Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Continuing projects Compostela Valley, 1st Congressional District Compostela Valley 1st District 3,829,614 GAA

MFO I: National Road Network Services 2,636,774

I. National Roads : 901,449

A. Primary Roads 369,159

- Daang Maharlika 369,159

- Widening (into 6 lanes) including Drainage and 3.954 km and Increased length of national 170,660 RROW roads widened 0.666 km K1377+ -201-K1377+465 28,640 3.122 km K1377+883-K1381+000 131,880 0.166 km K1410+158-K1410+324 10,140

- Off-Carriageway Improvement: Paving of 9.296 km Montevista and Monkayo Increased length of off- 97,739 shoulder with Construction of Median and Laybys 0.178 km K1393+022-K1393+200 carriageway along national 1,801 1.149 km K1393+200-K1394+400 roads improved/constructed 10,171 (includes pedestrian overpass @ K1394+660 ) 0.374 km K1394+400-K1394+774 21,790 2.472 km K1410+031-K1412+500 19,124 0.181 km K1412+500-K1412+681 1,815 0.099 km K1412+702-K1412+801 1,246 0.360 km K1412+801-K1413+160 6,620 0.290 km K1413+160-K1413+450 6,305 4.193 km K1413+450-K1417+629 28,869

- Rehabilitation/reconstruction/ upgrading of 1.242 km Monkayo Increase length of damaged 37,260 damaged paved road 0.110 km K1382+027-K1382+137 paved road 3,300 0.200 km K1382+308-K1382+508 rehabilitated/reconstructed/ 6,000 0.562 km K1383+764-K1384+340 upgraded 16,860 0.370 km K1384+340-K1384+710 11,100

- Rehabilitation/ Reconstruction of National Roads 212.000 lm Decreased areas vulnerable to 63,500 with Slips, Slope Collapse, and Landslide slips, slope collapse and 10.000 lm K1445+650-K1445+660 landslides 5,500 20.000 lm K1445+550-K1445+570 8,000 10.000 lm K1445+270-K1445+280 5,000

19-1 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 20.000 lm K1444+950-K1444+970 7,000 20.000 lm K1444+600-K1444+620 7,000 70.000 lm K1443+050-K1443+120 13,000 32.000 lm K1442+990-K1443+010 9,000 10.000 lm K1442+700-K1442+710 3,000 20.000 lm K1427+200-K1427+220 6,000

B. Secondary Roads 308,460

- Montevista-Compostela-New - 119,630 -Mati Boundary Road - Widening (into 6 lanes) including drainage and 1.821 km Compostela Increased length of national 119,630 ROW K1424 + 040 - K1425 + 867 roads widened

- - Maragusan Road 157,330

- Widening (into 4 lanes) including drainage and 3.438 km Increased length of national 123,830 ROW K1440 + 757 - K1444+200 roads widened

Rehabilitation/ Reconstruction of National Roads 480.000 lm New Bataan/Maragusan Decreased areas vulnerable to 33,500 with Slips, Slope Collapse, and Landslide slips, slope collapse and 20.000 lm K1440+750-K1440+770 landslides 2,500 50.000 lm K1443+700-K1443+750 3,000 60.000 lm K1446+040-K1446+100 4,000 100.000 lm K1452+500-K1452+600 5,000 100.000 lm K1459+300-K1459+400 6,000 100.000 lm K1459+800-K1459+900 6,000 30.000 lm K1460+200-K1460+230 5,000 20.000 lm K1445+600-K1445+620 2,000

- Compostela - Cateel Road (Compostela Side) Rehabilitation/ Reconstruction of National Roads 590.000 lm Compostela Decreased areas vulnerable to 31,500 with Slips, Slope Collapse, and Landslide slips, slope collapse and 100.000 lm K1603+050-K1603+150 landslides 4,000 80.000 lm K1605+500-K1605+580 3,000 100.000 lm K1605+300-K1605+400 5,000 70.000 lm K1606+300-K1606+370 3,000 100.000 lm K1606+700-K1606+800 3,000 50.000 lm K1607+000-K1607+050 2,500 50.000 lm K1612+100-K1612+150 6,000 40.000 lm K1612+600-K1612+640 5,000

19-2 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

C. Tertiary Roads 223,830

- Montevista-Compostela-New Bataan- 179,330 Maragusan-Mati Boundary Road - Widening (into 4 lanes) including drainage incl 4.651 km New Bataan Increased length of national 153,330 ROW 2.744 km K1435 +237 - K1438 + 002 roads widened 85,320 0.757 km K1438 + 627 - K1439 + 384 23,510 1.150 km K1439 + 800 - K1441 + 000 44,500

Rehabilitation/ Reconstruction of National Roads 168.000 lm Decreased areas vulnerable to 26,000 with Slips, Slope Collapse, and Landslide slips, slope collapse and 25.000 lm K1457+050-K1457+075 landslides 8,000 23.000 lm K1457+100-K1457+123 6,000 40.000 lm K1460+500-K1460+540 3,000 50.000 lm K1460+550-K1460+600 5,000 30.000 lm K1463+400-K1463+430 4,000

- Montevista - DNAS Road Rehabilitation/ Reconstruction of National Roads 655.000 lm Decreased areas vulnerable to 44,500 with Slips, Slope Collapse, and Landslide slips, slope collapse and 60.000 lm K1415+500-K1415+560 landslides 3,000 50.000 lm K1415+700-K1415+750 3,000 40.000 lm K1415+800-K1415+840 3,000 100.000 lm K1416+700-K1416+800 4,500 30.000 lm K1417+200-K1417+230 2,500 25.000 lm K1418+800-K1418+825 2,000 50.000 lm K1420+200-K1420+250 3,500 40.000 lm K1421+100-K1421+140 4,000 20.000 lm K1421+600-K1421+620 2,000 30.000 lm K1421+800-K1421+830 2,500 50.000 lm K1422+000-K1422+050 4,000 30.000 lm K1422+300-K1422+330 3,000 30.000 lm K1431+100-K1431+130 2,500 100.000 lm K1432+800-K1432+900 5,000

19-3 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) 1,632,565

Increased accessibility/connectivity

- -Maragusan-Caraga Road incl. ROW, - Concreting including construction of 100 lm 12.838 km Maragusan & New Bataan 701,395 Compostela Valley bridge and ROW - Maragusan- Road (Maragusan - Concreting including ROW 0.461 km Maragusan 16,488 Section), incl. ROW, Compostela Valley - Monkayo-Boston Road, incl. ROW, Compostela Valley - Concreting including ROW 7.000 km Monkayo 272,838 - Monkayo-Compostela Road, incl. ROW, - Concreting including const. of 120 lm bridge and 8.890 km Monkayo-Compostela 452,987 Compostela Valley ROW - Montevista-DNAS Road (DNAS-Laak), incl. - Concreting including ROW 4.325 km Montevista 188,857 ROW, Compostela Valley

III. Bridges 102,760

Along Daang Maharlika :

- Maitum Bridge - Widening of bridge (into 6 lanes) and approaches 18.000 lm Monkayo Increased length of widened 46,000 (400 lm) including ROW K1377+465 - K1377+883 bridges along national roads - Olaycon Bridge - Replacement of bridge including approaches (419 40.000 lm Monkayo Increased length of replaced 56,760 lm) incl. ROW K1402+061-K1402+520 bridges along national roads

MFO 2: Flood Management Services 630,000 Decreased areas vulnerable to flooding - Construction of Flood Mitigation Facilities - Construction of Flood Control Facilities along a. Maragusan, Compostela Valley 2,309.000 km Maragusan 90,000 b. New Bataan, Compostela Valley 2,309.000 km New Bataan 90,000 c. Compostela, Compostela Valley 2,309.000 km Compostela 90,000 d. Montevista, Compostela Valley 2,309.000 km Montevista 90,000 e. Monkayo, Compostela Valley 2,309.000 km Monkayo 90,000 - Construction of Flood Mitigation Facilities - Construction of Flood Control Facilities along Manat River

a. Montevista, Compostela Valley 2,309.000 km Montevista 90,000 b. Monkayo, Compostela Valley 2,309.000 km Monkayo 90,000

MFO 3: Construction and Maintenance 482,840

19-4 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads leading to Tourism Destinations 482,840

- Bongkilaton Road leading to Mandaya - Concreting 1.840 km Brgy. Ngan, Compostela 64,400 Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley - Ngan Road leading to Mandaya Village, - Concreting 1.809 km Brgy. Ngan, Compostela 63,315 Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Compostela, Compostela Valley - Pasian Road leading to Agrotourism - Concreting 2.885 km Brgy. Pasian, Monkayo 75,125 Complex, Brgy. Pasian, Monkayo, Compostela Valley - San Jose Road leading to Awao Falls, Brgy. - Concreting 8.000 km Brgy. San Jose, Monkayo 280,000 San Jose, Monkayo, Compostela Valley

Other Local Roads 80,000 Increased Accessiblity/ Connectivity PAMANA/VIILP: : 80,000

- Km 28 to Thru cut of Panansalan, Compostela - Upgrading (gravel to concrete) 2.000 km Compostela 80,000

Compostela Valley, 2nd Congressional District Compostela Valley 2nd District 5,555,437 GAA

MFO I: National Road Network Services 4,428,225

I. National Roads : 1,160,903

A. Primary Roads 773,513

- Daang Maharlika 234,458 - Widening (into 6 lanes) including drainage and 2.991 km Nabunturan Increased length of national 124,640 RROW roads widened 1.433 km K1438+981-K1440+399 59,820 1.558 km K1444+500-K1445+1058 64,820

19-5 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- Off-Carriageway Improvement: Paving of 10.879 km Nabunturan and Mawab Increased length of off- 109,818 shoulder with Construction of Median and Laybys 0.498 km K1423+200-K1423+698 carriageway along national 5,241 0.435 km K1423+698-K1424+037 roads improved/constructed 4,958 0.218 km K1424+037-K1424+255 3,981 0.365 km K1424+255-K1424+620 9,205 0.080 km K1424+620-K1424+700 1,160 2.213 km K1433+818-K1436+000 15,959 (includes pedestrian overpass @ K1437+820) ) 1.991 km K1436+000-K1438+000 31,460 0.961 km K1438+000-K1438+961 9,325 4.118 km K1440+399-K1444+500 28,531

- Surigao- Oriental Coastal Road 539,055 - Widening (into 6 lanes) including Drainage and 6.973 km Pantukan-Mabini-Maco Increased length of national 539,055 RROW 1.480 km K1786+154-K1787+640 roads widened 56,800 2.036 km K1808+692-K1810+762 181,260 1.759 km K1806+537-K1808+246 121,565 (includes reconst. of inner 4 lanes) 1.698 km K1788+420-K1790+121 179,430

B. Secondary Roads 319,000

- Asuncion-San Isidro-Laak-Veruela Road 316,000 - Widening ( into 4 lanes) including drainage and ROW 5.200 km Laak Increased length of national 302,000 2.000 km K1494+000 - K1496+000 roads widened 95,000 2.000 km K1500+000 - K1502+000 95,000 1.200 km K1508+800 - K1510+000 112,000

- Rehabilitation/ Reconstruction of National Roads 149.000 lm Decreased areas vulnerable to 14,000 with Slips, Slope Collapse, and Landslide slips, slope collapse and 60.000 lm K1515+300-K1515+360 landslides 5,000 59.000 lm K1519+200-K1519+259 4,000 30.000 lm K1523+200-K1523+230 5,000

- Nabunturan-Mainit Park Road - Rehabilitation/ Reconstruction of National Roads 83.000 lm Nabunturan Decreased areas vulnerable to 3,000 with Slips, Slope Collapse, and Landslide slips, slope collapse and 83.000 lm K1432+200-K1432+283 landslides 3,000

19-6 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

C. Tertiary Roads 68,390

- Nabunturan-Mainit Park Road 68,390 - Widening ( into 4 lanes) including drainage and ROW 2.163 km Anislagan Section, Nabunturan Increased length of national 68,390 K1435+782 - K1437+958 roads widened

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) : 3,267,322

- Mawab-Maragusan-Caraga Road, - Concreting incl. ROW 10.548 km Mawab Increased 636,331 - Mawab-Maco Bypass Road incl. ROW, - Concreting incl. replacement of bridge (24.1 lm) 3.439 km Maco accessibility/connectivity 157,301 Compostela Valley and ROW - Montevista-DNAS Road (DNAS-Laak), incl. - Concreting incl. ROW 12.664 km Laak 571,228 ROW, Compostela Valley - Montevista (Jct Mayaon)-Laak Diversion Rd, - Concreting incl. ROW 5.951 km Laak 249,570 - Nabunturan-New Corella- Road, incl. - Concreting incl. ROW 8.158 km Nabunturan 312,364 - Maragusan-Pantukan Road (Pantukan - Opening/Concreting incl. ROW 2.000 km Pantukan 66,052 Section), incl. ROW, Compostela Valley - Nabunturan-Mawab Road, incl. ROW, - Concreting incl. ROW 0.937 km Mawab & Nabunturan 34,392 Compostela Valley - Laak- City Road incl. ROW, - Concreting incl. ROW 20.752 km Laak 800,000 - Nabunturan - Laak Road, Compostela Valley - Concreting incl. const. of 3 bridges (60 lm) 13.348 km Laak 440,084

MFO 2: Flood Management Services 190,000 Decreased areas vulnerable to flooding - Construction of Flood Mitigation Facilities - Construction of Flood Control Facilities a. Nabunturan, Compostela Valley 2,309.000 km Nabunturan 90,000 Kingking River: - Rechanneling/ Construction of Revetment with Pantukan - a. Ayan Section Sheet Piles 500.000 lm 50,000 - b. Mauswagon Section (R/S) 500.000 lm 50,000

MFO 3: Construction and Maintenance 300,640 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

19-7 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT I. Roads leading to Tourism Destinations 201,640

- Araibo Road leading to Salvosa Falls, Brgy. - Concreting 0.487 km Brgy. Araibo, Pantukan 21,915 Araibo, Pantukan, Compostela Valley

- Linda Road leading to Ecotourism Park, Brgy. - Concreting 0.568 km Brgy. Linda, Nabunturan 14,200 Linda, Nabunturan, Compostela Valley

- Magnaga Road Circuit leading to various - Concreting 2.799 km Brgy. Magnaga, Pantukan 69,975 Beach Resorts, Brgy. Magnaga, Pantukan, Compostela Valley - Mainit Road leading to Mainit Hotspring of - Concreting 1.322 km Brgy. Mainit, Nabunturan 33,050 Mainit Protected Landscape, Brgy. Mainit, Nabunturan, Compostela Valley - Mampising Road leading to Mabini Protected - Concreting 2.500 km Brgy. Tagnanan, Mabini 62,500 Landscape and Seascape Marine Center and various Beach Resorts, Brgy. Tagnanan, Mabini, Compostela Valley

II. Roads Leveraging Linkages of Industry and 99,000

- San Roque - San Isidro Road connecting to - Concreting 2.200 km Brgy. Araibo, Pantukan 99,000 Nabunturan Public Transport Terminal and Prk. 5, San Isidro Food Terminal, Nabunturan

Other Local Roads 636,572 Increased Accessiblity/Connectivity

PAMANA/VIILP: : 636,572

- Piasusuan-Binugsayan Road, Compostela - Concreting 5.000 km Pantukan 125,000 - Brgy. Mahayahay, Maragusan - Brgy. - Construction/ Opening (Gravel Road) 6.534 km Maragusan-Mabini 341,572 Singapore - Brgy. Anitapan - Brgy. Mascareg - Brgy. Cabuyuan, Mabini, Compostela Valley 2nd LD - Candinuyan-Junction Cambaratic - Barigyan, - Construction/ Opening/Rehab./ Improvement 1.700 km Mabini 85,000 Compostela Valley (Gravel Road)

- Candinuyan - Cambaratic, Brgy. Golden - Construction/ Opening/Rehab./ Improvement 1.700 km Mabini 85,000 Valley, Compostela Valley (Gravel Road)

Davao City, 1st Congressional District 1st District 8,629,381 GAA

19-8 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT MFO I: National Road Network Services 6,642,811

I. National Roads : 340,740

A. Primary Roads 214,033

- Davao- Rd (Davao City-Jct 75,768 Sect) - Improvement of junction/intersection 1.000 proj Junction at Davao-Cotabato Increased no. of 46,500 (Davao City-Jct. Digos Section) junction/intersection improved and Davao- Road (Jct. Ulas) - Off-carriageway impv't./construction (center Increased length of off- 29,268 island and layby) incl ROW carriageway along national roads improved/constructed 0.563 km UM Matina Section 18,148 K1512+712 - K1513+168 R/S 1.390 km Bangkal Section 11,120 K1516+529 - K1518+024

- Daang Maharlika (MN) 138,265

- Preventive Maintenance 1.305 km Davao City Increased length of national 58,725 (Asphalt Overlay with drainage structures) K1506+893-K1508+182 roads in good condition - Improvement/construction of drainage (lateral) 2,215.000 lm Victoria Plaza Section Increased length of drainage 79,540 incl. sidwewalk, curb & gutter improved/constructed/ 768.000 lm K1507+961 - K1508+722 upgraded/rehabilitated 26,880

Claveria (CM Recto) Section 507.000 lm K1509+180 - K1509+687 19,865 940.000 lm K1509+690 - K1510+625 32,795

B. Secondary Roads 126,707

- Davao City Diversion Road 52,444 - Preventive Maintenance 0.184 km Brgy. Ma-a Increased length of national 12,328 (Asphalt Overlay 6-Lanes with Corrections) K1506+911 - K1507+000 roads in good condition

- Off-carriageway impv't./construction (center 3.827 km Brgy. Ma-a Increased length of off- 30,616 island and layby) 3.422 km K1507+000-K1510+502 carriageway along national 27,376 Rehabilitation/ Reconstruction of National Roads 0.405 km K1510+540-K1510+945 roads improved/constructed 3,240 with Slips, Slope Collapse, and Landslide - 20.000 lm Brgy. Ma-a Decreased areas vulnerable to 9,500 (Installation of gabions and geoweb) 20.000 lm K1509+830-K1509+850 slips, slope collapse and 9,500 landslides

19-9 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- ABS-CBN Quimpo Blvd. Diversion Road 39,338 - Preventive Maintenance 1.714 km Brgy. Matina Crossing Increased length of national 31,090 (Asphalt Overlay 6-Lanes with Corrections) K1513+620 - K1515+343 roads in good condition

- Off-carriageway impv't./construction (center 1.031 km Brgy. Matina Crossing Increased length of off- 8,248 island and layby) K1514+187 - K1515+243 carriageway along national roads improved/constructed

- 5th Avenue 34,925 - Preventive Maintenance 1.111 km Sta. Ana Avenue Increased length of national 22,220 (Asphalt Overlay 4-Lanes with Corrections) K1510+-512 - K1510+599 roads in good condition - Improvement/construction of drainage (lateral 363.000 lm Sta. Ana Avenue 12,705 drainage going to outfall) K1510+236 - K1510+599 II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) : 5,871,498 Increased Accessiblity/ Connectivity - Davao City Coastal Bypass Road at Jct. - Const. of asphalt road (4 lanes) including Slope 3.747 km Bago Aplaya-Times Beach-Roxas 5,044,707 Davao-Cotabato Road-Bago Aplaya-Talomo- Protection (seawall), Const. of one bridge (21 lm) Avenue Section Matina Aplaya-Roxas Avenue-Sta. Ana and partial construction of bridge (650 lm), site Wharf-R. Castillo (Bago Aplaya-Times Beach- development/structure/landscaping and ROW Roxas Avenue-Sta. Ana Wharf-R. Castillo), including ROW, Davao City - Davao City Diversion Road Extension to Toril, - Widening of road and bridge (70.08 lm) including 2.723 km Bangkal-Talomo-Puan Section 761,142 Bangkal-Talomo-Puan Section, Davao City, ROW (Jct. Dvo. City Diversion Road - Jct. Dvo. Bukidnon Road and Jct. Dvo. Bukidnon Road- Jct. - Dvo. Cotabato Old Rd Sections), incl. Bridge and ROW - Alternate Road from Region XI to Region X - Construction of additional lane width 1.431 km Davao City 17,172 (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak- Cabanglasan-Aglayan, Malaybalay), incl. ROW, Davao City - Jct. Davao City Diversion Road(Matina Pangi - Concreting, Widening, Rehab./Reconst. & Bridge 5.675 km Davao City 48,478 Section)-Matina Pangi Road-Sitio Toril-Jct. Widening incl. Drainage and RROW Cat. Grande Road incl. ROW, Davao City

