+ March 23, 2007

Total Page:16

File Type:pdf, Size:1020Kb

+ March 23, 2007 March 23, 2007 Vol. 46, No. 6 Spaceport News John F. Kennedy Space Center - America’s gateway to the universe http://www.nasa.gov/centers/kennedy/news/snews/spnews_toc.html Petro becomes first woman deputy director at KSC Former Science Applications International Center Operations, including Aerospace, including program division and deputy operations manager for overseeing and Corporation manager begins position April 29 manager. She directed technical executing a classified $13-million teams in the design, installation U.S. Department of Defense ASA recently selected ers, and was responsible for and sustainment support for the program at Cape Canaveral Air Janet Petro as the new overseeing program and project Subsurface Engineering and Force Station. The program Ndeputy director of the managers and providing opera- Logistics Support contract. involved integrating, supporting Kennedy Space Center effective tional guidance on various In SAIC’s St. Petersburg and coordinating payloads onto April 29. Petro succeeds William technical projects. division, she led the Cooperative various space vehicles at U.S. Air (Bill) Parsons, who assumed the “I am extremely pleased that Engagement Capability Pre- Force and NASA facilities. Petro position as the director of the Janet has decided to join the Planned Product Improvement also served as a captain in the U.S. center in January. leadership team at Kennedy,” said Program Team in developing Army’s aviation branch. Prior to joining NASA, Petro Parsons. “She brings with her a supportability products for an She holds a bachelor’s degree served in various management strong technical management upgraded signal data processing in engineering from the U.S. positions for Science Applications background and extensive assembly. Military Academy at West Point, International Corporation, also engineering leadership that is “I am honored I was selected to N.Y., and a Master of Science known as SAIC, where she directly applicable to the challeng- join the talented team of profes- degree in business administration provided extensive program ing future here at Kennedy.” sionals at KSC and feel excited to from Boston University Metropoli- management and technical At SAIC, Petro held positions be a part of the tremendously tan College. leadership since December 2000. of increasing responsibility within important mission we have been She resides in Indian Harbor She directly interacted with the corporation’s Satellite Beach given,” said Petro. Beach with her daughter, Hannah, senior-level government custom- Subsurface Engineering and Data Earlier in her career, Petro held and son, Andrew. various senior management Atlantis processing continues positions with McDonnell Douglas while new launch date considered Employees, families enjoy 2007 All-American Picnic IN THE Vehicle Assembly Building, technicians secure protective material around the base of the nose cone of Space Shuttle Atlantis’ external tank. THE 2007 Kennedy Space Center All-American Picnic was held The nose cone is undergoing repair from recent hail damage. At press March 10 at KARS Park 1, complete with beautiful weather and fun time, the launch date for mission STS-117 was still to be determined. activities. See contest results and photographs on pages 4-5. Page 2 SPACEPORT NEWS March 23, 2007 Students in ‘Harmony’ in naming space station module By Linda Herridge The winning entries for Staff Writer “Harmony” came from World Group Home School in Monona, rom theAwards incredible minds of Wis.; a ninth grade class from children came the new name Lubbock High School in Texas; Fof NASA’s Node 2 module, third grade classes from Buchanan which was announced during an Elementary School in Baton unveiling ceremony on March 15 Rouge, La., and West Navarre at Kennedy Space Center’s Space Intermediate School in Navarre, Station Processing Facility. Fla.; and eighth grade classes from Russ Romanella, along with League City Intermediate School mission STS-120 Commander Pam in League City, Texas, and Browne Melroy and Pilot George Zamka, Academy in Alexandria, Va. revealed the module’s new name: Harmony will be delivered to “Harmony.” It is the first U.S. piece the station on mission STS-120, of the station named by people scheduled for later this year. It is outside of the agency. the second of three nodes that will Also attending the event were serve as connectors on the station. Bill Gerstenmaier, associate During the mission, Harmony will administrator for Space Operations, be attached to the front of the U.S. and astronaut Mike Baker, a Lab Destiny. veteran of four space flights. IN THE Space Station Processing Facility, Russ Romanella (right), Both the European Space “It’s an exciting time in the director of International Space Station and Spacecraft Processing, Agency Columbus module and the history of human exploration, with presides over a ceremony to unveil the new name of NASA’s Node 2 Japan Aerospace