City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

1 CAPITAL IMPROVEMENT PLAN

I INTRODUCTION & OVERVIEW

The introduction to the WHAT IS Definition of Capital CIP and Budgeting Capital Improvement Plan A CAPITAL Improvements A CIP is typically (CIP) is divided into three IMPROVEMENT PLAN? Capital improvements are prepared and adopted sections: annually by the Planning A Capital Improvement Plan permanent physical • What is a (CIP) is a multi-year improvements, generally Commission and is Capital expected to have a normal presented as a Improvement program for expenditures Plan? by the City of Flint for life of ten years or longer. recommendation to the Equipment and objects Mayor and the City • Why Prepare a CIP? rehabilitation, replacement, and needed for day-to-day use Council. • How Does the CIP Each year, the plan Relate to the balancing of the City’s are generally not Master Plan? municipal infrastructure considered capital identifies the physical systems. Projects improvements. Smaller needs of the City’s considered through the CIP projects and projects that departments, estimates the process involve proposed are intended to last for costs of proposed projects, investments in the City’s fewer than ten years are and recommends infrastructure and funded through the City’s expenditures and sources facilities, such as police operating budget. of funding for priority and fire stations, parks and capital improvements.

recreation facilities, As such, the CIP plays an community centers, integral role in the process offices, roads and of formulating the City’s sidewalks, and utilities. annual capital budget.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 1 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

20 Year Horizon BENEFITS OF THE CIP The Flint CIP is a 6-20 year plan of programmed • Assist in implementation of the Master Plan. projects for the City’s • Identify both short- and long-term capital expenditures to allow budgeting. municipal infrastructure • Determine regular maintenance needs for City facilities so they remain viable. systems. The first two years of this plan should • Provide for a more effective evaluation of alternatives and solutions than the crisis- form the basis for the City’s decision process. two-year Capital • Enhance opportunities for grants by allowing for long-term planning. Approval of annual budgets • Provide the ability to stabilize debt and consolidate projects to reduce borrowing costs. allocates funds to undertake projects in this • Serve as a public relations and economic development tool. period, thus beginning the • Allow for a focus on preserving infrastructure while ensuring efficient use of public funds. implementation of the CIP. • Identify actual infrastructure needs of the City, including cases where In addition, capital projects additional funding is required beyond what is available locally. that will need to be • Provide opportunities for cooperation between departments and other units of implemented between government, such as Genesee County and Flint Community Schools, by pooling years 7 and 20 are also resources to reduce costs in some instances. included to provide a basis for future updates to this CIP.

Given the uncertainty around the availability of funds primarily tied to the budgets associated with water and sewer revenue, many of the necessary improvements that are planned in the 6-year CIP period are ultimately considered unfunded in this CIP.

2 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

CAPITAL IMPROVEMENT with positive balances in all immediately reduce its City’s funds, the 2016-2021 of its funds. Cash position water and sewer rates. In CIP update largely repeats the PLANNING IN FLINT had drastically improved, addition, the order barred City’s prior capital The City of Flint has been and the FY16 and FY17 the City from shutting off a improvement plan with significantly impacted by Budgets are realistically service for non-payment of projects postponed by one factory closures and balanced. water and subsequently fiscal year. Emerging capital population loss, with an 18% banned them from improvement projects have decline in population Looking forward to FY18 collecting delinquent been added and all existing between the 2000 and 2010 and beyond however, the balances prior to August 17. projects have been update to census. The loss of jobs and City will continue to face This ruling led to a projected reflect any changes in priority population and decline in significant challenges as City amount of approximately or estimated cost. local tax revenue and state- expenditures (expenses) are $11 million in uncollectible shared revenues has had a projected to outpace any accounts, or money the City A Common Issue significant impact on the increases in revenues. This was entitled to but not able City’s finances. The City The City of Flint, like many will lead to operating to collect on. It has also municipalities in the United returned to state deficits in many of the City resulted in significant drops receivership in December States, has been severely funds. Water rate increases in the number of payments impacted by the recession. In 2011, as a result of and the potential renewal being received from consistent deficits in the the wake of the Great of two City millages (Public customers. Recession, many local General Fund, a decline in Safety and Parks and pooled cash, poor budgeting governments in Michigan Recreation), have the ability As a direct result of the have witnessed a decrease in practices, and unfunded to assist the City’s budgets Court ruling and in order for liabilities for retiree property tax and income tax through long-term, ongoing the City to respond to this revenues while seeing the benefits. revenue. This stable income loss in projected revenue, a level of state- shared revenue Significant progress has could fund many much spending and hiring freeze reduced. needed capital across the City was been made in addressing improvement projects. That implemented. At this time, the financial issues leading With less money coming in, being said however, even the freeze remains in effect. to the assignment of an younger communities with with this funding additional emergency manager, as the relatively new infrastructure sources of revenue will be For water and sewer funds, $19.1 million deficit at the have been able to cope with required or decreases in it was necessary to identify end of FY12 had been severe budget reductions by operating costs must occur projects which could be eliminated by the end of postponing planned for the City to recognize any eliminated or postponed to FY15, largely as the result of infrastructure installation or progress towards improving lessen the financial burden a $7 million emergency loan. expansion. In established its capital. of the order while communities like Flint, th maintaining ongoing daily On April 29 , 2015 the however, budget cuts have While the City continues to operations so the City could Emergency Manager notified led to deferred maintenance await the ruling of litigation function. To that end, many the Governor of Michigan on existing infrastructure. over retiree healthcare, a of the water and sewer that the financial emergency This has often resulted in result that could devastate capital improvements were in Flint had been resolved. deterioration that now the City’s financial position, eliminated or postponed At that time, the Governor requires significant a number of issues multiple years with the relieved the Emergency expenditures to catch up. emerging in Q1 of FY16 exception of any projects Manager of his have adversely impacted necessary to ready the City responsibilities and a Many of the improvements the ability to complete even for receipt of water from Receivership Transition listed in the CIP are a direct planned FY16 capital the Karegnondi Water Advisory Board was created response to both the years of improvements. Authority (KWA). to oversee the transition of neglect due to severe city affairs, to its charter- budgetary issues and the fact On August 17, 2015 a As a result of the spending designated officials. that there has not been a preliminary injunction order freeze and postponement of Master Plan or was issued against the City capital improvement For the first time in nearly a comprehensive CIP developed requiring that the City projects in many of the decade, the City began FY16 for the City in decades. City of Flint Capital Improvement Plan DRAFT – 1.10.16 3 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

Flint Water Crisis Rising Cost of Deferred and appointed officials, percent wage reduction for In April 2014, the City of Maintenance and staff, working under remaining employees, and the Flint formally transitioned Providing ongoing the oversight of an restructuring of health and its primary source of maintenance, such as Emergency Manager retirement benefits for drinking water by resurfacing streets and appointed by the current employees and connecting to the Flint repairing or replacing leaky Governor, have taken retirees necessary to develop River. As a result of this roofs, is vital for several steps to make a credibly balanced spending switch, the corrosive nature maintaining the condition capital expenditures more plan. The City continues to closely reflect long-range work towards a process of of the treated river water of assets. When objectives. However, the realistic budgeting that will has led to an accelerated maintenance is not fully population and job losses, enable capital needs to be aging process of the City’s funded, it contributes to years of neglect, and lack planned for, rather than water infrastructure. deferred maintenance and of regular maintenance on reacted to. Additionally, an unexpected capital costs. The City has much of the City’s result of the switch has not funded required Other Influencing infrastructure, facilities, directly led to shortened maintenance on most Factors and properties have taken usefulness of this facilities due to tight In addition to adopted City their toll. infrastructure. budgetary constraints and policy, including the City Budget recommendations of the Perhaps the most damning competing priorities. As a Making progress on the Master Plan, several factors result of this switch has result the City has a large budget deficit has required and recent or on-going been the exposure of lead backlog in deferred capital difficult decisions and initiatives have shaped the to residents of Flint and in projects which is likely to sacrifices, including development of the CIP. These particular children of Flint. significantly increase as dedicating minimal influencing factors include: The treated Flint River more information is resources to capital water subsequently collected on the actual -Most City facilities are in improvements beyond resulted in the degradation condition of City facilities. urgent need of upgrades, emergency repairs. The FY16 repair, and/or replacement of the micro/bio-film that Compounding the problem, and FY17 budgets were of critical components, such protects the water service as assets continue to as HVAC systems, roofs, balanced through a mixture parking lots, sidewalks, lines from leeching. These deteriorate, the cost of of significant revenue plumbing and electrical lines run from the street repair will exponentially systems, security upgrades, increases, significant into a resident’s home and increase and can result in lighting, windows, etc., and expenditure de- creases, there are several buildings supply the residence with peripheral damage. For and steps taken to reduce that are closed and not water to live. Thus, the example, deferring roof being used. Completion of replacement could later legacy costs. Past revenue some energy efficiency and damaged service lines increases included increases other projects may result in resulted in lead leeching, result in needing to replace long-term net savings but the roof structural in water and sewer rates, require initial capital with Federal, State and passage of a 6 mill property outlays. The CIP calls for members, walls, and floor several facility assessments local testing all dismissing tax for police and fire, of a building. to determine the future the initial results of establishment of a special viability of facilities and elevated lead levels in Flint Getting the Most out of assessment district for prioritize where investments homes. Existing Infrastructure should occur. street lighting, and The total cost for The challenge to maintain implementation of a fee -Improvements to the City’s water system are needed, replacement of all City- services in the midst of sufficient to cover the cost not necessarily to mitigate owned water mains and shrinking resources and of waste collection. the factors from the primary source transfer, but property service lines is increasing costs has put Expenditure reductions to maintain and replace estimated at approximately pressure on City included elimination of 20 water system components $1 billion, but much further government to make its that are in dire need of percent of the City’s improvement or analysis and data collection limited capital resources workforce, compensation replacement regardless of is needed to solidify this work more efficiently. City the water source. Previous decreases equivalent to a 20 studies have shown the figure. administration, elected

4 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

the current drinking water trash abatement, but not current system to have system design. mowing costs as these very low efficiency, with groups do not mow many losses up to $2.0 million of the city’s parks. annually. -Inflow and infiltration (I/I) into the sanitary sewer -Budget issues have led to -The street system in Flint results in significant reductions in staffing and has severely deteriorated. A amounts of water being service levels for many Pavement Surface treated that is clean. Much city departments. For Evaluation and Rating of the I/I is at manholes instance, since 2002 the System (PASER) study in and perforated manhole Parks and Recreation 2012 found only 8% of covers in floodplain areas Division has eliminated 89 Federal-Aid eligible City that are regularly under staff positions, leaving less streets to be in good water. than 1 full-time employee condition. Estimates for focused on parks. repair of local streets -Housing diversity is exceed $50 million. limited, particularly for multi-family housing. Much of the housing stock -Sidewalks throughout the (82%) was built prior to City are in unsatisfactory 1970 and 14.1% of parcels condition and have an contain houses in poor or estimated unmet need of substandard condition. $40-85 million for repairs. These sidewalks are old, -Many residential parcels cracked, have separations are vacant lots (22%) and and heaving that are there are thousands of potential safety hazards, blighted parcels in the City. creating accessibility issues for persons with certain -Flint Community Schools disabilities. Grants have (FCS) suffers from budget been used to repair problems, outdated sidewalks in eligible areas facilities, and loss of but do not result in students. Enrollment for significant progress to the ’14-’15 academic year handle needs. Though no was roughly 5,700 detailed inventory is known students, 86% lower than to exist, it is also extremely the peak numbers in the likely that a significant late 1960’s. A number of number of curb ramps in FCS schools have been the City are in poor closed and many of them condition, create access currently sit vacant issues for persons with awaiting demolition or disabilities, and do not reuse in some manner. meet current standards under the Americans with -The City park system, Disabilities Act. Current city including over 67 facilities ordinance requires property and 1,800 acres, suffers owners to maintain their from severe neglect. Lack adjacent sidewalks. A 50/50 of regular maintenance cost share program has the and upkeep and potential to expedite the elimination of most staff repairs and improve and programs has accessibility throughout the resulted in many facilities city. being closed. Equipment at most parks is severely outdated and does not -The City owns and meet current design and operates several dams that safety standards, with are critical to the water many parks plagued by supply for the City, as well trash and graffiti. 34 parks as for recreational uses. All are currently cared for of them require varying through volunteer-led amounts of rehabilitation efforts including park and repair, with some being tenders and park adopter mandated to be removed as programs. This helps they are not viable and reduce the overall cost of provide no purpose given

City of Flint Capital Improvement Plan DRAFT – 1.10.16 5 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

WHY PREPARE A CIP? intergovernmental and participation in Federal or regional cooperation – state grant programs- Optimizes use of the Capital improvement Preparing and regularly THE BENEFITS OF CAPITAL taxpayer’s dollar – The planning offers public updating a CIP improves the CIP helps the Mayor officials of all City’s chance of obtaining aid IMPROVEMENT and City Council make governmental units (City through Federal and state PLANNING sound annual budget of Flint, MDOT, Genesee programs that provide funds decisions. Careful County, Flint Community for planning, construction, planning of capital Schools, Genesee County and financing of capital Over time, public facilities improvements helps Metropolitan Planning improvements. By knowing need major repair, prevent costly Commission, Mass which projects are planned, replacement, or expansion mistakes. In addition, Transportation Authority, eligibility can be determined and maintaining and capital planning allows etc.) an opportunity to and specific grants sought for upgrading a community’s the City to save money plan the location, timing, eligible projects. The CIP capital assets requires in several other ways. and financing of should include projects that significant financial For example, investors improvements in the can be started quickly by investment. This investment in municipal bonds interest of the community having construction must be weighed against tend to look more and region as a whole. documents ready should other community needs and favorably on Advance planning also grant funds become available. analyzed in light of communities that have allows these entities to community goals. The City a CIP; if bond financing seek funding of Flint, like many cities, is is selected for a capital opportunities that may Provides the City with an under pressure to make improvement project, have limited availability accurate account of its efficient use of capital the City may realize otherwise and provide the capital challenges. resources and must make significant savings on potential for coordination/ Creation of a CIP allows interest. cost-sharing for projects the City of Flint to face a difficult choices. There are more needs than can be that span community “reality check”, as it Guides redevelopment and borders and jurisdictions begins to assess the satisfied at once, and the growth – The location and significant amount of selection of one investment of the various capacity of capital governmental entities. challenges associated with over another may shape the improvements shape the fixing its capital. The CIP development of the City for growth and redevelopment Maintains a sound and takes stock of the actual years to come. of the City. needs, even if the funds to stable financial program- City decision-makers can Unplanned emergency fix them do not yet exist. Capital improvement use the CIP to develop well expenditures can endanger planning is a valuable tool to thought out policies to the financial well-being of ensure that choices are guide future land use and the City, as the lack of ability made wisely. The City’s economic development to plan generally leads to development goals are that are consistent with higher costs. Sharp changes implem3nt, in park, by the the implementation of the in the tax structure or Master Plan. careful provision of capital bonded indebtedness may facilities. The benefits of this Encourages coordination be avoided when systematic approach to between departments – construction projects are planning capital projects Participatory efforts of planned in advance and include: multiple City service units scheduled at intervals over in the planning and a number of years. When there is ample time for Focused attention and co- coordination of capital planning, the most ordination with community improvement planning economical means of goals, needs, and reduces scheduling financing each project can capabilities – By developing a conflicts and ensures that be selected in advance. The CIP, capital projects can be high priority needs are CIP can help the City avoid brought into line with the addressed before those of commitments and debts City’s long-range plans by a lower priority. In that would prevent the balancing identified needs addition, the CIP can be initiation of other important with financial capacities. used to promote projects at a later date. Considered individually, a innovative management building renovation, park techniques and improve system improvement, and governmental efficiency street widening may all be and effectiveness by viable projects, but each combining projects within project may look quite the same area to provide a different when, in the course lower overall cost than if of the CIP process, it is forced the projects were constructed separately. to compete directly with a number of other projects for limited funds.

Improves the basis for Enhances opportunities for 6 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

LEGAL BASIS FOR THE and can be under- taken amendments maximize resources by within the ensuing 6-year necessary to keep the maintaining a balance CAPITAL IMPROVEMENT period. The capital plan current; and the between operating and PLAN improvements program shall City Council, after capital budgets. A State of Michigan be based upon the review by the continuous relationship exists The State of Michigan requirements of the local unit Planning Commission, between the CIP and the provides for the of government for all types of shall consider the annual budget and a direct development and use of a public structures and Mayor’s proposed link can be seen between the capital improvement plan in improvements. Consequently, amendments and two documents, as there the Municipal Planning Act each agency or department of make the should be in a strategic (Section 125.3865, Act 33 of the local unit of government modifications in the planning environment. the Public Acts of 2008). with authority for public plan that it deems Budget appropriations lapse structures or improvements necessary.” at the end of the fiscal year “To further the desirable shall upon request furnish the as the operating budget is future development of the planning commission with funded with recurring annual local unit of government CIP & ANNUAL lists, plans, and estimates of revenues such as taxes, under the master plan, a BUDGET PROCESS time and cost of those public licenses, fines, user fees, and planning commission, after The City’s Annual Budget structures and interest income. adoption of a master plan, itemized and appropriates improvements.” shall annually prepare a the funds needed for all Linking Planning to capital improvements City of Flint municipal purposes. It is the Budget program of public In addition, the City of generally recommended The CIP plays a significant role structures and Flint Charter (Section 4- that budgets separate out in the implementation of a improvements, unless the 504) reinforces the City’s capital improvements Master Plan by providing a planning commission is planning responsibility, from operating expenses link between planning and exempted from this with Section 4-505 calling to ensure a clear budgeting for capital projects. requirement by charter or for periodic review of the demarcation between the The CIP process precedes the otherwise.” plan: two. budget process and is used to develop the capital project If the planning commission 4-504 Comprehensive portion of the annual budget. is exempted, the legislative Plan – “The Mayor shall The Operating Budget body either shall prepare and propose and the City includes the day-to-day Approval of the CIP by the adopt a capital improvements Council, after review by operational expenses of Planning Commission does program, separate from or as the Planning the City, such as salaries, not mean that they grant a part of the annual budget, Commission, shall supplies, and expenses final approval of all projects or shall delegate the approve, with the for programmed contained within the plan. preparation of the capital modifications the activities. Rather, by approving the CIP improvements program to Council deems A Capital Projects the Planning Commission the chief elected official or a necessary, a Budget would include acknowledges that these nonelected administrative comprehensive plan of the anticipated capital projects represent a official, subject to final policies for the social, project costs. The first reasonable interpretation of approval by the legislative economic and physical two years of projects the upcoming needs for the body. development and contained in the Capital City and that projects conservation of the Improvement Plan contained in the first year of The capital improvements City.” should be the basis for the plan are suitable for pro- gram shall show those formulating the Capital inclusion in the up- coming public structures and 4-505 Periodic Projects Budget. budget to be considered and improvements, in the general Review of Plan – ultimately approved by the order of their priority, that in “After approval of the City Council the commission’s judgment plan, the Mayor shall will be needed or desirable annually propose any The City needs to strive to City of Flint Capital Improvement Plan DRAFT – 1.10.16 7 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

Priorities vs. Funding RELATIONSHIP strong connection between Document Availability BETWEEN THE CIP & the comprehensive plan The CIP is a planning Priority rankings do not CITY MASTER PLAN and capital improvements document that serves to necessarily always The completion of the City’s in the form of short-range consolidate necessary correspond to funding Imagine Flint Plan in late implementation strategies. projects associated with sequence. For example, a 2013 has formed the basis In addition to the Master the City’s various road-widening project for Flint’s continued Plan, several other planning infrastructure asset which is ranked lower than recovery. The Master Plan is documents provide areas. These needs are a park project may be the first in over 50 years and implementation gathered primarily from funded before the park was the result of recommendations that link findings of the City’s project because the road collaboration between City the future vision of the master planning efforts project has access to a leaders, residents, and community to relatively and staff identification restricted revenue source, business owners to develop short-term actions. through the operations whereas a park project a vision for Flint’s recovery These documents include, and maintenance of the may have to compete for efforts. but are not limited to: City’s facilities and funding from other The CIP is intended to systems. The CIP • Parks & Recreation provides a methodology revenue sources. A complement the Master Master Plan for addressing the project’s funding depends Plan to ensure • Flint Parks upon a number of factors infrastructure can be Assessment & infrastructure needs to Amenity Inventory allow staff to determine – not only its merit, but provided to meet the goals also its location, cost, of the Master Plan, with a • Reimagining Chevy in the anticipated funding funding source, and clear definition of needs Hole sources and schedules for the projects logistics. and priorities to assist in • Flint River Assessment budget development necessary to meet the City Funds with Capital • City of Flint Water needs, based on priority, annually. However, it must Reliability Study Spending Capacity be noted that the City’s and the availability of 101- General Fund for • Flint River District the financial and staffing limited capital capital needs far exceed Strategy available resources, even resources to perform improvements • City of Flint Water these projects. with additional funding Supply Assessment 402 – Public Improvement from non-traditional Annual Update Process • Flint River Restoration Fund (Millage) for capital sources (grants, donations, Plan The CIP is a dynamic and building improvements etc.). The condition of the • Flint Downtown needs to be reevaluated at facilities will require difficult Traffic and Parking least annually. Each year all 202 – Transportation decisions to be made Study projects included within (major Roads) fund regarding prioritization of • Flint Street Lights Project the CIP should be CIP projects. 203 - Transportation • City of Flint Water and reviewed, a call for new (local roads) fund Comprehensive planning Waste- water Rate projects made, and Study influences the programming adjustments made to 590 – Utilities (sewer) • Portfolio Energy Use of capital improvements. As existing project lists arising capital funds Analysis noted above, state law from changes in the 591 - Utilities (water) reinforces that link by • State Revolving Fund Report amount of funding capital funds requiring that the Planning required, conditions or Commission annually • Transportation Improvement Plan timeline. A new year of prepare a CIP to support and (TIP) programming is also added implement Master Plan • City Strategic Plan each year to replace the recommendations.

year funded in the annual operating budget.

