2006 Capital Bond Program Development

Street and Transportation Needs

City Council Briefing April 5, 2006 Public Works and Transportation Project Categories That Make Up the Street and Transportation Program

1. Alley Petitions 2. Alley Reconstruction 3. Barrier Free Ramps (NEW) 4. Bridge Repair and Modifications 5. Intelligent Trans. System (ITS) Adaptive Signal Timing 6. ITS Speed and Travel Time System 7. Intergovernmental Partnership Projects 8. School Flasher Upgrades (NEW) 9. Sidewalk Improvements 10. Sidewalk Petitions 11. Street Lighting – CBD Roadway Lighting 12. Street Lighting – Enhanced Fixtures 13. Street Lighting-Existing Thoroughfares (NEW) 14. Street Lighting – Freeway Lighting 15. Street Petitions 16. Street Reconstruction – Local Streets

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 2 Project Categories That Make Up the Street and Transportation Program (cont’d)

17. Street Reconstruction – Thoroughfares 18. Street Resurfacing 19. Streetscape/Urban Design 20. Target Neighborhood 21. Thoroughfares 22. Traffic Accident Reduction Roadway Improvements (NEW) 23. Traffic Intersection Capacity and Safety Improvements 24. Traffic Safety Improvements – Guardrail Upgrades (NEW) 25. Traffic Sign Upgrades (NEW) 26. Traffic Signal Control Equipment Upgrades (NEW) 27. Traffic Signal Upgrades – CBD 28. Traffic Signal Upgrades – Citywide 29. Transportation System Mgt (TSM) – Dynamic Message Signs 30. TSM – Flood Detour Signs 31. TSM – Roadside Cameras 32. Warranted Signals and School Flashers

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 3 Funding History and Leveraged Funds for Previous Bond Programs

Bond Bond Leveraged Program Funding Funding Year Amount Amount

1995 $87.1 M $86.5 M

1998 $125.025 M $58.7 M

2003 $266.86 M $104 M

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 4 Funded Projects 2003 Bond

Marsalis Bridge Repairs Mockingbird Pedestrian Bridge

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 5 Funded Projects 2003 Bond

Harwood Reconstruction La Reunion Reconstruction

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 6 Funded Projects 2003 Bond

Barrier Free Ramp

Cockrell Hill N. Extension Roadside Camera 2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 7 Current Needs

{ Alley Petitions z Builds new alleys requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $470 K z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs { Alley Reconstruction z Reconstructs existing alleys at the end of their service life z Total Need - $256.83 M z Level of investment in the 95, 98, and 03 Bond Programs - $1.55 M per year

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 8 Current Needs (cont’d)

{ Barrier Free Ramps (new category) z Builds barrier free sidewalk ramps at requested locations z Total Need - $1.45 M z Receive 480 requests for ramps each year. z Average cost is $1,900 per ramp { Bridge Repair and Modification z Corrects noted deficiencies in bridge infrastructure based on TXDOT inspections z Total Need - $5.84 M z Level of investment in the 95, 98, and 03 Bond Programs - $1.21 M per year z These are necessary repairs and modifications for safety and have possibility of leveraged funds.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 9 Current Needs (cont’d)

{ Intelligent Transportation System (ITS) -Adaptive Signal Timing z Automatically changes signal timing to accommodate detouring traffic due to freeway incidents z Total Need - $638 K z Level of investment in the 03 Bond Program - $50 K per year z Need real-time software to be developed with new transportation computer system prior to further investment. { ITS-Speed & Travel Time System z Installs toll tag readers on thoroughfares approaching the Dallas North Tollway in order to provide real time travel information on the thoroughfares. z Total Need - $290 K z Need standardized toll-tag technology prior to further investment.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 10 Current Needs (cont’d)

{ Intergovernmental Partnership Projects z Develops transportation projects with other governmental agencies z Total Need - $298.37 M z Level of investment in the 95, 98, and 03 Bond Programs - $8.11 M per year z Historically funded all projects in the Needs Inventory { School Flasher Upgrades (new category) z Replaces outdated flasher system to allow flexible flasher schedules, increase reliability, eliminate underground cable repairs, and reduce electric bills z Total Need - $5.57 M

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 11 Current Needs (cont’d)

{ Sidewalk Improvements z Provides new sidewalks requested by schools and the public for pedestrian safety and replacement of deteriorated sidewalks requested by property owners. Property owners are assessed for a portion of the cost. z Total Need - $2.55 M z Level of investment in the 98, and 03 Bond Programs - $1.21 M per year { Sidewalk Petitions z Builds new sidewalk projects requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $225 K z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs .

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 12 Current Needs (cont’d)

{ Street Lighting-CBD Roadway Lighting z Addresses high number of requests for improved lighting in CBD. z Total Need - $1.35 M z Level of investment in the 03 Bond Program - $175 K per year { Street Lighting-Enhanced Fixtures z Provides higher lighting levels in high pedestrian activity areas z Total Need - $319 K z Level of investment in the 03 Bond Program - $7.5 K per year z Growing increase in requests for additional lighting.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 13 Current Needs (cont’d)

{ Street Lighting-Existing Thoroughfares (new category) z Provides consistent lighting levels on thoroughfares citywide. Five thoroughfares currently have no lighting. z Total Need - $2.06 M { Street Lighting-Freeway Lighting z Installs lighting on sections of freeways that currently have no lighting z Total Need - $2.31 M z Need confirmation from TXDOT on freeway reconstruction schedules prior to further investment.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 14 Current Needs (cont’d)

{ Street Petitions z Builds new streets requested by property owners through the Property Owner Petition Program. Property owners are assessed for a portion of the cost. z Total Need - $14.42 M z Historically funded all projects in the Needs Inventory in the 95, 98, and 03 Bond Programs { Street Reconstruction Local Streets z Addresses reconstruction needs of local streets at the end of their useful life. z Total Need - $64.94 M z Level of investment in the 03 Bond Program - $980 K per year

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 15 Current Needs (cont’d)

{ Street Reconstruction Thoroughfares z Addresses reconstruction needs of thoroughfares at the end of their useful life. z Total Need - $205.19 M z Level of investment in the 95, 98, and 03 Bond Programs - $4.95 M per year { Street Resurfacing z Provides for resurfacing of streets to extend their useful life z Total Need - $217.05 M z Level of investment in the 95, 98, and 03 Bond Programs - $8.62 M per year

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 16 Current Needs (cont’d)

{ Streetscape/Urban Design z Develops landscape and urban design improvements. z Total Need - $227.19 M z Level of investment in the 03 Bond Program - $4.15 M per year { Target Neighborhood z Provides city initiated improvements to bring residential streets to standard z Level of investment in the 95 and 03 Bond Programs - $1.69 M per year

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 17 Current Needs (cont’d)

{ Thoroughfares z Builds new or widened thoroughfares as specified by the Dallas Thoroughfare Plan. z Total Need - $2.318 B z Level of investment in the 95, 98, and 03 Bond Programs - $6.54 M per year { Traffic Accident Reduction Roadway Improvements (new category) z Improves accident analysis using existing police database and automate detection of accident trends. Funds countermeasures required to eliminate accident trends. z Total Need - $396 K

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 18 Current Needs (cont’d)

{ Traffic Intersection Capacity and Safety Improvements z Provides safety and/or geometric improvements to existing intersections z Total Need - $48.08 M z Historically funded through partnership projects to improve congestion and air quality. { Traffic Safety Improvements – Guardrail Upgrades (new category) z Upgrades existing 1960’s guardrail to current standards at 291 locations on thoroughfares (minor and residential streets to be in future phases). z Total Need - $5.93 M

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 19 Current Needs (cont’d)

{ Traffic Sign Upgrades (new category) z Replaces existing traffic control signs z Total Need - $25.91 M { Phase 1 - $6.13 M (at signals and school crossings) z Visibility standards were increased by Federal Highway Admin. for needs of aging population. 80% of the city’s 300,000 signs are older than 20 years and have low visibility. { Traffic Signal Control Equipment Upgrades (new category) z Replaces existing signal controllers as design life is exceeded (incl. battery powered backups for power failures). z Total Need - $6.64 M z Last citywide replacement was 1990 thru 2000. 2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 20 Current Needs (cont’d)

{ Traffic Signal Upgrades-CBD z Installs signal mast arms at locations with visibility issues. z Total Need - $6.81 M z Level of investment in the 03 Bond Program - $600 K per year { Traffic Signal Upgrades-Citywide z Installs signal hardware upgrades at locations with structural deficiencies or history of knockdowns. z Total Need - $51.58 M z Level of investment in the 03 Bond Program - $330 K per year

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 21 Current Needs (cont’d)

{ TSM (Traffic System Mgt.) - Dynamic Message Signs z Installs electronic message signs to display variable messages about incidents and congestion on freeways. z Total Need - $1.84 M z Signs that are identified in the ITS Master Plan. { TSM - Flood Detour Signs z Installs electronic message signs to give advanced warning of closures at major intersections. z Total Need - $1.81 M z Complements existing flood warning system.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 22 Current Needs (cont’d)

{ TSM-Roadside Cameras z Installs roadside cameras used to remotely view traffic so that messages regarding incidents may be posted or signal timing may be changed from City Hall. z Total Need - $676 K z Level of investment in the 03 Bond Program - $20 K per year z Cameras are for locations identified in the ITS Master Plan. { Warranted Signals and School Flashers z Installs new traffic signals and school flashers as warranted. z Total Need - $4.62 M z Level of investment in the 03 Bond Program - $410 K per year z Historically receive requests for 5 new school flashers and 8 new warranted traffic signals per year.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 23 Current Needs (cont’d)

{ Total needed for 32 individual categories as of March 31, 2006 - $3.78 B { The Needs Inventory is still being updated. { Projects continue to be added, and costs and rankings continue to be revised. { Costs are based on 2010 projections.

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 24 Leveraged Funds from Other Agencies

{ Existing Intergovernmental Partnership Projects with total value of $160.58 M estimated to leverage $112.94 M { Pending project selection in calls for projects z Dallas County Major Capital Improvement Program – project selection Summer ‘06 z Statewide Transportation Enhancement Program (STEP) – project selection late ‘06 z NCTCOG Partnership Program 3 - project selection Summer ‘06

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 25 Summary

{ Street and Transportation needs address many of the Council’s Key Focus areas; z Economic Development – providing for safe and efficient movement of people and goods and transportation to developing areas z Neighborhood Quality of Life z Public Safety { Needs have grown from $2.2 B in 2003 to $3.78 B as of March 31, 2006 { These needs continue to be updated based on public input received recently from various stakeholders. { The updated comprehensive Needs Inventory will be presented April 19, 2006

2006 Capital Bond Program: A Strategic Investment in the Economic Health and Future of Dallas 26 Appendix A

Street and Transportation Needs Inventory by Council District in Priority Order as of March 31, 2006

Note: The Needs Inventory is still being updated. Projects continue to be added. Costs and rankings continue to be revised.

Tier 2 projects are generally lower in priority and may not have a rank or cost estimate. Street and Transportation Needs Inventory

Project Name Description Tier Score Estimate Council District CW I.T.S. - Adaptive Signal Timing

Adaptive Signal Timing System Med Volume Arterial Computer Software, Traffic Flow Sensors and Engineering for 2 $638,154 Adaptive Signal Timings Summary for 'Category' = I.T.S. - Adaptive Signal Timing (1 detail record) Sum $638,154 Intergovernmental Partnership Projects

Congestion Mitigation&Air Quality Intersection Imp Partnership project with Dallas County and TxDOT to 1 $638,150 supplement 1995 and 1998 Bond Program funding to complete Dallas County CMAQ intersection improvement projects. Total estimated cost of $62.5 million. Dallas County 2006 Call for Projects In anticipation of Summer 2006 project selection from recent 1 $3,828,900 call for projects. This amount will cover the City's share of design. Construction will be funded in future bond program. STEP 2006 Call for Projects In anticipation of December 2006 project selection from recent 1 $0 call for projects. Summary for 'Category' = Intergovernmental Partnership Projects (3 detail records) Sum $4,467,050 School Flasher Upgrades

School Flasher Upgrades - Citywide Citywide Projects 1 $5,565,306

Summary for 'Category' = School Flasher Upgrades (1 detail record) Sum $5,565,306 Sidewalk Improvements

Sidewalk Replacement This program provide funding to assist individual owners with 1 $2,552,600 the cost of replacing sidewalks

Friday, March 31, 2006 Page 1 of 349 Project Name Description Tier Score Estimate Council District CW Sidewalk Improvements

Summary for 'Category' = Sidewalk Improvements (1 detail record) Sum $2,552,600 Street Lighting - Enhanced Fixtures

Street Lighting-Enghanced Fixtures - On-Demand On Demand Projects 1 $319,075

Summary for 'Category' = Street Lighting - Enhanced Fixtures (1 detail record) Sum $319,075 Street Resurfacing

Street Resurfacing Tier 2 Total estimated value for all individual blocks recommended for 2 $124,183,990 street resurfacing listed in Tier 2. Individual blocks listed in Tier 2 must be field evaluated, scored, and combined with contiguous blocks, if appropriate, before assigning a project cost. Summary for 'Category' = Street Resurfacing (1 detail record) Sum $124,183,990 Streetscape / Urban Design

Pedestrian Access Master Plan District wide study regarding pedestrian access limitations & 2 $2,233,525 opportunities as recommended in the Trinity River Comprehensive Land Use Plan Transit Link - Phase II Create link from Slocum to Stemmons Service Road. 2 $697,327

Trinity Parkway Retaining Walls - for two future pedestrian Retaining walls to support future 2 Pedestrian Decks over 2 $5,105,200 decks Trinity Parkway as recommended in Trinity River Balanced Vision Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $8,036,052 Traffic Accident Reduction Roadway Improvements

Traffic Accident Reduction Roadway Improvements - On- On-Demand Projects 1 $395,653 Demand

Friday, March 31, 2006 Page 2 of 349 Project Name Description Tier Score Estimate Council District CW Traffic Accident Reduction Roadway Improvements

Summary for 'Category' = Traffic Accident Reduction Roadway Improvements (1 detail record) Sum $395,653 Traffic Sign Upgrades

Phase 1 Upgrade traffic signs citywide. This project will be implemented 1 $6,126,240 in three phases. Phase 1 includes; 1) the purchase of sign inventory software and mobile data computers for sign crews, and 2) the design, materials and installation labor to upgrade signs Phase 2 Upgrade traffic signs citywide. This project will be implemented 1 $4,722,310 in three phases. Phase 2 includes the design , materials and installation labor to upgrade signs on all major arterials (non- residential streets). Phase 3 Upgrade traffic signs citywide. This project will be implemented 2 $15,060,340 in three phases. Phase 3 includes the design, material and installation lboar to upgrade signs in residential neighborhoods. Residential neighborhoods require street name signs at every in Summary for 'Category' = Traffic Sign Upgrades (3 detail records) Sum $25,908,890 Traffic Signal Control Equipment Upgrades

Traffic Signal Control Equipment Upgrades - Citywide Citywide Projects 1 $6,636,760

Summary for 'Category' = Traffic Signal Control Equipment Upgrades (1 detail record) Sum $6,636,760 Warranted Signals and School Flashers

Warranted Signals and School Flashers - On-Demand Locations are determined as traffic conditions demand. Traffic 1 $4,620,206 signals or school flashers will be installed when warranted by a traffic engineering study. Summary for 'Category' = Warranted Signals and School Flashers (1 detail record) Sum $4,620,206

Friday, March 31, 2006 Page 3 of 349 Project Name Description Tier Score Estimate Council District CW

Summary for 'Program' = STREET AND TRANSPORTATION (17 detail records) Sum $183,323,736 Summary for 'CD' = (17 detail records) Sum $183,323,736

Friday, March 31, 2006 Page 4 of 349 Project Name Description Tier Score Estimate Council District 1 Alley Reconstruction

Tennant (509-517) Hampton - Jefferson to Davis Full recon Tennant (509 - 517) 1 69 $35,736 Marsalis & Lancaster - E. Tenth To E. Ninth Full Reconstruction 1 64.5 $118,501

Marsalis & Lancaster - 11th to Jefferson Full reconstruction 1 46 $59,731

9Th St & 10Th St - Zang to Madison Full reconstruction - 9Th St 200-226 1 43 $100,394

Image La (4406 - 4530) "T" Alley to Cockrell Hill Full reconst Image Ln. (4406 - 4530) 1 40 $301,207

Berkley & Newport - Waverly To Rugged Full Reconstruction 1 32.5 $225,532

Steinman Avenue (300-322) 8yh - Patton to Denver Full recon Steinman Ave. (300 - 322) 1 31 $75,302

Bentley Av - 2400 - 2550 Full Reconstruction 2 $343,524

Bocaraton & Meadowcrest - Preston to "T" Alley (including Full Reconstruction 1 $287,168 "T" alley) Boyd St 2402 - 2510 Full reconstruction - Boyd St 2402 - 2510 2 $146,775

Dutton Dr - 3302 - 3434 Full Reconstruction 2 $246,685

Eighth St (E) - 510 - 520 Full Reconstruction 2 $68,807

Eighth St (E) - 618 - 624 Full Reconstruction 2 $136,339

Ewing Av (N) - 201 - 239 Full Reconstruction 2 $135,320

Falls Dr - 2503 - 2555 Full Reconstruction 2 $173,291

Falls Dr - 2603 - 2649 Full Reconstruction 2 $178,387

Falls Dr - 2902 - 3052 Full Reconstruction 2 $240,313

Illinois Av - 1101 - 1141 Full Reconstruction 2 $146,023

June Dr - 3303 - 3435 Full Reconstruction 2 $248,214

Montclair Av (S) - 603 - 719 Full Reconstruction 2 $133,535

Montreal Av - 1300 - 1430 Full Reconstruction 2 $215,849

Mt Royal St - 4102 - 4230 Full Reconstruction 2 $280,833

Friday, March 31, 2006 Page 5 of 349 Project Name Description Tier Score Estimate Council District 1 Alley Reconstruction

Ninth St - 901 - 939 Full Reconstruction 2 $132,517 Northaven & Yorkshire - Yorkshire to Royalshire Full Reconstruction (6123 Northaven Rd) 1 $179,320

Parkchester & Crestbrook - Royalshire to Bocaraton Full Reconstruction 1 $356,088

Royalshire & Parkchester - Royalshire to Bocaraton Full Reconstruction 1 $188,892

Tenth St (E) - 901 - 939 Full Reconstruction 2 $100,916

Tenth St (W) - 101 - 137 Full Reconstruction 2 $131,497

Twelfth St (W) - 2600 - 2650 Full Reconstruction 2 $173,546

Twelfth St (W) - 603 - 637 Full Reconstruction 2 $134,300

Wood Valley Pl - 2548 - 2558 Full Reconstruction 2 $68,042

Summary for 'Category' = Alley Reconstruction (31 detail records) Sum $5,362,582 Barrier Free Ramps

900 W. Canty St 4 BFRs on W. Canty St. @ Tyler 1 47 $5,207

10th St & Oak Cliff One BFR needed at the corner of 2100 W 10th St. Modification 1 36 $5,105 of parkway and existing SW is needed. Remove existing steps and build sidewalk curb where needed. Polk St. @ 9th St. Install 4 ramps at this intersection 1 33 $7,658

9th St @ Tyler Construct 4 ramps 1 23 $7,658

Bishop @ Yarmouth 2 BFRs needed at intersection 1 18 $3,829

301 S. Brighton One BFR to be constructed at corner of this house 1 3 $1,914

Suffolk( W) @ Bishop construct 2 BFRs on intersection's corners 1 3 $3,829

Summary for 'Category' = Barrier Free Ramps (7 detail records) Sum $35,200

Friday, March 31, 2006 Page 6 of 349 Project Name Description Tier Score Estimate Council District 1 Intergovernmental Partnership Projects

Davis - Hampton to Westmoreland Partnership project with Dallas County to reconstruct and widen 1 $3,798,269 to 4 lane divided. Total estimated cost of $12.4 million. Summary for 'Category' = Intergovernmental Partnership Projects (1 detail record) Sum $3,798,269 Sidewalk Petitions

Ewing Ave (S) - Clarendon Dr to 12th St Engineering, Paving 400 Block 1 100 $21,059

Summary for 'Category' = Sidewalk Petitions (1 detail record) Sum $21,059 Street Petitions

Ninth St (W) - Westmoreland Rd (N) to RaviniaDr(N) Paving and Drainage construction only 3000-3200 blk 1 90 $530,245

Marcell Av - Dacki Av to Hord Av Enginerring, Paving and Drainage 4500 blk 1 87 $650,913

Summary for 'Category' = Street Petitions (2 detail records) Sum $1,181,158 Street Reconstruction Local Streets

Western St - Cocrell Hill Rd to Sunny Side Av 4200 - 4300 Blks 1 46.97 $518,178

Summary for 'Category' = Street Reconstruction Local Streets (1 detail record) Sum $518,178 Street Reconstruction Thoroughfares

Westmoreland Rd (S) - 9th St to W Jefferson Blvd 100(S) - 100(N) Blks 1 59.35 $1,595,375

Larue St - Knoxville St to Sage Valley Ln 4600 Blk 1 40.98 $1,199,722

Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $2,795,097 Street Resurfacing

Friday, March 31, 2006 Page 7 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Fleming Pl. - R.L. Thornton Frwy. to Jefferson Blvd. 400 Block 1 79.145 $30,631 Colorado Blvd. (W) - Beckley Ave. to Sylvan Ave. 100 - 800 1 78.545 $374,977

Ninth St. (E) - Patton Ave. to Marsalis Ave. 400 - 500 1 73.79 $105,039

Knoxville St. - Dead End to Old Spanish Tr. 1500 - 1700 1 68.375 $76,323

Denver St. (N) - Davis St. to Fifth St. 300 - 600 1 64.635 $230,245

Page Ave. (W) - Zang Blvd. toMadison Ave. 200 block 1 63.705 $58,199

Crawford St. (N) - Jefferson Blvd. to Eighth St. 100 - 400 1 62.93 $114,995

Fifth St. (W) - Beckley Ave. to Elsbeth Ave. 100 Block 1 61.635 $46,968

Ballard Ave. - Colorado Blvd. to Eldorado Ave. 1100 - 1200 1 61.455 $110,910

Fouraker St. - Cedar Hill Ave. to N. Tyler St. 600 - 800 1 60.995 $135,415

Winston St. - Tyler St. to Vernon Ave. 800 block 1 60.91 $32,801

Betterton Cir. - Eleventh St. to R.L. Thornton Frwy. 800 - 900 1 57.09 $43,139

Cumberland St. - Brooklyn Ave. to Suffolk Ave. 700 - 800 1 56.88 $78,365

Comal St. - Jefferson Blvd. to IH-30 900 Block 1 56.42 $19,527

Delaware Ave. - Vernon Ave. - Tyler St. 800 Block 1 54.465 $29,100

Lakehurst Ct. - Randolph Dr. to Cockrell Hill Rd. 4200 - 4300 1 54.315 $35,609

Sunset Ave. - Franklin St. to Superior St. 2500 - 2600 1 53.37 $87,809

Patton Ave. (N) - Ninth St. to Eighth St. 200 block 1 52.695 $65,219

Seventh St. (E) - Jefferson Blvd. to Eads Ave. 900 - 1000 1 52.505 $23,229

Plymouth Rd. (N) - Superior St. to Davis St. 100 - 500 1 52.225 $184,042

Delaware Ave. Bishop Ave. to Griffth Ave. 400 - 600 1 49.565 $110,655

Marlborough Ave. (N) - Tenth St. to Davis St. 100 - 400 1 47.695 $48,755

Friday, March 31, 2006 Page 8 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Vernon Ave. (N) - Davis St. to Winston St. 600 block 1 47.28 $62,283 Ewing Ave. (N) - R.L. Thornton Frwy. to Viola St. 300 - 400 1 46.585 $43,267

Boyd St. - Dead End to Ferndale Ave. 1600 - 1900 1 46.455 $54,626

Ewing Ave. (S) - Eleventh St. to IH-35 200 Block 1 45.44 $55,647

Crawford St. (S) - Tenth St. to Twelfth St. 100 - 200 1 45.025 $49,010

Marlborough Ave. (S) - Brandon St. to Wright Ave. 1300 - 1400 1 44.515 $42,246

Suffolk Ave. (W) - Madison Ave. to Zang Blvd. 200 block 1 43.22 $70,069

Pembroke Ave. (E) - Rockwood St. to Story St. 200 block 1 43.16 $81,556

Alco Ave. - Franklin Ave. to Plymouth Rd. 2500 - 2600 1 42.92 $85,384

Gladstone Dr. - Superior St. to Pierce St. 2700 Block 1 41.645 $68,154

Eleventh St. (E) - Leads St. to Cliff St. 1100 Block 1 28.165 $23,229

Adams Av. (N) - 100 2 $0

Adams Av. (S) - 100 2 $0

Adams Av. (S) - 300 2 $0

Aster St. - 2600 2 $0

Barnett Av. (S) - 2500 2 $0

Beckley Av. (N) - 200 2 $0

Beckley Av. (S) - 200 2 $0

Berkley Av. - 1100 2 $0

Bishop Av. (N) - 1100 2 $0

Briscoe Blvd. (S) - 400 2 $0

Brooklyn Av. (W) - 2100 2 $0

Friday, March 31, 2006 Page 9 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Canty St. (W) - 100 2 $0 Cavender St. (N) - 200 2 $0

Cedar Hill Av. - 1100 2 $0

Chalmers St. - 400 2 $0

Clarendon Dr. (E) - 500 2 $0

Clarendon Dr. (W) - 200 2 $0

Clarendon Dr. (W) - 300 2 $0

Clarendon Dr. (W) - 3300 2 $0

Clarendon Dr. (W) - 3400 2 $0

Clarendon Dr. (W) - 3500 2 $0

Clinton Av. (S) - 2200 2 $0

Clinton Av. (S) - 500 2 $0

Clinton Av. (S) - 700 2 $0

Clinton Av. (S) - 800 2 $0

Colorado Blvd. (E) - 100 2 $0

Colorado Blvd. (E) - 200 2 $0

Colorado Blvd. (E) - 300 2 $0

Colorado Blvd. (E) - 400 2 $0

Colorado Blvd. (E) - 500 2 $0

Coombs Creek Dr. - 1800 2 $0

Coombs Creek Dr. - 1900 2 $0

Cumberland St. - 100 2 $0

Friday, March 31, 2006 Page 10 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Cumberland St. - 300 2 $0 Davis St. (E) - 100 2 $0

Davis St. (E) - 200 2 $0

Davis St. (W) - 100 2 $0

Dawes Dr. - 3100 2 $0

Denver St. (S) - 200 2 $0

Division St. - 4300 2 $0

Dutton Dr. - 3500 2 $0

Edgefield Av. (S) - 1500 2 $0

Edgefield Av. (S) - 2300 2 $0

Edgefield Av. (S) - 500 2 $0

Edgefield Av. (S) - 600 2 $0

Edgefield Av. (S) - 800 2 $0

Eighth St. (E) - 300 2 $0

Eighth St. (E) - 400 2 $0

Eighth St. (E) - 500 2 $0

Eighth St. (E) - 900 2 $0

Eli Av. - 600 2 $0

Elmwood Blvd. - 1700 2 $0

Ewing Av. (N) - 800 2 $0

Frances St. (S) - 100 2 $0

Grafton Av. - 2600 2 $0

Friday, March 31, 2006 Page 11 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Hampton Rd. (S) - 1000 2 $0 Hampton Rd. (S) - 500 2 $0

Hampton Rd. (S) - 900 2 $0

Hollywood Av. - 100 2 $0

Hollywood Av. - 2500 2 $0

Hollywood Av. - 300 2 $0

Hollywood Av. - 400 2 $0

Ivandell Av. - 2800 2 $0

Jefferson Blvd. (W) - 2400 2 $0

Jefferson Blvd. (W) - 3000 2 $0

Jefferson Blvd. (W) - 3600 2 $0

Jefferson Blvd. (W) - 800 2 $0

Jefferson Blvd. (W) - 900 2 $0

Jefferson Serv. (W) N - 3300 2 $0

Jerden La. (E) - 200 2 $0

Keats Dr. - 2100 2 $0

Kessler Lake Dr. - 700 2 $0

Kidd Springs Dr. - 800 2 $0

Knoxville St. - 2200 2 $0

Knoxville St. - 2300 2 $0

Lancaster Av. (N) - 400 2 $0

Larue St. - 4500 2 $0

Friday, March 31, 2006 Page 12 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Madison Av. (S) - 300 2 $0 Madison Av. (S) - 800 2 $0

Madison Av. (S) - 900 2 $0

Marlborough Av. (S) - 100 2 $0

Marsalis Av. (S) - 500 2 $0

Marvin Av. - 2500 2 $0

Mather Ct. - 3900 2 $0

Melbourne Av. - 2500 2 $0

Mt Everest St. - 3700 2 $0

Mt Royal St. - 4000 2 $0

Mt Shasta St. - 100 2 $0

Neely St. (W) - 500 2 $0

Paisley St. - 400 2 $0

Pampas St. - 4000 2 $0

Patton Av. (S) - 200 2 $0

Pembroke Av. (W) - 200 2 $0

Plymouth Rd. (S) - 100 2 $0

Poinsettia Dr. - 3500 2 $0

Randolph Dr. (N) - 200 2 $0

Randolph Dr. (N) - 300 2 $0

Randolph Dr. (S) - 300 2 $0

Richmondell Av. - 600 2 $0

Friday, March 31, 2006 Page 13 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Rolinda Dr. - 2500 2 $0 Rugged Dr. (E) - 2100 2 $0

Rugged Dr. (E) - 2200 2 $0

Sabine St. - 600 2 $0

Sixth St. (E) - 900 2 $0

Starr St. - 200 2 $0

Sunnyside Av. - 1300 2 $0

Sunset Av. - 900 2 $0

Superior St. - 1200 2 $0

Superior St. - 1800 2 $0

Superior St. - 1900 2 $0

Superior St. - 2000 2 $0

Superior St. - 2100 2 $0

Tennant St. (N) - 400 2 $0

Twelfth St. (E) - 600 2 $0

Twelfth St. (W) - 2100 2 $0

Twelfth St. (W) - 2700 2 $0

Tyler St. (N) - 1200 2 $0

Tyler St. (S) - 1200 2 $0

Van Buren Av. (S) - 200 2 $0

Westmoreland Rd. (S) - 1900 2 $0

Westmoreland Rd. (S) - 200 2 $0

Friday, March 31, 2006 Page 14 of 349 Project Name Description Tier Score Estimate Council District 1 Street Resurfacing

Westmoreland Rd. (S) - 600 2 $0 Wilbur St. - 2700 2 $0

Wilton Av. - 2400 2 $0

Wilton Av. - 2500 2 $0

Windomere Av. (S) - 800 2 $0

Yarmouth St. (W) - 200 2 $0

Zang Blvd. (S) - 600 2 $0

Summary for 'Category' = Street Resurfacing (161 detail records) Sum $2,677,422 Streetscape / Urban Design

Beckley Ave. Enhancement ROW acquisition, Remediation, Relocation, Streetscaping 2 $1,799,104

Davis St Phase II - Cedar Hill Av to Polk St 5 intersection improvements (paving, drainage, landscaping) on 2 $2,362,544 Davis St. Sidewalk curb, gutter and drive approach replacement Jefferson Blvd Median Improvement Intersection Improvements at Marsalis Ave and at Beckley Ave 2 $697,327 with left-turn lanes, and leave-out sidewalks for Davis St from Marsalis to Zang Oak Cliff Gateway Portal enhancements, designed with 2003 BP 2 $1,174,196

Summary for 'Category' = Streetscape / Urban Design (4 detail records) Sum $6,033,171 Target Neighborhood

Polk St (S) - Wilbur St to Ferndale Av Engineering, Paving and Drainage Blks 1900-2300 1 100 $673,886

Polk St (S) - Ferndale Av to Clarendon Av Engineering, Paving and Drainage blks 1100-1900 1 99 $1,876,455

Summary for 'Category' = Target Neighborhood (2 detail records) Sum $2,550,341

Friday, March 31, 2006 Page 15 of 349 Project Name Description Tier Score Estimate Council District 1 Thoroughfares

Clarendon - Gilpin to Zang Widen to standard four lane undivided roadway 1 50 $26,511,265 Davis Street - Westmoreland to Hampton Widen to 4 lanes divided with new bridge at Coombs Creek 1 48 $4,016,604

Clarendon - Zang to 750' West of Marsalis Widen to a four lane undivided roadway 1 41 $6,113,980

Clarendon (E) - Marsalis to Corinth Widen to a four lane undivided 1 37 $655,141

Davis - Zang to Eighth Reconstruct roadway to lane roadway. Thoroughfare Plan 1 37 $2,306,190 amendment required. Duncanville - Illinois to Shelley Widen to a four lane divided roadway froma two lane road. 1 35 $1,716,366

Shelley - Duncanville to Knoxville Build a new 4 lane divided roadway 1 25 $1,114,764

Cockrell Hill - Davis to Cockrell Hill CL Widen to a four lane undivided 1 20 $1,341,254

Ewing - Jefferson Blvd. E to I.H. 35 Widen to a four lane undivided roadway 1 18 $1,308,689

Knoxville - Illinois to Shelley Widen to a four lane divided roadway 1 18 $8,126,590

Summary for 'Category' = Thoroughfares (10 detail records) Sum $53,210,844 Traffic Intersection Capacity & Safety Improvement

Davis St at Cockrell Hill Rd Construct a free right turn lane on westbound Davis Street at 1 45 $0 Cockrell Hill Road. Beckley @ Jefferson Widen Beckely approaching Jefferson to provide northbound 1 35 $440,324 and southbound left-turn pockets. Jefferson @ Marsalis Street Modifications and Bott Widen Marsalis at Jefferson to provide northbound and 1 35 $513,073 southbound left-turn pockets. Eighth @ Jefferson Street Modifications and Bottle Widen Jefferson at Eighth to provide northbound and 1 30 $440,324 southbound left-turn lanes. Jefferson @ Westmoreland Street Modifications and Use wide median area to provide dual left-turns on Jefferson for 1 30 $720,841 eastbound and westbound approaches. Remove dip in roadway as you cross the intersection. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (5 detail records) Sum $2,114,561

Friday, March 31, 2006 Page 16 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Safety Improvements-Guardrail Upgrades

Hampton 400 N BLK Guardrail Upgrade 1 73 $7,307 Westmoreland 200 N BLK Guardrail Upgrade 1 67 $8,583

Marsalis 800 S BLK Guardrail Upgrade 1 60 $38,417

Tyler 900 S BLK Guardrail Upgrade 1 60 $9,317

Illlinois 4200 W BLK Guardrail Upgrade 1 47 $4,658

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (5 detail records) Sum $68,282 Traffic Signal Upgrades - Citywide

Cedar Hill @ Davis (Llewellyn) Traffic Signal Upgrade 1 93 $118,696

Davis @ Gilpin Traffic Signal Upgrades Citywide 1 80 $51,180

Jefferson @ Zang Traffic Signal Upgrade 1 80 $81,938

Marsalis @ Twelfth Traffic Signal Upgrade 1 80 $107,464

Polk @ Twelfth Traffic Signal Upgrade 1 80 $52,137

Adams @ Jefferson Traffic Signal Upgrade 1 67 $107,464

Bishop @ Twelfth Traffic Signal Upgrade 1 67 $81,938

Clarendon @ Westmoreland Traffic Signal Upgrade 1 67 $81,364

Duncanville @ Illinois Traffic Signal Upgrade 1 67 $62,564

Eighth @ Jefferson Traffic Signal Upgrade 1 67 $107,464

Falls @ Westmoreland Traffic Signal Upgrade 1 67 $120,610

Hampton @ Illinois Traffic Signal Upgrades Citywide 1 67 $53,924

Illinois @ Knoxville Traffic Signal Upgrade 1 67 $109,379

Jefferson @ Westmoreland Traffic Signal Upgrade 1 67 $191,445

Friday, March 31, 2006 Page 17 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Signal Upgrades - Citywide

Llewellyn @ Twelfth Traffic Signal Upgrade 1 67 $107,464 Twelfth @ Tyler Traffic Signal Upgrade 1 67 $104,274

Bishop @ Jefferson Traffic Signal Upgrade 1 53 $107,464

Clarendon @ Tyler Traffic Signal Upgrade 1 53 $82,896

Colorado @ Sylvan(Tyler) Traffic Signal Upgrade 1 53 $40,491

Crawford @ Jefferson Traffic Signal Upgrade 1 53 $107,464

Edgefield @ Illinois Traffic Signal Upgrade 1 53 $54,689

Eighth @ RL Thornton Traffic Signal Upgrade 1 53 $121,912

Jefferson @ Marsalis Traffic Signal Upgrade 1 53 $107,464

Marsalis @ RL Thornton Traffic Signal Upgrade 1 53 $203,187

RL Thornton @ Yarmouth (Zang) Traffic Signal Upgrade 1 53 $107,464

Twelfth @ Zang Traffic Signal Upgrade 1 53 $82,321

Clarendon @ Zang Traffic Signal Upgrade 1 40 $108,422

Davis @ Kings Hwy Traffic Signal Upgrade 1 40 $53,732

Davis @ Polk Traffic Signal Upgrade 1 40 $51,180

Davis @ Tyler Traffic Signal Upgrade 1 40 $75,746

Jefferson @ Llewellyn Traffic Signal Upgrade 1 40 $107,464

Jefferson @ Madison Traffic Signal Upgrade 1 40 $107,464

Jefferson @ Marlborough Traffic Signal Upgrade 1 40 $107,464

Jefferson @ Polk Traffic Signal Upgrade 1 40 $51,180

Jefferson @ Tyler Traffic Signal Upgrade 1 40 $102,359

Kiest @ Walton Walker Traffic Signal Upgrade 1 40 $80,809

Friday, March 31, 2006 Page 18 of 349 Project Name Description Tier Score Estimate Council District 1 Traffic Signal Upgrades - Citywide

Polk @ Tenth Traffic Signal Upgrade 1 40 $50,156 Tenth @ Tyler Traffic Signal Upgrade 1 40 $102,359

Tenth @ Zang Traffic Signal Upgrade 1 40 $120,610

Beckley @ Clarendon Left turn pockets on all approaches 1 27 $114,867

Clarendon @ Edgefield Left turn pockets on all approaches 1 27 $107,464

Edgefield @ Twelfth Traffic Signal Upgrade 1 27 $23,642

Summary for 'Category' = Traffic Signal Upgrades - Citywide (42 detail records) Sum $3,919,581 Traffic System Management - Roadside Cameras

Hampton-Illinois Roadside Camera 1 30 $6,382

Davis-Hampton Roadside Camera 1 25 $6,382

Singleton-Walton Walker Traffic Systems Management - Roadside Camera 1 20 $25,526

Summary for 'Category' = Traffic System Management - Roadside Cameras (3 detail records) Sum $38,289 Summary for 'Program' = STREET AND TRANSPORTATION (277 detail records) Sum $84,324,035 Summary for 'CD' = 1 (277 detail records) Sum $84,324,035

Friday, March 31, 2006 Page 19 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Petitions

Thurston Dr & Wanebe Dr - Bombay Ave to Gilford St Engineering, Paving and Drainage 7800 - 7900 blks 1 99 $88,703 Summary for 'Category' = Alley Petitions (1 detail record) Sum $88,703 Alley Reconstruction

Hondo & Arroyo Ave - Brown St. To N. Tollway Full Reconstruction 1 60 $169,468

Fitzhugh(1719 N)& Westburg alley parallel to Ross Full Reconstruction 1 56 $46,442

Columbia Ave & Eastside - Saint Mary to Garrett Full reconstruction - Columbia Ave (5108 - 5126) 1 49 $91,894

Gaston Av (5200 - 5324) Junius - Munger to Dumas Full reconst Gaston Ave (5200 - 5324) 1 49 $125,460

Moser Avenue (2100-2324) Henderson - Capitol to Fuqua Full recon Moser Ave. (2100 - 2324) 1 49 $231,010

Columbia Ave & Reiger - Beacon to Augusta Full Reconstruction - Columbia Ave (5501 - 5535) 1 46 $122,525

Maple Avenue (4431-4447) Sylvester - Lucas to Arroyo Full reconst Maple Avenue (4431 - 4447) 1 37 $62,539

Belmont & Richmond - Glencoe to McMillan Full Reconstruction 1 30 $200,813

Concord Ave (7302 - 7514) Denton - Lovedale to Anson Full reconstruction Concord Ave (7302 - 7514) 1 25 $202,932

Parry Av (4803 - 48843) Lindsley - Caldwell to Fitzhugh Full recons Parry Ave. (4803 - 48843) 1 25 $134,012

Parry & R. L. Thornton - Fitzhugh To Dead End Full Reconstruction 1 18 $64,475

Amherst Av - 2303 - 2427 Full Reconstruction 2 $187,307

Arroyo Av. 2300- 2346 Full reconstruction 2 $153,156

Beacon St. 1115 ----- Full reconstruction (T-alley only) 2 $76,578

Beeman Av - 5214 - 5322 Full Reconstruction 2 $238,784

Belmont Av - 4512 - 4614 Full Reconstruction 2 $146,787

Bradford Dr - 5427 - 5427 Full Reconstruction 2 $91,742

Brookfield Av - 2303 - 2427 Full Reconstruction 2 $186,543

Friday, March 31, 2006 Page 20 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Reconstruction

Brookfield Av - 2503 - 2529 Full Reconstruction 2 $89,448 Cameron Av - 401 - 523 Full Reconstruction 2 $179,916

Capital Av - 5016 - 5020 Full Reconstruction 2 $91,742

Carlson Dr - 2802 - 3010 Full Reconstruction 2 $294,085

Carlson Dr - 3202 - 3338 Full Reconstruction 2 $230,630

Columbia Av - 4900 - 4950 Full Reconstruction 2 $176,604

Corinth St - 129 - 149 Full Reconstruction 2 $94,800

Culver St - 5600 - 5634 Full Reconstruction 2 $114,932

Denton Dr - 5202 - 5328 Full Reconstruction 2 $204,891

Denton Dr (Serv) (7303 - 7515) Concord - Lovedale to Full reconst Denton Dr. (Serv) (7303 - 7515) 2 $202,932 Anson East Grand Av - 5401 - 5445 Full Reconstruction 2 $146,023

Fairview Av - 1307 - 1427 Full Reconstruction 2 $202,597

Fairview Av - 1500 - 1538 Full Reconstruction 2 $154,943

Fairview Av - 3202 - 3314 Full Reconstruction 2 $243,882

Gilford St - 2303 - 2427 Full Reconstruction 2 $186,032

Grandview Av - 402 - 522 Full Reconstruction 2 $171,762

Hondo Av - 2512 - 2512 Full Reconstruction 2 $186,032

Jerome St - 3001 - 3123 Full Reconstruction 2 $182,465

Live Oak & Bryan - Carroll to Annex Full Reconstruction 2 $143,594

Martinique Av - 401 - 523 Full Reconstruction 2 $170,233

Record Crossing Rd - 1206 - 1270 Full Reconstruction 2 $231,139

Record Crossing Rd - 1302 - 1440 Full Reconstruction 2 $230,630

Friday, March 31, 2006 Page 21 of 349 Project Name Description Tier Score Estimate Council District 2 Alley Reconstruction

Reynolds Av - 3002 - 3124 Full Reconstruction 2 $179,152 Richard Av - 5303 - 5355 Full Reconstruction 2 $182,210

Ross(5010) & San Jacinto - Bennett to N Garrett Full Reconstruction 2 $133,049

Samuell Blvd & I-H 30 - I.H.-30 To Winslow St. Full Reconstruction 2 $154,432

Summary for 'Category' = Alley Reconstruction (44 detail records) Sum $7,110,621 Barrier Free Ramps

Lamar @ Memorial 4 BFRs needed on intersection 1 46 $7,658

Ross @ Summit 2 BFRs on intersection 1 36 $3,829

Bryan St at N Fitzhugh Ave 3 BFRs at Intersection 1 35 $5,743

Bryan St at N Prairie Ave 4 BFRs at Intersection 1 35 $7,658

Butler St @ Harry Hines Blvd Existing inlets(2), a power pole, a traffic signal light, and a 1 32 $7,658 manhole are located at the corner of this intersection. Bryan @ Peak Barrier Free Ramps Need 2 BFRs @ # 4223, # 4302 Bryan St 1 31 $3,829

Bennett Ave at Live Oak St 3 BFRs at Intersection 1 21 $5,743

N Fitzhugh Ave at Sycamore St 2 BFRs at Intersection 1 17 $2,450

N Prairie Ave at Sycamore St 2 BFRs at Intersection 1 17 $3,829

Annex @ Virginia Ave One BFR needed at the corner of 1500 Annex Ave 1 3 $1,914

Congress Ave @ Reagan St 4 BFRs at Inresection 1 3 $7,658

Summary for 'Category' = Barrier Free Ramps (11 detail records) Sum $57,970 Bridge Repair and Modification

Friday, March 31, 2006 Page 22 of 349 Project Name Description Tier Score Estimate Council District 2 Bridge Repair and Modification

Corinth St. over Trinity River Superstructure rehab incl. repair to sheared girder, 2 cracked 1 56.25 $204,208 girders, numerous general spalls, rail damage, repair of spalls under span over N. levee - not full rehab Houston Street Viaduct over Trinity River Completion of rehab begun by TxDOT (design by HNTB) - 1 41.25 $2,871,675 rating based on 2004 BRINSAP - scheduled for reevaluation 2006 Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $3,075,883 Intergovernmental Partnership Projects

Design District Connection Partnership project with ______to design and 1 $0 construct new pedestrian connection from Design District to American Airlines Center. Total estimated cost of $7.5 million. Dolphin Rd - IH 30 to Military Parkway Partnership project with Dallas County to reconstruct existing 4 1 $1,014,659 lane undivided roadway. Total estimated cost of $3.6 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. E. Dallas Veloway Phase 2 Tunnel at DART's SE-1 Partnership project with DART and Dallas County to design and 1 $1,595,375 Crossing construct hike and bike trail under DART's SE Corridor Light Rail. Total estimated cost of $3.3 million. DART to begin construction on overall project mid 2006. Supplements 2003 Bond Program Industrial Blvd - Cadiz St to Continental Ave Partnership project with Dallas County and TxDOT to 1 $20,580,338 reconstruct the existing six and eight lane divided roadway. Total estimated cost of $40 million. Supplements 2003 Bond Program funds. Estimated to be let by mid 2010. Industrial Blvd - Cadiz St to Corinth St Design and Reconstruction to 8 lane cross section, turn lanes 2 $33,183,800 at major signalized intersections, ROW acquisition, bicycle lanes, and landscaping to serve as a Collector-Distributor for the Trinity Parkway as recommended in the Trinity Corridor Balanced Vi Irving Blvd. (EB) @ Old River Channel Bridge rehabilitation and/or reconstruction 2 $0

Friday, March 31, 2006 Page 23 of 349 Project Name Description Tier Score Estimate Council District 2 Intergovernmental Partnership Projects

Live Oak St. - Liberty to Peak Partnership project with Dallas County to reconstruct existing 1 $482,441 five lane undivided roadway. Total estimated cost of $4.6 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Malcolm X @ SFRR-Hickory Street Bridge rehabilitation and/or reconstruction 2 $0

Motor St - IH 35E to Medical Center Dr Partnership project with TxDOT and Dallas County to widen 1 $5,870,980 existing roadway to 6 lane divided and rebuild TRE bridge. Total estimated cost of $23.4 million. Estimated to be let by late 2010. Sylvan Bridge from Irving to Gallagher - Amenities Partnership project with TxDOT to provide new six lane bridge 1 $1,837,872 with amenities over the Trinity River. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2007. Supplements 2003 Bond Program funds. Trinity River - Consolidation of Power Transmission Lines Cost to remove existing aerial power transmission lines 1 $2,042,080 along East Levee with proposed new line along Industrial currently along the East Levee of the Trinity River Corridor Blvd. floodway and consolidate with the proposed new transmission lines along Industrial Blvd. to avoid utility conflicts with MHH Signature Bri Trinity River - Underground existing transmission lines Cost to underground existing power transmission lines along 1 $16,783,345 along East Levee the East Levee of the Trinity River Corridor to avoid utility conflicts with three Signature Bridges and Trinity Parkway (Potential cost share with TxDOT for partial segment) Trinity River - Underground transmission lines, UPRR to Cost to underground proposed power transmission lines from 1 $6,892,020 proposed Dallas South Network Substation approximately UPRR to proposed Dallas South Network Substation to avoid utility conflicts with Pegasus Project (Potential cost share with TxDOT) Summary for 'Category' = Intergovernmental Partnership Projects (13 detail records) Sum $90,282,909 Street Lighting-CBD Roadway Lighting

Jefferson @ I-30 to Young Roadway Lighting Installation 1 40 $128,014

Canton @ Akard to Harwood Roadway Lighting Installation 1 35 $181,353

Jackson @ Houston to Griffin Roadway Lighting Installation 1 35 $106,678

Friday, March 31, 2006 Page 24 of 349 Project Name Description Tier Score Estimate Council District 2 Street Lighting-CBD Roadway Lighting

Harwood @ Commerce to Canton Roadway Lighting Installation 1 30 $51,206 @ Ervay to Pearl Roadway Lighting Installation 1 10 $32,003

Wood @ Griffin to Akard Roadway Lighting Installation 1 10 $20,909

Summary for 'Category' = Street Lighting-CBD Roadway Lighting (6 detail records) Sum $520,164 Street Petitions

Kimsey Dr - Maple Av to Dead End Engineering, Paving & Drainage 2500-2700 Blks 1 94 $491,848

St. Mary Avenue - Terry Street - Garland Avenue Engineering Paving and Drainage S500 to S600 Blks 1 75 $187,279

Summary for 'Category' = Street Petitions (2 detail records) Sum $679,127 Street Reconstruction Local Streets

Gano St - Harwood St to Central Expwy 200 Blk 1 65.44 $188,211

Durant St - McKee St to Gano St 1600 Blk 1 64.67 $130,300

Fletcher St - Parry Ave to Ash Ln 700 - 800 Blks 1 64.3 $521,200

Lake Ave - Kings Rd to dead end 4700 Blk 1 63.19 $463,289

Park Av - St Louis St South to Dead-End 1100 Blks 1 62.86 $102,104

Ferris St - Orleans St to Malcolm X Blvd 2700 Blk 1 61.92 $463,289

Park Av - Beaumont St to Richardson Av 1800 - 2100 Blk 1 60.94 $978,922

Gurley Av - S Carroll Av to Stonewall St 4400 Blk 1 60.66 $216,971

Beaumont St - S. Ervay St to St Paul St 1700 Blk 1 59.98 $425,008

Ann Ave - Garland Rd to Parry Ave 800 blk 1 58.51 $232,287

Congo St - Carroll Ave to Bank St 4500 Blk 1 57.51 $367,574

Friday, March 31, 2006 Page 25 of 349 Project Name Description Tier Score Estimate Council District 2 Street Reconstruction Local Streets

Beeman Ave - Spurlock St to Jerome St 5100 blk 1 57.15 $491,376 Hudnall St - Denton Dr to Bradford Dr 2800 blk 1 55.14 $388,710

Roanoke Ave - Huron Av to Harry Hines Blvd 2100 Blk 1 54.82 $433,942

Fairmount St - Clara St to Kings Rd 4700 Blk 1 53.14 $446,705

Weldon St - N Carroll Av to Belmont Av 4500 - 4600 Blks 1 50.5 $701,965

Summary for 'Category' = Street Reconstruction Local Streets (16 detail records) Sum $6,551,853 Street Reconstruction Thoroughfares

Samuell Blvd - Winfield Av to UP RR 3500 - 3600 Blks 1 78.42 $657,767

Dolphin Rd - Samuell Blvd to R L Thornton Frwy 5400 Blk 1 77.38 $188,254

Dolphin Rd - R L Thornton Frwy to Jerome St 5200 - 5300 Blks 1 72.76 $1,398,825

Henderson Av (S) - Winslow Av to R L Thornton (Serv Rd) 1400 Blk 1 71.36 $707,070

Hobbs St - Haskell Av to Alpine St 4900 Blk 1 71.31 $446,705

Crowdus St (S) - Taylor St to St Louis St 400 Blk 1 69.45 $125,303

McKee St - Austin St to Dart L R 800 - 1000 Blks 1 68.57 $751,741

Lindsley Ave - Graham Av to Munger Blvd 5100 - 5400 Blks 1 68.34 $2,127,592

Peters St - W Griffin St to Powhattan St 1100 - 1200 Blks 1 68.12 $319,075

Benson St - Exposition Av to Commerce St 3700 Blk 1 67.37 $255,260

King George Dr - Regal Row to Viceroy Dr 8600 - 8700 Blks 1 64.84 $1,659,190

Hill Av (N) - Elm St to Simpson St 300 Blk 1 63.41 $355,183

Griffin St (E) - 900 Blk 900 Blk 1 62.99 $361,945

Valdina St - Wycliff Av West to Dead-End 2200 - 2300 Blks 1 61.37 $670,058

Friday, March 31, 2006 Page 26 of 349 Project Name Description Tier Score Estimate Council District 2 Street Reconstruction Thoroughfares

Gaston Av - Fitzhugh Av to Collett Av 4900 Blk 1 60.25 $728,767 River Bend Dr - Stemmons (Serv Rd) to Dead-end (Turn 1200 Blk 1 59.97 $2,127,592 Around) Cedar Crest Blvd Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $5,662,439 Bonnie View Ln to the Trinity River Bridge Cedar Crest Blvd, from Bonnie View Ln to the Trinity River Bridge, to serve as gateway for both East Oak Cliff and Trinity River greenbelt as recommended in the Trinity River Comprehensive Land Use Pl Continental Ave. - Industrial Blvd. to Stemmons Frwy Design and Reconstruction to 8 lane cross section, turn lanes, 1 $3,701,270 signalization, ROW acquisition, and pedestrian friendly streetscaping as recommended in the Trinity River Balanced Vision Plan Ervay Street Reconstruction / Urban Design, from MLK to Roadway reconstruction & streetscape enhancements on 1 $3,682,776 Marilla Ervay, from MLK to Marilla, to serve as a gateway into Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan S. Lamar St. - Grand Ave. to IH 45 - Construction Only Reconstruction (initially to 4 lanes), including ROW acquisition 1 $0 for 6 lanes, Signalization and turn lanes at major signalized intersections, and landscaping as recommended in the Trinity River Balanced Vision Plan (Construction Only) S. Lamar St. - Grand Ave. to IH 45- Design Only Design for Reconstruction (initially to 4 lanes), and landscaping 1 $957,225 as recommended in the Trinity River Balanced Vision Plan Summary for 'Category' = Street Reconstruction Thoroughfares (21 detail records) Sum $26,884,037 Street Resurfacing

Walton St. (N) - Elm St. to Main St. 100 - 300 1 89.49 $70,069

Good Latimer Expy. (S) - Corinth St. to S. Central Expy. 2100 - 2700 1 89.265 $25,552

Willow St. - Exposition Ave. to Peak St. 3700 - 4300 1 88.75 $163,749

Wichita St. - Industrial Blvd. to Slocum St. 200 - 300 1 87.375 $68,282

Cass St. - Motor St. to Dead End 4800 - 4900 1 85.77 $97,382

Friday, March 31, 2006 Page 27 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Browder St. - Griffin St. (E) to Blakeney Blvd. 1100 - 1200 1 85.37 $43,649 McKee St. - Wall St. to Ervay St. 1100 - 1600 1 84.56 $174,343

Pauline St. - Crutcher St. to Simpson St. 400 block 1 83.41 $24,760

Redfield St. - Lofland St. to Inwood Rd. 5200 - 5600 1 83.22 $249,389

Barry Ave. (S) - RL Thornton Frwy. To Phillip Ave. 900 - 1000 1 83.015 $141,031

Crowdus St. - Indiana St. to Canton St. 200N - 200S 1 82.68 $128,651

Hi Line Dr. - Edison St. to Oak Lawn Ave. 1400 - 1800 1 82.37 $211,866

Dawson St. - Good Latimer Expy. to Orleans St. 2500 - 2700 1 82.17 $131,969

Buffalo St. - Austin St. to Cockrell Ave. 800 Block 1 82.02 $30,376

Hickory St. - Ervay St. to First Ave. 1700 - 3400 1 81.76 $627,940

Adair St. - Race St. to Concrete 300 Block 1 81.07 $37,906

Worth St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 81.01 $79,131

Cockrell Ave. - 1900 Lamar to 2700 Lamar 2000 - 2700 1 80.73 $172,030

First Ave. - Exposition Ave. to Ash Ln. 400 - 800 1 80.18 $47,095

Arnold st. - S. Lamar St. to Austin St. 800 Block 1 80.125 $17,996

Walton St. (S) - Main St. to Taylor St. 100 - 300 1 79.685 $37,013

Bomar Ave. - Forest Park Rd. to Maple Ave. 2300 - 2400 1 79.475 $138,606

Denton Dr. - King Rd. to Minert St. 4700 Block 1 79.45 $107,082

Tex Oak Ave. - Dead End to Butler St. 5200 - 5300 1 79.05 $129,800

Munger Blvd. (S) - East Side Ave. to Garland Ave. 200 - 600 1 78.52 $300,313

Washington Ave (S). - Main St. to East Side Ave. 100 block 1 77.91 $23,356

Kinmore St. - St Charles Ave. to Winfield Ave. 3000 - 3400 1 77.9 $37,864

Friday, March 31, 2006 Page 28 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Corinth St. - Lamar St. to Gould St. 1100 - 1300 1 77.58 $55,519 Barry Ave. (S) - Ware St. to Haskell Ave. 1400 - 1700 1 77.27 $337,964

Denton Dr. - Hudnall St. to Denton Dr. Cut-Off 5400 - 5500 1 77.075 $166,174

Lofland St. - Harry Hines Blvd. to Redfield Dr. 2100 block 1 77.06 $69,431

Baylor St. - Dawson St. to Dead End 1500 - 1700 1 77.01 $54,243

Main St. - Exposition Ave. to Commerce St. 3600 block 1 76.23 $84,874

Taylor St. - Henry St. to Hall St. 2700 - 3000 1 76.215 $75,812

Corinth St. - Good Latimer Expy. To Bourbon St. 2500 Block 1 76.1 $45,436

Forest Park Rd. - Hawes Ave. to Empire Central Dr. 6800 - 6900 1 75.99 $102,104

Swiss Ave. - Apple St. to Carroll Ave. 4000 - 4400 1 75.42 $100,368

Lear St. - S. Ervay St. to Park Ave. 1700 - 1800 1 75.38 $69,175

Louise Ave. - S. Good Latimer Expy. to Malcom X 2500 - 2700 1 75.37 $128,651

Jerome St. - Beeman St. to Dolphin Rd. 2900 - 3300 1 74.72 $141,542

Beaumont St. - Akard St. to Wall St. 1200 Block 1 74.305 $28,844

Peak St. (N) - Gaston Ave. to Live Oak St. 900 - 1200 1 74.125 $159,155

Sullivan Dr. - Wall St. to Ervay St. 1200 - 1600 1 74.02 $110,017

Munger Blvd. (N) - Bryan St. to Live Oak St. 1300 block 1 73.955 $80,407

Malcolm X Blvd. (S) - Elm St. to Concrete 200 - 500 1 73.675 $99,934

Crutcher St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 73.015 $86,278

Knight St. - Harry Hines Blvd. to Brown St. 2200 - 2600 1 73.01 $171,407

Ash Ln. - Peak St. to Fletcher St. 4200 Block 1 72.56 $15,954

Seegar St. - Browder St. to Ervay St. 1500 - 1600 1 72.52 $63,432

Friday, March 31, 2006 Page 29 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Chestnut St. - Hall St. to Santa Fe Ave. 1400 - 1800 1 72.355 $284,232 Spurlock St. - Beeman Ave. to Dolphin Rd. 2900 - 3300 1 72.3 $171,279

Simpson St. - Washington Ave. to Haskell Ave. 3900 - 4000 1 71.92 $72,239

Harwood St. (S) - St. Louis St. to Corinth St. 1200 - 1900 1 71.905 $273,383

Henderson Ave. (S) - R.L. Thornton Frwy. to Oleander St. 1300 Block 1 71.65 $10,338

Gurley Ave. - Dead End to Stonewall St. 4200 - 4300 1 70.3 $24,747

Annex Ave. - Live Oak St. to Ross Ave. 1300 - 1600 1 69.88 $127,502

Grigsby Ave. - Gaston Ave. to Swiss Ave. 900 - 1000 1 69.79 $53,349

Bourbon St. - Corinth St. to Santa Fe Ave. 2000 block 1 69.77 $4,722

Murray St. - Main St. to Canton St. 100 - 200 1 69.72 $40,203

Harwood St (N) - Payne St. to Olive St. 2500 - 2600 1 69.7 $21,314

Washington Ave. (N) - Main St. to Worth St. 200 - 500 1 69.685 $173,704

Owenwood Ave. - Samuell Blvd. to Kinmore St. 4700 - 5200 1 69.58 $21,203

Plantation Rd. - Wyche Blvd. to Harry Hines Blvd. 1900 block 1 69.21 $47,606

St Mary Ave. (S) - East Grand Ave. to Philip Ave. 1100 block 1 69.12 $35,736

Bennett Ave. - Live Oak St. to Ross Ave. 1300 - 1600 1 68.71 $212,759

Beaumont St. - Park Ave. to Harwood St. 1900 Block 1 68.64 $27,313

Glass St. - Levee St. to Industrial Blvd. 100 block 1 68.635 $55,009

La Vista Dr. - East Grand Ave. to Cul-de-Sac 7400 block 1 68.35 $83,981

Orr St. - Sullivan Dr. to Ervay St. 1300 block 1 68.28 $44,032

King George Dr. - Viceroy Dr. to Regal Row 8600 - 8700 1 68.19 $180,724

Continental Ave. - Industrial Blvd. to Continental Bridge 100 Block 1 67.7 $319,330

Friday, March 31, 2006 Page 30 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Sycamore St. - Peak St. to Fitzhugh Ave. 4300 - 4800 1 67.675 $248,368 Cadiz St. - Lamar St. to R.R. Tracks (Conc.) 900 - 1000 1 67.52 $25,654

Beeman Ave. - Jerome St. to RL Thornton Frwy. 5200 - 5300 1 67.22 $81,300

St Charles Ave. - Jerome St. to Samuell Blvd. 5200 - 5400 1 67.17 $79,258

Harry Hines Blvd. - Record Crossing to Exchange Park 6000 - 6200 1 66.83 $280,403

Santa Fe Ave. - Dead End to Carroll Ave. 4300 - 4400 1 66.44 $16,337

St Louis St. - St. Paul St. to Harwood St. 1800 - 1900 1 66.37 $63,177

East Side Ave. - Fitzhugh Ave. to Beacon St. 4900 - 5500 1 66.13 $191,828

Junius St. - Washington Ave. to Haskell Ave. 3800- 4000 1 65.95 $63,177

Crutcher St. - Hall St. to Pauline St. 3500 Block 1 65.69 $81,811

Swiss Ave. - Annex Ave. to Fitzhugh Ave. 4700 - 4800 1 64.73 $82,194

San Jancinto St. - Haskell Ave. to Bennett Ave. 4100 - 4900 1 63.755 $502,862

Ross Ave. - Peak St. to Live Oak St. 4300 - 6000 1 63.685 $625,898

Greenville Ave. - Bryan St. to Palo Pinto Ave. 1300 - 2500 1 63.39 $386,208

Lindsley Ave. - S. Munger Blvd. to St. Mary St. 5000 - 5100 1 63.37 $67,006

Fuqua St. - Fitzhugh Ave. to Bennett Ave. 4900 Block 1 63.27 $21,059

Throckmorton St. - Maple Ave. to Holland Ave. 2500 - 3600 1 63.12 $430,879

Prairie Ave. (N) - Sycamore St. to Bryan St. 1200 - 1300 1 62.54 $51,690

Peeler St. - Atwell St. to Manor Way 5900 - 6200 1 62.265 $104,784

Crestview Dr. - Cedar Springs Rd. to Dead End 3100 - 3400 1 62.13 $183,021

Collville Ave. - Dead End to Mockingbird Ln. 6500 Block 1 61.91 $37,396

Alexander Ave. - Cockrell Ave. to Lamar St. 900 Block 1 61.7 $39,948

Friday, March 31, 2006 Page 31 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Shelby Ave. - Maple Ave. to Dickason Ave. 2500 - 2900 1 61.16 $121,759 Bowser Ave. - Wheeler St. to Dead End 5000 - 5100 1 61.025 $28,206

Lovedale Ave. - Harry Hines Blvd. to Mohawk Dr. 2100 - 2200 1 60.66 $184,042

Bryan St. - Haskell Ave. to Munger Ave. 4100 - 5100 1 60.63 $534,642

Ervay St. (S) - McKee St. to Corinth St. 1700 - 2000 1 60.61 $171,024

Fillmore Dr. - Empire Central Dr. to Lovedale Ave. 7000 - 7200 1 60.59 $99,169

Lamesa St. (S) - Alma St. to Montgomery St. 2200 - 2300 1 60.44 $52,839

Garrett Ave. (N) - Live Oak St. to Ross Ave. 1300 - 1600 1 60.09 $113,335

Samuell Blvd. - Winslow Ave. to Sibley Ave. 2800 - 3000 1 59.82 $189,786

Gano St. - Akard St. to Wall St. 1200 Block 1 58.895 $32,035

Holly Ave. - Bryan St. to San Jancinto St. 1400 - 1500 1 58.78 $135,543

Hedgerow Dr. - Cedar Springs Rd. to Lemmon Ave. 3100 - 3400 1 58.68 $163,494

Magnolia St. - McKinney Ave. to Field St. 2000 block 1 58.26 $27,696

Reagan St. - Dickason Ave. to Maple Ave. 2500 - 3100 1 58.16 $152,314

Alma St. - Lamesa St. to Lamar St. 900 - 1000 1 58.145 $21,314

Virginia Ave. - Annex Ave. to Fitzhugh Ave. 4600 - 4800 1 58.12 $101,721

Browder St. - Corinth St. to Parker St. 2100 Block 1 57.885 $24,633

Gould St. - Gano St. to Parker St. 1600 - 2100 1 57.6 $288,571

Madera St. - Manette St. to Bonita Ave. 2600 block 1 57.58 $21,825

Ash Ln. - Glasgow Dr. to Cameron Ave. 6200 - 6300 1 57.25 $44,926

Roanoke Ave. - Thurston Dr. to Denton Dr. 2500 - 2600 1 55.92 $79,641

Richardson Ave. - S. Ervay St. to S. Harwood St. 1700 - 2000 1 55.5 $117,802

Friday, March 31, 2006 Page 32 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Cedarplaza Ln. - Cedar Springs Rd. to Lemmon Ave. 3100 - 3400 1 55.34 $114,101 Viceroy Dr. - 1600 Viceroy Dr. to Regal Row 1600 - 1700 1 53.98 $112,697

Henderson Ave. (N) - Capitol Ave. to Alcott St. 2400 - 2700 1 53.39 $164,643

Wayne St. - Santa Fe Ave. to Lindsley Ave. 400 - 700 1 53.31 $61,135

Martinique Ave. - Santa Fe. Ave. - Ash Ln. 400 - 500 1 53.255 $49,265

Hartford St. - Douglas Ave. to Dead End 4300 - 4400 1 51.96 $67,516

Monarch St. - California Dr. to Fitzhugh Ave. 4500 - 4800 1 51.845 $120,100

St Paul St. (S) - Gano St. to Beaumont St. 1700 block 1 51.54 $83,215

Congress Ave. - Hood St. to Douglas Ave. 3600 - 4300 1 51.24 $225,650

Henderson Ave. (N) - Lewis St. to McMillian Ave. 1600 - 1800 1 50.545 $316,012

Shea Rd. - Mohawk Dr. to Harry Hines Blvd. 2000 - 2200 1 49.925 $156,474

Amherst Ave. (W) - Huron Dr. to Denton Dr. 2200 - 2600 1 49.85 $162,984

Browder St. - McKee St. to Beaumont St. 1700 Block 1 49.46 $28,461

Lindsley Ave. - S. Beacon St. to Graham Ave. 5500 block 1 49.105 $22,718

Lemmon Ave. - Inwood Rd. to Atwell St. 5700-6000 1 48.88 $122,014

Collett Ave. (S) - Columbia Ave. to Concrete 100 Block 1 47.815 $22,591

Herschel Ave. - Cedar Springs Rd. to Dickason Ave. 3000 Block 1 47.125 $27,568

Collett Ave. (N) - Worth St. to Bryan St. 700 - 1300 1 44.42 $337,454

Santa Fe. Ave. - Fitzhugh Ave. to Munger Blvd. 4900 block 1 43.515 $17,996

Wheeler St. - Lemmon Ave. to Dead End 3500 - 3700 1 42.39 $79,424

Shorecrest Dr. - Harry Hines Blvd. to Denton Dr. 2100 - 2400 1 40.63 $161,835

Garrett Ave. (S) - Munger Blvd. to Santa Fe Ave. 100 - 300 1 39.05 $29,355

Friday, March 31, 2006 Page 33 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Adeline St. - 1900 2 $0 Akard St. (S) - 400 2 $0

Alcott St. - 4700 2 $0

Ann Av. - 700 2 $0

Annex Av. - 1900 2 $0

Annex Av. - 900 2 $0

Anson Rd. - 2700 2 $0

Ash La. - 4800 2 $0

Ash La. - 5500 2 $0

Atoka St. - 4400 2 $0

Beacon St. (S) - 300 2 $0

Beaumont St. - 2000 2 $0

Belleview St. - 1300 2 $0

Belmont Av. - 4600 2 $0

Belmont Av. - 5500 2 $0

Bengal St. - 4700 2 $0

Bengal St. - 4800 2 $0

Bengal St. - 4900 2 $0

Bennett Av. - 2600 2 $0

Bennett Av. - 2700 2 $0

Benson St. - 3900 2 $0

Bombay Av. - 2300 2 $0

Friday, March 31, 2006 Page 34 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Bombay Av. - 2400 2 $0 Bonita Av. - 5200 2 $0

Briar Cliff Rd. - 1400 2 $0

Briar Cliff Rd. - 1500 2 $0

Brookfield Av. - 2500 2 $0

Brookriver Dr. - 8000 2 $0

Brookriver Dr. - 8200 2 $0

Brown St. - 3800 2 $0

Caroline St. - 2500 2 $0

Carroll Av. (N) - 400 2 $0

Carroll Av. (N) - 800 2 $0

Cedar Springs Rd. - 4700 2 $0

Cedar Springs Rd. - 5400 2 $0

Cedar Springs Rd. - 5500 2 $0

Cedar Springs Rd. - 5600 2 $0

Cedar Springs Rd. - 5700 2 $0

Cedar Springs Rd. - 5800 2 $0

Cedar Springs Rd. - 5900 2 $0

Cedar Springs Rd. - 6300 2 $0

Cedar Springs Rd. - 6400 2 $0

Cedar Springs Rd. - 6500 2 $0

Colony Ct. - 2300 2 $0

Friday, March 31, 2006 Page 35 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Columbia Av. - 4800 2 $0 Continental Av. - 500 2 $0

Corbin St. - 1100 2 $0

Core St. - 800 2 $0

Corinth St. - 2000 2 $0

Corinth St. - 2100 2 $0

Cortland Av. - 7100 2 $0

Crampton St. - 1200 2 $0

Crampton St. - 1300 2 $0

Dawson St. - 3000 2 $0

Dawson St. - 3200 2 $0

Denton Dr. - 8000 2 $0

Denton Dr. - 8200 2 $0

Dolphin Rd. - 5000 2 $0

Dolphin Rd. - 5100 2 $0

East Side Av. - 3800 2 $0

Edison St. - 1600 2 $0

Elmbrook Dr. - 7800 2 $0

Elmbrook Dr. - 7900 2 $0

Elmbrook Dr. - 8000 2 $0

Elmbrook Dr. - 8200 2 $0

Exposition Av. (N) - 100 2 $0

Friday, March 31, 2006 Page 36 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Fairview Av. - 1300 2 $0 Fairview Av. - 1500 2 $0

Farrington St. - 2000 2 $0

Farrington St. - 2100 2 $0

Farrington St. - 2300 2 $0

Farrington St. - 2400 2 $0

Farrington St. - 2600 2 $0

Field St. (N) - 2500 2 $0

Field St. (N) - 2600 2 $0

Fielder Ct. - 2600 2 $0

Fielder Ct. - 2700 2 $0

Fitzhugh Av. (N) - 2700 2 $0

Forest Park Rd. - 6600 2 $0

Forest Park Rd. - 6700 2 $0

Garrett Av. (N) - 1900 2 $0

Garrett Av. (N) - 2000 2 $0

Garrett Av. (N) - 2100 2 $0

Garrett Av. (S) - 400 2 $0

Good Latimer Exwy. (S) - 100 2 $0

Griffin Blvd. (N) - 800 2 $0

Griffin St. (N) - 100 2 $0

Grigsby Av. - 1300 2 $0

Friday, March 31, 2006 Page 37 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Grigsby Av. - 1600 2 $0 Hall St. (S) - 300 2 $0

Hall St. (S) - 500 2 $0

Harry Hines Blvd. - 2500 2 $0

Harry Hines Blvd. - 2700 2 $0

Harry Hines Blvd. - 2800 2 $0

Harry Hines Blvd. - 5400 2 $0

Harwood St. (N) - 2800 2 $0

Harwood St. (N) - 3100 2 $0

Hawes Av. - 1700 2 $0

Hawes Av. - 2000 2 $0

Hawes Av. - 2100 2 $0

Hawes Av. - 2200 2 $0

Henderson Av. (N) - 300 2 $0

Henry St. - 200 2 $0

Henry St. - 300 2 $0

Herschel Av. - 3000 2 $0

Hi Line Dr. - 1900 2 $0

Hill Av. (N) - 500 2 $0

Hinton St. - 1500 2 $0

Hinton St. - 1600 2 $0

Hinton St. - 1700 2 $0

Friday, March 31, 2006 Page 38 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Hinton St. - 1800 2 $0 Hondo Av. - 2200 2 $0

Hotel St. - 900 2 $0

Houston Viad. (N) - 600 2 $0

Houston Viad. (N) - 700 2 $0

Howell St. - 100 2 $0

Hudnall St. - 3400 2 $0

Indiana Blvd. - 2800 2 $0

Jackson St. - 800 2 $0

Junius St. - 5300 2 $0

Kelly Av. - 1700 2 $0

Kirby St. - 2700 2 $0

Knight St. - 2800 2 $0

Knight St. - 2900 2 $0

Lafayette St. - 4300 2 $0

Lahoma St. - 5100 2 $0

Lamar St. (S) - 2000 2 $0

Lamar St. (S) - 2100 2 $0

Langdon Av. - 2100 2 $0

Langdon Av. - 2300 2 $0

Langdon Av. - 2400 2 $0

Langdon Av. - 2500 2 $0

Friday, March 31, 2006 Page 39 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Langdon Av. - 2600 2 $0 Lemmon Av. - 2200 2 $0

Levee St. - 1000 2 $0

Levee St. - 1700 2 $0

Levee St. - 1800 2 $0

Levee St. - 1900 2 $0

Levee St. - 2000 2 $0

Lovers La. (W) - 2200 2 $0

Lovers La. (W) - 2500 2 $0

Lovers La. (W) - 2600 2 $0

Mail Av. - 2200 2 $0

Manufacturing St. - 100 2 $0

Manufacturing St. - 1300 2 $0

Maple Av. - 5300 2 $0

Maple Av. - 5400 2 $0

Maple Av. - 5600 2 $0

Maple Av. - 6000 2 $0

Maple Av. - 6300 2 $0

Maple Av. - 6400 2 $0

Market Center Blvd. - 1700 2 $0

Market Center Blvd. - 2000 2 $0

Market Center Blvd. - 2100 2 $0

Friday, March 31, 2006 Page 40 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Market St. (N) - 1700 2 $0 Mckinnon St. - 2600 2 $0

Medical Center Dr. - 5000 2 $0

Medical Center Dr. - 5500 2 $0

Moody St. - 1800 2 $0

Moody St. - 2000 2 $0

Munger Av. - 900 2 $0

Oak Lawn Av. - 100 2 $0

Oak Lawn Av. - 2300 2 $0

Oakbrook Blvd. - 6600 2 $0

Oakbrook Blvd. - 6700 2 $0

Pace St. - 1300 2 $0

Parkhouse St. - 100 2 $0

Peak St. (N) - 1800 2 $0

Peters St. - 1200 2 $0

Philip Av. - 4600 2 $0

Philip Av. - 4700 2 $0

Philip Av. - 4800 2 $0

Pittsburg St. - 100 2 $0

Race St. - 3900 2 $0

Rawlins St. - 5600 2 $0

Record Crossing Rd. - 1100 2 $0

Friday, March 31, 2006 Page 41 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Record Crossing Rd. - 1200 2 $0 Record Crossing Rd. - 1300 2 $0

Record Crossing Rd. - 1600 2 $0

Record Crossing Rd. - 1900 2 $0

Record Crossing Rd. - 2000 2 $0

Record St. (N) - 1700 2 $0

Record St. (N) - 1800 2 $0

Regal Row. - 1600 2 $0

Regal Row. - 1700 2 $0

Regal Row. - 1800 2 $0

Reiger Av. - 5200 2 $0

Reunion Blvd. - 200 2 $0

Richard Av. - 5300 2 $0

Richard Av. - 5400 2 $0

River Bend Dr. - 1100 2 $0

River Bend Dr. - 1300 2 $0

Riveredge Dr. - 100 2 $0

Rock Island St. - 1800 2 $0

Rock Island St. - 1900 2 $0

Ross Av. - 700 2 $0

Ross Av. - 800 2 $0

Sheridan St. - 2200 2 $0

Friday, March 31, 2006 Page 42 of 349 Project Name Description Tier Score Estimate Council District 2 Street Resurfacing

Sheridan St. - 2300 2 $0 Sheridan St. - 2400 2 $0

Sleepy Hollow Dr. - 1200 2 $0

Sleepy Hollow Dr. - 1300 2 $0

Slocum St. - 800 2 $0

Slocum St. - 900 2 $0

Sports St. - 700 2 $0

St Mary Av. (N) - 100 2 $0

Stoneleigh Av. - 5000 2 $0

Stoneleigh Av. - 5100 2 $0

Stoneleigh Av. - 5200 2 $0

Stoneleigh Av. - 5300 2 $0

Summit Av. - 2100 2 $0

Summit Av. - 2200 2 $0

Terry St. - 4100 2 $0

Turtle Creek Blvd. - 1300 2 $0

Wanebe Dr. - 7800 2 $0

Wichita St. - 1800 2 $0

Winslow Av. - 5700 2 $0

Winslow Av. - 5800 2 $0

Summary for 'Category' = Street Resurfacing (355 detail records) Sum $16,702,412

Friday, March 31, 2006 Page 43 of 349 Project Name Description Tier Score Estimate Council District 2 Streetscape / Urban Design

Cadiz / Corinth Tunnel Pedestrian Enhancements Design and construction of pedestrian enhancements and 2 $7,657,800 demolition of existing tunnel to provide pedestrian friendly access into Trinity Park Columbia Ave. Munger to Carroll Lnadscape / street Scape crosswalks at major intersections. 2 $3,556,368

Commerce St - Houston to Pearl See also: PB98N610 for design only, from Griffin to Harwood 2 $2,118,480 (Phase I). IMPS No. 10655, Intergovernmental Partnership Projects for street major rehab and/or reconstruction, from IH 35E to US-75 ~4,800 LF Deisgn District - Victory Station Pedestrian Link Provides a pedestrian/bicycle/zero emission vehicle link 2 $2,789,309 underneat Stemmons Freeway between the Trinity/Stemmons Elm St - Houston to Pearl Phase I - Griffin to Ervay. Bus lane improvements and 2 $2,186,818 pedestrian enhancements Freeway Air Rights Develop.-Woodall Rodgers & I-30 Study potential bridging of these freeway barries, providing 2 $178,515 landscping and pedestrian connections to Uptown and the Cedars Houston Street Pedestrian Way Extends the existing protected pedestrian walkway on Houston 2 $1,501,338 Street Viaduct from Greenbriar/Oak Cliff Founders Park to Reunion Boulevard/Union Station Lamar Street Lighting - Woodall Rodgers to Young Increased public safety on route between Convention Center 2 $767,060 and Uptown ~3,200 LF, lights @ 50' o/c each side Lamar Street Urban Design Enhancements along Lamar, IH-30 to Hatcher to encourage 2 $7,531,514 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Ross Avenue - Lamar to Julius Schepps Freeway Includes screening for parking, pedestrian and streetscape 2 $429,551 enhancements and upgrading street light. ~5,300 LF - currently under design Ross/San Jacinto Connector-Lamar to Griffin Complete planned couplet, preliminary engineering, ROW 2 $2,091,982 acquisition and construction San Jacinto Street Lighting - Lamar to Routh Increased public safety ~4,500 LF lights @ 50' o/c each side 2 $108,086

Stemmons Design District -Transit Link - Phase I Create link between west side of Stemmons and new DART 1 $2,091,982 Victory Light Rail Station.

