 detail records) Sum $35,565,105
Friday, March 31, 2006 Page 277 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Talisman Dr & Wildflower from Wildflower to Caraway Full Reconstruction (Talisman Dr - 2926 - 2996) 1 85 $207,949 SR#0600081180 Catamore(3144) & Woodwind - Dundee including 'T' Full Reconstruction 1 78 $313,042
Whitehall & Jubilee Trail - Shans to Cromwell Full Reconstruction 1 78 $425,087
Aberdeen Ave & Mimosa Ln - Tibbs to Edgemere Full Reconstruction 1 73 $234,839
Colgate & Marquette - Boedeker to Durham Full Reconstruction 1 73 $248,879
Cromwell(11001) - Royal to Lathrop Full Reconstruction 1 73 $311,290
Carry Back Cir. & TU ROW - Pensive to T-alley Full Reconstruction 1 70 $147,639
Meletio(5739) & Charlestown - Nuestra to Jamestown Full Reconstruction 1 70 $299,803
Ainsworth & Norcross - Ainsworth to Norcross Full Reconstruction 1 69 $276,013
Marquette(7207) & Centenary - Airline to Durham Full Reconstruction 1 69 $182,179
Warick & Merrell - Cromwell to Crittendon Full Reconstruction 1 69 $373,412
Pensive(10318) - Carry Back Cir to 'T' Full Reconstruction 1 68 $108,700
Desco Dr & Prestonshire Ln - Thackery to Hillcrest Full Reconstruction 1 67 $336,799
Lupton Dr & Stefani Dr - Edgemere to Thakery Full Reconstruction 1 67 $303,019
Shirestone La 12003 & Drujon - Forest to Willow Full recon. U-shape fr Shirestone to alley E of Drujon 1 66 $339,496 Shirestone Ln 12003 Goodyear and Carry Back - Ponder to T-alley Full Reconstruction 1 64 $263,901
Royal Lane (3505-3635) Vancouver- Cromwell to Lathrop Full recon Royal Ln. (3505 - 3635) 1 63 $335,667
Aberdeen Ave & Mimosa Ln - Dead End to Tulane Full Reconstruction 1 61 $209,862
Carry Back & Carry Back - Carry Back to Carry Back Full Reconstruction 1 61 $63,969
Latham & Leahy - T-alley to Channel Dr 1 61 $407,743
Lupton Dr & Prestonshire Ln - Edgemere to Thackery Full Reconstruction 1 61 $336,799
Del Norte & Northwood - Thackery To Hillcrest Full Reconstruction 1 60.3 $361,872
Friday, March 31, 2006 Page 278 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Aberdeen Ave & Stichter Ave - Tibbs to Edgemere Full Reconstruction 1 60 $251,303 Chevy Chase & Deloache - Thackery to Hillcrest Full Reconstruction 1 60 $365,297
Del Roy Dr (5209 - 5439) Preston Haven - Inwood to Full reconstruction Del Roy Dr. (5209 - 5439) 1 60 $305,036 Eastern High Vista & High Brook-High Meadow to High Valley Full Reconstruction 1 60 $293,065
Lakehurst(6472) & Mimosa - Tibbs to Edgemere Full Reconstruction 1 60 $247,958
Marsh & Crittendon - Merrell Rd To Ingleside Dr. Full Reconstruction 1 60 $147,807
Northaven Road (3509-3667) Flair - Sonnet to Marsh Full recon Northaven Rd. (3509 - 3667) 1 60 $305,036
Stefani Drive (6707-6839) Joyce - Thackery to Hillcrest Full recon Stefani Dr. (6707 - 6839) 1 60 $236,116
Vancouver Circle (3807-3821) Waldorf - Cox to Rosser Full recon Vancouver Cir. (3807 - 3821) 1 60 $113,591
Williamstown & Meletio - Quincy To Nuestra Dr. Full Reconstruction 1 60 $338,937
Orchid(6405) & Tulip - Tibbs to Edgemere Full Reconstruction 1 58.88 $233,180
Desco Dr & Prestonshire Ln - Tulane to Edgemere Full Reconstruction 1 58 $336,799
Glendora & Meadow - Tibbs to Edgemere Full Reconstruction 1 58 $251,303
Royal Ln & Vancouver Dr - Marsh Ln to Cox Ln Full Reconstruction, 3700 Blk (Action item) 1 57 $331,838
Glendora & Lakehurst - Preston to Tulane 1 56 $308,609
Park Ln & Woodland Dr - Edgemere to Thackery Full Reconstruction 1 55 $284,984
Royal & Tulip - Camellia to Tibbs Full Reconstruction 1 53 $354,934
Royal & Tulip - Tibbs to Edgemere Full Reconstruction 1 53 $264,258
Preston Haven & Caladium - Nuestra to Jamestown Full Reconstruction 1 47 $256,878
Seguin Drive 3704-3772 Inc T-alley Full recon 1 46 $216,205
High Bluff Dr (3505 - 3631) High Mesa - Highdale to "T" Full reconst High Bluff DR. (3505 - 3631) 1 43 $289,720 Alley Aberdeen & Mimosa - Tibbs to Tulane Full reconstruction - Aberdeen 6207-6339 1 40 $236,116
Friday, March 31, 2006 Page 279 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Boca Raton & Del Roy - Nuestra To Jamestown Rd. Full Reconstruction 1 40 $216,104 Caruth Blvd (7403 - 7443) Colgate - Boedeker to Durham Full reconstruction Caruth Blvd (7403 - 7443) 1 40 $238,923
High Bluff Dr (3506 - 3640) High Mesa - Highdale to "T" Full reconstr High Bluff Dr. (3506 - 3640) 1 40 $325,457 Alley St Cloud Cir (3402 - 3478) Winged Foot - Cromwell to "T" Full reconst. U-shape St Cloud Cir. (3402 - 3478) 1 40 $559,019 Alley Winged Foot Court (3407-3437) Saint Cloud - Cromwell to Full recon Winged Foot Crt. (3407 - 3437) 1 40 $559,019 "T" Alley Vancouver Dr & Waldorf - Cromwell to Lathrop Full Reconstruction 1 38 $376,653
Coogan Dr 10790 Channel - Brockbank to "T" Alley Full reconstruction Coogan Dr 10790 1 34 $63,815
St Cloud Cir (3309 - 3357) Forest - Lazywood to Cromwell Full reconst St Cloud Cir. (3309 - 3357) 1 31 $550,085
Green Terrace Dr (9408 - 9460) Thornberry - Northwest to Full reconstruction Green Terrace Dr. (9408 - 9460) 1 28 $311,417 "T" Alley Aberdeen Av - 6406 - 6478 Full Reconstruction 2 $248,978
Aberdeen Av - 6505 - 6635 Full Reconstruction 2 $242,098
Aberdeen Av - 6704 - 6834 Full Reconstruction 2 $241,333
Aberdeen Av - 6705 - 6835 Full Reconstruction 2 $244,136
Allencrest La - 4807 - 4931 Full Reconstruction 2 $312,178
Antigua & High Summit -High Summit to Rosser Full Reconstruction - Antigua 3856 2 $246,017
Azalea La - 5909 - 5973 Full Reconstruction 2 $244,646
Bandera & Del Norte - Thackery to Turtle Creek Full Reconstruction 2 $129,538
Bandera Av - 6206 - 6332 Full Reconstruction 2 $301,984
Bandera Ave & Del Norte Ln - Preston to Edgemere Full Reconstruction 2 $660,644
Beauty La - 10804 - 11030 Full Reconstruction 2 $361,363
Beechwood La - 3808 - 3992 Full Reconstruction 2 $391,688
Friday, March 31, 2006 Page 280 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Beechwood La - 3905 - 3993 Full Reconstruction 2 $311,924 Boca Raton 5806 - 5930 Full Recostructiion - Boca Raton 5806 - 5930 2 $268,023
Boca Raton Dr - 5209 - 5447 Full Reconstruction 2 $365,185
Boca Raton Dr - 5507 - 5531 Full Reconstruction 2 $136,339
Boca Raton Dr - 5510 - 5722 Full Reconstruction 2 $332,056
Brockbank Dr - 10412 ------Full Reconstruction 2 $73,138
Brockbank Dr - 10510 - 10550 Full Reconstruction 2 $213,300
Brockbank Dr - 10832 - 10848 Full Reconstruction 2 $72,884
Brookshire Dr - 6304 - 6340 Full Reconstruction 2 $164,117
Brookshire Dr - 6506 - 6630 Full Reconstruction 2 $241,078
Brookshire Dr - 6507 - 6631 Full Reconstruction 2 $241,333
Brookshire Dr - 6706 - 6830 Full Reconstruction 2 $237,764
Brookshire Dr - 6707 - 6831 Full Reconstruction 2 $234,197
Brookstown Dr - 5716 - 5826 Full Reconstruction 2 $278,029
Bryn Mawr Dr - 7803 - 7923 Full Reconstruction 2 $215,339
Cabana La - 3826 - 3866 Full Reconstruction 2 $192,404
Caladium Dr - 5707 - 5839 Full Reconstruction 2 $258,152
Caruth Blvd - 7402 - 7542 Full Reconstruction 2 $274,462
Castlewood Rd - 5212 - 5454 Full Reconstruction 2 $402,646
Castlewood Rd - 5319 - 5455 Full Reconstruction 2 $412,330
Charlestown Dr - 5506 - 5658 Full Reconstruction 2 $357,030
Chevy Chase Av - 6404 - 6418 Full Reconstruction 2 $100,407
Friday, March 31, 2006 Page 281 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Chevy Chase Av - 6426 - 6542 Full Reconstruction 2 $262,994 Chevy Chase Av - 6427 - 6543 Full Reconstruction 2 $332,056
Chevy Chase Av - 6703 - 6837 Full Reconstruction 2 $220,945
Citation(3329) & Whirlaway-Harwich to Webb Chapel Full Reconstruction 2 $220,409
Clover La - 4005 - 4071 Full Reconstruction 2 $235,471
Colhurst St - 5806 - 5868 Full Reconstruction 2 $299,691
Coral Gables Dr - 3608 - 3660 Full Reconstruction 2 $210,752
Coral Hills Dr & Cromwell Cir from T Alley to Cromwell Dr Full Reconstruction - Coral Hills Dr - 11739. The design is 1 $252,707 being done with 2003 Bond Coral Hills Dr (11523 - 11589) Forest - Webbs Chapel to Full Reconstruction Coral Hills Dr (11523 - 11589) 1 $609,321 Lazy Wood Cox La - 10544 - 10736 Full Reconstruction 2 $514,266
Cox La - 10655 ------Full Reconstruction 2 $270,639
Crestline Av - 12111 ------Full Reconstruction 2 $317,275
Cromwell Dr - 10432 - 10448 Full Reconstruction 2 $185,778
Cromwell Dr - 11330 ------Full Reconstruction 2 $252,291
Cromwell Dr - 11807 - 12011 Full Reconstruction 2 $308,355
Cromwell Dr - 11822 - 11926 Full Reconstruction 2 $375,633
Cromwell Dr - 12112 ------Full Reconstruction 2 $246,429
Crooked La - 4408 - 4550 Full Reconstruction 2 $347,856
Crooked La - 4609 - 4737 Full Reconstruction 2 $344,033
Del Norte La - 6009 - 6349 Full Reconstruction 2 $663,347
Del Norte La - 6403 - 6541 Full Reconstruction 2 $288,223
Del Roy Dr - 5609 - 5727 Full Reconstruction 2 $226,043
Friday, March 31, 2006 Page 282 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Del Roy Dr - 5811 - 5931 Full Reconstruction 2 $261,210 Deloache Av - 6406 - 6414 Full Reconstruction 2 $98,368
Deloache Av - 6426 - 6542 Full Reconstruction 2 $258,407
Deloache Av - 6604 - 6834 Full Reconstruction 2 $359,069
Desco Dr - 6011 - 6147 Full Reconstruction 2 $347,856
Desco Dr - 6406 - 6538 Full Reconstruction 2 $293,575
Desco Dr - 6407 - 6541 Full Reconstruction 2 $317,785
Desco Dr - 6606 - 6830 Full Reconstruction 2 $358,814
Dothan & Latham - Full Reconstruction 2 $390,319
Dothan La - 3210 - 3358 Full Reconstruction 2 $396,785
Dothan(2900) &Latham - 'T' alley to Caraway Full Reconstruction 2 $194,052
Dothan(3000) & Latham - Caraway to Channel Full Reconstruction 2 $205,600
Drujon & Shirestone - Willow & Nashwood Full Reconstruction 2 $228,081
Duchess Trl - 3217 - 3339 Full Reconstruction 2 $377,926
Duchess Trl - 3505 - 3645 Full Reconstruction 2 $378,691
Duchess Trl (3506 - 3646) Princess - Cromwell to Lathrop Full Reconstruction Duchess Trl. (3506 - 3646) 1 $379,711
Echo Brook La - 3806 - 3854 Full Reconstruction 2 $345,053
Elderwood Dr - 5808 - 5876 Full Reconstruction 2 $240,059
Elderwood Dr - 5904 - 5978 Full Reconstruction 2 $279,558
Flaxley Dr - 3507 - 3579 Full Reconstruction 2 $322,627
Flowerdale La (3111 - 3161) Royal Ln. - Channel to Full reconst Flowerdale Ln. (3111 - 3161) 2 $168,472 Dundee Glen Lakes & La Sierra (Dead End to Manderville) Full Reconstruction 2 $321,628
Friday, March 31, 2006 Page 283 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Glendora Av - 6007 - 6139 Full Reconstruction 2 $309,884 Glendora Av - 6206 - 6334 Full Reconstruction 2 $262,230
Glendora Av - 6406 - 6474 Full Reconstruction 2 $247,704
Glendora Av - 6700 - 6830 Full Reconstruction 2 $239,549
Harriet Cir - 12642 - 12646 Full Reconstruction 2 $122,323
Harvest Hill Rd - 4408 - 4556 Full Reconstruction 2 $370,537
High Bluff Dr - 3328 ------Full Reconstruction 2 $56,319