III. Bridges 430,573

- Matina Bridge along Davao-Cotabato Road - Reconstruction/ Upgrading (6 lanes) of Bridge 28.250 lm Brgy. Matina Crossing Increased length of bridges 75,000 (Davao City-Jct Digos Sect) including Approaches (200.00 lm) with RROW and K1516+201-K1516+429 widened/reconstructed along Pedestrian Overpass national roads

19-10 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Pangi Bridge along Davao City Div Rd - Widening (4 into 6 lanes) of Bridge including 100.600 lm Brgy. Matina Crossing 109,573 Approaches (199.4 lm) and ROW K1513+775-K1514+082

Along Davao-Cotabato Road (DC-Jct. Digos Section) - Talomo Br. 2 - Replacement of Bridge (into 3 lanes) incl ROW 40.000 ln.m. K1518+519 - K1518+559 123,000 - Talomo Br. 1 - Reconstruction of Bridge (into 3 lanes) incl ROW 40.000 ln.m. K1518+519 - K1518+559 123,000 MFO 2: Flood Management Services 1,873,400 Decreased areas vulnerable to flooding Davao River: - Davao River Flood Control, Bolton Bridge, - Installation of Gabions and Mattressess 980.000 lm Brgy. Ma-a 100,000 - Davao River Flood Control, Bolton Bridge - Construction of Reinforced Concrete Revetment 620.00 lm Brgy. 76 100,000 Downstream Section, Sta. 0+710 - Sta. on Steel Sheet Piles 1+330, Left Bank - Davao River Flood Control, Bolton Bridge Downstream - Construction of Reinforced Concrete Revetment 620.00 lm Brgy. 76 100,000 on Steel Sheet Piles Section, Sta. 1+830 - Sta. 2+450, Right Bank

- Davao River Flood Control, San Rafael - Installation of Gabions and Matresses 1,200.000 lm Brgy. Ma-a, San Rafael Section 100,000 Section, Sta. 6+465 - Sta. 7+065 - Davao River Flood Control, Brgy. 19-B, - Installation of Gabions and Matresses 1,200.000 lm Brgy. 19-B, Ventusa Section 100,000 Ventusa Section - Davao River Flood Control, Midland-Maa - Installation of Gabions and Mattresses 1,200.000 lm Brgy. Ma-a, Midland-Ma-a 100,000 Section, Sta. 5+100 - Sta. 5+700 Section

- Davao River Flood Control, Gem Village Section - Installation of Gabions and Mattresses 240.00 lm Brgy. Ma-a 20,000 GEM Village Section - Davao River Flood Control, Jade Valley - - Installation of Gabions and Mattresses 600.00 lm Brgy. Ma-a 50,000 Davao River Bridge Section Jade Valley - Davao River Bridge Section - Davao River Flood Control, Generoso Bridge - Construction of Reinforced Concrete Revetment 300.00 lm Brgy. 5-A 50,000 Section, Sta. 2+415 - Sta. 2+715, Left Bank on Steel Sheet Piles - Davao River Flood Control, Generoso Bridge - Construction of Reinforced Concrete Revetment 620.00 lm Brgy. 5-A 100,000 Section, Sta. 2+830 - Sta. 3+450, Left Bank on Steel Sheet Piles Matina River: - Brgy. Matina Pangi, Davao City - Construction of Riverbank Protection 520.000 lm Matina Pangi Section 52,000 - Matina River Flood Control, Kadayawan - Installation of Gabions and Mattresses 490.00 lm Kadayawan Section 50,000 Section - Matina River Flood Control, Kawayan Drive - Installation of Gabions and Mattresses 100.00 lm Kawayan Drive Outfall 70,000 Outfall, Sta. 0+310 - Sta. 1+100, Left Bank

19-11 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Matina River Flood Control, Davao Savings - Installation of Gabions and Mattresses 500.00 lm Brgy. Matina Pangi 50,000 Portion - Matina River Flood Control, Lopez Bridge - Installation of Gabions and Mattresses 490.00 lm Brgy. Matina Crossing, 50,000 Section Matina River Flood Control, Matina Aplaya - Installation of Gabions and Mattresses 800.00 lm Matina Aplaya Section 70,000 - Section Sta. 1+300 - Sta. 2+100, Left Bank Matina River Flood Control, Matina Aplaya - Installation of Gabions and Mattresses 600.00 lm Matina Aplaya Section 50,000 - Section Sta. 4+750 - Sta. 5+350, Left Bank - Matina River Flood Control, Nuestra Señora - Installation of Gabions and Mattresses 600.00 lm Nuestra Señora Urban Poor 50,000 Urban Poor Subdivision Section Subdivision Section

Talomo River: - Talomo River Flood Control, Kadayawan - Installation of Gabions and Mattresses 700.00 lm Kadayawan Section 50,000 Section - Talomo River Flood Control, Talomo Proper - Installation of Gabions and Mattresses 500.00 lm Talomo Proper 50,000

- Talomo River Flood Control, NHA Section - Installation of Gabions and Mattresses 490.00 lm NHA Section 50,000

Bago River : - Bago River Flood Control, Bago Aplaya - Installation of Gabions and Mattresses 600.00 lm Bago Aplaya Section 50,000 Section

- R. Magsaysay Catchment/Drainage Area - Impv't. of drainage 600.000 lm Brgy. 31 20,000 protecting R. Magsaysay Ave. - 5th Avenue - Impv't. of drainage 1,000.000 lm Jct. Sales to Outfall 35,000 - Improvement/Rehab. of Boulevard - Improvement of drainage to outfall 800.000 lm Quezon Boulevard Maindrain at 20,000 Maindrain at San Pedro Extension San Pedro Extension - Improvement/Const. of Drainage along Tulip - Improvement/Const. of Drainage 500.000 lm Tulip Drive 30,000 Drive, Davao City - Improvement/Rehabilitation of Drainage - Improvement/Rehabilitation of drainage 2,040.000 lm Jct. Tulip Drive – Jct. Ecoland 61,200 along ABS-CBN Quimpo Boulevard Diversion Terminal Road (Jct. Tulip Drive – Jct. Ecoland Terminal), Davao City - Improvement/Rehabilitation of Drainage - Improvement/Rehabilitation of Drainage 350.00 lm Brgy. Matina Crossing 20,000 along Davao-Cotabato Road (GSIS Heights Section), Matina - Construction/Improvement of Drainage - Construction of Drainage 1,000.00 lm Junction Davao-Cotabato Old 20,000 along Davao Cotabato Old Road (Junction Road - San Lorenzo Village Davao-Cotabato Old Road - San Lorenzo

19-12 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Construction/Improvement of Drainage, Jct. - Construction/Improvement of Drainage 320.000 lm Victoria Plaza Section - Veloso St. 35,200 Daang Maharlika Rd (MN), Victoria Plaza Section - Veloso St. up to outfall, Davao City

- Construction/Improvement of Drainage, Jct. - Construction/Improvement of Drainage 1,200.000 lm Lacson St. - N. Torres St. - Loyola 30,000 Daang Maharlika Rd (MN), Lacson St. - N. St. to Dacudao Avenue (outfall) Torres St. - Loyola St. to Dacudao Avenue (outfall), Davao City - Improvement/Rehabilitation of Jct. - Improvement/Rehabilitation of Drainage 500.000 lm Davao City Diversion Road 30,000 Magsaysay Avenue. - Jct. 5th Ave. (Guerrero St.), Davao City - Improvement/Rehabilitation of Drainage - Improvement/Rehabilitation of Drainage 300.000 lm Davao - Cotabato Old Road - 25,000 along Davao-Cotabato Old Rd to Davao- Davao - Cotabato Road Cotabato Rd to outfall - Improvement/construction of Drainage - Improvement/construction of drainage (going to 700.000 lm Brgy. Matina Crossing 35,000 along Davao City Diversion Road to outfall outfall) K1514+900 - K1515+000, up to outfall - Improvement/Rehabilitation of along R. - Installation of pump, flood gate power house, 1.000 proj R. Magsaysay Ave. 50,000 Magsaysay Ave. Outfall sump pit and other accessories

MFO 3: Construction and Maintenance 113,170 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism

I. Roads leading to Tourism Destinations 113,170

- Jct. Davao City Diversion Road-Matina Pangi - Construction of 3 bridges (95 lm) 0.095 km Brgy. Matina Pangi 81,500 Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City - Ponciano St.-Bangoy St. -Jacinto Extension - Concreting/Improvement 0.323 km Brgy. 11 12,920 St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands- Central Bank- F. Torres St., Davao City

- Jct. Davao-Cotabato Road, San Antonio St. - - Concreting/Improvement 0.750 km Brgy. Matina Crossing 18,750 4th St. -Kawayan Drive leading to Pasalubong Center (Apo ni Lola), Brgy. Matina Crossing, Davao City

19-13 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT Davao City, 2nd Congressional District Davao City 1st District 3,618,025 GAA

MFO I: National Road Network Services 2,382,227

I. National Roads : 611,035

A. Primary Roads 378,040

- Daang Maharlika 378,040 - Widening (into 6 lanes) including drainage, 1.259 km Brgy. Bunawan-Brgy. Buhangin Increased length of national 22,033 sidewalk, curb & gutter and RROW 1.163 km K1485+949-K1487+109 (R/S) roads widened 20,353 0.096 km K1487+109-K1487+205 1,680

- Improvement/construction of drainage (lateral 120.000 lm Panacan Section Increased length of drainage 2,485 drainage) 98.000 lm K1497+229 - K1497+327 R/S improved/constructed/ 1,715 22.000 lm K1497+716 - K1497+738 upgraded/rehabilitated 770

- Improvement/construction of drainage (lateral 1,380.000 lm Lanang Section Increased length of drainage 48,300 drainage) incl. sidewalk, curb & gutter 904.000 lm K1504+082 - K1505+000 improved/constructed/ 31,640 Bajada Section upgraded/rehabilitated 476.000 lm K1506+417 - K1506+893 16,660

- Preventive Maintenance (Rehab./Replacement of 0.323 km Bryg. Bunawan-Brgy. Tibungco Increased length of national 942 Slab) 0.323 km K1487+618 - K1487+941 roads in good condition 942

- Preventive Maintenance 7.607 km Brgy. Bunawan - Brgy. 19-B Increased length of national 304,280 (Asphalt Overlay inner 4 lanes with Corrections) 1.419 km K1486+000 - K1487+405 roads in good condition 56,760 4.209 km K1488+000 - K1492+200 168,360 0.768 km K1498+597 - K1499+387 30,720 1.211 km K1505+682 - K1506+893 48,440

B. Secondary Roads 24,935

- Davao City Diversion Road 24,935 - Preventive Maintenance 0.063 km Brgy. Tigatto Increased length of national 3,780 (Asphalt Overlay with Corrections, 6 lanes) K1506+680-K1506 + 743 roads in good condition Increased length of off- - Off-carriageway impv't./construction (paving of 2.839 km Brgy. carriageway along national 21,155 shoulder, center island and layby) Communal/Buhangin/Tigattto roads improved/constructed

19-14 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 1.571 km K1502+804-K1504+305 12,568 0.499 km K1504+700-K1505+192 3,992 0.163 km K1505+192 - K1505+355 L/S 815 0.250 km K1505+355 - K1505+605 2,000 0.356 km K1505+605 - K1505+961 L/S 1,780

C. Tertiary Roads 208,060

- Mabuhay-Pañalum-Paquibato Road 60,860 - Rehabilitation/Reconstruction of National Road 0.862 km Mabuhay - Pañalum-Paquibato Increased length of national 25,860 Road roads K1524+-051-K1524+811 rehabilitated/reconstructed - Construction of Retaining Wall 0.100 km Mabuhay - Pañalum-Paquibato Decreased areas vulnerable to 35,000 Road slips, slope collapse and K1527+780 - K1527+880 landslide

- Fatima-Malabog 147,200 - Installation of Gabions and Geoweb 0.222 km Fatima-Malabog Road Decreased areas vulnerable to 147,200 0.033 km K1501+267 - K1501+300 L/S slips, slope collapse and 25,400 0.106 km K1502+239 - K1502+345 landslide 82,000 0.023 km K1503+896 - K1503+919 L/S 12,500 0.030 km K1504+225 - K1504+255 R/S 17,300 0.030 km K1508+420 - K1508+450 L/S 10,000

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) : 1,709,777 Increased accessibility/connectivity - Malagamot Road-Jct Mudiang Road Bypass, - Paving of shoulders including drainage 6.524 km Davao City 88,577 Davao City - Alternate Road from Region XI to Region X - Opening/Concreting/Rehab./Reconst. including 14.709 km Davao City 761,240 (Jct Davao City Diversion Road-Catalunan construction of 4 bridges (190 lm) and ROW Grande-Talandag-Sumimao-Panalum-Tapak- Cabanglasan-Aglayan, Malaybalay), incl. ROW, Davao City - Mahayag-Gatungan-Callawa Diversion Road, - Concreting including ROW 2.172 km Davao City 144,520 incl. ROW, Davao City - Fatima-Malabog Road (Malabog-Gumitan), - Opening/Concreting incl. ROW 9.260 km Brgy. Marahan and Brgy. 615,440 incl. ROW, Davao City Gumitan - Jct. Daang Maharlika (Jct. Bunawan Section) - - Concreting of Road 2.850 km Davao City 100,000 Eliong- Jct. Acacia Road, Davao City

III. Bridges 61,416

19-15 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- Bunawan Bridge along Daang Maharlika (MN) - Widening of bridge (into 6 lanes) including 45.400 lm Bunawan Increased length of bridges 61,416 approaches (400.6 lm) and ROW K1487+205 -K1487+651 widened along national roads MFO 2: Flood Management Services 1,025,000 Decreased areas vulnerable to flooding Davao River: - Davao River, Tigatto Section (Jade Valley) , - Installation of Gabions and Mattresses 1,024.000 lm Brgy. Tigatto 100,000 - Davao River Basin, Tigatto Flood Control, Left - Installation of Gabions and Mattressess 1,185.000 lm Brgy. Tigatto 100,000 - Davao River Basin, Waan Flood Control, - Installation of Gabions and Matresses 1,046.000 lm Brgy. Waan 100,000 Right Bank, Davao City

Lasang River: - Lasang River, Paquibato Proper Section, - Installation of Gabions and Mattressess 1,000.000 lm Brgy. Paquibato 100,000 Davao City - Lasang River Flood Control, Lasang Section, - Construction of Concrete Revetment 620.000 lm Brgy. Lasang 100,000 Davao City

Bunawan River: - Bunawan River, Sta. 2+487 - Sta. 3+687, - Installation of Gabions and Mattresses for Slope 1,200.000 lm Brgy. Bunawan 100,000 Right Reach, Left Bank, Davao City Protection and Cut-off Channel

Panacan River: - Panacan River, Sta. 2+000 - Sta. 2+500, Right - Installation of Gabions and Mattressess 500.000 lm Panacan Section 40,000 Reach, Right Bank , Davao City

- Panacan River, Sta. 2+000 - Sta. 2+500, Right - Installation of Gabions and Mattressess 500.000 lm Panacan Section 40,000 Reach, Left Bank , Davao City

- Panacan River, Sta. 2+380 - Sta. 3+330, Left - Installation of Gabions and Mattressess 950.000 lm Panacan Section 75,000 Reach, Right Bank, Davao City

- Improvement of Drainage along R. Castillo - 700.000 lm Brgy. Agdao 20,000 Installation of RCCP/Box Culvert to Outfall Street - Daang Maharlika, Maindrain - Impv't. of drainage 2,000.000 lm Pampanga 50,000

- Malabog Creek Flood Control, Fatima- - Installation of Gabions and Mattressess 1,300.000 lm Malabog Section 50,000 Malabog Road, Davao City - Construction/Improvement of Drainage - Construction/Improvement of Drainage 500.000 lm Coaco Section 50,000 along Daang Maharlika Road Jct. Coaco up to outfall, Davao City - Improvement/Rehabilitation of Sasa Creek - Installation of pump, flood gate power house, 1.000 proj Sasa Section 100,000 sump pit and other accessories

MFO 3: Construction and Maintenance 210,798

19-16 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

I. Roads leading to Tourism Destinations 210,798

- Malabog-Paquibato Road leading to - Concreting 4.666 km Brgy. Malabog 69,990 Megkawayan Peak Resort, Brgy. Malabog, Davao City - Jct. Fatima-Malabog Road leading to - Concreting, rehab./reconst and construction of 1.110 km Malabog 70,000 Megkawayan Peak Resort, Malabog, Davao one bridge (20 lm) including road slope City protection structure - Crossing Mahayag Road leading to Safari - Concreting 1.496 km Brgy. Mahayag 26,928 Land Crocodile Park, Mahayag, Davao City - Coaco Road leading to Coaco Beach Resort, - Construction/Rehabilitation/ Improvement of 0.471 km Brgy. Pampanga 14,130 Brgy. Pampanga, Davao City Road including Drainage

- Jct. Acacia Road - New leading - Concreting/Drainage Improvement and Box 1.130 km Brgy. Acacia 29,750 to Safari Land Crocodile Park, Brgy. Acacia, Culvert Davao City

Davao City, 3rd Congressional District Davao City 3rd District 3,168,159 GAA

MFO I: National Road Network Services 2,428,288

I. National Roads : 998,335

A. Primary Roads 936,410

- Davao-Cotabato Road (Davao City-Jct Digos 90,262 Sect) - Rehab./Reconst. 1.020 km Lizada and Bunawan Increased length of national 2,550 roads 0.701 km K1526+626 – K1527+340 rehabilitated/reconstructed 1,753 0.227 km K1531+676 – K1531+903 568 0.092 km K1531+903 – K1532+000 230

- Preventive Maintenance 1.831 km Toril-Lizada Increased length of national 73,240 (Asphalt Overlay 100mm with corrections, 4 lanes) 0.200 km K1525+(-200) – K1525+000 roads in good condition 8,000 0.583 km K1525+000 – K1525+583 23,320 1.048 km K1525+583 – K1526+626 41,920

19-17 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

Sirawan-Binugao - Preventive Maintenance 1.809 km K1529+604 – K1530+733 Increased length of national 14,472 (Slab Replacement) roads in good condition

- Davao-Bukidnon Road 846,148 - Widening (into 4 lanes) including ROW 1.940 km Baganihan/Calinan/Los Amigos Increased length of national 107,313 0.774 km K1632+000-K1632+774 roads widened 52,632 0.581 km K1634+379-K1634+960 39,508 0.303 km K1680+384-K1680+687 (L/S) 5,303 0.282 km K1690+072-K1690+354 9,870

- Rehab./Reconst./Upgrading (Asphalt to Concrete) 7.476 km Salumay-Marilog Increased length of national 224,280 2.558 km K1629+120 – K1631+760 roads rehabilitated/ 76,740 1.114 km K1631+875 – K1632+974 reconstructed 33,420 1.554 km K1643+900 – K1645+450 46,620 1.014 km K1680+338 – K1681+350 30,420 1.236 km K1686+840 – K1688+120 37,080

- Rehabilitation/ Reconstruction of National Roads 992.000 lm Baganihan and Marilog Decreased areas vulnerable to 135,300 with Slips, Slope Collapse, and Landslide (Slope 36.000 lm K1626+105 - K1626+141 landslides/road slips 5,000 Protection) 105.000 lm K1629+040 - K1629+145 14,000 165.000 lm K1629+085 - K1629+250 22,500 84.000 lm K1630+651 - K1630+735 11,500 107.000 lm K1631+000 - 1631+107 14,600 161.000 lm K1631+362 - K1631+523 22,000 100.000 lm K1631+523 - K1631+623 13,700 53.000 lm K1631+792 - K1631+845 7,300 121.000 lm K1631+945 - K1632+051 16,500 60.000 lm K1659+600 - K1659+660 8,200

