3' Cil3' LO.m -E3 F) L Page 1 of 2

NIA - BAJUW RIS PlDP EXPANSEOW APFt -INVEMX)R?' OF PROPOSED RQW AFFECTED ABTEISS FPd: ROW PiD?>.~ls F!i'P:#IE CF CA1JP:L: bAAlf4 CANAL, ACTUAL DYH~QMSlDEF!A~ON-

----

Page I 'of 4 . . NIA - BATUTU RIS PlDP EXPANSOH AREA .-INVENXjWY QF PROWSED ROWAFFECTED AREAS FM: Bc\Y F1ap.xis NAwIEOF CAhiAL: MAIFI CANAL, ACTU.AL WDTH G0hlSlDEWATiOW

DEEI' RIGHT 51DE

------..---

----- ' FOR IRRIG. DBPT. ------2% ------

---

Page 2 of 4 Y- biRME GF CA!--iAL: --P4.AtM CAMAL, ACTUA.L WDTkI C3MSIDERkinOl4

-- 40,0CH3.OG O$;L="f FOR IRRIG. LIE\!'?. ------...- ----A 20,CjC%l.(]Q .-- D$)S113.AiGE C R ROP,D-- CROSSiti'G------4.~,030.@-?%?E'r' FOR IF: R IG.-.---- DfZiT;'.

- 33,0w.sJC--.------QK9' FOR IFZRIG, t3EiJ1-i. RC.AG CRQSXikJG

-II ------.-- N.,QIE OF CANAL: LATERAL D, Ei$TUAL WJlDT#i COMSIDEFtkTIOM ------

?--I--- I

Page ti of4 V 7 -.L . n 9 ->+_ --0 c? 'f! h L? Batutu RIS, Region 11 a. Informal Settlers

Informal settlers are scattered on the ROWS of the main canal and laterals of Batutu RIS spread in 7 Barangays in the Municipalities of Compostela and New in the Province of Compostela Valley. With the assistance of the Chairmen, consultation meetings were conducted with the 101 households - informal settlers. The agreements reached are the following:

i. All informal settlers signed waivers to move out when the improvement works commence. This is formalized thru the execution of MOA where the Barangay chairmen were signatories; ii. The informal settlers requested that NIA will assist them in hauling their dismantled structures to the relocation sites identified by them and 1 or by the LGUs; and iii. NIA's assistance was also requested in the form of constr~-lct:ion materials, like aggregates, cement, RSB, to replace ~~nsalvageablematerials which will no longer be useful in the reconstruction. Agreements during negotiation was to compensate 25% of the structl-~res.

The Project would spend about P1,007,000.00 in resolving the problem on informal settlers at Batutu RIS.

b. Right - of - Way at the Expansion Area

In negotiating for ROW for the canal system, dialogues were conducted with landowners in each Barangay covered by the expansion area. All of the farmers are willing to donate portion of their lands as ROW for the necessary canal system, provided the crops that would be damaged should be compensated. The estimated cost for this mode of ROW acquisition is PI,761 ,I80.00. Actual validation shall be done by a valuation committee for the project with the membership of the affected persons. REGION RESETTLEMENT PLAN FOR ROW SQUATTERS BATUTU RIS, COMPOSTELA COMVAL PROVINCE

INTRODUCTION:

The system started its operation and Maintenance in December, 1979 with water masters manning its operation and maintenance of the system.

The PD 552 empowered the IAs to enter into different type of contracts with incentives provided. The case of Batutu farmers they opted to choose type 1 contract taking charge on the canal maintenance and minor repair of the system. While in type 2 contract farmers are responsible in collecting irrigation service fees from the farmers.

Hence, both the NIA and the Irrigators Association (IA) has been very tolerant to people who lacks an area to build their shanties for their shelter. Shanties are built temporarily. Then little by little improving it until it seemingly became permanent in nature. Due to laxity in maintenance activities of the system, and in implementing the irrigation laws, local officials even gave. permlssion or acted sponsors of squatters to build the houses along the canals. Thus, squatters clustered themselves as a community. While others are apart from each other.