High Bluff Dr - 3420 - 3472 Full Reconstruction 2 $243,627
High Brook Dr - 3208 - 3342 Full Reconstruction 2 $298,926
High Meadow Dr - 12210 - 12232 Full Reconstruction 2 $565,743
High Vista Dr - 3506 - 3658 Full Reconstruction 2 $363,656
Inwood Rd - 11212 - 11232 Full Reconstruction 2 $646,782
Isabella La - 4611 ------Full Reconstruction 2 $148,572
Joyce Way & Stefani Dr. - Edgemere to Edgemere Full Reconstruction 2 $295,346
Joyce Wy - 6207 - 6329 Full Reconstruction 2 $260,190
Joyce Wy - 6504 - 6638 Full Reconstruction 2 $288,478
Joyce Wy - 6511 - 6639 Full Reconstruction 2 $233,177
Jubilee Trail (3509 - 3667) Whitewall - Sonnett to Marsh Full recon Jubilee Trail (3509 - 3667) 2 $307,588
Jubilee Trl - 3107 - 3179 Full Reconstruction 2 $291,792
Lakehurst Av - 6002 - 6126 Full Reconstruction 2 $307,846
Lakehurst Av - 6506 - 6630 Full Reconstruction 2 $243,117
Lakehurst Av - 6706 - 6830 Full Reconstruction 2 $244,646
Friday, March 31, 2006 Page 284 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Lakemont Dr - 9569 ------Full Reconstruction 2 $188,836 Laren La - 4408 - 4556 Full Reconstruction 2 $372,320
Lindenshire La - 5707 - 5837 Full Reconstruction 2 $338,172
Longbow Ct - 3104 - 3140 Full Reconstruction 2 $131,242
Lupton Av - 6006 - 6146 Full Reconstruction 2 $325,685
Lupton Av - 6007 - 6147 Full Reconstruction 2 $320,843
Lupton Av - 6707 - 6839 Full Reconstruction 2 $279,304
Lupton Dr & Prestonshire - Thackery to Hillcrest Full Reconstruction 2 $297,937
Lupton Dr & Stefani - Tulane to Edgemere Full reconstruction 2 $305,036
Marsh La - 10125 - 10215 Full Reconstruction 2 $290,772
Matador Dr - 3772 ------Full Reconstruction 2 $76,961
Matador Dr - 3773 ------Full Reconstruction 2 $77,216
Matador Dr (3704 - 3772) Park - March to "T" Alley Full Reconstruction Matador Dr. (3704 - 3772) 1 $241,842
Meadow Crest Dr - 5212 - 5528 Full Reconstruction 2 $432,208
Meadow Crest Dr - 5614 - 5722 Full Reconstruction 2 $320,078
Meletio La - 5706 - 5860 Full Reconstruction 2 $335,114
Melissa La - 4407 - 4549 Full Reconstruction 2 $349,129
Melshire Dr - 5503 - 5623 Full Reconstruction 2 $286,694
Merrell(3133) & Grantwood - Dundee to Royal Chapel Full Reconstruction 2 $135,811
Mid Surrey Ct - 11508 - 11530 Full Reconstruction 2 $129,459
Northaven Rd - 3306 - 3390 Full Reconstruction 2 $398,569
Northaven Rd - 3810 - 3850 Full Reconstruction 2 $139,142
Friday, March 31, 2006 Page 285 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Northaven Rd - 5501 - 5533 Full Reconstruction 2 $145,258 Northaven Road (3510-3668) Whithall - Sonnet to Marsh Full recon Northaven Rd. (3510 - 3668) 2 $305,036
Northhaven & Talisman - Dennis to Caraway Full Reconstruction 2 $284,145
Northport Dr - 6311 - 6353 Full Reconstruction 2 $169,978
Northport Dr - 6409 - 6475 Full Reconstruction 2 $245,411
Northport Dr - 6507 - 6631 Full Reconstruction 2 $233,177
Northport Dr - 6707 - 6831 Full Reconstruction 2 $230,630
Northwest Hwy (W) - 7404 - 7532 Full Reconstruction 2 $159,784
Northwood Rd - 6406 - 6416 Full Reconstruction 2 $82,823
Norway Rd - 5804 - 5946 Full Reconstruction 2 $338,172
Norway Rd - 5807 - 5945 Full Reconstruction 2 $373,339
Norway Rd - 6306 - 6340 Full Reconstruction 2 $166,664
Norway Rd - 6506 - 6630 Full Reconstruction 2 $241,333
Norway Road (6409-6475) Brookshire - Tibbs to Edgemere Full recon Norway Rd. (6409 - 6475) 2 $223,353
Orchid La - 6006 - 6046 Full Reconstruction 2 $166,410
Orchid La - 6007 - 6047 Full Reconstruction 2 $138,887
Orchid La - 6126 - 6134 Full Reconstruction 2 $95,310
Orchid La - 6220 - 6336 Full Reconstruction 2 $203,362
Orchid La - 6506 - 6630 Full Reconstruction 2 $239,295
Orchid La - 6706 - 6838 Full Reconstruction 2 $231,394
Orchid La - 6707 - 6839 Full Reconstruction 2 $222,474
Palomar La - 5112 - 5530 Full Reconstruction 2 $576,701
Friday, March 31, 2006 Page 286 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Park La - 8502 - 8544 Full Reconstruction 2 $128,948 Pebblebrook Dr - 5110 - 5440 Full Reconstruction 2 $563,195
Pebblebrook Dr - 5111 - 5531 Full Reconstruction 2 $670,227
Ponder(3015) & TXU row - Pensive to 'T' Full Reconstruction 2 $138,070
Port Royal(4000) & Boca Bay - Cox to 'T' Full Reconstruction 2 $206,448
Princess Cir - 3908 - 3938 Full Reconstruction 2 $100,407
Quincy Ln. - 12123 - 12515 Full Reconstruction 2 $454,889
Regent Dr - 3305 - 3371 Full Reconstruction 2 $235,981
Regent Dr (3505 - 3645) Royal - Cromwell to Lathrop Full Reconstruction Regent Dr. (3505 - 3645) 1 $377,672
Ridgebriar Drive (3531-3659) High Meadow - "T" Alley to Full recon Ridgebriar Dr. (3531 - 3659) 2 $287,168 Marsh Ridgeside Dr - 4606 - 4840 Full Reconstruction 2 $460,494
Rockdale Dr - 3705 - 3773 Full Reconstruction 2 $243,371
Royal & Leahy - T-alley to Channel Dr. Full Reconstruction 2 $382,260
Royal & Tulip - Edgemere to Thackery Full Reconstruction 2 $243,532
Royal La - 3730 - 3790 Full Reconstruction 2 $249,743
Salisbury Dr - 3406 - 3492 Full Reconstruction 2 $382,769
Satsuma Dr - 3004 - 3060 Full Reconstruction 2 $211,771
Satsuma Dr - 3106 - 3160 Full Reconstruction 2 $295,104
Silverton Dr - 3128 - 3152 Full Reconstruction 2 $200,559
Silverton Dr - 3129 - 3159 Full Reconstruction 2 $188,581
Silverton(3004) & Townsend - Caraway to Channel Full Reconstruction 2 $210,590
Sonnet Dr - 11608 - 11634 Full Reconstruction 2 $382,513
Friday, March 31, 2006 Page 287 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction
Southcrest Rd - 4202 - 4338 Full Reconstruction 2 $284,656 St Cloud Cir - 3403 - 3477 Full Reconstruction 2 $199,284
Stichter Av - 6704 - 6838 Full Reconstruction 2 $250,762
Stichter Ave & Walnut Hill - Edgemere to Thackery Full Reconstruction 2 $233,169
Sundial Dr - 3005 - 3059 Full Reconstruction 2 $210,242
Sundial Dr - 3105 - 3139 Full Reconstruction 2 $214,574
Talisman Dr - 3004 - 3058 Full Reconstruction 2 $210,498
Timberview(3310) & Citation-Harwich to Webb Chapel Full Reconstruction 2 $220,409
Townsend Dr - 3504 - 3636 Full Reconstruction 2 $371,810
Townsend Dr - 3505 - 3665 Full Reconstruction 2 $468,905
Valley Ridge Rd - 4207 - 4341 Full Reconstruction 2 $285,165
Vinecrest Dr - 3504 - 3636 Full Reconstruction 2 $370,281
Waldrop & Altman - Royal Chapel to Dundee Full Reconstruction 2 $137,840
Waldrop(3211) & Rotan - Royal Chapel to Dundee Full Reconstruction 2 $137,840
Wildflower & Sundial - Caraway to 'T' alley Full Reconstruction 2 $282,573
Summary for 'Category' = Alley Reconstruction (234 detail records) Sum $65,457,966 Barrier Free Ramps
5723 Harvest Hill Construct 12 BFRs on north side of Harvest Hill from Spuling to 1 48 $22,973 Montfort at driveways 3423 Forest Ln Need 5 BFRs on driveways and medians between driveways of 1 44 $9,572 Braums and the Library 3434 Forest Ln Need 2 BFRs on Driveway 1 44 $3,829
3535 Forest Ln Need one BFR on Driveway 1 44 $1,914
Friday, March 31, 2006 Page 288 of 349 Project Name Description Tier Score Estimate Council District 13 Barrier Free Ramps
Highdale @ Forest Ln Need 2 BFRs at intersection 1 44 $3,829 Inwood - from Forest Ln. to Harvest Hill 20 BFRS as follows: 4 on Forest @ Inwood, 2 on Willow @ 1 42 $38,289 Inwood, 3 on Harvest Hill @ Inwood, 7 Curb cuts on driveways of school (#12345 Inwood) and 4 curb cuts on driveways of # 11804, # 11920 Inwood 6015 Berkshire Construct 1 BFR on the curb side of the head-in parking area in 1 35 $3,829 front of 6015 Berkshire, & 1 BFR to slope sidewalk to driveway level Woodwind Ln - Dundee Dr 2 BFR's needed at intersection 1 27 $3,829
Jamestown @ Brookstown One BFR needed on N. E. corner of intersection 1 22 $1,914
Bandera Ave @ Thackery St Construct 2 Ramps 1 19 $3,829
Meadow Rd @ Meadow Park Pl Construct 2 ramps 1 18 $3,829
Meadow Rd @ Rambler Rd Construct 4 ramps 1 18 $7,658
Meadow Rd @ Treehouse Ln Install 2 ramps 1 18 $3,829
Candlenut Ln @ Haydale Dr Construct 2 ramps 1 9 $3,829
Summary for 'Category' = Barrier Free Ramps (14 detail records) Sum $112,953 I.T.S. - Speed & Travel Time System
Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $86,151
Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $86,151 Intergovernmental Partnership Projects
Park Lane from Boedecker to US 75 Partnership project with TxDOT to widen to 6 lane divided. 1 $0 Total estimated cost of $_____ million. Estimated to be let by ______. Supplements 1995 and 1998 Bond Program funds.
Friday, March 31, 2006 Page 289 of 349 Project Name Description Tier Score Estimate Council District 13 Intergovernmental Partnership Projects
Park Lane from US 75 to Greenville Partnership project with TxDOT to widen to 6 lane divided. 1 $0 Total estimated cost of $_____ million. Estimated to be let by ______. Supplements 1995 and 1998 Bond Program funds. Park Ln. @ Bachman Creek Bridge rehabilitation and/or reconstruction 2 $0
Preston Rd - Park Lane to N of Royal Partnership project with Dallas County to reconstruct the 1 $8,002,401 existing six lane divided roadway. Total estimated cost of $13.7 million. Estimated to be let by Dallas County late 2008. Supplements 2003 Bond Program funds. Royal Lane - Webb Chapel to Marquis Partnership project with Dallas County to reconstruct the 1 $1,531,560 existing six lane divided roadway. Total estimated cost of $2.7 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (5 detail records) Sum $9,533,961 Street Reconstruction Local Streets
Melody Ln -Shady Brook to 2000' west of Eastridge 5900 - 6200 Blks 1 61.27 $290,165
Larmanda St - Skillman St North to 450 Fft 6600 Blk 1 58.87 $224,948
Earlshire Dr - Regent Dr to Royal Ln 10700 blk 1 52.75 $234,839
Turtle Creek Blvd - Woodland Dr to Park Ln 9000 Blk 1 49 $423,732
Summary for 'Category' = Street Reconstruction Local Streets (4 detail records) Sum $1,173,684 Street Reconstruction Thoroughfares
Walnut Hill Ln - Glen Lakes Dr to Greenville Rd Full Reconstruction 82-8300 blk 1 75.75 $2,807,860
Webb Chapel Rd - 10600 Blk 10600 Blk 1 64.99 $1,276,300
Rambler Rd - Walnut Hill Ln to 750' North 7500 Blk 1 59.4 $751,967
Treehouse Ln - Meadow Rd to Dead-End 7700 Blk 1 56.75 $1,771,852
Friday, March 31, 2006 Page 290 of 349 Project Name Description Tier Score Estimate Council District 13 Street Reconstruction Thoroughfares
Westchester Dr - Luther Ln to Berkshire Ln 8300 Blk 1 56.24 $427,561 St Cloud Cir - Cromwell Dr to Cromwell Dr 3400 Blk 1 53.57 $1,198,446
Summary for 'Category' = Street Reconstruction Thoroughfares (6 detail records) Sum $8,233,984 Street Resurfacing
Juniper Dr. - Seguin Dr. to Mixon Dr. 3700 block 1 75 $112,953
Winged Foot Ct. - Cromwell Dr. to Cul-de-Sac 3400 block 1 72.67 $80,535
St Croix Dr. - Cul-de-Sac to Dartmoor Dr. 3100 - 3200 1 70.88 $124,822
Townsend Dr. - Webb Chapel Rd. to Vinecrest Dr. 3100 - 3800 1 70.07 $541,789