- Impv't of intersection/junction 2.000 proj Davao City 40,000 1.000 proj Jct. Deca Homes (Near Mintal Increased no. of 20,000 1.000 proj Jct. Calinan-Baguio-CadalianGym), K1695+525 Rd junction/intersection improved 20,000 (Near One Network Bank), - Off-Carriage Way impv't./const. (Paving of 20.817 km Davao - Bukidnon Road Increased length of off- 312,255 Shoulder) 4.122 km K1624+072 - K1628+173 carriageway along national 61,830 3.800 km K1638+1008 - K1642+795 roads constructed/improved 57,000 1.875 km K1659+360 - K1661+167 28,125 1.022 km K1664+726 - K1665+686 15,330 1.503 km K1671+225 - K1672+728 22,545

19-18 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 0.210 km K1673+010 - K1673+220 3,150

6.801 km K1673+605 - K1680+384 102,015 1.484 km K1680+687 - K1682+169 22,260

- Preventive Maintenance 0.675 km Increased length of national 27,000 (Asphalt Overlay 100mm with corrections) 0.675 km K1621+(-315) – K1621+360 roads in good condition 27,000

B. Tertiary Roads 61,925

- Calinan - Baguio - Cadalian 56,961 - Widening (into 4 lanes) including ROW 0.091 km Increased length of national 2,730 0.052 km K1687+935 - K1687+987 (L/S) roads widened 1,560 0.039 km K1688+029 - K1688+068 (L/S) 1,170

- Preventive Maintenance 0.246 km Toril-Lizada Increased length of national 3,690 (Asphalt Overlay) 0.246 km K1684+-783– K1684+-246 roads in good condition 3,690

- Off-Carriage Way impv't./const. (Paving of 3.369 km K1695+140 - K1698+461.43 Increased length of off- 50,541 Shoulder) carriageway along national roads constructed/improved - Eden - Tagurano - Off-Carriage Way impv't./const. (Paving of 0.331 km 4,964 Shoulder) 0.102 km K1537+460.09 - K1537+562 Increased length of off- 1,529 0.229 km K1537+575 - K1537+804 carriageway along national 3,435 roads constructed/improved

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) : 1,429,953

- Davao-Bukidnon Highway (Calinan - Const. of slope protection 0.300 km Davao City Increased 51,510 Portion) to Dalagdag-Fatima National Road accessibility/connectivity to , incl. ROW, Davao City - Jct Davao-Cotabato Road (Bangkal Section)- - Concreting incl. completion of bridge (45 lm) (4 0.727 km Davao City 125,677 Catalunan Grande Road-Jct Davao-Bukidnon lanes) ROW Road (Mintal Section), incl. ROW and Bridge, Davao City - Davao-Bukidnon Road(Jct. Marahan)-Brgy. - Concreting, rehab./reconst. , and construction of 6.558 km Davao City 550,147 Gumitan-Jct.Fatima-Malabog Road incl. 3 bridges (214 lm) including ROW ROW, Davao City

19-19 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Alternate Road from Region XI to Region X - Concreting and construction of additional lane 13.855 km Davao City 291,750 (Jct Davao City Diversion Road-Catalunan width including ROW Grande-Talandag-Sumimao-Panalum-Tapak- Cabanglasan-Aglayan, Malaybalay, incl. ROW and Bridge, Davao City

- Jct. Calinan-Baguio-Cadalian Rd (Baguio - Concreting incl. ROW 0.419 km Brgy. Baguio Proper 10,589 Proper-Wines-Magpet Bdry), Davao City

- Jct. Davao-Bukidnon Rd (Calinan Section) - - Opening/Concreting including const. of two 6.578 km Davao City 400,280 Wangan-Subasta-Tagakpan-Tungkalan- bridges (125 lm) incl. ROW Tagarano-Bayabas-Catigan-Baracatan- Sibulan Road, Davao City

MFO 2: Flood Management Services 340,000 Decreased areas vulnerable to Lipadas River: flooding - Lipadas River, Lizada, Davao City - Concrete Revetment on Steel Sheet Piles 200.00 lm Lizada 50,000

- Lipadas River, Crossing Bayabas, Davao City - Concrete Revetment on Steel Sheet Piles 200.00 lm Crossing Bayabas 50,000

- Lipadas River, Lobogan, Davao City - Concrete Revetment on Steel Sheet Piles 200.00 lm Lobogan 50,000

Talomo River: - Talomo River, Riverside-Tugbok Section, Davao -CityConcrete Revetment on Steel Sheet Piles 250.00 lm Riverside 50,000 - Talomo River, Calinan Section, Davao City - Concrete Revetment on Steel Sheet Piles 250.00 lm Calinan 40,000

Wangan River: - River Training Works at Wangan River - Construction of Waterway 800.000 lm Wangan, Calinan 50,000 (Downstream Section), Wangan, Calinan, Davao City

- River Training Works at Suawan River - Construction of Waterway 400.00 lm Suawan, Marilog 50,000 (Downstream Section), Suawan, Marilog, Davao City

MFO 3: Construction and Maintenance 399,871

19-20 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

I. Roads leading to Tourism Destinations 399,871

- Manambulan- UP Road, Tugbok - Concreting 0.622 km Manambulan 15,540 District, Davao City

- Jct. Davao - Bukidnon Road (Lacson Section) - Concreting including additional lane width 2.338 km Calinan and Baguio Districts 39,431 through Gumalang - Malagos Road leading to Sanctuary, Calinan and - Jct.Baguio Davao Districts, - Bukidnon Davao Road City (Lacson Section) - Concreting including additional lane width 10.605 km Calinan and Tugbok Districts 118,712 through Dacudao - Talomo River - Riverside - Los Amigos - Ula Road to Tacunan leading to DECA Wakeboard, Calinan and Tugbok Districts, Davao City - Jct. Davao - Bukidnon Road (Datu Salumay - Construction of concrete road including 5.069 km Marilog District 151,380 Section) to Sitio Patag leading to Hill's View drainage/flood control Mountain Resort, Marilog District, Davao City

- Jct. Davao - Bukidnon Road (Highway Tugbok - Construction of additional lane width and bridge 1.161 km Brgy. Tugbok 30,088 Proper) to Tacunan leading to DECA replacement (19 lm) Wakeboard, incl. Bridge, Brgy. Tugbok, Davao City - Jct. Davao - Bukidnon Road (Marahan, - Construction of concrete road including 2.271 km Brgy. Marilog, Marilog District 44,720 Marilog Proper Section) leading to D.A. rehab./reconst. Stockfarm, Brgy. Marilog, Marilog District, Davao City

Davao Del Norte, 1st Congressional District 1st District 8,690,074 GAA

MFO I: National Road Network Services 5,081,740

I. National Roads : 2,289,490

A. Primary Roads 1,143,504

- Daang Maharlika (Agusan-Davao Road) 794,144

19-21 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Widening (into 6 lanes) including drainage & 1.045 km Tagum City Increased length of national 99,776 slope protection and ROW K1446+-006-K1447 + 040 roads widened

- Improvement/construction of drainage 17,476.860 lm Tagum City Increased length of drainage 524,306 improved/constructed/ 6,981.000 lm K 1459 + 280.50 - K1462 + 900 209,430 upgraded/rehabilitated (B/S) 1,464.260 lm K1455 + 297 - K1456 + 061.13 43,928 (B/S) 1,216.000 lm K1454+131 - K1455 + 297 (L/S) 36,480 1,509.600 lm K1453 + 373.20 - K1454+131 (B/S) 45,288 6,306.000 lm K1450+134 - K1453+264 B/S 189,180

- Offcarriageway Improvement (sidewalk, curb and 3.260 km K1459 + 510.67 - K1462+900 78,240 gutter and bicycle lane)

- Preventive Maintenance (Asphalt Overlay with 1.855 km. K1458+158 - K1460+000 91,823 correction, 80mm)

- Surigao-Davao Coastal Rd 349,360 - Widening (into 6 lanes) including drainage & 2.974 km Tagum City Increased length of national 200,000 slope protection and ROW K1823 + 512 - K1826 + 480 roads widened

- Preventive Maintenance (Asphalt Overlay with 110,880 Corrections, 4 lanes), 100mm 1.618 km K1822 + -797 - K1822 + 821 Increased length of national 56,630 1.000 Km K1825 + 000 - K1826 + 000 roads in good condition 35,000 0.550 km K1827 + 503 - K1828 + 044 19,250

- Improvement/construction of drainage and ROW 1,924.000 lm (B/S) Tagum City Increased length of drainage 38,480 (includes length going to outfall) K1826 + 480 - K1827+453 improved/constructed/ upgraded/rehabilitated

B. Secondary Roads 1,145,986

- Kapalong-Talaingod-Valencia (Bukidnon) 359,980 Road - Widening (into 4 lanes) including drainage and 2.433 km Kapalong Increased length of national 145,980 ROW 1.382 km K1487+000 - K1488+382 roads widened 82,920 0.299 km K1492+418 - K1492+717 17,940 0.752 km K1493+158 - K1493 + 910 45,120

19-22 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- Rehabilitation/ Reconstruction of National Roads 9,149.500 sq.m. Talaingod Decreased areas vulnerable to 214,000 with Slips, Slope Collapse, and Landslide (Slope 620.000 sq.m. K1493+329 - K1493+360 slips, slope collapse and 15,000 Protection) 762.500 sq.m. K1503+880 - K1503+910.50 landslide 20,000 682.000 sq.m. K1503+938 - K1503+969 20,000 160.000 sq.m. K1515+990 - K1516+110 10,000 500.000 sq.m. K1519+830 - K1519+880 12,000 2,700.000 sq.m. K1519+920 - K1520+110 35,000 2,025.000 sq.m. K1520+250 - K1520+331 30,000 700.000 sq.m. K1520+380 - K1520+410 20,000 1,000.000 sq.m. K1520+650 - K1520+690 30,000 270.000 sq.m. K1489+200 - K1489+245 12,000 186.000 sq.m. K1490+100 - K1490+131 10,000

- Asuncion-San Isidro-Laak-Veruela Rd - Widening (into 4 lanes) including drainage and 10.168 km Asuncion Increased length of national 381,500 RROW 0.849 km K1478+008-K1478+857 roads widened 31,888 1.385 km K1479+981-K1481+366 51,988 5.884 km K1481+402 - K1487 + 286 220,700 2.050 km. K1489 + 000 - K1491 + 050 76,925

- Tagum-Panabo Cirumferential Road 225,356 - Widening (into 4 lanes) including drainage and 2.081 km Asuncion/Kapalong Increased length of national 92,188 RROW 2.081 km K1472+113 - K1473+1262 roads widened 92,188

- Improvement/Construction of drainage including 4,568.000 lm Tagum City Increased length of drainage 98,212 RROW improved/constructed/ 0 4,568.000 lm K1457 + (-913) - K1458 + 321 upgraded/rehabilitated 98,212 (B/S) Off Carriageway Improvement 2.913 km K1469 + 000 - K1471 + 903 (B/S) Increased length of off- 34,956 carriageway along national roads constructed/improved - Tagum City Diversion Road Increased length of national 179,150 - Widening (into 4 lanes) including drainage and 1.177 km Tagum City roads widened 95,078 ROW K1457 + 604 - K1458 + 750 Increased length of off- - Off - Carriageway Improvement (Curb and Gutter 1.763 km. Tagum City carriageway along national 42,312 and Sidewalk) K1455+(-551) - K1456 + 138 roads constructed/improved Preventive Maintenance (Asphalt Overlay with Tagum City Increased length of national - corrections 80mm) 1.044 km K1455+030 - K1456+000 roads in good condition 41,760

19-23 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) : 1,333,250

Increased accessibility/connectivity - Tagum City Bypass Road (Canocotan-San - Concreting (4 lanes) and widening incl. ROW 7.691 km Tagum City 344,770 Miguel-Pagsabangan), incl. ROW, Davao del Norte

- Alternate Road from Region XI to Region X - Opening/Concreting incl. ROW 11.593 km Davao Del Norte 488,480 (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak- Cabanglasan-Aglayan, Malaybalay), incl. ROW and Bridge, Davao del Norte - Carmen-Tagum City Coastal Road, incl. ROW, - Concreting incl. ROW 6.982 km Tagum City 500,000 Carmen, Tagum City, Davao del Norte

III. Bridges 109,000 Increased length of national bridges widened - Maniki Jumbo Bridge Along Tagum - Panabo - Widening (2 into 4 lanes) of Bridge including 178.400 lm Kapalong 109,000 Circumferential Road approaches (completion)

IV. Flyovers/Interchanges/Underpasses 1,350,000

- Tagum City Flyover along Agusan-Davao - Construction of flyover (completion) including 525.000 lm Tagum City 1,350,000 Road, Davao del Norte approaches (1.075 km), impvt. f app andslope protection MFO 2: Flood Management Services 1,530,000

Saug River: - Saug River, Protecting Tagum-Panabo - Const. of conc. revetment with steel sheet piles 554.00 lm Asuncion 100,000 Circumferential Road, Asuncion, Davao del Norte

- Construction of Revetment along Saug River - Const. of conc. revetment with steel sheet piles 554.00 lm Asuncion 100,000 Cambanogoy Asuncion, Davao del Norte

Tagum-Libuganon River: - Tagum - Libuganon Flood Control, - Const. of conc. revetment with steel sheet piles 1,720.00 lm Tagum City 200,000 Capungagan Section, Davao del Norte

19-24 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Construction of Dike along Tagum Libuganon - Construction of Earthdike 18,750.00 lm Tagum City 330,000 River Brgy. Bincungan - Brgy. Busaon, Tagum City, Davao del Norte Hijo River: - Hijo River Flood Control (Downstream of Hijo - Const. of conc. revetment with steel sheet piles 644.00 lm Tagum City 100,000 Bridge), Tagum City, Davao del Norte - Hijo River Flood Control (Upstream of Hijo - Const. of conc. revetment with steel sheet piles 572.00 lm Tagum City 100,000 Bridge), Tagum City, Davao del Norte - Construction of Hijo River Flood Control with Const. of conc. revetment with steel sheet piles 1.00 proj Tagum City 500,000 Promenade from Brgy. Magdum - Brgy. Est - and promenade - Rehabilitation of San Isidro Creek protecting - Construction of Lined Canal 1.00 proj Tagum City 100,000 Agusan - Davao Road

MFO 3: Construction and Maintenance 1,695,324 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads leading to Tourism Destinations 763,584

- Davao del Norte-Compostela Valley-Agusan - Concreting 3.119 km San Isidro & Kapalong, Davao del Norte 112,284 del Sur road leading to various tourism sites, San Isidro, Davao del Norte - Access Road leading to Tagum Energy Park, - Construction of concrete road including 3.334 km Brgy. Madaum, Tagum City 100,000 Brgy. Apokon to Hijo Resources to Lanikai construction of bridge (60 lm) Boutique Hotel and Banana Beach, Brgy. Madaum, Tagum City, Davao Del Norte

- Access Road leading to Tribal Village, Tibyun - Concreting 3.060 km New Corella 100,000 Cave, San Miguel Cave and Paradise Cave, New Corella, Davao Del Norte - Brgy. Liboganon Road leading to Local Beach - Concreting 1.752 km Brgy. Liboganon, Tagum City 60,000 Resorts, Brgy. Liboganon, Tagum City, Davao Del Norte - Dagohoy-Sitio Paition Road leading to - Concreting 3.000 km Brgy. Dagohoy, Talaingod 100,000 Pabahay sa , Brgy. Dagohoy, Talaingod, Davao Del Norte

19-25 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Panas, Carcor-Patrocenio to El Salvador to - Concreting 5.490 km Brgy. Carcor, New Corella 192,150 Nabunturan leading to Tinagong Busay Cave and View Deck and Balaang Bukid, Brgy. Carcor, New Corella, Davao Del Norte

- Sitio Pandulian, Mabantao-Florida-Suaon - Concreting 2.490 km Kapalong 99,150 Road leading to Kapalong Woodland Resort, Kapalong, Davao Del Norte

II. Roads Leveraging Linkages of Industry and 931,740 Trade (ROLL IT) - Asuncion-New Alegria-Cuambogan Road - Concreting 3.794 km Asuncion 96,811 connecting Asuncion Overland Transport Terminal in support of Coconut and Banana Industries, Asuncion, Davao del Norte - New Corella-Guadalupe-Del Monte - Concreting 4.700 km New Corella 155,098 connecting New Corella Overland Transport Terminal in support of Cacao, Coconut, Banana and Rubber Industry, New Corella, Davao del Norte - NRJ Sagayen-Sonlon Road, incl. bridge, - Concreting 13.655 km Tagum City 477,925 connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte - NRJ Surigao Davao Coastal Road to Hijo - Concreting 5.769 km Tagum City 201,906 Cadastral connecting Tagum City Overland Transport Terminal in support of Business Processing Outsourcing, Coconut Farm and Renewable Energy Industries, Tagum City, Davao del Norte Other Local Roads 383,010 Increased Accessiblity/ Connectivity PAMANA/VIILP: 23.160 383,010

- Patil-Kapatagan Road, Davao Del Norte - Opening 11.556 km San Isidro/Kapalong 208,010 - Jct. Sto. Niño-Gatong-Igang-Butay- - Concreting 4.847 km Talaingod 175,000 Nasilaban, Brgy. Palma Gil, Talaingod, Davao Del Norte

Davao Del Norte, 2nd Congressional District Davao Del Norte 2nd District 3,181,812 GAA

MFO I: National Road Network Services 1,786,907

19-26 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT I. National Roads : 1,530,907

A. Primary Roads 758,940

- Daang Maharlika (Agusan-Davao Road) 758,940 - Widening ( 6 into 10 lanes) including ROW 2.075 km Panabo City Increased length of national 99,600 roads widened 1.160 km K1476+722 - K1477+885 55,680 0.915 km K1478+140 - K1479 + 043 43,920

- Improvement/construction of drainage 11,889.984 lm (B/S) Carmen and Panabo Increased length of drainage 356,700 improved/constructed/ 3,311.120 lm (B/S) K1471 + 468 - K1473+077.56 99,334 upgraded/rehabilitated 4,972.864 lm (B/S) K1474+351 - K1476+816.432 149,186 1,776.000 lm (B/S) K1476+994 - K1477+885 53,280 1,830.000 lm (B/S) K1478+140 - K1479 + 043 54,900

- Off-Carriageway Improvement (sidewalk, curb 9.210 km Carmen - Panabo Section Increased length of off- 221,040 and gutter) carriageway along national 1.615 km K1468+000 - K1469+596 38,760 roads improved/constructed 7.595 km K1471+468 - K1479 + 043 182,280

- Preventive Maintenance (Asphalt Overlay with 1.360 km Panabo Increased length of national 81,600 Corrections, 6 lanes) roads in good condition 0.807 km K1469+000 - K1469+807 48,420 0.096 km K1476 + 722 - K1476 + 818 5,760 0.457 km K1479 + 043 - K1479 + 500 27,420

B. Secondary Roads 643,363

- Tagum-Panabo Circumferential Road 370,869 - Widening (into 4 lanes) including drainage and 7.308 km Panabo City Increased length of national 170,925 ROW 3.383 km K1487 + 906 - K1491+351 roads widened 84,575 1.222 km K1507 + 404 - K1508 + 617 26,884 0.342 km K1509+058 - K1509+400 7,524 0.474 km K1511+109 - K1511+583 10,428 1.887 km K1516+100 - K1518+033 41,514

- Preventive Maintenance (Slab Replacement) 4.539 km Panabo City Increased length of national 6,300 4.539 km K1518 + 006 - K1522+560 roads in good condition 6,300