Exploration module, Harmony. With him are mission STS-120 Commander Pam the recent incredible assembly Agency Kibo research module will Melroy and Pilot George Zamka. activities onboard the station, as use connecting ports on Harmony. well as preparations for future required students to learn about Entries came from 32 states and In an agreement between station missions happening here in the space station, build a scale one U.S. Department of Defense NASA and ESA, the node was built this facility,” said Romanella, who model of Node 2 and write an school in Japan. The 62 entries by Alenia Spazio at its facility in is director of International Space essay explaining their chosen involved more than 3,000 students Torino, Italy. Harmony weighs Station and Spacecraft Processing. name. across all grade levels. The most approximately 30,000 pounds and The node received its new “Involving the youth of our suggested name was submitted by is about 24 feet in length and 15 name through the NASA Exploring nation in our space program is six different schools and was feet in diameter. According to Space Challenges program geared important,” Melroy said. “It will be selected because it symbolizes the Romanella, it is presently the at kindergarten through 12th grade an exciting moment when the STS- spirit of international cooperation heaviest element for delivery to students nationwide. The Node 2 120 crew opens the module in embodied by the station as a the station. Challenge, held in the fall of 2006, space.” whole. U.S. Army’s Golden Knights to appear at World Space Expo he World Space Expo set for November 3-11 at the Kennedy Space Center Visitor Complex will include a weekend aerial salute by Tthe U.S. Army parachute team’s Golden Knights as part of a 45th anniversary tribute to Project Mercury. The Mercury program successfully launched six of the original “Mercury 7” astronauts into space, including Alan Shepard, the first American in space, and John Glenn, the first American to orbit Earth. The 920th Rescue Wing based at Patrick Air Force Base will also stage a demonstration as part of the tribute. The wing, formerly the 301st Rescue Squadron, was responsible for recovering the Mercury capsules when they splashed down in the Atlantic Ocean. “We could not think of a better way to open the World Space Expo aerial salute than with a tribute to the brave men who pioneered America’s manned space program,” said Daniel LeBlanc, chief operating officer of Kennedy Space Center Visitor Complex, host of the World Space Expo. The U.S. Army played a key role in the success of Project Mercury, using its Redstone vehicle as a launch platform. “It is a privilege to perform over the Kennedy Space Center while THE U.S. Army’s Golden Knights parachute team will perform at the paying tribute to the 45th anniversary of Project Mercury,” said Sgt. 1st opening of the Nov. 3-11 World Space Expo. The salute will pay tribute to Class Karen Morrison of Golden Knights Operations. the 45th anniversary of Project Mercury. March 23, 2007 SPACEPORT NEWS Page 3 Hanson receives woman engineer award By Jennifer Wolfinger According to Hanson, the women engineers develop their Staff Writer directorate works closely with the potential. Launch Services Program, Launch Nominees also must have oselle Hanson, the Engi- Vehicle Processing, International worked for and significantly neering Directorate’s Space Station and Spacecraft contributed to the enhancement of Rdeputy director for manage- Processing, and Constellation women’s status on the job or in the ment, was recently selected as the Ground Operations organizations. community; have at least seven Outstanding Woman Engineer of “I have been very fortunate to cumulative years of engineering the Year by the Society of Women have had opportunities to work in experience; and reside or work in Engineers’ Space Coast Chapter. many directorates here at Kennedy Brevard, Volusia or Indian River She was recognized for her Space Center and at NASA counties. sustained excellence, outstanding Headquarters and Johnson Space Hanson graduated from Corbin leadership and personal integrity Center, and to have led several High School in her hometown of that exemplifies and promotes the high-performing teams,” she Corbin, Ky. She received an goals of the society. explained. associate’s degree in civil engi- “I was very surprised and “I love the work we do at neering technology from the honored to be selected. I was NASA and the people — our University of Kentucky. Later, she nominated about 10 years ago in NASA and contractor work force earned a Bachelor of Science another category and, from that — are the best. I believe in degree in electrical engineering experience, I knew the other mentoring individuals and helping and a Master of Science in nominees would be highly them see opportunities to learn and industrial engineering and talented, respected and have grow.” management systems from the outstanding credentials,” said Award nominees must demon- University of Central Florida.
