Barrackpore Merit List
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Urban Population Growth in the Municipalities of North 24 Parganas, It Is Clear That North 24 Parganas Has Retained a High Level of Urbanization Since Independence
World Wide Journal of Multidisciplinary Research and Development WWJMRD 2018; 4(3): 68-73 www.wwjmrd.com International Journal Peer Reviewed Journal Urban Population Growth in the Municipalities of Refereed Journal Indexed Journal North 24 Parganas: A Spatio-Temporal Analysis UGC Approved Journal Impact Factor MJIF: 4.25 E-ISSN: 2454-6615 Mashihur Rahaman Mashihur Rahaman Abstract Research Scholar The rapid growth of urban population causes various problems in urban centres like increased P.G. Department of unemployment, economic instability, lacks of urban facilities, unhygienic environmental conditions Geography, Utkal University, Vani Vihar, Bhubaneswar, etc. People were well aware about the importance of population studies from very beginning. Odisha, India Explosively growing of urban population has attracted the attention of urban geographers and town planners. For country like India, it is very important to study the decadal variation of population growth, it helps in realizing problems. The population growth and socio-economic changes are closely related to each other. In present study North 24 Parana’s has been chosen as study area. The level of urbanization remained high in the district (57.6 % in 2011). Rapid increase in urbanization can be attributed to growth of Kolkata metropolis.Barasat is now within greater Kolkata (Kolkata 124).From 1991 onwards the real estate business in this district thrived and projects were taken which are more of residential type than business type. The aim of the present paper is to investigate the change in urban population growth rate of municipality wise during the three decades 1981-91, 1991- 2001 and 2001-2011. Due to push-pull factors the rural-urban migration is causing the process of urbanization. -
Page 1 of 8 LIST of CLINICAL ESTABLISHMENT (DIAGNOSTIC CENTRE), BARASAT SUB. DIV. NORTH 24 PARGANAS
Page 1 of 8 LIST OF CLINICAL ESTABLISHMENT (DIAGNOSTIC CENTRE), BARASAT SUB. DIV. NORTH 24 PARGANAS Last Sl Owner Facilities Name of Doctors Licence Revenue Name Address Phone No. Owners Name renewed No. Ph. No. Available on roll No. Collected upto Hospital Road, Sarkar X-Ray Clinic & Patho Lab Dr Debasish 1 Habra, North 24 253524 Sashim Sarkar, 5/56N 9.2.2008 Rs 1500 Clical Laboratory, Medium Majumder Parganas Patapatti, Kalibari, Eastern Clinical Patho Lab, 2 Habra, North 24 03216233212 Dr. R. Debnath 03216270412 Dr Ranjit Kr Debnath 12/71N 25.10.2005 Rs 500 Laboratory Medium Parganas Jessore Road, Champadali, Patho Lab 3 Gan Labarotary, 25622479 Ashim Gan 25622479 Dr K Chatterjee 36/25N 20.8.2005 Rs 500 Barasat, North 24 Medium Parganas Diagnostic Nabapally Colony Patho Lab Dr Manish 4 Laboratory & Chest More, Barasat, North 25524117 Aloka Mukherjee 25524117 115/23N 24.2.2006 Rs 250 Small Mukherjee Clinic, 24 Parganas 6, K.N.C. Raod, 1St Floor, Haritala, Dr. Ramesh Ch. 5 Health Care Centre, 25424479 25424479 Patho Lab DR G Mukherjee 101/N/130/P 16.5.2005 Rs 1750 Barasat, North 24 Saha, Parganas Barasat Cancer Banamapipur, Secretary Barasat Patho Lab 6 Research & Welfare Barasat, North 24 25622500 Cancer Research & 25522222 Dr Samir Roy 200/215/N 2.1.2006 Rs 1000 Medium Centre, Parganas Welfare Centre Chowmatha Badu Reliance Clinical Road, Patho Lab 7 25388155 Shiv Sankar Saha 25731834 Dr S R Chowdhury 249N/234 17.6.2005 Rs 500 Laboratory Madhyamgram, Small North 24 Parganas Bidhan Park, Dr A K Roy 8 Life Line Laboratory, Barasat, North 24 25521857 Chitali Mukherjee 25521930 Patho Small 258/273N 16.2.2006 Rs 375 Chowdhury Pargans Gobardanga Station Re-Life Diagonstic Patho Lab Dr A K Roy 9 Road, North 24 03216249885 Kalyan Samaddar 02316248569 299N/284 15.11.2005 Rs 500 Laboratory, Small Chowdhury Parganas Dolphin Medical 650/A/1 Ashoknagar, 03 Patho Lab Dr Kumud Ranjan 10 Smt. -