The CIP will continue to The City also provides a CIP as a Planning 8 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

develop over time. findings. The extent of PUBLIC PUBLIC Greater attention shall be damage that ultimately INVOLVEMENT INVOLVEMENT will be found to have devoted to provide more The City is committed to AFTER THE CIP occurred to Flint’s detailed information including the public in its PROCESS infrastructure because about individual project recovery efforts and a Some of the projects included of the Flint River switch requests, program significant public in the CIP are studies and must be recognized planning, fiscal analysis, involvement campaign was planning efforts that should and publically included during the Master fiscal policies and incorporate public discussed. These Plan. developing debt strategy. involvement as an integral findings and dialogue part of the project. The will ultimately position Given both the unusual and Need for Further Study majority of the projects that the City to accurately unique circumstances during A vast majority of are identified for understand the the update of this document, Flint’s infrastructure implementation in the CIP are challenges and the extensive community projects are not new “traditional” municipal public amount of funding engagement and outreach infrastructure – it is the works projects, such as water necessary to fix them. was unable to occur. As need to replace or noted earlier, the current main replacements, road rehabilitate and adjust landscapes involving the reconstructions, park the current aged water and subsequent development, government budget stability leaves many buildings, and structures. facilities. The infrastructure in place of the projects in this supported a document unattainable at significantly higher this given time. residential population and industrial user Local, State, and Federal court decisions as well as the base, so the as-yet unknown extent of infrastructure is damage to water generally prepared to infrastructure present support the “rebirth” of multiple uncertainties when the City as described in estimating the level of the Master Plan. infrastructure needs and funds available to address Due to the water crisis them. Given so many as previously noted, it’s unknowns, this CIP will be important that the City treated as an evolving continue to research, document, with changes investigate and made as more information ultimately conclude the becomes available. The severity and depth of water crisis has put a the lead-piping spotlight on capital needs in problem. A series of Flint. What is unescapable is technical measures the conclusion that the must be taken to resources required to make properly address the our damaged water infrastructure safe far scale of the problem exceed local capacity. On- and those include going State and/or federal collecting, analyzing help is urgently needed to and reporting on the address these problems.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 9 City of Flint Capital Improvement Plan • Introduction & Overview DRAFT – 1.10.16

10 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

2 CAPITAL IMPROVEMENT PLAN

READING & USING THE CIP

2016-2021 Standards for General guidance on the CIP POLICY Inclusion standards for an item’s This CIP outlines a The City’s CIP is a inclusion in the CIP schedule of public document that initiates includes that the project: expenditures over the and tracks high expenditure capital • Is consistent with an ensuing six-year period. adopted or anticipated The CIP provides for large, projects, purchases and programs. To qualify for component of the physical improvements inclusion in the CIP, a Master Plan, a state or that are permanent in single project or a program Federal requirement, or nature, including the basic of projects comprised of a City Council approved facilities, services, and components of a common policy; installations needed for the infrastructure or capital functioning of the system (e.g., neighborhood • Constitutes a permanent, community. These include parks system, annual street physical, or system transportation systems, program, etc.) must meet improvement in excess of parks, utilities, municipal certain standards, which an established cost or facilities, and other are to be set by the significant equipment miscellaneous projects. Planning Commission with purchases in excess of an The CIP provides a list of assistance from City staff established cost; or, high value capital budget and input of residents. • Adds to the value or items or projects for capacity of the inclusion in the proposed infrastructure of the City. Capital Budget of the City’s Annual Budget Document.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 13 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

Unfunded Needs Operational & Capital Projects The CIP cannot address all Maintenance Needs Budget of the capital expenditure Many cities include within Approval of the CIP by the needs for the City. As with their annual budget an City Council does not other communities Operations and mean that the Council throughout the region, Maintenance (O&M) grants final approval or authorization for all the state, and nation, the City’s Budget and a Capital projects contained in the infrastructure systems have Projects budget. Projects plan. Rather, by needs that are mounting at that are considered approving the CIP Council such a rate that they operational, maintenance, acknowledges that they cannot be addressed within or recurring are typically agree that these projects the span of a six- year CIP. excluded from the CIP, but represent a reasonable Some identified needs are captured in the O&M interpretation of the cannot be addressed Budget portion of the upcoming needs for the because of limits on the Annual City Budget City, with the projects annual amount of available Document. contained in the first two funding or staffing years of the plan being resources. Others cannot In this CIP, some O&M the basis for the City’s be addressed because of a projects are included in next Capital Projects lack of any applicable the CIP. A separate O&M Budget. Until a project is funding source, or perhaps budget should be contained within an policy or legal restrictions. developed in future years approved annual budget Furthermore, given the to include the items that and funding is identified, current financial situation have a regular schedule projects and schedules for each included in the created due to legal for maintenance or CIP are only guides that rulings, the City of Flint replacement, such as: are likely to be changed finds itself with very little- • Minor bridge as conditions change. to-no room for rehabilitation; infrastructure upgrades • Minor street repairs and outside of the immediate filling of potholes; water systems. • Replacement of roofs, doors, windows, etc.; As a result, there are needs whose solutions cannot be • Parking lot reconstruction; implemented within the CIP. Rather than discard or • Computer system ignore these items, they are upgrades; included in the CIP as • Hydrant and water valve replacement; unfunded needs and are shown as being unfunded, • Security system with many of them shown upgrades; and, out- side of the 6-year • Water meter window. This information replacement. will provide guidance to City staff in examining the limitations and restrictions currently in place and to seek alternative methods to achieve solutions. 14 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

2015 CIP Progress ASSIGNING PRIORITY It is important to The following classification PRIORITY 2 - IMPORTANT High-priority projects that note the significant Imagine Flint Master system has been used to should be done as funding amount of effort and Plan for a Sustainable prioritize capital becomes available. progress that has improvement needs and is Flint been either initiated used in the list of CIP These include projects The Master Plan utilizes an or completed over projects in this document: that would benefit the innovative “placemaking” community and projects the course of the approach, which defines PRIORITY 1 – URGENT whose validity of previous CIP year. desired places within the Urgent, high-priority planning and validity of Given that 2015 projects that should be City. While traditional done if at all possible. timing have been represented the approaches to city planning established. first, official are often concerned with the These include projects combined CIP in the specific “uses”, the Land Use that are required to City’s history, the PRIORITY 3 – DESIRABLE Plan builds on the idea of comply with a Federal or Worthwhile projects to 2016 CIP update will establishing unique and state requirement; be considered if funding highlight a handful desirable places. The Place- projects that would is available. of the significant Based Land Use Plan is the address an emergency or projects that were These are projects that central component of the remedy a condition addressed from the are adequately planned, Master Plan, the dangerous to public previous year, and but not absolutely implementation of which health, welfare, and also update on a required, and should be individual capital projects safety; projects that broad basis, the deferred to a subsequent should work toward. would provide facilities for total progress that year if budget reductions a critically needed has been achieved are necessary. These Master Plan Place Types community program; by the City, within projects may end up The Land Use Plan projects needed to each chapter. To being included within a establishes 12 distinct correct an inequitable make the document funded portion of the CIP place types within the city distribution of public easier to read and if alternative sources of that provide for various improvements in the past; follow, a color-coded funding are identified. land uses and types of and projects vital to the system has been places, essential for economic stability of the CIP Project Narratives devised to help the creating a harmonious and City. A special effort is The CIP includes an reader track the inviting community in made to find sufficient extensive inventory of progress and which to live, work, and funding for all of the capital improvement understand the visit. The following projects in this group, projects proposed for document: summary highlights the realizing that this is not inclusion in the proposed Project Completed intent of each place type. feasible given the Capital Budget of the in 2015 - Chapter 4: Land Use Plan significant needs. City’s Annual Budget of the Master Plan Document. As a planning Project On-Going provides detailed document with a direct from 2015 - descriptions accompanied impact on the physical Project Added from by a series of make-up of the city, the 2015 - implementation strategies projects included in the Project Removed: for each place type. CIP should support long- As previously noted, term City policy a handful of projects established in the Master were removed due Plan. to the unforeseen water crisis. These

projects are identified in their

respected charts. City of Flint Capital Improvement Plan DRAFT - 1.10.16 15 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

Community Open Space Community Open Space areas are designated where parks, open spaces, and environmental features predominate. These areas are defined by: large natural features, such as large greenways along the Flint River, Swartz Creek, Gilkey Creek, and Kearsley Creek; areas around Thread Lake, Kearsley Reservoir, and Flint Park Lake; large wooded areas and urban forests; and, other City parks and open spaces.

Green Neighborhoods Flint’s Green Neighborhoods are areas where previously vacant or underutilized properties have been repurposed. They have become low-density, residential neighborhoods with a significant amount of land dedicated to green uses, community gardens, small- scale urban agriculture, and small open space areas.

Traditional Neighborhoods The Traditional Neighborhood is the building block of the Flint community. It is where most people live and families are raised, in primarily detached single family homes. Flint’s Traditional Neighbor hoods are supported by various other uses including schools, com- munity centers, religious institutions and parks.

Mixed Residential Mixed Residential areas are generally concentrated around Down- town, providing a local population to help patronize Downtown businesses. Mixed Residential areas are also situated along busy corridors, providing an opportunity for transit-oriented development and more robust commercial services.

Neighborhood Centers Neighborhood Centers are a focal point of Flint’s neighborhoods and are distributed throughout the City. Neighborhood Centers are primarily located at the intersection of busy streets that provide ease of access for nearby residents and contribute to the overall activity of the area.

City Corridor City Corridors are situated along Flint’s busiest roads, providing areas for a range of activities on parcels easily accessible by automobiles and serviced by transit. City Corridors leverage the economic potential of traffic and help minimize land use incompatibilities by containing a variety of uses in manageable areas throughout the City.

16 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

Downtown Downtown is a dense and vibrant mixed use area near the geographic center of the City along Saginaw Street, between the Flint River and Interstate 69. Downtown is, and should continue to be, a compact area consisting of a variety of uses that together provide and foster an active pedestrian-oriented area.

Civic/Cultural Campus As home to Mott Community College, the Flint Cultural Center, and the Flint Central High School campus, the Civic/Cultural Campus is a unique area of the City. The Civic/Cultural Campus is a unique place type consisting entirely of institutional and public uses and any redevelopment within this place type should consist of uses that complement or strengthen the existing campus.

University Avenue Core Flint’s University Avenue Core is a unique area of the City, home to Hurley Medical Center, , , and Tool and Die. These anchor institutions form the central component of a high-intensity district outside of Downtown Flint.

Commerce and Employment Centers Commerce and Employment Centers are areas where the development pattern is focused around a community anchor such as a large employer, regional commercial center, or a cluster of smaller employment-related uses. Commerce and Employment Centers can attract a significant number of workers and visitors from outside of the community.

Production Centers Production Centers are designated where the City’s major industrial centers and economic generators exist such as GM’s and portions of the site. These intense industrial uses are capable of generating considerable noise, traffic, and other nuisances and should be separated from residential and commercial areas.

Green Innovation The deindustrialization of the City has resulted in a significant population decline and areas of Flint that once consisted of fully built out neighborhoods are now vacant. Areas of Green Innovation represent significant redevelopment opportunities that hold the potential for a variety of eco-friendly and sustainable solutions to repurpose large vacant areas and help reinvent the City.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 17 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

CIP ORGANIZATION Grouped CIP Information Sources • Chapter 5 – Several areas of the Master Projects Environmental Features, Capital projects and costs Plan identified Within each section, CIP Open Space, & Parks; listed were obtained from infrastructure/capital items have been grouped a variety of sources, projects and the CIP based on the various • Chapter 6 – including: maintains the same sections and sub-headings Infrastructure & chapter structure to enable contained within the Community Facilities; • Lists of capital projects a one-to-one comparison Master Plan. This will provided by various between CIP projects and enable a one-to-one • Chapter 7 – Economic departments; Master Plan policy. The CIP comparison between City Development & is organized into the policy identified in the Education; and, • Applications prepared following chapters: Master Plan and the by the City for various projects identified in the • Chapter 8 – Public grants; and, • Chapter 1 – CIP. So, for example, Safety, Health, & Introduction & improvements to traffic Welfare. • Previous studies Overview signals along Pierson Road prepared by the City, directly relate to the • Chapter 9 – Moving other governmental • Chapter 2 – Reading & “Technology & Wayfinding” Forward entities, or consultants section of the Using This CIP on behalf of either. Transportation & Mobility To assist with • Chapter 3 – Housing & chapter. In some cases, projects implementation of the Neighborhoods; listed have had very little Master Plan and align CIP In some sections the detail prepared and cost projects with long-term categories are further • Chapter 4 – estimates have been City policy, the CIP has subdivided to ensure there Transportation & approximated based on the been organized around is clear delineation of Mobility; anticipated scope of the the core chapters of the needs for departments. project. It is very likely that Master Plan. The CIP This is most significant for many of the costs noted for includes several sections the Infra- structure & various projects will vary, with corresponding Community Facilities sometimes considerably, Master Plan chapters, section, which is when additional including those in the subdivided for City Hall, information or analysis is above table. miscellaneous City obtained. facilities, Water Department, and Sewer Department subsections in CIP ORGANIZATION the CIP. CIP CHAPTER MASTER PLAN CHAPTER 3 Chapter 5 – Housing & Neighborhoods 4 Chapter 6 – Transportation & Mobility 5 Chapter 7 – Environmental Features, Open Space, & 6 ChapteParks r 8 – Infrastructure & Community Facilities 7 Chapter 9 – Economic Development & Education 8 Chapter 10 – Public Safety, Health & Welfare

18 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Reading & Using the CIP DRAFT – 1.10.16

CIP PROJECT SPREADSHEET READING CIP Priorities are stated as: • Total Cost – the total The information in the PROJECTS cost of the project, following CIP tables is a All projects have the 1. URGENT: projects which may be a one- summary of the CIP Project following information that should be time cost, multi-year, or Spreadsheet included at the provided: done if at all continuous. For end of the CIP. The project possible continuous cost projects • Project Name – a spreadsheet includes similar 2. IMPORTANT: projects (i.e., projects such as short description of information in a slightly that should be done as water-main the project. different format. The most replacements done soon as funding is relevant difference is that • Project Narrative – every year on a 20-year available the spreadsheet includes an provides additional detail cycle), the total cost 3. DESIRABLE: worthwhile “Unfunded Needs FY 2015- about each project that is shown is for the 20-year projects that can be 2035” column. This column known at the time of the CIP duration. deferred if needed reflects the amount of the CIP completion. The • City Cost Share – the total cost of each project exact extent of the scope portion of the total cost that is currently unfunded – of all projects may not be Projects have also been assumed to be the essentially not included in an known at this time but ordered within each responsibility of the City. approved budget, has no the narrative does give priority group such that the identified funding source additional detail that is most important projects • Non-City Funds – except for the City budget, not always obvious in the are at the top of the list and funding provided by an assumed match for a Project Name. least important at the grants, donations, or grant that is or may be bottom. For example, other sources not part of • Priority – as discussed sought for the improvement, various roadway the City’s budget. previously, all projects improvements are listed as etc.

were given a priority ‘2 – IMPORTANT’, but some With regard to City cost based on their need. share, unless a non-City Many “unfunded” projects projects should be are likely to be included in a Priority is provided for implemented ahead of fund source such as a projects on a case-by- grant has been identified future CIP update and may others within that priority have funding from alternate case basis and there is no group based on their and secures, it is assumed ranking between projects that the City will be sources. All projects location and the place type contained on the CIP spread- either within a they serve. responsible for funding department or between 100% of the cost of the sheet are included in the departments. In project. tables below, with some considering the priority, a multi-phase projects on the number of factors were spreadsheet lumped together considered. Of primary into one project (e.g., design importance was how the engineering, construction, project might assist in and construction engineering implementation of the for road projects are split into Master Plan, as well as three phases on the other plans (e.g., spreadsheet but combined Strategic Plan), provide a below). long-term cost savings or other similar benefit (e.g., roof replacement/repair prevents interior water damage to a building), or is required as a regulatory requirement (e.g., dam repair required by the state).

City of Flint Capital Improvement Plan DRAFT - 1.10.16 19

City of Flint Capital Improvement Plan • Housing & Neighborhoods DRAFT – 1.10.16

3 CAPITAL IMPROVEMENT PLAN

HOUSING & NEIGHBORHOODS

The City of Flint has lost In other traditional single- CIP Vision for Housing & Capital Improvement approximately half its family neighborhoods Neighborhoods Overview Housing maintenance or population over the past fifty experiencing significant Imagine thriving neighborhood stabilization years. This population loss has population loss, the City should neighborhoods, free of blight, projects are typically not resulted in a tremendous focus on helping these areas where a targeted demolition included in a Capital physical impact across Flint’s evolve into well- maintained, stabilizes traditional Improvement Plan. neighborhoods, with some less dense, “green neighborhoods and transforms Unfortunately, the burden of experiencing significant neighborhoods.” A few high-vacancy neighborhoods managing vacant properties falls vacancies and degrading neighborhoods with extreme into stable green on local government and cities housing conditions, while other population loss are being neighborhoods with larger lots, like Flint are struggling to find the neighborhoods have fared more repurposed to make way for community gardens, and well- resources necessary to demolish favorably, but are still fighting non-residential development maintained open space. or rehabilitate vacant buildings to remain stable. that can make productive use Imagine inclusive and take care of vacant property. of largely vacant areas. neighborhoods teeming with Moving forward, it is important The Housing and mixed-income and mixed use to note that the City continue to Neighborhoods Chapter in the The CIP plays an important developments integrated into commit its Community Master Plan outlines a wide role in tying infrastructure the fabric of the community Development Block Grant Funds variety of strategies needed to improvements to the needs and connected to transit and and pursue additional grants to address the drastic changes of each neighborhood place walkable retail options. fund neighborhood stabilization that have occurred in Flint’s type identified in the Master Imagine neighborhoods with efforts such as owner occupied neighborhood structure. In Plan. re-tooled, modern rehabilitation and new housing more populated infrastructure that is well- construction. The City should neighborhoods, the City must matched to the service needs also use grant funds to help devote resources toward vacant of the population. lot maintenance, targeted stimulate multi- family supply in demolition, building a fairly weak housing market. rehabilitation, and code enforcement to prevent these neighborhoods from destabilizing.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 21