19-27 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Off - carriageway improvement (Sidewalk, curb 5.241 km Sto. Tomas/Panabo City Increased length of off- 125,784 and gutter, paving of shoulder) 2.392 km K1493+1009 - K1496 + 470 carriageway along national 57,408 2.849 km K1523+000 - K1525 + 828 roads improved/constructed 68,376

- Improvement/construction of drainage including 3,393.000 lm Panabo City Increased length of drainage 67,860 outfall improved/constructed/ 3,393.000 km K1525 + 661 - K1525 + 828 upgraded/rehabilitated 67,860

- Babak - Samal - Kaputian Road 272,494

- Widening (into 4 lanes) including drainage and 3.942 km IGaCoS Increased length of national 197,100 RROW K1505 + 000 - K1509 + 000 roads widened - Preventive Maintenance (Asphalt Overlay with 3.278 km IGaCoS 75,394 correction 80mm) 0.994 km K1506 + 000 - K1507 + 000 Increased length of national 22,862 1.317 km K1507 + 617 - K1509 + 000 roads in good condition 30,291 0.967 km K1515 + 000 - K1516 + 000 22,241

C. Tertiary Roads 128,604

- Carmen-DAPECOL Cmpd Rd 128,604 - Widening (into 4 lanes) including reconst. 2 lanes 2.572 km Carmen Increased length of national 56,584 and drainage and ROW (app. Of Mangalcal Br.) ) 0.728 km K1477 + 680 - K1478 + 400 roads widened 16,016 1.330 km K1478 + 812 - K1480 + 176 29,260 0.514 km K1480 + 586 - K1481 + 080 11,308

- Preventive Maintenance (Asphalt Overlay with 3.601 km Carmen Increased length of national 72,020 corrections) 0.524 km K1473 + 479 - K1474 + 000 roads in good condition 10,480 0.763 km K1477 + 739 - K1478 + 494 15,260 1.727 km K1479 + 000 - K1480 + 790 34,540 0.587 km K1482 + 353 - K1482 + 940 11,740

II. Bridges 256,000 Increased length of national bridges widened/reconstructed/ strengthened/rehabilitated Along Daang Maharlika: - Tuganay Bridge along Daang Maharlika - Reconst. (into 6 lanes) including app. (411.65 lm) 54.350 lm Carmen 216,000 incl. ROW K1469+596-K1470+168 - Lasang Bridge - Completion of bridge (Widening including 55.650 lm Lasang, Panabo City 40,000 approaches and RROW App.=125.35 lm) K1482+836-K1482+1017

19-28 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

MFO 2: Flood Management Services 233,000

- Lasang River Flood Control (Upstream of - Construction of Concrete Revetment on Steel 661.000 lm Panabo 100,000 Lasang Bridge), Panabo, Davao del Norte Sheet Piles - Mangalcal Bank Protection along Carmen- - Const. of bank protection 503.000 lm Carmen 48,000 Dapecol Compound Road - Tuganay - Libuganon and Mag Creek - Rehabilitation of Earth Dike 357.140 lm Tuganay 10,000 Protection Dikes - Tuganay River Purok 10, D5 & D6, Pawas, - Widening/Deepening 5,000.000 lm Tuganay 75,000 Brgy. B.E. Dujali, Davao del Norte

MFO 3: Construction and Maintenance 1,161,905 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry

I. Roads Leading to Declared Tourism 978,405

- Island Garden City of Samal (IGACOS) - Opening/Improvement/ Concreting 15.308 km Island Garden City of Samal, 900,000 Circumferential Road, Davao del Norte Davao del Norte - Sitio Pasog-Licup-Tagbitan-ag-Sitio Tagluna - Concreting 2.000 km Island Garden City of Samal, 62,000 Road leading to Puting Bato and Canibad Davao del Norte Resort, Brgy. Aundanao, Island Garden City - Panabo City Coastal Road, Panabo City, - Concreting 0.490 km Panabo City 16,405 Davao del Norte

II. Roads Leveraging Linkages of Industry and 183,500 Trade (ROLL IT)

- Guadalupe-Lower Tuganay Road connecting - Concreting 6.021 km Tagum City 183,500 Carmen Overland Transport Terminal in support of Banana and Coconut Industries, Tagum City, Davao del Norte

Davao Del Sur 4,811,855 GAA

MFO I: National Road Network Services 3,713,042

19-29 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT I. National Roads : 1,342,637

A. Primary Roads 1,165,887

- Davao-Cotabato Road (Davao City-Jct Digos 113,960 Sect) - Widening (into 6 lanes) including drainage and 0.400 km Sta. Cruz & Digos City Increased length of national 22,000 ROW 0.400 km K1563+000-K1563+400 roads widened 22,000

- Rehab./Reconst. /Upgrading 0.898 km Sta. Cruz Increased length of national 17,960 (Asphalt to Concrete) 0.279 km K1534+(-)983-K1534+(-)704 roads rehabilitated/ 5,580 (Concrete Reconstruction) 0.619 km K1554+393-K1555+000 reconstructed 12,380 0 - Impv't. of intersection/junction 2.000 proj Increased no. of 20,000 1.000 proj Jct. Digos Diversion Jct., K1561 + junction/intersection improved 10,000 220 1.000 proj Jct. Davao - Cotabato Bypass 10,000 Rd, K1550 + 254

- Construction of Overpass 3.000 proj 54,000

1.000 proj Inawayan ES Increased no. of pedestrian 18,000 K1534+(-225) overpass 1.000 proj Astorga NHS Increased no. of pedestrian 18,000 K1539+950 overpass 1.000 proj Bato (Apolinar Franco ES) Increased no. of pedestrian 18,000 K1557+500 overpass

- Davao-Cotabato Road (Jct Digos Sect- 505,180 Cotabato Sect)

- Asphalt Overlay (with corrections) 14.894 km Matanao/Bansalan Increased length of national 446,820 0.671 km K1571 + 500 - K1572 + 138 roads in good condition 20,130 2.116 km K1574 + 561 - K1576 + 668 63,480 0.524 km K1578 + 776 - K1579 + 294 15,720 1.374 km K1580 + 000 - K1581 + 434 41,220 10.209 km K1583 + 000 - K1593 + 057 306,270

- Rehab./Reconst 2.177 km Digos/Matanao Increased length of national 58,360 0.695 km K1567 + 000 - K1567 + 695 roads rehabilitated/ 13,900 1.482 km K1570 + 000 - K1571 + 500 reconstructed 44,460

- Digos-Makar Road 546,747

19-30 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Rehab./Reconst. /Upgrading 1.902 km Hagonoy/Sulop Increased length of national 38,040 (Asphalt to Concrete) 0.631 km K1567 + 518 - K1568 + 000 roads rehabilitated/ 12,620 (Concrete Reconstruction) 0.799 km K1585 + 000 - K1585 + 799 reconstructed 15,980 (Concrete Reconstruction) 0.472 km K1588 + 532 - K1589 + 000 9,440

- Construction of Overpass 2.000 proj Increased no. of pedestrian 36,000 1.000 proj Guihing CES overpass 18,000 K1572+607 1.000 proj Padada NHS 18,000 K1575+839

- Off-carriageway Improvement/Construction 10.407 km Hagonoy 98,867 (paving of shoulders including 3.616 km K1568+336-K1571+933 34,352 warning/informatory signs) including drainage 6.791 km K1572+006-K1578+761 64,515

- Preventive Maintenance (Asphalt Overlay (with 6.228 km Digos/Hagonoy/Padada 186,840 corrections) 0.118 km K1567 + 400 - K1567 + 518 3,540 3.513 km K1572 + 507 - K1576 + 000 105,390 2.062 km K1581 + 953 - K1584 + 000 61,860 0.535 km K1587 + 936 - K1588 + 462 16,050

- Rehabilitation/ Reconstruction of National Roads 320.000 lm Decreased areas vulnerable to 187,000 with Slips, Slope Collapse, and Landslide (Slope 160.000 lm K1588+050-K1588+210 slips, slope collapse and 88,000 160.000 lm K1589+150-K1589+330 landslide 99,000

B. Secondary Roads 96,750

- Digos Diversion - Asphalt Overlay (with corrections) 1.344 km Digos Increased length of national 68,190 0.120 km K1562 + 000 - K1562 + 120 roads in good condition 7,200 0.415 km K1562 + 120 - K1562 + 535 12,450 0.325 km K1562 + 535 - K1562+860 19,500 0.484 km K1564 + 100 - K1564 + 584 29,040

- Davao Coastal Rd. (Malalag-Malita- 28,560 JAS) - Asphalt Overlay (with corrections) 0.670 km Increased length of national 20,100 0.670 km K1590 + 484 - K1591+156 roads in good condition 20,100 Increased length of national - Rehab./Reconst. 0.925 km roads rehabilitated/ 18,500 reconstructed 0.502 km K1584 + (-235) - K1584 + 267 10,040

19-31 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 0.423 km K1592+160-K1592+583 8,460

C. Tertiary Roads 80,000 - Bansalan-Mt Apo Natl Park Rd 80,000 - Off-carriageway Improvement/Construction 5.726 km Bansalan Increased length of off- 70,000 (paving of shoulders including K1586 + 080-K1592+000 carriageway along national warning/informatory signs) roads improved/constructed

- Construction of Drainage structure 5,000 lm Bansalan Increased length of drainage 10,000 K1594+292-K1596+710 improved/constructed/ upgraded/rehabilitated

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) 2,110,965

Increased accessibility/connectivity - Matanao-Kiblawan-Padada Road, incl. ROW, - Concreting including ROW 24.070 km Matanao, Kiblawan & Padada, 770,796 Davao del Sur

- Jct Padada (along Digos-Makar Road) – - Concreting , Widening (2 into 4 lanes) including 16.367 km Padada & Kiblawan 500,000 Kiblawan – Jct Malungon (along Digos-Makar ROW Road) Bypass Road, Davao del Sur - Jct Matanao (along Davao-Cot. Road) – New - Concreting , Widening (2 into 4 lanes) including 12.130 km Matanao & Hagonoy 550,000 Visayas – Jct Hagonoy (along Digos-Makar ROW Road) Bypass Road, incl. ROW, Davao del Sur - Jct Matti (along Davao-Cot. Road) – Jct - Widening (2 into 4 lanes) including ROW 5.975 km Matanao & Hagonoy 190,169 (along Digos-Makar Road) Bypass Road, incl. ROW, Davao del Sur - Jct. Davao - Bukidnon Road (Calinan Section) - Concreting incl. ROW 3.000 km Baracatan and Kapatagan, Davao 100,000 With funding under - Baracatan - Sibulan - Tibolo - Kapatagan del Sur 2018 but under Davao Road incl. ROW, Davao del Sur City (Road traverses DC and DDS)

III. Bridges 259,440

- Digos Bridge 1 along Digos-Makar Road - Replacement (into 4 lanes) including approaches 45.000 lm Digos City Increased length of national 128,940 incl. ROW bridges widened/ reconstructed - Cebulan Bridge along Davao-Cotabato Rd - Widening (4 into 6 lanes) including approaches 25.000 lm Digos City Increased length of national 45,000 (Davao City-Jct Digos Sect) (400 lm) incl. ROW K1536+673-K1537+091 (L/S) bridges widened 0-252 (R/S) - Coronon Bridge along Davao-Cotabato Rd - Widening (4 into 6 lanes) including approaches 35.000 lm Digos City Increased length of national 55,000 (Davao City-Jct Digos Sect) (883 lm) incl. ROW K1543+074-K1544+047 bridges widened

- Balutakay Bridge along Davao-Cotabato Rd - Widening (4 into 6 lanes) 30.000 lm Digos City Increased length of national 18,000 (Davao City-Jct Digos Sect) K1568+497-K1568+527 bridges widened 192-222

19-32 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Matti Bridge I along Davao-Cotabato Rd - Widening (2 into 3 lanes) 25.000 lm Digos City Increased length of national 6,250 (Davao City-Jct Digos Sect) K1569+201-K1569+226 bridges widened

- Matti Bridge II along Davao-Cotabato Rd - Widening (2 into 3 lanes) 25.000 lm Digos City Increased length of national 6,250 (Davao City-Jct Digos Sect) 201-226 bridges widened MFO 2: Flood Management Services 2,990.000 650,000 Decreased areas vulnerable to flooding

Digos River: - Ruparan Section - Construction of Concrete Revetment 700.00 lm Digos City 30,000 - Tres de Mayo Section - Construction of Concrete Revetment 480.00 lm Digos City 50,000 - Tres de Mayo Section (Ebreo Bridge) - Construction of Concrete Revetment 250.00 lm Digos City 50,000 - Digos Bridge 1 Section - Construction of Concrete Revetment 300.00 lm Digos City 40,000 - Digos Bridge 2 Cogon Section - Construction of Concrete Revetment 140.00 lm Digos City 26,000 - Dike at Brgy. Aplaya - Construction of Concrete Revetment/Dike 300.00 lm Digos City 50,000 - Digos Bridge 2 Aplaya Section - Construction of Concrete Revetment 140.00 lm Digos City 26,000 - Digos River (Zone I Section) - Construction of Concrete Revetment 400.00 lm Digos City 70,000

Padada River - Padada-Mainit River, Guihing, Hagonoy - Construction of concrete revetment 400.00 lm Hagonoy 100,000

- Malalag Flood Control - Construction of Concrete Revetment 1,335.00 lm Malalag 100,000 - Miral River - Construction of Concrete Revetment 600.00 lm Bansalan 20,000 - SPAMAST River Control Protection (along - Construction of Concrete Revetment 250.00 lm Digos City 20,000 Matti River) - Balutakay River - Construction of Concrete Revetment 350.00 lm Hagonoy 50,000 - Jct. Digos-Makar, Balutakay Section - Construction/Upgrading/Rehabilitation of 1,800.00 lm Hagonoy 15,000 Drainage Outfall - Jct. Dav.-Cot. Rd. , Sinawilan Section - Construction/Upgrading/Rehabilitation of 180.00 lm Hagonoy 3,000 Drainage Outfall

MFO 3: Construction and Maintenance 448,813 Services of Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads leading to Tourism Destinations 315,000

19-33 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- Access Road leading to Lao Integrated Farms- - Concreting including additional lane width 4.500 km Brgy. Eman, Bansalan 100,000 Mt. Apo Trail-Balutakay Waterfalls, Brgy. Eman, Bansalan, Davao del Sur - Access Road leading to Viewing Deck and - Concreting 0.508 km Brgy. Kapatagan, Digos Cit 15,000 Support Facilities at Brgy. Kapatagan, Digos City, Davao del Sur - Jct. Tres De Mayo-Brgy. Goma Road leading - Concreting including additional lane width 7.000 km Brgy. Goma, Digos City 100,000 to Mahilak Falls, Brgy. Goma, Digos City, Davao del Sur - Padada-Piape-Palili Circumferential Road - Concreting including additional lane width 4.000 km Brgy. Piape, Padada 100,000 leading to Scuba Diving, Beach Resorts, Mangrove Plantations, Brgy. Piape, Padada,

II. Roads Leveraging Linkages of Industry and 133,813 Trade (ROLL IT)

- Brgy. Poblacion-Brgy. Dalawinon connecting - Concreting 5.122 km Magsaysay 133,813 to Brgy. Kasuga in support of Meat Processing, Magsaysay, Davao del Sur

Davao Occidental 3,306,662 GAA

MFO I: National Road Network Services 1,259,162

I. National Roads : 482,300

A. Secondary Roads 252,093

- Davao Del Sur-Sarangani Coastal Road 252,093 (Malalag-Malita-JAS-Glan Road) - Preventive Maintenance (Slab Replacement) 2.876 km Basiawan, Sta. Maria Increased length of national 43,140 Biton, Don Marcelino roads in good condition 0.994 km K1612 + 000 - K1613 + 000 14,910 0.996 km K1615 + 000 - K1616 + 000 14,940 0.886 km K1681 + 000 - K1681 + 886 13,290

19-34 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Rehabilitation/ Reconstruction of National Roads 392.000 lm Don Marcelino & Jose Abad Decreased areas vulnerable to 208,953 with Slips, Slope Collapse, and Landslide Santos slips, slope collapse and (Slope Protection) landslide

20.000 lm K1670+650 - K1670+670 (R/S) 5,440 92.000 lm K1672+583 - K1672+675 (L/S) 102,733

70.000 lm K1631+850-K1631+920(R/S) 9,360 40.000 lm K1673+860-K1673+900(L/S) 32,400 30.000 lm K1673+930-K1673+960(L/S) 24,300 40.000 lm K1693+100-K1693+140(L/S) 10,720 100.000 lm K1707+680-K1707+780(L/S) 24,000

B. Tertiary Roads 230,207

- Highway Jct. Mana-Ticulon-Lagumit-Little - Concreting including ROW 2.391 km Malita 130,310 Baguio Road 0.554 km K1658+776-K1659+376 Increased length and 30,193 0.100 km K1659+406-K1659+506 percentage of paved national 5,450 0.034 km K1668+251-K1668+285 roads 1,853 0.978 km K1673+958-K1675+087 53,301 0.339 km K1675+112-K1675+451 18,476 0.386 km K1675+717-K1675+1103 21,037

- Demoloc-Little Baguio- Road 99,897 - Concreting including ROW 1.566 km Malita Increased length and 76,087 0.125 km K1657+133-K1657+258 percentage of paved national 6,075 0.208 km K1657+296-K1657+504 roads 10,109 0.200 km K1662+000-K1662+200 9,720 0.320 km K1662+680-K1663+000 15,552 0.713 km K1671+287.423-K1672+000 34,631 - Rehabilitation/ Reconstruction of National Roads 80.000 lm Malita Decreased areas vulnerable to 23,810 with Slips, Slope Collapse, and Landslide 22.000 lm K1649+059 - K1649+081 (R/S) slips, slope collapse and 4,440 (Slope Protection) 12.000 lm K1649+312 - K1649+324 (R/S) landslide 1,280 10.000 lm K1650+820 - K1650+830 (L/S) 5,400 25.000 lm K1652+770 - K1652+795 (L/S) 6,750 11.000 lm K1654+300 - K1654+311 (L/S) 5,940

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) 776,862 Increased accessibility/connectivity

19-35 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - Bolila-Kibalatong-Bito-Mana Diversion Road - Concreting, Bridge Construction (1-100 Lm) incl. 2.849 km Malita 162,666 incl. ROW, Davao Occidental RROW - Talagutong-Baluntaya-Ticulon-Little Baguio - Opening including Construction of Bridge (1-100 4.755 km Malita 218,497 Diversion Road incl. ROW, Davao Occidental Lm) and ROW

- Demoloc-Little Baguio-Alabel Road incl. - Opening including Construction of Bridge (1-60 7.386 km Brgy. Datu Danwata - Brgy. Kisoy 395,699 ROW, Davao Occidental Lm) including ROW

MFO 2: Flood Management Services 1,628,000 Decreased areas vulnerable to flooding - Lacaron Proper Flood Control - Construction of Concrete Revetment 700.00 lm Malita 28,000 - Tical Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Lapuan Flood Control - Construction of Concrete Revetment 800.00 lm Don Marcelino 32,000 - Kilalag Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Fatima Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Demoloc Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Lagumit Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Kinangan Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 40,000 - Biton Flood Control - Construction of Concrete Revetment (RC Cut-off 1,000.00 lm Don Marcelino 35,000 - Buhangin Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 1,430.00 lm Malita 50,000 - Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 1,430.00 lm Jose Abad Santos 50,000 - Butulan Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 2,000.00 lm Jose Abad Santos 70,000 - Culaman Flood Control - ConstructionWall) of Concrete Revetment (Steel Sheet 1,000.00 lm Malita 85,000 - Lais Flood Control - ConstructionPiles) of Concrete Revetment (RC Cut-off 2,000.00 lm Malita 70,000 - Lamidan Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 2,000.00 lm Sta. Maria 70,000 - Luayon Flood Control - RechannelingWall) of River 1,000.00 lm Don Marcelino 35,000 - Nuing Flood Control - Construction of Concrete Revetment (RC Cut-off 2,000.00 lm Jose Abad Santos 70,000 - Pangian Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 2,000.00 lm Malita 70,000 - Pongpong Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 4,000.00 lm Sta. Maria 140,000 - Sanghay Flood Control - ConstructionWall) of Concrete Revetment (RC Cut-off 2,000.00 lm Malita 70,000 - Lawa Flood Control - ConstructionWall) of Concrete Revetment 2,000.00 lm Don Marcelino 70,000 - Lacaron Flood Control - Construction of Concrete Revetment 2,800.00 lm Malita 98,000 - Sitio Balas Flood Control - Construction of Concrete Revetment 300.00 lm Malita 10,000 - New Argao-Tingolo Flood Control - Construction of Concrete Revetment 830.00 lm Malita 100,000 - Kumasie Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 35,000 - Felis Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 35,000 - Bolila Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 50,000 - Culibao Flood Control - Construction of Concrete Revetment 1,000.00 lm Malita 35,000 - Bankerohan Seawall - Construction of Concrete Revetment 600.00 lm Malita 60,000 - Pamana Seawall - Construction of Concrete Revetment 200.00 lm Malita 20,000

