Pre Feasibility Report July 2019

Total Page:16

File Type:pdf, Size:1020Kb

Pre Feasibility Report July 2019 Delhi-Mumbai Industrial Corridor Andhra Pradesh Industrial Development Corporation Infrastructure Corporation ENVIRONMENTAL IMPACT ASSESSMENT OF KRISHNAPATNAM INDUSTRIAL NORTH NODE Pre Feasibility Report July 2019 L&T Infra Engineering C1181311 L&T Infrastructure Engineering Limited RP002, Rev.C L&T Infrastructure Engineering Ltd. Client: Delhi Mumbai Industrial Corridor Development Corporation DMICDC Project: Project No.: EIA for Krishnapatnam North Node C1181311 Title: Document No.: Rev.: Pre-feasibility Report RP002 C This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\ports\2018\c1181311 - eia krishnapatnam node\working\reports\rp002- nor be copied or otherwise made use of either in full or in part by such person or form-1, tor & pfr\third submission\pfr 16.07.2019 r3.docx body without our prior permission in writing. Notes: 1. CONCEPT OF NODE DEVELOPMENT IS SIMILAR TO INDUSTRIAL PARK, THEREFORE THIS PROJECT WILL FALL UNDER CATEGORY 7(C) of Schedule of EIA NOTIFICATION, 2006 (as amended) Revision Details: SAP TKSS C 28-06-2019 Fourth Submission VHR BRT SAP B 30-05-2019 Third Submission VHR CVS BRT GNT SAP A 23-05-2019 Second Submission CVS VHR BRT SNV SAP 0 23-04-2019 First Submission CVS VHR BRT Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved EIA for Krishnapatnam North Node C1181311 Pre-feasibility Report RP002 rev.C TABLE OF CONTENTS 1 Preface ......................................................................................................................................... 1-1 2 Executive Summary.................................................................................................................... 2-1 3 Project Introduction/ Background Information ....................................................................... 3-1 3.1 Project Developer ................................................................................................................. 3-1 3.2 Project Site Location ............................................................................................................. 3-1 3.3 Need for the Project .............................................................................................................. 3-2 3.4 Brief Description of Nature of Project ................................................................................... 3-3 3.4.1 Industrial Sector Categorisation as per EIA Notification ............................................. 3-4 3.5 Economic Impact of the Project ............................................................................................ 3-7 3.6 Location Advantage/Justification .......................................................................................... 3-7 3.6.1 Salient Features of the Project Site ............................................................................ 3-7 3.7 Employment Generation ....................................................................................................... 3-8 4 Project Description ..................................................................................................................... 4-1 4.1 Type of Project ...................................................................................................................... 4-1 4.2 Site Location ......................................................................................................................... 4-1 4.3 Details of Alternative Sites .................................................................................................... 4-1 4.4 Size or Magnitude ................................................................................................................. 4-2 4.5 Resources Availability and Optimisation ............................................................................... 4-2 4.5.1 Water Availability & Source ........................................................................................ 4-2 4.5.2 Energy/Power & Source ............................................................................................. 4-3 4.5.3 Wastewater Treatment and Reuse ............................................................................. 4-3 4.5.4 Solid Waste Management........................................................................................... 4-4 4.6 Site Information ..................................................................................................................... 4-4 4.6.1 Topography ................................................................................................................. 4-6 4.6.2 Climate ........................................................................................................................ 4-6 4.6.3 Ecological Sensitive Areas and Other Marine Protected Area ................................... 4-7 4.6.4 CRZ Applicability ........................................................................................................ 4-9 4.6.5 Existing Connectivity ................................................................................................. 4-11 4.6.6 Land Ownership ........................................................................................................ 4-11 4.6.7 Existing Land use Pattern ......................................................................................... 4-13 4.6.8 Social Infrastructure .................................................................................................. 