Friday, March 31, 2006 Page 44 of 349 Project Name Description Tier Score Estimate Council District 2 Streetscape / Urban Design

Streetscape Improvements Streetscape and landscape improvements: Oaklawn, Market 2 $11,436,166 Center, Irving and Industrial. ~8,200 LF Trinity River Park - Reunion Gateway to Trinity Park - Design and Construction of major pedestrian and vehicular 2 $8,838,378 Access from Industrial Blvd. access to Reunion Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Trinity River Park - Reunion Gateway to Trinity Park - Design of major pedestrian and vehicular access to Reunion 2 $893,410 Access from Industrial Blvd. - Design Only Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Young St - Harwood to Ervay Landscape between Farmers Market and Civic Center ~1,200 2 $1,673,585 LF Summary for 'Category' = Streetscape / Urban Design (17 detail records) Sum $55,850,343 Thoroughfares

Inwood -Harry Hines to Maple Widen existing six lane roadway with 4' median to 15' median 1 67 $2,616,077 with left turn pockets Inwood -Maple to Cedar Springs Widen existing six lane roadway with 4' median to 15' median 1 67 $2,270,557 with left turn pockets Houston -Young to Elm Convert operation from 1-way to 2-way 1 61 $497,757

Continental - Industrial to IH 35E Design & reconstruction to an eight lane roadway with six left 1 56 $8,161,300 turns Haskell - Lemmon to Main Rebuild a three lane coupletwith sidewalk, streetscape & 1 56 $8,786,628 landscape improvements. Haskell - Main to East Grand Rebuild a three lane couplet 1 56 $30,298,865

Harry Hines - Mockingbird to Webb Chapel Ext Widen to 8 lane divided roadway 1 52 $24,333,859

Harry Hines - Oak Lawn to Market Center Widen to 8 lane divided roadway 1 50 $15,677,952

Industrial -Continental to Corinth Widen to eight lane divided cross section, Railway bridge 1 50 $5,857,548 reconstruction Haskell - Dolphin/ Hatcher to Crosstown Widen to a six lane divided roadway 1 48 $1,435,936

Griffin St - Corbin to Woodall Rodgers Widen to 40' of pavement 1 44 $3,226,816

Friday, March 31, 2006 Page 45 of 349 Project Name Description Tier Score Estimate Council District 2 Thoroughfares

Oak Lawn - IH 35E to Irving Blvd Widen to 6 lane divided roadway 1 44 $6,342,626 Harry Hines - Market Center to Inwood Widen to 8 lane divided roadway 1 40 $10,248,448

Industrial -UPRR bridge north of Commerce Replace UPRR bridge and widen to eight lane dvided cross 1 37.714 $15,738,017 section Lindsley -Munger to Tennison Memorial Reconstruct to a two lane undivided roadway; NTM Calming 1 37 $7,762,224 Project Harry Hines - Inwood to Mockingbird Widen to 8 lane divided roadway 1 35 $5,999,909

Loop 354/ Harry Hines - Motor to Oak Lawn Widen to an eight lane divided roadway 1 35 $591,979

Denton- Inwood to Mockingbird Widen to a four lane undivided roadway 1 34 $5,787,904

Young - Ervay to Harwood Enhanced sidewalks and streetscape 1 34 $1,723,724

Lamar (S) - Corinth to Cadiz Reconstruct to a six lane divided roadway 1 33 $16,865,652

St. Paul - Canton to Elm Widen to 44 foot pavement 1 31 $1,304,867

Wycliff - Sylvan Conn. - Harry Hines to IH 35 Build a new six lane bridge, including ramps at Market Center 1 31 $34,587,428

Beaumont - Lamar to Harwood Build New 4 lane undivided roadway 1 30 $5,526,282

Canton - Good Latimer to Trunk Widen to standard five lane roadway 1 28 $5,411,248

Canton - Good Latimer to Second Enhanced sidewalks and streetscape 1 28 $2,355,136

East Grand - Haskell to Barry Widen to a four lan e undivided roadway 1 27 $1,725,194

Maple -Mockingbird to Empire Central Widen to a four lane roadway 1 21 $3,145,055

Main - Exposition to Haskell Widen to a six lane divided roadway 1 20 $2,703,267

Cadiz - I-30 to WB Frontage Road Convert operation from 1-way to 2-way with Project Pegasus 1 13 $0

CBD Fair Link/Exposition/Second Ave - Hall St to I-30 Build five and six lane undivided north of DART SE LRT to 1 13 $9,857,677 Second at I030 Hiline -500' North of Turtle Creek to Market Center Blvd Build new four lane divided roadway and bridge over Turtle 1 13 $3,115,526 Creek (TP amendment required) IH 30/ RL Thornton Frwy - Munger to Carroll Enhanced Service Roads 1 13 $2,537,050

Friday, March 31, 2006 Page 46 of 349 Project Name Description Tier Score Estimate Council District 2 Thoroughfares

Commerce - Central to Fair Park Link Widen to four lane undivided roadway 1 12 $1,991,234 Continental Avenue - East Levee to Industrial Widen to a six lane divided roadway 1 11 $5,400,360

Continental Viaduct - Trinity River to IH 35 1 11 $4,327,822

Memorial Drive/Canton Connection-Griffin to Akard New four lane undivided (support Pegasus & next Convention 1 10 $1,903,041 Center expansion phase) Empire Central - Thurston to Forest Park Widen to a four lane undivided roadway 1 8 $2,029,641

Harwood - Elm to Canton Streescape and enhanced sidewalks 1 0 $36,979

Industrial - Corinth to MLK, Jr 1 0 $7,426,534

Industrial - I.H. 35 to Lake June 1 0 $7,670,599

Industrial - MLK,Jr to I-45 1 0 $7,077,871

Industrial - South Central to Lake June 1 0 $53,892,118

Belleview / McKee Extension to Trinity Park, from Lamar Build new four lane undivided roadway including undepass at 1 $27,006,721 to Industrial UPRR. ROW acquisition, remediation, relocation, and bridge and streetscaping over RR for vehicular access to the Canoe Launch for Trinity Lakes and Trinity Park, as recommended in the Trinity Riv Downtown Levee Road Design and Construction of Downtown Levee Road as 1 $2,068,323 recommended in the Trinity River Balanced Vision Plan Industrial - I-45 to South Central 1 $17,572,645

Summary for 'Category' = Thoroughfares (45 detail records) Sum $384,896,395 Traffic Intersection Capacity & Safety Improvement

Garland at Gaston Improve intersection geometrics to improve safety for 1 55 $1,155,052 northbound left-turn. Change to more urban intersection design. Tighten curves and square up intersection. Maple @ Oak Lawn Widen southbound Maple to construct a right turn lane. 1 45 $113,591

Friday, March 31, 2006 Page 47 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Intersection Capacity & Safety Improvement

Haskell @ State Construct a U-turn lane on Haskelll to allow westbound to 1 40 $109,124 eastbound movement. Haskell at Lemmon Improve lane channelization. 1 35 $468,402

Good Latimer @ Hickory Street Modifications and Bo Widen Hickory to alignment eastbound/westbound approaches, 1 30 $490,099 increase corner radii, and construct eastbound/westbound left- turn pockets. Hickory at South Central Exp. Increase turning radius on all corners. 1 10 $135,288

Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (6 detail records) Sum $2,471,555 Traffic Safety Improvements-Guardrail Upgrades

Harry Hines 3400 BLK Guardrail Upgrade 1 80 $25,751

Harry Hines 6500 BLK Guardrail Upgrade 1 80 $50,988

Harry Hines 7000-9100 BLK Guardrail Upgrade 1 80 $198,528

Harry Hines 9200 BLK Guardrail Upgrade 1 80 $44,830

Irving 2900 BLK Guardrail Upgrade 1 80 $6,653

Cedar Springs 4700 BLK Guardrail Upgrade 1 73 $13,337

Harry Hines 3800 BLK Guardrail Upgrade 1 73 $11,806

Harry Hines 3900-4300 BLK Guardrail Upgrade 1 73 $44,115

Harry Hines 5900 BLK Guardrail Upgrade 1 73 $9,317

Harry Hines 6000 BLK Guardrail Upgrade 1 73 $8,487

Irving 2300 BLK Guardrail Upgrade 1 73 $6,669

Irving 3000 BLK Guardrail Upgrade 1 73 $4,658

M.L. King 400 BLK Guardrail Upgrade 1 73 $33,024

Continental 200 BLK Guardrail Upgrade 1 67 $6,637

Friday, March 31, 2006 Page 48 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Safety Improvements-Guardrail Upgrades

Continental 300 BLK Guardrail Upgrade 1 67 $30,792 Irving 2600 BLK Guardrail Upgrade 1 67 $3,063

Maple 4900 BLK Guardrail Upgrade 1 67 $14,614

Continental 100 BLK Guardrail Upgrade 1 60 $3,063

Industrial 700 S BLK Guardrail Upgrade 1 60 $23,739

Industrial 800 S BLK Guardrail Upgrade 1 60 $5,392

Maple 5800 BLK Guardrail Upgrade 1 60 $19,751

Wycliff 1200 BLK Guardrail Upgrade 1 60 $15,890

Corinth 600 BLK Guardrail Upgrade 1 53 $18,136

Industrial 1300 S BLK Guardrail Upgrade 1 53 $23,612

Industrial 1800 S BLK Guardrail Upgrade 1 53 $26,930

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (25 detail records) Sum $649,783 Traffic Signal Upgrades - CBD

Austin @ Jackson Traffic Signal Upgrades CBD 1 63 $49,674

Field @ Wood Traffic Signal Upgrades CBD 1 63 $24,837

Jackson @ Lamar Traffic Signal Upgrade 1 63 $49,674

Main @ Record Traffic Signal Upgrade 1 63 $49,674

Austin @ Commerce Traffic Signal Upgrade 1 53 $49,674

Austin @ Main Traffic Signal Upgrades CBD 1 53 $55,851

Ervay @ Young Traffic Signal Upgrades CBD 1 53 $57,887

Field/Marilla @ Young Traffic Signal Upgrades CBD 1 53 $66,100

Friday, March 31, 2006 Page 49 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD

Lamar @ Main Traffic Signal Upgrades CBD 1 53 $62,028 Lamar @ Young Traffic Signal Upgrades CBD 1 53 $49,674

Record @ Wood Traffic Signal Upgrades CBD 1 53 $49,674

Akard @ Wood Traffic Signal Upgrade 1 47 $21,748

Austin @ Elm Traffic Signal Upgrades CBD 1 47 $43,496

Commerce @ Houston Traffic Signal Upgrade 1 47 $49,674

Elm @ Record Traffic Signal Upgrade 1 47 $43,496

Ervay @ Wood Traffic Signal Upgrade 1 47 $18,703

Houston @ Jackson Traffic Signal Upgrade 1 47 $59,922

St Paul @ Wood Traffic Signal Upgrade 1 47 $7,394

Griffin @ Memorial Traffic Signal Upgrades CBD 1 37 $59,922

Griffin @ Wood Traffic Signal Upgrades CBD 1 37 $29,961

Houston @ Reunion East/Young Traffic Signal Upgrades CBD 1 37 $57,887

Lamar @ Wood Traffic Signal Upgrades CBD 1 37 $43,496

Market @ Wood Traffic Signal Upgrades CBD 1 37 $43,496

Market @ Young Traffic Signal Upgrades CBD 1 37 $43,496

Record @ Young Traffic Signal Upgrades CBD 1 37 $43,496

Lamar @ Pacific/San Jacinto Traffic Signal Upgrades CBD 1 33 $88,703

Market @ Pacific Traffic Signal Upgrades CBD 1 33 $43,496

Pacific @ Record Traffic Signal Upgrades CBD 1 33 $49,674

Cadiz @ Ervay Traffic Signal Upgrade 1 30 $48,617

Cadiz @ St Paul Traffic Signal Upgrade 1 30 $35,283

Friday, March 31, 2006 Page 50 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD

Canton @ Ervay Traffic Signal Upgrade 1 30 $49,674 Canton @ Good Latimer Traffic Signal Upgrade 1 30 $70,043

Canton @ St Paul Traffic Signal Upgrade 1 30 $49,674

Commerce @ Good Latimer Traffic Signal Upgrade 1 30 $57,724

Commerce @ Griffin Traffic Signal Upgrade 1 30 $24,837

Commerce @ Record-Kennedy Crosswalk Traffic Signal Upgrade 1 30 $37,319

Corbin @ Lamar Traffic Signal Upgrades CBD 1 30 $62,028

Elm @ Good Latimer (Monument) Traffic Signal Upgrade 1 30 $52,681

Field/Griffin @ Munger Traffic Signal Upgrades CBD 1 30 $16,624

Good Latimer @ Main Traffic Signal Upgrade 1 30 $26,672

Griffin @ Jackson Traffic Signal Upgrade 1 30 $6,205

Griffin @ Ross Traffic Signal Upgrade 1 30 $78,454

Griffin @ San Jacinto Traffic Signal Upgrade 1 30 $35,416

Harwood @ Wood Traffic Signal Upgrade 1 30 $17,757

Harwood @ Young Traffic Signal Upgrade 1 30 $25,470

Houston @ Main Traffic Signal Upgrade 1 30 $55,851

Lamar @ Ross Traffic Signal Upgrade 1 30 $62,028

St Paul @ Young Traffic Signal Upgrade 1 30 $55,851

Akard @ Canton Traffic Signal Upgrade 1 20 $55,851

Akard @ Young Traffic Signal Upgrades CBD 1 20 $53,745

Griffin @ Young Traffic Signal Upgrades CBD 1 20 $70,171

Hotel @ Reunion East Traffic Signal Upgrades CBD 1 20 $55,851

Friday, March 31, 2006 Page 51 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - CBD

Hotel @ Reunion West Traffic Signal Upgrades CBD 1 20 $49,674 Houston @ Reunion West/Wood Traffic Signal Upgrades CBD 1 20 $49,674

Commerce @ Market Traffic Signal Upgrade 1 17 $43,496

Houston at Ross Traffic Signal Upgrades CBD 1 17 $68,135

Cadiz/Marilla @ Harwood Traffic Signal Upgrades CBD 1 10 $35,085

Canton/Young @ Pearl Traffic Signal Upgrades CBD 1 10 $53,745

Griffin @ Main Traffic Signal Upgrades CBD 1 10 $26,872

Lamar @ Munger Traffic Signal Upgrades CBD 1 10 $49,674

Summary for 'Category' = Traffic Signal Upgrades - CBD (60 detail records) Sum $2,792,987 Traffic Signal Upgrades - Citywide

Capitol at Peak Traffic Signal Upgrades Citywide 1 93 $118,696

Commonwealth @ Stemmons Traffic Signal Upgrades Citywide 1 93 $107,209

Greenville @ Richmond Traffic Signal Upgrades-City Traffic Signal Upgrade 1 93 $61,416

Junius @ Washington Traffic Signal Upgrades Citywide 1 87 $102,359

Bryan @ Carroll Traffic Signal Upgrades Citywide 1 80 $107,464

Harry Hines @ Market Center Traffic Signal Upgrades Citywide 1 80 $80,981

Lemmon @ Mahanna Traffic Signal Upgrades Citywide 1 80 $88,830

Abrams @ Beacon (Columbia) Traffic Signal Upgrade 1 67 $54,689

Beacon @ Lindsley Traffic Signal Upgrade 1 67 $100,828

Cameron @ East Grand (Tennison) Traffic Signal Upgrade 1 67 $100,955

Cedar Springs @ Hudnall Traffic Signal Upgrade 1 67 $53,732

Friday, March 31, 2006 Page 52 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide

Columbia @ Munger Traffic Signal Upgrade 1 67 $64,421 Congress @ Dallas N Tollway (Wycliff) Traffic Signal Upgrade 1 67 $75,302

Dolphin @ Haskell(Military Pkwy) Traffic Signal Upgrade 1 67 $21,876

Fitzhugh @ Gaston Traffic Signal Upgrade 1 67 $107,464

Gaston @ Haskell Traffic Signal Upgrade 1 67 $84,897

Gaston @ Peak Traffic Signal Upgrade 1 67 $107,464

Inwood - Lemmon Traffic Signal Upgrades Citywide 1 67 $61,262

Main @ Peak Traffic Signal Upgrade 1 67 $102,359

Maple @ Mockingbird Traffic Signal Upgrade 1 67 $118,313

Oak Lawn @ Stemmons Fwy Traffic Signal Upgrade 1 67 $244,411

Beacon @ East Grand Traffic Signal Upgrade 1 53 $100,828

Belleview @ Lamar Traffic Signal Upgrade 1 53 $88,384

Belmont @ Henderson Traffic Signal Upgrade 1 53 $114,867

Bennett @ Bryan(Collett) Traffic Signal Upgrade 1 53 $145,115

Brookriver @ Mockingbird Traffic Signal Upgrade 1 53 $108,422

Bryan @ Fitzhugh Traffic Signal Upgrade 1 53 $105,933

Carroll @ Lindsley (Parry) Traffic Signal Upgrade 1 53 $107,464

Cedar Crest @ Eleventh (Pontiac) Traffic Signal Upgrade 1 53 $77,650

Cedar Crest @ Morrell Traffic Signal Upgrade 1 53 $53,924

Collett @ Columbia Traffic Signal Upgrade 1 53 $86,737

Columbia @ Fitzhugh Traffic Signal Upgrade 1 53 $94,066

Commerce @ Malcolm X Traffic Signal Upgrade 1 53 $128,842

Friday, March 31, 2006 Page 53 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide

Corinth @ Ervay Traffic Signal Upgrade 1 53 $107,464 Corinth @ Harwood Traffic Signal Upgrade 1 53 $107,464

East Grand @ Fitzhugh Traffic Signal Upgrades Citywide 1 53 $53,732

Elm @ Hall Traffic Signal Upgrade 1 53 $128,842

Elm @ Malcolm X Traffic Signal Upgrade 1 53 $128,842

Empire Central @ Stemmons Fwy Traffic Signal Upgrade 1 53 $101,785

Forest Park @ Mockingbird Traffic Signal Upgrade 1 53 $106,890

Harry Hines @ Research Row Traffic Signal Upgrades Citywide 1 53 $109,379

Harry Hines @ Shorecrest Traffic Signal Upgrades Citywide 1 53 $103,316

Haskell @ Live Oak Traffic Signal Upgrades Citywide 1 53 $23,931

Haskell @ Main Traffic Signal Upgrade 1 53 $102,359

Lemmon @ Manor Way(Roper) Traffic Signal Upgrade 1 53 $41,410

Live Oak @ Peak Traffic Signal Upgrades Citywide 1 53 $49,393

Market Center Blvd @ Oak Lawn Traffic Signal Upgrade 1 53 $119,653

McKinnon @ Wolf Traffic Signal Upgrade 1 53 $35,614

Peak @ Ross Traffic Signal Upgrade 1 53 $102,359

Dorothy/Hudnall @ Lemmon Traffic Signal Upgrades Citywide 1 47 $71,792

Baylor Crosswalk @ Gaston Traffic Signal Upgrade 1 40 $30,950

Bennett @ Capitol Traffic Signal Upgrade 1 40 $107,464

Bryan @ Haskell Traffic Signal Upgrade 1 40 $54,250

Bryan @ Peak Traffic Signal Upgrade 1 40 $102,359

Canton @ Malcolm X Traffic Signal Upgrade 1 40 $107,464

Friday, March 31, 2006 Page 54 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide

Capitol @ Fitzhugh Traffic Signal Upgrade 1 40 $107,464 Carroll @ Columbia (Main) Traffic Signal Upgrade 1 40 $109,379

Carroll @ Gaston Traffic Signal Upgrade 1 40 $107,464

Cedar Springs @ Wycliff Traffic Signal Upgrades Citywide 1 40 $51,180

Commerce @ Hall Traffic Signal Upgrade 1 40 $128,842

Dallas N Tollway @ Wycliff (SBSR) Traffic Signal Upgrade 1 40 $83,534

East Grand @ Graham (Samuell) Traffic Signal Upgrade 1 40 $107,464

East Grand @ Mt Auburn School Traffic Signal Upgrade 1 40 $52,966

Elm @ Haskell Traffic Signal Upgrade 1 40 $102,359

Elm @ Peak Traffic Signal Upgrade 1 40 $102,359

Good Latimer @ Hickory Traffic Signal Upgrade 1 40 $128,842

Graham @ Lindsley Traffic Signal Upgrade 1 40 $102,359

Greenville @ Ross Traffic Signal Upgrades Citywide 1 40 $53,732

Harry Hines - Wycliff Traffic Signal Upgrades Citywide 1 40 $74,344

Harry Hines @ Mockingbird Traffic Signal Upgrades Citywide 1 40 $103,316

Harry Hines @ Moody Traffic Signal Upgrade 1 40 $192,977

Harry Hines @ Regal Row (Burbank) Traffic Signal Upgrade 1 40 $106,890

Haskell @ Ross Traffic Signal Upgrades Citywide 1 40 $24,696

Hi Line @ Oak Lawn Traffic Signal Upgrade 1 40 $150,221

Maple @ Turtle Creek Traffic Signal Upgrade 1 40 $57,035

Market Center @ Market Hall/Trade Mart Traffic Signal Upgrades Citywide 1 40 $122,780

Market Center Blvd @ Turtle Creek Traffic Signal Upgrade 1 40 $107,847

Friday, March 31, 2006 Page 55 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic Signal Upgrades - Citywide

Mockingbird @ Oakbrook Traffic Signal Upgrade 1 40 $117,356 Samuell @ Tennison Traffic Signal Upgrade 1 40 $47,085

Airdrome @ Mockingbird Traffic Signal Upgrades Citywide 1 27 $14,007

Beacon @ Samuell (Winslow) Traffic Signal Upgrade 1 27 $105,933

Belmont @ Greenville Traffic Signal Upgrade 1 27 $53,732

Canton @ Hall Traffic Signal Upgrade 1 27 $107,464

Capitol @ Haskell(State) Traffic Signal Upgrade 1 27 $117,101

Cedar Springs @ Manor Way Traffic Signal Upgrade 1 27 $107,464

Empire Central @ Harry Hines Traffic Signal Upgrade 1 27 $148,689

Hall @ Main Traffic Signal Upgrades Citywide 1 27 $107,464

Hall @ Worth Traffic Signal Upgrades Citywide 1 27 $107,464

Haskell @ Lemmon(Peak) Traffic Signal Upgrade 1 13 $76,731

Washington @ Worth Traffic Signal Upgrades Citywide 1 13 $107,464

Summary for 'Category' = Traffic Signal Upgrades - Citywide (90 detail records) Sum $8,469,891 Traffic System Management - Flood Detour Signs

Good Latimer under Pacific Dynamic Signs - Flood Detours 1 80 $5,054

Lamar, 2400 S. under RR Dynamic Signs - Flood Detours 1 80 $10,108

Second Ave. Low Road Dynamic Signs - Flood Detours 1 80 $42,118

Ervay, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $35,379

Harwood, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $16,005

Hi Line under RR Dynamic Signs - Flood Detours 1 60 $42,118

Friday, March 31, 2006 Page 56 of 349 Project Name Description Tier Score Estimate Council District 2 Traffic System Management - Flood Detour Signs

Summary for 'Category' = Traffic System Management - Flood Detour Signs (6 detail records) Sum $150,782 Traffic System Management - Roadside Cameras

Denton-Mockingbird Traffic Systems Management - Roadside Camera 1 60 $6,382

Field-Woodall Rodgers Frwy Roadside Camera 1 60 $6,382

Denton-Inwood Traffic Systems Management - Roadside Camera 1 40 $12,763

Elm-Houston Roadside Camera 1 40 $12,763

Continental-Houston Roadside Camera 1 35 $12,763

Field-Wichita Roadside Camera 1 35 $8,551

Houston E-Wichita Roadside Camera 1 35 $12,763

Houston W-Wichita Roadside Camera 1 35 $12,763

Houston-Ross Roadside Camera 1 35 $12,763

Lamar-Mckinney Roadside Camera 1 35 $12,763

Wycliff-Congress Roadside Camera 1 10 $12,763

Summary for 'Category' = Traffic System Management - Roadside Cameras (11 detail records) Sum $123,418 Summary for 'Program' = STREET AND TRANSPORTATION (731 detail records) Sum $607,358,833 Summary for 'CD' = 2 (731 detail records) Sum $607,358,833

Friday, March 31, 2006 Page 57 of 349 Project Name Description Tier Score Estimate Council District 3 Alley Petitions

Pringle Dr & Norco St - Canada Dr to Bernal St Engineering, Pavivng and Drainage 4000-4100 blks 1 97 $173,577 Summary for 'Category' = Alley Petitions (1 detail record) Sum $173,577 Alley Reconstruction

Kimball Ridge (W. of) - Kimball Dale to Blue Ridge Full Reconstruction, T-alleys included 1 50 $73,904

Anzio Cir - 3039 - 3063 Full Reconstruction 2 $171,507

Anzio Dr - 3002 - 3068 Full Reconstruction 2 $252,545

Beckley Av (N) - 1703 - 1909 Full Reconstruction 2 $349,129

Blue Ridge - 3618 - 3622 Full Reconstruction 2 $165,391

Bonnywood & Whitewood - Cedarhurst To Wayland Dr. Full Reconstruction 2 $322,904

Colorado (W) & Frot Worth - Colorado to Hampton Full Reconstruction (2128 Fort Worth Ave) 2 $121,048

Driftwood Dr - 1510 - 1642 Full Reconstruction 2 $369,262

Drowsy - 4116 - 4128 Full Reconstruction 2 $177,367

Edgefield Av (S) - 2902 - 2930 Full Reconstruction 2 $301,984

Edgefield Av (S) - 2972 - 2978 Full Reconstruction 2 $288,988

El Tivoli Dr - 2710 - 2772 Full Reconstruction 2 $188,581

Evergreeen Hills (B 905) - Kessler Canyon to DeadE 2 $26,044

Garapan Dr - 2603 - 2931 Full Reconstruction 2 $430,169

Hansboro Av - 1103 - 1323 Full Reconstruction 2 $294,085

Kimballdale - 3622 - 3936 Full Reconstruction 2 $466,865

Kings Hwy - 1103 - 1147 Full Reconstruction 2 $150,101

Montclair Av (N) - 201 - 317 Full Reconstruction 2 $149,845

Friday, March 31, 2006 Page 58 of 349 Project Name Description Tier Score Estimate Council District 3 Alley Reconstruction

Monte Carlo Cir - 1647 - 1655 Full Reconstruction 2 $297,652 Nicholson Dr - 2315 - 2465 Full Reconstruction 2 $237,764

Nicholson Dr - 2503 - 2933 Full Reconstruction 2 $538,221

Pictureline & ShadyHollow-ShadyHollow to Shady Hollow Full Reconstruction 2 $432,208

Pomeroy - 3817 ------Full Reconstruction 2 $250,252

Salerno Dr - 3103 - 3239 Full Reconstruction 2 $281,087

Shady Hollow - 3810 - 3858 Full Reconstruction 2 $221,285

Shady Hollow - 4030 - 4040 Full Reconstruction 2 $102,955

Singleton Blvd. 3317 Full recon 2 $63,815

Southwood Dr - 2505 - 2653 Full Reconstruction 2 $317,020

Summary for 'Category' = Alley Reconstruction (28 detail records) Sum $7,041,979 Barrier Free Ramps

900 W. Canty St 4 BFRs on W. Canty St. @ Tyler 1 47 $2,450

Wynnewood Dr. Polk to Illinois 12 BFRs Needed on Wynnewood as follows: 4 @ Illinois, 3 @ 1 46 $22,973 Pristol, 4 @ Edwards, and 1 on West end of the median on Polk Kings Hwy - Polk to Timbergrove 12 BFRs needed as follows: Kings @ Winnetka (4), @ Clinton 1 42 $22,973 (1), @ Lausanne (2), @ Montclair (2), @ Marycliff (2), and @ Timbergrove (1) Illinois @ Vernon Barrier Free Ramps Construct BFRs on NW & SW corners 1 32 $3,829

Monte Carlo @ Saner Construct 2 BFRs at intersection corners 1 18 $3,829

Burgoyne St @ Westmoreland Rd Construct 4 Ramps 1 12 $7,658

Obannon @ Bristol Construct 4 ramps 1 8 $7,658

Friday, March 31, 2006 Page 59 of 349 Project Name Description Tier Score Estimate Council District 3 Barrier Free Ramps

Navajo @ Legendary (and @ Nakomis) 2 BFRs needed on each intersection 1 3 $3,829 Summary for 'Category' = Barrier Free Ramps (8 detail records) Sum $75,200 Bridge Repair and Modification

Canada Drive over W. Fork Trinity River Embankment eroded and settling; moderately severe; grout 1 58.75 $63,815 injection beneath abutment caps, grout injection beneath approach slabs, replace sidewalks Duncanville Road over Five Mile Creek 3rd intermediate support from N, d/s end, 2'X40' spall, core for 1 46.25 $38,289 strength, repair as req., min. clean and coat rebar, grout patch; may need reinforcement by buttressing. Critical. Houston Street Viaduct over Trinity River Completion of rehab begun by TxDOT (design by HNTB) - 1 41.25 $319,075 rating based on 2004 BRINSAP - scheduled for reevaluation 2006 Colorado Blvd. over Coombs Creek Clean rebar, coat, repair spalls, grout or flowable fill in scour 1 36.25 $76,578 areas beneath culverts; not severe Summary for 'Category' = Bridge Repair and Modification (4 detail records) Sum $497,757 Intergovernmental Partnership Projects

Canada @ W. Fork Trinity River Bridge rehabilitation and/or reconstruction. 2 $0

Cockrell Hill - IH 30 to Davis Partnership project with Dallas County and TxDOT to construct 1 $399,737 interchange, frontage roads and 6 lane divided thoroughfare. This is funding needed to make final payment to TxDOT from their audit done at project's completion. Cockrell Hill - La Reunion to Singleton Partnership project with Dallas County to design and construct 1 $7,211,095 new 4 lane divided roadway. Total estimated cost of $11.3 million. Estimated to be let by Dallas County late 2008. Davis - Hampton to Westmoreland Partnership project with Dallas County to reconstruct and widen 1 $4,114,791 to 4 lane divided. Total estimated cost of $12.4 million. Hampton @ TPGCSFRR-Muncie Bridge rehabilitation and/or reconstruction 2 $0

Friday, March 31, 2006 Page 60 of 349 Project Name Description Tier Score Estimate Council District 3 Intergovernmental Partnership Projects

Ledbetter / Grady Niblo Ext - Merrifield to Mt. Creek Partnership project with Dallas County to build new 4 lane 1 $1,276,300 divided roadway. Total estimated cost of $7.8 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. Loop 12 - Spur 408 to IH 35E. Partnership project with TxDOT to fulfill 10% funding 1 $287,168 requirement for right of way and utility relocations to accommodate freeway improvements. Total estimated cost of $20 million. Supplements 2003 Bond Program funds. Mountain Creek - Grady Niblo to Spur 408 Partnership project with TxDOT and Dallas County to widen 1 $4,467,050 roadway to 4 lane divided. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2006. Singleton Blvd - Chalk Hill to E of Peoria Partnership project with Dallas County to reconstruct existing 1 $1,715,347 six lane divided roadway. Total estimated cost of $5.3 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Singleton Blvd Urban Design Phase II - Hampton Rd to Urban design enhancements along Singleton as recommended 1 $12,039,146 Walton Walker (Loop 12) in the Trinity River Comprehensive Land Use Plan. Summary for 'Category' = Intergovernmental Partnership Projects (10 detail records) Sum $31,510,635 Street Lighting - Freeway Lighting

IH 20 - Entire Length Across Dallas Freeway Lighting Installation 1 5 $493,768

Loop 12 (Walton Walker) - I-30 to I-35E Freeway Lighting Installation 1 5 $42,676

Loop 12 (Walton Walker) - I-30 to Spur 408 Freeway Lighting Installation 1 5 $53,659

Summary for 'Category' = Street Lighting - Freeway Lighting (3 detail records) Sum $590,104 Street Petitions

Westmount Av - Davis St to Avon St Engineering, Paving & Drainage 600-900 Blks 1 84 $926,721

Westmount Ave. - Avon St. to Fort Worth Ave. Engineering, Paving & Drainage 1000 & 1100 Blk 1 83 $721,282

Friday, March 31, 2006 Page 61 of 349 Project Name Description Tier Score Estimate Council District 3 Street Petitions

Cliffdale Ave. - Avon St. to Dead End Engineering, Paving & Drainage 1000-1100 Blks 1 82 $308,865 Avon St. - Westmount Av. to Cliffdale Av. Engineering, Paving & Drainage 2800 Block 1 81 $118,917

Ranier Street - Mary Cliff Road - Montclair Avenue (N) Engineering Paving and Drainage 1600 Blk 1 78 $268,023

Summary for 'Category' = Street Petitions (5 detail records) Sum $2,343,808 Street Reconstruction Local Streets

Vinson St Singleto Blvd South to Dead-End 2800-2900 Blks 1 61.19 $1,276,300

Garapan Dr - Illinois Ave to Bristo Dr 2300 - 2500 Blks 1 56.98 $1,084,855

Gallant Fox Dr - Merrifield Rd East to 750 Ft 1000 Blk 1 54.5 $239,306

Bastille Rd - La Reunion Pkwy South to Dead End 3900 Blk 1 51.63 $701,965

Grayson Dr - Fennesee Av to Hoke Smith Dr 3300 Blk 1 47.03 $419,855

Lake Vista Dr - High Brush Dr to Eagle Ford Dr 6000-6100 1 44.32 $909,170

Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,631,451 Street Reconstruction Thoroughfares

Commerce St (W) - Postal Way to Lone Star 2500 - 2700 Blks 1 71.65 $1,378,404

Terre Colony Ct - Lone Star Dr North to 1200 ft 1600 blk 1 70.93 $1,033,803

Lone Star Dr - Commerce St to Dead End (BNSF RR) 1800 Blk 1 70.04 $427,561

Weir St - Fitchburg St to Singleton Blvd 2400 - 2900 Blks 1 63.12 $1,289,063

Fitchburg St - Chalk Hill Rd to Weir St 4900 - 5000 Blks, Including RR crossing 1 62.83 $704,518

Joseph Hardin Dr - W Ledbetter Dr to Country Creek 4100 - 4200 Blks 1 61.61 $474,784

Joseph Hardin Dr - W Ledbetter to 1000' S Ledbette 4300 - 4400 Blk, Including RR crossing. 1 60.18 $1,276,300

Friday, March 31, 2006 Page 62 of 349 Project Name Description Tier Score Estimate Council District 3 Street Reconstruction Thoroughfares

Preakness Ln - Walton Walker Blvd Dr East to Dead-End 5200 - 5700 Blks 1 55.05 $791,306 Furey St - Bickers St to Morris St 3500 Blk 1 53.68 $445,429

West Commerce Street Reconstruction / Urban Design, Roadway reconstruction and streetscape enhancements on 1 $2,931,470 from Davis to Trinity River Levee West Commerce, from levee to Davis, to serve as gateway in Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (10 detail records) Sum $10,752,636 Street Resurfacing

Hansboro Ave. - Pierce St. to Westmoreland Rd. 2800 - 3200 1 81.715 $182,894

Puget St. - Singleton Blvd. to Bickers St. 3000 - 3600 1 74.87 $304,525

Llewellyn Ave (S). - Obannon Dr. to Saner Ave. 2700 block 1 68.335 $48,755

Stevens Wood Ln. - Oak Cliff Blvd. to Stevens Wood Ct. 2200 block 1 66.23 $40,842

Tilden St. - Beckley Ave. to Concrete 100 block 1 66.115 $31,908

Garapan Dr. - Illinois Ave. to 2404 Garapan Dr. 2300 Block 1 65.605 $67,644

Kessler Canyon Dr. - Kessler Pkwy. To Evergreen Hill Rd. 1600 block 1 65.365 $65,474

Kessler Pkwy. - Evergreen Hill Rd. to Sylvan Ave. 1000 - 1400 1 65.115 $257,174

Nicholson Dr. - Illinois Ave. to 2524 Nicholson Dr. 2300 - 2500 1 65 $173,449

Temple Dr. - Winnetka Ave. to Windomere Ave. 1100 - 1300 1 64.38 $48,117

Franklin St. (S) - Gladiolus Ln. to Cul-De-Sac 3900 Block 1 64.11 $27,696

Mary Cliff Rd. - Ranier St. to Kings Hwy. 700 - 900 1 63.985 $74,919

Handley Dr. - Greenbriar Ln. to Stemmons Ave. 1600 Block 1 60.67 $60,241

Keeneland Pkwy. - 670' E Walton Walker Frwy. To Walton 5600 block 1 60.18 $115,378 Walker Frwy.

Friday, March 31, 2006 Page 63 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Elmore Ave. (W) - Beckley Ave. to Zang Blvd. 100 - 400 1 60.1 $21,136 Owensons Dr. - Tyler St. to End of Circle Drive 700 - 800 1 58.75 $44,798

Montreal Ave. (S) - Illinois Ave. to Savoy St. 2600 - 2800 1 58.335 $131,076

Boisenberry Ln. - Country View Rd. to Bayberry Ln. 7200 - 7400 1 55.02 $63,177

Nomas St. - Furey St. to Esmalda Dr. 3500 - 3600 1 54.425 $113,208

Morris St. - Westmoreland Rd. to Furey St. 3300 - 3400 1 54.025 $65,602

Keeneland Pkwy. - Cavalcade Dr. to Merrifield Rd. 6100 - 6200 1 53.695 $63,949

Elderberry Ln. - Sugarberry Rd. to Wheatland Rd. 7100 - 7400 1 53.07 $99,551

Adbritian Dr. - Westmoreland Rd. to Dead End 3200 Block 1 51.325 $20,548

Bridal Wreath Ln. - Deerfield Ln. to Periwinkle Dr. 2700 block 1 50.805 $36,119

Willow Crest Ln. - Boulder Dr. to Westmoreland Rd. 3300 - 3500 1 49.735 $64,581

Kessler Pkwy. - Edgefield Ave. to Colorado Blvd. 2100 - 2300 1 48.745 $164,132

Franklin St. (N) - Dead End to Davis St. 600 Block 1 47.985 $19,272

Kimballdale Dr. - Wenatchee Dr. to Oak Arbor Dr. 3900 - 4000 1 46.06 $52,456

Lawndale Dr. - Leander Dr. to Walter Dr. 2200 - 2300 1 45.835 $50,414

La Senda Pl. - Greenbrier Ln. to Shady Ln. 1400 block 1 44.73 $17,230

Country View Rd. - Wheatland Rd. to Christie Ln. Alley 8700 - 8800 1 43.785 $44,926

Puget St. - Bayside St. to Angelina Dr. 3800 block 1 43.64 $29,483

Sugarberry Rd. - Elderberry Ln. to Alley N of Christie Ln. 8600 - 8700 1 43.185 $23,994

Elderberry Ct. - Elderberry Ln. to Cul-De-Sac 8600 Block 1 42.87 $9,700

Country View Rd. - Ashcrest Ln. to Bluestem Rd. 9100 Block 1 37.52 $39,821

Akron St. - 2200 2 $0

Friday, March 31, 2006 Page 64 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Akron St. - 2300 2 $0 Angelina Dr. - 1800 2 $0

Angelina Dr. - 1900 2 $0

Anzio Dr. - 3000 2 $0

Argonne Dr. - 1500 2 $0

Ashcrest La. - 7500 2 $0

Atlantic St. - 2000 2 $0

Baker Av. - 4100 2 $0

Barlow Av. - 1600 2 $0

Barlow Av. - 2100 2 $0

Bayberry La. - 7100 2 $0

Bayberry La. - 7300 2 $0

Bayberry La. - 7400 2 $0

Bayside St. - 1900 2 $0

Beckley Av. (N) - 2000 2 $0

Belvoir Cir. - 3900 2 $0

Bernal Dr. - 3700 2 $0

Bernal Dr. - 3800 2 $0

Bernal Dr. - 3900 2 $0

Bernal Dr. - 4000 2 $0

Bernal Dr. - 4100 2 $0

Bernal Dr. - 4200 2 $0

Friday, March 31, 2006 Page 65 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Bonnywood La. - 2800 2 $0 Boulder Dr. - 4200 2 $0

Boynton St. - 2700 2 $0

Brass Wy. - 4400 2 $0

Briarcrest Dr. - 1500 2 $0

Bridal Wreath La. - 3100 2 $0

Bristol Dr. - 2500 2 $0

Bristol Dr. - 2800 2 $0

Bronze Wy. - 4400 2 $0

Bronze Wy. - 4500 2 $0

Bronze Wy. - 4600 2 $0

Calypso St. - 2000 2 $0

Calypso St. - 2100 2 $0

Calypso St. - 2200 2 $0

Canada Dr. - 2500 2 $0

Canada Dr. - 2600 2 $0

Canada Dr. - 2700 2 $0

Canada Dr. - 2800 2 $0

Canada Dr. - 2900 2 $0

Casino Dr. - 3100 2 $0

Cedar Hill Av. - 1400 2 $0

Cedar Hill Av. - 1500 2 $0

Friday, March 31, 2006 Page 66 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Chevez Dr. - 1000 2 $0 Circle Dr. - 300 2 $0

Clinton Av. - 1200 2 $0

Cockrell Hill Rd. (S) - 3200 2 $0

Colorado Blvd. (E) - 100 2 $0

Colorado Blvd. (E) - 200 2 $0

Colorado Blvd. (W) - 2600 2 $0

Colorado Blvd. (W) - 2800 2 $0

Commerce St. (W) - 2100 2 $0

Commerce St. (W) - 2300 2 $0

Commerce St. (W) - 2800 2 $0

Commerce St. (W) - 2900 2 $0

Commerce St. (W) - 3200 2 $0

Conrad St. - 300 2 $0

Coombsville Av. - 2800 2 $0

Country Creek Ct. - 4700 2 $0

Crepe Myrtle Cir. - 3600 2 $0

Crow Creek Dr. - 2400 2 $0

Dan Morton Dr. - 3300 2 $0

Dan Morton Dr. - 3400 2 $0

Darien St. - 4000 2 $0

Davis Pkwy. - 2700 2 $0

Friday, March 31, 2006 Page 67 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Dennison St. - 1900 2 $0 Dennison St. - 2000 2 $0

Drowsy La. - 4100 2 $0

Edgefield Av. (N) - 1400 2 $0

Edgefield Av. (S) - 3200 2 $0

Edgefield Av. (S) - 3300 2 $0

Eighth St. (W) - 1200 2 $0

Eighth St. (W) - 1300 2 $0

El Tovar Av. - 3000 2 $0

Engle Av. - 1600 2 $0

Engle Av. - 2100 2 $0

Engle Av. - 2500 2 $0

Exchange Service Dr. - 4300 2 $0

Exchange Service Dr. - 4500 2 $0

Ferndale Av. - 800 2 $0

Finis St. - 4000 2 $0

Five Mile Pkwy. (W) - 2000 2 $0

Five Mile Pkwy. (W) - 2400 2 $0

Fort Worth Av. - 2400 2 $0

Fort Worth Av. - 2500 2 $0

Fort Worth Av. - 2900 2 $0

Fountainhead La. - 3900 2 $0

Friday, March 31, 2006 Page 68 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Franklin St. (S) - 2700 2 $0 Franklin St. (S) - 3200 2 $0

Franklin St. (S) - 3300 2 $0

Fullerton Dr. - 1200 2 $0

Furey St. - 3300 2 $0

Furey St. - 3400 2 $0

Gallagher St. - 1700 2 $0

Gallagher St. - 3500 2 $0

Gallagher St. - 3600 2 $0

Gallagher St. - 3700 2 $0

Garapan Dr. - 3000 2 $0

Gentry Dr. - 4100 2 $0

Glenfield Av. - 1600 2 $0

Glenfield Av. - 1700 2 $0

Glenfield Av. - 2200 2 $0

Glenfield Av. - 2400 2 $0

Glenfield Av. - 2500 2 $0

Glenfield Av. - 2600 2 $0

Glenfield Av. - 2700 2 $0

Glenfield Av. - 2800 2 $0

Glenfield Av. - 3000 2 $0

Glenfield Av. - 3100 2 $0

Friday, March 31, 2006 Page 69 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Glenfield Av. - 3200 2 $0 Grayson Dr. - 2800 2 $0

Greenbriar La. (W) - 200 2 $0

Greenbriar La. (W) - 600 2 $0

Greenbriar La. (W) - 800 2 $0

Groveview Dr. - 2800 2 $0

Groveview Dr. - 2900 2 $0

Groveview Dr. - 3000 2 $0

Guthrie St. - 400 2 $0

Haines Av. - 1300 2 $0

Haines Av. - 1400 2 $0

Hampton Rd. (N) - 3500 2 $0

Hampton Rd. (N) - 3600 2 $0

Hampton Rd. (N) - 3700 2 $0

Hampton Rd. (N) - 3800 2 $0

Hampton Rd. (N) - 3900 2 $0

Hampton Rd. (N) - 4000 2 $0

Hampton Rd. (N) - 700 2 $0

Harston St. - 3600 2 $0

Hartsdale Dr. - 1000 2 $0

Hartsdale Dr. - 1300 2 $0

Hedge Dr. - 7000 2 $0

Friday, March 31, 2006 Page 70 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Hoke Smith Dr. - 1100 2 $0 Hoke Smith Dr. - 1200 2 $0

Houston Viad. (S) - 800 2 $0

Investment Dr. - 5000 2 $0

Jefferson Blvd. (E) - 1500 2 $0

Jefferson Blvd. (W) - 1200 2 $0

Jefferson Blvd. (W) - 1300 2 $0

Jefferson Blvd. (W) - 1500 2 $0

Joseph Hardin Dr. - 4500 2 $0

Joseph Hardin Dr. - 4600 2 $0

Junior Dr. - 1400 2 $0

Junior Dr. - 1500 2 $0

Junior Dr. - 1700 2 $0

Kelly Av. - 2000 2 $0

Kiest Blvd. (W) - 2400 2 $0

Kiest Blvd. (W) - 2500 2 $0

Kiest Blvd. (W) - 3200 2 $0

Kilgore St. - 4100 2 $0

Kingbridge St. - 3200 2 $0

La Reunion Pkwy. - 3300 2 $0

Lancaster Av. (N) - 900 2 $0

Larkspur La. - 2700 2 $0

Friday, March 31, 2006 Page 71 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Ledbetter Dr. (W) - 4700 2 $0 Ledbetter Dr. (W) - 4800 2 $0

Ledbetter Dr. (W) - 5000 2 $0

Legendary La. - 3600 2 $0

Legendary La. - 3700 2 $0

Llewellyn Av. (S) - 2300 2 $0

Llewellyn Av. (S) - 3200 2 $0

Lone Star Dr. - 1900 2 $0

Lone Star Dr. - 2400 2 $0

Lone Star Dr. - 2500 2 $0

Lone Star Dr. - 2600 2 $0

Lone Star Dr. - 2700 2 $0

Louisiana Av. (W) - 400 2 $0

Lourdes St. - 3000 2 $0

Lourdes St. - 3100 2 $0

Mateur St. - 2700 2 $0

Mcadams Av. - 1100 2 $0

Mcbroom St. - 1900 2 $0

Mesa Glen La. - 4200 2 $0

Mountain Creek Pkwy. - 5500 2 $0

Mountain Creek Pkwy. - 5800 2 $0

Mountain Creek Pkwy. - 6100 2 $0

Friday, March 31, 2006 Page 72 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Mountain Creek Pkwy. - 6300 2 $0 Navaro St. - 3500 2 $0

Ninth St. (W) - 1500 2 $0

Nob Hill Rd. - 1600 2 $0

Nokomis Av. - 1400 2 $0

Nomas St. - 2000 2 $0

Nomas St. - 3400 2 $0

Norco St. - 4100 2 $0

North Boulevard Ter. - 600 2 $0

Norwich St. - 2900 2 $0

Obannon Dr. - 3100 2 $0

Overcrest St. - 2700 2 $0

Pecan Meadow Dr. - 4700 2 $0

Pentagon Pkwy. (W) - 1200 2 $0

Pentagon Pkwy. (W) - 2800 2 $0

Pentagon Pkwy. (W) - 3100 2 $0

Pentagon Pkwy. (W) - 3200 2 $0

Pentagon Pkwy. (W) - 3300 2 $0

Periwinkle Dr. - 3800 2 $0

Perryton Dr. - 2000 2 $0

Perryton Dr. - 2100 2 $0

Perryton Dr. (E) - 2900 2 $0

Friday, March 31, 2006 Page 73 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Pierce St. - 3000 2 $0 Plowman Av. - 1300 2 $0

Polk St. (N) - 600 2 $0

Postal Wy. - 2000 2 $0

Pueblo St. - 2000 2 $0

Ranier St. - 1200 2 $0

Rio Vista Ct. - 1700 2 $0

Rio Vista Dr. - 1700 2 $0

Rugged Dr. - 3900 2 $0

Rugged Dr. - 4200 2 $0

San Jose Dr. - 2700 2 $0

Saner Av. (W) - 1400 2 $0

Seventh St. (W) - 1000 2 $0

Seventh St. (W) - 1100 2 $0

Seventh St. (W) - 1500 2 $0

Shadow Wood Dr. - 3200 2 $0

Shady La. - 800 2 $0

Shaw St. - 1700 2 $0

Singleton Blvd. - 1800 2 $0

Singleton Blvd. - 1900 2 $0

Singleton Blvd. - 2000 2 $0

Sorcey Rd. - 7000 2 $0

Friday, March 31, 2006 Page 74 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Southwood Dr. - 2700 2 $0 Southwood Dr. - 2800 2 $0

Sportsmans Pkwy. - 5800 2 $0

Sportsmans Pkwy. - 5900 2 $0

Stemmons Av. - 1300 2 $0

Stevens Village Dr. - 600 2 $0

Stevens Wood Ct. - 900 2 $0

Sunset Av. - 1000 2 $0

Terre Colony Ct. - 1500 2 $0

Toronto St. - 3600 2 $0

Tram Dr. - 4100 2 $0

Turnpike Av. - 200 2 $0

Tyler St. (N) - 1200 2 $0

Vernon Av. (S) - 1400 2 $0

Vernon Av. (S) - 1500 2 $0

Vernon Av. (S) - 2000 2 $0

Vernon Av. (S) - 2100 2 $0

Vernon Av. (S) - 2300 2 $0

Vernon Av. (S) - 2400 2 $0

Vernon Av. (S) - 2500 2 $0

Vilbig Rd. - 2100 2 $0

Vilbig Rd. - 2200 2 $0

Friday, March 31, 2006 Page 75 of 349 Project Name Description Tier Score Estimate Council District 3 Street Resurfacing

Vineyard Dr. - 3700 2 $0 Vineyard Dr. - 4100 2 $0

Vinson St. - 2400 2 $0

Vinson St. - 2500 2 $0

Vinson St. - 2600 2 $0

Vinson St. - 2700 2 $0

Walter Dr. - 1200 2 $0

Weir St. - 2700 2 $0

Wentworth St. - 1300 2 $0

Wentworth St. - 1500 2 $0

Wentworth St. - 1600 2 $0

Westmoreland Rd. (N) - 1000 2 $0

Whitewood Dr. - 2400 2 $0

Willomet Av. (N) - 600 2 $0

Windomere Av. (N) - 1000 2 $0

Windomere Av. (N) - 1100 2 $0

Winnetka Av. (S) - 400 2 $0

Summary for 'Category' = Street Resurfacing (295 detail records) Sum $2,674,187 Streetscape / Urban Design

Beckley Ave. Enhancement ROW acquisition, Remediation, Relocation, Streetscaping 2 $2,384,859

Friday, March 31, 2006 Page 76 of 349 Project Name Description Tier Score Estimate Council District 3 Streetscape / Urban Design

Bickers Street Urban Design- Vilbig to Hampton Urban design enhancements along Bickers, from Vilbig to 2 $1,740,695 Hampton, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Bickers Street Urban Design, from Hampton to Urban design enhancements along Bickers, from Hampton to 2 $5,025,687 Westmoreland Westmoreland, to encourage pedesrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Bickers Street Urban Design, from Westmoreland to Urban design enhancements along Bickers, from 2 $1,801,561 Norwich Westmoreland to Norwich, to encourage pedesrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Davis St Phase II - Cedar Hill Av to Polk St 5 intersection improvements (paving, drainage, landscaping) on 2 $705,695 Davis St. Sidewalk curb, gutter and drive approach replacement Hampton Road Urban Design, from UPRR to Trinity River Urban design enhancements along Hampton, from Union 2 $9,118,423 Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Norwich Street Urban Design, from Singleton to Bernal Urban design enhancements along Norwich, from Singleton to 2 $2,738,078 Bernal, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Oak Cliff Gateway Park Lanscaping, Streetscaping at Houston/Jefferson area and 2 $1,185,457 along Zang Blvd. Westmoreland Road Urban Design, from UPRR to Trinity Urban design enhancements along Westmoreland, from Union 2 $4,093,783 River Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (9 detail records) Sum $28,794,238 Thoroughfares

Chalk Hill - Singleton to I 30 construct 4 lane divided 1 48 $3,486,984

Friday, March 31, 2006 Page 77 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares

Davis Street - Westmoreland to Hampton Widen to 4 lanes divided with new bridge at Coombs Creek 1 48 $4,351,321 Colorado - Walton Walker to Westmoreland Build a new 4 lane undivided roadway 1 43 $16,800,381

Duncanville - Illinois to Shelley Widen to a four lane divided roadway froma two lane road. 1 35 $1,786,422

Mountain Creek - Kiest to Spur 408 Build a new a six lane divided roadway 1 35 $26,003,452

Merrifield - Mountain Creek to Ledbetter Build a new 6 lane divided roadway 1 33 $27,011,946

Merrifield -Mountain Creek to Davis Build a new six lane divided roadway 1 33 $17,375,181

Jefferson - Walton Walker to Calumet Widen to a six lane divided roadway 1 31 $3,969,343

Canada Dr. - Hampton Road to Westmoreland Reconstruct roadway 1 29 $5,487,537

Canada Dr. - Westmoreland to Pluto build a new 4 lane roadway 1 29 $5,280,460

Plymouth - Hampton to Davis Widen to two lane undivided roadway from a one lane asphalt 1 29 $13,530,937 road Bahama - Fort Worth to Plymouth Build 4-lane roadway to replace existing asphalt roadway 1 28 $2,590,431

FM 1382 - Eagle Ford to 800 N of Camp Wisdom Widen to a six lane divided roadway 1 28 $11,149,495

FM1382 - 800' north of Camp Wisdom to IH 20 Widen to a six lane divided roadway 1 28 $4,233,086

Kiest - Mountain Creek to Grand Prairie CL Widen to a six lane divided roadway 1 28 $53,096,718

Canada Dr. - Sylvan Road to Hampton Road Rebuild to 4 lanes 1 27 $725,596

Ledbetter (W) - Ledbetter S. to Duncanville Widen to a six lane divided roadway 1 27 $5,074,102

Commerce (W) - Hampton to Sylvan Widen to six lane divided roadway from a two to four lane 1 26 $2,741,711 roadway Mountain Creek - 1900' west of Wheatland to Clark Build a new a six lane divided roadway 1 25 $14,554,171

Mountain Creek - Camp Wisdom to IH20 Widen to a six lane divided roadway 1 25 $3,262,590

Mountain Creek - IH20 to Ledbetter Widen to a six lane divided roadway 1 25 $4,977,183

Shelley - Duncanville to Knoxville Build a new 4 lane divided roadway 1 25 $1,114,764

Vilbig - Canada to Singleton Widen to a four lane undivided roadway 1 25 $3,974,712

Friday, March 31, 2006 Page 78 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares

Merrifield - Ledbetter to Kiest Build a new 6 lane divided roadway 1 23 $11,967,198 Duncanville - Kiest to Walton Walker Widen to a six lane divided roadway from a four lane roadway 1 21 $7,179,789

Cockrell Hill - Davis to Cockrell Hill CL Widen to a four lane undivided 1 20 $813,547

Mountain Creek - Eagle Ford to 1900' west of Wheatland Widen to a six lane divided roadway 1 20 $1,939,106

Chalk Hill Rd - Davis St to 800' south of IH-30 4-Lane Divided, Thoroughfare Plan anticipated to be revised 1 19 $2,741,676 from 6 to 4 due to the construction of Cockrel Hill Road. Camp Wisdom - Clark to Mountain Creek Build a new 6 lane bridge and roadway 1 17 $15,110,842

Canada - Beckley to Sylvan Widen 8'-10' on each side, increase median to 15' 1 17 $338,274

Duncanville - Ledbetter to Kiest Widen to a six lane divided roadway froma four lane roadway 1 17 $6,852,861

Red Bird (W) - Duncanville C.L. to Westmoreland Widen to a six lane divided roadway 1 17 $481,370

Camp Wisdom - FM 1382 to City Limit Build a new 6 lane bridge and roadway 1 15 $19,432,288

Camp Wisdom - FM 1382 to Mountain Creek Build a new 6 lane bridge and roadway 1 15 $7,339,552

Saner (W) - Westmoreland to Pierce Widen to a four lane undivided roadway 1 15 $2,281,796

Ledbetter (S) - Kiest to Ledbetter W. Widen to a six lane divided roadway 1 13 $6,720,393

Red Bird (W) - Kiwanis to Cedar Ridge Widen to a four lane undivided roadway 1 13 $2,106,292

S. Ledbetter - Kiest to Ledbetter Widen to a six lane divided roadway 1 13 $14,878,055

Cedar Ridge - Ledbetter to Ranchero Build a new six lane divided roadway 1 10 $11,217,856

Fourteenth (SE) - Grand Prairie CL to Skyline Widen to a six lane divided roadway and add right turn lanes 1 10 $10,022,472

Kiwanis - Red Bird to Spur 408 Widen to a four lane undivided roadway 1 10 $4,393,399

Pierce - Saner to Groveview Build a new two lane divided roadway 1 10 $5,703,122

Unnamed SW7 - Walton Walker to Unnamed SW6 Build a new 4 lane undivided roadway 1 10 $5,931,856

Ledbetter - Illinos to Kiest Widen to a six lane divided roadway 1 8 $12,769,821

S. Ledbetter - Illinois to Kiest Widen to a six lane divided roadway 1 8 $7,086,323

Friday, March 31, 2006 Page 79 of 349 Project Name Description Tier Score Estimate Council District 3 Thoroughfares

Vilbig - Akron to W. Commerce Widen to a four lane undivided roadway 1 5 $1,882,492 Cedar Ridge - Ranchero to IH 20 Widen 6 lanea divided from 66' to 72' 1 0 $3,328,405

Crystal Lake - South Ledbetter to Dan Morton Widen to a four lane undivided roadway 1 0 $1,842,109

Dan Morton - Crystal Lake to Ledbetter Widen to a four lane undivided roadway 1 0 $611,547

Unnamed SW6 - Mountain Creek to Merrifield Build a new 4 lane undivided roadway 1 0 $6,542,487

Duncanville - Red Bird to Ledbetter Widen to a six lane divided roadway 1 $6,453,633

Greenbriar/Beckley Permanent Ramps to IH-30 Design and construction of permanent ramps to IH-30 from 1 $0 (Methodist Hospital) Greenbriar/Beckley Greenbriar/Beckley Temporary Ramps to IH-30 (Methodist Design and construction of temporary ramps to IH-30 from 1 $3,190,750 Hospital) Greenbriar/Beckley Oak Cliff Levee Road Design and Construction of Oak Cliff Levee Road to TxDOT 1 $17,301,772 standards with connections to both IH-30 and IH-35 as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan) Summary for 'Category' = Thoroughfares (54 detail records) Sum $431,039,607 Traffic Intersection Capacity & Safety Improvement

Ledbetter @ Westmoreland Street Modifications and Widen both Ledbetter and Westmoreland approaches to 1 50 $809,812 construct dual left-turn lanes and right-turn lanes on all approaches. Construction will also remove dip in roadway. Davis St at Cockrell Hill Rd Construct a free right turn lane on westbound Davis Street at 1 45 $0 Cockrell Hill Road. Fort Worth at Westmoreland Widen Fort Worth Ave at Westmoreland to provide eastbound 1 45 $1,023,593 and westbound dual left-turn lanes. Widen Westmoreland to provide northbound and southbound right turn lanes. Bickers at Hampton Widen Bickers approaching Hampton to provide eastbound and 1 40 $440,324 westbound left-turn lanes. Correct alignment of east and west Bickers approaches.