With the advent of Particlpatory Irrigation Development Project (PIDP) irrigation canals should be free from squatters. Such that different activities were undertaken to move away the squatters in a diplomatic way. Irrigation Superintendent, assistant Irrigation Superintendent, Water Master and IA Presidents had a joint venture In conducting the survey in identifying the illegal occupants in our irrigation canals and facilities to satisfy the following objectives:

1. Assess and determine the properties that will be affected/damaged

2. To inform the occupants the importance of the irrigation facilities;

3. To give time to the illegal occupants when to clear the area

4. To inform the occupants the extent of services the NIA can offer in their actual moving-out. 5.To resolved before hand conflicts that may arise during eviction.

As such different meetings were conducted at Batutu RIS Office, Compostela, Comval Province and in different Barangays to gather comments and reactions from concerned squatters and to plan out mutual solutions to the problems.

As to masterlist of squatters on the canal ROW, (see appendix ).

COMPENSATION ON LAND LOSES:

As to land loses the squatters will not loss the land because it is owned by NIA. Should there be losses, it is on the damage of shanties built by them illegally. However, NIA will help in transporting their belongings in relocating the squatters with minimal assistance in the form of construction materials like aggregates, cement, RSB, etc. with the aid of LGU.

Land Damages:

In case of expansion areas, ROW damages of land is still undetermined as to the time of writing. However, question on willingness to give ROW has been raised. Accordlng to Local leaders in different barangays, should NIA encounter problem on ROW, LGU will help in negotiation because having an irrigation facilities has been their desire to have in their community most especially now that there are rice crisis in our country.

Crop Damages:

As to compensation on the damages of crops that will be incurred during the implementation of the project, potential affected landowner asked compensation to the crops to be affected.

CONSULTATIVE ASSEMBLY MEETINGS WITH INDIGENOUS PEOPLE (IPS)

In coordination with DENR, LGU, NGO, & NCIP of , Comval Province, a series of consultative assembly meetings were conducted in different barangays covering the watershed areas and impact areas. Participating in such meetings are Chieftains, tribesmen, LGUs, DENR, NGOs, and NIA. BATUTU RIS, COMPOSTELA, COMPOSTELA VALLEY PROVINCE

SUMMARY OF SQUATTERS ALONG MAIN CANAL AND LATERALS BY IA COVERAGE

Total Number of Total Area of Total Estimated Cost of Total Estimated Amount of Name of IA Squatters Structures (sq m) Affected Structures (P) NIA Assistance (P)

I. EAST AREA

. . . . .- . . . . .~. ~. a. SAJOLAEFIA . . - . - 12.. 254.00 .553,000.00 138,250.00

.. ~ b. LABAFIA 318.00 . 380]000;00 ~~.~ . . - ~.. . ..~19.. . . -. -.-.. . -- . .. . . ~ .~ . ~95,000.00

. ~ ~ .. ~ 22 352100 215,000.00 53,750.00 c. B.*CGF,A . - ~- .-

d. LASAFIA 2 ~ 48.00 . 90000.00 - 22,500.00-. e. LABEFIA 2 20.00 10,000.00 ------. - -. ------.. .- - - -- .- - .- - --. --. .------. .- .-.------2,500.00-- . - . f. LAMAFIA 2 48.00 35,000.00 8,750.00 SUB - TOTAL 59 1,040.00 1,283,000.00 320,750.00

AREA 2. WEST------~ - -~ a. PAMACAFIA 24 970.00 1,956,000.00 489,000.00 . - -- --. .- .-a ------.- b. GAFlA -- 11 312.50 -- 384,000.00 96,000.00 c. LABACFlA 6 149.00 360,000.00 90,000.00 d. PROVAFIA 1 49.00 45,000.00 I 1,25mo0 SUB - TOTAL 42 1,480.50 2,745,000.00 686,250.00 Submitted 10 Sept 2008 via email BANTU RIS, COMPO@l%LB,CONIPOBELA VALLEY PROVINCE MASTERLIST OF 88U-B MAIN CANAL AND LATER&& COWIPOSTECA. CO-Y PROVINCE

Subnliited 10 Sept 2008 via e~nail BADJTiJ RIS, CORIIPOSTEM, COMPQSELB VALLEY PROVINCE -.-MASTERLIST OF SQUATERS ALONG WIN CANAL AND LATEKALS --COhlPOSTELA. CQPJIF0STEL.A VALLEY PROflllc~~