List of Municipalities Sl.No
LIST OF MUNICIPAL BODIES WHERE ELECTIONS WILL BE HELD IN THE MIDDLE OF 2010 SL.NO. DISTRICT NAME OF MUNICIPALITY 1 Cooch Behar Municipality 2 Tufanganj Municipality Cooch Behar 3 Dinhata Municipality 4 Mathabhanga Municipality 5 Jalpaiguri Jalpaiguri Municipality 6 English Bazar Municipality Malda 7 Old Malda Municipality 8 Murshidabad Municipality 9 Jiaganj-Azimganj Municipality 10 Kandi Municipality Murshidabad 11 Jangipur Municipality 12 Dhulian Municipality 13 Beldanga Municipality 14 Nabadwip Municipality 15 Santipur Municipality 16 Ranaghat Municipality 17Nadia Birnagar Municipality 18 Kalyani Municipality 19 Gayeshpur Municipality 20 Taherpur Municipality 21 Kanchrapara Municipality 22 Halishar Municipality 23 Naihati Municipality 24 Bhatpara Municipality 25North 24-Parganas Garulia Municipality 26 North Barrackkpore Municipality 27 Barrackpore Municipality 28 Titagarh Municipality 29 Khardah Municipality \\Mc-4\D\Munc. Elec-2010\LIST OF MUNICIPALITIES SL.NO. DISTRICT NAME OF MUNICIPALITY 30 Kamarhati Municipality 31 Baranagar Municipality 32 North Dum Dum Municipality 33 Bongaon Municipality 34 Gobardanga Municipality 35North 24-Parganas Barasat Municipality 36 Baduria Municipality 37 Basirhat Municipality 38 Taki Municipality 39 New Barrackpore Municipality 40 Ashokenagar-Kalyangarh Municipality 41 Bidhannagar Municipality 42 Budge Budge Municipality 43South 24-Parganas Baruipur Municipality 44 Jaynagar-Mazilpur Municipality 45 Howrah Bally Municipality 46 Hooghly-Chinsurah Municipality 47 Bansberia Municipality 48 Serampore Municipality 49 Baidyabati Municipality 50 Champadany Municipality 51 Bhadreswar Municipality Hooghly 52 Rishra Municipality 53 Konnagar Municipality 54 Arambagh Municipality 55 Uttarpara Kotrung Municipality 56 Tarakeswar Municipality 57 Chandernagar Municipal Corporation 58 Tamluk Municipality Purba Medinipur 59 Contai Municipality 60 Chandrakona Municipality 61 Ramjibanpur Municipality 62Paschim Medinipur Khirpai Municipality 63 Kharar Municipality 64 Khargapur Municipality 65 Ghatal Municipality \\Mc-4\D\Munc. -
Place of Route March
Daily Report of Route March/ CMB Activity By BSF/CAPF Anexure- Date: 04 .04.2021 Place of Route March Programme for next day No. of Actual No. of Force Type of Force Vulnerable t c Date of Block/ Total Deployed (Report Polling Station nos. i r deployed ( Hamlets t s Route Subdivision Municipalit Police Station Time From Via To Distance By section covered under Route Police Station From To Remarks i CRPF/BSF covered by D March y covered mentioning coy. March etc.) the Route And Bn.) March 169, 170, 173, 174, 174A from 08:00 hrs to Duttabad, EB Block, Central Park, & 3 sections BSF, Bidhannagar BMC EA Block EC Block 09 km BSF 175, 175A, 176, 177 & 1 DE Block CF Block Shift-I 1 2 11:30 hrs Different roads of these blocks 39/F- Coy 0 178 2 . 4 BDN North PS BDN North PS 0 . 4 0 from 16:00 hrs to Duttabad, DB Block, DC Block, & 3 sections BSF, Bidhannagar BMC DA Block DD Block 08 km BSF 171 & 172 1 AE Block BF Block Shift-II 19:30 hrs Different roads of these blocks 39/F- Coy 181, 182, 183, 184, 185, 186, 186A, 187, 187A, BL, CL, DL, AK, BK,CK, DK, from 08:00 hrs to 2 KM 3 sections BSF, 188, 189, 189A, 190, Bidhannagar BMC AL Block Karunamoyee, DJ, DG, CG, BG, EE Block BSF 2 AG Block DG Block Shift-I 1 11:30 hrs (Approx) 191, 192, 193, 194, 195, 2 AG 39/F- Coy 0 196, 197, 198, 199, 200, 2 . -