Friday, March 31, 2006 Page 80 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Intersection Capacity & Safety Improvement

Canada @ Westmoreland Widen Canada approaching Westmoreland to provide an 1 40 $225,905 eastbound left-turn pocket. Bickers @ Westmoreland Widen Bickers at Westmoreland to provide eastbound and 1 30 $440,324 westbound left-turn lanes. Pentagon @ Polk Widen Pentagon Pkwy at Polk to provide eastbound and 1 25 $220,162 westbound left-turn pockets. Coombs Creek @ Kiest Widen Coombs Creek to align the northbound and southbound 1 15 $220,800 approaches and increase sight distance. Singleton @ Westmoreland Widen both roadway approaches to provide dual left-turn lanes 2 $1,805,912 and right turn lanes for all approaches. The project will improve truck and bus operations by improving turning radi. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (9 detail records) Sum $5,186,831 Traffic Safety Improvements-Guardrail Upgrades

Hampton 2200 N BLK Guardrail Upgrade 1 80 $7,403

Hampton 2300 N BLK Guardrail Upgrade 1 80 $6,382

Hampton 700 N BLK Guardrail Upgrade 1 80 $11,136

14th St 1300 BLK Guardrail Upgrade 1 73 $78,046

Camp Wisdom 7800 W BLK Guardrail Upgrade 1 73 $8,041

Canada 2700 BLK Guardrail Upgrade 1 73 $6,155

Cockrell Hill 2900 BLK Guardrail Upgrade 1 73 $32,386

Duncanville 3900 BLK Guardrail Upgrade 1 73 $5,935

Hampton 1400 N BLK Guardrail Upgrade 1 73 $10,785

Hampton 1500 N BLK Guardrail Upgrade 1 73 $31,461

Hampton 6900 S BLK Guardrail Upgrade 1 73 $11,870

Hampton 800 N BLK Guardrail Upgrade 1 73 $5,935

Friday, March 31, 2006 Page 81 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Safety Improvements-Guardrail Upgrades

Illinois 700 W BLK Guardrail Upgrade 1 73 $4,658 Jefferson 4600 W BLK Guardrail Upgrade 1 73 $8,583

Duncanville 3000 BLK Guardrail Upgrade 1 67 $15,890

Duncanville 4300 BLK Guardrail Upgrade 1 67 $4,658

Duncanville 4900 BLK Guardrail Upgrade 1 67 $4,658

Duncanville 5300 BLK Guardrail Upgrade 1 67 $9,317

Eagle Ford 5400 BLK Guardrail Upgrade 1 67 $40,140

Eagle Ford 5700 BLK Guardrail Upgrade 1 67 $32,801

Eagle Ford 5800 BLK Guardrail Upgrade 1 67 $12,252

Kiest 2400 W BLK Guardrail Upgrade 1 67 $6,669

Kiest 4700 W BLK Guardrail Upgrade 1 67 $27,568

Kiest 500 W BLK Guardrail Upgrade 1 67 $4,658

Westmoreland 3100 S BLK Guardrail Upgrade 1 67 $19,277

Zang 1500 N BLK Guardrail Upgrade 1 67 $25,462

Bernal 4300 BLK Guardrail Upgrade 1 60 $55,333

Camp Wisdom 8400 W BLK Guardrail Upgrade 1 60 $15,443

Camp Wisdom 8500 W BLK Guardrail Upgrade 1 60 $16,911

Clark 8500 BLK Guardrail Upgrade 1 60 $13,465

Clark 8600 BLK Guardrail Upgrade 1 60 $73,451

Clark 9000 BLK Guardrail Upgrade 1 60 $15,188

Clark 9300 BLK Guardrail Upgrade 1 60 $10,785

Clark 9500 BLK Guardrail Upgrade 1 60 $5,392

Friday, March 31, 2006 Page 82 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Safety Improvements-Guardrail Upgrades

Duncanville 3500 BLK Guardrail Upgrade 1 60 $4,658 Kiest 1400 W BLK Guardrail Upgrade 1 60 $4,658

Kiest 3500 W BLK Guardrail Upgrade 1 60 $16,177

Kiest 4300 W BLK Guardrail Upgrade 1 60 $10,593

Kiest 800 W BLK Guardrail Upgrade 1 60 $4,658

Tyler 1200 S BLK Guardrail Upgrade 1 60 $8,870

Westmoreland 1300 N BLK Guardrail Upgrade 1 60 $5,392

Westmoreland 4200 S BLK Guardrail Upgrade 1 60 $12,252

Wheatland 7500 W BLK Guardrail Upgrade 1 60 $9,062

Clark 8100 BLK Guardrail Upgrade 1 53 $11,997

Kiest 2900 E BLK Guardrail Upgrade 1 53 $38,417

Kiest 3800 W BLK Guardrail Upgrade 1 53 $4,658

Kiest 3900 W BLK Guardrail Upgrade 1 53 $10,051

Mountain Creek 7700 BLK Guardrail Upgrade 1 53 $5,839

Vernon 1400 S BLK Guardrail Upgrade 1 53 $6,126

Vernon 2500 S BLK Guardrail Upgrade 1 53 $5,392

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (50 detail records) Sum $796,897 Traffic Signal Upgrades - Citywide

Cockrell Hill @ Redbird Traffic Signal Upgrades Citywide 1 87 $52,966

Davis @ Gilpin Traffic Signal Upgrades Citywide 1 80 $51,180

Polk @ Twelfth Traffic Signal Upgrade 1 80 $52,137

Friday, March 31, 2006 Page 83 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Signal Upgrades - Citywide

Ledbetter @ Westmoreland Traffic Signal Upgrade 1 73 $54,881 Bahama @ Ft Worth (Jacqueline) Traffic Signal Upgrade 1 67 $121,568

Cockrell Hill @ Kiest Traffic Signal Upgrade 1 67 $109,762

Duncanville @ Illinois Traffic Signal Upgrade 1 67 $47,198

Hampton @ Illinois Traffic Signal Upgrades Citywide 1 67 $53,924

Hampton @ Kiest Traffic Signal Upgrade 1 67 $109,762

Illinois @ Vernon Traffic Signal Upgrade 1 67 $109,762

Kiest @ Polk Traffic Signal Upgrade 1 67 $109,762

Kiest @ Rugged Traffic Signal Upgrade 1 67 $90,873

Polk @ Saner Traffic Signal Upgrade 1 67 $118,313

Chalk Hill @ Davis Traffic Signal Upgrade 1 53 $51,180

Colorado @ Sylvan(Tyler) Traffic Signal Upgrade 1 53 $40,491

Edgefield @ Illinois Traffic Signal Upgrade 1 53 $54,689

Edgefield @ Jefferson Traffic Signal Upgrade 1 53 $109,379

Hampton @ Plymouth Traffic Signal Upgrade 1 53 $109,379

Illinois @ Nicholson Traffic Signal Upgrade 1 53 $107,847

Jefferson @ Montclair (Tenth) Traffic Signal Upgrade 1 53 $178,618

Kiest @ M. D. Love Traffic Signal Upgrades Citywide 1 53 $122,972

Kiest @ Westmoreland Traffic Signal Upgrade 1 53 $120,227

Louisiana @ Zang (Wynnewood) Traffic Signal Upgrade 1 53 $159,155

Kessler Pkwy @ Sylvan Traffic Signal Upgrade 1 47 $105,933

Colorado @ Ft Worth Traffic Signal Upgrade 1 40 $109,379

Friday, March 31, 2006 Page 84 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic Signal Upgrades - Citywide

Colorado @ Hampton Traffic Signal Upgrade 1 40 $109,379 Davis @ Edgefield Traffic Signal Upgrade 1 40 $107,464

Davis @ Kings Hwy Traffic Signal Upgrade 1 40 $53,732

Davis @ Montclair Traffic Signal Upgrade 1 40 $107,464

Davis @ Polk Traffic Signal Upgrade 1 40 $51,180

Davis @ Tyler Traffic Signal Upgrade 1 40 $26,613

Dennison @ Hampton Traffic Signal Upgrade 1 40 $107,464

Jefferson @ Polk Traffic Signal Upgrade 1 40 $51,180

Kiest @ Walton Walker Traffic Signal Upgrade 1 40 $68,837

Kings Hwy @ Polk (Tyler) Traffic Signal Upgrade 1 40 $102,359

Polk @ Tenth Traffic Signal Upgrade 1 40 $52,203

Saner @ Zang Traffic Signal Upgrade 1 40 $99,870

Bickers @ Hampton Traffic Signal Upgrade 1 33 $107,464

Edgefield @ Twelfth Traffic Signal Upgrade 1 27 $83,822

Hampton @ Leath Traffic Signal Upgrades Citywide 1 27 $107,464

Pentagon Pkwy @ Polk Traffic Signal Upgrade 1 27 $59,348

Summary for 'Category' = Traffic Signal Upgrades - Citywide (41 detail records) Sum $3,647,180 Traffic System Management - Dynamic Message Signs

Illinois EB approaching Vernon Dynamic Message Sign 1 25 $153,156

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (1 detail record) Sum $153,156

Friday, March 31, 2006 Page 85 of 349 Project Name Description Tier Score Estimate Council District 3 Traffic System Management - Roadside Cameras

Hampton-Illinois Roadside Camera 1 30 $6,382 Davis-Hampton Roadside Camera 1 25 $6,382

Hampton-Ledbetter Roadside Camera 1 20 $4,339

Singleton-Westmoreland Traffic Systems Management - Roadside Camera 1 20 $12,763

Illinois-Walton Walker Roadside Camera 1 15 $12,763

Ledbetter-Westmoreland Roadside Camera 1 15 $6,382

Summary for 'Category' = Traffic System Management - Roadside Cameras (6 detail records) Sum $49,010 Summary for 'Program' = STREET AND TRANSPORTATION (540 detail records) Sum $529,958,252 Summary for 'CD' = 3 (540 detail records) Sum $529,958,252

Friday, March 31, 2006 Page 86 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Petitions

Nebraska Av & Ramona Av - Maywood Av to Graceland Av Engineering Paving and Drainage 3000 blk 1 100 $54,881 Summary for 'Category' = Alley Petitions (1 detail record) Sum $54,881 Alley Reconstruction

Ashbrook & Everglade - Hazelhurst to Everglade Full Reconstruction 1 78 $352,259

Fallon(4847) & Chilton - Hazlehurst to Hazlehurst Full Reconstruction 1 78 $360,163

Hunters View&ForestHavenTr -Firefly to Rock Garden Full Reconstruction 1 78 $173,214

Morning Dew Cir(3800)-Morning Dew Tr toMorning dew Full Reconstruction 1 78 $273,107

Forest Haven(5939) & Rock Garden-'T' to Red Bird Full Reconstruction 1 73 $77,570

Garrison St 4002 & Volga - Garrison to Cardinal Full reconst Garrison St. 4002 1 72 $347,154

Elkridge & Breakwood -Breakwood to Enchanted Full Reconstruction 1 70 $406,179

Allview & Ashbrook - Forney to Hunnicut Full Reconstruction 1 69 $366,630

Hunters View(6026)&Red Bird-Rock Garden to RedBird Full Reconstruction 1 67 $171,208

Marsalis Avenue (1716-1734) Maryland - Iowa to Vermont Full reconst Marsalis Ave. (1716 - 1734) 1 66 $63,815

Ashbrook & Chilton - Hazelhurst to Hovenkamp Full Reconstruction -Ashbrook 4816 1 65 $363,899

Brownlee Ave & Halsey - Toluca to "T" Alley Full reconstruction - Brownlee Ave (202 - 346) 1 63 $266,491

Cove Hollow Dr. & Pentagon - Morning Dew to Morning Full reconstruction. L-shape - Cove Hollow Dr. (606 - 646) 1 63 $266,491 Springs Ewing Av (1310 - 1346) Harlandale - Winters to Genoa Full reconst Ewing Ave. (1310 - 1346) 1 60 $148,051

Beckley (S) & Arborvitae-Whipoorwill to Brookhaven Full Reconstruction 1 47 $179,662

Kathleen Avenue (2402-2562) Volga - Garrison to Cardinal Full recon Kathleen Ave. (2402 - 2562) 1 46 $344,601

Crest Av. (2403 - 2423) Corinth St. - Ohio to Missouri Full reconstruction Crest Ave. (2403 - 2423) 1 43 $79,131

Marsalis Avenue (2814-2848) Maryland - Brownlee to Full reconst Marsalis Ave. (2814 - 2848) 1 40 $108,486 Saner

Friday, March 31, 2006 Page 87 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction

Denley Dr. (3002 - 3022) & Lancaster - Corning to McVey Full reconstruction Denely Dr. (3002 - 3022) 1 37 $72,749 Lancaster Road (3404-3414) "T" Alley - Stovall to Lea Full reconst Lancaster Rd. (3404 - 3414) 1 37 $62,539 Crest Edgemont Dr (1502 - 1514) Glen - Denley to Stirling full reconst Edgemont Dr. (1502 - 1514) 1 34 $91,894

Cardinal Dr (3404 - 3444) Lea Crest - Sunnyvale to Full reconstruction Cardinal Dr (3404 - 3444) 1 28 $236,116 Garrison Deerpath Dr. 1801 - 1931 Full reconstruction 1 28 $228,458

Deerpath Dr. 2206 - 2252 Full reconstruction 1 28 $150,603

Denley Dr. 3106 - Lancaster - Corning to Keist Full reconst Denley Dr. 3106 1 28 $104,657

Fordham Rd (1303 - 1339) Grinnell - Malden to Kostner Full reconst Fordham Rd. (1303 - 1339) 1 28 $116,143

Kathleen Avenue (2602-2672) Volga - Cardinal to Full recon Kathleen Ave. (2602 - 2672) 1 28 $211,866 Sunnyvale Woodin Blvd. (603-623) Louisiana - Alaska to Marsalis Full recon Woodin Blvd (603 - 623) 1 28 $77,854

Eagle Dr (2955 - 2969) Illinois - Parrott to Overton Full reconst Eagle Dr. (2955 - 2969) 1 25 $186,340

Georgia Av (1503 - 1537) Iowa - Bruck to Corinth St. Full reconst Georgia Ave. (1503 - 1537) 1 25 $63,815

Malden La 3803 - 3827 Ful recon 1 25 $93,170

Marsalis Avenue 2702-2746 1 25 $137,840

Moffatt Avenue (2703-2781) Scotland - Sunnyvale to Full recon Moffatt Ave. (2703 - 2781) 1 25 $252,707 Tacoma Morrell Avenue (907-923) Claude - Harlandale to Fernwood Full recon Morrell Ave. (907 - 923) 1 25 $74,025

Seevers Avenue (1901-1931) Beckley - Georgia to Full recon Seevers Ave. (1901 - 1931) 1 25 $99,551 Louisiana Sunnyvale Street (3203-3219) "T" Alley - Skyland to Mundy Full recon Sunnyvale St. (3203 - 3219) 1 25 $153,156

Woodin Blvd. (1102-1114) Montana - Harlandale to "T" Full recon Woodin Blvd. (1102 - 1114) 1 25 $116,143 Alley Adelaide Dr - 1302 - 1354 Full Reconstruction 2 $207,694

Friday, March 31, 2006 Page 88 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction

Alabama Av - 3203 - 3335 Full Reconstruction 2 $256,623 Alhambra & Houghton - Umphress to Tillman Full Reconstruction - Alahambra Street 1704 - 1840 1 $275,234

Ann Arbor & Sleeth St. - Marsalis To Maryland Full Reconstruction 2 $124,106

Ann Arbor Av 1303 - 1355 Full recontruction 2 $172,301

Arizona Av - 1203 - 1247 Full Reconstruction 2 $162,842

Arizona Av - 1303 - 1347 Full Reconstruction 2 $163,097

Arizona Av 2802 - 2846 Full Reconstruction 2 $153,156

Ashbrook Rd - 5104 - 5310 Full Reconstruction 2 $390,923

Ashbrook Rd. 5105- 5341 Full Reconstruction 2 $319,075

Banting Wy - 5005 - 5207 Full Reconstruction 2 $310,140

Beckley Av (S) - 1819 Full Reconstruction 2 $220,436

Bergstorm Dr. 2104 -2260 Full reconstruction - Bergstorm Dr. 2104 -2260 1 $349,706

Blaney Wy - 5304 - 5346 Full Reconstruction 2 $422,778

Bonnie View Rd. 4203 - 4235 Full reconstruction - Bonnie View Rd. 4203 - 4235 2 $116,143

Bonnie View Rd. 4303 - 4435 Full reconstruction - Bonnie View Rd. 4303 - 4435 2 $248,879

Britton Ave 2600 - 2646 Full Reconstruction 2 $145,498

Britton Ave 2700 - 2746 Full reconstruction 2 $137,840

Britton Rd 3002 - 3046 Full reconstruction - Britton Rd 3002 - 3046 2 $146,775

Brook Valley Cir - 605 - 1015 Full Reconstruction 2 $424,307

Brook Valley La - 423 - 435 Full Reconstruction 2 $387,356

Buckner Blvd - 2303 - 2431 Full Reconstruction 2 $211,007

Canary Dr (2711 - 2821) Eagle - Keist to Parrott Full reconstruction Canary Dr. (2711 - 2821) 1 $245,586

Friday, March 31, 2006 Page 89 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction

Carson St 1503 - 1547 Full reconstruction 2 $148,051 Carson St. 1330 - 1346 Full reconstruction - Carson St. 1330 - 1346 2 $58,710

Cicero St - 4303 - 4447 Full Reconstruction 2 $275,226

Colebrook St - 7710 - 7836 Full Reconstruction 2 $266,308

Conrad St - 118 - 228 Full Reconstruction 2 $279,813

Courtney St - 7730 - 7766 Full Reconstruction 2 $103,211

Dugan St - 7714 ------Full Reconstruction 2 $73,138

Elmore Av (1607 - 1659) Missouri - Beknap to Fowler Full reconst Elmore Ave. (1607 - 1659) 2 $159,538

Ewing Av (1400 - 1446) Harlandale - Genoa to Edgemont Full reconst Ewing Ave. (1400 - 1446) 2 $148,051

Ewing Av (2903 - 2947) Idaho - McVey to Brownlee Full reconst Ewing Ave (2903 - 2947) 2 $142,946

Ewing Av (3402 - 3546) Utah - Holden to Overton Full reconst Ewing Ave. (3402 - 3546) 2 $259,089

Five Mile Pkwy - 806 - 1038 Full Reconstruction 2 $346,582

Five Mile Pkwy (W) - 606 - 724 Full Reconstruction 2 $193,933

Fonville Dr - 2305 - 2431 Full Reconstruction 2 $209,223

Galloway Av - 1002 - 1038 Full Reconstruction 2 $136,593

Galloway Av - 1102 - 1130 Full Reconstruction 2 $146,787

Galloway Av (1303 - 1351) Strickland - Denley to Full reconst Galloway Ave. (1303 - 1351) 2 $160,814 Woodbine Gaylord Dr - 1314 - 1348 Full Reconstruction 2 $115,443

Gaylord Dr - 2104 - 2248 Full Reconstruction 2 $343,269

Gaylord Dr - 2105 - 2248 Full Reconstruction 2 $341,995

Green Cove La - 604 - 634 Full Reconstruction 2 $164,626

Green Cove La - 816 ------Full Reconstruction 2 $97,093

Friday, March 31, 2006 Page 90 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction

Haywood Pkwy - 4904 - 5034 Full Reconstruction 2 $254,585 Hillard Dr - 7602 - 7634 Full Reconstruction 2 $155,707

Hillburn Dr - 1803 - 1861 Full Reconstruction 2 $228,590

Hillburn Dr - 1905 - 2061 Full Reconstruction 2 $395,001

Houghton Rd - 1704 - 1836 Full Reconstruction 2 $265,033

Kingsley Dr - 1315 - 1355 Full Reconstruction 2 $168,193

Kushla Av - 4304 - 4655 Full Reconstruction 2 $490,311

Locust Av - 2702 - 2780 Full Reconstruction 2 $279,558

Lonsdale Av - 1304 - 1366 Full Reconstruction 2 $218,398

Lonsdale Av - 1305 - 1359 Full Reconstruction 2 $281,087

Louisiana Av & Woodin - Lamont to Denlay Full reconst Louisiana Ave. (1200 - 1248) 2 $126,864

Major Dr - 2104 - 2242 Full Reconstruction 2 $314,471

Marfa Av - 2203 - 2339 Full Reconstruction 2 $251,272

Michigan Avenue (2803-2847) Saner to Brownlee Full Recon Michigan Ave. (2803 - 2847) 1 $143,137

Missouri Avenue (201-239) Guthrie - Toluca to Orial Full Recon Missouri Ave. (201 - 239) 2 $114,867

Overton Rd 1821 - 2019 Inc T-alley Full reconstruction. T-alley included 2 $179,958

Prichard La - 1824 - 1840 Full Reconstruction 2 $231,139

Prichard La - 1907 - 1923 Full Reconstruction 2 $81,294

Prichard La - 2102 - 2240 Full Reconstruction 2 $310,904

Red Bird(1031) & Fox Hill - S. Polk to Glen Oaks Full Reconstruction 2 $112,953

Rockport Dr - 4706 - 4844 Full Reconstruction 2 $260,701

Seydel St - 7714 - 7836 Full Reconstruction 2 $258,917

Friday, March 31, 2006 Page 91 of 349 Project Name Description Tier Score Estimate Council District 4 Alley Reconstruction

Terrace Drive (111-239) Elmore - Toluca to Beckley Full recon Terrace Dr. (111 -239) 2 $236,116 WindingWoods(5855)&Marview-UrbanCrestto Hazelhurst Full Reconstruction 2 $382,890

Summary for 'Category' = Alley Reconstruction (106 detail records) Sum $22,381,619 Barrier Free Ramps

Bruton Prichard to Buckner Construct 10 BFRs as folows: 4 on Bruton @ Prichard, 4 on 1 32 $22,973 Bruton @ Utica And two on Bruton @ Shortal. Also sidewalk transitions are needed on driveways between Prichard and shortal Montana @ Marsalis Need 1 BFR at intersection (700 Montana) 1 32 $1,914

726 Edgemont One Curb Cut needed in front of address, 4 BFRs on the 1 28 $9,572 intersection of Edgemont @ Ewing Briston @ Saner Install 1 BFR @ the bus stop 1 28 $1,914

Idaho @ Louisiana 4 BFRs on corners of intersection 1 27 $7,658

Polk @ Drury 2 BFRs on Polk @ Drury, one Curb Cut on end of crosswalk, 1 25 $4,135 and 2 BFRs on Polk @ Clear Fork 2001 Deer Path A Curb Cut in front of school entrance is needed. Remove and 1 22 $1,914 replace part of existing Side/Leadwalk to match new curb 2601 Prichard Ln @ Reva St 1 20 $7,658

Lake June @ Whitley BFR @ bus stop on North side of Lake June service road 1 19 $1,914

1631 S. Marsalis 2 BFRs on corners of Marsalis @ Vermont are needed 1 18 $3,829

Harlandale Ave @ Brightside Dr Construct 4 ramps 1 14 $7,658

1630 Danube Dr One curb cut is needed at lead walk 1 12 $1,914

Houghton @ Tillman BFRs on 4 corners of intersection 1 3 $7,658

Lea Crest @ Cardinal 4 BFRs are needed on corners of intersection 1 3 $7,658

Summit Ridge @ Fordham 4 BFRs on corners of intersection 1 3 $7,658

Friday, March 31, 2006 Page 92 of 349 Project Name Description Tier Score Estimate Council District 4 Barrier Free Ramps

Summary for 'Category' = Barrier Free Ramps (15 detail records) Sum $96,029 Bridge Repair and Modification

E. Kiest Blvd over Lancaster Kiest Shoping Center Clean & protect exposed rebar & grout; repair armor joints, 1 51.25 $255,260 seal; overlay deck; repair retaining walls and replace approach slabs both ends; repair damaged railing. Kiest Blvd. over DART (BNSF) RR Replace failed slope protection NE corner, replace slope 1 46.25 $76,578 protection SW corner, repair guardrail, correct settlement, repalce sidewalk sections; very severe Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $331,838 Intergovernmental Partnership Projects

Appian Way at Trib. to Cedar Creek Bridge rehabilitation and/or reconstruction 2 $0

Ramsey Ave. at Trib. To Cedar Creek Bridge rehabilitation and/or reconstruction 2 $0

Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $0 Sidewalk Petitions

Claymont Dr - Dangerfield Dr to 7233 Claymont Dr Engineering, Paving 7300-7400 Blocks 1 99 $158,261

Huttig Ave - Shortal Dr to Buckner Blvd (S) Engineering, Paving & Drainage 8000 Blk 1 98 $28,239

Summary for 'Category' = Sidewalk Petitions (2 detail records) Sum $186,501 Street Petitions

Locust Ave - Dalton St to Dead End This project provides paving and drainage improvements for 1 96 $435,661 Locus Ave from Dalton St to DeadEnd and a segment of Dalton St from Scotland Ave to Locust Ave

Friday, March 31, 2006 Page 93 of 349 Project Name Description Tier Score Estimate Council District 4 Street Petitions

Fowler St - Missouri Av to Illinois Av (E) Engineering, Paving & Drainage - 2300 blk 1 77 $109,762 Missouri Av (E) - Fowler St to Illinois Ave (E) Engineering, Paving & Drainage - 1700 blk 1 76 $89,596

Summary for 'Category' = Street Petitions (3 detail records) Sum $635,019 Street Reconstruction Local Streets

Linfield Rd - Bonny View Rd to Cranfill Dr 2800 Blk 1 58.32 $421,370

Traymore Ave - Lake June Rd to Hilburn Dr 1300 - 1400 Blks 1 56.08 $1,301,826

Chariot Dr - Rollington Rd to S Buckner Blvd 8000 Blk 1 55.06 $867,884

Hudspeth Ave - Biglow St to Garrison St 2100 - 2300 Blks 1 54.67 $1,129,526

Garrison St - Fordham Rd to Volga Av 4000 Blk 1 53.03 $321,628

Whitley Dr - Maxwell Av to Hillburn Dr 1400 Blk 1 51.52 $752,845

Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,795,078 Street Reconstruction Thoroughfares

Fordham Rd - Bonnie View Rd to Hale St 2500 - 2900 Blks 1 70.87 $4,300,863

South Lamar Street Reconstruction / Urban Design , from Roadway reconstruction and streetscape enhancements on 1 $20,612,245 IH-45 to SH310 South Lamar, from Hatcher to SH310, to spur pedestrian- friendly development and improve vehicular movement as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $24,913,108 Street Resurfacing

Moffatt Ave. - Tacoma St. to Cul-de-sac 2600 - 2700 1 75.205 $218,503

Friday, March 31, 2006 Page 94 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Five Mile Dr. - Yewpon Ave. to Frio Ln. 1400 - 1600 1 69.965 $178,069 Vesper St. - Bexar St. to Dead End 2500 block 1 69.69 $52,328

Idaho Ave. - Louisiana Ave. to Illinois Ave. 2000 - 2200 1 69.19 $96,999

Denley Dr. (S) - McVey Ave. to Illinois Ave. 2300 - 2900 1 68.88 $208,547

Lea Crest Dr. - Lancaster Rd. to Easter Ave. 1800 - 2100 1 68.085 $219,013

Overton Rd (E) - Idaho Ave. to Kushla Ave. 900 - 1100 1 67.145 $138,096

Tillman St. - Prichard Ln. to N. Buckner Blvd. 7900 - 8000 1 66.35 $115,122

Moffatt Ave. - Garrison St. to Aztec Dr. 2300 - 2400 1 65.205 $132,480

Strickland St. - Denley Dr. to Fernwood Ave. 1000 - 1200 1 64.56 $70,835

Hillard Dr. - Traymore Ave. to Hillburn Dr. 7600 - 7800 1 64.465 $52,954

Iowa Ave. (E) - Bruck St. to Cortnth Street Rd. 1500 Block 1 64.335 $39,948

Ewing Ave. (S) - Saner Ave. - Hobson Ave. 2700 Block 1 63.86 $39,565

Locust Ave. - Cul -De-Sac to Tocoma St. 2600 - 2700 1 63.165 $166,430

Springview Ave. - Bonnie View Rd. to Prosperity Av 3000 - 3100 1 61.8 $85,512

Hillburn Dr. - Piedmont Dr. to Daingerfield Dr. 2500 - 2600 1 61.795 $78,365

Elmore Ave. (W) - Beckley Ave. to Zang Blvd. 100 - 400 1 60.1 $119,768

Eisenhower Dr. - Brodie St. to Kiest Blvd. 3100 - 3200 1 59.94 $35,098

Marfa Ave. - Frio Dr. to Fernwood Ave. 1600 block 1 59.82 $72,239

Berwick Ave. - Sussex Ave. to Corinth St. 1900 - 2400 1 59.76 $125,588

Ewing Ave. (S) - Morrell Ave. to Galloway Ave. 900 - 1000 1 59.27 $120,355

Tacoma St. - Fordham Rd. to Cummings Ave. 4100 - 4700 1 58.39 $150,323

Halsey St. - Toluca Dr. to Eisenhower Dr. 200 - 300 1 58.38 $46,074

Friday, March 31, 2006 Page 95 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Edgemont Ave. - Marsalis Ave. to Ewing Ave. 700 Block 1 58.26 $63,687 Bardwell Ave. - Canary Dr. to Eagle Dr. 2900 Block 1 57.72 $38,161

Corning Ave. (W) - Beckley Ave. to Toluca Ave. 100 Block 1 57.465 $35,226

Houghton Rd. - Seco Blvd. to Tillman St. 1500 - 1800 1 56.715 $180,214

Hillburn Dr. - Lake June Rd. to Courtney St. 1300 Block 1 56.42 $52,711

Hillburn Dr. - Aurora St. to Umphress Rd. 1600 Block 1 56.21 $98,530

Ann Arbor Ave. - Malden Ln. to Kostner Ave. 1300 Block 1 55.85 $74,664

Scotland Dr. - 150' E of Landrum Ave. to Tacoma St. 2600 - 2700 1 55.275 $142,563

Belknap Ave. - Illinois Ave. to Elmore Ave. 2300-2500 1 54.89 $125,205

Asbrook Rd. - Havenkamp Dr. to Samuell Blvd. 5000 - 5400 1 54.335 $200,251

Claude St. - Denley Dr. to Moore St. 1300 Block 1 54.025 $48,499

Compton St. - Moore St. to 500' E. of Carey St. 1400 - 1500 1 53.69 $46,202

Rock Garden Tr. - Red Bird Ln. to Hunters View Ln. 6000 block 1 53.345 $19,783

Stella Ave. - Denley Dr. to Corinth Street Rd. 1400 - 1600 1 52.345 $76,578

Maryland Ave. - Illinois Ave. to Elmore Ave. 2300 - 2500 1 52.24 $112,314

Claude St. - Walnut St. to Corinth Street Rd. 1500 Block 1 52.145 $22,718

Forest Haven Tr. - Dead End to Cul-de-Sac 5800 - 5900 1 52 $54,626

Toluca St. - Beckleywood Blvd. to Granger St. 1700 block 1 51.265 $42,246

Montana Ave. (E) - S. Marsalis Ave. to Maryland Av 700 block 1 50.72 $19,145

Maywood Ave. - Frio Dr. to Fernwood Ave. 1400 block 1 50.065 $29,100

Skylark Dr. - Kiest Blvd. to Illinois Ave. 2000 - 2400 1 49.51 $200,634

Harlandale Ave. - Winters St. to Genoa Ave. 1300 Block 1 48.92 $69,558

Friday, March 31, 2006 Page 96 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Carson St. - Genoa Ave. to Edgemont Ave. 1400 Block 1 48.57 $37,268 Fernwood Ave. - Elmore Ave. to Saner Ave. 2600-2700 1 48.3 $62,539

Ewing Ave. (S) - Montana Ave. to Elmore Ave. 2200 - 2500 1 46.505 $118,696

Easter Ave. - Almeda Dr. to Elmore Ave. 2500 Block 1 44.36 $18,251

Marfa Ave. - Biglow St. to Easter Ave. 2100 block 1 43.09 $50,159

Custer Dr. - Tacoma St. to Sunnyvale St. 2700 Block 1 42.735 $67,389

Stella Ave. - Corinth Street Rd. to Cedar Crest Blvd. 1700 - 1800 1 42.43 $84,363

Vista Wood Blvd. - Ledbetter Dr. to Concrete 4700 block 1 38.47 $21,569

Maryland Ave. - McVey Ave. to Corning Ave. 3000 block 1 38.105 $28,461

Eisenhower Dr. - Bradley St. to Nimitz Dr. 2800 Block 1 34.955 $29,993

Adelaide Dr. - 1200 2 $0

Alabama Av. - 3100 2 $0

Alaska Av. - 1300 2 $0

Almeda Dr. - 2600 2 $0

Amy St. - 7300 2 $0

Ann Arbor Av. - 800 2 $0

Arborvitae Av. - 1300 2 $0

Arizona Av. - 1200 2 $0

Arizona Av. - 1500 2 $0

Avenue B - 1500 2 $0

Avenue D - 1600 2 $0

Aztec Dr. - 4300 2 $0

Friday, March 31, 2006 Page 97 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Aztec Dr. - 4400 2 $0 Beauchamp St. - 3000 2 $0

Beauchamp St. - 3100 2 $0

Benning Av. - 7000 2 $0

Bergstrom Dr. - 2100 2 $0

Bergstrom Dr. - 2200 2 $0

Bexar St. - 6500 2 $0

Bexar St. - 6700 2 $0

Blossom La. - 8000 2 $0

Brookmere Dr. - 1100 2 $0

Brookmere Dr. - 1200 2 $0

Bruton Rd. - 6600 2 $0

Buckner Blvd. (S) - 2100 2 $0

Cape Cod Dr. - 1400 2 $0

Cedar Haven Av. - 1300 2 $0

Cedar Lake Dr. - 4100 2 $0

Chariot Dr. - 7800 2 $0

Circle Dr. - 100 2 $0

Circle Dr. - 200 2 $0

Clear Creek Rd. - 4800 2 $0

Clear Creek Rd. - 4900 2 $0

Conway St. - 3400 2 $0

Friday, March 31, 2006 Page 98 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Conway St. - 3500 2 $0 Corinth St Rd. (S) - 2300 2 $0

Corinth St Rd. (S) - 300 2 $0

Corinth St Rd. (S) - 500 2 $0

Corning Av. (E) - 200 2 $0

De Haes Av. - 300 2 $0

De Kalb Av. - 4500 2 $0

Dover St. - 700 2 $0

Easter Av. - 2900 2 $0

Edgemont Av. - 1000 2 $0

Elmore Av. (E) - 1700 2 $0

Everglade Rd. - 5200 2 $0

Ewing Av. (S) - 4500 2 $0

Firefly La. - 600 2 $0

Five Mile Pkwy. (E) - 700 2 $0

Five Mile Pkwy. (E) - 800 2 $0

Fordham Rd. - 1200 2 $0

Fordham Rd. - 1700 2 $0

Fordham Rd. - 2000 2 $0

Fordham Rd. - 2200 2 $0

Fordham Rd. - 2300 2 $0

Fordham Rd. - 2700 2 $0

Friday, March 31, 2006 Page 99 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Fordham Rd. - 3000 2 $0 Fordham Rd. - 3200 2 $0

Fordham Rd. - 3400 2 $0

Fordham Rd. - 500 2 $0

Fordham Rd. - 600 2 $0

Forney Rd. - 7700 2 $0

Forney Rd. - 7900 2 $0

Fortune La. - 3800 2 $0

Fortune La. - 4100 2 $0

Fox Hill La. - 4800 2 $0

Front St. - 1200 2 $0

Galloway Av. - 1000 2 $0

Galloway Av. - 1200 2 $0

Garza Av. - 1700 2 $0

Garza Av. - 300 2 $0

Garza Av. - 700 2 $0

Genoa Av. - 600 2 $0

Genoa Av. - 700 2 $0

Glen Oaks Blvd. - 800 2 $0

Green Cove La. - 800 2 $0

Grinnell St. - 1300 2 $0

Harlandale Av. - 2800 2 $0

Friday, March 31, 2006 Page 100 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Haywood Pkwy. - 4700 2 $0 Hendricks Av. - 1100 2 $0

Hendricks Av. - 1200 2 $0

Hortense Av. - 1400 2 $0

Hortense Av. - 1500 2 $0

Hunnicut Rd. - 7200 2 $0

Idaho Av. - 1700 2 $0

Idaho Av. - 4300 2 $0

Jennings Av. - 2300 2 $0

Jim Miller Rd. (N) - 1900 2 $0

Kellogg Av. - 3100 2 $0

Kellogg Av. - 3200 2 $0

Kellogg Av. - 3300 2 $0

Kingsley Dr. - 1300 2 $0

Lake June Rd. - 6300 2 $0

Lake June Rd. - 6400 2 $0

Las Cruces La. - 2300 2 $0

Lea Crest Dr. - 1800 2 $0

Ledbetter Dr. (E) - 200 2 $0

Loganwood Dr. - 3100 2 $0

Loganwood Dr. - 3200 2 $0

Loganwood Dr. - 3600 2 $0

Friday, March 31, 2006 Page 101 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Louisiana Av. (E) - 1100 2 $0 Lynnhaven Av. - 1500 2 $0

Lynnhaven Av. - 1600 2 $0

Mcvey Av. (E) - 1000 2 $0

Mcvey Av. (E) - 700 2 $0

Mcvey Av. (E) - 800 2 $0

Mcvey Av. (E) - 900 2 $0

Mentor Av. - 700 2 $0

Michigan Av. - 1300 2 $0

Michigan Av. - 2000 2 $0

Michigan Av. - 3100 2 $0

Missouri Av. (E) - 1600 2 $0

Misty Glen La. - 800 2 $0

Misty Glen La. - 900 2 $0

Moberly La. - 8200 2 $0

Moberly La. - 8300 2 $0

Montague Av. - 1300 2 $0

Moore St. (S) - 400 2 $0

Moore St. (S) - 500 2 $0

Morning Springs Trl. - 4000 2 $0

Moss Point Rd. - 4800 2 $0

Moss Point Rd. - 4900 2 $0

Friday, March 31, 2006 Page 102 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Moss Point Rd. - 5000 2 $0 Mundy Cir. - 3500 2 $0

Nimitz Dr. - 400 2 $0

Norfolk Av. - 1800 2 $0

Norfolk Av. - 1900 2 $0

Oak Creek Cir. - 3700 2 $0

Oak Creek Cir. - 3800 2 $0

Ohio Av. (E) - 100 2 $0

Ohio Av. (E) - 1500 2 $0

Ohio Av. (E) - 200 2 $0

Olson Dr. - 4800 2 $0

Overton Rd. (E) - 1600 2 $0

Overton Rd. (E) - 1800 2 $0

Overton Rd. (E) - 1900 2 $0

Overton Rd. (E) - 2100 2 $0

Owega Av. - 1300 2 $0

Paloduro La. - 4800 2 $0

Penland St. - 100 2 $0

Penland St. - 200 2 $0

Pentagon Pkwy. (E) - 800 2 $0

Presidio Av. - 1500 2 $0

Prichard La. - 1800 2 $0

Friday, March 31, 2006 Page 103 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Ramsey Av. - 3000 2 $0 Ramsey Av. - 3300 2 $0

Ravehill La. - 7400 2 $0

Ravehill La. - 7500 2 $0

Ravehill La. - 7600 2 $0

Ravehill La. - 7700 2 $0

Ravehill La. - 7800 2 $0

Rockbluff Dr. - 3600 2 $0

Rockbluff Dr. - 3700 2 $0

Rockbluff Dr. - 3800 2 $0

Rothington Rd. - 8000 2 $0

Samuell Blvd. - 5900 2 $0

Saner Av. (E) - 600 2 $0

Seco Blvd. - 7500 2 $0

Seco Blvd. - 7600 2 $0

Seevers Av. - 2300 2 $0

Shafter Dr. - 8100 2 $0

Sleeth St. - 700 2 $0

Somerset Av. - 1800 2 $0

Somerset Av. - 1900 2 $0

Sorenson Cir. - 7100 2 $0

Stirling Av. - 1300 2 $0

Friday, March 31, 2006 Page 104 of 349 Project Name Description Tier Score Estimate Council District 4 Street Resurfacing

Summit Ridge Dr. - 3900 2 $0 Sunnyvale St. - 4100 2 $0

Templecliff Dr. - 1400 2 $0

Terrace Dr. - 100 2 $0

Traymore Av. - 1500 2 $0

Tribune Dr. - 3600 2 $0

Utah Av. - 3800 2 $0

Utica Dr. - 1900 2 $0

Vermont Av. - 1300 2 $0

Vermont Av. - 1500 2 $0

Vermont Av. - 300 2 $0

Village Wy. - 2100 2 $0

Warrington Dr. - 3900 2 $0

Wells St. - 2400 2 $0

Whippoorwill Dr. - 100 2 $0

Whitaker Av. - 1300 2 $0

Whitaker Av. - 1500 2 $0

Wilhurt Av. - 2800 2 $0

Summary for 'Category' = Street Resurfacing (239 detail records) Sum $4,833,514 Streetscape / Urban Design

Bexar Street Corridor - Rochester S. to Cul-de-sac Rochester S. to end - ~2,000 LF 2 $2,485,258

Friday, March 31, 2006 Page 105 of 349 Project Name Description Tier Score Estimate Council District 4 Streetscape / Urban Design

Illinois Ave fr IH-35E to Ozona St Median Beautification & Three Gateways at IH-35/ Illinois 2 $1,813,051 (TxDOT), Denley/ Illinois (DART) & Belknap/ Illinois (Park) South Central (SH310) Urban Design/Streetscape, from S. Pedestrian friendly enhancments along SH310, from South 2 $6,190,693 Loop 12 to the Trinity River Bridge Loop 12 to the Trintiy River bridge as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $10,489,002 Thoroughfares

Military Pkwy - Buckner to Jim Miller Widen to 6 lane divided roadway 1 55 $5,720,203

Overton - S.M. Wright to IH 45 Widen to 6 lane divided roadway 1 42 $1,691,368

Overton (E) - SH 310/ SM Wright to IH 45 Widen to a six lane divided roadway 1 42 $1,537,606

Sunnyvale - Kiest to Ann Arbor Widen to 4 lane divided roadway 1 41 $7,270,069

Overton - Conway to I.H. 35E Build a new 4 lane undivided roadway 1 39 $3,052,848

Ann Arbor - Marsalis to Ramona Widen to 4 lane undivide roadway (36 to 44 feet) 1 35 $5,412,375

Forney - Jim Miller to Lawnview Widen to a four lane undivided roadway 1 31 $2,233,216

Scyene - E. Scyene Cir. to West Scyene Widen to a four lane undivided roadway 1 30 $4,354,221

Saner - Beckley to Lancaster Widen to a four lane undivided roadway 1 25 $4,333,041

Morrell - Corinth to Ewing Widen to a four lane undivided roadway 1 24 $1,902,787

Military Pkwy - Buckner Blvd. to Prairie Creek Widen to a six lane divided roadway 1 23 $6,618,440

Conway - Kiest to Villiage Fair Widen to a four lane undivided roadway 1 19 $5,814,001

Beckley (S) - Kiest to IH 35E Exit Ramp Widen to 6 lane roadway 1 18 $2,029,641

Hunnicut - Samuell to I.H. 30 Widen to a four lane undivided roadway 1 16 $787,358

Greenspan - Laureland to Hammerking Build a new 4 lane undivided roadway 1 10 $1,470,231

Hammerking - IH 35 to Greenspan Build a new 4 lane undivided roadway 1 10 $1,997,069

Friday, March 31, 2006 Page 106 of 349 Project Name Description Tier Score Estimate Council District 4 Thoroughfares

Delafield - Hoyle to Military Pkwy Widen to a four lane undivided roadway 1 0 $2,537,050 Hoyle - Buckner to Delafield Widen to a four lane undivided roadway 1 0 $2,120,251

Scyene (Old) - Scyene Cir. to Buckner 1 $1,271,109

Summary for 'Category' = Thoroughfares (19 detail records) Sum $62,152,884 Traffic Intersection Capacity & Safety Improvement

Buckner at Hoyle Trim back median noses to allow simultaneous east and west 1 50 $51,402 left-turns on Hoyle. Ann Arbor @ Sunnyvale Widen the southbound approach to a left-turn pocket. 1 30 $215,593

Forney @ Jim Miller Street Modifications and Bottl Widen Forney approaching Jim Miller to provide an eastbound 1 25 $283,339 left-turn pocket. Kiest at Sunnyvale Widen Sunnyvale at Kiest to provide northbound and 1 25 $220,162 southboud left-turn lanes. Overton @ Sunnyvale Street Modifications and Bottl Install left turn pockets for all directions and increase the 1 25 $991,685 turning radius on all corners. Pentagon @ Polk Widen Pentagon Pkwy at Polk to provide eastbound and 1 25 $220,162 westbound left-turn pockets. Fordham @ Sunnyvale Widen all approaches to provide left-turn pockets. 1 20 $709,623

IH 35 @ Ledbetter Widen Ledbetter to provide a eastbound and westbound left- 2 $634,736 turn lanes. Widen both service road intersections to provide right turn lanes for all approaches. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $3,326,700 Traffic Safety Improvements-Guardrail Upgrades

Military 8000 BLK Guardrail Upgrade 1 87 $12,543

Military 8600 BLK Guardrail Upgrade 1 80 $10,785

Friday, March 31, 2006 Page 107 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Safety Improvements-Guardrail Upgrades

Military 9900 BLK Guardrail Upgrade 1 80 $3,925 Bruton 6100-6900 BLK Guardrail Upgrade 1 73 $58,008

Corinth St. Rd. 900-2100 S BLK Guardrail Upgrade 1 73 $36,470

Corinth St. Rd. 100 S BLK Guardrail Upgrade 1 67 $5,568

Jim Miller 4900 BLK Guardrail Upgrade 1 67 $16,911

Beckley 1300 S BLK Guardrail Upgrade 1 60 $27,058

Jim Miller 4700 BLK Guardrail Upgrade 1 60 $5,392

Marsalis 1200 S BLK Guardrail Upgrade 1 60 $62,252

Marsalis 4600 S BLK Guardrail Upgrade 1 60 $8,487

Marsalis 800 S BLK Guardrail Upgrade 1 60 $38,417

Military 4600 BLK Guardrail Upgrade 1 53 $10,529

Kiest 2200 E BLK Guardrail Upgrade 1 47 $5,246

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (14 detail records) Sum $301,590 Traffic Signal Upgrades - Citywide

Ewing @ Morrell Traffic Signal Upgrade 1 100 $111,676

Houston School Rd @ Ledbetter Traffic Signal Upgrade 1 87 $86,839

Ann Arbor @ Marsalis Traffic Signal Upgrade 1 80 $107,847

Kiest @ RL Thornton Traffic Signal Upgrade 1 80 $245,943

Kiest @ Sunnyvale Traffic Signal Upgrade 1 80 $54,211

Ledbetter @ RL Thornton Traffic Signal Upgrade 1 80 $187,935

Beckley @ Illinois Traffic Signal Upgrade 1 67 $82,896

Friday, March 31, 2006 Page 108 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Signal Upgrades - Citywide

Beckley @ Kiest Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 67 $122,525 Forney @ Jim Miller Traffic Signal Upgrade 1 67 $54,689

Illinois @ Kiest Traffic Signal Upgrade 1 67 $97,694

Kiest @ Marsalis Traffic Signal Upgrade 1 67 $120,227

Ledbetter @ Village Fair Traffic Signal Upgrade 1 67 $109,379

Marsalis @ Overton Traffic Signal Upgrade 1 67 $118,313

Marsalis @ Saner Traffic Signal Upgrade 1 67 $91,830

Marsalis @ Winters Traffic Signal Upgrade 1 67 $116,399

Overton @ Sunnyvale Traffic Signal Upgrade 1 67 $116,399

Polk @ Redbird Traffic Signal Upgrade 1 67 $67,438

Buckner @ Military Traffic Signal Upgrade 1 60 $201,655

Bruton @ Hillburn Traffic Signal Upgrade 1 53 $107,847

Conway @ Kiest Traffic Signal Upgrades Citywide 1 53 $103,316

Everglade @ Jim Miller Traffic Signal Upgrades Citywide 1 53 $53,924

Ewing @ Illinois Traffic Signal Upgrade 1 53 $109,379

Hampton @ Wheatland Traffic Signal Upgrade 1 53 $53,924

Hillburn @ Lake June Traffic Signal Upgrade 1 53 $60,305

Illinois @ Marsalis Traffic Signal Upgrade 1 53 $111,293

Jim Miller @ Seco Traffic Signal Upgrade 1 53 $118,313

Kiest @ M. D. Love Traffic Signal Upgrades Citywide 1 53 $122,972

Ledbetter @ Marsalis Traffic Signal Upgrades Citywide 1 53 $59,635

Polk @ Reynoldston Traffic Signal Upgrade 1 53 $34,311

Friday, March 31, 2006 Page 109 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic Signal Upgrades - Citywide

Beckley @ Saner Traffic Signal Upgrades Citywide 1 40 $114,867 Eighth @ Marsalis Traffic Signal Upgrade 1 40 $107,464

Harrell Bud School @ Marsalis Traffic Signal Upgrade 1 40 $97,254

Bruton @ Prichard Traffic Signal Upgrade 1 27 $107,464

Pentagon Pkwy @ Polk Traffic Signal Upgrade 1 27 $59,348

Summary for 'Category' = Traffic Signal Upgrades - Citywide (34 detail records) Sum $3,515,513 Traffic System Management - Dynamic Message Signs

Ledbetter 1400 E Dynamic Message Sign 1 10 $76,578

Ledbetter 1400 W Dynamic Message Sign 1 10 $76,578

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (2 detail records) Sum $153,156 Traffic System Management - Flood Detour Signs

Illinois @ Linfield I.T.S. - Dynamic Signs - Flood Dynamic Signs - Flood Detours 1 80 $13,057

Polk @ Pentagon Pkwy Dynamic Signs - Flood Detours 1 80 $42,118

Beckley, 1200 S. Dynamic Signs - Flood Detours 1 60 $42,118

Louisiana, 200 W. Dynamic Signs - Flood Detours 1 60 $42,118

Umphress @ Hillburn Dynamic Signs - Flood Detours 1 60 $34,537

Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $173,947 Traffic System Management - Roadside Cameras

Buckner-Bruton Roadside Camera 1 20 $6,382

Friday, March 31, 2006 Page 110 of 349 Project Name Description Tier Score Estimate Council District 4 Traffic System Management - Roadside Cameras

Illinois-IH45 Roadside Camera 1 10 $6,382 Summary for 'Category' = Traffic System Management - Roadside Cameras (2 detail records) Sum $12,763 Summary for 'Program' = STREET AND TRANSPORTATION (465 detail records) Sum $138,353,143 Summary for 'CD' = 4 (465 detail records) Sum $138,353,143

Friday, March 31, 2006 Page 111 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction

Glengreen & Dale Glade- Eastshore to St. Augustine Full Reconstruction 1 78 $328,877 Muskogee (10356) & Cymbal - Muskogee to Muskogee Full Reconstruction. 1 78 $322,684

Trailcrest & Racine - 'T' to Highfall Full Reconstruction 1 78 $202,422

St.Augustine&EarlecoveCir-EarlecoveCir toJennie Full Reconstruction 1 77 $241,716

Autmn (6626) & Racine - Millet to Racine Full Reconstruction 1 76 $433,540

Muskogee and Springhaven - Amity to Gardenside Full Reconstruction - SR# 04-00096226. 1 76 $670,058

Springhaven(10321) & Checota - Springhaven to 'T' Full Reconstruction 1 75 $294,746

Lapanto(8816) &Mosswood- Mosswood to incl.'T'alley Full Reconstruction 1 72 $376,557

Bissonet Av & Bolero Av - Bissonet Av to Elam Rd Full Reconstruction 780 FT 1 65 $179,958

Elder Oaks(2102)& Camp Wisdom-HamptontoCamp 1 64 $246,939 Wisdom Golden Trophy & Ferncliff-Polk St.to Sheady Meadow Full Reconstruction 1 63 $108,562

Jennie Lee Lane (9341 - 9357) Renova - Sandstone to full reconstruction Jennie Lee Ln. (9341 - 9357) 1 63 $72,749 Cypress Mossglen Drive (2606-2614) Jennie Lee to Groveridge Full recon Mossglen Dr (2606 - 2614) 1 60 $85,512

Autumun Meadow & Hunters Run - Mesa Verde(7411) Full Reconstruction 1 56 $309,278

Blossom La 8605 - 8623 Full Reconstruction - Blossom La 8605 - 8623 1 49 $54,881

Rosemeade(7822) & Courtney - Hillburn to Maxwell Full Reconstruction 1 49 $275,640

Lolita Drive (2500-2632) Pleasant - Jennie Lee to Ricardo Full reconst Lolita Dr. (2500 - 2632) 1 46 $204,234

Humoresque & Bowling Brook-Bowling Brook to Bowling Full Reconstruction 1 40 $245,050 Brook Jeane & Godfrey ( Godfrey toJonelle) 1 39 $505,415

Silvery Moon Drive (6112-6342) Rhapsody - Lazy River to Full recon Silvery Moon Dr. (6112 - 6342) 1 34 $248,879 Singing Hills Lazy River Drive (5706-5930) Red Bird to Wagon Wheels Full reconstr Lazy River Dr. (5706 - 5930) 1 31 $239,944

Friday, March 31, 2006 Page 112 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction

Cranfill Dr. 4830 Wadsworth - 51st to "T" Alley Full reconstruction Cranfill Dr. 4830 1 28 $74,025 Jim Miller Road (1031 - 1045) "T" Alley - Rosalinda to Full Reconstruction Jim Miller Rd. (1031 - 1045) 1 25 $66,368 Sarah Lee Alcorn Av & Antler Av - "T" Alley to Elam Rd Full Reconstruction - Alcorn Av 412-476 1 $277,774

Allentown Dr - 1605 - 1729 Full Reconstruction 2 $235,726

Ann Arbor & Marjorie - Tacoma to Bonnie View Full Reconstruction - Ann Arbor Avenue 2828-2842 1 $290,772

Atha & Marla - Woodmont to Bissonet Full Reconstruction - Atha Drive 6806 - 6942 1 $273,697

Atha Dr - 7005 - 7031 Full Reconstruction 2 $104,229

Aurora St - 7703 - 7835 Full Reconstruction 2 $318,804

Bilco St - 1521 - 1537 Full Reconstruction 2 $173,036

Bismark Dr - 4810 - 4856 Full Reconstruction 2 $201,324

Bissonet Av - 230 - 312 Full Reconstruction 2 $126,655

Blanton St - 2403 - 2423 Full Reconstruction 2 $204,382

Blanton St - 2511 - 2527 Full Reconstruction 2 $464,572

Blanton St - 2607 - 2653 Full Reconstruction 2 $156,726

Bluffcreek Dr - 9504 - 9580 Full Reconstruction 2 $255,349

Bluffcreek Dr - 9805 - 9923 Full Reconstruction 2 $389,905

Bonnie View Rd - 4703 - 4735 Full Reconstruction 2 $152,139

Brierfield Dr - 6705 - 7019 Full Reconstruction 2 $298,162

Castle Bay Dr - 9825 - 9923 Full Reconstruction 2 $190,874

Castlefield Dr - 9507 - 9577 Full Reconstruction 2 $240,569

Checota Dr - 9715 - 9743 Full Reconstruction 2 $309,375

Cherry Point Dr - 101 - 235 Full Reconstruction 2 $254,074

Friday, March 31, 2006 Page 113 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction

Cherrybrook Dr - 8602 - 8822 Full Reconstruction 2 $320,587 Coleshire Dr - 6805 - 7027 Full Reconstruction 2 $221,201

Colwick Av (4540 - 4544) Tacoma - Kilburn to "T" Alley Full Reconstruction Colwick Ave (4540 - 4544) 1 $253,820

Dahlia Ct. 3254 - 3268 full reconstruction. U-shape 2 $219,651

Dahlia Dr - 3006 - 3122 Full Reconstruction 2 $228,081

Dahlia Dr - 3122 - 3244 Full Reconstruction 2 $225,278

Dart Av - 6806 - 6936 Full Reconstruction 2 $262,485

Denham St - 6204 - 6256 Full Reconstruction 2 $178,133

Donnybrook La - 9006 - 9158 Full Reconstruction 2 $321,352

Elam Rd - 8203 - 8247 Full Reconstruction 2 $157,746

Ella Av - 405 - 429 Full Reconstruction 2 $296,633

Fenway St - 6240 - 6378 Full Reconstruction 2 $299,691

Fenway St 6136-6138 Full reconstruction 2 $160,814

Fiftieth St - 3012 - 3132 Full Reconstruction 2 $251,272

Fifty-second St - 3226 - 3248 Full Reconstruction 2 $81,803

Foxwood La - 8507 - 8539 Full Reconstruction 2 $357,540

Garden Crest & Autumn Meadow - Autumn Meadow to Me Full reconstruction (2030 Garden Crest Ln) 2 $283,339

Glen Forest La - 5505 - 5525 Full Reconstruction 2 $166,410

Glengreen Dr - 9851 ------Full Reconstruction 2 $74,667

GoldenTrphy & Ferncliff - AutumnWoods to Sheady Full Reconstruction 2 $172,893 Meadow Greenmound Av - 8311 - 8425 Full Reconstruction 2 $206,420

Heatherglen & Cedar Valley - Marblehead to Shady Glen Full Reconstruction 2 $376,557

Friday, March 31, 2006 Page 114 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction

Hillard Dr - 7702 - 7826 Full Reconstruction 2 $263,759 Hillmont Dr - 6812 - 6846 Full Reconstruction 2 $162,077

Hillvale Dr - 511 - 545 Full Reconstruction 2 $114,932

Hymie Cir (10001 - 10035) Glengeen to "T" Alley Full Reconstruction Hymie Cir. (10001 - 10035) 1 $315,491

Inca Dr - 2105 - 2365 Full Reconstruction 2 $503,308

Jennie Lee La - 8608 - 8824 Full Reconstruction 2 $243,627

Jennie Lee La - 8906 - 8928 Full Reconstruction 2 $110,856

Kilburn Av - 2746 ------Full Reconstruction 2 $90,213

Lake June Rd - 10121 - Tokowa - "T" Alley to Masters Full Reconstruction Lake June Rd. 10121 1 $216,104

Lake June Rd - 7843 ------Full Reconstruction 2 $246,685

Loop 12 - 6901 ------Full Reconstruction 2 $169,213

Marjorie Av - 3011 - 3129 Full Reconstruction 2 $253,310

Mattison St - 7847 ------Full Reconstruction 2 $84,352

McCutcheon La - 2333 ------Full Reconstruction 2 $85,372

McCutcheon La - 2608 - 2626 Full Reconstruction 2 $350,658

Meadow Valley La - 1806 - 1850 Full Reconstruction 2 $209,733

Mesita Dr - 10004 - 10058 Full Reconstruction 2 $235,726

Mirage Valley Dr - 7806 - 7920 Full Reconstruction 2 $245,411

Muskogee Dr - 10006 - 10128 Full Reconstruction 2 $170,742

Neosho Dr - 10018 - 10108 Full Reconstruction 2 $217,887

Neosho Dr - 10112 - 10116 Full Reconstruction 2 $38,991

Prichard La - 1326 - 1354 Full Reconstruction 2 $124,872

Friday, March 31, 2006 Page 115 of 349 Project Name Description Tier Score Estimate Council District 5 Alley Reconstruction

Robin Glen Dr & Willow Glen - Spring Glen to Cedar Glen Full Reconstruction Robin Glen Dr. (1208 - 1254) - T alley 2 $188,581 Included Shayna Dr - 10002 - 10140 Full Reconstruction 2 $256,878

Shyana Dr. & Hymie Cir. - Glengreen to Hymie Cir. Full Reconstruction 2 $163,606

Sunnyglen & Wedgecrest - Concrete 'T' to Sunnyglen Full Reconstruction 2 $110,261

Swansee St - 2104 - 2306 Full Reconstruction 2 $250,252

Valentine Court 7914 Buckner - Seco to Hillard Full recon Valentine Crt. 7914 2 $114,867

Woodlark Trl - 216 - 320 Full Reconstruction 2 $169,213

Summary for 'Category' = Alley Reconstruction (94 detail records) Sum $21,529,526 Barrier Free Ramps

6300 Elam Construct 18 BFR on all Driveways and leadwalks of Rufus 1 47 $34,460 Burleson School Ella @ Alcorn Construct BFRs on 4 corners 1 47 $7,658

Ella @ Capestove Construct 2 BFRs on corners pf intersection 1 47 $3,829

Ella @ Elam Construct 4 BFRs on corners of intersection 1 47 $7,658

Stoneport @ Alcorn 2 BFRs on intersection 1 47 $3,829

2100 Prairie Creek Construct BFRs on driveways of # 2112, 2116 N. Prairie Creek 1 46 $11,487 and driveways of 9199 Bruton (Exxon) Blue Creek Dr @ Horizon Dr Construct 2 BFR on corners of intersection 1 31 $3,829

Goldwood Dr @ Indian Ridge Trail 1 25 $10,042

Polk @ Drury 2 BFRs on Polk @ Drury, one Curb Cut on end of crosswalk, 1 25 $3,523 and 2 BFRs on Polk @ Clear Fork Masters @ Checota 4 BFRs needed on intersection 1 23 $7,658

Masters @ Muskogee 4 BFRs needed on intersection 1 23 $7,658

Friday, March 31, 2006 Page 116 of 349 Project Name Description Tier Score Estimate Council District 5 Barrier Free Ramps

Masters @ Tokowa 4 BFRs needed on intersection 1 23 $7,658 Stonehurst @ Ridgedorf Need 1 BFR at intersection on the corner of #1727 Ridgedorf 1 3 $1,914

Jade Dr. (4905) @ Misty Glen Ln. Install 4 ramps for this intersection 1 $7,658

Summary for 'Category' = Barrier Free Ramps (14 detail records) Sum $118,859 Bridge Repair and Modification

Lake June Rd. over Prairie Creek Repair/replace alum. railing, fill void below wingwall SE corner, 1 43.75 $114,867 fill before riprap both sides of channel w/grout injection, place grout around piers; mod.severe Gayglen Dr. over Elam Creek Scour, use grout injection/flowable fill beneath d/s apron, 1 36.25 $102,104 replace and repair u/s wingwalls; severe Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $216,971 Intergovernmental Partnership Projects

Polk @ Woody Branch Bridge rehabilitation and/or reconstruction 2 $0

Summary for 'Category' = Intergovernmental Partnership Projects (1 detail record) Sum $0 Street Lighting - Freeway Lighting

IH 35 E (S. RLT) - I-20 to Ledbetter Freeway Lighting Installation 1 5 $120,013

Summary for 'Category' = Street Lighting - Freeway Lighting (1 detail record) Sum $120,013 Street Petitions

Helena Ave - Elam Rd to Jeane St Enginering, Paving and Drainage 500-700 blks 1 97 $1,432,647

Old Homestead Dr - Pleasant Dr to Holcomb Rd Egineering, Paving and Drainage 8300 & 8400 Blks 1 93 $809,174

Friday, March 31, 2006 Page 117 of 349 Project Name Description Tier Score Estimate Council District 5 Street Petitions

San Leon Av - Glencliff Dr to Dead End Engineerin Paving & Drainage 9200 - 9400 Blks 1 86 $554,942 Summary for 'Category' = Street Petitions (3 detail records) Sum $2,796,763 Street Reconstruction Local Streets

Ann Arbor Ave (E) - Bonnie View Rd E. to Cranfill 2900 Blk 1 60.47 $1,094,705

Rocky Ridge Rd - Ledbetter Dr to Woodacre Dr 4900 Blk 1 60.06 $216,469

Rayville Dr - Jacobie Blvd to Buckner Blvd 7500 - 8000 Blks 1 59.97 $2,002,378

Memory Ln - Lake June Rd to Musgrave Dr 1300 - 1500 Blks 1 59.5 $943,186

Mattison St - Seco Blvd to Prichard Ln 7800 Blk 1 58.88 $593,589

Linfield Rd - Bonny View Rd to Cranfill Dr 2800 Blk 1 58.32 $172,109

Creekside Dr - Houghton Rd to Houghton Rd 1000 - 1100 Blks 1 58.09 $981,475

Myers Cir - Elam Rd to dead end 400 Blk 1 57.07 $392,351

Aurora St - Prichard Ln to Hillburn Dr 7800 blk 1 54.8 $492,245

Brightwood Dr - Elam Rd to Elam Heights Dr 500 Blk 1 54.3 $275,078

Bismark Dr - 51st St to Ledbetter Dr 4800 Blk 1 53.39 $887,029

Rosecliff Dr - N Prairie Creek Rd to Riverway Dr 9200 Blk 1 52.44 $382,890

Mckissick La - Weathland Rd to Egyptian Dr 7800 - 8100 Blks 1 48.8 $1,276,300

Summary for 'Category' = Street Reconstruction Local Streets (13 detail records) Sum $9,709,805 Street Reconstruction Thoroughfares

Lake June Rd - Pemberton Dr to C F Hawn Frwy(Serv Rd) 6100 Blk 1 68.81 $987,106

Summary for 'Category' = Street Reconstruction Thoroughfares (1 detail record) Sum $987,106

Friday, March 31, 2006 Page 118 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Rayville Dr. - Buckner Blvd. to Pleasant Dr. 8100 - 8200 1 74.19 $84,236 Oak Hill Cir. - Grovecrest Dr. to Holcomb Rd. 1500 - 1900 1 71.94 $213,653

Greendale Dr. - Tonawanda Dr. to Bruton Rd. 1800 - 2000 1 71.75 $168,599

Five Mile Dr. - Yewpon Ave. to Frio Ln. 1400 - 1600 1 69.965 $44,517

Kristen Dr. - Cranfill Dr. to 294 3200 block 1 65.835 $25,526

Hampton Rd. (S) - Challenger Dr. to nMarvin D. Love Frwy. 4900 - 5700 1 64.9 $507,074

Shorelark Dr. - Prairie Creek Rd. to Undercliff Dr 8900 - 9000 1 64.79 $48,627

Hidden Valley Dr. - Carioca Dr. to Dead End 1300 - 1400 1 64.68 $40,203

Sunnyvale St. - Ledbetter Dr. to Fifty Second St. 4800 block 1 64.68 $135,288

Springhaven Dr. - Gardenside Dr. to Amity Ln. 10300 - 10400 1 64.675 $67,006

Hillard Dr. - Traymore Ave. to Hillburn Dr. 7600 - 7800 1 64.465 $123,559

Red Bird Ln. (E) - 160' W of Sunny Crest Ln. to Old Ox Rd. 1300 - 1500 1 64.34 $216,078

Musgrave Dr. - Dead End to St. Augustine Rd. 9300 - 9500 1 63.96 $100,828

Los Gatos Dr. - Kirnwood Dr. to Dead End 7700 block 1 62.91 $28,844

Foxwood Ln. - Pleasant Dr. to Oak Hill Cir. 8300 - 8500 1 60.71 $120,100

Bridges St. - Cul-De-Sac to Redkey St. 100 - 200 1 60.535 $171,407

Denley Dr. (S) - Mentor Ave. to Kingsley Dr. 4500 - 4800 1 60.33 $208,803

Barret Dr. - Jim Miller Rd. to Bramlett Dr.@ Cul-d 7100-7300 1 59.09 $167,451

Tacoma St. - Fordham Rd. to Cummings Ave. 4100 - 4700 1 58.39 $100,215

Library Ln. - Camp Wisdom Rd. to Dead End 7100 - 7300 1 58.29 $63,304

Bollero Ave. - Antler Ave. to Elam Rd. 400 block 1 57.84 $57,561

Woodmont Dr. - Loop 12 to Alcorn Ave. 100 - 300 1 57.56 $76,578

Friday, March 31, 2006 Page 119 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Sedalia St. - 51st St. to Dahlia Dr. 4800 block 1 57.415 $72,366 Riverway Dr. - Riverway Bend Cir. To Bruton Rd. 1700 - 2000 1 56.675 $192,721

Coleshire Dr. - Greenspan Ave. to Highfall Dr. 6800 - 7000 1 56.655 $65,474

Mesita Dr. - Algonquin Dr. to Cul-de-sac 10000 block 1 55.775 $58,072

Penguin Dr. - Sumatra Dr. to Stratton Dr. 600 - 800 1 55.67 $131,969

Holcomb Rd. - Tonawanda Dr. to Bruton Rd. 1800 - 2000 1 55.54 $143,584

Broken Tree Tr. - Deerwood Dr. to Library Ln. 7300 Block 1 54.755 $35,864

Kilburn Ave. - Corrigan Ave. to Haas Dr. 2600 - 3100 1 54.635 $284,998

Penguin Dr. - Rocky Ridge Rd. to Cul-De-Sac 300 block 1 54.245 $38,800

Modree Ave. - Underwood Dr. to C. L. Veasey Blvd. 2700 block 1 54.07 $27,058

Heather Glen Dr. - Lake Placid Dr. to Marblehead Dr. 1800 - 2200 1 52.04 $153,411

Ravenwood Dr. - Elam Rd. to Elam Heights Dr. 500 block 1 50.645 $45,181

Dale Glade Dr. - St. Augustine Rd. to Glengreen Dr. 9600 Block 1 50.545 $63,687

Underwood St. - Kilburn Ave. to Modree Ave. 4500 - 4600 1 50.515 $55,902

Riverway Cir. - Riverway Dr. to Circle 1800 block 1 50.43 $20,931

Rilla Ave. - Dasch St. to Hillburn Dr. 7700 block 1 50.17 $35,226

Cummings St. - Sunnyvale St. to Bonnie View Rd. 2900 Block 1 49.895 $169,748

Dahlia Dr. - Bonnie View Rd. to Sedalia Dr. 3000 Block 1 49.515 $35,992

Blue Creek Dr. - Ledbetter Dr. to Horizon Dr. 2300 block 1 48.635 $151,114

Donnybrook Cir. - Donnybrook Ln. to Cul-De-Sac 8900 Block 1 47.96 $15,698

Donnybrook Pl. - Donnybrook Ln. to Cul-De-Sac 9000 Block 1 47.455 $16,464

Tokowa Dr. - Dead End to Gardenside Dr. 10000 - 10200 1 47 $58,710

Friday, March 31, 2006 Page 120 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Bluffcreek Dr. - Mossglen Dr. to Koonce Ave. 9700 - 9900 1 45.585 $99,807 Cardella Ave. - Prairie Creek Rd. to Quinn St. 9000 Block 1 45.495 $58,965

Hillvale Dr. - End of Curb to Rocky Ridge Rd. 300 Block 1 44.61 $9,189

Manhattan Dr. - Old Homestead Dr. to Eden Valley Dr. 700 - 800 1 44.385 $38,672

Autumn Woods Tr. - Red Bird Ln. to Highcrest Dr. 6200 - 6600 1 44.36 $178,427

Waterwood Ln. - Pleasant Dr. to Holcomb Rd. 8300 - 8400 1 44.19 $69,303

Lewiston Ave. - Gulf Palms Dr. to Dead End 2400 block 1 43.925 $6,509

Old Jamestown Ct. - Cymbal Dr. to Cymbal Dr. 1400 block 1 43.575 $31,397

Dorfspring Dr. - Stonehurst St. to Bohannon Dr. 1700 Block 1 43.32 $22,335

Claudia Ln. - Lake June Rd. to Dead End 1300 - 1400 1 43.31 $73,004

Eleventh St. (E) - Ewing Ave. to Betterton Cir. 800 Block 1 42.51 $15,571

Cedar Mountain Cir. - Red Cloud Dr. to Red Cloud Dr. 9900 Block 1 42.09 $81,045

Pilot Dr. - Rosemont Rd. to Dead End 800 block 1 41.63 $44,671

Undercliff Dr. - Shore Lark Dr. to Prairie Creek R 8900 block 1 40.39 $27,440

Eldon Dr. - Pleasant Dr. to Cherry Brook Dr. 8300 - 8800 1 39.79 $183,149

Singing Hills Dr. - Red Bird Ln. to Houston School 6000 - 6100 1 37.67 $75,174

Kristen Dr. - Veterans Dr. to Cul-de-S 2400 block 1 37.39 $30,759

Mossglen Dr. - Dead End to Bluff Creek Dr. 2400 block 1 35.27 $12,763

Acapulco Dr. - 1300 2 $0

Acuna St. - 10100 2 $0

Adonis Dr. - 700 2 $0

Altadena La. - 1800 2 $0

Friday, March 31, 2006 Page 121 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Antler Av. - 6800 2 $0 Atha Dr. - 6800 2 $0

Atlas Dr. - 1800 2 $0

Atlas Dr. - 1900 2 $0

Atlas Dr. - 2000 2 $0

Aurora St. - 7700 2 $0

Bartlett Av. - 4700 2 $0

Bartlett Av. - 4800 2 $0

Bartlett Av. - 4900 2 $0

Belfast Av. - 8400 2 $0

Biloxi Dr. - 2400 2 $0

Bissonet Av. - 300 2 $0

Boca Chica Cir. - 1100 2 $0

Boca Chica Dr. - 1200 2 $0

Boca Chica Dr. - 1300 2 $0

Boca Chica Dr. - 1700 2 $0

Brewster St. - 9400 2 $0

Brierfield Cir. - 6800 2 $0

Brierfield Dr. - 6700 2 $0

Brierfield Dr. - 6900 2 $0

Brierfield Dr. - 7000 2 $0

Bruton Rd. - 9500 2 $0

Friday, March 31, 2006 Page 122 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Bruton Rd. - 9600 2 $0 Bruton Rd. - 9700 2 $0

Buckner Blvd. (S) - 1300 2 $0

Buckner Blvd. (S) - 1500 2 $0

Buckner Blvd. (S) - 1600 2 $0

Calcutta Dr. - 700 2 $0

Camp Wisdom Rd. (W) - 200 2 $0

Camp Wisdom Rd. (W) - 400 2 $0

Camp Wisdom Rd. (W) - 500 2 $0

Camp Wisdom Rd. (W) - 600 2 $0

Camp Wisdom Rd. (W) - 700 2 $0

Camp Wisdom Rd. (W) - 800 2 $0

Camp Wisdom Rd. (W) - 900 2 $0

Cherry Point Dr. (W) - 100 2 $0

Cherry Point Dr. (W) - 200 2 $0

Cherry Point Dr. (W) - 300 2 $0

Cheyenne Rd. - 1500 2 $0

Clover Ridge Dr. - 2200 2 $0

Clover Ridge Dr. - 2300 2 $0

Colwick Av. - 4500 2 $0

Concerto La. - 6300 2 $0

Conner Dr. - 1500 2 $0

Friday, March 31, 2006 Page 123 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Craige Dr. - 9100 2 $0 Creek Cove Dr. - 200 2 $0

Cy Blackburn Cir. - 1300 2 $0

Dahlia Ct. - 3200 2 $0

Dartway Dr. - 8900 2 $0

Dasch St. - 7800 2 $0

Deerwood Dr. - 1100 2 $0

Deerwood Dr. - 1200 2 $0

Denley Dr. (S) - 5000 2 $0

Dolores Wy. - 1700 2 $0

Dolores Wy. - 1800 2 $0

Dolores Wy. - 1900 2 $0

Dove Creek Wy. - 4700 2 $0

Drury Dr. - 1500 2 $0

Egyptian Dr. - 1700 2 $0

Egyptian Dr. - 1800 2 $0

Elam Rd. - 7000 2 $0

Elam Rd. - 7100 2 $0

Elam Rd. - 7200 2 $0

Elam Rd. - 7300 2 $0

Elderoaks La. - 2300 2 $0

Elena St. - 4800 2 $0

Friday, March 31, 2006 Page 124 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Fiftieth St. - 2900 2 $0 Fifty-fourth St. - 2700 2 $0

Fordham Rd. - 3200 2 $0

Fordham Rd. - 3400 2 $0

Foxboro La. - 700 2 $0

Foxboro La. - 800 2 $0

Foxboro La. - 900 2 $0

Garrison St. - 4500 2 $0

Glen Arbor Dr. - 700 2 $0

Glen Arbor Dr. - 800 2 $0

Glencliff Dr. - 1300 2 $0

Grassy Ridge Trl. - 5600 2 $0

Grassy Ridge Trl. - 5700 2 $0

Greenspan Av. - 6600 2 $0

Greenspan Av. - 6700 2 $0

Greenspan Av. - 6800 2 $0

Greenspan Av. - 6900 2 $0

Greenspan Av. - 7000 2 $0

Haas Dr. - 4600 2 $0

Haas Dr. - 4700 2 $0

Haas Dr. - 4800 2 $0

Hampton Rd. (S) - 4300 2 $0

Friday, March 31, 2006 Page 125 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Hawley La. - 1500 2 $0 Highcrest Dr. - 400 2 $0

Highcrest Dr. - 600 2 $0

Highcrest Dr. - 700 2 $0

Highfall Dr. - 400 2 $0

Highfall Dr. - 500 2 $0

Highfall Dr. - 600 2 $0

Highfall Dr. - 700 2 $0

Hodde St. - 6800 2 $0

Hodde St. - 7000 2 $0

Holcomb Rd. - 1100 2 $0

Holcomb Rd. - 1300 2 $0

Holcomb Rd. - 700 2 $0

Holcomb Rd. - 800 2 $0

Holcomb Rd. - 900 2 $0

Houston School Rd. - 5200 2 $0

Houston School Rd. - 6100 2 $0

Houston School Rd. - 6700 2 $0

Houston School Rd. - 6800 2 $0

Houston School Rd. - 6900 2 $0

Inca Dr. - 2200 2 $0

Indian Ridge Trl. - 7700 2 $0

Friday, March 31, 2006 Page 126 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Jennie Lee La. - 8300 2 $0 Jennie Lee La. - 8900 2 $0

Kerrville St. - 9400 2 $0

Kildare Av. - 4700 2 $0

Kildare Av. - 4900 2 $0

Lake June Rd. - 6200 2 $0

Lake June Rd. - 6300 2 $0

Lake June Rd. - 6400 2 $0

Lake June Rd. - 8100 2 $0

Lake June Rd. - 8600 2 $0

Lake June Rd. - 9100 2 $0

Lake June Rd. - 9300 2 $0

Lake Placid Dr. - 5100 2 $0

Lake Placid Dr. - 5200 2 $0

Lake Placid Dr. - 5300 2 $0

Lake Placid Dr. - 5400 2 $0

Laureland Rd. (E) - 300 2 $0

Lazy River Dr. - 6100 2 $0

Lazy River Dr. - 6200 2 $0

Ledbetter Dr. (E) - 200 2 $0

Ledbetter Dr. (E) - 3100 2 $0

Ledbetter Dr. (E) - 4200 2 $0

Friday, March 31, 2006 Page 127 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Loop 12 (S) - 6100 2 $0 Loop 12 (S) - 7000 2 $0

Mark Trail Wy. - 4300 2 $0

Marla Dr. - 6800 2 $0

Marvel Dr. - 8100 2 $0

Masters Dr. (N) - 2100 2 $0

Masters Dr. (N) - 2400 2 $0

Matagorda Dr. - 1400 2 $0

Maxwell Av. - 7800 2 $0

Mccutcheon La. - 2100 2 $0

Midvale Dr. - 700 2 $0

Millett Dr. (E) - 400 2 $0

Milverton Dr. - 8700 2 $0

Minoco Dr. - 2900 2 $0

Moonglow Dr. - 6000 2 $0

Mountain Bend Cir. - 9900 2 $0

Myrtlewood Dr. - 1900 2 $0

Myrtlewood Dr. - 2000 2 $0

Mystic Trl. - 5100 2 $0

Mystic Trl. - 5300 2 $0

Neosho Dr. - 10000 2 $0

Neosho Dr. - 10100 2 $0

Friday, March 31, 2006 Page 128 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Oak Gate La. - 10400 2 $0 Oak Hill Cir. - 1200 2 $0

Oak Hill Pl. - 1900 2 $0

Old Jamestown Av. - 1300 2 $0

Palisade Dr. - 8800 2 $0

Palisade Dr. - 9200 2 $0

Polk St. (S) - 7000 2 $0

Polk St. (S) - 7500 2 $0

Prairie Creek Rd. (N) - 1300 2 $0

Prairie Creek Rd. (N) - 1800 2 $0

Prairie Creek Rd. (N) - 2300 2 $0

Prichard La. - 1300 2 $0

Prichard La. - 1400 2 $0

Prichard La. - 1500 2 $0

Rayenell Av. - 600 2 $0

Rayenell Av. - 700 2 $0

Rayenell Av. - 800 2 $0

Red Bird La. (E) - 1000 2 $0

Red Bird La. (E) - 900 2 $0

Red Cloud Dr. - 1900 2 $0

Red Cloud Dr. - 2000 2 $0

Reynoldston La. - 1800 2 $0

Friday, March 31, 2006 Page 129 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Reynoldston La. - 1900 2 $0 Reynoldston La. - 2000 2 $0

Reynoldston La. - 2200 2 $0

Reynoldston La. - 2300 2 $0

Riverway Pl. - 1800 2 $0

Rocky Ridge Rd. - 5100 2 $0

Rocky Ridge Rd. - 5300 2 $0

Rocky Ridge Rd. - 5400 2 $0

Rosemead Dr. - 7800 2 $0

Sand Springs Av. - 10200 2 $0

Sandstone Dr. - 2700 2 $0

Sarah Lee Dr. - 7000 2 $0

Scottsboro La. - 700 2 $0

Scottsboro La. - 800 2 $0

Scyene Rd. - 9200 2 $0

Seaway Dr. - 9200 2 $0

Shady Crest Trl. - 5800 2 $0

Shayna Dr. - 10000 2 $0

Shayna Dr. - 10100 2 $0

Shayna Dr. - 10200 2 $0

Shayna Dr. - 10400 2 $0

Simpson Stuart Rd. - 4900 2 $0

Friday, March 31, 2006 Page 130 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Singing Hills Dr. - 6000 2 $0 Singing Hills Dr. - 6100 2 $0

Slay St. - 9000 2 $0

St Augustine Dr. (N) - 1100 2 $0

St Augustine Dr. (N) - 1500 2 $0

St Augustine Dr. (N) - 1700 2 $0

St Augustine Dr. (N) - 2700 2 $0

Starkey St. - 6700 2 $0

Stonehurst St. - 8600 2 $0

Stonehurst St. - 8700 2 $0

Stratton Dr. - 5500 2 $0

Templecliff Dr. - 1100 2 $0

Templecliff Dr. - 1200 2 $0

Trailwood Dr. - 5800 2 $0

Turf Dr. - 1600 2 $0

Valentine Ct. - 7900 2 $0

Veterans Dr. - 4500 2 $0

Wes Hodges Rd. - 7900 2 $0

Western Hills Dr. - 6800 2 $0

Western Hills Dr. - 6900 2 $0

Wilbarger Dr. - 3300 2 $0

Wilbarger Dr. - 3400 2 $0

Friday, March 31, 2006 Page 131 of 349 Project Name Description Tier Score Estimate Council District 5 Street Resurfacing

Woodacre Cir. - 300 2 $0 Woodmont Dr. - 600 2 $0

Summary for 'Category' = Street Resurfacing (288 detail records) Sum $5,700,607 Streetscape / Urban Design

Lake June Road Urban Design, from US 175 to S. Loop 12 Urban design enhancements on Lake June Rd, from US 2 $4,948,215 Hwy175 to Jim Miller Rd, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Pemberton Hill Rd Expansion / Urban Design, from Lake Urban design enhancements on Pemberton Hill Rd. from Lake 2 $6,435,105 June Rd. to S. Loop 12 June Rd to South Loop 12, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan South Central (SH310) Urban Design/Streetscape, from S. Pedestrian friendly enhancments along SH310, from South 2 $6,190,693 Loop 12 to the Trinity River Bridge Loop 12 to the Trintiy River bridge as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $17,574,013 Thoroughfares

Buford - Camp Wisdom to Millet Build a 4 lane undivided roadway 1 70 $1,965,020

Elam - Jim Miller to Pemberton Hill Widen to a six lane divided roadway 1 43 $6,738,980

Red Bird (W) - Hampton to Polk Widen to a six lane divided roadway 1 35 $6,220,917

Long Acre - Loop 12 to Jim Miller Build a new 4 lane undivided roadway 1 25 $4,312,872

Military Pkwy - Buckner Blvd. to Prairie Creek Widen to a six lane divided roadway 1 23 $2,090,034

Simpson Stuart - S. Central to Locust Thoroughfare Widen to a six lane divided roadway 1 23 $2,009,344

Military Pkwy - Sam Houston to Prairie Creek WIDEN TO 6 LANE ROADWAY. 1 21 $6,457,947

Friday, March 31, 2006 Page 132 of 349 Project Name Description Tier Score Estimate Council District 5 Thoroughfares

Red Bird (W) - Westmoreland to U.S. 67 Widen to a six lane divided roadway 1 19 $4,323,417 Sam Houston - Forney to Mesquite CL. Widen to a four lane divided roadway 1 19 $10,993,886

Pemberton Hill - Elam to Lake June Build a new four lane undivided roadway 1 18 $3,289,326

Pemberton Hill - Loop 12 to Elam Build a new four lane undivided roadway 1 18 $1,897,519

Cheyenne - Cradlerock to Bruton Widen existing NB service road from 2 lane to 3 lane 1 13 $4,465,210

Haas - Ledbetter to Stag Widen to a four lane undivided roadway 1 10 $448,110

Sand Springs - Master to Lewinston Widen to a four lane undivided roadway 1 10 $5,458,503

SH 310/ SM Wright - Loop 12 to Simpson Stuart Widen to a six lane divided roadway 1 8 $13,192,664

Dallas Eco Business Park Complete extension of Locust Drive, with water, wastewater, 1 0 $6,868,521 and storm drainage, site grading, and construction of flood storage pond/wetlands mitigation area. Summary for 'Category' = Thoroughfares (16 detail records) Sum $80,732,269 Traffic Intersection Capacity & Safety Improvement

Buckner @ Lake June Street Modifications and Bottl Widen Buckner and Lake June to provide dual left-turn lanes 1 75 $1,474,127 on all approaches. Also, add right-turn lanes on all approaches. Buckner @ CF Hawn Frwy Street Modifications and Bo Widen Buckner approaching CF Hawn to provide three through 1 55 $282,062 lanes for northbound and southbound approaches. Ledbetter @ Veterans Street Modifications and Bott Widen Veterans approaching Ledbetter ro provide northbound 1 35 $256,536 and southbound left-turn pockets. Ann Arbor @ Sunnyvale Widen the southbound approach to a left-turn pocket. 1 30 $47,325

Camp Wisdom at Polk Increase curb radius on all four corners. Reduce damage 1 30 $98,275 caused by turning truck traffic. Glencliff @ Lake June Widen Lake June approaching Glencliff to provide an 1 30 $218,247 eastbound left-turn pocket.