Page 3 of 4

!9-SEP-2006 14:14 NIA BATLITU

Prpublae r f tha PhiAippinrr PAMBAPISJWG RA;dCA6IVAAN NG DATUBIG (national Irrigation Administration) batutu Rirar Irrigation Zysten Coapoctcla, Comgostcla Valley Province w Tclelar no- (0:14) -822-0492 lacal 131

September 29,2008

THE mOOmCTMPrN A.GER Sgstcnls Operatimu 4r Equipn'zent Management PIDB Nabonal Irrigation ~dmimustration EDSA, Q-uezonCity

Submitted lwwwith are the fallowing xports for your infurnmtian and guid-ef

1 List of Right of Way holders in expansion areas of Batutu RI3 2 Barangay Resolution of Bgy. Bpnagbanag 3 Barangey Resolution of Barmg 3y Siocan 4 Barangay ~esolutlonofBarangay New Visayas 5 Barangay Resolutia~zof Barangay Maparat

Please take note that the Resolution of Bah~tuNS Federation of Irrigators association be sent tomorrow via fax. Batutu RIS, Compostela, Compostela Valley Province

Summary of Crop Damages on Canal. Right - of - Way

Total Number of Total Length of Total Estimated Cost Canal Farmers of Affected Affected Area (m) (PI

1. Main Canal 25 5,476.00 581,180.00

2. Lateral A 17 4,116.00 41 0,000.00

3. Lateral B 10 3,042.00 300,000.00

4. Lateral C 9 2,526.00 250,000.00

5. Lateral D 6 2,228.00 220,000.00

TOTAL 67 , 17,388.00 1,761,180.00 3UflN EUNGIAI~ --/----JDJUU.OO----- !BOUWOEW Rl GHT SI UE JUN ESYl R TO ------L- tEOilNaERY iEf T 5'1 LIE- '4 CENTE 0FrBSicr:1N ------20-- 3oo.o~BOUYPEAY AIGHTS:EE SE13lJl L ROBLES '-1Ei~tiNDEKYi€F T SiEE

MLOl8IlS t SCIYYtl13 lSS3f ~OFW-T-I0-1lwya 0 1~~93%~01 EJr'4ISSOY3 atrotf lA30 3liJtllUOd A3X0 OD-OOO'OE -- 3313 LSD #E -I-- L3HYd 01 333Y 3d LA30 OWYIHO3 A3H0 00000'St 3318 QQ%L Nbrl3NW9 M013d33N03 ' 1 A30 -9Itla I 803 P3Y 0 OL1'000'52 1 33 I& 1SD'OSZ 1 1 9 ti03 00 A30 LHtl1 A3.HO, OOO'QP 1 -333 033NOB DL idW

S'63iAY Q31333dV MOtl P3SOdOad JO htlOlH3hNI Y38V NOISNVdX3 dQld Sltl filfl1U0 - YIN NIA BATUTU

I5XCERl."T T;ROitl 'I'ITE kIINllTES 012 THF, CCONSITLTA'SION h.IEli:'TTNG Hli:'PVEEN Tllii: RARANGAS: OFll'lCTALS AND MA-EIATIJTtJ RWEH 1I;ZRTGATION SYSI'FM \nTl4' 'I'T.iE Nrl141CGION/\I, OFFICII!: PER~XINNELW1:C.;,4RDINC= 'PDP EXI'ANSION .4RE:hS HET,I) AT nA'I"UTIT H.IS OICII'IC~E, I'ORLACION, CQMI'OSTEI',A, (~OMYOS'I'KT,RVhl.l,EY S'ROVI'NCE ON FOVEMIIER 17, 2(1M AT 1:0M P.M. TO 4:00 PI!,!.

