FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

TO OBTAIN ENVIRONMENTAL CLEARANCE

For Savudu Quarry

Extent: 1.33.0 Ha)-B2 Project IN S.F.NO : 194/1A VILLAGE : ANAIKULAM TALUK : TIRUCHULI DISTRIC : . SUBMITTED TO State/District Level Environment Impact Assessment Authority (SEIAA/DEIAA), Government of Tamilnadu

SUBMITTED BY THIRU.R.SUNDRAMOORTHI, S/o .RAJENDRAN, 4/301, WEST STREET, SANKARALINGAPURAM POST, , .

S.NO DESCRIPTION PAGE NOS

1 Declaration letter

2 Demand Draft/Chellan

3 Form-I

Approved Mining Plan Along With Approval 4 Letter

Precise area communication letter from District 5 Collector/ Principal Secretary to Government

6 Pre-Feasibility Report

7 VAO signed for quarry site

Letter from the AD/DD mines about the details

(Name of the Owner, S.F.No Extent & Distance from the boundary of this quarry) of quarries

8 (Proposed/Existing/Abandoned Quarries) Within a radius of 500m from the boundary of the proposed quarry site (Applicable for Rough stone/Granite)

9 Affidavit Document

Consolidated Above Document In PDF Format 10 Enclosed (DVD)

Form 1 for Savudu Quarry of Thiru.R.Sundramoorthy,

Anaikulam Village, Tiruchuli Taluk, Virudhunagar District, Tamilnadu.

FORM -1

Application Form for Obtaining Environmental Clearance from State/District Level Environment Impact Assessment Authority (SEIAA/DEIAA), Tamil Nadu

S. No Item Details 1 Name of the project/s Anaikulam Savudu Quarry project 2 S. No. in the schedule 1 (a) Proposed capacity = 17712m3 for a period of Two years only. Area =1.33.0 Ha. Dimensions of the area Proposed capacity/area/length/ length in (m) Width in (m) Depth in (m) 3 tonnage to be handled / (Max) (Avg) (Max) command area/lease area/number of wells to be drilled 108 82 2 It is open cast shallow quarrying the Savudu is clearly visible right from the surface hence No wells are proposed not drilled. New/ Expansion/ Modernization It’s a new Project ( Anaikulam Savudu 4 quarry) Existing capacity / Area etc. The proposed capacity is only 17712m3 for 2m. The total Geological reserve is about 5 3 26600 m . Area = 1.33.0 Ha. 6 Category of project i.e. `A’ or ‘B’ Category - B (B2) Does it attract the general 7 condition? If yes, please specify. No Does it attract the specific The project does not attract any specific 8 condition? If yes, please specify. condition. Location Anaikulam village, Veerasolan Guruvattam, Tiruchuli Taluk and Virudhunagar District. Plot/ Survey/ Khasra No. 194/1A 7 Village Anaikulam Taluk Tiruchuli District Virudhunagar State Tamilnadu Nearest railway station/ airport Tiruchuli Railway station 10 along with distance in km. Airport Nearest Town, city, District Nearest Town: Tiruchuli 11 Headquarters along with distance Nearest City : Virudhunagar in kms. District : Virudhunagar

Village Panchayats, Zila Parishad, Village Panchayat - Anaikulam 12 Municipal Corporation, Local Panchyat Union - Narikkudi body (Complete postal addresses Taluk - Tiruchuli with telephone nos. to be given) District - Virudhunagar 13 Name of the applicant Thiru.R.Sundramoorthi S/o .Rajendran, 4/301, West Street, 14 Registered Address Sankaralingapuram Post, Virudhunagar District, Tamil Nadu. Address for correspondence Thiru.R.Sundramoorthi Designation Proprietor/Owner (Owner/Partner/CEO) S/o .Rajendran, Address 4/301, West Street, Sankaralingapuram Post, 15 Virudhunagar District, Tamil Nadu. Pin code -