Sonnet Dr. - Jubilee Tr. To Dead End 11100 - 11600 1 68.73 $146,519
Wedgewood Ln. - Park Ln . to Cul-de-Sac 4900 block 1 68.44 $50,414
Tower Tr. - Coral Hills Dr. to Modella Dr. 3200 block 1 67.78 $133,501
Van Ness Ln. - Lenel Pl. to Dunhaven Rd. 3900 block 1 67.75 $53,094
Northaven Rd. - Denton Dr. to Cromwell Dr. 2600-3300 1 66.555 $615,202
Dartmoor Dr. - Coral Hills Dr. to Sonnet Dr. 3200 - 3400 1 66.48 $187,871
Coral Hills Dr. - Cromwell Dr. to Dartmoor Dr. 11300 - 11700 1 66.455 $280,020
Damon Ln. - Townsend Dr. to Royal Ln. 10800 - 10900 1 66.05 $88,703
Jubilee Tr. - Shans St. to Sonnet Dr. 3200 - 3400 1 64.43 $181,617
Beauty Ln. - Royal Ln. to Beauty Ln. 10800 - 11000 1 64.31 $211,228
Meadow Crest Dr. - Inwood Ln to Lamplighter Ln. 5100 block 1 64.185 $61,135
Coral Rock Ln. - Northaven Rd. to Cul-de-Sac 3100 - 3200 1 63.85 $81,683
Valley Ridge Rd. - Elmada Ln. to Midway Rd. 3900 - 4100 1 63.67 $125,716
Friday, March 31, 2006 Page 291 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Northaven Ct. - Northaven Rd. to Cul-De-Sac 3200 block 1 62.9 $51,307 Prestonshire Ln. - Tulane Blvd. to Dartwood Ln. 6200 - 7000 1 62.88 $237,264
Seguin Ln. - Mixon Dr. to Marsh Ln. 3700 block 1 62.46 $146,009
Walnut Hill Ln. - Preston Rd. to Hillcrest Rd. 6000-6800 1 61.98 $920,723
Northaven Rd. - Cox Ln. to Wonderland Tr. 3800 - 3900 1 61.415 $125,460
Clover Ln. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 61.14 $98,766
Walnut Hill Ln. - Lenel Pl. to Lakemont Dr. 4000 block 1 59.825 $148,051
Davila Dr. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 59.72 $102,876
Golf Lakes Tr. - Private Drive to Walnut Hill Ln. 9600 Block 1 59.47 $43,777
Cochran Chapel Cir. - Midway Rd. to Midway Rd. 4300 Block 1 58.94 $57,816
Durango Dr. - Lenel Pl. to Lakemont Dr. 3900 Block 1 58.62 $52,201
Strait Ln. - Walnut Hill Ln. to Dead End 9900 block 1 56.78 $33,056
Preston Rd. - Shetland Dr. to Prestoncrest Ln. 12600 block 1 56.405 $62,922
Meadowdale Ln. - Cul-De-Sac to Coppedge Ln. 3700 - 3800 1 55.41 $76,961
Joyce Way - Douglas Ave. to Preston Rd. 5800 - 5900 1 55.33 $117,292
Del Roy Dr. - Lamplighter Ln. to Inwood Rd. 5100 Block 1 55.18 $42,884
St Cloud Cir. - Cromwell Dr. to Coral Hills Dr. 3300 block 1 55.18 $74,281
Lazywood Ln. - Coral Hills Dr. to Dead End 11500 block 1 53.19 $44,415
Cromwell Ct. - Cromwell Dr. to Cromwell Dr. 11400 Block 1 53.1 $85,767
Satsuma Dr. - Grissom Ln. to Caraway Dr. 2700 - 2900 1 52.51 $174,343
Walnut Hill Cir. - Walnut Hill Ln. to Walnut Hill Ln.. 6000 block 1 50.96 $32,418
Darbyshire Dr. - Baroness Dr. to Countess Dr. 3300 Block 1 48.5 $86,023
Friday, March 31, 2006 Page 292 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Cromwell Cir. - Cromwell Dr. to Cromwell Dr. 11500 Block 1 48.485 $55,519 Boedeker St. - Stefani Dr. to Ashington Dr. 9500 Block 1 48.32 $41,863
Dartmoor Ct. - Dartmoor Dr. to Cul-de-sac 3200 Block 1 48.145 $45,436
Northwest Pkwy. - Baltimore Dr. to Turtle Creek Blvd. 6300 - 6600 1 47.69 $174,853
Shady Hill Dr. - Weeburn Dr. to Midway Rd. 3700 - 4100 1 44.28 $187,744
Waldorf Dr. - Cromwell Dr. to Lathrop Dr. 3500 - 3600 1 39.04 $183,021
Aberdeen Av. - 6100 2 $0
Aberdeen Av. - 6600 2 $0
Admiral Dr. - 9300 2 $0
Ames St. - 8400 2 $0
Averill Wy. - 6000 2 $0
Beechwood La. - 3800 2 $0
Beechwood La. - 3900 2 $0
Berkshire La. - 6000 2 $0
Berkshire La. - 6100 2 $0
Better Dr. - 10200 2 $0
Brookstown Dr. - 5800 2 $0
Caladium Dr. - 5300 2 $0
Candlenut La. - 3900 2 $0
Catina La. - 4500 2 $0
Channel Dr. - 10600 2 $0
Channel Dr. - 11000 2 $0
Friday, March 31, 2006 Page 293 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Charlestown Dr. - 5600 2 $0 Charlestown Dr. - 5700 2 $0
Charlestown Dr. - 5800 2 $0
Chevy Chase Av. - 6400 2 $0
Colgate Av. - 4400 2 $0
Colhurst St. - 5800 2 $0
Coppedge La. - 10200 2 $0
Coppedge La. - 10300 2 $0
Coppedge La. - 9800 2 $0
Coral Gables Dr. - 3600 2 $0
Coral Hills Pl. - 11700 2 $0
Countess Dr. - 10400 2 $0
Countess Dr. - 10500 2 $0
Creekdale Dr. - 4100 2 $0
Crestline Av. - 12000 2 $0
Crestline Av. - 12100 2 $0
Crestline Av. - 12400 2 $0
Crestover Dr. - 10100 2 $0
Crestover Dr. - 10200 2 $0
Crestover Dr. - 10300 2 $0
Crown Shore Dr. - 4000 2 $0
Daria Dr. - 10100 2 $0
Friday, March 31, 2006 Page 294 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Del Norte La. - 6200 2 $0 Del Roy Dr. - 5900 2 $0
Dothan La. - 3200 2 $0
Dothan La. - 3300 2 $0
Drujon La. - 12000 2 $0
Eastern Av. - 11400 2 $0
Eastern Av. - 11700 2 $0
Edgemere Rd. - 8500 2 $0
Edgemere Rd. - 8600 2 $0
Edgemere Rd. (E) - 9500 2 $0
Edgemere Rd. (E) - 9600 2 $0
Fair Oaks Av. - 7000 2 $0
Fieldfare Cir. - 10000 2 $0
Flowerdale La. - 3100 2 $0
Folkstone Rd. - 9400 2 $0
Folkstone Rd. - 9500 2 $0
Forest Bend Rd. - 5000 2 $0
Forest La. - 3100 2 $0
Forest La. - 3200 2 $0
Forest La. - 3300 2 $0
Forest La. - 3400 2 $0
Forest La. - 3500 2 $0
Friday, March 31, 2006 Page 295 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Forest La. - 3600 2 $0 Forest La. - 4400 2 $0
Forest La. - 4800 2 $0
Forest La. - 4900 2 $0
Forest La. - 5200 2 $0
Gaywood Rd. - 10000 2 $0
Glen Lakes Dr. - 5500 2 $0
Gooding Dr. - 10000 2 $0
Gooding Dr. - 10100 2 $0
Gooding Dr. - 10200 2 $0
Gooding Dr. - 10500 2 $0
Harvest Hill Rd. - 4300 2 $0
Harwich Dr. - 10000 2 $0
Haydale Dr. - 12300 2 $0
Heatherbrook Dr. - 4800 2 $0
Hedgeway Dr. - 10000 2 $0
Hedgeway Dr. - 10100 2 $0
Hedgeway Dr. - 10300 2 $0
Hedgeway Dr. - 10400 2 $0
High Meadow Dr. - 11800 2 $0
High Meadow Dr. - 11900 2 $0
High Meadow Dr. - 12000 2 $0
Friday, March 31, 2006 Page 296 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Inwood Rd. - 10100 2 $0 Inwood Rd. - 10200 2 $0
Inwood Rd. - 11200 2 $0
Inwood Rd. - 11300 2 $0
Inwood Rd. - 11700 2 $0
Isabella La. - 4500 2 $0
Jamestown Rd. - 12000 2 $0
Jamestown Rd. - 12200 2 $0
Jamestown Rd. - 12400 2 $0
Jourdan Wy. - 9600 2 $0
Joyce Wy. - 6700 2 $0
Joyce Wy. - 6800 2 $0
Jubilee Trl. - 3100 2 $0
Jubilee Trl. - 3500 2 $0
Kate St. - 8200 2 $0
Lakemont Dr. - 9600 2 $0
Lakemont Dr. - 9900 2 $0
Larmanda St. - 6700 2 $0
Larmanda St. - 6800 2 $0
Latham Dr. - 3000 2 $0
Latham Dr. - 3200 2 $0
Lathrop Dr. - 10900 2 $0
Friday, March 31, 2006 Page 297 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Lathrop Dr. - 11000 2 $0 Lindenshire La. - 5700 2 $0
Lindenshire La. - 5800 2 $0
Lively La. - 4100 2 $0
Lively La. - 4300 2 $0
Lively La. - 4400 2 $0
Lupton Av. - 6100 2 $0
Lupton Av. - 6200 2 $0
Lupton Av. - 6300 2 $0
Lupton Av. - 6400 2 $0
Lupton Av. - 6500 2 $0
Luther La. - 5900 2 $0
Luther La. - 6000 2 $0
Luther La. - 6100 2 $0
Manchester Dr. - 9500 2 $0
Mangold Cir. - 4900 2 $0
Manson Ct. - 4900 2 $0
Martha La. - 3800 2 $0
Matador Dr. - 3700 2 $0
Mcshann Rd. - 5600 2 $0
Meaders La. - 5300 2 $0
Meletio La. - 5900 2 $0
Friday, March 31, 2006 Page 298 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Mid Pines Dr. - 3600 2 $0 Mid Surrey Ct. - 11500 2 $0
Midway Rd. - 9500 2 $0
Mimosa La. - 6500 2 $0
Mimosa La. - 6600 2 $0
Mimosa La. - 6700 2 $0
Mum Pl. - 10700 2 $0
Nashwood La. - 4900 2 $0
Netherland Dr. - 10400 2 $0
Noel Rd. - 12800 2 $0
Northaven Rd. - 4100 2 $0
Northbrook Dr. - 5400 2 $0
Northwest Hwy. (W) - 5100 2 $0
Northwest Hwy. (W) - 6700 2 $0
Northwest Hwy. (W) - 7600 2 $0
Northwest Hwy. (W) - 7700 2 $0
Norway Rd. - 6500 2 $0
Nuestra Dr. - 12500 2 $0
Pallos Verdas Dr. - 3600 2 $0
Park La. - 3700 2 $0
Park La. - 5000 2 $0
Park La. - 8000 2 $0
Friday, March 31, 2006 Page 299 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Pemberton Dr. - 6300 2 $0 Pemberton Dr. - 6400 2 $0
Phoenix Dr. - 5700 2 $0
Pickwick La. - 8500 2 $0
Pineland Dr. - 5700 2 $0
Pinocchio Dr. - 11100 2 $0
Ponder Dr. - 3000 2 $0
Quincy La. - 11900 2 $0
Quincy La. - 12200 2 $0
Ridgebriar Dr. - 3500 2 $0
Ridgecove Dr. - 12200 2 $0
Rochelle Dr. - 4000 2 $0
Rockdale Dr. - 3700 2 $0
Rosser Rd. - 10200 2 $0
Rosser Rd. - 10300 2 $0
Royal Haven La. - 10900 2 $0
Royal La. - 3300 2 $0
Royal La. - 4300 2 $0
Royal La. - 4800 2 $0
Royal La. - 4900 2 $0
Royal Springs Dr. - 10600 2 $0
Russwood Cir. - 11200 2 $0
Friday, March 31, 2006 Page 300 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Shans St. - 11300 2 $0 Sherbrook La. - 10200 2 $0
Sherbrook La. - 10300 2 $0
Sherry La. - 6000 2 $0
Sherry La. - 6100 2 $0
Silverton Dr. - 2900 2 $0
Silverton Dr. - 3000 2 $0
Snow White Dr. - 11500 2 $0
Sombrero Dr. - 3100 2 $0
Somerton Dr. - 10500 2 $0
Spurling Dr. - 12800 2 $0
Spurling Dr. - 12900 2 $0
Sundial Dr. - 3100 2 $0
Thackery St. - 10600 2 $0
Thackery St. - 10700 2 $0
Thackery St. - 8700 2 $0
Timber Trail Dr. - 10200 2 $0
Tulane St. - 9700 2 $0
Vinecrest Dr. - 3500 2 $0
Waldorf Cir. - 3800 2 $0
Waller Dr. - 10100 2 $0
Walnut Hill La. - 4900 2 $0
Friday, March 31, 2006 Page 301 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Walnut Hill La. - 5100 2 $0 Watson Cir. - 5700 2 $0
Webb Chapel Rd. - 10300 2 $0
Webb Chapel Rd. - 10900 2 $0
Webb Chapel Rd. - 11000 2 $0
Webb Chapel Rd. - 11100 2 $0
Webb Chapel Rd. - 11400 2 $0
Webb Chapel Rd. - 11500 2 $0
Webb Chapel Rd. - 11600 2 $0
Webb Chapel Rd. - 11700 2 $0
Weeburn Dr. - 3600 2 $0
Weldon Howell Pkwy. - 6000 2 $0
Westchester Dr. - 8100 2 $0
Westchester Dr. - 8200 2 $0
Whirlaway Rd. - 3400 2 $0
Whitehall Dr. - 3100 2 $0
Whitehall Dr. - 3400 2 $0
Whitehall Dr. - 3500 2 $0
Whitehall Dr. - 3800 2 $0
Wilada Dr. - 4100 2 $0
Wildflower Dr. - 3100 2 $0
Williamstown Rd. - 5700 2 $0
Friday, March 31, 2006 Page 302 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing
Williamstown Rd. - 5800 2 $0 Williamstown Rd. - 5900 2 $0
Woodfin Dr. - 4300 2 $0
Yolanda Cir. - 5600 2 $0
Summary for 'Category' = Street Resurfacing (263 detail records) Sum $6,579,850 Streetscape / Urban Design
Zang Blvd Urban Design, from Davis to Trinity River Levee Enhancements on Zang, from levee to Davis, to encourage 2 $7,864,139 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $7,864,139 Thoroughfares
Inwood - Lemmon to University Add 14 left turn pockets in the existing 15' median 1 47 $1,692,065
Preston - NW Hwy to Elderwood Widen lanes from 10 to 11 feet and full median 1 28 $5,581,511
Inwood - Palomar to Yolanda Widen median to 15 feet and realign s-curve 1 24 $1,014,819
Summary for 'Category' = Thoroughfares (3 detail records) Sum $8,288,396 Traffic Intersection Capacity & Safety Improvement
Forest @ Inwood Widen Inwood Rd to construct northbound/southbound dual left- 1 70 $855,121 turn lanes and right turn lanes. Forest @ Marsh Widen both Forest Ln and Marsh Ln approaches to provide 1 70 $1,601,757 dual left-turn lanes and right turn lanes on all approaches. Greenville @ Meadow - Walnut Hill Construct 8 lane configuration on Greenville between Walnut 1 66 $2,731,282 Hill and Meadow with "back to back" left turn pockets.