Resolution NoLC, Serles of 200t

''A HJL?+OLU'I'ION FOR TFTE (:ENI)ORSE'vlENT OF NO OBJTCCTION N3C)ITT TITF, 1M P1,EMk:WTATTOIV OF I'ARTICLI'A TORY TRRICATTON D EVELOPTIlJ?.NT PIt(K;RAM (17DP) EXPANSI(IN AKEA OF RWER lRRIGArnON SYSTEM "

WHEREAS, the Erarangay Officials was called by Engr, Pcdro 13. Lomubos, Jr, the Irrigation Supat.inrc~:ndentnt'hu-Uatutu MS,Cotnposlele, Cornyostela Valley Province to discuss r~g~~lding~hs~~S)PCSSCC\ rehab1iita~lc-m of the 8xis.tin.gsystem and constnlction of new irrigation fir~ililicsin cxpmsion ~uctlal I.lam\gh!hw~g,Mo~tevista, Compnstcla Valley Province;

WiJ.b:REAS, the Rilr''rul&Iy C:nplain with his Earangay Councilors beIieved md were convinced un the sincerity ol' NL1 in hclping the lunners improved their living condilion thr.ougl~irrigation cicvzlopmml prt-jras;

WTlXREtiS, it is imnclerstooc'l that during th: constsuction of prqject, both mitiar ~nd~rrajor dunogcs mtiy occur In Lhz r.rght of w3y. The b:wrigay officrals ore willi~to heip in the Kght of Way negot~atlrms; ~0814:24 NIA BATUTU

NOW 'I'lW.llII'F'OHL1:.on motir~nof Kagi~w:~~ih';u-iano t.:, I .ibn, iluly mconilcil by b;ay;w:u.l I.uis I ,um&hany, rc.so]vcd il is tirrt'chy ri:solvcil t , cncli~ssc!thc prc,p~)selluxpirnslL~n rd' irrigt~lior~ dc.vclnprnsn1.prr~jcct of N'1.4-Batutu KLS t.o tlcvcl 111 tha rica i-iclcls of ~a~utgay1.3anegb:hanag,

1ti;:SULW.nI:I!HTIG,:R, thai ~vhilLc ver 'lev r: -1p1~tclltahrnught by 7.1 1 A, thc bnrungny will no[. oppose, henix Siam c1.s will suppoll hepriicr;t;

Prepared by: Certilied Correct rlnd Approved: ~CG~JU~I~~L;UP 1!1k k'l1~~ll)l)ll~~ I'~.ovi~lcr:of' c"om~~i)alr;laValley A/Iunicipality of' C7ornpoalzl:\ /.- Ilnrangay 'jioctga - -

R.hRA.IYG,iY RI S(3T.T r'l: 1ON

GXCEI,U"1' FROhff TX1E hIINLTTlTf4 014 1'XIE CC)NST_lLfI'ATION XIEE'TINC BFTWEEfi THl? 13AJLWGh'L' OE'PlC!IALIS AND 1-A'HIVb:(:H IHRTGA'Z'ION SYS'TEM W1'1'11 THE N1:i KMGIONAT. OFT~lCEPERSONNEL HkGA$nINC VLl>.P KXPri.NSTON AREAS HE'1.n XI' UAT'IJTTJ RtS OE'k'LC!.K, PO13LAClON, CCIMPC)S'I'I':LA, ClOhlY( )S'l'ELA VA'T ,I ,EY YNOVINCJF', ON NOVEA>IDER21, 2006 A-ll 3;00h.h~l. 'J'C) 1:00 FNI.

hm, 'I 'OK'l'lL1,iLVO IJ'. \'Ii;ON'I'E, 3R =Yanr~ngBaranguy hlN. PE1,II'I NO \.'IDOR4 = Hnrungay Kciagawad hfR. JESUS PERAS01 , = Barangny Ki~gawtid AIR. ET)T I ,REH'l'UkW0S = nurangay Kaqawad Rim. HI F:NVENIUO .WED0 = Har~ngayKaganad 9W PANC'lLJISIO VILLAASON = Bilriingily linguwarl

MR. .TC'IV'k:N BA'I'ALON MS. CONCl1l'l'ii V1T;I ,,.\SON

Rcsc~lul.io~lNo25 Series of 2006

M'IIEREAS, lht?Harangay Ofiicials was ~i1llel.lby ling^^. 1"cclro R. Lomtitoa, Jr, the higation Supt.~.intzt~tfdVI &lA-U;tlul~~ RIS, Cornpostela?Composleln Valley Yrovincc ru (L~SGLISS ~-~g,;l~.Clil~.fi~lle11r0130~~d r'~hi~bililat.ior. of the existing: svslcn~and conshuction of nc.w irrigation fi\cilitics in cspstlsiot~area. i1.t. Barangay Siocon, C'oillpostzla, Composlcla I'allcy ~'IWI~~ICL':