City of Flint Capital Improvement Plan • Housing & Neighborhoods DRAFT – 1.10.16

Imagine Flint for housing - 31 participants of Neighborhood stabilization. rehabilitation and Operation Fresh Start. Neighborhood The City continues to relocation. The plan - 4,208 enforcement Planning Initiative equitably commit funds for and any new potential complaints received; The City has committed to neighborhood stabilization, development would 3,551 responded to completing 10 - 15 with at least half allocated to focus on creating and 1,826 resolved. neighborhood plans within the Green Neighborhood. vibrant mixed-income City by 2020. Investments in Neighborhood Inventory Master Plan reference: neighborhoods that improving the quality of Program. Neighborhood Revitalization include quality, Priorities, p. 101; Eliminating housing, along with strategic Blight and Urban Decay, p. affordable housing The City continued to partner investments in neighborhood with the Community 110. and a multitude of infrastructure should be options for the Foundation and their NSG Code enforcement. guided by this neighborhood- residents of South program to offer $21,000 in The City continues to level planning effort. In Flint. mini-grants for neighborhood develop a pro-active code November 2015, the City was data collection work. In all, enforcement program awarded a multi-year grant Housing & 70,000 pieces of data was designed to first address from the Ruth Mott Neighborhoods – 2015 collected. absentee property owners Foundation to begin this CIP Progress Housing & in the city who are failing to process. The grant will enable Neighborhoods Policy adequately provide care to to the City to develop and It’s important to document and their property. Currently a The following housing and implement two (2) detail the tremendous amount Magistrate position is being neighborhood policies are neighborhood plans annually, of work being done by the City created to help expedite derived from the Master Plan over the next two years. The over the past year. The citations created through and should shape all projects City should continue to work following details the significant Code Enforcement. moving forward. These policies with its community partners progress and investment made Master Plan and identify the necessary towards improving Flint’s provide a framework for reference: Code funding to carry-out this housing and neighborhoods. In evaluating the merits of any Enforcement, p. 101. program indefinitely. all, there are 8 on-going capital improvement project. For detailed discussion of each Low-Maintenance HUD Choice projects that total roughly policy, please refer to the Restoration & Greening. Neighborhoods $12.8 million dollars in capital Master Plan section and the With funding from HHF, the Planning Project (CN) improvements to Flint neighborhoods. page referenced. City and GCLBA have begun to The City, in restore recently demolished partnership with the A full list of the projects can be Housing options lots with low-growth clover. diversification. Flint Housing found on the project The planting of clover offers a The City partnered with Commission (FHC) spreadsheet listed within this significant reduction to MSHDA to commission a was awarded a chapter. annual maintenance of vacant Target Market analysis $500,000 CN planning Hardest-Hit Funding. lots, resulting in two (2) report. The TMA should be grant for the South mowing’s a season. The City and GCLBA partnered used to encourage new, Flint community. The Master Plan reference: again in 2015, resulting in $12 quality multi-family housing grant specifically Greening & Repurposing, million of Federal demolition options to meet the new pp. 102-103. focuses on the dollars being awarded to the place based land use Atherton East housing GCLBA, to address abandoned patterns. complex, one of the properties in Flint. The Master Plan reference: most isolated and funding will result in 800- Diversifying Housing crime-ridden 1,000 additional problem Options, pp. 93-95. developments within properties being removed Data-driven investment. the City. Identified in from neighborhoods. the master plan as an The City developed a blight- inequitable Blight Removal Activities. matrix that uses data to development, the site The City continues to take a guide future block-level currently lies within a community-driven approach intervention. This has floodplain. The grant to eliminating blight. 2015 produced a data-driven will allow the City, produced some astounding foundation to make FHC, and residents of numbers of blight removal: investment decisions that the South Flint - Over 1,000 tons of align with the Land Use Plan. community the ability trash removed. Master Plan reference: Developing An Investment to craft a Framework, pp. 97-100. transformation plan 22 City of Flint Capital Improvement Plan DRAFT 1.10.16 City of Flint Capital Improvement Plan • Housing & Neighborhoods DRAFT – 1.10.16

HOUSING & NEIGHBORHOODS CAPITAL IMPROVEMENT PLAN

Blight Elimination

The Master Plan calls for the development of a multi-phase blight elimination framework that serves to stabilize neighborhoods through a collaborative approach between residents, local government, institutions, community groups, and business leaders and developers. In its important campaign to end blight in Flint, the City produced a Five-Year Blight Elimination Framework with assistance from the Genesee County Land Bank. The blight elimination framework uses the Master Plan place types to provide direction for blight removal, which can be used by institutions, residents, business owners, public officials, and the entire Flint community. Grant funding is aiding in the implementation of this document.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS Code Enforcement 1 – URGENT $2,500,000 TDB TDB Provide effective code enforcement to support blight removal and work to ensure that properties remain blight free. 5-year cost.

Boarding 1 – URGENT $1,100,000 TDB TDB Boarding of 5,000 structures. 5-year cost.

Mowing 1 – URGENT $17,988,300 TDB TDB Mow 20,000 properties annually with next-door support and using mow strips for properties not adjacent to occupied properties, if not reused. 5-year cost.

Waste Removal 1 – URGENT $3,800,000 TDB TDB Removal of 71,000 tons of trash, debris, and hazardous trees. 5- year cost.

Demolition 1 – URGENT $63,950,000 TDB TDB Demolish 5,000 vacant and blighted residential structures. 5-year Grant Funds cost. Secured

Vacant Lot Reuse 1 – URGENT $1,400,000 TDB TDB Facilitate reuse of 5,000 vacant lots. 5-year cost. Grant Funds Secured

City of Flint Capital Improvement Plan DRAFT – 1.10.16 23

HOUSING & NEIGHBORHOODS CAPITAL IMPROVEMENT PLAN

Improving Neighborhoods

Investing in Flint’s existing neighborhoods is a key component in improving quality of life, a guiding principle of the Master Plan. The City should continue to identify projects and initiatives that improve neighborhoods in accordance to the Master Plan.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS

Smith Village Landscaping and Green Infrastructure Plan 2 – IMPORTANT $75,000 $75,000 $0 The Renaissance of Smith Village Development is nearly complete. This plan will address remaining issues such as inconsistent grading and drainage, and make the neighborhood more attractive through better streetscape and landscape design. These issues give us the opportunity to make Smith Village a demonstration project for the implementation of green infrastructure, helping the City cut long term maintenance and utility costs while becoming more sustainable in the process.

Smith Village Landscaping and Infrastructure Improvements 2 – IMPORTANT $195,000 $195,000 $0 Implementation and construction of the above plan. Will include: streetscape and gateway improvements, landscaping and grading, sidewalk and utility repairs, and green infrastructure elements such as rain gardens.

LED streetlight program 3 – DESIRABLE $5,00,000 $5,000,000 $0 Converting existing streetlights to LED fixtures would require an initial capital outlay but the savings in energy costs was anticipated to have a payback of as soon as 3 years (based on EPICS-Purdue University study).

Residential Parcel Assessment 2 – IMPORTANT $20,000 $0 $20,000 Biennial inventory of residential parcels for structural Grant Funds quality and housing vacancy. Cost of undertaking one such Secured inventory is $20,000.

Choice Neighborhood Planning Project Development of a comprehensive Transformation Plan for 1 – URGENT $500,000 $500,000 $0 the south Flint community, which specifically targets the Atherton East housing complex. The plan includes funding Grant Funds for “short-term” action projects to improve the quality of Secured neighborhoods in South Flint.

Imagine Flint Neighborhood Planning Initiative 1 – URGENT $487,580 $177,580 $320,000 Two-year planning project that will create at least 4 Grant Funds neighborhood plans across Flint. Secured Interactive Parcel Mapping Platform 2 – IMPORTANT $50,000 $0 $50,000 Development and implementation of a parcel based mapping platform accessible to residents to assist with City code enforcement efforts and neighborhood stabilization.

City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

4 CAPITAL IMPROVEMENT PLAN

TRANSPORTATION & MOBILITY The City must approach while improving walkability and • How can investment in that capitalizes on its strategic transportation and mobility bikeability. transportation accomplish regional location, access to the with a strategy that is driven by other community goals, interstate highway system, the Master Plan. The City is Land use and transportation including neighborhood existing railroad infrastructure, primed to leverage its strategic are inherently linked. Together, stabilization; infrastructure and connection to Bishop regional location, access to the they create the places people improvement; economic Inter- national Airport to spark interstate highway system, and go and the ways they get there. development; and the new industries and grow connection to Bishop Land use and transportation promotion of public safety, companies. International Airport for new must be closely coordinated to health and welfare? economic development efforts. ensure that Flint grows in a • How does the local The City is also faced with the sustainable and efficient way. environment influence challenge of restructuring its transportation transportation and mobility All policies and projects should improvements? systems that were designed consider the impacts on both and built for a population twice the City’s land use pattern and that of which they currently transportation network based CIP Vision for Transportation & serve. on the following questions: Mobility • Does the existing Imagine an efficient, The Transportation & Mobility transportation system coordinated, and reliable Plan of the Master Plan stresses support anticipated transportation system within the need to work with agencies, development? Flint, where an interactive to better coordinate efforts, • How can future network of trails, sidewalks, manage and maintain their development complement bike lanes, buses, and roads roadways, and improve the the transportation afford all citizens multiple transportation system in Flint. network? modes of safe transit. Furthermore the city must • What modes of Imagine a Flint that is one of undertake and support transportation are most the most walkable and bike- initiatives that reduce appropriate for a given able communities in all of dependence on the automobile area? Michigan. Imagine a Flint

City of Flint Capital Improvement Plan DRAFT - 1.10.16 25 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

CIP Overview over the past year and capital improvement Pedestrian Safety The City of Flint has the document the progress being project. For detailed made from the previous years (Walking Audit) opportunity to redesign its discussion of each policy, CIP. The City will be partnering image and develop a more please refer to the Master with community groups to efficient mode of transit In all, 4 major projects were Plan section and page begin to audit the city’s fully completed and an referenced. sidewalk network while also throughout the city. An aging assessing the ADA street network that is severely additional 13 have begun and compatibility. still remain in progress. This Infrastructure Design in excess given the cur- rent Master Plan reference: substantial progress results in An increased emphasis on population counts should be Signage & Safety, p. 130-132 roughly $2.9 million fully road diets and traffic addressed though prioritized calming is taking shape as executed on CIP projects last Sidewalk Repair projects that align accordingly multiple City-streets are year (2015) and another $19.9 awaiting the results of (50/50 Program) with the future functional million worth of capital engineered road diet The City launched a 50/50 classification map, identifying improvements that remain “in studies. program works to repair current and future traffic Master Plan reference: faulty sidewalks with partial progress”. payment coming from counts. These roadways offer Infrastructure Design, p. The following details the 123-126 homeowners. The City should support to the areas of also continue to secure significant projects and envisioned higher density and federal, state, and grant investment made towards Trail Development The City completed and funding for the repair or regional opportunities found in improving Flint’s roads and installation of sidewalks. the land use plan. Focusing on remains in negotiations to increasing mobility for all build additional non- Master Plan reference: major road way improvements residents and visitors. A full list motorized trails. Signage & Safety, p. 131 that offer increased bicycle of the projects can be found on Master Plan reference: and pedestrian mobility the project spreadsheet listed Trail Improvements, p. 128 Mass Transit Authority options will aid the City The MTA should be consulted within this chapter. Street Tree Management to determine needs related to towards shifting the A tree inventory has been local infrastructure (bus turn- outs, stop locations, perception of an auto-oriented Pierson Rd. CMAQ Project conducted and a draft town, while providing the street tree management intersection phasing, ITS $420,000 project designed applications, etc.) and identify to upgrade traffic signals plan is currently under vibrant spaces for increased review. Once finalized, desirable modifications to recreation and reduced long- and remove unnecessary established routes. ones. adequate dollar amounts term maintenance for the city will be appropriated in Master Plan reference: to manage. upcoming CIP updates. Transit, p. 133-136 N. Saginaw St. Rehab. $2.5 million dollar project Data Collection efforts A strong prioritization on road that rehabilitated 1.8 miles Winter Plowing & Storage The City launched an diet projects and streetscape of N. Saginaw St. There is a need to acquire a aggressive program to better second location to store understand exactly “where” improvements present lower Stewart St. Bridge cost options that offer higher salt during the winter mobility problems are A $400,000 project that months to reduce reload occurring. The problem reward returns. Furthermore, provided preventative and travel time when spotter technology allows the transportation and mobility maintenance that runs over plowing city streets. residents and DPW staff to Buick City. identify problems in real time, CIP has the opportunity to Additionally, due to the age of the fleet, there are through the use and connect with the larger regional Genesee Valley Trail mechanical challenges collection of data. transit network, of which air, A 10-foot wide non- faced by the Department. motorized trail was DPW will need access to an rail and public transit have completed that connects tremendous long-term indoor storage facility to the City with the larger, help decrease opportunities. Linking increased regional trail network. startup/down times. passenger rail options with a Transportation & Mobility growing state network of public Aging Fleet Policy Due to the aging of the transit options provides fleet used to perform opportunities for Flint to The following winter maintenance significantly tap into its strategic transportation and mobility activities, the City location. policies are derived from desperately needs to start replacing the tandem the Master Plan and should Transportation & Mobility – trucks to reduce the repair shape all projects moving 2015 CIP Progress costs and downtown forward. These policies currently being It’s important to document and should provide a experienced. DPW is detail the tremendous amount proposing to purchase at framework for evaluating least two trucks/year, of work initiated by the City the merits of any given during the next three years. 26 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Maintenance of Existing Streets The street network within the City includes more than 550 miles of roadways. The current network of local streets has long been neglected, with estimates of repairs needed at $50 million, and this estimate may be well below actual costs when considering the full scope of projects. Even with the undeniable need, the FY 2012-13 maintenance programs accounted for only 4.5 miles of resurfacing. At that pace, City roadway resurfacing would be completed on a 122-year cycle even though the life expectancy of an asphalt roadway is 20 years at best. Pavement Surface Evaluation and Rating System (PASER) ratings in 2012 found only 8% of City streets to be in “Good” condition, down from 28% in 2008.

Investment in streets is vital to accomplishing the goals of the Master Plan and should be considered an investment in other aspects of the community. The goods and people transported by the street network supports commerce, industry, health, education, activity, and other important functions. Land use changes in the City and their relationship to the changing transportation needs should be analyzed in great detail as part of any redevelopment project. The Master Plan discussed a number of concepts and techniques to consider in various parts of the City to reflect the change in context, multi-modes of transportation available, and current practices in the industry.

Opportunities to make improvements, such as instituting Complete Streets, converting one-way streets to two-way in the area, consolidating curb cuts, reconnecting cul-de-sac streets, road diets, reconfiguring intersection alignments, removing traffic signals that are no longer needed, signal technology improvements, and access management (all of which are discussed in detail in the Master Plan Chapter 6), can all contribute to “right-sizing” the roadway network to meet the needs of the new Flint and be a critical infrastructure improvement for implementation of all aspects of the Master Plan. Eliminating some roadway segments can be done without compromising local mobility or character of neighborhoods, and these segments then do not compete with critical segments for maintenance dollars. There are numerous four-lane roadways throughout the City that have Average Daily Traffic (ADT) totals below 20,000, making them candidates for a road diet via conversion to three-lanes or narrow median four-lane boulevard, along with other improvements specific to the modal requirements of the corridor. A number of the projects included below include review of feasibility of a road diet implementation (see page 125 of the Master Plan for a complete list and map).

NOTE: It is anticipated that moving forward the City will spend an average of $75,000 each year for general engineering services. In addition, it is anticipated that the annual cost for bridge inspections and engineering services by consultants will be $44,000. These annual costs are not included as line items within the following CIP project table.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Lapeer Road – I-69 to Dort Hwy. 2 – IMPORTANT $1,382,973 $1,106,378 Milling and resurfacing of existing pavement, pavement $276,595 repairs, manhole adjustments, and reconstruction of curb ramps from I-69 to Dort Highway. Cost includes PE, construction, and CE.

Future TIP projects 2 – IMPORTANT $1,500,000 $300,000 $1,200,000 Not identified projects 1.5 million dollars for FY21 at assumed 20% cost-share. TIP projects for 2017-2020 recognized individually as new projects in CIP. FY2021 only year with unidentified projects.

Lapeer Road – Center Rd. to Railroad Tracks 2 – IMPORTANT $1,127,085 $225,417 $901,668 Milling and resurfacing of existing pavement, pavement repairs, manhole adjustments, and reconstruction of curb ramps from Center Road to Dort Highway. Cost includes PE, construction, and CE.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 27 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Stewart Avenue 2 – IMPORTANT $1,633,690 $326,738 $1,306,952 Milling and resurfacing of existing pavement, pavement repairs, manhole adjustments, and reconstruction of curb ramps from Andrew Street to Dupont Street. Cost includes PE, construction, and CE. Mackin Road 2 – IMPORTANT $2,500,000 $485,000 $2,015,000 Total reconstruction with storm sewer upgrades, new sidewalk, drive approaches, ADA ramps and signals from Ballenger Highway to Grand Traverse. Cost includes PE, construction, and CE.

Martin Luther King Avenue 2 – IMPORTANT $3,750,000 $750,000 $3,000,000 Total reconstruction with storm sewer upgrades, new sidewalk, drive approaches, ADA ramps and signals from Pierson to downtown. Cost includes PE, construction, and CE. Hamilton Avenue 2 – IMPORTANT $830,285 $166,057 $664,228 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from to ML King. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award

Atherton Road 2 – IMPORTANT $745,316 $149,063 $596,252 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Ogema to Dort Highway. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award.

Grand Traverse Street 2 – IMPORTANT $2,282,663 $456,526 $1,826,106 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Welch to Court. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award.

28 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Flint Cemetery driveway 3 – DESIRABLE $100,000 $100,000 $0 Construct a new driveway to improve accessibility to the cemetery, particularly for veterans.

Saginaw Street Brick Resurfacing 3 – DESIRABLE $3,859,415 $771,883 $3,087,532 Resurface existing brick-surfaced segment of Saginaw Street from the Flint River to Court Street with brick and other materials to improve road surface and environment for safe travel of motorists, bicyclists and pedestrians. TIP application submitted. Competing for federal funding award.

Andrew Street Full reconstruct of Andrew Street from Stewart to 1 – URGENT $874,971 $0 $874,971 Wager. Andrew will remain a 3 lane, one-way road with the potential to be converted to two-way in Grant Funds Secured the future. Cost includes PE, construction, and CE. Preliminary design completed by MDOT. Project to be constructed during calendar year 2016.

Stewart Avenue 1 – URGENT $1,628,097 $0 $1,628,097 Full reconstruct of Stewart Ave from James P. Grant Funds Secured Cole to Dort. Stewart will be reduced from a six lane roadway to 5 lanes. Cost includes PE, construction, and CE. Preliminary design completed by MDOT. Project to be constructed during calendar year 2016. Additional $192,000 grant awarded to cover projected project cost overrun.

Residential Streets 1 – URGENT $12,000,000 $12,000,000 $0 Includes a variety of road treatments to preserve and maintain residential streets annually at a cost of $2,000,000. Three-year prioritization list to be determined by April 2016 to assist in implementation of Master Plan to meet estimated $50,000,000 need. Residential paving program to be initiated spring 2016. Enacted Road Funding Bill to provide additional funds for road/bridge maintenance.

Miscellaneous projects 2 – IMPORTANT $45,000 $45,000 $0 Projects identified for FY 2016/2017 Includes contribution to preliminary engineering for S. Saginaw Street road diet ($25,000) and funding source identification for Leith Street access project ($20,000).

City of Flint Capital Improvement Plan DRAFT - 1.10.16 29 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Fenton Road 1 – URGENT $788,591 $157,718 $630,873 Milling and resurfacing of existing pavement, Grant Funds pavement repairs, manhole adjustments, and Secured reconstruction of curb ramps from Hemphill to Campbell Street. Cost includes PE, construction, and CE. Fleis & Vandenbrink performing preliminary engineering and design. Construction anticipated calendar year 2016.

Dupont Street 1 – URGENT $1,970,574 $656,860 $1,313,714 Milling and resurfacing of existing pavement, Grant Funds pavement repairs, manhole adjustments, and Secured reconstruction of curb ramps from Stewart Avenue to Carpenter Road. Cost includes PE, construction, and CE. Preliminary design completed. Project to be constructed during calendar year 2016.

Fenton Road 2 – IMPORTANT $1,984,569 $661,910 $1,322,700 Milling and resurfacing of existing pavement, pavement repairs, manhole adjustments, and reconstruction of curb ramps from I-69 to Campbell Street. Cost includes PE, construction, and CE. Fleis & Vandenbrink performing preliminary engineering and design. Construction anticipated calendar year 2016.

MDOT Projects 1 – URGENT TBD $556,000 TBD Annual projects anticipated for FY 2015, 2016, and Grant Funds 2017 that require a cost-share by the City to Secured participate. City cost share represents 12.5% of MDOT local share of federal project costs for improvements within City jurisdiction. MDOT completed construction I-69. Construction I-475 scheduled for 2016.

Hamilton Avenue 2 – IMPORTANT $1,928,498 $385,699 $1,542,798 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from ML King to Broadway. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award.

30 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Court Street 2 – IMPORTANT $3,296,932 $659,386 $2,637,546 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Crapo to Center. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award.

Davison Road 2 – IMPORTANT $1,983,650 $396,730 $1,586,920 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Hamilton to Dort. Cost includes PE, construction, and CE.