4-15 5 Planning Brief ............................................................................................................................. 5-1 5.1 Planning Concept .................................................................................................................. 5-1 5.2 Planning Considerations ....................................................................................................... 5-2 5.3 Land use Planning ................................................................................................................ 5-2 5.3.1 Industrial Area ............................................................................................................. 5-5 5.3.2 Technical Infrastructure .............................................................................................. 5-5 5.3.3 Amenities .................................................................................................................... 5-5 5.3.4 Utilities ........................................................................................................................ 5-6 5.3.5 Housing ....................................................................................................................... 5-7 5.3.6 Logistics Zone ............................................................................................................. 5-7 5.3.7 CRZ Area .................................................................................................................... 5-7 5.3.8 Green Areas ............................................................................................................... 5-7 5.3.9 Entry/Exit .................................................................................................................... 5-9 5.3.10 Internal Roads Network ............................................................................................ 5-11 6 Proposed Infrastructure ............................................................................................................. 6-1 6.1 Connectivity........................................................................................................................... 6-1 6.1.1 Approach Road ........................................................................................................... 6-2 6.2 Physical Infrastructure .......................................................................................................... 6-3 6.2.1 Water Supply .............................................................................................................. 6-3 6.2.2 Power Supply .............................................................................................................. 6-4 6.2.3 Wastewater Management ........................................................................................... 6-7 6.2.4 Storm Water Management.......................................................................................... 6-7 6.2.5 Solid Waste Management........................................................................................... 6-8 Table of Contents Page i C1181311 EIA for Krishnapatnam North Node RP002 rev.C Pre-feasibility Report 6.2.6 Housing ....................................................................................................................... 6-8 6.2.7 Logistics Zone ........................................................................................................... 6-10 6.2.8 Social Infrastructure .................................................................................................. 6-12 7 Rehabilitation and Resettlement Plan ...................................................................................... 7-1 8 Project Schedule and Cost Estimates ...................................................................................... 8-1 9 Analysis of Proposal .................................................................................................................
Recommended publications
  • Water for 4.92 Lakh Acres of Land in Nellore Dist
    Jana Sena would be an insignificant factor in the next Modern Telugu script evolved Y S Jagan elections and the fight would be only between the YSRC and Mohan from the old Telugu script from Reddy, the 11th to the 19th centuries the TDP. And I a going to co e to !ower and this is certain YSRC chief TIRUPATI SUNDAY 03 29�10�2017 Steps taken to curb road accidents: SP EXPRESS NEWS SERVI CE @ Kadapa !+ A Ba) <ee said that concrete steps were taken to c r) road accidents in the district and modern technology is )eing sed to contain crimes. The !+ held a crime review meeting here on !at rday in which $is" trict :egal !ervices A thority @$:!AA !ecretary == +rasad and $ep ty Transport (ommis" sioner % Basi 'eddy attended. !peaking on the occasion# the !+ directed the police and transport officials to keep strict tem has come in handy to police vigil# where highways are in preventing ) rglaries and crossed and cond ct patrolling ho se)reakings# the !+ said. to prevent road accidents. The $T( e.plained the steps He asked the police and trans" taken to c r) mishaps in the ac" port officials to work in a coor" cident prone areas. The $:!A dinated manner to contain road !ecretary clarified the do )ts accidents in the district. Top of police personnel on vario s FLORAL OFFERINGS TO LORD priority is )eing given to check legal iss es. Additional !+ A illegal sand mining and smug- Srinivasulu 'eddy, ASP Krish- Pushpa Yagam being performed at Sri Venkateswara temple at Tirumala on Saturday.
