Quick viewing(Text Mode)

BARASAT (16.876Km)

BARASAT (16.876Km)

NUMBER OF STATIONS IN OPERATION BETWEEN NOAPARA- KAVI SUBHASH MODIFIED DATE:- 22.12.16 BARRACKPUR N D. UNDER CONSTRUCTION OF KMRCL E. EXISTING E.RLY & S.E RAILWAY LINE AND STATIONS B. UNDER CONSTRUCTION BY METRO RAILWAY C. UNDER CONSTRUCTION BY RVNL A. EXISTING NOAPARA - KAVI SUBHASH (27.28 KM) UNDER GROUND iii. KAVISUBASH (NEW )-BIMANBANDAR (29.10 KM) iv. JOKA-BBD BAG (15.075 KM) i. - SALTLAKE EAST WEST CORRIDOR(14.67KM) ii. - BARRACKPUR (12.40 KM) i. NOAPARA - (17.025 KM) i. NOAPARA- BARANAGAR- (4.139 KM) 12.40KM TALPUKUR (CH-11.40) 15 (CH-10.10) TATA GATE (CH-8.80) BARASAT

ELEVATED (16.876Km) 7 SUBHAS NAGAR (CH-7.90) KHARDAH (CH-6.249EX KNAP/29.87EX KAVI SUBASH) (CH:6.50)

*11)*.;4+8'4 E.R MAIN LINE (HOWRAH-)

SURFACE 2 LINE SUBURBAN DUM-DUM E.R (CH:5.40)

HRIDAYPUR (CH:14.93) TOTAL (CH:4.20) 24

$641#&

(CH:12.31) E.R - LINE (CH:2.80) DAKSHINESWAR CH-6.23 EX DMI

NEW BARRACKPUR NOAPARA (KNAP) CH:2.091 EX KDMI (CH:7.81) (CH:10.250) (CH:1.20) (HALDIRAM) E R CHORD LINE

(HOWRAH-BARDHAMAN) (CH:2.835 EX KNAP)

BALLY CH-24.25 JESSORE RD CENTER-II) (CITY

(CH-0.00/4.47 EX DMI) (CH:5.125) ER CCR LINE TITUMIR

BARANAGAR

DUM

CANT

CH:22.17

CONVENTION VIP ROAD CENTER

CH:27.88

CH:23.37 SUB CBD-2 CBD-2 SUB RABINDRA TIRTHA DUM RAGHUNATHPUR ( ROAD) CH:0.000 (KDMI)

(KSHO) CH:26.34 NEW TOWN BAGUIHATI CH:20.91 4#,#4*#6

CH:4.704 PARK )12#.274 KALAKHETRA (CBD-2) CH:20.07 CH:14.592 (R.MITRA)

CH:2.030 CENTRAL PARK AEN/HQ-II HOWRAH

BELGACHIA (KBEL) CBD-1 CH:18.69

CH:2.936 CITY CENTRE

CH:2.151

KARUNAMOYEE CH:1.224 SHYAM BAZAR(KSHY) (KGPK)

GIRISH PARK

CH:5.705

B.B. D. BAGH(MAHAKARAN) KESHTOPUR S.E RLY MAIN LINE (HWH-KGP) CH:3.776

CH:0.000 SECTOR V SALT LAKE MAIDAN HOWRAH CH:15.649 SUB CBD-1 CH:17.55

PHOOL BAGAN CH:6.578 CH:16.22 SANTRAGACHI

BENGAL CHEMICAL CH:4.090 TECHNOPOLIS CH:6.471 M.G ROAD

(KMHR)

CH-12.385 CH:15.15 CH:7.508 CENTRAL (KCEN) SALT LAKE SECTOR-V CH:14.02 ESPLANADE

CH:11.514 KAVISUBHAS

SALT LAKE

CH:4.885 STADIUM NOAPARA STATION LOCATION OF ART

ESPLANADE NICCO PARK CH:12.57

(CH:14.215) SEALDAH

CH:8.885 SEALDAH

CHANDNI CHOWK (KCWC) (CH:12.025)

ESPLANADE(KESP) VICTORIA

CH:8.810

PARK STREET

(KPSK)

CH:9.618 (S.BANERJEE) SHALIMAR DY.CE/HQ GOUR KISHORE GHOSH CH:8.105 (CHINGRIGHATA)

(CH:13.29) PARK ST. KHIDDIRPUR

CH-9.87 BELIGHATA CH:9.5

CH:10.345 ART

BARUN SENGUPTA (SCIENCECITY) CH:8.23 TUNNEL END OF MAHANAYAK UTTAM KUMAR - STARTING 1 1 CH:11.361 RABINDRA SADAN (KRSD) CH:11.17 (KMDI) MAIDAN (KNBN) NETAJI BHAVAN RITWIK GHATAK( ROAD) MAHANAYAK UTTAM KUMAR - STARTING POINT OF POINT OF ELEVATED TOWARDS NETAJI - MAHANAYAK UTTAM KUMAR MOMINPUR (CH:8.755)

CH:12.209 V I P BAZAR CH:6.36

J.D PARK (KJPK) CH:13.242 KAVISUBHAS STATION KAVISUBHAS STATION B.G SECTION DUMDUM - BELGACHIA UNDER GROUND N NOAPARA- DUMDUM OAPARA - DUMDUM ELEVATED

HEMANTA MUKHERJEE SURFACE SECTION KAVISUBHAS TOTAL

NOAPARA - BALLYGUNJ (RUBY HOSPITAL) CH:5.12 (KKHG) CH:13.863

MAJERHAT

(CH:7.74) CH:7.3 '/$; CH:15.106 RABINDRA

SAROBAR

(KRSB) KAVI SUKANTA(KALIKA PUR) TRACK KILOMETERS CHIEF ENGINEER (P.SINGH)

TARATALA CH-6.49 ROUTE KM

27.28 E.R SEALDAH (SOUTH)

BG 1676 MM JYOTININDRA NATH

CH:16.450 KUMAR (KMUK) MH.UTTAM

2#55 (MUKUND PUR)CH:2.98

BEHALA BAZAR SUBURBAN LINE

(CH:5.46) &*4& 183.151

BEHALA CHOWRASTA CH:4.07 ETKM SATYAJIT ROY CH:1.59 27.280 15.250 (CH:4.12) 0.550 1.723 0.175

NANDY 1.100 8.060 0.422

CH:0.29 FOR AIRPORT CORRIDOR 1645.91 ITKM

SAKHER BAZAR NETAJI (KNTJ) CH:18.264 GARIA (CH:2.67)

CH:19.975 KAVI SUBHAS MASTERDA SURYASEN (KMSN)

GEETANJALI (KGTN) SCALE: 1 IN 10500 (APPROX)

(KSKD) SHAHID KHUDIRAM

CH:21.039

KAVI NAZRUL (KKNZ) CORRECTED UP TO 31ST.MARCH 2017 DEPOT (KKVS)

CH:22.284

CH-0.00 (CH:1.45) JOKA

CH:23.559

CH:25.135 EX DMI ( BOUNDARY

CH.-1.00KM

DIAMOND PARK

(CH:-2.00KM)

)