Form -1 Mining Plan & Pre-Feasibility Report
Total Page:16
File Type:pdf, Size:1020Kb
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE For Savudu Quarry Extent: 0.93.0 Ha)-B2 Project IN S.F.NO : 30/3 VILLAGE : SAPPANIYENDAL TALUK : TIRUCHULI DISTRICT : VIRUDHUNAGAR. SUBMITTED TO District Level Environment Impact Assessment Authority (DEIAA), Government of Tamilnadu SUBMITTED BY THIRU.S.CHELSHA (VINAYAN) S/O SUNDARESH, 4C/121-1, SUNDARAR STREET, WARD NO.65, ALAGAPPAN NAGAR, MADURAI - DISTRICT. S.NO DESCRIPTION PAGE NOS 1 Declaration letter 2 Demand Draft/Chelan 3 Form-I Approved Mining Plan Along With Approval 4 Letter Precise area communication letter from District 5 Collector/ Principal Secretary to Government 6 Pre-Feasibility Report 7 VAO signed for quarry site Letter from the AD/DD mines about the details (Name of the Owner, S.F.No Extent & Distance from the boundary of this quarry) of quarries 8 (Proposed/Existing/Abandoned Quarries) Within a radius of 500m from the boundary of the proposed quarry site (Applicable for Rough stone/Granite) 9 Affidavit Document Consolidated Above Document In PDF Format 10 Enclosed (DVD) Form 1 for Savudu Quarry of Thiru.S.Chelsha (Vinayan), Sappaniyendal Village, Tiruchuli Taluk, Virudhunagar District, Tamilnadu. FORM -1 Application Form for Obtaining Environmental Clearance from District Level Environment Impact Assessment Authority (DEIAA), Tamil Nadu S. No Item Details 1 Name of the project/s Sappaniyendal Savudu Quarry project. 2 S. No. in the schedule 1 (a) Proposed capacity = 12610m3 for a period of One year only. Area =0.93.0 Ha. Dimensions of the area Proposed capacity/area/length/ length in (m) Width in (m) Depth in (m) 3 tonnage to be handled / (Max) (Avg) (Max) command area/lease area/number of wells to be drilled 97 65 2 It is open cast shallow quarrying the Savudu is clearly visible right from the surface hence there are no wells proposed not drilled. New/ Expansion/ Modernization It’s a new Project ( Sappaniyendal Savudu 4 quarry) Existing capacity / Area etc. The proposed capacity is only 12610m3 for 2m. The total Geological reserve is about 5 3 18600 m . Area = 0.93.0 Ha. 6 Category of project i.e. `A’ or ‘B’ Category - B (B2) Does it attract the general 7 condition? If yes, please specify. No Does it attract the specific The project does not attract any specific 8 condition? If yes, please specify. condition. Location Sappaniyendal Village, Tiruchuli Taluk and Virudhunagar District. Plot/ Survey/ Khasra No. 30/3 7 Village Sappaniyendal Taluk Tiruchuli District Virudhunagar State Tamilnadu Nearest railway station/ airport Tiruchuli Railway station 10 along with distance in km. Madurai Airport 11 Nearest Town, city, District Nearest Town: Tiruchuli Headquarters along with distance Nearest City : Virudhunagar in kms. District : Virudhunagar Village Panchayats, Zila Parishad, Village Panchayat - Poomalaipatti 12 Municipal Corporation, Local Panchyat Union - Tiruchuli body (Complete postal addresses Taluk - Tiruchuli with telephone nos. to be given) District - Virudhunagar 13 Name of the applicant Thiru.S.Chelsha (Vinayan) Thiru.S.Chelsha (Vinayan) S/o Sundaresh, Registered Address 4C/121-1, Sundarar Street, 14 Ward No 65, Alagappan Nagar, Madurai District, Tamil Nadu. Address for correspondence Thiru.S.Chelsha (Vinayan) Designation Proprietor/Owner (Owner/Partner/CEO) Thiru.S.Chelsha (Vinayan) Address S/o Sundaresh, 4C/121-1, Sundarar Street, Ward No 65, Alagappan Nagar, 15 Madurai District, Tamil Nadu. Pin code 626129 E-mail [email protected], Telephone No. 9629788830 Fax No. - Details of Alternative Sites examined, if any. Location of There is no alternative site examined. The 16 these sites should be shown on a project is site specific. Topo sheet 17 Interlinked Projects There is no interlinked projects Whether separate application of As there is no interlinked project, no 18 interlinked project has been application has been submitted submitted? If yes, date of submission As there is no interlinked project hence no 19 application has been submitted. 20 If no, reason The project involves Savudu Quarry only. Whether the proposal involves (a) The project does not attract the Forest approval/ clearance under: if yes, (Conservation) Act 1780. There is no details of the same and their Forestland involved within the quarry lease- status to be given. applied area. 21 (a) The Forest (Conservation) Act, (b) There is no wild life within the 10km 1780? radius from applied area and does not fall (b) The Wildlife (Protection) Act, under the Wildlife (protection) Act 1772. 1772? (C) The project doesn’t attract the C.R.Z. (c) The C. R. Z. Notification, 1771? Notification, 1771. The applicant has obtained precise area communication from the District Collector, Virudhunagar vide Whether there is any Government Rc.No.KV3/669/2017- Dated: 04.06.2018. 