Friday, March 31, 2006 Page 133 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Intersection Capacity & Safety Improvement

IH 35 @ Ledbetter Widen Ledbetter to provide a eastbound and westbound left- 2 $634,736 turn lanes. Widen both service road intersections to provide right turn lanes for all approaches. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (7 detail records) Sum $3,011,309 Traffic Safety Improvements-Guardrail Upgrades

Harry Hines 6900 BLK Guardrail Upgrade 1 80 $6,573

Lake June 9400 BLK Guardrail Upgrade 1 73 $26,419

Camp Wisdom 200 W BLK Guardrail Upgrade 1 67 $1,962

Camp Wisdom 400 E BLK Guardrail Upgrade 1 67 $47,319

Elam 7100 BLK Guardrail Upgrade 1 67 $19,176

Lake June 7300 BLK Guardrail Upgrade 1 67 $10,402

Lake June 9000 BLK Guardrail Upgrade 1 67 $14,774

Masters 3000 N BLK Guardrail Upgrade 1 67 $3,925

Prairie Creek 800 N BLK Guardrail Upgrade 1 67 $106,571

Simpson Stuart 4700 BLK Guardrail Upgrade 1 67 $5,935

Bruton 10200 BLK Guardrail Upgrade 1 60 $4,658

Camp Wisdom 1100 E BLK Guardrail Upgrade 1 60 $9,684

Camp Wisdom 700 E BLK Guardrail Upgrade 1 60 $5,392

Elam 6400 BLK Guardrail Upgrade 1 60 $5,839

Elam 8900 BLK Guardrail Upgrade 1 60 $18,825

Prairie Creek 1500 N BLK Guardrail Upgrade 1 60 $6,126

Prairie Creek 600 S BLK Guardrail Upgrade 1 60 $38,512

Friday, March 31, 2006 Page 134 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Safety Improvements-Guardrail Upgrades

Red Bird 3100-3200 W BLK Guardrail Upgrade 1 60 $12,252 Simpson Stuart 4300 BLK Guardrail Upgrade 1 60 $7,578

St. Augustine 1200 S BLK Guardrail Upgrade 1 60 $12,444

St. Augustine 900 S BLK Guardrail Upgrade 1 60 $3,286

Bruton 10100 BLK Guardrail Upgrade 1 53 $5,392

Masters 1900 N BLK Guardrail Upgrade 1 53 $4,658

Prairie Creek 2500 N BLK Guardrail Upgrade 1 53 $9,317

Prairie Creek 500 S BLK Guardrail Upgrade 1 53 $10,529

Prairie Creek 200 N BLK Guardrail Upgrade 1 33 $1,962

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (26 detail records) Sum $399,515 Traffic Signal Upgrades - Citywide

Simpson Stuart @ S M Wright Traffic Signal Upgrade 1 100 $27,249

Houston School Rd @ Ledbetter Traffic Signal Upgrade 1 87 $33,771

Sam Houston @ Scyene Traffic Signal Upgrade 1 87 $117,739

Camp Wisdom @ Hampton Traffic Signal Upgrade 1 80 $41,161

Camp Wisdom @ Polk Traffic Signal Upgrade 1 80 $69,150

Hampton @ Redbird Traffic Signal Upgrade 1 80 $54,881

Polk @ Wheatland Traffic Signal Upgrade 1 80 $54,881

Elam @ Jim Miller Traffic Signal Upgrade 1 67 $107,847

Polk @ Redbird Traffic Signal Upgrade 1 67 $50,875

Conner @ Lake June Traffic Signal Upgrade 1 60 $109,379

Friday, March 31, 2006 Page 135 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic Signal Upgrades - Citywide

Camp Wisdom @ Greenspan Traffic Signal Upgrade 1 53 $54,689 Camp Wisdom @ Pastor Bailey Traffic Signal Upgrade 1 53 $53,924

Hampton @ Wheatland Traffic Signal Upgrade 1 53 $53,924

Hillburn @ Lake June Traffic Signal Upgrade 1 53 $60,305

Ledbetter @ Marsalis Traffic Signal Upgrades Citywide 1 53 $59,635

Polk @ Reynoldston Traffic Signal Upgrade 1 53 $84,002

Lake June @ Pleasant Traffic Signal Upgrade 1 47 $108,422

Holcomb @ Lake June Traffic Signal Upgrade 1 40 $116,781

Elam at Prairie Creek Traffic Signal Upgrades Citywide 1 13 $52,966

Summary for 'Category' = Traffic Signal Upgrades - Citywide (19 detail records) Sum $1,311,581 Traffic System Management - Dynamic Message Signs

Ledbetter 2800 E Dynamic Message Sign 1 15 $76,578

Ledbetter 1400 E Dynamic Message Sign 1 10 $76,578

Ledbetter 1400 W Dynamic Message Sign 1 10 $76,578

Loop 12 (Walton Walker) 6000 Dynamic Message Sign 1 10 $153,156

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (4 detail records) Sum $382,890 Traffic System Management - Flood Detour Signs

Illinois @ Linfield I.T.S. - Dynamic Signs - Flood Dynamic Signs - Flood Detours 1 80 $29,061

Pemberton Hill @ Sarah Lee Dynamic Signs - Flood Detours 1 60 $42,118

St. Augustine @ Lake June Dynamic Signs - Flood Detours 1 60 $27,798

Friday, March 31, 2006 Page 136 of 349 Project Name Description Tier Score Estimate Council District 5 Traffic System Management - Flood Detour Signs

Umphress @ Hillburn Dynamic Signs - Flood Detours 1 60 $7,581 Summary for 'Category' = Traffic System Management - Flood Detour Signs (4 detail records) Sum $106,558 Traffic System Management - Roadside Cameras

Buckner-Bruton Roadside Camera 1 20 $6,382

Buckner-Lake June Roadside Camera 1 20 $12,763

Camp Wisdom-RLT Traffic Systems Management - Roadside Camera 1 20 $6,382

Hampton-IH20 Roadside Camera 1 20 $12,763

Hampton-Ledbetter Roadside Camera 1 20 $4,212

Lancaster-Ledbetter Roadside Camera 1 20 $6,382

Buckner-CF Hawn Frwy Roadside Camera 1 15 $12,763

Illinois-IH45 Roadside Camera 1 10 $6,382

Summary for 'Category' = Traffic System Management - Roadside Cameras (8 detail records) Sum $68,027 Summary for 'Program' = STREET AND TRANSPORTATION (504 detail records) Sum $144,765,810 Summary for 'CD' = 5 (504 detail records) Sum $144,765,810

Friday, March 31, 2006 Page 137 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction

Blue Grass(700) & Furlong - Furlong to 'T' alley Full Reconstruction 1 78 $210,666 Lockmoor & Newcastle - Dale Crest to Harwich Full Reconstruction 1 73 $251,527

Crossman Ave (3200 - 3218) Winnetka - Pueblo to Nomas Full reconstruction Crossman Ave (3200 - 3218) 1 60 $68,920

Dennis & Brockbank - Royal To Silverton Full Reconstruction 1 60 $436,539

Kinkaid & Darvany - Harwich to Web Chappel Full Reconstruction 1 60 $219,161

Newcastle Drive (3023-3097) Walnut Hill - Brockbank to Full recon Newcastle Dr. (3023 - 3097) 1 60 $316,522 Dale Crest Norwalk Avenue 3103-3235 Full recon 1 60 $243,773

Witham(9900) & Valley Ridge - Arvana to Marsh Ln Full Reconstruction 1 60 $534,915

Seguin Dr. & Marsh Place - Marsh Ln To Marsh Ln P Full Reconstruction 1 52.5 $326,449

Flowerdale & Royal Ln. - Coogan to Brockbank Full Reconstruction 1 51 $266,052

Kendale(3000) & Clydale - T-alley to Timberline Full Reconstruction 1 45 $186,535

Lockmoor & Darvany - Dale Crest to Harwich Full Reconstruction 1 45 $256,114

Brockbank & Bellknoll - Channel Dr. to Seymour Full Reconstruction 1 43 $254,839

Witham Street & Valley Ridge - Park to Arvana Full recon. T-ally included Witham St. (9910 - 9946) 1 43 $216,971

Witham(9905) & Constance - Arvana to Constance Full Reconstruction 1 43 $459,397

Matador & Rockdale - Marsh Ln to & incl T-alley Full Reconstruction 1 40.3 $301,220

Community Dr (3031 - 3069) Lanoue - Timberland to "T" Full reconstruction Community Dr (3031 - 3069) 1 28 $192,721 Alley Conroe St (3322 - 3366) Obanchain - McBroom to Morris Full reconstruction Conroe St (3322 - 3366) 1 25 $145,498

Lively Lane (3854-3966) Van Ness - Mixon to Lenel Full reconst Lively Ln. (3854 - 3966) 1 25 $339,496

Witham Street (9951-9987) Constance - Arvana to Glenrio Full recon Witham St. (9951 - 9987) 1 25 $151,880

Allegheny Dr - 10405 - 10731 Full Reconstruction 2 $1,064,210

Allegheny Dr - 10616 Full Reconstruction 2 $94,290

Friday, March 31, 2006 Page 138 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction

Almazan & Bolivar Dr. - El Centro To Marsh Ln. Full Reconstruction 2 $156,730 Almazan Dr - 3704 - 3770 Full Reconstruction 2 $233,433

Beau Purple(5842) - Furlong to Blue Grass Full Reconstruction 2 $69,147

Bimbella La 702 -760 reconstruction - Bimbella La 702 -760 1 $213,142

Bowman Blvd 9805 - 9989 Full reconstruction 2 $518,178

Brockbank Dr - 10002 - 10134 Full Reconstruction 2 $301,984

Brockbank Dr - 10777 - 10785 Full Reconstruction 2 $74,923

Cortez Dr - 3703 - 3771 Full Reconstruction 2 $237,000

Darvany Dr - 3105 - 3195 Full Reconstruction 2 $339,191

Darvany Dr - 3305 - 3363 Full Reconstruction 2 $234,962

Davila Dr - 3702 - 3770 Full Reconstruction 2 $235,981

Dunhaven Rd - 3755 - 3769 Full Reconstruction 2 $332,310

Dunhaven Rd - 3841 - 3899 Full Reconstruction 2 $247,194

Envoy Ct - 7108 - 7188 Full Reconstruction 2 $295,104

Gallant Fox Dr - 611 - 631 Full Reconstruction 2 $215,339

Gallant Fox Dr - 806 - 860 Full Reconstruction 2 $217,633

Harwell Dr - 9905 - 9929 Full Reconstruction 2 $99,897

Harwell Dr - 9906 - 9930 Full Reconstruction 2 $127,165

Kendale Dr - 3102 - 3234 Full Reconstruction 2 $298,926

Linda Dr - 3415 - 3459 Full Reconstruction 2 $180,936

Lockmoor La - 3061 - 3185 Full Reconstruction 2 $342,759

Lockmoor La - 3303 - 3369 Full Reconstruction 2 $243,882

Friday, March 31, 2006 Page 139 of 349 Project Name Description Tier Score Estimate Council District 6 Alley Reconstruction

Lombardy Lane (3302-3333) Storey Cir.- Geraldine to Full reconst Lombardy Ln. (3302 - 3333) 2 $86,916 Webb Chapel Manana Dr - 3704 - 3772 Full Reconstruction 2 $265,288

Manana Dr - 3705 - 3773 Full Reconstruction 2 $239,295

Northwest Hwy (W) - 3205 - 3249 Full Reconstruction 2 $144,749

Park La - 3902 - 3990 Full Reconstruction 2 $295,104

Rockdale Dr - 3611 - 3683 Full Reconstruction 2 $336,388

Webb Chapel & El Rito - Larza to Almazan Full recon Webb Chapel 9526 2 $79,131

Winnetka Avenue & Crossman - Pueblo to Nomas Full recon Winnetka Ave. (3203 - 3223) 2 $70,197

Summary for 'Category' = Alley Reconstruction (52 detail records) Sum $13,270,578 Bridge Repair and Modification

Canada Drive over W. Fork Trinity River Embankment eroded and settling; moderately severe; grout 1 58.75 $63,815 injection beneath abutment caps, grout injection beneath approach slabs, replace sidewalks Sylvan Avenue (3 spans) over Trinity River Repair spalls girder ends N & S spans, repair impact damage 1 56.25 $153,156 SE wingwall N span, jack & support on bent cap N span, repair scour C span using cofferdam, critical, programmed for repl 12/07 Continental Ave. over Trinity River Major rehab necessary, spalls, rebar exposed, cracks ($1M), 1 45 $127,630 alternatively, replace NW retaining wall, replace approaches; not critical Summary for 'Category' = Bridge Repair and Modification (3 detail records) Sum $344,601 I.T.S. - Speed & Travel Time System

Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $60,305

Friday, March 31, 2006 Page 140 of 349 Project Name Description Tier Score Estimate Council District 6 I.T.S. - Speed & Travel Time System

Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $60,305 Intergovernmental Partnership Projects

California Crossing @ Elm Fork of Trinity River Bridge rehabilitation and/or reconstruction 2 $0

Canada @ W. Fork Trinity River Bridge rehabilitation and/or reconstruction. 2 $0

Industrial Blvd - Cadiz St to Continental Ave Partnership project with Dallas County and TxDOT to 1 $6,860,113 reconstruct the existing six and eight lane divided roadway. Total estimated cost of $40 million. Supplements 2003 Bond Program funds. Estimated to be let by mid 2010. Loop 12 - Spur 408 to IH 35E. Partnership project with TxDOT to fulfill 10% funding 1 $1,308,208 requirement for right of way and utility relocations to accommodate freeway improvements. Total estimated cost of $20 million. Supplements 2003 Bond Program funds. Singleton - WB at Trib. of W Fork (E of Martinez) Bridge rehabilitation and/or reconstruction 2 $0

Singleton Blvd - Chalk Hill to E of Peoria Partnership project with Dallas County to reconstruct existing 1 $1,347,773 six lane divided roadway. Total estimated cost of $5.3 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Singleton Blvd Urban Design Phase II - Hampton Rd to Urban design enhancements along Singleton as recommended 1 $12,039,146 Walton Walker (Loop 12) in the Trinity River Comprehensive Land Use Plan. Sylvan Bridge from Irving to Gallagher - Amenities Partnership project with TxDOT to provide new six lane bridge 1 $9,648,828 with amenities over the Trinity River. Total estimated cost of $30 million. Estimated to be let by TxDOT late 2007. Supplements 2003 Bond Program funds. Trinity River - Consolidation of Power Transmission Lines Cost to remove existing aerial power transmission lines 1 $2,042,080 along East Levee with proposed new line along Industrial currently along the East Levee of the Trinity River Corridor Blvd. floodway and consolidate with the proposed new transmission lines along Industrial Blvd. to avoid utility conflicts with MHH Signature Bri

Friday, March 31, 2006 Page 141 of 349 Project Name Description Tier Score Estimate Council District 6 Intergovernmental Partnership Projects

Trinity River - Underground existing power transmission Cost to underground existing power transmission lines between 1 $35,991,660 lines upstream from future Margaret Hunt Hill Bridge switching stations, upstream from future Margaret Hunt Hill Bridge to avoid utility conflicts with MHH Signature Bridge and Trinity Parkway (Potential cost share with TxDOT) Trinity River - Underground existing transmission lines Cost to underground existing power transmission lines along 1 $16,783,345 along East Levee the East Levee of the Trinity River Corridor to avoid utility conflicts with three Signature Bridges and Trinity Parkway (Potential cost share with TxDOT for partial segment) Walnut Hill - Malibu to Luna Partnership project with Dallas County to design and construct 1 $23,930,625 6 lane divided roadway. Total estimated cost of $25 million. Estimated to be let by late 2009. Summary for 'Category' = Intergovernmental Partnership Projects (12 detail records) Sum $109,951,777 Street Lighting - Freeway Lighting

Loop 12 (Walton Walker) - I-30 to I-35E Freeway Lighting Installation 1 5 $205,851

Loop 12 (Walton Walker) - I-30 to Spur 408 Freeway Lighting Installation 1 5 $228,758

Summary for 'Category' = Street Lighting - Freeway Lighting (2 detail records) Sum $434,609 Street Petitions

Bagley St (N) - Goodman St to Dead End Engineering, Paving and Drainage 1200 block 1 99 $530,941

Goodman St. - N Bagley St. to Morocco Ave. Engineering, Paving & Drainage 5100-5200 Blk 1 80 $390,548

Summary for 'Category' = Street Petitions (2 detail records) Sum $921,489 Street Reconstruction Local Streets

Beatrice St - Comstock St to Commerce St 2200 - 2400 Blks 1 68.37 $982,751

Goodnight Ln - Royal Ln to Crown Rd 11400 Blk 1 57.35 $1,340,115

Friday, March 31, 2006 Page 142 of 349 Project Name Description Tier Score Estimate Council District 6 Street Reconstruction Local Streets

Gallant Fox Dr - Merrifield Rd East to 750 Ft 1000 Blk 1 54.5 $239,306 Van Ness Lane - Marsh Lane to Mixon Drive 3700 Blk 1 54.24 $739,167

Weisenberger Dr - Bernal Dr to Leath St 3700 - 3800 Blks 1 53.55 $462,021

Hammerly Dr - Leath St to Angelina Dr 3900 blk 1 48.88 $257,813

Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $4,021,172 Street Reconstruction Thoroughfares

Regal Row - Viscount Row to UP RR 200 - 300 Blks 1 78.17 $2,393,063

Fort Worth Av - Clinton Av to Edgefield av 1300 Blk 1 72.25 $842,358

Crown Rd - Emerald St to Goodnight Ln 2300 Blk 1 71.62 $1,114,782

Pulaski St - Irving Blvd to Halifax St 5000 - 5100 Blks 1 68.66 $1,249,498

Southwell Rd - Ables Ln to Shady Tr 2500 Blk 1 66.76 $984,027

River Wharf Dr - Barge Ln to Sea Harbor Rd 6300 Blk 1 66.44 $391,824

Empire Central Pl - Empire Central Dr to Empress Row 1100 Blk 1 65.61 $1,161,433

Irving Blvd (N Serv Rd) - Mockingbird ln to Woodall St 3100 - 3200 Blks 1 64.08 $2,125,040

Empress Row - Regal Row to Viceroy Dr 9000 Blk 1 62.81 $583,269

Titan Dr - Empress Row to Governors Row 1200 Blk 1 62.72 $1,410,312

Walnut Hill La - Harry Hines Blvd to Denton Dr 2700 Blk 1 62.45 $814,279

Wire Way - 10600 Blk 10600 Blk 1 60.93 $868,666

Composite Dr - Program Dr to Electronic Ln 10700 blk 1 60.72 $631,769

Newkirk St - W Northwest Hwy North to 700 Ft 10500 Blk 1 58.67 $724,938

Friday, March 31, 2006 Page 143 of 349 Project Name Description Tier Score Estimate Council District 6 Street Reconstruction Thoroughfares

Continental Ave. - Industrial Blvd. to Stemmons Frwy Design and Reconstruction to 8 lane cross section, turn lanes, 1 $3,701,270 signalization, ROW acquisition, and pedestrian friendly streetscaping as recommended in the Trinity River Balanced Vision Plan Trinity River - Underground Transmission Lines below Cost to underground proposed power transmission lines below 1 $21,441,840 Canada Dr, from Sylvan to West Levee Switching Station Canada Drive, from Sylvan to West Levee Switching Station near Continental West Commerce Street Reconstruction / Urban Design, Roadway reconstruction and streetscape enhancements on 1 $2,931,470 from Davis to Trinity River Levee West Commerce, from levee to Davis, to serve as gateway in Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (17 detail records) Sum $43,369,837 Street Resurfacing

Ladybird Ln. - Denton Dr. to Monroe Dr. 2800 - 2900 1 88.21 $120,355

Sharp St. - Quebec St. to Halifax St. 4800-5100 1 82.07 $292,656

Congressman Ln. - Denton Dr. to Monroe Dr. 2800 - 2900 1 81.775 $102,232

Lakawana St. - Quebec St. to Irving Blvd. 4900-5000 1 80.77 $137,330

Calvert St. - Quebec St. to Irving Blvd. 4800-4900 1 80.48 $141,031

Iron Ridge St. - Lakawana St. to Stemmons Fwy. 3000-3100 1 79.95 $187,233

Zodiac Ln. - Virgo Ln. to Royal Ln. 11200 - 11300 1 76.92 $157,623

Monroe Dr. - Walnut Hill Ln. to Merrell Rd. 10000 - 10200 1 76.215 $431,645

Grissom Ln. - Royal Ln. to Forest Ln. 10800 - 11500 1 76.04 $559,530

Hawick Ln. - Marsh Ln. to Cul-De- Sac 3700 Block 1 75.98 $52,328

Doric St. - Abernathy Ave. to Cul-De-Sac 10500 - 10700 1 75.93 $72,494

Royal Ln. - Emerald St. to Denton Dr. 2400 - 2600 1 75.86 $457,681

Friday, March 31, 2006 Page 144 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Perth St. - Harry Hines Blvd. to Cul-de-Sac 2600 block 1 74.2 $114,995 Emerald St. - Royal Ln. to LBJ Frwy. 11400 - 11700 1 74.07 $310,269

Anaheim Dr. - Northaven Rd. to Forest Ln. 11300 - 11500 1 73.88 $212,504

Hidalgo Dr. - Webb Chapel Rd. to Marsh Ln. 3400 - 3600 1 73.395 $323,414

Fontana Dr. - Larga Dr. to Marsh Ln. 3500 - 3600 1 73.38 $176,129

Indian Tr. - Royal Ln. to Denton Dr. 10800 - 11300 1 72.75 $378,933

Linda Dr. - Larga Dr. to Marsh Ln. 3500 - 3600 1 72.74 $106,826

Transport Dr. - Black Gold Dr. to Irving Blvd. 4800-4900 1 72.24 $189,786

Gaspar Dr. - Larga Dr. to Lakemont Dr. 3500 - 3900 1 70.66 $284,870

Arvana St. - Constance St. to Valley Ridge Rd. 9900 Block 1 70.36 $100,572

Halifax St. - Iron Ridge St. to mockingbird Ln. 3100 - 3200 1 70.145 $377,274

Manana Dr. - Nekirk St. to Shady Tr. 2200 - 2500 1 69.96 $458,702

La Joya Dr. - Larga Dr. to Dunhaven Rd. 3500 - 3700 1 69.765 $408,416

Sovereign Row - Cul-De-Sac to Dividend Dr. 7600 - 8300 1 69.26 $286,657

Directors Row - Cul-De-Sac to Profit Dr. 8300 - 8800 1 67.925 $283,466

Wemdon Dr. - Lenel Pl. to Mixon Dr. 3800 - 3900 1 67.73 $247,602

Durango Dr. - El Centro Dr. to Marsh Ln. 3600 Block 1 67.09 $141,797

Dunhaven Rd. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 66.95 $258,578

Electronic Ln. - Composite Dr. to Composite Dr. 2500 - 2600 1 66.86 $156,219

Northaven Rd. - Denton Dr. to Cromwell Dr. 2600-3300 1 66.555 $263,658

Black Gold Dr. - Cash Rd. to Transport Dr. 3900 - 4000 1 66.215 $136,947

El Centro Dr. - Webb Chapel Rd. to Manana Dr. 9400 - 9700 1 66 $416,074

Friday, March 31, 2006 Page 145 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Hawick Ln. - Mixon Dr. to Wemdon Dr. 3800 - 3900 1 65.975 $227,054 Kelso Dr. - Beau Purple Dr. to 533 Kelso Dr. 500 block 1 65.59 $90,745

Eaton Dr. - Mixon Dr. to Wemdon Dr. 3800 Block 1 65.53 $117,547

Fort Worth Ave. - Windomere Ave. to Montclair Ave. 1500 Block 1 65.005 $59,220

Hargrove Dr. - Webb Chapel Ext. to Larga Dr. 9600 - 9700 1 64.98 $31,269

Sheila Ln. - Northwest Hwy. to Timberline Dr. 3200 block 1 64.4 $158,006

Bowman Blvd. - Park Ln. to Walnut Hill Ln. 9800 - 9900 1 64.39 $198,337

Tumalo Tr. - Bernal Dr. to Cul-De-Sac 3100 - 4000 1 64.11 $245,943

Ables Ln. - Electronic Ln. to Southwell Rd. 10900 - 11000 1 63.66 $219,651

Webb Chapel Rd. - Almazan Dr. to Walnut Hill Ln. 9500 - 9900 1 63.61 $1,036,228

Chireno St. - Bowman Blvd. to Walnut Hill Ln. 9900 Block 1 62.76 $182,128

Harlingen St. - Leath St. to Dead End 3900 Block 1 62.37 $50,797

Clover Ln. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 61.14 $183,423

Lively Ln. - Park Ln. to Lenel Pl. 3800 - 3900 1 60.99 $187,999

Profit Dr. - Chancellor Row to Premier Row 500 - 700 1 60.38 $245,177

Irving Blvd. Svc. Rd. (S) - Lakawana St. to Calvert St. 2700 - 2800 1 60.06 $300,441

Davila Dr. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 59.72 $191,056

Allegheny Dr. - Carrizo Ln. to Brockbank Dr. 10400 - 10700 1 58.83 $187,744

Chappel St. - Ft Worth Ave. to IH-30 Svc. Rd. 1600 - 1700 1 58.11 $32,290

Jane Ln. - Mockingbird Ln. to Don Dr. 3300 - 3400 1 57.14 $108,868

Zodiac Ln. - Merrell Rd. to Dairy Milk Ln. 10300 block 1 56.1 $90,745

Shorecrest Dr. Denton Dr to 445' W. of 3250 Shorecrest 2500 - 3100 1 55.68 $596,415 Dr.

Friday, March 31, 2006 Page 146 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Mixon Dr - Northwest Hwy. to Van Ness Ln. 9300 - 9700 1 55.66 $384,804 Odessa St. - Tumalo Tr. toDead End 3100 - 4100 1 54.41 $386,591

Larga Dr. - Hidalgo Dr. to Park Ln. 9700 block 1 54.23 $152,263

Keeneland Pkwy. - Cavalcade Dr. to Merrifield Rd. 6100 - 6200 1 53.695 $52,322

Winnetka Ave. (N) - Singleton Blvd. to Morris St. 3000 - 3300 1 53.4 $128,396

Winnetka Ave. (N) - Vecinos Blvd. to Canada Dr. 3600 block 1 53.305 $15,316

Dennis Rd. - Northaven Rd. to Forest Ln. 11400 - 11700 1 53.17 $208,930

Finnell St. - Lombardy Ln. to Rentzel St. 10500 - 10700 1 52.71 $197,571

Furlong Dr. - Blue Grass Dr. to 145' N of Beau Purple Dr. 500 - 700 1 51.28 $98,658

Iroquois Dr. - Dead End to Chippewa Dr. 1900 - 2000 1 51.15 $140,265

Kinkaid Cir. - Webb Chapel Rd. to Cul-De-Sac 3400 block 1 51 $10,849

Top Line Dr. - Blackgold Dr. to Irving Blvd. 4800 - 4900 1 50.57 $226,160

Cherry Laurel Ln. - Keenland Pkwy. To Sportsmans Pkwy. 900 - 1200 1 50.2 $136,309

Brockbank Dr. - Merrell Rd. to Coogan Dr. 10400 - 10600 1 50.09 $302,738

Sumter Dr. - Timberline Dr. to Hargrove Dr. 3100 - 3200 1 50.08 $180,724

Palacios Ave. - Gallagher St. to Homeland St. 3500 - 3600 1 49.42 $55,264

Viceroy Dr. - Governors Row to Stemmons Frwy. 1200 - 1300 1 49.29 $273,001

Metromedia Pl. - Chancellor Row to J.W. Carpenter Frwy. 800 - 1000 1 48.98 $218,120

Dale Crest Dr. - Park Ln. to Park Ln. 9700 - 9800 1 45.08 $121,631

Dividend Dr. - Directors Row to John W. Carpenter Frwy. 700 - 1000 1 45.08 $211,228

Ablene St. - Gallagher St. to Leath St. 3500 - 3800 1 43.42 $175,236

Kinkaid Dr. - Brockbank Dr. to Dale Crest Dr. 3000 - 3100 1 39.97 $145,115

Friday, March 31, 2006 Page 147 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Barge Ln. - Singleton Blvd. to River Wharf Dr. 2600 - 2900 1 38.63 $89,469 Fannie St. - Chalk Hill Rd. to Dead End 5100 - 5500 1 38.13 $248,623

Monetary Dr. - Viscount Row to Directors Row 400 - 500 1 37.79 $117,292

Valley Ridge Rd. - Park Ln. to Marsh Ln. 3500 - 3600 1 35.755 $295,336

Harwell Dr. - Chapel Creek Dr. to Kinkaid Dr. 9800 - 9900 1 33.88 $126,992

Ingersoll St. - Nomas St. to Gallagher St. 3300 - 3400 1 33.51 $92,276

Admiral Dr. - 9300 2 $0

Alberta Dr. - 2300 2 $0

Amos St. - 1300 2 $0

Andjon Dr. - 2600 2 $0

Angelina Dr. - 4800 2 $0

Bay Oaks Dr. - 2900 2 $0

Bayonne St. - 800 2 $0

Beau Purple Dr. - 5800 2 $0

Beckley Av. (N) - 2100 2 $0

Beckley Av. (N) - 2600 2 $0

Beckley Av. (N) - 2700 2 $0

Beckley Av. (N) - 3000 2 $0

Bernal Dr. - 5700 2 $0

Bimebella La. - 700 2 $0

Blackhawk Dr. - 5400 2 $0

Bogata Blvd. - 3400 2 $0

Friday, March 31, 2006 Page 148 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Botany Bay Dr. - 700 2 $0 Brenner Dr. - 2600 2 $0

Canada Dr. - 2200 2 $0

Canada Dr. - 2500 2 $0

Canada Dr. - 2600 2 $0

Canada Dr. - 2700 2 $0

Canada Dr. - 2800 2 $0

Canada Dr. - 2900 2 $0

Canada Dr. - 3100 2 $0

Canada Dr. - 3300 2 $0

Canada Dr. - 3400 2 $0

Canada Dr. - 3500 2 $0

Carrizo La. - 2900 2 $0

Cartwright St. - 2400 2 $0

Cartwright St. - 2500 2 $0

Century St. - 2800 2 $0

Chapel Creek Dr. - 3200 2 $0

Chihuahua St. - 3500 2 $0

Clymer St. - 2300 2 $0

Conveyor La. - 1200 2 $0

Crown Rd. - 2400 2 $0

Darvany Dr. - 3200 2 $0

Friday, March 31, 2006 Page 149 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Darvany Dr. - 3300 2 $0 Davis St. (W) - 5300 2 $0

Davis St. (W) - 5400 2 $0

Deason St. - 2300 2 $0

Diplomacy Row. - 9200 2 $0

Directors Row. - 9100 2 $0

Don Dr. - 4800 2 $0

Easy St. - 3400 2 $0

Empress Row. - 8800 2 $0

Forest La. - 2500 2 $0

Gallant Fox Dr. - 500 2 $0

Gallant Fox Dr. - 600 2 $0

Gemini La. - 11300 2 $0

Glenrio La. - 9900 2 $0

Goodnight La. - 11500 2 $0

Governors Row. - 9100 2 $0

Gretna St. - 4700 2 $0

Halifax St. - 4200 2 $0

Hammerly Dr. - 3600 2 $0

Hammerly Dr. - 3700 2 $0

Hammerly Dr. - 4000 2 $0

Harry Hines Blvd. - 11500 2 $0

Friday, March 31, 2006 Page 150 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Indian Trl. - 11000 2 $0 Iroquois Dr. - 2400 2 $0

King Arthur Dr. - 9100 2 $0

King William Dr. - 10500 2 $0

King William Dr. - 10600 2 $0

Kinkaid Cir. - 3400 2 $0

Lakawana St. - 4800 2 $0

Lemmon Av. E - 9200 2 $0

Leo La. - 11200 2 $0

Life Av. - 1500 2 $0

Lockmoor La. - 3100 2 $0

Lockmoor La. - 3200 2 $0

Lockmoor La. - 3300 2 $0

Lombardy La. - 2300 2 $0

Majesty Dr. - 1200 2 $0

Marsh Lane Pl. - 3600 2 $0

Maybank Dr. - 10500 2 $0

Maybeth St. - 3400 2 $0

Mcbroom St. - 1200 2 $0

Mcbroom St. - 900 2 $0

Memphis St. - 4700 2 $0

Mercantile Row. - 5000 2 $0

Friday, March 31, 2006 Page 151 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Mercantile Row. - 5100 2 $0 Merrell Rd. - 2400 2 $0

Mockingbird La. (W) - 500 2 $0

Montclair Av. (N) - 2000 2 $0

Morocco Av. (N) - 1200 2 $0

Morrison La. - 11000 2 $0

Morrison La. - 11100 2 $0

Nagle St. - 2800 2 $0

Navaro St. - 3500 2 $0

Newcastle Dr. - 3100 2 $0

Newkirk St. - 10600 2 $0

Nogales Dr. - 3400 2 $0

Nomas St. - 1200 2 $0

Norma St. - 4800 2 $0

Nova Dr. - 2600 2 $0

Obenchain St. - 3500 2 $0

Oradell La. - 3000 2 $0

Overlake Dr. - 9400 2 $0

Park La. - 3200 2 $0

Park La. - 3700 2 $0

Ponder Dr. - 3000 2 $0

Profit Dr. - 1200 2 $0

Friday, March 31, 2006 Page 152 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Quaker St. - 1100 2 $0 Quebec St. - 3000 2 $0

Quinella Dr. - 800 2 $0

Reading St. - 4800 2 $0

Reading St. - 4900 2 $0

Regal Row. - 100 2 $0

Rochelle Dr. - 3900 2 $0

Rutz St. - 3300 2 $0

Security Dr. - 1100 2 $0

Security Dr. - 1200 2 $0

Seymour Dr. - 2900 2 $0

Shady Trl. - 10600 2 $0

Shaw St. - 1600 2 $0

Shorecrest Dr. - 3600 2 $0

Silverton Dr. - 2900 2 $0

Singleton Blvd. - 1000 2 $0

Singleton Blvd. - 1100 2 $0

Singleton Blvd. - 1300 2 $0

Singleton Blvd. - 1400 2 $0

Singleton Blvd. - 1500 2 $0

Singleton Blvd. - 1600 2 $0

Singleton Blvd. - 1700 2 $0

Friday, March 31, 2006 Page 153 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Singleton Blvd. - 200 2 $0 Singleton Blvd. - 300 2 $0

Singleton Blvd. - 400 2 $0

Singleton Blvd. - 500 2 $0

Singleton Blvd. - 600 2 $0

Singleton Blvd. - 6400 2 $0

Singleton Blvd. - 700 2 $0

Singleton Blvd. - 800 2 $0

Singleton Blvd. - 900 2 $0

Southwell Rd. - 2400 2 $0

Sovereign Row. - 8400 2 $0

Sovereign Row. - 8600 2 $0

Sovereign Row. - 8700 2 $0

Sovereign Row. - 8800 2 $0

Spangler Rd. - 10600 2 $0

Sportsmans Pkwy. - 5800 2 $0

Sportsmans Pkwy. - 5900 2 $0

Storey La. - 2600 2 $0

Sylvan Av. - 2300 2 $0

Sylvan Av. - 2400 2 $0

Sylvan Av. - 2700 2 $0

Sylvan Av. - 2800 2 $0

Friday, March 31, 2006 Page 154 of 349 Project Name Description Tier Score Estimate Council District 6 Street Resurfacing

Sylvan Av. - 2900 2 $0 Tarna Dr. - 2600 2 $0

Tillery Av. (S) - 200 2 $0

Vicksburg St. - 4700 2 $0

Vilbig Rd. - 2100 2 $0

Viscount Row. - 9100 2 $0

Walnut Hill La. - 2300 2 $0

Walnut Ridge St. - 2400 2 $0

Webb Chapel Ext. - 3000 2 $0

Webb Chapel Ext. - 3100 2 $0

Winnetka Av. (N) - 3500 2 $0

Witham St. - 9800 2 $0

Witham St. - 9900 2 $0

Woodall St. - 5100 2 $0

Zelrich La. - 2600 2 $0

Summary for 'Category' = Street Resurfacing (247 detail records) Sum $17,878,391 Streetscape / Urban Design

Northwest Hwy Urban Design Project Pedestrian bridge across Northwest Hwy at Timberline. 1 74 $418,397

Bernal Drive Urban Design, from Singleton to Peoria Urban design enhancementsalong Bernal, from Singleton to 2 $4,124,593 Peoria, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan

Friday, March 31, 2006 Page 155 of 349 Project Name Description Tier Score Estimate Council District 6 Streetscape / Urban Design

Norwich Street Urban Design, from Singleton to Bernal Urban design enhancements along Norwich, from Singleton to 2 $2,738,078 Bernal, to encourage pedestrain use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Sylvan Ave Urban Design, from W. Commerce to Trinity Enhancements on Sylvan, from West Commerce to levee, to 2 $6,293,627 River Levee encourage pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Trinity River Park - Reunion Gateway to Trinity Park - Design and Construction of major pedestrian and vehicular 2 $8,838,378 Access from Industrial Blvd. access to Reunion Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan Trinity River Park - Reunion Gateway to Trinity Park - Design of major pedestrian and vehicular access to Reunion 2 $893,410 Access from Industrial Blvd. - Design Only Gateway from Industrial as recommended in the Trinity River Balanced Vision Plan West Dallas Gateway Park Parking, Pedestrian Ramps, Signage for Parks at west end of 2 $2,789,309 Continental St Viaduct at Beckley Westmoreland Road Urban Design, from UPRR to Trinity Urban design enhancements along Westmoreland, from Union 2 $4,093,783 River Levee Pacific RR to levee, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (8 detail records) Sum $30,189,575 Thoroughfares

Singleton -Walton Walker to Trinity River Widen to a six lane divided roadway 1 74 $0

Community - NW Hwy to Webb Chapel Widen to 4 lane undivide roadway 1 68 $4,543,597

Commerce - Sylvan to Canada Widen to 6 lane divided roadway 1 60.586 $4,459,113

Luna - Royal to Spur 482/ NW Highway Widen to a six lane divided roadway 1 60 $18,039,340

Singleton - Grand Prairie C.L. to Walton Walker Widen to 4 lane undivided roadway 1 53 $2,890,234

Harry Hines - Mockingbird to Webb Chapel Ext Widen to 8 lane divided roadway 1 52 $5,707,942

Friday, March 31, 2006 Page 156 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares

Harry Hines - Royal to NW Hwy Widen to 8 lane divided roadway 1 50 $23,679,139 Chalk Hill - Singleton to I 30 construct 4 lane divided 1 48 $4,093,416

Storey - Spur 482 to Dallas C.L. Widen to 6 lane divided roadway 1 48 $7,442,016

Luna - Wildwood - NW Hwy to Irving C.L. Widen to 6 lane divided roadway 1 46.989 $2,301,179

Goodnight - Offset Elim. from Walnut Hill (at Malibu) to Build a new four lane undivided roadway 1 46 $3,340,039 Ex. Align 1000' Colorado - Walton Walker to Westmoreland Build a new 4 lane undivided roadway 1 43 $8,274,815

Northaven - Denton to Harry Hines Build a new 4 lane undivided roadway 1 42 $1,014,819

Shorecrest - Harry Hines to Regal Row Build a new four lane undivided roadway with new right of way. 1 42 $4,602,359 UP/HP water treatment plant is in path of roadway alignment. Harry Hines - Webb Chapel to NW Highway Widen to 8 lane divided roadway 1 40 $5,618,797

Manana - IH 35E to Newkirk Widen to 4 lane undivided roadway 1 38.107 $1,014,819

Goodnight- Lombardy to Manana Widen to a four lane undivided roadway 1 38 $3,918,009

Storey - Spur 482 to IH 35 Widen to 6 lane divided roadway 1 38 $2,621,620

Manana - Loop 354/ Harry Hines to IH 35E Widen to a four lane undivided roadway 1 36 $1,522,230

Wildwood - Irving City Limit to Nortwest Highway Build a new four lane undividedeast of BNSF RR 1 33 $7,020,099

Brockbank - Lombardy to Wheellock Widen from 38' to 44' 1 31 $2,976,806

Jefferson - Walton Walker to Calumet Widen to a six lane divided roadway 1 31 $3,118,770

Mican/Pluto/Schuster -Singleton to Bernal Build a new four lane undivided roadway 1 30 $5,544,619

Canada Dr. - Hampton Road to Westmoreland Reconstruct roadway 1 29 $4,866,306

Canada Dr. - Westmoreland to Pluto build a new 4 lane roadway 1 29 $5,073,383

Newkirk - Joe Field to Manana Build a new 4 lane undivided roadway 1 29 $7,103,742

Merrell - IH 35E to Goodnight Thoroughfares - B Widen to a 4 lane undivided roadway 1 28 $1,014,819

Canada Dr. - Sylvan Road to Hampton Road Rebuild to 4 lanes 1 27 $4,855,915

Friday, March 31, 2006 Page 157 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares

Goodnight - Joe Field to Royal Build a new 4 lane undivided roadway 1 27 $3,842,655 Manana - Newkirk to Spangler Widen to 4 lane undivided roadway 1 27 $2,434,542

Commerce (W) - Hampton to Sylvan Widen to six lane divided roadway from a two to four lane 1 26 $3,786,173 roadway Emerald - Royal to I-635 Widen to a four lane undivided roadway 1 26 $3,803,628

Manana - Spangler to Luna Build a new 4 lane undivided roadway 1 26 $1,691,368

California Crossing - Wildwood to N.W. Hwy. widen to standard 4 lane roadway 1 24 $7,469,615

Manana - Hines to I.H. 35E Widen to 4 lane undivide roadway 1 24 $1,522,230

Newkirk - Royal to Joe Field Widen to a four lane undivided roadway 1 24 $1,099,390

Timberline - Lombardy to N.W. Hwy Widen to a four lane undivided roadway 1 23 $5,419,389

Merrell - Shady Trail to IH 35E Widen to four lane undivided roadway 1 22 $2,114,209

Merrell - Harry Hines to Denton Widen to a four lane undivided roadway 1 21 $1,463,445

Merrell -Denton to Harry Hines Widen to a four lane undivided roadway 1 21 $1,463,445

Goodnight - Crown to IH635 Widen to a four lane undivided roadway 1 20 $2,106,330

Reeder - Royal to Forest Widen to a four lane undivided roadway 1 20 $4,228,418

Chalk Hill Rd - Davis St to 800' south of IH-30 4-Lane Divided, Thoroughfare Plan anticipated to be revised 1 19 $2,068,282 from 6 to 4 due to the construction of Cockrel Hill Road. Walnut Hill - 250' West of Malibu to IH35E Widen to a six lane divided roadway 1 19 $636,603

Walnut Hill - Luna to 250' west of Malibu Build new 6 lane divided roadway 1 19 $16,916,776

Lombardy - NW Highway to Harry Hines Widen to a four lane undivided roadway 1 18 $2,875,325

Merrell - Luna to Goodnight Build a new 4 lane undivided roadway 1 18 $5,919,786

California Crossing - Irving City Limit to Wildwood Build a 4 lane undivided bridge and roadway 1 17 $5,852,554

Canada - Beckley to Sylvan Widen 8'-10' on each side, increase median to 15' 1 17 $1,353,094

Shady Trail - Loop 12 to Harry Hines Widen to a four lane undivided roadway 1 17 $9,897,211

Friday, March 31, 2006 Page 158 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares

Crown - Emerald to I.H. 35E Widen to a four lane undivided roadway 1 16 $323,804 Canada Dr. - Margret Hunt Hill Bridge to Sylvan Avenue Build a four lane roadway 1 15 $4,749,121

Unnamed NW2 - Harry Hines and Unnamed NW1 Build a new 4 lane divided roadway 1 15 $1,590,502

Crown - Newkirk to Goodnight Widen to a four lane undivided roadway 1 14 $259,044

SH 356/ Commonwealth - I.H. 35 to Irving Bouleva Widen to a six lane divided roadway 1 14 $1,014,819

Commonwealth - I.H. 35 to Irving Blvd Widen to 6 lane divided roadway 1 12 $1,014,819

Continental Viaduct - Trinity River to IH 35 1 11 $3,837,879

Beckley - 500' south of Commerce to Margret Hunt Hill Widen to fourand six lane divided roadway (Supplement Trinity 1 10 $3,973,571 Bridge Bond Funds) Crown - IH 35E to Reeder Widen to a four lane undivided roadway 1 10 $253,705

Newkirk - Crown to 500' N of Royal Widen to a four lane undivided roadway 1 10 $1,268,525

Program Dr -IH 35E to Composite Add a new four lane undivided roadway (TP amendment 1 10 $1,593,441 required) Schuster - Mican to Bernal Build a new 4 lane undivided roadway 1 10 $1,090,302

Vilbig - Akron to W. Commerce Widen to a four lane undivided roadway 1 5 $1,669,380

IH 35E - Spur 348/ Northwest Hwy to North of Store Enhanced service roads 1 3 $2,537,050

IH 35E - Walnut Hill to Manana Enhanced service roads 1 3 $2,959,893

Goodnight - Royal to North of Harcourt 1 0 $3,399,212

Unnamed NW1 - I.H. 35E to I.H. 635 Build a new 4 lane divided roadway 1 0 $6,229,466

Downtown Levee Road Design and Construction of Downtown Levee Road as 1 $2,068,323 recommended in the Trinity River Balanced Vision Plan Extend / Connect Herbert & Hardwick Streets Extend / Connect Herbert & Hardwick Streets, from IH-30 to 1 $0 Canada Drive, to provide better access for LaBajada community as recommended in the Trinity River Comprehensive Land Use Plan

Friday, March 31, 2006 Page 159 of 349 Project Name Description Tier Score Estimate Council District 6 Thoroughfares

Irving Blvd Enhancements, from Industrial Blvd. to Irving Widening and streetscape enhancments of Irving Blvd, from 1 $39,178,581 City Limits Industrial Blvd to Irving city limits as recommended in the Trinity River Comprehensive Land Use Plan Luna Road / Wildwood Realignment / Connection, south Widen Luna Rd / Wildwood, south of Northwest Highway to 1 $12,534,517 of Northwest Highway to south of California Crossing south of California Crossing Rd, into a four lane divided thoroughfare with sidewalks, curbs, gutters, and drainage as recommended in the Trinity River Comprehensive Land Use Plan Luna Road Widening / Enhancements, from Royal Lane to Widen Luna Rd, from Royal Lane to south of Northwest 1 $10,738,838 Northwest Highway Highway, into a six lane divided thoroughfare with sidewalks or parallel trails, drainage, and intersection improvements as recommended in the Trinity River Comprehensive Land Use Plan Shorecrest - Lemmon to Denton widen to a standard four lane roadway 1 $4,538,779

Summary for 'Category' = Thoroughfares (73 detail records) Sum $341,445,983 Traffic Intersection Capacity & Safety Improvement

Lombardy at Brockbank Widen both Lombary and Brockbank to construct left-turn lanes 1 60 $491,376 for alll approaches. High accident location. Shady Trail at Walnut Hill Widen Shady Trail to provide northbound and southbound left- 1 50 $440,324 turn pockets. Also, increase the turning radius on the southwest and northeast corners. Ables at Walnut Hill Widen Ables approaching Walnut Hill to provide northbound 1 40 $440,324 and southbound left-turn lanes. Canada @ Westmoreland Widen Canada approaching Westmoreland to provide an 1 40 $225,905 eastbound left-turn pocket. Royal - 400 ft West of Gemini Provide a left-turn pocket for westbound traffic 400 feet west of 1 40 $86,788 Gemini. This project will improve access to the office and increase safety related to internal circulation through the post office parking lot. Dennis/Brockbank at Royal Widen Royal Lane approaching Dennis/Brockbank to provide 1 35 $805,345 eastbound and westbound left-turn lanes.

Friday, March 31, 2006 Page 160 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Intersection Capacity & Safety Improvement

Shorecrest @ Webb Chapel Widen Webb Chapel approaching Shorecrest to provide a 1 30 $256,536 southbound left-turn pocket. Widen Shorecrest approaching Webb Chapel to provide an eastbound left-turn pocket. Crown @ Newberry Improve intersection alignment. 2 $0

Crown @ Newkirk Improve intersection alignment. 2 $0

Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (9 detail records) Sum $2,746,598 Traffic Safety Improvements-Guardrail Upgrades

Canada 600 BLK Guardrail Upgrade 1 87 $7,307

Canada 1400 BLK Guardrail Upgrade 1 80 $20,191

Canada 700 BLK Guardrail Upgrade 1 80 $63,815

Harry Hines 9500 BLK Guardrail Upgrade 1 80 $22,113

Harry Hines 9600 BLK Guardrail Upgrade 1 80 $20,804

Irving 2900 BLK Guardrail Upgrade 1 80 $6,653

Jefferson 5900 W BLK Guardrail Upgrade 1 80 $46,776

Lemmon 9300 BLK Guardrail Upgrade 1 80 $20,868

Belt Line 500 E BLK Guardrail Upgrade 1 73 $60,816

Canada 2700 BLK Guardrail Upgrade 1 73 $6,155

Commerce 100 W BLK Guardrail Upgrade 1 73 $8,232

Harry Hines 9700 BLK Guardrail Upgrade 1 73 $13,465

Irving 2300 BLK Guardrail Upgrade 1 73 $6,669

Irving 3000 BLK Guardrail Upgrade 1 73 $4,658

Jefferson 5600 W BLK Guardrail Upgrade 1 73 $5,392

Friday, March 31, 2006 Page 161 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Safety Improvements-Guardrail Upgrades

Sylvan 3500 BLK Guardrail Upgrade 1 73 $25,942 Sylvan 3800 BLK Guardrail Upgrade 1 73 $7,403

Walnut Hill 2500 BLK Guardrail Upgrade 1 73 $15,009

Beckley 2500 N BLK Guardrail Upgrade 1 67 $10,096

Canada 2400 BLK Guardrail Upgrade 1 67 $7,307

Continental 200 BLK Guardrail Upgrade 1 67 $6,637

Irving 2600 BLK Guardrail Upgrade 1 67 $3,063

Singleton 4400 BLK Guardrail Upgrade 1 67 $6,669

Singleton 5600 BLK Guardrail Upgrade 1 67 $20,422

Bernal 4600 BLK Guardrail Upgrade 1 60 $16,212

Continental 100 BLK Guardrail Upgrade 1 60 $3,063

Marsh 9400 BLK Guardrail Upgrade 1 60 $37,523

Park 8200 BLK Guardrail Upgrade 1 53 $5,457

Webb Chapel 9900 BLK Guardrail Upgrade 1 53 $5,392

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (29 detail records) Sum $484,109 Traffic Signal Upgrades - Citywide

Commerce @ Justice Center Traffic Signal Upgrades Citywide 1 93 $148,306

Commonwealth @ Stemmons Traffic Signal Upgrades Citywide 1 93 $107,209

Nomas @ Sylvan Traffic Signal Upgrade 1 93 $117,739

Fort Worth @ W. Commerce Traffic Signal Upgrade 1 80 $97,254

Harry Hines @ Webb Chapel Ext Traffic Signal Upgrade 1 67 $164,962

Friday, March 31, 2006 Page 162 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic Signal Upgrades - Citywide

Chalk Hill @ Davis Traffic Signal Upgrade 1 53 $51,180 Davis @ Justin Traffic Signal Upgrade 1 53 $80,981

Empire Central @ Stemmons Fwy Traffic Signal Upgrade 1 53 $101,785

Harry Hines @ Raceway Traffic Signal Upgrades Citywide 1 53 $79,450

Irving @ Lakawana Traffic Signal Upgrades Citywide 1 53 $106,890

Larga @ Webb Chapel Ext Traffic Signal Upgrade 1 53 $108,422

Sylvan @ W. Commerce Traffic Signal Upgrade 1 53 $120,610

Ambassador @ Mockingbird Traffic Signal Upgrade 1 40 $81,364

Brockbank - Dennis @ Royal Ln Traffic Signal Upgrade 1 40 $203,570

Clover @ Marsh Traffic Signal Upgrade 1 40 $109,443

Commonwealth @ Iron Ridge Traffic Signal Upgrade 1 40 $123,737

El Centro @ Webb Chapel Rd Traffic Signal Upgrade 1 40 $100,828

Gemini @ Royal Traffic Signal Upgrades Citywide 1 40 $107,847

Halifax @ Mockingbird Traffic Signal Upgrade 1 40 $106,890

Larga @ Webb Chapel Rd Traffic Signal Upgrade 1 40 $106,890

Park Ln @ Webb Chapel (Bogata) Traffic Signal Upgrade 1 40 $109,379

Newkirk-Northwest Hwy Traffic Signal Upgrade 1 33 $105,933

Bond @ Davis Traffic Signal Upgrade 1 27 $107,464

Davis @ Morocco Traffic Signal Upgrade 1 27 $107,464

Davis @ Walton Walker Traffic Signal Upgrades Citywide 1 27 $212,504

Summary for 'Category' = Traffic Signal Upgrades - Citywide (25 detail records) Sum $2,868,101

Friday, March 31, 2006 Page 163 of 349 Project Name Description Tier Score Estimate Council District 6 Traffic System Management - Dynamic Message Signs

Northwest Hwy EB approaching Lemmon Traffic Systems Management - Dynamic Message Signs 1 30 $153,156 Westmoreland NB approaching Irving Traffic Systems Management - Dynamic Message Signs 1 25 $153,156

Irving EB approaching Mockingbird Traffic Systems Management - Dynamic Message Signs 1 20 $153,156

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (3 detail records) Sum $459,468 Traffic System Management - Flood Detour Signs

Luna @ X, Y, & Z Dynamic Signs - Flood Detours 1 60 $42,118

California Crossing @ Luna Dynamic Signs - Flood Detours 1 40 $42,118

Goodnight @ Walnut Hill Dynamic Signs - Flood Detours 1 40 $42,118

Tantor @ X, Y, & Z Dynamic Signs - Flood Detours 1 40 $42,118

Wildwood @ California Crossing Dynamic Signs - Flood Detours 1 40 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $210,590 Traffic System Management - Roadside Cameras

Irving-Mockingbird Traffic Systems Management - Roadside Camera 1 25 $12,763

Summary for 'Category' = Traffic System Management - Roadside Cameras (1 detail record) Sum $12,763 Summary for 'Program' = STREET AND TRANSPORTATION (495 detail records) Sum $568,669,946 Summary for 'CD' = 6 (495 detail records) Sum $568,669,946

Friday, March 31, 2006 Page 164 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction

S. Ervay & Holmes - South to Grand S. Ervay 2707-2829, Full reconstruction 1 85 $206,761 Homeway and Babalos - Homeway to Babalos Full Reconstruction 1 67 $277,279

James (Beside 3515) - James to Unimp. Alley Alley Reconstruction, Beside 3515 James From James to 1 63 $173,909 Unimproved Alley Blyth & Gross Rd. - Shiloh To La Parada Full Reconstruction 1 61.5 $230,630

Shorewood(3011) & Klondike - La Prada to Michael Full Reconstruction 1 57 $225,934

Cleveland St. (2803 - 2829) Gould - South to Park Row Full reconstruction Cleveland St. (2803 - 2829) 1 52 $64,326

Klondike Dr. & Jones Boro - Ashdown To Shiloh Full Reconstruction 1 48.9 $367,988

Meyers St. & Grand Plaza - Ash to Grand Full Reconstruction - Meyers St. 2602 1 46 $174,598

Martin Luther King Blvd & Peabody - Latimer to Atlanta Full reconstruction - Martin Luther King Blvd. 2506 1 43 $111,038

Gill St (3305 - 3345) Hollis to Fairway Full reconst Gill St. (3305 - 3345) 1 40 $243,773

Healey Dr. & Larry - Tellerson To Casa Oaks Full Reconstruction 1 40 $258,661

Marimont & Michael - Oates Dr. To T- Alley Full Reconstruction 1 40 $312,178

Pennsylvania Avenue (1301-1327) Peabody - Parnell to Full recon Pennsylvania Ave. (1301 - 1327) 1 40 $89,341 Cleveland Scottsbluff Drive (2905-3027) Shorewood - La Prada to Full recon Scottsbluss Dr. (2905 - 3027) 1 31 $208,037 Michael Colonial St &Wendelkin - Lenway to Cooper Full reconstruction - Colonial St 3500 - 3530 1 28 $95,723

Klondike Dr. & Oates Rd. - La Parada Dr. To Marimo Full Reconstruction 1 28 $173,546

Colonial Ave (3701 - 3739) Spence - Romine to Full reconstruction Colonial Ave (3701 - 3739) 1 25 $122,525 Metropolitan Ferguson Rd &Villa Cliff Full reconst - Ferguson Rd 7727 - 7907 1 25 $339,623

Martin Luther King Blvd. & Peabody - Meadow to Trunk Full Reconstruction - Martin Luther King Blvd. 3114 1 18 $103,380

Edgewood St (3402 - 3426) Pondrom - Warren to Lenway Full reconst Edgewood St. (3402 - 3426) 1 15 $85,512

Bannock St. 1715- 1729 Full reconstruction (T-Alley not included) 2 $53,605

Friday, March 31, 2006 Page 165 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction

Birmingham Ave 3001 - 3033 reconstruction - Birmingham Ave 3001 - 3033 2 $108,486 Blackheath & Osborn - Showbend to Everglade Full Reconstruction 2 $254,504

Blaydon Dr - 2507 - 2537 Full Reconstruction 2 $129,204

Blaydon Dr (2307 - 2439) Bluffton - Freeport to Ashdown Full Reconstruction Blaydon Dr (2307 - 2439) 1 $274,462

Bluffton Dr - 2307 - 2439 Full Reconstruction 2 $273,953

Blyth Dr - 2307 - 2439 Full Reconstruction 2 $274,717

Cinnabar Dr - 4307 - 4339 Full Reconstruction 2 $241,588

Dugald Pl - 2104 - 2336 Full Reconstruction 2 $415,388

Freeland Wy & Babalos - Freeport to Babalos Full Reconstruction 2 $282,200

Freeport Dr - 8905 - 9233 Full Reconstruction 2 $300,710

Globe Av - 2506 - 2650 Full Reconstruction 2 $371,046

Healey Dr - 2604 - 2668 Full Reconstruction 2 $222,220

Healey Dr - 2702 - 2944 Full Reconstruction 2 $347,346

Healey Dr - 2703 - 2945 Full Reconstruction 2 $346,582

Healey Dr - 3105 - 3149 Full Reconstruction 2 $172,782

Healey Dr - 3205 - 3261 Full Reconstruction 2 $234,706

Hillglenn Rd - 3215 - 3273 Full Reconstruction 2 $247,449

Hillsboro Av - 2505 - 2655 Full Reconstruction 2 $370,026

Hollis Av - 5943 ------Full Reconstruction 2 $191,894

Inadale Av - 2315 - 2445 Full Reconstruction 2 $307,082

Inadale Av - 2505 - 2655 Full Reconstruction 2 $369,772

Jonesboro Av - 2315 - 2451 Full Reconstruction 2 $354,482

Friday, March 31, 2006 Page 166 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction

Klondike Dr - 2315 - 2449 Full Reconstruction 2 $305,042 Klondike Dr - 2505 - 2651 Full Reconstruction 2 $370,281

Klondike Dr - 2703 - 2829 Full Reconstruction 2 $228,336

Klondike Dr - 2704 - 2830 Full Reconstruction 2 $226,807

Larry Dr - 2404 - 2542 Full Reconstruction 2 $301,220

Larry Dr - 2604 - 2660 Full Reconstruction 2 $199,539

Larry Dr - 3005 - 3071 Full Reconstruction 2 $286,694

Lockhart Av - 2305 - 2445 Full Reconstruction 2 $346,327

Lockhart Av - 2505 - 2651 Full Reconstruction 2 $369,772

Lockhart Av - 2703 - 2829 Full Reconstruction 2 $227,061

Marbella La - 2606 - 2648 Full Reconstruction 2 $164,626

Maverick Av - 2405 - 2563 Full Reconstruction 2 $319,823

Maverick Av - 2605 - 2645 Full Reconstruction 2 $163,352

Maverick Av - 2705 - 2835 Full Reconstruction 2 $206,420

Millmar and Hillglenn - LaPrada to Modlin Full Reconstruction 2 $176,584

Pinebluff Dr - 2454 - 2546 Full Reconstruction 2 $412,075

Piper La - 9406 ------Full Reconstruction 2 $349,385

Rimdale Dr - 2702 - 2814 Full Reconstruction 2 $212,281

Scottsbluff Dr - 2703 - 2831 Full Reconstruction 2 $284,656

Scottsbluff Dr (2904 - 3028) Shenstone - LaPrada to Full Reconstruction Scottsbluff Dr. (2904 - 3028) 1 $228,846 Michael South Blvd. 1846 Full recon 2 $45,947

Wonderlight & Gross - Peavy to cul-de-sac Full Reconstruction 2 $206,761

Friday, March 31, 2006 Page 167 of 349 Project Name Description Tier Score Estimate Council District 7 Alley Reconstruction

Summary for 'Category' = Alley Reconstruction (65 detail records) Sum $15,640,801 Barrier Free Ramps

Dixon @ Bourquin Install 4 ramps 1 47 $7,658

York St @ 2nd Ave 1 ramps needed at this intersection 1 33 $1,914

Hatcher St @ Roberts Ave 2 ramps needed at this intersection 1 28 $3,829

Hatcher St @ Spring Garden Dr 2 ramps needed at this intersection 1 28 $3,829

Hatcher St @ Verdun Ave 2 ramps needed at this intersection 1 28 $3,829

Pickrell @ Osborn Need (One) BFR on even side of block 1 24 $1,914

Hatcher St @ Electra St 2 ramps needed at this intersection 1 23 $3,829

Grand @ Jefferies Need BFR at Bus Stop on SE corner of intersection 1 22 $1,914

Ferguson Rd @ Peavy Rd Construct 4 ramps 1 21 $842

Dorrington Dr @ Ferguson Rd 1 19 $7,658

Hatcher St @ Bradshaw St 2 ramps needed at this intersection 1 18 $3,829

Hatcher St @ Meadow St 3 ramps needed at this intersection 1 18 $5,743

York St @ Verdun Ave 4 ramps needed at this intersection 1 18 $7,658

Ferguson Rd @ Healy Dr Construct 4 ramps 1 16 $2,987

2nd Ave @ Bertrand Ave 3 ramps needed at this intersection 1 13 $5,743

3145 Mcdermott Ave construct a new BFR or modify the existing driveway of # 3145 1 13 $3,829 for a wheel chair pick up Colonial @ Eugene 2 BFRs needed on intersection 1 13 $3,829

Lindaro @ Inadale 2 BFRs on intersection 1 13 $3,829

Ferguson Rd @ Hilglenn Rd Construct 2 ramps 1 11 $3,829

Friday, March 31, 2006 Page 168 of 349 Project Name Description Tier Score Estimate Council District 7 Barrier Free Ramps

Ferguson Rd @ Larry Dr Construct 4 ramps 1 11 $3,446 Bertrand Ave @ Bradshaw St 2 ramps needed at this intersection 1 8 $3,829

Bertrand Ave @ Spring Garden Dr 2 ramps needed at this intersection 1 8 $3,829

Bertrand Ave @ Verdun Ave 2 ramps needed at this intersection 1 8 $3,829

Spring Garden Dr @ York St 4 ramps needed at this intersection 1 8 $7,658

Bertrand Ave @ Electra St 2 ramps needed at this intersection 1 3 $3,829

Bertrand Ave @ Roberts Ave 2 ramps needed at this intersection 1 3 $3,829

Culver St @ Winfield Construct 4 BFRs on corners of intersection 1 3 $7,658

Electra St @ York St 4 ramps needed at this intersection 1 3 $7,658

Harrison @ Clarence One BFR needed at the corner of 2604 Harrison Ave 1 3 $1,914

Meadow St @ Marburg St 2 ramps needed at this intersection 1 3 $3,829

Meadow St @ Southland St 2 ramps needed at this intersection 1 3 $3,829

Meadow St @ York St 2 ramps needed at this intersection 1 3 $3,829

York St @ Bradshaw St 4 ramps needed at this intersection 1 3 $7,658

York St @ Roberts Ave 4 ramps needed at this intersection 1 3 $7,658

Meadow St @ Bertrand Ave 2 ramps needed at this intersection 1 $3,829

Summary for 'Category' = Barrier Free Ramps (35 detail records) Sum $156,602 Bridge Repair and Modification

Corinth St. over Trinity River Superstructure rehab incl. repair to sheared girder, 2 cracked 1 56.25 $433,942 girders, numerous general spalls, rail damage, repair of spalls under span over N. levee - not full rehab Summary for 'Category' = Bridge Repair and Modification (1 detail record) Sum $433,942

Friday, March 31, 2006 Page 169 of 349 Project Name Description Tier Score Estimate Council District 7 Intergovernmental Partnership Projects

Lakeland Dr @ Ash Creek Bridge rehabilitation and/or reconstruction. 2 49.04 $0 Dolphin Rd - IH 30 to Military Parkway Partnership project with Dallas County to reconstruct existing 4 1 $899,792 lane undivided roadway. Total estimated cost of $3.6 million. Estimated to be let by Dallas County mid 2007. Supplements 2003 Bond Program funds. E. Dallas Veloway Phase 2 Tunnel at DART's SE-1 Partnership project with DART and Dallas County to design and 1 $1,595,375 Crossing construct hike and bike trail under DART's SE Corridor Light Rail. Total estimated cost of $3.3 million. DART to begin construction on overall project mid 2006. Supplements 2003 Bond Program East Dallas RR Xings - 8 Xings along the KCS Partnership project with TxDOT to upgrade gates, install 1 $117,420 medians, and signs. Total estimated cost of $2.3 million. Estimated to be let by early 2008. La Prada - Oates to Motley Partnership project with Dallas County to design and 1 $2,010,173 reconstruct existing 4 and 6 lane divided roadway. Total estimated cost of $6.2 million. Estimated to be let by Dallas County mid 2010. Supplements 2003 Bond Program funds. Malcolm X @ SFRR-Hickory Street Bridge rehabilitation and/or reconstruction 2 $0

Military Pkwy (EB) @ Trib. to White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0

Military Pkwy (WB) @ Trib. to White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0

Second Ave. (NB) at Trib. To White Rock Creek Bridge rehabilitation and/or reconstruction 2 $0

Second Ave. (SB) to .5 Miles SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0

Second Ave. (SB) to 1.1 Mile SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0

Second Ave. (SB) to 1.3 Miles SE of Hatcher Bridge rehabilitation and/or reconstruction 2 $0

Summary for 'Category' = Intergovernmental Partnership Projects (12 detail records) Sum $4,622,759 Sidewalk Petitions

Ewing Ave (S) - Clarendon Dr to 12th St Engineering, Paving 400 Block 1 100 $17,230

Friday, March 31, 2006 Page 170 of 349 Project Name Description Tier Score Estimate Council District 7 Sidewalk Petitions

Summary for 'Category' = Sidewalk Petitions (1 detail record) Sum $17,230 Street Lighting - Existing Thoroughfares

Military Pkwy @ Lawnview Street Lighting 1 27 $510,520

Summary for 'Category' = Street Lighting - Existing Thoroughfares (1 detail record) Sum $510,520 Street Petitions

Fairway Ave - Gill St to James St Engineering, Paving & Drainage 5700 blk 1 92 $181,235

Summary for 'Category' = Street Petitions (1 detail record) Sum $181,235 Street Reconstruction Local Streets

Harrison Ave - Clarence St to Grand Ave 2600 Blk 1 65.8 $225,905

Coombs St - Good Latimer Expwy to RR 2400 Blk 1 65.62 $419,410

Logan - Good Latimer Expwy to Myrtle St 2500 - 2700 Blks SR# 04-00327242 1 65.61 $765,780