E-mail [email protected], Telephone No. Cell No.7200012343 Fax No. - Details of Alternative Sites examined, if any. Location of There is no alternative site examined. The 16 these sites should be shown on a project is site specific. Topo sheet 17 Interlinked Projects There is no interlinked projects Whether separate application of As there is no interlinked project, no 18 interlinked project has been application has been submitted submitted? If yes, date of submission As there is no interlinked project hence no 19 application has been submitted. 20 If no, reason The project involves Savudu Quarry only. Whether the proposal involves (a) The project does not attract the Forest approval/ clearance under: if yes, (Conservation) Act 1780. There is no details of the same and their Forestland involved within the quarry lease- status to be given. applied area. 21 (a) The Forest (Conservation) Act, (b) There is no wild life within the 10km 1780? radius from applied area and does not fall (b) The Wildlife (Protection) Act, under the Wildlife (protection) Act 1772. 1772? (C) The project doesn’t attract the C.R.Z. (c) The C. R. Z. Notification, 1771? Notification, 1771. The applicant has obtained precise area communication from the District Collector, Virudhunagar vide Rc.No.KV3/985/2017- Whether there is any Government Dated 07.01.2018. 22 Order/ Policy relevant/ relating to the site? The Mining Plan was got approval by the Deputy Director, Department of Geology and Mining,Virudhunagar vide Rc.No.KV3/985 /2017- Dated 18.01.2018. There is no forest land involved in this lease 23 Forest land involved (hectares) area. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? There is no court case pending, litigations 24 (a) Name of the Court relating to the project directly and indirectly. (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

I. Basic information II. Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (Topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) with confirmation No sources of information data Permanent or temporary change in land use, land The topography will be slightly changed cover or topography after the quarrying of Savudu as per the 1.1 including increase in Yes Mining Plan, Savudu formation is seen intensity of land use (with right from the surface to a depth of 2m respect to local land use below ground level. plan)

Clearance of existing land, The quarry lease applied area is devoid of 1.2 vegetation and building? No vegetation’s, Human settlement and buildings hence clearance is redundant.

The quarrying activity is proposed to carry out within the quarry lease applied area. Temporary approach road within 1.3 Creation of new land uses? No the area will be form for the easy access of men and machinery which will be well maintained. The Savudu deposits are clearly visible Pre-construction right from the surface hence pre- 1.4 investigations e.g. bore No construction investigation and soil houses, soil testing? testing is not proposed before quarrying operation. There will be no major civil work in this project involved. The infrastructure 1.5 Construction works? Yes facilities are proposed in the quarry site on semi-permanent structures.

There is no existing building within the 1.6 Demolition works? No quarry lease applied area; hence no demolition work is involved.

Temporary sites used for Sites service on semi-permanent construction works or 1.7 Yes structure will be constructed only after housing of construction grant of quarry lease. workers? There are no tall buildings or linear structure found in and around the Above ground buildings, quarry site. There is no requirement of structures or Savudu works 1.8 No cutting and filling in the site. The including linear structures, cut and fill or excavations. proposed quarry is to exploit Savudu from consolidated sediments for 2m below ground level. Open cast semi mechanized method of Underground works quarrying will be adopted. No 1.9 including mining or No underground mining or tunneling is tunneling? proposed. The quarry operation is restricted up to a depth of 2m below ground level. After Reclamation works? removing the Savudu there is no 1.10 No proposal for backfilling or reclamation. The quarried out land will be leveled and used for agricultural purpose. There is no such type of activities 1.11 Dredging? No involved in this opencast quarrying operation. There is no such type of activities 1.12 Offshore structures? No involved; It is an inland quarrying project. Production and No production and manufacturing is 1.13 No manufacturing processes? involved in the Savudu Quarrying.