22 Order/ Policy relevant/ relating to the site? The Mining Plan was got approval by the Deputy Director, Department of Geology and Mining, Virudhunagar vide Rc.No.KV3/669/2017- Dated: 15.06.2018 There is no forest land involved in this lease 23 Forest land involved (hectares) area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations 24 (a) Name of the Court relating to the project directly and indirectly. (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. I. Basic information II.Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (Topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) with confirmation No sources of information data Permanent or temporary change in land use, land The topography will be slightly changed cover or topography after the quarrying of Savudu as per the 1.1 including increase in Yes Mining Plan, Savudu formation is seen intensity of land use (with right from the surface to a depth of 2m respect to local land use below ground level. plan) Clearance of existing land, The quarry lease applied area is devoid of 1.2 vegetation and building? No vegetation’s, Human settlement and buildings hence clearance is redundant. The quarrying activity is proposed to carry out within the quarry lease applied area. Temporary approach road within 1.3 Creation of new land uses? No the area will be form for the easy access of men and machinery which will be well maintained. The Savudu deposits are clearly visible Pre-construction right from the surface hence pre- 1.4 investigations e.g. bore No construction investigation and soil houses, soil testing? testing is not proposed before quarrying operation. There will be no major civil work in this project involved. The infrastructure 1.5 Construction works? Yes facilities are proposed in the quarry site on semi-permanent structures. There is no existing building within the 1.6 Demolition works? No quarry lease applied area; hence no demolition work is involved. Temporary sites used for Sites service on semi-permanent construction works or 1.7 Yes structure will be constructed only after housing of construction grant of quarry lease. workers? There are no tall buildings or linear structure found in and around the Above ground buildings, quarry site. There is no requirement of structures or Savudu works 1.8 No cutting and filling in the site. The including linear structures, cut and fill or excavations. proposed quarry is to exploit Savudu from consolidated sediments for 2m below ground level. Open cast semi mechanized method of Underground works quarrying will be adopted. No 1.9 including mining or No underground mining or tunneling is tunneling? proposed. The quarry operation is restricted up to a depth of 2m below ground level. After Reclamation works? removing the Savudu there is no 1.10 No proposal for backfilling or reclamation. The quarried out land will be leveled and used for agricultural purpose. There is no such type of activities 1.11 Dredging? No involved in this opencast quarrying operation. There is no such type of activities 1.12 Offshore structures? No involved; It is an inland quarrying project. Production and No production and manufacturing is 1.13 No manufacturing processes? involved in the Savudu Quarrying. There is no proposal for storage of material within the quarry lease applied area. The Savudu will be loaded directly to the trucks / tractor for transportation Facilities for storage of 1.14 No to the needy customer’s site for goods or materials? construction industries for Government & Public sector projects besides catering domestic housing and infrastructure projects in and around the district. There is no wastage encountered during the quarrying operation, the entire excavation will be used for construction industries for Government & Public Facilities for treatment or 1.15 disposal of solid waste or No sector projects besides catering domestic liquid effluents? housing and infrastructure projects in and around the district. The Savudu will not produce toxic effluence in the form of solid, liquid or gas. The proposed project is 0.93.0 Ha for a period of One year only. The required Facilities for long term 1.16 housing of operational No employees (7Nos.) are available in the workers? nearby villages, hence long term housing of operational workers are not proposed. No new roads, rail or sea traffic is New road, rail or sea traffic proposed during operation, the existing during construction or road will be utilized for transportation of operation? 1.17 No the Savudu. However, internal roads within the quarry lease applied area will be developed and maintained. New road, rail, air There is no such type of activities waterborne or other involved in this project. transport infrastructure 1.18 No Existing road will be utilized for the including new or altered transportation of Savudu to the needy routes and stations, ports, customer’s site.