Clarence St - Central Exwy East to Dead End 2100 blk 1 65.33 $167,195

Bethurum Ave - Bexar St to Belt Line St (Railroad) 2700 Blk 1 63.74 $854,189

Sutton St - Spring Ave to Pine St 2800 Blk 1 61.56 $182,511

Crozier St - Pine St to Carpenter Av 4200 - 4300 Blks 1 60.86 $453,087

Troy St - Spring Ave to Hatcher St 2900 Blk 1 60.72 $289,555

Clarence St - Good Latimer Expwy to Malcolm X Blvd 2500 - 2700 Blks 1 60.61 $1,177,054

Bannock St - S. Lamar St to Colonial Ave 1600 Blk 1 60.46 $521,200

Casa Oaks Dr - Healey Dr to Oates Dr 9800 Blk 1 60.39 $746,636

Friday, March 31, 2006 Page 171 of 349 Project Name Description Tier Score Estimate Council District 7 Street Reconstruction Local Streets

Borich St - R. B. Cullum Blvd to Second Ave 3400 Blk 1 60.06 $189,411 Junction St - Bertrand Ave to Montie St 3200 Blk 1 59.98 $390,900

Clarence St - King St to S Harwood St 1800 - 1900 Blks 1 59.94 $536,046

Meadow St - Birmingham Ave to Warren Ave 3300 Blk 1 59.79 $304,034

Emery St - S Lamar St to Hohen Av 1600 Blk 1 59.27 $440,324

Culver St - Winfield Ave to Boone Ave 3500 Blk 1 59 $477,766

Lyons St - Monte Pl to Hatcher St 3200 Blk 1 58.62 $115,822

Ash La - 1st Av to Exposition Av 3600 Blk 1 58.12 $217,166

Mingo St - Dolphin Rd to Silver Av 3300 Blk 1 58.08 $321,628

Jeffries St - Tanner St to Warren Av 3400 Blk 1 58 $261,642

Healey Dr - Ferguson Rd to Tellerson Ave 2300 Blk 1 56.57 $554,703

Gay St - Spring Ave to Copeland St 2900 Blk 1 56.17 $332,989

Pasteur Ave - Ferguson Rd to Beck Ave 2600 Blk 1 55.13 $874,266

Menger Av - Elmira St to Lawnview Av 6000 Blk 1 55.05 $313,970

Laughlin Dr - Avenue Q South to Dead End 2400 Blk 1 54.33 $231,645

Boone Av - Fairview Av to Dead End 5200 Blk 1 53.38 $319,075

Avenue G - Sanderson Ave to 500 feet north 400 Blk 1 52.36 $376,422

Summary for 'Category' = Street Reconstruction Local Streets (28 detail records) Sum $12,060,328 Street Reconstruction Thoroughfares

Samuell Blvd - Winfield Av to UP RR 3500 - 3600 Blks 1 78.42 $946,542

Dolphin Rd - Samuell Blvd to R L Thornton Frwy 5400 Blk 1 77.38 $130,821

Friday, March 31, 2006 Page 172 of 349 Project Name Description Tier Score Estimate Council District 7 Street Reconstruction Thoroughfares

Prairie Creek Rd (N) - Forney Rd to City Limits 4700 Blk 1 74.29 $1,114,789 Cedar Crest Blvd Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $5,662,439 Bonnie View Ln to the Trinity River Bridge Cedar Crest Blvd, from Bonnie View Ln to the Trinity River Bridge, to serve as gateway for both East Oak Cliff and Trinity River greenbelt as recommended in the Trinity River Comprehensive Land Use Pl Ervay Street Reconstruction / Urban Design, from MLK to Roadway reconstruction & streetscape enhancements on 1 $3,682,776 Marilla Ervay, from MLK to Marilla, to serve as a gateway into Downtown Dallas as recommended in the Trinity River Comprehensive Land Use Plan Hatcher Street Reconstruction / Urban Design, from Roadway reconstruction and streetscape enhancements on 1 $6,150,260 Malcolm X to Lamar Hatcher, from Malcolm X to Lamar, to serve the community as recommended in the Trinity River Comprehensive Land Use Plan S. Lamar St. - Grand Ave. to IH 45 - Construction Only Reconstruction (initially to 4 lanes), including ROW acquisition 1 $0 for 6 lanes, Signalization and turn lanes at major signalized intersections, and landscaping as recommended in the Trinity River Balanced Vision Plan (Construction Only) S. Lamar St. - Grand Ave. to IH 45- Design Only Design for Reconstruction (initially to 4 lanes), and landscaping 1 $957,225 as recommended in the Trinity River Balanced Vision Plan S. M. Wright Freeway Downgrade - Grand Ave. to C.F. Construction of conversion of S. M. Wright Freeway to city 1 $30,375,940 Hawn - Construction Only boulevard, including demolition of bridges, retaining walls and freeway mainlanes and reconstructing 6 lanes with neighborhood park located in median and streetscaping as recommended in the Trinit South Lamar Street Reconstruction / Urban Design , from Roadway reconstruction and streetscape enhancements on 1 $20,612,245 IH-45 to SH310 South Lamar, from Hatcher to SH310, to spur pedestrian- friendly development and improve vehicular movement as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Street Reconstruction Thoroughfares (10 detail records) Sum $69,633,038 Street Resurfacing

Friday, March 31, 2006 Page 173 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Herald St. - Lamar St. to Colonial Ave. 1600 Block 1 90.725 $58,582 Good Latimer Expy. (S) - Corinth St. to S. Central Expy. 2100 - 2700 1 89.265 $485,479

Clarendon Dr. (E) - Cliff St. to Corinth St. 1200 - 1600 1 85.91 $520,220

Logan St. - Merlin St. to Myrtle St. 2800 - 2900 1 83.57 $45,181

Caswell St. - R.B.Cullum Blvd. to Second Ave. 3400 Block 1 82.88 $15,698

Peabody Ave. - SM Wright Frwy. to Dead End 1300 - 1900 1 82.88 $125,588

Harwood St (S) - Concrete @ Coombs St. to Pennsylvania 2500 - 3200 1 80.96 $291,379 Ave. Cockrell Ave. - 1900 Lamar to 2700 Lamar 2000 - 2700 1 80.73 $105,438

First Ave. - Exposition Ave. to Ash Ln. 400 - 800 1 80.18 $141,286

Holmes St. - Grand Ave. to Pine St. 2700 - 4100 1 78.31 $383,018

Eleventh St. (E) - Cedar Crest Dr. to Eighth St. 2100 - 2900 1 77.92 $154,305

Kinmore St. - St Charles Ave. to Winfield Ave. 3000 - 3400 1 77.9 $76,875

Harrison Ave. - Logan St. to Coombs St. 2400 Block 1 77.42 $34,077

St Clair St. - Municipal St. to Bexar St. 2400 - 2500 1 76.98 $77,599

Peabody Ave. - Malcom X Blvd. to Trunk Ave. 2800 - 3100 1 74.72 $30,248

Spring Ave. - Hector St. to Hatcher St. 3600 - 4900 1 74.21 $336,816

Dilido Rd. - John West Rd. to Senate St. 3300 - 3600 1 74.14 $198,465

Metropolitan Ave. - Gertrude Ave. to Foreman St. 4100 - 4300 1 73.94 $167,451

La Prada Dr. - Oates Dr. to Millmar Dr. 9800 - 9900 1 73.75 $355,322

Cedar Crest Blvd. - Cadillac Dr. to Morrell Ave. 2900 block 1 73.39 $38,800

South Blvd. - Parnell St. to Ervay St. 1300 - 1600 1 73.24 $128,523

Senate St. - St Francis Ave. to Dilido Rd. 8800 - 9000 1 71.905 $241,731

Friday, March 31, 2006 Page 174 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Riek Rd. - Ferguson Rd. to End of Concrete 2300 block 1 71.705 $38,034 Glover Pass - Scyene Rd. to Overlook Dr. 3000 - 3600 1 70.77 $240,200

Garden Dr. - SM Wright Frwy. To Harwood St. 2200 Block 1 70.325 $42,373

Gurley Ave. - Dead End to Stonewall St. 4200 - 4300 1 70.3 $45,960

Owenwood Ave. - Samuell Blvd. to Kinmore St. 4700 - 5200 1 69.58 $36,103

Oak Ln. - Jeffries St. to Fourth Ave. 2900 - 3100 1 69.575 $93,808

Trunk Ave. (S) - Oak St. to Grand Ave. 700 - 1200 1 69.1 $167,068

Fleetwood St. - Concrete @ Haskell Ave to Schull St. 1500 - 1600 1 69.02 $63,304

Schull St. - Caldwell Ave. to Fleetwood St. 1600 block 1 68.87 $34,205

Eugene St. - Central Expy. to Malcolm X Blvd. 2200 - 2700 1 68.85 $140,904

Sanger Ave. - Ervay St. to Harwood St. 1700 - 1900 1 68.83 $71,728

K St. - Good Latimer Expy. (S) to Dead End 2400 block 1 68.665 $52,328

Bonnie View Rd. - Illinois Ave. to King Cole Ave. 3300 - 3400 1 67.99 $84,619

Foreman St. - Hamilton Ave. to Spring Ave. 2200 - 2700 1 67.745 $108,230

Fletcher St. - Gurley Ave. to Dead End 1100 - 1300 1 67.615 $125,205

Lawrence St. - SM Wright Frwy. To Crozier St. 2200 - 2400 1 67.005 $63,560

Kenilworth St. - Second Ave. to Todd St. 3500 - 3700 1 66.965 $80,407

Kimble St. - Lenway St. to Warren Ave. 3400 block 1 66.76 $13,912

Third Ave. - Concrete to Fourth Ave. 600 - 800 1 66.68 $141,669

Elmira St. - Greenmere Pl. to Hollis Ave. 3100 Block 1 66.63 $37,651

Latimer St. - Cooper St. to Romine Ave. 3600 - 3700 1 65.86 $45,947

St Francis Ave. - Bridge to Creekwood Dr. 1900 block 1 65.785 $18,762

Friday, March 31, 2006 Page 175 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Hutchins Ave. - Cliff St to Cleaves St. 1200 - 1400 1 65.57 $80,279 Southland St. - Malcom X Blvd. to Meadow St. 2800 - 3000 1 65.53 $82,704

Gould St. - Grand Ave. to MLK Blvd. 2700 - 2900 1 65.33 $67,389

Hamilton Ave. - Lagow St. to Dead End 4200 - 4400 1 65.305 $327,881

Lyons St. - Spring Ave. to Hatcher St. 2900 - 3100 1 64.94 $39,948

Chenault St. - Buckner Blvd. to Dead End 1900 Block 1 64.43 $54,498

Cliff St. (N) - Tenth St. to Ninth St. 100 Block 1 63.79 $25,781

Meyers St. - Lenway St. to McDermott Ave. 3500 - 3700 1 61.985 $71,218

Avenue E - Sanderson Ln. to Eleventh St. 300 - 400 1 61.31 $53,477

Lawnview Ave. - Forney Rd. to Samuell Blvd. 4500 - 5200 1 60.29 $242,369

Atlanta St. - Grand Ave. to MLK Blvd. 2700 - 2900 1 60.26 $58,199

Jim Miller Rd. (N) - R.L. Thornton Frwy. To Highland Rd. 5700 block 1 59.565 $38,289

Shiloh Rd. - Dead End to Blyth Dr. 8700 block 1 59.45 $51,945

Christiensen Dr. - Latta Pkwy. to Ethel Dr. 6300 Block 1 59.41 $42,501

Stoneman St. - Lamar St. to SM Wright Frwy. 1600 - 1700 1 59.25 $95,340

Ervay St. (S) - South Blvd. to MLK Blvd. 2900 Block 1 58.995 $14,039

Park Row Ave. - Meadow St. to Concrete 3000 block 1 58.975 $32,163

McKenzie St. - Haskell Ave. to Herndon St. 1200 - 1400 1 58.635 $47,223

Pear St. - Lamar St. to Sm Wright Frwy. 1600 - 1700 1 58.54 $77,727

Hooper St. - US 175 Svc. Rd. to Hodge St. 2200 Block 1 58.35 $20,421

Bannock St. - Colonial Ave. to SM Wright Frwy. 1700 Block 1 57.985 $30,504

Marshall St. - Swanson St. to Foreman St. 4200 - 4300 1 57.21 $41,990

Friday, March 31, 2006 Page 176 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Pine St. - Holmes St. to SM Wright Frwy. 1600 - 1700 1 57 $73,132 Bradshaw St. - Garden Ln. to Dead End 5000 - 5100 1 56.325 $32,673

Du Bois Ave. - Eleventh St. to Childs St. 300 - 500 1 56.105 $61,518

Romine Ave. - Julius Schepps Frwy. To Lamar St. 1400 block 1 56.07 $13,401

Park Row Ave. - Jeffries St. to Malcolm X Blvd. (S) 2800 block 1 54.925 $65,219

South Blvd. - Harwood St. to Dead End 1900 block 1 54.48 $21,314

Anderson St. - S.M. Wright Frwy. To Shield St. 2200 - 2400 1 54.31 $43,777

Latimer St. - Eugene St. to Pine Ave. 4000 block 1 54.28 $54,115

South Blvd. - Dead End to Malcolm X Blvd. 2300 - 2700 1 53.785 $131,331

Marlin Dr. - Oates Dr. to La Prada Dr. 9800 - 9900 1 53.585 $188,758

Avenue J - Eleventh St. to Childs St. 300 - 500 1 53.385 $40,459

South Blvd. - Malcom X Blvd. to Meadow St. 2800 - 3000 1 52.97 $76,450

Starks Ave. - Bexar St. to Dead End 2500 - 2700 1 52.8 $55,902

Reed Ln. - Meyers St. to Second Ave. 3000 - 3400 1 52.53 $138,479

Seventh St. (E) - Jefferson Blvd. to Eads Ave. 900 - 1000 1 52.505 $9,955

South Blvd. - Meadow St. to Trunk Ave. 3100 block 1 52.455 $45,947

Harris Ct. - Durett Cir. To Dead End 1500 - 1600 1 52.18 $56,540

Birmingham Ave. - Malcolm X Blvd. to Meyers St. 2800 - 2900 1 51.79 $87,809

Cleveland St. - MLK Blvd. to Grand Ave. 2700 - 2900 1 51.21 $69,048

Hamilton Ave. -Cross St. to Lagow St. 3800 - 4100 1 50.36 $125,333

Jamaica St. - Lagow St. to Foreman St. 4200 - 4300 1 48.23 $54,498

Tanner St. - Malcom X Blvd. to Jefferies St. 2800 block 1 47.07 $19,910

Friday, March 31, 2006 Page 177 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Avenue F - Eleventh St. to Sanderson Ave. 300 - 400 1 44.465 $41,735 Sidney St. - Todd St. to Racell St. 3800 - 3900 1 44.33 $53,349

Avenue I - Eleventh St. to Childs St. 300 - 500 1 43.45 $43,905

Avenue H - Eleventh St. to Sanderson Ave. 300 - 400 1 39.13 $47,606

Anderson St. - Bexar St. to Dead End 2600 - 2700 1 38.315 $45,053

Academy Dr. - 3800 2 $0

Academy Dr. - 4100 2 $0

Areba St. - 2200 2 $0

Atlanta St. - 3100 2 $0

Avenue D - 1600 2 $0

Avenue G - 300 2 $0

Baldwin St. - 4400 2 $0

Baldwin St. - 4600 2 $0

Baldwin St. - 4700 2 $0

Baldwin St. - 4800 2 $0

Beck Av. - 9300 2 $0

Beck Av. - 9400 2 $0

Belgrade Av. - 5800 2 $0

Belgrade Av. - 6300 2 $0

Birmingham Av. - 2400 2 $0

Birmingham Av. - 2500 2 $0

Bonnie View Rd. - 2800 2 $0

Friday, March 31, 2006 Page 178 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Bonnie View Rd. - 2900 2 $0 Bonnie View Rd. - 400 2 $0

Boone Av. - 5300 2 $0

Canyon St. - 1700 2 $0

Carpenter Av. - 4200 2 $0

Casa Oaks Dr. - 9900 2 $0

Catron Dr. - 4900 2 $0

Catron Dr. - 5200 2 $0

Claremont Dr. - 7700 2 $0

Cooper St. - 1400 2 $0

Copeland St. - 3600 2 $0

Copeland St. - 4200 2 $0

Copeland St. - 4300 2 $0

Corinth St Rd. (S) - 300 2 $0

Corinth St Rd. (S) - 500 2 $0

Crozier St. - 4200 2 $0

Crozier St. - 4400 2 $0

Crozier St. - 4600 2 $0

Crozier St. - 4800 2 $0

Crozier St. - 4900 2 $0

Dathe St. - 2800 2 $0

Denley Dr. (N) - 300 2 $0

Friday, March 31, 2006 Page 179 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Dorris St. - 2600 2 $0 Eads Av. - 600 2 $0

Eads Av. - 800 2 $0

East Grand Av. - 4200 2 $0

East Grand Av. - 4300 2 $0

Echo Av. - 5000 2 $0

Edgewood St. - 2800 2 $0

Edgewood St. - 2900 2 $0

Elmira St. - 4200 2 $0

Farragut St. - 2800 2 $0

Fitzhugh Av. (S) - 3500 2 $0

Frost Av. - 2800 2 $0

Gaisford St. - 1600 2 $0

Garden Dr. - 1600 2 $0

Ghent St. - 2500 2 $0

Ghent St. - 2600 2 $0

Goldspier Dr. - 3300 2 $0

Gross Rd. - 1700 2 $0

Gross Rd. - 2700 2 $0

Guaranty St. - 3700 2 $0

Hancock St. - 3500 2 $0

Harding St. - 2300 2 $0

Friday, March 31, 2006 Page 180 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Harding St. - 2400 2 $0 Harrell Av. - 2300 2 $0

Harwood St. (S) - 2400 2 $0

Harwood St. (S) - 3400 2 $0

Harwood St. (S) - 4800 2 $0

Haven St. - 1600 2 $0

Healey Dr. - 2600 2 $0

Hickman St. - 2300 2 $0

Hilltop St. - 3600 2 $0

Hilltop St. - 4000 2 $0

Hilltop St. - 4100 2 $0

Hilltop St. - 4400 2 $0

Hooper St. - 2400 2 $0

Hunnicut Rd. - 8200 2 $0

Jb Jackson Jr Blvd. - 2200 2 $0

Jeffries St. - 2900 2 $0

Jim Miller Rd. (N) - 6200 2 $0

Jonesboro Av. - 2500 2 $0

Jonesboro Av. - 2600 2 $0

Jordan St. - 2200 2 $0

Jordan St. - 2300 2 $0

Jordan St. - 2400 2 $0

Friday, March 31, 2006 Page 181 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Kellogg Av. - 2800 2 $0 Kennison Dr. - 6800 2 $0

King St. - 2400 2 $0

Kynard St. - 3800 2 $0

La Prada Dr. - 9500 2 $0

La Vern Av. - 3500 2 $0

La Vern Av. - 3600 2 $0

Lagow St. - 3100 2 $0

Lasca St. - 3000 2 $0

Lasca St. - 4000 2 $0

Lasca St. - 4100 2 $0

Lasca St. - 4200 2 $0

Lasca St. - 4300 2 $0

Leland Av. - 4400 2 $0

Leland Av. - 4600 2 $0

Logan St. - 2400 2 $0

Lowery St. - 2600 2 $0

Maceo Cir. - 2700 2 $0

Macon St. - 2200 2 $0

Macon St. - 2300 2 $0

Macon St. - 2500 2 $0

Macon St. - 2600 2 $0

Friday, March 31, 2006 Page 182 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Macon St. - 2700 2 $0 Macon St. - 2800 2 $0

Malcolm X Blvd. (S) - 2700 2 $0

Malcolm X Blvd. (S) - 3000 2 $0

Marburg St. - 2500 2 $0

Marburg St. - 2600 2 $0

Marburg St. - 2700 2 $0

Marne St. - 5000 2 $0

Martin Luther King Blvd. - 1300 2 $0

Maurine F Bailey Wy. - 2700 2 $0

Mcdermott Av. - 3100 2 $0

Meadow St. - 3400 2 $0

Meadow St. - 3600 2 $0

Medill St. - 2700 2 $0

Menger Av. - 6100 2 $0

Merlin St. - 2400 2 $0

Merlin St. - 2600 2 $0

Metropolitan Av. - 3300 2 $0

Military Pkwy Serv. N - 6800 2 $0

Military Pkwy Serv. S - 5900 2 $0

Millard St. - 800 2 $0

Millmar Dr. - 2900 2 $0

Friday, March 31, 2006 Page 183 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Millmar Dr. - 3000 2 $0 Millmar Dr. - 3100 2 $0

Millmar Dr. - 3200 2 $0

Mingo St. - 3400 2 $0

Mingo St. - 3500 2 $0

Modlin St. - 3400 2 $0

Morrell Av. - 2200 2 $0

Municipal St. - 6100 2 $0

Myrtle St. - 3300 2 $0

Myrtle St. - 3600 2 $0

Myrtle St. - 3800 2 $0

Myrtle St. - 3900 2 $0

Oakdale St. - 2800 2 $0

Octavia St. - 3700 2 $0

Olson Dr. - 4800 2 $0

Park Row Av. - 2300 2 $0

Parry Av. - 3400 2 $0

Peabody Av. - 1200 2 $0

Peabody Av. - 2500 2 $0

Peabody Av. - 2600 2 $0

Peavy Rd. - 2700 2 $0

Peavy Rd. - 2800 2 $0

Friday, March 31, 2006 Page 184 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

Peavy Rd. - 2900 2 $0 Pecan Rd. - 400 2 $0

Penelope St. - 3700 2 $0

Pennsylvania Av. - 1200 2 $0

Pennsylvania Av. - 1500 2 $0

Pennsylvania Av. - 1600 2 $0

Petain Av. - 6200 2 $0

Piper La. - 9400 2 $0

Pondrom St. - 3500 2 $0

Prairie Creek Rd. (N) - 4500 2 $0

Prairie Creek Rd. (N) - 4600 2 $0

Romine Av. - 2400 2 $0

Rowan Av. - 1400 2 $0

Rowan Av. - 1600 2 $0

Rustown Dr. - 9600 2 $0

Samuell Blvd. - 6000 2 $0

Seldon Wy. - 4700 2 $0

Silver Av. - 4600 2 $0

Southland St. - 2200 2 $0

St Francis Av. - 2600 2 $0

St Francis Av. - 2700 2 $0

St Francis Av. - 2800 2 $0

Friday, March 31, 2006 Page 185 of 349 Project Name Description Tier Score Estimate Council District 7 Street Resurfacing

St Francis Av. - 2900 2 $0 St Francis Av. - 3000 2 $0

St Francis Av. - 3100 2 $0

St Francis Av. - 3200 2 $0

Starks Av. - 2300 2 $0

Sutter St. - 1800 2 $0

Tayloe St. - 6900 2 $0

Terrell St. - 3400 2 $0

Terrell St. - 3500 2 $0

Tips Blvd. - 3000 2 $0

Todd St. - 4500 2 $0

Trunk Av. (S) - 1300 2 $0

Tuskegee St. - 3200 2 $0

Warren Av. - 1800 2 $0

Wildoak Dr. - 2400 2 $0

Woodhue Rd. - 8100 2 $0

Summary for 'Category' = Street Resurfacing (280 detail records) Sum $9,051,158 Streetscape / Urban Design

Bexar Street Corridor - Rochester S. to Cul-de-sac Rochester S. to end - ~2,000 LF 2 $582,962

Ferguson Road Urban Design Plan Ferguson from IH-30 to Buckner, and Highland from Ash Creek 2 $1,534,120 to Dorrington - gateway, sidewalk, intersection, street lighting and landscaping improvements ~20,000 LF

Friday, March 31, 2006 Page 186 of 349 Project Name Description Tier Score Estimate Council District 7 Streetscape / Urban Design

Lamar Street Urban Design Enhancements along Lamar, IH-30 to Hatcher to encourage 2 $7,531,514 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (3 detail records) Sum $9,648,596 Thoroughfares

Haskell - Main to East Grand Rebuild a three lane couplet 1 56 $8,054,129

Military Pkwy - Buckner to Jim Miller Widen to 6 lane divided roadway 1 55 $706,991

Haskell - Dolphin/ Hatcher to Crosstown Widen to a six lane divided roadway 1 48 $2,245,951

Bexar - Myrtle to C.F. Hawn Widen to five lane undivided roadway 1 46 $4,602,492

Bexar - Dysen to C.F. Hawn Widen to a four lane undivided roadway 1 44 $1,835,095

Clarendon (E) - Marsalis to Corinth Widen to a four lane undivided 1 37 $5,300,688

Eleventh - Corinth to M.L. King Widen to a four lane undivided roadway 1 33 $341,651

Second - Dixon to U175/ CF Hawn Widen to a four lane divided roadway 1 32 $2,706,187

Forney - Jim Miller to Lawnview Widen to a four lane undivided roadway 1 31 $3,802,503

Lamar (S) - IH 45 to Sanger Widen to a six lane divided roadway 1 31 $18,736,471

Gurley - Haskell to Fairgrounds Build a new four lane divided roadway -entrance to Fair Park 1 30 $1,183,957

Gurley - Haskell to Fairgrounds Build a new 4 lane divided roadwy - entrance to Fair Park 1 30 $1,073,884

East Grand - Haskell to Barry Widen to a four lan e undivided roadway 1 27 $1,657,539

Kiest - Bonnie View to Southerland Widen to a six lane divided roadway 1 21 $2,178,275

Lamar (S) - 500' South of Hatcher to IH 45 Widen to a six lane divided roadway 1 21 $8,961,657

Pennsylvania - Lamar to Colonial Widen to a four lane undivided roadway 1 21 $1,812,280

Chenault - Dilido to C.L. Widen to 4 lane undivided roadway 1 20 $6,757,549

Friday, March 31, 2006 Page 187 of 349 Project Name Description Tier Score Estimate Council District 7 Thoroughfares

Forney - Lawnview to Military Widen to a four lane undivided roadway 1 16 $3,419,339 La Prada - East CL to Oates Widen to a six lane divided roadway from a four lane roadway 1 0 $1,361,136

Unnamed NE 1 - Chenault to I.H. 30 Build a new 4 lane undivided roadway 1 0 $508,612

Military Pkwy - Jim Miller to Lawnview 1 $5,829,655

Military Pkwy - Forney to Dolphin/ Hatcher 1 $1,304,002

Oak Cliff Levee Road Design and Construction of Oak Cliff Levee Road to TxDOT 1 $17,301,772 standards with connections to both IH-30 and IH-35 as recommended in the Trinity River Balanced Vision Plan (Ultimate Plan) S. M. Wright Freeway Downgrade - Grand Ave. to C.F. Design of conversion of S. M. Wright Freeway to city 1 $3,828,900 Hawn - Design Only boulevard, including demolition of bridges, retaining walls and freeway mainlanes and reconstructing 6 lanes with neighborhood park located in median and streetscaping as recommended in the Trinity Rive Summary for 'Category' = Thoroughfares (24 detail records) Sum $105,510,716 Traffic Intersection Capacity & Safety Improvement

Buckner @ East R.L. Thornton Use one of the existing Buckner southbound service road lanes 1 50 $174,853 on the bridge to make an eastbound to westbound U-turn lane. Use one of the existing Buckner northbound service road lanes on the bridge to make a westbound to eastbound U-turn lane. Martin Luther King @ R B Cullum (SH 352) Use wide median area to construct northbound and southbound 1 50 $509,244 dual left-turn lanes. This project will reduce vehicle delays for AM rush hour traffic and for high volume traffic generated by special events at Fair Park, State Fair an the Cotton Bowl. Grand Ave at RB Cullum (SH 352) Use the wide median area to construct an additional 1 45 $145,498 northbound left-turn lane. This improvement will reduce vehicle delays during the AM rush hour and after special events at Fair Park/State Fair/Cotton Bowl. Hunnicut at Military Pkwy Construct an eastbound left-turn pocket on Military Pkwy. 1 30 $227,181

Friday, March 31, 2006 Page 188 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Intersection Capacity & Safety Improvement

Forney @ Jim Miller Street Modifications and Bottl Widen Forney approaching Jim Miller to provide an eastbound 1 25 $283,339 left-turn pocket. Forney @ Lawnview Widen all approaches to provide left turn pockets. 1 25 $690,478

Kiest at Sunnyvale Widen Sunnyvale at Kiest to provide northbound and 1 25 $220,162 southboud left-turn lanes. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (7 detail records) Sum $2,250,755 Traffic Safety Improvements-Guardrail Upgrades

Second 5400 BLK Guardrail Upgrade 1 80 $51,500

Corinth St. Rd. 900-2100 S BLK Guardrail Upgrade 1 73 $36,470

M.L. King 400 BLK Guardrail Upgrade 1 73 $33,024

Military 5100 BLK Guardrail Upgrade 1 73 $4,819

Bruton 5400 BLK Guardrail Upgrade 1 67 $19,336

Corinth St. Rd. 100 S BLK Guardrail Upgrade 1 67 $5,568

Ferguson 9400 BLK Guardrail Upgrade 1 67 $11,056

Jim Miller 3400 BLK Guardrail Upgrade 1 67 $12,252

Military 4900 BLK Guardrail Upgrade 1 67 $18,925

Military 5700 BLK Guardrail Upgrade 1 67 $10,689

Samuell 3800 BLK Guardrail Upgrade 1 67 $22,112

Kiest 1900 E BLK Guardrail Upgrade 1 53 $4,658

Military 5200 BLK Guardrail Upgrade 1 53 $4,754

Bruton 5600 BLK Guardrail Upgrade 1 47 $7,849

Military 7400 BLK Guardrail Upgrade 1 47 $4,658

Friday, March 31, 2006 Page 189 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Safety Improvements-Guardrail Upgrades

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (15 detail records) Sum $247,672 Traffic Signal Upgrades - Citywide

Lagow @ Spring Traffic Signal Upgrade 1 100 $125,396

Garden @ Second Traffic Signal Upgrades Citywide 1 93 $103,316

Lawnview @ Scyene Traffic Signal Upgrades Citywide 1 87 $107,464

Kiest @ Sunnyvale Traffic Signal Upgrade 1 80 $54,211

La Prada @ Oates Traffic Signal Upgrade 1 80 $109,762

Dolphin @ Haskell(Military Pkwy) Traffic Signal Upgrade 1 67 $87,503

Forney @ Jim Miller Traffic Signal Upgrade 1 67 $54,689

IH 45 (Julius Schepps) @ Lamar Traffic Signal Upgrades Citywide 1 67 $298,016

Illinois @ Kiest Traffic Signal Upgrade 1 67 $22,916

Hatcher @ Second Traffic Signal Upgrade 1 60 $105,933

Buckner @ Peavy Traffic Signal Upgrade 1 53 $107,847

Cedar Crest @ Eleventh (Pontiac) Traffic Signal Upgrade 1 53 $30,197

Cedar Crest @ Morrell Traffic Signal Upgrade 1 53 $53,924

East Grand @ Fitzhugh Traffic Signal Upgrades Citywide 1 53 $53,732

Eighth @ RL Thornton Traffic Signal Upgrade 1 53 $81,275

Ervay @ Grand Traffic Signal Upgrade 1 53 $107,464

Everglade @ Jim Miller Traffic Signal Upgrades Citywide 1 53 $53,924

Ferguson @ Highland Traffic Signal Upgrades Citywide 1 53 $120,610

Ferguson @ Millmar Traffic Signal Upgrade 1 53 $19,413

Friday, March 31, 2006 Page 190 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic Signal Upgrades - Citywide

Forest Ave @ M L King Traffic Signal Upgrade 1 53 $95,723 Grand @ Harwood Traffic Signal Upgrade 1 53 $107,464

Grand @ R B Cullum Traffic Signal Upgrade 1 53 $148,689

Gross Rd @ Peavy Rd Traffic Signal Upgrade 1 53 $107,464

Hatcher @ SM Wright Traffic Signal Upgrade 1 53 $216,333

Hatcher @ Spring Traffic Signal Upgrade 1 53 $145,115

M L King @ R. B. Cullum Traffic Signal Upgrades Citywide 1 53 $123,737

M L King @ S M Wright Traffic Signal Upgrade 1 53 $175,172

Oates @ Shiloh Traffic Signal Upgrade 1 53 $118,313

Pennsylvania @ R. B. Cullum Traffic Signal Upgrades Citywide 1 53 $189,531

Ferguson @ St. Francis Traffic Signal Upgrades Citywide 1 40 $107,464

Fitzhugh @ R B Cullum Traffic Signal Upgrade 1 40 $171,599

John West @ La Prada Traffic Signal Upgrades Citywide 1 40 $159,155

Malcolm X @ Pine Traffic Signal Upgrade 1 40 $107,464

Samuell @ Tennison Traffic Signal Upgrade 1 40 $55,274

Atlanta @ M L King Traffic Signal Upgrade 1 27 $107,464

Colonial (Ervay) @ ML King Traffic Signal Upgrade 1 27 $107,464

Holmes @ M. L. King Traffic Signal Upgrades Citywide 1 27 $107,464

M L King @ Meadow Traffic Signal Upgrade 1 27 $150,221

Malcolm X @ Pennsylvania Traffic Signal Upgrade 1 27 $107,464

Summary for 'Category' = Traffic Signal Upgrades - Citywide (39 detail records) Sum $4,306,170

Friday, March 31, 2006 Page 191 of 349 Project Name Description Tier Score Estimate Council District 7 Traffic System Management - Flood Detour Signs

Lamar, 2400 S. under RR Dynamic Signs - Flood Detours 1 80 $32,010 Second Ave. @ Dixon Dynamic Signs - Flood Detours 1 80 $42,118

Ervay, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $6,739

Harwood, 2300 S. under RR Dynamic Signs - Flood Detours 1 60 $26,113

Hatcher, 4700 Dynamic Signs - Flood Detours 1 60 $42,118

Lawnview between Samuel and Forney Dynamic Signs - Flood Detours 1 60 $42,118

Sargent @ Southerland Dynamic Signs - Flood Detours 1 60 $42,118

Bertrand @ Junction Dynamic Signs - Flood Detours 1 40 $42,118

Bexar, 6000 St. under RR Dynamic Signs - Flood Detours 1 40 $42,118

Frost @ Oakland Channel Dynamic Signs - Flood Detours 1 40 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (10 detail records) Sum $359,687 Traffic System Management - Roadside Cameras

Buckner-Samuell Traffic Systems Management - Roadside Camera 1 25 $12,763

Hatcher-Second Roadside Camera 1 20 $12,763

Hatcher-SM Wright Roadside Camera 1 15 $12,763

IH 45-Lamar Roadside Camera 1 15 $25,526

Summary for 'Category' = Traffic System Management - Roadside Cameras (4 detail records) Sum $63,815 Summary for 'Program' = STREET AND TRANSPORTATION (536 detail records) Sum $234,695,024 Summary for 'CD' = 7 (536 detail records) Sum $234,695,024

Friday, March 31, 2006 Page 192 of 349 Project Name Description Tier Score Estimate Council District 8 Alley Reconstruction

Pecan Ridge (7340) - Conc. to Meadow Stone Full Reconstruction 1 78 $87,161 Texridge Dr & Bettyrae Way (Leigh Ann to Texridge) Full reconstruction,. T-alley is not included. 1 76 $260,365

Meadow Isle & Meadow Gate - 'T' to Bainbridge Full Reconstruction 1 75 $200,041

Mill Valley & Grove Oaks - Mill Valley to Apache Full reconstruction 1 71 $206,761

Robertson Drive (4015-4151) Mehalia - "T" Alley to Full recon Robertson Dr. (4015 - 4151) 1 66 $289,720 Crosswood Club Wood Dr. (6425 - 6621) Marvin D. Love - Club Manor Full reconstruction Club Wood Dr. (6425 - 6621) 1 60 $210,590 to Hampton Frosty Trl & Pebbleshores - Strawberry to Pebbleshores Full reconst 1 60 $217,354

Firewood Dr (4209 - 4223) Happy canyon - Roseville to Full reconst Dr. (4209 - 4223) 1 55 $63,815 Golden Gate Silverhill Drive (3409-3545) Softcloud - Moonhill to Full recon Silverhill Dr. (3409 - 3545) 1 43 $298,654 Strawberry Robertson Drive (4205-4251) Mehalia - Crosswood to Full recon Robertson Dr. (4205 - 4251) 1 31 $134,012 Goldenagate Jadewood Dr (808 - 950) Kirnwood - Woodshire to Racine Full reconst Jadewood Dr (808 - 950) 1 28 $241,221

Arborcrest Dr - 7104 - 7230 Full Reconstruction 2 $245,411

Arborcrest Dr - 7105 - 7231 Full Reconstruction 2 $324,920

Camp Wisdom Rd - 1004 - 1060 Full Reconstruction 2 $118,245

Clark College Dr - 4106 - 4260 Full Reconstruction 2 $359,578

Deerwood Dr - 810 - 944 Full Reconstruction 2 $303,768

Goldwood Dr - 706 - 786 Full Reconstruction 2 $269,875

Greenspan Av - 7812 - 7850 Full Reconstruction 2 $262,994

Greenspan Av - 7930 - 8004 Full Reconstruction 2 $112,385

Grove Oaks Blvd - 9906 - 10030 Full Reconstruction 2 $195,208

Friday, March 31, 2006 Page 193 of 349 Project Name Description Tier Score Estimate Council District 8 Alley Reconstruction

Havenwood Dr - 706 - 786 Full Reconstruction 2 $269,110 Ivywood Dr - 806 - 954 Full Reconstruction 2 $301,984

Loop 12 - 7900 - 7950 Full Reconstruction 2 $145,767

Mclarty Dr - 3710 - 3780 Full Reconstruction 2 $205,911

Summary for 'Category' = Alley Reconstruction (24 detail records) Sum $5,324,850 Barrier Free Ramps

Bonnie View Rd @ Highland Hills Dr 2 ramps needed 1 48 $3,829

6500 S. Cockrell Hill One BFR needed on the Southern Driveway of Arborstone 1 27 $1,914 Apartments Camp Wisdom Rd @ Westmoreland Rd Construct 2 ramps 1 26 $3,829

Simpson Stuart @ Bonnie View Rd. Need a BFR @ NE corner of Simpson Stuart & Bonnie View Rd 1 26 $1,914

8613 Old Hickory Tr One BFR @ Bus stop @ 8613 Old Hickory Tr 1 23 $1,914

Clearwood Dr @ Polk St (S) Construct 4 ramps 1 18 $7,658

Clearwood Dr @ Woodshire Dr Construct 2 ramps 1 18 $3,829

Treetop @ Tioga 2 BFRs needed on corners of intersection 1 13 $3,829

9805 Caravelle Ct One Curb Cut needed in front of this address 1 3 $1,914

Summary for 'Category' = Barrier Free Ramps (9 detail records) Sum $30,631 Bridge Repair and Modification

Simpson Stuart Rd. over Fivemile Creek Repair voids E approach slab, SE corner abutment cap, 1 63.75 $114,867 sidewalks, repair storm sewer & backfill trench, use grout injection/flowable fill and gabions; critical Ravenview Rd. over Hickory Creek Fill voids beneath abutments, construct grout collars around 1 45 $15,316 exposed drillshaft/column connections; mod. severe

Friday, March 31, 2006 Page 194 of 349 Project Name Description Tier Score Estimate Council District 8 Bridge Repair and Modification

Cloverhill Road over Hickory Creek Trib. Severe scour d/s end, less u/s end, potential threat to culverts - 1 42.5 $89,341 severe - 50x25 gabion mattress, flowable fill d/s, 50x10 mattress u/s Belt Line Rd. over Hickory Creek Scour, d/s riprap undermined, grout beneath, provide gabion 1 38.75 $191,445 matress, severe. Lawson Rd. over Mesquite Br. Trib. Culverts blocked with silt, channel obustructed - clear and 1 26.25 $51,052 clean, repair slight erosion Summary for 'Category' = Bridge Repair and Modification (5 detail records) Sum $462,021 Intergovernmental Partnership Projects

Bonnie View Rd - Langdon to Wintergreen Partnership project with Dallas County to design and construct 1 $21,339,736 6 lane divided roadway. Total estimated cost of $22.8 million. Estimated to be let early 2009. McCommas Bluff Rd. at Trib. to Five Mile Creek Bridge rehabilitation and/or reconstruction 2 $0

Southern Dallas RR Xings - Cleveland & Witt @ BNSF Partnership project with TxDOT to resurface crossings. Total 1 $63,815 estimated cost of $250,000. Estimated to be let by late 2007. Summary for 'Category' = Intergovernmental Partnership Projects (3 detail records) Sum $21,403,551 Street Lighting - Existing Thoroughfares

Simpson Stuart - Bonnie View to Lancaster Street Lighting 1 50 $408,416

Summary for 'Category' = Street Lighting - Existing Thoroughfares (1 detail record) Sum $408,416 Street Lighting - Freeway Lighting

IH 20 - Entire Length Across Dallas Freeway Lighting Installation 1 5 $1,049,258

IH 35 E (S. RLT) - I-20 to Ledbetter Freeway Lighting Installation 1 5 $120,013

Friday, March 31, 2006 Page 195 of 349 Project Name Description Tier Score Estimate Council District 8 Street Lighting - Freeway Lighting

Summary for 'Category' = Street Lighting - Freeway Lighting (2 detail records) Sum $1,169,271 Street Petitions

Pleasant Vista Dr - Elam to Silver Meadow (Alley) Engineering, Paving and Drainage 500-600 blks 1 98 $779,181

Woodway Dr - Fountaindale Dr to Dead-End Engineering, Paving and Drainage 1 91 $288,920

Fairport Rd - Murdock Rd to Dowdy Ferry Rd Engineering, Paving & Drainage 8100 & 8200 blks 1 89 $784,925

Bainbridge Dr - Camp Wisdom to Cliffwood Dr Engineering, Paving & Drainage - 2600-2700 blks 1 79 $894,686

Summary for 'Category' = Street Petitions (4 detail records) Sum $2,747,712 Street Reconstruction Local Streets

Olusta Dr - Murdock Rd to Oklaunion Dr 7900 - 8000 Blks 1 52.96 $844,911

Forsythe Dr - Gayglen Dr to Komatty Dr 400 Blk 1 52.17 $434,334

Phantom Hill Rd - Bitter Creek Dr to Cheyenne Rd 10800 Blk 1 50.02 $550,155

Summary for 'Category' = Street Reconstruction Local Streets (3 detail records) Sum $1,829,400 Street Reconstruction Thoroughfares

Simpson Stuart - Highland Hills Dr to Flagstaff 3800 Blk 1 69.8 $1,521,427

St Augustine Rd(S) - Old Seagoville Rd to CF Hawn 300 - 400 Blks 1 67.49 $2,250,117

Old Seagoville Rd - St Augustine Dr to September Ln 9600 - 9700 Blks 1 63.29 $1,793,202

Gannon Ln - Westmoreland Rd to Marvin D Love (Serv Rd) 3800 - 3900 Blks 1 43.95 $1,419,246

Summary for 'Category' = Street Reconstruction Thoroughfares (4 detail records) Sum $6,983,991

Friday, March 31, 2006 Page 196 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Leigh Ann Dr. - Kirnwood Dr. to Wheatland Rd. 7700 - 8100 1 72.51 $346,133 Pebble Valley Ln. - Dead End to Masters Dr. 9800 - 10100 1 72.135 $98,658

Beltline Rd. (S) - 1803 Beltline Rd. to Kleberg Rd 1800-2400 1 70.57 $374,722

St Augustine Dr. (N) - Grove Oaks Blvd. to Tamalpais Dr. 200 - 700 1 70.23 $521,751

Hidden Valley Dr. - Carioca Dr. to Dead End 1300 - 1400 1 64.68 $40,203

Forsythe Dr. - Loop 12 to Gayglen Dr. 100 - 300 1 55.97 $132,480

Bambi St. - Murdock Rd. to Dowdy Ferry Rd. 8100 - 8200 1 53.465 $144,094

Happy Hollow Ln. - Bitter Creek Dr. to Cheyenne Rd. 10800 Block 1 51.03 $42,373

Friendship Dr. - Rain Forest Dr. to Lake June Rd. 1200 Block 1 49.785 $38,544

Woodspan Dr. - Goldwood Dr. to Kirnwood Dr. 7600 - 7700 1 49.63 $114,484

Fifty-Sixth St. - Bonnie View Rd. to 2869 Fifty-Sixth St. 2900 Block 1 48.93 $44,288

Burroaks Cir. - Burroaks Dr. to Cul-de-sac 8100 Block 1 48.885 $41,990

Wild Honey Dr. - Dead End to Pebbleshores Dr. 6500 - 6600 1 43.13 $42,628

Cricket Dr. - Trego Ct. to Pleasant Woods Dr. 10300 - 10400 1 42.685 $43,649

Angus Dr. - 700 2 $0

Anise La. - 2200 2 $0

Arborcrest Dr. - 7100 2 $0

Arborcrest Dr. - 7200 2 $0

Bainbridge Dr. - 3100 2 $0

Belt Line Rd. (S) - 1300 2 $0

Belt Line Rd. (S) - 1400 2 $0

Belt Line Rd. (S) - 1600 2 $0

Friday, March 31, 2006 Page 197 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Bitter Creek Dr. - 800 2 $0 Bluewood Dr. - 400 2 $0

Bluewood Dr. - 600 2 $0

Bluewood Dr. - 700 2 $0

Bluewood Dr. - 900 2 $0

Bonnie View Rd. - 5300 2 $0

Bonnie View Rd. - 5600 2 $0

Bonnie View Rd. - 5700 2 $0

Brierfield Dr. - 7100 2 $0

Camp Wisdom Rd. (E) - 1200 2 $0

Camp Wisdom Rd. (W) - 200 2 $0

Camp Wisdom Rd. (W) - 400 2 $0

Camp Wisdom Rd. (W) - 500 2 $0

Camp Wisdom Rd. (W) - 600 2 $0

Camp Wisdom Rd. (W) - 700 2 $0

Camp Wisdom Rd. (W) - 800 2 $0

Camp Wisdom Rd. (W) - 900 2 $0

Cherry Valley Blvd. - 2500 2 $0

Cleardale Dr. - 700 2 $0

Cleardale Dr. - 800 2 $0

Cleardale Dr. - 900 2 $0

Cockrell Hill Rd. (S) - 4500 2 $0

Friday, March 31, 2006 Page 198 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Cockrell Hill Rd. (S) - 4800 2 $0 Cockrell Hill Rd. (S) - 5400 2 $0

Cockrell Hill Rd. (S) - 5900 2 $0

Cockrell Hill Rd. (S) - 6200 2 $0

Crimnson Ct. - 9400 2 $0

Crosswood La. - 6500 2 $0

Del Rey Dr. - 7000 2 $0

Dowdy Ferry Rd. - 2000 2 $0

Edgedale Dr. - 900 2 $0

Edna Av. - 4400 2 $0

Elam Rd. - 10400 2 $0

Elam Rd. - 9200 2 $0

Emberwood Dr. - 700 2 $0

Gannon La. - 4000 2 $0

Glennlyons Dr. - 4000 2 $0

Gold Rd. - 4900 2 $0

Goldwood Dr. - 400 2 $0

Goldwood Dr. - 700 2 $0

Goldwood Dr. - 800 2 $0

Greenspan Av. - 7000 2 $0

Greenspan Av. - 7500 2 $0

Hogan Dr. - 900 2 $0

Friday, March 31, 2006 Page 199 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Houston School Rd. - 6900 2 $0 Houston School Rd. - 7000 2 $0

Independence Dr. - 4100 2 $0

Independence Dr. - 4200 2 $0

Ivywood Dr. - 700 2 $0

Ivywood Dr. - 800 2 $0

Jadewood Dr. - 800 2 $0

Kinslow Dr. - 10300 2 $0

Kinslow Dr. - 10400 2 $0

Lancaster Rd. (S) - 8000 2 $0

Lancaster Rd. (S) - 8100 2 $0

Lancaster Rd. (S) - 8200 2 $0

Longridge Dr. - 300 2 $0

Longridge Dr. - 400 2 $0

Marvel Dr. - 9200 2 $0

Masters Dr. (S) - 100 2 $0

Masters Dr. (S) - 200 2 $0

Masters Dr. (S) - 300 2 $0

Morgan Dr. - 2700 2 $0

Motor City Blvd. - 2500 2 $0

Murdeaux La. (S) - 100 2 $0

Murdock-Dowdy Ferry Conn. - 8100 2 $0

Friday, March 31, 2006 Page 200 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Neuhoff Dr. - 7500 2 $0 Overridge Dr. - 7800 2 $0

Pleasant Vista Dr. - 300 2 $0

Polk St. (S) - 7200 2 $0

Polk St. (S) - 7300 2 $0

Polk St. (S) - 7500 2 $0

Polk St. (S) - 7600 2 $0

Polk St. (S) - 7800 2 $0

Polk St. (S) - 7900 2 $0

Polk St. (S) - 8000 2 $0

Polk St. (S) - 9200 2 $0

Prairie Creek Rd. (N) - 300 2 $0

Prairie Creek Rd. (S) - 200 2 $0

Quartet Dr. - 1400 2 $0

Rain Forest Dr. - 1000 2 $0

Rain Forest Dr. - 1100 2 $0

Rain Forest Dr. - 1200 2 $0

Rylie Rd. - 9800 2 $0

Schepps Pkwy. - 7400 2 $0

Schepps Pkwy. - 7600 2 $0

Simpson Stuart Rd. - 3500 2 $0

Simpson Stuart Rd. - 3600 2 $0

Friday, March 31, 2006 Page 201 of 349 Project Name Description Tier Score Estimate Council District 8 Street Resurfacing

Simpson Stuart Rd. - 3700 2 $0 Simpson Stuart Rd. - 3900 2 $0

Simpson Stuart Rd. - 4000 2 $0

Simpson Stuart Rd. - 4100 2 $0

Simpson Stuart Rd. - 4900 2 $0

Tamalpais Dr. - 10000 2 $0

Wheatland Rd. (W) - 4000 2 $0

Woodlot Dr. - 10300 2 $0

Woodshire Dr. - 7600 2 $0

Woodshire Dr. - 7700 2 $0

Woodshire Dr. - 7800 2 $0

Woodshire Dr. - 7900 2 $0

Woodwick Dr. - 7100 2 $0

Summary for 'Category' = Street Resurfacing (123 detail records) Sum $2,025,999 Streetscape / Urban Design

Dowdy Ferry Road Urban Design, from IH20 to Midland Urban design enhancements along Dowdy Ferry Rd, from IH20 2 $7,867,113 to Midland, to encourage pedestrian use and improve the traffic environment as recommended in the Trinity River Comprehensive Land Use Plan South Central (SH310) Urban Design/Streetscape, from Enhancements along SH310, from IH20 to South Loop 12 as 2 $24,545,802 IH20 to S. Loop 12 recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (2 detail records) Sum $32,412,915

Friday, March 31, 2006 Page 202 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares

Buford - Camp Wisdom to Millet Build a 4 lane undivided roadway 1 70 $4,982,730 Youngblood /Tioga Connection- JJ Lemmon to SH 310 Build a new 4 lane undivided roadway including grade crossing 1 50 $10,794,878 a UPRR JJ Lemmon - Newton Creek to IH635 Widen to a four lane undivided roadway 1 48 $4,228,418

JJ Lemmon - Robertson to Clark College Widen to a four lane undivided roadway 1 42 $5,278,870

Morgan - Plaza to Tioga Build a new four lane undivided roadway 1 39 $6,043,726

Teagarden - Dowdy Ferry to Jordan Valley Widen to a standardnfour lane undivided roadway 1 38 $22,872,089

Beckleymeade/Seahawk - Hampton to Polk Widen to 4 lane undivided roadway 1 37 $8,321,911

Cotton Valley - Danieldale to Beckleymeade Widen to 4 lane undivided roadway 1 35 $2,181,021

Kirnwood - I.H. 35E to Houston School Road Build a new 4 lane undivided roadway 1 35 $10,334,967

Pentagon - Lancaster to Haas Build a new four lane undivided roadway 1 35 $4,957,014

Pentagon - Lancaster to Bronx Build a new 4 lane undivided roadway 1 35 $2,180,829

Pentagon - Veterans to Haas Build a new 4 lane undivided roadway 1 35 $11,187,674

Woody - Seagoville to Skyfrost Build a new 4 lane undivided roadway 1 35 $17,160,635

Silverado - Kleberg to Arrowdell Build a new four lane divided roadway 1 30 $6,520,404

Clover Hill - Kleberg to Simonds Widen to 4 lane undivided roadway 1 29 $5,259,551

Lasater - Lawson to City Limit Build a new 6 lane divided roadway 1 29 $7,868,183

Kirnwood Dr - IH-20 WBSR to Wheatland Rd Widen to a four lane divided 1 26 $1,537,606

Blanco - Langdon to Telephone Build a new 4 lane undivided roadway 1 25 $5,888,363

Crouch - Old Ox to Lancaster Build a two lane undivided roadway with curbs and gutters 1 25 $4,822,789

Fireside - Murdock to St. Augustine Widen to a four lane undivided roadway 1 25 $4,627,961

Rylie - Loop 12 (at Lake June) to Prairie Creek Build a new 6 lane divided roadway 1 25 $41,164,101

Telephone - Blanco to Bonnie View Widen to a six lane divided roadway 1 25 $4,121,743

Friday, March 31, 2006 Page 203 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares

Telephone - Bonnie View to Lancaster Widen to a six lane divided roadway 1 25 $12,254,126 Bonnie View - Lancaster City Limitsat Wintergreen to Build a 6 lane divided thoroughfare. 1 24 $24,530,589 Langdon Golden Gate - JJ Lemmon to Simpson Stuart Widen to a four lane undivided roadway 1 23 $3,254,902

Rylie Crest - C.F. Hawn to Dallas City Limit Widen to a four lane undivided roadway 1 23 $3,269,701

Rylie Crest - U.S. 175 to Balch Springs C.L. Build a new 4 lane undivided roadway 1 23 $10,655,612

Simpson Stuart - S. Central to Locust Thoroughfare Widen to a six lane divided roadway 1 23 $2,557,347

Acres - Rylie Crest to Elam Build 6-lane roadway to replace existing asphalt roadway 1 20 $8,201,069

Bainbridge - Kirnwood to Camp Wisdom widen from 46-53'pave./68-80' ROW to 33/var/33' pave./120' 1 20 $9,066,507 ROW Edd - Kleburg to U.S. 175 Widen to a four lane undivided roadway 1 20 $6,127,662

Old Ox - Crouch to Camp Wisdom Build a new 4 lane undivided roadway 1 20 $2,537,050

Red Bird (W) - Westmoreland to U.S. 67 Widen to a six lane divided roadway 1 19 $3,537,341

Red Bird (W) - Duncanville C.L. to Westmoreland Widen to a six lane divided roadway 1 17 $2,956,988

St. Augustine - IH20 to Teagarden Widen to a four lane undivided roadway 1 16 $2,747,454

Beckett - S. Belt Line to C.L. Widen to 4 lane undivided roadway 1 15 $8,456,835

Blanco - Telephone to C.L. Widen to 4 lane undivided roadway 1 15 $9,024,384

Cleveland Rd. - Hutchins C.L. to Bonnie View Build a new four lane roadway. 1 15 $25,904,300

Log Cabin - S. Belt Line to C.L. Build a new 4 lane undivided roadway 1 15 $8,462,240

Unnamed SE2 - Rylie to I.H. 635 Build a new 4 lane undivided roadway 1 15 $6,210,630

Unnamed SE3 - Hutchins C.L. to Witt Build a new 4 lane undivided roadway 1 15 $15,669,604

Westmoreland - Desoto C.L. at Kirnwood to Wheatland Build a new 4 lane divided roadway 1 15 $2,704,228

Witt - City Limit to Blanco Build a new four lane undivided roadway 1 15 $6,010,642

Woody - Kleberg to 175 Widen to a four lane undivided roadway 1 15 $3,366,425

Friday, March 31, 2006 Page 204 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares

Danieldale - Hampton Road to Old Hickory WIden to a six lane divided roadway 1 14 $5,612,599 Danieldale - IH 35E to Hampton Road Widen to a six lane divided roadway 1 14 $22,666,264

Garden Grove - Rylie Crest to Edd Widen to a four lane undivided roadway 1 13 $6,919,229

Wheatland - Lancaster to Lancaster CL Widen to a four lane undivided roadway 1 13 $5,295,618

Kirnwood - Hampton to Bainbridge Widen to a four lane undivided 1 12 $2,448,430

Lasater - Balch Springs City Limit to Seagaville C Widen to a six lane divided roadway 1 12 $7,416,364

Wheatland - IH 35 to Houston School Widen to a six lane divided roadway 1 12 $7,219,523

Beauford - US 175 to Garden Grove Widen to 6 lane roadway 1 10 $6,523,717

Cedardale - C.L. to Bonnie View Widen to 4 lane undivided roadway 1 10 $10,056,635

Edd - Gardengrove to Seagoville Widen to a four lane undivided roadway 1 10 $2,485,647

Haas - Ledbetter to Stag Widen to a four lane undivided roadway 1 10 $700,890

Langdon - Cedardale to JJ Lommon Widen to a four lane undivided roadway 1 10 $14,580,843

Skyfrost - S. Belt Line to Stark Widen to a four lane undivided roadway 1 9 $6,023,456

SH 310/ SM Wright - Simpson Stuart to I.H. 20 Widen to a six lane divided roadway 1 8 $13,869,210

TIOGA - Morgan to Cinnamon Oaks Build a new four lane undivided roadway 1 7 $541,655

S. Belt Line (S) - Kleburg to City Limit Widen to a six lane divided roadway 1 5 $8,841,627

Old Hickory Tr. - Stoneview to Danieldale Widen to a four lane undivided roadway from a two lane 1 4 $5,201,727 undivided Haymarket - Teagarden to St. Augustine Widen to a four lane undivided roadway 1 3 $6,926,127

Jordan Valley - C.F. Hawn Freeway to Middlefield Widen to a four lane undivided roadway 1 3 $11,944,089

Middlefield - City Limits to Jordan Valley Widen to a four lane undivided roadway 1 3 $5,512,775

Rylie Crest - Shephers to Seagoville Widen to a four lane undivided roadway 1 3 $5,171,948

Edd - Foothill to Kleberg Widen to a four lane undivided roadway 1 0 $3,481,372

Friday, March 31, 2006 Page 205 of 349 Project Name Description Tier Score Estimate Council District 8 Thoroughfares

Kleberg - S. Belt Line to Cloverhill Widen to a four lane undivided roadway 1 0 $8,771,221 La Palma - Skyfrost to Seagoville CL Widen to a four lane undivided roadway 1 0 $1,048,368

Ravenview - Garden Grove to Balch Spring CL Widen to a six lane divided roadway 1 0 $15,652,134

Shepherd - Balch Springs CL to Beauford Build a new four lane divided roadway 1 0 $5,390,591

Unnamed SE4 - I-635E to Telephone Build a new 4 lane undivided roadway 1 0 $12,830,321

Ravenview - US 75 to Belt Line Widen to a six lane divided roadway 1 $15,652,134

S. Belt Line - Balch Springs CL to Dallas County L Widen to six lane divided roadway 1 $12,116,060

S. Belt Line - S. Belt Line Ext. to S. Belt Lin Widen to six lane divided roadway 1 $10,404,438

Summary for 'Category' = Thoroughfares (74 detail records) Sum $611,146,108 Traffic Intersection Capacity & Safety Improvement

Buckner @ CF Hawn Frwy Street Modifications and Bo Widen Buckner approaching CF Hawn to provide three through 1 55 $282,062 lanes for northbound and southbound approaches. Camp Wisdom @ Westmoreland Street Modifications an Widen Camp Wisdom and Westmoreland approaches to 1 50 $1,474,127 provide dual left-turn lanes and right-turn lanes on all approaches. Ledbetter @ Westmoreland Street Modifications and Widen both Ledbetter and Westmoreland approaches to 1 50 $809,812 construct dual left-turn lanes and right-turn lanes on all approaches. Construction will also remove dip in roadway. Ledbetter @ Veterans Street Modifications and Bott Widen Veterans approaching Ledbetter ro provide northbound 1 35 $256,536 and southbound left-turn pockets. Camp Wisdom at Polk Increase curb radius on all four corners. Reduce damage 1 30 $98,275 caused by turning truck traffic. Simpson Stuart Rd at SM Wright Frwy Widen all approaches to provide left-turn pockets. 1 30 $500,310

SM Wright Frwy at Youngblood Rd Widen SM Wright to provide a southbound left-turn lane and 1 30 $182,511 northbound right turn lane into the McCommas Land Fill. Trucks currently stop in a queue on the through travel lanes while they wait to enter the McCommans Landfill.

Friday, March 31, 2006 Page 206 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Intersection Capacity & Safety Improvement

Belt Line @ CF Hawn Frwy Construct a right turn lane on the CF Hawn Frwy Eastbound 1 20 $220,800 Service Road approaching Beltline Road. Dowdy Ferry at Teagarden Widen Dowdy Ferry approaching Teagarden to provide a 1 20 $299,931 southbound left-turn pocket. Highland Hills Dr @ Simpson Stuart Rd Widen Highland Hills approaching Simpson Stuart to provide 1 15 $513,073 northbound and southbound left-turn pockets. Implement more accessible pedestrian crossings. Lasater @ Lawson Widen the eastbound approach and construct a raised median. 2 $307,844

Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (11 detail records) Sum $4,945,280 Traffic Safety Improvements-Guardrail Upgrades

Dowdy Ferry 2200 BLK Guardrail Upgrade 1 80 $5,457

Dowdy Ferry 2300 BLK Guardrail Upgrade 1 80 $20,804

Harry Hines 6900 BLK Guardrail Upgrade 1 80 $6,573

Belt Line 2600 S BLK Guardrail Upgrade 1 73 $40,331

Belt Line 2700 S BLK Guardrail Upgrade 1 73 $19,783

Belt Line 2800 S BLK Guardrail Upgrade 1 73 $23,165

Belt Line 3000 S BLK Guardrail Upgrade 1 73 $122,684

Belt Line 3400 S BLK Guardrail Upgrade 1 73 $22,718

Red Bird 4200 W BLK Guardrail Upgrade 1 73 $30,897

Wheatland 400 W BLK Guardrail Upgrade 1 73 $24,345

Belt Line 600 S BLK Guardrail Upgrade 1 67 $7,086

Bonnie View 5100 BLK Guardrail Upgrade 1 67 $3,925

Bonnie View 5700 BLK Guardrail Upgrade 1 67 $4,658

Camp Wisdom 1800 E BLK Guardrail Upgrade 1 67 $43,141

Friday, March 31, 2006 Page 207 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Safety Improvements-Guardrail Upgrades

Camp Wisdom 200 W BLK Guardrail Upgrade 1 67 $1,962 Lawson 500 BLK Guardrail Upgrade 1 67 $5,839

Seagoville 15000 BLK Guardrail Upgrade 1 67 $5,935

Simpson Stuart 4700 BLK Guardrail Upgrade 1 67 $5,935

Westmoreland 5100 S BLK Guardrail Upgrade 1 67 $9,317

Westmoreland 5700 S BLK Guardrail Upgrade 1 67 $13,720

Westmoreland 6300 S BLK Guardrail Upgrade 1 67 $18,123

Belt Line 300 S BLK Guardrail Upgrade 1 60 $6,126

Belt Line 500 S BLK Guardrail Upgrade 1 60 $4,658

Bonnie View 6200 BLK Guardrail Upgrade 1 60 $4,658

Camp Wisdom 1100 E BLK Guardrail Upgrade 1 60 $9,684

Camp Wisdom 1700 E BLK Guardrail Upgrade 1 60 $5,392

Camp Wisdom 1900 E BLK Guardrail Upgrade 1 60 $76,833

Camp Wisdom 700 E BLK Guardrail Upgrade 1 60 $5,392

Dowdy Ferry 2100 BLK Guardrail Upgrade 1 60 $5,392

Masters 400 N BLK Guardrail Upgrade 1 60 $3,543

Masters 500 N BLK Guardrail Upgrade 1 60 $10,051

Masters 500 S BLK Guardrail Upgrade 1 60 $5,392

Red Bird 3100-3200 W BLK Guardrail Upgrade 1 60 $12,252

Red Bird 3300 W BLK Guardrail Upgrade 1 60 $12,252

Red Bird 3600 W BLK Guardrail Upgrade 1 60 $12,252

Red Bird 3800 W BLK Guardrail Upgrade 1 60 $7,594

Friday, March 31, 2006 Page 208 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Safety Improvements-Guardrail Upgrades

Simpson Stuart 4300 BLK Guardrail Upgrade 1 60 $7,578 St. Augustine 1200 S BLK Guardrail Upgrade 1 60 $12,444

St. Augustine 300 S BLK Guardrail Upgrade 1 60 $5,839

St. Augustine 900 S BLK Guardrail Upgrade 1 60 $3,286

Westmoreland 7300 S BLK Guardrail Upgrade 1 60 $20,615

Bonnie View 6600 BLK Guardrail Upgrade 1 53 $6,126

Lawson 100 BLK Guardrail Upgrade 1 53 $15,188

Prairie Creek 200 N BLK Guardrail Upgrade 1 33 $1,962

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (44 detail records) Sum $690,914 Traffic Signal Upgrades - Citywide

Simpson Stuart @ S M Wright Traffic Signal Upgrade 1 100 $27,249

Bonnie View @ Corrigan (Stag) Traffic Signal Upgrade 1 87 $107,464

Cherry Valley @ Lancaster Traffic Signal Upgrade 1 87 $107,464

Cockrell Hill @ Redbird Traffic Signal Upgrades Citywide 1 87 $52,966

Camp Wisdom @ Hampton Traffic Signal Upgrade 1 80 $41,161

Camp Wisdom @ Polk Traffic Signal Upgrade 1 80 $40,612

Hampton @ Redbird Traffic Signal Upgrade 1 80 $54,881

Ledbetter @ Veterans Traffic Signal Upgrade 1 80 $93,170

Polk @ Wheatland Traffic Signal Upgrade 1 80 $54,881

Ledbetter @ Westmoreland Traffic Signal Upgrade 1 73 $54,881

Camp Wisdom @ Lancaster (Simp Stuart) Traffic Signal Upgrade 1 67 $82,321

Friday, March 31, 2006 Page 209 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic Signal Upgrades - Citywide

Cockrell Hill @ IH20 Traffic Signal Upgrade 1 67 $221,757 Camp Wisdom @ Greenspan Traffic Signal Upgrade 1 53 $54,689

Camp Wisdom @ Pastor Bailey Traffic Signal Upgrade 1 53 $53,924

Gannon @ Westmoreland Traffic Signal Upgrades Citywide 1 53 $107,847

Westmoreland @ Wheatland Traffic Signal Upgrade 1 53 $133,629

Bonnie View @ Simpson Stuart Traffic Signal Upgrade 1 40 $105,933

Old Seagoville @ St Augustine Traffic Signal Upgrade 1 27 $116,399

Redbird @ Westmoreland Traffic Signal Upgrade 1 20 $105,933

Elam at Prairie Creek Traffic Signal Upgrades Citywide 1 13 $52,966

Summary for 'Category' = Traffic Signal Upgrades - Citywide (20 detail records) Sum $1,670,128 Traffic System Management - Dynamic Message Signs

Ledbetter 2800 E Dynamic Message Sign 1 15 $76,578

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (1 detail record) Sum $76,578 Traffic System Management - Flood Detour Signs

Simpson Stuart @ Five Mile Creek Dynamic Signs - Flood Detours 1 80 $42,118

Dowdy Ferry @ Middlefield Dynamic Signs - Flood Detours 1 60 $42,118

Simpson Stuart @ I-45 Dynamic Signs - Flood Detours 1 60 $42,118

St. Augustine @ Lake June Dynamic Signs - Flood Detours 1 60 $14,320

Ravenview, 11900 Dynamic Signs - Flood Detours 1 40 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (5 detail records) Sum $182,792

Friday, March 31, 2006 Page 210 of 349 Project Name Description Tier Score Estimate Council District 8 Traffic System Management - Roadside Cameras

Camp Wisdom-RLT Traffic Systems Management - Roadside Camera 1 20 $6,382 Hampton-IH20 Roadside Camera 1 20 $12,763

Hampton-Ledbetter Roadside Camera 1 20 $4,212

Lancaster-Ledbetter Roadside Camera 1 20 $6,382

Buckner-CF Hawn Frwy Roadside Camera 1 15 $12,763

Lancaster-LBJ Roadside Camera 1 15 $12,763

Ledbetter-Westmoreland Roadside Camera 1 15 $6,382

Bonnieview-IH20 Traffic Systems Management - Roadside Camera. Cameras 1 10 $12,763 allow traffic engineers and emergency operations staff to remotely view traffic conditions from the City Hall Traffic Management Center "TMC". Summary for 'Category' = Traffic System Management - Roadside Cameras (8 detail records) Sum $74,408 Summary for 'Program' = STREET AND TRANSPORTATION (343 detail records) Sum $693,584,963 Summary for 'CD' = 8 (343 detail records) Sum $693,584,963

Friday, March 31, 2006 Page 211 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Ferguson & Cassandra (Maylee to Ferguson) Full reconstruction 1 85 $191,445 Milhof(11000)&Delford CIR-Barnes bridge to Plummer Full Reconstruction 1 85 $307,844

Cotillion & Mayhew - Shiloh to Maylee Full Reconstruction 1 77 $385,792

Mayhew(3538) & Delford Cir - 'T' to Cotillion Full Reconstruction 1 77 $98,096

San Lorenzo and San Juan - Inc. T-alley Full Reconstruction 1 76 $200,830

Freemont & Whitehill - Berryhill to 'T'(inclusive) Full Reconstruction 1 75 $242,429

Tascosa St & Ulloa St - Ruidosa to "T" Alley Full reconstruction, include T-alley - 11106 Tascosa St. 1 75 $334,952

Maylee & Libby - Ruth Ann to Gus Thomasson Full Reconstruction 1 69.9 $182,658

Delford(3519) & Barnes Bridge-Ferguson to Dunaway Full Reconstruction 1 67 $222,420

Annapolis & University - Ridgelawn To Berwyn Ln. Full Reconstruction 1 66 $329,830

Lakeshore Drive (6400-6532) Goliad Circle - Abrams to Full reconst Lakeshore Dr (6400 - 6532) 1 66 $160,814 Cambria Vada & Blessing - Blessing to Patrick Full Reconstruction 1 66 $387,700

Lingo La (10104) - Hartline Dr to Highwood Dr Full Reconstruction 1 65 $96,901

Whitehill & Town North - Larmanda to 'T' alley b/ Full Reconstruction 1 65 $265,288

Kingsbury Drive 1 63 $271,852

Newcombe Dr (10105 - 10147) San Juan - Blake Cir. to Full recon Newcombe Dr. (10105 - 10147) 1 63 $135,288 Crest Ridge San Benito &Santa Clara - White Rock to Breezewood Full Reconstruction (8207 San Benito) 1 63 $216,709

San Paula & San Medina-Materhorn to Santa Garza Full reconstruction 1 63 $216,971

Sharondale Lane (10805-10875) Ruth Ann - Maylee to "T" Full recon Sharondale Ln. (10805 - 10875) 1 63 $233,563 Alley Bennington & Rutgers - Trammell to Middlebury Full Reconstruction 1 62 $203,871

Cassandra Way (10808 - 10880) Dunway - Maylee to "T" Full Reconstruction Cassandra Way (10808 - 10880) 1 60 $204,004 Alley

Friday, March 31, 2006 Page 212 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Ulloa Lane (11002-11308) Visalia - Ruidosa to "T" Alley Full recon Ulloa Ln. (11002 - 11308) 1 60 $279,510 Highwood(2908)&Materhorn -Crest Ridge to Materhorn Full Reconstruction 1 50 $140,832

Ruth Ann and Mayhew - Maylee to T-alley Full Reconstruction 1 50 $217,688

Clemson & Havenford - Bucknell to Trammel Full Reconstruction, 7106 Clemson 1 47 $220,434

Mandalay & Sharondale - Maylee to T-alley Full Reconstruction 1 41 $304,034

Cassandra Way (10805 - 10879) Ferguson - Maylee to Full reconstruction Cassandra Way (10805 - 10879) 1 40 $194,355 Plummer Ellsworth Av (6402 - 6464) Kenwood - Abrams to Cambria Full reconst Ellsworth Ave. (6402 - 6464) 1 40 $197,827

Forest Hills Blvd (9103 - 9131) San Fernando - Old Gate Full reconst Forest Hills Blvd. (9103 - 9131) 1 40 $100,828 to Redwood Highwood Dr (2506 - 2648) Materhorn - Casa Oaks to Full reconst Highwood Dr. (2506 - 2648) 1 40 $270,576 Shiloh Kilarney Drive (10017-10225) Lake Gardens - Peavy to Full Reconst Kilarney Dr. (10017 -10225) 1 40 $316,650 Whitehaven San Marcus Avenue (3105-3235) San Lucas - Materhorn Full recon San Marcus Ave. (3105 - 3235) 1 40 $218,247 to Santa Garza Patrick & MKT R/R - Abrams To Blessing Full Reconstruction 1 31 $716,099

Avalon & Lakewood - Avalon to Pearson Full Reconstruction 1 29 $261,210

Aledo Dr - 10402 - 10532 Full Reconstruction 2 $284,146

Aledo Dr - 10403 - 10551 Full Reconstruction 2 $294,594

Aledo Dr - 10663 - 10675 Full Reconstruction 2 $250,507

Andrea & Millmar - LaPrada to Shiloh Full Reconstruction - Andrea Lane 2702 - 2944 1 $346,582

Andrea La - 2703 - 2945 Full Reconstruction 2 $346,327

Andrea La - 3004 - 3206 Full Reconstruction 2 $226,297

Aqua Dr - 403 - 423 Full Reconstruction 2 $281,852

Friday, March 31, 2006 Page 213 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Aqua Dr - 552 - 626 Full Reconstruction 2 $203,871 Ascot La - 6704 - 6712 Full Reconstruction 2 $197,501