    [Show full text]
  • Environmental Impact Assessment of Krishnapatnam Industrial North Node
    Andhra Pradesh Industrial National Industrial Corridor Development Infrastructure Corporation Corporation (NICDC) Limited. ENVIRONMENTAL IMPACT ASSESSMENT OF KRISHNAPATNAM INDUSTRIAL NORTH NODE Executive Summary August 2020 SUBMITTED BY L&T Infra Engineering C11811311 RP005, Rev. 0 L&T Infrastructure Engineering Ltd. Client: National Industrial Corridor Development Corporation Limited NICDC Project: Project No.: EIA Krishnapatnam North Node C1181311 Title: Document No.: Rev.: Executive Summary RP005 0 This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\ports\2018\c1181311 - eia krishnapatnam node\working\reports\executive nor be copied or otherwise made use of either in full or in part by such person or summary\executive summmary english.docx body without our prior permission in writing. Notes: 1. Revision Details: IRR 0 31.08.2020 First Submission VHR SAP TKSS SNV Sign Init. Sign. Init. Init. Sign. Rev. Date Details . Prepared Checked Approved Table of Contents EIA Krishnapatnam North Node C1181311 Executive Summary RP005 rev. 0 TABLE OF CONTENTS 1 Introduction .....................................................................................................................................1 2 Project Site ......................................................................................................................................1 3 Justification of the Project ............................................................................................................3
    [Show full text]
  • LHA Recuritment Visakhapatnam Centre Screening Test Adhrapradesh Candidates at Mudasarlova Park Main Gate,Visakhapatnam.Contact No
    LHA Recuritment Visakhapatnam centre Screening test Adhrapradesh Candidates at Mudasarlova Park main gate,Visakhapatnam.Contact No. 0891-2733140 Date No. Of Candidates S. Nos. 12/22/2014 1300 0001-1300 12/23/2014 1300 1301-2600 12/24/2014 1299 2601-3899 12/26/2014 1300 3900-5199 12/27/2014 1200 5200-6399 12/28/2014 1200 6400-7599 12/29/2014 1200 7600-8799 12/30/2014 1177 8800-9977 Total 9977 FROM CANDIDATES / EMPLOYMENT OFFICES GUNTUR REGISTRATION NO. CASTE GENDER CANDIDATE NAME FATHER/ S. No. Roll Nos ADDRESS D.O.B HUSBAND NAME PRIORITY & P.H V.VENKATA MUNEESWARA SUREPALLI P.O MALE RAO 1 1 S/O ERESWARA RAO BHATTIPROLU BC-B MANDALAM, GUNTUR 14.01.1985 SHAIK BAHSA D.NO.1-8-48 MALE 2 2 S/O HUSSIAN SANTHA BAZAR BC-B CHILAKURI PETA ,GUNTUR 8/18/1985 K.NAGARAJU D.NO.7-2-12/1 MALE 3 3 S/O VENKATESWARULU GANGANAMMAPETA BC-A TENALI. 4/21/1985 SHAIK AKBAR BASHA D.NO.15-5-1/5 MALE 4 4 S/O MAHABOOB SUBHANI PANASATHOTA BC-E NARASARAO PETA 8/30/1984 S.VENUGOPAL H.NO.2-34 MALE 5 5 S/O S.UMAMAHESWARA RAO PETERU P.O BC-B REPALLI MANDALAM 7/20/1984 B.N.SAIDULU PULIPADU MALE 6 6 S/O PUNNAIAH GURAJALA MANDLAM ,GUNTUR BC-A 6/11/1985 G.RAMESH BABU BHOGASWARA PET MALE 7 7 S/O SIVANJANEYULU BATTIPROLU MANDLAM, GUNTUR BC-A 8/15/1984 K.NAGARAJENDRA KUMAR PAMIDIMARRU POST MALE 8 8 S/O.
    [Show full text]
  • Ddos Nellore.Pdf
    Name of DDO Mobile EMAIL ddodesg ddodesc OLD DDO CODE 9949911508 [email protected] M.P.D.O MPDO 8042202047 ATMAKUR B. VIJAY SUKUMAR 9573696378 [email protected] SPL.DY.COL SPL. DY 8011217005 L.TGP( LA) COLLECTO nellore unit R PANGULURU 9505517213 [email protected] AD AD 8010104001 ANITHA KUMARI MARKETING NLR B.Muralidhar 9848775361 PRL I.T.I Principal 8091502001 SANGAM [email protected] B.Ravindra Babu 8374449052; [email protected] AD AD 8010103001 HORTICULT URE NLR BALASANI 8374449053; [email protected] A.D OF AD 08012403001 SRINIVASULU HORTICULT URE NO.II,ATMAK URU P.Praharaju 9550785637 [email protected] SC BH NO.5 hostel welfar 0801-2402-006 M.Thirupathaiah 9705346067 [email protected] Office of the AAO 8030703001 Assistant Audit Officer, State Audit, Gudur Sri D.Simhadri 9705346057 [email protected] Office of the AAO 8010703004 Assistant Audit Officer, State Audit, Nellore G.VIJAYA LAKSHMI 9963694222; [email protected] Office of the DAO 8010703002 Assistant Audit Officer, State Audit (MANDAL PARISHAD), Nellore G.VIJAYA LAKSHMI 9963694222; [email protected] Office of the DAO 8010703003 Assistant Audit Officer, State Audit (ZP), Nellore T.Venkateswarlu 9849904497 [email protected] ABCWO ASST.BC 08012403001 NELLORE WELFARE OFFICER KAPARAPU 9494938251; [email protected] ASST CANE AST. CANE 8011308001 LOKESWAR COMMISSIO COMMISSIO NER NER ,PAPPULU STREET ,STONEHOU SEPET,NELL ORE K.Omkar Rao 9492555116 [email protected] ASS COMM ACL 8031503002 OF LABOUR GUDUR Sri P. Venkata 9492555115 [email protected] ASST ACL 8011503008 Narayana COMM OF LABOUR NELLORE Prabhu Kumar [email protected] AC.LEGAL AD 8011609001 Rayana METROLOG Y NELLORE Moldireddy.Sudhakar 9440902265; [email protected] A.C.