WHKRKAS, llle Ui?ratlg,l.yC:i~p~ain with his Unsi1nga.y I-:o~~ncilombelieved and WCTC c;oflvir~ccclon Cltc s~n~crilyof NlA UI hclpitig UI e falmtrs improvc:cl their living condition ~hvughir~.igalii)n rlovelopnzrlt ~~rqjctils; LV'Ht!:H.EAS,ii. is UIIC(CI'YTO(:III 1.11a.1dut,ing 1hc consll-uctiotl of'project, both tuno or anil 111i!jo1.dd111agrs rnay i)i;cur in tli~riglu of way. ?'hi: 1jusnng;ty oilic;i,aleare willing to ltclp in [hi: TZ,igl:ll~01 Iv:'np. negut.iar.iur~r;

NOW 'l'IIk;!:Kh~!:r~'OHlC,011 nori ion of Kagavvad Rianvenitfo Acedo and duly secondcd by Kiigawi~ciJesus Yc~.asol.,fr. resolved as ir is ilcrchv tcsol~vcdIi) cndol-si! lilt: prnpased espsmiot~of i~~iga.tii)tldcvzlo~~tn~nt. project ol' hJT;tRatutu 1x1s lo develop llle rice ticld,s: i~fHnlhi!~$i~~f Siixon;.

I'scpal-CLIby: i..'c~.~ii',ietlclot,~cct and Approvccl: Republic of tha Philippics Province of i.:ompostela Valley h![unicipality of >dlon.tevi~trr Rarangay New Visayas

EXCERPT FROM T1%12MIN 1J'SU OF THE CONSIJLTATTON MI;:ISr1'LNC BETWEEN THE BARANCAY OI~YI(:lA.I~StWl? WiA-RATTJTI3 RIVMI? I.IU

&lE,VitRf,~Nf.~ M, &rv W 12 A 13'1 MK.RANIIY MON'I'RLBA MR. h1OIS ES IiIQlTIT bat,nAum SAMCWAN hilt. CONKADO JrZRhIE MR. RORElXTQ SAWN MR.YEDR (1 I J.&llAk'

"A RESOI.,lJTION k'OH 'ME E,IM)ORSl!MJ2NT OF NO OmC'170N NTOUT THE I M 1' i ,'l~~M'EN1'ATIONOF I'A.IZ'I"lC.'PATORY '1R.RlCG'I'I ON DEVELOI'M ICN'l' PRC)C;K,P;\/I (PnW) EXI'AVSION AF4EA OF NIA-13A'I'lI'I"I.l' KJ17FR 1:RlZLC~h'l'SON SI'S'TIShL"

WHEREAS, the l3~1.engayOi'l'icinls was cs. Izd by Eng. Pcdra li. I,omutos, Jr. the 1rrigati.o~ Supcsintcnclent of NIA-Baltrli~R.TS, Clnmpo:t.eln, Cvntpc>stclnValle,y Yruvincc to discuss regarding the popvscd rehabilitation of thc :xi$t,t)ngsystem tmci construction of new irrigation facilities in aspcmsion nrta at 'New Vistqus, Cvlnntevist~ Cornpostclrt V~lIeyProvince;

\VfIEHEAS,thc Bnratlgny (laplain with hi,s t3arfmgay Councilor$ helievad u~dwtr-c convincud on thc sincerity of N1'A in helping hc ktrn:et.s improved thcir I.tv~ngcondit.iim through irrigalivn devalop~ilc.ntprriects;

\IWFRTi.AS, it is unclsr.sto~7dth;41, during the construction of project, bod^ minor and major dun~;~~osmay rjL:CiiI. in [h~!righ~. r)t' wtiy 'I'h :. barsizg~lyofliclals al'r! will~ng1.0 help in dlc kght of Wt~yncg~itinf ions, r008 14:27 NIA BATUTU