Fleming Road 2 – IMPORTANT $1,762,578 $352,516 $1,410,062 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Pasadena to Bell Creek. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award. Kearsley Street 2 – IMPORTANT $1,318,891 $263,778 $1,055,113 Resurfacing project to include milling the existing pavement, pavement repairs, placement of 4 inches of Grant Funds Secured HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines Chevrolet to Beach. Cost includes PE, construction, and CE. Wade Trim performing preliminary design. Construction anticipated FY 2017.

Van Slyke Road 2 – IMPORTANT $858,837 $171,767 $687,070 Project to include milling the existing pavement, pavement repairs, placement of 4 inches of HMA over existing pavement, manhole adjustments, sidewalk ramps and associated sidewalks and curbs reconstructed in accordance with ADA guidelines from Atherton to Hemphill and a pedestrian crosswalk added at the Atherton Rd intersection. Cost includes PE, construction, and CE. TIP application submitted. Competing for federal funding award.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 31 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Technology & Wayfinding Projects on the transportation network to improve mobility are not restricted to paving or reconstruction. There are many low cost improvements that can be considered that can have a dramatic positive impact on mobility. Given the reduction in population, it is very likely that some intersections that are currently signalized would no longer warrant them. The City has 288 signalized intersections, well over twice the number anticipated for the population according to the Institute for Transportation Engineers (ITE). Conversion of signalized intersections to two-or four-way stop control can save several thousand dollars annually in electricity costs, not to mention the cost of hardware and controllers. For intersections where signals are warranted, improvements can still be made, including coordinating a series of signals on major arterial roadways to allow vehicle platoons driving the posted speed limit to progress through a corridor. Where synchronization isn’t an option, alternatives such as changing the cycle length as warranted by traffic throughout the day or addition of vehicle detection systems to modify signal phasing based on traffic volumes in real time can be considered to minimize queuing of vehicles and wasted green time. These changes, in addition to emergency signal preemption and transit signal priority can assist in improving mobility for emergency vehicles and buses.

Another, often overlooked, method of improving mobility is through improved wayfinding signage. Addition of distinctive, uniform, and attractive signage along key corridors, intersections, and locations can be instrumental in directing visitors to key destinations, such as downtown, public parking, parks, hospitals, schools, colleges, motels, restaurants, etc. Within key areas such as downtown, additional pedestrian-level maps can further highlight attractions in each area. As the Master Plan is implemented it is very likely that a number of projects in addition to those listed will be identified to improve mobility. The City should collaborate with entities such as MDOT to review traffic signals on state routes and downtown business groups for ideas on wayfinding programs in the downtown. It is also feasible that student projects at one of the local colleges could be done for wayfinding recommendations and options throughout the City.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Analysis of City traffic signals 2 – IMPORTANT TBD TBD TBD Review of all City traffic signals to determine if they are war- ranted and, if so determine if synchronization, cycle length changes, etc. can improve mobility and reduce delays. Pierson Road CMAQ Project COMPLETED $420,517 $0 $420,517 LED and wireless traffic signal upgrades at 6 of 12 intersections from Harvard to Dort Highway. Traffic signal improvements at the following locations: Pierson Road at Harvard Street, Saginaw Street, Selby Street, and Horton Ave. Improvements include full signal replacement and ADA ramp upgrades at each intersection. Traffic signal removal at the following locations: Pierson Road at North Street and Pierson Road at Industrial Ave. This is the second phase of a project completed in 2012 to perform traffic signal improvements at six other locations along Pierson Road and completes the Pierson Road corridor. Project is funded by a Federal Congestion Management/Air Quality (CMAQ) grant and includes both construction and CE.

32 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Infrastructure Design Street network improvements that are not typical resurfacing or reconstruction can also have a dramatic impact on mobility. Implementation of “Complete Streets” designed and operated to be safe for pedestrians, bicyclists, motorists, and transit riders of all ages and abilities can often not only ease congestion but also support economic growth, improve safety, encourage walking and biking, improve air quality, and enhance mobility for children. A Complete Streets approach to roadway infrastructure promotes the development of a multi-modal transportation network where safe alternatives to cars are available. The City has adopted a non- binding Complete Streets ordinance stating its support for development of multi-modal corridors, and a logical next step is adopting a binding policy outlining how various components can be integrated into future public and private development projects. The components could include design guidelines, technological improvements, signage, education programs and outreach, road diets, one- way to two-way conversions, addition of bike lanes, access management, mid-block pedestrian crossings/pedestrian signals, traffic calming, and intersection realignment, among others. The Master Plan has already identified a number of corridors in the City that could be candidates for a road diet (conversion from four full width travel lanes, often with full length center left turn lane to generally 2 travels lanes with on-street parking, transit lanes, bike lanes, and/or medians added). A handful of projects have been identified below as a first step in the Complete Streets program for the City during implementation of the Master Plan.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Saginaw Street 2 – IMPORTANT $1,940,822 $388,164 $1,552,658 Milling and resurfacing of existing pavement, pavement repairs, manhole adjustments, and reconstruction of curb ramps from Hamilton Avenue to the Flint River. Cost includes PE, construction, and CE. Buick City redevelopment perimeter streets 2 – IMPORTANT $3,750,000 $750,000 $3,000,000 Total reconstruction with storm sewer upgrades, new sidewalk, drive approaches, ADA ramps and signals to facilitate redevelopment in the area. Cost includes PE, construction, and CE.

South Saginaw Street road diet 1 – URGENT $30,000 $0 $30,000 Planning staff received a $30,000 grant to complete Grant Funds the road diet for S. Saginaw St. from I-69 to Hemphill Secured Rd. These resources will result in new bike lanes being created on Saginaw St., a streetscape plan with gateway enhancements being generated and minor streetscape improvements being implemented.

Harrison Street Enhancement 2 –IMPORTANT $385,189 $106,884 $278,345 Cost includes CE and construction. Rowe Professional Services completed preliminary design. Construction scheduled calendar year 2016

Saginaw Street COMPLETE $2,449,677 $444,616 $2,005,061 Construction and CE for 1.77 miles of road rehabilitation, including cold-milling of existing asphalt roadway, placement of HMA surfacing, select curb repair, minor base repair including detail 7 & 8 joint repair, manhole cover adjustments, ADA compliant ramp improvements, select storm sewer improvements, traffic signal improvements, pavement markings and restoration from Hamilton to Pierson.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 33 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Mobility & Access Given the fact that the City’s transportation network hosted much higher traffic volumes than are expected in the future, the existing network is likely a candidate for other improvements not already mentioned that would improve mobility and access. The City should consider a comprehensive analysis of the street network within the City to ascertain what improvements best meet the needs, both current and future. The scope of this analysis should build upon that already completed in the Master Plan but go to a higher level of detail, looking at additional data such as traffic counts, crash data, land use, etc. and develop a more comprehensive listing of projects that can be discussed at a future update of this CIP. This study should also consider the need for connectivity to Bishop International Airport and the state highways and interstate highways in the City (M-21, M-54, I-69, I-75 and I-475), transit needs of MTA, and regional mobility. Other factors to consider is reconnecting cul-de-sacs where mobility would be enhanced, making new network connections to eliminate isolation from a neighborhood, and street removals that no longer serve their original purpose.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS City-Wide Transportation Network Analysis 1 – URGENT TBD TBD TBD Study suggested performing a thorough analysis of the true needs of the City’s roadway network.

Bus Rapid Transit 3 – DESIRABLE TBD TBD TBD The City, in partnership with the Mass Transit Authority (MTA), should pursue a feasibility study on BRT transit along Saginaw Street. Identified as the “primary artery” within Flint, BRT along Saginaw Street would provide increased accessibility and access through much of the City’s core.

Leith Street (Access Point) 3 – DESIRABLE $18,750,000 $3,750,000 $15,000,000 Total reconstruction with storm sewer upgrades, new sidewalk, drive approaches, ADA ramps and signals from Dort to Saginaw, which would restore east-west access across I-475 and Buick City and provide access on the north side of the City. Cost includes PE, construction, and CE.

Leith Street Bridge COMPLETED $41,977 $2,098 $39,878 Preventative maintenance of the bridge over the C&O railroad includes substructure repairs of the piers under the fascia beams. Costs include construction and CE.

34 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Bridges As would be expected, bridges in the City are in a similar situation when compared to the streets. There are a number of vehicle and pedestrian bridges that are in need of regular maintenance, rehabilitation, or replacement. At least 53 bridges in the City are rated as “structurally deficient” or “functionally obsolete” according to a Highway Bridge Report prepared by MDOT in 2013. The City has a total of 32 bridges under its jurisdiction, 23 of which (72%) were found to be “structurally deficient” or “functionally obsolete” according to a Bridge Technical Report prepared by Genesee County Metropolitan Planning Commission. All of these bridges facilitate the movement of vehicles over freeways, other roadways, railroads, and watercourses and are essential to the movement of goods and people in the City. It is unlikely that any of the vehicle bridges are no longer required; however there are some pedestrian-only overpasses that no longer serve their original purpose due to the changes in population, closing of schools, etc.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS Atherton Road over Carmen Creek Bridge 1 – URGENT $425,000 $85,000 $340,000 Preventative maintenance of the Grant Funds bridge over Thread Creek. Cost Secured includes PE, construction, and CE.

12th Street Pedestrian Bridge 3 – DESIRABLE $150,000 $150,000 $0 Demolish pedestrian bridge over 12th Street and railroad at Southwestern Academy. Verify that bridge no longer is needed to meet future plans of Flint Community Schools and Master Plan implementation.

Kearsley Park Boulevard Bridge 1 – URGENT Preventative maintenance of the Grant Funds $135,000 $32,400 $102,600 bridge over Gilkey Creek. Cost Secured includes PE, construction, and CE.

Barton Street Bridge 1-URGENT Preventative maintenance of the Grand Funds $183,750 $44,100 $139,650 bridge over Thread Creek. Cost Secured includes PE, construction, and CE.

1 – URGENT Bridge Maintenance Projects $1,000,000 $1,000,000 $0 Annual allocation to perform miscellaneous routine bridge maintenance projects FY2017 to FY2021. $200,000 annually. Torrey Road (12th Street) Bridge over Carmen 2 - Creek IMPORTANT $1,227,500 $245,500 $982,000 Bridge replacement. Costs include PE, Grant Funds construction, CE. Construction anticipated in Secured FY2017 S. Saginaw Street Bridge over Flint River 2 – Preventative maintenance project. Costs include IMPORTANT $387,500 $77,500 $310,000 PE, construction, CE. Construction anticipated in Grant Funds FY2018 Secured Stewart Street Bridge Preventative maintenance of the bridge over the C & O COMPLETED $414,754 $20,737 $394,016 Railroad includes pin and hanger replacement, deck joint replacement, and cleaning and coating the beam ends. Costs include construction and CE.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 35 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Pedestrian Network The City has a comprehensive sidewalk network that serves its neighborhoods, commercial areas, and recreational areas. The condition of many sidewalks is deteriorating and areas exist where gaps limit pedestrian safety and mobility. There is no detailed inventory of sidewalks but there is extensive evidence of the need for significant work being needed to maintain, repair, or replace sidewalks. Sidewalk maintenance is an on-going challenge given Flint’s limited resources, a problem common in most urban areas. A walkability audit should be performed that identifies pedestrian paths and physical barriers to walking, access to transit, and accessibility to persons with disabilities.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Sidewalk repairs 2 - IMPORTANT TBD TBD TBD Repairs to sidewalks city-wide with estimated cost of $40,000,000 minimum. By ordinance, sidewalk repairs are the responsibility of the property owner and a cost-sharing program is being evaluated to facilitate city-wide improvements. An accurate, detailed inventory is needed to assess most critical areas based on Master Plan implementation goals.

Walkability audit of City pedestrian network 2 - IMPORTANT TBD TBD TBD Review of entire network of City sidewalks to determine condition and ADA compliance to allow prioritization of projects. Should include extensive public involvement and be consistent with the implementation of the Master Plan. Right-of-way Maintenance The City has recently completed a comprehensive street tree audit. These findings are under review and will determine specific monetary amounts dedicated to street tree maintenance for the upcoming years. Additionally, fleet service and upgrades are ne eded for winter maintenance activities.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Street Tree Maintenance 2 - IMPORTANT TBD TBD TBD Annual allocation to perform routine maintenance of urban tree system as recommended in the Street Tree Management Plan. Costs include tree removals, plantings, and routine maintenance activities. Salt Storage Facility 2 - IMPORTANT TBD TBD TBD Secure additional salt storage facility in northern section of City to decrease salt truck reload time and improve plowing efficiency.

Equipment Storage Facility 2 - IMPORTANT TBD TBD TBD Facility to store vehicles to protect engines and mechanical parts to decrease startup time/downtime and improve response times. Tandem Trucks 1 - URGENT $1,050,000 $1,050,000 $0 Purchase two trucks per year for the next three years, thereafter follow approved depreciation schedule for vehicle replacements ($175,000 each)

36 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Transportation & Mobility DRAFT – 1.10.16

TRANSPORTATION & MOBILITY CAPITAL IMPROVEMENT PLAN

Trail Improvements Trails provide many benefits to the community including an improved transportation system, health and safety, environmental preservation, and economic vitality for the community. Trails and pathways are an important component of creating a livable community and attracting a talented workforce to the City of Flint and Genesee County. The Genesee County Regional Trail Plan included a number of trail projects that should be considered both within the City as well as regional trail connections. The Genesee County Plan identified the Flint River Trail, Genesee Valley Trail, and Grand Traverse Greenway as the top 3 priority trail projects in the county. Groups, such as the Genesee Regional Trail Council (GRTC), consisting of representatives from local communities, Friends of the Flint River Trail, M-15 Heritage Route, Clio Area Pathways, Genesee County Parks and Recreation Commission, Genesee County Road Commission, Genesee County Land Bank, MTA, MDOT, University of Michigan-Flint, Ruth Mott Foundation, and numerous other groups. The purpose of the GRTC is to create an interconnected system of trails linking people and communities throughout Genesee County and guide the development of the countywide trail plan. There are a number of agencies and organizations that offer funding for the development of non-motorized trail systems. The Federal and state government, non-profit organizations, and corporations all offer programs for trail funding, and several funding sources can only be used for non-motorized trail systems. Maintaining eligibility for the various funding sources and seeking funding for improvements is critical to meeting the goals for trails in the City.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Northeast Flint River trail extension (3.8 miles) 3 – DESIRABLE $1,140,000 $1,140,000 $0 Estimated from Genesee County Regional Trail Plan (2007)

Eastern Flint River trail extension (4.9 miles) 3 – DESIRABLE $1,470,000 $1,470,000 $0 Estimated from Genesee County Regional Trail Plan (2007)

Western Flint River trail extension - Carriage Town (1.3 miles) 3 – DESIRABLE $390,000 $390,000 $0 Estimated from Genesee County Regional Trail Plan (2007)

Southern Flint River trail extension - Flint Golf Club (2.0 miles) 3 – DESIRABLE $600,000 $600,000 $0 Estimated from Genesee County Regional Trail Plan (2007) Western Flint River trail extension - Mott Park (2.2 miles) 3 – DESIRABLE $660,000 $660,000 $0 Estimated from Genesee County Regional Trail Plan (2007) Southern Flint River trail extension - Swartz Creek (2.8 miles) 3 – DESIRABLE $840,000 $840,000 $0 Estimated from Genesee County Regional Trail Plan (2007)

Southern Flint River trail extension - CSX railroad (3.1 miles) 3 – DESIRABLE $930,000 $930,000 $0 Estimated from Genesee County Regional Trail Plan (2007)

Genesee Valley Trail COMPLETED $655,803 $131,070 $524,733 Construct 10-foot wide non-motorized pathway from Chevrolet Ave. to M-21.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 37 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

5 CAPITAL IMPROVEMENT PLAN ENVIRONMENTAL FEATURES, OPEN SPACE & PARKS

Built around the Flint River, Open space and parks are The Environmental Features, CIP Vision for Environmental the City has always had a critical components of urban Open Space & Parks Features, Open Spaces & direct relationship with the life. They provide Plan in the Master Plan Parks natural environment. The opportunities for passive and aims to balance some Imagine a new national Master Plan presents an active recreation, access to of Flint’s most reputation for Flint, with the opportunity for the City to nature, enhanced air and significant challenges City positioned as a post- generate greater social and water quality, and help define with unique industrial leader in protecting capital benefits from its the character of each opportunities to the environment and building environmental features, open neighborhood and community enhance the quality of upon its natural assets to spaces, and parks. as a whole. They also present life for its residents, and clean polluted air, land, and possibilities for improving the create a natural water, and confront climate efficiency of the City’s framework around change. Imagine an extensive infrastructure and capital which to build a new, network of well-kept parks, systems. prosperous Flint. It also safe and accessible to all and identifies ways that beautifully maintained. Accordingly, the Master Plan water bodies, green Imagine the Flint River establishes the framework open spaces, and parks revitalized by an alliance of for more extensive can dovetail into other City, non-profit, volunteer, blue/green corridors planning efforts, and resident partners. throughout the City, that are including land use, Imagine the Flint River as an complemented by linked transportation, anchor for economic growth trails, paths, parks, and other community facilities, and recreation and home to a open space amenities. public safety, and more. vibrant “green waterfront” of Investment in environmental features, open spaces, and parks and trails spanning the parks capital is needed to entire length of the river. generate greater benefits from these assets. City of Flint Capital Improvement Plan DRAFT – 1.10.16 37 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

2015, the parks millage only and attractive parks and CIP Overview Environmental natural areas, including having Primary capital investments generated $312,000 of which Features, Open Spaces a neighborhood park within ½ within Flint parks system 90% was spent the most & Parks Policy mile of their home and a basic of mowing services and larger park within 1 mile. All should be made in The following environmental park improvements should be conjunction with the land use utilities. Staffing in parks has features, open space, and ADA compliant. also been vastly decreased. and transportation and parks policies are derived from Master Plan reference: Park In 2008 the City had the mobility plans, ensuring that the Master Plan and should Standards, p. 156. any investment, even minimal equivalent of 65 full time shape all projects moving Operation & maintenance. in nature, over the next 5- positions. In 2015 it had less forward. These policies should than one full time position Operational & maintenance years be targeted at the provide a frame- work for shared by four staffers. Partnerships for shared vulnerable populations, thus evaluating the merits of any responsibility for each of the Renewing the parks millage aiding neighborhood capital improvement project. City's parks should be in 2016 and finding stabilization and our Youth For detailed discussion of each dictated by the number of additional long term funding demographics. policy, please refer to the park users, with small local is necessary as the parks Master Plan section and the parks maintained by Increased emphasis should be millage alone is not sufficient page referenced. neighborhood groups and placed on implementing to our needs. Despite budget large regional parks alternative methods to constraints, the City Flint River revitalization. transferred to state, county, address the traditional continues to aggressively One of the defining projects in the revitalization of Flint or regional control. All parks landscapes that are found pursue grant funding to should be transforming the would remain under the throughout many Flint parks supplement the millage. Flint River and its riverfront oversight of the City of Flint today. By identifying portions into a clean and appealing and a Parks Advisory Board Parks & Open Space – 2015 CIP recreational and comprised of residents and or entire public spaces that Progress entertainment destination. stakeholder are unused, transitions to Over the past year, the City Projects should include increased waterfront park Master Plan reference: Park native landscapes shall be has made great progress on Maintenance, p. 158. prioritized as part of a space, re-design of major capital projects. In all, 8 Riverbank Park, increased Park Partners and comprehensive park projects have been completed connectivity to Downtown Partnerships. naturalization process. totaling $575,000 in capital and neighborhoods, and better utilization of Park partners, who currently upgrades during 2015. University Pavilion. work in over 40 of Flint’s 68 This approach is highlighted within the Additionally, 7 projects worth Master Plan reference: Flint parks, have also contributed $1.24 million remain in River, pp. 150-151; Flint to capital improvements at Greening Project that River & Water- front, pp. incorporates both active and progress. 220. Max Brandon, Flint Park Lake, passive landscapes with non- The following list details the Hardenbrook, Longway, River greenbelt. traditional greening significant projects and Mott, Sarginson, and Bassett Vacant land adjacent to the parks. processes, ultimately investment made towards Flint River should be reducing long term improving Flint’s infrastructure. assembled for “blue/green Master Plan reference: infrastructure” that can maintenance costs while A full list of the projects can be Park Partners, 158. both absorb rainwater and providing benefits to found on the project provide additional natural Naturalization. infrastructure systems spreadsheet listed within this spaces for residents. chapter. The transition of under- through new green and blue Master Plan reference: utilized parkland from Brennan Park Improvements Greenbelt (Blue/Green infrastructure methods. manicured turf or fields to A $55,000 community-build Infrastructure), pp. 151- native vegetation represents project that to improve the 152. an opportunity to increase City of Flint Parks Millage playground. park beauty and reduce Water quality. maintenance costs. Riverbank Park Development The Flint River, Thread Lake, The parks millage, which ends Kearsley Reservoir, Flint Master Plan reference: A $500,000 phased Naturalization, pp. 160- in 2016, is the only dedicated improvement project that Park Lake, and other waterways should be 161. source of funding for City will increase access to the park, complete with a new protected from pollution parks and open space. and contamination. ADA ramp. Maintaining our extensive Master Plan reference: network of parks is costly and Max Brandon Park Eco-Park Water Quality, p. 150. the revenue brought in by A $137,500 project to naturalize parts of Max our millage has been on a Brandon Park while Park access. steady decline due to incorporating community All residents should have decreased property values. In engagement through reasonable access to safe interpretative signage 38 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

ENVIRONMENTAL FEATURES, OPEN SPACE & PARKS CAPITAL IMPROVEMENT PLAN The City of Flint Parks and Recreation Master Plan 2013-2017 was adopted in late 2012, which includes additional information about the park system. Maintenance of a current park master plan is a requirement for eligibility of numerous grant programs and the City is urged to keep this plan updated. The City has been very successful at obtaining various grants to make improvements and, given the budget issues of the City, continued grant acquisition will be needed to make any improvements of significance. Recommendations of the park master plan should be reviewed in concert with Master Plan recommendations to ensure that the distribution of park funding is equitable, serving populations in need, and strategic investments in parks and community centers serve to stabilize neighborhoods.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS McKinley Park Improvements 1 – URGENT $300,000 $0 $300,000 The City was awarded a Natural Resources Trust Fund grant Grant Funds from MDNR to make improvements to McKinley Park, which Secured is located on Thread Lake. Grant to be matched by donations. Project will include tennis court renovations, improved waterfront access, new playground equipment and accessibility improvements, pavilion and overlook construction, parking improvements, and related items.