Avalon Av - 6703 - 6759 Full Reconstruction 2 $192,659

Axton Ln - 6507 - 6565 Full Reconstruction 2 $222,220

Ballycastle Dr - 2305 - 2373 Full Reconstruction 2 $237,255

Barbarosa Dr - 10813 Full Reconstruction 2 $334,350

Barbarosa Dr - 10814 - 11038 Full Reconstruction 2 $290,517

Barnes Av - 11409 - 11454 Full Reconstruction 2 $225,023

Baronne Cir - 10135 - 10465 Full Reconstruction 2 $305,553

Benbrook Dr - 10614 - 10738 Full Reconstruction 2 $298,672

Benbrook Dr - 10804 - 10848 Full Reconstruction 2 $175,840

Benbrook Dr - 10805 - 10849 Full Reconstruction 2 $159,275

Bennington Dr - 7106 - 7158 Full Reconstruction 2 $144,238

Bennington Dr & Haverford - Trammel to Middlebury Full Reconstruction Bennington Dr (7205 - 7335) 1 $224,629

Berkinshire Dr - 811 - 821 Full Reconstruction 2 $299,946

Berryhill St (6207 - 6245) Winchester - Freemont to "T" Full Reconstruction Berryhill St (6207 - 6245) 1 $157,236 Alley Blake Av - 2104 - 2114 Full Reconstruction 2 $165,900

Blanning and Hambrick - Northlake to Waterview Full Reconstruction 2 $224,629

Blanning Dr - 507 - 563 Full Reconstruction 2 $208,969

Bondstone Dr - 407 - 451 Full Reconstruction 2 $183,994

Bondstone Dr - 507 - 575 Full Reconstruction 2 $239,040

Broadmoor Dr - 11705 - 11855 Full Reconstruction 2 $336,897

Friday, March 31, 2006 Page 214 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Brookcove La - 7121 - 7251 Full Reconstruction 2 $333,585 Brookhurst Dr - 552 - 626 Full Reconstruction 2 $207,949

Bucknell Dr - 6907 - 7151 Full Reconstruction 2 $586,386

Casa Oaks Dr - 10029 - 10045 Full Reconstruction 2 $259,936

Casa Vale Dr - 1407 - 1445 Full Reconstruction 2 $150,356

Casa View Av - 10123 - 10187 Full Reconstruction 2 $296,888

Castalon Dr - 10814 ------Full Reconstruction 2 $247,958

Centerville Rd - 1605 - 1819 Full Reconstruction 2 $251,016

Centerville Rd - 1903 - 2037 Full Reconstruction 2 $302,239

Centerville Rd - 2812 - 2820 Full Reconstruction 2 $133,281

Classen Dr - 407 - 543 Full Reconstruction 2 $190,619

Cotillion Dr - 10709 - 10755 Full Reconstruction 2 $160,804

Cotillion Dr - 10803 - 10855 Full Reconstruction 2 $189,090

Cotillion Dr - 10935 ------Full Reconstruction 2 $234,452

Creekmere Cir - 10134 - 10148 Full Reconstruction 2 $200,813

Crest Ridge & La Prada - Santa Garza to Motley Full Reconstruction, 3322 Crest Ridge Dr. 2 $194,908

Crest Ridge Dr - 2314 - 2350 Full Reconstruction 2 $156,981

Crest Ridge Dr - 2319 - 2349 Full Reconstruction 2 $151,374

Crest Ridge Dr - 2516 - 2648 Full Reconstruction 2 $294,850

Crest Ridge Dr - 2704 - 2812 Full Reconstruction 2 $155,197

Crest Ridge Dr - 2705 - 2821 Full Reconstruction 2 $210,242

Crest Ridge Dr - 3305 - 3351 Full Reconstruction 2 $177,369

Friday, March 31, 2006 Page 215 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Dalehurst Dr - 10515 - 10527 Full Reconstruction 2 $365,950 Dawn Dr - 10502 - 10566 Full Reconstruction 2 $276,500

Desdemona Dr - 11536 - 11544 Full Reconstruction 2 $279,304

Dorchester Dr - 11520 - 11626 Full Reconstruction 2 $204,382

Dumbarton & Glen Cross - Glen Cross to Cotillion Full Reconstruction 2 $236,116

Dunaway (10922) & Park Oak Cir. - Plummer to 'T' Full Reconstruction 2 $142,338

Dunloe Dr - 2302 - 2380 Full Reconstruction 2 $299,946

Eastwood Dr - 10111 - 10231 Full Reconstruction 2 $303,004

Eastwood Dr - 10116 - 10230 Full Reconstruction 2 $288,223

Edgerton Dr - 7108 - 7344 Full Reconstruction 2 $470,179

Encino Dr - 2810 - 2836 Full Reconstruction 2 $106,523

Encino Dr - 2811 - 2837 Full Reconstruction 2 $101,171

Fenwick Dr - 2106 - 2250 Full Reconstruction 2 $277,265

Flamingo La - 11610 - 11830 Full Reconstruction 2 $393,981

Forest Hills Blvd - 8310 - 8378 Full Reconstruction 2 $262,739

Forest Hills Blvd - 8606 - 8838 Full Reconstruction 2 $327,978

Forestgrove Dr - 1005 - 1049 Full Reconstruction 2 $266,308

Freemont St - 7006 - 7066 Full Reconstruction 2 $209,733

Freemont(6945) & Wakefield - "T" Alley to Larmanda Full reconstruction 2 $215,950

Fuller Dr - 1217 - 1319 Full Reconstruction 2 $218,907

Garland Rd - 8310 - 8372 Full Reconstruction 2 $263,250

Garland Rd - 8510 - 8566 Full Reconstruction 2 $225,788

Friday, March 31, 2006 Page 216 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Glengariff Dr - 2305 - 2367 Full Reconstruction 2 $236,491 Greenbrook & Hillgreen - Brookcove To Twin Tree Full Reconstruction 2 $426,280

Harter Rd - 637 - 673 Full Reconstruction 2 $155,707

Highwood Dr - 2404 - 2480 Full Reconstruction 2 $314,727

Highwood Dr - 2704 - 2818 Full Reconstruction 2 $203,362

Housley Dr (2306 - 2828) Tolosa - Joaquin to Shiloh Full Reconstruction Housley Dr. (2306 - 2828) 1 $533,123

Irongate La - 7012 - 7056 Full Reconstruction 2 $451,066

Kingsbury Dr - 6508 - 6524 Full Reconstruction 2 $76,961

Kirkwood Dr - 505 - 559 Full Reconstruction 2 $205,400

Lakeshore Dr - 6700 - 6816 Full Reconstruction 2 $292,046

Lakeshore Dr - 6902 - 6960 Full Reconstruction 2 $280,323

Lakeshore Dr - 7000 - 7038 Full Reconstruction 2 $166,920

Lakeshore Dr - 7001 - 7039 Full Reconstruction 2 $164,626

Lakeshore Dr - 7103 - 7131 Full Reconstruction 2 $129,204

Losa Dr - 10002 - 10024 Full Reconstruction 2 $99,387

Mandalay & Swaffar - Barnes Bridge Rd to Swaffar Full Reconstruction 2 $303,019

Marlin Dr - 9905 - 9921 Full Reconstruction 2 $216,869

Meadow Lake Av - 7002 - 7048 Full Reconstruction 2 $274,971

Myrtice Dr - 11005 - 11307 Full Reconstruction 2 $285,929

Northwest Hwy (E) - 10120 ------Full Reconstruction 2 $275,736

Parader & Drummond- Barnes Bridge to Cotillion Full Reconstruction, 3625 Parader Ct. 2 $398,583

Plummer Dr - 10405 - 10465 Full Reconstruction 2 $234,962

Friday, March 31, 2006 Page 217 of 349 Project Name Description Tier Score Estimate Council District 9 Alley Reconstruction

Plummer(10119) & Sandra Lynn-Mandalay to Strayhorn Full Reconstruction 2 $215,574 Ravendale La - 6719 - 6729 Full Reconstruction 2 $240,059

San Benito Wy - 8107 - 8185 Full Reconstruction 2 $293,065

San Benito Wy - 8311 - 8379 Full Reconstruction 2 $262,739

San Juan Av - 10105 - 10187 Full Reconstruction 2 $204,382

San Lucas Av - 2906 - 3014 Full Reconstruction 2 $99,133

San Lucas Av (2903 - 3015) San Paula - Shioh to Santa Full Reconstruction San Lucas Ave. (2903 - 3015) 1 $241,333 Garza San Marcus & San Paula - Casa Oaks to Shiloh Full Reconstruction 2 $298,654

San Marcus Av - 2331 - 2373 Full Reconstruction 2 $157,236

San Marcus Av - 2405 - 2455 Full Reconstruction 2 $171,507

San Marcus Av - 3104 - 3234 Full Reconstruction 2 $243,627

San Marcus Av - 3304 - 3350 Full Reconstruction 2 $177,369

Springwater & Sherwood Glen -Springwater to Mercer Full Reconstruction 2 $393,413

Swaffar(11000) Strayhorn -Barnes Bridge to Swaffar Full Reconstruction 2 $328,009

Wakefield and Freemont Full Reconstruction 2 $197,744

Winchester & Wakefield - Wakefield to Larmanda Full Reconstruction 2 $186,340

Yorksprings & Carissa - Valley Spring to T-alley Full Reconstruction 2 $313,970

Summary for 'Category' = Alley Reconstruction (146 detail records) Sum $35,957,732 Barrier Free Ramps

Garland Rd. (Knobb Oaks to Buckner) 1- Construct 5 BFRs at Bus Stops 2- connect BFRs to Bus 1 56 $13,401 Stops with Sidewalk Ferguson Rd @ Woodmeadow Pwy Construct 4 ramps 1 30 $7,658

Friday, March 31, 2006 Page 218 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps

Aqua @ Northlake 4 BFRs on intersection 1 26 $7,658 Aqua @ Waterview 2 BFRs & 2 Curb Cuts on school side 1 26 $7,658

Garland Rd @ Alvin St Construct 3 ramps 1 25 $5,743

Garland Rd @ Fuller Dr Construct 3 ramps 1 25 $5,743

Garland Rd @ Lochmond Cir Construct 2 ramps 1 25 $3,829

Ferguson Rd @ Peavy Rd Construct 4 ramps 1 21 $6,815

Ferguson Rd @ Skyview Dr Construct 4 ramps 1 21 $3,829

Gus Thomasson Rd @ Aledo Dr Construct 4 ramps 1 21 $7,658

Ferguson Rd @ Crest Ridge Dr Construct 4 ramps 1 16 $7,658

Ferguson Rd @ Healy Dr Construct 4 ramps 1 16 $4,671

Ferguson Rd @ Highwood Dr Construct 4 ramps 1 16 $7,658

Ferguson Rd @ Province Ln Construct 4 ramps 1 16 $7,658

Ferguson Rd @ San Paula Ave Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Casa View Ave Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Desdemona Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Fern Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Hermosa Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Losa Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Newcombe Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ San Felipe Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Woodale Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ Zacha Dr Construct 4 ramps 1 16 $7,658

Friday, March 31, 2006 Page 219 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps

Peavy Rd @ Millmar Cir Construct 4 ramps 1 16 $7,658 Peavy Rd @ Millmar Dr Construct 4 ramps 1 16 $7,658

Gus Thomasson Rd @ San Medina Ave Construct 4 ramps 1 14 $7,658

Lippitt Ave @ Lockwood Blvd Construct 4 ramps 1 14 $7,658

Peavy Rd @ Cayuga Dr Construct 4 ramps 1 14 $7,658

Peavy Rd @ Redondo Dr- Naylor St Construct 4 ramps 1 14 $7,658

Ferguson Rd @ Larry Dr Construct 4 ramps 1 11 $4,212

Ferguson Rd @ San Medina Ave Construct 4 ramps 1 11 $7,658

Ferguson Rd @ Viewcrest Dr Construct 2 ramps 1 11 $3,829

Gus Thomasson Rd @ Dawn Dr Construct 4 ramps 1 11 $7,658

Gus Thomasson Rd @ Sylvia Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Cloister Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Estacado Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Hermosa Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Kiltartan Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Losa Dr Construct 2 ramps 1 11 $3,829

Peavy Rd @ Mercer Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Oates Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Olmos Dr Construct 4 ramps 1 11 $7,658

Peavy Rd @ Peavy Pl Construct 4 ramps 1 11 $7,658

Peavy Rd @ Province Ln Construct 4 ramps 1 11 $7,658

Peavy Rd @ Crowberry Dr Construct 4 ramps 1 9 $7,658

Friday, March 31, 2006 Page 220 of 349 Project Name Description Tier Score Estimate Council District 9 Barrier Free Ramps

Lovers Ln @ Ridgelawn Dr Construct 4 ramps 1 7 $7,658 Peavy Rd @ Coldwater Cir Construct 4 ramps 1 7 $7,658

Peavy Rd @ Peavy Cir Construct 4 ramps 1 7 $7,658

Ferguson Rd @ Hartline Dr Construct 4 ramps 1 6 $7,658

Ferguson Rd @ San Marcus Ave Construct 4 ramps 1 6 $7,658

Gus Thomasson Rd @ Cayugo Dr Construct 4 ramps 1 6 $7,658

Gus Thomasson Rd @ Esta Buena Dr Construct 4 ramps 1 6 $7,658

Gus Thomasson Rd @ Kilkenny Pl Construct 4 ramps 1 6 $7,658

Gus Thomasson Rd @ Lavano Ln Construct 4 ramps 1 6 $7,658

Peavy Rd @ San Lorenzo Ave Construct 4 ramps 1 4 $7,658

Peavy Rd @ Tamarack Dr Construct 4 ramps 1 4 $7,658

Summary for 'Category' = Barrier Free Ramps (57 detail records) Sum $415,819 Bridge Repair and Modification

Lawther (West) over White Rock Creek Cofferdam each side for work space, concrete collars around 1 55 $95,723 piers, grout inject beneath abutment beams Williamson Rd. over McCommas Br. Center of 3 bridges on Williamson on erosion needs - scour 1 50 $114,867 severe, abutments undermined - gabions, critical - also on erosion needs - this is the most critical and should be repaired if others are not selected Summary for 'Category' = Bridge Repair and Modification (2 detail records) Sum $210,590 I.T.S. - Speed & Travel Time System

Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $66,049

Friday, March 31, 2006 Page 221 of 349 Project Name Description Tier Score Estimate Council District 9 I.T.S. - Speed & Travel Time System

Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $66,049 Intergovernmental Partnership Projects

Lakeland Dr @ Ash Creek Bridge rehabilitation and/or reconstruction. 2 49.04 $0

East Dallas RR Xings - 8 Xings along the KCS Partnership project with TxDOT to upgrade gates, install 1 $469,678 medians, and signs. Total estimated cost of $2.3 million. Estimated to be let by early 2008. Jupiter Rd - Garland Rd to Centerville Partnership project with TxDOT to reconstruct and widen to 3 1 $255,260 lane roadway. Total estimated cost of $2.6 million. Estimated to be let by TxDOT early 2007. Supplements 1995 and 1998 Bond Program funds. La Prada - Oates to Motley Partnership project with Dallas County to design and 1 $861,503 reconstruct existing 4 and 6 lane divided roadway. Total estimated cost of $6.2 million. Estimated to be let by Dallas County mid 2010. Supplements 2003 Bond Program funds. Miller Road at Rowlett Creek Bridge rehabilitation and/or reconstruction 2 $0

Mockingbird Ln @ SPRR-Fisher Rd Bridge rehabilitation and/or reconstruction. 2 $0

Northwest Hwy - W. Lawther to Buckner Partnership project with TxDOT and Dallas County to leverage 1 $1,263,537 additional TxDOT $ for amenities and beautification. Total estimated cost of $16.5 million. Estimated to be let by TxDOT late 2007. SH 78 - Buckner (Loop 12) to IH 635 Partnership project with TxDOT to construct amenities to 1 $3,382,195 complement TxDOT's widening project. Total estimated cost of $6.2 million. Estimated to be let by late 2008. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (8 detail records) Sum $6,232,173 Street Petitions

Oldgate Ln. - Garland Rd to Diceman Dr. Engineering, Paving and Drainage 1 100 $1,923,563

Friday, March 31, 2006 Page 222 of 349 Project Name Description Tier Score Estimate Council District 9 Street Petitions

Summary for 'Category' = Street Petitions (1 detail record) Sum $1,923,563 Street Reconstruction Local Streets

Rio Hondo Dr - San Felipe Dr to Hermosa Dr 1300 - 1400 Blks 1 61.42 $284,116

Melody Ln -Shady Brook to 2000' west of Eastridge 5900 - 6200 Blks 1 61.27 $2,347,698

Monterrey Ave - Barbarosa Dr to Farola Dr 1700 - 2000 Blks 1 60.54 $829,595

Larmanda St - Skillman St North to 450 Fft 6600 Blk 1 58.87 $253,665

Whittier Ave - San Leandro Dr to Eustis Ave 1700 Blk 1 58.7 $347,466

Lake Highlands Dr - Northcliff Dr to Waterview Rd 9700 Blk 1 57.74 $144,222

Westlake Ave - Hillside Dr to Nonesuch Rd 6500 Blk 1 57.55 $382,890

San Fernando Wy - Ocalla Av to Oldgate Ln 9000 Blk 1 56.13 $402,035

Coolair Dr - Edgelake Dr to Waterview Rd 500 - 600 Blks 1 55.61 $933,525

Materhorn Dr - Cret Ridge Dr to Shiloh Rd 2800 Blk 1 55.53 $560,296

Wood Dale - Gus Thomasson Rd to Crest Ridge Dr 10400 - 10500 Blks 1 55.43 $717,281

Highwood Dr - Shiloh St to San Marcus Av 2700 - 2900 Blks 1 55.3 $730,044

Clary Dr - Easton Rd to Baronne Cir 10200 blk 1 55.18 $417,350

Centerville Rd (Serv Rd) - Aledo Dr to Galena St 1600 - 2000 Blks 1 55.05 $1,180,578

Whitehill St - Kingsbury Dr to Berryhill St 6800 Blk 1 53.92 $506,722

Farola Dr - Desdemona Dr to Monterrey Av 1900 - 2000 Blks <- Resurfacing 1 53.48 $1,180,578

Abston Ln - Gardenia Dr to Holt Dr 11500 - 11800 Blks 1 53.22 $694,934

Highwood Dr - Ferguson Rd to Hartline Dr 2400 BLK 1 52.84 $433,942

Northridge Dr - Sperry St East to Dead-End 6900 Blk 1 52.53 $130,300

Friday, March 31, 2006 Page 223 of 349 Project Name Description Tier Score Estimate Council District 9 Street Reconstruction Local Streets

El Campo Dr - San Fernando Way to Redondo Dr 1300 Blk 1 52.27 $446,705 Green Tree Ln - Fisher Rd to Mockingbird Ln 6900 Blk 1 51.57 $622,545

Lingo La - Highwood rd to Crestridge Dr 10100 Blk 1 45.57 $580,717

Summary for 'Category' = Street Reconstruction Local Streets (22 detail records) Sum $14,127,201 Street Reconstruction Thoroughfares

La Prada Dr - Millmar Dr to Motley Dr (City Limits) 10000 Blk 1 65.92 $1,467,745

Peavy Rd - Bluff Dale Dr to E Lake Highlands Dr 800 Blk 1 62.55 $1,212,485

Summary for 'Category' = Street Reconstruction Thoroughfares (2 detail records) Sum $2,680,230 Street Resurfacing

Tavaros Ave. - Garland Rd. to San Fernando Way 1200 block 1 78.87 $39,821

San Lucas Ave. - San Marcus Ave. to Materhorn Dr. 2900 - 3000 1 76.445 $59,986

San Paula Ave. - Ferguson Rd. to Santa Garza Dr. 2400 - 3200 1 74.76 $295,336

Pickens St. - Gaston Ave. to Tokalon Dr. 2300 - 2400 1 74.74 $72,494

Barbarosa Dr. - Farola Dr. to Monterrey Ave. 10800 - 11000 1 74.14 $90,617

Kingsbury Dr. - Town North Dr. to Walling Ln. 6500 - 7000 1 72.91 $214,036

Thale Dr. - Aledo Dr. to Desdemona Dr. 1600 - 1700 1 71.835 $63,049

Highwood Dr. - San Marcus Ave. to Crest Ridge Dr. 2900 Block 1 70.89 $44,032

Shiloh Rd. - Highwood Dr. to ferguson Rd. 10100 - 10500 1 70.6 $328,137

Crest Ridge Dr. - Wood Dale Dr. to Casa Oaks Dr. 1600 - 2400 1 70.08 $406,884

Plummer Dr. - Swaffar Dr. to Ferguson Rd. 10200 - 10500 1 69.8 $233,946

Friday, March 31, 2006 Page 224 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Sharondale Ln. - Maylee Blvd. to Sandra Lynn Dr. 10800 block 1 69.12 $115,760 Montalba Ave. - Farola Dr. to Joaquin Dr. 2000 - 2200 1 68.51 $159,920

Hillbrook St. - Lake Circle Dr. to Bob-O-Link Dr. 2900 - 3600 1 68.37 $105,933

Materhorn Dr. - San Marcus Ave. to San Lucas Ave. 3000 block 1 68.315 $16,847

Cotillion Dr. - Shiloh Rd. to Barnes Bridge Rd. 10600 - 11000 1 68.19 $324,818

Park Brook Dr. - Bel Aire Dr. to Cul-de-Sac 300 block 1 67.89 $23,484

Easton Rd. - Lake Highlands Dr. to Kahala Dr. 600 Block 1 67.51 $61,773

Pat Dr. - Aledo Dr. to Desdemona Dr. 1600 - 1800 1 66.105 $118,185

Berryhill St. - Town North Dr. to Kingsbury Dr. 6100 - 6300 1 65.98 $227,054

Groveland Dr. - Lakeland Dr. to Corday St. 8500 Block 1 65.81 $24,505

Dumbarton Dr. - Cotillion Dr. to Drumbarton Dr. 11400 - 11500 1 65.66 $114,229

Sandra Lynn Dr. - Cotillion Dr. to Dunaway Dr. 10400 block 1 65.65 $61,390

Erhard Dr. - Milhof Dr. to Barnes Bridge Rd. 11000 Block 1 65.24 $65,729

St Francis Ave. - Santa Clara Dr. to San Leandro Rd. 1500 - 1600 1 65.23 $79,769

Freemont St. - Kingsbury Dr. to Walling Ln. 6800 - 7000 1 65.175 $155,326

Eastwood Dr. - Fern Dr. to Crest Ridge Dr. 10300 Block 1 65.06 $71,728

Angora St. - Lunar Rd. to Forest Hills Pl. 9200 - 9300 1 64.82 $102,104

Quanah St. - Visalia Dr. to Shiloh Rd. 2800 block 1 64.77 $38,800

San Marcus Ave. - Ferguson Rd. to Shiloh Rd. 2400 - 2600 1 64.3 $171,662

Mayhew Dr. - Plummer Dr. to Cotillion Dr. 3500 block 1 64.28 $81,300

Galena St. - Winthrop Dr. to Centerville Rd. 10600 Block 1 64.23 $70,069

Lanewood Cir. - Lippitt Ave. to Sunland St. 11100 - 11200 1 64.08 $72,494

Friday, March 31, 2006 Page 225 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Emerald Isle Dr. - Garland Rd. to End of Curb 1100 Block 1 63.89 $39,055 Southridge Dr. - Hillbrook St. to Sperry St. 6700 - 6800 1 63.54 $80,535

Santa Garza Dr. - La Prada Dr. to Marlin Dr. 9900 block 1 63.45 $39,693

Evangeline Way - Easton Rd. to Lake Gardens Dr. 10500 Block 1 62.935 $65,985

Ruidosa Ave. - Stallcup Dr. to Shiloh Rd. 2400 - 2800 1 62.79 $141,159

Abrams Rd. - Glennox Ln. to Lover Ln. 5200 block 1 62.67 $35,098

Brookhurst Dr. - Van Dyke Rd. to Waterview Dr. 400 - 600 1 62.64 $89,213

Meadow Lake Ave. - Winstead Dr. to Lawther Dr. 7100 - 7200 1 62.33 $85,129

Forest Hills Blvd. - Oldgate Ln. to Garland Rd. 9100 - 9400 1 59.705 $183,915

Gaston Ave. - Cambria Blvd. to Loving Ave 6600 - 7000 1 59.01 $381,231

Drummond Dr. - Cotillion to Ferguson(Incl.Drumd.Ci 11400 - 11600 1 58.17 $190,807

Cloister Dr. - Loree Dr. to Macmanus Dr. 9600 - 9700 1 57.225 $63,304

San Pedro Pkwy. - St. Francis Ave. to Lakeland Dr. 8400 - 8500 1 56.07 $106,699

Kirkwood Dr. - Northlake Dr. to Lake Highlands Dr. 500 - 900 1 54.785 $112,697

Aledo Dr. - Wood Dale Dr. to Monterrey Ave. 10700 - 11000 1 54.75 $172,301

Mandalay Dr. - Barnes Bridge Rd. to Sandra Lynn Dr. 10900 - 11000 1 54.58 $93,936

El Capitan Dr. - Joaquin Dr. to Dead End north of Barnes 1800-2200 1 53.8 $156,857 Bridge Rd. Marlin Dr. - Oates Dr. to La Prada Dr. 9800 - 9900 1 53.585 $154,439

El Capitan Dr. - San Francisco Dr. to Shiloh Rd. 2500-2800 1 53.48 $76,195

Desdemona Dr. - Barnes Bridge Rd. to Costa Mesa Dr. 11500 - 11600 1 52.715 $59,348

Winchester St. - Freemont St. to Larmanda St. 6800 - 6900 1 52.34 $99,169

Tisinger Ave. - Barbarosa Dr. to Tascosa Dr. 1800 - 2500 1 49.61 $195,912

Friday, March 31, 2006 Page 226 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Wakefield St. - Berryhill St. to Larmanda St. 6900 block 1 49.56 $49,520 Tokalon Dr. - Winsted Dr. to Lawther Dr. (W) 7100 - 7300 1 49.54 $65,985

Mercer Dr. - Vinewood Dr. to Buckner Blvd. 9000 - 9400 1 47.065 $260,110

Mercer Pl. - Mercer Dr. to Cul-De-Sac 9000 block 1 47.045 $23,356

Mercer Cir. - Mercer Dr. to Cul-De-Sac 9100 block 1 41.485 $12,763

Abrams Rd. - 6000 2 $0

Abston La. - 11500 2 $0

Abston La. - 11700 2 $0

Abston La. - 11800 2 $0

Alexander Dr. - 6700 2 $0

Andrea La. - 2500 2 $0

Andrea La. - 2600 2 $0

Arboreal Dr. - 7000 2 $0

Ash Creek Dr. - 9600 2 $0

Ash Creek Dr. - 9800 2 $0

Avalon Av. - 6800 2 $0

Axton La. - 6400 2 $0

Axton La. - 6500 2 $0

Bally Mote Dr. - 1100 2 $0

Benbrook Dr. - 10700 2 $0

Blackwell St. - 5800 2 $0

Bluff Dale Dr. - 9700 2 $0

Friday, March 31, 2006 Page 227 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Bondstone Dr. - 400 2 $0 Bondstone Dr. - 500 2 $0

Brendenwood Dr. - 2300 2 $0

Burwood La. - 6800 2 $0

Carnegie Dr. - 9900 2 $0

Casa Oaks Dr. - 9900 2 $0

Castolon Dr. - 10800 2 $0

Castolon Dr. - 10900 2 $0

Castolon Dr. - 11300 2 $0

Cayuga Dr. - 10600 2 $0

Centerville Serv. - 2000 2 $0

Centerville Serv. - 2200 2 $0

Cimarec St. - 11600 2 $0

Classen Dr. - 600 2 $0

Corporate Dr. - 12000 2 $0

Corporate Dr. - 12100 2 $0

Costa Mesa Dr. - 2300 2 $0

Dalehurst Dr. - 10200 2 $0

Dalhart La. - 6900 2 $0

Danbury La. - 6400 2 $0

Delford Cir. - 3600 2 $0

Dixfield Dr. - 11700 2 $0

Friday, March 31, 2006 Page 228 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Dixfield Dr. - 11900 2 $0 Easton Rd. - 100 2 $0

Easton Rd. - 1400 2 $0

Edgerton Dr. - 7000 2 $0

Edgerton Dr. - 7100 2 $0

Ellsworth Av. - 6800 2 $0

Estacado Dr. - 10800 2 $0

Farola Dr. - 1700 2 $0

Farola Dr. - 1800 2 $0

Fenton Dr. - 7100 2 $0

Freemont St. - 6800 2 $0

Freemont St. - 6900 2 $0

Gaston Pkwy. - 9300 2 $0

Gatewood Dr. - 11500 2 $0

Genetta Dr. - 11000 2 $0

Goliad Av. - 6400 2 $0

Gus Thomasson Rd. - 1600 2 $0

Gus Thomasson Rd. - 2500 2 $0

Gus Thomasson Rd. - 3300 2 $0

Hambrick Rd. - 500 2 $0

Hermosa Dr. - 10800 2 $0

Highwood Dr. - 2100 2 $0

Friday, March 31, 2006 Page 229 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Highwood Dr. - 2200 2 $0 Highwood Dr. - 2600 2 $0

Housley Dr. - 2600 2 $0

Itasca Dr. - 11200 2 $0

Joaquin Dr. - 10300 2 $0

Jupiter Rd. - 11600 2 $0

Jupiter Rd. - 11800 2 $0

Jupiter Rd. - 11900 2 $0

Kenwood Av. - 6900 2 $0

Kiltartan Dr. - 1500 2 $0

Kiltartan Dr. - 1700 2 $0

Kirkwood Dr. - 500 2 $0

La Fonda Blvd. - 11800 2 $0

La Prada Dr. - 2300 2 $0

Lake Highlands Dr. (E) - 9900 2 $0

Lake Terrace Cir. - 800 2 $0

Lakedale Dr. - 10000 2 $0

Larmanda St. - 6700 2 $0

Larmanda St. - 6800 2 $0

Leda Dr. - 100 2 $0

Leda Dr. - 200 2 $0

Libby La. - 10300 2 $0

Friday, March 31, 2006 Page 230 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Lochspring Dr. - 10800 2 $0 Loree Dr. - 1700 2 $0

Loving Av. - 2400 2 $0

Lunar La. - 1200 2 $0

Materhorn Dr. - 2300 2 $0

Mayhew Dr. - 3100 2 $0

Mayhew Dr. - 3200 2 $0

Mercer Cir. - 9100 2 $0

Merrilee La. - 6700 2 $0

Merrilee La. - 6900 2 $0

Milhof Dr. - 11000 2 $0

Millmar Dr. - 2900 2 $0

Millmar Dr. - 3000 2 $0

Millmar Dr. - 3100 2 $0

Millmar Dr. - 3200 2 $0

Modlin St. - 3400 2 $0

Monterrey Av. - 1700 2 $0

Monterrey Av. - 1800 2 $0

Monterrey Av. - 2000 2 $0

Neering Dr. - 11700 2 $0

North Ridge Dr. - 6700 2 $0

Northcliff Dr. - 10200 2 $0

Friday, March 31, 2006 Page 231 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Northwest Hwy. (E) - 12400 2 $0 Northwest Hwy. (E) - 12600 2 $0

Northwest Pkwy. (E) S - 11300 2 $0

Northwest Pkwy. (E) S - 12000 2 $0

Northwest Pkwy. (E) S - 12100 2 $0

Norwood Dr. - 2000 2 $0

Olmos Dr. - 10000 2 $0

Peavy Rd. - 1100 2 $0

Perimeter Dr. - 12500 2 $0

Perimeter Dr. - 12600 2 $0

Ravendale La. - 6600 2 $0

Redwood Cir. - 1300 2 $0

Ridgemont Dr. - 6400 2 $0

Rockview La. - 6900 2 $0

Ruidosa Av. - 3700 2 $0

Rupley La. - 11300 2 $0

San Benito Wy. - 8200 2 $0

San Benito Wy. - 8400 2 $0

San Diego Dr. - 2800 2 $0

San Fernando Wy. - 8900 2 $0

San Juan Av. - 10000 2 $0

San Juan Av. - 10100 2 $0

Friday, March 31, 2006 Page 232 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

San Leandro Dr. - 8400 2 $0 San Leandro Dr. - 8500 2 $0

San Vicente Av. - 2700 2 $0

Sandalwood Dr. - 10800 2 $0

Santa Clara Dr. - 8600 2 $0

Santa Teresa Av. - 3100 2 $0

Santa Teresa Av. - 3200 2 $0

Shiloh Rd. - 10600 2 $0

Shiloh Rd. - 12000 2 $0

Shiloh Rd. - 12100 2 $0

Solta Dr. - 10100 2 $0

Strand St. - 11500 2 $0

Strand St. - 11800 2 $0

Strayhorn Dr. - 10900 2 $0

Sylvania Dr. - 900 2 $0

Syracuse Dr. - 7200 2 $0

Syracuse Dr. - 7300 2 $0

Tealford Dr. - 2800 2 $0

Timplemore Dr. - 1100 2 $0

Twin Tree La. - 7100 2 $0

University Blvd. (E) - 6100 2 $0

Valley Spring Dr. - 12000 2 $0

Friday, March 31, 2006 Page 233 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Vickery Blvd. - 6400 2 $0 Vinewood Dr. - 8700 2 $0

Visalia Dr. - 11300 2 $0

Walling La. - 6800 2 $0

Walling La. - 6900 2 $0

Walling La. - 7400 2 $0

Waterview Rd. - 9300 2 $0

West Shore Dr. - 2700 2 $0

West Shore Dr. - 2800 2 $0

Westglen Dr. - 8700 2 $0

Westlake Av. - 6600 2 $0

Westlake Av. - 6800 2 $0

Westlake Av. - 7000 2 $0

White Rock Dr. - 1600 2 $0

Whitehill St. - 7000 2 $0

Whittier Av. - 1200 2 $0

Whittier Av. - 1400 2 $0

Wildgrove Av. - 7000 2 $0

Williamson Cir. - 7200 2 $0

Winton St. - 6600 2 $0

Woodmeadow Pkwy. - 10600 2 $0

Woodmeadow Pkwy. - 10700 2 $0

Friday, March 31, 2006 Page 234 of 349 Project Name Description Tier Score Estimate Council District 9 Street Resurfacing

Woodmeadow Pkwy. - 10800 2 $0 Woodmeadow Pkwy. - 11000 2 $0

Woodmeadow Pkwy. - 11100 2 $0

Woodridge Dr. - 10000 2 $0

Yeager Dr. - 12400 2 $0

Yorkmont Cir. - 11200 2 $0

Summary for 'Category' = Street Resurfacing (237 detail records) Sum $7,145,627 Streetscape / Urban Design

Garland Road Urban Design Plan Garland Road from San Rafael to LBJ - sidewalk, driveway, 1 58.83 $1,534,120 intersection, street lighting and landscaping improvements ~25,600 LF Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $1,534,120 Thoroughfares

Mockingbird - Buckner to Hillside Widen bridge to 6 lanes, add 8 left turn pockets 1 35 $13,530,937

La Prada - East CL to Oates Widen to a six lane divided roadway from a four lane roadway 1 0 $670,410

Santa Ana - Garland to Shiloh Widen to a four lane undivided roadway 1 0 $3,961,666

Summary for 'Category' = Thoroughfares (3 detail records) Sum $18,163,013 Traffic Intersection Capacity & Safety Improvement

Abrams @ Kenwood Street Modifications and Bottlene Widen Abrams at Kenwood to provide northbound and 1 40 $181,873 southbound left-turn lanes. Abrams @ Lake Circle Widen Abrams at Lake Circle to provide northbound and 1 30 $218,247 southbound left-turn pockets.

Friday, March 31, 2006 Page 235 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Intersection Capacity & Safety Improvement

Abrams @ Lovers Street Modifications and Bottlenec Widen the southside of Lovers just east of Abrams to improve 1 30 $95,084 the transition from three lanes to two lanes. Abrams @ McCommas Widen Abrams Rd at McCommas to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Monticello - Sondra Widen Abrams at Monticello/Sondra to provide northbound and 1 30 $218,247 southbound left-turn pockets. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (5 detail records) Sum $931,699 Traffic Safety Improvements-Guardrail Upgrades

Miller 18000 BLK Guardrail Upgrade 1 87 $47,478

Skillman 6600 BLK Guardrail Upgrade 1 87 $17,007

Abrams 6900 BLK Guardrail Upgrade 1 80 $30,216

Miller 24000 BLK Guardrail Upgrade 1 80 $126,481

Mockingbird 7000 E BLK Guardrail Upgrade 1 80 $33,120

Skillman 6000 BLK Guardrail Upgrade 1 80 $8,487

Mockingbird 6700 E BLK Guardrail Upgrade 1 73 $4,658

Mockingbird 7600 E BLK Guardrail Upgrade 1 73 $18,443

Mockingbird 8100 E BLK Guardrail Upgrade 1 73 $20,644

Rowlett 21000 BLK Guardrail Upgrade 1 73 $84,083

Skillman 6200 BLK Guardrail Upgrade 1 73 $14,039

Abrams 6100 BLK Guardrail Upgrade 1 67 $7,403

Ferguson 8800 BLK Guardrail Upgrade 1 67 $4,658

Ferguson 9400 BLK Guardrail Upgrade 1 67 $11,056

Ferguson 9800 BLK Guardrail Upgrade 1 67 $3,543

Friday, March 31, 2006 Page 236 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Safety Improvements-Guardrail Upgrades

Skillman 4600 BLK Guardrail Upgrade 1 67 $8,870 Skillman 5200 BLK Guardrail Upgrade 1 67 $7,307

Skillman 6100 BLK Guardrail Upgrade 1 67 $13,465

Skillman 6400 BLK Guardrail Upgrade 1 67 $17,868

Easton 800 BLK Guardrail Upgrade 1 60 $16,975

Gus Thomasson 2200 BLK Guardrail Upgrade 1 60 $6,713

Easton 1200 BLK Guardrail Upgrade 1 53 $3,925

Easton 900 BLK Guardrail Upgrade 1 53 $3,925

Ferguson 9500 BLK Guardrail Upgrade 1 53 $3,543

Gus Thomasson 2100 BLK Guardrail Upgrade 1 53 $5,392

Maylee 10300-10500 BLK Guardrail Upgrade 1 53 $126,226

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (26 detail records) Sum $645,526 Traffic Signal Upgrades - Citywide

Gaston @ Richmond Traffic Signal Upgrades Citywide 1 93 $56,317

Abrams @ Monticello(Sondra) Traffic Signal Upgrade 1 87 $48,627

Buckner @ Mockingbird(Peavy) Traffic Signal Upgrade 1 80 $176,704

Ferguson @ Joaquin Traffic Signal Upgrade 1 80 $107,847

Buckner @ Northcliff Traffic Signal Upgrade 1 67 $107,847

Barnes Bridge @ Ferguson Traffic Signal Upgrades-C Traffic Signal Upgrade 1 60 $107,847

Buckner @ Lake Highlands Traffic Signal Upgrade 1 60 $120,610

Gus Thomasson @ Maylee (Mandalay) Traffic Signal Upgrade 1 60 $157,240

Friday, March 31, 2006 Page 237 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic Signal Upgrades - Citywide

Lake Highlands @ Peavy Traffic Signal Upgrade 1 60 $118,313 Abrams @ Belmont (Lakewood) Traffic Signal Upgrade 1 53 $59,316

Abrams @ Kenwood Traffic Signal Upgrade 1 53 $13,616

Abrams @ Lovers Traffic Signal Upgrade 1 53 $108,805

Casa View @ Gus Thomasson Traffic Signal Upgrade 1 53 $107,847

Ferguson @ Millmar Traffic Signal Upgrade 1 53 $88,435

Millmar @ Peavy Rd Traffic Signal Upgrade 1 53 $100,828

Skillman @ University Traffic Signal Upgrade 1 53 $29,578

Abrams @ Larmanda Traffic Signal Upgrade 1 40 $106,890

Barnes Bridge @ Shiloh Traffic Signal Upgrade 1 40 $115,824

Buckner @ Poppy/Athlone Traffic Signal Upgrade 1 40 $109,379

Estacado @ Peavy Rd Traffic Signal Upgrade 1 40 $107,464

Ferguson @ Woodmeadow Traffic Signal Upgrades Citywide 1 40 $107,847

Hermosa @ Peavy Rd Traffic Signal Upgrade 1 40 $107,464

Hillside @ Mockingbird Traffic Signal Upgrade 1 40 $120,610

Oates @ Peavy Traffic Signal Upgrade 1 40 $116,399

Mockingbird @ Williamson Traffic Signal Upgrades Citywide 1 27 $102,359

Summary for 'Category' = Traffic Signal Upgrades - Citywide (25 detail records) Sum $2,504,015 Traffic System Management - Flood Detour Signs

Abrams, 4600 under RR Dynamic Signs - Flood Detours 1 100 $42,118

Skillman, 4400 under RR Dynamic Signs - Flood Detours 1 100 $4,633

Friday, March 31, 2006 Page 238 of 349 Project Name Description Tier Score Estimate Council District 9 Traffic System Management - Flood Detour Signs

West Lawther @ Northwest Hwy Dynamic Signs - Flood Detours 1 100 $42,118 Easton, 800 Dynamic Signs - Flood Detours 1 80 $42,118

Ferguson, 11500 Dynamic Signs - Flood Detours 1 80 $42,118

Lake Highlands between Buckner Blvd and Peavy Dynamic Signs - Flood Detours 1 60 $42,118

Lake Highlands, 9500 Dynamic Signs - Flood Detours 1 60 $42,118

Peavy @ Dixon Branch Dynamic Signs - Flood Detours 1 60 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (8 detail records) Sum $299,458 Summary for 'Program' = STREET AND TRANSPORTATION (544 detail records) Sum $92,836,815 Summary for 'CD' = 9 (544 detail records) Sum $92,836,815

Friday, March 31, 2006 Page 239 of 349 Project Name Description Tier Score Estimate Council District 10 Alley Reconstruction

Ferndale & Liptonshire - Liptonshire to Kingsley Full Reconstruction 1 78 $299,349 Lipton shire & Leaside - Livenshire to McCree Full reconstruction 1 73 $336,943

Windy Crest & Webb Kay - Bill Brown to Windy Crest Full Reconstruction 1 70 $326,349

Caribou & Ferndale - Church to Vistadale Full Reconstruction (Caribou 10142) 1 63 $266,491

Shoreview 9805 & Fitzroy - Audelia to Aldwick Full Reconstruction Shoreview 9805 1 63 $205,655

Larchwood Drive (8904-9032) Liptonshire - McCree to Full reconstr Larchwood Dr (8904 - 9032) 1 60 $239,944 Plano Mccree Road (10005-10151) Shady View - Aldwick to Full Reconst Mccree Rd. (10005 - 10151) 1 60 $276,957 Ferndale Lemans Drive (10606-10690) Havenlake - Lullwater to Full Reconstr Lemans Dr. (10606 - 10690) 1 40 $242,497 Plano Aldwick Dr - 9105 - 9209 Full Reconstruction 2 $118,245

Arborside Dr - 8519 - 8615 Full Reconstruction 2 $169,978

Birchcoft Dr - 8466 - 8496 Full Reconstruction 2 $163,352

Blackbird La 7805 - 7845 full reconstruction - Blackbird La 7805 - 7845 2 $144,222

Blackwood Dr - 6967 Full Reconstruction 2 $317,529

Chesterton Dr - 10606 - 10646 Full Reconstruction 2 $264,014

Chiswell Rd - 9707 - 9747 Full Reconstruction 2 $90,723

Chiswell Rd - 9834 - Full Reconstruction 2 $212,536

Ellery Dr - 8426 ------Full Reconstruction 2 $69,316

Estate La - 10407 - 10629 Full Reconstruction 2 $385,572

Ferndale Rd - 9216 ------Full Reconstruction 2 $202,088

Fitzroy Dr - 9805 - 9831 Full Reconstruction 2 $127,419

Forest Green Dr - 3287 - 3363 Full Reconstruction 2 $304,024

Friday, March 31, 2006 Page 240 of 349 Project Name Description Tier Score Estimate Council District 10 Alley Reconstruction

Gladwood La - 8512 - 8546 Full Reconstruction 2 $170,233 Graywood Dr - 8505 - 8635 Full Reconstruction 2 $219,927

Hyde Park Dr - 6806 - 6846 Full Reconstruction 2 $141,945

Lanarkshire Dr - 8812 - 8832 Full Reconstruction 2 $139,397

Lanshire Dr (10005 - 10125) Linkwood - Aldwick to Full Reconstruction Lanshire Dr. (10005 - 10125) 1 $191,130 Ferndale Lanward Cir - 9747 - 9755 Full Reconstruction 2 $72,629

Larchwood Dr - 8804 - 8884 Full Reconstruction 2 $291,281

Larchwood Dr - 9011 - 9033 Full Reconstruction 2 $411,820

Larchwood Dr - 9102 - 9342 Full Reconstruction 2 $286,949

Leaside & Livenshire - Leaside to Mccree Alley Full Reconstruction 2 $283,339

Leaside Dr - 9003 - 9075 Full Reconstruction 2 $371,555

Pleasant View Dr - 7107 - 7205 Full Reconstruction 2 $143,729

Summary for 'Category' = Alley Reconstruction (33 detail records) Sum $7,487,138 Barrier Free Ramps

Racensway Dr @ Church Rd Construct 4 ramps 1 24 $7,658

Winding Ridge Dr @ Church Rd Construct 2 ramps 1 24 $3,829

Abram @ Meadowknoll BFR on NE corner of Abrams @ Meadowknoll need S/W 1 23 $12,763 extension behind signal pole. on SE corner of Abrams @ Whitehurst need similar extension. Modify conc wall on NE corner of Abrams @ Whitehurst to accomdate S/W Chiswell @ Crestedge Construct 2 BFRs at intersection 1 12 $3,829

Cliffmere Dr @ Overwood Rd Construct 2 ramps 1 7 $3,829

Friday, March 31, 2006 Page 241 of 349 Project Name Description Tier Score Estimate Council District 10 Barrier Free Ramps

9510 Shady Valley Dr (Alley Entrance Behind) Construct 2 Ramps 1 4 $3,829 9512 Winding Ridge Dr (Alley Entrance Behind) Construct 2 ramps 1 4 $3,829

Robin Hill (10151) @ Tanglevine 2 BFRs 1 4 $3,829

Winding Ridge Dr @ Shady Valley Dr Construct 2 ramps 1 4 $3,829

Faircrest @ Audelia Construct One BFR on intersection with Audelia & 4 BFRs on 1 3 $9,572 intersection with Trailcliff Whittenburg Gate @ Orbiter Dr Construct 2 BFR on corners of intersection 1 3 $3,829

Summary for 'Category' = Barrier Free Ramps (11 detail records) Sum $60,624 Bridge Repair and Modification

Lawther (West) over White Rock Creek Cofferdam each side for work space, concrete collars around 1 55 $95,723 piers, grout inject beneath abutment beams TI Blvd. over Floyd Branch Riprap undermined, threatens abutment; grout inject/flowable 1 42.5 $51,052 fill/gabions; severe Fair Oaks Crossing over Jackson Br. Trib. Bridge riprap undermined, grout injection, possibly gabion 1 33.75 $63,815 matress; mod. severe Summary for 'Category' = Bridge Repair and Modification (3 detail records) Sum $210,590 I.T.S. - Speed & Travel Time System

Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $34,460

Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $34,460 Intergovernmental Partnership Projects

Audelia Rd. at Jackson Branch Bridge rehabilitation and/or reconstruction 2 $0

Forest Ln - EB @ Cottonwood Creek Bridge rehabilitation and/or reconstruction 2 $0

Friday, March 31, 2006 Page 242 of 349 Project Name Description Tier Score Estimate Council District 10 Intergovernmental Partnership Projects

Forest Ln - EB @ Floyd Branch Bridge rehabilitation and/or reconstruction 2 $0 Forest Ln - WB @ Floyd Branch Bridge rehabilitation and/or reconstruction 2 $0

LBJ/Skillman Station Pedestiran Bridge Partnership project with TxDOT to provide a pedestrian bridge 1 $1,276,300 across LBJ adjacent to the DART LRT. Total estimated cost of $______million. Estimated to be let by late 2007. Supplements 2003 Bond Program funds. Northwest Hwy - W. Lawther to Buckner Partnership project with TxDOT and Dallas County to leverage 1 $421,179 additional TxDOT $ for amenities and beautification. Total estimated cost of $16.5 million. Estimated to be let by TxDOT late 2007. Valley View/Walnut - IH 635 to City Limits Partnership project with TxDOT to widen existing roadway to 6 1 $446,705 lane divided. Total estimated cost of $14.5 million. Estimated to be let by late 2008. Supplements 1995 and 1998 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (7 detail records) Sum $2,144,184 Street Lighting - Existing Thoroughfares

Skillman - Merriman Pkwy to Fair Oaks Street Lighting 1 80 $464,573

Markville/Vantage Point - Greenville to TI Blvd Street Lighting 1 57 $245,050

Abrams - Walnut Hill to Forest Street Lighting 1 40 $428,837

Summary for 'Category' = Street Lighting - Existing Thoroughfares (3 detail records) Sum $1,138,460 Street Reconstruction Local Streets

Boundbrook Ave - Stillwater Ave to Woodbrook Dr 8700 - 8800 blks 1 59.52 $879,408

Linkwood Dr - Ferndale Rd to Lockhaven Dr 10200 Blk 1 51.73 $574,335

Summary for 'Category' = Street Reconstruction Local Streets (2 detail records) Sum $1,453,743

Friday, March 31, 2006 Page 243 of 349 Project Name Description Tier Score Estimate Council District 10 Street Reconstruction Thoroughfares

Dilworth Rd - Pagemill Rd to Hillguard Rd 9600 Blk 1 59.85 $1,276,300 Petal St - 11000 Blk 11000 Blk 1 57.45 $593,585

Pinewood Dr - Gladwood La to Stults Rd 9300 - 9400 Blk 1 48.28 $829,595

Summary for 'Category' = Street Reconstruction Thoroughfares (3 detail records) Sum $2,699,480 Street Resurfacing

Gladwood Ln. - Pinewood Dr. to Westfield Dr. 8400 - 8700 1 82.12 $150,093

Larchwood Dr. - Plano Rd. to McCree Rd. 8800 - 9000 1 74.24 $144,350

Lanarkshire Dr. - Lanarkshire Dr. to Lanshire Dr. 8800 block 1 71.28 $44,415

Longmont Dr. - Ferndale Rd. to McCree Rd. 9000 block 1 70.89 $107,975

Skillman St. - Adleta Ct. to Adleta Blvd. 9200 block 1 69.525 $86,533

Greenstone Dr. - Pinewood Dr. to Gladwood Ln. 8400 Block 1 69.49 $86,150

Chartwell Dr. - Pagemill Rd. to Plano Rd. 9600-9800 1 68.09 $470,955

Boundbrook Ave. - Stillwater Dr. to Gladwood Ln. 8900-9100 1 65.49 $386,719

Sanden Dr. - Miller Rd. to Bekay St. 10700-10900 1 62.15 $205,101

Bryson Dr. - Giddings Cir. To Wallbrook Dr. 9200 - 9500 1 61.68 $161,197

Forest Springs Dr. - Abrams Rd. to Meadowknoll Dr. 9400 - 9500 1 61.64 $230,372

Larchfield Ln. - Lynbrook Dr. to Longmeadow Dr. 10600 block 1 61.205 $49,138

Woodshore Dr. - Gladwood Ln. to Stults Rd. 9200-9400 1 61.06 $63,687

Richardson Branch Tr. - Club Meadows Dr. to Vista View 8400 - 8600 1 57.815 $75,302 Dr. Edgecliff Dr. - Queenswood Ln. to Lynngrove Dr. 9900-10000 1 56.01 $45,819

Fieldcrest Dr. - Spring Branch Dr. to Dartridge Dr 9600-9800 1 55.38 $115,888

Friday, March 31, 2006 Page 244 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Club Glen Dr. - Whitehurst Dr. to Arbor Tr. 9200 Block 1 55.22 $34,332 Lavalle Ln. - Woodbrook Dr. to Greenville Ave. 8800 block 1 54.13 $32,163

Faircrest Dr. - 140 10100 - 10200 1 54.105 $36,502

Heatherdale Dr. - Dove Meadow Dr. to Abrams Rd. 9200 block 1 49.78 $44,798

Sanshire Ave. - Parkshire Ave. to Danashire Ave. 8700 - 8800 1 49 $62,283

Judd Ct. - Forest Ln. to Cul-De-Sac 11800 block 1 47.87 $40,459

Vista View Dr. - Richardson Branch Tr. to Cul-de-S 8400 - 8900 1 46.06 $144,988

Atherton Dr. - Meadowknoll Dr. to Arbor Park Dr. 9500 - 9600 1 45.005 $52,073

Vista Creek Dr. - Whitehurst Dr. to Dead End @ Cul-de- 9000 - 9100 1 43.75 $48,372 Sac Moss Meadows Dr. - Abrams Rd. to Arborside Dr. 8000 block 1 43.31 $55,136

Quail Run - Rolling Rock Ln. to Concrete 10900 block 1 43.145 $6,892

Briarhurst Dr. - Coral Cove Dr. to Whitehurst Dr. 9200 - 9300 1 42.88 $33,822

Arbor Park Dr. - Arbor Park Ct. to Whitehurst Dr. 8800-9100 1 42.51 $146,775

Stone Creek Pl. - Greenville Ave. to Stone Creek 9000 - 9100 1 37.69 $77,216

Arbor Branch Dr. - Club Glen Dr. to Cul-de-Sac 9200 Block 1 35.83 $27,440

Aldwick Dr. - 8600 2 $0

Aldwick Dr. - 8700 2 $0

Alta Oaks Dr. - 9200 2 $0

Arbor Trail Dr. - 9200 2 $0

Arborhill Dr. - 9400 2 $0

Arborhill Dr. - 9500 2 $0

Arborhill Dr. - 9600 2 $0

Friday, March 31, 2006 Page 245 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Arborside Dr. - 8700 2 $0 Ashcroft Av. - 8600 2 $0

Audelia Rd. - 8500 2 $0

Bellafonte Dr. - 12200 2 $0

Bellafonte Dr. - 12300 2 $0

Blackbird La. - 7800 2 $0

Blackwood Dr. - 6900 2 $0

Bonner Dr. - 8000 2 $0

Boundbrook Av. - 8600 2 $0

Buxhill Dr. - 9800 2 $0

Carthage La. - 13300 2 $0

Chesterton Dr. - 10500 2 $0

Chiswell Rd. - 9200 2 $0

Chiswell Rd. - 9700 2 $0

Clayshire Cir. - 7300 2 $0

Clearwater Dr. - 8900 2 $0

Clearwater Dr. - 9300 2 $0

Clearwater Dr. - 9400 2 $0

Clover Valley Dr. - 9200 2 $0

Colfax Dr. - 6800 2 $0

Coral Cove Dr. - 9200 2 $0

Craigshire Av. - 7300 2 $0

Friday, March 31, 2006 Page 246 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Danashire Av. - 7300 2 $0 Debshire Cir. - 7300 2 $0

Dilworth Rd. - 9600 2 $0

Echo Valley Dr. - 8700 2 $0

Fair Oaks Crsg. - 8800 2 $0

Fallbrook Dr. - 9500 2 $0

Fallbrook Dr. - 9600 2 $0

Fenchurch Rd. - 8600 2 $0

Ferndale Rd. - 9800 2 $0

Forestgate Dr. - 12000 2 $0

Garwood Dr. - 10300 2 $0

Glen Creek Ct. - 9000 2 $0

Grader St. - 11200 2 $0

Grader St. - 11300 2 $0

Graywood Dr. - 8600 2 $0

Graywood Dr. - 8700 2 $0

Graywood Dr. - 8800 2 $0

Green Oaks Cir. - 9000 2 $0

Greenville Av. - 9600 2 $0

Greenville Av. - 9700 2 $0

Hayfield Dr. - 10800 2 $0

Heatherdale Dr. - 9500 2 $0

Friday, March 31, 2006 Page 247 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Heatherdale Dr. - 9600 2 $0 High Oaks Cir. - 7800 2 $0

Kingsley Rd. - 9700 2 $0

Lakemere Dr. - 10600 2 $0

Lanshire Dr. - 9700 2 $0

Lanward Dr. - 9600 2 $0

Larchwood Dr. - 9200 2 $0

Leaside Dr. - 9000 2 $0

Leaside Dr. - 9100 2 $0

Lemans Dr. - 10600 2 $0

Liptonshire Dr. - 8800 2 $0

Livenshire Dr. - 9600 2 $0

Lizshire Av. - 7300 2 $0

Lockhaven Dr. - 8500 2 $0

Lullwater Dr. - 8700 2 $0

Lynford Dr. - 10200 2 $0

Lynford Dr. - 10300 2 $0

Mccree Rd. - 10000 2 $0

Mccree Rd. - 10100 2 $0

Merriman Pkwy. - 6800 2 $0

Merriman Pkwy. - 6900 2 $0

Millridge Cir. - 9600 2 $0

Friday, March 31, 2006 Page 248 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Millridge Dr. - 9500 2 $0 Millridge Dr. - 9600 2 $0

Northwest Pkwy. (E) N - 10300 2 $0

Northwest Pkwy. (E) N - 10800 2 $0

Northwest Pkwy. (E) N - 10900 2 $0

Park Highlands Dr. - 9600 2 $0

Parkford Dr. - 10000 2 $0

Parkford Dr. - 10100 2 $0

Parkshire Av. - 7300 2 $0

Pegshire Av. - 8700 2 $0

Petal St. - 10900 2 $0

Petal St. - 11100 2 $0

Petal St. - 11200 2 $0

Petal St. - 11300 2 $0

Plano Rd. - 9600 2 $0

Ridgehaven Dr. - 10100 2 $0

Shadydale La. - 9800 2 $0

Shadyview Dr. - 10000 2 $0

Shadyview Dr. - 10100 2 $0

Switzer Av. - 10700 2 $0

Switzer Av. - 10800 2 $0

Switzer Av. - 11000 2 $0

Friday, March 31, 2006 Page 249 of 349 Project Name Description Tier Score Estimate Council District 10 Street Resurfacing

Ti Blvd. - 12600 2 $0 Trailpine Dr. - 10000 2 $0

Trenton Dr. - 12500 2 $0

Twisted Oaks Cir. - 7700 2 $0

Webb Kay Dr. - 9000 2 $0

Westfield Dr. - 8600 2 $0

Westfield Dr. - 8700 2 $0

Westfield Dr. - 8800 2 $0

Westover Dr. - 8000 2 $0

Whitehurst Dr. - 10000 2 $0

Whitehurst Dr. - 9100 2 $0

Wildhaven Dr. - 9300 2 $0

Windy Crest Dr. - 9200 2 $0

Windy Crest Dr. - 9300 2 $0

Woodbluff Ct. - 9000 2 $0

Woodbrook Dr. - 8700 2 $0

Woodbrook Dr. - 8900 2 $0

Woodbrook Dr. - 9000 2 $0

Woodshore Dr. - 8900 2 $0

Summary for 'Category' = Street Resurfacing (145 detail records) Sum $3,266,945 Streetscape / Urban Design

Friday, March 31, 2006 Page 250 of 349 Project Name Description Tier Score Estimate Council District 10 Streetscape / Urban Design

LBJ/Skillman Station Area Plan 1 72.17 $1,952,516 Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $1,952,516 Thoroughfares

TI Drive/ Floyd - Restland to Markville Widen to a four lane undivided roadway 1 26 $1,172,117

Summary for 'Category' = Thoroughfares (1 detail record) Sum $1,172,117 Traffic Intersection Capacity & Safety Improvement

Royal @ Skillman Widen Skillman to provide right turn lanes for the northbound 1 70 $1,032,527 and southbound approaches. Widen Royal to provide eastbound and westbound dual left-turn lanes. T Forest @ Greenville Widen both the Forest Ln and Greenville Ave approaches to 1 55 $1,319,694 construct dual left-turn lanes and right-turn lanes on all approaches. Greenville @ Royal Widen both Greenville and Royal approaches to provide dual 1 55 $2,367,537 left turn lanes on all aproaches. Abrams @ Forest Widen Forest Ln approaching Abrams to provide dual left-turn 1 50 $1,119,315 lanes for eastbound and westbound Forest. Add a westbound right turn lane on Forest. Church @ Skillman Widen Church approaching Skillman to provide eastbound and 2 35 $513,073 westbound left-turn lanes. By widening the roadway on the east side, we can re-establish a second through lane for eastbound traffic that is now used for a westbound left-turn lane. Church @ White Rock Trail Widen Church approaching White Rock Trail to provide 1 25 $453,087 eastbound and westbound left-turn pockets. Audelia Rd at Faircrest Dr Reconsruct approximately 50 feet of the Faircrest approaching 1 20 $218,247 the intersection to eliminate the steep incline.

Friday, March 31, 2006 Page 251 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Intersection Capacity & Safety Improvement

Campanella @ TI Blvd Increase the turning radius on the northwest corner of the 1 20 $21,697 intersection. This will allow DART busses to turn off of TI Blvd into the narrow street without conflicting with vehicles on Campenella. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $7,045,176 Traffic Safety Improvements-Guardrail Upgrades

Forest 9600 BLK Guardrail Upgrade 1 87 $3,543

Forest 9700 BLK Guardrail Upgrade 1 87 $3,543

Skillman 7700 BLK Guardrail Upgrade 1 87 $26,260

Skillman 9500 BLK Guardrail Upgrade 1 87 $17,914

Forest 8300 BLK Guardrail Upgrade 1 80 $47,632

Greenville 8300 BLK Guardrail Upgrade 1 80 $56,604

Walnut Hill 8500 BLK Guardrail Upgrade 1 80 $125,269

Audelia 11700 BLK Guardrail Upgrade 1 73 $8,106

Forest 10200 BLK Guardrail Upgrade 1 73 $17,415

Forest 8400 BLK Guardrail Upgrade 1 73 $7,594

Forest 9800 BLK Guardrail Upgrade 1 73 $17,409

Forest 9900 BLK Guardrail Upgrade 1 73 $5,641

Greenville 8400 BLK Guardrail Upgrade 1 73 $7,594

Miller 10200 BLK Guardrail Upgrade 1 73 $4,365

Miller 10700 BLK Guardrail Upgrade 1 73 $5,935

Plano 10100 BLK Guardrail Upgrade 1 73 $16,081

Plano 10600 BLK Guardrail Upgrade 1 73 $8,870

Friday, March 31, 2006 Page 252 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Safety Improvements-Guardrail Upgrades

Skillman 7600 BLK Guardrail Upgrade 1 73 $8,328 Skillman 7800 BLK Guardrail Upgrade 1 73 $16,420

Skillman 8000-8600 BLK Guardrail Upgrade 1 73 $114,101

Abrams 7100 BLK Guardrail Upgrade 1 67 $5,392

Audelia 11600 BLK Guardrail Upgrade 1 67 $12,106

Royal 9800 BLK Guardrail Upgrade 1 67 $31,881

Walnut Hill 9300 BLK Guardrail Upgrade 1 67 $7,724

Walnut Hill 9700 BLK Guardrail Upgrade 1 67 $7,849

Royal 8600 BLK Guardrail Upgrade 1 60 $15,775

Audelia 10600 BLK Guardrail Upgrade 1 53 $5,392

Buckingham 10300 BLK Guardrail Upgrade 1 53 $12,731

Forest 10300 BLK Guardrail Upgrade 1 53 $20,804

Walnut Hill 8700 BLK Guardrail Upgrade 1 53 $7,594

Royal 10000 BLK Guardrail Upgrade 1 47 $5,392

Walnut Hill 8800 BLK Guardrail Upgrade 1 47 $6,126

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (32 detail records) Sum $657,390 Traffic Signal Upgrades - Citywide

Audelia @ Church Traffic Signal Upgrade 1 73 $107,847

Audelia/Whitehurst @ Skillman Traffic Signal Upgrades Citywide 1 67 $148,689

Walnut Hill @ White Rock Trail Traffic Signal Upgrade 1 67 $120,610

Abrams @ Forest Ln Traffic Signal Upgrade 1 53 $108,805

Friday, March 31, 2006 Page 253 of 349 Project Name Description Tier Score Estimate Council District 10 Traffic Signal Upgrades - Citywide

Abrams @ Walnut HIll Traffic Signal Upgrade 1 53 $107,847 Audelia @ Royal Traffic Signal Upgrade 1 53 $107,847

Fair Oaks @ Walnut Hill Traffic Signal Upgrade 1 53 $109,379

Forest Ln @ Shephard (TI) Traffic Signal Upgrade 1 53 $209,632

Plano Rd @ Walnut Hill Traffic Signal Upgrade 1 53 $109,762

Walnut Hill @ Winedale Traffic Signal Upgrade 1 27 $116,399

Fire Station 28 @ Greenville Traffic Signal Upgrades Citywide 1 13 $75,876

Summary for 'Category' = Traffic Signal Upgrades - Citywide (11 detail records) Sum $1,322,694 Traffic System Management - Flood Detour Signs

Goforth @ Lanshire Dynamic Signs - Flood Detours 1 60 $42,118

White Rock Trail, 9200 Dynamic Signs - Flood Detours 1 60 $42,118

Merriman Pkwy, 7400 Dynamic Signs - Flood Detours 1 40 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (3 detail records) Sum $126,354 Summary for 'Program' = STREET AND TRANSPORTATION (264 detail records) Sum $30,771,870 Summary for 'CD' = 10 (264 detail records) Sum $30,771,870

Friday, March 31, 2006 Page 254 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction

Tahoe & Brush Creek-Brush Creek to Roaring Springs Full Reconstruction 1 81 $172,301 Peyton & Sprucewood - Meandering to Paldao Full Reconstruction 1 78 $452,340

Eudora Dr (7110 - 7238) Mason Dells - St. Judes to Saint Full reconst Eudora Dr. (7110 - 7238) 1 60 $290,996 Michaels Mason Dells Drive & Yamini - Chicot to St. Judes Full reconstruction - Mason Dells Dr. (7006 - 7046) 1 60 $175,057

Rolling Hills & Spring Grove - Coit to Carillon Full Reconstruction 1 58 $265,361

Cliffbrook(7019) &Gateridge-Hillcrest to Cliffbroo Full Reconstruction 1 54 $420,413

Rex Dr 6207 to alley E of Royalton Full reconst 1 40 $241,221

Royalton Drive (6207-6331) Rex Cir - Royalshire to Tibbs Full recon Royalton Dr. (6207 - 6331) 1 40 $237,392

Royal Lane (6405-6475) Lavendale - Tibbs to Royalton Full recon Royal Ln. (6405 - 6475) 1 30 $238,668

Alpha Rd - 6919 - 7037 Full Reconstruction 2 $401,881

Ashridge Dr - 13609 - 13735 Full Reconstruction 2 $392,963

Ashridge Dr - 13610 - 13746 Full Reconstruction 2 $342,249

Azalea & Rex - Preston to "T" Alley Full Reconstruction, Alley Behind 6069 Azalea Ln, Including "T" 1 $110,856 Alley (Marty Corbin - 6142 Rex Dr). Field Checked on 1/19/06. Azalea La - 6007 - 6031 Full Reconstruction 2 $321,098

Azalea La - 6118 Full Reconstruction 2 $113,658

Azalea La - 6121 - 6339 Full Reconstruction 2 $294,339

Azalea La - 6405 - 6429 Full Reconstruction 2 $101,936

Azalea La - 7307 - 7523 Full Reconstruction 2 $246,429

Azalea la 6066 ----- Full reconstruction (T-Alley only) 2 $99,551

Azalea La 7306- 7522 Full Reconstruction 2 $229,734

Baxtershire Dr - 7008 - 7026 Full Reconstruction 2 $113,149

Baxtershire Dr - 7110 - 7250 Full Reconstruction 2 $353,718

Friday, March 31, 2006 Page 255 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction

Birchwood Dr - 7131 - 7247 Full Reconstruction 2 $329,507 Blairview Dr - 7367 - 7393 Full Reconstruction 2 $492,349

Blossomheath La - 13206 - 13352 Full Reconstruction 2 $270,130

Boca Raton Dr - 6217 - 6273 Full Reconstruction 2 $573,388

Bradbury La - 6723 - 6841 Full Reconstruction 2 $236,235

Briar Cove Dr - 6718 - 6840 Full Reconstruction 2 $322,372

Briar Cove Dr - 6900 - 7024 Full Reconstruction 2 $326,194

Brookcrest Dr - 14009 - 14067 Full Reconstruction 2 $218,398

Brookridge Dr - 14121 - 14126 Full Reconstruction 2 $301,984

Brushcreek La - 13106 - 13132 Full Reconstruction 2 $213,810

Carillon Dr (13908 - 14030) Peyton - Spring Valley to "T" Full Reconstruction Carillon Dr (13908 - 14030) 1 $178,642 Alley Chicot Dr - 11307 - 11447 Full Reconstruction 2 $313,453

Churchill Wy - 6431 - 6551 Full Reconstruction 2 $271,659

Clearsprings Rd - 8229 - 8241 Full Reconstruction 2 $197,246

Clearsprings Rd 8206-8272 Full reconstruction 2 $0

Cliffbrook Dr - 7314 - 7634 Full Reconstruction 2 $363,656

Dykes Wy - 6301 - 6423 Full Reconstruction 2 $194,697

Dykes Wy - 6504 - 6566 Full Reconstruction 2 $223,239

Egret Ln. 10538 ---- Woodthrush - Ravenscroft to "T" Alley Full reconst Egret Ln. 10538 2 $96,999

Elmridge Dr - 7309 - 7365 Full Reconstruction 2 $285,929

Flagstone La - 13106 - 13230 Full Reconstruction 2 $203,362

Flagstone La - 13306 - 13560 Full Reconstruction 2 $456,162

Friday, March 31, 2006 Page 256 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction

Greenhollow La - 8205 - 8257 Full Reconstruction 2 $212,536 Greenwich La - 6507 - 6651 Full Reconstruction 2 $366,714

Hillbriar Dr - 6602 - 6768 Full Reconstruction 2 $540,259

Kendallwood Dr - 7160 - 7190 Full Reconstruction 2 $159,019

Kenshire La - 7406 - 7436 Full Reconstruction 2 $211,516

Lavendale Av - 6120 - 6338 Full Reconstruction 2 $310,904

Lavendale Av - 6908 - 7048 Full Reconstruction 2 $336,643

Linden La - 6023 - 6263 Full Reconstruction 2 $422,269

Linden La - 6206 - 6262 Full Reconstruction 2 $206,165

Mason Dells Dr - 7810 - 7814 Full Reconstruction 2 $464,317

Meadow Crest Dr - 6006 - 6124 Full Reconstruction 2 $237,001

Midbury Dr - 7108 - 7242 Full Reconstruction 2 $304,024

Midbury Dr - 7506 - 7722 Full Reconstruction 2 $313,707

Midbury Dr - 7507 - 7723 Full Reconstruction 2 $327,468

Northaven Rd - 6008 - 6170 Full Reconstruction 2 $318,549

Overdale Dr - 7411 - 7547 Full Reconstruction 2 $378,182

Paldao Dr (7311 - 7429) Spring Valley - Meandering to Full Reconstruction Paldao Dr. (7311 - 7429) 1 $336,133 Carillon Preston Haven Dr - 6009 - 6057 Full Reconstruction 2 $203,871

Preston Haven Dr - 6111 - 6151 Full Reconstruction 2 $171,253

Rolling Hills and Clearsprings - Coit to Waterfall Full Reconstruction 2 $358,273

Rolling Hills La - 14046 - 14058 Full Reconstruction 2 $132,517

Rollings Hills Lane (13806-13860) Brookgreen - Coit to Full recon Rollings Hills Ln. (13806 - 13860) 2 $179,958 Willow Bend

Friday, March 31, 2006 Page 257 of 349 Project Name Description Tier Score Estimate Council District 11 Alley Reconstruction

Royalton Dr - 6419 - 6499 Full Reconstruction 2 $422,269 Stonemoss Dr - 13807 - 13915 Full Reconstruction 2 $143,729

Wellcrest(7423)&Woodthrush - Sandpiper to Boedeker Full Reconstruction 2 $223,301

Summary for 'Category' = Alley Reconstruction (69 detail records) Sum $18,965,299 Barrier Free Ramps

14019 Coit - Bustop Install Ramp at bus stop in front of 14019 Coit Road. 1 33 $1,914

13139 Blossomheath Ln @ Alpha Rd Construct 4 ramps 1 20 $7,658

Hillcrest Rd @ Hillwood Ln Construct 4 ramps 1 20 $4,518

Preston Rd @ Highcourt Pl Construct 4 ramps 1 20 $7,658

14740 Meandering Way Construct 4 ramps 1 19 $7,658

Belt Line Rd @ Alexis Dr Construct 4 Ramps 1 18 $7,658

Preston Rd @ Regency Pl Construct 4 ramps 1 16 $7,658

6151 Alpha Rd @ Danvers Dr Construct 2 Ramps 1 11 $3,829

Brookgreen Dr @ Waterfall Way Construct 4 Ramps 1 9 $7,658

Rolling Hills Ln @ Waterfall Way Construct 4 ramps 1 9 $7,658

Highcourt Pl @ Highmark Sq Ct Construct 4 ramps 1 4 $7,658

Meadowcreek Dr @ Townbluff Dr Install 4 ramps 1 4 $7,658

Regency Pl @ Highcourt Pl Construct 4 ramps 1 4 $7,658

Regency Pl @ Highplace Cir Construct 4 ramps 1 4 $7,658

6865 Greenwich One curb cut needed at leadwalk - SR#06-00021456. 1 3 $1,914

Summary for 'Category' = Barrier Free Ramps (15 detail records) Sum $96,412

Friday, March 31, 2006 Page 258 of 349 Project Name Description Tier Score Estimate Council District 11 Intergovernmental Partnership Projects

Alpha Rd - Noel to Preston Partnership project with Dallas County to widen existing 1 $5,105,200 roadway to 6 lane divided. Total estimated cost of $10.2 million. Estimated to be let by Dallas County late 2009. Supplements 1998 Bond Program funds. Hillcrest Road (NB) at White Rock Creek Bridge rehabilitation and/or reconstruction. 2 $0

Montfort from Peterson to Alpha Partnership project with TxDOT to widen to 5 lane divided. 1 $382,890 Total estimated cost of $1.9 million. Estimated to be let by TxDOT by fall 2007. Supplements 1995 and 1998 Bond Program funds. North Dallas RR Xings - 10 Xings along Cotton Belt Partnership project with TxDOT to upgrade gates and extend 1 $331,838 crossing surfaces. Total estimated cost of $2.9 million. Estimated to be let by early 2008. Supplements 2003 Bond Program funds. Preston Rd - Park Lane to N of Royal Partnership project with Dallas County to reconstruct the 1 $421,179 existing six lane divided roadway. Total estimated cost of $13.7 million. Estimated to be let by Dallas County late 2008. Supplements 2003 Bond Program funds. Spring Valley at Goldmark Partnership project with Dallas County for intersection 1 $382,890 improvements in conjunction with Dallas County and City of Richardson. Total estimated cost of $1.5 million. Estimated to be let by mid 2008. Valley View/Walnut - IH 635 to City Limits Partnership project with TxDOT to widen existing roadway to 6 1 $446,705 lane divided. Total estimated cost of $14.5 million. Estimated to be let by late 2008. Supplements 1995 and 1998 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (7 detail records) Sum $7,070,702 Street Reconstruction Local Streets

Pinyon Tree Rd - Lyndon B Johnson Frwy East to 700 ft 9200 Blk 1 57.32 $599,861

Riverbrook Dr - Stone Canyon Rd to Riverfall Dr 7700 Blk 1 57.11 $912,100

Friday, March 31, 2006 Page 259 of 349 Project Name Description Tier Score Estimate Council District 11 Street Reconstruction Local Streets

Summary for 'Category' = Street Reconstruction Local Streets (2 detail records) Sum $1,511,961 Street Resurfacing

Pinyon Tree Rd. - LBJ Frwy. To Dead End 9200 block 1 67.325 $47,478

Baxtershire Dr. - Hillcrest Rd. to St Michaels Dr. 6900 - 7200 1 65.255 $112,953

Goldmark Dr. - Midpark Rd. to Spring Valley Rd. 13500-14000 1 62.69 $313,587

Emily Rd. - Coit Rd. to Kit Ln. 13100-13300 1 59.25 $407,012

Boedeker St. - Blairview Dr. to Lakehurst Ave. 9900 - 10000 1 51.115 $73,898

Blossomheath Ln. - LBJ Svc. Rd. to Coit Rd. 13000-13300 1 50.45 $157,240

Bent Branch Ln. - Firelog Ln. to Flickering Shadow Dr. 9800 Block 1 43.325 $52,711

Laurel Wood Ln. - Meadowside dr. to Valley View Ln. 13200 block 1 42.51 $9,828

Alpha Rd. - 5300 2 $0

Alpha Rd. - 5500 2 $0

Alpha Rd. - 5700 2 $0

Alpha Rd. - 5800 2 $0

Alpha Rd. - 5900 2 $0

Alpha Rd. - 7100 2 $0

Alpha Rd. - 7400 2 $0

Alpha Rd. - 7700 2 $0

Arapaho Rd. - 5300 2 $0

Arapaho Rd. - 5400 2 $0

Arapaho Rd. - 5500 2 $0

Friday, March 31, 2006 Page 260 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing

Arapaho Rd. - 6000 2 $0 Azalea La. - 6000 2 $0

Black Berry La. - 6100 2 $0

Blossomheath La. - 13500 2 $0

Briar Cove Dr. - 7100 2 $0

Briar Cove Dr. - 7200 2 $0

Cliffbrook Dr. - 6900 2 $0

Clodus Fields Dr. - 7900 2 $0

Cypress Hills Dr. - 15300 2 $0

Cypress Hills Dr. - 15400 2 $0

Delmeta Dr. - 6900 2 $0

Edelweiss Cir. - 6900 2 $0

Elmridge Dr. - 7300 2 $0

Emeraldwood Dr. - 6200 2 $0

Ferris Creek La. - 12300 2 $0

Floyd Cir. - 13300 2 $0

Floyd Cir. - 13400 2 $0

Gateridge Dr. - 7000 2 $0

Golden Creek Rd. - 15700 2 $0

Grayport Dr. - 14900 2 $0

Greenhollow La. - 7900 2 $0

Greenwich La. - 6500 2 $0

Friday, March 31, 2006 Page 261 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing

Greenwich La. - 6700 2 $0 Happy La. - 6500 2 $0

Harvest Glen Dr. - 6600 2 $0

Hickory Hill Dr. - 6300 2 $0

Hill Haven Dr. - 11200 2 $0

Hillcrest Rd. - 11100 2 $0

Hillcrest Rd. W - 14900 2 $0

Jasmine La. - 11500 2 $0

Kenshire La. - 7400 2 $0

Knollview Dr. - 14800 2 $0

Maplecrest Dr. - 7300 2 $0

Mason Dells Dr. - 7100 2 $0

Mason Dells Dr. - 7200 2 $0

Meadowcreek Dr. - 6900 2 $0

Meandering Wy. - 14600 2 $0

Meandering Wy. - 14700 2 $0

Merit Dr. - 12000 2 $0

Merit Dr. - 12300 2 $0

Merit Dr. - 12600 2 $0

Merit Dr. - 12700 2 $0

Midbury Dr. - 7000 2 $0

Midbury Dr. - 7100 2 $0

Friday, March 31, 2006 Page 262 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing

Midbury Dr. - 7400 2 $0 Midbury Dr. - 7600 2 $0

Midpark Rd. - 8400 2 $0

Montfort Pl. - 13500 2 $0

Noel Rd. - 14100 2 $0

Northaven Rd. - 7800 2 $0

Northcreek La. - 6700 2 $0

Oakbluff Dr. - 7200 2 $0

Overdale Dr. - 7400 2 $0

Overview Dr. - 14500 2 $0

Pebbledowne Dr. - 11200 2 $0

Peterson La. - 5500 2 $0

Preston Creek Dr. - 6000 2 $0

Ridgeview Cir. - 6700 2 $0

Riverfall Dr. - 7900 2 $0

Rolling Vista Dr. - 6600 2 $0

Rolling Vista Dr. - 6700 2 $0

Royal Crest Dr. - 6100 2 $0

Spring Grove Av. - 13700 2 $0

Spring Valley Rd. - 7000 2 $0

Spring Valley Rd. - 7300 2 $0

Spring Valley Rd. - 7600 2 $0

Friday, March 31, 2006 Page 263 of 349 Project Name Description Tier Score Estimate Council District 11 Street Resurfacing

Sprucewood Dr. - 13500 2 $0 Sprucewood Dr. - 13800 2 $0

Tahoe Dr. - 13100 2 $0

Thistle La. - 7700 2 $0

Tophill Cir. - 7100 2 $0

Trails End Dr. - 15300 2 $0

Trails End Dr. - 15400 2 $0

Trails End Dr. - 15500 2 $0

Trails End Dr. - 15600 2 $0

Valley View Pl. - 7200 2 $0

Verde Valley La. - 5000 2 $0

Village Trail Dr. - 7600 2 $0

Village Trail Dr. - 7700 2 $0

White Rose Trl. - 6000 2 $0

Wightman Pl. - 12200 2 $0

Willow Bend Rd. - 13400 2 $0

Willow Bend Rd. - 13500 2 $0

Woodthrush Dr. - 7500 2 $0

Woodthrush Dr. - 7600 2 $0

Yamini Dr. - 7300 2 $0

Summary for 'Category' = Street Resurfacing (105 detail records) Sum $1,174,707

Friday, March 31, 2006 Page 264 of 349 Project Name Description Tier Score Estimate Council District 11 Streetscape / Urban Design

Spring Valley/Coit Urban Design Study Street intersection and median enhacements. 2 86 $278,931 Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $278,931 Thoroughfares

Noel - Spring Valley to Verde Valey Widen to a six lane divided roadway 1 54 $15,997,623

Alpha- Dallas Pkwy to Preston - Phase II Widen to 6 lane divided roadway and adding right turn lanes. 1 45 $9,225,579

Spring Valley - DNT to Montfort Widen to 8 lane divided roadway 1 45 $3,890,145

Noel - Alpha to Spring Valley 6 Lane roadway construction. Estimate adds curb lanes and 1 34 $7,880,172 does not include R.O.W. Spring Valley - Hillcrest to Coit Widen to 6 lane divided roadway 1 30 $6,819,337

Montfort - Verde Valley to Spring Valley Widen to 6 lane divided roadway 1 28.389 $4,089,452

TI Drive/ Floyd - Restland to Markville Widen to a four lane undivided roadway 1 26 $688,386

Arapaho - Dallas Parkway to Knoll Trail Widen from 33' pave./80' ROW to 44' pave./80' ROW 1 13 $2,544,755

Knoll Trail - Arapaho to KellerSprings Build a 4 lane divided roadway. 1 10 $4,351,577

Summary for 'Category' = Thoroughfares (9 detail records) Sum $55,487,025 Traffic Intersection Capacity & Safety Improvement

Forest at Preston Rd Widen Preston Rd to provide a northbound right turn lane and 1 50 $256,536 widen Forest Ln to provide an eastbound right turn lane. Merit @ Park Central Use median area to widen Park Central and create a 1 30 $255,260 northbound right turn lane. Arapaho @ Dallas Parkway Intersection identified on Thoroughfare Plan - project scope not 2 0 $0 currently defined. Town of Addison has committed to make improvements. Arapaho @ Knoll Trail Street Modifications and Bot Intersection identified on Thoroughfare Plan - project scope not 2 $0 currently defined. Need to define.