Government of West Bengal Office of the Sub-Divisional Magistrate & Sub-Divisional Officer, Barrackpore, North 24 Parganas P
Government of West Bengal Office of the Sub-Divisional Magistrate & Sub-Divisional Officer, Barrackpore, North 24 Parganas Phone-033 2592 0616; Fax-033 2592 0814 e-mail: [email protected] ORDER In partial modification of this office Memo No. 167(9)/ConlBkp dated 04.02.2021 in connection with ensuing West Bengal Legislative Assembly General Election, 2021 the following officers are drafted as Assistant Returning Officer under 103 — Bizpur Assembly Constituency to 114-Dum Dum Assembly Constituency (copy enclosed). Sub-Divisional Magistrate & Sub-Divisional Officer Barrackpore, North 24 Parganas Memo No. /ConfBkp Date 20.02.2021 Copy forwarded for information to:- 1. The District Magistrate & District Election Officer, North 24 Parganas, Barasat 2. The Commissioner of Police, Barrackpore Police Commissionerate, Barrackpore 3. The Additional District Magistrate (General), North 24 Parganas, Barasat 4. The Returning Officer, Assembly Constituency 5. The Officer-in-Charge, Election, Barrackpore 6. The Officer-in-Charge, Training Cell, Barrackpore 7. The N.D.C., Barrackpore 8. The (Head of the Office) 9. Sri / Smt. , Assistant Returning Officer, Assembly Constituency Sub-Divisional Magistrate & Sub-Divisional Officer Barrackpore, North 24 Parganas List of AROs in connection with General Election to WBLA, 2021 AC No. & SI. Name of ARO Name No. Designation of ARO Mobile No. Senior Revenue Officer - II & Block Land & Land I AtanuDas 9903211705 Reforms Officer, Barrackpore - I Revenue Officer (1), Block Land & Land Reforms 2 SanjoyKumarDas 8582843535 Officer's Office, Barrackpore - 103 - Bijpur Revenue Officer (II), Block Land & Land Reforms 3 Subhashia Dasgupta 9851088820 Officer's Office, Barrackpore - 4 Santu Das C.D.P.O., ICDS, Kanchrapara 8927802757 8240454775 / 5 Sekh Kabir Ali Sub - Inspector of Schools, Bizpur Circle 8768788652 8336959188 I 1 Samit Sarkar, WBCS (Exe.) B.D.O., Barrackpore-1 7439311972 2 Gour Chandra Mandal 104 - Naihati it. -
Metro Railway Kolkata Presentation for Advisory Board of Metro Railways on 29.6.2012
METRO RAILWAY KOLKATA PRESENTATION FOR ADVISORY BOARD OF METRO RAILWAYS ON 29.6.2012 J.K. Verma Chief Engineer 8/1/2012 1 Initial Survey for MTP by French Metro in 1949. Dum Dum – Tollygunge RTS project sanctioned in June, 1972. Foundation stone laid by Smt. Indira Gandhi, the then Prime Minister of India on December 29, 1972. First train rolled out from Esplanade to Bhawanipur (4 km) on 24th October, 1984. Total corridor under operation: 25.1 km Total extension projects under execution: 89 km. June 29, 2012 2 June 29, 2012 3 SEORAPFULI BARRACKPUR 12.5KM SHRIRAMPUR Metro Projects In Kolkata BARRACKPUR TITAGARH TITAGARH 10.0KM BARASAT KHARDAH (UP 17.88Km) KHARDAH 8.0KM (DN 18.13Km) RISHRA NOAPARA- BARASAT VIA HRIDAYPUR PANIHATI AIRPORT (UP 15.80Km) (DN 16.05Km)BARASAT 6.0KM SODEPUR PROP. NOAPARA- BARASAT KONNAGAR METROMADHYAMGRAM EXTN. AGARPARA (UP 13.35Km) GOBRA 4.5KM (DN 13.60Km) NEW BARRACKPUR HIND MOTOR AGARPARA KAMARHATI BISARPARA NEW BARRACKPUR (UP 10.75Km) 2.5KM (DN 11.00Km) DANKUNI UTTARPARA BARANAGAR BIRATI (UP 7.75Km) PROP.BARANAGAR-BARRACKPORE (DN 8.00Km) BELGHARIA