There is no proposal for storage of material within the quarry lease applied area. The Savudu will be loaded directly to the trucks / tractor for transportation Facilities for storage of 1.14 No to the needy customer’s site for goods or materials? construction industries for Government & Public sector projects besides catering domestic housing and infrastructure projects in and around the district. There is no wastage encountered during the quarrying operation, the entire excavation will be used for construction industries for Government & Public Facilities for treatment or 1.15 disposal of solid waste or No sector projects besides catering domestic liquid effluents? housing and infrastructure projects in and around the district. The Savudu will not produce toxic effluence in the form of solid, liquid or gas. The proposed project is 1.33.0 Ha for a period of Two years only. The required Facilities for long term 1.16 housing of operational No employees (7Nos.) are available in the workers? nearby villages, hence long term housing of operational workers are not proposed.

No new roads, rail or sea traffic is New road, rail or sea traffic proposed during operation, the existing during construction or road will be utilized for transportation of operation? 1.17 No the Savudu.

However, internal roads within the quarry

lease applied area will be developed and

maintained.

New road, rail, air There is no such type of activities waterborne or other involved in this project. transport infrastructure 1.18 No Existing road will be utilized for the including new or altered transportation of Savudu to the needy routes and stations, ports, customer’s site. airports etc.?

Closure or diversion of existing transport routes or The project will not cause any changes 1.19 infrastructure leading to No and hindrance in the existing traffic changes in traffic movements. movements? New or diverted The project does not involve diver’s ion of 1.20 transmission lines or No transmission/pipe lines. pipelines? The quarrying operation is restricted up Impoundment, damming, to a depth of 2m below ground level; 1.21 culverting, realignment or No Ground water occurrence in this area is other changes to the at 25m depth from ground profile. Hence hydrology of watercourses there is no damage for ground water or aquifers? hydrology or aquifers.

There is no stream crossing within the 1.22 Stream crossings? No quarry lease applied area.

Abstraction or transfers of The proposed quarrying does not require 1.23 water form ground or No any abstraction or transfer of water from surface waters? the ground or surface water bodies. The quarry operation is restricted up to a depth of 2m. Quarry operation will not Changes in water bodies or 1.24 the land surface affecting No affect the drainage pattern of the area. drainage or run-off? There is no change in water bodies or the land surface affected during run off. During operation phase, after grant of lease quarrying personnel will be brought from surrounding villages by jeep or van. Transport of personnel or materials for construction, The materials and tools shall be 1.25 No operational or transported by trucks and tippers, the decommissioning? existing road and infrastructure facilities are sufficient. No construction operation or decommissioning envisaged.

Long-term dismantling or There is no Dismantling or 1.26 decommissioning or No decommissioning is proposed in this restoration works? project. Ongoing activity during decommissioning which There is no such type of activities involved 1.27 No could have an impact on in this project. the environment? During operational phase, the manpower requirement will be around 7. Local people are envisaged in this quarry Influx of people to an area operation. No child labor will be deployed 1.28 in either temporarily or Yes for any type of quarrying operation. All the permanently? labors engaged for quarrying operations will be trained, equipped with protective devices and insured till the end of life of quarry. Introduction of alien There are no causes to develop the alien 1.29 No species? species. There will no loss of native species or genetic diversity taken during the Loss of native species or 1.30 No quarrying operation as the lease applied genetic diversity? area is devoid of vegetation and agriculture.

1.31 Any other actions? No There is no any other actions

2. Use of Natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supply):

Details thereof (with approximate Information/Checklist Yes S. No quantities/rates, wherever possible) with confirmation /No sources of information data Total quarry lease applied area is 1.33.0Ha It’s a consent Patta land Vide Patta no1211 The Applicant has obtained consent from pattadhar, Please refer the Annexure No – IV The lease applied area is exhibits slightly undulated topography covered Land especially undeveloped 2.1 No with Savudu which does not sustain any or agricultural land (ha) type of vegetation due to the topography of the land. The altitude of the area is 53m (Maximum) from MSL, the slope of the area is gentle towards Southern side. Please refer the Topography, Geological plan and sections (Plate No – III&IV). The project does not require huge water for quarrying operation, about 1 KLD of water will be used for the project. 1. Drinking Water – 0.3 KLD & Domestic purpose 2. Dust Suppression – 0.3 KLD 3. Green belt – 0.4 KLD Total – 1 KLD 0.3 KLD of Packaged Drinking water and Water (expected source & Domestic purpose will be brought from 2.2 Yes competing users) unit: KLD the approved water vendors in Tiruchuli which is about 15 km on the southeastern side of the area. 0.3 KLD of water for dust suppression and 0.4KLD of water for Green developments will be brought from approved water venders or existing borehole on nearby quarry. Total requirement for the project is around 1KLD. There is no Minerals used for 2.3 Minerals (MT) No construction purposes

