Pre Feasibility Report July 2019

Pre Feasibility Report July 2019

Delhi-Mumbai Industrial Corridor Andhra Pradesh Industrial Development Corporation Infrastructure Corporation ENVIRONMENTAL IMPACT ASSESSMENT OF KRISHNAPATNAM INDUSTRIAL NORTH NODE Pre Feasibility Report July 2019 L&T Infra Engineering C1181311 L&T Infrastructure Engineering Limited RP002, Rev.C L&T Infrastructure Engineering Ltd. Client: Delhi Mumbai Industrial Corridor Development Corporation DMICDC Project: Project No.: EIA for Krishnapatnam North Node C1181311 Title: Document No.: Rev.: Pre-feasibility Report RP002 C This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\ports\2018\c1181311 - eia krishnapatnam node\working\reports\rp002- nor be copied or otherwise made use of either in full or in part by such person or form-1, tor & pfr\third submission\pfr 16.07.2019 r3.docx body without our prior permission in writing. Notes: 1. CONCEPT OF NODE DEVELOPMENT IS SIMILAR TO INDUSTRIAL PARK, THEREFORE THIS PROJECT WILL FALL UNDER CATEGORY 7(C) of Schedule of EIA NOTIFICATION, 2006 (as amended) Revision Details: SAP TKSS C 28-06-2019 Fourth Submission VHR BRT SAP B 30-05-2019 Third Submission VHR CVS BRT GNT SAP A 23-05-2019 Second Submission CVS VHR BRT SNV SAP 0 23-04-2019 First Submission CVS VHR BRT Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved EIA for Krishnapatnam North Node C1181311 Pre-feasibility Report RP002 rev.C TABLE OF CONTENTS 1 Preface ......................................................................................................................................... 1-1 2 Executive Summary.................................................................................................................... 2-1 3 Project Introduction/ Background Information ....................................................................... 3-1 3.1 Project Developer ................................................................................................................. 3-1 3.2 Project Site Location ............................................................................................................. 3-1 3.3 Need for the Project .............................................................................................................. 3-2 3.4 Brief Description of Nature of Project ................................................................................... 3-3 3.4.1 Industrial Sector Categorisation as per EIA Notification ............................................. 3-4 3.5 Economic Impact of the Project ............................................................................................ 3-7 3.6 Location Advantage/Justification .......................................................................................... 3-7 3.6.1 Salient Features of the Project Site ............................................................................ 3-7 3.7 Employment Generation ....................................................................................................... 3-8 4 Project Description ..................................................................................................................... 4-1 4.1 Type of Project ...................................................................................................................... 4-1 4.2 Site Location ......................................................................................................................... 4-1 4.3 Details of Alternative Sites .................................................................................................... 4-1 4.4 Size or Magnitude ................................................................................................................. 4-2 4.5 Resources Availability and Optimisation ............................................................................... 4-2 4.5.1 Water Availability & Source ........................................................................................ 4-2 4.5.2 Energy/Power & Source ............................................................................................. 4-3 4.5.3 Wastewater Treatment and Reuse ............................................................................. 4-3 4.5.4 Solid Waste Management........................................................................................... 4-4 4.6 Site Information ..................................................................................................................... 4-4 4.6.1 Topography ................................................................................................................. 4-6 4.6.2 Climate ........................................................................................................................ 4-6 4.6.3 Ecological Sensitive Areas and Other Marine Protected Area ................................... 4-7 4.6.4 CRZ Applicability ........................................................................................................ 4-9 4.6.5 Existing Connectivity ................................................................................................. 4-11 4.6.6 Land Ownership ........................................................................................................ 4-11 4.6.7 Existing Land use Pattern ......................................................................................... 4-13 4.6.8 Social Infrastructure .................................................................................................. 4-15 5 Planning Brief ............................................................................................................................. 5-1 5.1 Planning Concept .................................................................................................................. 5-1 5.2 Planning Considerations ....................................................................................................... 5-2 5.3 Land use Planning ................................................................................................................ 5-2 5.3.1 Industrial Area ............................................................................................................. 5-5 5.3.2 Technical Infrastructure .............................................................................................. 5-5 5.3.3 Amenities .................................................................................................................... 5-5 5.3.4 Utilities ........................................................................................................................ 5-6 5.3.5 Housing ....................................................................................................................... 5-7 5.3.6 Logistics Zone ............................................................................................................. 5-7 5.3.7 CRZ Area .................................................................................................................... 5-7 5.3.8 Green Areas ............................................................................................................... 5-7 5.3.9 Entry/Exit .................................................................................................................... 5-9 5.3.10 Internal Roads Network ............................................................................................ 5-11 6 Proposed Infrastructure ............................................................................................................. 6-1 6.1 Connectivity........................................................................................................................... 6-1 6.1.1 Approach Road ........................................................................................................... 6-2 6.2 Physical Infrastructure .......................................................................................................... 6-3 6.2.1 Water Supply .............................................................................................................. 6-3 6.2.2 Power Supply .............................................................................................................. 6-4 6.2.3 Wastewater Management ........................................................................................... 6-7 6.2.4 Storm Water Management.......................................................................................... 6-7 6.2.5 Solid Waste Management........................................................................................... 6-8 Table of Contents Page i C1181311 EIA for Krishnapatnam North Node RP002 rev.C Pre-feasibility Report 6.2.6 Housing ....................................................................................................................... 6-8 6.2.7 Logistics Zone ........................................................................................................... 6-10 6.2.8 Social Infrastructure .................................................................................................. 6-12 7 Rehabilitation and Resettlement Plan ...................................................................................... 7-1 8 Project Schedule and Cost Estimates ...................................................................................... 8-1 9 Analysis of Proposal .................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    71 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us