    [Show full text]
  • Master Plan and Zonal Development Plan for NUDA Region
    Request for Proposal (RFP) For Preparation of Perspective Plan, Master Plan and Zonal Development Plan for NUDA Region NELLORE URBAN DEVELOPMENT AUTHORITY Door No:26-1-891 Near Shirdi Sai temple B.V.Nagar, Mini By-Pass Road,Nellore SPSR Nellore District Andhra Pradesh, India Email: [email protected] REQUEST FOR PROPOSAL (RFP) Consultancy Services for 1) Review of General Town Planning Scheme (Master Plan) for Nellore Municipal Corporation in GIS format and Preparation of new Master Plan for merging villages of Nellore Municipal corporation, Sullurupeta Municipality and Naidupeta Nagarpanchayat in GIS format with special emphasis on Urban Infrastructure, Transportation plan and Investment Plan. 2) Preparation of Perspective Plan, Master Plan and ZDPs for the entire NUDA Region in GIS format in synchronize with the ULBs. 3) Detailed Zoning Regulations. SECTION – 1 BRIEF INTRODUCTION RFP-NUDA 1 Introduction 1.1 Nellore Urban Development Authority (NUDA) was constituted on 24.03.2017 vide G.O.MS.No. 108, MA&UD DePartment, Government of Andhra Pradesh under powers granted under sections 3 and 4 of the Andhra Pradesh Metropolitan Region and Urban Development Authorities Act, 2016, with the areas for a total area of 1644.17 Sq.Kms stretching from Nellore Municipal Corporation, Kavali, Guduru, Sullurupeta Municipalities and Naidupeta Nagarapanchayat and 156 villages in 21 mandals (i.e. 145 villages in 19 mandals in SPSR Nellore District and 11 villages in 2 mandals in Chittoor District). The population of NUDA region as per Census 2011 is 13.01 Lakhs 1.2 As said above the functions of NUDA will be governed by under Andhra Pradesh Metropolitan Region and Urban Development Authorities Act 2016 with the objective of achieving orderly (planned) growth and environmental up gradation wherever necessary.
    [Show full text]
  • A P Social Welfare Residential Educational Institutions Society Hyderabad D.S.S
    A P SOCIAL WELFARE RESIDENTIAL EDUCATIONAL INSTITUTIONS SOCIETY HYDERABAD D.S.S. Bhavan Complex, Opp: Chacha Nehru Park, Masab Tank, Hyderabad Toll Free No: 1800-425-45678 Rc.No.E2/0639/2015 Dated:19.02.2015 FIFCAT -2015 (FIFTH CLASS COMMON ADMISSSION TEST-2015) NOTIFICATION FOR ADMISSION INTO 5th CLASS (ENGLISH MEDIUM) FOR THE ACADEMIC YEAR 2015-2016 The APSWREIS visualizes to providing quality modern education to the talented students of belonging to marginalized section of Society, predominantly from rural through the use of modern techniques, pedagogy and various experiential learning activities in a stress-free environment to make learning a joyful experience. The APSWREIS is intended to conduct an Entrance Test 2015 for admission into Class V during the academic year 2015-2016 in all APSWR Institutions across the state on 12.4.2015 between 11.00 AM to 1.00 PM. 1. Eligibility Criteria: a) SC / ST students should have born between 01.09.2002 to 31.08.2006. b) OC / BC / SC-Converted Christians (BC-C) should have born between 01.09.2004 to 31.08.2006. c) The student should have studied continuously in the respective district for the two academic years (2013-14 and 2014-15) in a Government school or in a school recognized by the Government. d) During the year 2014-15 candidates must be studying 4th class continuously in a Government school or in a recognized school. e) The parental income for the year 2014-15 should not be exceed Rs.60,000/- per annum for rural areas and Rs.75000/- for Urban areas.