BARRACKPORE/ BELA NAGAR BIRATI DAKSHINESWAR (2.0Km EX.BARANAGAR) BALLY BARANAGAR (0.0Km)(5.2Km EX.DUM DUM) SHANTI NAGAR BIMAN BANDAR 4.55KM (UP 6.15Km) BALLY GHAT RAMKRISHNA PALLI (DN 6.4Km) RAJCHANDRAPUR DAKSHINESWAR 2.5KM DAKSHINESWAR BARANAGAR RD. NOAPARA DAKSHINESWAR - DURGA NAGAR AIRPORT BALLY HALT NOAPARA (0.0Km) (2.09Km EX.DMI) HALDIRAM BARANAGAR BELUR JESSOR RD DUM DUM 5.0KM DUM DUM CANT. CANT 2.60KM NEW TOWN DUM DUM LILUAH KAVI SUBHAS- DUMDUM DUM DUM ROAD CONVENTION CENTER DUM DUM DUM DUM - BELGACHIA KOLKATA DASNAGAR TIKIAPARA AIRPORT BARANAGAR HOWRAH SHYAM BAZAR RAJARHAT RAMRAJATALA SHOBHABAZAR Maidan BIDHAN NAGAR RD. -
Date Wise Details of Covid Vaccination Session Plan
Date wise details of Covid Vaccination session plan Name of the District: Darjeeling Dr Sanyukta Liu Name & Mobile no of the District Nodal Officer: Contact No of District Control Room: 8250237835 7001866136 Sl. Mobile No of CVC Adress of CVC site(name of hospital/ Type of vaccine to be used( Name of CVC Site Name of CVC Manager Remarks No Manager health centre, block/ ward/ village etc) Covishield/ Covaxine) 1 Darjeeling DH 1 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVAXIN 2 Darjeeling DH 2 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVISHIELD 3 Darjeeling UPCH Ghoom Dr. Kumar Sariswal 9851937730 Darjeeling UPCH Ghoom COVISHIELD 4 Kurseong SDH 1 Bijay Sinchury 7063071718 Kurseong SDH COVAXIN 5 Kurseong SDH 2 Bijay Sinchury 7063071718 Kurseong SDH COVISHIELD 6 Siliguri DH1 Koushik Roy 9851235672 Siliguri DH COVAXIN 7 SiliguriDH 2 Koushik Roy 9851235672 SiliguriDH COVISHIELD 8 NBMCH 1 (PSM) Goutam Das 9679230501 NBMCH COVAXIN 9 NBCMCH 2 Goutam Das 9679230501 NBCMCH COVISHIELD 10 Matigara BPHC 1 DR. Sohom Sen 9435389025 Matigara BPHC COVAXIN 11 Matigara BPHC 2 DR. Sohom Sen 9435389025 Matigara BPHC COVISHIELD 12 Kharibari RH 1 Dr. Alam 9804370580 Kharibari RH COVAXIN 13 Kharibari RH 2 Dr. Alam 9804370580 Kharibari RH COVISHIELD 14 Naxalbari RH 1 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVAXIN 15 Naxalbari RH 2 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVISHIELD 16 Phansidewa RH 1 Dr. Arunabha Das 7908844346 Phansidewa RH COVAXIN 17 Phansidewa RH 2 Dr. Arunabha Das 7908844346 Phansidewa RH COVISHIELD 18 Matri Sadan Dr. Sanjib Majumder 9434328017 Matri Sadan COVISHIELD 19 SMC UPHC7 1 Dr. Sanjib Majumder 9434328017 SMC UPHC7 COVAXIN 20 SMC UPHC7 2 Dr. -
BAGUIATI Dum Dum Park 15Th August & 6Th September 2017
JAGORANI TREE PLANTATION (PHASE-1 & 2) BAGUIATI AND Dum Dum Park 15th August & 6th September 2017 TABLE OF CONTENTS TOPIC Pg. No. 1. Acknowledgement………………………………………………………. 3 2. Abstract................................................................................................................4 3. Introduction.....................................................................................................5 4. Gallery.........................................................................................6 5. Jagorani’s Task...............................................................................................12 6. Jagorani’s Hope.........................................................................12 7. Expenditure.....................................................................................................12 8. Conclusion.......................................................................................................12 ACKNOWLEDGEMENT Jagorani’s attempt to make earth a balanced ecological place has been sustained for the second time in “tree plantation 1st and 2nd phase 2017”, thanks to progressive support from volunteers and committee member's influence. First of all, Jagorani likes to thank our Project co-ordinator for the leadership influence, for perfect completion of the project. Jagorani likes to appreciate the local club to encourage this very initiative. Thanks to those volunteers who turned up for the cause of nature. PARTICIPATES ABSTRACT EARTH IS ONLY HABITABLE PLACE IN UNIVERSE.WE LIVE THROUGH -