Construction material - two, There is no Construction material 2.4 aggregates, and/Soil No proposed . (expected source-MT)

Forests and timber There are no forests and timber material 2.5 No (source-MT) is proposed.

The limited scale of activities adopted in Savudu Quarrying does not require high- tension electric power supply. Fuels are Energy including electricity and fuels (source, competing used for operating vehicles during 2.6 Yes users) unit: fuel (MT),Energy quarrying process. Fuels required for (MW) excavator for the entire project life 2810 liters of HSD.

2.7 Any other natural resources There is no other natural resource will (use appropriate standard No be required. units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate Information/Checklist Yes S. No quantities/rates, wherever possible) with confirmation /No sources of information data Use of substances or There is no proposal for storage, materials, which are handling or transportation of any hazardous (as per MSIHC 3.1 No hazardous materials or substances as rules) to human health or the per MSIHC rules in this Savudu Quarry environment (flora, fauna, and water supplies) project. The Savudu does not produce any toxic Changes in occurrence of effluent in the form of solid, liquid and disease or affect disease 3.2 No gas, hence the diseases related to insect vectors ( e.g. insect or water or water borne diseases is not borne diseases) envisaged. Welfare of people will get positive change due to the project, where a number of Welfare activities are being undertaken. Due to increase of the employment earning of local people and lifestyle of the people will enhance, Affect the welfare of peole e.g. around 7 peoples will be directly benefit 3.3 by changing living No to this project. conditions? No child labor will be engaged for any type of quarrying operation. All the labor will be insured and the salary and benefits will be paid as per the Labor enforcement officers (Ministry of labor and welfare) Norms.

Vulnerable groups of people There is no effect envisaged for the who could be affected by the 3.4 No vulnerable groups of people who could project e.g. hospital patients, be affected by the project. children’s, the elderly etc., 3.5 Any other causes No There is no other cause are envisaged

4.0 Production of solid wastes during construction or operation or decommissioning (MT/mounts) Details thereof (with approximate Information/Checklist Yes S. No quantities/rates, wherever possible) with confirmation /No sources of information data The Savudu Quarrying does not produce any waste. The entire Savudu will be Spoil, overburden or mine 4.1 No excavated. There are no wastages wastes encountered during the quarrying period (Two years only). Small quantity of Municipal waste will be Municipal waste (domestic 4.2 Yes generated which shall be disposed as per and or commercial wastes) guidelines. In this quarrying activities waste oil will be generated during the operation period it will be sent to authorize Re- Circulars Hazardous wastes (as per as per SPCB/ CPCB norms. Care and 4.3 Hazardous Waste No maintenance of vehicles by experience Management Rules) qualified mechanics will be undertaken to prevent breakdown and spillage of oils and lubes.

Other industrial process Industrial wastages are not generated 4.4 No wastes during the quarrying operation. There is no such type of activities in this 4.5 Surplus product No quarry. Sanitary facilities will be constructed as Sewage sludge or other semi-permanent structure and the 4.6 sludge form effluent Yes sewage waste will be disposed as per the treatment norms. Construction or demolition There are no Construction or demolition 4.7 No wastes wastes involved in this quarry.

No redundant machineries involved in Redundant machinery or 4.8 No this project, only Excavator and tipper equipment are involved in this quarry operation.

Contaminated soils or other There is no contaminated material or soil 4.9 No materials observed in the quarry area. There is no agricultural waste 4.10 Agricultural wastes No anticipated.