    [Show full text]
  • Physical Science 15 ------9493511572
    SSC PUBLIC EXAMINATIONS, MARCH - 2015 :: SPOT VALUATION :: TENTATIVE SENIORITY LIST :: SPSR NELLORE DISTRICT SUBJECT :- PHY.SCI. No of Years Handling Whether in dealing X Class if yes, X Class DESIGNATION S/NO Name of the MANDAL NAME OF THE SCHOOL NAME OF THE TEACHER WITH SURNAME (including HM) in the present handling CELL NO REMARKS (with Subject) academic year subject SA CADRE LP CADRE (2014-2015) 1 OZILI APRS CHILAMANCHENU B. Vidyasagar PGT-PS Yes PS 24 9490413938 2 SYDAPURAM MMLWO HS TALUPUR I SREEDHAR SA-PS YES SCIENCE 22 0 9493525449 3 SULLURPET GHS SULLURPET G MADHUSUDHAN BABU SA-PS YES PS 21 9440994826 4 KAVALI MPL HS VR NAGAR B.Madhusudhana Raju SA-PS YES PS 20 9000390788 5 VAKADU PJN GHS VAKADU Smt A Nagamani SA-PS YES SCIENCE 19 9550640930 6 ALLUR RKJC ALLUR P.Sambaiah SA-PS YES PHYSICS 19 9441937729 7 VENKATAGIRI APSWRS GIRLS VENKATAGIRI C, Konaiah SA-PS Yes PS 18 18 9550930197 8 KAVALI APRS THUMMALAPENTA M.RAMESHCHANDRA PGT-PS YES PS 18 18 9493922110 9 OZILI ZPPHS KURUGONDA G MURALI SA-PS YES PS 17 9491448505 10 Nellore BVS Mpl Corp Girls High School, Nawabpet, NelloreM.Venkateswarlu SA-PS Yes P.S. 17 2 9866045253 11 SYDAPURAM MMLWO HS KALICHEDU V V RAMANAIAH SA-PS YES SCIENCE 16 0 9441539390 12 CHILLAKUR ZPPHS PCV PALEM B Srinivasulu SA-PS YES PS 15 8985939395 13 VENKATAGIRI RVM HS VENKATAGIRI K V USHAHARINI SA-PS yes PS 15 9492937007 14 Kodavalur APTW JR.COLLEGE (G), C S PURAM Paleti.Venkateswara rao PGT-PS Yes Physical science 15 ------ 9493511572 15 Indukurpet GAHS, MYPADU Devarapalli Ravindra Babu SA-PS YES PS 15 0 16 CHILLAKUR ZPPHS CHILLAKUR V VIMALA SA-PS YES PS 14 9866226754 17 SULLURPET ZPPHS MANNARPOLUR A RAMESH SA-PS Yes PS 14 9989123204 18 BUCHIREDDYPALEM ZPHS, Damaramadugu P.V.