Recommended publications
  • HLS 17RS-1433 ORIGINAL 2017 Regular Session HOUSE CONCURRENT RESOLUTION NO. 41 by REPRESENTATIVE GARY CARTER SPECIAL DAY/WEEK/MO
    HLS 17RS-1433 ORIGINAL 2017 Regular Session HOUSE CONCURRENT RESOLUTION NO. 41 BY REPRESENTATIVE GARY CARTER SPECIAL DAY/WEEK/MONTH: Commends several Tulane University students upon winning NASA's BIG Idea Challenge competition 1 A CONCURRENT RESOLUTION 2 To commend Tulane University students John Robertson, Otto Lyon, Benjamin Lewson, 3 Matthew Gorban, Ethan Gasta, Maxwell Woody, and Afsheen Sajjadi upon their 4 selection as winners of NASA's 2017 BIG Idea Challenge competition. 5 WHEREAS, the National Aeronautics and Space Administration (NASA) is widely 6 regarded as the finest space exploration organization in the world and has an exceptional 7 reputation; and 8 WHEREAS, NASA hosts the BIG Idea Challenge, which is intended to produce 9 designs of crucial importance to manned spaceflight; and 10 WHEREAS, twenty-nine teams from top national universities submitted designs to 11 the BIG Idea Challenge competition; and 12 WHEREAS, the group of students representing Tulane designed a revolutionary solar 13 electric propulsion cargo transport spacecraft, called "The Sunflower", and submitted their 14 design to the BIG Idea Challenge competition in November of 2016; and 15 WHEREAS, in December of 2016, the students were selected to be among five 16 finalist teams and were invited to present their design before a panel of distinguished judges 17 at NASA's Langley research facility in Hampton, Virginia; and 18 WHEREAS, the judges selected the Tulane team and their design as the winner of 19 the BIG Idea Challenge competition; and Page 1 of
    [Show full text]
  • Assessment of Data Used to Manage Real Property Assets (IG-11-024
    AUGUST 4, 2011 AUDIT REPORT OFFICE OF AUDITS NASA INFRASTRUCTURE AND FACILITIES: ASSESSMENT OF DATA USED TO MANAGE REAL PROPERTY ASSETS OFFICE OF INSPECTOR GENERAL National Aeronautics and Space Administration REPORT NO. IG-11-024 (ASSIGNMENT NO. A-11-001-00) Final report released by: Paul K. Martin Inspector General Acronyms FERP Facilities Engineering and Real Property Division GAO Government Accountability Office GSA General Services Administration NPR NASA Procedural Requirements NTC NASA Technical Capabilities OIG Office of Inspector General O&M Operations and Maintenance RPMS Real Property Management System SPF Space Power Facility REPORT NO. IG-11-024 AUGUST 4, 2011 OVERVIEW NASA INFRASTRUCTURE AND FACILITIES: ASSESSMENT OF DATA USED TO MANAGE REAL PROPERTY ASSETS The Issue NASA’s real property holdings include approximately 5,000 buildings and structures such as wind tunnels, laboratories, launch pads, and test stands. In total, the assets occupy 44 million square feet and represent more than $26.4 billion in current replacement value.1 However, 80 percent of NASA’s facilities are 40 or more years old and many are in degraded condition. Moreover, NASA is dealing with the challenge of its aging infrastructure at a time of large and growing budget deficits that are straining the resources of all Federal agencies. As discretionary funding continues to decline, NASA will be required to make more prudent decisions regarding its infrastructure. In addition, the issue of the Agency’s aging infrastructure has been identified by NASA, the
    [Show full text]
  • Delta II Icesat-2 Mission Booklet
    A United Launch Alliance (ULA) Delta II 7420-10 photon-counting laser altimeter that advances MISSION rocket will deliver the Ice, Cloud and land Eleva- technology from the first ICESat mission tion Satellite-2 (ICESat-2) spacecraft to a 250 nmi launched on a Delta II in 2003 and operated until (463 km), near-circular polar orbit. Liftoff will 2009. Our planet’s frozen and icy areas, called occur from Space Launch Complex-2 at Vanden- the cryosphere, are a key focus of NASA’s Earth berg Air Force Base, California. science research. ICESat-2 will help scientists MISSION investigate why, and how much, our cryosphere ICESat-2, with its single instrument, the is changing in a warming climate, while also Advanced Topographic Laser Altimeter System measuring heights across Earth’s temperate OVERVIEW (ATLAS), will provide scientists with height and tropical regions and take stock of the vege- measurements to create a global portrait of tation in forests worldwide. The ICESat-2 mission Earth’s third dimension, gathering data that can is implemented by NASA’s Goddard Space Flight precisely track changes of terrain including Center (GSFC). Northrop Grumman built the glaciers, sea ice, forests and