Friday, March 31, 2006 Page 265 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Intersection Capacity & Safety Improvement

Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (4 detail records) Sum $511,796 Traffic Safety Improvements-Guardrail Upgrades

Belt Line 5600 BLK Guardrail Upgrade 1 80 $32,386

Forest 7600 BLK Guardrail Upgrade 1 80 $42,182

Arapaho 5600 BLK Guardrail Upgrade 1 73 $47,064

Belt Line 6900 BLK Guardrail Upgrade 1 73 $3,543

Forest 6400 BLK Guardrail Upgrade 1 73 $7,594

Forest 6600 BLK Guardrail Upgrade 1 73 $3,925

Forest 6700 BLK Guardrail Upgrade 1 73 $10,529

Forest 7200 BLK Guardrail Upgrade 1 73 $32,497

Hillcrest 13000 BLK Guardrail Upgrade 1 73 $26,515

Hillcrest 13300 BLK Guardrail Upgrade 1 73 $5,641

Hillcrest 13800 BLK Guardrail Upgrade 1 67 $21,059

Spring Valley 6300 BLK Guardrail Upgrade 1 67 $53,337

Hillcrest 11300 BLK Guardrail Upgrade 1 60 $16,209

Royal 7300 BLK Guardrail Upgrade 1 60 $12,252

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (14 detail records) Sum $314,733 Traffic Signal Upgrades - Citywide

Dallas Parkway @ Spring Valley Traffic Signal Upgrades Citywide 1 100 $98,913

Arapaho - Dallas Parkway Traffic Signal Upgrades Citywide 1 93 $205,484

Friday, March 31, 2006 Page 266 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Signal Upgrades - Citywide

Montfort @ Verde Valley Traffic Signal Upgrade 1 87 $118,696 Merit - Park Central Traffic Signal Upgrades Citywide 1 80 $102,359

Preston @ Preston Royal S C Traffic Signal Upgrade 1 73 $60,305

Arapaho @ Hillcrest Traffic Signal Upgrades-Citywi Traffic Signal Upgrade 1 67 $21,569

Abrams @ Flickering Shadow Traffic Signal Upgrade 1 53 $107,847

Alpha @ Montfort Traffic Signal Upgrade 1 53 $109,762

Alpha @ Valley View Mall Traffic Signal Upgrade 1 53 $105,933

Arapaho @ Prestonwood Traffic Signal Upgrade 1 53 $107,847

Beltline @ Meadow Creek Traffic Signal Upgrade 1 53 $107,847

Boedeker @ Walnut Hill Traffic Signal Upgrade 1 53 $59,322

Edgemere @ Royal Ln Traffic Signal Upgrade 1 53 $74,378

Forest Ln @ Park Central Traffic Signal Upgrade 1 53 $132,416

Harvest Hill @ Preston Rd (Linden) Traffic Signal Upgrade 1 53 $40,982

Hillcrest @ Hillcrest Plaza Traffic Signal Upgrade 1 53 $106,890

Hillcrest @ Meadow Traffic Signal Upgrade 1 53 $61,473

Hillcrest @ Spring Valley Traffic Signal Upgrades Citywide 1 53 $82,321

Northaven @ Preston Traffic Signal Upgrade 1 53 $60,340

Abrams @ Chimney Hill (Pinyon Tree) Traffic Signal Upgrade 1 40 $107,847

Alpha @ Hillcrest Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 40 $81,364

Arapaho @ Knoll Trail Traffic Signal Upgrade 1 40 $107,847

Arapaho @ Meadow Creek Traffic Signal Upgrade 1 40 $34,511

Beltline @ Meandering Way Traffic Signal Upgrade 1 40 $51,767

Friday, March 31, 2006 Page 267 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic Signal Upgrades - Citywide

Churchill Way @ Hillcrest Traffic Signal Upgrade 1 40 $106,890 Dilbeck @ Preston Rd Traffic Signal Upgrade 1 40 $107,847

Hillcrest @ Midbury (Northaven) Traffic Signal Upgrade 1 40 $109,379

Montfort @ Peterson Traffic Signal Upgrade 1 40 $105,933

Noel @ Peterson Traffic Signal Upgrade 1 40 $105,933

Royal @ St Michaels Traffic Signal Upgrade 1 40 $118,313

Floyd Circle @ T I Blvd Traffic Signal Upgrade 1 33 $79,450

Arapaho @ Golden Creek Traffic Signal Upgrade 1 27 $61,255

Boedeker @ Meadow Traffic Signal Upgrades Citywide 1 27 $107,464

Churchill Way @ Preston Traffic Signal Upgrade 1 27 $43,356

Meandering Way @ Spring Valley Traffic Signal Upgrade 1 27 $116,399

Preston @ Willow Traffic Signal Upgrades Citywide 1 27 $58,199

Sherman @ TI Blvd Traffic Signal Upgrades Citywide 1 13 $101,402

Summary for 'Category' = Traffic Signal Upgrades - Citywide (37 detail records) Sum $3,369,843 Traffic System Management - Dynamic Message Signs

Hillcrest SB approaching Arapaho Dynamic Message Sign 1 60 $76,578

Hillcrest SB approaching LBJ Traffic Systems Management - Dynamic Message Signs 1 60 $153,156

Beltline WB approaching DNP Dynamic Message Sign 1 25 $153,156

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (3 detail records) Sum $382,890 Traffic System Management - Roadside Cameras

Friday, March 31, 2006 Page 268 of 349 Project Name Description Tier Score Estimate Council District 11 Traffic System Management - Roadside Cameras

Dallas Parkway-Keller Springs Roadside Camera 1 30 $6,382 Dallas Parkway-Springvalley Roadside Camera 1 30 $25,526

Summary for 'Category' = Traffic System Management - Roadside Cameras (2 detail records) Sum $31,908 Summary for 'Program' = STREET AND TRANSPORTATION (268 detail records) Sum $89,196,205 Summary for 'CD' = 11 (268 detail records) Sum $89,196,205

Friday, March 31, 2006 Page 269 of 349 Project Name Description Tier Score Estimate Council District 12 Alley Reconstruction

Chattington(7606)&Rolling Acres-Tophill toCarriage Full Reconstruction 1 68 $324,592 Leameadow(7119)& Town Bluff -Hillcrest to Wildvine Full Reconstruction 1 68 $327,042

Brentfield(7424)&Rustic Valley-Havenglen to Brentf Partial Reconstruction. Field checked on 1/19/06. 2 66 $430,805

Roundrock Road (7608-7824) Woodstone - Meandering to Full recon Roundrock Rd. (7608 - 7824) 1 66 $358,640 Spring Creek Alto Caro & La Verdura -La Verdura to Spring Creek Full Reconstruction 1 63 $388,531

Roundrock Road (7906-7986) Woodstone - Springcreek to Full recon Roundrock Rd. (7906 - 7986) 1 60 $250,155 Coit El Estdo & Arapaho - Coit to Arapaho Full Reconst. L-shape (Coit 15615) 1 40 $213,142

Amberwood Rd - 16101 - 16239 Full Reconstruction 2 $399,843

Appledale La - 2604 - 2632 Full Reconstruction 2 $487,253

Briaridge Rd - 7708 - 7820 Full Reconstruction 2 $205,400

Briaridge Rd. 7906 - 7986 Full reconstruction 2 $271,852

Chalkstone Dr - 7628 - 7748 Full Reconstruction 2 $335,368

Chattington & Rolling Acres- Carriage toSpring Crk Full Reconstruction 2 $251,957

Daybreak Dr - 2303 - 2715 Full Reconstruction 2 $497,192

El Pastel & La Sabrina - El Pastel to Spring Creek Full Reconstruction 1 $356,088

Fallmeadow La - 7612 - 7668 Full Reconstruction 2 $251,016

Fallmeadow La - 7931 - 7997 Full Reconstruction 2 $339,191

Farley Trl - 17703 - 17871 Full Reconstruction 2 $459,730

Harbinger La - 2303 - 2423 Full Reconstruction 2 $244,900

Kingsridge - 2307 - 2627 Full Reconstruction 2 $487,253

La Cabeza and La Managa - Salado to Spring Creek Full Reconstruction 2 $190,933

Lawngate Dr - 4203 - 4231 Full Reconstruction 2 $169,468

Friday, March 31, 2006 Page 270 of 349 Project Name Description Tier Score Estimate Council District 12 Alley Reconstruction

Mapleshade(5910) & Deseret-Mahogany to Bentwood Full Reconstruction 2 $263,841 Ridgestone Dr - 2304 - 2448 Full Reconstruction 2 $303,768

Tophill & Rolling Acres - Tophill to Carriage 7615 Top Hill La 2 $173,909

Summary for 'Category' = Alley Reconstruction (25 detail records) Sum $7,981,869 Barrier Free Ramps

18211 Kelly Blvd Curb Cuts are needed on Kelly Blvd (Frankford-18211), 1 33 $34,460 Frankford (City limit-SH 190) And Apple Ridge (Frankford- Dead End). Total 18 Locations Meandering - La Sobrina 2 BFR's at intersection 1 23 $3,829

Kelly Blvd @ Timberglen 2 BFR needed at intersection 1 21 $3,829

Hillcrest Rd @ Hillwood Ln Construct 4 ramps 1 20 $3,140

Applecross Ln @ Springcreek Rd Construct 4 ramps 1 12 $7,658

Brentfield @ Meadow Creek Total 5 BFRs. 3 on Meadowcreek @ Brentfield, 2 on 1 12 $7,658 Meadowcreek @ Windy Ridge Applecross Ln @ Kilbridge Ln Construct 4 ramps 1 4 $7,658

Holly Tree Dr @ Fox Fire Dr One BFR needed @ intersection 1 4 $1,914

Blue Mist La (6005) Need curb cut in front of address 1 3 $1,914

Salado Dr. @ Carta Valley Construct 4 ramps 1 $7,658

Summary for 'Category' = Barrier Free Ramps (10 detail records) Sum $79,718 Bridge Repair and Modification

Dickerson over E. Fork Trib/McKamy Br (Osage) Clean & paint metal, repair timber deck, gabion scour 1 68.75 $51,052 protection, repair guardrails; consider full replacement (~$150,000); leverages TxDOT funding for repair; Serious

Friday, March 31, 2006 Page 271 of 349 Project Name Description Tier Score Estimate Council District 12 Bridge Repair and Modification

Summary for 'Category' = Bridge Repair and Modification (1 detail record) Sum $51,052 Intergovernmental Partnership Projects

Dickerson St @ East Fork McKamy Branch Bridge rehabilitation and/or reconstruction. 2 $0

North Dallas RR Xings - 10 Xings along Cotton Belt Partnership project with TxDOT to upgrade gates and extend 1 $1,327,352 crossing surfaces. Total estimated cost of $2.9 million. Estimated to be let by early 2008. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $1,327,352 Street Petitions

Riseden Dr - Winding Rose Tr to Hillcrest Rd Engineering, Paving & Drainage 6800 Blk 1 88 $555,191

Stedman Dr - Davenport Rd to ex Pavement N Stedman Engineering, Paving & Drainage 17000 Blk 1 85 $344,601

Summary for 'Category' = Street Petitions (2 detail records) Sum $899,792 Street Resurfacing

Arapaho Rd. - Meandering Way to Coit Rd. 7500-7900 1 75.88 $451,810

La Verdura Dr. - Alto Caro Dr. to El Pastel Dr. 7600-7800 1 59.11 $141,542

Highland Glen Tr. - Highland Heather to Meandering 7300 Block 1 55.26 $33,822

Williamswood Dr. - Dickerson St.to Kirkham Dr. 7300 block 1 55.12 $51,307

Arapaho Rd. - Hillcrest Rd. to Meandering Way 7000-7400 1 54.74 $249,134

Kelly Blvd. - Frankford Rd. to Timber Oaks Dr. 18000-18100 1 54.07 $155,326

Winding Creek Ct. - Davenport Rd. to Cul-de-Sac 6900 block 1 53.73 $288,189

La Sobrina Dr. - Spring Creek Rd. to El Pastel Dr. 7800 block 1 52.24 $63,177

Friday, March 31, 2006 Page 272 of 349 Project Name Description Tier Score Estimate Council District 12 Street Resurfacing

Briarnoll Dr. - Carrolwood Dr. to Debbe Dr. 7300 Block 1 47.91 $62,922 Rembrandt Ter. - Michaelanglo Dr. to Gainsboro Dr. 18500-18700 1 37.44 $166,557

Kingstree Dr. - Roundrock Dr. to D.E. @ Cul-de-Sac 15100 block 1 30.2 $66,368

Anglebluff Cir. - 6800 2 $0

Arapaho Rd. - 6000 2 $0

Bentwood Trl. - 6000 2 $0

Bentwood Trl. - 6200 2 $0

Bretton Bay La. - 4400 2 $0

Briargrove La. - 4200 2 $0

Briargrove La. - 4500 2 $0

Briargrove La. - 4600 2 $0

Carriage La. - 15200 2 $0

Carrollwood Dr. - 17900 2 $0

Carrollwood Dr. - 18000 2 $0

Club Hill Dr. - 16800 2 $0

Club Hill Dr. - 16900 2 $0

Debbe Dr. - 7200 2 $0

Flintcove Dr. - 6900 2 $0

Frankford Rd. - 2600 2 $0

Frankford Rd. - 5000 2 $0

High Star La. - 4200 2 $0

Hillcrest Rd. - 15900 2 $0

Friday, March 31, 2006 Page 273 of 349 Project Name Description Tier Score Estimate Council District 12 Street Resurfacing

Hillcrest Rd. W - 14900 2 $0 Kelly Blvd. - 17700 2 $0

Kelly Blvd. - 18200 2 $0

Kirkmeadow La. - 4100 2 $0

Lloyd Cir. - 18900 2 $0

Loveland Dr. - 17600 2 $0

Mccallum Blvd. - 6300 2 $0

Mill Falls Dr. - 6900 2 $0

Misty Trl. - 6200 2 $0

Oakington Ct. - 17400 2 $0

Old Mill Rd. - 2600 2 $0

Platte River Wy. - 18700 2 $0

Rooster La. - 17700 2 $0

Rosemeade Pkwy. - 3600 2 $0

Roundrock Rd. - 7700 2 $0

Roundrock Rd. - 7900 2 $0

Snowbird Trl. - 6100 2 $0

Timberglen Rd. - 3400 2 $0

Warm Mist La. - 5900 2 $0

Woodstone La. - 7900 2 $0

Summary for 'Category' = Street Resurfacing (50 detail records) Sum $1,730,152

Friday, March 31, 2006 Page 274 of 349 Project Name Description Tier Score Estimate Council District 12 Thoroughfares

Rosemeade -Midway to SH 190 Widen to accommodate 14' continuous left turn 1 31 $1,010,989 Frankford - Richardson C.L. to Coit Road Widen to a six lane divided roadway from a two lane roadway 1 29 $12,419,559

Dallas Parkway - Trinty Mills to N. City Limits Widen service roads. 1 0 $5,578,618

Dallas Parkway - Westgrove to Trinity Mills Widen service roads. 1 0 $1,952,516

Summary for 'Category' = Thoroughfares (4 detail records) Sum $20,961,682 Traffic Intersection Capacity & Safety Improvement

Coit Rd at McCallum Blvd Widen Coit Road at McCallum to provide a second northbound 1 45 $513,073 left-turn lane. Arapaho east of Meandering Way Widen Arapaho just east of Meandering Way to provide a 1 40 $86,788 westbound leftturn pocket. Davenport at Frankford 1 35 $0

Frankford at Kelly Remove dip in roadway on Frankford Rd crossing Kelly Blvd. 1 35 $218,247

Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (4 detail records) Sum $818,108 Traffic Safety Improvements-Guardrail Upgrades

Coit 17500 BLK Guardrail Upgrade 1 80 $16,949

Coit 18000 BLK Guardrail Upgrade 1 80 $6,713

Frankford 5400 BLK Guardrail Upgrade 1 80 $37,230

Frankford 4400 BLK Guardrail Upgrade 1 73 $18,123

Frankford 6600 BLK Guardrail Upgrade 1 73 $5,201

Frankford 6800 BLK Guardrail Upgrade 1 73 $41,595

Hillcrest 16100 BLK Guardrail Upgrade 1 67 $8,730

Hillcrest 17500 BLK Guardrail Upgrade 1 67 $19,764

Friday, March 31, 2006 Page 275 of 349 Project Name Description Tier Score Estimate Council District 12 Traffic Safety Improvements-Guardrail Upgrades

Hillcrest 18100 BLK Guardrail Upgrade 1 67 $19,617 Marsh 18700 BLK Guardrail Upgrade 1 67 $13,465

Campbell 6400 BLK Guardrail Upgrade 1 60 $17,868

Hillcrest 10700 BLK Guardrail Upgrade 1 60 $7,594

McCallum 6300 BLK Guardrail Upgrade 1 60 $6,669

McCallum 6800 BLK Guardrail Upgrade 1 60 $18,187

Midway 18900 BLK Guardrail Upgrade 1 60 $5,392

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (15 detail records) Sum $243,097 Traffic Signal Upgrades - Citywide

Arapaho @ Meandering Way Traffic Signal Upgrades-C Traffic Signal Upgrade 1 80 $106,890

Kelly @ Timberglen Traffic Signal Upgrades Citywide 1 80 $102,359

Arapaho @ Hillcrest Traffic Signal Upgrades-Citywi Traffic Signal Upgrade 1 67 $86,278

Campbell @ Davenport Traffic Signal Upgrade 1 67 $80,981

Bentwood @ Genstar(Preston Rd) Traffic Signal Upgrade 1 53 $107,847

Coit @ McCallum Traffic Signal Upgrade 1 53 $107,847

Arapaho @ Meadow Creek Traffic Signal Upgrade 1 40 $73,336

Arapaho @ Spring Creek Traffic Signal Upgrade 1 40 $107,847

Beltline @ Meandering Way Traffic Signal Upgrade 1 40 $56,081

Campbell - Hillcrest Traffic Signal Upgrades Citywide 1 40 $83,279

Campbell - Meandering Way Traffic Signal Upgrades Citywide 1 40 $54,881

Hillcrest @ La Manga Traffic Signal Upgrades Citywide 1 40 $107,464

Friday, March 31, 2006 Page 276 of 349 Project Name Description Tier Score Estimate Council District 12 Traffic Signal Upgrades - Citywide

Arapaho @ Golden Creek Traffic Signal Upgrade 1 27 $46,210 Summary for 'Category' = Traffic Signal Upgrades - Citywide (13 detail records) Sum $1,121,301 Traffic System Management - Dynamic Message Signs

Coit SB approaching Beltline Traffic Systems Management - Dynamic Message Signs 1 60 $153,156

Hillcrest SB approaching Arapaho Dynamic Message Sign 1 60 $76,578

Summary for 'Category' = Traffic System Management - Dynamic Message Signs (2 detail records) Sum $229,734 Traffic System Management - Roadside Cameras

Coit-190 Traffic Systems Management - Roadside Camera 1 40 $25,526

Dallas Parkway-Frankford Roadside Camera 1 40 $25,526

Frankford-Midway Roadside Camera 1 40 $12,763

Frankford-Preston Roadside Camera 1 40 $12,763

Preston-190 Traffic Systems Management - Roadside Camera 1 40 $25,526

Dallas Parkway-Keller Springs Roadside Camera 1 30 $6,382

Dallas Parkway-Trinity Mills Roadside Camera 1 30 $12,763

Summary for 'Category' = Traffic System Management - Roadside Cameras (7 detail records) Sum $121,249 Summary for 'Program' = STREET AND TRANSPORTATION (135 detail records) Sum $35,565,105 Summary for 'CD' = 12 (135 detail records) Sum $35,565,105

Friday, March 31, 2006 Page 277 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Talisman Dr & Wildflower from Wildflower to Caraway Full Reconstruction (Talisman Dr - 2926 - 2996) 1 85 $207,949 SR#0600081180 Catamore(3144) & Woodwind - Dundee including 'T' Full Reconstruction 1 78 $313,042

Whitehall & Jubilee Trail - Shans to Cromwell Full Reconstruction 1 78 $425,087

Aberdeen Ave & Mimosa Ln - Tibbs to Edgemere Full Reconstruction 1 73 $234,839

Colgate & Marquette - Boedeker to Durham Full Reconstruction 1 73 $248,879

Cromwell(11001) - Royal to Lathrop Full Reconstruction 1 73 $311,290

Carry Back Cir. & TU ROW - Pensive to T-alley Full Reconstruction 1 70 $147,639

Meletio(5739) & Charlestown - Nuestra to Jamestown Full Reconstruction 1 70 $299,803

Ainsworth & Norcross - Ainsworth to Norcross Full Reconstruction 1 69 $276,013

Marquette(7207) & Centenary - Airline to Durham Full Reconstruction 1 69 $182,179

Warick & Merrell - Cromwell to Crittendon Full Reconstruction 1 69 $373,412

Pensive(10318) - Carry Back Cir to 'T' Full Reconstruction 1 68 $108,700

Desco Dr & Prestonshire Ln - Thackery to Hillcrest Full Reconstruction 1 67 $336,799

Lupton Dr & Stefani Dr - Edgemere to Thakery Full Reconstruction 1 67 $303,019

Shirestone La 12003 & Drujon - Forest to Willow Full recon. U-shape fr Shirestone to alley E of Drujon 1 66 $339,496 Shirestone Ln 12003 Goodyear and Carry Back - Ponder to T-alley Full Reconstruction 1 64 $263,901

Royal Lane (3505-3635) Vancouver- Cromwell to Lathrop Full recon Royal Ln. (3505 - 3635) 1 63 $335,667

Aberdeen Ave & Mimosa Ln - Dead End to Tulane Full Reconstruction 1 61 $209,862

Carry Back & Carry Back - Carry Back to Carry Back Full Reconstruction 1 61 $63,969

Latham & Leahy - T-alley to Channel Dr 1 61 $407,743

Lupton Dr & Prestonshire Ln - Edgemere to Thackery Full Reconstruction 1 61 $336,799

Del Norte & Northwood - Thackery To Hillcrest Full Reconstruction 1 60.3 $361,872

Friday, March 31, 2006 Page 278 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Aberdeen Ave & Stichter Ave - Tibbs to Edgemere Full Reconstruction 1 60 $251,303 Chevy Chase & Deloache - Thackery to Hillcrest Full Reconstruction 1 60 $365,297

Del Roy Dr (5209 - 5439) Preston Haven - Inwood to Full reconstruction Del Roy Dr. (5209 - 5439) 1 60 $305,036 Eastern High Vista & High Brook-High Meadow to High Valley Full Reconstruction 1 60 $293,065

Lakehurst(6472) & Mimosa - Tibbs to Edgemere Full Reconstruction 1 60 $247,958

Marsh & Crittendon - Merrell Rd To Ingleside Dr. Full Reconstruction 1 60 $147,807

Northaven Road (3509-3667) Flair - Sonnet to Marsh Full recon Northaven Rd. (3509 - 3667) 1 60 $305,036

Stefani Drive (6707-6839) Joyce - Thackery to Hillcrest Full recon Stefani Dr. (6707 - 6839) 1 60 $236,116

Vancouver Circle (3807-3821) Waldorf - Cox to Rosser Full recon Vancouver Cir. (3807 - 3821) 1 60 $113,591

Williamstown & Meletio - Quincy To Nuestra Dr. Full Reconstruction 1 60 $338,937

Orchid(6405) & Tulip - Tibbs to Edgemere Full Reconstruction 1 58.88 $233,180

Desco Dr & Prestonshire Ln - Tulane to Edgemere Full Reconstruction 1 58 $336,799

Glendora & Meadow - Tibbs to Edgemere Full Reconstruction 1 58 $251,303

Royal Ln & Vancouver Dr - Marsh Ln to Cox Ln Full Reconstruction, 3700 Blk (Action item) 1 57 $331,838

Glendora & Lakehurst - Preston to Tulane 1 56 $308,609

Park Ln & Woodland Dr - Edgemere to Thackery Full Reconstruction 1 55 $284,984

Royal & Tulip - Camellia to Tibbs Full Reconstruction 1 53 $354,934

Royal & Tulip - Tibbs to Edgemere Full Reconstruction 1 53 $264,258

Preston Haven & Caladium - Nuestra to Jamestown Full Reconstruction 1 47 $256,878

Seguin Drive 3704-3772 Inc T-alley Full recon 1 46 $216,205

High Bluff Dr (3505 - 3631) High Mesa - Highdale to "T" Full reconst High Bluff DR. (3505 - 3631) 1 43 $289,720 Alley Aberdeen & Mimosa - Tibbs to Tulane Full reconstruction - Aberdeen 6207-6339 1 40 $236,116

Friday, March 31, 2006 Page 279 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Boca Raton & Del Roy - Nuestra To Jamestown Rd. Full Reconstruction 1 40 $216,104 Caruth Blvd (7403 - 7443) Colgate - Boedeker to Durham Full reconstruction Caruth Blvd (7403 - 7443) 1 40 $238,923

High Bluff Dr (3506 - 3640) High Mesa - Highdale to "T" Full reconstr High Bluff Dr. (3506 - 3640) 1 40 $325,457 Alley St Cloud Cir (3402 - 3478) Winged Foot - Cromwell to "T" Full reconst. U-shape St Cloud Cir. (3402 - 3478) 1 40 $559,019 Alley Winged Foot Court (3407-3437) Saint Cloud - Cromwell to Full recon Winged Foot Crt. (3407 - 3437) 1 40 $559,019 "T" Alley Vancouver Dr & Waldorf - Cromwell to Lathrop Full Reconstruction 1 38 $376,653

Coogan Dr 10790 Channel - Brockbank to "T" Alley Full reconstruction Coogan Dr 10790 1 34 $63,815

St Cloud Cir (3309 - 3357) Forest - Lazywood to Cromwell Full reconst St Cloud Cir. (3309 - 3357) 1 31 $550,085

Green Terrace Dr (9408 - 9460) Thornberry - Northwest to Full reconstruction Green Terrace Dr. (9408 - 9460) 1 28 $311,417 "T" Alley Aberdeen Av - 6406 - 6478 Full Reconstruction 2 $248,978

Aberdeen Av - 6505 - 6635 Full Reconstruction 2 $242,098

Aberdeen Av - 6704 - 6834 Full Reconstruction 2 $241,333

Aberdeen Av - 6705 - 6835 Full Reconstruction 2 $244,136

Allencrest La - 4807 - 4931 Full Reconstruction 2 $312,178

Antigua & High Summit -High Summit to Rosser Full Reconstruction - Antigua 3856 2 $246,017

Azalea La - 5909 - 5973 Full Reconstruction 2 $244,646

Bandera & Del Norte - Thackery to Turtle Creek Full Reconstruction 2 $129,538

Bandera Av - 6206 - 6332 Full Reconstruction 2 $301,984

Bandera Ave & Del Norte Ln - Preston to Edgemere Full Reconstruction 2 $660,644

Beauty La - 10804 - 11030 Full Reconstruction 2 $361,363

Beechwood La - 3808 - 3992 Full Reconstruction 2 $391,688

Friday, March 31, 2006 Page 280 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Beechwood La - 3905 - 3993 Full Reconstruction 2 $311,924 Boca Raton 5806 - 5930 Full Recostructiion - Boca Raton 5806 - 5930 2 $268,023

Boca Raton Dr - 5209 - 5447 Full Reconstruction 2 $365,185

Boca Raton Dr - 5507 - 5531 Full Reconstruction 2 $136,339

Boca Raton Dr - 5510 - 5722 Full Reconstruction 2 $332,056

Brockbank Dr - 10412 ------Full Reconstruction 2 $73,138

Brockbank Dr - 10510 - 10550 Full Reconstruction 2 $213,300

Brockbank Dr - 10832 - 10848 Full Reconstruction 2 $72,884

Brookshire Dr - 6304 - 6340 Full Reconstruction 2 $164,117

Brookshire Dr - 6506 - 6630 Full Reconstruction 2 $241,078

Brookshire Dr - 6507 - 6631 Full Reconstruction 2 $241,333

Brookshire Dr - 6706 - 6830 Full Reconstruction 2 $237,764

Brookshire Dr - 6707 - 6831 Full Reconstruction 2 $234,197

Brookstown Dr - 5716 - 5826 Full Reconstruction 2 $278,029

Bryn Mawr Dr - 7803 - 7923 Full Reconstruction 2 $215,339

Cabana La - 3826 - 3866 Full Reconstruction 2 $192,404

Caladium Dr - 5707 - 5839 Full Reconstruction 2 $258,152

Caruth Blvd - 7402 - 7542 Full Reconstruction 2 $274,462

Castlewood Rd - 5212 - 5454 Full Reconstruction 2 $402,646

Castlewood Rd - 5319 - 5455 Full Reconstruction 2 $412,330

Charlestown Dr - 5506 - 5658 Full Reconstruction 2 $357,030

Chevy Chase Av - 6404 - 6418 Full Reconstruction 2 $100,407

Friday, March 31, 2006 Page 281 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Chevy Chase Av - 6426 - 6542 Full Reconstruction 2 $262,994 Chevy Chase Av - 6427 - 6543 Full Reconstruction 2 $332,056

Chevy Chase Av - 6703 - 6837 Full Reconstruction 2 $220,945

Citation(3329) & Whirlaway-Harwich to Webb Chapel Full Reconstruction 2 $220,409

Clover La - 4005 - 4071 Full Reconstruction 2 $235,471

Colhurst St - 5806 - 5868 Full Reconstruction 2 $299,691

Coral Gables Dr - 3608 - 3660 Full Reconstruction 2 $210,752

Coral Hills Dr & Cromwell Cir from T Alley to Cromwell Dr Full Reconstruction - Coral Hills Dr - 11739. The design is 1 $252,707 being done with 2003 Bond Coral Hills Dr (11523 - 11589) Forest - Webbs Chapel to Full Reconstruction Coral Hills Dr (11523 - 11589) 1 $609,321 Lazy Wood Cox La - 10544 - 10736 Full Reconstruction 2 $514,266

Cox La - 10655 ------Full Reconstruction 2 $270,639

Crestline Av - 12111 ------Full Reconstruction 2 $317,275

Cromwell Dr - 10432 - 10448 Full Reconstruction 2 $185,778

Cromwell Dr - 11330 ------Full Reconstruction 2 $252,291

Cromwell Dr - 11807 - 12011 Full Reconstruction 2 $308,355

Cromwell Dr - 11822 - 11926 Full Reconstruction 2 $375,633

Cromwell Dr - 12112 ------Full Reconstruction 2 $246,429

Crooked La - 4408 - 4550 Full Reconstruction 2 $347,856

Crooked La - 4609 - 4737 Full Reconstruction 2 $344,033

Del Norte La - 6009 - 6349 Full Reconstruction 2 $663,347

Del Norte La - 6403 - 6541 Full Reconstruction 2 $288,223

Del Roy Dr - 5609 - 5727 Full Reconstruction 2 $226,043

Friday, March 31, 2006 Page 282 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Del Roy Dr - 5811 - 5931 Full Reconstruction 2 $261,210 Deloache Av - 6406 - 6414 Full Reconstruction 2 $98,368

Deloache Av - 6426 - 6542 Full Reconstruction 2 $258,407

Deloache Av - 6604 - 6834 Full Reconstruction 2 $359,069

Desco Dr - 6011 - 6147 Full Reconstruction 2 $347,856

Desco Dr - 6406 - 6538 Full Reconstruction 2 $293,575

Desco Dr - 6407 - 6541 Full Reconstruction 2 $317,785

Desco Dr - 6606 - 6830 Full Reconstruction 2 $358,814

Dothan & Latham - Full Reconstruction 2 $390,319

Dothan La - 3210 - 3358 Full Reconstruction 2 $396,785

Dothan(2900) &Latham - 'T' alley to Caraway Full Reconstruction 2 $194,052

Dothan(3000) & Latham - Caraway to Channel Full Reconstruction 2 $205,600

Drujon & Shirestone - Willow & Nashwood Full Reconstruction 2 $228,081

Duchess Trl - 3217 - 3339 Full Reconstruction 2 $377,926

Duchess Trl - 3505 - 3645 Full Reconstruction 2 $378,691

Duchess Trl (3506 - 3646) Princess - Cromwell to Lathrop Full Reconstruction Duchess Trl. (3506 - 3646) 1 $379,711

Echo Brook La - 3806 - 3854 Full Reconstruction 2 $345,053

Elderwood Dr - 5808 - 5876 Full Reconstruction 2 $240,059

Elderwood Dr - 5904 - 5978 Full Reconstruction 2 $279,558

Flaxley Dr - 3507 - 3579 Full Reconstruction 2 $322,627

Flowerdale La (3111 - 3161) Royal Ln. - Channel to Full reconst Flowerdale Ln. (3111 - 3161) 2 $168,472 Dundee Glen Lakes & La Sierra (Dead End to Manderville) Full Reconstruction 2 $321,628

Friday, March 31, 2006 Page 283 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Glendora Av - 6007 - 6139 Full Reconstruction 2 $309,884 Glendora Av - 6206 - 6334 Full Reconstruction 2 $262,230

Glendora Av - 6406 - 6474 Full Reconstruction 2 $247,704

Glendora Av - 6700 - 6830 Full Reconstruction 2 $239,549

Harriet Cir - 12642 - 12646 Full Reconstruction 2 $122,323

Harvest Hill Rd - 4408 - 4556 Full Reconstruction 2 $370,537

High Bluff Dr - 3328 ------Full Reconstruction 2 $56,319

High Bluff Dr - 3420 - 3472 Full Reconstruction 2 $243,627

High Brook Dr - 3208 - 3342 Full Reconstruction 2 $298,926

High Meadow Dr - 12210 - 12232 Full Reconstruction 2 $565,743

High Vista Dr - 3506 - 3658 Full Reconstruction 2 $363,656

Inwood Rd - 11212 - 11232 Full Reconstruction 2 $646,782

Isabella La - 4611 ------Full Reconstruction 2 $148,572

Joyce Way & Stefani Dr. - Edgemere to Edgemere Full Reconstruction 2 $295,346

Joyce Wy - 6207 - 6329 Full Reconstruction 2 $260,190

Joyce Wy - 6504 - 6638 Full Reconstruction 2 $288,478

Joyce Wy - 6511 - 6639 Full Reconstruction 2 $233,177

Jubilee Trail (3509 - 3667) Whitewall - Sonnett to Marsh Full recon Jubilee Trail (3509 - 3667) 2 $307,588

Jubilee Trl - 3107 - 3179 Full Reconstruction 2 $291,792

Lakehurst Av - 6002 - 6126 Full Reconstruction 2 $307,846

Lakehurst Av - 6506 - 6630 Full Reconstruction 2 $243,117

Lakehurst Av - 6706 - 6830 Full Reconstruction 2 $244,646

Friday, March 31, 2006 Page 284 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Lakemont Dr - 9569 ------Full Reconstruction 2 $188,836 Laren La - 4408 - 4556 Full Reconstruction 2 $372,320

Lindenshire La - 5707 - 5837 Full Reconstruction 2 $338,172

Longbow Ct - 3104 - 3140 Full Reconstruction 2 $131,242

Lupton Av - 6006 - 6146 Full Reconstruction 2 $325,685

Lupton Av - 6007 - 6147 Full Reconstruction 2 $320,843

Lupton Av - 6707 - 6839 Full Reconstruction 2 $279,304

Lupton Dr & Prestonshire - Thackery to Hillcrest Full Reconstruction 2 $297,937

Lupton Dr & Stefani - Tulane to Edgemere Full reconstruction 2 $305,036

Marsh La - 10125 - 10215 Full Reconstruction 2 $290,772

Matador Dr - 3772 ------Full Reconstruction 2 $76,961

Matador Dr - 3773 ------Full Reconstruction 2 $77,216

Matador Dr (3704 - 3772) Park - March to "T" Alley Full Reconstruction Matador Dr. (3704 - 3772) 1 $241,842

Meadow Crest Dr - 5212 - 5528 Full Reconstruction 2 $432,208

Meadow Crest Dr - 5614 - 5722 Full Reconstruction 2 $320,078

Meletio La - 5706 - 5860 Full Reconstruction 2 $335,114

Melissa La - 4407 - 4549 Full Reconstruction 2 $349,129

Melshire Dr - 5503 - 5623 Full Reconstruction 2 $286,694

Merrell(3133) & Grantwood - Dundee to Royal Chapel Full Reconstruction 2 $135,811

Mid Surrey Ct - 11508 - 11530 Full Reconstruction 2 $129,459

Northaven Rd - 3306 - 3390 Full Reconstruction 2 $398,569

Northaven Rd - 3810 - 3850 Full Reconstruction 2 $139,142

Friday, March 31, 2006 Page 285 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Northaven Rd - 5501 - 5533 Full Reconstruction 2 $145,258 Northaven Road (3510-3668) Whithall - Sonnet to Marsh Full recon Northaven Rd. (3510 - 3668) 2 $305,036

Northhaven & Talisman - Dennis to Caraway Full Reconstruction 2 $284,145

Northport Dr - 6311 - 6353 Full Reconstruction 2 $169,978

Northport Dr - 6409 - 6475 Full Reconstruction 2 $245,411

Northport Dr - 6507 - 6631 Full Reconstruction 2 $233,177

Northport Dr - 6707 - 6831 Full Reconstruction 2 $230,630

Northwest Hwy (W) - 7404 - 7532 Full Reconstruction 2 $159,784

Northwood Rd - 6406 - 6416 Full Reconstruction 2 $82,823

Norway Rd - 5804 - 5946 Full Reconstruction 2 $338,172

Norway Rd - 5807 - 5945 Full Reconstruction 2 $373,339

Norway Rd - 6306 - 6340 Full Reconstruction 2 $166,664

Norway Rd - 6506 - 6630 Full Reconstruction 2 $241,333

Norway Road (6409-6475) Brookshire - Tibbs to Edgemere Full recon Norway Rd. (6409 - 6475) 2 $223,353

Orchid La - 6006 - 6046 Full Reconstruction 2 $166,410

Orchid La - 6007 - 6047 Full Reconstruction 2 $138,887

Orchid La - 6126 - 6134 Full Reconstruction 2 $95,310

Orchid La - 6220 - 6336 Full Reconstruction 2 $203,362

Orchid La - 6506 - 6630 Full Reconstruction 2 $239,295

Orchid La - 6706 - 6838 Full Reconstruction 2 $231,394

Orchid La - 6707 - 6839 Full Reconstruction 2 $222,474

Palomar La - 5112 - 5530 Full Reconstruction 2 $576,701

Friday, March 31, 2006 Page 286 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Park La - 8502 - 8544 Full Reconstruction 2 $128,948 Pebblebrook Dr - 5110 - 5440 Full Reconstruction 2 $563,195

Pebblebrook Dr - 5111 - 5531 Full Reconstruction 2 $670,227

Ponder(3015) & TXU row - Pensive to 'T' Full Reconstruction 2 $138,070

Port Royal(4000) & Boca Bay - Cox to 'T' Full Reconstruction 2 $206,448

Princess Cir - 3908 - 3938 Full Reconstruction 2 $100,407

Quincy Ln. - 12123 - 12515 Full Reconstruction 2 $454,889

Regent Dr - 3305 - 3371 Full Reconstruction 2 $235,981

Regent Dr (3505 - 3645) Royal - Cromwell to Lathrop Full Reconstruction Regent Dr. (3505 - 3645) 1 $377,672

Ridgebriar Drive (3531-3659) High Meadow - "T" Alley to Full recon Ridgebriar Dr. (3531 - 3659) 2 $287,168 Marsh Ridgeside Dr - 4606 - 4840 Full Reconstruction 2 $460,494

Rockdale Dr - 3705 - 3773 Full Reconstruction 2 $243,371

Royal & Leahy - T-alley to Channel Dr. Full Reconstruction 2 $382,260

Royal & Tulip - Edgemere to Thackery Full Reconstruction 2 $243,532

Royal La - 3730 - 3790 Full Reconstruction 2 $249,743

Salisbury Dr - 3406 - 3492 Full Reconstruction 2 $382,769

Satsuma Dr - 3004 - 3060 Full Reconstruction 2 $211,771

Satsuma Dr - 3106 - 3160 Full Reconstruction 2 $295,104

Silverton Dr - 3128 - 3152 Full Reconstruction 2 $200,559

Silverton Dr - 3129 - 3159 Full Reconstruction 2 $188,581

Silverton(3004) & Townsend - Caraway to Channel Full Reconstruction 2 $210,590

Sonnet Dr - 11608 - 11634 Full Reconstruction 2 $382,513

Friday, March 31, 2006 Page 287 of 349 Project Name Description Tier Score Estimate Council District 13 Alley Reconstruction

Southcrest Rd - 4202 - 4338 Full Reconstruction 2 $284,656 St Cloud Cir - 3403 - 3477 Full Reconstruction 2 $199,284

Stichter Av - 6704 - 6838 Full Reconstruction 2 $250,762

Stichter Ave & Walnut Hill - Edgemere to Thackery Full Reconstruction 2 $233,169

Sundial Dr - 3005 - 3059 Full Reconstruction 2 $210,242

Sundial Dr - 3105 - 3139 Full Reconstruction 2 $214,574

Talisman Dr - 3004 - 3058 Full Reconstruction 2 $210,498

Timberview(3310) & Citation-Harwich to Webb Chapel Full Reconstruction 2 $220,409

Townsend Dr - 3504 - 3636 Full Reconstruction 2 $371,810

Townsend Dr - 3505 - 3665 Full Reconstruction 2 $468,905

Valley Ridge Rd - 4207 - 4341 Full Reconstruction 2 $285,165

Vinecrest Dr - 3504 - 3636 Full Reconstruction 2 $370,281

Waldrop & Altman - Royal Chapel to Dundee Full Reconstruction 2 $137,840

Waldrop(3211) & Rotan - Royal Chapel to Dundee Full Reconstruction 2 $137,840

Wildflower & Sundial - Caraway to 'T' alley Full Reconstruction 2 $282,573

Summary for 'Category' = Alley Reconstruction (234 detail records) Sum $65,457,966 Barrier Free Ramps

5723 Harvest Hill Construct 12 BFRs on north side of Harvest Hill from Spuling to 1 48 $22,973 Montfort at driveways 3423 Forest Ln Need 5 BFRs on driveways and medians between driveways of 1 44 $9,572 Braums and the Library 3434 Forest Ln Need 2 BFRs on Driveway 1 44 $3,829

3535 Forest Ln Need one BFR on Driveway 1 44 $1,914

Friday, March 31, 2006 Page 288 of 349 Project Name Description Tier Score Estimate Council District 13 Barrier Free Ramps

Highdale @ Forest Ln Need 2 BFRs at intersection 1 44 $3,829 Inwood - from Forest Ln. to Harvest Hill 20 BFRS as follows: 4 on Forest @ Inwood, 2 on Willow @ 1 42 $38,289 Inwood, 3 on Harvest Hill @ Inwood, 7 Curb cuts on driveways of school (#12345 Inwood) and 4 curb cuts on driveways of # 11804, # 11920 Inwood 6015 Berkshire Construct 1 BFR on the curb side of the head-in parking area in 1 35 $3,829 front of 6015 Berkshire, & 1 BFR to slope sidewalk to driveway level Woodwind Ln - Dundee Dr 2 BFR's needed at intersection 1 27 $3,829

Jamestown @ Brookstown One BFR needed on N. E. corner of intersection 1 22 $1,914

Bandera Ave @ Thackery St Construct 2 Ramps 1 19 $3,829

Meadow Rd @ Meadow Park Pl Construct 2 ramps 1 18 $3,829

Meadow Rd @ Rambler Rd Construct 4 ramps 1 18 $7,658

Meadow Rd @ Treehouse Ln Install 2 ramps 1 18 $3,829

Candlenut Ln @ Haydale Dr Construct 2 ramps 1 9 $3,829

Summary for 'Category' = Barrier Free Ramps (14 detail records) Sum $112,953 I.T.S. - Speed & Travel Time System

Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $86,151

Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $86,151 Intergovernmental Partnership Projects

Park Lane from Boedecker to US 75 Partnership project with TxDOT to widen to 6 lane divided. 1 $0 Total estimated cost of $_____ million. Estimated to be let by ______. Supplements 1995 and 1998 Bond Program funds.

Friday, March 31, 2006 Page 289 of 349 Project Name Description Tier Score Estimate Council District 13 Intergovernmental Partnership Projects

Park Lane from US 75 to Greenville Partnership project with TxDOT to widen to 6 lane divided. 1 $0 Total estimated cost of $_____ million. Estimated to be let by ______. Supplements 1995 and 1998 Bond Program funds. Park Ln. @ Bachman Creek Bridge rehabilitation and/or reconstruction 2 $0

Preston Rd - Park Lane to N of Royal Partnership project with Dallas County to reconstruct the 1 $8,002,401 existing six lane divided roadway. Total estimated cost of $13.7 million. Estimated to be let by Dallas County late 2008. Supplements 2003 Bond Program funds. Royal Lane - Webb Chapel to Marquis Partnership project with Dallas County to reconstruct the 1 $1,531,560 existing six lane divided roadway. Total estimated cost of $2.7 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (5 detail records) Sum $9,533,961 Street Reconstruction Local Streets

Melody Ln -Shady Brook to 2000' west of Eastridge 5900 - 6200 Blks 1 61.27 $290,165

Larmanda St - Skillman St North to 450 Fft 6600 Blk 1 58.87 $224,948

Earlshire Dr - Regent Dr to Royal Ln 10700 blk 1 52.75 $234,839

Turtle Creek Blvd - Woodland Dr to Park Ln 9000 Blk 1 49 $423,732

Summary for 'Category' = Street Reconstruction Local Streets (4 detail records) Sum $1,173,684 Street Reconstruction Thoroughfares

Walnut Hill Ln - Glen Lakes Dr to Greenville Rd Full Reconstruction 82-8300 blk 1 75.75 $2,807,860

Webb Chapel Rd - 10600 Blk 10600 Blk 1 64.99 $1,276,300

Rambler Rd - Walnut Hill Ln to 750' North 7500 Blk 1 59.4 $751,967

Treehouse Ln - Meadow Rd to Dead-End 7700 Blk 1 56.75 $1,771,852

Friday, March 31, 2006 Page 290 of 349 Project Name Description Tier Score Estimate Council District 13 Street Reconstruction Thoroughfares

Westchester Dr - Luther Ln to Berkshire Ln 8300 Blk 1 56.24 $427,561 St Cloud Cir - Cromwell Dr to Cromwell Dr 3400 Blk 1 53.57 $1,198,446

Summary for 'Category' = Street Reconstruction Thoroughfares (6 detail records) Sum $8,233,984 Street Resurfacing

Juniper Dr. - Seguin Dr. to Mixon Dr. 3700 block 1 75 $112,953

Winged Foot Ct. - Cromwell Dr. to Cul-de-Sac 3400 block 1 72.67 $80,535

St Croix Dr. - Cul-de-Sac to Dartmoor Dr. 3100 - 3200 1 70.88 $124,822

Townsend Dr. - Webb Chapel Rd. to Vinecrest Dr. 3100 - 3800 1 70.07 $541,789

Sonnet Dr. - Jubilee Tr. To Dead End 11100 - 11600 1 68.73 $146,519

Wedgewood Ln. - Park Ln . to Cul-de-Sac 4900 block 1 68.44 $50,414

Tower Tr. - Coral Hills Dr. to Modella Dr. 3200 block 1 67.78 $133,501

Van Ness Ln. - Lenel Pl. to Dunhaven Rd. 3900 block 1 67.75 $53,094

Northaven Rd. - Denton Dr. to Cromwell Dr. 2600-3300 1 66.555 $615,202

Dartmoor Dr. - Coral Hills Dr. to Sonnet Dr. 3200 - 3400 1 66.48 $187,871

Coral Hills Dr. - Cromwell Dr. to Dartmoor Dr. 11300 - 11700 1 66.455 $280,020

Damon Ln. - Townsend Dr. to Royal Ln. 10800 - 10900 1 66.05 $88,703

Jubilee Tr. - Shans St. to Sonnet Dr. 3200 - 3400 1 64.43 $181,617

Beauty Ln. - Royal Ln. to Beauty Ln. 10800 - 11000 1 64.31 $211,228

Meadow Crest Dr. - Inwood Ln to Lamplighter Ln. 5100 block 1 64.185 $61,135

Coral Rock Ln. - Northaven Rd. to Cul-de-Sac 3100 - 3200 1 63.85 $81,683

Valley Ridge Rd. - Elmada Ln. to Midway Rd. 3900 - 4100 1 63.67 $125,716

Friday, March 31, 2006 Page 291 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Northaven Ct. - Northaven Rd. to Cul-De-Sac 3200 block 1 62.9 $51,307 Prestonshire Ln. - Tulane Blvd. to Dartwood Ln. 6200 - 7000 1 62.88 $237,264

Seguin Ln. - Mixon Dr. to Marsh Ln. 3700 block 1 62.46 $146,009

Walnut Hill Ln. - Preston Rd. to Hillcrest Rd. 6000-6800 1 61.98 $920,723

Northaven Rd. - Cox Ln. to Wonderland Tr. 3800 - 3900 1 61.415 $125,460

Clover Ln. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 61.14 $98,766

Walnut Hill Ln. - Lenel Pl. to Lakemont Dr. 4000 block 1 59.825 $148,051

Davila Dr. - Marsh Ln. to Lakemont Dr. 3700 - 3900 1 59.72 $102,876

Golf Lakes Tr. - Private Drive to Walnut Hill Ln. 9600 Block 1 59.47 $43,777

Cochran Chapel Cir. - Midway Rd. to Midway Rd. 4300 Block 1 58.94 $57,816

Durango Dr. - Lenel Pl. to Lakemont Dr. 3900 Block 1 58.62 $52,201

Strait Ln. - Walnut Hill Ln. to Dead End 9900 block 1 56.78 $33,056

Preston Rd. - Shetland Dr. to Prestoncrest Ln. 12600 block 1 56.405 $62,922

Meadowdale Ln. - Cul-De-Sac to Coppedge Ln. 3700 - 3800 1 55.41 $76,961

Joyce Way - Douglas Ave. to Preston Rd. 5800 - 5900 1 55.33 $117,292

Del Roy Dr. - Lamplighter Ln. to Inwood Rd. 5100 Block 1 55.18 $42,884

St Cloud Cir. - Cromwell Dr. to Coral Hills Dr. 3300 block 1 55.18 $74,281

Lazywood Ln. - Coral Hills Dr. to Dead End 11500 block 1 53.19 $44,415

Cromwell Ct. - Cromwell Dr. to Cromwell Dr. 11400 Block 1 53.1 $85,767

Satsuma Dr. - Grissom Ln. to Caraway Dr. 2700 - 2900 1 52.51 $174,343

Walnut Hill Cir. - Walnut Hill Ln. to Walnut Hill Ln.. 6000 block 1 50.96 $32,418

Darbyshire Dr. - Baroness Dr. to Countess Dr. 3300 Block 1 48.5 $86,023

Friday, March 31, 2006 Page 292 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Cromwell Cir. - Cromwell Dr. to Cromwell Dr. 11500 Block 1 48.485 $55,519 Boedeker St. - Stefani Dr. to Ashington Dr. 9500 Block 1 48.32 $41,863

Dartmoor Ct. - Dartmoor Dr. to Cul-de-sac 3200 Block 1 48.145 $45,436

Northwest Pkwy. - Baltimore Dr. to Turtle Creek Blvd. 6300 - 6600 1 47.69 $174,853

Shady Hill Dr. - Weeburn Dr. to Midway Rd. 3700 - 4100 1 44.28 $187,744

Waldorf Dr. - Cromwell Dr. to Lathrop Dr. 3500 - 3600 1 39.04 $183,021

Aberdeen Av. - 6100 2 $0

Aberdeen Av. - 6600 2 $0

Admiral Dr. - 9300 2 $0

Ames St. - 8400 2 $0

Averill Wy. - 6000 2 $0

Beechwood La. - 3800 2 $0

Beechwood La. - 3900 2 $0

Berkshire La. - 6000 2 $0

Berkshire La. - 6100 2 $0

Better Dr. - 10200 2 $0

Brookstown Dr. - 5800 2 $0

Caladium Dr. - 5300 2 $0

Candlenut La. - 3900 2 $0

Catina La. - 4500 2 $0

Channel Dr. - 10600 2 $0

Channel Dr. - 11000 2 $0

Friday, March 31, 2006 Page 293 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Charlestown Dr. - 5600 2 $0 Charlestown Dr. - 5700 2 $0

Charlestown Dr. - 5800 2 $0

Chevy Chase Av. - 6400 2 $0

Colgate Av. - 4400 2 $0

Colhurst St. - 5800 2 $0

Coppedge La. - 10200 2 $0

Coppedge La. - 10300 2 $0

Coppedge La. - 9800 2 $0

Coral Gables Dr. - 3600 2 $0

Coral Hills Pl. - 11700 2 $0

Countess Dr. - 10400 2 $0

Countess Dr. - 10500 2 $0

Creekdale Dr. - 4100 2 $0

Crestline Av. - 12000 2 $0

Crestline Av. - 12100 2 $0

Crestline Av. - 12400 2 $0

Crestover Dr. - 10100 2 $0

Crestover Dr. - 10200 2 $0

Crestover Dr. - 10300 2 $0

Crown Shore Dr. - 4000 2 $0

Daria Dr. - 10100 2 $0

Friday, March 31, 2006 Page 294 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Del Norte La. - 6200 2 $0 Del Roy Dr. - 5900 2 $0

Dothan La. - 3200 2 $0

Dothan La. - 3300 2 $0

Drujon La. - 12000 2 $0

Eastern Av. - 11400 2 $0

Eastern Av. - 11700 2 $0

Edgemere Rd. - 8500 2 $0

Edgemere Rd. - 8600 2 $0

Edgemere Rd. (E) - 9500 2 $0

Edgemere Rd. (E) - 9600 2 $0

Fair Oaks Av. - 7000 2 $0

Fieldfare Cir. - 10000 2 $0

Flowerdale La. - 3100 2 $0

Folkstone Rd. - 9400 2 $0

Folkstone Rd. - 9500 2 $0

Forest Bend Rd. - 5000 2 $0

Forest La. - 3100 2 $0

Forest La. - 3200 2 $0

Forest La. - 3300 2 $0

Forest La. - 3400 2 $0

Forest La. - 3500 2 $0

Friday, March 31, 2006 Page 295 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Forest La. - 3600 2 $0 Forest La. - 4400 2 $0

Forest La. - 4800 2 $0

Forest La. - 4900 2 $0

Forest La. - 5200 2 $0

Gaywood Rd. - 10000 2 $0

Glen Lakes Dr. - 5500 2 $0

Gooding Dr. - 10000 2 $0

Gooding Dr. - 10100 2 $0

Gooding Dr. - 10200 2 $0

Gooding Dr. - 10500 2 $0

Harvest Hill Rd. - 4300 2 $0

Harwich Dr. - 10000 2 $0

Haydale Dr. - 12300 2 $0

Heatherbrook Dr. - 4800 2 $0

Hedgeway Dr. - 10000 2 $0

Hedgeway Dr. - 10100 2 $0

Hedgeway Dr. - 10300 2 $0

Hedgeway Dr. - 10400 2 $0

High Meadow Dr. - 11800 2 $0

High Meadow Dr. - 11900 2 $0

High Meadow Dr. - 12000 2 $0

Friday, March 31, 2006 Page 296 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Inwood Rd. - 10100 2 $0 Inwood Rd. - 10200 2 $0

Inwood Rd. - 11200 2 $0

Inwood Rd. - 11300 2 $0

Inwood Rd. - 11700 2 $0

Isabella La. - 4500 2 $0

Jamestown Rd. - 12000 2 $0

Jamestown Rd. - 12200 2 $0

Jamestown Rd. - 12400 2 $0

Jourdan Wy. - 9600 2 $0

Joyce Wy. - 6700 2 $0

Joyce Wy. - 6800 2 $0

Jubilee Trl. - 3100 2 $0

Jubilee Trl. - 3500 2 $0

Kate St. - 8200 2 $0

Lakemont Dr. - 9600 2 $0

Lakemont Dr. - 9900 2 $0

Larmanda St. - 6700 2 $0

Larmanda St. - 6800 2 $0

Latham Dr. - 3000 2 $0

Latham Dr. - 3200 2 $0

Lathrop Dr. - 10900 2 $0

Friday, March 31, 2006 Page 297 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Lathrop Dr. - 11000 2 $0 Lindenshire La. - 5700 2 $0

Lindenshire La. - 5800 2 $0

Lively La. - 4100 2 $0

Lively La. - 4300 2 $0

Lively La. - 4400 2 $0

Lupton Av. - 6100 2 $0

Lupton Av. - 6200 2 $0

Lupton Av. - 6300 2 $0

Lupton Av. - 6400 2 $0

Lupton Av. - 6500 2 $0

Luther La. - 5900 2 $0

Luther La. - 6000 2 $0

Luther La. - 6100 2 $0

Manchester Dr. - 9500 2 $0

Mangold Cir. - 4900 2 $0

Manson Ct. - 4900 2 $0

Martha La. - 3800 2 $0

Matador Dr. - 3700 2 $0

Mcshann Rd. - 5600 2 $0

Meaders La. - 5300 2 $0

Meletio La. - 5900 2 $0

Friday, March 31, 2006 Page 298 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Mid Pines Dr. - 3600 2 $0 Mid Surrey Ct. - 11500 2 $0

Midway Rd. - 9500 2 $0

Mimosa La. - 6500 2 $0

Mimosa La. - 6600 2 $0

Mimosa La. - 6700 2 $0

Mum Pl. - 10700 2 $0

Nashwood La. - 4900 2 $0

Netherland Dr. - 10400 2 $0

Noel Rd. - 12800 2 $0

Northaven Rd. - 4100 2 $0

Northbrook Dr. - 5400 2 $0

Northwest Hwy. (W) - 5100 2 $0

Northwest Hwy. (W) - 6700 2 $0

Northwest Hwy. (W) - 7600 2 $0

Northwest Hwy. (W) - 7700 2 $0

Norway Rd. - 6500 2 $0

Nuestra Dr. - 12500 2 $0

Pallos Verdas Dr. - 3600 2 $0

Park La. - 3700 2 $0

Park La. - 5000 2 $0

Park La. - 8000 2 $0

Friday, March 31, 2006 Page 299 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Pemberton Dr. - 6300 2 $0 Pemberton Dr. - 6400 2 $0

Phoenix Dr. - 5700 2 $0

Pickwick La. - 8500 2 $0

Pineland Dr. - 5700 2 $0

Pinocchio Dr. - 11100 2 $0

Ponder Dr. - 3000 2 $0

Quincy La. - 11900 2 $0

Quincy La. - 12200 2 $0

Ridgebriar Dr. - 3500 2 $0

Ridgecove Dr. - 12200 2 $0

Rochelle Dr. - 4000 2 $0

Rockdale Dr. - 3700 2 $0

Rosser Rd. - 10200 2 $0

Rosser Rd. - 10300 2 $0

Royal Haven La. - 10900 2 $0

Royal La. - 3300 2 $0

Royal La. - 4300 2 $0

Royal La. - 4800 2 $0

Royal La. - 4900 2 $0

Royal Springs Dr. - 10600 2 $0

Russwood Cir. - 11200 2 $0

Friday, March 31, 2006 Page 300 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Shans St. - 11300 2 $0 Sherbrook La. - 10200 2 $0

Sherbrook La. - 10300 2 $0

Sherry La. - 6000 2 $0

Sherry La. - 6100 2 $0

Silverton Dr. - 2900 2 $0

Silverton Dr. - 3000 2 $0

Snow White Dr. - 11500 2 $0

Sombrero Dr. - 3100 2 $0

Somerton Dr. - 10500 2 $0

Spurling Dr. - 12800 2 $0

Spurling Dr. - 12900 2 $0

Sundial Dr. - 3100 2 $0

Thackery St. - 10600 2 $0

Thackery St. - 10700 2 $0

Thackery St. - 8700 2 $0

Timber Trail Dr. - 10200 2 $0

Tulane St. - 9700 2 $0

Vinecrest Dr. - 3500 2 $0

Waldorf Cir. - 3800 2 $0

Waller Dr. - 10100 2 $0

Walnut Hill La. - 4900 2 $0

Friday, March 31, 2006 Page 301 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Walnut Hill La. - 5100 2 $0 Watson Cir. - 5700 2 $0

Webb Chapel Rd. - 10300 2 $0

Webb Chapel Rd. - 10900 2 $0

Webb Chapel Rd. - 11000 2 $0

Webb Chapel Rd. - 11100 2 $0

Webb Chapel Rd. - 11400 2 $0

Webb Chapel Rd. - 11500 2 $0

Webb Chapel Rd. - 11600 2 $0

Webb Chapel Rd. - 11700 2 $0

Weeburn Dr. - 3600 2 $0

Weldon Howell Pkwy. - 6000 2 $0

Westchester Dr. - 8100 2 $0

Westchester Dr. - 8200 2 $0

Whirlaway Rd. - 3400 2 $0

Whitehall Dr. - 3100 2 $0

Whitehall Dr. - 3400 2 $0

Whitehall Dr. - 3500 2 $0

Whitehall Dr. - 3800 2 $0

Wilada Dr. - 4100 2 $0

Wildflower Dr. - 3100 2 $0

Williamstown Rd. - 5700 2 $0

Friday, March 31, 2006 Page 302 of 349 Project Name Description Tier Score Estimate Council District 13 Street Resurfacing

Williamstown Rd. - 5800 2 $0 Williamstown Rd. - 5900 2 $0

Woodfin Dr. - 4300 2 $0

Yolanda Cir. - 5600 2 $0

Summary for 'Category' = Street Resurfacing (263 detail records) Sum $6,579,850 Streetscape / Urban Design

Zang Blvd Urban Design, from Davis to Trinity River Levee Enhancements on Zang, from levee to Davis, to encourage 2 $7,864,139 pedestrian use and improve traffic environment as recommended in the Trinity River Comprehensive Land Use Plan Summary for 'Category' = Streetscape / Urban Design (1 detail record) Sum $7,864,139 Thoroughfares

Inwood - Lemmon to University Add 14 left turn pockets in the existing 15' median 1 47 $1,692,065

Preston - NW Hwy to Elderwood Widen lanes from 10 to 11 feet and full median 1 28 $5,581,511

Inwood - Palomar to Yolanda Widen median to 15 feet and realign s-curve 1 24 $1,014,819

Summary for 'Category' = Thoroughfares (3 detail records) Sum $8,288,396 Traffic Intersection Capacity & Safety Improvement

Forest @ Inwood Widen Inwood Rd to construct northbound/southbound dual left- 1 70 $855,121 turn lanes and right turn lanes. Forest @ Marsh Widen both Forest Ln and Marsh Ln approaches to provide 1 70 $1,601,757 dual left-turn lanes and right turn lanes on all approaches. Greenville @ Meadow - Walnut Hill Construct 8 lane configuration on Greenville between Walnut 1 66 $2,731,282 Hill and Meadow with "back to back" left turn pockets.

