B.G SECTION CONVENTION UNDER GROUND BELGACHIA- MAHANAYAK UTTAM KUMAR 15.250 CH:22.17 CENTER NOAPARA- DUMDUM 0.422 ELEVATED TITUMIR (CITY CENTER-II) DUMDUM - BELGACHIA 1.100 E.R DUM-DUMHRIDAYPUR BANGAON SUBURBAN LINE SUB CBD-1 NOAPARA - DUMDUM 1.723 (CH:14.93) CH-24.25 SUB CBD-2 CBD-1 CH:18.69 CH:17.55 CH:20.91 NEW TOWN MAHANAYAK UTTAM KUMAR - STARTING POINT OF 8.060 (CH:10.250) CH:23.37 KAVISUBHAS STATION KALAKHETRA BARASAT (CBD-2) CH:20.07 SURFACE NEW BARRACKPUR BIDHANNAGAR (16.876Km) (CH:12.31) CH:16.22 TUNNEL END OF MAHANAYAK UTTAM KUMAR - STARTING MADHYAMGRAM 0.550 POINT OF ELEVATED TOWARDS NETAJI KAVISUBHAS STATION 0.175 N TOTAL 27.280 RABINDRACH:26.34 TIRTHA TECHNOPOLIS BIRATI (RAJARHAT ROAD) KESHTOPUR CH:15.15 ) (CH:7.81) VIP ROAD CH:27.88 4#,#4*#6 SALT LAKE CH:4.07 TEGHORIA )12#.274SECTOR V SALT LAKE SECTOR-V CH:14.02 CH:7.3 (HALDIRAM) CH:0.000 JESSORE RD NANDY KARUNAMOYEE (CH:5.125) CH:11.17 CH:1.224 (NEW GARIA (CH-6.249EX KNAP/29.87EX KAVI SUBASH) DUM DUM DUM DUM CENTRAL PARK NICCO PARK CH:12.57 PARK CANT BAGUIHATI CH:2.030 (CH:2.835 EX KNAP) BENGAL CHEMICAL CH:25.135 EX DMI RAGHUNATHPUR GOUR KISHORE GHOSH HEMANTA(RUBY MUKHERJEE HOSPITAL) CH:5.12 NOAPARA (KNAP) CH:4.090 GARIA CITY CENTRE (CHINGRIGHATA) KAVI SUKANTA(KALIKAJYOTININDRA PUR) NATH CH:2.936 SALT LAKE (MUKUND PUR)CH:2.98 CH:2.091 EX KDMI BELIGHATA CH:9.5 V I P BAZAR CH:6.36 '/$; STADIUM BARUN SENGUPTA (SCIENCECITY) CH:8.23 SATYAJIT ROY CH:1.59 BELGACHIA (KBEL) CH:4.885 RITWIK GHATAK(BANTALA ROAD) KAVI(KKVS) SUBHAS CH:2.151 2#55 CH:0.29 FOR AIRPORT CORRIDOR SEALDAH SHAHID KHUDIRAM PHOOL BAGAN (KSKD) CH:23.559 PANIHATI SODEPUR E.R SEALDAH - NAIHATI LINE DUM DUM CH:6.578 (CH:5.40) (CH:4.20) (KDMI) KAVI NAZRUL (KKNZ) SUBHAS NAGAR KAMARHATI CH:0.000 SHYAM BAZAR(KSHY) SEALDAH AGARPARA CH:22.284 (CH:6.50) (CH:1.20) CH:3.776 CH:8.885 TATA GATE (CH:2.80) (CH-8.80) BARANAGAR CENTRAL PARK CIRCUS BALLYGUNJ SUBURBAN LINE TALPUKUR (CH-0.00/4.47 EX DMI) (KCEN) E.R SEALDAH (SOUTH) (CH-11.40) $641#& GIRISH PARK CH:7.508 CHANDNI CHOWK GEETANJALI (KGTN) CH:21.039 DAKSHINESWAR (KGPK) (KCWC) CH:8.105 CH-6.23 EX DMI CH:5.705 M.G ROAD MAIDAN J.D PARK (KJPK) TITAGARH KHARDAH ESPLANADE(KESP) (CH-10.10) (KMHR) (KMDI) (CH-7.90) CH:8.810 CH:13.242 RABINDRA MASTERDA CH:6.471 CH:10.345 PARK STREET SAROBAR SURYASEN MH.UTTAM (KPSK) RABINDRA (KRSB) (KMSN) *11)*.;4+8'4 CH:9.618 CH:15.106 KUMAR (KMUK) CH:19.975 SADAN (KRSD) CH:16.450 SHOBHABAZAR CH:11.361 B.B. D. BAGH(MAHAKARAN) (KSHO) CH:4.704 NETAJI (KNTJ) E.R MAIN LINE (HOWRAH-BARDHAMAN) CH-12.385 PARK ST. BALLY KALIGHAT (KKHG) CH:18.264 ESPLANADE (CH:13.29) NETAJI BHAVAN 12.40KM ESPLANADE (CH:14.215) CH:13.863 BARRACKPUR (KNBN)CH:12.209 ER CCR LINE HOWRAH CH:11.514 BEHALA BAZAR VICTORIA MOMINPUR CH:14.592 (CH:8.755) (CH:5.46) (CH:12.025) MAJERHAT (CH:7.74) BEHALA CHOWRASTA (CH:4.12) NUMBER OF STATIONS IN OPERATION BETWEEN NOAPARA- KAVI SUBHASH HOWRAH SAKHER BAZAR KHIDDIRPUR (CH:2.67) UNDER GROUND ELEVATED SURFACE TOTAL CH-9.87 MAIDAN THAKURPUKUR 15 2 24 7 LINE CHORD R E (CH:1.45) (HOWRAH-BARDHAMAN) CH:15.649 SHALIMAR TARATALA &*4& CH-6.49 JOKA A. EXISTING NOAPARA - KAVI SUBHASH (27.28 KM) DIAMOND PARK CH-0.00 (CH:-2.00KM) B. UNDER CONSTRUCTION BY METRO RAILWAY S.E RLY MAIN LINE (HWH-KGP) LINE MAIN RLY S.E i. NOAPARA - BARASAT (17.025 KM) CH.-1.00KM C. UNDER CONSTRUCTION BY RVNL i. NOAPARA- BARANAGAR-DAKSHINESWAR (4.139 KM) LOCATION OF ART TRACK KILOMETERS DISTRICT DEPOT BG 1676 MM SANTRAGACHI STATION ART BOUNDARY ii. BARANAGAR- BARRACKPUR (12.40 KM) SECTION NOAPARA 1 ROUTE KM ETKM ITKM iii. KAVISUBASH (NEW GARIA)-BIMANBANDAR (29.10 KM) NOAPARA - KAVISUBHAS 1 KAVISUBHAS 27.28 183.151 1645.91 iv. JOKA-BBD BAG (15.075 KM) CORRECTED UP TO D. UNDER CONSTRUCTION OF KMRCL 31ST.MARCH 2017 i. HOWRAH- SALTLAKE EAST WEST CORRIDOR(14.67KM) (R.MITRA) (S.BANERJEE) (P.SINGH) SCALE: 1 IN 10500 (APPROX) E. EXISTING E.RLY & S.E RAILWAY LINE AND STATIONS AEN/HQ-II DY.CE/HQ CHIEF ENGINEER MODIFIED DATE:- 22.12.16.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-