19-36 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

MFO 3: Construction and Maintenance 419,500 Services of Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads Leading to Declared Tourism 412,000

- Access Road leading to Arizona Beach Resort - Concreting 2.280 km Brgy. Lacaron, Malita 74,000 and various beaches, Brgy. Lacaron, Malita, Davao Occidental - Access Road leading to Brgy. Ogpao various - Concreting 2.400 km Brgy. San Agustin, Sta. Maria 71,000 beaches, Sitio Logpond, Brgy. San Agustin, Sta. Maria, Davao Occidental - Access Road leading to Hiquiana Beach - Concreting 2.250 km Brgy. San Agustin , Sta. Maria 70,000 Resort and various beaches, Brgy. San Agustin , Sta. Maria, Davao Occidental - Access Road leading to Puting Balas Beach - Concreting 2.450 km Brgy. Basiawan, Sta. Maria 86,250 Resort and Kisulad White Sand Beaches, Brgy. Basiawan, Sta. Maria, Davao Occidental

- Diego- Sitio Colagsing Road leading to - Concreting 2.270 km Brgy. Tanglad, Sta. Maria 54,250 Magbato Beach Resort and Various Beaches , Brgy. Tanglad, Sta. Maria, Davao Occidental

- Dora -Sitio Colagsing Road leading to Book - Concreting 2.360 km Brgy. Tanglad, Sta. Maria 56,500 Island and other Various Beaches, Brgy. Tanglad, Sta. Maria, Davao Occidental

II. Roads Leveraging Linkages of Industry and 7,500

- Access Road from Junction Davao-Sarangani - Concreting 0.300 km Lacaron, Malita, Davao Occidental 7,500 National Road to Brgy. Pangian Including Construction of RCBC in support of MARWABEMPCO Cacao Plantation and Processing Plant, Brgy. Lacaron, Malita, Davao Occidental

19-37 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

Davao Oriental, 1st Congressional District 1st District 3,851,292 GAA

MFO I: National Road Network Services 2,318,192

I. National Roads : 1,176,333

A. Secondary Roads 1,176,333

- Bdry.- Davao Oriental Coastal 1,056,658 - Widening (into 4 lanes) including ROW 30.430 km Boston-Tarragona Increased length of national 912,900 roads widened 2.902 km K1522+220-K1525 + 140 87,060 3.687 km K1539 + 333 - K1543 + 100 110,610 0.049 km K1547+631-K1547+680 1,470 3.000 km K1565+ 440 - K1568 + 440 90,000 1.299 km K1580 + 829 - K1582 + 127 38,970 1.674 km K1582 + 546 - K1584 + 220 50,220 3.000 km K1596 + 664 - K1599 + 664 90,000 3.000 km K1605+799 - K1608 + 799 90,000 0.833 km K1618 + 000 - K1618 + 833 24,990 1.029 km K1627 + 000 - K1628 + 029 30,870 0.881 km K1631 + 270 - K1632 + 151 26,430 2.949 km K1650 + 051 - K1653 + 000 88,470 3.000 km K1657+327-K1660+327 90,000 0.540 km K1663 + 000 - K1663 + 540 16,200 0.647 km K1664 + 167 - K1664 + 814 19,410 1.940 km K1677 + 060 - K1679 + 000 58,200

- Rehab./Reconstruction 4.361 km Boston-Tarragona Increased length of national 87,220 roads 0.075 km K1514+(-267) - K1514+(-192) rehabilitated/reconstructed 1,500 0.374 km K1514+(-192) - K1514+182 7,480 0.399 km K1514+182 - K1514+581 7,980 0.205 km K1521+620- K1521+825 4,100 0.981 km K1523+000 - K1524+000 19,620 0.160 km K1527 + 163 - K1527 + 323 3,200 0.109 km K1527+725 - K1527+834 2,180 0.971 km K1528 + 000 - K1529 + 000 19,420 0.286 km K1529 + 000 - K1529 + 286 5,720 0.155 km K1529 + 638 - K1529 + 793 3,100 0.183 km K1546 + 399 - K1546 + 582 3,660

19-38 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 0.097 km K1550 + 951 - K1551 + 000 1,940 0.366 km K1551 + 000 - K1551 + 366 7,320

- Preventive Maintenance (Asphalt Overlay) 2.049 km Boston-Tarragona Increased length of national 24,588 roads in good condition 0.983 km K1517 + 000 - K1518 + 000 11,796 0.501 km K1518 + 000 - K1518 + 501 6,012 0.369 km K1518 + 501 -K1518+870 4,428 0.125 km K1518+933 - K1519 + 066 1,500 0.071 km K1520 + 000 - K1520 + 071 852

- Rehabilitation/ Reconstruction of National Roads 297.000 lm Cateel Decreased areas vulnerable to 31,950 with Slips, Slope Collapse, and Landslide/Slope 54.000 lm K1514 + 013 - K1514 + 067 (RS) landslides/road slips 4,390 Protection 24.000 lm K1514 + 107 - K1514 + 131 (RS) 1,960 43.000 lm K1514 + 970 - K1515 + 000 (RS) 2,440 118.000 lm K1535 + 282 - K1535 + 400 (RS) 6,390 23.000 lm K1637 + 217 - K1637 + 240 (RS) 6,750 17.000 lm K1689 + 108 - K1689 + 125 (RS) 5,160 18.000 lm K1692 + 300 - K1692 + 318 (RS) 4,860

- Compostela - Cateel Road (Davao Oriental 119,675 - Road Widening (into 4 lanes) including ROW 3.303 km Cateel Increased length of national 115,605 3.303 km K1556 + 873 - K1559 + 933 roads widened 115,605

- Rehabilitation/ Reconstruction of National Roads 50.000 lm Cateel Decreased areas vulnerable to 4,070 with Slips, Slope Collapse, and Landslide/Slope 50.000 lm K1556 + 700 - K1556 + 750 (RS) landslides/road slips 4,070 Protection

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) 1,141,859

- Mati-Tarragona Bypass (Lucatan-Tagabakid - Construction of Asphalt Road including slope 0.299 km Tarragona 48,230 Road) incl. ROW, Davao Oriental protection and ROW - Mawab-Maragusan-Caraga Road , Package - Concreting including ROW 15.700 km Caraga 680,774 A, incl. ROW, Davao Oriental - Diversion Road, incl. ROW, Davao - Opening, Concreting including replacement of 5.607 km Baganga 204,960 Oriental bridge (59.575 lm) and RROW - Monkayo-Boston Road, incl. ROW, Davao - Concreting including ROW 10.000 km Boston 207,895 With funding under 2018 Oriental but under ComVal (Road traverses ComVal and DO

19-39 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

MFO 2: Flood Management Services 413,425 Decreased areas vulnerable to flooding

- Manay River - Construction of Revetment 658.00 lm Manay 50,000 - Cateel River Protecting Surigao del Sur Bdry - - Construction of Revetment 290.00 lm Cateel 50,981 Davao Oriental Coastal Road, Tina Section - Manurigao River - Construction of Revetment 550.00 lm Caraga 61,444 - Baganga River Control - Construction of Revetment 428.00 lm Baganga 50,000 - Boston River Control - Construction of Revetment 100.00 lm Boston 10,000 - Baganga Coastal Protection - Construction of Seawall 325.85 lm Baganga 50,000 - Boston Coastal Protection - Construction of Seawall 330.00 lm Boston 35,000 - Cateel River (Aragon Section) - Construction of Revetment (Steel Sheet Pile) 230.00 lm Cateel 45,000 - San Ignacio Seawall - Construction of Foot Protection 240.00 lm Manay 10,000 - Panlobogan Flood Control - Construction of Revetment 135.00 lm Manay 7,000 - Baganga Central Urban Drainage - Construction of Flood Mitigating Structure 500.00 lm Baganga 7,000 - Tarragona Central Urban Drainage - Construction of Flood Mitigating Structure 500.00 lm Tarragona 7,000 - Mahan-ub Flood Control - Construction of Revetment 300.00 lm Manay 20,000 - Nasipit Flood Control - Construction of Revetment 200.00 lm Tarragona 0 10,000

MFO 3: Construction and Maintenance 759,675 Services of Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry

I. Roads Leading to Declared Tourism 605,925

- Jct. Manay-Taocanga Road leading to - Concreting 4.000 km Manay 100,000 Diamaboc Lake, Manay, Davao Oriental - Jct. San Antonio - Baybay leading to - Concreting 3.176 km Cateel 79,500 Creamsand Longbeach, Brgy. Baybay, Cateel, Davao Oriental

19-40 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - NRJ Salingcomot-Languyon leading to - Concreting 4.000 km Baganga 100,000 Languyon Mangrove Park, Brgy. Salingcomot, Baganga, Davao Oriental - NRJ San Antonio-Lamiawan-Sangab Road - Concreting 3.500 km Caraga 87,500 leading to Sangab Cultural Community, Brgy. Pinchon, Caraga, Davao Oriental - NRJ San Isidro-Campawan leading to Curtain - Concreting incl bridge (15 lm) 2.800 km Baganga 113,925 Falls,Brgy. Campawan, Baganga, Davao Oriental

- Jct. (Mawab-Maragusan-Caraga) to Brgy. - Concreting 3.300 km Caraga 82,500 Mercedes to Sitio Cabyawan leading to Magpamangaw Falls, Brgy. Mercedes,Caraga, Davao Oriental - San Luis NHJ to Insular leading to San Luis - Concreting 1.700 km 42,500 Beach Line, Caraga, Davao Oriental

II. Roads Leveraging Linkages of Industry and 153,750

- Access Road connecting Junction Tagduan - Concreting 2.550 km Caraga 63,750 Section, Brgy. San Jose to Sitio Lib-og, Brgy. Mercedes in support of Abaca and Coconut Industries, Caraga, Davao Oriental - Road connecting Sitio Mahayahay to Sitio - Concreting 3.600 km Boston 90,000 Buko Buko sa Anay in support to Coffee, Cacao, Abaca & Coconut Industries, Boston, Davao Oriental

Other Local Roads 360,000 Increased accessibility/connectivity PAMANA/VIILP: : 360,000

- Road of Thru-cut, Brgy. Panansalan-La - Concreting 3.900 km Cateel 39,000 Fortuna, Brgy. Malibago, Cateel, Davao Oriental - Baganga-Binondo-Boundary Davao - Construction/ Opening/Rehab./ Improvement 23.100 km Baganga 231,000 Oriental/Comval, Davao Oriental (Gravel Road) - San Jose-Simulao Road, Davao Oriental - Rehab./ Improvement (Gravel Road) 9.000 km Boston 90,000

Davao Oriental, 2nd Congressional District Davao Oriental 2nd District 4,139,565 GAA

19-41 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT MFO I: National Road Network Services 3,225,046

I. National Roads : 1,700,320

A. Primary Roads 635,640

- Pres. Diosdado P. Macapagal National 635,640 Highway - Widening (into 4 lanes) including Drainage and 14.400 km Panikian Increased length of national 472,000 slope protection and ROW roads widened 0.300 km K1763+058 - K1763+201 11,400 K1763+217 - K1763+374 San Isidro and 3.760 km K1764+184 - K1766+825 150,400 K1767+872 - K1769+000 7.697 km K1769+000 - K1776+421 230,910 K1776+421 - K1776+620

2.643 km K1776+620 - K1779+260 79,290

- Preventive Maintenance: Asphalt overlay (80mm 4.091 km Bilawan Increased length of national 163,640 thk.) 0.896 km K1718+749 - K1719+575 roads in good condition 35,840 0.847 km K1720+158 - K1721+000 33,880 Badas 0.539 km K1723+651 - K1724+194 21,560 Manikling 1.339 km K1743+586 - K1744+922 53,560 0.470 km K1753+177 - K1753+647 18,800

B. Secondary Roads 656,530

- Pres. Diosdado P. Macapagal National - Widening (into 4 lanes) including Drainage and 6.106 km Increased length of national 183,180 Highway slope protection and RROW roads widened

Mati 0.858 km K1700+121 - K1700+979 25,740 2.430 km K1702+192K1701+405 - K1705+008K1701+569 72,900

19-42 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT 2.818 km K1705+420 -K1706+565 84,540 K1706+997 -K1708+670

- Mati-Maragusan Road 473,350 - Concreting including RROW 0.872 km Increased length and 69,760 Lupon percentage of paved national 0.347 km K1499+-065-K1499+282 roads 27,760 0.525 km K1503+135 - K1503+660 42,000

- Widening ( into 4 lanes) including Drainage and 10.753 km Mati 322,590 RROW 3.212 km K1513+379 - K1516+585 Increased length of national 96,360 1.995 km K1524+547 - K1526+542 roads widened 59,850 5.546 km K1528+000 - K1533+540 166,380

- Rehabilitation/Reconstruction of National Roads 5,065.000 sq.m. Mati-Maragusan Road Decrease areas vulnerable to 81,000 with Slips, Slope Collapse and Landslide 810.000 sq.m. K1499+(-572) - K1499+(-545) landslide/Roadslip 9,000 945.000 sq.m. K1499+(-489) - K1499+(-462) 10,000 529.000 sq.m. K1499+(-432) - K1499+(-409) 6,000 450.000 sq.m. K1499+(-093) - K1499+(-075) 5,000 540.000 sq.m. K1499+451 - K1499+463 6,000 775.000 sq.m. K1499+563 - K1499+594 9,000 92.400 sq.m. K1501+033 - K1501+060 11,000 140.000 sq.m. K1501+477 - K1501+491 2,000 92.400 sq.m. K1507+030 - K1507+036 3,000 92.400 sq.m. K1507+860 - K1507+866 3,000 92.400 sq.m. K1509+303 - K1509+309 3,000 92.400 sq.m. K1510+045 - K1510+051 3,000 46.200 sq.m. K1510+297 - K1510+300 2,000 46.200 sq.m. K1510+924 - K1510+927 2,000 46.200 sq.m. K1511+309 - K1511+311 2,000 183.000 sq.m. K1511+315 - K1511+376 2,000 92.400 sq.m. K1512+600 - K1512+606 3,000

C. Tertiary Roads 408,150

- Tibanban-Lavigan Road - Widening (into 4 lanes) including drainage and 4.378 km Increased length of national 131,340 slope protection and ROW Governor Generoso roads widened 2.037 km K1778+019 - K1780+190 61,110 2.341 km K1780+485-K1783+000 70,230

19-43 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT

- Jct Manikling-Gov Generoso Rd - Widening (into 4 lanes) including Drainage and 5.827 km San Isidro/Governor Generoso 174,810 ROW 2.559 km K1744+436 - K1747+000 76,770 3.268 km K1749+725 - K1753+000 98,040

- Dahican- Lawigan Road - Widening (into 4 lanes) including Drainage and 3.400 km Mati 102,000 ROW K1716+600 - K1720+000

II. Local Roads (Bypasses/Diversion Rds/Missing Gaps) 1,524,726 Increased accessibility/connectivity

- Mati-Tarragona Bypass (Tagabakid-Lucatan - Construction of asphalt road including Slope 0.200 km Mati 710,842 Road), incl. ROW, Davao Oriental Protection Structure and Bridge (1-60 Lm) including ROW - Matiao-Magsaysay Coastal Road, incl. ROW, - Construction of Asphalt Road, Construction of 0.629 km Mati 305,000 Davao Oriental Bridges (2-42 Lm) and Construction of Road Slope Protection Structure (Seawall/Retaining Wall) including ROW - Macangao- Tagboa-New Visayas - San Isidro - - Concreting incl. Row 6.963 km Mati/Lupon 250,000 Calagasan-Sabat - Malig - Don Mariano Marcos Road, incl. ROW, Lupon, Davao - Upper Tibanban-Oregon-Magdug Road, incl. - Concreting & Bridge Const. (1-60Lm) incl. 4.382 km Tibanban-Lavigan 241,244 ROW and Bridge, Davao Oriental Drainage and RROW

- Mapantad-Tagbobolo-Taguibo Bypass Road - Concreting 0.980 km Mati-Lupon 17,640

MFO 2: Flood Management Services 0.00 210,000 Decreased areas vulnerable to flooding

- Mayo River - Construction of Gabion 1,150.00 lm Mati 50,000 - Sumlog River - Construction of Concrete Revetment 875.00 lm Lupon 50,000 - Bitanagan River - Construction of Concrete Revetment 200.00 lm Mati 10,000 - Bitaogan River - Construction of Concrete Revetment 500.00 lm San Isidro 20,000 - Surop River - Construction of Concrete Revetment 1,164.00 lm Governor Generoso 40,000 - Tagabebe River - Construction of Gabion 500.00 lm Governor Generoso 40,000

19-44 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT MFO 3: Construction and Maintenance 576,000 Services of Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads Leading to Declared Tourism 363,662

- Jct. - Mt. Hamiguitan Road leading - Concreting including slope protection 0.067 km Mati 30,000 to Mt. Hamiguitan, San Isidro, Davao Oriental - Access Road leading to Waniban, Oak and - Concreting 3.133 km Mati 74,750 Pujada Island, Brgy. Lawigan, Mati City, Davao Oriental - Brgy. Dawan to Brgy. Macambol leading to - Concreting 2.115 km Mati 50,162 Macambol (Sitio Wagon) Spring Resort and Pujada Bay, Brgy. Macambol, Mati City, Davao Oriental - Langka-Luban-Cabuaya Road leading to Rock - Concreting 3.491 km Mati 92,500 Formations, Lake And White Sand Beaches, Brgy. Luban, Mati City, Davao Oriental

- Lupon Coastal Road from Aroma, Brgy. - Concreting 2.363 km Lupon 55,500 Poblacion To Brgy. Ilangay Leading to Illa Dio Beach Resorts, Brgy. Ilangay, Lupon, Davao Oriental - Lupon Coastal Road From Purok San Roque, - Concreting 2.588 km Lupon 60,750 Brgy. Poblacion To Purok Bundas, Brgy. Bagumbayan leading To Diving Site, Wenceslao Resort, & Arigid Ai Beach Resort,

II. Roads Leveraging Linkages of Industry and 212,338

- Brgy. Don Mariano Marcos Junction - Concreting 3.334 km Lupon 83,338 connecting to Sitio Malig in support of Rubber and Cacao Industries, Lupon, Davao Oriental - Brgy. Marayag Hi-way Junction connecting to - Concreting 2.000 km Lupon 50,000 Sitio DCS in support to Coffee and Rubber Industries, Lupon, Davao Oriental

19-45 Tier 1 Agency: Department of Public Works and Highways XI 58,885,562 0.00 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS CONGRESSIONAL COST (PHP'000) REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS DISTRICT - NHJ Brgy. Matiao connecting to Sitio Tua-tua - Concreting 0.600 km Mati 19,000 in support of Coconut, Mango, and Coffee Industries, Mati City, Davao Oriental

- Road from Junction Brgy. Sainz connecting to - Concreting 1.500 km Mati 60,000 Sitio Licop in support of Cacao, Coffee, Corn, and Mango Industries, Mati City, Davao Oriental Other Local Roads 128,520 Increased accessibility/connectivity