more. ATLAS is a spacecraft. NASA’s Launch Services Program at Kennedy Space Center is responsible for launch management. In addition to ICESat-2, this mission includes four CubeSats which will launch from dispens- ers mounted to the Delta II second stage. The CubeSats were designed and built by UCLA, University of Central Florida, and Cal Poly. The miniaturized satellites will conduct research DELTA II For nearly 30 years, the reliable in space weather, changing electric potential Delta II rocket has been an industry and resulting discharge events on spacecraft workhorse, launching critical and damping behavior of tungsten powder in a capabilities for NASA, the Air Force Image Credit NASA’s Goddard Space Flight Center zero-gravity environment.
    [Show full text]
  • Chapter 4: Environmental Consequences of Alternatives
    Final Constellation Programmatic Environmental Impact Statement 4. ENVIRONMENTAL CONSEQUENCES OF ALTERNATIVES The potential environmental consequences of both the National Aeronautics and Space Administration’s (NASA) Proposed Action (Preferred Alternative) to continue preparations for and to implement the Constellation Program, and the No Action Alternative, not continue preparations for nor implement the Constellation Program, are summarized in Chapter 2 and are presented in detail in this Chapter. In addition, this Chapter presents in Cumulative Impacts (see Section 4.3) the potential environmental consequences of two overlapping but individual NASA actions: implementing the Constellation Program and close-out of the Space Shuttle Program. 4.1 ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION (PREFERRED ALTERNATIVE) Under the Proposed Action, NASA would continue preparations for and implement the Constellation Program. This Program would involve activities at many U.S. Government and commercial facilities. Although detailed aspects of the Constellation Program and the full scope of the activities that might occur at each facility are not fully known, the activities described in Section 2.1 present enough information to broadly estimate the nature of the potential environmental impacts that might occur if NASA implements the Proposed Action. Figure 2-2 presents a high-level summary of the major Constellation Program activities that would be expected to occur at each of the primary U.S. Government facilities, as well as commercial facilities with the potential for significant environmental impacts. Given the long-term nature of the Constellation Program, and NASA’s desire to utilize as much of the Space Shuttle Program infrastructure as practicable, it is expected that over time, many of the existing facilities currently used by the Space Shuttle Program and planned to be used for the Constellation Program would require maintenance, upgrading, renovation, and/or replacement.
    [Show full text]
  • Gateway Program Acquisition Strategy Overview
    70th International Astronautical Congress (IAC), Washington D.C., United States, 21-25 October 2019. Copyright ©2019 by the International Astronautical Federation (IAF). All rights reserved. IAC-19,E3,6,5,x53831 GATEWAY PROGRAM ACQUISITION STRATEGY OVERVIEW Emma Lehnhardta, Christopher Zavrelb, Nicole Herrmannc a National Aeronautics and Space Administration, Johnson Space Center, United States, [email protected] b Stellar Solutions Inc, United States, [email protected] c National Aeronautics and Space Administration, Headquarters, United States, [email protected] Abstract This paper will provide an overview of the acquisition strategy for the Gateway Program. The Gateway will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface, as well as a staging point for further deep space exploration. The Gateway will foster U.S. industry and international partnerships and enable multi-discipline utilization. The National Aeronautics and Space Administration (NASA) will lead this next step and will serve as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop the Gateway. The Gateway will be developed in a manner that will also allow future capabilities and collaborations with U.S. Government, private sector companies, and international partners. Gateway is embracing innovation and flexibility; both in system architecture and in procurement approach. The Gateway’s agile acquisition strategy will shape the entire system life cycle, from design and analysis through production, verification, launch, logistics and operations. This strategy will encourage new ways of doing business to accommodate new techniques, technologies and approaches; improving affordability and maximizing Gateway utility.
