<<

Kamarhati e - Newsletter

Kamarhati Municipality e - Newsletter From Chairman Desk:-

News is a good fascia to reach common people. After a long gap it is the right time to share innovative work with our citizen. Our goal is to make the town pollution free by developing open space & road beautification. Maximum vacant lands are improved by open green space like children parks, landscaping etc. as per our vision. There are innumerable benefits of open spaces. Most significantly it is used by children and senior citizens. The effect of open green space is to reduce unhealthy carbon di- oxide by plantation of trees. The presence of trees and dense greenery can reduce temperature for atmosphere and help to control heat growth that has become issue of current urban settlements as mentioned in the guide line of the department of environment, Govt. of .

Digitization is playing a vital role in developing country like India. Internet connectivity become inhabitable. Now we decide to provide free Wi-Fi system to create the habit of our citizen to use the online work as well as banking system too. In this connection we are also to inform our citizen that our town is going to celebrate 125 years after few years.so, some places within our town is well known not only at national level but also Internationally such as , Adyapith, Shilpapitha and Boro masjid. So, we select seven places of our town to erect tower with Wi-Fi radio system to boost the internet connection.

Govt. of has taken an innovative project by erecting a skywalk from Dakshineswar railway station to gate, which length is about 380 meter long and 10.5 meter wide. It is the dream project of our hon’ble Chief Minister Smt. Mamata Baneerjee, which was executed by KMDA, as this type of skywalk is the 1st project not only in our state but in our country. It was inaugurated on 5th November, 2018 before Kalipuja by our Hon’ble chief minister.

Our citizen are going to get the facility of metro railway after completion of extension of metro line from Noapara to Dakshineswar. And it may take more than 6 months. It connect our citizen to city directly with minimum time.

But our major thinking is now to irradiate dengue, swine-flew etc. from our town and we are taking necessary measures and follow the government guide line. Mentioning the procedure and method to reduce the growth rate of mosquito. Kamarhati Municipality e - Newsletter

In the last year we were able to collect the property tax 488.98 lakhs but in the current financial year (2019-2020) Our target is to reach 600 lakhs.

Apart from above mentioned work we renovated and modernized Arriadaha buroshibtala Burning Ghat and we also installed CCTV camera at different important places.

Kamarhati Municipality e - Newsletter

Components:-

❖ Swachh Bharat / Nirmal Bangla Mission ❖ Green City Project & E-governance ❖ Pradhanmantri Aawas Yojana (HFA) ❖ Arriadaha burning Ghat ❖ Health

❖ Water supply

❖ Word for public

Kamarhati Municipality e - Newsletter SWACHH BHARAT:-

Swachh Bharat And Nirmal Bangla Mission

It has been started since 2016-2017 financial years, after the Kamarhati municipality successfully had contributed towards the declaration of open defecation free (ODF) of north 24 parganas, the municipality is keeping a strict vigil to ensure that the toilets built are being used by the beneficiaries. Although it is a fact that several beneficiaries had to cancel their allocation of the latrine due to inadequate area. Keeping in view of this scenario the municipality has started community latrine especially for the EWS and slum dwellers, where sufficient space is not available for the individual latrine model. It is to be noted that we have more demand.

Kamarhati Municipality e - Newsletter

Achievement Year Target G.O No. Total fund Completed On going 24/1(11)/MNB 2016-2017 300 145 155 2397000.00 (NZP). dt.11.02.16 24/1(11)/MNB 2017-2018 300 155 2397000.00 (NZP). dt.11.02.16

Beneficiary Total govt. Rate per Total Year contribution share unit expenditure collected disbursed 2016-2017 10990 307000.00 2397000.00 1158550.00

2017-2018 10990 54000.00 2397000.00 1078650.00

Once the project details along with fund share are finalized municipality residents will be informed in due course of time.

Kamarhati Municipality e - Newsletter Green City Project & E-Governance:-

This is a mission project which is entirely funded by the state government itself with the aim of increasing greening of city and as well to restore the water bodies of city along with their beautification. This project will also address the issue of “Safe Drive Save life” by constructing footpath along selected busy roads thus segregating pedestrians from vehicular traffic and hence reducing conflicts and accidents while making for more space for the vehicles to play through smoothly and relieve from congestion.