PAMANA/VIILP: : 128,520

- National Jct. Road Brgy. Panikian-Brgy. - Improvement/Concreting 7.140 km Brgy. Panikian-Brgy. Maragatas 128,520

19-46 Tier 2 Agency: Department of Public Works and Highways XI

BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

Compostela Valley, 1st Congressional District Compostela Valley 2,412,808 GAA

MFO I: National Road Network Services 11,508

I. Bridges 11,508

Along Montevista - Compostela - Mati Bdry Road: Increased length of national bridges Along national roads - Osmeña Br. - Rehabilitation/Major Repair 1.000 proj Compostela rehabilitated/repaired 2,835 - Bangoy Br. - Rehabilitation/Major Repair 1.000 proj New Bataan 8,673

MFO 3: Construction and Maintenance Services of 30.606 1,075,700 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads leading to Tourism Destinations 448,200

- Pasian Road leading to Magdagandang Falls and - Concreting 3.000 km Brgy. Pasian, Monkayo 90,000 With project profile caves, Brgy. Pasian, Monkayo, Compostela Valley

- Linoan Road leading to eco-tourism park, NIA water - Concreting 1.500 km Brgy. Linoan, Montevista 45,000 impoundment, and built forest, Brgy. Linoan, Montevista, Compostela Valley - Montevista sports complex circumferential Road - Concreting 1.200 km Brgy. Poblacion, 24,000 leading to Montevista sports complex, Brgy. Montevista Poblacion, Montevista, Compostela Valley - Linoan Road leading to Farm Tourism Site, Brgy. - Concreting 0.200 km Brgy. Linoan, Montevista 4,000 Linoan, Montevista, Compostela Valley

- Andap Road leading to Kalamokan whitewater - Concreting 1.850 km Brgy. Andap, New Bataan 55,500 rafting site, Brgy. Andap, New Bataan, Compostela Valley - Andap Road leading to Tinay highland resort, Brgy. - Concreting 0.500 km Brgy. Andap, New Bataan 15,000 Andap, New Bataan, Compostela Valley

19-47 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Andap Road leading to Bamboo highland resort, - Concreting 0.260 km Brgy. Andap, New Bataan 7,800 Wth project profile Brgy. Andap, New Bataan, Compostela Valley

- Poblacion Road leading to wood processing industry, - Concreting 0.360 km Brgy. Poblacion, 7,200 business centre, tourism information centre, and bus Montevista terminal, Brgy. Poblacion, Montevista,Compostela Valley

- Mayaon Road leading to cave systems of Mayaon, - Concreting 3.410 km Brgy. Mayaon, Montevista 102,300 Montevista, Compostela Valley

- San Miguel Road leading to Dam and Ecotourism - Concreting 1.610 km Brgy. San Miguel, 32,200 Park, Brgy. San Miguel Compostela, Compostela Compostela Valley - San Miguel Road leading to Tingali falls ecotourism - Concreting 3.260 km Brgy. San Miguel, 65,200 park, Brgy. San Miguel Compostela, Compostela Compostela Valley

II. Roads Leveraging Linkages of Industry and Trade 627,500

- Concreting of Brgy. Paloc to Brgy. Tandik, - Concreting 3.250 km Brgy. Paloc and Tandik 97,500 Wth project profile Maragusan, Compostela Valley - Concreting of Brgy Tapia to Brgy. New Calape to - Concreting 2.000 km Brgys. Tapia, New Calape 80,000 Wth project profile Brgy. Canidkid, Montevista, Compostela Valley and Canidkid, Montevista

- Concreting of Brgy. Mapawa to Brgy. Tigbao, - Concreting 3.000 km Brgys. Mapawa and Tigbao, 90,000 Maragusan, Compostela Valley Maragusan

- Concreting of FMR from Cervantes to Lower Ulip, - Concreting 3.000 km Brgys. Lower Ulip, 90,000 Poblacion to Brgy. Mamunga, Monkayo, Compostela Poblacion and Mamunga Valley - Concreting of FMR from Sitio Mapaso to Prk. 8, Brgy. - Concreting 3.000 km Brgy. Kahayag, New Bataan 90,000 Kahayag, New Bataan, Compostela Valley

- Concreting of Poblacion - Lebanon Road, - Concreting 3.000 km Brgy. Poblacio, Montevista 90,000 Montevista, Compostela Valley

- Concreting of Brgy. Banlag to Sitio Kabangkalan, - Concreting 3.000 km Brgys. Banlag and Casoon, 90,000 Brgy. Casoon FMR, Monkayo, Compostela Valley Monkayo

Other Local Roads 1,325,600 Increased Accessiblity/ Connectivity

19-48 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

BYPASSES/DIVERSION RDS/MISSING GAPS : 1,325,600

- Poblacion, Maragusan - Paloc Road - Concreting including ROW 3.000 km Maragusan 94,000 With RDC endorsement in 2017, with PDC endorsement and - Monkayo - Loreto, Agusan Sur - Improvement/ Concreting of Road with 9.141 km Monkayo 350,000 project profile Drainage Structures, Repair/ Rehabilitation of Existing Bridge (4 - New Bataan - Baganga Road - Opening, Concreting including const. of 12.020 km New Bataan 717,600 (Taytayan - Manurigao, New Bataan) 2 bridges (6 lm) and ROW - Monkayo - Montevista Road - Const./Opening/Road Upgrading (gravel 2.000 km Monkayo and Montevista 73,000 (Banlag - San Isidro - Banglasan - Canidkid) to concrete) including RROW - Montevista - Nabunturan Road - Concreting including ROW 2.500 km Montevista 91,000 (San Vicente, Montevista - San Roque, Nabunturan)

Compostela Valley, 2nd Congressional District Compostela Valley 1,773,950 GAA

MFO I: National Road Network Services 11,000

I. Bridges 11,000 Along national roads Along Surigao-Davao Oriental Coastal Road: - Kingking Br. - Rehabilitation/Major Repair 1.000 proj Pantukan Increased length of national bridges 5,000 Along Nabunturan - Maragusan Road: rehabilitated/repaired - Manat Br. - Rehabilitation/Major Repair 1.000 proj Nabunturan 1,500 Along Asuncion - Laak - Veruela Road: - Soop Br. - Rehabilitation/Major Repair 1.000 proj Laak 4,500

MFO 2: Flood Management Services 31,100.000 550,000 Decreased areas vulnerable to flooding

- Brgy. Mendoza, Pantukan - Construction of Seawall 1,000.000 lm Pantukan 50,000 With RDC endorsement - Brgy. , Pantukan - Construction of Seawall 2,400.000 lm Pantukan 100,000 in 2017 and with PDC - Brgy. Matiao, Pantukan - Construction of Seawall 2,400.000 lm Pantukan 100,000 endorsement - Brgy. Kingking, Poblacion, Pantukan - Construction of Seawall 2,400.000 lm Pantukan 100,000 - Brgy. Tambongon, Pantukan - Construction of Seawall 2,800.000 lm Pantukan 100,000

19-49 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Brgy. San Juan, Maco - Construction of Seawall 1,000.000 lm Maco 50,000 - Construction of Wave Breaker & Seawall Bucana - Installation of Wave Breaker & Seawall 1,200.000 lm Pantukan 50,000 With RDC endorsement Fuentes, Pantukan in 2017 and with PDC endorsement

MFO 3: Construction and Maintenance Services of #REF! 973,700 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

I. Roads leading to Tourism Destinations 540,500

- Bongbong Road leading to various beach resorts, - Concreting 0.740 km Brgy. Bongbong, Pantukan 14,800 With project profile Brgy. Bongbong, Pantukan, Compostela Valley

- Libaylibay Road leading to Taguway Waterfalls, Prk. 4- - Concreting 0.460 km Brgy. Libaylibay, Maco 9,200 9, Brgy. Libaylibay, Maco, Compostela Valley

- Mipangi Road leading to Tagaytay Waterfalls and - Concreting 3.000 km Brgy. Mipangi, Nabunturan 90,000 Caves, Brgy. Mipangi, Nabunturan, Compostela Valley - Linda - Sasa Road leading to ecotourism park, - Concreting 3.170 km Brgy. Linda and Sasa, 95,100 Nabunturan, Compostela Valley Nabunturan

- Matilo - Katipunan Road leading to Togonan - Concreting 3.000 km Brgy. Matilo and 90,000 waterfalls, Cepada Farm, DOST green gold and Katipunan, Nabunturan copper mine processing plant, Nabunturan, Compostela Valley - Mainit - Tagnocon - Katipunan Road leading to DOST - Concreting 3.000 km Brgy. Mainit, Tagnocon 90,000 green mine gold and copper processing plant and and Katipunan, Batinag Falls, Nabunturan, Compostela Valley Nabunturan - Sto. Niño Road leading to Sto. Niño caves, Brgy. Sto. - Concreting 2.120 km Brgy. Sto. Niño, Laak 63,600 Niño, Laak, Compostela Valley

- Pindasan Road leading to resorts centre (Beach View - Concreting 0.430 km Brgy. Pindasan, Mabini 8,600 Resort), Brgy. Pindasan, Mabini, Compostela Valley

- Libudon Road leading to Laki Pool Inland Resort, - Concreting 3.500 km Brgy. Pindasan, Mabini 70,000 Brgy. Libudon, Mabini, Compostela Valley

19-50 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Magnaga Road leading to Water World beach resort, - Concreting 0.200 km Brgy. Magnaga, Pantukan 4,000 Brgy. Magnaga, Pantukan, Compostela Valley

- Poblacion Road leading to public market centre and - Concreting 0.260 km Brgy. Poblacion, New 5,200 bus terminal, Brgy. Poblacion, New Bataan, Bataan Compostela Valley

II. Roads Leveraging Linkages of Industry and Trade 433,200

- Concreting of Brgy. Bongabong to Sitio Magapalway - Concreting 3.000 km Brgy. Bongabong, Pantukan 90,000 With project profile Road, Pantukan, Compostela Valley - Concreting of Brgy. Kingking to Brgy. Napnapan, - Concreting 3.200 km Brgys. Kingking and 96,000 Pantukan, Compostela Valley Napnapan - Concreting of Brgy. Mainit to Brgy. Tagnocon, - Concreting 3.200 km Brgys. Mainit and 96,000 Nabunturan, Compostela Valley Tagnocon - Concreting of New Road, Maco, Compostela - Concreting 1.840 km Brgy. New Leyte 55,200 Valley - Concreting of Brgy. Tibagon to Brgy. Napnapan, - Concreting 3.200 km Brgys. Tibagon and 96,000 Pantukan, Compostela Valley Napnapan

Other Local Roads 239,250 Increased Accessiblity/Connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: 19.13 239,250

- Montevista - Nabunturan Road - Road Upgrading (gravel to concrete) 2.500 km Nabunturan 91,000 With PDC endorsement (San Vicente, Montevista - San Roque, Nabunturan) including RROW and project profile

- Mawab - Nabunturan Road - Const./Opening/Road Upgrading (gravel 2.800 km Nabunturan and Mawab 148,250 With RDC endorsement (Nuevo Iloco - Sta. Monica, Mainit Road, to concrete) including RROW with in 2017, with PDC Nabunturan) bridge component endorsement and project profile

Davao City, 1st Congressional District Davao City 1,783,080 GAA

MFO I: National Road Network Services 15,000

I. Bridges 15,000 Along Davao-Cotabato Road (DC-Jct. Digos Section) Along national road

19-51 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Gov. Generoso Br. 1 - Rehabilitation 1.000 proj Davao City Increased length of national bridges 5,000 rehabilitated/retrofitted - Gov. Generoso Br. 2 - Retrofitting 1.000 proj Davao City 10,000

MFO 2: Flood Management Services #REF! 1,033,640

- Bago Gallera Creek Flood Control, Brgy. Bago Gallera - Improvement of creek incl. Box culvert 500.00 lm Brgy. Bago Gallera 70,000 Rosalina Village Section, Rosalina Village Section - Libby Creek Flood Control (B/B) - Improvement of creek 1,000.00 lm Brgy. Bago Gallera 100,000

- Datu Loho Creek - Impv't. of creek 1,300.000 lm Ma-a 50,000 With RDC endorsement - Const. of Seawall at Brgy. 76, Bucana - Const. of Shore Protection 500.000 lm Buacana 50,000 in 2017 - Const. of Seawall at Brgy. 23 - Const. of Shore Protection 500.000 lm Brgy. 76, Bucana 50,000 - Const. of Seawall at Brgy. 31 - Const. of Shore Protection 500.000 lm Brgy. 23 50,000 - Improvement/Rehab. of F. Torres-Mt. Mayon-E. - Impv't. of drainage 1,500.000 lm F. Torres-Mt. Mayon-E. 40,000 Quirino drainage - Improvement/Rehabilitation of Ponce St. Outfall, - Installation of pump, flood gate power 1.000 proj Ponce St. 80,000 Davao City house, sump pit and other accessories - Improvement/Const. of Drainage along Acacia St.,- - Improvement/Const. of Drainage 405.000 lm Acacia St.,-Jct. Patnubay 16,200 Jct. Patnubay St., Davao City St. - Construction/Improvement of Ecoland Phase IV - Construction/Improvement of drainage 870.00 lm Ecoland Phase IV, Brgy.Bucana 20,000 Drainage (Up to Outfall) to Outfall

- Contruction of Sitio Saka - Sitio Bagasa Drainage, - Construction of drainage 2,000.00 lm Brgy. Bago Gallera 50,000 Bago Gallera

- Improvement/Rehabilitation of Drainage along - Improvement/Rehabilitation of 1,250.00 lm Brgy. 28-C 20,000 Suazo Street Drainage

- Construction/Improvement of Drainage along Mt. - Construction/Improvement of Drainage 1,000.00 lm Brgy. 7-A 20,000 Apo,Mt. Mayon, General Luna, Jose Abad Santos and Camus Street - Construction of Drainage Within Brgy. 9-A and - Construction of Drainage 5,000.00 lm Brgy. 9-A and Brgy. 10-A 80,000 Brgy. 10-A

- Construction/Improvement of Drainage Along Edsa - Construction/Improvement of Drainage 1,000.00 lm Edsa Street, Tahimik 20,000 Street, Tahimik Avenue (Barangay 74-A) Avenue (Barangay 74-A)

- Construction of Drainage along Rose Santol and - Construction of Drainage 1,000.00 lm Rose Santol and Evergreen 20,000 Evergreen Streets, Barangay Sto. Niño Streets, Barangay Sto. Niño

- Construction of Drainage at Durian Street, University - Construction of Drainage 1,000.00 lm Durian Street, University 20,000 Avenue, Juna Subdivision Avenue, Juna Subdivision

19-52 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Construction/Improvement of Drainage along - Construction/Improvement of Drainage 1,000.00 lm Artiaga, Faura, Bonifacio, 20,000 Artiaga, Faura, Bonifacio, Mabini, Aurora Streets Mabini, Aurora Streets

- Improvement of the Drainage System in Brgy. 37-D, - Improvement of Drainage 1,000.00 lm Brgy. 37-D, Brgy. 76-A and 30,000 Brgy. 76-A and Brgy. 36-D Brgy. 36-D

- Construction of Drainage along Cadena De Amor and - Construction of Drainage 1,000.00 lm Cadena De Amor and Ilang- 30,000 Ilang-Ilang Streets (Sabroso), Barangay 76-A Ilang Streets (Sabroso), Barangay 76-A - Construction of Drainage along - Construction of Drainage 1,000.00 lm Pag-Asa Street, Bangkal, 20,000 Pag-Asa Street, Bangkal, Barangay 74-A Barangay 74-A

- Construction/Improvement of Drainage along Dona - Construction/Improvement of Drainage 1,000.00 lm Dona Carmen Street, 30,000 Carmen Street, Dumoy Dumoy

- Construction of Drainage at Purok 3-9, Matina Pangi - Construction of Drainage 1,500.00 lm Purok 3-9, Matina Pangi 30,000 - Improvement of Sitio Saka Drainage, Brgy. Bago - Improvement of Drainage 1,300.00 lm Sitio Saka Drainage, Brgy. 30,000 Gallera Bago Gallera - Construction/Improvement of Drainage along - Construction/Improvement of Drainage 1,000.00 lm Garnet Street, Brgy. 8-A 17,440 Garnet Street - Construction of Drainage along Pagatpat St., S.I.R., - Construction of Drainage 500.00 lm Pagatpat St., S.I.R., Phase 10,000 Phase 1, Brgy. 76-A 1, Brgy. 76-A - Construction/Rehabilitation of Lateral Drainage - Construction/Rehabilitation of Lateral 1,800.000 lm Brgy. 28-C 30,000 along Pag-asa St. - Suazo St. -Ponce St. leading to Drainage Quezon Boulevard Main Drain, Davao City - Construction/Rehabilitation of Lateral Drainage - Construction/Rehabilitation of Lateral 1,800.000 lm Brgy. 28-C 30,000 along Pag-asa St. - Suazo St. -Ponce St. leading to Drainage Quezon Boulevard Main Drain, Davao City

MFO 3: Construction and Maintenance Services of #REF! 95,645 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations

I. Roads leading to Tourism Destinations 95,645 Bago Aplaya Road (Jct. Davao-Cotabato Rd - Jct. Widening/ Improvement of Roads with - Davao - Cotabato Old Road) leading to UP Mindanao, - construction of bridge (31.4 ln.m.) 2.561 km Brgy. Bago Gallera & Brgy. 70,130 Davao City Bago Aplaya Jct. E. Quirino Ave.-Mt. Apo - Gen. Luna St. - Mt. Construction/ Improvement of Roads - Mayon St. - J. Abad Santos - Camus St. Road leading - 0.945 km Brgy. 6-a & Brgy 7-a 25,515 to People's Park, Davao City

19-53 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

Other Local Roads 638,795 Increased Accessiblity/ Connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: 638,795

- Jct. Daang Maharlika Road-Gov. Gregorio V. Cañeda - Reconstruction of road incl. ROW 0.707 km Davao City 65,751 Rd-Jct. F.S. Dizon Road, Davao City

- Bypass Road at Jct. Davao-Cotabato Road - Central - Rehabilitation/Reconstruction/ Road 1.730 km Davao City 206,384 Park (Cordillera Rd.) - Jct. Matina Aplaya Road, Opening incl. Drainage, Construction of Davao City New Bridge, Slope Protection and RROW

- Maa Radio Station-Bacaca, incl. ROW, Bridge and - Concreting including additional lane 2.714 km Davao City 366,660 With RDC endorsement in Slope Protection, Davao City width, const. of bridge (130 lm), slope 2017 and project profile protection and ROW

Davao City, 2nd Congressional District Davao City 4,575,628 GAA

MFO I: National Road Network Services 213,640

I. National Roads : 213,640

A. Tertiary Roads 213,640

- Fatima-Malabog 213,640 National Road - Widening including drainage, sidewalk, 5.341 km Fatima-Malabog Road Increased length of national roads 213,640 curb & gutter (into 4 Lanes) 3.100 km K1501+(-442) - K1503+725 widened 124,000 2.241 km K1510+000 - K1513+223 89,640

MFO 2: Flood Management Services #REF! 80,000 Decreased areas vulnerable to flooding - Construction/Improvement of Drainage along Gospel - Construction/Improvement of Drainage 1,000.000 lm Brgy. Duterte 30,000 Street (Up to the Outfall), Davao City - Improvement/Const. of Drainage along Jct. JP - Improvement/Const. of Drainage 600.000 lm Jct. JP Cabaguio Ave.- 25,000 Cabaguio Ave.- Garnet St., Dacudao Ave., Davao Garnet St., Dacudao Ave. City - Improvement/Const. of Drainage along Jct. JP - Improvement/Const. of Drainage 550.000 lm JP Cabaguio Ave.- Amber 25,000 Cabaguio Ave.-Amber St.-Dacudao Ave., Davao City St.-Dacudao Ave