Riverbank Park improvements 1 – URGENT $500,000 $0 $500,000 Make upgrades to meet ADA standards, barrier-free Grant Funds access to amphitheater stage including new railings, Secured landscaping enhancements, and kayak access to river. This project is funded by a grant from the Michigan DNR.

Brennan Park Improvements 1 – URGENT $55,000 $15,000 $40,000 Improvements to the park and playground equipment. Grant Funds

Bassett Park Master Plan CIP 2 – IMPORTANT $124,000 $15,000 $110,000 Improvements consistent with the park master plan developed in 2012, including filling the side yard, construct storage shed and concrete slab, improve tennis courts and ball diamonds, improve playground, and add mulch to trails.

Hardenbrook Park Master Plan CIP 2 – $87,000 $0 $87,000 Improvements consistent with the park master IMPORTANT plan developed in 2013, including pavilion repairs, installation of a new pavilion, benches, picnic tables and grills, landscaping, and new playground equipment.

Longway Park Improvements CIP 3 – DESIRABLE $55,000 $0 $55,000 Developed in early 2016 through the Adopt-a- Park program, project includes removal of hazardous equipment, new play scape, improvements to the soccer/rugby fields, picnic area, and wooded area.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 39 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS

Mott Park Improvements CIP 3 – DESIRABLE $60,000 $0 $60,000 Project includes removal of hazardous equipment, new play equipment, improvements to the street hockey court, picnic area, and brush removal area.

Sarginson Park Improvements CIP 3 – DESIRABLE $65,000 $0 $65,000 Project includes removal of hazardous equipment, new ball field, bleachers, and improved picnic area.

Kearsley Park Softball Field Improvements COMPLETED $195,000 $0 $195,000 Improvements to the Kearsley Park softball field, which Mott intends to use for their women’s softball team. Improvements include the installation of evening lighting, dugouts, bleachers, scoreboard, fencing, and the construction of a concession stand/clubhouse.

Durant Park Master Plan CIP COMPLETED $54,339 $0 $54,339 Improvements consistent with the park master plan developed in 2012, including basketball upgrades, playground equipment, sidewalk improvements, tree removal, and mower purchase.

Mann Hall Park Master Plan CIP COMPLETED $84,021 $0 $84,021 Improvements consistent with the park master plan developed in 2012, including new playground equipment, flag pole, concrete pavilion pad, playground safety surfacing, benches, and landscaping.

Max Brandon Park Playground Improvements COMPLETED $60,000 $0 $60,000 A new playground added. Completed by the County.

Flint Park Lake Playground Improvements COMPLETED $50,000 $0 $50,000 A new playground added. Completed by the County.

Rollingwood Park Master Plan CIP COMPLETED $79,100 $79,100 $0 Improvements include playground equipment, baseball infield and benches, horseshoe pits, flagpole lighting, fishing dock, scoreboard, bleachers, and lights.

Woodlawn Park Master Plan CIP COMPLETED $43,200 $43,200 $0 Improvements include a shade structure, play equipment, shade trees, and repair tennis court.

Bassett Park Maintenance Partnership REMOVED Crim Fitness Foundation will take on maintenance and operations oversight in Bassett Park for FY 2015 under a two- year partnership agreement beginning in FY 2014.

40 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

ENVIRONMENENVIRONMENTALTAL FE FEATURES,ATURES, OPEN OPEN S SPAPCEACE & & P ARPARKKSS CCAPIAPITALTAL IMPR IMPROOVEMENTVEMENT PLAN PLAN

Naturalization

Naturalization is the transition of parkland from manicured turf or fields to native vegetation. There are many benefits to naturalizing part of Flint’s park inventory including a reduction in operating expenses, the creation of a healthier environment through increased local biodiversity, and improved storm-water management.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Park Naturalization Plan 2 – IMPORTANT TBD TBD TBD Develop a Park Naturalization Plan to identify and prioritize City- owned parks for naturalization and reduced maintenance.

Max Brandon Park - Park Naturalization/Education Project 1 – URGENT $137,500 $50,000 $87,500 Project to promote naturalization within Max Brandon Grant Funds Park through eco-educational curriculum, restoration of Secured the park’s wetland, increased access through construction of a boardwalk, and hazardous tree removal.

Park Forestry Management 1 – URGENT $10,000 $10,000 $0 The City has secured the services of Genesee

Conservation District to manage tree removal within the City’s network of parks for FY 2015. Using trained forestry staff, and informed by a street and park tree inventory that is currently underway, GCD will ensure that the City’s limited forestry funds will be used in a manner that is both equitable and efficient.

Park Maintenance Partnership 1 – URGENT $100,000 $100,000 $0 Genesee County and City of Flint partnership in which the County will take on maintenance and safety patrols in four of Flint’s largest parks under a pilot program. 5-year cost. Park Naturalization Project - Tree Plantings 3- DESIRABLE TBD $0 TBD The City is interested in working with Fresh Coast Capital in inactive and underutilized parkland to farm poplar trees. FCC would maintain the property for 15 - 18 years at no cost to the city and share 10% of sale revenue. Parkland would remain open to the public and educational signage would be installed.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 41 City of Flint Capital Improvement Plan • Environmental Features, Open Space & Parks DRAFT – 1.10.16

Open Space Brownfield Remediation Brownfields are parcels of land where the presence of environmental contamination complicates redevelopment. In addition to redeveloping brownfields for economic development and community revitalization purposes, there is a rising interest among communities to redevelop brownfields as environmental assets for active and passive recreation.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Oak Park decommissioning 3 – DESIRABLE $0 $0 $0 Located in an inaccessible area surrounded on three sides by the Buick City brownfield site, this park is proposed to be decommissioned and integrated into the redevelopment plans of the area.

Chevy Commons Greening Project 1 – URGENT $200,000 $0 $200,000 Phase III of remediation of Chevy Commons Grant Funds into an active/passive public open space. Secured Chevy Commons phytoremediation Phase III 1 – URGENT $200,000 $0 $200,000 Phase III of remediation of Chevy Commons, funding is Great Grant Funds Lakes Restoration Initiative grant. Secured

Flint River Restoration As a prime natural resource, the Flint River served as the basis for the founding of the City of Flint. Historically, the Flint River was used for drinking water, power, and transportation. Currently, the river is utilized much less, in part due to water quality and infrastructure concerns. In order for the City to successfully achieve its goal related to environmental features and open space, revitalization and enhancement of the Flint River must be a major focal point.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Flint River Restoration Plan - Season 3 3 – DESIRABLE $5,300,000 $5,300,000 $0 Implementation of the 2010 report “Flint Riverfront Restoration Plan”.

Flint River Restoration Plan - Season 2 3 – DESIRABLE $6,700,000 $6,700,000 $0 Implementation of the 2010 report “Flint Riverfront Restoration Plan”. Flint River Restoration Plan - Season 1 3 – DESIRABLE $7,100,000 $7,100,000 $0 Implementation of the 2010 report “Flint Riverfront Restoration Plan”.

Flint River Restoration Plan - Future Projects 3 – DESIRABLE $40,000,000 $40,000,000 $0 Implementation of the 2010 report “Flint Riverfront Restoration Plan”.

42 City of Flint Capital Improvement Plan DRAFT – 1.10.16

6 CAPITAL IMPROVEMENT PLAN

INFRASTRUCTURE & COMMUNITY FACILITIES

In 1960, 197,000 people lived in transportation, as well as a Flint, and the community was health emergency and the City community that is fiscally In April 2014, the City of Flint bracing for rapid growth of Flint does not have the responsible and able to support formally transitioned its around its core industries. resources to cover these costs. these systems in a fair and primary source of drinking Infrastructure was in place to equitable way. water by connecting to the With a roughly estimated cost support over 200,000 people. Flint River. As a result of this for replacement of all City- Flint’s population has dropped This chapter represents switch, the corrosive nature of owned water mains and by 48% since that time, yet the perhaps the most substantial the treated river water has led property service lines sitting City is still responsible for capital challenges to the City to an accelerated aging around approximately $1 billion, maintaining infrastructure and consists of the highest cost process of the City’s water State and/or Federal help is systems capable of servicing its items. Given the many infrastructure. Additionally, an urgently needed to accomplish peak population. unknowns at this time of the unexpected result of the these tasks. water infrastructure, this switch has directly led to chapter was developed and Chapter 6 in the Master Plan shortened usefulness of this formatted to be adaptable and considers ways to tailor infrastructure. infrastructure and services to flexible dependent upon suit local population centers further data collection and Perhaps the most damning and anticipated long-term analysis that will occur result of this switch has been development patterns. extensively throughout the the exposure of lead to FY16-17 year. The attempts at residents of Flint and in The Master Plan establishes a project costs and timeline will particular children of Flint. coordinated vision for Flint’s fluctuate throughout the year, Identifying the extent of government facilities, dependent on the emergency damage to the water infrastructure, and utilities situation that currently exist in distribution system and the where infrastructure and the City. location of lead service lines is services are closely coordinated a critical priority and a with housing, economic necessary step before development, the environment, replacing and repairing the parks and open space, and affected infrastructure occurs. This must occur to fully resolve the ongoing public City of Flint Capital Improvement Plan DRAFT - 1.10.16 43 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

Valve Exercising CIP Vision for Immediate actions should Sustainability. also be taken to right-size Approximately 1,430 valves Infrastructure were exercised throughout the Green technology should be the facilities within the city. leveraged to reduce energy & Community Substantial decline in system costs, improve air quality, and staffing levels as well as Facilities Roof Replacements increase long-term sustainability. decades of inadequate Imagine an efficient and Plant 2 lab and operations While sustainable approaches to preventative maintenance reliable system of center was treated with a new infrastructure improvements has resulted in millions of infrastructure and community roof may require additional up-front services that ensures the safety dollars needed to just costs, long term cost savings of the Flint community meets improve these public places City Hall Campus LED Lights should be considered when the needs of residents and to satisfactory levels. A Installation of energy efficient evaluating project costs supports investment in study shall be conducted to LED lights around City Hall. Master Plan reference: businesses, innovation, and the look at alternatives for local economy. Imagine a Flint major sites such as City Hall IT/IS Upgrades Sustainable & Renewable that serves its residents and the Police and Fire $639,415 was spent in 2015 Infrastructure, p. 177. headquarters, while also through an effective local Fiscal Year. Activities included Facility maintenance & government and quality considering the disposition maintenance for dell desktop efficiency upgrades. facilities. Imagine a Flint that of the buildings to be workstations, routers, and To ensure the long-term viability invests in infrastructure in vacated and sold. BS&A Software, and Microsoft of City facilities, the City should order to spark new software. Some activities that conduct on-going maintenance, development, restore the Infrastructure & Facilities were not completed include employ new technologies, environmental integrity of the – 2015 CIP Progress Backup servers, new routers, increase energy efficiency, and area, meet the needs of and a much needed phone identify consolidation various activities throughout CIP Progress system upgrade. Overall opportunities. the City, and is not only Project Completed in $220,000 in improvements was Master Plan reference: capable, but is also 2015 - not completed. Government Facilities, p. dependable. 178.

Project On-Going Infrastructure & Community CIP Overview Dams. from 2015 - Facilities Policy The Hamilton and Utah Dams The City has an overwhelming The infrastructure and should be removed, the Fabri task of addressing its Project Added from community facilities Dam should be reconstructed, numerous dated facilities and 2015 - policies are derived from the Kearsley Dam should receive the tremendous amounts of Project Removed: the Master Plan and maintenance, the need for the inefficient and aging water These projects are identified should shape all projects Holloway Dam should be and sewer possessions. moving forward. These assessed, and a fish passage Immediate improvements to in their respected charts as policies should provide a should be constructed at the water and sewer system “removed”. framework for evaluating Thread Dam. should be prioritized so they In all, there were 13 major the merits of any capital address the areas contributing Master Plan reference: projects completed, totaling improvement project. For Dams, p. 186. to the most substantial water $4.25 million in capital detailed discussion of each losses within the city. upgrades. Also, an additional 8 policy, please refer to the Sanitary & storm sewer system. remain in progress. The Master Plan section and Sewer systems should receive In concert with the land use completion of these will result the page referenced. necessary ongoing maintenance plan areas identified as primary in an additional $12.3 million in City-led upgrades to its Infrastructure & Land Use as recommended by staff and residential and business and Plan alignment. economic hubs, improvements systems. engineers, and short- term The provision of upgrades and long-term capital should be prioritized to meet The following list details the infrastructure and the needs of the business improvements including significant projects and community services investments in green community while ensuring investment made towards throughout the City should quality services for Flint’s tax- infrastructure should be improving Flint’s infrastructure: be aligned with the Land Use identified, planned, and paying residents. Future capital Plan, with land use typologies improvements in place types budgeted for. Bio solids Load Out Facility informing “right-sizing” and with lower densities should investment decisions. Master Plan reference: have a lower priority in order Construction of a bio solids load Sanitary Sewer System, p. 185 to ensure the highest out facility at the WPC center. Master Plan reference: cost/benefit ratio. Infrastructure & Future Land

Use, pp. 175-176. 44 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

City Hall Flint’s administrative center consists of a number of buildings, including City Hall, City Hall North, City Hall South, and City Hall Dome, which collectively total more than 187,000 square feet. According to City Facilities, Grounds, & Maintenance Division staff, the condition of these buildings ranges from poor to fair. Constructed in 1956, these four buildings house a majority of Flint’s governmental operations and are in need of extensive upgrades, repairs, system replacement, and maintenance. Significant reductions (well over 50% from historic levels) in staffing at departments housed at the City Hall complex has resulted in significant portions of the buildings being unused or used for storage.

The list of necessary capital improvements for the four City Hall buildings is only a portion of what is likely needed, and there are serious questions as to the long-term viability of the buildings considering their age, condition, and cost of corrections needed. The City should consider a study of alternative options for right-sizing their facilities to meet projected staffing needs, either in a renovated facility that is purchased or leased or a new facility constructed in the downtown area. The study could also look at partnerships with the County for a combined City-County Government Complex. The study would also need to consider the disposition of the existing complex and buildings to be vacated if the study shows this to be the most viable option.

The administrative center complex at one time was considered to be an architectural masterpiece; but due to outdated components, lack of maintenance and energy inefficiencies the buildings require extensive emergency repairs and extensive maintenance has been deferred due to budgetary constraints. City Hall north is essentially vacant due to staff reductions and a leaking roof. The existing windows in all buildings are single pane, aluminum frame and highly inefficient, as are the light fixtures inside and outside the buildings. The boilers and chillers are 80% efficient at best and in need of re- placement soon. The marble on the façade, once a major contributor to the beauty of the building, suffers from water intrusions that have caused these large marble slabs to fall off the building. Significant information technology improvements are needed throughout to modernize computer servers, other hard- ware, and cabling. The elevators at City Hall break down regularly and create a safety hazard to users trapped inside until repairs can be made. The pavement in the parking lot used by employees is in very poor condition. Sidewalks are in various states of disrepair and in need of replacement.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Study to determine options for housing City Hall staff 1 – URGENT TDB TDB TDB Commission a comprehensive study of the Civic Center Complex to determine best option to right-size in the most cost-effective manner. City should enlist a committee to develop a comprehensive scope of services for a Request for Proposals that includes budget to adequately investigate the existing facilities and options and costs available to house City operations long-term.

City Hall Dome drains 1 – URGENT $1,640 $1,640 $0 Repair roof drains at the City Hall Dome to fix leaks.

City Hall North Building Roof 1 – URGENT $99,384 $99,384 $0 Repairs to the roof on the City Hall North Building to fix areas that currently leak. City Hall chiller 1 – URGENT $155,000 $155,000 $0 Replace 1 of 2 chillers at City Hall. Emergency repairs 1 – URGENT $4,500,000 $4,500,000 $0 Annual cost of $225,000 for emergency repairs to various City facilities.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 45 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Walkway between Police and City Hall 2 – IMPORTANT $20,000 $20,000 $0 Repair and seal walkway between Police Station and City Hall. 2 – IMPORTANT $90,000 $90,000 $0 City Hall Dome repairs Various maintenance and repairs to the City Hall Dome. 2 – IMPORTANT $400,000 $400,000 $0 Window replacement Replacement of single pane, aluminum frame windows in City Hall. Energy Analysis Report identified payback of 15 years in energy savings. City Hall façade 2 – IMPORTANT $3,000,000 $3,000,000 $0 Remove existing and replacement of the façade of City Hall. Existing marble siding is falling off the building and is a safety hazard. Gaps behind the marble allow water intrusions, exacerbating the problem. 2 – IMPORTANT $3,300,000 $3,300,000 $0 City Hall heating/cooling system Total replacement and upgrades of controls and boilers/chillers to the City Hall heating/cooling system. 3 – DESIRABLE $24,000 $24,000 $0 Separate utility meters Separate the utility meter for City Hall, Police HQ, and Fire Station #1 to monitor energy use. 3 – DESIRABLE $100,000 $100,000 $0 City Hall 7th Street parking lot Rehabilitation of parking lot at City Hall. City Hall 5th Street parking lot 3 – DESIRABLE $132,000 $132,000 $0 Rehabilitation of parking lot at City Hall. Information technology improvements 3 – DESIRABLE $3,730,246 $3,730,246 $0 Includes a variety of IT improvements, including backup servers, new Dell workstations, routers and switches, software, cabling and fiber, etc. Long-term needs should be assessed to prioritize and fund projects.

Building Management System 2 – IMPORTANT $148,000 $148,000 $0 Upgrades to the BMS controls are on-going.

2 – IMPORTANT $24,000 $24,000 $0 Council Chambers light fixtures Convert existing light fixtures to LED to save energy costs.

3 – DESIRABLE $70,000 $70,000 $0 City Hall Ceilings Replacement of ceiling tiles throughout City Hall. Improvements to multiple offices have been completed.

3 – DESIRABLE $350,000 $350,000 $0 Council Chambers renovations Renovations to Council Chambers to include windows, painting, and ceiling, and IT upgrades to add projection screens. City Hall Elevator Removal and installation of two new efficient elevators at City Hall 2- IMPORTANT $400,000 $400,000 $0

South City Hall Building bridge COMPLETED $30,000 $30,000 $0 Bridge connecting the South City Hall Building to 7th Street is closed and in need of repair. Scope includes making repairs and sealing to prevent wate46 r intrusions. City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN Other City Facilities City facilities outside of the City Hall complex, public safety departments, and public works are limited. The primary facilities in this category would include the Street Maintenance & Sanitation Department, public parking lots, District Court, and anything else that does not fit into another category or department. All of these facilities have needs for various maintenance, etc. and should be considered to generally be important to fund as soon as possible. A number of projects were identified during discussion with City staff and are presented below; however, a comprehensive evaluation of the Street Maintenance & Sanitation Department facility has not been performed and is needed to ensure all projects are accounted for.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Street Maintenance & Sanitation Department facility improvements 2 – IMPORTANT TDB TDB TDB Various capital improvements needed at the facility that would be identified following a comprehensive audit of the facility. 12th Street garage roof repairs COMPLETED $266,900 $266,900 $0 Repairs to the garage used to service the City fleet vehicles (located at the Street Maintenance & Sanitation Department facility).