Friday, March 31, 2006 Page 303 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Intersection Capacity & Safety Improvement
Forest @ Midway Widen Forest Ln to construct eastbound/westbound dual left 1 60 $731,320 turn lanes. Forest at Preston Rd Widen Preston Rd to provide a northbound right turn lane and 1 50 $256,536 widen Forest Ln to provide an eastbound right turn lane. Douglas at Sherry Widen Douglas at Sherry to provide a southbound right-turn 1 35 $182,511 lane. Lane Park @ Park Lane Widen roadway to construct a westbound left-turn pocket. 1 30 $227,181
Dallas N Tollway - Inwood at Harvest Hill Widen Harvest Hill to provide a 3rd under the Dallas North 1 25 $513,073 Tollway overpass. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $7,098,781 Traffic Safety Improvements-Guardrail Upgrades
Abrams 6900 BLK Guardrail Upgrade 1 80 $30,216
Royal 8000 BLK Guardrail Upgrade 1 80 $22,112
Forest 5100 BLK Guardrail Upgrade 1 73 $31,206
Greenville 7300 BLK Guardrail Upgrade 1 73 $41,320
Skillman 6200 BLK Guardrail Upgrade 1 73 $14,039
Inwood 9100 BLK Guardrail Upgrade 1 67 $4,819
Inwood 9700 BLK Guardrail Upgrade 1 67 $20,542
Walnut Hill 3400 BLK Guardrail Upgrade 1 67 $20,996
Webb Chapel 10300 BLK Guardrail Upgrade 1 67 $43,662
Webb Chapel 10200 BLK Guardrail Upgrade 1 53 $13,465
Park 7300 BLK Guardrail Upgrade 1 47 $13,912
Walnut Hill 3300 BLK Guardrail Upgrade 1 47 $6,126
Friday, March 31, 2006 Page 304 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Safety Improvements-Guardrail Upgrades
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (12 detail records) Sum $262,416 Traffic Signal Upgrades - Citywide
Killion/Ridge @ Midway Rd Traffic Signal Upgrade 1 73 $118,313
Merrell @ Midway Rd Traffic Signal Upgrade 1 73 $118,313
Preston @ Preston Royal S C Traffic Signal Upgrade 1 73 $60,305
Cox @ Forest Ln Traffic Signal Upgrade 1 67 $108,422
Cromwell @ Forest Ln Traffic Signal Upgrade 1 67 $120,610
Dallas N Tollway @ Forest Ln (Quincy) Traffic Signal Upgrade 1 67 $128,842
Forest Ln @ Marsh Traffic Signal Upgrade 1 67 $109,762
Forest Ln @ Welch Traffic Signal Upgrade 1 67 $107,847
Inwood @ Northaven Traffic Signal Upgrade 1 67 $109,379
Marsh @ Northaven Traffic Signal Upgrade 1 67 $118,313
Boedeker @ Park Ln Traffic Signal Upgrade 1 53 $105,933
Boedeker @ Walnut Hill Traffic Signal Upgrade 1 53 $46,610
Dallas N Tollway @ Harvest Hill (Inwood) Traffic Signal Upgrade 1 53 $175,172
Edgemere @ Royal Ln Traffic Signal Upgrade 1 53 $35,001
Edgemere @ Tibbs (Walnut Hill) Traffic Signal Upgrade 1 53 $120,610
Forest Ln @ Rosser Traffic Signal Upgrade 1 53 $109,379
Harvest Hill @ Midway Rd Traffic Signal Upgrade 1 53 $81,938
Harvest Hill @ Preston Rd (Linden) Traffic Signal Upgrade 1 53 $66,865
Hillcrest @ Meadow Traffic Signal Upgrade 1 53 $46,374
Friday, March 31, 2006 Page 305 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Signal Upgrades - Citywide
Inwood @ Willow Traffic Signal Upgrade 1 53 $107,464 Lenel @ Walnut Hill Traffic Signal Upgrade 1 53 $118,313
Marsh @ Merrell Traffic Signal Upgrade 1 53 $118,313
Northaven @ Preston Traffic Signal Upgrade 1 53 $57,973
Northaven @ Webb Chapel Traffic Signal Upgrade 1 53 $118,313
Caruth Plaza @ Park Ln Traffic Signal Upgrade 1 47 $127,311
Forest Ln @ Nuestra Traffic Signal Upgrade 1 40 $108,422
Glen Lakes @ Walnut Hill Traffic Signal Upgrade 1 40 $107,847
Greenville @ Meadow Traffic Signal Upgrade 1 40 $107,847
Greenville @ Pineland Traffic Signal Upgrades-City Traffic Signal Upgrade 1 40 $124,695
Midway Rd @ Northaven Traffic Signal Upgrade 1 40 $116,399
Rambler @ Walnut Hill Traffic Signal Upgrade 1 40 $118,313
Churchill Way @ Preston Traffic Signal Upgrade 1 27 $57,472
Douglas @ Luther Traffic Signal Upgrade 1 27 $107,464
Fair Oaks @ Pineland Traffic Signal Upgrade 1 27 $107,464
Harvest Hill - Noel Traffic Signal Upgrades Citywide 1 27 $54,498
Harvest Hill @ Montfort Traffic Signal Upgrade 1 27 $52,966
Northpark @ Park Ln Traffic Signal Upgrade 1 27 $116,399
Preston @ Willow Traffic Signal Upgrades Citywide 1 27 $58,199
Royal @ Welch Traffic Signal Upgrade 1 27 $118,696
Merrell @ Webb Chapel Traffic Signal Upgrades Citywide 1 13 $107,464
Summary for 'Category' = Traffic Signal Upgrades - Citywide (40 detail records) Sum $3,999,825
Friday, March 31, 2006 Page 306 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic System Management - Flood Detour Signs
Inwood, 9800 @ Park Dynamic Signs - Flood Detours 1 80 $42,118 Summary for 'Category' = Traffic System Management - Flood Detour Signs (1 detail record) Sum $42,118 Summary for 'Program' = STREET AND TRANSPORTATION (592 detail records) Sum $118,734,222 Summary for 'CD' = 13 (592 detail records) Sum $118,734,222
Friday, March 31, 2006 Page 307 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Petitions
Goodwin Av & Vanderbilt Av - Laneri Av to Glencoe St Engineering, Paving & Drainage 5300 blk 1 98 $154,920 Summary for 'Category' = Alley Petitions (1 detail record) Sum $154,920 Alley Reconstruction
Goliad & Palo Pinto - Delmar to Matilda Full Reconstruction 1 80 $145,498
Herschel & Prescott (Douglas to Throckmorton) Alley full reconstruction 1 79 $160,814
Holland & Bowser - Throckmortan to Reagan Full Reconstruction 1 78 $105,937
Holland (3918) & Gilbert - Reagan to Throckmorton Full Reconstruction 1 77 $98,786
Gaston (5740) - Skillman to Lowell St Full Reconstruction 1 76 $72,366
Longview St (5502 - 5554) McCommas - McMillan to Full Reconstruction Longview St. (5502 - 5554) 1 76 $185,778 Worcola Morningside(5814) & Mercedes-Matilda to Delmar Full Reconstruction 1 74 $156,395
Rawlins & Lemmon - Herschel To Wycliff Full Reconstruction 1 69.6 $126,217
Junius(4902) & Worth - Fitzugh to Collett Full Reconstruction 1 67 $170,705
Rawlins(4224) & Lemmon - Douglas to Wycliff Full Reconstruction 1 67 $138,071
US Hwy 75 & Mckinney - Lee to Oliver Full Reconstruction 1 66 $155,070
US Hwy 75 & Mckinney - Oliver to Armstrong Full Reconstruction 1 66 $155,070
Llano and Vickery - Alderson to Abrams Full Reconstruction 1 65 $161,745
Live Oak & Bryan Parkway - Skillman to La Vista Full Reconstruction 1 63 $161,823
Town Hill Ln & Crestmont - Ridgelawn To Abrams Rd Full Reconstruction 1 63 $310,904
Dyer & Yale - Central Expy To Prenticest Full Reconstruction 1 60.6 $163,097
Lakeshore Drive (6107-6165) Palo Pinto - Skillman to Full reconstr Lakeshore Dr. (6107 - 6165) 1 60 $185,064 Cecille Richmond and Prospect - Greenville to Matilda Full Reconstruction 1 55 $152,989
Friday, March 31, 2006 Page 308 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Live Oak & Bryan Parkway - Beacon to Glendale St. Full Reconstruction 1 54 $180,173 Ross Avenue 2501-2527 Full recon 1 52 $89,341
Palo Pinto(6339) & Velasco - Alderson to Abrams Full Reconstruction 1 50 $238,486
Howell St 3401 - 3445 Full reconst 1 46 $81,683
Tremont St. & Victor St. - Collett Ave. To Munger Full Reconstruction 1 46 $174,565
La Foy Boulevard (5501 - 5643) Lemmon - Inwood to Full reconst La Foy Blvd. (5501 - 5643) 1 43 $234,839 Versailles Mockingbird Lane & Saint Moritz - Skillman to Norris Full recon Mockingbird Ln. (6101 - 6155) 1 43 $215,695
Monticello Avenue & Mercedes - Clements to Norris Full recon Monticello Ave (6139 - 6179) 1 43 $139,117
Saratoga Circle (6105-6361) Skillman to Dalny Full recon Saratoga Cir. (6105 - 6361) 1 43 $763,227
Versailles Avenue (3517-3531) Inwood - Lemmon to Full recon Versailles Ave. (3517 - 3531) 1 43 $234,839 Lemmonwood Greenville Av (4802 - 5050) Northway - University to Milton Full reconst Greenville Ave. (4802 - 5050) 1 40 $264,194
Junius Street (5002-5114) Worth - Collett to Munger Full reconstruction Junius St. (5002 - 5114) 1 40 $158,261
Kenwood & Penrose - Skillman St. To Norris Full Reconstruction 1 40 $249,998
Lemmon & Bowser - Douglass To Knight St. Full Reconstruction 1 40 $108,052
St. Albans Drive (6206-6250) Woodcrest - Norris to Full recon St. Albans Dr. (6206 - 6250) 1 40 $179,958 Alderson Goliad Av (6001 - 6047) Palo Pinto - Concho to Skillman Full reconst Goliad Ave. (6001 - 6047) 1 36 $145,753
Monticello & Merrimac - Homer To Laneri Full Reconstruction 1 35.3 $186,032
Amherst Av - 5002 - 5126 Full Reconstruction 2 $184,503
Anita St - 5502 - 5534 Full Reconstruction 2 $120,284
Anita St - 5603 - 5649 Full Reconstruction 2 $158,510
Anita St - 5802 - 5820 Full Reconstruction 2 $79,000
Friday, March 31, 2006 Page 309 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Anita St - 5822 - 5844 Full Reconstruction 2 $83,332 Anita St - 5902 - 5930 Full Reconstruction 2 $109,581
Belmont Av & Goliad Ave - Matilda to Delmar Full Reconstruction 2 $150,032
Belmont Av (6002 - 6048) Richmond - Concho to Skillman Full Reconstruction Belmont Av (6002 - 6048) 1 $161,823
Boaz St - 5400 - 5570 Full Reconstruction 2 $193,933
Bowser Av - 3903 - 3929 Full Reconstruction 2 $107,798
Bowser Av - 4002 - 4040 Full Reconstruction 2 $134,300
Bowser Av - 4003 - 4041 Full Reconstruction 2 $133,791
Bowser Av - 4102 - 4130 Full Reconstruction 2 $61,671
Bryn Mawr Dr - 5505 - 5647 Full Reconstruction 2 $287,969
Buena Vista St - 3902 - 3950 Full Reconstruction 2 $175,584
Caillet St - 7202 - 7418 Full Reconstruction 2 $201,833
Cambrick St - 3223 ------Full Reconstruction - Cambrick St - 3223 2 $162,090
Camden Av - 4402 - 4424 Full Reconstruction 2 $86,136
Casa Loma Av (7302 - 7338) Coronado - Tucker to Grand Full Reconstruction Casa Loma Ave (7302 - 7338) 1 $146,787
Cedar Springs Rd - 4306 - 4340 Full Reconstruction 2 $132,517
Central Serv - 4229 - 4245 Full Reconstruction 2 $217,378
Central Serv - 4703 - 4855 Full Reconstruction 2 $159,019
Clermont Av - 403 - 523 Full Reconstruction 2 $186,032
Cole Av - 4100 - 4152 Full Reconstruction 2 $200,049
Concho St - 4303 - 4345 Full Reconstruction 2 $160,548
Cordova St - 403 - 527 Full Reconstruction 2 $184,503
Friday, March 31, 2006 Page 310 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Crestmont Dr - 6120 - 6148 Full Reconstruction 2 $122,832 Dalny St - 4410 - 4436 Full Reconstruction 2 $131,242
Delmar St - 4203 - 4245 Full Reconstruction 2 $153,414
Devonshire Dr - 8100 ------Full Reconstruction 2 $161,823
Dyer St - 5601 - 5643 Full Reconstruction 2 $99,235
Edmondson Av - 5305 - 5353 Full Reconstruction 2 $186,032
Ellsworth Av - 5602 - 5646 Full Reconstruction 2 $159,019
Ellsworth Av - 5702 - 5742 Full Reconstruction 2 $161,059
Ellsworth Av - 5824 - 5844 Full Reconstruction 2 $80,274
Ellsworth Av - 6002 - 6056 Full Reconstruction 2 $196,226
Ellsworth Av - 6202 - 6270 Full Reconstruction 2 $241,078
Elsby Av - 4802 - 4930 Full Reconstruction 2 $201,324
Emerson Av - 5305 - 5351 Full Reconstruction 2 $166,920
Fisher Rd - 6460 - 6498 Full Reconstruction 2 $197,501
Gilbert Av - 3801 - 3829 Full Reconstruction 2 $109,581
Gilbert Av - 3903 - 3929 Full Reconstruction 2 $107,798
Goodwin and Vanderbilt - Greenville to Matilda Full Reconstruction 2 $462,130
Goodwin Av - 5201 - 5255 Full Reconstruction 2 $182,720
Hall St - 3904 - 3926 Full Reconstruction 2 $109,581
Hanover Av - 4700 - 4728 Full Reconstruction 2 $142,965
Hanover Av - 4800 - 4930 Full Reconstruction 2 $200,304
Hawthorne Av - 4206 - 4246 Full Reconstruction 2 $159,784
Friday, March 31, 2006 Page 311 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Herschel Av - 4005 - 4051 Full Reconstruction 2 $160,548 Insurance La - 4605 - 4649 Full Reconstruction 2 $179,152