19-54 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

MFO 3: Construction and Maintenance Services of #REF! 1,270,495 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

I. Roads leading to Tourism Destinations 447,895

- Park Avenue Road - Bangus St. - Sarphil Road - Holy - Widening/ Rehabilitation/ Improvement 2.049 km Brgy. Wilfredo Aquino & 61,470 Cross Drive Road - Bolcan St. leading to Puentespina of Road including Drainage Brgy. San Antonio Orchids & Tropical Plants, Davao City - Forestal Road leading to D' Leonor Inland Resort & - Concreting/Rehabilitation/ 2.350 km Brgy. Cabantian 82,250 Adventure Park, Cabantian, Davao City Reconstruction/ Drainage Improvement

- Jct. Del Pilar Extension - Jct. Ubalde Road leading to - Concreting/Rehabilitation/ 2.350 km Davao City 35,575 SMX Convention Center, Davao City Reconstruction/ Drainage Improvement

- Construction/Concreting of Sitio Binaton - Sitio - Construction/Concreting of of Road 6.715 km Davao City 268,600 Polokon - Jct. KTC Road leading to Megkawayan Peak Resort and Remy Areja's Resort, Brgy. Malabog,

II. Roads Leveraging Linkages of Industry and Trade 822,600 (ROLL IT)

- Concreting of Purok 13 connecting to Purok 16 of - Concreting of Road 14.000 km Davao City 276,600 Brgy. Pandaitan in Support of Banana, Coconut and Cacao Industries, Paquibato District, Davao City

- Concreting of Sitio Tibungol connecting to Purok 14 - Concreting of Road 7.000 km Davao City 140,000 of Barangay Pandaitan in Support of Cacao Industry, Paquibato District, Davao City

- Concreting of Purok 14 connecting to Kinse-Kinse of - Concreting of Road 10.000 km Davao City 200,000 Barangay Salapawan in Support of Cacao Industry, Paquibato District, Davao City - Concreting of Sitio Saloy connecting to Sitio - Concreting of Road 7.000 km Davao City 145,000 Cabonbon of Barangay Malabog in Support of Cacao & Coconut Industries, Paquibato District, Davao City

- Concreting of Callawa Proper connecting to Purok 5, - Concreting of Road 3.050 km Davao City 61,000 14 and 15 of Brgy. Callawa in Support of Cassava, Banana and Cacao Industries, Buhangin District, Davao City

Other Local Roads 3,011,493

19-55 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

Increased Accessiblity/ Connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: #REF! 3,011,493

- Jct. Daang Maharlika Rd. (Licanan - Maduao Section) - Upgrading (4 lanes) including drainage, 1.670 km Licanan, Davao City 96,069 With RDC endorsement incl. ROW, Davao City Reconstruction (2 into 4 lanes) including in 2017 and project drainage and widening of road into 4 profile lanes including drainage - Brgy. Fatima, Paquibato District-Brgy. Dalagdag, - Concreting & Rehab./Reconst. Incl. 4.194 km Davao City 189,306 Calinan District-Brgy. Callawa, incl. ROW, Davao City Drainage and ROW - Sto. Tomas Poblacion - Brgy. Magwawa - Brgy. - Concreting including const. of 2 bridges 3.900 km Davao City 247,175 Panaga Road incl. ROW, Davao City (95 lm) ROW

- Jct. Daang Maharlika Road - Brgy. San Isidro - Brgy. - Concreting(into 4 lanes), Widening 2.425 km Davao City 245,013 With project profile Malativas - Fatima-Malabog Road incl. ROW, Davao (substandard 2 lanes into 4 lanes) incl. City Drainage and ROW - Jct. Fatima-Malabog Road-Saloy-Bantol-Jct. Davao- - Opening/Concreting/Rehab./Reconst. 9.000 km Davao City 364,100 Bukidnon Road incl. ROW, Davao City including ROW - Salapawan-Mapula-Luming-Gumitan incl. ROW, - Opening/Concreting including const. of 6.988 km Davao City 499,300 Davao City 3 bridges (70 lm) incl. ROW - Panaga-Pandaitan (Sitio Tibungol)-Paradise Embak- - Concreting including const. of 1 bridge 9.008 km Davao City 458,320 Jct. Mabuhay-Pañalum Road Incl. ROW, Davao City (50 lm) incl. ROW - Jct. Daang Maharlika Road-Palm Drive-Pag-asa St.- - Reconstruction including additional lane 1.860 km Davao City 152,190 Dumanlas Road-Jct. Diversion Road incl. ROW, Davao width incl. ROW City

- Jct. J.P. Cabaguio Ave-Lacatan St.-Pioneer Drive-Jct. - Reconstruction of road incl. ROW 0.965 km Davao City 104,220 With project profile Daang Maharlika Road incl. ROW, Davao City

- Jct. Daang Maharlika Road-Carmelite Road-Mahayag - Opening/Concreting/Rehab./Reconst./A 1.845 km Davao City 198,755 St.-Jct. DC Diversion Road incl. ROW, Davao City dditional lane width incl. ROW

- Jct. DC Diversion Road-Jct. Malagamot Road-Jct. - Opening/Concreting/Rehab./Reconst./A 4.915 km Davao City 457,045 Mudiang Road-Jct. Eliong Road-Crossing Mahayag dditional lane width incl. ROW Road-Jct. Daang Maharlika Road incl. ROW, Davao City

Davao City, 3rd Congressional District Davao City 1,878,850 GAA

19-56 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

MFO 2: Flood Management Services 2,700.00 200,000 Decreased areas vulnerable to flooding - Construction of Seawall along the Lizada-Sirawan- - Construction 1,000.00 lm Sirawan 100,000 With RDC endorsement in Binugao Coast 2017 - Construction of Dikes along Davao River - Construction 1,000.00 lm Marilog, Calinan, Tugbok 100,000

MFO 3: Construction and Maintenance Services of #REF! 275,190 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, industry and trade

I. Roads Leveraging Linkages of Industry and Trade 275,190 - Concreting of Sitio Baracayo Road Connecting to - Concreting 4.404 88,080 With project profile Sitio San Agustin of Brgy. Daliaon Plantation in Support to Banana and Abaca Industries in Toril District, Davao City - Concreting of Brgy. Tagluno Connecting to Brgy. - Construction of concrete road including 4.323 87,110 With project profile Tungkalan in Support of Coconut/Coco Coir rehab./reconst. Industries, Toril District, Davao City

- Concreting of Sitio Bato Village Connecting to Sitio - Concreting 5.000 100,000 With project profile Dominguez of Brgy. Manuel Guianga in Support of Cacao and Banana Industries, Tugbok District, Davao City

Other Local Roads 1,403,660 Increased Accessiblity/ Connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: #REF! 1,403,660

- Brgy. Tibuloy to Catigan-Baracatan-Eden- Davao- - Concreting incl. ROW 3.300 km Brgys. Eden - Baracatan - 100,000 With RDC endorsement Cotabato Highway incl. ROW, Davao City Catigan in 2017 and project profile - Lacson Road - Lamanan - Dominga - Dalagdag Road - Concreting and const. of 1 bridge (40 1.888 km Brgys. Lacson - Lamanan - 100,000 incl. ROW, Marilog District, Davao City lm) incl. ROW Dominga -- Dalagdag - Davao Fish Port through Davao-Cotabato Highway - Concreting incl. ROW 2.091 km Brgy. Lizada 69,890 Lizada Portion incl. ROW, Davao City

19-57 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Eden-Tagurano-Tungkalan-Daliaon Plantation- - Concreting incl. ROW 3.300 km Brgys. Eden-Tagurano- 100,000 Manuel Guianga-Sirib Road incl. ROW, Toril District, Tungkalan-Daliaon Davao City Plantation-Manuel Guianga- Sirib - Lamanan to Sitio Kanakan, Brgy. Tamugan to Brgy. - Concreting incl. ROW 3.974 km Brgy. Saloy 120,412 Saloy incl. ROW, Marilog District, Davao City

- Davao-Bukidnon Highway to Magsaysay-Sitio - Concreting incl. ROW 4.750 km Brgy. Magsaysay 143,925 Lumatag to Davao-Arakan Road incl. ROW, Davao City - Subasta-Balengaeng-Tagakpan Road incl. ROW, - Opening/Concreting incl. ROW 2.608 km Brgys. Subasta-Balengaeng- 137,537 Calinan District, Davao City Tagakpan - Tagakpan-Sirib Road incl. ROW, Calinan District, - Concreting incl. ROW 4.353 km Brgys. Tagakpan-Sirib 131,896 Davao City - Eden-Tagurano Road to Kilate-Bato Road, Toril - Concreting incl. ROW 1.333 km Brgy. Bato - Kilate 100,000 District incl. ROW, Davao City

- Lacson-Dacudao-Talomo River-Los Amigos-Ula- - Concreting and const. of 1 bridge (62 0.634 km Calinan 100,000 With project profile Tacunan Matina Biao-Langub Bypass Road incl. ROW, lm) incl. ROW Calinan District, Davao City

- Davao-Bukidnon Highway Lacson Portion to Calinan- - Concreting 3.500 km Brgy. Lacson 50,000 Baguio-Cadalian National Road - Salaysay - Arakan Road, Marilog, Davao City - Concreting 2.00 km Salaysay, Dalag, Arakan 50,000

- Tambobong - Salaysay Road (Balacan - Sitio Luyan), - Concreting 8.00 km Salaysay, Dalag, Arakan 200,000 Marilog District, Davao City

Davao Del Norte, 1st Congressional District Davao Del Norte 230,000 GAA

MFO I: National Road Network Services 80,000

I. Bridges 80,000 Increased length of national bridges widened Along national road - Nanaga Bridge 1 along Kapalong-Talaingod-Valencia - Widening (2 into 4 lanes) of Bridge 46.150 lm Talaingod 50,000 (Bukidnon) Rd including approaches (104.85 lm) and K1492+864-K1493+010 ROW

- Nanaga Bridge 2 along Kapalong-Talaingod-Valencia - Widening (2 into 4 lanes) of Bridge 25.850 lm Talaingod 30,000 (Bukidnon) Rd including approaches (96.15 lm) and K1494+067-K1494+189 ROW

19-58 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

MFO 2: Flood Management Services 150,000

- Rehabilitation of San Miguel Creek - Construction of Lined Canal 1.00 proj Tagum City 50,000

- Rehabilitation of Mankilam Creek - Construction of Lined Canal 1.00 proj Tagum City 50,000

- Rehabilitation of Magugpo Creek - Construction of Lined Canal 1.00 proj Tagum City 50,000

Davao Del Norte, 2nd Congressional District Davao Del Norte 3,667,230 GAA

MFO I: National Road Network Services 274,450

I. Bridges 274,450 Increased length of national bridges Along national roads widened/reconstructed/ strengthened/rehabilitated

Along Babak - Samal - Kaputian Road - Binoling Br. 2 - Construction of Concrete Bridge 24.000 lm Samal 60,000 - Along Tagum - Panabo Circumferential Road (Parallel Bridge) - Locutan Br. 2 (B00189MN) - Replacement of Bridge 107.800 lm Sto. Tomas 84,000 - Feeder Rd. Br. (B00183MN) - Widening of Bridge 232.500 sq.m. Sto. Tomas 34,650 - Tanglaw Br. 1 (B00188MN) - Widening of Bridge 287.030 sq.m. B.E. Dujali 42,000 - Tanglaw Br. 4 (B00185MN) - Widening of Bridge 158.800 sq.m. B.E. Dujali 37,800

- Gov. Miranda Br. 2 (B01270MN) along Daang - Retrofitting / Strengthening of Bridge 1.000 proj Carmen 6,000 Maharlika (MN) - Locutan Br. 1 (B00190MN) along Tagum-Panabo - Retrofitting / Strengthening of Bridge 1.000 proj Sto. Tomas 1,000 - Tanglaw Br. 2 (B00187MN) along Tagum-Panabo - Retrofitting / Strengthening of Bridge 1.000 proj Carmen 1,000 - Ising Br. (B01859MN) along Daang Maharlika (MN) - Retrofitting / Strengthening of Bridge 1.000 proj Carmen 8,000

MFO 2: Flood Management Services 5,150.000 572,000

- New Creek - Widening/Deepening 2,796.750 lm Carmen 42,000 With RDC endorsement in 2017 - Construction of Flood Control at Brgy. Dapco, - Construction of Flood Mitigation Structure 3,303.000 Panabo 30,000 With RDC endorsement in Panabo City, Davao del Norte 2017 - Construction of Earthdike with revetment along - Construction of Earthdike and revetment 2,000.000 lm Carmen 100,000 Tuganay river Dujali, Davao del Norte

19-59 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Construction of Earthdike with revetment along - Construction of Earthdike and revetment 2,000.000 lm Carmen 100,000 Tuganay river junction Mactan Channel, Carmen, Davao del Norte - Construction of Earthdike along Tuganay River Dujali, - Construction of Earthdike 6,250.000 lm Carmen 100,000 Davao del Norte - Construction of Earthdike along Ising River, Carmen, - Construction of Earthdike 6,250.000 lm Carmen 100,000 Davao del Norte - Construction of Earthdike along Sadpudon Creek, - Construction of Earthdike 6,250.000 lm Carmen 100,000 Carmen, Davao del Norte

MFO 3: Construction and Maintenance Services of #REF! 1,048,511 Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry

I. Roads Leading to Declared Tourism Destination 1,048,511

- Brgy. San Antonio Proper to Sitio Anggas Peak, Brgy. - Concreting 2.000 km Island Garden City of 88,650 With RDC endorsement San Antonio, Island Garden City of Samal, Davao Del Samal, Davao del Norte in 2017 and project Norte profile - Jct. Camudmud leading to Samal Dairy Farm, - Concreting 2.680 km Island Garden City of 114,140 Provincial Demo Farm, Mango Orchard and Secdea Samal, Davao del Norte Beach Resort, Island Garden City of Samal, Davao Del Norte - Concreting of Road leading to Tourism Sites (Jct - Concreting 1.200 km. Island Garden City of 35,000 National Road to Hagimit Falls), Island Garden City Samal, Davao del Norte of Samal, Davao del Norte

- Jct. City Road Sitio Buhangin leading to - Concreting 2.000 km Island Garden City of 83,540 Magongawong Falls, Brgy. Tagbaobo, Island Garden Samal, Davao del Norte City of Samal, Davao Del Norte - Jct. Road Tuganay-Dujali-Kinamayan to Pob New - Concreting 5.000 km gry. Cabay-Angan, B.E. 117,250 Casay, RJS Purok 5, Pob Cabayangan to Purok Dujali Sampaguita leading to Palayamanan, Bgry. Cabay- Angan, B.E. Dujali, Davao Del Norte - Jct. Tagum-Panabo-Circumferential Road to Fd Rd 5 - Concreting including const. of bridge (25 5.025 km Brgy. San Jose, Sto. Tomas 143,726 Road leading to various tourism sites, Brgy. San Jose, lm) Sto. Tomas, Davao Del Norte - NRJ (Cabaluna Road) to Junction Brgy. Consolacion - Concreting 3.500 km Brgy. Malativas, Panabo 59,200 leading to Inland Resorts of Brgy. Malativas, Panabo City City, Davao Del Norte

19-60 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- NRJ Fd Rd 5 - Lagdek Road leading to Municipal - Concreting 4.600 km Brgy. San Jose, Sto. Tomas 110,000 Ecological Park and Ecology Center (MEPEC), Brgy. San Jose, Sto. Tomas, Davao Del Norte - Talikud Circumferential Road, Island Garden City of - Concreting, welcome arc, view deck, 4.000 km Island Garden City of 220,000 Samal, Davao del Norte information and safety signages & street Samal, Davao del Norte lights - Jct. Agusan-Davao Road, Brgy Cagangohan to Purok - Concreting 3.000 Brgy. J.P. Laurel, Panabo 77,005 Cogon leading to Ecotourism Mangrove, Brgy. J.P. City Laurel, Panabo City, Davao Del Norte

Other Local Roads 1,772,269

BYPASSES/DIVERSION ROADS/MISSING GAPS: 1,772,269 Increased accessibility/connectivity

- Panabo City Bypass Road, incl. ROW, Davao del - Concreting, Widening incl. Slope 9.615 km Panabo City/Carmen 360,000 With RDC endorsement Norte Protection and ROW in 2017 and project - Braulio E. Dujali-Sto. Tomas Road (Jct Agusan-Davao - Concreting incl. Slope Protectionand 9.286 km B.E. Dujali—Sto. Tomas 340,000 profile Road, Tuganay Section-B.E. Dujali-Sto. Tomas-Tagum- ROW Panabo Circumferential Road, incl. ROW, Davao del Norte - NRJ Panabo City-Jct Fatima-Malabog Road, incl. - Concreting incl. ROW 18.921 km Panabo City 377,738 ROW, Davao del Norte

- Jct Tagum-Panabo Circumferential Road-Dalisay - - Concreting incl. bridge (30 lm) and ROW 6.833 km Panabo City 205,000 Mabuhay, Panabo City-Panalum, incl. ROW, Davao del Norte

- Jct Tagum-Panabo Circumferential Road-Malitbog- - Concreting incl. bridge (70 lm) and ROW 5.000 km Panabo City 239,531 Kasilak to Jct Consolacion, incl. ROW , Davao del - Sto.Norte Tomas Poblacion - Brgy. Magwawa - Brgy. - Concreting & Bridge Construction (160 1.817 km Sto. Tomas 250,000 Panaga Road incl. ROW lm) incl. Drainage and RROW

Davao Del Sur Davao Del Sur 1,346,880 GAA

MFO I: National Road Network Services 106,880

I. National Roads : 100,000

A. Secondary Roads 100,000

- Digos Junction Road 100,000 National road

19-61 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Construction/Improvement of Drainage 7,056 lm Digos Increased length of drainage 100,000 with Sidewalk (Going to Outfall) K1565+799-K1566+340 B/S improved/constructed/ upgraded/rehabilitated

II. Bridges 6,880 Along national road - Marber Br. Davao-Cotabato Rd (Davao City-Jct Digos - Retrofitting 1.000 proj Bansalan Increased length of national bridges 4,800 Sect): retrofitted/rehabilitated/ strengthened - Inawayan Br. along Davao-Cotabato Rd (Davao City- - Retrofitting 1.000 proj Sta. Cruz 2,080 Jct Digos Sect)

MFO 2: Flood Management Services 2,990.000 50,000 Decreased areas vulnerable to flooding

Digos River: - Digos River (Purok Calumpang, Cogon) - Construction of Concrete Revetment 300.00 lm Digos City 50,000

MFO 3: Construction and Maintenance Services of 250,000 Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry

I. Roads leading to Tourism Destinations 250,000

- Access Road Leading to Advance Faith-Based - Concreting 4.000 km Sulop, Davao del Sur 100,000 With project profile Tourism, Brgy. Poblacion to Brgy. New , Sulop, Davao del Sur - Darong-Sibulan-Tibolo Rd Leading to Cultural/Tribal - Concreting 4.000 km Sta. Cruz, Davao del Sur 100,000 Communities and School of Living Tradition, Tibolo

- Marawer-Baruring, Brgy. Kapatagan Leading to - Concreting 2.000 km Sta. Cruz, Davao del Sur 50,000 Tudaya Falls

Other Local Roads 940,000

19-62 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

BYPASSES/DIVERSION ROADS/MISSING GAPS: 940,000 Increased accessibility/connectivity

- Bato Sta. Cruz - Matutungan - Binaton incl. ROW, - Concreting incl. ROW 4.000 km Sta. Cruz and Digos City, 100,000 With RDC endorsement Digos City Davao del Sur in 2017 and project - Baracatan - Sibulan - Tudaya - Marawer Road incl. - Concreting incl. ROW 4.000 km Sta. Cruz and Digos City, 100,000 profile ROW Davao del Sur - Poblacion Matanao – Tamlangon- Cabasagan- - Concreting incl. ROW 4.000 km Matanao, Davao del Sur 100,000 Bangkal Road incl. ROW - Tanwalang - New Cebu - Mc Kinley - Talas - Concreting incl. ROW 3.500 km Sulop, Davao del Sur 100,000 connecting to Digos-Makar Road, Sulop Davao del Sur incl. ROW - Kiblawan-Kimlawis-Bongmal-Tampakan Bypass Road - Concreting incl. ROW 4.000 km Padada & Kiblawan, Davao 100,000 incl. ROW del Sur

