BARASAT (16.876Km)
NUMBER OF STATIONS IN OPERATION BETWEEN NOAPARA- KAVI SUBHASH MODIFIED DATE:- 22.12.16 BARRACKPUR N D. UNDER CONSTRUCTION OF KMRCL E. EXISTING E.RLY & S.E RAILWAY LINE AND STATIONS B. UNDER CONSTRUCTION BY METRO RAILWAY C. UNDER CONSTRUCTION BY RVNL A. EXISTING NOAPARA - KAVI SUBHASH (27.28 KM) UNDER GROUND iii. KAVISUBASH (NEW GARIA)-BIMANBANDAR (29.10 KM) iv. JOKA-BBD BAG (15.075 KM) i. HOWRAH- SALTLAKE EAST WEST CORRIDOR(14.67KM) ii. BARANAGAR- BARRACKPUR (12.40 KM) i. NOAPARA - BARASAT (17.025 KM) i. NOAPARA- BARANAGAR-DAKSHINESWAR (4.139 KM) 12.40KM TALPUKUR (CH-11.40) 15 TITAGARH (CH-10.10) TATA GATE (CH-8.80) BARASAT
ELEVATED (16.876Km) 7 SUBHAS NAGAR (CH-7.90) KHARDAH (CH-6.249EX KNAP/29.87EX KAVI SUBASH) (CH:6.50)
*11)*.;4+8'4 E.R MAIN LINE (HOWRAH-BARDHAMAN)
SURFACE 2 LINE SUBURBAN BANGAON DUM-DUM E.R PANIHATI (CH:5.40)
HRIDAYPUR (CH:14.93) TOTAL (CH:4.20) SODEPUR 24
$641#& MADHYAMGRAM
(CH:12.31) E.R SEALDAH - NAIHATI LINE AGARPARA (CH:2.80) DAKSHINESWAR CH-6.23 EX DMI
NEW BARRACKPUR NOAPARA (KNAP) CH:2.091 EX KDMI (CH:7.81)BIRATI KAMARHATI (CH:10.250) (CH:1.20) (HALDIRAM) TEGHORIA E R CHORD LINE
(HOWRAH-BARDHAMAN) (CH:2.835 EX KNAP)
BALLY CH-24.25 JESSORE RD CENTER-II) (CITY
(CH-0.00/4.47 EX DMI) (CH:5.125) ER CCR LINE TITUMIR
BARANAGAR
DUM
CANT
CH:22.17
CONVENTION VIP ROAD CENTER
CH:27.88
CH:23.37 SUB CBD-2 CBD-2 SUB RABINDRA TIRTHA DUM RAGHUNATHPUR (RAJARHAT ROAD) CH:0.000 (KDMI)
(KSHO) SHOBHABAZAR CH:26.34 NEW TOWN BAGUIHATI CH:20.91 4#,#4*#6
CH:4.704 DUM DUM PARK )12#.274 KALAKHETRA (CBD-2) CH:20.07 CH:14.592 (R.MITRA)
CH:2.030 CENTRAL PARK AEN/HQ-II HOWRAH
BELGACHIA (KBEL) CBD-1 CH:18.69
CH:2.936 CITY CENTRE
CH:2.151
KARUNAMOYEE CH:1.224 SHYAM BAZAR(KSHY) (KGPK)
GIRISH PARK
CH:5.705
B.B. D. BAGH(MAHAKARAN) KESHTOPUR S.E RLY MAIN LINE (HWH-KGP) CH:3.776
CH:0.000 SECTOR V SALT LAKE MAIDAN HOWRAH CH:15.649 SUB CBD-1 CH:17.55
PHOOL BAGAN CH:6.578 BIDHANNAGAR CH:16.22 SANTRAGACHI
BENGAL CHEMICAL CH:4.090 TECHNOPOLIS CH:6.471 M.G ROAD
(KMHR)
CH-12.385 CH:15.15 CH:7.508 CENTRAL (KCEN) SALT LAKE SECTOR-V CH:14.02 ESPLANADE
CH:11.514 KAVISUBHAS
SALT LAKE
CH:4.885 STADIUM NOAPARA STATION LOCATION OF ART
ESPLANADE NICCO PARK CH:12.57
(CH:14.215) SEALDAH
CH:8.885 SEALDAH
CHANDNI CHOWK (KCWC) (CH:12.025)
ESPLANADE(KESP) VICTORIA
CH:8.810
PARK STREET
(KPSK)
CH:9.618 (S.BANERJEE) SHALIMAR DY.CE/HQ GOUR KISHORE GHOSH CH:8.105 (CHINGRIGHATA)
(CH:13.29) PARK ST. KHIDDIRPUR
CH-9.87 BELIGHATA CH:9.5
CH:10.345 ART
BARUN SENGUPTA (SCIENCECITY) CH:8.23 TUNNEL END OF MAHANAYAK UTTAM KUMAR - STARTING 1 1 CH:11.361 RABINDRA SADAN (KRSD) PARK CIRCUS CH:11.17 (KMDI) MAIDAN (KNBN) NETAJI BHAVAN RITWIK GHATAK(BANTALA ROAD) MAHANAYAK UTTAM KUMAR - STARTING POINT OF POINT OF ELEVATED TOWARDS NETAJI BELGACHIA- MAHANAYAK UTTAM KUMAR MOMINPUR (CH:8.755)
CH:12.209 V I P BAZAR CH:6.36
J.D PARK (KJPK) CH:13.242 KAVISUBHAS STATION KAVISUBHAS STATION B.G SECTION DUMDUM - BELGACHIA UNDER GROUND N NOAPARA- DUMDUM OAPARA - DUMDUM ELEVATED
HEMANTA MUKHERJEE SURFACE SECTION KAVISUBHAS TOTAL
NOAPARA - BALLYGUNJ (RUBY HOSPITAL) CH:5.12 KALIGHAT (KKHG) CH:13.863
MAJERHAT
(CH:7.74) CH:7.3 '/$; CH:15.106 RABINDRA
SAROBAR
(KRSB) KAVI SUKANTA(KALIKA PUR) TRACK KILOMETERS CHIEF ENGINEER (P.SINGH)
TARATALA CH-6.49 ROUTE KM
27.28 E.R SEALDAH (SOUTH)
BG 1676 MM JYOTININDRA NATH
CH:16.450 KUMAR (KMUK) MH.UTTAM
2#55 (MUKUND PUR)CH:2.98
BEHALA BAZAR SUBURBAN LINE
(CH:5.46) &*4& 183.151
BEHALA CHOWRASTA CH:4.07 ETKM SATYAJIT ROY CH:1.59 27.280 15.250 (CH:4.12) 0.550 1.723 0.175
NANDY 1.100 8.060 0.422
CH:0.29 FOR AIRPORT CORRIDOR 1645.91 ITKM
SAKHER BAZAR NETAJI (KNTJ) CH:18.264 GARIA (CH:2.67)
CH:19.975 KAVI SUBHAS MASTERDA SURYASEN (KMSN)
GEETANJALI (KGTN) SCALE: 1 IN 10500 (APPROX)
(KSKD) SHAHID KHUDIRAM
CH:21.039
KAVI NAZRUL (KKNZ) CORRECTED UP TO 31ST.MARCH 2017 DEPOT (KKVS)
CH:22.284
CH-0.00 (CH:1.45) THAKURPUKUR JOKA
CH:23.559
CH:25.135 EX DMI (NEW GARIA BOUNDARY DISTRICT
CH.-1.00KM
DIAMOND PARK
(CH:-2.00KM)
)