Friday, March 31, 2006 Page 303 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Intersection Capacity & Safety Improvement

Forest @ Midway Widen Forest Ln to construct eastbound/westbound dual left 1 60 $731,320 turn lanes. Forest at Preston Rd Widen Preston Rd to provide a northbound right turn lane and 1 50 $256,536 widen Forest Ln to provide an eastbound right turn lane. Douglas at Sherry Widen Douglas at Sherry to provide a southbound right-turn 1 35 $182,511 lane. Lane Park @ Park Lane Widen roadway to construct a westbound left-turn pocket. 1 30 $227,181

Dallas N Tollway - Inwood at Harvest Hill Widen Harvest Hill to provide a 3rd under the Dallas North 1 25 $513,073 Tollway overpass. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (8 detail records) Sum $7,098,781 Traffic Safety Improvements-Guardrail Upgrades

Abrams 6900 BLK Guardrail Upgrade 1 80 $30,216

Royal 8000 BLK Guardrail Upgrade 1 80 $22,112

Forest 5100 BLK Guardrail Upgrade 1 73 $31,206

Greenville 7300 BLK Guardrail Upgrade 1 73 $41,320

Skillman 6200 BLK Guardrail Upgrade 1 73 $14,039

Inwood 9100 BLK Guardrail Upgrade 1 67 $4,819

Inwood 9700 BLK Guardrail Upgrade 1 67 $20,542

Walnut Hill 3400 BLK Guardrail Upgrade 1 67 $20,996

Webb Chapel 10300 BLK Guardrail Upgrade 1 67 $43,662

Webb Chapel 10200 BLK Guardrail Upgrade 1 53 $13,465

Park 7300 BLK Guardrail Upgrade 1 47 $13,912

Walnut Hill 3300 BLK Guardrail Upgrade 1 47 $6,126

Friday, March 31, 2006 Page 304 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Safety Improvements-Guardrail Upgrades

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (12 detail records) Sum $262,416 Traffic Signal Upgrades - Citywide

Killion/Ridge @ Midway Rd Traffic Signal Upgrade 1 73 $118,313

Merrell @ Midway Rd Traffic Signal Upgrade 1 73 $118,313

Preston @ Preston Royal S C Traffic Signal Upgrade 1 73 $60,305

Cox @ Forest Ln Traffic Signal Upgrade 1 67 $108,422

Cromwell @ Forest Ln Traffic Signal Upgrade 1 67 $120,610

Dallas N Tollway @ Forest Ln (Quincy) Traffic Signal Upgrade 1 67 $128,842

Forest Ln @ Marsh Traffic Signal Upgrade 1 67 $109,762

Forest Ln @ Welch Traffic Signal Upgrade 1 67 $107,847

Inwood @ Northaven Traffic Signal Upgrade 1 67 $109,379

Marsh @ Northaven Traffic Signal Upgrade 1 67 $118,313

Boedeker @ Park Ln Traffic Signal Upgrade 1 53 $105,933

Boedeker @ Walnut Hill Traffic Signal Upgrade 1 53 $46,610

Dallas N Tollway @ Harvest Hill (Inwood) Traffic Signal Upgrade 1 53 $175,172

Edgemere @ Royal Ln Traffic Signal Upgrade 1 53 $35,001

Edgemere @ Tibbs (Walnut Hill) Traffic Signal Upgrade 1 53 $120,610

Forest Ln @ Rosser Traffic Signal Upgrade 1 53 $109,379

Harvest Hill @ Midway Rd Traffic Signal Upgrade 1 53 $81,938

Harvest Hill @ Preston Rd (Linden) Traffic Signal Upgrade 1 53 $66,865

Hillcrest @ Meadow Traffic Signal Upgrade 1 53 $46,374

Friday, March 31, 2006 Page 305 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic Signal Upgrades - Citywide

Inwood @ Willow Traffic Signal Upgrade 1 53 $107,464 Lenel @ Walnut Hill Traffic Signal Upgrade 1 53 $118,313

Marsh @ Merrell Traffic Signal Upgrade 1 53 $118,313

Northaven @ Preston Traffic Signal Upgrade 1 53 $57,973

Northaven @ Webb Chapel Traffic Signal Upgrade 1 53 $118,313

Caruth Plaza @ Park Ln Traffic Signal Upgrade 1 47 $127,311

Forest Ln @ Nuestra Traffic Signal Upgrade 1 40 $108,422

Glen Lakes @ Walnut Hill Traffic Signal Upgrade 1 40 $107,847

Greenville @ Meadow Traffic Signal Upgrade 1 40 $107,847

Greenville @ Pineland Traffic Signal Upgrades-City Traffic Signal Upgrade 1 40 $124,695

Midway Rd @ Northaven Traffic Signal Upgrade 1 40 $116,399

Rambler @ Walnut Hill Traffic Signal Upgrade 1 40 $118,313

Churchill Way @ Preston Traffic Signal Upgrade 1 27 $57,472

Douglas @ Luther Traffic Signal Upgrade 1 27 $107,464

Fair Oaks @ Pineland Traffic Signal Upgrade 1 27 $107,464

Harvest Hill - Noel Traffic Signal Upgrades Citywide 1 27 $54,498

Harvest Hill @ Montfort Traffic Signal Upgrade 1 27 $52,966

Northpark @ Park Ln Traffic Signal Upgrade 1 27 $116,399

Preston @ Willow Traffic Signal Upgrades Citywide 1 27 $58,199

Royal @ Welch Traffic Signal Upgrade 1 27 $118,696

Merrell @ Webb Chapel Traffic Signal Upgrades Citywide 1 13 $107,464

Summary for 'Category' = Traffic Signal Upgrades - Citywide (40 detail records) Sum $3,999,825

Friday, March 31, 2006 Page 306 of 349 Project Name Description Tier Score Estimate Council District 13 Traffic System Management - Flood Detour Signs

Inwood, 9800 @ Park Dynamic Signs - Flood Detours 1 80 $42,118 Summary for 'Category' = Traffic System Management - Flood Detour Signs (1 detail record) Sum $42,118 Summary for 'Program' = STREET AND TRANSPORTATION (592 detail records) Sum $118,734,222 Summary for 'CD' = 13 (592 detail records) Sum $118,734,222

Friday, March 31, 2006 Page 307 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Petitions

Goodwin Av & Vanderbilt Av - Laneri Av to Glencoe St Engineering, Paving & Drainage 5300 blk 1 98 $154,920 Summary for 'Category' = Alley Petitions (1 detail record) Sum $154,920 Alley Reconstruction

Goliad & Palo Pinto - Delmar to Matilda Full Reconstruction 1 80 $145,498

Herschel & Prescott (Douglas to Throckmorton) Alley full reconstruction 1 79 $160,814

Holland & Bowser - Throckmortan to Reagan Full Reconstruction 1 78 $105,937

Holland (3918) & Gilbert - Reagan to Throckmorton Full Reconstruction 1 77 $98,786

Gaston (5740) - Skillman to Lowell St Full Reconstruction 1 76 $72,366

Longview St (5502 - 5554) McCommas - McMillan to Full Reconstruction Longview St. (5502 - 5554) 1 76 $185,778 Worcola Morningside(5814) & Mercedes-Matilda to Delmar Full Reconstruction 1 74 $156,395

Rawlins & Lemmon - Herschel To Wycliff Full Reconstruction 1 69.6 $126,217

Junius(4902) & Worth - Fitzugh to Collett Full Reconstruction 1 67 $170,705

Rawlins(4224) & Lemmon - Douglas to Wycliff Full Reconstruction 1 67 $138,071

US Hwy 75 & Mckinney - Lee to Oliver Full Reconstruction 1 66 $155,070

US Hwy 75 & Mckinney - Oliver to Armstrong Full Reconstruction 1 66 $155,070

Llano and Vickery - Alderson to Abrams Full Reconstruction 1 65 $161,745

Live Oak & Bryan Parkway - Skillman to La Vista Full Reconstruction 1 63 $161,823

Town Hill Ln & Crestmont - Ridgelawn To Abrams Rd Full Reconstruction 1 63 $310,904

Dyer & Yale - Central Expy To Prenticest Full Reconstruction 1 60.6 $163,097

Lakeshore Drive (6107-6165) Palo Pinto - Skillman to Full reconstr Lakeshore Dr. (6107 - 6165) 1 60 $185,064 Cecille Richmond and Prospect - Greenville to Matilda Full Reconstruction 1 55 $152,989

Friday, March 31, 2006 Page 308 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Live Oak & Bryan Parkway - Beacon to Glendale St. Full Reconstruction 1 54 $180,173 Ross Avenue 2501-2527 Full recon 1 52 $89,341

Palo Pinto(6339) & Velasco - Alderson to Abrams Full Reconstruction 1 50 $238,486

Howell St 3401 - 3445 Full reconst 1 46 $81,683

Tremont St. & Victor St. - Collett Ave. To Munger Full Reconstruction 1 46 $174,565

La Foy Boulevard (5501 - 5643) Lemmon - Inwood to Full reconst La Foy Blvd. (5501 - 5643) 1 43 $234,839 Versailles Mockingbird Lane & Saint Moritz - Skillman to Norris Full recon Mockingbird Ln. (6101 - 6155) 1 43 $215,695

Monticello Avenue & Mercedes - Clements to Norris Full recon Monticello Ave (6139 - 6179) 1 43 $139,117

Saratoga Circle (6105-6361) Skillman to Dalny Full recon Saratoga Cir. (6105 - 6361) 1 43 $763,227

Versailles Avenue (3517-3531) Inwood - Lemmon to Full recon Versailles Ave. (3517 - 3531) 1 43 $234,839 Lemmonwood Greenville Av (4802 - 5050) Northway - University to Milton Full reconst Greenville Ave. (4802 - 5050) 1 40 $264,194

Junius Street (5002-5114) Worth - Collett to Munger Full reconstruction Junius St. (5002 - 5114) 1 40 $158,261

Kenwood & Penrose - Skillman St. To Norris Full Reconstruction 1 40 $249,998

Lemmon & Bowser - Douglass To Knight St. Full Reconstruction 1 40 $108,052

St. Albans Drive (6206-6250) Woodcrest - Norris to Full recon St. Albans Dr. (6206 - 6250) 1 40 $179,958 Alderson Goliad Av (6001 - 6047) Palo Pinto - Concho to Skillman Full reconst Goliad Ave. (6001 - 6047) 1 36 $145,753

Monticello & Merrimac - Homer To Laneri Full Reconstruction 1 35.3 $186,032

Amherst Av - 5002 - 5126 Full Reconstruction 2 $184,503

Anita St - 5502 - 5534 Full Reconstruction 2 $120,284

Anita St - 5603 - 5649 Full Reconstruction 2 $158,510

Anita St - 5802 - 5820 Full Reconstruction 2 $79,000

Friday, March 31, 2006 Page 309 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Anita St - 5822 - 5844 Full Reconstruction 2 $83,332 Anita St - 5902 - 5930 Full Reconstruction 2 $109,581

Belmont Av & Goliad Ave - Matilda to Delmar Full Reconstruction 2 $150,032

Belmont Av (6002 - 6048) Richmond - Concho to Skillman Full Reconstruction Belmont Av (6002 - 6048) 1 $161,823

Boaz St - 5400 - 5570 Full Reconstruction 2 $193,933

Bowser Av - 3903 - 3929 Full Reconstruction 2 $107,798

Bowser Av - 4002 - 4040 Full Reconstruction 2 $134,300

Bowser Av - 4003 - 4041 Full Reconstruction 2 $133,791

Bowser Av - 4102 - 4130 Full Reconstruction 2 $61,671

Bryn Mawr Dr - 5505 - 5647 Full Reconstruction 2 $287,969

Buena Vista St - 3902 - 3950 Full Reconstruction 2 $175,584

Caillet St - 7202 - 7418 Full Reconstruction 2 $201,833

Cambrick St - 3223 ------Full Reconstruction - Cambrick St - 3223 2 $162,090

Camden Av - 4402 - 4424 Full Reconstruction 2 $86,136

Casa Loma Av (7302 - 7338) Coronado - Tucker to Grand Full Reconstruction Casa Loma Ave (7302 - 7338) 1 $146,787

Cedar Springs Rd - 4306 - 4340 Full Reconstruction 2 $132,517

Central Serv - 4229 - 4245 Full Reconstruction 2 $217,378

Central Serv - 4703 - 4855 Full Reconstruction 2 $159,019

Clermont Av - 403 - 523 Full Reconstruction 2 $186,032

Cole Av - 4100 - 4152 Full Reconstruction 2 $200,049

Concho St - 4303 - 4345 Full Reconstruction 2 $160,548

Cordova St - 403 - 527 Full Reconstruction 2 $184,503

Friday, March 31, 2006 Page 310 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Crestmont Dr - 6120 - 6148 Full Reconstruction 2 $122,832 Dalny St - 4410 - 4436 Full Reconstruction 2 $131,242

Delmar St - 4203 - 4245 Full Reconstruction 2 $153,414

Devonshire Dr - 8100 ------Full Reconstruction 2 $161,823

Dyer St - 5601 - 5643 Full Reconstruction 2 $99,235

Edmondson Av - 5305 - 5353 Full Reconstruction 2 $186,032

Ellsworth Av - 5602 - 5646 Full Reconstruction 2 $159,019

Ellsworth Av - 5702 - 5742 Full Reconstruction 2 $161,059

Ellsworth Av - 5824 - 5844 Full Reconstruction 2 $80,274

Ellsworth Av - 6002 - 6056 Full Reconstruction 2 $196,226

Ellsworth Av - 6202 - 6270 Full Reconstruction 2 $241,078

Elsby Av - 4802 - 4930 Full Reconstruction 2 $201,324

Emerson Av - 5305 - 5351 Full Reconstruction 2 $166,920

Fisher Rd - 6460 - 6498 Full Reconstruction 2 $197,501

Gilbert Av - 3801 - 3829 Full Reconstruction 2 $109,581

Gilbert Av - 3903 - 3929 Full Reconstruction 2 $107,798

Goodwin and Vanderbilt - Greenville to Matilda Full Reconstruction 2 $462,130

Goodwin Av - 5201 - 5255 Full Reconstruction 2 $182,720

Hall St - 3904 - 3926 Full Reconstruction 2 $109,581

Hanover Av - 4700 - 4728 Full Reconstruction 2 $142,965

Hanover Av - 4800 - 4930 Full Reconstruction 2 $200,304

Hawthorne Av - 4206 - 4246 Full Reconstruction 2 $159,784

Friday, March 31, 2006 Page 311 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Herschel Av - 4005 - 4051 Full Reconstruction 2 $160,548 Insurance La - 4605 - 4649 Full Reconstruction 2 $179,152

Inwood Rd - 4007 - 4107 Full Reconstruction 2 $196,481

Kenwood Av - 6204 - 6270 Full Reconstruction 2 $224,259

Lange Cir (6355 - 6361) Saratoga - Norris to Abrams Full Reconstruction Lange Cir. (6355 - 6361) 1 $845,302

Lark La - 5042 ------Full Reconstruction 2 $132,517

Lemmon & Rawlins - Reagan to Oak Lawn(3403) Full Reconstruction 2 $106,942

Lindsley Av - 6914 - 6946 Full Reconstruction 2 $119,774

Longview St - 5200 - 5350 Full Reconstruction 2 $287,714

Longview St - 5505 - 5555 Full Reconstruction 2 $185,523

Lovers La (W) - 5208 - 5212 Full Reconstruction 2 $155,707

Malcolm Dr - 6207 - 6245 Full Reconstruction 2 $155,452

Malcolm Dr - 6252 - 6296 Full Reconstruction 2 $157,490

Malcolm Dr - 6253 - 6299 Full Reconstruction 2 $186,543

Marquita Av - 5800 - 5848 Full Reconstruction 2 $164,881

Marquita Av - 5900 - 5946 Full Reconstruction 2 $163,606

Marquita Av - 6003 - 6043 Full Reconstruction 2 $155,197

Marquita Av - 6134 - 6178 Full Reconstruction 2 $158,001

Martel Av - 6252 - 6314 Full Reconstruction 2 $231,648

McCommas Blvd - 6202 - 6242 Full Reconstruction 2 $156,217

McCommas Blvd - 6302 - 6366 Full Reconstruction 2 $234,197

Merrimac Av - 5302 - 5346 Full Reconstruction 2 $190,365

Friday, March 31, 2006 Page 312 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Milton(5814) & Birchbrook - Matilda to Amherst Full Reconstruction 2 $249,628 Mockingbird La - 5502 - 5646 Full Reconstruction 2 $284,911

Monticello Av - 5121 - 5150 Full Reconstruction 2 $99,897

Monticello Av - 5200 - 5252 Full Reconstruction 2 $185,523

Morton St - 7202 - 7418 Full Reconstruction 2 $200,813

Newton Av - 4201 - 4255 Full Reconstruction 2 $156,981

Oliver St - 3315 ------Full Reconstruction 2 $152,394

Oram St - 5809 - 5853 Full Reconstruction 2 $160,294

Purdue Av - 4802 - 4930 Full Reconstruction 2 $202,088

Purdue Av - 5504 - 5650 Full Reconstruction 2 $285,929

Ravendale La - 6112 - 6170 Full Reconstruction 2 $241,588

Ravendale La - 6203 - 6269 Full Reconstruction 2 $235,726

Reiger & Victor - Beacon to Fulton Full Reconstruction 2 $124,550

Revere Pl(6021) & Martel - Skillman to Concho Full Reconstruction 2 $179,882

Ridgedale Av - 5502 - 5554 Full Reconstruction 2 $185,014

Saratoga Cir - 6206 - 6276 Full Reconstruction 2 $279,813

Skillman St - 4330 - 4344 Full Reconstruction 2 $243,882

Thrush St - 4902 - 5032 Full Reconstruction 2 $207,184

University Blvd - 4902 - 5024 Full Reconstruction 2 $189,090

Vanderbilt Av - 6134 - 6180 Full Reconstruction 2 $157,490

Victor & Reiger - Fitzhugh to Munger Full Reconstruction 2 $334,391

Winton Street (6019-6031) Mockingbird - Concho to Full recon Winton Street (6019 - 6031) 2 $44,671 Skillman

Friday, March 31, 2006 Page 313 of 349 Project Name Description Tier Score Estimate Council District 14 Alley Reconstruction

Woodcrest La - 6205 - 6259 Full Reconstruction 2 $203,362 Summary for 'Category' = Alley Reconstruction (128 detail records) Sum $23,315,008 Barrier Free Ramps

Field @ Elm Rebuild south 2 ramps 1 66 $3,829

Field @ Patterson Install new ramp at NW corner 1 66 $1,914

5619 Belmont Ave Construct 4 BFRs on east side of Belmont @ 5615, 5619 & 1 42 $7,658 5621 (slope down driveways) Lemmon @ Wycliff 1 BFR needed at intersection 1 41 $1,914

3525 Turtle Creek Construct 2 BFRs on Holland @ Turtle Creek, and 2 Curb Cuts 1 32 $7,658 on driveway at 3525 Turtle Creek Mc Commas @ Skillman 4 corners of intersection 1 32 $7,658

4001 Live Oak Construct sidewalk extensions on sides of driveways at 3909, 1 31 $11,487 4001 and 4021 Live Oak 2901 Matilda Install 4 BFRs on Matilda @ Goodwin 1 27 $7,658

Lemmon @ Douglas 3 BFRs needed at intersection 1 27 $5,743

Anita (5500) @ McMillan Need 3 BFRs on Intersection corners 1 23 $5,743

Skillman @ Ellsworth Construct 4 BFRs on corners of intersection 1 22 $7,658

Skillman @ Kenwood Construct BFRs on 4 corners of intersection 1 22 $7,658

Lemmon @ Oak Grove 2 BFRs needed at intersection 1 21 $3,829

N Fitzhugh Ave at Sycamore St 2 BFRs at Intersection 1 17 $1,378

Lindsley @ Tenison Memorial Need BFR on SW corner of intersection. modify existing 1 13 $12,763 Sidewalk to maintain slope. Remove and replace existing retaining wall Ridgeway St (702) @ Junius St Construct 2 BFRs on corners of intersection. Citizen on 1 13 $3,829 wheelchair

Friday, March 31, 2006 Page 314 of 349 Project Name Description Tier Score Estimate Council District 14 Barrier Free Ramps

Southwestern Blvd. @ Village Glen One BFR missing on intersection 1 10 $1,914 Crestmont Dr @ Ledgestone Dr Construct 4 ramps 1 4 $7,658

Clermont @ Santa Fe Install 2 BFRs on intersection (400 block only) 1 3 $3,829

Summary for 'Category' = Barrier Free Ramps (19 detail records) Sum $111,778 I.T.S. - Speed & Travel Time System

Northwest Highway from IH 635 to Walton Walker Speed and travel time system 2 20 $43,075

Summary for 'Category' = I.T.S. - Speed & Travel Time System (1 detail record) Sum $43,075 Intergovernmental Partnership Projects

Live Oak St. - Liberty to Peak Partnership project with Dallas County to reconstruct existing 1 $2,197,789 five lane undivided roadway. Total estimated cost of $4.6 million. Estimated to be let by Dallas County late 2007. Supplements 2003 Bond Program funds. McKinney Avenue Trolley Downtown Extension Partnership project with TxDOT and DART to extend trolley 1 $3,828,900 down Olive from McKinney to Bryan. Total estimated cost of $6.0 million. Estimated to be let by mid 2007. Supplements 1995 Bond Program funds. Summary for 'Category' = Intergovernmental Partnership Projects (2 detail records) Sum $6,026,689 Street Lighting-CBD Roadway Lighting

Pacific @ Harwood to Central Roadway Lighting Installation 1 40 $117,346

St. Paul @ Ross to Federal Roadway Lighting Installation 1 40 $42,672

Harwood @ Commerce to Canton Roadway Lighting Installation 1 30 $55,473

Woodall Rodgers EBSR - Harwood to Pearl Roadway Lighting Installation 1 30 $106,678

Friday, March 31, 2006 Page 315 of 349 Project Name Description Tier Score Estimate Council District 14 Street Lighting-CBD Roadway Lighting

Federal @ Field to Akard Roadway Lighting Installation 1 20 $42,672 Patterson @ Griffin to Ervay Roadway Lighting Installation 1 20 $74,675

San Jacinto @ Griffin to Akard Roadway Lighting Installation 1 20 $53,339

Jackson @ Browder to Central Roadway Lighting Installation 1 10 $181,353

Munger @ Field to Akard Roadway Lighting Installation 1 10 $64,006

Wood @ Ervay to Pearl Roadway Lighting Installation 1 10 $74,675

Wood @ Griffin to Akard Roadway Lighting Installation 1 10 $21,763

Summary for 'Category' = Street Lighting-CBD Roadway Lighting (11 detail records) Sum $834,651 Street Petitions

Laneri Ave - Merrimac Ave to Mercedes Ave Engineering, Paving and Drainage 3300 blk 1 95 $110,825

Summary for 'Category' = Street Petitions (1 detail record) Sum $110,825 Street Reconstruction Local Streets

Milton St - Greenville Av to Dead-End 5600 Blk 1 61.8 $370,127

Cole Avenue - Cedar Springs Rd to Vine St 2600 - 2700 blks 1 60.75 $608,821

Caruth Haven Ln - Greenville Av to Southwestern Blvd 5700 Blk 1 59.24 $998,966

Hilton Dr - Flora St to N Hall St 1800 Blk 1 55.43 $204,208

Hudnall St - Denton Dr to Bradford Dr 2800 blk 1 55.14 $151,165

Cragmont Ave - Abbott Ave East to RR 3500 blk 1 54.66 $223,353

Summary for 'Category' = Street Reconstruction Local Streets (6 detail records) Sum $2,556,639

Friday, March 31, 2006 Page 316 of 349 Project Name Description Tier Score Estimate Council District 14 Street Reconstruction Thoroughfares

Lemmon Ave - Caddo St to N Haskell Av 2300 Blk 1 69.55 $1,084,855 Gordon St - Swiss Av to Live Oak Sr 1100 - 1200 Blks 1 65.75 $446,705

Texas St- Live Oak St to Swiss Av 600 Blk 1 65.38 $622,834

Seelcco St - Denton Dr to 675' NE of Denton Dr 2600 - 2700 Blks 1 64.59 $650,913

Hubert St - La Vista Ct to La Vista Dr 1900 Blk 1 64.42 $202,932

Liberty St - Bryan St to Live Oak St 700 Blk 1 64.15 $308,865

Dyer St - Central Expwy to Greenville Av 5500 - 5600 Blks 1 63.29 $974,119

Mcmillan Av - Martel Av to Mccommas Blvd 3600 Blk 1 58.71 $560,296

Bookhout Street - Wolf to 400' North 3000 Blk 1 58.66 $405,885

Summary for 'Category' = Street Reconstruction Thoroughfares (9 detail records) Sum $5,257,404 Street Resurfacing

Good Latimer Expy. (S) - Canton St. to IH 30 Bridge 400 - 800 1 87.695 $375,743

Hawkins St. (N) - Pacific Ave. to Live Oak St. 300 - 700 1 81.11 $83,598

Flora St. - Woodall Rodgers Frwy. To Leonard St. 2400 - 2700 1 80.21 $46,585

Barry Ave. (N) - Columbia Ave. to Elm Alley 100 Block 1 79.73 $11,870

Swiss Ave. - Apple St. to Carroll Ave. 4000 - 4400 1 75.42 $25,092

Abrams Rd. - Ledgestone Dr. to Fisher Rd. 5500 - 5600 1 75.11 $89,852

Insurance Ln. - Hester Ave. to Knox St. 4600 Block 1 74.845 $38,417

Webb St. - Central Expy. To Tracy St. 3000 - 3100 1 74.395 $49,903

San Jancinto St. - Olive St. to N. Pearl St. 2100 block 1 73.18 $16,847

Greenville Ave. - Winton St. to Mockingbird Ln. 4100 Block 1 71.54 $32,035

Friday, March 31, 2006 Page 317 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Bryan St. - Central Expwy to Spenwick Ter. 2600-3200 1 71.17 $147,157 Alderson St. - Anita St. to Mockingbird Ln. 3900 - 4000 1 71 $46,074

Florence St. - Cantegral St. to Liberty St. 2700 - 2800 1 70.72 $53,222

Delmar Ave. - Prospect Ave. to Llano Ave. 2100 - 2600 1 70.42 $209,951

Chadbourne Rd. - Stanford Ave. to Caruth Blvd. 8100 - 8600 1 69.62 $207,909

Monticello - Greenville Ave. to Alderson St. 5700 - 6200 1 69.605 $159,155

Prather St. - Commerce St. to Jackson St. 200 block 1 69.475 $13,146

Burbank St. - Denton Dr. to Dead End 2700 Block 1 68.79 $78,110

Columbia Ave. - Beacon Ave. to Fulton St. 5600 Block 1 68.735 $41,990

Martel Ave. - Central Expy to Alderson St. 5300 - 6300 1 68.64 $584,928

Skillman St. - Mockingbird Ln. to Woodcrest Ln. 4200 - 4300 1 68.415 $110,272

Ledgestone Dr. - Town Hill Ln. to Abrams Rd. 5400 - 5600 1 68.13 $117,292

McCommas Blvd - Homer St. to Clements St. 5200 - 6100 1 67.635 $405,736

Routh St. - Ross Ave. to Central Expy. Svc. Rd. 1000 - 1200 1 67.615 $82,704

Morningside Ave. - Greenville Ave. to Skillman St. 5700 - 6000 1 67.38 $139,117

Hall St. (N) - Turtle Creek Blvd. to Oak Lawn Ave. 3400 - 3700 1 67.04 $148,944

Welborn St. - Lemmon Ave. to Holland Ave. 3500 - 3600 1 66.91 $82,960

Malcom Dr. - Clements St. to Alderson St. 6200 block 1 66.76 $66,112

Parkmont St. - Gaston Ave. to Bryan St. 900 - 1100 1 66.46 $68,027

Hester Ave. - McKinney Ave. to Cole Ave. 3100 Block 1 66.28 $29,227

Glencoe St. - Willis Ave. to Longview St. 2600 - 3500 1 66.07 $290,103

Cole Ave. - Fitzhugh Ave. to 258' N Monticello Ave. 4200 - 4800 1 66.005 $495,715

Friday, March 31, 2006 Page 318 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Purdue Ave. - Chadbourne Rd. to Devonshire Dr. 5400 - 5600 1 66.005 $121,249 Bremen St. - McCommas Blvd. to Anita St. 3500 - 3900 1 65.405 $122,014

Elsby Ave. - Lover Ln. to Catawha Rd. 4500 Block 1 64.34 $87,171

Harwood St. (N) - McKinney Ave. to Harry Hines Blvd. 2100 - 2200 1 64.125 $39,310

Maple Ave. - McKinney Ave. to Cedar Springs Rd. 2400 - 2600 1 63.845 $121,121

Washington Ave. (N) - Ross Ave. to N. Lemmon Ave. 1700 - 2300 1 63.785 $149,965

Ross Ave. - Peak St. to Live Oak St. 4300 - 6000 1 63.685 $156,474

Alderson St. - La Vista Ave. to Richmond Ave. 1900 - 2100 1 63.63 $56,412

Hyer St. - Lomo Alto Dr. to Dead End 1 63.495 $72,877

Greenville Ave. - Bryan St. to Palo Pinto Ave. 1300 - 2500 1 63.39 $68,154

Haskell Ave. (N) - Ross Ave. to Cabell Dr. 1700 - 2100 1 63.195 $142,307

Worcola St. - Goodwin Ave. to Ridgedale Dr. 2900 - 3000 1 63.01 $50,286

Reagan St. - Cedar Springs Rd. to Lemmon Ave. 3200 - 3400 1 62.68 $99,296

Merrimac Ave. - Homer St. to Laneri Ave. 5200 block 1 62.425 $48,117

Oak Grove Ave. - McKinney Ave. to Lemmon Ave. (E) 3100 - 3500 1 62.355 $152,518

Ellsworth Ave. - McMillan Ave. to Concho St. 5500 - 5900 1 61.84 $211,228

Delmar Ave. - Mockingbird Ln. to Dead End 4200-4400 1 61.72 $165,791

Noble Ave. - Lemmon Ave. to Hall St. 3300 - 3400 1 61.515 $50,541

Gilbert Ave. - Oak Lawn Ave. to Throckmorton St. 3800 - 3900 1 61.35 $54,243

Monticello Ave. - Concrete @ Central Expy. To Laneri Ave. 5100 - 5200 1 61.33 $70,579

Bowser Ave. - Wheeler St. to Dead End 5000 - 5100 1 61.025 $28,206

Concho St. - Anita St. to Woodcrest Ln. 4000 - 4300 1 60.01 $142,307

Friday, March 31, 2006 Page 319 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Matalee Ave. - McMillan Ave. to Greenville Ave. 5500 - 5600 1 59.84 $74,408 Mercedes Ave. - Homer St. to Glencoe St. 5200 - 5300 1 59.69 $64,964

Cole Ave. - Blackburn St. to Cambrick St. 3800 - 3900 1 58.825 $115,122

Concho St - Marquita Ave. to Revere Pl. 3100 - 3500 1 58.77 $156,474

Delmar Ave. - Marquita Ave. to Penrose 3100 - 3700 1 58.52 $202,932

Homer St. - Henderson Ave. to Monticello Ave. 2400 - 3100 1 58.455 $305,291

Reagan St. - Dickason Ave. to Maple Ave. 2500 - 3100 1 58.16 $16,924

Laclede St. - Concrete to Allen St. 2700 - 2800 1 58.075 $54,881

Skillman St. - Gaston Ave. to Swiss Ave. 900 - 1000 1 57.485 $33,311

Buena Vista St. - Cambrick St. to Oliver St. 4000 - 4300 1 57.445 $126,864

East Grand Ave. - LaVista Dr. to 200' S Gaston Ave. 7300 - 7500 1 57.17 $206,122

Ridgedale Ave. - McMillan Ave. to Worcola St. 5500 block 1 56.68 $61,901

Hall St. (N) - Ross Ave. to Munger Ave. 1700 - 1800 1 56.26 $46,840

Abbott Ave. - Fitzhugh Ave. to Armstrong Pkwy. 4200 - 4400 1 56.235 $179,703

Vickery Blvd. - Greenville Ave. to Skillman St. 5700 - 6000 1 56.05 $165,664

Revere Pl. - Delmar Ave. to Alderson St. 5900 - 6300 1 55.17 $181,745

Glendale St. - Gaston Ave. to Live Oak St. 800 - 1200 1 55.135 $236,754

La Vista Dr. - Abrams Rd. to Abrams Pkwy. 6400 block 1 54.92 $22,846

Wylie Dr. - Weiss St. to Reeves St. 3300 - 3400 1 54.92 $63,943

Thomas Ave. - Washington Ave. to Caddo St. 3800 block 1 54.5 $28,334

Anita St. - Concho St. to Skillman St. 6000 Block 1 54.46 $36,247

Empire Dr. - LaVista Dr. to Oram St. 1900 Block 1 54.125 $21,187

Friday, March 31, 2006 Page 320 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Thomas Ave. - Worthington St. to Allen St. 2800 block 1 53.89 $45,947 Collett Ave. (N) - Columbia Ave. to Collett Pl. 100 Block 1 53.54 $22,463

St Joseph St. - Live Oak St. to Bryan St. 1300 block 1 53.36 $93,298

Cochran St. - Washington Ave. to Caddo St. 3800 Block 1 52.925 $32,035

Norris St. - Marquita Ave. to Monticello Ave. 3000 block 1 52.76 $25,271

Milam St. - Lee St. to Garrett Ave. 5000 block 1 50.47 $49,010

Penrose Ave. - Delmar Ave. to Norris St. 5900 - 6200 1 49.95 $170,258

Concho St. - Oram St. to Vickery Blvd. 2000 - 2700 1 49.51 $259,344

McMillian Ave. - Goodwin Ave. to Longview St. 2900 - 3500 1 48.54 $341,027

Ashland St. - Harry Hines Blvd. to Cedar Springs Rd. 1800 Block 1 48.095 $7,658

St Joseph St. - Gaston Ave. to Swiss Ave. 900 - 1000 1 47.935 $49,265

Palm Ln. - Matilda St. to Dead End 5800 block 1 47.23 $41,990

Gurley Ave. - Valencia St. to Cameron Ave. 6400 Block 1 47.145 $38,417

Ravendale Ln. - Matilda St. to Delmar Ave. 5800 block 1 46.15 $64,070

Roseland Ave. - Hall St. to Washington Ave. 3300 - 3700 1 46.15 $102,742

Woodcrest Ln. - Ravendale Ln. to 135' w of Delmar Ave. 4300 block 1 44.565 $70,324

Lee Pkwy. - Hall St. to Rawlins St. 3300 block 1 44.445 $29,993

Willis Ave. - Central Expy. To Homer St. 5000 - 5100 1 44.24 $51,180

Dorothy Ave. - Lemmon Ave. to Bowser Ave. 3500 Block 1 44.175 $36,502

Fairmount St. - Thomas Ave. to State St. 2300 Block 1 43.355 $27,696

Llano Ave. - Matilda St. to Skillman St. 5800 - 6000 1 43.135 $250,921

Collett Ave. (N) - Reiger Ave. to Tremont St. 300 - 400 1 42.765 $69,814

Friday, March 31, 2006 Page 321 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Milton St. - Danbury Ln. to Matilda St. 5800 - 6000 1 42.69 $90,490 Glasgow Dr. (N) - Abrams Rd. to Worth St. 500 Block 1 42.63 $44,926

Holland Ave. - Turtle Creek Blvd. to Oak Lawn Ave. 3600 - 3700 1 42.62 $97,892

Thomas Ave. - Pearl St. to Maple-routh Conn. 2200 - 2300 1 42.61 $19,017

Wheeler St. - Lemmon Ave. to Dead End 3500 - 3700 1 42.39 $34,039

McMillian Ave. - Anita St. to Ellsworth Ave. 3900 block 1 42.325 $20,804

Belmont Ave. - McMillan Ave. to Greenville Ave. 5500 - 5600 1 42.17 $127,502

St Joseph St. - Swiss Ave. to Live Oak St. 1100 - 1200 1 39.645 $61,901

Anita St. - Alderson St. to Abrams Rd. 6300 Block 1 39.205 $29,738

Flora St. - Central Expy. To Hall St. 3000 - 3200 1 35.41 $63,304

Abrams Rd. - 1300 2 $0

Adolph St. - 3000 2 $0

Akard St. (N) - 100 2 $0

Akard St. (N) - 400 2 $0

Akard St. (N) - 600 2 $0

Akard St. (S) - 100 2 $0

Alamo St. - 2100 2 $0

Alamo St. - 2200 2 $0

Allen St. - 2200 2 $0

Amesbury Dr. - 5600 2 $0

Amherst Av. (W) - 4800 2 $0

Amherst Av. (W) - 4900 2 $0

Friday, March 31, 2006 Page 322 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Amherst Av. (W) - 5500 2 $0 Amherst Av. (W) - 5600 2 $0

Amherst Cir. - 5400 2 $0

Ansley Av. - 6800 2 $0

Apple St. - 1100 2 $0

Apple St. - 1200 2 $0

Armstrong Av. - 3300 2 $0

Aubrey Av. - 6600 2 $0

Aubrey Av. - 6700 2 $0

Avondale Av. - 4200 2 $0

Belmont Av. - 5500 2 $0

Belmont Av. - 5600 2 $0

Blackburn St. - 3300 2 $0

Bluffview Blvd. - 3900 2 $0

Bluffview Blvd. - 4100 2 $0

Boll St. - 1700 2 $0

Boll St. - 2300 2 $0

Boll St. - 2700 2 $0

Bookhout St. - 2800 2 $0

Bookhout St. - 2900 2 $0

Bordeaux Av. - 6200 2 $0

Bordeaux Av. - 6400 2 $0

Friday, March 31, 2006 Page 323 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Bowen St. - 3000 2 $0 Bowser Av. - 3700 2 $0

Bradford Dr. - 5000 2 $0

Bradford Dr. - 5100 2 $0

Bristol Av. - 7800 2 $0

Brookfield Av. - 2700 2 $0

Brown St. - 3500 2 $0

Brown St. - 3600 2 $0

Bryan Pkwy. - 5600 2 $0

Bryan St. - 5400 2 $0

Bryan St. - 5500 2 $0

Bryn Mawr Dr. - 5400 2 $0

Bryn Mawr Dr. - 5500 2 $0

Bryn Mawr Dr. - 5600 2 $0

Caddo St. - 1400 2 $0

Cadiz St. - 2000 2 $0

Caillet St. - 7100 2 $0

Camden Av. - 4200 2 $0

Camden Av. - 4300 2 $0

Carlisle Pl. - 3200 2 $0

Carlisle St. - 3100 2 $0

Carlisle St. - 3200 2 $0

Friday, March 31, 2006 Page 324 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Caroline St. - 2400 2 $0 Caruth Blvd. - 5400 2 $0

Cedar Springs Rd. - 4600 2 $0

Cedar Springs Rd. - 4700 2 $0

Central Exwy. (S) - 100 2 $0

Central Exwy. (S) - 1100 2 $0

Cochran Heights Dr. - 9100 2 $0

Colby St. - 2400 2 $0

Cole Av. - 2800 2 $0

Cole Av. - 2900 2 $0

Cole Av. - 3000 2 $0

Cole Av. - 3100 2 $0

Collville Av. - 6600 2 $0

Columbia Av. - 5000 2 $0

Cordova St. - 400 2 $0

Covington La. - 6200 2 $0

Crestmont Dr. - 6100 2 $0

Crestmont Dr. - 6200 2 $0

Crestmont Dr. - 6300 2 $0

Eastern Av. - 7200 2 $0

Eastern Av. - 7500 2 $0

Eastern Av. - 7900 2 $0

Friday, March 31, 2006 Page 325 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Eastern Av. - 8000 2 $0 Eastern Av. - 8100 2 $0

Eastern Av. - 8200 2 $0

Eastern Av. - 8300 2 $0

Edgewater St. - 3500 2 $0

Ellsworth Av. - 5400 2 $0

Ellsworth Av. - 6200 2 $0

Elm St. - 2500 2 $0

Emerson Av. - 5300 2 $0

Federal St. - 1500 2 $0

Field St. (N) - 1700 2 $0

Field St. (N) - 1900 2 $0

Fitzhugh Av. (N) - 3300 2 $0

Fitzhugh Av. (N) - 3500 2 $0

Floyd St. - 3300 2 $0

Floyd St. - 3400 2 $0

Floyd St. - 3500 2 $0

Floyd St. - 3800 2 $0

Freeman St. - 1800 2 $0

Fulton St. (N) - 400 2 $0

Glencoe St. - 3700 2 $0

Glencrest La. - 8500 2 $0

Friday, March 31, 2006 Page 326 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Glencrest La. - 8600 2 $0 Glencrest La. - 8700 2 $0

Glenwick La. - 5400 2 $0

Glenwood Av. - 4200 2 $0

Good Latimer Exwy. (N) - 100 2 $0

Good Latimer Exwy. (N) - 200 2 $0

Good Latimer Exwy. (N) - 300 2 $0

Good Latimer Exwy. (N) - 400 2 $0

Good Latimer Exwy. (N) - 500 2 $0

Good Latimer Exwy. (S) - 100 2 $0

Goodwin Av. - 6000 2 $0

Greenbrier Dr. - 5700 2 $0

Greenville Av. - 3100 2 $0

Greenville Av. - 5000 2 $0

Greenville Av. - 5200 2 $0

Greenway Blvd. (E) - 7600 2 $0

Griffin St. (N) - 100 2 $0

Gurley Av. - 6400 2 $0

Hall St. (N) - 4100 2 $0

Harry Hines Blvd. - 2500 2 $0

Harvard Av. - 3100 2 $0

Harwood St. (N) - 1700 2 $0

Friday, March 31, 2006 Page 327 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Harwood St. (N) - 2100 2 $0 Harwood St. (N) - 2200 2 $0

Hibernia St. - 2600 2 $0

Hibernia St. - 2700 2 $0

Holland Av. - 5100 2 $0

Holland Av. - 5500 2 $0

Howell St. - 2400 2 $0

Howell St. - 3500 2 $0

Hudson St. - 5600 2 $0

Hudson St. - 5700 2 $0

Hudson St. - 5900 2 $0

Hudson St. - 6000 2 $0

Hugo St. - 2400 2 $0

Irving Av. - 4200 2 $0

Jack Evans St. - 1800 2 $0

Junius St. - 5400 2 $0

Junius St. - 5600 2 $0

Kelton Dr. - 4400 2 $0

Kings Rd. - 3400 2 $0

Knight St. - 3300 2 $0

Knight St. - 3400 2 $0

La Vista Ct. - 5800 2 $0

Friday, March 31, 2006 Page 328 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

La Vista Dr. - 5700 2 $0 La Vista Dr. - 5900 2 $0

Lahoma St. - 4900 2 $0

Lahoma St. - 5000 2 $0

Lakemont Dr. - 8800 2 $0

Lemmon Av. - 2400 2 $0

Lemmon Ave East - 2700 2 $0

Lemmon Ave East - 2800 2 $0

Lemmon Ave East - 2900 2 $0

Lemmon Ave East - 3000 2 $0

Lemmon Wood Plz. - 3500 2 $0

Leonard St. - 700 2 $0

Lewis St. - 5900 2 $0

Liberty St. - 800 2 $0

Lindsley Av. - 7100 2 $0

Live Oak St. - 2000 2 $0

Live Oak St. - 2600 2 $0

Live Oak St. - 2700 2 $0

Live Oak St. - 2800 2 $0

Live Oak St. - 2900 2 $0

Live Oak St. - 3000 2 $0

Live Oak St. - 3100 2 $0

Friday, March 31, 2006 Page 329 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Live Oak St. - 3300 2 $0 Live Oak St. - 3400 2 $0

Live Oak St. - 3500 2 $0

Live Oak St. - 3600 2 $0

Live Oak St. - 3700 2 $0

Live Oak St. - 3800 2 $0

Live Oak St. - 3900 2 $0

Live Oak St. - 4000 2 $0

Lockheed Av. - 6500 2 $0

Lontos Dr. - 6400 2 $0

Loving Av. - 2400 2 $0

Main St. - 1200 2 $0

Maple Routh Conn. - 2200 2 $0

Maple Routh Conn. - 2300 2 $0

March Av. - 4700 2 $0

Mary St. - 1600 2 $0

Matilda St. - 2100 2 $0

Matilda St. - 2500 2 $0

Matilda St. - 3400 2 $0

Matilda St. - 3700 2 $0

Matilda St. - 3800 2 $0

Matilda St. - 4300 2 $0

Friday, March 31, 2006 Page 330 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Matilda St. - 4700 2 $0 Matilda St. - 5200 2 $0

Mccommas Blvd. - 3000 2 $0

Mckinney Av. - 3100 2 $0

Mckinnon St. - 2600 2 $0

Mcmillan Av. - 2900 2 $0

Miller Av. - 5200 2 $0

Mockingbird La. (W) - 5300 2 $0

Monte Vista Dr. - 500 2 $0

Moody St. - 2000 2 $0

Morningside Av. - 6100 2 $0

Munger Av. - 1800 2 $0

Munger Av. - 3300 2 $0

Munger Av. - 3500 2 $0

Munger Av. - 4000 2 $0

Newmore Av. - 5200 2 $0

Newton Ct. - 4300 2 $0

Olive St. - 1800 2 $0

Olive St. - 2100 2 $0

Olive St. - 2200 2 $0

Oliver St. - 3000 2 $0

Oram St. - 5800 2 $0

Friday, March 31, 2006 Page 331 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Overbrook Dr. - 3500 2 $0 Pacific Av. - 2000 2 $0

Paulus Av. (N) - 500 2 $0

Pearl Exwy. (S) - 700 2 $0

Pecos St. - 1500 2 $0

Penrose Av. - 6000 2 $0

Pershing St. - 5000 2 $0

Ravendale La. - 6300 2 $0

Reeves St. - 9300 2 $0

Reiger Av. - 4900 2 $0

Rexford Dr. - 8700 2 $0

Richmond Av. - 6300 2 $0

Rock Creek Dr. - 3500 2 $0

Rock Creek Dr. - 4100 2 $0

Ross Av. - 1900 2 $0

Routh St. - 1700 2 $0

Routh St. - 2300 2 $0

Routh St. - 2400 2 $0

Routh St. - 2600 2 $0

Routh St. - 2900 2 $0

Routh St. - 3000 2 $0

Sale St. - 2900 2 $0

Friday, March 31, 2006 Page 332 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

San Jacinto Pl. - 1900 2 $0 San Jacinto St. - 1500 2 $0

San Jacinto St. - 1800 2 $0

San Jacinto St. - 2600 2 $0

San Jacinto St. - 2700 2 $0

Santa Fe Av. - 6600 2 $0

Savage St. - 4800 2 $0

Sevilla St. - 6500 2 $0

Skillman St. - 2400 2 $0

Skillman St. - 5700 2 $0

Southern Av. - 5300 2 $0

Springbrook St. - 3500 2 $0

St Mary Av. (N) - 100 2 $0

St Moritz Av. - 6100 2 $0

St Paul St. (N) - 1700 2 $0

Stanford Av. - 5400 2 $0

Stanford Av. - 5500 2 $0

Stanford Av. - 5600 2 $0

State St. - 2500 2 $0

State St. - 2600 2 $0

State St. - 2700 2 $0

Stonebridge Dr. - 3900 2 $0

Friday, March 31, 2006 Page 333 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Stoneleigh Av. - 5000 2 $0 Stoneleigh Av. - 5100 2 $0

Stoneleigh Av. - 5200 2 $0

Stoneleigh Av. - 5300 2 $0

Sudbury Dr. - 6200 2 $0

Summit Av. - 2300 2 $0

Swiss Cir. - 3300 2 $0

Tarsi Dr. - 6500 2 $0

Texas St. - 400 2 $0

Texas St. - 800 2 $0

Texas St. - 900 2 $0

Thomas Av. - 2700 2 $0

Throckmorton St. - 4200 2 $0

Thrush St. - 4900 2 $0

Tom Braniff La. - 3200 2 $0

Town Hill La. - 6100 2 $0

Town Hill La. - 6200 2 $0

Travis St. - 3500 2 $0

Travis St. - 4000 2 $0

Travis St. - 4100 2 $0

Travis St. - 4200 2 $0

Travis St. - 4300 2 $0

Friday, March 31, 2006 Page 334 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Travis St. - 4600 2 $0 Tremont St. - 5300 2 $0

Tucker St. - 2200 2 $0

Turtle Creek Blvd. - 2400 2 $0

Turtle Creek Blvd. - 2500 2 $0

Turtle Creek Blvd. - 2600 2 $0

Turtle Creek Blvd. - 2700 2 $0

Turtle Creek Blvd. - 2800 2 $0

Twin Sixties Dr. - 5300 2 $0

University Blvd. (W) - 5200 2 $0

Valencia St. - 400 2 $0

Vanderbilt Av. - 6000 2 $0

Vann Ct. - 3200 2 $0

Versailles Av. (N) - 3500 2 $0

Versailles Av. (N) - 3800 2 $0

Victor St. - 6100 2 $0

Victor St. - 6200 2 $0

Victoria Av. - 6800 2 $0

Villars St. - 1600 2 $0

Waddell Av. - 6600 2 $0

Washington Av. (N) - 1000 2 $0

Welborn St. - 2400 2 $0

Friday, March 31, 2006 Page 335 of 349 Project Name Description Tier Score Estimate Council District 14 Street Resurfacing

Welborn St. - 2500 2 $0 Wichita St. - 1800 2 $0

Wood St. - 1700 2 $0

Wood St. - 1800 2 $0

Woodrow Av. - 2600 2 $0

Woodside St. - 2800 2 $0

Worcola St. - 3500 2 $0

Wycliff Av. - 3100 2 $0

Wycliff Av. - 3300 2 $0

Wycliff Av. - 3400 2 $0

Yale Blvd. - 5600 2 $0

Summary for 'Category' = Street Resurfacing (417 detail records) Sum $11,429,254 Streetscape / Urban Design

Bryan Street Divide pedestrain connections between Bryan Place 2 $697,327 neighborhood and downtown, along the DART light rail extension Columbia Ave. Munger to Carroll Lnadscape / street Scape crosswalks at major intersections. 2 $627,594

Commerce St - Houston to Pearl See also: PB98N610 for design only, from Griffin to Harwood 2 $4,715,327 (Phase I). IMPS No. 10655, Intergovernmental Partnership Projects for street major rehab and/or reconstruction, from IH 35E to US-75 ~4,800 LF Elm St - Houston to Pearl Phase I - Griffin to Ervay. Bus lane improvements and 2 $4,646,989 pedestrian enhancements

Friday, March 31, 2006 Page 336 of 349 Project Name Description Tier Score Estimate Council District 14 Streetscape / Urban Design

Freeway Air Rights Develop.-Woodall Rodgers & I-30 Study potential bridging of these freeway barries, providing 2 $100,415 landscping and pedestrian connections to Uptown and the Cedars Pearl Street Lighting - Live Oak to Cedar Spring Provide pedestrian connrctions between the Arts District and 2 $1,185,457 Uptown / Victory ~4,900 LF, lights @ 50' o/c each side Ross Avenue - Lamar to Julius Schepps Freeway Includes screening for parking, pedestrian and streetscape 2 $3,475,456 enhancements and upgrading street light. ~5,300 LF - currently under design San Jacinto Street Lighting - Lamar to Routh Increased public safety ~4,500 LF lights @ 50' o/c each side 2 $1,080,858

Summary for 'Category' = Streetscape / Urban Design (8 detail records) Sum $16,529,422 Thoroughfares

Ross -Lamar to Central Expwy Enhanced sidewalks and streetscape 1 59 $7,387,384

Haskell - Lemmon to Main Rebuild a three lane coupletwith sidewalk, streetscape & 1 56 $6,903,779 landscape improvements. Commerce - Griffin to Pearl Reconstruct street and enhance sidewalks and streetscape 1 55 $17,102,420

Live Oak -Olive to Central Boulevard Convert operation from 1-way to 2-way from DART CBDETC to 1 50 $475,760 new Central Blvd Pearl -Live Oak to Young Realign Pearl from Live Oak to Pacific; Convert from 1-way to 2- 1 48 $7,785,430 way; Enhance sidewalk Elm - Griffin to Pearl Reconstruct as a four lane undivided roadway with enhanced 1 45 $17,102,420 sidewalks and streetscape Akard - Commerce to Elm Convert operation from 1-way to 2-way 1 39 $393,994

Flora - Leonard to Routh Widen to 40 foot pavement 1 38 $4,722,310

Routh - Woodall Rogers to Ross Widen to a four lane divided roadway with center turn lane 1 38 $2,836,983

Field -Elm to Wood Convert operation from 1-way to 2-way 1 37 $650,913

Ervay -I-30 WB Frontage Road to Commerce Convert operation from 1-way to 2-way (Widen to five lane 1 36 $7,438,557 roadway)

Friday, March 31, 2006 Page 337 of 349 Project Name Description Tier Score Estimate Council District 14 Thoroughfares

Mockingbird - Abrams to Matilida Widen to a six lane divided roadway 1 32 $33,827,340 St. Paul - Canton to Elm Widen to 44 foot pavement 1 31 $702,621

Central Boulevard - Live Oak to Commerce Reconstruct street as a six lane divided blvd; convert from 1- 1 30 $13,209,705 way to 2-way; enhance Routh St - Ross to San Jacinto Widen to six lane divided roadway 1 29 $1,773,984

Canton - Good Latimer to Trunk Widen to standard five lane roadway 1 28 $2,001,421

Browder - Commerce to Jackson Convert operation from 1-way to 2-way 1 25 $236,116

Marilla -Ervay to Harwood Enhanced sidewalks and streetscape 1 20 $1,563,468

Hall St. - US 75 to Ross Widen to a two lane undivided roadway 1 18 $1,366,931

Canton/Marilla - Akard to Harwood Convert operation from 1-way to 2-way with Project Pegasus 1 16 $319,075

Commerce - Central to Fair Park Link Widen to four lane undivided roadway 1 12 $853,386

Federal -Akard to Ervay Convert operation from 1-way to 2-way 1 10 $175,891

Patterson -Field to Akard Convert operation from one-way to two way 1 10 $140,393

Harwood - Elm to Canton Streescape and enhanced sidewalks 1 0 $369,794

Fair Park Link/ Gaston -US 75 to Malcolm X Widen to a five lane undivided roadway 1 $5,996,665

Lovers Lane (W) - Dallas North Tollway to Inwood Widen to a six lane divided roadway within 90' of right-of-way 1 $2,728,999

Pearl/Central Conn. - Canton to Central Expressway 1 $2,852,702

Shorecrest - Lemmon to Denton widen to a standard four lane roadway 1 $3,286,702

Summary for 'Category' = Thoroughfares (28 detail records) Sum $144,205,141 Traffic Intersection Capacity & Safety Improvement

Garland at Gaston Improve intersection geometrics to improve safety for 1 55 $1,155,052 northbound left-turn. Change to more urban intersection design. Tighten curves and square up intersection.

Friday, March 31, 2006 Page 338 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Intersection Capacity & Safety Improvement

Lemmon approaching Howell Hign accident location. Reduce accidents caused by sharp 1 55 $936,804 curve. Reconstruct to flatten and improve banking of curve. Maple @ Oak Lawn Widen southbound Maple to construct a right turn lane. 1 45 $113,591

Abrams @ Kenwood Street Modifications and Bottlene Widen Abrams at Kenwood to provide northbound and 1 40 $181,873 southbound left-turn lanes. Haskell @ State Construct a U-turn lane on Haskelll to allow westbound to 1 40 $109,124 eastbound movement. Cedar Springs at Turtle Creek/Bowen 1 35 $459,468

Haskell at Lemmon Improve lane channelization. 1 35 $468,402

Abrams @ Lake Circle Widen Abrams at Lake Circle to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Lovers Street Modifications and Bottlenec Widen the southside of Lovers just east of Abrams to improve 1 30 $95,084 the transition from three lanes to two lanes. Abrams @ McCommas Widen Abrams Rd at McCommas to provide northbound and 1 30 $218,247 southbound left-turn pockets. Abrams @ Monticello - Sondra Widen Abrams at Monticello/Sondra to provide northbound and 1 30 $218,247 southbound left-turn pockets. Greenville at Lovers 1 30 $0

Inwood at Bordeaux 1 30 $0

Shorecrest @ Webb Chapel Widen Webb Chapel approaching Shorecrest to provide a 1 30 $256,536 southbound left-turn pocket. Widen Shorecrest approaching Webb Chapel to provide an eastbound left-turn pocket. Bluebonett @ Bluffview Improve NB/SB curves. Safety improvements. 2 24 $534,915

Richmond @ Skillman Street Modifications and Bottl Remove dip in the roadway on Richmond at Skillman. 1 20 $145,498

Knox at Cole and Knox at Mckinney Widen McKinney to provide left-turn pockets at Cole and at 2 $513,073 Mckinney. Summary for 'Category' = Traffic Intersection Capacity & Safety Improvement (17 detail records) Sum $5,624,161

Friday, March 31, 2006 Page 339 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Safety Improvements-Guardrail Upgrades

Greenville 7700 BLK Guardrail Upgrade 1 80 $14,614 Lemmon 9300 BLK Guardrail Upgrade 1 80 $20,868

Cedar Springs 4700 BLK Guardrail Upgrade 1 73 $13,337

Good-Latimer 600 S BLK Guardrail Upgrade 1 73 $6,573

Abrams 3700 BLK Guardrail Upgrade 1 67 $7,307

Abrams 5500 BLK Guardrail Upgrade 1 67 $15,443

Greenville 4400 BLK Guardrail Upgrade 1 67 $21,346

Inwood 7400 BLK Guardrail Upgrade 1 67 $3,543

Lemmon 2800 BLK Guardrail Upgrade 1 67 $15,922

Skillman 4600 BLK Guardrail Upgrade 1 67 $8,870

Skillman 5200 BLK Guardrail Upgrade 1 67 $7,307

Skillman 5700 BLK Guardrail Upgrade 1 60 $29,803

Summary for 'Category' = Traffic Safety Improvements-Guardrail Upgrades (12 detail records) Sum $164,932 Traffic Signal Upgrades - CBD

Akard @ Commerce Traffic Signal Upgrades CBD 1 63 $49,674

Akard @ Jackson Traffic Signal Upgrades CBD 1 63 $43,496

Browder @ Commerce Traffic Signal Upgrades CBD 1 63 $49,674

Browder @ Jackson Traffic Signal Upgrades CBD 1 63 $43,496

Central @ Commerce/Jackson Traffic Signal Upgrades CBD 1 63 $70,171

Commerce @ Lane Traffic Signal Upgrade 1 63 $49,674

Commerce @ Prather Traffic Signal Upgrade 1 63 $49,674

Friday, March 31, 2006 Page 340 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD

Elm - Field Traffic Signal Upgrades CBD 1 63 $49,674 Elm @ Ervay Traffic Signal Upgrade 1 63 $43,496

Elm @ Harwood Traffic Signal Upgrade 1 63 $55,736

Elm @ Stone Pl Traffic Signal Upgrade 1 63 $43,496

Ervay @ Federal Traffic Signal Upgrade 1 63 $49,674

Ervay @ Jackson Traffic Signal Upgrade 1 63 $49,674

Field @ Wood Traffic Signal Upgrades CBD 1 63 $24,837

Harwood @ Jackson Traffic Signal Upgrade 1 63 $49,674

Live Oak @ Olive Traffic Signal Upgrade 1 63 $49,674

Olive @ San Jacinto Traffic Signal Upgrade 1 63 $57,887

Akard @ Elm Traffic Signal Upgrades CBD 1 53 $59,922

Akard @ Ervay/Ross Traffic Signal Upgrades CBD 1 53 $62,028

Elm @ St Paul Traffic Signal Upgrade 1 53 $49,674

Ervay @ Pacific Traffic Signal Upgrades CBD 1 53 $55,851

Ervay @ Patterson Traffic Signal Upgrades CBD 1 53 $43,496

Flora @ Harwood Traffic Signal Upgrades CBD 1 53 $55,851

Flora @ Olive Traffic Signal Upgrades CBD 1 53 $49,674

Akard @ Wood Traffic Signal Upgrade 1 47 $21,748

Elm @ Griffin Traffic Signal Upgrade 1 47 $66,100

Ervay @ Wood Traffic Signal Upgrade 1 47 $24,793

Harwood @ Live Oak Traffic Signal Upgrade 1 47 $43,496

Harwood @ San Jacinto Traffic Signal Upgrade 1 47 $43,496

Friday, March 31, 2006 Page 341 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD

Jackson @ St Paul Traffic Signal Upgrade 1 47 $43,496 Live Oak/Pacific @ St. Paul Traffic Signal Upgrades CBD 1 47 $66,100

Ross @ St Paul Traffic Signal Upgrade 1 47 $55,851

San Jacinto @ St Paul Traffic Signal Upgrade 1 47 $43,496

St Paul @ Wood Traffic Signal Upgrade 1 47 $36,102

Akard @ Main Traffic Signal Upgrades CBD 1 43 $49,674

Central @ Marilla Traffic Signal Upgrades CBD 1 43 $62,028

Ceremonial @ Lamar Traffic Signal Upgrades CBD 1 43 $66,100

Ervay @ Main Traffic Signal Upgrades CBD 1 43 $55,851

Field @ Main Traffic Signal Upgrades CBD 1 43 $49,674

Main @ St. Paul Traffic Signal Upgrades CBD 1 43 $49,674

Akard @ Patterson Traffic Signal Upgrades CBD 1 37 $51,709

Griffin @ Wood Traffic Signal Upgrades CBD 1 37 $29,961

Akard @ Pacific Traffic Signal Upgrades CBD 1 33 $43,496

Bryan @ Crockett Traffic Signal Upgrades CBD 1 33 $49,674

Bryan @ Ervay Traffic Signal Upgrades CBD 1 33 $43,496

Bryan @ St. Paul Traffic Signal Upgrades CBD 1 33 $49,674

Federal @ Harwood Traffic Signal Upgrades CBD 1 33 $49,674

Federal @ St. Paul Traffic Signal Upgrades CBD 1 33 $51,709

Canton @ Good Latimer Traffic Signal Upgrade 1 30 $70,043

Commerce @ Good Latimer Traffic Signal Upgrade 1 30 $57,724

Commerce @ Griffin Traffic Signal Upgrade 1 30 $24,837

Friday, March 31, 2006 Page 342 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD

Commerce @ Murphy Crosswalk Traffic Signal Upgrade 1 30 $33,248 Commerce @ St Paul Traffic Signal Upgrade 1 30 $37,319

Elm @ Good Latimer (Monument) Traffic Signal Upgrade 1 30 $17,560

Elm @ Pearl Exy Traffic Signal Upgrade 1 30 $43,496

Field @ Jackson Traffic Signal Upgrade 1 30 $45,532

Field @ Ross Traffic Signal Upgrade 1 30 $64,064

Field @ San Jacinto Traffic Signal Upgrades CBD 1 30 $49,674

Field/Griffin @ Munger Traffic Signal Upgrades CBD 1 30 $16,624

Good Latimer @ Main Traffic Signal Upgrade 1 30 $35,356

Griffin @ Jackson Traffic Signal Upgrade 1 30 $45,504

Griffin @ San Jacinto Traffic Signal Upgrade 1 30 $36,861

Harwood @ Olive (Pacific) Traffic Signal Upgrade 1 30 $99,022

Harwood @ Ross Traffic Signal Upgrade 1 30 $49,674

Harwood @ Wood Traffic Signal Upgrade 1 30 $27,775

Harwood @ Young Traffic Signal Upgrade 1 30 $32,416

Jackson/Wood @ Pearl Exwy Traffic Signal Upgrade 1 30 $57,887

Main @ Pearl Exy Traffic Signal Upgrade 1 30 $51,709

Pearl St @ Ross Traffic Signal Upgrade 1 30 $78,454

Pearl St @ San Jacinto Traffic Signal Upgrade 1 30 $72,277

Ross @ Routh Traffic Signal Upgrade 1 30 $55,851

Canton @ Central Traffic Signal Upgrades CBD 1 27 $68,135

Akard @ Woodall Rodgers Traffic Signal Upgrade 1 20 $105,524

Friday, March 31, 2006 Page 343 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - CBD

Commerce @ Field Traffic Signal Upgrade 1 20 $45,532 Crockett @ Pearl St Traffic Signal Upgrade 1 20 $78,454

Flora @ Pearl Traffic Signal Upgrades CBD 1 20 $53,745

Bryan @ Harwood Traffic Signal Upgrades CBD 1 17 $43,496

Akard @ Munger Traffic Signal Upgrades CBD 1 10 $62,028

Cadiz/Marilla @ Harwood Traffic Signal Upgrades CBD 1 10 $35,085

Griffin @ Main Traffic Signal Upgrades CBD 1 10 $26,872

Main @ Murphy Crosswalk Traffic Signal Upgrades CBD 1 10 $37,319

Summary for 'Category' = Traffic Signal Upgrades - CBD (81 detail records) Sum $4,012,343 Traffic Signal Upgrades - Citywide

Gaston @ Richmond Traffic Signal Upgrades Citywide 1 93 $56,317

Greenville @ Richmond Traffic Signal Upgrades-City Traffic Signal Upgrade 1 93 $40,944

Abrams @ Glasgow Traffic Signal Upgrade 1 87 $105,550

Abrams @ Monticello(Sondra) Traffic Signal Upgrade 1 87 $48,627

Lemmon @ Washington Traffic Signal Upgrades Citywide 1 87 $105,933

Carlisle @ Cedar Springs Traffic Signal Upgrades Citywide 1 80 $107,464

Lemmon @ Lomo Alto Traffic Signal Upgrade 1 80 $118,313

Lemmon @ Mahanna Traffic Signal Upgrades Citywide 1 80 $88,830

Fisher @ Skillman (Southwestern) Traffic Signal Upgrade 1 73 $105,933

Abrams @ Beacon (Columbia) Traffic Signal Upgrade 1 67 $54,689

Akard @ Cedar Springs (St Paul) Traffic Signal Upgrade 1 67 $108,422

Friday, March 31, 2006 Page 344 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide

Alderson @ LaVista (Paulus) Traffic Signal Upgrade 1 67 $107,464 Amesbury @ Lovers Ln Traffic Signal Upgrade 1 67 $107,847

Beacon @ Gaston Traffic Signal Upgrade 1 67 $114,867

Cameron @ East Grand (Tennison) Traffic Signal Upgrade 1 67 $100,955

Cedar Springs @ Hudnall Traffic Signal Upgrade 1 67 $53,732

Cedar Springs @ Maple Traffic Signal Upgrade 1 67 $80,981

Columbia @ Munger Traffic Signal Upgrade 1 67 $64,421

Douglas @ Lemmon Traffic Signal Upgrades Citywide 1 67 $104,274

Gaston @ Haskell Traffic Signal Upgrade 1 67 $22,568

Gaston @ Skillman Traffic Signal Upgrade 1 67 $107,464

Inwood - Lemmon Traffic Signal Upgrades Citywide 1 67 $61,262

Lemmon @ Welborn Traffic Signal Upgrade 1 67 $90,873

Mockingbird @ Roper Traffic Signal Upgrade 1 67 $91,830

Oram @ Skillman Traffic Signal Upgrade 1 67 $107,464

Skillman @ Vanderbilt Traffic Signal Upgrade 1 67 $80,981

Abrams @ Fisher Traffic Signal Upgrade 1 60 $106,890

Abrams @ Belmont (Lakewood) Traffic Signal Upgrade 1 53 $59,316

Abrams @ Kenwood Traffic Signal Upgrade 1 53 $83,638

Alamo @ Cedar Springs (Field) Traffic Signal Upgrade 1 53 $171,599

Beacon @ Live Oak (Lindell) Traffic Signal Upgrade 1 53 $114,867

Blackwell @ Greenville Traffic Signal Upgrade 1 53 $105,933

Collett @ Columbia Traffic Signal Upgrade 1 53 $21,684

Friday, March 31, 2006 Page 345 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide

Columbia @ Fitzhugh Traffic Signal Upgrade 1 53 $15,313 Fitzhugh @ Travis Traffic Signal Upgrades-Citywide Traffic Signal Upgrade 1 53 $108,422

Greenville @ Mockingbird Traffic Signal Upgrades-C Traffic Signal Upgrade 1 53 $105,933

Greenville @ Yale Traffic Signal Upgrade 1 53 $107,847

Hall @ Ross Traffic Signal Upgrade 1 53 $107,464

Harry Hines @ Olive (Wichita) Traffic Signal Upgrade 1 53 $123,737

Haskell @ Live Oak Traffic Signal Upgrades Citywide 1 53 $23,931

Lemmon - Wycliff Traffic Signal Upgrades Citywide 1 53 $101,402

Lemmon @ Manor Way(Roper) Traffic Signal Upgrade 1 53 $76,903

Maple @ Wolf Traffic Signal Upgrades Citywide 1 53 $116,399

McKinnon @ Wolf Traffic Signal Upgrade 1 53 $75,679

Skillman @ University Traffic Signal Upgrade 1 53 $88,735

Dallas N Tollway @ Lovers Ln Traffic Signal Upgrade 1 47 $206,761

Dorothy/Hudnall @ Lemmon Traffic Signal Upgrades Citywide 1 47 $71,792

Akard @ McKinney Traffic Signal Upgrade 1 40 $107,464

Baylor Crosswalk @ Gaston Traffic Signal Upgrade 1 40 $30,950

Bluffview @ Lemmon Traffic Signal Upgrade 1 40 $75,876

Bowen @ Carlisle Traffic Signal Upgrades Citywide 1 40 $102,359

Bowen @ McKinney Traffic Signal Upgrade 1 40 $123,737

Bryan @ Haskell Traffic Signal Upgrade 1 40 $48,109

Carlisle @ Hall Traffic Signal Upgrade 1 40 $107,464

Caruth Haven @ Southwestern Traffic Signal Upgrade 1 40 $125,652

Friday, March 31, 2006 Page 346 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide

Cedar Springs @ Fairmount Traffic Signal Upgrade 1 40 $128,842 Cedar Springs @ Harwood Traffic Signal Upgrade 1 40 $128,842

Cedar Springs @ McKinnon Traffic Signal Upgrade 1 40 $145,115

Cedar Springs @ Moody (Pearl) Traffic Signal Upgrade 1 40 $109,379

Cedar Springs @ Wycliff Traffic Signal Upgrades Citywide 1 40 $51,180

Cole @ Fitzhugh Traffic Signal Upgrade 1 40 $104,274

Cole @ Knox Traffic Signal Upgrade 1 40 $102,359

Fitzhugh @ McKinney Traffic Signal Upgrade 1 40 $103,316

Gaston @ Kidwell (LaVista) Traffic Signal Upgrade 1 40 $105,933

Gaston @ Paulus Traffic Signal Upgrade 1 40 $107,464

Greenville @ Ross Traffic Signal Upgrades Citywide 1 40 $53,732

Greenville @ Southwestern Traffic Signal Upgrades- Traffic Signal Upgrade 1 40 $54,881

Hall @ McKinney Traffic Signal Upgrade 1 40 $102,359

Haskell @ Ross Traffic Signal Upgrades Citywide 1 40 $24,696

Knox @ McKinney Traffic Signal Upgrade 1 40 $102,359

Lemmon @ Lovers Traffic Signal Upgrade 1 40 $159,155

Live Oak @ Skillman Traffic Signal Upgrades Citywide 1 40 $107,464

Maple @ McKinney Traffic Signal Upgrades Citywide 1 40 $107,464

Maple @ Turtle Creek Traffic Signal Upgrade 1 40 $59,363

McCommas @ Skillman Traffic Signal Upgrade 1 40 $107,464

McKinney @ Olive Traffic Signal Upgrade 1 40 $123,737

McKinney @ Pearl St Traffic Signal Upgrade 1 40 $109,379

Friday, March 31, 2006 Page 347 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide

McMillan @ Mockingbird Ln Traffic Signal Upgrade 1 40 $143,584 Ross @ Washington Traffic Signal Upgrades Citywide 1 40 $54,498

Abrams @ LaVista Traffic Signal Upgrade 1 27 $107,464

Airdrome @ Mockingbird Traffic Signal Upgrades Citywide 1 27 $14,007

Belmont @ Greenville Traffic Signal Upgrade 1 27 $53,732

Belmont @ Skillman Traffic Signal Upgrade 1 27 $140,010

Bluffview @ Lovers Ln Traffic Signal Upgrade 1 27 $107,464

Capitol @ Haskell(State) Traffic Signal Upgrade 1 27 $117,101

Cedar Springs @ Throckmorton Traffic Signal Upgrad Traffic Signal Upgrade 1 27 $107,464

Dallas N Tollway @ Mockingbird Ln Traffic Signal Upgrade 1 27 $201,655

Devonshire @ Lovers Traffic Signal Upgrades Citywide 1 27 $107,464

Fairmount @ McKinney Traffic Signal Upgrade 1 27 $123,737

Greenville @ McCommas Traffic Signal Upgrade 1 27 $107,464

Harwood @ McKinney Traffic Signal Upgrade 1 27 $102,359

Knox @ Travis Traffic Signal Upgrades Citywide 1 27 $126,354

Lovers Ln @ Preston Park Traffic Signal Upgrade 1 27 $107,464

McKinney @ St Paul Traffic Signal Upgrade 1 27 $127,566

McKinnon @ Moody Traffic Signal Upgrade 1 27 $180,533

Richmond @ Skillman Traffic Signal Upgrade 1 27 $107,464

Abrams Pkwy @ Gaston (Oram) Traffic Signal Upgrade 1 23 $107,464

Abrams @ Richmond Traffic Signal Upgrade 1 13 $76,300

Haskell @ Lemmon(Peak) Traffic Signal Upgrade 1 13 $83,125

Friday, March 31, 2006 Page 348 of 349 Project Name Description Tier Score Estimate Council District 14 Traffic Signal Upgrades - Citywide

Summary for 'Category' = Traffic Signal Upgrades - Citywide (99 detail records) Sum $9,556,904 Traffic System Management - Flood Detour Signs

Skillman, 4400 under RR Dynamic Signs - Flood Detours 1 100 $37,485

Good Latimer under Pacific Dynamic Signs - Flood Detours 1 80 $37,064

Farmers Market #1 Dynamic Signs - Flood Detours 1 40 $42,118

Farmers Market #2 Dynamic Signs - Flood Detours 1 40 $42,118

Summary for 'Category' = Traffic System Management - Flood Detour Signs (4 detail records) Sum $158,784 Traffic System Management - Roadside Cameras

Denton-Mockingbird Traffic Systems Management - Roadside Camera 1 60 $6,382

Field-Woodall Rodgers Frwy Roadside Camera 1 60 $6,382

Pearl-Cedar Springs Roadside Camera 1 40 $12,763

Field-Wichita Roadside Camera 1 35 $4,212

Cedar Springs-Oak Lawn Roadside Camera 1 20 $25,526

Dallas N Tollway-Lovers Roadside Camera 1 15 $25,526

Summary for 'Category' = Traffic System Management - Roadside Cameras (6 detail records) Sum $80,790 Summary for 'Program' = STREET AND TRANSPORTATION (850 detail records) Sum $230,172,721 Summary for 'CD' = 14 (850 detail records) Sum $230,172,721 Grand Total $3,782,310,681

Friday, March 31, 2006 Page 349 of 349