    [Show full text]
  • Sarvepalli Assembly Andhra Pradesh Factbook
    Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781, 26810964-65-66 Email : [email protected] Website : www.electionsinindia.com Online Book Store : www.datanetindia-ebooks.com Report No. : AFB/AP-119-0118 ISBN : 978-93-5293-014-2 First Edition : January, 2018 Third Updated Edition : June, 2019 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 160 for the use of this publication. Printed in India No. Particulars Page No. Introduction 1 Assembly Constituency at a Glance | Features of Assembly as per 1-2 Delimitation Commission of India (2008) Location and Political Maps 2 Location Map | Boundaries of Assembly Constituency in District | Boundaries 3-9 of Assembly Constituency under Parliamentary Constituency | Town & Village-wise Winner Parties- 2014-PE, 2014-AE, 2009-PE and 2009-AE Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 10-15 Villages | Village Panchayat | Intermediate Panchayat Demographics 4 Population | Households | Rural/Urban Population | Towns and Villages by 16-17 Population Size | Sex Ratio
    [Show full text]
  • R""Th*L+Ffi LI"#ANDAGRICULTURE
    Annexure-II GOVERNMENT OF ANDHRA PRADESH ANDHRArnaonsHrffi GPfl r""tH*l+ffi LI"#ANDAGRICULTURE REQUEST FOR BIDS (RFB) (One Envelope Bidding Process without e-Procurement) NATIONAL OPEN COMPETITIVE PROCUREMENT Tender Notice No. 10/2018-19, Dt: 09/06/2018 The Superintending Engineer, Irrigation Circle, Nellore District, invited Tenders from the intending bidders for the following works. Bid Documents can be purchased from the above. Approxlmate Pack Bid Security value ofwork Cost of Period of Name of work (Rs.l age (Rs. In Lakhs) Document Completion No ANDHRA PRADBSH - IIITEGRATED IRRIGATION AND AGRICULTURE TRANSFORMATION PROJECT (APIIATP. NATIONAL COMPETITIVE BIDDING- WORLD BANK PHASEII) SPSR NELLORE DISTRICT REHABILITATION OF SANKAVARAM TANK 6000+ 1080= 1 (INDEPENDENT) IN SANKAVARAM VILLAGE IN 9679023 194000 12 Months 7O8O VINJAMURU MANDAL / REHABILITATION OF TELUGURAYAPURAM 6000+ 1080= o TANK(INDEPENDENT)IN TELUGURAYAPURAM 7ao4547 156500 12 Months 7o8o - VILI.AGE IN KALUVOYA MANDAL I REHABILITATION OF RUDRAKOTA L,ARGE TANK 6000+ 1080= .) (INDEPENDENT) IN RUDRAKOTA VILLAGE IN 8202802 164500 12 Months 7O8o - KAVALI MANDAL I REHABILITATION OF BODAGUDIPADU TANK 6000+ 1080= (INDEPENDENT) IN BODAGUDIPADU VILLAGE IN 9340217 187000 1.2 Months 4 7080 - DAGADARTHI MANDAL I REHABILITATION OF DUNDIGAM TANK 6000+ 1080= 5 (INDEPENDENT) IN DUNDIGAM VILLAGE IN 32BB02t 66000 12 Months 7O8o / - DAGADARTHI MANDAL PANDIPADU TANK REHABILITATION OF 6000+ 1080= 6 (INDEPENDENT) IN PANDIPADU VILLAGE IN A S 767LOO4 154000 12 Months 7O8O / - PETA MANDAL TANK REHABILITATION
    [Show full text]
  • Not Applicable for IOC/HPC
    APPOINTMENT OF RETAIL OUTLET DEALERSHIPS IN AP BY IOC Location Sl. Name Of Location Revenue District Type of RO Estimated Category Type of Site Minimum Minimum Minimum Estimated Estimated Mode of Fixed Fee / Security No. (Not (Regular/Rur monthly (CC/DC/CFS) Frontage of Depth of Site Area of site working fund selection Min bid Deposit ( Rs applicable al) Sales Site (in M) (in M) (in Sq. M.). capital required for (Draw of amount ( Rs in Lakhs) for IOC/HPC) Potential requirement developmen Lots/Bidding in Lakhs) (MS+HSD) in for t of ) Kls operation of infrastructur RO (Rs in e at RO (Rs Lakhs) in Lakhs ) DRAW OF 1 BUKKAPATNAM VILLAGE & MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 2 GOTLUR VILLAGE, DHARMAVARAM MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 3 VAYALPADU (NOT ON NH - SH), VAYALAPADU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS THONDAVADA VILLAGE (NOT ON NH/SH), CHANDRAGIRI DRAW OF 4 CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 5 DODDIPALLE (NOT ON NH/SH), PILERU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS NARAYANA NELLORE VILLAGE (NOT ON SH/NH) NANDALUR DRAW OF 6 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 7 ARAKATAVEMULA NOT ON SH/NH , RAJUPALEM MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 8 GUTTURU VILLAGE, PENUKONDA MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 9 MADDALACHERUVU VILLAGE, KANAGANAPALLE MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 10 KALICHERLA (NOT ON NH/SH), PEDDAMANDYAM MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS CHINNACHEPALLE, NOT ON SH/ NH, KAMALAPURAM DRAW OF 11 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 12 GUDIPADU NOT ON SH/NH, DUVVUR MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS BUGGANIPALLE VILLAGE NOT ON NH/SH, BETHAMCHERLA DRAW OF 13 KURNOOL Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 14 GOVINDPALLE VILLAGE NOT ON NH/SH, SIRVEL MANDAL KURNOOL Rural 48 ST CFS 20 20 400 0 0 0 2 LOTS DRAW OF 15 POLAKAL VILLAGE NOT ON NH/SH, C .
