SFA List of References
Total Page:16
File Type:pdf, Size:1020Kb
SFA Handels GmbH Neue Aarburgerstrasse 20 Tel. +41 (0)62 785 11 85 CH-4852 Rothrist Fax +41 (0)62 785 11 89 www.sfa-anlagenbau.com [email protected] VAT No. CHE-113.277.190 List of References SFA Handels GmbH Revision 07, 2020 Neue Aarburgerstrasse 20, 4852 Rothrist, Switzerland, +41 62 785 11 85, F +41 62 785 11 89, [email protected], www.sfa-anlagenbau.com Commercial Court CH 5000 Aarau, Commercial Registration No. CH-400.4.208.140-9, VAT No. CHE-113.277.190 UBS Switzerland AG, IBAN (CHF): CH20 0023 1231 4271 4901 E, IBAN (EUR): CH48 0023 1231 4271 4960 C IBAN (USD): CH15 0023 1231 4271 4961 L, SWIFT CODE UBSWCHZH80A Engineering Year Customer Place Scope of supply Chemical industry 1985 Chemical Factory Uetikon Engineering for steam boiler plant, including infrastructure. (Switzerland) 1985 Claviag AG Moosleerau Engineering for reconstruction of the heating of spray dryer (Switzerland) Optima and Magna in accordance with LRV 92. 1985 Sandoz AG Muttenz Engineering for the sanitation of the organically polluted exhaust air (Switzerland) at Muttenz. 1985 Sandoz AG Muttenz Feasibility study and offer boiler house, heat distribution, process measuring and (Switzerland) control technology units and equipment. 1986 Sarna AG Sarnen Feasibility study with concept and detail engineering on pentane disposal and (Switzerland) energy recovery. 1986 Schaerer + Rothrist Feasibility study, risk analysis and detail engineering for the collection and Schlaepfer AG (Switzerland) disposal of the ethyl oxide-exhaust air. 1986 Rohner AG Pratteln Energy study, energy center and fabrication with (Switzerland) economy, package of measures, investments. 1987 Bertrams Muttenz Basic- and detail engineering for 1 special steam boiler Chemianlagen AG (Switzerland) for the saltpetre production. Place of installation Argentina. 1987 Ciba Geigy AG Basel Processing and detail design of a special combustion plant (Switzerland) for the project AOPRC (China). ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 2 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Chemical industry 1995 STIA AG Pratteln Engineering for a complete exhaust air cleaning- plant, and registration in (Switzerland) the production. Engineering for the sanitation of the fuel depot section II. Automation concept chemistry production building 30. 1999 Gremolith AG Bazenheid Feasibility study and detail engineering on the collection and (Switzerland) disposal of room- and production exhaust air. 1999 Federal Office for the Bern Feasibility study, engineering and delivery of a separation plant for Environment FOEN (Switzerland) separating quicksilver after the crematorium, including complete plant installation. 2000 LONZA AG Visp LRV conformal reconstruction of the 70 t/h boilers with replacement of (Switzerland) the burner and exhaust air disposal, including new installation of the complete process measuring and control technology automation system and adaptations to the attendant facilities. 2000 LONZA AG Visp Inspection of the existing exhaust air disposal in the factory, (Switzerland) in building F17, in Visp. 2005 Hoffmann Basel Feasibility study on waste solvent management La Roche AG (Switzerland) and utilization in Basel. 2009 Hoffmann Basel Performance and evaluation of the measured results from La Roche AG (Switzerland) the combustion tests at in a special- high- temperature- combustion chamber with liquid and gaseous chemical residues. Flue gas analysis on polychloried dioxins and furanes (PCDD, PCDF). ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 3 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Municipal waste / Biomass / RDF 1982 Zürcher Regensdorf Economical investigation inspection for power supply. Furnierwerk (Switzerland) 1983 Hasena AG Laeufelfingen Engineering for hot water generation with distribution system. (Switzerland) 1987 PRT-Tomar Tomar Basic- and detail engineering for firing equipment Cork production (Portugal) for solids and 1 steam boiler with a capacity of 25 t/h, 45 bar pressure, including complete plant installation. 