Another interesting component of this project is Wi-Fi free Zone across the entire municipality. The selected seven zones were granted as a important zone for Wi-Fi installation. This would be part of the state government ambition for encouraging e-governance activities and as well increasing penetration of digital literacy too, among the citizen of the town.

Kamarhati municipality being located at the northern periphery of is a significant entry points for millions of migrants from surrounding urban and suburban areas. This gives rise to major security concerns for the local and state authorities. Hence to monitor effectively CCTV cameras has already been installed at strategic Junctions of major roads passing through the municipality, hospital area and also in other areas with presence of important municipal assets and vital infrastructures.

Kamarhati Municipality e - Newsletter Pradhan Mantri Awas Yojna (Housing For All):-

Another important project initiated during the last quarter was the housing for all mission also known as pradhanmantri Aawas yojana, with the aim at providing permanent houses to the needy, who cannot affort a proper roof over their head.

Kamarhati Municipality e - Newsletter

Fund received Beneficiary under HFA Utilized Fund FY from SUDA (LAKH) Sanctioned Completed Ongoing (LAKH 2015-16 476 331 92 1481.97 1429.9

2016-17 600 - 353 329.00 247.00

Kamarhati Municipality e - Newsletter Arriadaha Buroshibtala Burning Ghat:-

Burning Ghat is a holy place for Hindu religion people. Buroshibtala burning Ghat was established on 1993 at Arriadaha in Kamarhati. In addition, one rest room was constructed beside furnish room. Recently furnace chamber has been replaced by new model and moderation of civil construction was done. It was inaugurated by our Honorable Chairman Sri Gopal Saha on 4th January 2019. The environment around Arriadaha Buroshibtala Buring Ghat is very decent and clean.

Kamarhati Municipality e - Newsletter Health:-

Health, as defined by the world health organization (WHO), is a state of complete physical, mental condition of the social well –being, merely the absence of disease or infirmity. Keeping the importance in mind government takes a scheme through The Urban Primary Health Center (UPHC) under NUHM. The concept of primary health centers is foundational to the Indian Health System. Building for new UPHC and additional infrastructure shall be provided by the state Govt. as per specified parameters. The cost within these parameters can be counted as part of 20% state share. There are seven Nos. of UPHC building in our Kamarhati Municipality. We have organized 20-25 nos. of health camp in a month.

UPHC-1 Kamarhati lock gate UPHC-2 A.C.sarkar Road (Dolpiri Bazar) UPHC-3 Basanta Bihar UPHC-4 Nandan Nagar near girls high school UPHC-5 Kamarhati Municipality UPHC-6 D.P.Nagar (Desopriyo nagar) UPHC-7 Jatindas nagar

Kamarhati Municipality e - Newsletter Water Supply:-

This is one of the main focus of the municipality to upgrade the existing water supply network of municipality along with laying of new pipelines. Our aim is to avoid ground water extraction to surface water. This is under AMRUT project being funded by the Government of India and state government also. Presently, less than 70% of the area is covered with the clear distribution system with direct pumping of treated surface water and from deep tube well .Augmentation of pumps at CWPH , augmentation dedicated pumping main, construction of ESRs, connection between downcomer from ESR to existing distribution network and replacement of some distribution line with higher diameter pipes required in order to achieve 100 % geographical coverage are the main component of the project. The capital cost of the scheme comes to Rs. 5000. Lakh. Total beneficiaries of the scheme of 402230 nos. are projected for the vision of 2034 Ad.

Kamarhati Municipality e - Newsletter Plastic Prohibition & Green open space:-

Efforts are ongoing to implement the new policy by prohibiting plastic, Less than 50 micron, hence our- “Municipality would like to request all concerned parties to stop manufacturing of carry –bags /plastic films , which is less than 50 microns ; else the facility will be shut down. Violation Of this would be strictly addressed with appropriate financial and other punitive action” - word for the public.

Government has already implemented rules to convert open space to green Field. Citizens are requested to obey the rules and maintain municipal building act 2007 for constructing building as per rule.

Kamarhati Municipality e - Newsletter

For feedback & Suggestions

------Please Contact------

Office of the Municipal Councillors, Kamarhati 1, M.M. Feeder Road, P.O. Belgharia 24-Parganas (North), Kolkata-700056 Phone No.: 033-25649580, 033-25648646 Fax: (033) 2564 -1361/2544-3900 Email:[email protected]