    [Show full text]
  • NASA's Strategic Direction and the Need for a National Consensus
    NASA's Strategic Direction and the Need for a National Consensus NASAs Strategic Direction and the Need for a National Consensus Committee on NASAs Strategic Direction Division on Engineering and Physical Sciences THE NATIONAL ACADEMIES PRESS Washington, D.C. www.nap.edu PREPUBLICATION COPYSUBJECT TO FURTHER EDITORIAL CORRECTION Copyright © National Academy of Sciences. All rights reserved. NASA's Strategic Direction and the Need for a National Consensus THE NATIONAL ACADEMIES PRESS 500 Fifth Street, NW Washington, DC 20001 NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. The members of the committee responsible for the report were chosen for their special competences and with regard for appropriate balance. This study is based on work supported by Contract NNH10CC48B between the National Academy of Sciences and the National Aeronautics and Space Administration. Any opinions, findings, conclusions, or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of the agency that provided support for the project. International Standard Book Number-13: 978-0-309-XXXXX-X International Standard Book Number-10: 0-309-XXXXX-X Copies of this report are available free of charge from: Division on Engineering and Physical Sciences National Research Council 500 Fifth Street, NW Washington, DC 20001 Additional copies of this report are available from the National Academies Press, 500 Fifth Street, NW, Keck 360, Washington, DC 20001; (800) 624-6242 or (202) 334-3313; http://www.nap.edu.
    [Show full text]
  • The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions
    Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions Presented at the 2007 ISPA/SCEA Joint International Conference & Workshop June 12-15, New Orleans, LA Bob Bitten, Debra Emmons, Claude Freaner 1 Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com Abstract • The upcoming retirement of the Delta II family of launch vehicles leaves a performance gap between small expendable launch vehicles, such as the Pegasus and Taurus, and large vehicles, such as the Delta IV and Atlas V families • This performance gap may lead to a variety of progressions including – large satellites that utilize the full capability of the larger launch vehicles, – medium size satellites that would require dual manifesting on the larger vehicles or – smaller satellites missions that would require a large number of smaller launch vehicles • This paper offers some comparative costs of co-manifesting single- instrument missions on a Delta IV/Atlas V, versus placing several instruments on a larger bus and using a Delta IV/Atlas V, as well as considering smaller, single instrument missions launched on a Minotaur or Taurus • This paper presents the results of a parametric study investigating the cost- effectiveness of different alternatives and their effect on future NASA missions that fall into the Small Explorer (SMEX), Medium Explorer (MIDEX), Earth System Science Pathfinder (ESSP), Discovery,
    [Show full text]
  • Photographs Written Historical and Descriptive
    CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY HAER FL-8-B BUILDING AE HAER FL-8-B (John F. Kennedy Space Center, Hanger AE) Cape Canaveral Brevard County Florida PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA HISTORIC AMERICAN ENGINEERING RECORD SOUTHEAST REGIONAL OFFICE National Park Service U.S. Department of the Interior 100 Alabama St. NW Atlanta, GA 30303 HISTORIC AMERICAN ENGINEERING RECORD CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. FL-8-B Location: Hangar Road, Cape Canaveral Air Force Station (CCAFS), Industrial Area, Brevard County, Florida. USGS Cape Canaveral, Florida, Quadrangle. Universal Transverse Mercator Coordinates: E 540610 N 3151547, Zone 17, NAD 1983. Date of Construction: 1959 Present Owner: National Aeronautics and Space Administration (NASA) Present Use: Home to NASA’s Launch Services Program (LSP) and the Launch Vehicle Data Center (LVDC). The LVDC allows engineers to monitor telemetry data during unmanned rocket launches. Significance: Missile Assembly Building AE, commonly called Hangar AE, is nationally significant as the telemetry station for NASA KSC’s unmanned Expendable Launch Vehicle (ELV) program. Since 1961, the building has been the principal facility for monitoring telemetry communications data during ELV launches and until 1995 it processed scientifically significant ELV satellite payloads. Still in operation, Hangar AE is essential to the continuing mission and success of NASA’s unmanned rocket launch program at KSC. It is eligible for listing on the National Register of Historic Places (NRHP) under Criterion A in the area of Space Exploration as Kennedy Space Center’s (KSC) original Mission Control Center for its program of unmanned launch missions and under Criterion C as a contributing resource in the CCAFS Industrial Area Historic District.