Rainfall, North 24-Parganas
DISTRICT DISASTER MANAGEMENT PLAN 2016 - 17 NORTHNORTH 2424 PARGANASPARGANAS,, BARASATBARASAT MAP OF NORTH 24 PARGANAS DISTRICT DISASTER VULNERABILITY MAPS PUBLISHED BY GOVERNMENT OF INDIA SHOWING VULNERABILITY OF NORTH 24 PGS. DISTRICT TO NATURAL DISASTERS CONTENTS Sl. No. Subject Page No. 1. Foreword 2. Introduction & Objectives 3. District Profile 4. Disaster History of the District 5. Disaster vulnerability of the District 6. Why Disaster Management Plan 7. Control Room 8. Early Warnings 9. Rainfall 10. Communication Plan 11. Communication Plan at G.P. Level 12. Awareness 13. Mock Drill 14. Relief Godown 15. Flood Shelter 16. List of Flood Shelter 17. Cyclone Shelter (MPCS) 18. List of Helipad 19. List of Divers 20. List of Ambulance 21. List of Mechanized Boat 22. List of Saw Mill 23. Disaster Event-2015 24. Disaster Management Plan-Health Dept. 25. Disaster Management Plan-Food & Supply 26. Disaster Management Plan-ARD 27. Disaster Management Plan-Agriculture 28. Disaster Management Plan-Horticulture 29. Disaster Management Plan-PHE 30. Disaster Management Plan-Fisheries 31. Disaster Management Plan-Forest 32. Disaster Management Plan-W.B.S.E.D.C.L 33. Disaster Management Plan-Bidyadhari Drainage 34. Disaster Management Plan-Basirhat Irrigation FOREWORD The district, North 24-parganas, has been divided geographically into three parts, e.g. (a) vast reverine belt in the Southern part of Basirhat Sub-Divn. (Sundarban area), (b) the industrial belt of Barrackpore Sub-Division and (c) vast cultivating plain land in the Bongaon Sub-division and adjoining part of Barrackpore, Barasat & Northern part of Basirhat Sub-Divisions The drainage capabilities of the canals, rivers etc. -
West Bengal Bikash Bidhan Nagar, Calc Antiual Report 1999-2000
r Department of School Education A Government of West Bengal Bikash Bidhan Nagar, Calc Antiual Report 1999-2000 Department of School Education Government of West Bengal Bikash Bhavan Bidhan Nagar, Calcutta-700 091 \amtuu of B4u«tcioQ«t PiittQiai «a4 A4niMttriti«o. ll^ ii Sri A«ir»kBdo M«rg, ! X a n i i C S i s w a s Minister-in-charge DEPT. OF EDUCATION (PRIMARY, SECONDARY AND MADRASAH) & DEPT. OF REFUGEE RELIEF AND REHABILITATION Government of West Bengal Dated, Calcutta 28.6.2000 FOREWORD It is a matter of satisfaction to me that 4th Annual Report of the Department of School Education, Government of West Bengal is being presented to all concerned who are interested to know the facts and figures of the system and achievements of the Department. The deficiencies which were revealed in the last 3 successive reports have been tried to be overcome in this report. The figures in relation to all sectors of School Education Department have been updated. All sorts of efforts have been taken in preparation of this Annual Report sO that the report may be all embracing in respect of various information of this Department. All the facts and figures in respect of achievement of Primary Education including the District Primary Education Programme have been incorporated in this Report. The position of Secondary School have been clearly adumbrated in this issue. At the same time, a large number of X-class High Schools which have been upgraded to Higher Secondary Schools (XI-XII) have also been mentioned in this Report. -
