March 17, 2021 DATE PRG Overview

• Patapsco Regional Greenway is a proposed 40-mile, shared-use trail running through the State Park from the to Sykesville. • Completed segments include: – Freedom Park Trail (Carroll Co. 1.6 miles) – ( Co. 5.3 miles) – at the Middle Branch (Baltimore City 1.6 miles) – at Ridgely’s Cove (Baltimore City 1.0 miles) – Trail at the Inner Harbor (Baltimore City 0.4 miles) – Waterfront Promenade (Baltimore City 1.3 miles) – Port Covington Waterfront Parks (Baltimore City 1.2 miles)

2 Sykesville to McKeldin, Carroll County

Preliminary Design: Feb 2021 – Dec 2021 Tasks completed to date: • Kickoff Meeting 2/5/21 • Established bi-weekly progress meetings • Steering Committee site visit 2/17 (primarily for the downtown section) • Preparing for site visit for Freedom Park Trail to PVSP McKeldin area • Existing data collection – Local planning documents, obtained County GIS data, cultural and natural resource data • Established contact information for the Advisory Committee. (meeting to be scheduled this week) • Tech Memo #1 – Outlines existing conditions, narrative, and mapping

3 Next Steps • Develop existing conditions GIS mapping – end of March 2021 • Advisory Committee – Hold initial meeting to review project objectives • Complete alternative development and present to Steering Committee – Two alignments from downtown Sykesville to Freedom Park – Two alignments from Freedom Park to PVSP McKeldin area • Prepare Technical Memorandum #1 documenting: – Existing conditions – Alignment alternatives – Steering Committee comments – Preliminary cost estimate • Develop materials for public input

4 For More Information