    [Show full text]
  • Do NASA's Wind Tunnel and Propulsion Test Facilities Serve
    NEWS RELEASE RESEARCH BRIEF CONFERENCE PROCEEDINGS Do NASA’s Wind Tunnel and Propulsion Test Facilities Serve National Needs? RAND RESEARCH AREAS he nation has invested billions of dollars in CHILD POLICY CIVIL JUSTICE wind tunnel and propulsion test facilities— Abstract EDUCATION investments that have created a testing NASA’s wind tunnel and propulsion test facil- ENERGY AND ENVIRONMENT infrastructure that has helped secure the PROJECT HEALTH AND HEALTH CARE ities continue to be important to U.S. com- Tcountry’s national security and prosperity through INTERNATIONAL AFFAIRS petitiveness across the military, commercial, MEMORANDUM NATIONAL SECURITY advances in commercial and military aeronautics and space sectors. But management issues POPULATION AND AGING and space systems. are creating real risks. This research shows PUBLIC SAFETY Many of these facilities exist within the National SCIENCE AND TECHNOLOGY that NASA needs to develop an aeronautics SUBSTANCE ABUSE Aeronautics and Space Administration (NASA). test technology vision and plan, analyze the TERRORISM AND Over the past two decades, NASA has reduced the HOMELAND SECURITY viability of a national test facility plan, iden- TRANSPORTATION AND number of these facilities by one-third, has identi- tify and maintain its minimum set of facilities, INFRASTRUCTURE fied additional facilities to be closed, and is experi- and identify shared financial support to keep encing patterns of declining use in some facilities its underutilized but essential facilities from that suggest they too may face closure. entering financial collapse. Given these trends, the RAND Corporation was asked to clarify the nation’s aeronautic testing needs and the continuing place that NASA’s facilities have in serving these needs.
    [Show full text]
  • Gao-21-306, Nasa
    United States Government Accountability Office Report to Congressional Committees May 2021 NASA Assessments of Major Projects GAO-21-306 May 2021 NASA Assessments of Major Projects Highlights of GAO-21-306, a report to congressional committees Why GAO Did This Study What GAO Found This report provides a snapshot of how The National Aeronautics and Space Administration’s (NASA) portfolio of major well NASA is planning and executing projects in the development stage of the acquisition process continues to its major projects, which are those with experience cost increases and schedule delays. This marks the fifth year in a row costs of over $250 million. NASA plans that cumulative cost and schedule performance deteriorated (see figure). The to invest at least $69 billion in its major cumulative cost growth is currently $9.6 billion, driven by nine projects; however, projects to continue exploring Earth $7.1 billion of this cost growth stems from two projects—the James Webb Space and the solar system. Telescope and the Space Launch System. These two projects account for about Congressional conferees included a half of the cumulative schedule delays. The portfolio also continues to grow, with provision for GAO to prepare status more projects expected to reach development in the next year. reports on selected large-scale NASA programs, projects, and activities. This Cumulative Cost and Schedule Performance for NASA’s Major Projects in Development is GAO’s 13th annual assessment. This report assesses (1) the cost and schedule performance of NASA’s major projects, including the effects of COVID-19; and (2) the development and maturity of technologies and progress in achieving design stability.