Inwood Rd - 4007 - 4107 Full Reconstruction 2 $196,481
Kenwood Av - 6204 - 6270 Full Reconstruction 2 $224,259
Lange Cir (6355 - 6361) Saratoga - Norris to Abrams Full Reconstruction Lange Cir. (6355 - 6361) 1 $845,302
Lark La - 5042 ------Full Reconstruction 2 $132,517
Lemmon & Rawlins - Reagan to Oak Lawn(3403) Full Reconstruction 2 $106,942
Lindsley Av - 6914 - 6946 Full Reconstruction 2 $119,774
Longview St - 5200 - 5350 Full Reconstruction 2 $287,714
Longview St - 5505 - 5555 Full Reconstruction 2 $185,523
Lovers La (W) - 5208 - 5212 Full Reconstruction 2 $155,707
Malcolm Dr - 6207 - 6245 Full Reconstruction 2 $155,452
Malcolm Dr - 6252 - 6296 Full Reconstruction 2 $157,490
Malcolm Dr - 6253 - 6299 Full Reconstruction 2 $186,543
Marquita Av - 5800 - 5848 Full Reconstruction 2 $164,881
Marquita Av - 5900 - 5946 Full Reconstruction 2 $163,606
Marquita Av - 6003 - 6043 Full Reconstruction 2 $155,197
Marquita Av - 6134 - 6178 Full Reconstruction 2 $158,001
Martel Av - 6252 - 6314 Full Reconstruction 2 $231,648
McCommas Blvd - 6202 - 6242 Full Reconstruction 2 $156,217
McCommas Blvd - 6302 - 6366 Full Reconstruction 2 $234,197
Merrimac Av - 5302 - 5346 Full Reconstruction 2 $190,365
Friday, March 31, 2006 Page 312 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Milton(5814) & Birchbrook - Matilda to Amherst Full Reconstruction 2 $249,628 Mockingbird La - 5502 - 5646 Full Reconstruction 2 $284,911
Monticello Av - 5121 - 5150 Full Reconstruction 2 $99,897
Monticello Av - 5200 - 5252 Full Reconstruction 2 $185,523
Morton St - 7202 - 7418 Full Reconstruction 2 $200,813
Newton Av - 4201 - 4255 Full Reconstruction 2 $156,981
Oliver St - 3315 ------Full Reconstruction 2 $152,394
Oram St - 5809 - 5853 Full Reconstruction 2 $160,294
Purdue Av - 4802 - 4930 Full Reconstruction 2 $202,088
Purdue Av - 5504 - 5650 Full Reconstruction 2 $285,929
Ravendale La - 6112 - 6170 Full Reconstruction 2 $241,588
Ravendale La - 6203 - 6269 Full Reconstruction 2 $235,726
Reiger & Victor - Beacon to Fulton Full Reconstruction 2 $124,550
Revere Pl(6021) & Martel - Skillman to Concho Full Reconstruction 2 $179,882
Ridgedale Av - 5502 - 5554 Full Reconstruction 2 $185,014
Saratoga Cir - 6206 - 6276 Full Reconstruction 2 $279,813
Skillman St - 4330 - 4344 Full Reconstruction 2 $243,882
Thrush St - 4902 - 5032 Full Reconstruction 2 $207,184
University Blvd - 4902 - 5024 Full Reconstruction 2 $189,090
Vanderbilt Av - 6134 - 6180 Full Reconstruction 2 $157,490
Victor & Reiger - Fitzhugh to Munger Full Reconstruction 2 $334,391
Winton Street (6019-6031) Mockingbird - Concho to Full recon Winton Street (6019 - 6031) 2 $44,671 Skillman
Friday, March 31, 2006 Page 313 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction
Woodcrest La - 6205 - 6259 Full Reconstruction 2 $203,362 Summary for 'Category' = Alley Reconstruction (128 detail records) Sum $23,315,008 Barrier Free Ramps
Field @ Elm Rebuild south 2 ramps 1 66 $3,829
Field @ Patterson Install new ramp at NW corner 1 66 $1,914
5619 Belmont Ave Construct 4 BFRs on east side of Belmont @ 5615, 5619 & 1 42 $7,658 5621 (slope down driveways) Lemmon @ Wycliff 1 BFR needed at intersection 1 41 $1,914
3525 Turtle Creek Construct 2 BFRs on Holland @ Turtle Creek, and 2 Curb Cuts 1 32 $7,658 on driveway at 3525 Turtle Creek Mc Commas @ Skillman 4 corners of intersection 1 32 $7,658
4001 Live Oak Construct sidewalk extensions on sides of driveways at 3909, 1 31 $11,487 4001 and 4021 Live Oak 2901 Matilda Install 4 BFRs on Matilda @ Goodwin 1 27 $7,658
Lemmon @ Douglas 3 BFRs needed at intersection 1 27 $5,743
Anita (5500) @ McMillan Need 3 BFRs on Intersection corners 1 23 $5,743
Skillman @ Ellsworth Construct 4 BFRs on corners of intersection 1 22 $7,658
Skillman @ Kenwood Construct BFRs on 4 corners of intersection 1 22 $7,658
Lemmon @ Oak Grove 2 BFRs needed at intersection 1 21 $3,829
N Fitzhugh Ave at Sycamore St 2 BFRs at Intersection 1 17 $1,378
Lindsley @ Tenison Memorial Need BFR on SW corner of intersection. modify existing 1 13 $12,763 Sidewalk to maintain slope. Remove and replace existing retaining wall Ridgeway St (702) @ Junius St Construct 2 BFRs on corners of intersection. Citizen on 1 13 $3,829 wheelchair
Friday, March 31, 2006 Page 314 of 349 Project Name Description Tier Score Estimate Council District 14 Barrier Free Ramps
Southwestern Blvd. @ Village Glen One BFR missing on intersection 1 10 $1,914 Crestmont Dr @ Ledgestone Dr Construct 4 ramps 1 4 $7,658
Clermont @ Santa Fe Install 2 BFRs on intersection (400 block only) 1 3 $3,829
Summary for 'Category' = Barrier Free Ramps (19 detail records) Sum $111,778 I.T.S. - Speed & Travel Time System
Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $43,075
Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $43,075 Intergovernmental Partnership Projects
Live Oak St. - Liberty to Peak Partnership project with Dallas County to reconstruct existing 1 $2,197,789 five lane undivided roadway. Total estimated cost of $4.6 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. McKinney Avenue Trolley Downtown Extension Partnership project with TxDOT and DART to extend trolley 1 $3,828,900 down Olive from McKinney to Bryan. Total estimated cost of $6.0 million. Estimated to be let by mid 2007. Supplements 1995 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $6,026,689 Street Lighting-CBD Roadway Lighting
Pacific @ Harwood to Central Roadway Lighting Installation 1 40 $117,346
St. Paul @ Ross to Federal Roadway Lighting Installation 1 40 $42,672
Harwood @ Commerce to Canton Roadway Lighting Installation 1 30 $55,473
Woodall Rodgers EBSR - Harwood to Pearl Roadway Lighting Installation 1 30 $106,678
Friday, March 31, 2006 Page 315 of 349 Project Name Description Tier Score Estimate Council District 14 Street Lighting-CBD Roadway Lighting
Federal @ Field to Akard Roadway Lighting Installation 1 20 $42,672 Patterson @ Griffin to Ervay Roadway Lighting Installation 1 20 $74,675
San Jacinto @ Griffin to Akard Roadway Lighting Installation 1 20 $53,339
Jackson @ Browder to Central Roadway Lighting Installation 1 10 $181,353
Munger @ Field to Akard Roadway Lighting Installation 1 10 $64,006
Wood @ Ervay to Pearl Roadway Lighting Installation 1 10 $74,675
Wood @ Griffin to Akard Roadway Lighting Installation 1 10 $21,763
Summary for 'Category' = Street Lighting-CBD Roadway Lighting (11 detail records) Sum $834,651 Street Petitions
Laneri Ave - Merrimac Ave to Mercedes Ave Engineering, Paving and Drainage 3300 blk 1 95 $110,825
Summary for 'Category' = Street Petitions (1 detail record) Sum $110,825 Street Reconstruction Local Streets
Milton St - Greenville Av to Dead-End 5600 Blk 1 61.8 $370,127
Cole Avenue - Cedar Springs Rd to Vine St 2600 - 2700 blks 1 60.75 $608,821
Caruth Haven Ln - Greenville Av to Southwestern Blvd 5700 Blk 1 59.24 $998,966
Hilton Dr - Flora St to N Hall St 1800 Blk 1 55.43 $204,208
Hudnall St - Denton Dr to Bradford Dr 2800 blk 1 55.14 $151,165
Cragmont Ave - Abbott Ave East to RR 3500 blk 1 54.66 $223,353
Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $2,556,639
Friday, March 31, 2006 Page 316 of 349 Project Name Description Tier Score Estimate Council District 14 Street Reconstruction Thoroughfares
Lemmon Ave - Caddo St to N Haskell Av 2300 Blk 1 69.55 $1,084,855 Gordon St - Swiss Av to Live Oak Sr 1100 - 1200 Blks 1 65.75 $446,705
Texas St- Live Oak St to Swiss Av 600 Blk 1 65.38 $622,834
Seelcco St - Denton Dr to 675' NE of Denton Dr 2600 - 2700 Blks 1 64.59 $650,913
Hubert St - La Vista Ct to La Vista Dr 1900 Blk 1 64.42 $202,932
Liberty St - Bryan St to Live Oak St 700 Blk 1 64.15 $308,865
Dyer St - Central Expwy to Greenville Av 5500 - 5600 Blks 1 63.29 $974,119
Mcmillan Av - Martel Av to Mccommas Blvd 3600 Blk 1 58.71 $560,296
Bookhout Street - Wolf to 400' North 3000 Blk 1 58.66 $405,885
Summary for 'Category' = Street Reconstruction Thoroughfares (9 detail records) Sum $5,257,404 Street Resurfacing
Good Latimer Expy. (S) - Canton St. to IH 30 Bridge 400 - 800 1 87.695 $375,743
Hawkins St. (N) - Pacific Ave. to Live Oak St. 300 - 700 1 81.11 $83,598
Flora St. - Woodall Rodgers Frwy. To Leonard St. 2400 - 2700 1 80.21 $46,585
Barry Ave. (N) - Columbia Ave. to Elm Alley 100 Block 1 79.73 $11,870
Swiss Ave. - Apple St. to Carroll Ave. 4000 - 4400 1 75.42 $25,092
Abrams Rd. - Ledgestone Dr. to Fisher Rd. 5500 - 5600 1 75.11 $89,852
Insurance Ln. - Hester Ave. to Knox St. 4600 Block 1 74.845 $38,417
Webb St. - Central Expy. To Tracy St. 3000 - 3100 1 74.395 $49,903
San Jancinto St. - Olive St. to N. Pearl St. 2100 block 1 73.18 $16,847
Greenville Ave. - Winton St. to Mockingbird Ln. 4100 Block 1 71.54 $32,035
Friday, March 31, 2006 Page 317 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Bryan St. - Central Expwy to Spenwick Ter. 2600-3200 1 71.17 $147,157 Alderson St. - Anita St. to Mockingbird Ln. 3900 - 4000 1 71 $46,074
Florence St. - Cantegral St. to Liberty St. 2700 - 2800 1 70.72 $53,222
Delmar Ave. - Prospect Ave. to Llano Ave. 2100 - 2600 1 70.42 $209,951
Chadbourne Rd. - Stanford Ave. to Caruth Blvd. 8100 - 8600 1 69.62 $207,909
Monticello - Greenville Ave. to Alderson St. 5700 - 6200 1 69.605 $159,155
Prather St. - Commerce St. to Jackson St. 200 block 1 69.475 $13,146
Burbank St. - Denton Dr. to Dead End 2700 Block 1 68.79 $78,110
Columbia Ave. - Beacon Ave. to Fulton St. 5600 Block 1 68.735 $41,990
Martel Ave. - Central Expy to Alderson St. 5300 - 6300 1 68.64 $584,928
Skillman St. - Mockingbird Ln. to Woodcrest Ln. 4200 - 4300 1 68.415 $110,272
Ledgestone Dr. - Town Hill Ln. to Abrams Rd. 5400 - 5600 1 68.13 $117,292
McCommas Blvd - Homer St. to Clements St. 5200 - 6100 1 67.635 $405,736
Routh St. - Ross Ave. to Central Expy. Svc. Rd. 1000 - 1200 1 67.615 $82,704
Morningside Ave. - Greenville Ave. to Skillman St. 5700 - 6000 1 67.38 $139,117
Hall St. (N) - Turtle Creek Blvd. to Oak Lawn Ave. 3400 - 3700 1 67.04 $148,944
Welborn St. - Lemmon Ave. to Holland Ave. 3500 - 3600 1 66.91 $82,960
Malcom Dr. - Clements St. to Alderson St. 6200 block 1 66.76 $66,112
Parkmont St. - Gaston Ave. to Bryan St. 900 - 1100 1 66.46 $68,027
Hester Ave. - McKinney Ave. to Cole Ave. 3100 Block 1 66.28 $29,227
Glencoe St. - Willis Ave. to Longview St. 2600 - 3500 1 66.07 $290,103
Cole Ave. - Fitzhugh Ave. to 258' N Monticello Ave. 4200 - 4800 1 66.005 $495,715
Friday, March 31, 2006 Page 318 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Purdue Ave. - Chadbourne Rd. to Devonshire Dr. 5400 - 5600 1 66.005 $121,249 Bremen St. - McCommas Blvd. to Anita St. 3500 - 3900 1 65.405 $122,014
Elsby Ave. - Lover Ln. to Catawha Rd. 4500 Block 1 64.34 $87,171
Harwood St. (N) - McKinney Ave. to Harry Hines Blvd. 2100 - 2200 1 64.125 $39,310
Maple Ave. - McKinney Ave. to Cedar Springs Rd. 2400 - 2600 1 63.845 $121,121
Washington Ave. (N) - Ross Ave. to N. Lemmon Ave. 1700 - 2300 1 63.785 $149,965
Ross Ave. - Peak St. to Live Oak St. 4300 - 6000 1 63.685 $156,474
Alderson St. - La Vista Ave. to Richmond Ave. 1900 - 2100 1 63.63 $56,412
Hyer St. - Lomo Alto Dr. to Dead End 1 63.495 $72,877
Greenville Ave. - Bryan St. to Palo Pinto Ave. 1300 - 2500 1 63.39 $68,154
Haskell Ave. (N) - Ross Ave. to Cabell Dr. 1700 - 2100 1 63.195 $142,307