Parking lot lighting COMPLETED $250,000 $250,000 $0 New lighting for the Stevens Street/7th Street/City Hall/Police Station parking lot to improve safety, lot is currently not lit.

District Court improvements REMOVED $125,000 $125,000 $0 Repairs, maintenance, etc. at the District Court building and grounds that are the responsibility of the City per the lease agreement with Genesee County (the owner of the building).

City of Flint Capital Improvement Plan DRAFT - 1.10.16 47 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Water Department The Water Department is responsible for the treatment and distribution of potable water to customers utilizing an extensive infrastructure system. Their facilities include six (6) dams, numerous buildings and related facilities, pumping stations and storage facilities, and conveyance system of approximately 600 miles of water distribution and transmission pipes and appurtenances. The existing City water system was designed to service a much larger population and significantly more industry than is currently being served.

The various facilities of the Water Department have been grouped below to allow for an individual discussion of each. The current water system has twice the storage and pumping capacity that is needed to operate the system. A number of options to reduce pumping and storage were identified in a Water Reliability Study (prepared by Rowe and Potter Consulting in 2011). Implementing these operational changes going forward will allow the city to operate more cost effectively and concentrate on upgrading and maintaining key infrastructure.

It is important to note that the City’s water system suffers from a number of problems which can be at least partially corrected by making the necessary capital improvements, which should be prioritized and done to be consistent with the implementation of the Master Plan and modified as needed. The most prevalent problems were discussed in great detail in the Water Reliability Study, including the age and efficiency of the water system. Much of the water distribution sys- tem is over 70 years old and is in need of rehabilitation or replacement. There is a significant amount of water-main in the system that is over 70 years old, prone to breaks, and unable to provide modern pressures and fire flows.

Water system efficiency analysis indicated that the City of Flint system is at 68.41% (i.e., only 68.41% of the water that was purchased from Detroit was recovered by user fees). This indicates that the city has significant leaks, inaccurate meters and/or illegal connections to the system. This inefficiency results in lost revenue in the range of $1.5 million to $2.0 million dollars per year. A program to improve the water system efficiency should be put in place. A high priority should be placed on implementing a program to reduce the unaccounted for water.

48 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Dams The six dams owned and operated by the City are critical to the water supply system of the City, as well as providing various recreational opportunities. This is even more important currently as the City is dependent on the Flint River as an emergency back-up source to supply water to its customers Various studies have been done on the dams to determine their condition and future plans for either replacement or removal. Improvements to Hamilton Dam, built in 1920, have been mandated by the state due to its poor condition and deteriorating structural deficiencies. A study was completed by the City in 2008 that evaluated various options. Hamilton Dam is located just upstream from Fabri Dam. Fabri Dam is an inflatable dam in the downtown area constructed in 1979 for visual and recreational enhancement. The 2008 study reviewed options for its removal.

Utah Dam was built in 1928 to prevent industrial oil discharges from entering the City’s water intakes and is located downstream from both Holloway Reservoir and Kearsley Creek. Utah Dam serves no viable purpose and the gates are permanently locked in an open position. Utah Dam has been recommended for removal. Holloway Dam was constructed in 1953 for potable water supply and flow augmentation of wastewater effluent. The Holloway Reservoir serves as emergency back-up supply of water, with a storage capacity of17,500 acre-feet of water, and is the structure furthest upstream in the system. Kearsley Dam, constructed in 1928 for water and ice supply, has a storage capacity of 1,800 acre-feet and is used primarily for recreation and occasional flow augmentation. Kearsley Creek joins the Flint River a short distance downstream from the dam just upstream from Utah Dam.

Thread Dam, also build in 1928, impounds 80 acres of water on Thread Creek, providing recreational opportunities. Thread Creek joins Swartz Creek west of the lake, with Swartz Creek flowing into the Flint River downstream of the other five dams. Capital projects on the six dams that require expenditures of City funds should be kept to the minimum needed to prevent further degradation of the dams and to meet regulatory requirements until such time as higher priority projects in the City have been completed. In accordance with the Flint River Restoration Plan, dams that can be removed should be considered for removal and funding sought from various sources that promote dam removal for river restoration and removal of barriers for boating and fish movement.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Thread Dam improvements 1 – URGENT $655,600 $655,600 $0 Replace dam.

Hamilton Dam Removal 1 – URGENT $3,500,000 $1,060,000 $2,500,000 Removal of the Hamilton Dam.

Holloway Dam 2 – IMPORTANT $1,600,000 $1,600,000 $0 Drum Gate Rehabilitation

City-Wide Dam Inspection & Maintenance Plan 3 – DESIRABLE $0 $0 $0 Develop a comprehensive plan to address the City’s six failing and/or obsolete dams along the Flint River.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 49 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Buildings & Related Facilities The Water Department has a number of buildings and related facilities for which they are responsible. The most significant is the Water Treatment Plant (WTP) located at 4500 N. Dort Highway, which includes Plant 2 (Plant 1 has been decommissioned), water testing laboratory, and a number of smaller facilities. The WTP was put into service in 1954 and significant upgrades were completed in 2006 to meet state regulatory requirements. The WTP operated an average of 20 days per year previously since water from Detroit was treated but the plant will be operated on a continual basis. A significant number of upgrades, replacement of equipment, and regular maintenance are required for the WTP to properly take in raw water, treat it through the entire process, and transmit treated water to the conveyance system. In addition to the facilities at the WTP, the Water Department is also responsible for the Water Service Center (located at 3310 E. Court Street) and the Water Department has a need for a variety of large vehicles and other equipment.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Electrical upgrades 1 – URGENT $1,167,100 $1,167,100 $0 Electrical upgrades at various facilities.

Fencing 1 – URGENT $109,300 $109,300 $0 Water plant security fencing. Alum feed system 1 - URGENT $39,300 $39,300 $0 Alum feed system for water treatment process. Project will be complete in 2016. Project is tied to KWA. Phosphoric acid feed system - Partially Complete 1 - URGENT $185,800 $185,800 $0 Phosphoric acid feed system for water treatment. Temporary feed system set up, long term system for KWA system needs to be established. Post filtration system 1 - URGENT $387,200 $387,200 $0 Post filtration system for water treatment process.

Vehicles dump trucks, flatbed, tractor, etc. 2 - IMPORTANT $13,631,400 $13,631,400 $0 Annual cost for 6 years.

SCADA upgrades - In Progress 1 – URGENT $836,400 $836,400 $0 Upgrades of Supervisory Control and Data Acquisition (SCADA) to allow system to operate more efficiently and with lower labor costs by using SCADA to operate and analyze the water system and its operation. Security cameras - (2 installed, need 3 more) 1 – URGENT $7,000 $7,000 $0 Install security cameras at water treatment plant.

Roof replacements - Partially complete 1 – URGENT $500,000 $500,000 $0 At various pump stations throughout the system. West Side reservoir & pump station complete. Cedar Street reservoir & pump station and Torrey Rd. booster station still needed. Water Plant rehabilitation - In Progress 2 – IMPORTANT $1,030,000 $1,030,000 $0 Rehabilitation of Phase II, Segment I.

Roof replacement - Complete COMPLETED $257,500 $257,500 $0 Plant 2 lab and operations center.

50 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Pumping Stations & Storage Facilities The Water Department operates several pumping and water storage facilities. • Dort Reservoir and Pumping Stations No. 3. (PS #3) and No. 4 (PS #4) – located at the WTP, the reservoir is a 20-million gallon (MG) ground storage facility. This facility was constructed in 1966 and is used primarily for emergency water storage and for use during peak water demand periods. PS #4 total pumping capacities is 46 million gallons per day (MGD) with a firm pumping capacity of 26 MGD. The pumping station was rehabilitated in 1994 with two new 20 MGD pumps and one 6 MGD pump to induce turnover of the Dort Reservoir. This pumping station is primarily used to provide supply from the Dort Reservoir during emergency situations and peak demand events. A 2.0 MG elevated water storage tank is also located at the WTP that is used primarily for emergency water storage and as a pressure buffer. The elevated tank fills and drains as system demands and pressures dictate. A 3.0 MG ground storage tank is also located at the WTP complex. This storage tank was constructed in 1954 and is used primarily as an emergency water supply and pumping source during peak demand events. • Cedar Street Reservoir and Pumping Station – the Cedar Street Reservoir is a 20 MG ground storage facility located between 1-69 and Swartz Creek, off of Cedar Street. This facility was constructed in 1948 and is primarily used as an emergency water supply and a pumping source during peak demand events. The pumping station electrical controls have not been updated since the original construction. The station requires significant upgrades to bring it up to current automatic operation standards. The pumping station is equipped with three pumps installed in 1948 and are primarily used to supply water from the Cedar Street reservoir during emergency events and peak demand periods. This pumping facility has a total pumping capacity of 30 MGD and a firm pump capacity of 18 MGD. Pump operation and filling of the reservoir can be controlled from the WTP or manually at the pumping station. The pumping station is equipped with chlorination facilities to provide additional chlorine residual as needed. • West Side Reservoir and Pumping Station – the West Side Reservoir is a 12 MG ground storage facility located near Mackin Road and Jean Avenue. This facility was constructed in 1970 and is primarily used as an emergency water supply and a pumping source during peak demand events. The West Side Pumping Station is equipped with four pumps, all installed in 1970, and has a total pumping capacity 24 MGD with a firm pump capacity of 16 MGD. Pump operation and filling of the reservoir can be controlled from the WTP or manually at the pumping station. The pumping station is equipped with chlorination facilities to provide additional chlorine residual as needed. • Torrey Road Pumping Station – the Torrey Road pumping station is equipped with two pumps installed in 1954. The station has a total pump capacity of 6.8 MGD and a firm pump capacity of 2.8 MGD. The primary function of this station is as an in-line booster pumping station to provide increase pressures to the southwest portion of the city. This pumping station takes suction from the 24” transmission main along Hammerburg Road and discharges to the 18” transmission main supplying the southwest pressure district. There is no standby power provided to this pumping station.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Pump replacement 1 – URGENT $140,000 $140,000 $0 Pump station #3 pump with variable frequency drive (VFD).

Electrical upgrades 1 – URGENT $466,600 $466,600 $0 New feeder to pump station 4.

Valve rebuild 2 – IMPORTANT $54,600 $54,600 $0 Elevated tank altitude valve.

Pump replacement 1 – URGENT $270,000 $270,000 $0 Replace pumps 1 and 2 at pump station #4 new pumps with VFD. Pump # 2 has been replaced. Pump # 1 still needed

Electrical upgrades COMPLETED $120,000 $120,000 $0 At Cedar Street Pump Station.

Roof replacement COMPLETED $1,200,000 $1,200,000 $0 Westside pump station.

Lift pump station REMOVED $2,100,000 $2,100,000 $0 Plant 2 to Dort Reservoir. City of Flint Capital Improvement Plan DRAFT - 1.10.16 51 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Conveyance Systems & Appurtenances The conveyance system of the Water Department includes all transmission and distribution pipes, valves, hydrants, and water meters. The conveyance system of the City of Flint consists of water mains ranging in size from 4” to 72” in diameter. Many of these mains exceed 70 years old, and the majority constructed of cast iron or ductile iron pipe up to 24” in diameter. Transmission mains larger than 24” are primarily constructed of steel piping. A majority of the system has adequate transmission piping to convey sufficient flows and pressure for fire protection. However, the distribution and transmission systems are old and in serious need of replacement. A large number of water main breaks occur every year and are repaired by staff, with a significant number of breaks occurring due to the harsh 2013-14 winter season. These breaks result in water service disruptions and potential water quality problems to customers. The system appurtenances are generally over 50 years old and in constant need of repair or replacement also.

As projects are considered, opportunities should be evaluated to right size the water distribution system and make the most effective and efficient use of existing infrastructure. In accordance with the Master Plan, infrastructure may be modified to provide the level of service appropriate for a given place type.

The information below if summarized directly from the Water Reliability Study.

• Piping System. Much of the City of Flint’s water distribution system is over 70 years old and is in need of rehabilitation or replacement. There is a significant amount of 4” water main in the system that is over 70 years old, prone to water main breaks, and unable to provide modern pressures and fire flows. The 20-year plan for the water distribution system is twofold: 1) rehabilitate or replace the primary transmission system that serves the City and 2) abandon 4” water mains where there is a suitable parallel main or replace the 4” with 8”. The priority of these replacements should be consistent with the needs of the Master Plan implementation. The Water Department has also included replacement of 3,800 feet of transmission mains annually, the prioritization of which should consider severity of current problems, needs for implementation of the Master Plan, and ability to service high water users adequately. • Valves. The City of Flint distribution system currently has a total valve count of 7,258 valves to be operated and maintained (20 72” valves, 661 24”–72”, 737 16”–20”, 1,398 12”, and 4,462 <12). Critical valves are 16” and larger valves that are on the primary transmission mains around the city and in the event of a break in a major transmission main, valve failure, or multiple valve failures, could result in shutting down a significant portion of the city. The Water Reliability Study noted that there are 1,418 critical valves in the system and these valves should receive primary attention. Primary attention would consist of operating the valves on a rotating two-year basis and making all repairs and replacements that are necessary. Approximately 700 critical valves would be operated and maintained each year. Subcritical valves are the 12” valves on minor transmission mains and the failure of one or more of these valves could result in shutting down a residential area. There are 1,398 subcritical valves in the system. These valves should receive secondary attention which would consist of a 5-year plan for operation and maintenance. This would require that approximately 280 valves be operated and maintained each year. Normal valves are any valve smaller than 12” and the failure of one or more of these valves would shut down a small residential area. There are 4462 of these valves in the system and these valves should receive operation and maintenance attention on a 10-year rotating basis. Approximately 450 valves would require attention each year. The total valve operation and maintenance program would require that approximately 1,430 valves receive routine maintenance each year in addition to any emergency repair and replacement that is required during the course of a year. • Hydrants. The City of Flint has 3,605 hydrants in the water system and many are in excess of 50 years old. In the spring of 2010 the City purchased 80 hydrants to begin replacing old hydrants. Similar to the asset management approach to the valve maintenance, the plan for hydrants would include a transition from reactive maintenance to planned maintenance and replacement. The goal would be to analyze the hydrant age in the system and begin to change out hydrants in excess of 50 years old and then over a period of twenty years create a system where hydrant age did not exceed 25 years.

52 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Water line loop 2 – IMPORTANT $100,000 $100,000 $0 Install 24” loop at the WTP to increase distribution options. Raw water line 2 – IMPORTANT $636,500 $636,500 $0 Provide raw water line to Pump Station 4. Water Main Replacement 2 - IMPORTANT $16,000,000 $16,000,000 $0 Replace various sections of residential water mains with a goal of 3800' per year.

Yard valves 2 – IMPORTANT $1,000,000 $1,00,000 $0 Replace yard valves, cost is for 6 years.

Water Meters – Partially Complete 2 – IMPORTANT $8,500,000 $8,500,000 $0 Annual replacement of water meters throughout the system, cost is for 6 years. Valve exercising $500,000 $500,000 $0 Operate the approximately 8,000 system valves throughout 2 - IMPORTANT the system on a 2 - 10 year basis. 1 - URGENT $200,000 $200,000 $0 Valve Repairs Valve excavation Gain access to over 600 paved over system valves to 1 - URGENT $2,000,000 $2,000,000 $0 evaluate, maintain accessibility, and replace if necessary. 24'' Transmission main replacement 3800' of 24'' transmission main at various locations $18,000,000 $18,000,000 $0 annually. Project is designed in 5 segments with one 1 - URGENT segment scheduled for completion each year.

Lead Service Line Replacement Replace lead service lines leading to customer’s residence 1 - URGENT TBD TBD TBD and businesses.

Valve exercising COMPLETED $400,000 $400,000 $0 Operate the approximately 1,430 valves throughout the system on an annual basis.

Hydrant replacement program REMOVED $6,227,284 $6,227,284 $0 Replace hydrants throughout the City on 20-25 year rotation, cost is for 20 years. FY 15 cost $250,000 with annual increases of 3% assumed.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 53 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Sewer Department The Sewer Department is responsible for the collection and treatment of wastewater at various facilities, most notably the 50 MGD wastewater treatment plant referred to as the Water Pollution Control Facility (WPCF) located at G-4652 Beecher Road. The City of Flint also accepts wastewater from the Beecher Metropolitan Sewer District (BMSD). The WPCF has a peak capacity of approximately 85 MGD. The City has an extensive sanitary and storm sewer collection and treatment system that includes approximately 569 miles of gravity sanitary sewers and force mains, 11 pump stations (1 additional pump station on the system is operated by BMSD), an 8- foot 6-inch deep tunnel (10 MG of storage), a 10 MG Retention Treatment Basin (RTB), WPCF and a number of associated buildings, and 350 miles of storm sewers.

The WPCF provides primary and secondary treatment to the sanitary wastewater, with primary treatment consisting of physical removal of suspended solids via grit tanks and primary sedimentation basins. Secondary treatment is performed through the activated sludge process, which consists of aeration and final settling tanks. Chlorination and dechlorination, using liquefied and gaseous chlorine and sulfur dioxide, is used to disinfect the final effluent prior to its discharge into the Flint River. Even though the sanitary and storm sewer systems are separated, the 10 MG capacity of the RTB can be exceeded, resulting in a discharge to the river. All overflows receive skimming, settling, and disinfection prior to release. Since January of 2009, the City has experienced 11 partially treated discharges.

The City was awarded a State Revolving Fund (SRF)/Strategic Water Quality Initiatives Fund (S2) Grant from the Michigan Department of Environmental Quality (MDEQ) in 2011 (study prepared by Rowe and Fishbeck, Thompson, Carr, & Huber, Inc. in 2013). The scope of the grant-funded engineering study included smoke testing in areas of the City suspected of containing sources of inflow and infiltration (I/I), as well as a sanitary manhole inspection program focusing on the manholes located along the creeks and rivers where water was suspected of entering the sanitary system during high river elevations. The Sewer System Evaluation Study (SSES) included smoke testing of approximately 2,397 manholes and the inspection of 256 manholes along the rivers. Although the sanitary system is separated, wet weather brings significant flow increases into the system. Most footing drains are connected to the sanitary system; however, during these large rain events, the City’s deep tunnel and RTB’s capacity can be exceeded, and it results in discharges from the RTB to the Flint River.

Green Infrastructure

The Master Plan calls for the development of green infrastructure to absorb rainwater, reduce flooding, and lessen the burden on the City’s sewer infrastructure. The City should also promote the use of Best Management Practice (BMPs) and Low Impact Development (LID) techniques that help protect and restore water quality while reducing the quantity of storm water run-off throughout the City. Vacant or underutilized parcels within Green Neighborhood and Green Innovation place types may also present opportunities for large scale green infrastructure projects.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Green Infrastructure Assessment 1 – URGENT TDB TDB TDB Undertake a study to identify opportunities for the implementation of large scale green infrastructure projects that will limit the volume of storm water entering the sewer system.

54 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Buildings & Related Facilities

The Sewer Department operates the Water Pollution Control Facility (wastewater treatment plant) and 29 buildings at the WPCF grounds. The buildings on the grounds of the WPCF are of variable age and condition and require a variety of upgrades, replacement of equipment, and regular maintenance to properly treat the wastewater collected from system users and discharge it to the Flint River consistent with regulatory requirements. The Department has similar needs to that of the Water Department for large vehicles and other equipment.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS 1 – URGENT $106,100 $106,100 $0 Wastewater Plant roof Repair roof at WPC. 1 – URGENT $150,000 $150,000 $0 Disinfection process upgrades Improvements to processes for treating wastewater. 1 – URGENT $212,200 $212,200 $0 Lighting upgrades Lighting upgrades at WPC. 2 – IMPORTANT $35,000 $35,000 $0 Samplers Samplers at WPC. Air compressor 2 – IMPORTANT $44,000 $44,000 $0 Air compressor. Primary tank rebuild 2 – IMPORTANT $75,000 $75,000 $0 Rebuild primary tank at WPC.