4.11 Other solid wastes No There is no other solid waste anticipated.

5.0. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) confirmation No with sources of information data The emissions of SO2 (Sulfur dioxide) & NO2 (Nitrogen dioxide) may be due to Emissions form combustion of use of diesel operated quarry 5.1 fossil fuels from stationary or Yes machinery and vehicles. Better mobile sources maintenance of equipment in good condition will help to reduce such emissions. Dust is the main pollutant produced in the proposed activity. Emission from loading and plying of tippers can Emissions from production Yes take place but they will be maintained 5.2 processes within limits by proper maintenance and sprinkling of water on haul roads, Tarpaulin covers during Transportation. Fugitive dust will be generated from material handling activities. Dust suppression by water Emissions from materials sprinkling will be provided to prevent 5.3 handing including storage or Yes the fugitive dust emissions during transport loading. Tarpaulin covers will be covered in vehicles during transportation. Emissions form construction There is no major construction 5.4 activities including plant and No activities are envisaged. equipment Minor Dust will be generated during Dust or odors form handling loading of material, transportation of of materials including Savudu and it will be controlled. 5.5 No construction materials, However, there is no possibility of any sewage and waste odor generation as there are no organic solvents/processes involved. Emissions from incineration The Savudu Quarrying does not 5.6 No of waste produce any toxic effluents. Emissions from burning of waste in open air (e.g. slash There is no such type of activities 5.7 No materials, construction involved in this project. debris) 5.8 Emissions from any other Emissions from other sources are not No sources envisaged.

6.0. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) confirmation No with sources of information data Due to operation of machinery there is likely hood of some increase in noise level. The noise level at site will be maintained below permissible limit. Measures like lubrication and From operation of equipment preventive maintenance shall be 6.1 e.g. engines, ventilation plant, Yes taken to control noise from the crushers machinery. The vibration during the movement of machinery will be minimal for a short span which will be well within the prescribed limits. From industrial or similar There is no proposal of processing 6.2 No processes plant From construction or No construction or demolition work 6.3 No demolition takes place. No drilling or blasting is proposed for 6.4 From blasting or piling No this Savudu Quarrying operation. The transport of Savudu through tippers can produce noise but are maintained within permissible limits, From construction or 6.5 Yes by keeping machinery in proper operational traffic condition as per RTO &TNPCB norms and maintenance under experience and qualified mechanics.

The quarry operation will be carried From lighting or cooling out at the daytime only between 7Am 6.6 No systems to 6Pm hence; the lighting and cooling systems are not required. 6.7 From any other sources No Not envisaged

7.0. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface water, ground water, coastal water or the sea: Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) confirmation No with sources of information data No hazardous materials will be used in the process. From handling, Storage, use Oiling and lubrication of hauling 7.1 or spillage of hazardous No vehicles will be done by using oil tray materials to prevent spillage of oil. Vehicles and machinery will be well maintained to prevent leakage of oil.

The discharge of sewage will The Discharge of sewage will be be collected on soak pits will collected on soak pits and will be 7.2 be discharge to a place No discharge to a place authorized by authorized by municipal Municipal Authorities as per guide authorizes as per guidelines lines. There is likely hood of increase of By deposition of pollutants particulate matter due to quarrying 7.3 emitted to air into the land or No operations. Regular sprinkling of into water water will suppress dust at points/places of generation.

An efficient and effective management plan is proposed for the project; 7.4 From any other sources No hence it may not have any significant impact on the surrounding environment. Is there a risk of long term There is no such type of activities buildup of pollutants in the involved in this quarry. 7.5 No environment from these sources?

8.0. Risk of accidents during construction or operation of the project, which could affect human health or the environment Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) confirmation No with sources of information data No explosions and spillages are From explosions, spillages, proposed for quarry operation. The fires etc., form storage, Savudu will be directly excavated with 8.1 No handling, use or production of the help of excavator. hazardous substances The quarry operation does not produced hazardous material. Limited vehicles are only used for quarrying operation up to a depth of 2m below ground level. Hence the accident is anticipated minimal. However, all safety measures 8.2 From any other causes Yes shall be taken to prevent any accidents. The quarrying activities will be monitored under the supervision of experienced and qualified competent mines foreman.