NOW TlIEHEFO'HI?, on motion of Kngawnr! R.nndy Montnlbr,, duty st!condcd by Lapawell Moisw l.,iyuil, rcsolvfid as lr is hcrcby rc:solvec. to cndorsc U~L!]1r(lposdd cx}'~~nsionor irrigation dcvelopment prolcct of NUGBulutu HIS to develop the rice fields of Bwungay Nwvisayks;

HESOLVEl) t~T.JlC'1'1~I..f?R2that whu~avzrdzvc:opml!nls brc~~ghtby IgIA Iht. bal-n.ngnywill 11o1 oppose, hc1--1;:i!ltirn~ers ~ili suppon thc prc?jzct,:

Clertified Correct and Approved: NIA BATUTU

12cpublic of thc 1"hiliplsint;s I'rovincc l~lLClanlpv,utalnVallcy fvlur~icipality (1 t' ( Itrn~poalzlit I3ii1.ii11~~kqapan t

RSC:1fiM--TS FROM' '1:11X MI-M.TTF,S Ok' TIIE CONStIL'l'ATION htlRE'I'TNC .RE:TWEEP; TH F: L~~WUVC;I\I'OI+'k'LCIALS ANT) NIA-l3ATT.JTTJ RIVER IHRTCATION SJ'YTEM Wl'I'fi 'I'HE NT.4. WGAONAI, OFFICE: YERSONNFI, l

h~I,i;.hi[.4Ri.,l

'' A RESO.I,T.TTTC)N FOR THE INDOKST:R4ENT O'F' NO 013JKC~'rTCIN GROU'S 'I'11E PROPOSETI XXirANSION ARFA OF 'I'l.l'li: IhWLEMENThTTON 014' l'AR.'I'I~:LPA'l'ORY IRRTC:J\TTON .1)12V.i!:! AJYMENT PRC)OR.AM("IIIP) OF NIA HA'L'IJ'l'L' RIVER IRRTCAT'IQN SY S'L'EN!"

JVI.IERF,AS, llic H~~:;.mgayUfiiciillr~ wi!s c;;rllild by Eng. Pcrlro R, T..omutos, Jr. ,I,rrig;rtionSupzrintcndcnl c>J'1JId4-DahituKIS, i::onipoelt'la, Conlpostola Valley Province to discuss and ro intcra~lwith them about tl~cprc:)pc.)serl rehal>ilitatiotl of existing dam and convtniciio~iof dlr: itrignlion lbcilities for 116 cxpar~~icmarea in Uaru~gn:\iMaparat, Cortipostt'le, C'ompo~lelaValley Province;

WIIEKKAS, tllc Rarimgay Captain wid1 blc Haransay Councilors btlievec! and conuin~cclon the ?rinceri.tyuf NIA in hulpir: y :he F~~miersto inlprovc thcir living cotldition tllrougli il~igaiionprojz~t; .,dl 14:23 NIA BATUTU

WHKHKAS, it is understood tllut during lhc c;on~tr.\~r;tion,posaiblz damag~~both ~nqjor snd minut. distraclion may rwur in thc right ol' way. '1'11~barmgay otlicials arc dcrem~incclto help in the Xigl~tof Way ncgotinlicln and in whatever activities brought by it~igalionrlsalopment fbr i11c h~ncfitof each constituents;

WTIEREAS, tllu ~~fiymg;iyC.ouncil iue av,.arc on the chmge~in ti^ usual farming schedulcu during the prqiect conu~uclion;

NOW 'rHEHEPORE, on motion of' Kngawd Cirilo Bcrorl duly wecondad by Kagawad Ramon P. kk~&w~rc.eo~v~d as it ia Ikcrebq rcsolvcd b txkdor.rc tlic: pnl>osedexpansiorl of irrigation dc\~elol~n~cntprcgcct oi NIA-Ratutu TlIS to dcvelop the rice f3zl~1 of Uarlrngay Maparat.

RF,SOL\?llY) FUK'l'J:ITCT2, dlrrt whi~lc~crdewlopmcnt brought by N1,4 the Barangay will - not oppose hrncc fanners will benefit on lhit, ~nvj~cl.