Worcola St. - Goodwin Ave. to Ridgedale Dr. 2900 - 3000 1 63.01 $50,286
Reagan St. - Cedar Springs Rd. to Lemmon Ave. 3200 - 3400 1 62.68 $99,296
Merrimac Ave. - Homer St. to Laneri Ave. 5200 block 1 62.425 $48,117
Oak Grove Ave. - McKinney Ave. to Lemmon Ave. (E) 3100 - 3500 1 62.355 $152,518
Ellsworth Ave. - McMillan Ave. to Concho St. 5500 - 5900 1 61.84 $211,228
Delmar Ave. - Mockingbird Ln. to Dead End 4200-4400 1 61.72 $165,791
Noble Ave. - Lemmon Ave. to Hall St. 3300 - 3400 1 61.515 $50,541
Gilbert Ave. - Oak Lawn Ave. to Throckmorton St. 3800 - 3900 1 61.35 $54,243
Monticello Ave. - Concrete @ Central Expy. To Laneri Ave. 5100 - 5200 1 61.33 $70,579
Bowser Ave. - Wheeler St. to Dead End 5000 - 5100 1 61.025 $28,206
Concho St. - Anita St. to Woodcrest Ln. 4000 - 4300 1 60.01 $142,307
Friday, March 31, 2006 Page 319 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Matalee Ave. - McMillan Ave. to Greenville Ave. 5500 - 5600 1 59.84 $74,408 Mercedes Ave. - Homer St. to Glencoe St. 5200 - 5300 1 59.69 $64,964
Cole Ave. - Blackburn St. to Cambrick St. 3800 - 3900 1 58.825 $115,122
Concho St - Marquita Ave. to Revere Pl. 3100 - 3500 1 58.77 $156,474
Delmar Ave. - Marquita Ave. to Penrose 3100 - 3700 1 58.52 $202,932
Homer St. - Henderson Ave. to Monticello Ave. 2400 - 3100 1 58.455 $305,291
Reagan St. - Dickason Ave. to Maple Ave. 2500 - 3100 1 58.16 $16,924
Laclede St. - Concrete to Allen St. 2700 - 2800 1 58.075 $54,881
Skillman St. - Gaston Ave. to Swiss Ave. 900 - 1000 1 57.485 $33,311
Buena Vista St. - Cambrick St. to Oliver St. 4000 - 4300 1 57.445 $126,864
East Grand Ave. - LaVista Dr. to 200' S Gaston Ave. 7300 - 7500 1 57.17 $206,122
Ridgedale Ave. - McMillan Ave. to Worcola St. 5500 block 1 56.68 $61,901
Hall St. (N) - Ross Ave. to Munger Ave. 1700 - 1800 1 56.26 $46,840
Abbott Ave. - Fitzhugh Ave. to Armstrong Pkwy. 4200 - 4400 1 56.235 $179,703
Vickery Blvd. - Greenville Ave. to Skillman St. 5700 - 6000 1 56.05 $165,664
Revere Pl. - Delmar Ave. to Alderson St. 5900 - 6300 1 55.17 $181,745
Glendale St. - Gaston Ave. to Live Oak St. 800 - 1200 1 55.135 $236,754
La Vista Dr. - Abrams Rd. to Abrams Pkwy. 6400 block 1 54.92 $22,846
Wylie Dr. - Weiss St. to Reeves St. 3300 - 3400 1 54.92 $63,943
Thomas Ave. - Washington Ave. to Caddo St. 3800 block 1 54.5 $28,334
Anita St. - Concho St. to Skillman St. 6000 Block 1 54.46 $36,247
Empire Dr. - LaVista Dr. to Oram St. 1900 Block 1 54.125 $21,187
Friday, March 31, 2006 Page 320 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Thomas Ave. - Worthington St. to Allen St. 2800 block 1 53.89 $45,947 Collett Ave. (N) - Columbia Ave. to Collett Pl. 100 Block 1 53.54 $22,463
St Joseph St. - Live Oak St. to Bryan St. 1300 block 1 53.36 $93,298
Cochran St. - Washington Ave. to Caddo St. 3800 Block 1 52.925 $32,035
Norris St. - Marquita Ave. to Monticello Ave. 3000 block 1 52.76 $25,271
Milam St. - Lee St. to Garrett Ave. 5000 block 1 50.47 $49,010
Penrose Ave. - Delmar Ave. to Norris St. 5900 - 6200 1 49.95 $170,258
Concho St. - Oram St. to Vickery Blvd. 2000 - 2700 1 49.51 $259,344
McMillian Ave. - Goodwin Ave. to Longview St. 2900 - 3500 1 48.54 $341,027
Ashland St. - Harry Hines Blvd. to Cedar Springs Rd. 1800 Block 1 48.095 $7,658
St Joseph St. - Gaston Ave. to Swiss Ave. 900 - 1000 1 47.935 $49,265
Palm Ln. - Matilda St. to Dead End 5800 block 1 47.23 $41,990
Gurley Ave. - Valencia St. to Cameron Ave. 6400 Block 1 47.145 $38,417
Ravendale Ln. - Matilda St. to Delmar Ave. 5800 block 1 46.15 $64,070
Roseland Ave. - Hall St. to Washington Ave. 3300 - 3700 1 46.15 $102,742
Woodcrest Ln. - Ravendale Ln. to 135' w of Delmar Ave. 4300 block 1 44.565 $70,324
Lee Pkwy. - Hall St. to Rawlins St. 3300 block 1 44.445 $29,993
Willis Ave. - Central Expy. To Homer St. 5000 - 5100 1 44.24 $51,180
Dorothy Ave. - Lemmon Ave. to Bowser Ave. 3500 Block 1 44.175 $36,502
Fairmount St. - Thomas Ave. to State St. 2300 Block 1 43.355 $27,696
Llano Ave. - Matilda St. to Skillman St. 5800 - 6000 1 43.135 $250,921
Collett Ave. (N) - Reiger Ave. to Tremont St. 300 - 400 1 42.765 $69,814
Friday, March 31, 2006 Page 321 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Milton St. - Danbury Ln. to Matilda St. 5800 - 6000 1 42.69 $90,490 Glasgow Dr. (N) - Abrams Rd. to Worth St. 500 Block 1 42.63 $44,926
Holland Ave. - Turtle Creek Blvd. to Oak Lawn Ave. 3600 - 3700 1 42.62 $97,892
Thomas Ave. - Pearl St. to Maple-routh Conn. 2200 - 2300 1 42.61 $19,017
Wheeler St. - Lemmon Ave. to Dead End 3500 - 3700 1 42.39 $34,039
McMillian Ave. - Anita St. to Ellsworth Ave. 3900 block 1 42.325 $20,804
Belmont Ave. - McMillan Ave. to Greenville Ave. 5500 - 5600 1 42.17 $127,502
St Joseph St. - Swiss Ave. to Live Oak St. 1100 - 1200 1 39.645 $61,901
Anita St. - Alderson St. to Abrams Rd. 6300 Block 1 39.205 $29,738
Flora St. - Central Expy. To Hall St. 3000 - 3200 1 35.41 $63,304
Abrams Rd. - 1300 2 $0
Adolph St. - 3000 2 $0
Akard St. (N) - 100 2 $0
Akard St. (N) - 400 2 $0
Akard St. (N) - 600 2 $0
Akard St. (S) - 100 2 $0
Alamo St. - 2100 2 $0
Alamo St. - 2200 2 $0
Allen St. - 2200 2 $0
Amesbury Dr. - 5600 2 $0
Amherst Av. (W) - 4800 2 $0
Amherst Av. (W) - 4900 2 $0
Friday, March 31, 2006 Page 322 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Amherst Av. (W) - 5500 2 $0 Amherst Av. (W) - 5600 2 $0
Amherst Cir. - 5400 2 $0
Ansley Av. - 6800 2 $0
Apple St. - 1100 2 $0
Apple St. - 1200 2 $0
Armstrong Av. - 3300 2 $0
Aubrey Av. - 6600 2 $0
Aubrey Av. - 6700 2 $0
Avondale Av. - 4200 2 $0
Belmont Av. - 5500 2 $0
Belmont Av. - 5600 2 $0
Blackburn St. - 3300 2 $0
Bluffview Blvd. - 3900 2 $0
Bluffview Blvd. - 4100 2 $0
Boll St. - 1700 2 $0
Boll St. - 2300 2 $0
Boll St. - 2700 2 $0
Bookhout St. - 2800 2 $0
Bookhout St. - 2900 2 $0
Bordeaux Av. - 6200 2 $0
Bordeaux Av. - 6400 2 $0
Friday, March 31, 2006 Page 323 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Bowen St. - 3000 2 $0 Bowser Av. - 3700 2 $0
Bradford Dr. - 5000 2 $0
Bradford Dr. - 5100 2 $0
Bristol Av. - 7800 2 $0
Brookfield Av. - 2700 2 $0
Brown St. - 3500 2 $0
Brown St. - 3600 2 $0
Bryan Pkwy. - 5600 2 $0
Bryan St. - 5400 2 $0
Bryan St. - 5500 2 $0
Bryn Mawr Dr. - 5400 2 $0
Bryn Mawr Dr. - 5500 2 $0
Bryn Mawr Dr. - 5600 2 $0
Caddo St. - 1400 2 $0
Cadiz St. - 2000 2 $0
Caillet St. - 7100 2 $0
Camden Av. - 4200 2 $0
Camden Av. - 4300 2 $0
Carlisle Pl. - 3200 2 $0
Carlisle St. - 3100 2 $0
Carlisle St. - 3200 2 $0
Friday, March 31, 2006 Page 324 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Caroline St. - 2400 2 $0 Caruth Blvd. - 5400 2 $0
Cedar Springs Rd. - 4600 2 $0
Cedar Springs Rd. - 4700 2 $0
Central Exwy. (S) - 100 2 $0
Central Exwy. (S) - 1100 2 $0
Cochran Heights Dr. - 9100 2 $0
Colby St. - 2400 2 $0
Cole Av. - 2800 2 $0
Cole Av. - 2900 2 $0
Cole Av. - 3000 2 $0
Cole Av. - 3100 2 $0
Collville Av. - 6600 2 $0
Columbia Av. - 5000 2 $0
Cordova St. - 400 2 $0
Covington La. - 6200 2 $0
Crestmont Dr. - 6100 2 $0
Crestmont Dr. - 6200 2 $0
Crestmont Dr. - 6300 2 $0
Eastern Av. - 7200 2 $0
Eastern Av. - 7500 2 $0
Eastern Av. - 7900 2 $0
Friday, March 31, 2006 Page 325 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Eastern Av. - 8000 2 $0 Eastern Av. - 8100 2 $0
Eastern Av. - 8200 2 $0
Eastern Av. - 8300 2 $0
Edgewater St. - 3500 2 $0
Ellsworth Av. - 5400 2 $0
Ellsworth Av. - 6200 2 $0
Elm St. - 2500 2 $0
Emerson Av. - 5300 2 $0
Federal St. - 1500 2 $0
Field St. (N) - 1700 2 $0
Field St. (N) - 1900 2 $0
Fitzhugh Av. (N) - 3300 2 $0
Fitzhugh Av. (N) - 3500 2 $0
Floyd St. - 3300 2 $0
Floyd St. - 3400 2 $0
Floyd St. - 3500 2 $0
Floyd St. - 3800 2 $0
Freeman St. - 1800 2 $0
Fulton St. (N) - 400 2 $0
Glencoe St. - 3700 2 $0
Glencrest La. - 8500 2 $0
Friday, March 31, 2006 Page 326 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Glencrest La. - 8600 2 $0 Glencrest La. - 8700 2 $0
Glenwick La. - 5400 2 $0
Glenwood Av. - 4200 2 $0
Good Latimer Exwy. (N) - 100 2 $0
Good Latimer Exwy. (N) - 200 2 $0
Good Latimer Exwy. (N) - 300 2 $0
Good Latimer Exwy. (N) - 400 2 $0
Good Latimer Exwy. (N) - 500 2 $0
Good Latimer Exwy. (S) - 100 2 $0
Goodwin Av. - 6000 2 $0
Greenbrier Dr. - 5700 2 $0
Greenville Av. - 3100 2 $0
Greenville Av. - 5000 2 $0
Greenville Av. - 5200 2 $0
Greenway Blvd. (E) - 7600 2 $0
Griffin St. (N) - 100 2 $0
Gurley Av. - 6400 2 $0
Hall St. (N) - 4100 2 $0
Harry Hines Blvd. - 2500 2 $0
Harvard Av. - 3100 2 $0
Harwood St. (N) - 1700 2 $0
Friday, March 31, 2006 Page 327 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Harwood St. (N) - 2100 2 $0 Harwood St. (N) - 2200 2 $0
Hibernia St. - 2600 2 $0
Hibernia St. - 2700 2 $0
Holland Av. - 5100 2 $0
Holland Av. - 5500 2 $0
Howell St. - 2400 2 $0
Howell St. - 3500 2 $0
Hudson St. - 5600 2 $0
Hudson St. - 5700 2 $0
Hudson St. - 5900 2 $0
Hudson St. - 6000 2 $0
Hugo St. - 2400 2 $0
Irving Av. - 4200 2 $0
Jack Evans St. - 1800 2 $0
Junius St. - 5400 2 $0
Junius St. - 5600 2 $0
Kelton Dr. - 4400 2 $0
Kings Rd. - 3400 2 $0
Knight St. - 3300 2 $0
Knight St. - 3400 2 $0
La Vista Ct. - 5800 2 $0
Friday, March 31, 2006 Page 328 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
La Vista Dr. - 5700 2 $0 La Vista Dr. - 5900 2 $0
Lahoma St. - 4900 2 $0
Lahoma St. - 5000 2 $0
Lakemont Dr. - 8800 2 $0
Lemmon Av. - 2400 2 $0
Lemmon Ave East - 2700 2 $0
Lemmon Ave East - 2800 2 $0
Lemmon Ave East - 2900 2 $0
Lemmon Ave East - 3000 2 $0
Lemmon Wood Plz. - 3500 2 $0
Leonard St. - 700 2 $0
Lewis St. - 5900 2 $0
Liberty St. - 800 2 $0
Lindsley Av. - 7100 2 $0
Live Oak St. - 2000 2 $0
Live Oak St. - 2600 2 $0
Live Oak St. - 2700 2 $0
Live Oak St. - 2800 2 $0
Live Oak St. - 2900 2 $0
Live Oak St. - 3000 2 $0
Live Oak St. - 3100 2 $0
Friday, March 31, 2006 Page 329 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Live Oak St. - 3300 2 $0 Live Oak St. - 3400 2 $0
Live Oak St. - 3500 2 $0
Live Oak St. - 3600 2 $0
Live Oak St. - 3700 2 $0
Live Oak St. - 3800 2 $0
Live Oak St. - 3900 2 $0
Live Oak St. - 4000 2 $0
Lockheed Av. - 6500 2 $0
Lontos Dr. - 6400 2 $0
Loving Av. - 2400 2 $0
Main St. - 1200 2 $0
Maple Routh Conn. - 2200 2 $0
Maple Routh Conn. - 2300 2 $0
March Av. - 4700 2 $0
Mary St. - 1600 2 $0
Matilda St. - 2100 2 $0
Matilda St. - 2500 2 $0
Matilda St. - 3400 2 $0
Matilda St. - 3700 2 $0
Matilda St. - 3800 2 $0
Matilda St. - 4300 2 $0
Friday, March 31, 2006 Page 330 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Matilda St. - 4700 2 $0 Matilda St. - 5200 2 $0
Mccommas Blvd. - 3000 2 $0
Mckinney Av. - 3100 2 $0
Mckinnon St. - 2600 2 $0
Mcmillan Av. - 2900 2 $0
Miller Av. - 5200 2 $0
Mockingbird La. (W) - 5300 2 $0
Monte Vista Dr. - 500 2 $0
Moody St. - 2000 2 $0
Morningside Av. - 6100 2 $0
Munger Av. - 1800 2 $0
Munger Av. - 3300 2 $0
Munger Av. - 3500 2 $0
Munger Av. - 4000 2 $0
Newmore Av. - 5200 2 $0
Newton Ct. - 4300 2 $0
Olive St. - 1800 2 $0
Olive St. - 2100 2 $0
Olive St. - 2200 2 $0
Oliver St. - 3000 2 $0
Oram St. - 5800 2 $0
Friday, March 31, 2006 Page 331 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Overbrook Dr. - 3500 2 $0 Pacific Av. - 2000 2 $0
Paulus Av. (N) - 500 2 $0
Pearl Exwy. (S) - 700 2 $0
Pecos St. - 1500 2 $0
Penrose Av. - 6000 2 $0
Pershing St. - 5000 2 $0
Ravendale La. - 6300 2 $0
Reeves St. - 9300 2 $0
Reiger Av. - 4900 2 $0
Rexford Dr. - 8700 2 $0
Richmond Av. - 6300 2 $0