There is no Eath quake, floods, Landslides, cloud burst recorded in Could the project be affected the area. Its opencast quarrying by natural disasters causing 8.3 environmental damage (e.g. No proposed only for 2m depth below floods, Earth quakes, ground level. Which will not cause landslides, cloudburst etc.)? any adverse environmental damage due to natural disasters?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate Information/Checklist Yes/ S. No quantities/rates, wherever possible) confirmation No with sources of information data

Lead to development of Living standard will be improved supporting. cities, ancillary development or development of the nearby villages. stimulated by the project This short span of project does which could have impact on not require any supporting

the environment e.g.: infrastructures like roads, power

9.1  Supporting infrastructure supply, waste treatment, etc., (roads, power supply, waste The workers are available from or waste treatment, etc.) No the nearby villages, hence the project  housing development will not attract housing Development,  extractive industries  supply industries Extractive industries, supply  other industries or any other activities.

The quarry operation is restricted up to a depth of 2m below ground level, Lead to after- use of the site, after removing the Savudu there is no 9.2 which could heaven impact on No proposal for backfilling or environment reclamation. The quarried out land will be leveled and used for agricultural purpose.

Set a precedent for later 9.3 No There is no later developments developments Have cumulative effects due to proximity to other existing There is no cumulative impacts are 9.4 No or planned projects with envisaged. similar effects

(I) Environmental Sensitivity S. Name/ Aerial distance (within 15 km.) Areas No Identity Proposed project location boundary Areas protected under international conventions, national or No protected areas to be identified with in 15 km 1 local legislation No for their distance. ecological, landscape, cultural or other related Areasvalue which are important or sensitive for There is no wild life, bird sanctuary, Reserve or Social ecological rea forest 15km near the quarrying lease applied area. sons -

Wetlands, 2 No There is no coastal, Forest, Eco sensitive Zone within watercourses the radius of 15Km, the area does not fall in HACA or other water region. bodies, coastal zone, biospheres, mountains, forestsAreas used by protected, important or sensitive species of flora There is no protected sensitive species identified 3 No or fauna for within the 15km radius. breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or There is no Inland, coastal, marine or underground 4 No underground water around the site. waters

State, National There is no State or National boundaries within a 5 No boundaries radius of 15Km. Routes or facilities used by the public 6 for access to Yes There is no Tourist, pilgrim areas within 15Km radius recreation or other tourist, pilgrim areas Defense 7 No No defense installation found 15km near the site installations Sindapalli is a densely populated village which is about at a distance 5.0km.

Approximate distance & Approximate S.No Name of the Village Direction from population lease applied Densely area

8 populated or Yes built-up area 1. Chellaiyaapuram 4 Km 100

2. Illuppaiyur 3 Km 500

3. Sengamadai 1.5Km 10

4. Sethupuram 1.5Km 100

Areas occupied

by sensitive Anaikulam is having all the facilities, which are at a man-made distance of 3.5km lease-applied area. 9 land uses Yes (hospitals, schools, places of worship, community facilities)Areas containing important, high quality or The quarry operation is restricted to only 2m Below scarce ground level. Hence the ground water will not be 10 No resources affected beside the area is devoid of agriculture, (ground water Forestry, Tourist place etc., resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

Areas already subjected to pollution or environmental damage. (those 11 No This is a fresh quarry lease applied area. where existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to

present The area is not susceptible to natural hazards like No environmental landslides, Earth quake; it is a high stable land. problems (Earth quakes, subsidence, 12 landslides, erosion, flooding or extreme or adverse climatic “I hereby given undertaking that the data and information given in the application and enclosuresconditions are) true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Place: Virudhunagar Signature of the applicant Date: Thiru.R.Sundramoorthy

Signature of the Recognized qualified person S.LAKSHMIKANTHAN.M.Sc., Recognized qualified person RQP/MAS/262/2014/A