2 – IMPORTANT $87,400 $87,400 $0 Lighting panel upgrades Upgrade lighting panel at WPC. 2 – IMPORTANT $100,000 $100,000 $0 Coarse bubble diffusers Coarse bubble diffusers at WPC. 2 – IMPORTANT $109,300 $109,300 $0 Meter replacement Final effluent meter. Meter replacement 2 – IMPORTANT $109,300 $109,300 $0 Battery A influent meter.

2 – IMPORTANT $109,300 $109,300 $0 Air diffuser upgrades Battery B. 2 – IMPORTANT $130,000 $130,000 $0

Vehicle storage addition Addition to vehicle storage. 2 – IMPORTANT $175,000 $175,000 $0 Controls Root blowers at WPC. 2 – IMPORTANT $200,000 $200,000 $0

HVAC equipment HVAC improvements at WPC. 2 – IMPORTANT $238,700 $238,700 $0 Aeration blower replacement Replace aeration blower at WPC. City of Flint Capital Improvement Plan DRAFT - 1.10.16 55 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS 2 – IMPORTANT $274,488 $274,488 $0 Final tank installation Install final tank at WPC. 2 – IMPORTANT $327,800 $327,800 $0 Sludge cake storage Storage facility for sludge cakes. 2 – IMPORTANT $380,000 $380,000 $0 Concrete repairs Major concrete repairs at WPC. 2 – IMPORTANT $437,100 $437,100 $0 Blower header insulation Insulate blower header. 2 – IMPORTANT $491,700 $491,700 $0 Grit piping Battery B. 2 – IMPORTANT $600,000 $600,000 $0 Concrete coatings Concrete coatings. Solids disposal 2 – IMPORTANT $800,000 $800,000 $0 Ultimate disposal of solids. 2 – IMPORTANT $1,000,000 $1,000,000 $0 Headworks & bar screens Headworks and bar screens at WPC. 2 – IMPORTANT $1,000,000 $1,000,000 $0 Lab Remodeling of lab, new equipment, sample lines, and ventilation. 2 – IMPORTANT $2,185,500 $2,185,500 $0 4160 volt switchgear 4160 volt switchgear at WPC. 2 – IMPORTANT $5,500,000 $5,500,000 $0 Battery A grit chamber Replacement of Battery A grit chamber. 1 – URGENT $400,000 $400,000 $0

HVAC upgrades - In Progress HVAC upgrades at WPC. 2 – IMPORTANT $695,200 $695,200 $0 Final tank retrofits - In Progress At final 4 tanks at WPC. 2 – IMPORTANT $100,000 $100,000 $0 Modulating Valve B grit Butterfly Valve COMPLETED $190,000 $190,000 $0 Air diffuser upgrades Battery A. COMPLETED $85,000 $85,000 $0 Sump pumps Sump pumps. COMPLETED $90,000 $90,000 $0

Biosolids load out facility engineering For biosolids load out facility. COMPLETED $100,000 $100,000 $0 Biogas pump house Biogas pump house.

56 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

COMPLETED $130,000 $130,000 $0 Outdoor lighting Lighting at WPC. COMPLETED $1,300,000 $1,300,000 $0

Biosolids load out facility - 95% Complete Construction of biosolids load out facility at WPC. REMOVED $106,100 $106,100 $0 Isolation gates Battery B isolation gates. REMOVED $163,900 $163,900 $0 Heavy mobile equipment Purchase of heavy equipment required to respond to emergency repairs. REMOVED $650,000 $650,000 $0 Sodium hypochlorite Purchase of sodium hypochlorite used in water treatment process. REMOVED $9,352,700 $9,352,700 $0 Vehicles, dump trucks, vactor, etc. Annual cost for 20 years.

City of Flint Capital Improvement Plan DRAFT - 1.10.16 57 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Pumping Stations & Storage Facilities

As mentioned above, the City operates 11 pump stations. Storage facilities include an 8-foot 6-inch deep tunnel (10 MG of storage) and a 10 MG Retention Treatment Basin (RTB). The deep tunnel was constructed of concrete in the late 1970s as part of the RTB project. The flow is transported through a series of interceptors to the three main feeder pump stations (East Pump Station, Third Avenue Pump Station, and Northwest Pump Station). These three main pump stations then pump the flow to the WPCF for treatment. Both the East Pump Station and the Northwest Pump Station are located next to the WPCF. The Third Avenue Pump Station is located southeast of the WPCF and requires 18,181 feet of force main to send the flows to the WPCF.

The 8-foot 6-inch tunnel is upstream of the East Pump Station and discharges to the station. During large rain events, the tunnel is used for storage. The flow is allowed to accumulate in the tunnel and the East Pump Station pumping rate is reduced to allow the flow from the Northwest Pump Station and Third Avenue Pump Station to be pumped to the WPCF without restriction. The latter have essentially no storage capability, and must pump ac- cording to flow received. If the flows from the Northwest Pump Station and Third Avenue Pump Station exceed the capacity of the WPCF, the excess flow is diverted to the 8-foot 6-inch tunnel through the same 48” pipe that normally conveys sewage from the East Pump Station to the WPCF. Should the rain event be large enough to fill the tunnel, then flow from the tunnel will overflow to the 10 MG RTB for temporary storage. The RTB provides skimming and disinfection should its capacity be exceeded, prior to discharging flows to the river.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Electrical upgrades 1 – URGENT $82,000 $82,000 $0 Various lift stations.

Replace lift station. 1 – URGENT $250,000 $250,000 $0 Replace lift station 6.

Replacement pumps 1 – URGENT $318,300 $318,300 $0 At northwest pump station.

Switchgear at EPS 1 – URGENT $450,900 $450,900 $0 Replace switchgear at East Pump Station.

Replace pumps 1 – URGENT $655,600 $655,600 $0 East pump station.

Replacement pump 1 – URGENT $1,700,000 $1,700,000 $0 Third Avenue pump station.

Electrical switchgear 1 – URGENT $1,900,000 $1,900,000 $0 Third Avenue pump station.

High pressure header 2 – IMPORTANT $300,000 $300,000 $0 Third Avenue pump station.

Retention basin COMPLETED $100,000 $100,000 $0 Improvements at retention basin at WPC, including metering, concrete work, and chemical feed upgrades.

58 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Infrastructure & Community Facilities DRAFT – 1.10.16

INFRASTRUCTURE & COMMUNITY FACILITIES CAPITAL IMPROVEMENT PLAN

Conveyance Systems & Appurtenances

The City has an extensive sanitary sewer collection and treatment system that includes approximately 569 miles of 8” to 72” gravity sewers and force mains, with manholes at regular intervals. The majority of the gravity sewers were constructed between the 1920s and 1950s, consisting mostly of vitrified clay, concrete, and some newer polyvinyl chloride (PVC) segments. The sanitary manholes are either block or pre-cast concrete. Televising portions of the system during the 2011 SSES revealed joint integrity to have been compromised along sections of the interceptors adjacent to Swartz and Thread Creek. Both sections of interceptors televised had root balls reducing the flow capacity at multiple locations by as much as 80 to 90%. The video also shows stretches of pipe with root infiltration at every joint, reducing flow capacity ranging from 15 to 50%. Some minor infiltration was observed; how- ever, the root balls hindered the camera progress through the sections of pipe at the creek crossings and therefore potential inflow from the creeks was not determined. The integrity of the pipe itself appeared to be sound; however, most joints appeared to have some separation where root infiltration was present. This separation could potentially allow infiltration to occur during wet weather conditions. There was some sediment buildup observed in a few spots along the interceptors; however, there was not enough to reduce capacity of the interceptor.

Manhole inspections were performed on the manholes that parallel Swartz, Carman, Gilkey and Thread Creeks. The creeks are upstream of Meter 9 which appears to have significant (I/I). Ninety-three (93) manholes with perforated covers, which would be submerged during a “design storm” or a larger wet weather event, were found. Besides the perforated covers, several manholes were found to be in poor condition structurally and leaking. The Huron-Camden and Northwest areas have been identified as problems areas with regards to I/I, based on studies conducted in the past. Additional and more recent studies had flow meters strategically placed in the sanitary trunk line sewers around the City. These flow meters identified a significant flow increase to the sanitary system during rain events throughout the City. In the past, the use of dye testing procedures was used to identify cross- connections with some degree of success. However dye testing does not allow for a complete identification of all potential inflow sources; therefore, smoke testing of the system was the most economical and timely procedure to identify additional sources of inflow. The purpose of smoke testing was to identify potential sources of significant I/I through cross connections between sanitary and storm sewer collections systems. The smoke testing was performed as a team effort between City staff and ROWE.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS Manhole rehab in floodplains 1 – URGENT $1,200,000 $1,200,000 $0 Replace perforated covers and rehab/lining of manholes located within floodplains to reduce water inflow/infiltration (I/I).

Root control 1 – URGENT $9,331,830 $9,331,830 $0 Root control within existing pipes to remove roots which might block waste flow, cost if for 20 years.

Pipe lining 1 – URGENT $15,000,000 $15,000,000 $0 Lining of existing pipes to reduce water infiltration, cost if for 20 years.

Major valve repairs 2 – IMPORTANT $200,000 $200,000 $0 Repair major valves in system.

Meter replacement 2 – IMPORTANT $8,400,000 $8,400,000 $0

City of Flint Capital Improvement Plan DRAFT - 1.10.16 59 City of Flint Capital Improvement Plan • Economic Development &

7 CAPITAL IMPROVEMENT PLAN ECONOMIC DEVELOPMENT & EDUCATION

Economic development and economic development CIP Vision for Economic CIP Overview education will form the strategies and targeted sectors Development A sluggishly growing economy foundation of the future of of investment to meet changing & Education with a surplus of available Flint and there will need to be market needs. Imagine Flint as a dynamic work- force labor and multi- sector alignment and college town, a center of inexpensive, vacant substantial investments in To realize the economic innovation and commercial space can be found people, places, and planning to development and education entrepreneurship, a top throughout all areas of Flint. achieve the City’s economic vision and goals of the Master destination for medical sector Reshaping the economy in Flint development vision. Plan, the City must support and companies, an international is a primary principle of the in specifically, concentrate and hub for trade and master plan and is addressed The City of Flint was built on coordinate work force and transportation and a through a variety of new, the automotive industry. While economic development community where residents of unique place types that focus the auto industry continues to facilities in line with the Master all backgrounds share equally increased improvements and play an important role in the Plan, strive to reuse Brownfield in Flint’s economic rebirth. investment strategically within economy, other sectors are sites for productive purposes, Imagine an entrepreneurial these areas. evolving including life sciences, and ensure that educational youth population, equipped for transportation, facilities and opportunities are success through a robust Neighborhood Centers, City distribution/logistics, advanced well connected and reinforced education system and an Corridors, Commerce & manufacturing, and by the City’s capital extensive network of local Employment Centers, information technology. The improvements and businesses and institutions. Production Centers and the emergence of these and other infrastructure. Imagine a thriving small Innovation District should industries is needed to diversify business scene, where aspiring represent the focus of future the City’s economy and create businesses owners are economic development growth and new opportunities empowered to open shops in initiatives and capital upgrades. for employment. neighborhoods across the City. Imagine transforming our In addition, the City must also current liability of vacant land recognize that the 21st century into new green spaces for economy is unpredictable and economic growth, creating jobs in constant flux. To stay for residents in alternative competitive moving forward, energy, local food production, the City must continually and or “green initiatives” fields. proactively reassess its City of Flint Capital Improvement Plan DRAFT – 1.10.16 59

City of Flint Capital Improvement Plan • Economic Development & Education DRAFT – 1.10.16

By emphasizing repairs position the vacant buildings opportunities to gain additional commercial properties. and enhancements to for adaptive reuse. education, skills, and training. Master Plan reference: Examples of school adaptive Master Plan reference: Adult Redeveloping & Repurposing these areas of perceived Workforce Development, pp. development, nodes of reuse projects include com- 208-209. Properties, p. 215-216. higher density and activity munity centers, art centers, can develop creating and Flint’s own Oak Street Small business support. Brownfields. enhanced options for School, which is being Incentives, incubators, and Capitalize on Flint’s existing workforce development, transformed into assistance programs should infrastructure and well- employment centers and apartments for seniors. be used to encourage small connected transportation future residential market business development in the network to spur redevelopment Economic Development & demand. By reducing the City Corridor and Neighbor- of the Buick City and Delphi East Education Policy importance on capital hood Center place types, brownfield sites, in alignment The economic development projects within current especially in underserved with the Land Use Plan. and education policies are areas of commercial build areas experiencing significant Master Plan reference: derived from the Master Redeveloping & Repurposing slated for future areas of levels of retail leakage. Plan and should shape all Properties, pp. 215-216. non-commercial, the City Master Plan reference: projects moving forward. can focus its limited Supporting Small Businesses, These policies should pp. 210-213. Downtown Revitalization. resources to invest in the provide a framework for Four catalyst projects were future to achieve the goal evaluating the merits of any Growth industries. identified that can best of reshaping our economy. The City and its economic continue revitalization efforts capital improvement development partners should in the Downtown area: (1) Key Partners project. target retention and expansion development of the Flat Lot; It is important to remember For detailed discussion of efforts at the following six (2) restoration of Capitol that some of Flint’s largest each policy, please refer to industries, which were Theatre; (3)redevelopment institutions such as Flint the Master Plan section and determined by the Flint of Riverbank Park, including Community Schools, the page referenced. Regional Cluster Project to better utilization of the University of Michigan- Flint, Community education. offer the highest potential for University Pavilion and new Kettering University, Mott The City and Flint Community growth: life sciences; waterfront park space; and Community College, Baker Schools should work together to transportation, distribution, (4)creation of the Flint Health College, and Hurley and reestablish a sustainable version and logistics; automotive and and Wellness District. McLaren Medical Centers of community education, with transportation equipment have significant capital Master Plan reference: schools serving as “homebases” manufacturing; machinery Downtown Flint, pp. 218-220. improvement needs and within neighborhoods and manufacturing; information confront similar challenges in providing programming, technology; and food Innovation District. funding projects. This presents meeting space, and social manufacturing. The City should encourage the City with a unique services. increased physical, social, and Master Plan reference: Flint opportunity to coordinate our Master Plan reference: Regional Cluster Project, p. transportation linkages between capital improvement efforts, Community Education, p. 205. 203. key employers and institutional seek additional cost savings by anchors clustered around the combining projects, jointly K-12 and college curriculum Blue and green economy. center of the City, from McLaren integration. applying for grants, and Leverage Green Innovation Regional Medical Center in the Social and educational eliminating reiterative work. areas and the construction of west through Downtown to partnerships should be Developing stronger ties the Karegnondi Water Pipeline Delphi East in the east. developed between Flint’s for the creation of new “green” with Flint Community public schools, Kettering Master Plan reference: and “blue” jobs. Innovation District, p. 221. Schools on capital University, UM-Flint, Baker Master Plan reference: improvements has great College, and Mott Community Green Initiatives, p. 214; Blue New residents. potential given that many College in order to better Economy, p. 214. Residential growth into the schools (open and closed) prepare Flint’s K-12 students for City should be encouraged are located next to City college. Commercial demolition & and incentivized, parks, such as the Stewart Master Plan reference: revitalization. School and Brennan Park. Integrating K-12 with Higher particularly for foreign- Education, p. 208. A Commercial Areas This connectivity allows for born immigrants, current Investment Framework, cooperation on commuters, veterans, Workforce development. grounded in the Land Use Plan, maintenance and on young professionals, and Adults, especially ex-offenders should be developed that can improvements to facilities. city employees living in and those struggling with created a targeted framework In the case of closed Flint. literacy should be provided with for demolition, public schools, this would help investment, and reuse of 60 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Economic Development & Education DRAFT – 1.10.16

ECONOMIC DEVELOPMENT & EDUCATION CAPITAL IMPROVEMENT PLAN

Placemaking

Flint’s Innovation District encompasses the University Avenue and Court Street corridors, the Flint River, and Delphi East. This area includes the region’s largest employers, research institutions, and cultural assets such as: Kettering University, Mott Community College, University of Michigan - Flint, Genesys Downtown Flint Health Center, Hurley Medical Center, McLaren Regional Medical Center, Delphi East, and the Flint Cultural Center. Capital improvements within the Innovation District should be evaluated and prioritized to maximize benefits to the district’s anchor institutions and their users.

PROJECT NAME TOTAL COST CITY COST NON-CITY PRIORITY SHARE FUNDS Innovation District Comprehensive Plan 2 – IMPORTANT $150,000 TBD TBD The Innovation district stretches from the McLaren Regional Medical center in the west, to Mott Community College in the east, and also contains Flint’s Downtown, Kettering University, and other civic and cultural assets.

Wayfinding Signage – Innovation District 3 – DESIRABLE TBD TBD TBD Expand wayfinding program to roadways within the Innovation District, consistent with the design of the Downtown wayfinding program.

Grand Traverse Greenway Trail Development 2 – IMPORTANT TBD TBD TBD 3-mile multi-use trail on the abandoned CSX Railroad to connect Downtown Flint, the Flint River, and surrounding neighborhoods to the southern part of the City.

International Academy Safe Routes to School Improvements COMPLETED Improvements include: replacing sections of sidewalk along Oakley Street and Saginaw Street, updating ADA ramps and installing pedestrian heads at Oakley and Grand Traverse Street, and repainting crosswalks and updating pedestrian lights at Oakley and Saginaw.

Commercial Area Enhancement

PROJECT NAME TOTAL COST CITY COST NON-CITY PRIORITY SHARE FUNDS Buick City Accelerator Building 2 – IMPORTANT TBD TBD TBD Development and construction of a spec. building that would serve as an incubator on the Buick City site and allow for organizational growth. Commercial Structure Demolition 2 – IMPORTANT $21,600,000 TBD TBD Working from the Blight Elimination Framework, 432 blighted commercial structures have been identified as priority demolitions to enhance economic development within City commercial/retail nodes. Oak Business Center Facility Improvements COMPLETED $50,000 $50,000 $0 Current large parking lot (formerly the lot of an auto dealership) needs to be replaced. Asphalt will be torn out and replaced and new striping put down.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 61

ECONOMIC DEVELOPMENT & EDUCATION CAPITAL IMPROVEMENT PLAN

Information Technology Upgrade

Information Technology Services for the City of Flint is responsible for planning and upgrading the information technology systems that allow the city to remain responsive and efficient when providing services to residents. A goal of the City is to develop free wireless internet accessibility in key community areas.

TOTAL COST CITY COST NON-CITY PROJECT NAME PRIORITY SHARE FUNDS Consolidation and Construction of City owned Fiber Optic Network 2 – IMPORTANT $240,000 $240,000 $0 The construction and upgrade of Fiber optic communication lines that connect City offices in a Metropolitan Area Network (MAN) can strategically be done with Collaboration and consolidation partners such as the GISD and local universities can connect networks. The benefits are lower operating costs and more control and flexibility. Investment lasts 12 Years.

Mesh Wireless Internet Accessibility for Residents 3 – DESIRABLE $900,000 TBD TBD A community run wireless network could be created with Mesh technology. Currently this technology is being piloted in Detroit and can be applied to Flint.

City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

8 CAPITAL IMPROVEMENT PLAN PUBLIC SAFETY, HEALTH & WELFARE community organizations must

reinforce agencies and Crime affects not only the CIP Vision for Public everyday quality of life for institutions that provide health CIP Overview Flint’s residents, but also the care and education. Through Safety, Health & The City faces a constant battle City’s regional and national this holistic and collaborative Welfare against extremely high levels of perception. Moving forward, approach, the Flint community Imagine Flint as one of the crime and the general health increasing the safety of will be empowered to instill safest cities in the country, welfare of Flint residents. Strapped with debilitating residents will be dependent positive change that leads to a with a proactive and staffing levels, public safety upon providing adequate healthier population and a technologically- savvy police resources to our at-risk higher quality of life. force trusted by residents. operations must be at the forefront of efficiency to ensure youth; finding innovative Imagine Flint as a regional adequate service support for new strategies, technologies, hub for fresh and locally and partnerships to prevent grown produce, where a the Flint community. Old and crime; and sustaining thriving movement of dysfunctional facilities must be prioritized first and receive effective, proactive, and entrepreneurial growers significant improvements and responsive police and fire transform vacant lots into departments. gardens and provide healthy upgrades in order to meet the The transportation systems that food to schools, farmers growing need and demand for smart, data driven policing and this CIP works to improve and markets, restaurants, and inspire are important not for stores across the City. fire safety procedures. As noted their own sake but for the Imagine all previously in the com- munity facilities section, a study to public safety, health, and of Flint’s youth growing up in determine the feasibility of full welfare that they work to stable neighborhoods that advance. Healthy transportation are clean, safe, and re- habilitation or potential choices will rely on investment welcoming, patrolled by new build remains of substantial importance. in sidewalks, bike paths, and police officers known to supporting systems that provide residents and home to full accessibility to all residents, community centers providing regardless of age or level of around-the-clock activities mobility. and services for youth.