Rock Creek Dr. - 3500 2 $0
Rock Creek Dr. - 4100 2 $0
Ross Av. - 1900 2 $0
Routh St. - 1700 2 $0
Routh St. - 2300 2 $0
Routh St. - 2400 2 $0
Routh St. - 2600 2 $0
Routh St. - 2900 2 $0
Routh St. - 3000 2 $0
Sale St. - 2900 2 $0
Friday, March 31, 2006 Page 332 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
San Jacinto Pl. - 1900 2 $0 San Jacinto St. - 1500 2 $0
San Jacinto St. - 1800 2 $0
San Jacinto St. - 2600 2 $0
San Jacinto St. - 2700 2 $0
Santa Fe Av. - 6600 2 $0
Savage St. - 4800 2 $0
Sevilla St. - 6500 2 $0
Skillman St. - 2400 2 $0
Skillman St. - 5700 2 $0
Southern Av. - 5300 2 $0
Springbrook St. - 3500 2 $0
St Mary Av. (N) - 100 2 $0
St Moritz Av. - 6100 2 $0
St Paul St. (N) - 1700 2 $0
Stanford Av. - 5400 2 $0
Stanford Av. - 5500 2 $0
Stanford Av. - 5600 2 $0
State St. - 2500 2 $0
State St. - 2600 2 $0
State St. - 2700 2 $0
Stonebridge Dr. - 3900 2 $0
Friday, March 31, 2006 Page 333 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Stoneleigh Av. - 5000 2 $0 Stoneleigh Av. - 5100 2 $0
Stoneleigh Av. - 5200 2 $0
Stoneleigh Av. - 5300 2 $0
Sudbury Dr. - 6200 2 $0
Summit Av. - 2300 2 $0
Swiss Cir. - 3300 2 $0
Tarsi Dr. - 6500 2 $0
Texas St. - 400 2 $0
Texas St. - 800 2 $0
Texas St. - 900 2 $0
Thomas Av. - 2700 2 $0
Throckmorton St. - 4200 2 $0
Thrush St. - 4900 2 $0
Tom Braniff La. - 3200 2 $0
Town Hill La. - 6100 2 $0
Town Hill La. - 6200 2 $0
Travis St. - 3500 2 $0
Travis St. - 4000 2 $0
Travis St. - 4100 2 $0
Travis St. - 4200 2 $0
Travis St. - 4300 2 $0
Friday, March 31, 2006 Page 334 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Travis St. - 4600 2 $0 Tremont St. - 5300 2 $0
Tucker St. - 2200 2 $0
Turtle Creek Blvd. - 2400 2 $0
Turtle Creek Blvd. - 2500 2 $0
Turtle Creek Blvd. - 2600 2 $0
Turtle Creek Blvd. - 2700 2 $0
Turtle Creek Blvd. - 2800 2 $0
Twin Sixties Dr. - 5300 2 $0
University Blvd. (W) - 5200 2 $0
Valencia St. - 400 2 $0
Vanderbilt Av. - 6000 2 $0
Vann Ct. - 3200 2 $0
Versailles Av. (N) - 3500 2 $0
Versailles Av. (N) - 3800 2 $0
Victor St. - 6100 2 $0
Victor St. - 6200 2 $0
Victoria Av. - 6800 2 $0
Villars St. - 1600 2 $0
Waddell Av. - 6600 2 $0
Washington Av. (N) - 1000 2 $0
Welborn St. - 2400 2 $0
Friday, March 31, 2006 Page 335 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing
Welborn St. - 2500 2 $0 Wichita St. - 1800 2 $0
Wood St. - 1700 2 $0
Wood St. - 1800 2 $0
Woodrow Av. - 2600 2 $0
Woodside St. - 2800 2 $0
Worcola St. - 3500 2 $0
Wycliff Av. - 3100 2 $0
Wycliff Av. - 3300 2 $0
Wycliff Av. - 3400 2 $0
Yale Blvd. - 5600 2 $0
Summary for 'Category' = Street Resurfacing (417 detail records) Sum $11,429,254 Streetscape / Urban Design
Bryan Street Divide pedestrain connections between Bryan Place 2 $697,327 neighborhood and downtown, along the DART light rail extension Columbia Ave. Munger to Carroll Lnadscape / street Scape crosswalks at major intersections. 2 $627,594
Commerce St - Houston to Pearl See also: PB98N610 for design only, from Griffin to Harwood 2 $4,715,327 (Phase I). IMPS No. 10655, Intergovernmental Partnership Projects for street major rehab and/or reconstruction, from IH 35E to US-75 ~4,800 LF Elm St - Houston to Pearl Phase I - Griffin to Ervay. Bus lane improvements and 2 $4,646,989 pedestrian enhancements
Friday, March 31, 2006 Page 336 of 349 Project Name Description Tier Score Estimate Council District 14 Streetscape / Urban Design
Freeway Air Rights Develop.-Woodall Rodgers & I-30 Study potential bridging of these freeway barries, providing 2 $100,415 landscping and pedestrian connections to Uptown and the Cedars Pearl Street Lighting - Live Oak to Cedar Spring Provide pedestrian connrctions between the Arts District and 2 $1,185,457 Uptown / Victory ~4,900 LF, lights @ 50' o/c each side Ross Avenue - Lamar to Julius Schepps Freeway Includes screening for parking, pedestrian and streetscape 2 $3,475,456 enhancements and upgrading street light. ~5,300 LF - currently under design San Jacinto Street Lighting - Lamar to Routh Increased public safety ~4,500 LF lights @ 50' o/c each side 2 $1,080,858
Summary for 'Category' = Streetscape / Urban Design (8 detail records) Sum $16,529,422 Thoroughfares
Ross -Lamar to Central Expwy Enhanced sidewalks and streetscape 1 59 $7,387,384
Haskell - Lemmon to Main Rebuild a three lane coupletwith sidewalk, streetscape & 1 56 $6,903,779 landscape improvements. Commerce - Griffin to Pearl Reconstruct street and enhance sidewalks and streetscape 1 55 $17,102,420
Live Oak -Olive to Central Boulevard Convert operation from 1-way to 2-way from DART CBDETC to 1 50 $475,760 new Central Blvd Pearl -Live Oak to Young Realign Pearl from Live Oak to Pacific; Convert from 1-way to 2- 1 48 $7,785,430 way; Enhance sidewalk Elm - Griffin to Pearl Reconstruct as a four lane undivided roadway with enhanced 1 45 $17,102,420 sidewalks and streetscape Akard - Commerce to Elm Convert operation from 1-way to 2-way 1 39 $393,994
Flora - Leonard to Routh Widen to 40 foot pavement 1 38 $4,722,310
Routh - Woodall Rogers to Ross Widen to a four lane divided roadway with center turn lane 1 38 $2,836,983
Field -Elm to Wood Convert operation from 1-way to 2-way 1 37 $650,913
Ervay -I-30 WB Frontage Road to Commerce Convert operation from 1-way to 2-way (Widen to five lane 1 36 $7,438,557 roadway)
Friday, March 31, 2006 Page 337 of 349 Project Name Description Tier Score Estimate Council District 14 Thoroughfares
Mockingbird - Abrams to Matilida Widen to a six lane divided roadway 1 32 $33,827,340 St. Paul - Canton to Elm Widen to 44 foot pavement 1 31 $702,621
Central Boulevard - Live Oak to Commerce Reconstruct street as a six lane divided blvd; convert from 1- 1 30 $13,209,705 way to 2-way; enhance Routh St - Ross to San Jacinto Widen to six lane divided roadway 1 29 $1,773,984
Canton - Good Latimer to Trunk Widen to standard five lane roadway 1 28 $2,001,421
Browder - Commerce to Jackson Convert operation from 1-way to 2-way 1 25 $236,116
Marilla -Ervay to Harwood Enhanced sidewalks and streetscape 1 20 $1,563,468
Hall St. - US 75 to Ross Widen to a two lane undivided roadway 1 18 $1,366,931
Canton/Marilla - Akard to Harwood Convert operation from 1-way to 2-way with Project Pegasus 1 16 $319,075
Commerce - Central to Fair Park Link Widen to four lane undivided roadway 1 12 $853,386
Federal -Akard to Ervay Convert operation from 1-way to 2-way 1 10 $175,891
Patterson -Field to Akard Convert operation from one-way to two way 1 10 $140,393
Harwood - Elm to Canton Streescape and enhanced sidewalks 1 0 $369,794
Fair Park Link/ Gaston -US 75 to Malcolm X Widen to a five lane undivided roadway 1 $5,996,665
Lovers Lane (W) - Dallas North Tollway to Inwood Widen to a six lane divided roadway within 90' of right-of-way 1 $2,728,999
Pearl/Central Conn. - Canton to Central Expressway 1 $2,852,702
Shorecrest - Lemmon to Denton widen to a standard four lane roadway 1 $3,286,702
Summary for 'Category' = Thoroughfares (28 detail records) Sum $144,205,141 Traffic Intersection Capacity & Safety Improvement
Garland at Gaston Improve intersection geometrics to improve safety for 1 55 $1,155,052 northbound left-turn. Change to more urban intersection design. Tighten curves and square up intersection.
Friday, March 31, 2006 Page 338 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Intersection Capacity & Safety Improvement
Lemmon approaching Howell Hign accident location. Reduce accidents caused by sharp 1 55 $936,804 curve. Reconstruct to flatten and improve banking of curve. Maple @ Oak Lawn Widen southbound Maple to construct a right turn lane. 1 45 $113,591
Abrams @ Kenwood Street Modifications and Bottlene Widen Abrams at Kenwood to provide northbound and 1 40 $181,873 southbound left-turn lanes. Haskell @ State Construct a U-turn lane on Haskelll to allow westbound to 1 40 $109,124 eastbound movement. Cedar Springs at Turtle Creek/Bowen 1 35 $459,468
Haskell at Lemmon Improve lane channelization. 1 35 $468,402
Abrams @ Lake Circle Widen Abrams at Lake Circle to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Lovers Street Modifications and Bottlenec Widen the southside of Lovers just east of Abrams to improve 1 30 $95,084 the transition from three lanes to two lanes. Abrams @ McCommas Widen Abrams Rd at McCommas to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Monticello - Sondra Widen Abrams at Monticello/Sondra to provide northbound and 1 30 $218,247 southbound left-turn pockets. Greenville at Lovers 1 30 $0
Inwood at Bordeaux 1 30 $0
Shorecrest @ Webb Chapel Widen Webb Chapel approaching Shorecrest to provide a 1 30 $256,536 southbound left-turn pocket. Widen Shorecrest approaching Webb Chapel to provide an eastbound left-turn pocket. Bluebonett @ Bluffview Improve NB/SB curves. Safety improvements. 2 24 $534,915
Richmond @ Skillman Street Modifications and Bottl Remove dip in the roadway on Richmond at Skillman. 1 20 $145,498
Knox at Cole and Knox at Mckinney Widen McKinney to provide left-turn pockets at Cole and at 2 $513,073 Mckinney. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (17 detail records) Sum $5,624,161
Friday, March 31, 2006 Page 339 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Safety Improvements-Guardrail Upgrades
Greenville 7700 BLK Guardrail Upgrade 1 80 $14,614 Lemmon 9300 BLK Guardrail Upgrade 1 80 $20,868
Cedar Springs 4700 BLK Guardrail Upgrade 1 73 $13,337
Good-Latimer 600 S BLK Guardrail Upgrade 1 73 $6,573
Abrams 3700 BLK Guardrail Upgrade 1 67 $7,307
Abrams 5500 BLK Guardrail Upgrade 1 67 $15,443
Greenville 4400 BLK Guardrail Upgrade 1 67 $21,346
Inwood 7400 BLK Guardrail Upgrade 1 67 $3,543
Lemmon 2800 BLK Guardrail Upgrade 1 67 $15,922
Skillman 4600 BLK Guardrail Upgrade 1 67 $8,870
Skillman 5200 BLK Guardrail Upgrade 1 67 $7,307
Skillman 5700 BLK Guardrail Upgrade 1 60 $29,803
Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (12 detail records) Sum $164,932 Traffic Signal Upgrades - CBD
Akard @ Commerce Traffic Signal Upgrades CBD 1 63 $49,674
Akard @ Jackson Traffic Signal Upgrades CBD 1 63 $43,496
Browder @ Commerce Traffic Signal Upgrades CBD 1 63 $49,674
Browder @ Jackson Traffic Signal Upgrades CBD 1 63 $43,496
Central @ Commerce/Jackson Traffic Signal Upgrades CBD 1 63 $70,171
Commerce @ Lane Traffic Signal Upgrade 1 63 $49,674
Commerce @ Prather Traffic Signal Upgrade 1 63 $49,674
Friday, March 31, 2006 Page 340 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD
Elm - Field Traffic Signal Upgrades CBD 1 63 $49,674 Elm @ Ervay Traffic Signal Upgrade 1 63 $43,496
Elm @ Harwood Traffic Signal Upgrade 1 63 $55,736
Elm @ Stone Pl Traffic Signal Upgrade 1 63 $43,496
Ervay @ Federal Traffic Signal Upgrade 1 63 $49,674
Ervay @ Jackson Traffic Signal Upgrade 1 63 $49,674
Field @ Wood Traffic Signal Upgrades CBD 1 63 $24,837
Harwood @ Jackson Traffic Signal Upgrade 1 63 $49,674
Live Oak @ Olive Traffic Signal Upgrade 1 63 $49,674
Olive @ San Jacinto Traffic Signal Upgrade 1 63 $57,887
Akard @ Elm Traffic Signal Upgrades CBD 1 53 $59,922
Akard @ Ervay/Ross Traffic Signal Upgrades CBD 1 53 $62,028
Elm @ St Paul Traffic Signal Upgrade 1 53 $49,674
Ervay @ Pacific Traffic Signal Upgrades CBD 1 53 $55,851
Ervay @ Patterson Traffic Signal Upgrades CBD 1 53 $43,496
Flora @ Harwood Traffic Signal Upgrades CBD 1 53 $55,851