Army Recruitment Rally 2021 at Rctc Ground Barrackpore Cantt
INDIAN ARMY RALLY NOTIFICATION: 2021-2022 ARMY RECRUITING OFFICE, BARRACKPORE (WB) ONLINE REGISTRATION IS MANDATORY AND WILL BE OPENED FROM 08 JULY 2021 TO 21 AUGUST 2021 FOR SOLDIER GENERAL DUTY, SOLDIER TECHNICAL, SOLDIER CLERK/ STORE KEEPER TECHNICAL, SOLDIER TRADESMEN 10TH PASS, SOLDIER TRADESMEN 8TH PASS, AND SOLDIER TECHNICAL NURSING ASSISTANT EXACT DATE OF RALLY WILL BE CONFIRMED LATER 1. Army Recruitment Rally will be held for eligible candidates of 24 Parganas (North), Hooghly, Bankura and Purulia districts at RCTC Ground Barrackpore Cantonment. Exact date of rally will be confirmed later. Online registration is mandatory and will be open from 08 July 2021 to 21 August 2021. Admit Cards for the rally will be sent to candidates registered e-mail 15 days prior to the commencement of rally. Candidate should reach the venue on given date and time as mentioned in the Admit Card. Any candidate who fails to produce his admit card will not be allowed to participate in the Rally. 2. Candidates will be screened for following Categories and as per Qualitative Requirements mentioned below. CATEGORY & PHYSICAL CRITERIA Category Age Born Minimum Physical QR Education QR (As on 01 Between Height Chest (Cm) October (Both dates (Cm) 2020) inclusive) Soldier 17 ½ - 21 01 October 2000 169 77 Class 10th / Matric Pass with General Duty to ( + 5 Cm minimum 45% marks in 01 April 2004 expansion) aggregate and 33% in each subject. For Boards following grading system minimum of D Grade (33-40) in individual subjects or grade which contains 33% and overall aggregate of C2 grade. For Gorkhas simple 10 pass with minimum 33 % in aggregate in all subject. -
Information Memorandum
INFORMATION MEMORANDUM Rail Coach Factory, Kanchrapara – Project 1.0 Background 1.1 The Ministry of Railways, Government of India (the “Authority” ) is engaged in the development of railways. Railway network of the Authority is about 64,000 route kilometres and carries more than 6.5 billion passengers every year. For update on trends, prospects and opportunities, in transport sector in general and railway sector in particular, in India, prospective Applicants may visit the website www.indianrailways.gov.in for Vision 2020 document and www.planningcommission.nic.in for chapter on transportation in 11 th Five Year Plan. 1.2 In view of growth, witnessed in recent years and projection in coming years, in demand for urban and intercity mass mobility, the Authority has decided to enable setting up of a factory to manufacture rail cars powered by a dedicated propulsion system at Kanchrapara in West Bengal (the “Factory” ) for supply thereof on the basis of a long term procurement-cum-maintenance contract (the “Project” ) through Public-Private Partnership (the “ PPP ”) on Build, Own and Operate (the "BOO" ) basis, and has decided to carry out the bidding process for selection of a private entity as the bidder to whom the Project may be awarded. 2.0 The Site 2.1 The Authority has earmarked about 150 acres of land in Kanchrapara – Halisahar railway complex in North 24-parganas District of West Bengal for setting up the Factory (the “Site” ). Kanchrapara Eastern Railway Workshop and a railway colony is also situated in the Kanchrapara – Halisahar railway complex. About 10, 000 employees work in Kanchrapara – Halisahar railway complex.