    [Show full text]
  • Brainstorming Meet on Chennai Water Managemnet
    BRAINSTORMING MEET ON CHENNAI WATER MANAGEMNET Organised by REGIONAL METEOROLOGICAL DEPARTMENT & INDIAN METEOROLOGICAL SOCIETY, CHENNAI CHAPTER. ECOSYSTEM BASED SOLUTIONS FOR DISASTER RISK REDUCTION IN CHENNAI CITY AND IT’S SUB URBS. By T. Kanthimathinathan, Water Resources Management (Hydrology & Flood Control) Consultant, T.N.D.R.R.D.A. CHENNAI 03.08.2019. HYDROLOGICAL FEATURES OF CHENNAI AND ITS SUBURBS AN OVERVIEW NATURAL DRAINAGE SYSTEMS OF CHENNAI BASIN Chennai City and its suburbs in Thiruvallur and Kancheepuram Districts lies in Chennai Basin. The main rivers flowing in Chennai basin are, 1. Araniyar 2. Kosasthalaiyar 3. Cooum 4. Adayar There are only five outlets for discharging the entire runoff from Chennai Basin into Bay of Bengal are, 1. Pulicat Creek (Araniyar River) 2. Ennore Creek (Kosasthalaiyar River) 3. Cooum River mouth (Cooum River) 4. Adayar River mouth (Adayar River) 5. Kovalam Creek (Muttukadu & Pallikkaranai isolated water sheds) NATURAL DRAINAGE SYSTEMS OF CHENNAI BASIN Contnd…. The estuarine coastal fragile eco-systems available behind the above outlets of Chennai Basin are, 1. Pulicat Lake behind Pulicat creek 2. Ennore backwaters behind Ennore Creek 3. Pallikkaranai marsh land and Muttukadu backwaters behind Kovalam Creek. Chennai Basin is divided into the following eight sub-basins according to the drainage pattern 1. Gummidipoondi Sub basin 2. Araniyar Sub basin 3. Kosasthalaiyar Sub basin 4. Nagariyar Sub basin 5. Nandhiyar Sub basin 6. Cooum Sub basin 7. Adayar Sub basin & 8. Kovalam Sub basin INTER BASIN TRANSFER SYSTEMS AVAILABLE FOR SUPPLEMENTING CHENNAI BASIN WATER NEEDS. Krishna River to Chennai Basin : From Srisailam reservoir to Somasila reservoir through SRMC, link cannal, Velugodu balancing Reservoir, TGP main canal and CMP Canal.
    [Show full text]
  • F.No.Ll-89 /20 L3-IA.III Government of India
    F.No.ll-89 /20 l3-IA.III • Government of India Ministry of Environment, Forests & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003 Dated: 8th December, 2014 To The Chairman, Mj s Vishakhapatnam Port Trust, Visakhapatnam - 530 035 Fax: 0891-2565023 Email: [email protected] Subject: Setting up of a new major Port at Durgarajapatnam, Andhra Pradesh by M/ s Vishakhapatnam Port Trust - ToR reg. Sir, This is with reference to letter no. IENGjEE(Projects)j110jDRPj Pt.1j743 dated 11.12.2013 forwarding along with application and subsequent letter dated 13.06.2014 seeking for Terms of Reference for the aforesaid project. 2. The proposal was considered by the EAC in its meetings held on 28th February to 1st March, 2014 and 25th - 27th August, 2014 and the proponent has informed that: 1. The proposal involves setting up of a new major Port at Durgarajapatnam, Andhra Pradesh. 11. It is proposed to be developed a major port at Dugarajapatnam along Andhra Coast in the East Coast of India at a distance of about 90 km north of Ennore port and 700 km south of Visakhapatnam port. 111. It is planned to develop the port with world class terminal facilities well suited to meet the present and future needs of the trades. Dugarajapatnam port once developed will have a unique distinction of being most modern green field major port in India with water depth up to 21 m, making it the deepest and capable of handling deep draft super cape size vessels to handle containers and bulk cargo.
    [Show full text]