Flora @ Olive Traffic Signal Upgrades CBD 1 53 $49,674
Akard @ Wood Traffic Signal Upgrade 1 47 $21,748
Elm @ Griffin Traffic Signal Upgrade 1 47 $66,100
Ervay @ Wood Traffic Signal Upgrade 1 47 $24,793
Harwood @ Live Oak Traffic Signal Upgrade 1 47 $43,496
Harwood @ San Jacinto Traffic Signal Upgrade 1 47 $43,496
Friday, March 31, 2006 Page 341 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD
Jackson @ St Paul Traffic Signal Upgrade 1 47 $43,496 Live Oak/Pacific @ St. Paul Traffic Signal Upgrades CBD 1 47 $66,100
Ross @ St Paul Traffic Signal Upgrade 1 47 $55,851
San Jacinto @ St Paul Traffic Signal Upgrade 1 47 $43,496
St Paul @ Wood Traffic Signal Upgrade 1 47 $36,102
Akard @ Main Traffic Signal Upgrades CBD 1 43 $49,674
Central @ Marilla Traffic Signal Upgrades CBD 1 43 $62,028
Ceremonial @ Lamar Traffic Signal Upgrades CBD 1 43 $66,100
Ervay @ Main Traffic Signal Upgrades CBD 1 43 $55,851
Field @ Main Traffic Signal Upgrades CBD 1 43 $49,674
Main @ St. Paul Traffic Signal Upgrades CBD 1 43 $49,674
Akard @ Patterson Traffic Signal Upgrades CBD 1 37 $51,709
Griffin @ Wood Traffic Signal Upgrades CBD 1 37 $29,961
Akard @ Pacific Traffic Signal Upgrades CBD 1 33 $43,496
Bryan @ Crockett Traffic Signal Upgrades CBD 1 33 $49,674
Bryan @ Ervay Traffic Signal Upgrades CBD 1 33 $43,496
Bryan @ St. Paul Traffic Signal Upgrades CBD 1 33 $49,674
Federal @ Harwood Traffic Signal Upgrades CBD 1 33 $49,674
Federal @ St. Paul Traffic Signal Upgrades CBD 1 33 $51,709
Canton @ Good Latimer Traffic Signal Upgrade 1 30 $70,043
Commerce @ Good Latimer Traffic Signal Upgrade 1 30 $57,724
Commerce @ Griffin Traffic Signal Upgrade 1 30 $24,837
Friday, March 31, 2006 Page 342 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD
Commerce @ Murphy Crosswalk Traffic Signal Upgrade 1 30 $33,248 Commerce @ St Paul Traffic Signal Upgrade 1 30 $37,319
Elm @ Good Latimer (Monument) Traffic Signal Upgrade 1 30 $17,560
Elm @ Pearl Exy Traffic Signal Upgrade 1 30 $43,496
Field @ Jackson Traffic Signal Upgrade 1 30 $45,532
Field @ Ross Traffic Signal Upgrade 1 30 $64,064
Field @ San Jacinto Traffic Signal Upgrades CBD 1 30 $49,674
Field/Griffin @ Munger Traffic Signal Upgrades CBD 1 30 $16,624
Good Latimer @ Main Traffic Signal Upgrade 1 30 $35,356
Griffin @ Jackson Traffic Signal Upgrade 1 30 $45,504
Griffin @ San Jacinto Traffic Signal Upgrade 1 30 $36,861
Harwood @ Olive (Pacific) Traffic Signal Upgrade 1 30 $99,022
Harwood @ Ross Traffic Signal Upgrade 1 30 $49,674
Harwood @ Wood Traffic Signal Upgrade 1 30 $27,775
Harwood @ Young Traffic Signal Upgrade 1 30 $32,416
Jackson/Wood @ Pearl Exwy Traffic Signal Upgrade 1 30 $57,887
Main @ Pearl Exy Traffic Signal Upgrade 1 30 $51,709
Pearl St @ Ross Traffic Signal Upgrade 1 30 $78,454
Pearl St @ San Jacinto Traffic Signal Upgrade 1 30 $72,277
Ross @ Routh Traffic Signal Upgrade 1 30 $55,851
Canton @ Central Traffic Signal Upgrades CBD 1 27 $68,135
Akard @ Woodall Rodgers Traffic Signal Upgrade 1 20 $105,524
Friday, March 31, 2006 Page 343 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD
Commerce @ Field Traffic Signal Upgrade 1 20 $45,532 Crockett @ Pearl St Traffic Signal Upgrade 1 20 $78,454
Flora @ Pearl Traffic Signal Upgrades CBD 1 20 $53,745
Bryan @ Harwood Traffic Signal Upgrades CBD 1 17 $43,496
Akard @ Munger Traffic Signal Upgrades CBD 1 10 $62,028
Cadiz/Marilla @ Harwood Traffic Signal Upgrades CBD 1 10 $35,085
Griffin @ Main Traffic Signal Upgrades CBD 1 10 $26,872
Main @ Murphy Crosswalk Traffic Signal Upgrades CBD 1 10 $37,319
Summary for 'Category' = Traffic Signal Upgrades - CBD (81 detail records) Sum $4,012,343 Traffic Signal Upgrades - Citywide
Gaston @ Richmond Traffic Signal Upgrades Citywide 1 93 $56,317
Greenville @ Richmond Traffic Signal Upgrades-City Traffic Signal Upgrade 1 93 $40,944
Abrams @ Glasgow Traffic Signal Upgrade 1 87 $105,550
Abrams @ Monticello(Sondra) Traffic Signal Upgrade 1 87 $48,627
Lemmon @ Washington Traffic Signal Upgrades Citywide 1 87 $105,933
Carlisle @ Cedar Springs Traffic Signal Upgrades Citywide 1 80 $107,464
Lemmon @ Lomo Alto Traffic Signal Upgrade 1 80 $118,313
Lemmon @ Mahanna Traffic Signal Upgrades Citywide 1 80 $88,830
Fisher @ Skillman (Southwestern) Traffic Signal Upgrade 1 73 $105,933
Abrams @ Beacon (Columbia) Traffic Signal Upgrade 1 67 $54,689
Akard @ Cedar Springs (St Paul) Traffic Signal Upgrade 1 67 $108,422
Friday, March 31, 2006 Page 344 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide
Alderson @ LaVista (Paulus) Traffic Signal Upgrade 1 67 $107,464 Amesbury @ Lovers Ln Traffic Signal Upgrade 1 67 $107,847
Beacon @ Gaston Traffic Signal Upgrade 1 67 $114,867
Cameron @ East Grand (Tennison) Traffic Signal Upgrade 1 67 $100,955
Cedar Springs @ Hudnall Traffic Signal Upgrade 1 67 $53,732
Cedar Springs @ Maple Traffic Signal Upgrade 1 67 $80,981
Columbia @ Munger Traffic Signal Upgrade 1 67 $64,421
Douglas @ Lemmon Traffic Signal Upgrades Citywide 1 67 $104,274
Gaston @ Haskell Traffic Signal Upgrade 1 67 $22,568
Gaston @ Skillman Traffic Signal Upgrade 1 67 $107,464
Inwood - Lemmon Traffic Signal Upgrades Citywide 1 67 $61,262
Lemmon @ Welborn Traffic Signal Upgrade 1 67 $90,873
Mockingbird @ Roper Traffic Signal Upgrade 1 67 $91,830
Oram @ Skillman Traffic Signal Upgrade 1 67 $107,464
Skillman @ Vanderbilt Traffic Signal Upgrade 1 67 $80,981
Abrams @ Fisher Traffic Signal Upgrade 1 60 $106,890
Abrams @ Belmont (Lakewood) Traffic Signal Upgrade 1 53 $59,316
Abrams @ Kenwood Traffic Signal Upgrade 1 53 $83,638
Alamo @ Cedar Springs (Field) Traffic Signal Upgrade 1 53 $171,599
Beacon @ Live Oak (Lindell) Traffic Signal Upgrade 1 53 $114,867
Blackwell @ Greenville Traffic Signal Upgrade 1 53 $105,933
Collett @ Columbia Traffic Signal Upgrade 1 53 $21,684
Friday, March 31, 2006 Page 345 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide
Columbia @ Fitzhugh Traffic Signal Upgrade 1 53 $15,313 Fitzhugh @ Travis Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 53 $108,422
Greenville @ Mockingbird Traffic Signal Upgrades-C Traffic Signal Upgrade 1 53 $105,933
Greenville @ Yale Traffic Signal Upgrade 1 53 $107,847
Hall @ Ross Traffic Signal Upgrade 1 53 $107,464
Harry Hines @ Olive (Wichita) Traffic Signal Upgrade 1 53 $123,737
Haskell @ Live Oak Traffic Signal Upgrades Citywide 1 53 $23,931
Lemmon - Wycliff Traffic Signal Upgrades Citywide 1 53 $101,402
Lemmon @ Manor Way(Roper) Traffic Signal Upgrade 1 53 $76,903
Maple @ Wolf Traffic Signal Upgrades Citywide 1 53 $116,399
McKinnon @ Wolf Traffic Signal Upgrade 1 53 $75,679
Skillman @ University Traffic Signal Upgrade 1 53 $88,735
Dallas N Tollway @ Lovers Ln Traffic Signal Upgrade 1 47 $206,761
Dorothy/Hudnall @ Lemmon Traffic Signal Upgrades Citywide 1 47 $71,792
Akard @ McKinney Traffic Signal Upgrade 1 40 $107,464
Baylor Crosswalk @ Gaston Traffic Signal Upgrade 1 40 $30,950
Bluffview @ Lemmon Traffic Signal Upgrade 1 40 $75,876
Bowen @ Carlisle Traffic Signal Upgrades Citywide 1 40 $102,359
Bowen @ McKinney Traffic Signal Upgrade 1 40 $123,737
Bryan @ Haskell Traffic Signal Upgrade 1 40 $48,109
Carlisle @ Hall Traffic Signal Upgrade 1 40 $107,464
Caruth Haven @ Southwestern Traffic Signal Upgrade 1 40 $125,652
Friday, March 31, 2006 Page 346 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide
Cedar Springs @ Fairmount Traffic Signal Upgrade 1 40 $128,842 Cedar Springs @ Harwood Traffic Signal Upgrade 1 40 $128,842
Cedar Springs @ McKinnon Traffic Signal Upgrade 1 40 $145,115
Cedar Springs @ Moody (Pearl) Traffic Signal Upgrade 1 40 $109,379
Cedar Springs @ Wycliff Traffic Signal Upgrades Citywide 1 40 $51,180
Cole @ Fitzhugh Traffic Signal Upgrade 1 40 $104,274
Cole @ Knox Traffic Signal Upgrade 1 40 $102,359
Fitzhugh @ McKinney Traffic Signal Upgrade 1 40 $103,316
Gaston @ Kidwell (LaVista) Traffic Signal Upgrade 1 40 $105,933
Gaston @ Paulus Traffic Signal Upgrade 1 40 $107,464
Greenville @ Ross Traffic Signal Upgrades Citywide 1 40 $53,732
Greenville @ Southwestern Traffic Signal Upgrades- Traffic Signal Upgrade 1 40 $54,881
Hall @ McKinney Traffic Signal Upgrade 1 40 $102,359
Haskell @ Ross Traffic Signal Upgrades Citywide 1 40 $24,696
Knox @ McKinney Traffic Signal Upgrade 1 40 $102,359
Lemmon @ Lovers Traffic Signal Upgrade 1 40 $159,155
Live Oak @ Skillman Traffic Signal Upgrades Citywide 1 40 $107,464
Maple @ McKinney Traffic Signal Upgrades Citywide 1 40 $107,464
Maple @ Turtle Creek Traffic Signal Upgrade 1 40 $59,363
McCommas @ Skillman Traffic Signal Upgrade 1 40 $107,464
McKinney @ Olive Traffic Signal Upgrade 1 40 $123,737
McKinney @ Pearl St Traffic Signal Upgrade 1 40 $109,379
Friday, March 31, 2006 Page 347 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide
McMillan @ Mockingbird Ln Traffic Signal Upgrade 1 40 $143,584 Ross @ Washington Traffic Signal Upgrades Citywide 1 40 $54,498
Abrams @ LaVista Traffic Signal Upgrade 1 27 $107,464
Airdrome @ Mockingbird Traffic Signal Upgrades Citywide 1 27 $14,007
Belmont @ Greenville Traffic Signal Upgrade 1 27 $53,732
Belmont @ Skillman Traffic Signal Upgrade 1 27 $140,010
Bluffview @ Lovers Ln Traffic Signal Upgrade 1 27 $107,464
Capitol @ Haskell(State) Traffic Signal Upgrade 1 27 $117,101
Cedar Springs @ Throckmorton Traffic Signal Upgrad Traffic Signal Upgrade 1 27 $107,464
Dallas N Tollway @ Mockingbird Ln Traffic Signal Upgrade 1 27 $201,655
Devonshire @ Lovers Traffic Signal Upgrades Citywide 1 27 $107,464
Fairmount @ McKinney Traffic Signal Upgrade 1 27 $123,737
Greenville @ McCommas Traffic Signal Upgrade 1 27 $107,464
Harwood @ McKinney Traffic Signal Upgrade 1 27 $102,359
Knox @ Travis Traffic Signal Upgrades Citywide 1 27 $126,354
Lovers Ln @ Preston Park Traffic Signal Upgrade 1 27 $107,464
McKinney @ St Paul Traffic Signal Upgrade 1 27 $127,566
McKinnon @ Moody Traffic Signal Upgrade 1 27 $180,533
Richmond @ Skillman Traffic Signal Upgrade 1 27 $107,464
Abrams Pkwy @ Gaston (Oram) Traffic Signal Upgrade 1 23 $107,464
Abrams @ Richmond Traffic Signal Upgrade 1 13 $76,300
Haskell @ Lemmon(Peak) Traffic Signal Upgrade 1 13 $83,125
Friday, March 31, 2006 Page 348 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide
Summary for 'Category' = Traffic Signal Upgrades - Citywide (99 detail records) Sum $9,556,904 Traffic System Management - Flood Detour Signs
Skillman, 4400 under RR Dynamic Signs - Flood Detours 1 100 $37,485
Good Latimer under Pacific Dynamic Signs - Flood Detours 1 80 $37,064
Farmers Market #1 Dynamic Signs - Flood Detours 1 40 $42,118
Farmers Market #2 Dynamic Signs - Flood Detours 1 40 $42,118
Summary for 'Category' = Traffic System Management - Flood Detour Signs (4 detail records) Sum $158,784 Traffic System Management - Roadside Cameras
Denton-Mockingbird Traffic Systems Management - Roadside Camera 1 60 $6,382
Field-Woodall Rodgers Frwy Roadside Camera 1 60 $6,382
Pearl-Cedar Springs Roadside Camera 1 40 $12,763
Field-Wichita Roadside Camera 1 35 $4,212
Cedar Springs-Oak Lawn Roadside Camera 1 20 $25,526
Dallas N Tollway-Lovers Roadside Camera 1 15 $25,526
Summary for 'Category' = Traffic System Management - Roadside Cameras (6 detail records) Sum $80,790 Summary for 'Program' = STREET AND TRANSPORTATION (850 detail records) Sum $230,172,721 Summary for 'CD' = 14 (850 detail records) Sum $230,172,721 Grand Total $3,782,310,681