Prrp~rrdby: C:ertlf cd Correct and Approved; BATf.r[T,T RIS FEDER4TION OF IRRIGATORS ASSOCTATION, INC. Compostela, Compostela Vdly Province

EXCERPT FROM TIIIEMINUTES OF TKE FEI)EMTION MEETIXC, OF NTA- BATLJ'lZT MVER ZWGATIQN SYSTEM HELD AT BATUTU RXS OFFTCE , COMPOSTELA, COMPOSTELA VALLm PROVINCE XI' 1: 00- 4100 PM, NO\TMBER 3,2006.

Mr. T .ud~inI]. Obcja = L,U.ILilE;r-A, Prcsidenl Mr. Rzmcgio 0 Cabcro - Ptt'vIAC AFIA, President hk. Bienvcnido NLlhinay, Sr. = BACO'FlCA, President hh. EIeseo Belocum =: MACmA, President Nh. Mailno Paco = PAB.4FI.4, Resident Mr. Lino G. Lenclio ==T,AAACAI?Ih, President Mr. Leonarclo C. dela Vtga =: GAR4 President - 'Mr. 'Edi~oEbora = PROVAFlA, President Mr. Julim C. Hormigas = SAJOFIA, President MIr. Sdvndor L. A_lmilla = LABAFIA, Prcsidcnt Mr. Rcynaldo L. GonArss - L,4BEFIA, Prcsidcnt h1I.r. Loranzo A. Bdoaloa = LASAFIA, President hh. Sulian Veloso = INOBURFLA, President Mr. Tofiliano V. Vigonk, Sr. = SD[;I.A, President

Absent: None

RJ3SOLUTIONNO. E.S.2006

" A RESOLUTION ZNDORSLVG SUPPORT FOR THE IMPLEMENTATION OF PARTICIPATORY IRRIGATION DEVELOPMENT PROSECT (PmP) OF THE NIA BATUT'LT RIVKR IRRIGATION SY STEW.

MmWAS, the Batutu RIS Federation of Ifl'igators' Association called an emergency m.eeti.ngupon request ot'tl~t:Irrigation Superintendent., Engr. Pedro 13. Lomutos, Jr. about the additional requir~lnenrsin securing Environinental Clearance, an endorse~nenl'from the sfisling LI Federation;

W]:3XKEA4S,the 'RATUT'IJ RIS Federation of Inigaton' Association are already aware of tl~cl~roposed in~proven~enl activities to bc undertaken through Participato~yhizatioiz Dcvclopmc~11Progr'm~ VIDP),

Yt:I-PEF!E,%S: we tho Presidents of esisring four~eon(14) Irrigators association of 13atutu US arc expressing our support and no objection fix whatevcr activtics to be unda-taken by thi? PmPI

~(J,+@EI 2008 08:19 FAX 082 221 6230 NIA REG XI

\\'HERE.QS, wx the Inigfors' Association Federatim of Batuhr NS will help in the Right of Way negotiation of the project and in whatever activities bought by inigatim development, NO!$? TIXEXWOm, ofon motion of E. Julim C. Hotmigas, SATOLARA, President. resolved as it is hereby resolved to endorse and support the proposed rehabilitation and hprovement activities PPTDP.

Unmnhnously approved.

Prepared by:, CE~TEIFIEDCORRECT AND APPROVED:

- AY, SR. LUD%&Bud% Federation Presldmt 1 ' 25-~E~-200816: 42 NIA BATUTU

liming kasnbutan gikirno tali sn NIB ug s~cl akc! . WW Pi4~G.a , nga ako mutugor ?;a 'cl;~~iay pagduhaduk~a.s a ;laghampa I;R akor~ggi- ok;upahan aga Sugar s uk?d sa Hjght - fif,- Way sa EM.

gilangkuban sa ak~rg, k.ab-c~tsp

Kkix~~kaaabuvln ghma 1 oa NTA ug sa 8ko Mr. ..---AI~CAJ~O-PM[LA. nga aka mutugot sa ~s~a!~pagduhaduha rr paglmwa iia aka- 51-okupshsn nga lugar rulod sa Right - af- Wqb? sa NlA*

sa l~agapametuodklrung petss. Abril-- Q, 2007... -.- diri Earangay f1aIl78:.y3, ilabi, C.~)rnp~~tcla.Campostele. Valley Provinca.