- Jct. Sinaragan (along Davao - Cot. Road) - Kibuaya - - Concreting incl. ROW 4.000 km Matanao & Hagonoy, 100,000 Sacub - Sinayawan - Leling (along Digos-Makar Road) Davao del Sur incl. ROW

- Tres de Mayo-Tiguman-Igpit-Balutakay Rd. incl. ROW - Concreting incl. ROW 2.000 km Digos City, Davao del Sur 40,000 With project profile

- Jct. Sulop (along Digos-Makar Rd.)-Waterfall-Labon- - Concreting 3.000 km Sulop, Davao del Sur 100,000 Osmeña-Banate (along Digos-Makar) Road

- Digos-Aplaya-Dawis Road (jct. Diversion Rd) - Widening 2 into 4 Lanes including Sidewalk 2.000 km Digos City, Davao del Sur 100,000

- Soong-Kibanban (Jct. Dav-Cot. Rd) Road Digos City, - Concreting 3.000 km Digos City, Davao del Sur 100,000 Davao del Sur

Davao Occidental Davao Occidental 4,619,750 GAA

MFO I: National Road Network Services 0

I. Bridges 115,000

Along Davao-Sarangani Coastal Road (Malalag- Along national roads Malita-JAS-Glan) - Pangian Br. - Replacement including approaches incl. ROW Increased length of national bridges 35.000 lm Malita 45,000 reconstructed - Johnson Sr. Br. - Retrofitting/Strengthening 1.000 proj Don Marcelino 15,000 Increased length of national bridges - Vicente Maruya Sr. Br. - Retrofitting/Strengthening 1.000 proj Don Marcelino retrofitted/strengthened 10,000

- Calian Br. - Rehabilitation/Major Repair 1.000 proj Don Marcelino Increased length of national bridges 10,000 - Culaman Br. - Rehabilitation/Major Repair 1.000 proj Malita rehabilitated 10,000 - Joyce Br. - Rehabilitation/Major Repair 1.000 proj Jose Abad Santos 5,000

19-63 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Marabatuan Br. - Rehabilitation/Major Repair 1.000 proj Jose Abad Santos Increased length of national bridges 5,000 - Meybio Br. - Rehabilitation/Major Repair 1.000 proj Jose Abad Santos rehabilitated 5,000

Along Demoloc-Little Baguio-Alabel Road - Demoloc Br. 2 - Rehabilitation/Major Repair 1.000 proj Malita Increased length of national bridges 10,000 rehabilitated

MFO 2: Flood Management Services 1,350.00 377,500 Decreased areas vulnerable to flooding - Basiawan Flood Control - Dredging/Desilting/Widening of earth canal 2,500.00 lm Sta. Maria 100,000 - Kalbay Flood Control - Construction of Concrete Revetment 1,400.00 lm Jose Abad Santos 50,000 With RDC endorsement - Manguile Flood Control - Construction of Concrete Revetment 2,000.00 lm Jose Abad Santos 70,000 in 2017 - Sitio Bito Flood Control - Construction of Concrete Revetment 300.00 lm Malita 10,000 - Sitio Tala Flood Control - Construction of Drainage Canal including 200.00 lm Malita 7,500 - Tabayon Flood Control - ConstructionConst. of 1-barrel of Concrete box culvert Revetment 2,000.00 lm Jose Abad Santos 140,000

MFO 3: Construction and Maintenance Services of 413,800 Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry

I. Roads Leading to Declared Tourism Destinations 275,300

- Balut Island Circumferential Road, Municipality of - Concreting 5.000 km Sarangani, Davao 275,300 With RDC endorsement in Sarangani, Davao Occidental Occidental 2017 and project profile

II. Roads Leveraging Linkages of Industry and Trade 138,500 - Access Road from Junction Davao-Sarangani - Concreting 2.200 km Lacaron, Malita, Davao 66,000 With RDC endorsement National Road to Brgy. Pangian Including Occidental in 2017 and project Construction of RCBC in support of MARWABEMPCO profile Banana Plantation and Processing Plant, Brgy. Lacaron, Malita, Davao Occidental - Access Road from Junction Davao-Sarangani - Concreting 1.000 km Lacaron, Malita, Davao 35,000 National Road to Sitio Basak in support of Occidental MARWABEMPCO Shrimp Hatchery at Brgy. Lacaron, Malita, Davao Occidental

19-64 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Access Road from Junction Davao-Sarangani - Concreting 1.500 km Basiawan, Sta. Maria, 37,500 National Road to Sitio Colibao in support of Davao Occidental UNICARBAI MPC Cacao Plantation and Processing Plant at Basiawan, Sta. Maria, Davao Occidental

Other Local Roads 3,828,450

BYPASSES/DIVERSION ROADS/MISSING GAPS: 3,828,450 Increased accessibility/connectivity

- H-way Jct. Mana – Ticulon – Lagumit –Little Baguio – - Opening & Bridge Construction (1-30 3.000 km Malita 221,565 With RDC endorsement Alabel Road incl. ROW Lm) and ROW in 2017 and project - Pangian-Pinalpalan-Alabel Road incl. ROW - Opening & Bridge Construction (1-60 5.000 km Malita 258,414 profile Lm) and ROW - Pob. Sta. Maria Pongpong-San Antonio Road incl. ROW - Concreting incl. ROW 3.000 km Sta. Maria 133,500

- Carahayan- Alegado - Glan Road incl. ROW - Opening incl. ROW 5.000 km Jose Abad Santos 229,800 - Nuing-San Isidro-Molmol-Lagimit-Big Margus-Glan - Opening incl. ROW 5.000 km Jose Abad Santos 197,500 Road incl. ROW - Sarangani Island Circumferential Road incl. ROW - Concreting incl. ROW 5.000 km Sarangani Island 275,300 - Cayaponga-Malalan Bypass Road incl. ROW - Construction/ Opening/ Concreting and 1.500 km Jose Abad Santos 246,750 ROW - Calian-Mabuhay-Little Baguio Bypass Road - Construction/ Opening/ Concreting and 5.000 km Don Marcelino 200,225 With project profile ROW - Culaman-Kinam-Malapatan Bypass Road - Construction/Opening and ROW 7.250 km Jose Abad Santos 290,326 - Datu Danwata-Latian-Little Baguio Bypass Road - Construction/Opening and ROW 5.000 km Malita 200,225 - Demoloc-San Juan-Malungon Bypass Road - Construction/Opening including bridge 4.060 km Malita 160,180 ( 60 lm) and ROW - Mana-Lais-Besang Bypass Road - Construction/Opening and ROW 3.450 km Malita 189,805 - Manuel Peralta-Latian-Datal Anggas-Alabel Bypass - Construction/Opening including bridge 6.130 km Malita 220,180 Road (30 lm) and ROW

- Marabatuan-Datal Bukay-Glan Road - Construction/Opening and ROW 6.000 km Jose Abad Santos 240,270 - San Juan-Datu Intan-Malungon Bypass Road - Construction/ Opening including bridge 3.200 km Malita 224,140 (100 lm) and ROW - West Lamidan-Kinam-Malapatan Bypass Road - Construction/Opening and ROW 6.000 km Don Marcelino 240,270 - Calian-Lamidan Diversion Road - Opening incl. ROW 3.000 km Don Marcelino 150,000 - Linadasan-Kiobog Diversion Road - Opening incl. ROW 3.000 km Don Marcelino 150,000

Davao Oriental, 1st Congressional District Davao Oriental 961,755 GAA

MFO I: National Road Network Services 374,835

19-65 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

I. Bridges 374,835 Increased length of national bridges Along national roads widened/reconstructed/ constructed rehabilitated/repaired/ strengthened

Along Surigao del Sur Bdry-Davao Or Coastal - Quinonoan Bridge - Rehabilitation/ Major Repair of 1.000 proj Manay 3,000 Permanent Bridge K1669+894-K1670+108

- Kuta Bridge - Rehabilitation/ Major Repair of 1.000 proj Caraga 1,100 Permanent Bridge K1639+092-K1639+122

- Baganga Bridge - Widening (into 4 lanes) including app 230.800 lm Baganga 282,006 (168.2 lm) and ROW K1589+600-K1590+000

- Masao Bridge - Widening (into 4 lanes) including app 18.850 lm Baganga 32,174 (400.15 lm) and ROW K1582+127-K1582+546

- Taytayan Bridge - Rehabilitation/ Major Repair of 1.000 proj Cateel 1,100 Permanent Bridge K1551 + 366-K1551+ 518

- Wiig Bridge - Widening (into 4 lanes) including app 18.830 lm Boston 33,683 (451.17 lm) and ROW K1521 + 879-K1522+ 220

Along Compostela - Cateel Road (Davao Oriental Side)

- Aliwagwag Bridge - Rehabilitation/ Major Repair of 1.000 proj Cateel 2,500 Permanent Bridge K1568 + 571-K1568+ 682

- Tagolinao Bridge - Widening (into 4 lanes) including app 12.800 lm Cateel 17,272 (119.2 lm) and ROW K1567 +160-K1567+292

- Udiongan Bridge - Rehabilitation/ Major Repair of 1.000 proj Cateel 2,000 Permanent Bridge K1569 + 1878-K1569+ 1936

Other Local Roads 586,920 Increased accessibility/connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: #REF! 586,920

- San Ignacio Bypass Road incl. ROW - Opening & Bridge Construction (2-100 3.300 km Manay 193,800 With RDC endorsement in Lm) including ROW 2017 and project profile

- Mati-Lupon-Manay Road incl. ROW - Concreting incl. ROW 10.000 km Lupon - Manay 393,120 With project profile

19-66 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

Davao Oriental, 2nd Congressional District Davao Oriental 2,995,194 GAA

MFO I: National Road Network Services 817,574

I. Bridges 817,574

Along national roads Along Pres. Diosdado Macapagal Highway Increased length of national bridges - Cuabo Bridge - Widening (2 into 4 lanes) of Bridge 15.640 lm Lupon widened/reconstructed 33,000 including approaches (277.36 lm) K1744+990 - K1745+281 - Bitanagan Bridge - Widening (2 into 4 lanes) of Bridge 31.740 lm Mati 45,000 including approaches (400.26lm) and K1706+565 - K1706+997 ROW - Tagaomom Bridge - Widening (2 into 4 lanes) of Bridge 12.600 lm Mati 24,000 including approaches (399.4lm) and K1705+008 - K1705+420 ROW - Taganoknok Bridge - Widening (2 into 4 lanes) of Bridge 26.50 lm Mati 39,000 including approaches (399.5 lm) K1699+705 - K1700+121

- Mayo Bridge - Widening (2 into 4 lanes) of Bridge 225.00 lm Mati 304,000 including approaches (564 lm) K1701+405 - K1702+192 - Sumlog Bridge - Widening (2 into 4 lanes) of Bridge 232.00 lm Lupon 314,000 including approaches (600 lm) K1748+938 - K1749+766 - Bilawan Br. - Retrofitting 1.000 proj Mati 2,074

- Camogna Bridge along Tibanban-Lavigan Road - Widening (2 into 4 lanes) of Bridge 40.00 lm Camogna 54,000 including approaches (403 lm) K1773+069 - K1773+512

- Bitaogan Br. Along Jct. Manikling-Gov. Generoso - Repair/Rehabilitation 1.000 proj San Isidro Increased length of national bridges 2,500 Road rehabilitated/retrofitted

MFO 2: Flood Management Services 0.00 330,000 Decreased areas vulnerable to flooding

- Batasan Creek - Construction of Concrete Revetment 200.00 lm Lupon 10,000 With RDC endorsement - Cuabo Creek - Construction of Concrete Revetment 250.00 lm Lupon 10,000 in 2017 - Mabua Creek - Construction of Concrete Revetment 500.00 lm Davao Oriental 20,000 - Muñoz Creek - Construction of Concrete Revetment 50.00 lm Davao Oriental 2,500 - Camansi Creek - Construction of Concrete Revetment 50.00 lm Davao Oriental 2,500 - Batobato Creek - Construction of Concrete Revetment 50.00 lm Governor Generoso 2,500 - La union Creek - Construction of Concrete Revetment 100.00 lm San Isidro 5,000

19-67 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Magdug Creek - Construction of Concrete Revetment 1,000.00 lm Governor Generoso 40,000 - Nangan Creek - Construction of Concrete Revetment 100.00 lm Governor Generoso 5,000 - Tamban Creek - Construction of Concrete Revetment 50.00 lm Governor Generoso 2,500 - Dawan Creek - Construction of Concrete Revetment 50.00 lm Mati 2,500 - Dinagsaan Creek - Construction of Concrete Revetment 100.00 lm Davao Oriental 5,000 - Pangyan River - Construction of Concrete Revetment 50.00 lm Lupon 2,500 - Tandang Sora River - Construction of Gabion 375.00 lm Governor Generoso 15,000 - Anitap River - Construction of Gabion 750.00 lm Governor Generoso 30,000 - Upper Tibanban Creek - Construction of Gabion 1,150.00 lm Governor Generoso 50,000 - Oregon Creek - Construction of Gabion 1,725.00 lm Governor Generoso 75,000 - Tubo-Tubo River - Construction of Gabion 1,150.00 lm Governor Generoso 50,000

MFO 3: Construction and Maintenance Services of 1,453,620 Other Infrastructure Reduced travel time from Airport, Ports, and overland terminal to major tourism destinations; increased access to service centers/tourism destinations, trade and industry I. Roads Leading to Declared Tourism Destinations 1,018,620

- Construction of Concrete Road - Brgy. Macambol to - Concreting 12.500 km Mati 405,000 Brgy. Cabuaya leading to Liver Pool & Beach Resort, Oak and Pujada Island, Rock Formations, Lake And White Sand Beaches, Brgy. Macambol, Mati City, Davao Oriental

- Improvement/Concreting from Proper Talisay to - Concreting 3.000 km Mati 69,000 Sitio Magtalinga Road San Isidro, Davao Oriental leading to Pugad Sayaw Tourist Spot, Mati, Davao Oriental - Concreting of Don Martin Marundan to Buso, Mati - Concreting 1.000 km Mati 46,000 Davao Oriental Road leading to Buso Hot Spring & Banana Plantation, Mati, Davao Oriental

- Construction of Coastal Road from Purok 5 Poblacion - Concreting 4.810 km Banaybanay 105,820 to Santos, Baybay Calubihan, Banaybanay, Davao Oriental leading to Migratory Bird Sanctuary

- Improvement/ Concreting of Road from Sitio Pasto, - Concreting 8.000 km Governor Generoso 184,000 Brgy. Crispin Dela Cruz, Sitio Badiang, Brgy. Osmeña, Governor Generoso, Davao Oriental leading to Mt. Hamiguitan Range and Wildlife Sanctuary

19-68 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Concreting of Brgy. Maputi to Cawacawa Road San - Concreting 8.000 km San Isidro 200,000 Isidro, Davao Oriental leading to Cawacawa Pool and Falls - Improvement of Cambaleon Lake, San Isidro, Davao - Concreting 0.100 km San Isidro 2,200 Oriental leading to Cambaleon Lake and Wild Duck Sanctuary - Construction of Road leading to Seaport at Brgy. - Concreting 0.300 km San Isidro 6,600 Baon, San Isiro, Davao Oriental

II. Roads Leveraging Linkages of Industry and Trade 435,000

- Construction Of Road Connecting Junction Brgy. - Concreting 2.000 km Banaybanay 20,000 Paniquian To Brgy. Mahayag In Support To Agribusiness: Cacao, Corn And Coconut Industry - Brgy. Banaybanay Parish Center connecting to - Concreting 2.000 km Banaybanay 20,000 Molave Poblacion Banaybanay in support of Rice, Coconut, Mango and Banabana Industries - Bucana Piso connecting to Mapanga Brgy. Calubihan - Concreting 1.500 km Banaybanay 15,000 banaybanay in support of Coconut, Banana, Mango and Rice Industries, Banaybanay, Davao Oriental

- Concreting of Road connecting to Purok 6-B - Concreting 2.000 km Banaybanay 20,000 Poblacion in support of Coconut, Banana and Rice Industries, Banaybanay, Davao Oriental - NHJ Brgy. Limbahan connecting to Brgy. Ilangay in - Concreting 4.000 km Lupon 40,000 support of Coconut, Banana and Mango Industries, Lupon, Davao Oriental

- Concreting of Road connecting to Brgy. San Jose in - Concreting 3.000 km Lupon 30,000 support of Coconut, Banana, Corn, Cacao and Mango Industries, Lupon, Davao Oriental - Concreting of Road connecting to Brgy. Magsaysay - Concreting 3.000 km Lupon 30,000 in support of Coconut, Banana, Corn and Mango Industries, Lupon, Davao Oriental - Concreting of Road connecting to Brgy. Lantawan in - Concreting 4.000 km Lupon 40,000 support of Coconut, Banana, Corn, Cacao and Falcata Industries, Lupon, Davao Oriental

- Concreting of Road connecting to Brgy. Mahayahay - Concreting 2.000 km Lupon 20,000 in support of Coconut, Banana, Corn, Rice and Falcata Industries, Lupon, Davao Oriental

- Brgy. Baybay connecting to Brgy. Batobato in - Concreting 1.000 km San Isidro 10,000 support of Coconut, Banana,Fishpond and Mango Industries, San Isidro, Davao Oriental

19-69 BRIEF PROGRAM/PROJECT DESCRIPTION SPATIAL COVERAGE RDP RESULTS MATRIX (RM) SOURCE OF UACS PROGRAMS/ACTIVITIES/PROJECTS COST (PHP'000) LEVEL OF READINESS REMARKS Scope of Work Physical Target PROVINCE INDICATOR ADDRESSED FUNDS

- Concreting of Road connecting to Brgy. Maag in - Concreting 3.000 km San Isidro 30,000 support of Coconut, Banana, Rice and Mango Industries, San Isidro, Davao Oriental

- Concreting of Road connecting to Brgy. San Miguel in - Concreting 3.000 km San Isidro 30,000 support of Coconut, Banana, Corn, Cacao and Mango Industries, San Isidro, Davao Oriental

- Concreting of Road connecting to Brgy. Montserrat - Concreting 1.000 km Governor Generoso 10,000 in support of Coconut, Banana, Corn and Fishport Industries, Governor Generoso, Davao Oriental

- Concreting of Road connecting to Purok Baybay Brgy. - Concreting 2.000 km Governor Generoso 20,000 in support of Coconut, Banana, and Mango Industries, Governor Generoso, Davao Oriental

- Concreting of Road connecting to Sitio Lampasan - Concreting 2.000 km Mati 20,000 Brgy. Dawan in support of Coconut, Banana, Corn, Cacao, Mango and Falcata Industries, Mati City, Davao Oriental - Concreting of Road connecting to Brgy. Danao in - Concreting 3.000 km Mati 30,000 support of Coconut, Banana, Corn, Cacao, Mango, Falcata and Durian Industries, Mati City, Davao Oriental - Concreting of Road connecting to Sitio Baso Brgy. - Concreting 2.000 km Mati 20,000 Badas in support of Coconut, Banana, Corn, and Cacao Industries, Mati City, Davao Oriental

- Concreting of Road connecting to Sitio Parot Brgy. - Concreting 3.000 km Mati 30,000 Taguibo in support of Coconut, Corn, Cacao, Mango, Falcata, Banabana and Durian Industries, Mati City, Davao Oriental

Other Local Roads 394,000 Increased accessibility/connectivity

BYPASSES/DIVERSION ROADS/MISSING GAPS: 7.06 394,000

- Mati-Lupon-Manay Road - Concreting 10.000 km Mati-Lupon 394,000 With RDC endorsement in 2017 and project profile

19-70