2014 Vattenfall Europe Rostock Feasibility study with cost account for a sludge incineration plant in Germany. (Germany) Adjustment to an existing plant, steam boiler 100 t/h, new fuel specification with 8 – 12 MJ/kg. 2016 Danpower GmbH Potsdam Feasibility study with cost account for a sludge incineration plant in Germany. (Germany) Amount of fuel 160’000 t/year. 2019 Top Energy Solution Co., Ltd. Chungcheongnam-do Feasibility study and pre-engineering for a Bio-SRF incineration power plant. (South Korea) Calculation of the overall cost for the power plant. Pre-engineering for the fuel feeding system, combustion grate system, combustion air system, cooling water system, ash removal system, cooling water system, combustion air system, steam boiler in a special vertical design and integration in the general layout. Pre-engineering for the steam boiler in a special vertical design with 60 to/hr, 43 bar, 420°C., including general layout, 3-D model, Bill of Material, calculation of the water circulation and fluegas temperatures, calculation and evaluation of solutions for the of SNCR or SCR system. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 4 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2020 GETEC Park Swiss AG Muttenz Feasibility study and pre-engineering for 1 Line of industrial / chemical waste (Switzerland) incineration power plant. Calculation of the overall cost for the refurbishment of the fuel feeding system, combustion grate system, combustion air system and ash removal system. Pre-engineering for the refurbishment with space requirements, general layout for planning permissions, etc. Evaluation of solutions for the fuel feeding system, grate system and ash removal system with cost and performance comparison. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 5 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Disposal industry 1994 City Freiburg Freiburg Feasibility study on an animal body incineration plant in Montmollin, canton (Switzerland) Neuenburg. 1995 Muera Biel Investigation of the condition, wall-thickness measurement of the waste incineration (Switzerland) boiler. 1999 Bayer Chemie Werk Mannheim Basic- and detail engineering for 1 waste heat boiler in a special combustion (Germany) plant. Waste heat boiler capacity of 12 t/h, 22 bar pressure. 2002 GZM/GBL Lyss Feasibility-study on CHP generation. (Switzerland) Animal body incineration plant, generation of current over a gas turbine. 2004 Building authority Basel Feasibility-study on the disposal of human / organically City of Basel (Switzerland) hospital residues as well as condition analysis of the existing crematory plants. 2005 AWZ Zurich Feasibility-study on the disposal of the waste air of the tankage company (Switzerland) in occurrence of revision or damage. Synthetics 1999 Ceta SA Vouvry Feasibility study and detail engineering for the registration and (Switzerland) disposal of production exhaust air. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 6 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Metal industry 1985 Sugar factory Frauenfeld Energy study on the waste heat potential fabrication shavings, drying (Switzerland) process/boiler house with optimization suggestions. 1987 Apaco AG Grellingen Feasibility study exhaust air disposal of metal pickling plant. (Switzerland) 1992 Edak AG Dachsen Feasibility study (Switzerland) exhaust air disposal of metal pickling plant. 2001 Produits Morgia SA Morges Engineering for the building of a power center, one long-distance line channel and (Switzerland) under stations. Paper industry 1993 Versoix Versoix Genevea Energy study, power center including distribution system under (Switzerland) consideration of economy and investments. Textile industry 1997 Bethge AG Zofingen Energy study, power center with distribution system. (Switzerland) 1999 VFA AG Thalwil Energy study, power center, including distribution system under (Switzerland) consideration of economy and investments. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 7 of 21 Neue Aarburgerstrasse 20 [email protected] CH-4852 Rothrist Engineering Year Customer Place Scope of supply Shipbuilding 1986 Howaldts-Deutsche Kiel Engineering for the building of a marine boiler for a platform ship in Nigeria. Werft AG (Germany) 1986 Howaldts-Deutsche Kiel Engineering for the building of marine steam boilers Werft AG (Germany) 30 - 80 t/h for the general marine engineering in Korea and China. ______________________________________________________________________________________________________________________