Social service providers and City of Flint Capital Improvement Plan DRAFT – 1.10.16 63 City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

Key Partners Public Safety, Health control, informal Physical activity & exercise. surveillance, regular Changes in policies, The City only has five & Welfare Policy maintenance, and code programs, and the built community centers: Haskell, The public safety, heath, and enforcement. environment Berston, Hasselbring, welfare policies are derived (e.g. walkability and Brennan, and McKinley. Two Master Plan reference: from the Master Plan and Crime Prevention through bikeability) should play a of these centers are so well Environmental Design, p. should shape all projects proactive role in reversing utilized that they have 242. moving for- ward. These poor health trends and already exceeded their policies should pro- vide a Community policing and increasing healthy lifestyles. capacity, demonstrating a framework for evaluating the holistic partnerships. Master Plan reference: clear need for community merits of any capital The City and law Physical Activity & Exercise, centers in the City, especially improvement project. For enforcement entities should pp. 252-253. for youth. detailed discussion of each take a holistic approach to policy, please refer to the public safety through Throughout the Master Plan, Master Plan section and the partnerships with we overwhelmingly heard page referenced. community organizations, from youth that there are no social service providers, Facility maintenance and safe places to go. Youth educators, and health often cited this fact as a location. To ensure the long-term providers that can built trust reason from high crime in viability of the City’s public with residents and offer the City. Thus, it is critical safety facilities, the City alternative paths to at-risk that the City work with com- should conduct on-going youth and ex-offenders. The munity partners to raise maintenance, employ new development of “wrap- substantial funds to make technologies, increase around community centers” much needed upgrades to energy efficiency, and was identified by residents these community facilities. identify consolidation as one of the most Sadly, with the City’s fiscal opportunities. The location important steps towards crisis, little has been done to of Neighborhood Service achieving this end. these facilities, but based on Centers should be aligned Master Plan reference: the priorities outlined in the Community Partnerships, p. with the Land Use Plan. Master Plan, funding 242-244. Master Plan reference: improvements to these State-Of- The-Art Police & Healthcare access. facilities must be a priority. Fire Departments, pp. 238- While the City’s role in When cities have invested in 239; Government healthcare is very limited, it community centers, they Facilities, p. 178. should actively support often have seen significant Police and Fire Department policies, practices, and declines in crime. staffing. funding opportunities that increase awareness of New revenue streams and existing services, expand strategies should be services, increase identified that can help accessibility of facilities, and sustain adequate personnel reduce citizen dependence levels, including grants, inter- on drugs, alcohol, and department collaboration, smoking. and possible creation of an Master Plan reference: auxiliary or reserve force. Community Partnerships, Master Plan reference: p. 242-244. State-Of- The-Art Police & Fire Departments, pp. 238- 239. Urban food production. Vacant lots and green Crime Prevention through space should be used for Environmental Design localized food production (CPTED). that can generate Environmental contributions affordable fresh foods for to crime should be residents. eliminated through Master Plan reference: strategies such as Nutrition & Access to territoriality, natural access Produce, pp. 250-252. 64 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

PUBLIC SAFETY, HEALTH & WELFARE CAPITAL IMPROVEMENT PLAN

Police Department

The facilities of the FPD include Police Headquarters, located on the City Hall Complex site, along with several service centers. The headquarters facility has a number of issues associated with it. Constructed at the same time as City Hall (1956), the 62,400 square foot building suffers from many of the same problems and inefficiencies. Many building components are outdated and in need of maintenance or replacement. The building is extremely energy inefficient. The list of necessary capital improvements for FPD facilities is only a portion of what is likely needed, and there are serious questions as to the long-term viability of at least some of the buildings considering their age, condition, and cost of corrections needed. The City should consider including in a study of options for right- sizing their facilities to meet projected staffing needs the needs of the Police Department, especially the head- quarters. Opportunities could also exist as part of the implementation of the Master Plan to repurpose FCS facilities into combined police mini- stations/ community centers/senior centers.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Police Station bridge to 5th Street 1 – URGENT $30,000 $30,000 $0 Improvements to the public access from 5th Street. Includes improvements for emergency exit from facility by employees.

Flint City Lock-Up Door Replacements 1 – URGENT $50,000 $50,000 $0 Replace doors in temporary lock-up facility located on the 3rd floor of Police Station. Doors currently do not operate or close as they should.

Police Station HVAC 2 – IMPORTANT $1,685,000 $1,685,000 $0 Improvements to the heating and cooling system at Police Station.

Police Station remodeling 2 – IMPORTANT $250,000 $250,000 $0 Remodeling of interior space.

Police Station roof repairs 1 – URGENT $100,000 $100,000 $0 Repairs to the roof to prevent and correct leaks. Police Station electrical upgrades 2 – IMPORTANT $200,000 $200,000 $0 Improvements to the electrical system at the Police Station.

1 – URGENT $209,450 $209,450 $0 Police Station -Property Room Fencing and shelving for property, Move blood drying cabinets to MPO and construct venting system, create electrical supply for blood drying Cabinets, connect water supply to Blood Drying Cabinets. Electronic door entry readers, Dehumidifiers, Air purifiers, Labor to move Drying cabinets, sprinkler Fire Suppression System, Security Cameras and paint. Police Station- General Improvements New paint and replacement of kickplate trim throughout 1-URGENT $517,000.00 $517,000.00 $0 entire building. Replacement of windows and fix the flooding issues on east end of building

Police Station- Patrol Operations Upgrades Upgrades include removing old wiring, flooring, ceiling 1-URGENT $68,900 $68,900 $0 tiles and replacing with new wiring, new paint and new carpet. City of Flint Capital Improvement Plan DRAFT – 1.10.16 65 City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

Police Department

PROJECT NAME TOTAL CITY COST NON-CITY PRIORITY COST SHARE FUNDS

Police Station- Control Center (formally TRU) 1-URGENT $21,500 $21,500 $0 New wire room for feeds, installation of new video monitors and replacement of ceiling tiles and new paint

Police Station- Juvenile Offices $30,000 $30,000 $0 Repairs and upgrades to the offices include flooring, bathrooms and holding cells 2- IMPORTANT

Police Station Lighting 2-IMPORTANT $100,000 $100,000 $0 Installation of new, motion sensor lights

Police Station- Front Desk $20,000 $20,000 $0 Workspace overhaul and remodel. 2- IMPORTANT

Police Station- Traffic Bureau $8,500 $8,500 $0 Replace carpet and new paint 2- IMPORTANT Police Station HVAC Improvements to the heating and cooling system at Police $1,685,000 $1,685,000 $0 Station. 2- IMPORTANT

Police Station- Crime Stoppers Office $5,000 $5,000 $0 Replace carpet that was flooded and now smells moldy 2- IMPORTANT

Police Station- Women's Locker Room $500 $500 $0 Replace broken toilet in handicapped stall 2- IMPORTANT Police Station – City Lock Up Substantial upgrades and rehabilitation to the BLOCK's, $35,000 $35,000 $0 Female holding area and the Booking Room 2- IMPORTANT Police shooting range REMOVED Improvements to police shooting range.

66 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

PUBLICPUBLIC S SAFETAFETY,Y HEA, HEALTHLTH & & WEL WELFAREFARE CCAPIAPITALTAL IMPR IMPROOVEMENTVEMENT PLAN PLAN

Fire Department

The Fire Department includes six (6) fire stations (with old Station 5 and Station 7 being closed) which are in various conditions. All have needs to varying degrees for upgrades or other improvements. There is no comprehensive facility assessment known for any of the fire stations and this should be considered. It is very likely that these facilities have many of the same issues as others of the City, with the added concerns of FFD staff being on duty 24 hours, 365 days a year. The assigned station is home to firefighters, who perform their duties as assigned, eat, and sleep at the station. This aspect presents unique issues not present in other facilities, such as kitchen remodeling and updates appliances, etc.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS 1 – URGENT $10,000 $10,000 $0 Atherton Road Station Roof Repair Repairs to the roof at the Atherton Road Fire Station. 1 – URGENT $15,000 $15,000 $0 Fire Station 2 Roof Repairs to the roof at Fire Station 2. Fire Station 1 Kitchen 2 – IMPORTANT $60,000 $60,000 $0 Remodeling of the kitchen at the main Fire Station.

Fire Station 5 Miscellaneous Items 2 – IMPORTANT $90,000 $90,000 $0 Updates and maintenance to miscellaneous items at Fire Station 5, including security upgrades, Nederman unit, bay door, refrigerator, etc. Fire Station 8 Miscellaneous Items 2 – IMPORTANT $95,000 $95,000 $0 Updates and maintenance to miscellaneous items at Fire Station 8, including tiles, plumbing, Nederman unit, HVAC unit, etc. 2 – IMPORTANT $96,500 $96,500 $0 Fire Station 6 Miscellaneous Items Updates and maintenance to miscellaneous items at Fire Station 6, including minor roof repairs, HVAC unit, tiles, lighting, painting, etc. 2 – IMPORTANT $145,000 $145,000 $0 Fire Station 1 Miscellaneous Items Updates and maintenance to miscellaneous items at Fire Station 1, including a new HVAC unit, carpeting, ceiling tiles, painting, etc. 2 – IMPORTANT $150,000 $150,000 $0 Fire Station 3 Miscellaneous Items Updates and maintenance to miscellaneous items at Fire Station 3, including a new AC unit, minor roof repairs, parking lot gate, bay door, etc. 2 – IMPORTANT $150,000 $150,000 $0 Fire Station 4 Miscellaneous Items Updates and maintenance to miscellaneous items at Fire Station 4, including various systems and furnishings. 2 – IMPORTANT $845,000 $845,000 $0 Fire Station 1 HVAC Improvements to the heating and cooling system at Fire Station 1. COMPLETED $127,400 $127,400 $0 Fire Station 1 Roof Replacement Replace roof at Fire Station 1.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 67 City of Flint Capital Improvement Plan • Public Safety, Health & Welfare DRAFT – 1.10.16

Community Wellbeing The City currently has two senior centers (Brennan and Hasselbring), two youth centers (Berston and Haskell), and the McKinley Center (run by VISTA Drop-In Center). All are well utilized, with programming at all of the centers if provided by various non-profit partners. Some are utilized to the point that they physically cannot accommodate more users without capital investments, an indication of the need for more centers and partners to help with programming. Utilization of senior and community centers can be a key component in implementation of the Master Plan and many of the different place types, which can include adaptive reuse of FCS facilities. There is an immediate need for improvements at the two senior centers and it is likely that improvements are needed at the others. Identifying funding for necessary projects needs to be a priority, along with project partners.

TOTAL CITY COST NON-CITY PROJECT NAME PRIORITY COST SHARE FUNDS

Facility Needs Assessment 1 – URGENT TBD TBD TBD Undertake a study to identify improvements needed at the various com- munity centers (Berston, Brennan, Haskell, Hasselbring, and McKinley) and identify long term goals for providing services at each center. Soil\Turf repairs at Haskell Youth Center 2 – IMPORTANT $13,000 $13,000 $0 Soil cap design and construction for the demolished swimming pool site at Haskell Youth Center.

Pierce Community Center HVAC 3 – DESIRABLE $15,000 $15,000 $0 Replacement of air conditioning units at Pierce Community Center.

Fire Sprinkler System at Berston Field House 3 – DESIRABLE $150,000 $150,000 $0 Fire sprinkler system installation at Berston Field House. Cost estimate by Sedgewick & Ferweda Architects in on- site survey and analysis report (May 19, 2014).

LED Lighting Conversion 3- DESIRABLE $210,000 $210,000 $0 Convert existing lights at city-owned community centers (including Berston, Haskell, Pierce, McKinley, Mott Park, Brennan, and Hasselbring) to high- efficiency LED fixtures to reduce long-term utility costs. Total cost represents a rough estimate based on the cost of conversion for gym lighting at Berston Field House.

Bishop & MLK Service Center COMPLETED $50,000 $50,000 $0 Improvements to the Service Center that are needed. Berston Lighting Improvements COMPLETED $37,850 $37,850 $0 Installation of new energy efficient lights

McKinley Center HVAC Repairs COMPLETED $10,194 $10,194 $0 Emergency replacement of multiple furnaces in the McKinley Center Hands Free Faucets REMOVED Installation of hands-free faucets at Berston, Haskell, McKinley, and Mott Park.

68 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Moving Forward DRAFT – 1.10.10

9 CAPITAL IMPROVEMENT PLAN MOVING FORWARD

NEXT STEPS The next steps required for • Use of this CIP to plan for • Explore possible funding The City of Flint is gathering the growth and development recommended sources and significant momentum of Flint over the next 20 years infrastructure implementation towards a rebirth. include: improvements; techniques for projects; Implementation of the Master Plan will require • Promote cooperation and • Enhance public • Use of the Master Plan significant capital participation among various communication and to guide City policies agencies, organizations, community engagement in investments. The projects and decision-making; listed in this CIP are but a community groups, and decision-making; and, fraction of what is needed for • Review and update of the individuals; • Update the CIP, Strategic the City to once again attain Zoning Ordinance, which is • Prepare and implement Plan, and Master Plan at its previous status. currently underway, and a 5-year Strategic Plan to regular intervals. other development prioritize objectives and controls to reflect policies list accomplishments of presented in the Master preceding years; Plan;

City of Flint Capital Improvement Plan DRAFT – 1.10.16 69 City of Flint Capital Improvement Plan • Moving Forward DRAFT – 1.10.16

ADOPTING AN ANNUAL Step 1: Organize the Step 2: Identify Needs Step 3: Identify Key Scope Process Each member of the CIP Team Items CIP PROCESS Since the City has not had a identifies the needs within or The CIP is a distinct element Next, each member of the affected by its particular asset of the annual budget process formal process for CIP Team identifies key area. Team members should that flows through City collaborating on development scope items that are likely to develop their CIP “wish list” of government in separate, but of a CIP, the first step should influence the cost and/or be to develop and organize a needs for facilities they are linked channels. The CIP schedule requirements of responsible for throughout process typically occurs process for doing so. Staff the project to address the the year and bring this list to earlier than the budget members whose work du- needs. These items may the first CIP Team meeting. process, as the CIP will be ties, responsibilities, and/or include: impacts to natural expertise are impacted by or These needs can be identified used in developing the capital features; changes to the by reviewing the findings of projects portion of the annual affect capital improvement character of an area; the City’s various master budget. The process for projects should be identified locations within established as members of the CIP Team. plans, maintenance records developing the CIP generally boundaries such as historic and experiences of staff, and involves the following steps. These meetings should occur districts, DDA, Master Plan on a regular basis throughout citizen requests submitted place types, etc.; impacts on the year and not wait until since the last CIP process. other utility infrastructure immediately prior to the systems or their operations; budget process, as the CIP special assessment or other process will take on less outside funding component; meaning if it is merged in any need to obtain right-of-way way with the budget. The CIP or easement area; or, draft should be completed require a public engagement well prior to beginning the process. budget process, with adjustments to the CIP made as needed based on budget discussions.

70 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Moving Forward DRAFT – 1.10.10

There are tools that can be Step 4: Prioritize Needs Collaborative Classification 5. Run the model utilized in this process. The key task for the CIP Team Process The results of the prioritization One is the utilization of the is to evaluate and prioritize This CIP utilizes the model express the overall, City’s geographic the many identified needs. collaborative classification relative benefit of each information system (GIS), This is a critical component of method to prioritize projects. need/project compared to the which should contain an the CIP process. Project This method considers the others in that particular inventory and status or selection and scheduling is varied perspectives on a given category. These results are condition of many of the constrained by the amount of project to arrive at a reviewed to confirm that the key items listed above. By funding anticipated to be prioritization relative to the criteria, weighting, and scoring identifying the location of a available for capital projects. other needs within that have not produced improper particular need, the Shrinking funds and rising project category. results. If it is determined by presence or absence of costs incurred in maintaining the team that some aspects of many key items can be and rehabilitating Prioritization or Weighting the results are in- appropriate, determined. Another tool, deteriorating infrastructure the criteria, weighting, and/or Model though not as technical as make the process of selecting scoring should be reviewed and Some communities utilize the GIS, is the broad the most vital capital projects adjusted and the model re- run. a detailed, yet clear perspective of the CIP Team even more crucial and The purpose of this iterative method of prioritizing members. By leveraging difficult. The merits of each process is to better calibrate the projects. The City of Flint the expertise of the various need must be judged against model, but care must be taken should consider use of a staff involved with, or the policies and criteria of the to not adjust the model to prioritization or weighting affected by, the operations CIP process and the goals of produce “desired” results. model, which employs the and improvement of a each component of the particular asset area, many following procedure: Master Plan, as well as against Note that while priorities for critical scope items can be the other competing needs. 1. Determine the decision projects are included in the factored into the planning criteria to be used in the project listings, it is and programming of a prioritization analysis incumbent on the City to project to address a determine the final priority particular need. 2. Assign relative weights to for projects between the criteria from 0 to 100, departments once If these scope items are not with 100 being the most department heads have taken into account as part of important prioritized projects within the CIP process, the criteria and the others their own area of implementation of many responsibility. Regardless of weighted relative to the most projects is likely to encounter the method employed important delays and cost over- runs as (prioritization model, these items are discovered 3. Determine performance collaborative process, or during the actual project study measures from 0 to 10 for other means), this step is to and design activities. each criterion be conducted without consideration of project cost 4. Score each need/project or availability of funding or for each criterion staffing resources. The goal of this step is to assign a priority to each project to allow for subsequent steps to be completed.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 71 City of Flint Capital Improvement Plan • Moving Forward DRAFT – 1.10.16

Step 5: Schedule The projects should initially Step 6: Prepare, Adopt & Policy Assessment Projects be grouped by the fiscal year Approve The City Council ultimately During previous steps, CIP in which funding is proposed. As the process continues, approves the assumptions, Team members identified The CIP Team should then and increasingly detailed criteria, policies, and needs, developed scope, and evaluate each fiscal year information emerges, recommendations of the CIP prioritized needs based on grouping and adjust project projects may be added, Team and City Planning use of some method for doing schedules until an overall altered, or abandoned. Commission by approving the so. An item of major schedule of projects is Eventually, the CIP Team CIP. Depending on the policy importance is the scheduling established wherein: arrives at a final list of orientation, modifications are of projects based on the projects that is submitted to expected throughout the initial estimate of the project Higher priority needs are the City Planning Commission process. This is considered an costs, proposed funding addressed before lower for review. essential part of the source(s) for those costs, and priority needs. procedure, placing the burden prioritization. The Planning Commission on those who dissent to Available funding limits are evaluates the CIP package in assess the policies underlying The CIP Team members not exceeded for the light of additional the recommendations and to should develop an initial upcoming budget cycle. information, holds a public advocate their differences, proposed schedule for the hearing, and makes final resulting in the necessary projects based on their Staffing resources are programming decisions evolution of the entire capital understanding of the need anticipated to have capacity before adopting the CIP and planning process. and its relative priority within to perform the projects. sending it on to City Council. its asset category. Unlike a Council approves the CIP after budget, a CIP is not required its review. Approval is not a to be fiscally constrained commitment to finance the based on available dollars, approved projects, but is a but it should have some statement of policy regarding semblance of reality to be the City’s approach to effective and serve its meeting its future capital intended purpose of needs. However, the first two providing guidance to future years of the CIP do form the budget cycles. initial basis for the Capital Projects Budget portion of the City’s Annual Budget.

72 City of Flint Capital Improvement Plan DRAFT – 1.10.16 City of Flint Capital Improvement Plan • Moving Forward DRAFT – 1.10.10

Highlight Priority Needs APPENDIX Regardless of Funding The attached Appendix It is inevitable that the includes the CIP spreadsheet number of projects required that pro- vides more detailed to address all of the City’s information about budget infrastructure needs will cycles, funding sources, and exceed the available funding. project costs for projects listed In the endeavor to provide in this CIP. Several projects do better service to the not have a detailed scope or community, capital projects cost determined and there are are proposed at times which, numerous additional studies unfortunately, are moved to a and investigations needed for later date when funding is the City to document existing available, or are determined conditions and fully to be un- funded or understand infrastructure and unprogrammed. This process capital improvement needs. should not discourage staff Additional discussion on from continuing to submit “Moving Forward” can be identified needs, but should found in Chapter 12 of the develop into a mechanism to Master Plan. help in the effort to uncover alternate sources of funding and see that higher-priority projects get implemented.

City of Flint Capital Improvement Plan DRAFT – 1.10.16 73