    [Show full text]
  • Spaceport News John F
    Aug. 9, 2013 Vol. 53, No. 16 Spaceport News John F. Kennedy Space Center - America’s gateway to the universe MAVEN arrives, Mars next stop Astronauts By Steven Siceloff Spaceport News gather for AVEN’s approach to Mars studies will be Skylab’s Mquite different from that taken by recent probes dispatched to the Red Planet. 40th gala Instead of rolling about on the By Bob Granath surface looking for clues to Spaceport News the planet’s hidden heritage, MAVEN will orbit high above n July 27, the Astronaut the surface so it can sample the Scholarship Foundation upper atmosphere for signs of Ohosted a dinner at the what changed over the eons and Kennedy Space Center’s Apollo/ why. Saturn V Facility celebrating the The mission will be the first 40th anniversary of Skylab. The of its kind and calls for instru- gala featured many of the astro- ments that can pinpoint trace nauts who flew the missions to amounts of chemicals high America’s first space station. above Mars. The results are Six Skylab astronauts partici- expected to let scientists test pated in a panel discussion dur- theories that the sun’s energy ing the event, and spoke about slowly eroded nitrogen, carbon living and conducting ground- dioxide and water from the Mar- breaking scientific experiments tian atmosphere to leave it the aboard the orbiting outpost. dry, desolate world seen today. Launched unpiloted on May “Scientists believe the planet 14, 1973, Skylab was a complex CLICK ON PHOTO NASA/Tim Jacobs orbiting scientific laboratory. has evolved significantly over NASA’s Mars Atmosphere and Volatile Evolution (MAVEN) spacecraft rests on a processing the past 4.5 billion years,” said stand inside Kennedy’s Payload Hazardous Servicing Facility Aug.
    [Show full text]
  • Nasa Launch Services Program
    NASA LAUNCH SERVICES PROGRAM HELIOPHYSICS EXPLORERS MIDEX 2019 ANNOUNCEMENT OF OPPORTUNITY PRE-PROPOSAL CONFERENCE JULY 23, 2019 Diana Manent Calero Flight Projects Office 1 Launch Services Program Relationships (NASA/HEOMD/KSC) NASA HQ Bridenstine ISS CRS SPACE HUMAN SCIENCE TECHNOLOGY EXPLORATION Zurbuchen Reuter Bowersox Commercial Crew DIRECTOR, LAUNCH SERVICES OFFICE FLIGHT NORMAN PLANNING KENNEDY PROCUREMENT BOARD SPACE CENTER RESOURCES CABANA INFRASTRUCTURE LAUNCH IT LEGAL ETC. SPACECRAFT PROGRAMS SERVICES SAFETY & AND PROJECTS AT NASA PROGRAM ENGINEERING MISSION CENTERS ASSURANCE MITSKEVICH INDEPENDENT TECHNICAL AUTHORITIES Interfaces to other NASA Centers Support Contractor Interface SSC MSFC, GRC ELVIS (AI Solutions) PROPULSION TECHNICAL SUPPORT SUPPORT SUPPORT CONTRACTOR 2 LSP Organizational Structure Matrixed Organizations LAUNCH SERVICES PROGRAM Amanda Mitskevich Chuck Dovale Risk Mgmt/Tech Policy SYSTEM INTEGRATION Business Development Darren Bedell LSP CHIEF ENGINEER Launch Manifest James Wood PROCUREMENT LAUNCH DIRECTOR Coordination John Vondenhuevel Omar Baez Engineering Mission Management Bob Mott Pre-Phase A–E CHIEF FINANCIAL OFFICE FLIGHT PROJECTS HQ McKinney Albert Sierra Chief Safety Officer Rick Boutin Contracts CHIEF COUNSEL Budgeting Joe Batey PROGRAM BUSINESS S & MA Bobbi Gnan Raoul Caimi Strategic Planning Technical Authority Center Support PROGRAM PLANNING Policy Lisa Haber FLEET & SYSTEMS MGMT FLIGHT ANALYSIS INFRASTRUCTURE MGMT Jenny Lyons/Denise Pham Mike Carney Ralph Mikulas Fleet Flight Dynamics Ground
    [Show full text]